11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 7.00 Kilometer
4.00 Km = a 0.00 Km = b
A B
5.0 Km = c
Base Camp --------->
20 ....................................
21 ....................................
22 ....................................
NFORMASI
……………………
………………………………………..
……………………………………….
……………………
...............
( Leff = a + b )
meter
meter
riode Pelaksanaan)
D
..........
...........
............
...........
...........
NO. URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp) TOTAL HARGA (Rp)
DIVISI 1 UMUM
1.2 Mobilisasi Ls 1.00 50,000,000.00 50,000,000.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 1.00 50,000,000.00 50,000,000.00
1.8.(2) Jembatan Sementara M1 30.00 35,000,000.00 1,050,000,000.00
1.17 Pengamanan Lingkungan Hidup Ls 1.00 40,000,000.00 40,000,000.00
1.19 Keselamatan dan Kesehatan Kerja Ls 1.00 100,000,000.00 100,000,000.00
1.21 Manajemen Mutu Ls 1.00 75,000,000.00 75,000,000.00
Jumlah Harga Pekerjaan DIVISI 1 1,365,000,000.00
DIVISI 2 DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 39,124.08 39,400.00 1,541,488,752.00
2.3.(21) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 200 cm x 200 cm M1 8,200.00 14,638,500.00 120,035,700,000.00
Jumlah Harga Pekerjaan DIVISI 2 121,577,188,752.00
DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa M3 491,696.53 39,400.00 19,372,843,282.00
3.2.(1b) Timbunan Biasa dari hasil galian M3 134,166.60 75,300.00 10,102,745,055.30
3.2.(2a) Timbunan Pilihan dari sumber galian M3 40,024.20 119,426.00 4,779,930,109.20
3.3.(1) Penyiapan Badan Jalan M2 54,407.00 13,200.00 718,172,400.00
3.4.(1) Pembersihan dan Pengupasan Lahan M2 54,407.00 18,300.00 995,648,100.00
Jumlah Harga Pekerjaan DIVISI 3 35,969,338,946.50
DIVISI 5 PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 14,666.00 393,100.00 5,765,206,172.40
5.1.(2) Lapis Pondasi Agregat Kelas B M3 17,599.20 387,800.00 6,824,971,621.44
Jumlah Harga Pekerjaan DIVISI 5 12,590,177,793.84
DIVISI 6 PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 54,407.00 26,800.00 1,458,107,600.00
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 108,814.00 25,000.00 2,720,350,000.00
6.3(5a) Laston Lapis Aus (AC-WC) Ton 17,410.24 1,205,700.00 20,991,526,368.00
6.3(7a) Laston Lapis Fondasi (AC-Base) Ton 20,892.29 997,539.00 20,840,872,079.23
Jumlah Harga Pekerjaan DIVISI 6 46,010,856,047.23
DIVISI 9 PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.1.(1) Mandor Jam 945.00 32,528.57 30,739,500.00
9.1.(2) Pekerja Biasa Jam 945.00 20,428.57 19,305,000.00
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 945.00 592,079.46 559,515,092.23
9.1.(5) a Truk Bak Datar 3 - 4 ton Jam 945.00 370,112.29 349,756,114.23
9.1.(7) Bulldozer 100 - 150 PK Jam 945.00 720,826.88 681,181,403.95
9.1.(8) Motor Grader min 100 PK Jam 945.00 381,699.19 360,705,735.86
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 945.00 283,129.79 267,557,651.73
9.1.(10) Loader Roda Berantai 75 - 100 PK Jam 945.00 381,699.19 360,705,735.86
9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam 945.00 489,460.69 462,540,353.36
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 945.00 498,177.24 470,777,490.38
9.1.(14) Penggilas Bervibrasi 5 - 8 Ton Jam 945.00 319,160.31 301,606,491.01
9.1.(15) Pemadat Bervibrasi 1.5 - 3.0 PK Jam 945.00 109,611.00 103,582,394.38
9.2.(1) Marka Jalan Termoplastik M2 6,150.00 126,033.00 775,102,950.00
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 32,800.00 116,900.00 3,834,320,000.00
9.2.(15) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe LED Unit 137.00 12,468,500.00 1,708,184,500.00
Pekerjaan Pemasangan Paving Block t=8cm (Trotoar) M2 16,400.00 145,600.00 2,387,840,000.00
Pekerjaan Pipa PVC 4" M1 28,700.00 447,800.00 12,851,860,000.00
Pekerjaan Kabel Tray U 300x100x3000 M1 8,200.00 125,000.00 1,025,000,000.00
Pekerjaan Besi Siku 75x75x2.2 M1 8,200.00 116,666.67 956,666,666.67
Pekerjaan Manhole (Cover Man Hole) Buah 82.00 215,000.00 17,630,000.00
DIVISI 1 UMUM
1.2 Mobilisasi Ls 1.00 50,000,000.00 50,000,000.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 1.00 50,000,000.00 50,000,000.00
1.17 Pengamanan Lingkungan Hidup Ls 1.00 40,000,000.00 40,000,000.00
1.19 Keselamatan dan Kesehatan Kerja Ls 1.00 100,000,000.00 100,000,000.00
1.21 Manajemen Mutu Ls 1.00 75,000,000.00 75,000,000.00
Jumlah Harga Pekerjaan DIVISI 1 315,000,000.00
DIVISI 2 DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 39,124.08 39,400.00 1,541,488,752.00
2.3.(21) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 200 cm x 200 cm M1 8,200.00 14,638,500.00 120,035,700,000.00
Jumlah Harga Pekerjaan DIVISI 2 121,577,188,752.00
DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa M3 491,696.53 39,400.00 19,372,843,282.00
3.2.(1b) Timbunan Biasa dari hasil galian M3 134,166.60 75,300.00 10,102,745,055.30
3.2.(2a) Timbunan Pilihan dari sumber galian M3 40,024.20 119,426.00 4,779,930,109.20
3.3.(1) Penyiapan Badan Jalan M2 54,407.00 13,200.00 718,172,400.00
3.4.(1) Pembersihan dan Pengupasan Lahan M2 54,407.00 18,300.00 995,648,100.00
Jumlah Harga Pekerjaan DIVISI 3 35,969,338,946.50
DIVISI 5 PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 14,666.00 393,100.00 5,765,206,172.40
5.1.(2) Lapis Pondasi Agregat Kelas B M3 17,599.20 387,800.00 6,824,971,621.44
Jumlah Harga Pekerjaan DIVISI 5 12,590,177,793.84
DIVISI 6 PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 54,407.00 26,800.00 1,458,107,600.00
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 108,814.00 25,000.00 2,720,350,000.00
6.3(5a) Laston Lapis Aus (AC-WC) Ton 17,410.24 1,205,700.00 20,991,526,368.00
6.3(7a) Laston Lapis Fondasi (AC-Base) Ton 20,892.29 997,539.00 20,840,872,079.23
Jumlah Harga Pekerjaan DIVISI 6 46,010,856,047.23
DIVISI 7 STRUKTUR
Perkiraan Harga Jembatan per meter M1 148.00 70,000,000.00 10,360,000,000.00
M1 268.00 70,000,000.00 18,760,000,000.00
Jumlah Harga Pekerjaan DIVISI 7 29,120,000,000.00
PERHITUNG
KUANTITAS SATUAN BERAT JENIS LEBAR TEBAL TINGGI
KG/M3 M M M
39,124.08 M3
32,492.88 M3 2.10
6,631.20 M3 0.75
8,200.00 M1
491,696.53 M3
3,031.17
5,076.30
134,166.60 M3
47,412.60
263,615.80
40,024.20 M3
32,644.20 13.27 0.30
7,380.00 0.75 1.20
54,407.00 M1 13.27
54,407.00 M2 13.27
14,666.00 M3 13.27 0.15
17,599.20 M3 13.27 0.18
54,407.00 Liter 13.27
108,814.00 Liter 13.27
17,410.24 Ton 3,200.00 13.27 0.05
20,892.29 Ton 3,200.00 13.27 0.06
6,150.00 M2 0.30
32,800.00 M1
137.00 Unit
16,400.00 M2 2.00
28,700.00 M1
24,600.00 M1
4,100.00 M1
8,200.00 M1
8,200.00 M1
82.00 Buah
PERHITUNGAN
KEDALAMAN PANJANG JUMLAH LUAS VOLUME
M M BUAH/SISI M2 M3
4,100.00 6.00
2.00 2,050.00
4,100.00 2.00
4,100.00 2.00
82.00
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
B. PERALATAN
Periksa lembar 1.2-2 8,550,000
3 Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Method
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor
E. MOBILISASI PERSONIL
E.I. Personil Sesuai Struktur Organisasi LS 1 25,000,000 25,000,000
1 GS
2 Tenaga Ahli Jalan
3 Tenaga Ahli Jembatan ....
4 ...................... ....
5 ...................... ....
6 ...................... ....
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
B. PERALATAN
HARGA
NO. URAIAN SATUAN VOLUME TOTAL KETERANGAN
SATUAN
IV. Operasional
Catatan :
1. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar kontrak) dan biaya lain-lainnya.
2. Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Pengawas.
MANAJEMEN DAN KESELAMATAN LALU LINTAS
SATUAN PENGUKURAN : Lump sum
HARGA SATUAN : Rp. 0.00
NO. RAMBU KONSTRUKSI DAN PENGALIHAN SATUAN ZONA 1 VOLUME ZONA 2 VOLUME
Rambu Tetap
1 Rambu Batas Kecepatan Buah 8 8
2 Rambu Perintah Mengikuti Lajur Buah 2
3 Rambu Pengarah Tikungan Buah
4 Rambu Larangan Berjalan Terus (Giveaway) Buah 1
5 Rambu Larangan Menyalip Kendaraan Lain Buah 2
6 Rambu Peringatan Jalan Licin Buah
7 Rambu Pengarah Tikungan Ganda Buah
8 Rambu APILL Buah
Catatan :
Kolom volume adalah jumlah kebutuhan zona di lapangan dikalikan kolom ZONA 1, 2, dstnya
contoh : misal di lapangan dibutuhkan dua ZONE 1
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan
D. TENAGA / PERSONIL
Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
4. Jumlah atau Kuantitas disesuaikan Pada Lampiran Spesifikasi 2018 Tabel 1.8.B.1 Kondisi Zona 7
5. Harga Peralatan Lalu Lintas ditambah 20% (asumsi ongkir dan biaya pasang)
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
C. TENAGA / PERSONIL
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
A. DATA DAN ASUMSI
1 Kegiatan yang dilakukan adalah pengukuran baku mutu air tanah dan air permukaan
2 Pengambilan sampel minimal 3 titik Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN
2 Pengukuran Kebisingan, Parameter yang diambil
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) sampel 9.00
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji kebisingan
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.300.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji kebisingan
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.300.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji kebisingan
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.300.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
A. DATA DAN ASUMSI
1 Kegiatan yang dilakukan, pengukuran baku mutu udara
(Uji Udara Emisi dan Ambien)
2 Pengambilan sampel Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
A. DATA DAN ASUMSI
1 Kegiatan yang dilakukan, pengukuran baku mutu udara
(Uji Udara Emisi dan Ambien)
2 Pengambilan sampel Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia memobilisasi peralatan pengeboran kelokasi yang
telah disetujui oleh PPK
2 Pengeboran dilakukan dengan mengambil SPT dan sampel
tanah terganggu (Disturb) dengan interval mak.2 meter atau
setiap ada perubahan strata tanah
3 Benda uji diambil dan dilakukan pengujian laboratorium
Pengeboran dilakukan hingga mencapai tanah keras atau
SPT hingga nilai >40
4 Dibuat laporan hasil pengujian
D. TENAGA/PERSONIL
Estimasi kedalaman boring per titik M 40.00
1 Tenaga Ahli Pengeboran OH 1.00
2 Tenaga Pendukung OH 4.00
3 Mobilisasi dan Demobilisasi Tenaga Ls 1.00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia memobilisasi peralatan sondir kelokasi yang
telah disetujui oleh PPK
2 Sondir dilakukan untuk mengukur tahanan ujung dan
hambatan akibat gesekan dengan interval 0,20m sampai
tahanan ujung mak.sebesar 250 Kg/Cm2
3 Dibuat laporan hasil pengujian
D. TENAGA/PERSONIL
Estimasi kedalaman boring per titik M 30.00
1 Tenaga Ahli Sondir OH 1.00
2 Tenaga Pendukung OH 4.00
3 Mobilisasi dan Demobilisasi Tenaga Ls 1.00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia setelah menerima SPMK mengusulkan personil
Tenaga Ahli Mutu Pekerjaan sbg Manajer Kendali Mutu
2 Tenaga Ahli dibantu oleh Asisten Kendali Mutu yang
berpengalaman dibidangnya dan tenaga pendukung
3 Membuat RMK dan laporan mutu yg disetujui PPK
4 Melakukan pengendalian mutu semua pekerjaan dan
membuat laporan secara berkala
C. TENAGA / PERSONIL
Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya tersebut sudah termasuk biaya pembuatan laporan yang terkait dengan mutu pekerjaan
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan pembuatan laporan mutu seperti komputer, printer, kertas dan sebagainya.
Analisa El - 181
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
660,000.00 1,320,000.00
660,000.00 660,000.00
660,000.00 0.00 (minimum 3)
660,000.00 0.00
660,000.00 0.00
660,000.00 0.00
660,000.00 0.00
660,000.00 0.00
660,000.00 0.00
660,000.00 2,640,000.00
660,000.00 0.00
1,074,000.00 0.00
240,000.00 9,600,000.00 Jarak antar Cone Maks 5 m Asumsi Pek. Per 200 m
78,000.00 0.00 Disesuaikan dengan Lokasi
840,960.00 0.00 Disesuaikan dengan Lokasi
203,880.00 0.00 Disesuaikan dengan Kebutuhan
3,240,000.00 0.00
100,000.00 Exercise
0.00
marka sesuai pemenhub No.67 tahun 2018
0.00 0.00
45,000.00 0.00
90,000.00 0.00
342,000.00 0.00
7,800.00 0.00 Asumsi Pek. Per 200 m
4,140,000.00 41,400,000.00
0.00
3,941,075.00 47,292,900.00
4,856,850.00 29,141,100.00
132,054,000.00
dukung yang
Kondisi Zona 7
Analisa El - 182
ATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
0
-
0.00 -
379,518.31 113,855,493.06
-
180,790.86 81,355,887.50
174,974.36 236,215,387.50
210,463.50 31,569,525.00
462,996,293.06
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
Contoh: Diambil dari Tarif
Jasa Layanan Teknis, Balai
Riset dan Standardisasi
Industri Samarinda + biaya
Transportasi
215,000.00 1,935,000
1,935,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
240,000.00 2,160,000
2,160,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
230,000.00 2,070,000
2,070,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
Contoh: Diambil dari Tarif
Jasa Layanan Teknis, Balai
Riset dan Standardisasi
Industri Samarinda + biaya
Transportasi
230,000.00 2,070,000
2,070,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
2,205,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
305,000.00 2,745,000
2,745,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
400,000.00 3,600,000
3,600,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
328,000.00 2,952,000
2,952,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
470,000.00 4,230,000
4,230,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
215,000.00 1,935,000
1,935,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
Contoh: Diambil dari Tarif
Jasa Layanan Teknis, Balai
Riset dan Standardisasi
Industri Samarinda + biaya
Transportasi
0.00
ATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
725,000.00 6,525,000
6,525,000.00
300.000,00
ATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
900,000.00 8,100,000
8,100,000.00
300.000,00
Analisa El - 117(b)
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
0.00
300.000,00
Analisa El - 117(c)
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
413,666.67 3,723,000 Jasa Layanan Teknis, Balai
Riset dan Standardisasi
Industri Samarinda + biaya
3,723,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
493,333.33 4,440,000
4,440,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
533,333.33 4,800,000
4,800,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
513,333.33 4,620,000
4,620,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
496,333.33 4,467,000
4,467,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
475,333.33 4,278,000
4,278,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
0.00
Analisa El - 119
ATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-
Analisa El - 1201
ATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
801,666.67 801,666.67
403,000.00 1,612,000.00
1,000,000.00 1,000,000.00
21,213,666.67
2,121,366.67
23,335,033.33
583,375.83
Analisa El - 1202
ATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,500,000.00 4,500,000.00 sewa
1,000,000.00 1,000,000.00 tergantung lokasi
45,000.00 1,350,000.00
15,000.00 2,250,000.00
300,000.00 300,000.00
0.00 -
801,666.67 801,666.67
403,000.00 1,612,000.00
500,000.00 500,000.00
12,313,666.67
1,231,366.67
13,545,033.33
451,501.11
Analisa El - 121
ATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
20,041,666.67 240,500,000.00
11,212,500.00 403,650,000.00
300,000.00 3,600,000.00
966,250,000.00
dukung yang
Asumsi Pek. Per 200 m
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air
SATUAN PEMBAYARAN : M3
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
JENIS PEKERJAAN : Gorong-gorong Pracetak Kotak Beton Bertulang, ukuran dalam 200 x 200 cm
SATUAN PEMBAYARAN : M1
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
2,983.36
791.74
3,775.10
0.00
6,419.31
25,558.40
0.00
31,977.71
35,752.81
3,575.28
39,328.09
JUMLAH
HARGA
(Rp.)
33,562.82
26,850.26
213,769.36
274,182.44
27,900.00
90,000.00
12,806,750.00
12,924,650.00
90,041.89
18,781.74
0.00
108,823.63
13,307,656.08
1,330,765.61
14,638,421.69
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E15) Jam 0.0046 444,964.26
2. Dump Truck (E09) Jam 0.1221 420,917.24
3. Motor Grader (E13) Jam 0.0020 455,614.02
4 Vibro Roller (E19) Jam 0.0042 290,145.73
5. Water tank truck (E23) Jam 0.0341 375,162.36
6 Alat Bantu Ls 1.0000 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0085 486,854.58
2. Dump Truck (E09) Jam 0.1410 420,917.24
3. Motor Grader (E13) Jam 0.0040 455,614.02
3. Tandem (E17) Jam 0.0112 452,888.40
4. Water Tanker (E23) Jam 0.0341 375,162.36
5. Alat Bantu Ls 1.0000 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Motor Grader (E13) jam 0.0017 455,614.02
2. Tandem / Vibro Roller (E17) jam 0.0244 452,888.40
3 Alat Bantu Ls 1.0000 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
2,983.36
791.74
3,775.10
0.00
6,419.31
25,558.40
0.00
31,977.71
35,752.81
3,575.28
39,328.09
JUMLAH
HARGA
(Rp.)
35.97
14.20
50.17
0.00
2,049.61
51,397.39
904.00
1,213.80
12,806.75
0.00
68,371.54
68,421.71
6,842.17
75,263.88
JUMLAH
HARGA
(Rp.)
294.78
117.35
412.13
25,000.00
25,000.00
4,140.51
59,348.58
1,807.99
5,052.30
12,806.75
0.00
83,156.13
108,568.27
10,856.83
119,425.09
JUMLAH
HARGA
(Rp.)
63.93
50.90
114.83
0.00
784.19
11,060.45
0.00
11,844.64
11,959.46
1,195.95
13,155.41
18,599.79
#VALUE!
JUMLAH
HARGA
(Rp.)
888.43
141.47
1,029.89
0.00
3,386.51
1,659.99
10,522.79
0.00
15,569.28
16,599.18
1,659.92
18,259.09
JENIS PEKERJAAN : Lapis Fondasi Agregat Kelas A
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0087 486,854.58
2. Dump Truck (E09) jam 0.0982 420,917.24
3. Motor Grader (E13) jam 0.0010 455,614.02
4. Vibratory Roller (E19) jam 0.0097 290,145.73
5 Alat Bantu Ls 1.0000 0.00
A. TENAGA
1. Pekerja (L01) jam 0.0779 18,571.43
2. Mandor (L03) jam 0.0097 29,571.43
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0086 486,854.58
2. Dump Truck (E09) jam 0.0967 420,917.24
3. Motor Grader (E13) jam 0.0010 455,614.02
4. Vibratory Roller (E19a) jam 0.0097 290,145.73
5 Alat Bantu Ls 1.0000 0.00
1,446.67
287.94
1,734.62
306,773.79
306,773.79
4,235.69
41,347.40
436.12
2,825.21
0.00
48,844.42
357,352.83
35,735.28
393,088.12
JUMLAH
HARGA
(Rp.)
1,446.67
287.94
1,734.62
302,600.00
302,600.00
4,178.06
40,685.27
436.12
2,825.21
0.00
48,124.67
352,459.29
35,245.93
387,705.21
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair/Emulsi
SATUAN PEMBAYARAN : Liter
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
1. Pekerja (L01) Jam 0.0015 18,571.43
2. Mandor (L03) Jam 0.0007 29,571.43
B. BAHAN
C. PERALATAN
A. TENAGA
C. PERALATAN
1. Wheel Loader E15 Jam 0.0054 486,854.58
2. AMP E01 Jam 0.0201 9,382,313.91
3. Genset E12 Jam 0.0201 370,071.25
4. Dump Truck E09 Jam 0.0417 420,917.24
5. Asp. Finisher E02 Jam 0.0125 329,908.30
6. Tandem Roller E17a Jam 0.0128 468,218.25
7 P. Tyre Roller E18 Jam 0.0084 501,929.65
8 Alat Bantu Ls 1.0000 0.00
A. TENAGA
B. BAHAN
1 Agr Pch Mesin 20-30 (M93) M3 0.1417 225,800.00
2 Agr Pch Mesin 5-10 & 10-15 (M92) M3 0.3209 238,000.00
3 Agr Pch Mesin 0 - 5 (M91) M3 0.2876 238,000.00
3 Semen (M12) Kg 9.7850 1,300.00
4 Aspal (M10) Kg 48.9250 10,000.00
C. PERALATAN
1. Wheel Loader E15 Jam 0.0054 486,854.58
2. AMP E01 Jam 0.0201 9,382,313.91
3. Genset E12 Jam 0.0201 370,071.25
4. Dump Truck E09 Jam 0.0417 420,917.24
5. Asphalt Finisher E02 Jam 0.0067 329,908.30
6. Tandem Roller E17a Jam 0.0071 468,218.25
7 P. Tyre Roller E18 Jam 0.0045 501,929.65
8 Alat Bantu Ls 1.0000 0.00
27.20
21.66
48.86
24,033.33
24,033.33
87.08
128.74
215.82
24,298.01
2,429.80
26,727.81
JUMLAH
HARGA
(Rp.)
27.20
21.66
48.86
22,316.67
22,316.67
87.08
183.36
71.89
342.32
22,707.85
2,270.78
24,978.63
JUMLAH
HARGA
(Rp.)
3,729.20
593.80
4,323.01
97,773.30
127,881.65
12,586.60
623,150.00
861,391.54
2,613.96
188,399.88
7,431.15
17,531.76
4,132.67
5,972.68
4,220.40
0.00
230,302.49
1,096,017.04
109,601.70
1,205,618.74
JUMLAH
HARGA
(Rp.)
3,729.20
593.80
4,323.01
31,989.19
76,370.95
68,438.52
12,720.50
489,250.00
678,769.17
2,613.96
188,399.88
7,431.15
17,531.76
2,204.09
3,328.92
2,250.88
0.00
223,760.63
906,852.80
90,685.28
997,538.08
JENIS PEKERJAAN : Mandor
SATUAN PEMBAYARAN : Jam
A. TENAGA
B. BAHAN
C. ALAT
A. TENAGA
B. BAHAN
C. ALAT
A. TENAGA
B. BAHAN
A. TENAGA
1. Pekerja Biasa (L01) jam 0.39 18,571.43
2. Tukang (L02) jam 0.15 20,428.57
3. Mandor (L03) jam 0.04 29,571.43
B. BAHAN
C. PERALATAN
JENIS PEKERJAAN : Unit Lampu Penerangan Jalan Lengan Ganda, Tipe LED
SATUAN PEMBAYARAN : Buah
A. TENAGA
B. BAHAN
C. PERALATAN
A TENAGA
B BAHAN
A TENAGA
29,571.43
29,571.43
2,957.14
32,528.57
JUMLAH
HARGA
(Rp.)
18,571.43
18,571.43
1,857.14
20,428.57
JUMLAH
HARGA
(Rp.)
2,651.88
364.63
527.83
3,544.34
91,348.13
13,256.10
104,604.23
4,837.57
1,589.13
0.00
6,426.70
114,575.26
11,457.53
126,032.79
JUMLAH
HARGA
(Rp.)
7,186.11
3,161.89
1,144.25
11,492.25
85,143.25
231.75
85,375.00
9,381.06
0.00
9,381.06
106,248.32
10,624.83
116,873.15
JUMLAH
HARGA
(Rp.)
6,665.68
1,833.06
1,326.73
9,825.47
1,284,236.69
6,000,000.00
4,030,000.00
11,314,236.69
10,877.09
0.00
10,877.09
11,334,939.26
1,133,493.93
12,468,433.18
JUMLAH
HARGA
(Rp.)
4,642.86
11,142.86
510.71
73.93
16,370.36
90,750.00
13,950.00
11,290.00
115,990.00
132,360.36
13,236.04
145,596.39
JUMLAH
HARGA
(Rp.)
1,504.29
3,008.57
275.79
118.29
4,906.93
297,900.00
104,265.00
402,165.00
407,071.93
40,707.19
447,779.12
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA
BIAYA
KAP. HARGA SEWA KET.
ALAT ALAT/JAM
(di luar PPN)
370,361.46
134,065.52
35,408.27
37,043.02
100,000.00
100,000.00
20,000.00
buah baut 15,000,000.00 63,529.15
l/mnt 7,000,000.00 59,444.01
m/menit 26,000,000.00 69,146.23
m2/jam 7,500,000.00 59,699.33
Ton 900,000,000.00 205,007.49
Ton/jam 600,000,000.00 362,255.23
m2/jam 30,000,000.00 71,188.80
Ton 75,000,000.00 76,595.62
Mpa 16,000,000.00 60,291.08
0.0 5,000,000.00 58,422.73
m/jam 120,000,000.00 89,031.29
m/jam 70,000,000.00 75,213.88
DAFTAR HARGA BAHAN BANGUNAN
KOTA BOGOR
TAHUN ANGGARAN 2019
NO JENIS BAHAN BANGUNAN
1 2
Semen PC / 50 kg
- Tiga roda
- Holcim
- Gresik
- Padang
- Semen Putih WM
56 Semen Putih
- Semen Putih WM
- Semen Putih WC
- Semen putih plamur
57 Semen Warna
58 Semen Merah
59 Sirtu
60 Tanah Liat
61 Tanah Urug
62 Terawang/roster 5X11X24
63 Terawang/roster 12X11X24
64 Urugan Pilihan
65 Soda api
66 Air bersih PDAM per 3 kubik
PAGAR BRC
432 Pagar BRC Lengkap Tiang ( Tanpa Pondasi )
Pagar Brc 90×240 Electroplating Galvanized Diameter 6
Pagar Brc 90×240 Electroplating Galvanized Diameter 7
Pagar Brc 120×240 Electroplating Galvanized Diameter 6
Pagar Brc 120×240 Electroplating Galvanized Diameter 7
Pagar Brc 120×240 Electroplating Galvanized Diameter 8
Pagar Brc 150×240 Electroplating Galvanized Diameter 6
Pagar Brc 150×240 Electroplating Galvanized Diameter 7
Pagar Brc 150×240 Electroplating Galvanized Diameter 8
Pagar Brc 175×240 Electroplating Galvanized Diameter 6
Pagar Brc 175×240 Electroplating Galvanized Diameter 7
Pagar Brc 175×240 Electroplating Galvanized Diameter 8
Pagar Brc 190×240 Electroplating Galvanized Diameter 6
Pagar Brc 190×240 Electroplating Galvanized Diameter 7
Pagar Brc 190×240 Electroplating Galvanized Diameter 8
Pagar Brc 240×240 Electroplating Galvanized Diameter 7
Pagar Brc 240×240 Electroplating Galvanized Diameter 8
Pagar Brc 90×240 Hot Dip Galvanized Diameter 6
Pagar Brc 90×240 Hot Dip Galvanized Diameter 7
Pagar Brc 120×240 Hot Dip Galvanized Diameter 6
Pagar Brc 120×240 Hot Dip Galvanized Diameter 7
Pagar Brc 120×240 Hot Dip Galvanized Diameter 8
Pagar Brc 150×240 Hot Dip Galvanized Diameter 6
Pagar Brc 150×240 Hot Dip Galvanized Diameter 7
Pagar Brc 150×240 Hot Dip Galvanized Diameter 8
Pagar Brc 175×240 Hot Dip Galvanized Diameter 6
Pagar Brc 175×240 Hot Dip Galvanized Diameter 7
Pagar Brc 175×240 Hot Dip Galvanized Diameter 8
Pagar Brc 190×240 Hot Dip Galvanized Diameter 6
Pagar Brc 190×240 Hot Dip Galvanized Diameter 7
Pagar Brc 190×240 Hot Dip Galvanized Diameter 8
Pagar Brc 240×240 Hot Dip Galvanized Diameter 7
Pagar Brc 240×240 Hot Dip Galvanized Diameter 8
Tiang BRC tinngi 120 Electroplating Galvanized Diameter 2″
Tiang BRC tinngi 150 Electroplating Galvanized Diameter 2″
Tiang BRC tinngi 175 Electroplating Galvanized Diameter 2″
Tiang BRC tinngi 200 Electroplating Galvanized Diameter 2″
Tiang BRC tinngi 220 Electroplating Galvanized Diameter 2″
Tiang BRC tinngi 225 Electroplating Galvanized Diameter 2″
Tiang BRC tinngi 240 Electroplating Galvanized Diameter 2″
Tiang BRC tinngi 300 Electroplating Galvanized Diameter 2″
Tiang BRC tinngi 120 Electroplating Galvanized Diameter 1,5″
Tiang BRC tinngi 150 Electroplating Galvanized Diameter 1,5″
Tiang BRC tinngi 175 Electroplating Galvanized Diameter 1,5″
Tiang BRC tinngi 200 Electroplating Galvanized Diameter 1,5″
Tiang BRC tinngi 220 Electroplating Galvanized Diameter 1,5″
Tiang BRC tinngi 120 Hotdip Galvanized Diameter 2″
Tiang BRC tinngi 150 Hotdip Galvanized Diameter 2″
Tiang BRC tinngi 175 Hotdip Galvanized Diameter 2″
Tiang BRC tinngi 200 Hotdip Galvanized Diameter 2″
Tiang BRC tinngi 220 Hotdip Galvanized Diameter 2″
Tiang BRC tinngi 225 Hotdip Galvanized Diameter 2″
Tiang BRC tinngi 240 Hotdip Galvanized Diameter 2″
Tiang BRC tinngi 300 Hotdip Galvanized Diameter 2″
Tiang BRC tinngi 120 Hotdip Galvanized Diameter 1,5″
Tiang BRC tinngi 150 Hotdip Galvanized Diameter 1,5″
Tiang BRC tinngi 175 Hotdip Galvanized Diameter 1,5″
Tiang BRC tinngi 200 Hotdip Galvanized Diameter 1,5″
Tiang BRC tinngi 220 Hotdip Galvanized Diameter 1,5″
PLAT ALUMINIUM
433 Plat Alumunium 0.1 mm
434 Plat Alumunium 0.2 mm
435 Plat Alumunium 0.3 mm
436 Plat Alumunium 0.4 mm
437 Plat Alumunium 0.5 mm
438 Plat Alumunium 0.6 mm
J BAHAN KACA
471 Glass Bead
472 Glass Block DN 20 x 20 ( Kedawung )
473 Glass Block DN 20 x 20 Ex LN
474 Kaca 6 mm Gravver ( GRAFIR )
475 Kaca Patri EX Luar negeri terpasang
476 Kaca Patri Lokal Terpasang ( ASAHI )
477 Kaca Polos 2 mm ( ASAHI )
478 Kaca Polos 3 mm ( ASAHI )
479 Kaca Polos 5 mm ( ASAHI )
480 Kaca Polos 8 mm
481 Kaca Rayband 12 mm ( ASAHI )
482 Kaca Rayband 5 mm ( ASAHI )
483 Kaca Rayband 8 mm ( ASAHI )
Thermo Plastik
L BAHAN PERPIPAAN
2 Besi Pipa Hitam Ø 1" t=2 mm
3 Besi Pipa Hitam Ø 2" t=2 mm
4 Besi Pipa Hitam Ø 3" t=2 mm
5 Besi Pipa Hitam Ø 4" t=2 mm
6 Besi Pipa Hitam Ø 6" t=2 mm
7 Besi Pipa untuk Hydrant BSP Ø 1"
8 Besi Pipa untuk Hydrant BSP Ø 1,25"
9 Besi Pipa untuk Hydrant BSP Ø 1,5"
10 Besi Pipa untuk Hydrant BSP Ø 2"
11 Besi Pipa untuk Hydrant BSP Ø 2,5"
12 Besi Pipa untuk Hydrant BSP Ø 3"
13 Besi Pipa untuk Hydrant BSP Ø 4"
14 Besi Pipa untuk Hydrant BSP Ø 6"
15 Lem isarplas
- ukuran 45 gram
- ukuran 400 gram
16 Macam2 Sambungan GIP Ø 1/2"
17 Macam2 Sambungan GIP Ø 3/4"
18 Macam2 Sambungan GIP Ø 1"
19 Macam2 Sambungan GIP Ø 1 1/4"
20 Macam2 Sambungan GIP Ø 1 1/2"
21 Macam2 Sambungan GIP Ø 1 3/4"
22 Macam2 Sambungan GIP Ø 2"
23 Macam2 Sambungan GIP Ø 2 1/2"
24 Macam2 Sambungan GIP Ø 3"
25 Macam2 Sambungan GIP Ø 4"
26 Macam2 Sambungan Paralon Ø 1/2"
27 Macam2 Sambungan Paralon Ø 3/4"
28 Macam2 Sambungan Paralon Ø 1"
29 Macam2 Sambungan Paralon Ø 1 1/4"
30 Macam2 Sambungan Paralon Ø 1 1/2"
31 Macam2 Sambungan Paralon Ø 1 3/4"
32 Macam2 Sambungan Paralon Ø 2"
33 Macam2 Sambungan Paralon Ø 2 1/2"
34 Macam2 Sambungan Paralon Ø 3"
35 Macam2 Sambungan Paralon Ø 4"
36 Penyekat Poslin Urinoir TOTO
37 Pipa GIP Medium A Ø 1/2" ( 6 m1 )
38 Pipa GIP Medium A Ø 3/4" ( 6 m1 )
39 Pipa GIP Medium A Ø 1" ( 6 m1 )
40 Pipa GIP Medium A Ø 1 1/4" ( 6 m1 )
41 Pipa GIP Medium A Ø 1 1/2" ( 6 m1 )
42 Pipa GIP Medium A Ø 1 3/4"( 6 m1 )
43 Pipa GIP Medium A Ø 2" ( 6 m1 )
44 Pipa GIP Medium A Ø 2 1/2" ( 6 m1 )
45 Pipa GIP Medium A Ø 3" ( 6 m1 )
46 Pipa GIP Medium A Ø 4" ( 6 m1 )
47 Pipa PVC 4" berlobang jenis AW
48 Pipa PVC SNI S-12,5 Ø 1½"
49 Pipa PVC SNI S-12,5 Ø 2"
50 Pipa PVC SNI S-12,5 Ø 3"
51 Pipa PVC SNI S-12,5 Ø 4"
52 Pipa PVC SNI S-12,5 Ø 6"
53 Pipa PVC MASPION ABU Ø 1 1/2" (AW)
54 Pipa PVC MASPION ABU Ø 1 1/4" (AW)
55 Pipa PVC MASPION ABU Ø 1" (AW)
56 Pipa PVC MASPION ABU Ø 1/2" (AW)
57 Pipa PVC MASPION ABU Ø 2 1/2" (AW)
58 Pipa PVC MASPION ABU Ø 2" (AW)
59 Pipa PVC MASPION ABU Ø 3" (AW)
60 Pipa PVC MASPION ABU Ø 3/4" (AW)
61 Pipa PVC MASPION ABU Ø 4" (AW)
62 Pipa PVC 4" berlobang jenis AW
63 Pipa PVC RUCIKA type AW Ø 1 1/2"
64 Pipa PVC RUCIKA type AW Ø 1 1/4"
65 Pipa PVC RUCIKA type AW Ø 1"
66 Pipa PVC RUCIKA type AW Ø 1/2"
67 Pipa PVC RUCIKA type AW Ø 2 1/2"
68 Pipa PVC RUCIKA type AW Ø 2"
69 Pipa PVC RUCIKA type AW Ø 3"
70 Pipa PVC RUCIKA type AW Ø 3/4"
71 Pipa PVC RUCIKA type AW Ø 4"
72 Pipa PVC RUCIKA type AW Ø 6"
73 Pipa PVC RUCIKA type AW Ø 8"
74 Sambungan Pipa PVC Jenis AW 4 " TY
75 Solatip Leideng
76 Tempat Sabun S11 N Ex Toto / Tempat Sabun Poslin
77 Urinoir lengkap TOTO warna standar lengkap
78 Wastafel Bulat warna standar lengkap
79 Wastafel lengkap INA
80 Wastafel lengkap TOTO LW 230
81 Sambungan rumah (SR) Ø 1/2"
82 Air valve 1/2"
M BAHAN SANITAIR
83 Stop Kran 3/4 " KIT
84 Stop Kran 1 " KIT
85 Stop Kran 1 1/2 " KIT
86 Stop Kran 2 " KIT
87 Stop Kran 2 1/2" KIT
88 Stop Kran 3 " KIT
89 Check Valve 1/2 "
90 Double Neple 1/2 "
91 Water Mur 1/2 "
92 Gate Walve 1/2 "
93 Saringan Air Lt KM Stainless Steel
94 Apooer Bath Tube
95 Kran stain less Lokal Kait
96 Shower Dengan Tiang
97 Shower Tanpa Tiang
98 Kran Tembok Sun Eui dia. 1/2 "
99 Kran Tembok ITAP dia. 1/2 "
100 Kran Bebek Sun Eui 1/2 "
101 Kran Bebek ITAP 1/2 "
102 Kran Panas Dingin San Eui Standard
103 Bath Cape Washteren
104 Tempat Sabun Poslin
105 Wastafel Lengkap TOTO LW 230
106 Wastafel Lengkap INA
107 Closet Jongkok Poslin warna TOTO
108 Closet Jongkok Standard Putih Poslin TOTO
109 Closet Jongkok Lengkap Sistem Jet TOTO
110 Closet Duduk Warna Standard TOTO C 240 Lengkap
111 Wastafel Bulat Warna Standard Lengkap
112 Closet Duduk Warna Standard lengkap INA
113 Urinoir Lengkap TOTO Warna Standard lengkap
114 Penyekat Poslin Urinoar TOTO
115 Kitchen Zink Stainless Standard Lokal ( 1 Lobang )
116 Kitchen Zink Stainless Non Standard Franke ( 1 Lobang )
117 Kitchen Zink Stainless Non Standard Franke ( 2 Lobang )
118 Sealtipe
- Tachi PTFE
- Sanho
- Onda
O BAHAN MEKANIKAL
168 AC Split 1 PK Setara TOSHIBA
169 AC Split 2 PK Setara TOSHIBA
170 AC Split 3 PK Setara TOSHIBA
171 Diesel Pump kap. 750 gln / menit 120 m1 ( 105 kW )
172 Down Light +SL 25 W
173 Electrical Pump kap. 750 gln / menit 120 m1 ( 90 kW )
174 Exhouse Fan H 100 W 40 x 40 cm
175 Exhouse Fan H 360 W 60 x 60 cm
176 Exhouse Fan H 380 W CFM 55 x 55 cm
177 Fire House 1.5 x 30 m + nose
178 Hydran Box dalam Gedung (lengkap)
179 Jockey Pump kap. 80 gln / menit 100 m1 ( 18,6 kW )
180 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit )
181 Presure Tank kap. 500 liter lengkap
P BAHAN ELEKTRIKAL
182 Kabel NYA 1x 1.5 Prima (1 rol = 50 m')
183 Kabel NYA 1x 2.5 Prima (1 rol = 50 m')
184 Kabel NYM 2 x 1.5 Prima (1 rol = 50 m')
185 Kabel NYM 3 x 1.5 Prima (1 rol = 50 m')
186 Kabel NYM 2 x 2.5 Prima (1 rol = 50 m')
187 Kabel NYM 3 x 2.5 Prima (1 rol = 50 m')
188 Kabel NYM 4 x 2.5 Prima (1 rol = 50 m')
189 Kabel NYM 2 x 4 Prima (1 rol = 50 m')
190 Kabel NYM 3 x 4 Prima (1 rol = 50 m')
191 Kabel NYM 4 x 4 Prima (1 rol = 50 m')
192 Kabel NYM 2 x 6 Supreme (1 rol = 50 m')
193 Kabel NYM 3 x 6 Supreme (1 rol = 50 m')
194 Kabel NYM 4 x 6 Supreme (1 rol = 50 m')
195 Kabel NYM 2 x 10 Supreme (1 rol = 50 m')
196 Kabel NYM 3 x 10 Supreme (1 rol = 50 m')
197 Kabel NYM 4 x 10 Supreme (1 rol = 50 m')
198 Kabel NYM 4 x 16 Supreme (1 rol = 50 m')
199 Kabel NYY 2 x4 Supreme (1 rol = 50 m')
12500 Kabel NYY 3 x4 Supreme (1 rol = 50 m')
12501 Kabel NYY 4 x4 Supreme (1 rol = 50 m')
12502 Kabel NYY 2 x6 Supreme (1 rol = 50 m')
12503 Kabel NYY 3 x6 Supreme (1 rol = 50 m')
12504 Kabel NYY 4 x6 Supreme (1 rol = 50 m')
12505 Kabel NYY 2 x 10 Supreme (1 rol = 50 m')
12506 Kabel NYY 3 x 10 Supreme (1 rol = 50 m')
12507 Kabel NYY 4 x 10 Supreme (1 rol = 50 m')
12508 Kabel NYY 4 x 16 Supreme (1 rol = 50 m')
12509 NSFB FUJI EA - 100 A
12510 NSFB FUJI EA - 150 A
12511 Rumah Panel 30 x 60 cm (kosong)
12512 Skring Kas 2 grop Biasa
12513 Skring Kas 3 grop Biasa
12514 Skring Kas 5 grop Biasa
12515 MCB 1 PAS
12516 MCB 3 PAS
12517 Tahanan 50 A Merk Fuji
12518 Saklar Broko Tunggal Standard ( 1 Phase )
12519 Saklar Broko Seri Standard ( 1 Phase )
12520 Stop Kontak Broko Standard ( 1 Phase )
12521 Stop Kontak Broko 3 Phase ( Out Bow )
12522 Stop Kontak Broko 3 Phase ( In Bow )
12523 Stop Kontak Handle 3 Phase
12524 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat )
12525 Lampu pijar 25 Watt s/d 100 Watt
12526 Lampu Neon TL Philip 20 W
12527 Lampu Neon TL Philip 40 W
12528 Trapo TL 20 W ( Philip )
12529 Trapo TL 40 W ( Philip )
12530 Trapo TL 20 W ( Sinar )
12531 Trapo TL 40 W ( Sinar )
12532 Stater Neon Philip
12533 Stater Neon Biasa
12534 Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan )
12535 Down Light + SL 25 W
12536 Lampu SL Philip 25 W
12537 Lampu Sirkel TL 20 W Lengkap
12538 Lampu Mercuri 80 W
12539 Lampu Taman + Tiang + Lampu 1 Buah
12540 Lampu Baret 30 cm + Neon
12541 Lampu Neon Arcrilik 2 x 40 W lengkap
12542 Jarum Penangkal Petir 16
12543 Kawat BC ( Tembaga )
12544 Pentanahan Penangkal Petir
12545 Pentanahan Panel
W PAGAR PRACETAK
12693 Panel beton pracetak
12694 Kolom beton pracetak
19
SATUAN HARGA SATUAN
Rp.
3 4
m³ 225,800
bh 1,000
bh 2,000
bh 1,300
m3 776,000
bh 4,000
bh 3,000
m³ 280,000
m³ 254,000
kg 21,000
m³ 232,250
m³ 280,000
m³ 305,000
m³ 225,800
m³ 238,000
m³ 238,000
m³ 238,710
m³ 233,000
m³ 192,800
bh 19,500
bh 38,000
m² 224,000
m³ 15,000
m² 132,000
btg 15,000
m2 124,000
m2 116,000
bh 18,000
bh 7,000
batang 33,000
batang 61,000
batang 73,000
batang 82,000
batang 33,000
batang 61,000
batang 73,000
batang 82,000
batang 51,000
batang 66,000
batang 86,000
batang 103,000
batang 117,000
batang 137,000
bh 19,000
bh 38,000
bh 38,000
m1 193,000
m³ 524,000
kg 9,000
m³ 314,200
m³ 314,200
m³ 300,000
m³ 279,000
m³ 280,000
bh 161,000
m² 82,500
m² 92,500
m² 95,000
m² 100,000
m³ 1,128,000
m³ 1,148,000
m³ 1,179,000
m³ 1,219,000
m³ 1,260,000
bh 5,000
bh 8,000
kg 1,300
kg
kg
kg
kg
zak
1,300
kg 1,300
kg
kg
kg
zak
kg 2,300
kg 2,300
kg 3,650
kg 15,000
kg 234,000
m³ 140,000
m³ 36,000
m³ 203,000
bh 12,000
bh 16,000
m³ 157,000
kg 20,000
Air bersih PDAM per 3 kubik 65,000
lbr 5,000
kg 122,000
kg 80,000
kg 83,000
kg 122,000
lt 29,000
kg 57,000
kg 70,000
kg 70,000
kg 131,000
lt 60,000
lt 295,000
lt 27,000
kg 21,000
kg 29,000
gln 32,000
kg 46,000
kg 43,000
kg 41,000
kg 59,000
kg 61,000
kg 61,000
bh 36,000
bh 36,000
bh 3,000
kg 66,000
bh 12,000
bh 18,000
kg 72,000
kg 56,000
kg 16,000
ltr 80,000
bks 3,000
lt 62,000
m³ 483,000
m³ 702,000
kg 16,000
kg 42,000
bh 26,000
kg 51,000
5 lt 18,000
lt 14,000
lt 15,000
lt 26,000
lt 28,000
kg 58,000
ml 61,000
bt 31,000
bt 25,000
bt 16,000
bt 25,000
bt 16,000
m³ 2,032,000
m³ 4,279,000
m³ 6,210,000
m³ 6,210,000
m³ 7,556,000
m³ 4,140,000
m³ 6,000,000
m³ 7,245,000
m³ 8,280,000
m³ 8,280,000
m³ 10,350,000
m³ 9,315,000
m³ 6,728,000
m³ 5,175,000
m³ 6,210,000
m³ 5,175,000
m³ 8,280,000
m³ 1,708,000
btg 15,000
btg 20,000
btg 25,000
btg 27,000
btg 20,000
btg 18,000
btg 27,000
btg 62,000
btg 62,000
btg 82,000
btg 82,000
btg 86,000
btg 153,000
btg 153,000
btg 122,000
btg 325,000
btg 203,000
btg 203,000
btg 305,000
btg 203,000
btg 203,000
bh 11,000
m³ 2,691,000
m' 9,000
m' 9,000
m' 15,000
m' 20,000
m' 37,000
m' 199,000
m' 78,000
lbr 32,000
lbr 30,000
m² 62,000
lbr 83,000
lbr 71,000
lbr 70,000
lbr 61,000
lbr 101,000
lbr 145,000
btg 11,000
m² 21,000
m² 17,000
m² 31,000
lbr 198,000
lbr 182,000
lbr 113,000
lbr 135,000
lbr 104,000
lbr 193,000
lbr 104,000
lbr 149,000
lbr 212,000
lbr 101,000
lbr 424,000
m² 74,000
m² 155,000
lbr 89,000
lbr 92,000
lbr 95,000
lbr 114,000
lbr 48,000
lbr 59,000
lbr 57,000
lbr 71,000
lbr 112,000
m² 72,000
bh 1,000
bh 2,000
bh 3,000
kg 19,000
ltr 56,000
m² 3,353,000
m² 2,712,000
m² 3,689,000
m² 3,102,000
m² 602,000
m² 261,000
m² 287,000
m² 290,000
m² 261,000
m² 471,000
m² 164,000
m² 67,000
m² 72,000
m² 56,000
m² 72,000
m² 56,000
m² 74,000
m² 66,000
m² 73,000
m² 66,000
m² 112,000
m² 66,000
m² 110,000
m² 68,000
m² 107,000
m² 65,000
m² 78,000
m² 55,000
m² 61,000
m² 94,000
m² 372,000
m² 405,000
m² 404,000
m² 270,000
m² 697,000
m² 472,000
m² 180,000
bh 34,000
bh 32,000
bh 14,000
bh 23,000
bh 29,000
bh 13,000
bh 14,000
bh 14,000
bh 23,000
bh 23,000
bh 16,000
bh 51,000
bh 33,000
bh 127,000
bh 97,000
bh 62,000
bh 62,000
bh 149,000
bh 98,000
bh 10,000
bh 5,000
bh 10,000
bh 10,000
bh 34,000
bh 320
bh 320
bh 1,170
bh 3,520
m' 57,000
bh 47,000
bh 12,000
bh 22,000
bh 12,000
bh 10,000
bh 12,000
bh 21,000
bh 10,000
bh 10,000
bh 10,000
bh 12,000
bh 21,000
bh 20,000
bh 37,000
bh 37,000
bh 37,000
bh 37,000
bh 37,000
bh 37,000
bh 37,000
bh 37,000
m² 12,000
bh 214,000
kg 108,000
bh 211,000
unit 774,000
m1 79,000
m1 92,000
m1 112,000
unit 178,000
unit 229,000
unit 363,000
unit 24,000
unit 28,000
unit 38,000
unit 47,000
m1 58,000
m1 76,000
m1 105,000
unit 295,000,000
unit 1,956,570,000
unit 582,978,000
unit 798,600,000
unit 85,000,000
unit 1,086,096,000
ikat 10,000
- kualitas super, panjang 2 M 53,000
- kualitas no 2, panjang 1,5 M 41,000
- kualitas no 3, panjang 1M 32,000
-kualitas no 4, panjang4 M 20,000
- kualitas no5, panjang 40 - 60 cm 22,000
btg 22,000
btg 31,000
btg 61,000
btg 61,000
btg 89,000
btg 100,000
btg 137,000
btg 193,000
btg 993,000
btg 1,260,000
btg 1,336,000
btg 2,391,000
btg 3,177,000
btg 3,599,000
btg 5,712,000
btg 8,140,000
btg 9,629,000
btg 10,424,000
btg 18,713,000
- diameter 20 mm 8,000
- diameter 25 mm 10,000
- diameter 16 mm 15,000
- diameter 32 mm 25,000
- diameter 40 mm 37,000
- diameter 20 mm 36,000
- diameter 25 mm 41,000
- diameter 16 mm 48,000
- diameter 32 mm 53,000
- diameter 40 mm 74,000
unit 1,264,000
unit 1,669,000
unit 2,084,000
unit 2,976,000
unit 4,404,000
unit 5,448,000
unit 7,239,000
unit 8,112,000
unit 1,052,000
unit 1,321,000
unit 1,658,000
unit 2,744,000
unit 3,761,000
unit 5,106,000
unit 7,083,000
unit 7,763,000
unit 544,000
unit 828,000
unit 798,000
unit 895,000
unit 1,053,000
unit 1,383,000
unit 1,511,000
unit 2,385,000
unit 3,128,000
unit 4,020,000
unit 4,986,000
unit 943,000
unit 1,582,000
unit 1,415,000
unit 1,586,000
unit 1,673,000
unit 1,973,000
unit 2,490,000
unit 216,000
unit 311,000
unit 380,000
unit 540,000
unit 716,000
unit 866,000
unit 1,139,000
unit 1,267,000
unit 1,399,000
unit 140,000
unit 187,000
unit 225,000
unit 316,000
unit 424,000
unit 563,000
unit 681,000
unit 776,000
unit 840,000
unit 1,071,000
unit 2,104,000
unit 2,583,000
unit 3,288,000
unit 859,000
unit 859,000
unit 859,000
unit 1,910,000
Buah 25,000
Buah 19,000
Buah 30,000
m 149,000
m 231,000
m 325,000
m 177,000
m² 189,000
m² 230,000
bh 211,000
bh 300,000
bh 428,000
bh 610,000
bh 760,000
bh 557,000
bh 658,000
bh 937,000
bh 937,000
bh 935,000
bh 189,000
bh 189,000
bh 149,000
bh 927,000
bh 1,120,000
bh 1,707,000
bh 1,298,000
bh 1,652,000
bh 2,049,000
bh 4,126,000
bh 3,440,000
bh 4,126,000
bh 4,817,000
bh 5,502,000
bh 6,190,000
bh 6,877,000
bh 27,462,000
bh 27,334,000
bh 34,381,000
bh 47,403,000
m' 51,000
kg 15,000
kg 14,000
kg 13,000
kg 13,000
kg 13,000
kg 13,000
kg 18,000
kg 14,000
kg 16,000
kg 13,000
kg 14,000
kg 14,000
kg 14,000
m' 28,000
m' 25,000
m² 171,000
m¹ 259,000
m¹ 285,000
m¹ 259,000
m¹ 285,000
bh 181,000
btg 13,000
btg 26,000
m1 12,000
m1 16,000
m² 621,000
ps 14,000
m1 45,000
m1 280,000
kg 2,000
kg 246,000
kg 284,000
m1 1,080
- ukuran 1 kg 40,000
- ukuran 0,5 kg 25,000
- ukuran 350 gram 12,000
buah 180,000
buah 305,325
buah 396,923
buah 344,138
buah 465,750
buah 530,438
buah 351,383
buah 483,863
buah 626,693
buah 451,260
buah 539,753
buah 706,905
buah 441,945
buah 553,725
buah 760,208
buah 688,275
buah 848,700
buah 377,258
buah 501,458
buah 429,525
buah 579,600
buah 747,788
buah 494,730
buah 620,483
buah 808,335
buah 584,775
buah 703,283
buah 933,570
buah 617,895
buah 755,550
buah 995,153
buah 874,575
buah 1,103,828
buah 147,798
buah 173,880
buah 182,678
buah 195,098
buah 220,973
buah 239,085
buah 246,848
buah 272,723
buah 140,760
buah 147,798
buah 162,495
buah 176,675
buah 203,895
buah 159,390
buah 195,615
buah 209,795
buah 236,498
buah 248,400
buah 259,268
buah 268,583
buah 320,643
buah 146,453
buah 158,355
buah 182,678
buah 190,440
buah 208,035
m² 62,000
m² 72,000
m² 83,000
m² 93,000
m² 104,000
m² 114,000
kg 10,200
kg 9,300
kg 10,100
kg 21,000
kg 21,000
kg 20,000
kg 18,000
kg 18,000
bt 38,000
bt 47,000
m² 681,000
m² 621,000
m' 106,000
m' 8,000
m² 15,000
m² 15,000
m² 18,000
m² 19,000
m² 725,000
lbr 60,000
lbr 67,000
m1 70,000
m1 75,000
kg 22,000
bh 25,000
bh 21,000
m² 1,616,000
m² 4,720,000
m² 1,738,000
m² 56,000
m² 92,000
m² 99,000
m² 153,000
m² 395,000
m² 117,000
m² 125,000
kg 43,000
kg 20,000
kg 22,000
bh 7,000
bh 67,000
bh 12,000
kg 23,000
kg 15,000
kg 18,000
kg 18,000
bh 39,000
kg 23,000
kg 23,000
kg 18,000
kg 18,000
kg 18,000
kg 18,000
kg 71,000
bh 2,000
bt 138,000
bt 277,000
bt 503,000
bt 656,000
bt 920,000
bt 205,000
bt 281,000
bt 311,000
bt 437,000
bt 636,000
bt 829,000
bt 1,182,000
bt 1,992,000
bh 166,000
bh 181,000
bh 565,000
bh 820,000
bh 1,123,000
bh 1,553,000
bh 124,000
bh 31,000
bh 9,000
bh 155,000
bh 26,000
bh 657,000
bh 53,000
bh 391,000
bh 76,000
bh 47,000
bh 68,000
bh 36,000
bh 391,000
bh 1,496,000
unit 3,353,000
bh 36,000
unit 1,047,000
unit 1,008,000
unit 311,000
unit 181,000
unit 450,000
unit 2,962,000
unit 673,000
bh 1,656,000
unit 3,623,000
lbr 1,604,000
bh 1,336,000
bh 1,738,000
bh 3,057,000
bh 6,000
- Tachi PTFE
- Sanho
- Onda
lbr 50,000
m² 543,000
m² 194,000
m² 222,000
lbr 54,000
lbr 69,000
lbr 54,000
lbr 48,000
lbr 49,000
lbr 62,000
bh 11,000
bh 1,700
bh 2,100
bh 1,900
bh 2,100
bh 2,600
m² 435,000
m² 326,000
m²
bh 15,000
bh 17,000
bh 16,000
bh 8,000
bh 7,000
bh 14,000
bh 14,000
m² 115,000
m² 104,000
bh 5,000
bh 2,000
bh 10,200
bh 161,000
bh 153,000
bh 135,000
m² 145,000
m² 36,000
bh 9,000
bh 8,000
bh 7,000
bh 7,000
m1 109,000
m1 101,000
m1 57,000
m1 16,000
m1 45,000
m1 54,000
bh 1,200
m1 52,000
m1 41,000
unit 4,743,000
unit 21,642,000
unit 30,311,000
unit 785,352,000
bh 112,000
unit 315,003,000
unit 510,000
unit 6,742,000
unit 7,552,000
unit 6,473,000
unit 8,093,000
unit 91,869,000
unit 1,980,000
unit 45,989,000
Roll 85,000
Roll 126,000
m' 5,250
m' 6,700
m' 14,000
m' 11,500
m' 7,000
m' 6,000
m' 12,000
m' 17,000
m' 9,500
m' 12,500
m' 16,700
m' 15,700
m' 20,800
m' 22,900
m' 31,300
m' 9,500
m' 12,500
m' 20,800
m' 9,400
m' 15,700
m' 19,400
m' 16,700
m' 22,800
m' 28,100
m' 44,600
bh 880,000
bh 1,800,000
unt 150,000
unt 190,000
unt 228,000
unt 478,000
bh 50,000
bh 61,000
bh 538,000
bh 18,000
bh 22,000
bh 21,000
bh 85,000
bh 144,000
bh 84,000
ttk 180,000
bh 10,000
bh 30,000
bh 35,000
bh 47,500
bh 50,000
bh 25,000
bh 30,000
bh 5,000
bh 3,500
bh 125,000
bh 290,000
bh 125,000
bh 105,000
bh 108,000
bh 380,000
bh 200,000
bh 740,000
bh 95,000
kg 40,000
ttk 420,000
ttk 180,000
unt 140,000
unt 426,000
unt 743,000
m1 43,000
ps 6,000
ps 8,000
ps 9,000
ps 129,000
bh 26,000
bh 12,000
ps 34,000
ps 16,000
bh 41,000
bh 62,000
bh 104,000
bh 78,000
bh 155,000
bh 362,000
bh 95,000
bh 295,000
bh 122,000
bh 86,000
bh 137,000
dn 362,000
bh 518,000
unt 362,000
m1 50,000
m1 54,000
bh 33,000
bh 52,000
bh 11,000
bh 47,000
kg 10,000
kg 9,032
kg 9,032
ton 1,190,000
ton 1,260,000
ton 1,315,000
ton 1,400,000
Sand Sheet 1,490,000
COLDMIX 1,400,000
EMULSI 11,000
LASTON 1,315,000
ltr 14,000
ltr 13,000
m3 1,037,000
m3 854,000
m3 880,000
m3 900,000
m3 906,000
m3 916,000
m3 921,000
m3 926,000
m3 942,000
m3 973,000
m3 994,000
m3 1,009,000
m3 1,014,000
m3 1,035,000
m3 1,045,000
m3 1,056,000
m3 1,087,000
m3 1,118,000
m3 1,139,000
m3 1,190,000
m3 1,216,000
m3 1,242,000
m3 1,246,000
m3 1,279,000
m3 1,321,000
m3 1,348,000
m3 1,371,000
m3 1,395,000
m3 1,433,000
m3 1,452,000
m3 1,482,000
m3 1,504,000
m3 1,524,000
m3 1,555,000
m3 1,578,000
m3 1,616,000
m3 1,665,000
m3 1,107,000
m3 1,159,000
m3 1,216,000
m3 1,283,000
unit 2,622,000
unit 15,577,000
unit 6,203,000
unit 552,000
unit 1,489,000
unit 2,092,000
unit 10,355,000
unit 10,330,000
unit 347,000
unit 122,445,000
unit 42,678,000
unit 7,621,000
unit 10,416,000
unit 12,296,000
unit 3,500,000
unit 3,290,000
buah 617,000
buah 370,000
buah 813,000
buah 1,219,000
buah 6,197,000
buah 3,515,000
buah 341,000
buah 247,000
buah 61,000
buah 179,000
1 watt 2,000
m² 29,000
m² 26,000
m² 32,000
m² 29,000
meter 1,413,000
ttk 337,000
m² 2,000
spl 283,000
spl 305,000
spl 104,000
1 watt 2,000
unit 7,260,000
unit 799,000
ttk 498,000
Diamond bit 4 inch 14,328,000
Diamond bit 2,5 inch 10,134,000
Mesin Core Drill Electric 50,953,000
Test Hotmix 335,000
bh 50,000
bh 46,000
kg 22,000
kg 16,000
bh 146,000
bh 145,000
bh 10,000
bh 193,000
bh 31,000
bh 77,000
bh 2,000
bh 64,000
rool 17,000
bh 43,000
lbr 95,000
btg 189,000
/jam 59,000
/jam 430,000
/jam 1,358,000
/jam 165,000
/jam 165,000
/jam 165,000
/jam 165,000
/jam 8,754,000
/jam 131,000
/jam 201,000
/jam 133,000
/jam 201,000
/jam 166,000
/jam 98,000
/jam 119,000
/jam 166,000
/jam 275,000
/jam 147,000
/jam 45,000
/jam 239,000
/jam 484,000
/jam 45,000
/jam 62,000
/jam 85,000
/jam 132,000
/jam 45,000
/jam 43,000
/jam 132,000
/jam 132,000
/jam 116,000
/jam 225,000
/jam 225,000
/jam 221,000
/jam 214,000
/jam 29,000
/paket 864,000
/paket 1,881,000
/paket 7,098,000
/paket 6,936,000
/paket 14,713,000
lt
m³ 93,000
lt 7,000
lt 11,000
lt 7,900
lt 48,000
lt 48,000
15 kg 116,000
15.1 kg 308,000
btl 86,000
kg 16,000
kg 22,000
m³ 1,388,000
lt 35,000
DAFTAR UPAH PEKERJA BANGUNAN
KOTA BOGOR
TAHUN ANGGARAN 2019
MENU UTAMA
DIVISI 1 UMUM
1.2 Mobilisasi 50,000,000.00 0.02 0.010 0.010
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 50,000,000.00 0.02 0.010 0.010
1.8.(2) Jembatan Sementara 1,050,000,000.00 0.43 0.108 0.108
1.17 Pengamanan Lingkungan Hidup 40,000,000.00 0.02 0.016
1.19 Keselamatan dan Kesehatan Kerja 100,000,000.00 0.04 0.041
1.21 Manajemen Mutu 75,000,000.00 0.03 0.031
DIVISI 2 DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 1,541,488,752.00 0.63 0.158 0.158 0.158
2.3.(21) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 200 cm x 200 cm 120,035,700,000.00 49.16 9.832 9.832 9.832
Bobot Kumulatif 0.108527 2.321688 6.18806 10.05443 14.08714 27.38256 39.47013 51.113
Minggu ke -
9 10 11 12 13 14 15 16 17 18
100
0.108 0.108
0.158
9.832 9.832
12.09439 12.08585 5.762873 5.683234 5.870096 5.336684 0.891301 0.498727 0.419368 0.244477
63.20739 75.29324 81.05611 86.73935 92.60944 97.94613 98.83743 99.33615 99.75552 100