Propinsi : Banten :
Kabupaten : Tangerang :
Kecamatan : Solear Jenis Prasarana ; plt Budi daya ikan lele
Desa : Cikasungka Volume : 70 x 3 x6 M 2 Kelompok
1
VOLUME HARGA JUMLAH
Kategori
URAIAN Satuan SATUAN TOTAL
Total Biaya
( Rp. ) ( Rp. )
1 Belanja Kegiatan
1.1 Foto Copi 15.00 Eks 5,000 75,000
1.2 Snak 15.00 Dus 10,000 150,000
1.3 Makan 15.00 Dus 25,000 375,000
1.4 Transport Peserta 15.00 oh 35,000 525,000
1.5 Spanduk 1.00 bh 300,000 300,000
Sub Total 1,425,000
2 BAHAN
2.1 Bambu 10.0 btg I-a 20,000 200,000
2.2 terpal Kolam ikan lele 4 x 6 3.0 buah I-a 700,000 2,100,000
2.3 kawat 5.0 kg I-a 20,000 100,000
Sub Total 2,400,000
3 PERALATAN
3.1 Bibit Lele 8,000.0 Ekor I-b 500 4,000,000
3.2 Pakan 20.0 Zak I-b 375,000 7,500,000
3.3 Vitamin 3.0 Klg I-b 400,000 1,200,000
Sub Total 12,700,000
4 Tim Teknis Kegiatan
4.1 Pengarah 1.0 okeg 500,000 500,000
4.2 Ketua 1.0 okeg 400,000 400,000
4.3 Sekretaris 1.0 okeg 300,000 300,000
4.4 Anggota 3.0 okeg 200,000 600,000
Sub Total 1,800,000
5 UPAH
5.1 Pekerja 10.0 Hok I-b 120,000 1,200,000
5.2 Tukang 6.0 Hok I-b 150,000 900,000
Sub Total 2,100,000
TOTAL BIAYA 1 +2 + 3 20,425,000
Kategori Biaya :
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian/penyewaan alat mesin
III-a Pembayaran tenaga kerja
III-b Pembayaran tenaga untuk
pengumpulan bahan