Jumlah
No. Mata Perkiraan Harga Harga-Harga
Uraian Satuan
Pembayaran Kuantitas Satuan (Rp.)
(Rp.)
DIVISI 1. UMUM
1.1 Plank Proyek Buah 1.00 250,000.00 250,000.00
1.2 Mobilisasi
A Peralatan
- Asphalt Finisher Unit 1.00 1,350,000.00 1,350,000.00
- Asphalt Sprayer Unit 1.00 500,000.00 500,000.00
- Compressor 4000-6500 L/M Unit 1.00 500,000.00 500,000.00
- Motor Greder > 100 HP Unit 1.00 1,350,000.00 1,350,000.00
- Tandem Roller 6-8 T. Unit 1.00 1,350,000.00 1,350,000.00
- Tire Roller 8-10 T. Unit 1.00 1,350,000.00 1,350,000.00
- Vibratory Roller 5-8 T. Unit 1.00 1,350,000.00 1,350,000.00
- Water Tanker 3000-4500 L. Unit 1.00 500,000.00 500,000.00
B Fasilitas Laboratorium
- Pengujian Core Drill AC - WC Titik 8.00 25,000.00 200,000.00
- Pengujian Extraxsi Buah 1.00 200,000.00 200,000.00
- Sand Cone Kelas A Titik 3.00 50,000.00 150,000.00
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 9,750,000.00
DIVISI 2. DRAINASE
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 851,903.72
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 6,237,370.97
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 30,156,660.09
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 79,550,754.18
DIVISI 7. STRUKTUR
7.1 (7c) Beton mutu sedang dengan fc’= 20 MPa (K-250) (Pecah Tangan/Alam) M3 2.76 1,346,336.00 3,715,887.36
7.1 (8) Beton mutu rendah dengan fc’= 15 MPa (K-175) M3 1.04 1,058,842.00 1,101,195.68
7.3 (1) Baja Tulangan BJ 24 Polos Kg 423.05 18,678.00 7,901,727.90
7.9 Pasangan Batu M3 14.79 762,776.00 11,281,457.04
7.9(1) Plesteran M2 24.90 78,012.00 1,942,498.80
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 25,942,766.78
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 57,327,083.13
1 2 3 4 5 6
DIVISI 1. UMUM
1.1 Plank Proyek Buah 1.00 1.00
1.2 Mobilisasi
A Peralatan
- Asphalt Finisher Unit 1.00 1.00
- Asphalt Sprayer Unit 1.00 1.00
- Compressor 4000-6500 L/M Unit 1.00 1.00
- Motor Greder > 100 HP Unit 1.00 1.00
- Tandem Roller 6-8 T. Unit 1.00 1.00
- Tire Roller 8-10 T. Unit 1.00 1.00
- Vibratory Roller 5-8 T. Unit 1.00 1.00
- Water Tanker 3000-4500 L. Unit 1.00 1.00
B Fasilitas Laboratorium
- Pengujian Core Drill AC - WC Titik 8.00 8.00
- Pengujian Extraxsi Buah 1.00 1.00
- Sand Cone Kelas A Titik 3.00 3.00
DIVISI 7. STRUKTUR
7.1 (7c) Beton mutu sedang dengan fc’= 20 MPa (K-250) (Pecah Tangan/Alam) M3 2.76 2.80
7.1 (8) Beton mutu rendah dengan fc’= 15 MPa (K-175) M3 1.04 -
7.3 (1) Baja Tulangan BJ 24 Polos Kg 423.05 454.18
7.9 Pasangan Batu M3 14.79 42.00
7.9(1) Plesteran M2 24.90 36.40
DIVISI 1. UMUM
1.1 Plank Proyek Buah 1.00 250,000.00 250,000.00 0.119 1.00 250,000.00 0.119 - - - -
1.2 Mobilisasi
A Peralatan
- Asphalt Finisher Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Asphalt Sprayer Unit 1.00 500,000.00 500,000.00 0.238 1.00 500,000.00 0.238 - - - -
- Compressor 4000-6500 L/M Unit 1.00 500,000.00 500,000.00 0.238 1.00 500,000.00 0.238 - - - -
- Motor Greder > 100 HP Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Tandem Roller 6-8 T. Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Tire Roller 8-10 T. Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Vibratory Roller 5-8 T. Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Water Tanker 3000-4500 L. Unit 1.00 500,000.00 500,000.00 0.238 1.00 500,000.00 0.238 - - - -
B Fasilitas Laboratorium
- Pengujian Core Drill AC - WC Titik 8.00 25,000.00 200,000.00 0.095 8.00 200,000.00 0.095 - - - -
- Pengujian Extraxsi Buah 1.00 200,000.00 200,000.00 0.095 1.00 200,000.00 0.095 - - - -
- Sand Cone Kelas A Titik 3.00 50,000.00 150,000.00 0.071 3.00 150,000.00 0.071 - - - -
DIVISI 7. STRUKTUR
7.1 (7c) Beton mutu sedang dengan fc’= 20 MPa (K-250) (Pecah Tangan/Alam) M3 2.76 1,346,336.00 3,715,887.36 1.771 3.08 4,146,714.88 1.976 0.32 430,827.52 - -
7.1 (8) Beton mutu rendah dengan fc’= 15 MPa (K-175) M3 1.04 1,058,842.00 1,101,195.68 0.525 - - - - - 1.04 1,101,195.68
7.3 (1) Baja Tulangan BJ 24 Polos Kg 423.05 18,678.00 7,901,727.90 3.766 453.82 8,476,449.96 4.040 30.77 574,722.06 - -
7.9 Pasangan Batu M3 14.79 762,776.00 11,281,457.04 5.377 40.28 30,724,617.28 14.644 25.49 19,443,160.24 - -
7.9(1) Plesteran M2 24.90 78,012.00 1,942,498.80 0.926 47.60 3,713,371.20 1.770 22.70 1,770,872.40 - -
0.00
70.56 -
-
-
- -
-
-
56.12 8.10
9.99 -
-
-
492.98 0.00
- -
53.98 0.00
6.15 0.00
-
-
3.08 -
- -
453.82 0.00
40.28 -
47.60 -
-
-
10.02 1.15
6.79 (0.00)
0.00
(0.00)
REKAPITULASI ADDENDUM - I
Kegiatan : Pemeliharaan Berkala Jalan
Pekerjaan : Paket 3 Jalan Bukit Sileh - Batu Bajanjang - Aia Angek Koto Anau
Sumber Dana : DAU
Kec. : Lembang Jaya
Kab : Solok
Tahun : 2019
DIVISI 1. UMUM
1.1 Plank Proyek Buah 1.00 250,000.00 250,000.00 0.119 1.00 250,000.00 0.119 - - - -
1.2 Mobilisasi
A Peralatan
- Asphalt Finisher Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Asphalt Sprayer Unit 1.00 500,000.00 500,000.00 0.238 1.00 500,000.00 0.238 - - - -
- Compressor 4000-6500 L/M Unit 1.00 500,000.00 500,000.00 0.238 1.00 500,000.00 0.238 - - - -
- Motor Greder > 100 HP Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Tandem Roller 6-8 T. Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Tire Roller 8-10 T. Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Vibratory Roller 5-8 T. Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Water Tanker 3000-4500 L. Unit 1.00 500,000.00 500,000.00 0.238 1.00 500,000.00 0.238 - - - -
B Fasilitas Laboratorium
- Pengujian Core Drill AC - WC Titik 8.00 25,000.00 200,000.00 0.095 8.00 200,000.00 0.095 - - - -
- Pengujian Extraxsi Buah 1.00 200,000.00 200,000.00 0.095 1.00 200,000.00 0.095 - - - -
- Sand Cone Kelas A Titik 3.00 50,000.00 150,000.00 0.071 3.00 150,000.00 0.071 - - - -
DIVISI 7. STRUKTUR
7.1 (7c) Beton mutu sedang dengan fc’= 20 MPa (K-250) (Pecah Tangan/Alam) M3 2.76 1,346,336.00 3,715,887.36 1.771 3.08 4,146,714.88 1.976 0.32 430,827.52 - -
7.1 (8) Beton mutu rendah dengan fc’= 15 MPa (K-175) M3 1.04 1,058,842.00 1,101,195.68 0.525 - - - - - 1.04 1,101,195.68
7.3 (1) Baja Tulangan BJ 24 Polos Kg 423.05 18,678.00 7,901,727.90 3.766 453.82 8,476,449.96 4.040 30.77 574,722.06 - -
7.9 Pasangan Batu M3 14.79 762,776.00 11,281,457.04 5.377 40.28 30,724,617.28 14.644 25.49 19,443,160.24 - -
7.9(1) Plesteran M2 24.90 78,012.00 1,942,498.80 0.926 47.60 3,713,371.20 1.770 22.70 1,770,872.40 - -
0.00
37.42 (33.14)
-
-
- -
-
-
56.12 8.10
9.99 -
-
-
492.98 0.00
- -
53.98 0.00
6.15 0.00
-
-
3.08 -
- -
453.82 0.00
40.28 -
27.04 (20.56)
-
-
10.02 1.15
6.79 (0.00)
0.00
(0.00)
REKAPITULASI FINAL QUANTITY
Kegiatan : Pemeliharaan Berkala Jalan
Pekerjaan : Paket 3 Jalan Bukit Sileh - Batu Bajanjang - Aia Angek Koto Anau
Sumber Dana : DAU
Kec. : Lembang Jaya
Kab : Solok
Tahun : 2019
DIVISI 1. UMUM
1.1 Plank Proyek Buah 1.00 250,000.00 250,000.00 0.119 1.00 250,000.00 0.119 - - - -
1.2 Mobilisasi
A Peralatan
- Asphalt Finisher Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Asphalt Sprayer Unit 1.00 500,000.00 500,000.00 0.238 1.00 500,000.00 0.238 - - - -
- Compressor 4000-6500 L/M Unit 1.00 500,000.00 500,000.00 0.238 1.00 500,000.00 0.238 - - - -
- Motor Greder > 100 HP Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Tandem Roller 6-8 T. Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Tire Roller 8-10 T. Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Vibratory Roller 5-8 T. Unit 1.00 1,350,000.00 1,350,000.00 0.643 1.00 1,350,000.00 0.643 - - - -
- Water Tanker 3000-4500 L. Unit 1.00 500,000.00 500,000.00 0.238 1.00 500,000.00 0.238 - - - -
B Fasilitas Laboratorium
- Pengujian Core Drill AC - WC Titik 8.00 25,000.00 200,000.00 0.095 8.00 200,000.00 0.095 - - - -
- Pengujian Extraxsi Buah 1.00 200,000.00 200,000.00 0.095 1.00 200,000.00 0.095 - - - -
- Sand Cone Kelas A Titik 3.00 50,000.00 150,000.00 0.071 3.00 150,000.00 0.071 - - - -
DIVISI 7. STRUKTUR
7.1 (7c) Beton mutu sedang dengan fc’= 20 MPa (K-250) (Pecah Tangan/Alam) M3 2.76 1,346,336.00 3,715,887.36 1.771 3.08 4,146,714.88 1.976 0.32 430,827.52 - -
7.1 (8) Beton mutu rendah dengan fc’= 15 MPa (K-175) M3 1.04 1,058,842.00 1,101,195.68 0.525 - - - - - 1.04 1,101,195.68
7.3 (1) Baja Tulangan BJ 24 Polos Kg 423.05 18,678.00 7,901,727.90 3.766 453.82 8,476,449.96 4.040 30.77 574,722.06 - -
7.9 Pasangan Batu M3 14.79 762,776.00 11,281,457.04 5.377 40.28 30,724,617.28 14.644 25.49 19,443,160.24 - -
7.9(1) Plesteran M2 24.90 78,012.00 1,942,498.80 0.926 47.60 3,713,371.20 1.770 22.70 1,770,872.40 - -
0.00
70.56 -
-
-
- -
-
-
56.12 8.10
9.99 -
-
-
492.98 0.00
- -
53.98 0.00
6.15 0.00
-
-
3.08 -
- -
453.82 0.00
40.28 -
47.60 -
-
-
10.02 1.15
6.79 (0.00)
0.00
(0.00)
DCIQ - 120350
JUMLAH 1.00 Bh
Rekapitulasi Mobilisasi
A Mobilisasi 1.00 Ls
JUMLAH 1.00 Ls
JUMLAH 70.56 M3
BACK UP DATA
Lokasi 1
Luas P= 7.00 M'
Lokasi 2
Luas P= 7.00 M'
JUMLAH 56.12 M3
BACK UP DATA
AGREGAT KELAS A
3 Putus
7 Putus
Rekapitulasi Lapis Pondasi Agregat Tanpa Penutup Aspal ( Kelas C Material Alam)
A 5.2.(2) Lapis Pondasi Agregat Tanpa Penutup Aspal (Kelas C Material Alam)
JUMLAH 9.99 M3
BACK UP DATA
5.1.(2) Lapis Pondasi Agregat Tanpa Penutup Aspal (Klas C Material Alam)
9.99
#NAME?
#NAME? #NAME?
DCIQ - 120350
0+128 3.45
22.00 3.53 77.55 0.80 62.04
0+150 3.60
19.00 3.58 68.02 0.80 54.42
0+169 3.56
Putus
0+216 3.45
15.00 3.45 51.75 0.80 41.40
0+231 3.45
Putus
0+480 3.60
14.00 3.55 49.70 0.80 39.76
0+494 3.50
Putus
0+635 3.40
15.00 3.45 51.75 0.80 41.40
0+650 3.50
20.00 3.50 70.00 0.80 56.00
0+670 3.50
Putus
0+791 3.56
9.00 3.58 32.22 0.80 25.78
0+800 3.60
22.00 3.60 79.20 0.80 63.36
0+822 3.60
Putus
0+827 3.56
38.00 3.58 136.04 0.80 108.83
0+865 3.60
JUMLAH 6.15 Kg
Putus
Putus
Putus
Putus
Putus
DCIQ-120350
Kegiatan : Pemeliharaan Berkala Jalan
PEMERINTAH KABUPATEN SOLOK Pekerjaan : Paket 3 Jalan Bukit Sileh - Batu Bajanjang - Aia Angek Koto Anau
BACK UP DATA Sumber Dana : DAU
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG Kec. : Lembang Jaya
Kab : Solok
Komplek Perkantoran Pemda Kabupaten Solok
Tahun : 2019
SUB JUMLAH 2 - - - - - - -
JUMLAH TOTAL 174.00 53.99 6.15 53.98
#REF!
138
36
280
454
138 -32
36 -46
133
163
470
53.99
7.71
46 -
DCIQ - 120350
A 7.1 (7b) Beton mutu sedang dengan fc’= 20 MPa (K-250) (Stone Crusher)
JUMLAH 3.08 M3
BACK UP DATA
7.1 (7b) Beton mutu sedang dengan fc’= 20 MPa (K-250) (Stone Crusher)
Volume
Sket Pelaksanaan Perhitungan
(M3)
Sta 0+232
P = 7.00 M'
Sta 0+822
P = 7.00 M'
JUMLAH 453.82 Kg
BACK-UP DATA
7.3 (1) Baja Tulangan BJ 24 Polos
SKET GAMBAR PELAKSANAAN PERHITUNGAN
Diameter Panjang Berat/
Banyak Volume
No STA Uraian Tulangan Tulangan Meter Ket
Ø12-13
Ø12-13
mm M' Bh M' Kg
1 Sta 0+232
Panjang 7 m
1. Tulangan Pokok 12.00 2.40 54.00 0.888 115.05
Sta 0+822
Panjang 7
1. Tulangan Pokok 12.00 2.40 54.00 0.888 115.05
Plat
0.006165
Tul. Utama
6.9400 0.024
13.8800 0.048 13.9280
6.9400 0.024
13.8800 0.048 13.9280
30
JUMLAH 40.28 M3
BACK UP DATA
Luas Total
= 1.39 x 2.00 bh = 2.78 M2
3. = 0.20 x 0.20 = 0.04 M2 +
2.82 M2
Volume
= 2.82 x 7.00 = 19.74 M3 19.74
Loneng
= 1.00 x 0.40 x 0.50 = 0.20 M3
= 0.20 x 2.00 2bh = 0.40 M3 0.40
Luas Total
= 1.39 x 2.00 bh = 2.78 M2
3. = 0.20 x 0.20 = 0.04 M2 +
2.82 M2
Volume
= 2.82 x 7.00 = 19.74 M3 19.74
Loneng
= 1.00 x 0.40 x 0.50 = 0.20 M3
= 0.20 x 2.00 2bh = 0.40 M3 0.40
40.28
-
DCIQ - 120350
Rekapitulasi Plesteran
A 7.9.(1) Plesteran
JUMLAH 47.60 M2
BACK UP DATA
7.9.(1) Plesteran
Volume
Sket Pelaksanaan Perhitungan
(M3)
JUMLAH 10.02 M3
BACK UP DATA
0+450
1 0+217.00 4.00 2.50 0.08 0.80 Kn
0+400
0+350
0+300
0+250
0+200
0+150
0+100
1.57 229.00
0.80
8.87
1.15
8.87
1.15
DCIQ - 120350
JUMLAH 6.79 M3
BACK UP DATA
BACK UP DATA
BACK UP DATA
Sub Total 3 - M3
Jumlah Total 3.88 M3
(5.54) 1.20
0.02
6.79
6.79
#REF!
6.79
6.79