RINCIAN BIAYA SDN 34 MENSERE

KONTRAKTOR PELAKSANA MINGGU KE : TANGGAL : KONTRAKTOR PELAKSANA MINGGU KE : TANGGAL : MINGGU KE : TANGGAL : MINGGU KE : TANGGAL : MINGGU KE : TANGGAL : MINGGU KE : TANGGAL : MINGGU KE : TANGGAL :

Pekerjaan : Rehabilitasi dan Renovasi Sekolah Kabupaten Sambas Monday, October 11, 2021 Monday, October 18, 2021 Monday, October 25, 2021 Monday, November 1, 2021 Monday, November 8, 2021 ### Monday, November 22, 2021
Dinas / Instansi : Kementrian Pekerjaan Umum Dan Perumahan Rakyat
Direktorat Jendral Cipta Karya
Satker Pelaksana Prasarana Pendidikan Olahraga Dan Pasar
22 s/d
23 s/d
24 s/d
25 s/d
26 s/d
27 s/d
28 s/d

Lokasi : Kabupaten Sambas Sunday, October 17, 2021 Sunday, October 24, 2021 Sunday, October 31, 2021 Sunday, November 7, 2021 ### ### Sunday, November 28, 2021
Tahun Anggaran : 2021

MINGGU LALU MINGGU INI S/D MINGGU INI MINGGU LALU MINGGU INI S/D MINGGU INI MINGGU LALU MINGGU INI S/D MINGGU INI MINGGU LALU MINGGU INI S/D MINGGU INI MINGGU LALU MINGGU INI S/D MINGGU INI MINGGU LALU MINGGU INI S/D MINGGU INI MINGGU LALU MINGGU INI S/D MINGGU INI
NO JENIS PEKERJAAN JUMLAH HARGA ( RP ) BOBOT TERTIMBANG (%)
BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%)

1 PEKERJAAN PENDAHULUAN 24,217,505.74 1.00 - 1.00 - - - 1.00 0.997 - 1.00 - - - 1.00 0.997 - 1.00 - - - 1.00 0.997 - 1.00 - - - 1.00 0.997 - 1.00 - - - 1.00 0.997 - 1.00 - - - 1.00 0.997 - 1.00 - - - 1.00 0.997
2 PEKERJAAN STRUKTUR 667,506,464.78 27.48 - 24.43 - - - 24.43 24.426 - 24.43 - - - 24.43 24.426 - 24.43 - - - 24.43 24.426 - 24.43 - - - 24.43 24.426 - 24.43 - - - 24.43 24.426 - 24.43 - - - 24.43 24.426 - 24.43 - - - 24.43 24.426
3 PEKERJAAN ARSITEKTUR 1,044,521,807.47 43.00 - 26.72 - 0.74 - 27.46 27.461 - 27.46 - - - 27.46 27.461 - 27.46 - - - 27.46 27.461 - 27.46 - - - 27.46 27.461 - 27.46 - - - 27.46 27.461 - 27.46 - - - 27.46 27.461 - 27.46 - 6.33 - 33.80 33.795
4 PEKERJAAN ELEKTRIKAL 38,070,677.95 1.57 - - - 0.82 - 0.82 0.823 - 0.82 - - - 0.82 0.823 - 0.82 - - - 0.82 0.823 - 0.82 - - - 0.82 0.823 - 0.82 - - - 0.82 0.823 - 0.82 - - - 0.82 0.823 - 0.82 - - - 0.82 0.823
5 PEKERJAAN FASILITAS PENDUKUNG 654,525,209.94 26.95 - - - 3.79 - 3.79 3.785 - 3.79 - - - 3.79 3.785 - 3.79 - - - 3.79 3.785 - 3.79 - - - 3.79 3.785 - 3.79 - - - 3.79 3.785 - 3.79 - - - 3.79 3.785 - 3.79 - 0.54 - 4.33 4.330

JUMLAH 2,428,841,665.88 100.000 0.000 52.142 0.000 5.351 0.000 57.493 57.493 0.000 57.493 0.000 0.000 0.000 57.493 57.493 0.000 57.493 0.000 0.000 0.000 57.493 57.493 0.000 57.493 0.000 0.000 0.000 57.493 57.493 0.000 57.493 0.000 0.000 0.000 57.493 57.493 0.000 57.493 0.000 0.000 0.000 57.493 57.493 0.000 57.493 0.000 6.878 0.000 64.371 64.371
242,884,166.59
2,671,725,832.46

Harga Jumlah MINGGU LALU MINGGU INI S/D MINGGU INI MINGGU LALU MINGGU INI S/D MINGGU INI MINGGU LALU MINGGU INI S/D MINGGU INI MINGGU LALU MINGGU INI S/D MINGGU INI MINGGU LALU MINGGU INI S/D MINGGU INI MINGGU LALU MINGGU INI S/D MINGGU INI MINGGU LALU MINGGU INI S/D MINGGU INI
No. Jenis Pekerjaan Volume Satuan Satuan Harga Satuan BOBOT ( % ) BOBOT TERTIMBANG (%)
(Rp) (Rp) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % ) VOLUME BOBOT ( % )
1 2 3 4 6 7 8 9 10 11 12 9 10 11 12 9 10 11 12 9 10 11 12 9 10 11 12 9 10 11 12 9 10 11 12

1. PEKERJAAN PENDAHULUAN

1. Pemasangan Bowplank 169.50 m1 49,513.31 8,392,505.74 0.346 170 0.346 - 170 0.35 100 170 0.346 0.00 - 170 0.35 100 170 0.346 0.00 - 170 0.35 100 170 0.346 0.00 - 170 0.35 100 170 0.346 0.00 - 170 0.35 100 170 0.346 0.00 - 170 0.35 100 170 0.346 0.00 - 170 0.35 100
2. Papan Nama Proyek 1.00 Lsm 325,000.00 325,000.00 0.013 1 0.013 - 1 0.01 100 1 0.013 0.00 - 1 0.01 100 1 0.013 0.00 - 1 0.01 100 1 0.013 0.00 - 1 0.01 100 1 0.013 0.00 - 1 0.01 100 1 0.013 0.00 - 1 0.01 100 1 0.013 0.00 - 1 0.01 100
3. Biaya Penyelenggaraan SMK3 Konstruksi 1.00 Unit 15,500,000.00 15,500,000.00 0.638 1 0.638 - 1 0.64 100 1 0.638 0.00 - 1 0.64 100 1 0.638 0.00 - 1 0.64 100 1 0.638 0.00 - 1 0.64 100 1 0.638 0.00 - 1 0.64 100 1 0.638 0.00 - 1 0.64 100 1 0.638 0.00 - 1 0.64 100
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TOTAL PEKERJAAN I PENDAHULUAN 24,217,505.74 0.997 0.997 - 0.997 0.997 - 0.997 0.997 - 0.997 0.997 - 0.997 0.997 - 0.997 0.997 - 0.997 0.997 - 0.997
2. PEKERJAAN STRUKTUR - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
I PEKERJAAN TANAH
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1. Galian Tanah Pondasi 172.29 M3 90,128.50 15,528,239.27 0.639 172 0.639 - 172 0.64 100 172 0.639 0.00 - 172 0.64 100 172 0.639 0.00 - 172 0.64 100 172 0.639 0.00 - 172 0.64 100 172 0.639 0.00 - 172 0.64 100 172 0.639 0.00 - 172 0.64 100 172 0.639 0.00 - 172 0.64 100
2. Urugan Kembali bekas Galian 57.07 M3 30,042.83 1,714,544.50 0.071 57 0.071 - 57 0.07 100 57 0.071 0.00 - 57 0.07 100 57 0.071 0.00 - 57 0.07 100 57 0.071 0.00 - 57 0.07 100 57 0.071 0.00 - 57 0.07 100 57 0.071 0.00 - 57 0.07 100 57 0.071 0.00 - 57 0.07 100
3. Urugan Pasir Alas Bawah Pondasi 5.25 M3 233,916.05 1,228,059.24 0.051 5 0.051 - 5 0.05 100 5 0.051 0.00 - 5 0.05 100 5 0.051 0.00 - 5 0.05 100 5 0.051 0.00 - 5 0.05 100 5 0.051 0.00 - 5 0.05 100 5 0.051 0.00 - 5 0.05 100 5 0.051 0.00 - 5 0.05 100

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TOTAL PEKERJAAN I TANAH 18,470,843.00 0.760 0.760 - 0.760 0.760 - 0.760 0.760 - 0.760 0.760 - 0.760 0.760 - 0.760 0.760 - 0.760 0.760 - 0.760

II PONDASI SETEMPAT - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Pekerjaan Pondasi -
Pondasi P1 51.00 Unit -
- Tulangan Pokok D.13 mm Ulir ( Tapak dan Kolom Pondasi) 1,403.44 Kg 17,594.72 24,693,140.46 1.017 1,403 1.017 - 1,403 1.02 100 1,403 1.017 0.00 - 1,403 1.02 100 1,403 1.017 0.00 - 1,403 1.02 100 1,403 1.017 0.00 - 1,403 1.02 100 1,403 1.017 0.00 - 1,403 1.02 100 1,403 1.017 0.00 - 1,403 1.02 100 1,403 1.017 0.00 - 1,403 1.02 100
- Tulangan Beugel Kolom D8 - 15 cm 159.12 Kg 17,594.72 2,799,672.60 0.115 159 0.115 - 159 0.12 100 159 0.115 0.00 - 159 0.12 100 159 0.115 0.00 - 159 0.12 100 159 0.115 0.00 - 159 0.12 100 159 0.115 0.00 - 159 0.12 100 159 0.115 0.00 - 159 0.12 100 159 0.115 0.00 - 159 0.12 100
- Bekisting Pondasi 34.02 m2 179,979.54 6,122,904.07 0.252 34 0.252 - 34 0.25 100 34 0.252 0.00 - 34 0.25 100 34 0.252 0.00 - 34 0.25 100 34 0.252 0.00 - 34 0.25 100 34 0.252 0.00 - 34 0.25 100 34 0.252 0.00 - 34 0.25 100 34 0.252 0.00 - 34 0.25 100
- Beton K.250 8.16 m3 1,363,477.28 11,125,974.62 0.458 8 0.458 - 8 0.46 100 8 0.458 0.00 - 8 0.46 100 8 0.458 0.00 - 8 0.46 100 8 0.458 0.00 - 8 0.46 100 8 0.458 0.00 - 8 0.46 100 8 0.458 0.00 - 8 0.46 100 8 0.458 0.00 - 8 0.46 100
- Lantai Kerja Mutu fc = 7,4 Mpa 1.63 m3 1,050,316.05 1,712,015.16 0.070 2 0.070 - 2 0.07 100 2 0.070 0.00 - 2 0.07 100 2 0.070 0.00 - 2 0.07 100 2 0.070 0.00 - 2 0.07 100 2 0.070 0.00 - 2 0.07 100 2 0.070 0.00 - 2 0.07 100 2 0.070 0.00 - 2 0.07 100
- Cerucuk 10 - 12, P.6 m 459.00 btg 26,904.67 12,349,244.46 0.508 459 0.508 - 459 0.51 100 459 0.508 0.00 - 459 0.51 100 459 0.508 0.00 - 459 0.51 100 459 0.508 0.00 - 459 0.51 100 459 0.508 0.00 - 459 0.51 100 459 0.508 0.00 - 459 0.51 100 459 0.508 0.00 - 459 0.51 100
- Pemancangan Cerucuk tertanam 6 meter 2,754.00 m1 3,500.00 9,639,000.00 0.397 2,754 0.397 - 2,754 0.40 100 2,754 0.397 0.00 - 2,754 0.40 100 2,754 0.397 0.00 - 2,754 0.40 100 2,754 0.397 0.00 - 2,754 0.40 100 2,754 0.397 0.00 - 2,754 0.40 100 2,754 0.397 0.00 - 2,754 0.40 100 2,754 0.397 0.00 - 2,754 0.40 100
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Pondasi P2 18.00 Unit - 18 - - 18 - 100 18 - - 18 - 100 18 - - 18 - 100 18 - - 18 - 100 18 - - 18 - 100 18 - - 18 - 100 18 - - 18 - 100
- Tulangan Pokok D.13 mm Ulir ( Tapak dan Kolom Pondasi) 495.33 Kg 17,594.72 8,715,194.99 0.359 495 0.359 - 495 0.36 100 495 0.359 0.00 - 495 0.36 100 495 0.359 0.00 - 495 0.36 100 495 0.359 0.00 - 495 0.36 100 495 0.359 0.00 - 495 0.36 100 495 0.359 0.00 - 495 0.36 100 495 0.359 0.00 - 495 0.36 100
- Tulangan Beugel Kolom D8 - 15 cm 56.16 Kg 17,594.72 988,119.74 0.041 56 0.041 - 56 0.04 100 56 0.041 0.00 - 56 0.04 100 56 0.041 0.00 - 56 0.04 100 56 0.041 0.00 - 56 0.04 100 56 0.041 0.00 - 56 0.04 100 56 0.041 0.00 - 56 0.04 100 56 0.041 0.00 - 56 0.04 100
- Bekisting Pondasi 12.01 m2 179,979.54 2,161,554.32 0.089 12 0.089 - 12 0.09 100 12 0.089 0.00 - 12 0.09 100 12 0.089 0.00 - 12 0.09 100 12 0.089 0.00 - 12 0.09 100 12 0.089 0.00 - 12 0.09 100 12 0.089 0.00 - 12 0.09 100 12 0.089 0.00 - 12 0.09 100
- Beton K.250 2.88 m3 1,363,477.28 3,926,814.57 0.162 3 0.162 - 3 0.16 100 3 0.162 0.00 - 3 0.16 100 3 0.162 0.00 - 3 0.16 100 3 0.162 0.00 - 3 0.16 100 3 0.162 0.00 - 3 0.16 100 3 0.162 0.00 - 3 0.16 100 3 0.162 0.00 - 3 0.16 100
- Lantai Kerja Mutu fc = 7,4 Mpa 0.58 m3 1,050,316.05 609,183.31 0.025 1 0.025 - 1 0.03 100 1 0.025 0.00 - 1 0.03 100 1 0.025 0.00 - 1 0.03 100 1 0.025 0.00 - 1 0.03 100 1 0.025 0.00 - 1 0.03 100 1 0.025 0.00 - 1 0.03 100 1 0.025 0.00 - 1 0.03 100
- Cerucuk 10 - 12, P.6 m 162.00 btg 26,904.67 4,358,556.87 0.179 162 0.179 - 162 0.18 100