I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan
2 Pemasangan Pagar
3 Pemasangan Bowplank
4 Direksi Keet 3 7
II PEKERJAAN TANAH
1 Pemancangan Pile 20 45
2 Galian Pile Cap PC 1 0.5 0.5 0.5 13
3 Galian Pile Cap PC 2 1.25 0.5 0.7 32
4 Galian Pondasi Batu Kali
III PEKERJAAN PONDASI
1 Pile 0.25 0.25 20
Total V Pile 77
2 Pile Cap PC1 0.5 0.5 0.5
Lantai Kerja 0.5 0.5 0.05
Total Pile Cap 1 13
Bekisting Pile Cap 1 0.5 0.54 0.55
Penulangan PC 1
Tulangan 1 4-D13 4.32 D13 13
Tulangan 2 4-D13 4.32 D13 13
Tulangan 3 4-D13 4.32 D13 13
Tulangan 4 4-D13 4.32 D13 13
Tulangan 5 1-D13 2.88 D13 13
3 Pile Cap PC2 1.4 0.5 0.7
Lantai Kerja 1.4 0.5 0.05
Jumlah total Pile Cap 2 31
Bekisting Pile Cap 2 1.4 0.54 0.75
Penulangan PC 2
Tulangan 1 7-D16 15.19 D16 31
Tulangan 2 7-D13 15.19 D13 31
Tulangan 3 D13-150 9.94 D13 31
Tulangan 4 D13-150 9.94 D13 31
Tulangan 5 1-D13 5.88 D13 31
IV PEKERJAAN TIE BEAM
1 Tie Beam 1 109.462 0.3 0.6
Bekisting 109.462 0.3 0.6 2
Penulangan
tul atas 109.462 D19 5
tul tengah 109.462 D10 2
tul bawah 109.462 D19 3
begel D10
2 Tie Beam 2 72.36 0.25 0.5
Bekisting 72.36 0.25 0.5 2
Penulangan
tul atas 72.36 D19
tul tengah 72.36 D10
tul bawah 72.36 D19
begel
3 Tie Beam 3 41.33 0.2 0.4
Bekisting 41.33 0.2 0.4 2
Penulangan
V PEKERJAAN KOLOM
Kolom 1 0.5 0.5 8.5 10
Bekisting 0.5 0.54 8.5
Penulangan
Kolom 2 0.4 0.4 8.5 12
Bekisiting 0.4 0.44 8.5
Penulangan
VI PEKERJAAN PEDESTAL
Pedestal 1 0.45 0.35 1.2 11
Bekisting 0.45 0.39 1.2
Penulangan
Pedestal 2 0.3 0.25 1.2 5
Bekisting 0.3 0.29 1.2
Penulangan
VII PEKERJAAN BALOK
Balok 1 1 0.4 0.8
Bekisting 1 0.44 0.8
Penulangan
Balok 2 1 0.25 0.5
Bekisting 1 0.29 0.5
Penulangan
Balok 3 1 0.25 0.4
Bekisting 1 0.29 0.4
Penulangan
Balok 4 1 0.2 0.4
Bekisting 1 0.24 0.4
Penulangan
Ring Balok 1
Bekisting
Penulangan
Ring Balok 2
Bekisting
Penulangan
VIII PEKERJAAN PLAT
luas showroom 27.1 24
luas Bengkel 25.8 23.45
luas ruangan 36.6 5.3
Plat lt 1 0.15
Plat lt 2 21.7 24 0.15
Volume Satuan Total
4239,38 m2 4.239E+09
3,074 m1
196.068 m1
21 m2
900
1.625 m3 0
14 m3
m3
1.25 m3
96.25
0.125 m3
0.0125 m3
1.625
8.56 m2
19.70 m3
440.25 m2
0.12 0.62
0.03 0.07
0.12 0.37
9.05 m3
291.44 m2
3.31 m3
166.92 m2
1.87 m3
125.98 m2
21.25 m3
72.16 m2
16.32 m3
71.36 m2
2.079 m3
12.96 m2
0.45 m3
11.96 m2
0.32 m3 1,678.25
10.08 m2
0.125 m3 2,965.23
8.58 m2
0.1 m3 2,388.40
8.18 m2
0.08 m3 1,474.37
8.08 m2
650.4 m2
605.01 m2
193.98 m2
217.4085 m3
73.19 m3
D1 13 Bengkokan
D2 13
D3 13
D4 13
D5 13
PERKIRAAN HARGA
NO. KOMPONEN SATUAN
SATUAN KUANTITAS
(Rp.)
JENIS PEKERJAAN 1m' Pagar sementara tinggi 2 m'
A. TENAGA
1 Pekerja Biasa Org/hr 0.4000 68,500.00
2 Tukang Kayu Org/hr 0.2000 89,500.00
4 Mandor Org/hr 0.0200 94,500.00
JUMLAH HARGA TENAGA
B BAHAN
1 Dolken bambu 3 m btg 0.3300 46,200.00
2 Portland Cement (PC) kg 2.5000 1,400.00
3 Seng Gelombang BJLS 180x90x0.0 lbr 1.1000 55,600.00
4 Pasir Cor m3 0.0050 264,000.00
5 Stenslah/batu pecah tangan 10-15 m3 0.0090 275,000.00
6 Kayu kelapa : 4/6 m3 1.0000 13,800.00
7 Paku Kayu Segala Ukuran kg 0.0600 16,200.00
JUMLAH HARGA BAHAN
C PERALATAN LS 1000
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 1% 1%
F HARGA SATUAN PEKERJAAN (D+E)
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 1% 1%
F HARGA SATUAN PEKERJAAN (D+E)
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 1% 1%
F HARGA SATUAN PEKERJAAN (D+E)
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 5% 5%
F HARGA SATUAN PEKERJAAN (D+E)
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 5% 5%
F HARGA SATUAN PEKERJAAN (D+E)
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 5% 5%
F HARGA SATUAN PEKERJAAN (D+E)
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 5% 5%
F HARGA SATUAN PEKERJAAN (D+E)
JUMLAH
HARGA
(Rp)
ntara tinggi 2 m'
27,400.00
17,900.00
1,890.00
47,190.00
15,246.00
3,500.00
61,160.00
1,320.00
2,475.00
13,800.00
972.00
98,473.00
1000
1,000.00
146,663.00
1,466.63
148,129.63
gan Bowplank
6,850.00
17,900.00
472.50
25,222.50
13,800.00
36,300.00
42,350.00
92,450.00
1000
1,000.00
118,672.50
1,186.73
119,859.23
sihan Lahan
6,850.00
472.50
7,322.50
-
1000
1,000.00
8,322.50
83.23
8,405.73
82,200.00
107,400.00
55,300.00
28,050.00
4,725.00
277,675.00
-
990,000.00
95,760.00
40,320.00
8,100.00
49,000.00
39,600.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
ng Pekerja (1m2)
82,200.00
107,400.00
55,300.00
28,050.00
4,725.00
277,675.00
-
24,960.00
95,760.00
40,320.00
8,100.00
49,000.00
39,600.00
18,150.00
275,890.00
553,565.00
27,678.25
581,243.25
82,200.00
107,400.00
55,300.00
4,725.00
249,625.00
-
49,920.00
95,760.00
15,120.00
8,100.00
168,900.00
418,525.00
20,926.25
439,451.25
iasa 1m (1m2)
82,200.00
1,712.50
83,912.50
-
83,912.50
4,195.63
88,108.13
Harga 2018
No Jenis Bahan SAT. Daerah Datar Daerah
(Rp) Pegunungan (Rp)
1 2 3 4 5