Anda di halaman 1dari 29

ESTIMASI BIYA III

PEKERJAAN JALAN DUKU-SICINCIN

KELOMPOK 1
OLEH:
VIONA ALFAMURAS 19100154100
YAFI MUHAMMAD LUTHFI 19100154100
FIRLIE DWI BAGUS ZEIN 19100154100
RIZQY HELANDYA AKBAREVI 19100154100
TITA ERLINA 19100154100
RISKA YANTI 19100154100
DEA BILRAS 19100154100

DOSEN PENGAMPU :
DWIFITRA Y JUMAS, ST, SMCE

JURUSAN TEKNIK EKONOMI KONTRUKSI-QS


FAKULTAS TEKNIK SIPIL DAN PERENCANAAN
UNIVERSITAS BUNG HATTA
2021
N

54100
54100
54100
4100
54100
54100
54100

SI-QS
NAAN
KARTU ASISTENSI
JURUSAN TEKNIK EKONOMI KONTRUKSI
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN
UNIVERSITAS BUNG HATTA

KELOMPOK : 1 MATA KULIAH


KELAS : 5A DOSEN

No. Hari/Tanggal Uraian


N

: ESTIMASI BIAYA II
: DWIFITRA Y JUMAS, ST, MSCE

Paraf
INFORMASI UMUM

No. URAIAN

1 Nama Kegiatan
2 No. Paket Kontrak
3 Nama Paket
4 Lokasi
5 Prop / Kab / Kodya
6 Penyedia Jasa

7 Lokasi pekerjaan

8 Kondisi jalan lama

9 Panjang efe
( lihat sketsa di bawah )

10 Lebar jala ( bahu + perkerasan + bahu )

11 Lebar Ren ( bahu + perkerasan + bahu )

12 Penampang jalan, jenis dan volume pekerjaan pokok

13 Jangka Waktu :
Pelaksanaan
Preservasi Rekonstruksi, Rehabilitasi Jalan
Preservasi Pemeliharaan Rutin Jalan
Preservasi Rutin Jembatan
Gabungan Lingkup

14 Jarak rata-rata Base Camp ke lokasi pekerjaan --->


15 Jarak rata-rata Batching Plan ke lokasi pekerjaan --->

Perhitungan didasarkan pada sketsa di bawah ini :

00+000 19+000
0.30

16 Jam kerja efektif dalam 1 hari


17 Asuransi, Pajak, dsb. untuk Peralatan
18 Tingkat Suku Bunga Investasi Alat
19 Biaya Umum dan Keuntungan

20 RINGKASAN METODE PELAKSANAAN

a. Mobilisasi dilaksanakan sesuai ketentuan yang berlaku dalam Kontrak.

b. Pekerjaan Tanah dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


...............................................................
c. Pekerjaan Lapis Pondasi Agregat dilaksanakan untuk . . . . . . . . . . . . . . . . . . . .
...............................................................
d. Pekerjaan Campuran Aspal Panas dilaksanakan untuk . . . . . . . . . . . . . . . . . . .
...............................................................
e. Pekerjaan Pasangan Batu dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . .
...............................................................
f. Pekerjaan Pengembalian Kondisi dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . .
...............................................................
g. ...............................................................
...............................................................

21 Lokasi Quarry

22 Jumlah Jembatan = ...................... Buah

23 Total Bentang Jembatan = .................. Buah

24 ....................................

25 ....................................

26 ....................................
I UMUM

INFORMASI

: Pembangunan/Peningkatan Jalan Provinsi di Ruas Jalan Duku - Sicincin (P.087)


:
: Pembangunan Jalan Duku - Sicincin (P.087)
: Kabupaten Padang Pariaman
: Sumatera Barat / Kabupaten Padang Pariaman
: PT. ALCO SEJAHTERA ABADI

Periksa lampiran

..............................

2.40 Kilometer ( Leff = a + b )

( 1.50 + 7.00 + 1.50 ) meter

( 1.50 + 7.00 + 1.50 ) meter

Lihat lampiran.

Pelaksanaan Pemeliharaan
180 hari 180 hari
hari hari
hari hari
hari hari
180 hari kalender 180 hari kalender
6 bulan

L= 11 Kilometer
L= 11 Kilometer

9.60 Km 28+600
Base Camp (AMP) 2.40

7.00 jam
0.002 x Harga Pokok Alat
10.00 %
10.00 % x Biaya Langsung

berlaku dalam Kontrak.

.......................................
....................................
untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
....................................
untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
....................................
........................................
....................................
untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
....................................
....................................
....................................

Periksa lampiran.

Periksa lampiran.

Periksa lampiran.
Km
HARGA DASAR SATUAN U

No. URAIAN KODE

1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
4. Operator (L04)
5. Pembantu Operator (L05)
6. Sopir / Driver (L06)
7. Pembantu Sopir / Driver (L07)
8. Mekanik (L08)
9. Pembantu Mekanik (L09)
10. Kepala Tukang (L10)
11.
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

DAFTAR
HARGA DASAR SATUAN BA
No. URAIAN KODE

1 Pasir Pasang (Sedang) M01b


2 Pasir Beton (Kasar) M01a
3 Pasir Halus (untuk HRS) M01c
4 Pasir Urug (ada unsur lempung) M01d
5 Batu Kali M02
6 Agregat Pecah Kasar
7 Agg. Halus LP A
8 Agregat Lolos # 1 "
9 Lolos screen1 ukuran ( 0 - 5)
10 Lolos screen2 ukuran ( 0 - 5)
11 Lolos screen2 ukuran ( 5 - 9,5)
12 Lolos screen2 ukuran ( 9.5 - 19,0)
13 Filler M05
14 Batu Belah / Kerikil M06
15 Gravel M07
16 Bahan Tanah Timbunan M08
17 Bahan Pilihan M09
18 Aspal M10
19 Kerosen / Minyak Tanah M11
20 Semen / PC (50kg) M12
21 Semen / PC (kg) M12a
22 Besi Beton Polos M13
23 Kawat Beton M14
24 Kawat Bronjong Ukuran SNI M15
25 Sirtu M16
26 Cat Marka (Non Thermoplas) M17a
27 Cat Marka (Thermoplastic) M17b
28 Paku M18
29 Kayu Perancah M19
30 Bensin M20
31 Solar M21
32 Minyak Pelumas / Olie M22
33 Plastik Filter M23
34 Pipa Galvanis Dia. 1.5" M24
35 Pipa Porus M25
36 Agr.Base Kelas A M26
37 Agr.Base Kelas B M27
38 Agr.Base Kelas C M28
39 Agr.Base Kelas S M29
40 Geotextile type woven M30
41 Aspal Emulsi M31
42 Pohon Jenis Mahoni M32
43 Thinner M33
44 Glass Bead M34
45 Pelat Rambu (Eng. Grade) M35a
46 Pelat Rambu (High I. Grade) M35b
47 Rel Pengaman (W Beam) M36
48 Beton K-250 M37
49 Baja Tulangan (Polos)BjTP 280 M39a
50 Baja Tulangan (Ulir) U32 M39b
51 Kapur M40
52 Chipping M41
53 Chipping (kg) M41kg
54 Cat Minyak M42

55 Pemantul Cahaya (Reflector) M43


56 Pasir Urug M44
57 Arbocell M45
58 Baja Bergelombang M46
59 Beton K-125 M47
60 Baja Struktur M48
Baja Struktur BJ 50
61 Tiang Pancang Baja M49
62 Tiang Pancang Beton Pratekan 400 M50
63 Kawat Las M51
64 Pipa Baja diameter 200 mm M52
65 Minyak Fluks M53
66 Bunker Oil M54
67 Asbuton Halus M55
68 Baja Prategang M56
69 Baja Tulangan (Polos) U32 M57a
70 Baja Tulangan (Ulir) U39 M39c
71 Baja Tulangan (Ulir) U48 M39d
72 PCI Girder L=17m M58a
73 PCI Girder L=20m M58b
74 PCI Girder L=25m M58c
75 PCI Girder L=30,9m M58d
76 PCI Girder L=35m M58e
77 PCI Girder L=40m M58f
77b PCI Girder L=40,8m M58f
78 Beton Fc' 25 M59
79 Beton K-175 M60
80 Cerucuk M61
81 Elastomer M62
82 Bahan pengawet: kreosot M63
83 Mata Kucing M64
84 Anchorage M65
85 Anti strpping agent M66
86 Bahan Modifikasi M67
87 Beton K-500 M68
88 Beton K-400 M69
89 Ducting (Kabel prestress) M70
90 Ducting (Strand prestress) M71
91 Beton K-350 M72
92 Multipleks 12 mm M73
93 Elastomer jenis 1 (300x350x36) M74a
94 Elastomer jenis 2 (350x400x39) M74b
95 Elastomer jenis 3 (300x300x60) M74c
96 Expansion Tipe Joint Asphaltic Plug M75d
97 Expansion Join Tipe Rubber M75e
98 Expansion Join Baja Siku M75f
99 Marmer M76
100 Kerb Type A M77
101 Paving Block M78
102 Mini Timber Pile M79
103 Expansion Joint Tipe Torma M80
104 Strip Bearing M81
105 Joint Socket Pile 35x35 M82
106 Joint Socket Pile 16x16x16 M83
107 Mikro Pile 16x16x16 M84
108 Matras Concrete M85
109 Assetilline M86
110 Oxygen M87
111 Batu Bara (Kalori min 5800 kkal/gr) M88
112 Pipa Galvanis Dia 2,5" M24a
113 Pipa Galvanis Dia 75 mm M24b
113 Pipa PVC 6"
113 Pipa PVC 4"
114 Pipa PVC 3"
114 Pipa PVC 2,5"

115 Agregat Pecah Mesin 0-5 mm M91


115 Agregat Pecah Mesin 5-10 & 10-20 mm M92
116 Agregat Pecah Mesin 20-30 mm M93
116 Joint Sealent M94
117 Cat Dasar Anti Karat M95
117 Expansion Cap M96
118 Polytene 125 mikron M97
118 Curing Compound M98
119 Kayu Kelas 1
119 Gebalan Rumput M99
120 Additive Beton M67a
120 Casing M100
121 Pasir Tailing M101
121 Polimer M102
122 Kerb jenis 1 M103
122 Kerb jenis 2 M104
123 Kerb jenis 3 M105
123 Bahan Modifikasi M106
124 Aditif anti pengelupasan M107
124 Bahan Pengisi (Filler) Tambahan M108
125 Asbuton yang diproses M109
125 Elastomer Alam M110
126 Elastomer Sintesis M111
126 Anchorage M112
127 - hidup M113
127 - mati M114
128 Kabel Prategang M115
128 - Selongsong M116
129 - Baja Prategang M117
129 - Grouting M118
130 Angkur Kabel Prategang, Tipe............... M119
130 Angkur Kabel Prategang, Tipe............ M120
131 Baja Profil M121
131 Baja Tulangan BJTP 24 (epoxy coated) M122
132 Epoxy coated M123
132 Cairan Perekat (Epoxy Resin) M124
133 Epoxy Bahan Penutup (sealant) M125
133 Alat Penyuntik Anti Gravitasi M126
134 Polymer Mortar M127
134 Anti Korosif Baja M128
135 Acuan/multipleks M129
135 Concrete Grouting M130
136 Pelat Baja M131
136 Baut Angkur M132
137 Pipa Aluminium M133
137 Cat Galvanis M134
138 Baut Mutu Tinggi M135
138 Baja Struktur Titik leleh 2500 kg/cm2 M136
139 Baja Struktur Titik leleh 2800 kg/cm2 M137
139 Baja Struktur Titik leleh 3500 kg/cm2 M138
140 Bahan Grouting M139
140 Kayu Kelas 1 M140
141 Pelat Baja (Klem) M141
141 Timbunan Porous M142
142 Bahan pengaman tebing galian (kayu) M143
142 Bahan Curing M144
143 Gelagar baja M145
143 Fibre jenis e-glass M146
144 Bahan Geosynthetic M147
144 Bahan Baja Profil M148
145 Bahan Baja Profil, Mutu BJ 32 M149
145 Bahan Baja Profil, Mutu BJ 41 M150
146 Bahan Baja Profil, Mutu BJ 52 M151
146 Petrolium jelly M152
147 Bahan anti rayap M153
147 Pelat Baja Galvanis M154
148 Baja Struktur Lantai Ortotropik M155
148 Aspal Modifikasi M156
149 PCI Girder L=45m M157
149 Multiplek/Venolite 22 mm M158
150 Ampelas M159
150 Ampelas Besi M160
151 Alumunium Epoxymastic M161
151 Polyurethane Alkyd Copoymer M162
152 Pohon Perdu M163
152 Tanah Humus M164
153 Pupuk M165
153 Strand ground Anchore M166
154 Up Lift Anchores 11 Strand M167
154 Corruqeted Polythylene M168
155 HDPE 14/16 mm M169
155 Spesial Grase Anti Korosi M170
156 Anfo M171
156 Dinamit M172
157 Detonator M173
157 Couting Finish Beton M174
158 Kawat Terames M175
158 Wiremesh Spasi 15 x 15 cm Type M4 Di M176
159 Wiremesh Spasi 15 x 15 cm Type M5 Di M177
159 Wiremesh Spasi 15 x 15 cm Type M6 Di M178
160 Wiremesh Spasi 15 x 15 cm Type M7 Di M179
160 Wiremesh Spasi 15 x 15 cm Type M8 Di M180
161 Wiremesh Spasi 15 x 15 cm Type M9 Di M181
161 Wiremesh Spasi 15 x 15 cm Type M10 D M182
162 Wiremesh Spasi 15 x 15 cm Type M11 D M183
162 Wiremesh Spasi 15 x 15 cm Type M12 D M184
163 Baja T 12 mm M185
163 Deck Drain + Aksesoris M186
164 Dinding Modular M187
164 Electrode M188
165 Rel Pengaman (Three Beam) M189
165 Cat Tembok M190
166 Thinner Galvanis M191
166 Besi Beton Ulir M192
167 Elastomer Type 3 (450x500x60) M193
167 Elastomer Type 3 (500x500x67) M194
168 Kawat Beronjong yang dilapisi Galvanis M195
168 Backer Road M196
169 Sealed Exp. Gap M197
169 Asphaltic Plug M198
170 Floor Deck t = 1,2 mm H = 75 mm M199
170 Cat Epoxy M200
171 Deck Drain + Aksesoris M201
171 Lampu Jalan Lengan Tunggal Type LED M202
172 Lampu Jalan Lengan Ganda, Tipe Merku M202.a
172 Aspal Emulsi (AE CQS-1P) M203
173 Asbuton Matic Emulsi M204
173 Geotextile Non Woven Kelas 2 (300gr) M205
174 Geomembrane M206
174 Air M207
175 Tack Coat - Asphalt Emulsi (AE CSS -1R M208
175 Cat Tembok M209
176 Cat Dasar Tembok M209-1
176 Cat Galvanis M210
177 Amplas M211
177 Plamur M212
178 Box Beton Pracetak (1,5 x 1,5 x 1,2 m) M213
178 Limbah Plastik M214
179 Latex (Karet Alam)
179 Epoksi Resin M215
179 Sealant M216
180 Tabung Penyuntik M217
181 Lem PVC
ASAR SATUAN UPAH
HARGA
SATUAN SATUAN KETERANGAN
( Rp.)

Jam 14,563.59 100,000.00 / hari


Jam 17,420.63 120,000.00 / hari
Jam 21,706.35 150,000.00 / hari
Jam 21,706.35 150,000.00 / hari
Jam 14,563.49 100,000.00 / hari
Jam 17,420.63 120,000.00 / hari
Jam 14,563.59 100,000.00 / hari
Jam 21,706.35 150,000.00 / hari
Jam 17,420.63 120,000.00 / hari
Jam 21,706.35 150,000.00 / hari

DAFTAR
ASAR SATUAN BAHAN
HARGA
SATUAN SATUAN KETERANGAN
( Rp.)

M3 145,000.00 Quarry
M3 145,000.00 Quarry
M3 145,000.00 Quarry
M3 0.00 Base Camp
M3 175,000.00 Lokasi Pekerjaan
M3 0.00 Base Camp
M3 0.00 Base Camp
M3 0.00 Base Camp
M3 0.00 Base Camp
M3 0.00 Base Camp
M3 0.00 Base Camp
M3 0.00 Base Camp
Kg 1,240.00 Base Camp/Analisa
M3 0.00 Lokasi Pekerjaan
M3 0.00 Base Camp
M3 15,000.00 Lokasi Pekerjaan
M3 75,000.00 Lokasi Pekerjaan
KG 11,100.00 Base Camp
LITER 11,500.00 Pertamina
Zak 62,000.00 Base Camp
Kg 1,240.00 Base Camp
Kg 10,500.00 Lokasi Pekerjaan
Kg 17,500.00 Lokasi Pekerjaan
Kg 18,500.00 Lokasi Pekerjaan
M3 135,000.00 Quarry
Kg 36,000.00 Lokasi Pekerjaan
Kg 40,000.00 Lokasi Pekerjaan
Kg 17,300.00 Lokasi Pekerjaan
M3 3,500,000.00 Lokasi Pekerjaan
LITER 12,000.00 Pertamina
LITER 9,800.00 Pertamina
LITER 40,000.00 Pertamina
M2 15,000.00 Lokasi Pekerjaan
Batang 202,000.00 Lokasi Pekerjaan
M' 45,000.00 Lokasi Pekerjaan
M3 0.00 Base Camp/Analisa
M3 0.00 Base Camp/Analisa
M3 179,934.83 Base Camp/Analisa
M3 0.00 Base Camp/Analisa
M2 35,000.00 Lokasi Pekerjaan
Kg 15,000.00 Base Camp
M2 45,000.00 Lokasi Pekerjaan
LITER 25,000.00 Lokasi Pekerjaan
Kg 35,000.00 Lokasi Pekerjaan
BH 875,000.00 Lokasi Pekerjaan
BH 940,000.00 Lokasi Pekerjaan
M' 600,000.00 Lokasi Pekerjaan
M3 1,554,526.90 Lokasi Pekerjaan
Kg 10,000.00 Lokasi Pekerjaan
Kg 12,700.00 Lokasi Pekerjaan
M3 40,000.00 Hasil Proses
M3 287,000.00 Base Camp
Kg 152.27 Base Camp
Kg 80,000.00 Base Camp

Bh. 17,755.00 Base Camp


M3 0.00 Base Camp/Analisa
Kg. 104,073.00 Base Camp
Kg 37,300.00 Lokasi Pekerjaan
M3 759,955.22 Analisa
Kg 24,000.00
Kg 26,000.00
Kg 11,700.00 Base Camp
M3 290,000.00 Lokasi Pekerjaan
Dos 330,000.00 Lokasi Pekerjaan
Kg 23,000.00 Pelabuhan terdekat
Liter 6,237.00 Base Camp
Liter 10,000.00 Base Camp
Ton 9,100,000.00 Base Camp
Kg 55,000.00 Base Camp
Kg 10,500.00 Lokasi Pekerjaan
Kg 13,500.00 Lokasi Pekerjaan
Kg 14,500.00 Lokasi Pekerjaan
Buah - Lokasi Pekerjaan
Buah 198,939,168.00 Lokasi Pekerjaan
Buah 230,000,000.00 Lokasi Pekerjaan
Buah 320,000,000.00 Lokasi Pekerjaan
Buah 335,800,000.00 Lokasi Pekerjaan
Buah 355,900,000.00 Lokasi Pekerjaan
Buah 369,000,000.00 Lokasi Pekerjaan
M3 1,698,408.17 Analisa
M3 1,166,750.92 Analisa
M 25,000 Lokasi Pekerjaan
buah 3,651,250
liter 8,067
buah 280,000
buah 3,300,000
Kg 50,000.00
Kg 1,000.00
M3 (6,956,521.74)
M3 0.00
M' 161,610
M' 50,000
M3 0.00
Lbr 161,000.00
buah 862,500.00 Base Camp
buah 915,224.00 Base Camp
buah 1,500,000.00 Base Camp
M 0.00 Base Camp
M 1,200,000.00 Base Camp
M 366,534.00 Base Camp
Buah 422,069.00 Base Camp
Buah 250,000.00 Base Camp
M2 100,000.00 Lokasi Pekerjaan
Buah 29,090.00 Lokasi Pekerjaan
M1 1,554,992.00 Lokasi Pekerjaan
Buah 303,223.00 Lokasi Pekerjaan
Set 786,382.00 Lokasi Pekerjaan
Set 72,725.00 Lokasi Pekerjaan
M1 65,452.00 Lokasi Pekerjaan
Buah 405,000.00 Lokasi Pekerjaan
Botol 229,500.00 Lokasi Pekerjaan
Botol 114,750.00 Lokasi Pekerjaan
Kg 722.00 Lokasi Pekerjaan
M 198,900.00 Lokasi Pekerjaan
M 260,000.00 Lokasi Pekerjaan
M' 155,475.00
M' 45,000.00
M' 44,150.00
M' 25,000.00

M3 318,176.83 Base Camp


M3 318,176.83 Base Camp
M3 318,176.83 Base Camp
0 84,100.00 Lokasi Pekerjaan
0 115,000.00 Lokasi Pekerjaan
0 45,000.00 Lokasi Pekerjaan
0 55,231.00 Lokasi Pekerjaan
0 75,210.00 Lokasi Pekerjaan
0 4,000,000.00 Lokasi Pekerjaan
M2 17,500.00
Kg 65,000.00 Lokasi Pekerjaan
M2 800,000.00
M3 287,674.00 Base Camp
45,000.00 Base Camp
Buah 45,000.00
Buah 50,000.00
Buah 59,257.00
Kg 75,000.00 Lokasi Pekerjaan
Kg 70,000.00 Lokasi Pekerjaan
Kg 1,240.00 Lokasi Pekerjaan
Kg 9,100.00 Lokasi Pekerjaan
Kg 30,000.00 ???
Kg 30,000.00 ???

bh 750,000.00
bh 400,000.00
Kg
M' ?
Kg 55,000.00 ?
M2 0.00 ?
M2 0.00
buah 0.00
Kg 0.00
Kg 0.00
Kg 0.00
Kg 0.00
Kg 84,100.00
Kg 0.00 alat penyuntik epoxy
Kg 0.00
Kg 0.00
M3 0.00
Kg 0.00
Kg 0.00
Kg 0.00
M' 0.00
Kg 0.00
Buah 0.00
Kg 0.00
Kg 0.00
Kg 0.00
Kg 0.00
Kg 0.00
Kg 0.00
M3 0.00
M3 0.00
M2 0.00
Kg 0.00
M2 0.00
M2 0.00
Kg 0.00
Kg 0.00
Kg 0.00
Kg 0.00
Kg 0.00
Kg 0.00
Kg 0.00
Kg 0.00
kg 8,000.00
Buah 337,530,141.67 Lokasi Pekerjaan
Lbr 205,000.00
Lbr 2,500.00 Lokasi Pekerjaan
Lbr 6,000.00 Lokasi Pekerjaan
Ltr 198,000.00 Lokasi Pekerjaan
Ltr 265,000.00 Lokasi Pekerjaan
M2 165,000.00 Lokasi Pekerjaan
M3 85,000.00 Lokasi Pekerjaan
Kg 25,000.00 Lokasi Pekerjaan
Kg 88,000.00 Lokasi Pekerjaan
Buah 3,150,000.00 Lokasi Pekerjaan
M` 175,000.00 Lokasi Pekerjaan
M` 68,000.00 Lokasi Pekerjaan
Kg 45,000.00 Lokasi Pekerjaan
Kg 175,000.00 Base Camp
Kg 200,000.00 Base Camp
Unit 27,500.00 Base Camp
Ltr 250,000.00 Lokasi Pekerjaan
Unit 458,500.00 Lokasi Pekerjaan
Lbr 157,800.00 Lokasi Pekerjaan
Lbr 246,500.00 Lokasi Pekerjaan
Lbr 355,000.00 Lokasi Pekerjaan
Lbr 483,500.00 Lokasi Pekerjaan
Lbr 630,750.00 Lokasi Pekerjaan
Lbr 801,800.00 Lokasi Pekerjaan
Lbr 985,000.00 Lokasi Pekerjaan
Lbr 1,193,000.00 Lokasi Pekerjaan
Lbr 1,420,000.00 Lokasi Pekerjaan
Kg 11,000.00 Pabrik
Bh 1,150,000.00
M2 1,250,000.00
Kg 75,000.00
M` 1,250,000.00 Lokasi Pekerjaan
Kg 20,000.00 Lokasi Pekerjaan
Ltr 66,000.00 Lokasi Pekerjaan
Kg 14,000.00 Lokasi Pekerjaan
Buah 2,990,000.00 Base Camp
Buah 3,651,250.00 Base Camp
Kg 26,000.00 Lokasi Pekerjaan
Ls 250,000.00 Lokasi Pekerjaan
Ls 500,000.00 Lokasi Pekerjaan
Ls 800,000.00 Lokasi Pekerjaan
Kg 22,000.00 Lokasi Pekerjaan
Kg 210,000.00 Lokasi Pekerjaan
Unit 1,600,000.00 Lokasi Pekerjaan
Buah 13,500,000.00 Lokasi Pekerjaan
Buah 25,000,000.00 Lokasi Pekerjaan
Kg 15,000.00 Lokasi Pekerjaan
Kg 6,000.00 Lokasi Pekerjaan
m2 14,700.00 Lokasi Pekerjaan
m2 40,000.00 Lokasi Pekerjaan
Kg 1,000.00 Lokasi Pekerjaan
Kg 11,000.00 Lokasi Pekerjaan
Kg 65,000.00 Lokasi Pekerjaan
Kg 45,000.00 Lokasi Pekerjaan
Kg 55,000.00
Lbr 6,000.00 Lokasi Pekerjaan
Kg 25,000.00
Bh 7,200,000.00 Lokasi Pekerjaan
Kg 24,500.00
Kg 15,000.00
Kg 136,363.64 Lokasi Pekerjaan
Kg 46,250.00 Lokasi Pekerjaan
Buah 20,000.00 Lokasi Pekerjaan
buah 10,000.00
`
Nama Kegiatan : Pembangunan/Peningkatan Jalan Provinsi di Ruas Jalan di Ruas Jalan Duku - Sicincin (P.087)
Nama Paket : Pembangunan Jalan Duku - Sicincin (P.087)
Lokasi : Kabupaten Padang Pariaman
Prov/Kab/Kot : Sumatera Barat/Kabupaten Padang Pariaman
Penyedia Jasa : PT ALCO SEJAHTERA ABADI

No. Mata
Uraian
Pembayaran

a b

DIVISI 1. UMUM
1.2 Mobilisasi
1.19 Keselamatan dan Kesehatan Kerja

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air
2.2.(1) Pasangan Batu dengan Mortar
2.3.(4) Gorong-gorong Pipa Beton Bertulang, diameter dalam 100 cm

DIVISI 3. PEKERJAAN TANAH Dan GEOSINTETIK


3.1.(1) Galian Biasa
3.1.(4) Galian Struktur dengan Kedalaman 0-2 meter
3.2.(1a) Timbunan Biasa dari Sumber Galian
3.2.(2a) Timbunan Pilihan dari Sumber Galian
3.4.(1) Pembersihan dan Pengupasan Lahan

DIVISI 5. PERKERASAN BERPUTIR dan PERKERASAN BETON SEMEN


5.1.(1) Lapis Pondasi Agregat Kelas A
5.1.(2) Lapis Pondasi Agregat Kelas B

DIVISI 6. PERKERASAN ASPAL


6.1.(1) Lapis Resap Pengikat - Aspal Cair/Emulsi
6.3.(6a) Laston Lapis Antara (AC-BC)
6.3.(8) Bahan Anti Pengelupasan

DIVISI 7. STRUKTUR
7.1.(7a) Beton Struktur, fc'20 Mpa
7.3.(1) Baja Tulangan Polos BjTP 280
7.9.(1) Pasangan Batu

DIVISI 9. PEKERJAAN HARIAN dan PEKERJAAN LAIN-LAIN


9.1.(1) Mandor
9.1.(2) Pekerja Biasa
9.1.(4a) Dump Truck 3-4 m3
9.1.(8) Motor Glader Min 100 PK
9.1.(11) Alat Penggali (Excavator) 80-140 PK
9.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Type LED
9.2.(22a) Stabilitas dengan Tanaman
lan Duku - Sicincin (P.087)

Satuan Volume

c d

LS 1.00
LS 1.00

M3 3,456.00
M3 200.00
M1 40.00

M3 5,500.00
M3 153.00
M3 8,893.80
M3 4,839.87
M2 5,000.00

M3 3,957.00
M3 6,803.12

Liter 31,294.38
Ton 3,563.85
Kg 2,000.57

M3 134.64
Kg 16,156.80
M3 1,760.00

Jam 12.00
Jam 216.00
Jam 18.00
Jam 14.00
Jam 16.00
Buah 56.00
M2 14000.00