CATATAN : Sebelum menekan tombol SETUJU atau tombol TIDAK SETUJU , terleb
INFORMASI UMUM
No. URAIAN INFORMASI
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 8.73 Kilometer
7.45 Km = a C 7.45 Km = b
A B
5.0 Km = c
Base Camp ---------> D
20 ....................................
21 ....................................
22 ....................................
NFORMASI
……………………
………………………………………..
……………………………………….
……………………
...............
( Leff = a + b )
meter
meter
iode Pelaksanaan)
..........
...........
............
...........
...........
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
HARGA
No. URAIAN SATUAN VOL. SATUAN
(Rp.)
B. PERALATAN
Periksa lembar 1.2-2
3 Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Method
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor
4 Concrete Testing
Slump Cone
Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength (RIGID)
Crushing Machine
E. MOBILISASI PERSONIL
E.I. Personil Sesuai Struktur Organisasi LS 1 25,000,000
1 GS
2 Tenaga Ahli Jalan
3 Tenaga Ahli Jembatan ....
4 ...................... ....
5 ...................... ....
6 ...................... ....
G. DEMOBILISASI LS 1 130,290,000
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
KODE HARGA
No. JENIS ALAT ALAT SATUAN VOL. SATUAN
(Rp.)
B. PERALATAN
1 ASPHALT MIXING PLANT E01 Unit 1 200,000,000
2 ASPHALT FINISHER E02 Unit 1 500,000
3 POWER BROOM E03 Unit 1 100,000
4 BULLDOZER 100-150 HP E04 Unit 1 500,000
5 COMPRESSOR 4000-6500 L\M E05 Unit 1 150,000
6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit 1 100,000
7 CRANE 10-15 TON E07 Unit 1 150,000
8 DUMP TRUCK 3 - 4 M3 E08 Unit 18 150,000
9 DUMP TRUCK 6-8 M3 E09 Unit 5 150,000
10 EXCAVATOR 80-140 HP E10 Unit 3 500,000
11 FLAT BED TRUCK 3-4 TON E11 Unit 1 150,000
12 GENERATOR SET E12 Unit 1 300,000
13 MOTOR GRADER >100 HP E13 Unit 1 500,000
14 TRACK LOADER 75-100 HP E14 Unit 1 500,000
15 WHEEL LOADER 1.0-1.6 M3 E15 Unit 1 500,000
16 THREE WHEEL ROLLER 6-8 T E16 Unit 2 500,000
17 TANDEM ROLLER 6-8 T. E17 Unit 1 500,000
18 TIRE ROLLER 8-10 T. E18 Unit 1 500,000
19 VIBRATORY ROLLER 5-8 T. E19 Unit 1 500,000
20 CONCRETE VIBRATOR E20 Unit 5 50,000
21 STONE CRUSHER E21 Unit 1 40,000,000
22 WATER PUMP 70-100 mm E22 Unit 2 50,000
23 WATER TANKER 3000-4500 L. E23 Unit 1 150,000
24 PEDESTRIAN ROLLER E24 Unit 1 50,000
25 TAMPER E25 Unit 1 50,000
26 JACK HAMMER E26 Unit 2 50,000
27 FULVI MIXER E27 Unit 1 500,000
28 CONCRETE PUMP E28 Unit 2 500,000
29 TRAILER 20 TON E29 Unit 2 1,000,000
30 PILE DRIVER + HAMMER E30 Unit 2 1,000,000
31 CRANE ON TRACK 35 TON E31 Unit 2 1,000,000
32 WELDING SET E32 Unit 2 200,000
33 BORE PILE MACHINE E33 Unit 1 500,000
34 ASPHALT LIQUID MIXER E34 Unit 1 300,000
35 TRONTON 15 TON E35 Unit
36 COLD MILLING MACHINE E37 Unit
37 ROCK DRILL BREAKER E36 Unit
38 COLD RECYCLER E38 Unit
39 HOT RECYCLER E39 Unit
40 AGGREGAT (CHIP) SPREADER E40 Unit
41 ASPHALT DISTRIBUTOR E41 Unit
42 SLIP FORM PAVER E42 Unit
43 CONCRETE PAN MIXER E43 Unit
44 CONCRETE BREAKER E44 Unit
45 ASPAHLT TANKER E45 Unit
46 CEMENT TANKER E46 Unit
47 CONDRETE MIXER (350) E47 Unit
48 VIBRATING RAMMER E48 Unit
49 TRUK MIXER (AGITATOR) E49 Unit
50 BORE PILE MACHINE E50 Unit
51 CRANE ON TRACK 75-100 TON E51 Unit
52
53
NO. URAIAN
150,000,000
I. Laboratory Building
1. Laboratory Building
260,300,000
II. Soil & Aggregate Testing
1. Compaction Test
600,000,000 2. CBR Test
3 Specifc Gravity
4 Atterberg Limits
5 Grain Size Analysis
6 Field Density Test by Sand Cone Methode
7 Moisture Content
8 Abrasion of Aggregate by Los Angeles Machine
V. Peralatan pendukung
1 Mobil Pick Up
2 Komputer + Printer
3 Furniture
VI. Operasional
VII. Test Luar
Test Luar, sesuai kebutuhan atau atas
perintah Pengawas Pekerjaan
Catatan :
25,000,000 1. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang
yang dibayar kontrak) dan biaya lain-lainnya.
2. Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsu
Rambu Tetap
1 Rambu Batas Kecepatan
2 Rambu Perintah Mengikuti Lajur
3 Rambu Pengarah Tikungan
4 Rambu Larangan Berjalan Terus (Giveaway)
50,000,000 5 Rambu Larangan Menyalip Kendaraan Lain
6 Rambu Peringatan Jalan Licin
7 Rambu Pengarah Tikungan Ganda
130,290,000 8 Rambu APILL
: Lump sum
: Rp. 124,000,000.00
HARGA
SATUAN VOLUME TOTAL KETERANGAN
SATUAN
20,000,000.00
20,000,000.00
10,000,000.00
10,000,000.00
10,000,000.00
Rp 124,000,000.00
Buah 8 8 8 4
Buah 2 2
Buah
Buah 1
Buah 2
Buah
Buah
Buah 4
Buah 8 8 8 4
Buah 4 4 4 2
Buah
Buah
Buah
Buah
Buah
Buah
Buah 2
M2
4 8 20 12
2 1 4 1
3
2 4
4
2
4 16 24 10
2 4 4 4
2
40
Biaya
ZONA 9 VOLUME TOTAL KETERANGAN
mobilisasi
12 -
1 -
- lihat spesifikasi
-
-
-
-
-
10 -
4 -
4 -
- lihat spesifikasi
- lihat spesifikasi
- lihat spesifikasi
- lihat spesifikasi
- lihat spesifikasi
-
- lihat spesifikasi
###
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
Proyek / Bagpro :
No. Paket Kontrak :
Nama Paket :
Prop / Kab / Kodya :
1 Umum
2 Drainase
3 Pekerjaan Tanah Dan Geosintetik
4 Pelebaran Preventif
5 Pekerasan Berbutir Dan Perkerasan Beton Semen
6 Perkerasan Aspal
7 Struktur
8 Rehabilitasi Jembatan
9 Pekerjaan Harian Dan Pekerjaan Lain-Lain
10 Pekerjaan Pemeliharaan Kinerja
Disusun oleh
Pejabat Pembuat Komitmen
( ............................. )
NIP
Jumlah Harga
Pekerjaan
(Rupiah)
3,422,154,666
81,986,648
4,817,265
51,037,489
26,985,176
26,307,976
925,248,935
954,654,512
74,805,113
21,967,709
5,590,147,799
559,014,780
6,149,162,579
...................................
...................................
Disusun oleh
Pejabat Pembuat Komitmen
( ............................. )
DAFTAR KUANTITAS DAN HARGA
SPESIFIKASI 2010 Revisi 3
PPK : ………………………………………………
No. Paket Kontrak: ………………………………………………
Nama Paket : …………………………………………………………………..
Prop / Kab / Kody: ………………………………………………
a b c d
DIVISI 1. UMUM
1.2 Mobilisasi
1.2 Mobilisasi LS 1.0
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 1.0
2.2.(1) Pasangan Batu dengan Mortar M3 1.0
2.3.(1) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm M1 1.0
2.3.(2) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm M1 1.0
2.3.(3) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm M1 1.0
2.3.(4) Gorong-gorong Pipa Beton Bertulang, diameter dalam 40 cm M1 1.0
2.3.(5) Gorong-gorong Pipa Beton Bertulang, diameter dalam 60 cm M1 1.0
2.3.(6) Gorong-gorong Pipa Beton Bertulang, diameter dalam 80 cm M1 1.0
2.3.(7) Gorong-gorong Pipa Beton Bertulang, diameter dalam 100 cm M1 1.0
2.3.(8) Gorong-gorong Pipa Beton Bertulang, diameter dalam 120 cm M1 1.0
2.3.(9) Gorong-gorong Pipa Beton Bertulang, diameter dalam 150 cm M1 1.0
2.3.(10) Gorong-gorong Pipa Baja Bergelombang Ton 1.0
2.3.(11) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 40 cm x 40 cm M1 1.0
2.3.(12) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 50 cm x 50 cm M1 1.0
2.3.(13) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 60 cm x 60 cm M1 1.0
2.3.(14) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 80 cm x 80 cm M1 1.0
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm M1 1.0
2.3.(16) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 120 cm x 120 cm M1 1.0
2.3.(17) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 140 cm x 140 cm M1 1.0
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm M1 1.0
2.3.(19) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 160 cm x 160 cm M1 1.0
2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 180 cm x 180 cm M1 1.0
2.3.(21) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 200 cm x 200 cm M1 1.0
2.3.(22) Saluran berbentuk U Tipe DS 1 M1 1.0
2.3.(23) Saluran berbentuk U Tipe DS 1a (dengan tutup) M1 1.0
2.3.(24) Saluran berbentuk U Tipe DS 2 M1 1.0
2.3.(25) Saluran berbentuk U Tipe DS 2a (dengan tutup) M1 1.0
2.3.(26) Saluran berbentuk U Tipe DS 3 M1 1.0
2.3.(27) Saluran berbentuk U Tipe DS 3a (dengan tutup) M1 1.0
2.3.(28) Saluran berbentuk U Tipe DS 4 M1 1.0
2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1 1.0
2.3.(30) Saluran berbentuk U Tipe DS 5 M1 1.0
2.3.(31) Saluran berbentuk U Tipe DS 5a (dengan tutup) M1 1.0
2.3.(32) Saluran berbentuk U Tipe DS 6 M1 1.0
2.3.(33) Saluran berbentuk U Tipe DS 6a (dengan tutup) M1 1.0
2.3.(34) Pasangan Batu tanpa Adukan (Aanstamping) M3 1.0
2.4.(1) Bahan Drainase Porous atau Penyaring (Filter) M3 1.0
2.4.(2) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan, diameter 4 inch M1 1.0
2.4.(3) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan, diameter 5 inch M1 1.0
2.4.(4) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan, diameter 6 inch M1 1.0
2.4.(5) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan, diameter 8 inch M1 1.0
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
4.3 Pemeliharaan Dengan Laburan Aspal Satu Lapis (Single Chip Seal)
- - -
4.4 Lapis Penutup Bubur Aspal Emulsi (Emulsified Asphalt Slurry Seal)
4.4.(1) Penghamparan lapis penutup bubur aspal emulsi, tipe 1, CSS-1h SS-1h M2 1.0
4.4.(2) Penghamparan lapis penutup bubur aspal emulsi, tipe 1, CQS-1h QS-1h M2 1.0
4.4.(3) Penghamparan lapis penutup bubur aspal emulsi, tipe 2, CSS-1h SS-1h M2 1.0
4.4.(4) Penghamparan lapis penutup bubur aspal emulsi, tipe 2, CQS-1h QS-1h M2 1.0
4.4.(5) Penghamparan lapis penutup bubur aspal emulsi, tipe 3, CSS-1h SS-1h M2 1.0
4.4.(6) Penghamparan lapis penutup bubur aspal emulsi, tipe 3, CQS-1h QS-1h M2 1.0
4.5 Lapis Permukaan Mikro Aspal Emulsi Modifikasi Polimer (Micro Surfacing)
4.5.(1) Lapis Permukaan Mikro dengan aspal emulsi modifikasi polymer PMCQS-1h atau PMCQS-1h untuk Tipe 1 M2 1.0
4.5.(2) Lapis Permukaan Mikro Perata dengan aspal emulsi modifikasi polymer PMCQS-1h atau PMCQS-1h untuk Tipe 1 Ton 1.0
4.5.(3) Lapis Permukaan Mikro dengan aspal emulsi modifikasi polymer PMCQS-1h atau PMCQS-1h untuk Tipe 2 M2 1.0
4.5.(4) Lapis Permukaan Mikro Perata dengan aspal emulsi modifikasi polymer PMCQS-1h atau PMCQS-1h untuk Tipe 2 Ton 1.0
4.7 Lapis Tipis Beton Aspal (LTBA) dan Stone Matrix Asphalt Tipis (SMA TIPIS)
4.7.(1) Lapis Tipis Beton Aspal - A (LTBA-A) Ton 1.0
4.7.(2) Lapis Tipis Beton Aspal - B Halus (LTBA-B Halus) Ton 1.0
4.7.(3) Lapis Tipis Beton Aspal - B Halus (LTBA-B Kasar) Ton 1.0
4.7.(4) Lapis Tipis Beton Aspal - B Halus Modifikasi Kasar (LTBA-B Mod Kasar) Ton 1.0
4.7.(5) Stone Matrix Asphalt Tipis (SMA Tipis) Ton 1.0
4.7.(6) Stone Matrix Asphalt Modifikasi Tipis (SMA Mod Tipis) Ton 1.0
4.10 Penambahan Penyalurab Beban Pada Perkerasan Beton Semen (Dowel Retrofit)
4.10.(1) Penambahan dan/atau Penggantian Ruji (Dowel) pada Perkerasan Beton Semen dengan Epoksi Buah 1.0
4.11
4.11.(1) Penjahitan Melintang Tipe 1 (tabel pelat beton = 150 - 175 mm) Buah 1.0
4.11.(2) Penjahitan Melintang Tipe 2 (tabel pelat beton = > 175 mm - 200 mm) Buah 1.0
4.11.(3) Penjahitan Melintang Tipe 3 (tabel pelat beton = > 200 mm - 225 mm) Buah 1.0
4.11.(4) Penjahitan Melintang Tipe 4 (tabel pelat beton = > 225 mm - 250 mm) Buah 1.0
4.11.(5) Penjahitan Melintang Tipe 5 (tabel pelat beton = > 250 mm - 275 mm) Buah 1.0
4.11.(6) Penjahitan Melintang Tipe 6 (tabel pelat beton = > 275 mm -300 mm) Buah 1.0
4.11.(7) Penjahitan Melintang Tipe 7 (tabel pelat beton = > 300 mm - 325 mm) Buah 1.0
4.11.(8) Penjahitan Melintang Tipe 8 (tabel pelat beton = > 325 mm - 350 mm) Buah 1.0
4.12
4.12.(1) Penutupan Sambungan Melintang (Termoplastik) M1 1.0
4.12.(2) Penutupan Sambungan Melintang (Termoseting) M1 1.0
4.12.(3) Penutupan Sambungan Melintang (Preformed) M1 1.0
4.12.(4) Penutupan Sambungan Memanjang (Termoplastik) M1 1.0
4.12.(5) Penutupan Sambungan Memanjang (Termoseting) M1 1.0
4.12.(6) Penutupan Sambungan Memanjang (Preformed) M1 1.0
4.12.(7) Penutupan Retak (Termoplastik) M1 1.0
4.12.(8) Penutupan Retak (Termoseting) M1 1.0
4.13
4.13.(1) Pengeboran Lubang Buah 1.0
4.13.(2) Material Injeksi Berbahan Dasar Semen Kg 1.0
4.13.(3) Material Injeksi Berbahan Dasar Cellular Kg 1.0
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
7.1 (1) Beton struktur, fc’50 MPa M3 1.0
7.1 (2) Beton struktur, fc’45 MPa M3 1.0
7.1 (3) Beton struktur, fc’40 MPa M3 1.0
7.1 (4) Beton struktur, fc’35 MPa M3 1.0
7.1 (5a) Beton struktur, fc’30 MPa M3 1.0
7.1 (5b) Beton strukutr bervolome besar, fc'30 MPa M3 1.0
7.1 (5c) Beton strukutr memadat sendiri, fc'30 MPa M3 1.0
7.1 (6a) Beton struktur, fc’25 Mpa M3 1.0
7.1 (6b) Beton struktur bervolume besar, fc’25 Mpa M3 1.0
7.1 (6c) Beton struktur memadat sendiri, fc’25 Mpa M3 1.0
7.1 (7a) Beton strukur, fc’20 MPa M3 1.0
7.1 (7b) Beton strukut bervolume besar, fc’20 MPa M3 1.0
7.1 (7c) Beton strukut memadat sendiri, fc’20 MPa M3 1.0
7.1 (7d) Beton strukut, fc’20 MPa yang dilaksanakan di air M3 1.0
7.1 (8) Beton , fc’15 Mpa M3 1.0
7.1 (9) Beton Siklop, fc’15 Mpa M3 1.0
7.1 (10) Beton, fc’10 Mpa M3 1.0
7.2 (1a) Penyediaan Unit Pracetak Gelagar Tipe I Bentang 16 meter Buah 1.0
7.2 (1b) Penyediaan Unit Pracetak Gelagar Tipe I Bentang 25 meter Buah 1.0
7.2 (1c) Penyediaan Unit Pracetak Gelagar Tipe I Bentang … meter Buah 1.0
7.2 (2a) Pemasangan Unit Pracetak Gelagar Tipe I Bentang 16 meter Buah 1.0
7.2 (2b) Pemasangan Unit Pracetak Gelagar Tipe I Bentang 25 meter Buah 1.0
7.2 (2c) Pemasangan Unit Pracetak Gelagar Tipe I Bentang … meter Buah 1.0
7.2 (3a) Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah 1.0
7.2 (3b) Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter Buah 1.0
7.2 (4a) Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah 1.0
7.2 (4b) Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Buah 1.0
7.2.(5) Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah 1.0
7.2.(6) Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah 1.0
7.2.(7) Baja Prategang Kg 1.0
7.2.(8) Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah 1.0
7.2.(9) Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah 1.0
7.2.(10) Beton Pratekan untuk Diafragma fc' 45 MPa termasuk Pekerjaan pasca-tarik (post-tension) M3 1.0
7.2.(11a) Penyediaan Balok T Beton Pratekan bentang 40m Buah 1.0
7.2.(11b) Pemasangan Balok T Beton Pratekan bentang 60 m Buah 1.0
7.2.(12a) Penyediaan Panel Full Depth slab Buah 1.0
7.2.(12b) Penyediaan Panel Full Depth slab Buah 1.0
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 1.0
7.3 (2) Baja Tulangan Sirip BjTS 280 Kg 1.0
7.3 (3) Baja Tulangan Sirip BjTS 420A Kg 1.0
7.3 (4) Baja Tulangan Sirip BjTS 420B Kg 1.0
7.3 (5) Baja Tulangan Sirip BjTS 520 Kg 1.0
7.3 (6) Baja Tulangan Sirip BjTS 550 Kg 1.0
7.3 (7) Baja Tulangan Sirip BjTS 700 Kg 1.0
7.3 (8) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 1.0
7.4 (1a) Penyediaan Baja Struktur Grade 250 (Kuat Leleh 250 MPa) Kg 1.0
7.4 (1b) Penyediaan Baja Struktur Grade 345 (Kuat Leleh 345 MPa) Kg 1.0
7.4 (1c) Penyediaan Baja Struktur Grade 485 (Kuat Leleh 485 MPa) Kg 1.0
7.4 (1d) Penyediaan Baja Struktur Grade 690 (Kuat Leleh 690 Mpa Untuk Tebal Pelat < 2,5) Kg 1.0
7.4 (1e) Penyediaan Baja Struktur Grade 690 (Kuat Leleh 620 Mpa Untuk Tebal Pelat < 2,5-4,0 inch) Kg 1.0
7.4 (2) Pemasangan Baja Struktur Kg 1.0
7.4 (3) Penyediaan Struktur Jembatan Rangka Baja Standar …… m Kg 1.0
7.4 (4) Pemasangan Jembatan Rangka Baja Standar Panjang ….. M Kg 1.0
7.4 (5a) Pemasangan Jembatan Rangka Baja yang disediakan Pengguna Jasa Kg 1.0
7.4 (5b) Pengangkutan Bahan Jembatan yang disediakan Pengguna Jasa Kg 1.0
7.5.(1) Tiang bor sekan primer diameter 80 cm (fc' > 15 MPa) M1 1.0
7.5.(2) Tiang bor sekan sekunder diameter 80 cm (fc' > 30 MPa) M1 1.0
7.5.(3) Tiang bor sekan primer diameter 100 cm (fc' > 15MPa) M1 1.0
7.5.(4) Tiang bor sekan sekunder diameter 100 cm (fc' > 30 MPa) M1 1.0
7.5.(5) Tiang bor sekan primer diameter 120 cm (fc' > 15 MPa) M1 1.0
7.5.(6) Tiang bor sekan sekunder diameter 120 cm (fc' > 30 MPa) M1 1.0
7.5.(7) Tiang bor sekan primer diameter 150 cm (fc' > 15 MPa) M1 1.0
7.5.(8) Tiang bor sekan sekunder diameter 150 cm (fc' > 15 MPa) M1 1.0
7.5.(9) Tiang bor sekan primer diameter …… cm (fc' > 15 MPa) M1 1.0
7.5.(10) Tiang bor sekan sekunder diameter ….. cm (fc' > 15 MPa) M1 1.0
7.6 (1) Fondasi Cerucuk, Penyediaan dan Pemancangan M1 1.0
7.6 (2) Dinding Turap Kayu Tanpa Pengawetan, Penyediaan dan Pemancangan M2 1.0
7.6.(3) Dinding Turap Kayu Dengan Pengawetan, Penyediaan dan Pemancangan M2 1.0
7.6.(4) Dinding Turap Baja, Penyediaan dan Pemancangan M2 1.0
7.6.(5) Dinding Turap Beton, Penyediaan dan Pemancangan M2 1.0
7.6.(6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran…… mm M1 1.0
7.6.(7) Penyediaan Tiang Pancang Kayu Dengan Pengawetan Ukuran…… mm M1 1.0
7.6 (8a) Penyediaan Tiang Pancang Baja Diameter 500 mm tebal 10 mm M1 1.0
7.6 (8b) Penyediaan Tiang Pancang Baja Diameter …. mm tebal …... mm M1 1.0
7.6.(8c) Penyediaan Tiang Pancang Baja Diameter …... mm tebal …… mm M1 1.0
7.6.(9a) Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1 1.0
7.6.(9b) Penyediaan Tiang Pancang Baja H Beam Ukuran …..mm x …….. mm x …….mm x ……... mm M1 1.0
7.6.(10a) Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1 1.0
7.6.(10b) Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran ……..mm x ……... mm M1 1.0
7.6.(11a) Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1 1.0
7.6.(11b) Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran ……. mm x ………. mm M1 1.0
7.6.(12a) Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1 1.0
7.6.(12b) Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter ……...mm M1 1.0
7.6.(13) Pemancangan Tiang Pancang Kayu Ukuran ….. Mm M1 1.0
7.6.(14a) Pemancangan Tiang Pancang Baja Diameter 500 mm M1 1.0
7.6.(14b) Pemancangan Tiang Pancang Baja Diameter …….. mm M1 1.0
7.6.(15a) Pemancangan Tiang Pancang Baja H beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1 1.0
7.6.(15b) Pemancangan Tiang Pancang Baja H beam Ukuran…….. mm x …….. mm x …….. mm x ……... mm M1 1.0
7.6.(16a) Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1 1.0
7.6.(16b) Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran………. mm x ………... mm M1 1.0
7.6.(17a) Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1 1.0
7.6.(17b) Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran ………. mm x ….. mm M1 1.0
7.6.(18a) Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1 1.0
7.6.(18b) Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter ….. mm 1.0
7.6.(19a) Tiang Bor Beton, diameter 800 mm M1 1.0
7.6.(19b) Tiang Bor Beton, diameter ….. mm M1
Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13)s/d 7.6.(18) bila Tiang Pancang dikerjakan di tempat Yang Berair 1.0
7.6.(20) M1
7.6.(21) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) Bila Tiang Bor Beton dikerjakan ditempat Yang Berair M 1
1.0
7.6.(22) Pengujian Pembebanan Pada Tiang Dengan Diameter sampai 600 mm Buah 1.0
7.6.(23) Pengujian Pembebanan Pada Tiang Dengan Diameter di atas 600 mm Buah 1.0
7.6.(24) Tiang Uji jenis …. Ukuran …… M1 1.0
7.6.(25a) Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... Dengan beban hidrolik Cara Beban Siklik Buah 1.0
7.6 (25b) Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... Dengan beban hidrolik Cara Beban Bertahap Buah 1.0
7.6 (26a) Pengujian Pembebanan Statis pada Tiang ukuran / diameter ……. meja beban statis Cara beban Siklik Buah 1.0
7.6 (26b) Pengujian Pembebanan Statis pada Tiang ukuran / diameter ……. meja beban statis Cara beban Bertahap Buah 1.0
7.6 (27a) Pengujian Crosshole sonic logging (CSL) pada Tiang bor beton diameter .... Buah 1.0
7.6 (27b) Pengujian Pembebanan Dinamis Jenis PDLT (Pile Dynamic Load Testing) pada Tiangukuran / diameter .... Buah 1.0
7.6 (28) Pengujian Keutuhan Tiang dengan Pile Integrated Test (PIT) Buah 1.0
7.7.(1) Dinding Sumuran Silinder terpasang, Diameter ……………. M1 1.0
7.9.(1) Pasangan Batu M3 1.0
7.10.(1) Pasangan Batu Kosong yang Diisi Adukan M3 1.0
7.10.(2) Pasangan Batu Kosong M3 1.0
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 1.0
7.10.(3b) Bronjong dengan kawat yang dilapisi PVC M3 1.0
7.10.(4) Tambahan Biaya untuk Anyaman Penulangan Tanah dengan Kawat yang Dilapisi PVC M2 1.0
7.11.(1a) Sambungan Siar Muai Tipe Asphaltic Plug, Fixed M1 1.0
7.11.(1b) Sabungan siar Muai Tipe Asphaltic Plug, Movable M1 1.0
7.11.(2) Sambungan Siar Muai Tipe Silicone Seal M1 1.0
7.11.(3) Sambungan Siar Muai Tipe Strip seal M1 1.0
7.11.(4) Sambungan Siar Muai Tipe Compression Seal M1 1.0
7.11.(5) Sambungan Siar Muai Expansion Joint Tipe Modular, lebar …….. M1 1.0
7.11.(6) Sambungan Siar Muai Expansion Joint Tipe Finger Plate, lebar …….. M1 1.0
7.11.(7) Sambungan Siar Muai Expansion Tipe Karet dengan Lebar Celah …….. Cm M3 1.0
7.11.(8) Joint Filler untuk Sambungan Konstruksi M3 1.0
7.11.(9) Sambungan Siar Muai Tipe Modular, Lebar …….. M3 1.0
7.12.(1a) Landasan Logam Tipe Fixed Buah 1.0
7.12.(1b) Landasan Logam Tipe Moveable Buah 1.0
7.12.(1c) Landasan Logam Tipe ……. Buah 1.0
7.12.(2) Landasan Elastomerik Karet Alam Berlapis Baja Ukuran ….. Mm x ….. Mm x…….. Mm Buah 1.0
7.12.(3) Landasan Elastomerik Karet Sintetis Berlapis Baja Ukuran ….. Mm x ….. Mm x…….. Mm Buah 1.0
7.12.(4) Landasan karet Strip M1 1.0
7.12.(5) Landasan Tipe Logam Berongga (Pot Bearing) Buah 1.0
7.12.(6) Landasan Tipe Logam Jenis Spherical Buah 1.0
7.13.(1) Sandaran (Railing) M1 1.0
7.14.(1) Papan Nama Jembatan M1 1.0
7.15.(1) Pembongkaran Pasangan Batu M3 1.0
7.15.(2) Pembongkaran Beton M3 1.0
7.15.(3) Pembongkaran Beton Pratekan M3 1.0
7.15.(4) Pembongkaran Bangunan Gedung M2 1.0
7.15.(5) Pembongkaran Rangka Baja M2 1.0
7.15.(6) Pembongkaran Balok Baja (Steel Stingers) M1 1.0
7.15.(7) Pembongkaran Lantai Jembatan Kayu M2 1.0
7.15.(8) Pembongkaran Jembatan Kayu M2 1.0
7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3/ km 1.0
7.16.(1) Dreck drain Buah 1.0
7.16.(2a) Pipa Drainase Baja diameter 150 mm M1 1.0
7.16.(2b) Pipa Drainase Baja diameter ……. Mm M1 1.0
7.16.(3a) Pipa Drainase PVC diameter 150 mm M1 1.0
7.16.(3b) Pipa Drainase PVC diameter …… mm M1 1.0
7.16.(4) Pipa Penyalur PVC M1 1.0
7.11.(1) Pengujian Pembebanan Jembatan Buah Jembatan 1.0
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Harga Jumlah
Satuan Harga-Harga
(Rupiah) (Rupiah)
e f = (d x e)
1,364,590,000 1,364,590,000
558,871,800 558,871,800
464,552,989 464,552,989
215,000.0 1,935,000
240,000.0 2,160,000
230,000.0 2,070,000
230,000.0 2,070,000
245,000.0 2,205,000
305,000.0 2,745,000
400,000.0 3,600,000
328,000.0 2,952,000
470,000.0 4,230,000
215,000.0 1,935,000
-
725,000.0 6,525,000
900,000.0 8,100,000
-
413,666.7 3,723,000
493,333.3 4,440,000
533,333.3 4,800,000
513,333.3 4,620,000
496,333.3 4,467,000
475,333.3 4,278,000
-
583,376 583,376
451,501 451,501
966,250,000 966,250,000
3,422,154,666
34,750.47 34,750.47
1,286,690.82 1,286,690.82
118,178.34 118,178.34
169,209.97 169,209.97
207,090.03 207,090.03
446,772.26 446,772.26
702,746.93 702,746.93
1,104,308.84 1,104,308.84
1,496,834.51 1,496,834.51
1,952,077.16 1,952,077.16
2,914,910.76 2,914,910.76
16,730,288.60 16,730,288.60
512,442.08 512,442.08
682,178.36 682,178.36
855,584.28 855,584.28
1,275,110.55 1,275,110.55
2,081,767.69 2,081,767.69
2,952,064.50 2,952,064.50
4,643,435.69 4,643,435.69
5,390,877.76 5,390,877.76
6,774,330.18 6,774,330.18
9,350,883.80 9,350,883.80
12,647,585.53 12,647,585.53
366,471.00 366,471.00
487,316.00 487,316.00
383,735.00 383,735.00
521,843.00 521,843.00
400,998.00 400,998.00
556,370.00 556,370.00
435,525.00 435,525.00
625,424.00 625,424.00
470,052.00 470,052.00
694,478.00 694,478.00
470,052.00 470,052.00
694,478.00 694,478.00
792,373.16 792,373.16
270,350.56 270,350.56
71,034.92 71,034.92
101,476.05 101,476.05
138,865.05 138,865.05
175,687.55 175,687.55
81,986,648
10,819.39 10,819
26,499.75 26,500
65,030.22 65,030
16,127.67 16,128
566,490.97 566,491
836,114.21 836,114
132,030.21 132,030
472,441.13 472,441
20,942.49 20,942
379,831.16 379,831
92,675.50 92,675
39,755.64 39,756
115,846.37 115,846
77,299.53 77,300
206,457.72 206,458
250,572.15 250,572
311,948.16 311,948
12,336.81 12,337
16,634.57 16,635
10,774.06 10,774
41,701.61 41,702
123,089.46 123,089
325,107.90 325,108
107,725.11 107,725
107,421.97 107,422
138,342.40 138,342
147,406.40 147,406
165,842.04 165,842
4,817,265
12,249.92 12,250
12,249.92 12,250
12,249.92 12,250
9,663.84 9,664
- -
21,044.33 21,044
19,545.86 19,546
19,681.54 19,682
21,897.11 21,897
21,547.55 21,548
23,780.40 23,780
8,020.69 8,021
58,615.26 58,615
3,801.44 3,801
31,803.71 31,804
1,172,632.08 1,172,632
1,348,795.30 1,348,795
- 0.00
- 0.00
1,105,795.02 1,105,795
1,025,541.57 1,025,542
943,931.98 943,932
972,942.09 972,942
1,744,626.01 1,744,626
1,791,656.13 1,791,656
395,006.01 395,006
291,385.87 291,386
291,768.00 291,768
10,484,765.25 10,484,765
13,269,772.79 13,269,773
13,269,725.68 13,269,726
336,249.99 336,250
789.78 790
270,104.99 270,105
23,565.04 23,565
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
102,938.12 102,938
162,156.37 162,156
781,707.47 781,707
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
20,256.23 20,256
451,156.51 451,157
471,010.77 471,011
51,037,489
379,969.14 379,969
323,625.95 323,626
220,094.18 220,094
587,650.13 587,650
384,707.30 384,707
327,967.31 327,967
1,683,510.94 1,683,511
1,832,688.31 1,832,688
3,672,449.57 3,672,450
3,215,326.56 3,215,327
2,133,290.46 2,133,290
4,487,175.12 4,487,175
4,055,909.95 4,055,910
1,295,090.80 1,295,091
781,200.65 781,201
648,290.35 648,290
519,867.31 519,867
436,361.80 436,362
26,985,176
20,072.63 20,073
23,586.15 23,586
24,808.60 24,809
6,091.38 6,091
8,487.90 8,488
7,775.66 7,776
21,540.35 21,540
11,195.51 11,196
9,481.97 9,482
14,009.74 14,010
1,073,644.57 1,073,645
1,478,075.77 1,478,076
1,063,819.70 1,063,820
1,452,299.44 1,452,299
1,092,476.61 1,092,477
975,409.35 975,409
984,786.32 984,786
1,376,424.04 1,376,424
942,911.95 942,912
1,310,472.04 1,310,472
866,433.80 866,434
1,189,501.11 1,189,501
113,300.00 113,300
1,064,455.44 1,064,455
1,018,765.73 1,018,766
1,006,173.68 1,006,174
974,056.37 974,056
947,261.12 947,261
901,856.68 901,857
964,551.98 964,552
922,677.61 922,678
845,765.83 845,766
1,086,726.17 1,086,726
1,328,340.45 1,328,340
1,180,740.84 1,180,741
26,307,976
2,503,314.45 2,503,314
2,440,002.40 2,440,002
2,367,666.95 2,367,667
2,295,065.49 2,295,065
2,227,072.11 2,227,072
2,283,776.07 2,283,776
2,182,258.40 2,182,258
2,137,596.30 2,137,596
2,220,096.30 2,220,096
2,147,578.44 2,147,578
2,235,913.98 2,235,914
2,318,413.98 2,318,414
2,277,621.76 2,277,622
2,985,776.19 2,985,776
2,233,885.57 2,233,886
1,071,781.37 1,071,781
2,271,063.54 2,271,064
137,758,443.28 137,758,443
226,047,412.33 226,047,412
- 0.00
7,264,475.06 7,264,475
9,155,957.58 9,155,958
- 0.00
380,875,281.74 380,875,282
- 0.00
9,155,957.58 9,155,958
- 0.00
- 0.00
- 0.00
513,344.63 513,345
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
1,407,270.16 1,407,270
667,540.97 667,541
15,063.40 15,063
15,063.40 15,063
15,063.40 15,063
15,746.38 15,746
15,063.40 15,063
15,063.40 15,063
15,063.40 15,063
17,538.40 17,538
16,953.57 16,954
19,166.53 19,167
20,266.53 20,267
24,666.53 24,667
21,366.53 21,367
3,125.33 3,125
16,966.53 16,967
3,125.33 3,125
3,125.33 3,125
16,966.53 16,967
1,943,314.43 1,943,314
2,924,711.72 2,924,712
2,658,935.66 2,658,936
3,512,733.92 3,512,734
3,533,583.83 3,533,584
4,475,360.73 4,475,361
5,143,731.59 5,143,732
6,447,050.74 6,447,051
- 0.00
- 0.00
59,360.71 59,361
136,294.71 136,295
173,369.43 173,369
2,697,060.30 2,697,060
700,403.74 700,404
63,199.08 63,199
65,947.78 65,948
2,696,671.16 2,696,671
- 0.00
- 0.00
821,321.59 821,322
- 0.00
701,330.78 701,331
- 0.00
1,141,057.63 1,141,058
- 0.00
777,130.05 777,130
- 0.00
252,723.51 252,724
400,291.51 400,292
- 0.00
204,006.98 204,007
- 0.00
204,006.98 204,007
- 0.00
204,006.98 204,007
- 0.00
415,687.04 415,687
- 0.00
2,095,427.50 2,095,428
- 0.00
84,755.51 84,756
134,731.59 134,732
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
7,823,923.67 7,823,924
1,033,503.67 1,033,504
582,196.20 582,196
534,145.87 534,146
786,500.00 786,500
1,049,663.16 1,049,663
241,043.00 241,043
2,154,364.67 2,154,365
3,062,310.81 3,062,311
747,833.77 747,834
1,377,321.45 1,377,321
1,385,646.42 1,385,646
1,193,297.40 1,193,297
4,152,979.30 4,152,979
1,927,009.56 1,927,010
2,532,716.12 2,532,716
310,516.88 310,517
2,076,475.19 2,076,475
2,266,000.00 2,266,000
- 0.00
1,244,100.00 1,244,100
987,800.00 987,800
301,950.00 301,950
12,975,668.37 12,975,668
14,260,887.17 14,260,887
88,151.25 88,151
355,669.35 355,669
328,111.62 328,112
482,442.50 482,443
466,401.50 466,401
251,678.97 251,679
1,142,845.93 1,142,846
419,035.33 419,035
142,774.89 142,775
45,753.30 45,753
- 0.00
138,600.00 138,600
222,518.07 222,518
- 0.00
87,466.15 87,466
- 0.00
87,466.15 87,466
- 0.00
925,248,935
149,412.38 149,412
143,168.93 143,169
95,410.96 95,411
118,339.86 118,340
3,151,409.96 3,151,410
3,718,488.10 3,718,488
33,032.85 33,033
- 0.00
33,032.85 33,033
- 0.00
529,077.68 529,078
529,077.68 529,078
529,077.68 529,078
529,077.68 529,078
49,587.68 49,588
- 0.00
1,098,982.00 1,098,982
193,173,619.47 193,173,619
41,609.86 41,610
- 0.00
- 0.00
63,059.86 63,060
- 0.00
- 0.00
41,609.86 41,610
- 0.00
41,609.86 41,610
- 0.00
41,609.86 41,610
- 0.00
29,721.33 29,721
- 0.00
29,721.33 29,721
- 0.00
88,141.83 88,142
- 0.00
78,311.59 78,312
- 0.00
77,109.98 77,110
- 0.00
77,109.98 77,110
- 0.00
102,160.36 102,160
178,405.91 178,406
- 0.00
178,405.91 178,406
178,405.91 178,406
- 0.00
178,405.91 178,406
178,405.91 178,406
- 0.00
6,217,295.57 6,217,296
1,148,034.04 1,148,034
1,150,779.64 1,150,780
1,128,449.16 1,128,449
- 0.00
35,961,682.01 35,961,682
7,265,350.43 7,265,350
8,916,233.96 8,916,234
6,281,139.71 6,281,140
6,227,104.39 6,227,104
5,983,945.44 5,983,945
6,470,263.33 6,470,263
7,243,815.00 7,243,815
11,327,266.40 11,327,266
7,127,522.52 7,127,523
40,020.20 40,020
40,020.20 40,020
40,020.20 40,020
40,020.20 40,020
40,020.20 40,020
4,448,235.72 4,448,236
756,427.01 756,427
1,367,804.25 1,367,804
1,385,646.42 1,385,646
234,374.11 234,374
4,154,554.11 4,154,554
218,701.05 218,701
3,849,560.99 3,849,561
8,243,920.47 8,243,920
4,069,010.99 4,069,011
11,875,701.67 11,875,702
8,766,560.99 8,766,561
8,210,920.47 8,210,920
215,507.01 215,507
168,877.50 168,878
656,415.48 656,415
2,784,222.96 2,784,223
3,126,565.21 3,126,565
71,433,246.46 71,433,246
500,554,675.66 500,554,676
954,654,512
33,731.96 33,732
27,365.02 27,365
28,911.80 28,912
493,430.25 493,430
421,087.71 421,088
337,546.54 337,547
366,962.49 366,962
321,590.68 321,591
704,714.63 704,715
352,251.94 352,252
255,241.79 255,242
352,251.94 352,252
453,464.59 453,465
682,278.50 682,279
468,284.04 468,284
288,465.66 288,466
87,221.96 87,222
515,918.61 515,919
163,386.10 163,386
94,279.11 94,279
50,797.34 50,797
47,670.58 47,671
335,879.00 335,879
124,503.07 124,503
378,591.41 378,591
589,106.41 589,106
421,522.77 421,523
675,882.32 675,882
50,843.35 50,843
187,180.53 187,181
64,130.21 64,130
2,881,222.92 2,881,223
67,560.12 67,560
107,710.12 107,710
116,876.79 116,877
66,826.79 66,827
132,932.18 132,932
150,597.46 150,597
157,805.38 157,805
187,044.44 187,044
225,373.78 225,374
83,336.67 83,337
736,264.64 736,265
732,360.74 732,361
732,360.74 732,361
12,958.28 12,958
41,938.47 41,938
8,954.19 8,954
628,691.94 628,692
9,147,543.54 9,147,544
12,464,043.54 12,464,044
7,701,043.54 7,701,044
9,571,043.54 9,571,044
7,976,043.54 7,976,044
10,121,043.54 10,121,044
627,313.57 627,314
713,596.59 713,597
6,907.88 6,908
17,850.47 17,850
6,879.96 6,880
6,494.96 6,495
74,805,113
493,430.25 493,430
197,595.00 197,595
1,554,216.66 1,554,217
664,947.68 664,948
271,376.67 271,377
421,952.24 421,952
7,504.36 7,504
8,031.83 8,032
1,286,812.03 1,286,812
5,834,647.91 5,834,648
1,357,158.41 1,357,158
1,541,289.22 1,541,289
384,611.03 384,611
1,580,628.15 1,580,628
1,544,566.10 1,544,566
1,437,441.64 1,437,442
25,148.56 25,149
2,862,635.43 2,862,635
16,424.94 16,425
16,424.94 16,425
272,087.73 272,088
188,778.33 188,778
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
21,967,709
HARGA & JARAK RATA-RATA
DARI SUMBER BAHAN (QUARRY)
HARGA JARAK
No. URAIAN SATUAN ROYALTY QUARRY
(Rp) ( Km )
Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3
7,
PETA LOKASI QUARRY 4
5
Medan Kisaran Kisaran - Sp. Kawat
k
km 000+000 Km 158+000 m
5,00 km
10,00 km
ke Rantau Prapat
Catatan :
Patumbak - Medan = 10 km
Medan - Lokasi Proyek = 165.20 km
Total Sumber Quarry Patumbak s/d Lokasi Proyek = 175.20 km
Lokasi Proyek - Base Camp = 8.73 km
Total Sumber Quarry Patumbak s/d Base Camp = 176.73 km
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 20.00 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume pasir Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 20.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume batu kali Bil 1.44 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 25.00 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam
9 Berat volume batu belah Bil 1.60 ton/m3
3.d PEKERJA
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 7,711.34 Rupiah
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 25.00 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume gravel Bil 2.20 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 20.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume sirtu Bil 1.51 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 15.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume pasir urug Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 7.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat isi volume pasir beton Bil 1.69 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1
KET.
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Base Camp
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
ke Tanjung
Balai
ke Rantau Prapat
angsiantar
HAN
HARGA
SATUAN
(Rp.)
25,750.00
412,240.54
382,807.01
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
19,500.00
412,240.54
382,807.01
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
9,000.00
412,240.54
382,807.01
457,627.36
14,285.71
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
8,000.00
412,240.54
382,807.01
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
17,500.00
412,240.54
382,807.01
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
18,000.00
412,240.54
382,807.01
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
20,000.00
412,240.54
382,807.01
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS untuk bahan lapis Agregat dan lapis Aspal
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3
I ASUMSI
1 Bahan dasar Sirtu (material Batu bercampur pasir) diterima di lokasi Alat
Pemecah Batu (di Base Camp)
2 Kegiatan dilakukan di dalam lokasi Base Camp
4 Berat Isi Bahan : - Batu / Gravel D1
- Pasir D2
- Batu Pecah D3
5 Harga Satuan Bahan Dasar : - Batu Kali Rp1
- Sirtu Rp2
6 Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) Rp3
- Wheel Loader Rp4
7 Kapasitas Alat : - Pemecah Batu (Stone Crusher) Cp1
- Wheel Loader Cp2
8 Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) Fa1
- Wheel Loader Fa2
9 Faktor Kehilangan Material Fh
II METHODE PELAKSANAAN
1 Wheel Loader mengangkut Sirtu dari tumpukan
dan menuangkannya ke Alat Pemecah Batu.
2 Bahan dasar yang digunakan Sirtu (material Batu bercampur kerikil dan pasir)
3 Dilokasi hooper/Feeder dipasang penyiram air (water sprayer)
berfungsi sebagai pencucian bahan dari kotoran (lumpur)
4 Setelah disemprot air Sirtu dimasukkan kedalam pemecah pertama
(primary crusher) kapasitas 60 ton/jam (bukaan Jaw 10 cm s.d 20 cm tergantung
ukuran boulder)
6 Hasil Primary Crusher disaring memakai Scalping Screen(screen 1) dengan
ukuran ayakan #1,5 inch (3,75 cm) atau #2,0 inch (5,00 cm)
yg menghasilkan lolos ayakan agregat ukuran (0 - 50) dan tdk lolos agg.(50 - 200)
Asumsi material yang lolos saringan (screen1)
Asumsi keseluruhannya menghasilkan ukuran (0 - 50)
7 Hasil yang lolos saringan(screen1) sebagai fraksi halus tidak boleh dipakai
langsung untuk bahan campuran lapisan perkerasan aspal, tetapi dapat digunakan
untuk bahan campuran Agregat kelas B dan S, khusus untuk Agregat A yang
digunakan hanya ukuran (0 - 5)
8 Hasil yang tidak lolos screen1 dimasukan ke pemecah kedua (Secondary Crusher)
kemudian dipisahkan mempergunakan Screen2 yang menghasilkan ukuran
(0 - 5), (5 - 3/8"=9,50mm) dan (3/8" - 3/4"=19mm atau 1"=2,54mm))
yang dapat langsung digunakan untuk kebutuhan Agregat Kasar Lapis pondasi
Agregat A (ukuran 5 - 1") dan Agg.Kasar dan Agg.Halus lapisan perkerasan Aspal
Asumsi proporsi hasil pemisahan saringan (screen2)
- menghasilkan ukuran (0 - 5)
- menghasilkan ukuran (5 - 3/8"=9,5mm)
- menghasilkan ukuran (3/8" - 3/4"=19mm)
9 Hasil yang tidak lolos dimasukan kedalam pemecah ketiga (Tertiary crusher)
atau (secondary Crusher) dan hasilnya dimasukan kembali ke saringan screen2
1.c. Biaya Produksi Batu Pecah stone crusher 1 set dgn wheel loader
= {(Tst x Rp3) + (Tw x Rp4)} Bp
IV PERHITUNGAN
1 Primary Crusher
Produksi Primary Crusher + scalping Screen 1 Prod
Lolos scalping screen (sreen1) LSc 1
Tidak lolos scalping screen(screen1) ( 100 - LSc 1 ) TLSc1
Asumsi % Biaya proses scalping screen ukuran # 2"=50 mm thdp biaya produksi LSc2
Biaya Produksi scalping Screen BPSc
Volume (0 - 50) = ((Prod x LSc 1) x LSc2))/D1 V1
2 Secondary Crusher
Produksi Secondary Crusher + scalping Screen 2 Prod
Asumsi % Biaya proses produksi Batu Pecah thdp BOP S.Crusher 1 set LSc3
Biaya Produksi = LSc3 : 100 x BP + BPSc : 2 Bprod
kapasitas yang diproduksi = Prod x TLSc1/100 : D3 CpSC1
Lolos screen2 ukuran ( 0 - 5) LSc4
Volume ukuran ( 0 - 5) = (CpSC1 x LSc4/100) V2
Lolos screen2 ukuran ( 5 - 9,5) LSc5
Volume ukuran ( 5 - 9,5) = (CpSC1 x LSc5/100) V3
Lolos screen2 ukuran ( 9.5 - 19,0) LSc6
Volume ukuran ( 9,5 - 19.0) = (CpSC1 x LSc6/100) V4
20 %
8.74 m3 72
80 %
38.96 m3
20 %
30 %
50 %
1.00 Jam
34.09 M3/Jam Batu pecah
40.38 M3/Jam
1.25 M3
2.00 menit
1.08 Jam
1,446,099.73 Rp./Jam
1,934,753.58 Rp.
60.00 Ton/Jam
20.00 %
80.00 %
20.00 %
289,219.95 Rp.
8.74 m3
48.00 Ton/Jam
80.00 %
1,301,489.76 Rp.
38.96 m3
20.00 %
7.79 m3
30.00 %
11.69 m3
50.00 %
19.48 m3
141,545.79 Rp
33.33 %
644,917.86 Rp.
207,764.46 Rp./M3
180,176.31 Rp./M3
158,105.78 Rp./M3
166,382.23
ITEM PEMBAYARAN : AGREGAT KELAS A (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.20 M
6 Berat isi padat Bip 1.78 ton/m3
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 APK 69.85 %
- Pasir Urug (PI ≤ 6%, LL ≤ 25%) PU 30.15 %
9 Berat Isi Agregat (lepas) Bil 1.45 ton/m3
10 Faktor kehilangan - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 Fh1 1.05
- Pasir Urug (PI ≤ 6%, LL ≤ 25%) Fh2 1.05
1. BAHAN
Fraksi Pecah Mesin = APK x 1 M3 x Bip/Bil x Fh1 0.9003 M3
Aggregat Halus Lapis pond A = PU x 1 M3 x Bip/Bil x Fh2 0.3886 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat blending T1 2.00 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.10 M
6 Berat isi padat Bip 1.78 ton/m3
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 APK 41.80 %
- Pasir Urug (PI ≤ 6%, LL ≤ 25%) PU 58.20 %
9 Berat Isi Agregat (lepas) Bil 1.45 ton/m3
10 Faktor kehilangan - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 Fh1 1.05
- Pasir Urug (PI ≤ 6%, LL ≤ 25%) Fh2 1.05
1. BAHAN
Fraksi Pecah Mesin = APK x 1 M3 x Bip/Bil x Fh1 0.5388 M3
Aggregat Halus Lapis Permukaan = PU x 1 M3 x Bip/Bil x Fh2 0.7502 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat blending T1 2.00 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SA
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : AGREGAT KELAS A (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A
Spesifikasi 5.1.3.2.d) SATUAN PEMBAYARAN : M3
memenuhi Spec.
NO. KOMPONEN SATUAN
A. TENAGA
B. BAHAN
formula sdh disesuaikan 1 Fraksi Pecah Mesin 5-10 &10-20 & 20-30 M3
2 Pasir Urug (PI ≤ 6%, LL ≤ 25%) M3
(lepas)
kondisi sedang
C. PERALATAN
1. Wheel Loader (E15) jam
jarak 50 meter 2. Blending Equipment (E52) jam
3. Water Tank Truck (E23) jam
4. Alat Bantu Ls
padat
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : AGREGAT LAPIS PERMUKAAN (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN AGREGAT LAPIS PERMUKAAN
Spesifikasi 5.1.3.2.d) SATUAN PEMBAYARAN : M3
memenuhi Spec.
sdh disesuaikan NO. KOMPONEN SATUAN
A. TENAGA
B. BAHAN
(lepas)
kondisi sedang
C. PERALATAN
1. Wheel Loader (E15) jam
jarak 50 meter 2. Blending Equipment (E52) jam
3. Water Tank Truck (E23) jam
4. Alat Bantu Ls
padat
………………………
…………………………………………..
………………………
(kondisi lepas) :
GAT KELAS A :
:
0.00
0.9003 141,545.79 127,439.68
0.3886 180,176.31 70,020.68
ERALATAN ( A + B + C ) 221,161.68
MULIR STANDAR UNTUK
ISA MASING-MASING HARGA SATUAN
………………………
…………………………………………..
………………………
RMUKAAN (kondisi lepas) :
GAT LAPIS PERMUKAAN :
:
ERALATAN ( A + B + C ) 235,128.73
ITEM PEMBAYARAN : AGREGAT KELAS B (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B
SATUAN PEMBAYARAN : M3
I ASUMSI
1 Bahan Agregat Halus & Kasar diterima di lokasi
Base Camp
2 Jarak dari stockpile ke alat blending l
3 Jam kerja effektif perhari Tk
4 Kegiatan dilakukan di dalam lokasi Base Camp
5 Berat isi padat Bip
6 Jam kerja efektif per-hari Tk
25-10&10-
8 Proporsi Campuran : - Fraksi Pecah Mesin 5-10 &10-20 & 20-3 20&20-30
II URUTAN PEKERJAAN
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor Efisiensi alat Fa
Waktu Siklus :
- Waktu pemuatan alat belending T1
Ts1
Koefisien Alat / M3 = 1 : Q2
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi Agregat / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I ASUMSI
1 Bahan Agregat Halus & Kasar diterima di lokasi
Base Camp
2 Jarak dari stockpile ke alat blending l
3 Jam kerja effektif perhari Tk
4 Kegiatan dilakukan di dalam lokasi Base Camp
5 Berat isi padat Bip
6 Jam kerja efektif per-hari Tk
25-10&10-
8 Proporsi Campuran : - Fraksi Pecah Mesin 5-10 &10-20 & 20-3 20&20-30
II URUTAN PEKERJAAN
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor Efisiensi alat Fa
Waktu Siklus :
- Waktu pemuatan alat belending T1
Ts1
Koefisien Alat / M3 = 1 : Q2
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
URAIAN ANALISA HARGA SATUAN FORMULIR
PEREKAMAN ANALISA MA
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
50.00 M ITEM PEMBAYARAN NO.
7.00 jam JENIS PEKERJAAN
SATUAN PEMBAYARAN
1.78 ton/m3
7.00 jam
36.30 % Gradasi harus
63.70 % memenuhi Spesifikasi NO. KOMPONEN
1.47 ton/m3
1.05
1.05
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
1.50 M3 (lepas)
0.85 - kondisi sedang C. PERALATAN
0.83 - 1. Wheel Loader
2. Blending Equipment
2.00 menit jarak 50 meter 3. Water Tank Truck
4. Alat Bantu
2.00 menit
31.75 M3 padat
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
0.0315 jam
25.00 M3/jam
0.83
20.75 M3
0.0482 jam
4.00 M3
0.07 M3
100.00 liter/menit
0.83 -
71.14 M3
0.0141 jam
31.75 M3/Jam
222.23 M3
2.00 orang
1.00 orang
0.0630 Jam
0.0315 Jam
FORMULIR
KOEFISIEN SATUAN KETERANGAN PEREKAMAN ANALISA MA
PROYEK
No. PAKET KONTRAK
50.00 M NAMA PAKET
7.00 jam PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
1.78 ton/m3 JENIS PEKERJAAN
7.00 jam SATUAN PEMBAYARAN
36.30 % Gradasi harus
63.70 % memenuhi Spesifikasi
NO. KOMPONEN
1.45 ton/m3
1.05
1.05
A. TENAGA
1. Pekerja
2. Mandor
B. BAHAN
2.00 menit
0.0315 jam
25.00 M3/jam
0.83
20.75 M3
0.0482 jam
4.00 M3
0.07 M3
100.00 liter/menit
0.83 -
71.14 M3
0.0141 jam
31.75 M3/Jam
222.23 M3
2.00 orang
1.00 orang
0.0630 Jam
0.0315 Jam
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
:
: ………………………………………………
: …………………………………………………………………..
: ………………………………………………
: AGREGAT KELAS B (kondisi lepas) :
: PENGADAAN AGREGAT KELAS B :
: M3 :
:
: ………………………………………………
: …………………………………………………………………..
: ………………………………………………
: AGREGAT KELAS S :
: PENGADAAN AGREGAT KELAS S :
: M3 :
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.20 M
6 Berat isi padat Bip 1.78 ton/m3
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 APK 82.50 %
- Coarse Sand (NP) PK 17.50 %
9 Berat Isi Agregat (lepas) Bil 1.45 ton/m3
10 Faktor kehilangan - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 Fh1 1.05
- Coarse Sand (NP) Fh2 1.05
1. BAHAN
Fraksi Pecah Mesin = APK x 1 M3 x Bip/Bil x Fh1 1.0634 M3
Coarse sand (NP) = PK x 1 M3 x Bip/Bil x Fh2 0.2256 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat blending T1 2.00 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SA
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : LAPIS DRAINASE (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN LAPIS DRAINASE
Spesifikasi 5.1.3.2.d) SATUAN PEMBAYARAN : M3
memenuhi Spec.
NO. KOMPONEN SATUAN
A. TENAGA
B. BAHAN
(lepas)
kondisi sedang
C. PERALATAN
1. Wheel Loader (E15) jam
jarak 50 meter 2. Blending Equipment (E52) jam
3 Alat Bantu Ls
padat
………………………
…………………………………………..
………………………
:
:
:
ERALATAN ( A + B + C ) 214,295.85
375000
ITEM PEMBAYARAN : LAPIS PONDASI AGREGAT (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN LAPIS PONDASI AGREGAT (CBR 60%)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SA
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.20 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : Agregat Pecah Kasar A20-30 24.00 %
Agregat Lolos # 1 " A5-10&10-20 21.24 %
Fraksi lolos Scalping 0 - 37,5 mm St 54.76 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Faktor kehilangan Agregat Pecah Kasar Fh1 1.05
Agregat Lolos # 1 " Fh2 1.05
Fraksi lolos Scalping 0 - 37,5 mm Fh3 1.05
1. BAHAN
Agregat Pecah Kasar = "20-30" x 1 M3 x Fh1 M93 0.2520 M3
Agregat Lolos # 1 " = "5-10 & 10-20" x 1 M3 x Fh2 M92 0.2230 M3
Fraksi lolos Scalping 0 = St x 1 M3 x Fh3 M16 0.5750 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat blending T1 2.00 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.10 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat blending T1 2.00 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
RAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : LAPIS PONDASI AGREGAT (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN LAPIS PONDASI AGREGAT (CBR 60%)
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0315
2. Blending Equpment (E52) jam 0.0482
3 Alat Bantu Ls 1.0000
(lepas)
kondisi sedang JUMLAH HARGA PERALATAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : LAPIS PERMUKAAN AGREGAT (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN LAPIS PERMUKAAN AGREGAT (CBR 60%)
SATUAN PEMBAYARAN : M3
PERKIRAAN
Gradasi harus NO. KOMPONEN SATUAN KUANTITAS
memenuhi Spec.
A. TENAGA
1. Pekerja (L01) jam 0.0630
2. Mandor (L03) jam 0.0315
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0315
2. Blending Equpment (E52) jam 0.0482
3 Alat Bantu Ls 1.0000
(lepas)
kondisi sedang JUMLAH HARGA PERALATAN
padat
TANDAR UNTUK
ING-MASING HARGA SATUAN
………………
…………………………………..
………………
AT (kondisi lepas) :
NDASI AGREGAT (CBR 60%) :
:
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 899.96
24,285.71 764.96
400,000.00 100,800.00
180,176.31 40,182.92
158,105.78 90,907.66
457,627.36 14,414.60
212,272.90 10,230.02
0.00 0.00
LATAN ( A + B + C ) 258,200.12
TANDAR UNTUK
ING-MASING HARGA SATUAN
………………
…………………………………..
………………
REGAT (kondisi lepas) :
MUKAAN AGREGAT (CBR 60%) :
:
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 899.96
24,285.71 764.96
400,000.00 191,520.00
142,700.00 81,510.24
457,627.36 14,414.60
212,272.90 10,230.02
0.00 0.00
LATAN ( A + B + C ) 299,339.78
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT MIXING PLANT
2. Tenaga Pw 294.0 HP
3. Kapasitas Cp 60.0 T/Jam
4. Alat a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 5,500,000,000.0 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Rp./liter
5. Bahan Bakar Solar Ms 14,500.00 Rp./liter
6. Minyak Pelumas Mp 42,000.00 Rp./liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
8 Bahan bakar Batubara 500.00 Rp/kg
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINISHER
2. Tenaga Pw 72.4 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,400.0 Jam
c. Harga Alat B 600,000,000 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan POWER BROOM
2. Tenaga Pw 12.0 HP
3. Kapasitas Cp 4,000.0 M2/Jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 34,452,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BULLDOZER 100-150 HP
2. Tenaga Pw 155.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 2,500,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 250,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M
2. Tenaga Pw 75.0 HP
3. Kapasitas Cp 5,000.0 CPM/(L/m)
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 19,800,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3
2. Tenaga Pw 20.0 HP
3. Kapasitas Cp 500.0 Liter
4. Alat Baru : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 35,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE 10-15 TON
2. Tenaga Pw 138.0 HP
3. Kapasitas Cp 15.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,951,950,000 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3 - 4 M3
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 4.0 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 360,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 6-8 M3
2. Tenaga Pw 190.0 HP
3. Kapasitas Cp 8.0 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 420,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP
2. Tenaga Pw 133.0 HP
3. Kapasitas Cp 0.93 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,100,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan FLAT BED TRUCK 3-4 TON
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 4.0 ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 700,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR SET
2. Tenaga Pw 180.0 HP
3. Kapasitas Cp 135.0 KVA
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 207,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TRACK LOADER 75-100 HP
2. Tenaga Pw 70.0 HP
3. Kapasitas Cp 0.8 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,100,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3
2. Tenaga Pw 96.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,700,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan THREE WHEEL ROLLER 6-8 T
2. Tenaga Pw 55.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 700,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TANDEM ROLLER 6-8 T.
2. Tenaga Pw 74.3 HP
3. Kapasitas Cp 6.9 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,698,750,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TIRE ROLLER 8-10 T.
2. Tenaga Pw 135.0 HP
3. Kapasitas Cp 10.9 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,425,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 5-8 T.
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 7.050 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 644,300,000 Rupiah
B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 64,430,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE VIBRATOR
2. Tenaga Pw 5.5 HP
3. Kapasitas Cp 25.0 -
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 12,500,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan STONE CRUSHER
2. Tenaga Pw 220.0 HP
3. Kapasitas Cp 60.0 T/Jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 3,500,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WATER PUMP 70-100 mm
2. Tenaga Pw 6.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 7,467,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan PEDESTRIAN ROLLER
2. Tenaga Pw 8.8 HP
3. Kapasitas Cp 835.000 Ton
4. Alat Baru : a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 667,380,560 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TAMPER
2. Tenaga Pw 1.5 HP
3. Kapasitas Cp 121.000 Ton
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 102,900,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 10,290,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan JACK HAMMER
2. Tenaga Pw 0.0 HP
3. Kapasitas Cp 1,330.000 -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 46,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan FULVI MIXER
2. Tenaga Pw 345.0 HP
3. Kapasitas Cp 2,005 -
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 900,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PUMP
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 100.00 M3/jam
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 4,525,762,500 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TRAILER 20 TON
2. Tenaga Pw 175.0 HP
3. Kapasitas Cp 20.00 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 850,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan PILE DRIVER + HAMMER
2. Tenaga Pw 25.0 HP
3. Kapasitas Cp 2.50 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 400,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 35 TON
2. Tenaga Pw 125.0 HP
3. Kapasitas Cp 35.00 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 5,970,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan WELDING SET
2. Tenaga Pw 11.0 Kva
3. Kapasitas Cp 250.00 Amp
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 11,350,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 2,000.00 Meter
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 2,250,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp 1,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 150,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER
2. Tenaga Pw 40.0 HP
3. Kapasitas Cp 20,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 150,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 30,066.21 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 25,803.30 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Rp./liter
5. Bahan Bakar Solar Ms 14,500.00 Rp./liter
6. Minyak Pelumas Mp 42,000.00 Rp./liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
8 Bahan bakar Batubara 0.00 Rp/kg
A. URAIAN PERALATAN
ASPHALT MIXING PLANT (MODIFIKASI,
1. Jenis Peralatan ASBUTON)
2. Tenaga Pw 294.0 HP
3. Kapasitas Cp 60.0 T/Jam
4. Alat a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 5,500,000,000.0 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 30,066.21 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 25,803.30 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Rp./liter
5. Bahan Bakar Solar Ms 14,500.00 Rp./liter
6. Minyak Pelumas Mp 42,000.00 Rp./liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
8 Bahan bakar Batubara 0.00 Rp/kg
A. URAIAN PERALATAN
1. Jenis Peralatan TANDEM ROLLER 8-10 T.
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,550,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 30,066.21 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 25,803.30 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 9,800.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan FLAT BED TRUCK 10 TON
2. Tenaga Pw 190.0 HP
3. Kapasitas Cp 8.0 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 900,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
KET. TENAGA KAPASITAS HARGA ALAT YANG DIPAK
ALAT ALAT ALAT
UMUR
ALAT
E01
(HP) - (Tahun) (Tahun)
No. JENIS PERALATAN KODE
ALAT
HP Cp B A
1 2 2a 3 4 5 6
E02
HP Cp B A
1 2 2a 3 4 5 6
E03 HP Cp B A
1 2 2a 3 4 5 6
68. MINI EXCAVATOR 40-60 HP E10a 50.0 0.2 M3 450,000,000 5.0
nilai terendah karena jarang 69. BABY VIBRATORY ROLLER 1-2 T. E19a 7.6 1.5 Ton 120,000,000 5.0
70. WATER JET BLASTING E64 6.5 100.0 Liter 16,000,000 3.0
71. KUNCI TORSI 200-1000N.M E74 0.0 1.0 buah baut 15,000,000 2.0
72. POMPA + MIXER EPOXY, 810 Watt E75 1.1 0.8 l/mnt 7,000,000 2.0
73. CONCRETE CUTTER 130 feet/mnt E76 13.0 39.6 m/menit 26,000,000 2.0
74. SAND BLASTING E77 75.0 10.0 m2/jam 7,500,000 2.0
75. MOBILE CRANE 1 TON E78 190.0 1.0 Ton 900,000,000 5.0
76. DRUM MIXER E79 20.0 4.0 Ton/jam 600,000,000 2.0
77. STAMPER E81 22.0 60.0 m2/jam 30,000,000 2.0
78. JACK HIDROLIK JEMBATAN E82 22.0 50.0 Ton 75,000,000 5.0
79. HYDROLIC PUMP E83 22.0 30.0 Mpa 16,000,000 5.0
80 MANIFOLD E84 0.0 1.0 0.0 5,000,000 2.0
81. THERMOPLASTIC SPREADING MA E85 5.5 1,300.0 m/jam 120,000,000 5.0
82 COLD PAINT SRAY MACHINE E86 5.5 1,300.0 m/jam 70,000,000 5.0
83 FLAT BED TRUCK 10 TON E11a 190.0 8.0 M3 900,000,000 5.0
KET.
E04
KET.
E05
KET.
E06
KET.
E07
KET.
E08
KET.
E09
KET.
E10
KET.
E11
KET.
E12
KET.
E13
KET.
E14
KET.
E15
KET.
E16
KET.
E17
KET.
E18
KET.
E19
KET.
E20
KET.
E21
KET.
E22
KET.
E23
KET.
E24
KET.
E25
KET.
E26
KET.
E27
KET.
E28
KET.
E29
KET.
E30
KET.
E31
KET.
E32
KET.
E33
KET.
E34
KET.
E34a
Kapasitas 20.000
Khusus digunakan
untuk Asphalt
Modifikasi
KET.
E01a
Khusus AMP
#REF!
KET.
E01b
Khusus AMP
KET.
E17a
KET.
E11a
ANALISA BIAYA SEWA PERALATAN PER JAM KERJA (I)
W B C D e1 e2 E f1 f2
7 8 9 10 11 12 13 14 15
W B C D e1 e2 E f1 f2
7 8 9 10 11 12 13 14 15
= 10.00 % per-tahun
= 21,429 Rupiah per-orang/jam
= 14,286 Rupiah per-orang/jam
= 7,000 Rupiah per-liter
= 14,500 Rupiah per-liter
= 42,000 Rupiah per-liter
an pada Lembar Rekapitulasi Biaya Pekerjaan
untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
bah bahan bakar untuk pemanasan Aspal = 1/1000 x Kapasitas tangki aspal x harga bahan bakar solar ( lihat E 01 , E 03, E 41)
W B C D e1 e2 E f1 f2
7 8 9 10 11 12 13 14 15
1,200.0 450,000,000 45,000,000 0.26380 89,031.65 750.00 89,781.65 0.1200 0.0004
1,200.0 120,000,000 12,000,000 0.26380 23,741.77 200.00 23,941.77 0.1200 0.0004
1,200.0 16,000,000 1,600,000 0.40211 4,825.38 26.67 4,852.04 0.1200 0.0004
1,200.0 15,000,000 1,500,000 0.57619 6,482.14 25.00 6,507.14 0.1200 0.0004
1,200.0 7,000,000 700,000 0.57619 3,025.00 11.67 3,036.67 0.1200 0.0004
1,200.0 26,000,000 2,600,000 0.57619 11,235.71 43.33 11,279.05 0.1200 0.0004
1,200.0 7,500,000 750,000 0.57619 3,241.07 12.50 3,253.57 0.1200 0.0004
2,000.0 900,000,000 90,000,000 0.26380 106,837.98 900.00 107,737.98 0.1000 0.0003
1,200.0 600,000,000 60,000,000 0.57619 259,285.71 1,000.00 260,285.71 0.1200 0.0004
1,200.0 30,000,000 3,000,000 0.57619 12,964.29 50.00 13,014.29 0.1200 0.0004
1,200.0 75,000,000 7,500,000 0.26380 14,838.61 125.00 14,963.61 0.1200 0.0004
1,200.0 16,000,000 1,600,000 0.26380 3,165.57 26.67 3,192.24 0.1200 0.0004
1,200.0 5,000,000 500,000 0.57619 2,160.71 8.33 2,169.05 0.1200 0.0004
1,200.0 120,000,000 12,000,000 0.26380 23,741.77 200.00 23,941.77 0.1200 0.0004
1,200.0 70,000,000 7,000,000 0.26380 13,849.37 116.67 13,966.03 0.1200 0.0004
2,000.0 900,000,000 90,000,000 0.26380 106,837.98 900.00 107,737.98 0.1000 0.0003
= 10.00 % per-tahun
= 30,066 Rupiah per-orang/jam
= 25,803 Rupiah per-orang/jam
= 7,000 Rupiah per-liter
= 9,800 Rupiah per-liter
= 42,000 Rupiah per-liter
an pada Lembar Rekapitulasi Biaya Pekerjaan
untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
bah bahan bakar untuk pemanasan Aspal = 1/1000 x Kapasitas tangki aspal x harga bahan bakar solar ( lihat E 01 , E 03, E 41)
M KERJA (I)
M KERJA (II)
TOTAL
BIAYA
SEWA ALAT
PER
JAM KERJA
(Rp.) KET.
E+J
K L
22 23
219,605.94 Pek. Ringan
77,925.38 Pek. Ringan
49,535.21 Pek. Ringan
43,373.93 Pek. Ringan
39,288.79 Pek. Ringan
48,991.00 Pek. Ringan
39,544.11 Pek. Ringan
184,852.27 Pek. Berat
342,100.00 Pek. Ringan
51,033.57 Pek. Ringan
56,440.39 Pek. Ringan
40,135.86 Pek. Ringan
38,267.50 Pek. Ringan
68,876.06 Pek. Ringan
55,058.65 Pek. Ringan
184,852.27 Pek. Berat
A PERALATAN PER JAM KERJA
BIAYA
HARGA SEWA KET.
ALAT ALAT/JAM
(di luar PPN)
5,500,000,000 9,300,227.32
600,000,000 291,688.84
34,452,000 66,291.43
2,500,000,000 676,363.95
19,800,000 148,532.82
35,000,000 85,708.29
1,951,950,000 560,718.71
360,000,000 241,419.48
420,000,000 382,807.01
1,100,000,000 412,240.54
700,000,000 297,760.49
207,000,000 332,906.02
1,145,500,000 422,701.29
1,100,000,000 320,229.04
1,700,000,000 457,627.36
700,000,000 232,037.99
1,698,750,000 425,712.77
1,425,000,000 469,016.92
644,300,000 262,241.51
12,500,000 50,091.68
3,500,000,000 951,291.03
7,467,000 46,179.40
660,000,000 342,249.64
667,380,560 200,697.19
102,900,000 77,255.27
46,000,000 43,336.89
900,000,000 981,397.14
4,525,762,500 935,116.94
850,000,000 419,076.61
400,000,000 138,510.33
5,970,000,000 1,115,707.01
11,350,000 53,660.58
2,250,000,000 593,016.76
150,000,000 71,361.06
800,000,000 469,608.50
5,300,000,000 1,293,062.71
12,000,000 453,464.59
7,400,000,000 2,604,981.33
16,000,000,000 3,299,827.58
395,000,000 415,435.09
395,000,000 375,233.72
13,769,105,700 2,388,230.41
20,988,000 95,036.55
900,000,000 636,968.69
500,000,000 446,370.95
500,000,000 388,370.95
35,000,000 75,644.29 T x Te1 x Te2 x Fa
8,190,000 46,180.86
1,425,000,000 593,159.42
1,170,000,000 462,899.05
10,540,000,000 2,074,385.74
500,000,000 212,272.90
150,000,000 122,478.56
82,500,000 58,329.76
82,500,000 58,329.76
1,650,000,000 557,418.92
24,000,000 185,741.30
12,000,000 52,307.79
100 40,978.44
585,000,000 158,145.05
100 53,261.34
400,000,000 53,745.67
300,000,000 220,935.07
35,530,000 44,194.31
5,500,000,000 9,300,227.32
5,500,000,000 9,300,227.32
1,550,000,000 438,613.03
370,361.46
134,065.52
35,408.27
37,043.02
100,000.00
100,000.00
20,000.00
15,000,000.00 43,373.93
7,000,000.00 39,288.79
26,000,000.00 48,991.00
7,500,000.00 39,544.11
900,000,000.00 184,852.27
600,000,000.00 342,100.00
30,000,000.00 51,033.57
75,000,000.00 56,440.39
16,000,000.00 40,135.86
5,000,000.00 38,267.50
120,000,000.00 68,876.06
70,000,000.00 55,058.65
T x Te1 x Te2 x Fa
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan TRONTON 15 TON
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 15.0 Ton
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 800,000,000 Rupiah
5.
A. URAIAN PERALATAN
1. Jenis Peralatan COLD MILLING MACHINE
2. Tenaga Pw 240.0 HP
3. Kapasitas Cp 1,000 m
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 5,300,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ROCK DRILL BREAKER
2. Tenaga Pw 2.7 HP
3. Kapasitas Cp 0.7 M3
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 12,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan COLD RECYCLER
2. Tenaga Pw 900.0 HP
3. Kapasitas Cp 2.200 M
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 7,400,000,000 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan HOT RECYCLER
2. Tenaga Pw 400.0 HP
3. Kapasitas Cp 3 M
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 16,000,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan AGGREGAT (CHIP) SPREADER
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 3.5 M
4. Alat Baru a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 395,000,000.0 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT DISTRIBUTOR
2. Tenaga Pw 115 HP
3. Kapasitas Cp 4,000 Liter
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 395,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan SLIP FORM PAVER
2. Tenaga Pw 174 HP
3. Kapasitas Cp 7.00 M
4. Alat Baru a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 13,769,105,700 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PAN MIXER
2. Tenaga Pw 15 HP
3. Kapasitas Cp 600.00 Liter
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 20,988,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 2,098,800 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE BREAKER
2. Tenaga Pw 290 HP
3. Kapasitas Cp 20.00 m3/jam
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 900,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPAHLT TANKER
2. Tenaga Pw 190 HP
3. Kapasitas Cp 4,000.00 liter
4. Alat Baru a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 500,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CEMENT TANKER
2. Tenaga Pw 190 HP
3. Kapasitas Cp 4,000.00 liter
4. Alat Baru a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 500,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONDRETE MIXER (350)
2. Tenaga Pw 20 HP
3. Kapasitas Cp 350.00 liter
4. Alat Baru a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 35,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATING RAMMER
2. Tenaga Pw 4 HP
3. Kapasitas Cp 80.00 KG
4. Alat Baru a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 8,190,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan TRUK MIXER (AGITATOR)
2. Tenaga Pw 220 HP
3. Kapasitas Cp 5.00 M3
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,425,000,000 Rupiah
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE
2. Tenaga Pw 125 HP
3. Kapasitas Cp 60.00 CM
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,170,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 75-100 TON
2. Tenaga Pw 200 HP
3. Kapasitas Cp 75.00 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 10,540,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BLENDING EQUIPMENT
2. Tenaga Pw 50 HP
3. Kapasitas Cp 30.00 Ton
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 500,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 50,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BAR CUTTER
2. Tenaga Pw 3 HP
3. Kapasitas Cp
4. Alat Baru a. Umur Ekonomis A 8 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,250 Jam
c. Harga Alat B 82,500,000 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BREAKER
2. Tenaga Pw 170 HP
3. Kapasitas Cp 15 m3/jam
4. Alat Baru a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 1,650,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan GROUTING PUMP
2. Tenaga Pw 100 HP
3. Kapasitas Cp 15 Ton
4. Alat Baru a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 24,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan JACK HIDROLIC
2. Tenaga Pw 10 HP
3. Kapasitas Cp - -
4. Alat Baru a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 12,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 1,200,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan MESIN LAS
2. Tenaga Pw 3.0 Hp
3. Kapasitas Cp 0.17 Ton
4. Alat Baru a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 900 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan PILE DRIVER LEADER, 75 kw
2. Tenaga Pw 70.0 HP
3. Kapasitas Cp 75.0 kw
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 9,600.0 Jam
c. Harga Alat B 585,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan PILE HAMMER
2. Tenaga Pw 10.0 Hp
3. Kapasitas Cp 0.0 0
4. Alat Baru a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 800.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan PILE HAMMER, 2,5 Ton
2. Tenaga Pw 1.0 HP
3. Kapasitas Cp 2.5 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 8,000.0 Jam
c. Harga Alat B 400,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan STRESSING JACK
2. Tenaga Pw 89.0 Hp
3. Kapasitas Cp 15.0 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,800.0 Jam
c. Harga Alat B 300,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A URAIAN PERALATAN
1. Jenis Peralatan WELDING MACHINE, 300 A
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 10,000.0 Jam
c. Harga Alat B 35,530,000 Rupiah
A. URAIAN PERALATAN
1. Jenis Peralatan MINI EXCAVATOR 40-60 HP
2. Tenaga Pw 50.0 HP
3. Kapasitas Cp 0.20 M3
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 450,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BABY VIBRATORY ROLLER 1-2 T.
2. Tenaga Pw 7.6 HP
3. Kapasitas Cp 1.5 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 120,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan WATER JET BLASTING
2. Tenaga Pw 7 HP
3. Kapasitas Cp 100 Liter
4. Alat Baru a. Umur Ekonomis A 3 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200 Jam
c. Harga Alat B 16,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 1,600,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan POMPA + MIXER EPOXY, 810 Watt
2. Tenaga Pw 1 HP
3. Kapasitas Cp 0.80 l/mnt
4. Alat Baru a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 7,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE CUTTER 130 feet/mnt
2. Tenaga Pw 13 HP
3. Kapasitas Cp 39.62 m/menit
4. Alat Baru a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 26,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan SAND BLASTING
2. Tenaga Pw 75 HP
3. Kapasitas Cp 10.00 m2/jam
4. Alat Baru a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 7,500,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan MOBILE CRANE 1 TON
2. Tenaga Pw 190.0 HP
3. Kapasitas Cp 1.0 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 900,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan DRUM MIXER
2. Tenaga Pw 20 HP
3. Kapasitas Cp 4.00 Ton/jam
4. Alat Baru a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 600,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan STAMPER
2. Tenaga Pw 22 HP
3. Kapasitas Cp 60.00 m2/jam
4. Alat Baru a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 30,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan JACK HIDROLIK JEMBATAN
2. Tenaga Pw 22 HP
3. Kapasitas Cp 50.00 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 75,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan HYDROLIC PUMP
2. Tenaga Pw 22 HP
3. Kapasitas Cp 30.00 Mpa
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 16,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan MANIFOLD
2. Tenaga Pw HP
3. Kapasitas Cp 1.00
4. Alat Baru a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 5,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan THERMOPLASTIC SPREADING MACHINE
2. Tenaga Pw 6 HP
3. Kapasitas Cp 1,300.00 m/jam
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 120,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan COLD PAINT SRAY MACHINE
2. Tenaga Pw 6 HP
3. Kapasitas Cp 1,300.00 m/jam
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 70,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan
2. Tenaga Pw 6 HP
3. Kapasitas Cp 1,300.00 m/jam
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 0 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan
2. Tenaga Pw 6 HP
3. Kapasitas Cp 70.00 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 0 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 0 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 21,428.57 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 14,500.00 Liter
6. Minyak Pelumas Mp 42,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
KET.
E35
% / Tahun
KET.
E37
% / Tahun
KET.
E36
% / Tahun
KET.
E38
% / Tahun
KET.
E39
% / Tahun
KET.
E40
% / Tahun
KET.
E41
5
% / Tahun
KET.
E42
% / Tahun
KET.
E43
% / Tahun
KET.
E44
% / Tahun
KET.
E45
% / Tahun
KET.
E46
% / Tahun
KET.
E47
% / Tahun
KET.
E48
% / Tahun
KET.
E49
% / Tahun
KET.
E50
% / Tahun
KET.
E51
% / Tahun
KET.
E52
% / Tahun
KET.
E53
% / Tahun
KET.
E54
% / Tahun
KET.
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KET.
E10a
% / Tahun
KET.
E19a
% / Tahun
KETERANGAN
E64
% / Tahun
KET.
E74
buah baut
% / Tahun
KET.
E75
% / Tahun
KET.
E76
% / Tahun
KET.
E77
% / Tahun
KET.
E78
% / Tahun
KET.
E79
3-5
% / Tahun
KET.
E81
% / Tahun
KET.
E82
% / Tahun
KET.
E83
% / Tahun
KET.
E84
% / Tahun
KET.
E85
% / Tahun
KET.
E86
% / Tahun
KET.
% / Tahun
KET.
% / Tahun
KET.
% / Tahun
URAIAN ANALISIS CETAKAN GORONG-GORO
No. URAIAN
A. URAIAN PERALATAN
1 Jenis Peralatan
2 Alat a. Umur Ekonomis
b. Durasi penggunaan cetakan
D. INFORMASI LAINNYA
1 Tingkat Suku Bunga
2 Upah Operator / Sopir
3 Upah Pembantu Operator / Pmb.Sopir
4 Pekerja
5 Los Kerja
6 Bahan Bakar Bensin
7 Bahan Bakar Solar
8 Minyak Pelumas
No. URAIAN
A. URAIAN PERALATAN
1 Jenis Peralatan
2 Alat a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
3 Dimensi cetakan
Lebar gorong-gorong
Tinggi gorong-gorong
Tebal atas gorong-gorong
Tebal dasar saluran dan dinding tegak gorong-gorong
4 Saluran beton kotak Untuk mendapatkan 1 M' gorong-gorong diperlukan
Luas panampang dinding
Kll
Panjang saluran per buah
- Beton 30 MPa = A x l
Berat Saluran per buah
5 Penampang beton Total
6 Panjang saluran per M3 beton
3 Operator OJ = Orang
4 Pembantu Operator OJ = Orang
5 Teknisi OJ = Orang
6 Pekerja OJ = Orang
7 Tukang Las OJ = Orang
8 K.Tkg OJ = Orang
9 Mandor OJ = Orang
10 Hotel OJ = Kamar
Biaya Operasi per Jam = (H+I+J+K+L+M)
D. INFORMASI LAINNYA
1 Tingkat Suku Bunga
2 Upah Operator / Sopir
3 Upah Pembantu Operator / Pmb.Sopir
4 Teknisi
5 Pekerja
6 Tukang
7 K.Tkg
8 Mandor
9 Los Kerja
10 Bahan Bakar Bensin
11 Bahan Bakar Solar
12 Minyak Pelumas
No. URAIAN
A. URAIAN PERALATAN
1 Jenis Peralatan
2 Alat a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
3 Dimensi cetakan
4 Saluran beton bentuk U Tipe DS 1 Lebar bagian dalam
Kedalaman saluran
Tebal dinding tegak
Tebal dasar saluran beton
Panjang saluran per buah
Berat Saluran per buah
Penampang Saluran beton
Kll
5 Tutup Saluran beton Lebar dalam
Tebal tutup
Panjang tutup
Penampang Tutup
Berat tutup per buah
6 Penampang beton Total
3 Operator OJ = Orang
4 Pembantu Operator OJ = Orang
5 Teknisi OJ = Orang
6 Pekerja OJ = Orang
7 Tukang Las OJ = Orang
8 K.Tkg OJ = Orang
9 Mandor OJ = Orang
10 Hotel OJ = Kamar
Biaya Operasi per Jam = (H+I+J+K+L+M)
D. INFORMASI LAINNYA
1 Tingkat Suku Bunga
2 Upah Operator / Sopir
3 Upah Pembantu Operator / Pmb.Sopir
4 Teknisi
5 Pekerja
6 Tukang
7 K.Tkg
8 Mandor
9 Los Kerja
10 Bahan Bakar Bensin
11 Bahan Bakar Solar
12 Minyak Pelumas
No. URAIAN
A. URAIAN PERALATAN
1 Jenis Peralatan
2 Alat a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
3 Dimensi cetakan
4 Saluran beton bentuk U Tipe DS 1 Lebar bagian dalam
Kedalaman saluran
Tebal dinding tegak
Tebal dasar saluran beton
Panjang saluran per buah
Berat Saluran per buah
Penampang Saluran beton
Kll
5 Tutup Saluran beton Lebar dalam
Tebal tutup
Panjang tutup
Penampang Tutup
Berat tutup per buah
Kll
6 Penampang beton Total
3 Operator OJ = Orang
4 Pembantu Operator OJ = Orang
5 Teknisi OJ = Orang
6 Pekerja OJ = Orang
7 Tukang Las OJ = Orang
8 K.Tkg OJ = Orang
9 Mandor OJ = Orang
10 Hotel OJ = Kamar
Biaya Operasi per Jam = (H+I+J+K+L+M)
D. INFORMASI LAINNYA
1 Tingkat Suku Bunga
2 Upah Operator / Sopir
3 Upah Pembantu Operator / Pmb.Sopir
4 Teknisi
5 Pekerja
6 Tukang
7 K.Tkg
8 Mandor
9 Los Kerja
10 Bahan Bakar Bensin
11 Bahan Bakar Solar
12 Minyak Pelumas
d 0.20 M
D 0.340 M
t 0.070 M
Luas1 0.031 M2
Luas2 0.091 M2
Ao 0.059 M2
t.Bj 0.010 M
Kll 1.697 M'
Vol/Bj.pm' 0.017 M3
Bj.Baja 7,860
Brt CTkn 133.4 Kg
10,267 Rp/Kg
Hrg Ctkn 1,369,571 Rupiah
Hrg Ctkn 1,575,006 Rupiah
Jum.Ctkn 2.00 Buah
B 3,150,013
sudah disesuaikan Dur,hr 0.021 Hari
Dur.jam 0.500 jam
C - Rupiah
i x (1 + i)^A D 1.1000
(1 + i)^A - 1
%xB J 20.70
W
%xB K 98.1 Rupiah
W
= OJ x U1 L - Rupiah
= OJ x U2 M - Rupiah
= OJ x T1 N - Rupiah
= OJ x P - Rupiah
(H+I+J+K+L+M) P 119 Rupiah
i 10.00 % / Tahun
U1 21,428.57 Rp./Jam 150,000
U2 14,285.71 Rp./Jam 100,000
T1 14,285.71 Rp./Jam 350,000
45,000.00 Rp./Jam 350,000
Mb 7,000.00 Rp./liter
Ms 14,500.00 Rp./liter
Mp 42,000.00 Rp./liter
T 3,012 Rupiah
= T x Dur 1,506 Rp/ M'
Ukuran 40 x 40 cm
A 1 Tahun
W1 1,200 Jam
W2 1,200 Jam
B 0.40 M
T 0.40 M
tag 9.00 cm
an dinding tegak gorong-gorong tbg 9.00 cm
M' gorong-gorong diperlukan
= (tag x B) + (tbg x (B+2*(T-tbg+tag) A 0.11 M2
Kll-1 0.74 m'
L2 1.00 M'
(EI-714) 0.11 M3/M'
= A x D3 Brt 262 Kg
0.736 M2/M'
=1/Ao1 8.961 M'/M3
2,350 Kg
Bi,Bj 7.856 Ton/m3
Hrg.pkg 10,267 Rp/kg
Kell 0.74 m
tbl.baja 12 mm
69.4 Kg
10.5 Kg
20 %
Brt.Tot 95.9 Kg
= Brt.Tot x Hrg Bj B 2,692,623 Rupiah
hari Dur.hari 1.0 hari
Dur.jam 24.0 jam
C 269,262 Rupiah
i x (1 + i)^A D 1.1000 -
(1 + i)^A - 1
% x B / W2 J 41 Rupiah
% x B / W2 K 192.78 Rupiah
= OJ x U1 L 0.00 Rupiah
= OJ x U2 M 0.00 Rupiah
= OJ x T1 N 0.00 Rupiah
= OJ x P 0.00 Rupiah
= OJ x Tkg 0.00 Rupiah
= OJ x Tkg 0.00 Rupiah
= OJ x M 0.00 Rupiah
= OJ x H1 0.00 Rupiah
(H+I+J+K+L+M) P 233.48 Rupiah
i 10.00 % / Tahun
U1 210,463.50 Rp./Jam
U2 14,285.71 Rp./Jam
T1 64,071.43 Rp./Jam
14,285.71 Rp./Jam
21,428.57 Rp./Jam
22,857.14 Rp./Jam
24,285.71 Rp./Jam
45,000.00 Rp./Jam
Mb 7,000.00 Rp./liter
Ms 14,500.00 Rp./liter
Mp 42,000.00 Rp./liter
T 2,459 Rupiah
Sw 59,025 Rp/M'/Mgu
S = Bo 400 mm
h = Ho 700 mm
t1 150 mm
t2 150 mm
L2 1000 mm
= A x D3 Brt 740 Kg
=(2*t2+S)*(h+t1)-(S*h) Ao1 0.32 m2
Kll-1 2.63 m'
Bo mm
t1 mm
L2 mm
Ao2 M2
Brt.ttp Kg
2.630 M2/M'
2,350 Kg
Bi,Bj 7.856 Ton/m3
Hrg.pkg 10,267 Rp/kg
Kell 2.63 m
tbl.baja 12 mm
247.9 Kg
29.7 Kg
20 %
Brt.Tot 333.2 Kg
= Brt.Tot x Hrg Bj B 3,420,525 Rupiah
hari Dur.hari 1.0 hari
Dur.jam 24.0 jam
C 342,053 Rupiah
i x (1 + i)^A D 1.1000 -
(1 + i)^A - 1
% x B / W2 J 0 Rupiah
% x B / W2 K 0.00 Rupiah
= OJ x U1 L 0.00 Rupiah
= OJ x U2 M 0.00 Rupiah
= OJ x T1 N 0.00 Rupiah
= OJ x P 0.00 Rupiah
= OJ x Tkg 0.00 Rupiah
= OJ x Tkg 0.00 Rupiah
= OJ x M 0.00 Rupiah
= OJ x H1 0.00 Rupiah
(H+I+J+K+L+M) P 0.00 Rupiah
i 10.00 % / Tahun
U1 210,463.50 Rp./Jam 1,473,245
U2 14,285.71 Rp./Jam 100,000
T1 64,071.43 Rp./Jam 350,000
14,285.71 Rp./Jam
21,428.57 Rp./Jam
22,857.14 Rp./Jam
24,285.71 Rp./Jam
45,000.00 Rp./Jam 350,000
Mb 7,000.00 Rp./liter
Ms 14,500.00 Rp./liter
Mp 42,000.00 Rp./liter
T 2,822 Rupiah
Sw 67,726 Rp/M'/Mgu
Tanpa Penutup
Tbl dind Sewa Rp/m'/Mgu
150 Rp 67,726.40
150 Rp 20,659.04
150 Rp 21,564.55
150 Rp 23,375.57
150 Rp 25,186.60
150 Rp 25,186.60
S = Bo 400 mm
h = Ho 700 mm
t1 150 mm
t2 150 mm
L2 1000 mm
= A x D3 Brt 740 Kg
=(2*t2+S)*(h+t1)-(S*h) Ao1 0.32 m2
= 2xH + 4 x h + 4 x t2 Kll-1 3.60 m'
Bo 400 mm
t1 150 mm
L2 400 mm
Ao2 0 M2
Brt.ttp 247 Kg
= 4 x t2 + 2 x h + 2 x t1 Kll-2 1.70 m'
3.705 M2/M'
2,350 Kg
Bi,Bj 7.856 Ton/m3
Hrg.pkg 10,267 Rp/kg
Kell 5.30 m
tbl.baja 12.00 mm
499.6 Kg
29.7 Kg
20 %
Brt.Tot 635.2 Kg
= Brt.Tot x Hrg Bj B 6,521,647 Rupiah
hari Dur.hari 1.0 hari
Dur.jam 24.0 jam
C 652,165 Rupiah
i x (1 + i)^A D 1.1000 -
(1 + i)^A - 1
% x B / W2 J 0 Rupiah
% x B / W2 K 0.00 Rupiah
= OJ x U1 L 0.00 Rupiah
= OJ x U2 M 0.00 Rupiah
= OJ x T1 N 0.00 Rupiah
= OJ x P 0.00 Rupiah
= OJ x Tkg 0.00 Rupiah
= OJ x Tkg 0.00 Rupiah
= OJ x M 0.00 Rupiah
= OJ x H1 0.00 Rupiah
(H+I+J+K+L+M) P 0.00 Rupiah
i 10.00 % / Tahun
U1 210,463.50 Rp./Jam 1,473,245
U2 14,285.71 Rp./Jam 100,000
T1 64,071.43 Rp./Jam 350,000
14,285.71 Rp./Jam
21,428.57 Rp./Jam
22,857.14 Rp./Jam
24,285.71 Rp./Jam
45,000.00 Rp./Jam 350,000
Mb 7,000.00 Rp./liter
Ms 14,500.00 Rp./liter
Mp 42,000.00 Rp./liter
T 5,380 Rupiah
Sw 129,129 Rp/M'/Mgu
engan Penutup
Tbl dind Sewa Rp/m'/Mgu
150 Rp 129,128.61
150 Rp 43,330.33
150 Rp 48,998.16
150 Rp 60,333.80
150 Rp 71,669.45
150 Rp 71,669.45
Cetakan Gorong-Gorong Beton
Ø 25 cm, Per M' Ø 30 cm, Per M' Ø 40 cm, Per M' Ø 50 cm, Per M' Ø 60 cm, Per M'
1 1 1 1 1
1,200 1,200 1,200 1,200 1,200
4,114 4,114 4,114 4,114 4,114
- - - - -
- - - - -
- - - - -
- - - - -
41 47 60 73 86
17 22 31 48 59
0 0 0 0 0
0 0 0 0 0
Ø 80 cm, Per M' Ø 100 cm, Per M' Ø 120 cm, Per M' Ø 150 cm, Per M' Ø 200 cm, Per M'
1 1 1 1 1
1,200 1,200 1,200 1,200 1,200
4,114 4,114 4,114 4,114 4,114
- - - - -
- - - - -
- - - - -
- - - - -
200 237 167 208 289
140 x 140 150 x 150 160 x 160 180 x 180 200 x 200
1 1 1 1 1
1,200 1,200 1,200 1,200 1,200
4,114 4,114 4,114 4,114 4,114
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan
D. TENAGA / PERSONIL
Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
4. Jumlah atau Kuantitas disesuaikan Pada Lampiran Spesifikasi 2018 Tabel 1.8.B.1 Kondisi Zona 7
5. Harga Peralatan Lalu Lintas ditambah 20% (asumsi ongkir dan biaya pasang)
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
C. TENAGA / PERSONIL
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN
2 Pengukuran Kebisingan, Parameter yang diambil
1.17.(1k) Pengujian Parameter Kualitas Air Lainnya sampel
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji kebisingan
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji kebisingan
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.300.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji kebisingan
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.300.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
A. DATA DAN ASUMSI
1 Pengeboran untuk penyelidikan tanah dilokasi kegiatan
termasuk pembuatan laporan hasil penyelidikan
2 Jasa pengeboran termasuk sewa peralatan yg digunakan,
personil yang melakukan pengeboran, biaya pengujian
laboratorium dan pembuatan laporan
3 Penentuan lokasi pengeboran harus seijin direksi
B. URUTAN KERJA
1 Penyedia memobilisasi peralatan pengeboran kelokasi yang
telah disetujui oleh PPK
2 Pengeboran dilakukan dengan mengambil SPT dan sampel
tanah terganggu (Disturb) dengan interval mak.2 meter atau
setiap ada perubahan strata tanah
3 Benda uji diambil dan dilakukan pengujian laboratorium
Pengeboran dilakukan hingga mencapai tanah keras atau
SPT hingga nilai >40
4 Dibuat laporan hasil pengujian
D. TENAGA/PERSONIL
Estimasi kedalaman boring per titik M 40.00
1 Tenaga Ahli Pengeboran OH 1.00
2 Tenaga Pendukung OH 4.00
3 Mobilisasi dan Demobilisasi Tenaga Ls 1.00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia memobilisasi peralatan sondir kelokasi yang
telah disetujui oleh PPK
2 Sondir dilakukan untuk mengukur tahanan ujung dan
hambatan akibat gesekan dengan interval 0,20m sampai
tahanan ujung mak.sebesar 250 Kg/Cm2
3 Dibuat laporan hasil pengujian
D. TENAGA/PERSONIL
Estimasi kedalaman boring per titik M 30.00
1 Tenaga Ahli Sondir OH 1.00
2 Tenaga Pendukung OH 4.00
3 Mobilisasi dan Demobilisasi Tenaga Ls 1.00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
C. TENAGA / PERSONIL
Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya tersebut sudah termasuk biaya pembuatan laporan yang terkait dengan mutu pekerjaan
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan pembuatan laporan mutu seperti komputer, printer, kertas dan sebagainya.
Analisa El - 181
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
660,000.00 13,200,000.00
660,000.00 2,640,000.00
660,000.00 1,980,000.00 (minimum 3)
660,000.00 0.00
660,000.00 2,640,000.00
660,000.00 0.00
660,000.00 0.00
660,000.00 0.00
660,000.00 15,840,000.00
660,000.00 2,640,000.00
660,000.00 0.00
1,074,000.00 0.00
240,000.00 9,600,000.00 Jarak antar Cone Maks 5 m Asumsi Pek. Per 200 m
78,000.00 0.00 Disesuaikan dengan Lokasi
840,960.00 0.00 Disesuaikan dengan Lokasi
203,880.00 0.00 Disesuaikan dengan Kebutuhan
3,240,000.00 0.00
100,000.00 67,050,000.00
Exercise marka sesuai pemenhub No.67 tahun 2018
0.00 0.00
45,000.00 0.00
90,000.00 0.00
342,000.00 0.00
7,800.00 1,560,000.00 Asumsi Pek. Per 200 m
4,140,000.00 41,400,000.00
0.00
3,941,075.00 283,757,400.00
4,856,850.00 116,564,400.00
558,871,800.00
dukung yang
Kondisi Zona 7
Analisa El - 182
ATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
0
-
0.00 -
384,707.30 115,412,188.75
-
180,790.86 81,355,887.50
174,974.36 236,215,387.50
210,463.50 31,569,525.00
464,552,988.75
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
215,000.00 1,935,000
1,935,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
Contoh: Diambil dari Tarif
Jasa Layanan Teknis, Balai
Riset dan Standardisasi
Industri Samarinda + biaya
Transportasi
240,000.00 2,160,000
2,160,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
230,000.00 2,070,000
2,070,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
230,000.00 2,070,000
2,070,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
245,000.00 2,205,000
2,205,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
Contoh: Diambil dari Tarif
Jasa Layanan Teknis, Balai
Riset dan Standardisasi
Industri Samarinda + biaya
Transportasi
305,000.00 2,745,000
2,745,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
3,600,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
328,000.00 2,952,000
2,952,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
470,000.00 4,230,000
4,230,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
Contoh: Diambil dari Tarif
Jasa Layanan Teknis, Balai
Riset dan Standardisasi
Industri Samarinda + biaya
Transportasi
215,000.00 1,935,000
1,935,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
ATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
725,000.00 6,525,000
6,525,000.00
300.000,00
ATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
900,000.00 8,100,000
8,100,000.00
300.000,00
Analisa El - 117(b)
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
0.00
300.000,00
Analisa El - 117(c)
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
413,666.67 3,723,000 Jasa Layanan Teknis, Balai
Riset dan Standardisasi
Industri Samarinda + biaya
3,723,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
493,333.33 4,440,000
4,440,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
533,333.33 4,800,000
4,800,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
513,333.33 4,620,000
4,620,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
496,333.33 4,467,000
4,467,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
475,333.33 4,278,000
4,278,000.00
ATUAN
HARGA JUMLAH
SATUAN HARGA KETERANGAN
(Rp.) (Rp.)
0.00
Analisa El - 119
ATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Analisa El - 1201
ATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
801,666.67 801,666.67
403,000.00 1,612,000.00
1,000,000.00 1,000,000.00
21,213,666.67
2,121,366.67
23,335,033.33
583,375.83
Analisa El - 1202
ATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
801,666.67 801,666.67
403,000.00 1,612,000.00
500,000.00 500,000.00
12,313,666.67
1,231,366.67
13,545,033.33
451,501.11
Analisa El - 121
ATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
26,541,666.67 318,500,000.00 min 5 tahun pengalaman
20,041,666.67 240,500,000.00
11,212,500.00 403,650,000.00
300,000.00 3,600,000.00
966,250,000.00
dukung yang
Asumsi Pek. Per 200 m
ITEM PEMBAYARAN NO. : 2.1.(1)
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HA
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
2. ALAT
2.a. MINI EXCAVATOR (E10a)
Kapasitas Bucket V 0.20
Faktor Bucket Fb 1.00
Faktor Efisiensi alat Fa 0.83
Faktor konversi , kedalaman 40 %-75 %, Normal Fv 1.00
Waktu siklus Ts1
- Menggali , memuat (swing 180ᵒ) T1 0.240
- Lain lain T2 0.080
Waktu siklus = T1 + T2 Ts1 0.32
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 37.35
Produksi Galian / hari = Tk x Q1 Qt 261.45
Kebutuhan tenaga :
- Pekerja P 6.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1606
- Mandor = (Tk x M) : Qt (L03) 0.0268
Rp. 34,750.47 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Perbandingan Pasir & Semen : - Volume Semen Sm 17
: - Volume Pasir Ps 83
7 Perbandingan Batu & Mortar :
- Batu Bt 60
- Mortar (campuran semen & pasir) Mr 40
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.00
- Batu D2 1.05
- Adukan (mortar) D3 1.90
- Pasir D4 1.45
- Semen Portland D5 3.14
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.05 (M02) 1.20
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.03 0.0737
x {D5 x (1000)} (M12) 232.00
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.4808
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1 4.00
- Mengaduk T2 4.00
- Menuang T3 1.00
- Menunggu, dll. T4 1.00
Ts1 10.00
3. TENAGA
Produksi Pas. Batu yang menentukan ( Prod. C. Mixer ) Q1 2.49
Produksi Pasangan Batu dalam 1 hari = Tk x Q1 Qt 17.43
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016
- Tukang = (Tk x Tb) : Qt (L02) 4.8193
- Pekerja = (Tk x P) : Qt (L01) 4.8193
Rp. 1,286,690.82 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.20
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Tebal gorong-gorong tg 2.90
2. ALAT
2.a. TAMPER (tebal lapis porous) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 26.73
Produksi Gorong-gorong Tanpa Tulangan / hari = Tk x Q2 Qt 187.09
Kebutuhan tenaga :
- Pekerja P 14.00
- Tukang T 8.00
- Mandor M 1.00
Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 0.5238
- Tukang = (Tk x T) : Qt (L02) 0.2993
- Mandor = (Tk x M) : Qt (L03) 0.0374
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.25
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Tebal gorong-gorong tg 3.20
2. ALAT
2.a. TAMPER (tebal lapis porous) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 22.27
Produksi Gorong-gorong Tanpa Tulangan / hari = Tk x Q2 Qt 71.27
Kebutuhan tenaga :
- Pekerja P 14.00
- Tukang T 8.00
- Mandor M 1.00
Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 1.3750
- Tukang = (Tk x T) : Qt (L02) 0.7857
- Mandor = (Tk x M) : Qt (L03) 0.0982
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.30
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Tebal gorong-gorong tg 4.40
2. ALAT
2.a. TAMPER (tebal lapis porous) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 17.82
Produksi Gorong-gorong Tanpa Tulangan / hari = Tk x Q2 Qt 124.73
Kebutuhan tenaga :
- Pekerja P 14.00
- Tukang T 8.00
- Mandor M 1.00
Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 0.7857
- Tukang = (Tk x T) : Qt (L02) 0.4490
- Mandor = (Tk x M) : Qt (L03) 0.0561
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.40
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Tebal gorong-gorong tg 5.08
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 35.88
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 13.36
Produksi Gorong-gorong Bertulang / hari = Tk x Q2 Qt 93.55
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
Koefisien tenaga / M1 :
Pekerja = (Tk x P) : Qt (L01) 0.7483
Tukang = (Tk x T) : Qt (L02) 0.4490
Mandor = (Tk x M) : Qt (L03) 0.0748
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.60
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Tebal gorong-gorong tg 6.35
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 29.78
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 11.58
Produksi Gorong-gorong Bertulang / hari = Tk x Q2 Qt 81.07
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.80
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Tebal gorong-gorong tg 7.50
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 18.82
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 10.69
Produksi Gorong-gorong Bertulang / hari = Tk x Q2 Qt 74.84
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 1.00
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Tebal gorong-gorong tg 8.50
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 13.38
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 10.69
Produksi Gorong-gorong Bertulang / hari = Tk x Q2 Qt 74.84
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 1.20
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Tebal gorong-gorong tg 10.00
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 9.98
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 8.91
Produksi Gorong-gorong Bertulang / hari = Tk x Q2 Qt 62.36
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 1.50
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Tebal gorong-gorong tg 12.50
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 6.89
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 6.24
Produksi Gorong-gorong Bertulang / hari = Tk x Q2 Qt 43.66
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter dalam gorong-gorong baja d 1.00
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Tebal gorong-gorong tg 0.25
7 BJ Pipa Baja Bergelombang BJp 7.90
BJp1 0.12445
II. URUTAN KERJA
1 Gorong-gorong baja diterima dari pemasok
di lokasi pekerjaan
2 Dasar gorong-gorong digali sesuai kebutuhan
3 Tebal lapis porus pada dasar gorong-gorong baja tp 0.15
4 Gorong-gorong baja dipasang sesuai Gambar
5 Material pilihan untuk penimbunan kembali (padat)
6 Sekelompok pekerja akan melaksanakan pekerjaan
dengan cara manual dengan menggunakan alat bantu
2. ALAT
2.a. TAMPER (untuk pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.15
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 4.45
Produksi Gorong-gorong Pipa Baja Bergelombang / hari = Tk x Q2 Qt 31.18
Kebutuhan tenaga :
- Pekerja P 8.00
- Tukang T 3.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Lebar gorong-gorong B 0.40
4 Tinggi gorong-gorong T 0.40
5 Tebal atas gorong-gorong tag 9.00
6 Tebal dasar saluran dan dinding tegak gorong-gorong tbg 9.00
7 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.00
8 Jam kerja efektif per-hari Tk 7.00
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 35.29
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 37.35
Produksi Gorong-gorong Kotak / hari = Tk x Q2 Qt 261.45
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Lebar gorong-gorong B 0.50
4 Tinggi gorong-gorong T 0.50
5 Tebal atas gorong-gorong tag 10.00
6 Tebal dasar saluran dan dinding tegak gorong-gorong tbg 10.00
7 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.00
8 Jam kerja efektif per-hari Tk 7.00
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 49.80
Produksi Gorong-gorong Kotak / hari = Tk x Q2 Qt 348.60
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Lebar gorong-gorong B 0.60
4 Tinggi gorong-gorong T 0.60
5 Tebal atas gorong-gorong tag 11.00
6 Tebal dasar saluran dan dinding tegak gorong-gorong tbg 10.00
7 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.00
8 Jam kerja efektif per-hari Tk 7.00
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 26.00
n x (El-241)
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Lebar gorong-gorong B 0.80
4 Tinggi gorong-gorong T 0.80
5 Tebal atas gorong-gorong tag 12.00
6 Tebal dasar saluran dan dinding tegak gorong-gorong tbg 10.00
7 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.00
8 Jam kerja efektif per-hari Tk 7.00
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 19.00
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 43.58
Produksi Gorong-gorong Kotak / hari = Tk x Q2 Qt 305.03
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Lebar gorong-gorong B 1.00
4 Tinggi gorong-gorong T 1.00
5 Tebal atas gorong-gorong tag 14.00
6 Tebal dasar saluran dan dinding tegak gorong-gorong tbg 12.50
7 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.00
8 Jam kerja efektif per-hari Tk 7.00
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 14.12
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 34.86
Produksi Gorong-gorong Kotak / hari = Tk x Q2 Qt 244.02
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Lebar gorong-gorong B 1.20
4 Tinggi gorong-gorong T 1.20
5 Tebal atas gorong-gorong tag 14.00
6 Tebal dasar saluran dan dinding tegak gorong-gorong tbg 12.50
7 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.00
8 Jam kerja efektif per-hari Tk 7.00
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 10.74
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 29.88
Produksi Gorong-gorong Kotak / hari = Tk x Q2 Qt 209.16
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Lebar gorong-gorong B 1.40
4 Tinggi gorong-gorong T 1.40
5 Tebal atas gorong-gorong tag 16.00
6 Tebal dasar saluran dan dinding tegak gorong-gorong tbg 16.00
7 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.00
8 Jam kerja efektif per-hari Tk 7.00
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 8.37
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 24.90
Produksi Gorong-gorong Kotak / hari = Tk x Q2 Qt 174.30
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Lebar gorong-gorong B 1.50
4 Tinggi gorong-gorong T 1.50
5 Tebal atas gorong-gorong tag 17.00
6 Tebal dasar saluran dan dinding tegak gorong-gorong tbg 15.00
7 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.00
8 Jam kerja efektif per-hari Tk 7.00
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 7.46
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 23.66
Produksi Gorong-gorong Kotak / hari = Tk x Q2 Qt 165.59
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Lebar gorong-gorong B 1.60
4 Tinggi gorong-gorong T 1.60
5 Tebal atas gorong-gorong tag 18.00
6 Tebal dasar saluran dan dinding tegak gorong-gorong tbg 18.00
7 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.00
8 Jam kerja efektif per-hari Tk 7.00
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 6.68
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 21.79
Produksi Gorong-gorong Kotak / hari = Tk x Q2 Qt 152.51
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Lebar gorong-gorong B 1.80
4 Tinggi gorong-gorong T 1.80
5 Tebal atas gorong-gorong tag 20.00
6 Tebal dasar saluran dan dinding tegak gorong-gorong tbg 18.00
7 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.00
8 Jam kerja efektif per-hari Tk 7.00
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 5.43
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 19.42
Produksi Gorong-gorong Kotak / hari = Tk x Q2 Qt 135.95
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Lebar gorong-gorong B 2.00
4 Tinggi gorong-gorong T 2.00
5 Tebal atas gorong-gorong tag 20.00
6 Tebal dasar saluran dan dinding tegak gorong-gorong tbg 18.00
7 Jarak rata-rata Base Camp ke lokasi pekerjaan L 1.00
8 Jam kerja efektif per-hari Tk 7.00
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.50
Banyak lintasan n 10
Tebal lapis hamparan tp 0.10
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 4.49
n x (El-241)
3. TENAGA
Produksi menentukan : Flat Bed Truck Q2 17.43
Produksi Gorong-gorong Kotak / hari = Tk x Q2 Qt 122.01
Kebutuhan tenaga :
- Pekerja P 10.00
- Tukang T 6.00
- Mandor M 1.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base Camp
seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
Saluran beton Tipe U DS 1
Lebar bagian dalam Bo 400.00
Lebar saluran B 700.00
Kedalaman saluran h 400.00
Tebal dinding tegak t1 150.00
Tebal dasar saluran t2 150.00
Panjang saluran Ln 3,000.00
Volume Saluran per meter Prf 0.32
6 Perbandingan Campuran fc 25 MPa : Semen Sm 299.0
: Pasir Ps 842.0
: Agregat Kasar Kr 1,097.0
: Air Air 185.0
: Plasticizer Plt 0.9
7 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
8 Berat Isi :
- Beton D1 2.20
- Pasir D2 1.45
- Agregat Kasar D3 1.45
- Air D4 1.00
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 4.00
- Mengaduk T2 4.00
- Menuang T3 1.00
- Tunggu, dll. T4 1.00
Ts 10.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016
- Tukang = (Tk x Tb) : Qt (L02) 2.0080
- Pekerja = (Tk x P) : Qt (L01) 4.0161
Rupiah 366,471.00 / M1
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base Camp
seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
Saluran beton Tipe U DS 1
Lebar bagian dalam Bo 400.00
Lebar saluran B 700.00
Kedalaman saluran h 400.00
Tebal dinding tegak t1 150.00
Tebal dasar saluran t2 150.00
Panjang saluran Ln 3,000.00
Volume Saluran per meter Prf 0.63
6 Perbandingan Campuran fc 25 MPa : Semen Sm 299.0
: Pasir Ps 842.0
: Agregat Kasar Kr 1,097.0
: Air Air 185.0
: Plasticizer Plt 0.9
7 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
8 Berat Isi :
- Beton D1 2.20
- Pasir D2 1.45
- Agregat Kasar D3 1.45
- Air D4 1.00
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 4.00
- Mengaduk T2 4.00
- Menuang T3 1.00
- Tunggu, dll. T4 1.00
Ts 10.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016
- Tukang = (Tk x Tb) : Qt (L02) 2.0080
- Pekerja = (Tk x P) : Qt (L01) 4.0161
Rupiah 366,471.00 / M1
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : Bulan
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 4.00
- Mengaduk T2 4.00
- Menuang T3 1.00
- Tunggu, dll. T4 1.00
Ts 10.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016
- Tukang = (Tk x Tb) : Qt (L02) 2.0080
- Pekerja = (Tk x P) : Qt (L01) 4.0161
Rupiah 366,471.00 / M1
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base Camp
seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
Saluran beton Tipe U DS 1
Lebar bagian dalam Bo 500.00
Lebar saluran B 800.00
Kedalaman saluran h 400.00
Tebal dinding tegak t1 150.00
Tebal dasar saluran t2 150.00
Panjang saluran Ln 3,000.00
Volume Saluran per meter Prf 0.72
6 Perbandingan Campuran fc 25 MPa : Semen Sm 299.0
: Pasir Ps 842.0
: Agregat Kasar Kr 1,097.0
: Air Air 185.0
: Plasticizer Plt 0.9
7 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
8 Berat Isi :
- Beton D1 2.20
- Pasir D2 1.45
- Agregat Kasar D3 1.45
- Air D4 1.00
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 4.00
- Mengaduk T2 4.00
- Menuang T3 1.00
- Tunggu, dll. T4 1.00
Ts 10.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016
- Tukang = (Tk x Tb) : Qt (L02) 2.0080
- Pekerja = (Tk x P) : Qt (L01) 4.0161
Rupiah 366,471.00 / M1
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base Camp
seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
Saluran beton Tipe U DS 1
Lebar bagian dalam Bo 600.00
Lebar saluran B 900.00
Kedalaman saluran h 400.00
Tebal dinding tegak t1 150.00
Tebal dasar saluran t2 150.00
Panjang saluran Ln 3,000.00
Volume Saluran per meter Prf 0.41
6 Perbandingan Campuran fc 25 MPa : Semen Sm 299.0
: Pasir Ps 842.0
: Agregat Kasar Kr 1,097.0
: Air Air 185.0
: Plasticizer Plt 0.9
7 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
8 Berat Isi :
- Beton D1 2.20
- Pasir D2 1.45
- Agregat Kasar D3 1.45
- Air D4 1.00
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 4.00
- Mengaduk T2 4.00
- Menuang T3 1.00
- Tunggu, dll. T4 1.00
Ts 10.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016
- Tukang = (Tk x Tb) : Qt (L02) 2.0080
- Pekerja = (Tk x P) : Qt (L01) 4.0161
Rupiah 366,471.00 / M1
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base Camp
seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
Saluran beton Tipe U DS 1
Lebar bagian dalam Bo 600.00
Lebar saluran B 900.00
Kedalaman saluran h 400.00
Tebal dinding tegak t1 150.00
Tebal dasar saluran t2 150.00
Panjang saluran Ln 3,000.00
Volume Saluran per meter Prf 0.81
6 Perbandingan Campuran fc 25 MPa : Semen Sm 299.0
: Pasir Ps 842.0
: Agregat Kasar Kr 1,097.0
: Air Air 185.0
: Plasticizer Plt 0.9
7 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
8 Berat Isi :
- Beton D1 2.20
- Pasir D2 1.45
- Agregat Kasar D3 1.45
- Air D4 1.00
II. URUTAN KERJA
1 Galian lokasi saluran sesuai elevasi dan dimensi rencana
2 Semen, pasir, agregat dan air diaduk dengan komposisi sesuai
rancangan mutu dengan menggunakan beton mixer
3 Beton di-cor ke dalam bekisting dan diratakan dg vibrator
4 Penyelesaian dan perapihan setelah pengecoran
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 4.00
- Mengaduk T2 4.00
- Menuang T3 1.00
- Tunggu, dll. T4 1.00
Ts 10.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016
- Tukang = (Tk x Tb) : Qt (L02) 2.0080
- Pekerja = (Tk x P) : Qt (L01) 4.0161
Rupiah 366,471.00 / M1
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base Camp
seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
Saluran beton Tipe U DS 1
Lebar bagian dalam Bo 800.00
Lebar saluran B 1,100.00
Kedalaman saluran h 400.00
Tebal dinding tegak t1 150.00
Tebal dasar saluran t2 150.00
Panjang saluran Ln 3,000.00
Volume Saluran per meter Prf 0.50
6 Perbandingan Campuran fc 25 MPa : Semen Sm 299.0
: Pasir Ps 842.0
: Agregat Kasar Kr 1,097.0
: Air Air 185.0
: Plasticizer Plt 0.9
7 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
8 Berat Isi :
- Beton D1 2.20
- Pasir D2 1.45
- Agregat Kasar D3 1.45
- Air D4 1.00
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 4.00
- Mengaduk T2 4.00
- Menuang T3 1.00
- Tunggu, dll. T4 1.00
Ts 10.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016
- Tukang = (Tk x Tb) : Qt (L02) 2.0080
- Pekerja = (Tk x P) : Qt (L01) 4.0161
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base Camp
seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
Saluran beton Tipe U DS 1
Lebar bagian dalam Bo 800.00
Lebar saluran B 1,100.00
Kedalaman saluran h 400.00
Tebal dinding tegak t1 150.00
Tebal dasar saluran t2 150.00
Panjang saluran Ln 3,000.00
Volume Saluran per meter Prf 0.99
6 Perbandingan Campuran fc 25 MPa : Semen Sm 299.0
: Pasir Ps 842.0
: Agregat Kasar Kr 1,097.0
: Air Air 185.0
: Plasticizer Plt 0.9
7 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
8 Berat Isi :
- Beton D1 2.20
- Pasir D2 1.45
- Agregat Kasar D3 1.45
- Air D4 1.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016
- Tukang = (Tk x Tb) : Qt (L02) 2.0080
- Pekerja = (Tk x P) : Qt (L01) 4.0161
Rupiah 366,471.00 / M1
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base Camp
seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
Saluran beton Tipe U DS 1
Lebar bagian dalam Bo 1,000.00
Lebar saluran B 1,300.00
Kedalaman saluran h 400.00
Tebal dinding tegak t1 150.00
Tebal dasar saluran t2 150.00
Panjang saluran Ln 3,000.00
Volume Saluran per meter Prf 0.59
6 Perbandingan Campuran fc 25 MPa : Semen Sm 299.0
: Pasir Ps 842.0
: Agregat Kasar Kr 1,097.0
: Air Air 185.0
: Plasticizer Plt 0.9
7 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
8 Berat Isi :
- Beton D1 2.20
- Pasir D2 1.45
- Agregat Kasar D3 1.45
- Air D4 1.00
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 4.00
- Mengaduk T2 4.00
- Menuang T3 1.00
- Tunggu, dll. T4 1.00
Ts 10.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016
- Tukang = (Tk x Tb) : Qt (L02) 2.0080
- Pekerja = (Tk x P) : Qt (L01) 4.0161
Rupiah 366,471.00 / M1
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base Camp
seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
Saluran beton Tipe U DS 1
Lebar bagian dalam Bo 1,000.00
Lebar saluran B 1,300.00
Kedalaman saluran h 400.00
Tebal dinding tegak t1 150.00
Tebal dasar saluran t2 150.00
Panjang saluran Ln 3,000.00
Volume Saluran per meter Prf 1.17
6 Perbandingan Campuran fc 25 MPa : Semen Sm 299.0
: Pasir Ps 842.0
: Agregat Kasar Kr 1,097.0
: Air Air 185.0
: Plasticizer Plt 0.9
7 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
8 Berat Isi :
- Beton D1 2.20
- Pasir D2 1.45
- Agregat Kasar D3 1.45
- Air D4 1.00
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 4.00
- Mengaduk T2 4.00
- Menuang T3 1.00
- Tunggu, dll. T4 1.00
Ts 10.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016
- Tukang = (Tk x Tb) : Qt (L02) 2.0080
- Pekerja = (Tk x P) : Qt (L01) 4.0161
Rupiah 366,471.00 / M1
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base Camp
seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
Saluran beton Tipe U DS 1
Lebar bagian dalam Bo 1,000.00
Lebar saluran B 1,300.00
Kedalaman saluran h 400.00
Tebal dinding tegak t1 150.00
Tebal dasar saluran t2 150.00
Panjang saluran Ln 3,000.00
Volume Saluran per meter Prf 0.59
6 Perbandingan Campuran fc 25 MPa : Semen Sm 299.0
: Pasir Ps 842.0
: Agregat Kasar Kr 1,097.0
: Air Air 185.0
: Plasticizer Plt 0.9
7 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
8 Berat Isi :
- Beton D1 2.20
- Pasir D2 1.45
- Agregat Kasar D3 1.45
- Air D4 1.00
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 4.00
- Mengaduk T2 4.00
- Menuang T3 1.00
- Tunggu, dll. T4 1.00
Ts 10.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016
- Tukang = (Tk x Tb) : Qt (L02) 2.0080
- Pekerja = (Tk x P) : Qt (L01) 4.0161
Rupiah 366,471.00 / M1
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di Base Camp
seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
Saluran beton Tipe U DS 1
Lebar bagian dalam Bo 1,000.00
Lebar saluran B 1,300.00
Kedalaman saluran h 400.00
Tebal dinding tegak t1 150.00
Tebal dasar saluran t2 150.00
Panjang saluran Ln 3,000.00
Volume Saluran per meter Prf 1.17
6 Perbandingan Campuran fc 25 MPa : Semen Sm 299.0
: Pasir Ps 842.0
: Agregat Kasar Kr 1,097.0
: Air Air 185.0
: Plasticizer Plt 0.9
7 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
8 Berat Isi :
- Beton D1 2.20
- Pasir D2 1.45
- Agregat Kasar D3 1.45
- Air D4 1.00
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 4.00
- Mengaduk T2 4.00
- Menuang T3 1.00
- Tunggu, dll. T4 1.00
Ts 10.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016
- Tukang = (Tk x Tb) : Qt (L02) 2.0080
- Pekerja = (Tk x P) : Qt (L01) 4.0161
Rupiah 366,471.00 / M1
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu dan pasir) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan material Fh 1.05
7 Perbandingan Batu & Pasir : - Batu Bt 70
- Pasir Ps 30
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.05 (M02) 1.2600
Pasir -----> {(Ps x D1 x 1 M3) : D3} x 1.05 (M01) 0.3910
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gerobak Dorong
- Palu Batu
3. TENAGA
Produksi pasangan batu kosong dalam 1 hari Qt 24.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 9.00
- Pekerja P 18.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 2.9167
- Tukang = (Tk x Tb) : Qt (L02) 26.2500
- Pekerja = (Tk x P) : Qt (L01) 52.5000
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp. 792,373.16 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan terpengaruh oleh aliran air tanah
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan material Fh 1.05
6 Perbandingan batu pecah dan pasir : - Batu pecah Bt 50.00
- Pasir Kasar Ps 50.00
8 Berat Jenis Bahan :
- Batu D2 1.05
- Pasir D3 1.45
2. ALAT
2.a. ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Alat-alat kecil lain
3. TENAGA
Produksi yang dapat diselesaikan / hari Qt 10.00
Kebutuhan tenaga :
- Pekerja P 4.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.8000
- Mandor = (Tk x M) : Qt (L03) 0.7000
Rp. 270,350.56 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan terpengaruh oleh aliran air tanah
4 Jam kerja efektif per-hari Tk 7.00
5 Diameter dalam pipa d 10.16
6 Faktor kehilangan material Fh 1.03
7 Material penyaring terdiri dari material porus
8 Penyangga sambungan pipa dengan mortar
2. ALAT
2.a. ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Pacul
- Alat-alat kecil lain
- Bor
3. TENAGA
Produksi yang dapat diselesaikan / hari Qt 12.00
Kebutuhan tenaga :
- Pekerja P 2.00
- Tukang T 4.00
- Mandor M 1.00
Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 1.1667
- Tukang = (Tk x T) : Qt (L02) 2.3333
- Mandor = (Tk x M) : Qt (L03) 0.5833
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan terpengaruh oleh aliran air tanah
4 Jam kerja efektif per-hari Tk 7.00
5 Diameter dalam pipa d 12.70
6 Faktor kehilangan material Fh 1.03
7 Material penyaring terdiri dari material porus
8 Penyangga sambungan pipa dengan mortar
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan terpengaruh oleh aliran air tanah
4 Jam kerja efektif per-hari Tk 7.00
5 Diameter dalam pipa d 15.24
6 Faktor kehilangan material Fh 1.03
7 Material penyaring terdiri dari material porus
8 Penyangga sambungan pipa dengan mortar
3. TENAGA
Produksi yang dapat diselesaikan / hari Qt 12.00
Kebutuhan tenaga :
- Pekerja P 2.00
- Tukang T 1.00
- Mandor M 1.00
Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 1.1667
- Tukang = (Tk x T) : Qt (L02) 0.5833
- Mandor = (Tk x M) : Qt (L03) 0.5833
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan terpengaruh oleh aliran air tanah
4 Jam kerja efektif per-hari Tk 7.00
5 Diameter dalam pipa d 20.32
3. TENAGA
Produksi yang dapat diselesaikan / hari Qt 12.00
Kebutuhan tenaga :
- Pekerja P 2.00
- Tukang T 1.00
- Mandor M 1.00
Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 1.1667
- Tukang = (Tk x T) : Qt (L02) 0.5833
- Mandor = (Tk x M) : Qt (L03) 0.5833
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
PROP / KAB / KODYA : ………………………………………………
jam ITEM PEMBAYARAN NO. : 2.1.(1)
- JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Salura
SATUAN PEMBAYARAN : M3
Disesuaikan dengan
kondisi dilapangan
Km sesuai ketentuan Pasal
1.5.3 A. TENAGA
B. BAHAN
M3
- -
-
menit
menit
menit
menit Permen PUPR
No 28/PRT/M/2016
M3/Jam
Jam
C. PERALATAN
Analisa EI-211
SATUAN KETERANGAN
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-221
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.2.(1)
KM JENIS PEKERJAAN : Pasangan Batu dengan Mortar
jam SATUAN PEMBAYARAN : M3
% 1:5
ton/M3
ton/M3 lepas A. TENAGA
ton/M3
ton/M3 1. Pekerja (L01) jam
ton/M3 Berat Jenis 2. Tukang Batu (L02) jam
3. Mandor (L03) jam
B. BAHAN
1. Batu (M02) M3
2. Semen (PC) (M12) Kg
3. Pasir (M01) M3
M3 Lepas
Kg
M3
C. PERALATAN
menit
menit
menit
menit
menit
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
M3 E. OVERHEAD & PROFIT 10.0
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
Lump Sum dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-221
SATUAN KETERANGAN
M3/Jam
M3
orang
orang
orang
jam
jam
jam
Analisa EI-231
FORMULIR STANDAR UNTU
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
PROP / KAB / KODYA : ………………………………………………
m ITEM PEMBAYARAN NO. : 2.3.(1)
Km JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulang
jam SATUAN PEMBAYARAN : M'
Cm
A. TENAGA
M
1. Pekerja (L01) jam
2. Tukang (L02) jam
3. Mandor (L03) jam
B. BAHAN
M3/M'
M3/M' 1. Beton f`c 15 Mpa (EI-716) M3
M3/M' 2. Urugan Porus (EI-241) M3
3. Mat. Pilihan (M09) M3
bh/M' 5 Cetakan diameter 20 cm bh/M'
Km / Jam Diperhitungkan
- hanya tamper
M C. PERALATAN
lintasan
M 1. Tamper (E25) jam
2. Tamper (E25) jam
M' / Jam 3 Flat Bed Truck (E11) jam
4 Alat Bantu Ls
jam
Km / Jam Diperhitungkan
- hanya tamper
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
M3 / Jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
M'
Km/Jam
Km/Jam
menit
menit
menit
menit
M' / Jam
jam
Analisa EI-231
SATUAN KETERANGAN
Lump Sump
M'/jam
M
orang
orang
orang
Jam
Jam
Jam
Analisa EI-232
FORMULIR STANDAR UNTU
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
PROP / KAB / KODYA : ………………………………………………
m ITEM PEMBAYARAN NO. : 2.3.(2)
Km JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulang
jam SATUAN PEMBAYARAN : M1
Cm
A. TENAGA
M Sand bedding
1. Pekerja (L01) jam
2. Tukang (L02) jam
3. Mandor (L03) jam
B. BAHAN
M3/M'
M3/M' 1. Beton 15 Mpa M3
M3/M' 2. Urugan Porus M3
3. Mat. Pilihan (M09) M3
bh/M' 5 Cetakan diameter 25 cm bh/M'
Km / Jam Diperhitungkan
- hanya tamper
M C. PERALATAN
lintasan
M 1. Tamper (E25) jam
2. Tamper (E25) jam
M' / Jam 3 Flat Bed Truck (E11) jam
4 Alat Bantu Ls
jam
Km / Jam Diperhitungkan
- hanya tamper
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
M3 / Jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
M'
Km/Jam
Km/Jam
menit
menit
menit
menit
M' / Jam
jam
Analisa EI-232
SATUAN KETERANGAN
Lump Sump
M'/jam
M
orang
orang
orang
Jam
Jam
Jam
Analisa EI-233
FORMULIR STANDAR UNTU
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
PROP / KAB / KODYA : ………………………………………………
m ITEM PEMBAYARAN NO. : 2.3.(3)
Km JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulang
jam SATUAN PEMBAYARAN : M1
Cm
A. TENAGA
M Sand bedding
1. Pekerja (L01) jam
2. Tukang (L02) jam
3. Mandor (L03) jam
B. BAHAN
M3/M'
M3/M' 1. Beton 15 Mpa M3
M3/M' 2. Urugan Porus M3
3. Mat. Pilihan (M09) M3
bh/M' 5 Cetakan diameter 30 cm bh/M'
Km / Jam Diperhitungkan
- hanya tamper
M C. PERALATAN
lintasan
M 1. Tamper (E25) jam
2. Tamper (E25) jam
M' / Jam 3 Flat Bed Truck (E11) jam
4 Alat Bantu Ls
jam
Km / Jam Diperhitungkan
- hanya tamper
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
M3 / Jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
M'
Km/Jam
Km/Jam
menit
menit
menit
menit
M' / Jam
jam
Analisa EI-233
SATUAN KETERANGAN
Lump Sump
M'/jam
M
orang
orang
orang
Jam
Jam
Jam
Analisa EI-234
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
m PROP / KAB / KODYA : ………………………………………………
Km ITEM PEMBAYARAN NO. : 2.3.(4)
jam JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, dia
Cm SATUAN PEMBAYARAN : M1
M A. TENAGA
Km / Jam
-
M C. PERALATAN
lintasan
M 1. Tamper (E25) jam
M' / Jam 2. Flat Bed Truck (E11) jam
3. Alat Bantu Ls
jam
Km / Jam
-
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
lintasan E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
M' / Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
M' 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-234
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
Jam
Jam
Jam
Analisa EI-235
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
m PROP / KAB / KODYA : ………………………………………………
Km ITEM PEMBAYARAN NO. : 2.3.(5)
jam JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, d
Cm SATUAN PEMBAYARAN : M1
M3/M' B. BAHAN
Kg/M'
M3/M' 1. Beton 30 Mpa (M59) M3
M3/M' 2. Baja Tulangan (M39) Kg
3. Timbunan Porus M3
bh/M' 4. Mat. Pilihan (M09) M3
5 Cetakan diameter 60 cm bh/M'
Km / Jam
-
M
lintasan C. PERALATAN
M
M' / Jam 1. Tamper (E25) Jam
2. Flat Bed Truck (E11) Jam
3. Alat Bantu Ls
jam
Km / Jam
-
M
lintasan
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
M E. OVERHEAD & PROFIT 10.0
M' / Jam F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
M' 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
Km/Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-235
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-236
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
m PROP / KAB / KODYA : ………………………………………………
Km ITEM PEMBAYARAN NO. : 2.3.(6)
Jam JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, dia
Cm SATUAN PEMBAYARAN : M1
M3 B. BAHAN
Kg
M3 1. Beton 30 MPa (M59) M3
M3 2. Baja Tulangan (M39) Kg
3. Urugan Porus M3
bh/M' 4. Mat. Pilihan (M09) M3
5 Cetakan diameter 80 cm bh/M'
Km / Jam
-
M
lintasan C. PERALATAN
M
M' / Jam 1. Tamper (E25) Jam
2. Flat Bed Truck (E11) Jam
3. Alat Bantu Ls
jam
Km / Jam
-
M
lintasan
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
M E. OVERHEAD & PROFIT 10.0
M' / Jam F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
M' 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
Km/Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-236
SATUAN KETERANGAN
M' / Jam
jam
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-237
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
m PROP / KAB / KODYA : ………………………………………………
Km ITEM PEMBAYARAN NO. : 2.3.(7)
Jam JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, dia
Cm SATUAN PEMBAYARAN : M1
M3/M' B. BAHAN
Kg/M'
M3/M' 1. Beton 30 MPa (M59) M3
M3/M' = Vp 2. Baja Tulangan (M39) Kg
3. Urugan Porus M3
bh/M' 4. Mat. Pilihan (M09) M3
5 Cetakan diameter 100 cm bh/M'
Km / Jam
-
M
lintasan C. PERALATAN
M
M' / Jam 1. Tamper (E25) Jam
2. Flat Bed Truck (E11) Jam
3. Alat Bantu Ls
jam
Km / Jam
-
M
lintasan
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
M E. OVERHEAD & PROFIT 10.0
M' / Jam F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
M' 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
Km/Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-237
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-238
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
m PROP / KAB / KODYA : ………………………………………………
Km ITEM PEMBAYARAN NO. : 2.3.(8)
Jam JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, dia
Cm SATUAN PEMBAYARAN : M1
M3/M' B. BAHAN
Kg/M'
M3/M' 1. Beton 30 Mpa (M59) M3
M3/M' 2. Baja Tulangan (M39) Kg
3. Urugan Porus M3
bh/M' 4. Mat. Pilihan (M09) M3
5 Cetakan diameter 120 cm bh/M'
Km / Jam
-
M
lintasan C. PERALATAN
M
M' / Jam 1. Tamper (E25) Jam
2. Flat Bed Truck (E11) Jam
3. Alat Bantu Ls
jam
Km / Jam
-
M
lintasan
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
M E. OVERHEAD & PROFIT 10.0
M' / Jam F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
M' 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
Km/Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-238
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-239
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
m PROP / KAB / KODYA : ………………………………………………
Km ITEM PEMBAYARAN NO. : 2.3.(9)
Jam JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, dia
Cm SATUAN PEMBAYARAN : M1
Km / Jam
-
M
lintasan C. PERALATAN
M
M' / Jam 1. Tamper (E25) Jam
2. Flat Bed Truck (E11) Jam
3. Alat Bantu Ls
jam
Km / Jam
-
M
lintasan
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
M E. OVERHEAD & PROFIT 10.0
M' / Jam F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
M' 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
Km/Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-239
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-2310
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
m PROP / KAB / KODYA : ………………………………………………
Km ITEM PEMBAYARAN NO. : 2.3.(10)
Jam JENIS PEKERJAAN : Gorong - Gorong Pipa Baja Bergelombang
Cm SATUAN PEMBAYARAN : Ton
T/m3
T/m'
M
A. TENAGA
Kg B. BAHAN
M'/T
M3/T 1. Pipa Baja Glb. (M46) Kg
M3/T 2. Urugan Porus (EI-241) M3
3. Mat. Pilihan (M09) M3
Km / Jam
-
M C. PERALATAN
lintasan
M 1. Tamper (E25) Jam
2. Flat Bed Truck (E11) Jam
ton / Jam 3 Alat Bantu Ls
jam
Km / Jam
-
M D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
lintasan E. OVERHEAD & PROFIT 10.0
lapis F. HARGA SATUAN PEKERJAAN ( D + E )
M Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
ton / Jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
jam 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
M'
Km/Jam
Km/Jam
menit
menit
menit
menit
M' / Jam
jam
Lump Sump
Analisa EI-2310
SATUAN KETERANGAN
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-2311
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 2.3.(11)
cm JENIS PEKERJAAN : Gorong-gorong Kotak Beton Bertulang, uk
cm SATUAN PEMBAYARAN : M1
Km
Jam
A. TENAGA
M
1. Pekerja (L01) Jam
2. Tukang (L02) Jam
3. Mandor (L03) Jam
B. BAHAN
M2
M' 1. Beton 30 Mpa (M59) M3
M3/M' 2. Baja Tulangan (M39) Kg
Kg/M' 3. Urugan Porus (EI241) M3
M3/M' 4. Mat. Pilihan (M09) M3
M3/M' 5 Cetakan ukuran 40 x 40 bh/M'
bh/M'
jam
Km / Jam
- JUMLAH HARGA PERALATAN
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
lintasan E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
M' / Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
M' 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-2311
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-2312
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 2.3.(12)
cm JENIS PEKERJAAN : Gorong-gorong Kotak Beton Bertulang, uk
cm SATUAN PEMBAYARAN : M1
Km
Jam
A. TENAGA
M
1. Pekerja (L01) Jam
2. Tukang (L02) Jam
3. Mandor (L03) Jam
B. BAHAN
M2
M' 1. Beton 30 Mpa (M59) M3
M3/M' 2. Baja Tulangan (M39) Kg
Kg/M' 3. Urugan Porus (EI-241) M3
M3/M' 4. Mat. Pilihan (M09) M3
M3/M' 5 Cetakan ukuran 50 x 50 bh/M'
bh/M'
Km / Jam JUMLAH HARGA BAHAN
-
M C. PERALATAN
lintasan
M 1. Tamper (E25) Jam
M' / Jam 2. Flat Bed Truck (E11) Jam
3. Alat Bantu Ls
jam
Km / Jam
- JUMLAH HARGA PERALATAN
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
lintasan E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
M' / Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
M' 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-2312
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-2313
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 2.3.(13)
cm JENIS PEKERJAAN : Gorong-gorong Kotak Beton Bertulang, uk
cm SATUAN PEMBAYARAN : M1
Km
Jam
A. TENAGA
M
1. Pekerja (L01) Jam
2. Tukang (L02) Jam
3. Mandor (L03) Jam
B. BAHAN
M2
M' 1. Beton 30 Mpa (M59) M3
M3/M' 2. Baja Tulangan (M39) Kg
Kg/M' 3. Urugan Porus M3
M3/M' 4. Mat. Pilihan (M09) M3
M3/M' 5 Cetakan ukuran 60 x 60 bh/M'
bh/M'
jam
Km / Jam
- JUMLAH HARGA PERALATAN
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
lintasan E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
M' / Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
M' 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-2313
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-2314
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 2.3.(14)
cm JENIS PEKERJAAN : Gorong-gorong Kotak Beton Bertulang, uk
cm SATUAN PEMBAYARAN : M1
Km
Jam
A. TENAGA
M
1. Pekerja (L01) Jam
2. Tukang (L02) Jam
3. Mandor (L03) Jam
B. BAHAN
M2
M' 1. Beton 30 Mpa (M59) M3
M3/M' 2. Baja Tulangan (M39) Kg
Kg/M' 3. Urugan Porus (EI-241) M3
M3/M' 4. Mat. Pilihan (M09) M3
M3/M' 5 Cetakan ukuran 80 x 80 bh/M'
bh/M'
jam
Km / Jam
- JUMLAH HARGA PERALATAN
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
lintasan E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
M' / Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
M' 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-2314
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-2315
0 x 100 cm
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTU
PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 2.3.(15)
cm JENIS PEKERJAAN : Gorong-gorong Kotak Beton Bertulang, uk
cm SATUAN PEMBAYARAN : M1
Km
Jam
A. TENAGA
M
1. Pekerja (L01) Jam
2. Tukang (L02) Jam
3. Mandor (L03) Jam
B. BAHAN
M2
M' 1. Beton 30 Mpa (M59) M3
M3/M' 2. Baja Tulangan (M39) Kg
Kg/M' 3. Urugan Porus (EI-241) M3
M3/M' 4. Mat. Pilihan (M09) M3
M3/M' 5 Cetakan ukuran 100 x 100 bh/M'
bh/M'
jam
Km / Jam
- JUMLAH HARGA PERALATAN
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
lintasan E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
M' / Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
M' 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-2315
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-2316
0 x 120 cm
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTU
PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 2.3.(16)
cm JENIS PEKERJAAN : Gorong-gorong Kotak Beton Bertulang, uk
cm SATUAN PEMBAYARAN : M1
Km
Jam
A. TENAGA
M
1. Pekerja (L01) Jam
2. Tukang (L02) Jam
3. Mandor (L03) Jam
B. BAHAN
M2
M' 1. Beton 30 Mpa (M59) M3
M3/M' 2. Baja Tulangan (M39) Kg
Kg/M' 3. Urugan Porus (EI-241) M3
M3/M' 4. Mat. Pilihan (M09) M3
M3/M' 5 Cetakan ukuran 120 x 120 bh/M'
bh/M'
jam
Km / Jam
- JUMLAH HARGA PERALATAN
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
lintasan E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
M' / Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
M' 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-2316
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-2317
0 x 140 cm
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTU
PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 2.3.(17)
cm JENIS PEKERJAAN : Gorong-gorong Kotak Beton Bertulang, uk
cm SATUAN PEMBAYARAN : M1
Km
Jam
A. TENAGA
M
1. Pekerja (L01) Jam
2. Tukang (L02) Jam
3. Mandor (L03) Jam
B. BAHAN
M2
M' 1. Beton 30 Mpa (M59) M3
M3/M' 2. Baja Tulangan (M39) Kg
Kg/M' 3. Urugan Porus (EI-241) M3
M3/M' 4. Mat. Pilihan (M09) M3
M3/M' 5 Cetakan ukuran 140 x 140 bh/M'
bh/M'
jam
Km / Jam
- JUMLAH HARGA PERALATAN
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
lintasan E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
M' / Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
M' 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-2317
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-2318
0 x 150 cm
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTU
PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 2.3.(18)
cm JENIS PEKERJAAN : Gorong-gorong Kotak Beton Bertulang, uk
cm SATUAN PEMBAYARAN : M1
Km
Jam
NO. KOMPONEN SATUAN
A. TENAGA
M
1. Pekerja (L01) Jam
2. Tukang (L02) Jam
3. Mandor (L03) Jam
B. BAHAN
M2
M' 1. Beton 30 Mpa (M59) M3
M3/M' 2. Baja Tulangan (M39) Kg
Kg/M' 3. Urugan Porus (EI-241) M3
M3/M' 4. Mat. Pilihan (M09) M3
M3/M' 5 Cetakan ukuran 150 x 150 bh/M'
bh/M'
jam
Km / Jam
- JUMLAH HARGA PERALATAN
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
lintasan E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
M' / Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
M' 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-2318
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-2319
0 x 160 cm
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTU
PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 2.3.(19)
cm JENIS PEKERJAAN : Gorong-gorong Kotak Beton Bertulang, uk
cm SATUAN PEMBAYARAN : M1
Km
Jam
A. TENAGA
M Sand bedding
1. Pekerja (L01) Jam
2. Tukang (L02) Jam
3. Mandor (L03) Jam
B. BAHAN
M2
M' 1. Beton 30 Mpa (M59) M3
M3/M' 2. Baja Tulangan (M39) Kg
Kg/M' 3. Urugan Porus (EI-241) M3
M3/M' 4. Mat. Pilihan (M09) M3
M3/M' 5 Cetakan ukuran 160 x 160 bh/M'
bh/M'
jam
Km / Jam
- JUMLAH HARGA PERALATAN
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
lintasan E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
M' / Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
M' 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-2319
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-2320
0 x 180 cm
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTU
PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 2.3.(20)
cm JENIS PEKERJAAN : Gorong-gorong Kotak Beton Bertulang, uk
cm SATUAN PEMBAYARAN : M1
Km
Jam
A. TENAGA
M Sand bedding
1. Pekerja (L01) Jam
2. Tukang (L02) Jam
3. Mandor (L03) Jam
JUMLAH HARGA TENAGA
B. BAHAN
M2
M' 1. Beton 30 Mpa (M59) M3
M3/M' 2. Baja Tulangan (M39) Kg
Kg/M' 3. Urugan Porus (EI-241) M3
M3/M' 4. Mat. Pilihan (M09) M3
M3/M' 5 Cetakan ukuran 180 x 180 bh/M'
bh/M'
jam
Km / Jam
- JUMLAH HARGA PERALATAN
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
lintasan E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
M' / Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
M' 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-2320
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI-2321
0 x 200 cm
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTU
PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 2.3.(21)
cm JENIS PEKERJAAN : Gorong-gorong Kotak Beton Bertulang, uk
cm SATUAN PEMBAYARAN : M1
Km
Jam
A. TENAGA
M Sand bedding
1. Pekerja (L01) Jam
2. Tukang (L02) Jam
3. Mandor (L03) Jam
B. BAHAN
M2
M' 1. Beton 30 Mpa (M59) M3
M3/M' 2. Baja Tulangan (M39) Kg
Kg/M' 3. Urugan Porus (EI-241) M3
M3/M' 4. Mat. Pilihan (M09) M3
M3/M' 5 Cetakan ukuran 200 x 200 bh/M'
bh/M'
jam
Km / Jam
- JUMLAH HARGA PERALATAN
M
lintasan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C
lintasan E. OVERHEAD & PROFIT 10.0
M F. HARGA SATUAN PEKERJAAN ( D + E )
M' / Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja da
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Pen
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan
M' 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yan
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Km/Jam
Km/Jam
menit
menit
menit
menit
Berlanjut ke halaman berikut
Analisa EI-2321
SATUAN KETERANGAN
M' / Jam
jam
Lump Sump
M'/jam
M
orang
orang
orang
jam
jam
jam
Analisa EI - 2322
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : 2.3.(22)
JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 1
SATUAN PEMBAYARAN : M1
KM
Jam
Lihat Gambar
mm
mm
mm NO. KOMPONEN SATUAN
mm
mm
mm
M3 A. TENAGA
Kg/M3
Kg/M3 1. Pekerja (L01) Jam
Kg/M3 2. Tukang (L02) Jam
Kg/M3 3. Mandor (L03) Jam
Kg/M3
Sub Total Tena
B. MATERIAL
T/M3
T/M3 1. Semen (M12) Kg
T/M3 2. Pasir Beton (M01) M3
T/M3 3. Aggregat Kasar (M03) M3
5. Formworks (M195) M2
6 Air (M170) Ltr
7 Besi Beton (M57a) Kg
8 Kawat beton (M14) Kg
Sub Total Mater
C. PERALATAN
Jam
Analisa EI - 2322
0
next page
SATUAN KETERANGAN
M3
M3
-
Kali
M3
Jam
M3
Jam
M3
Orang
Orang
Orang
Jam
Jam
Jam
continued
Analisa EI - 2322
0
next page
SATUAN KETERANGAN
Analisa EI - 2323
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : 2.3.(23)
JENIS PEKERJAAN :Saluran berbentuk U Tipe DS 1a (den
SATUAN PEMBAYARAN : M1
KM
Jam
Lihat Gambar
mm
mm
mm NO. KOMPONEN SATUAN
mm
mm
mm
M3 A. TENAGA
Kg/M3
Kg/M3 1. Pekerja (L01) Jam
Kg/M3 2. Tukang (L02) Jam
Kg/M3 3. Mandor (L03) Jam
Kg/M3
Sub Total Tena
B. MATERIAL
T/M3
T/M3 1. Semen (M12) Kg
T/M3 2. Pasir Beton (M01) M3
T/M3 3. Aggregat Kasar (M03) M3
5. Formworks (M195) M2
6 Air (M170) Ltr
7 Besi Beton (M57a) Kg
8 Kawat beton (M14) Kg
Sub Total Mater
C. PERALATAN
Jam
Analisa EI - 2323
0
next page
SATUAN KETERANGAN
M3
M3
-
Kali
M3
Jam
M3
Jam
M3
Orang
Orang
Orang
Jam
Jam
Jam
continued
Analisa EI - 2323
0
next page
SATUAN KETERANGAN
Analisa EI - 2324
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : 2.3.(24)
JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 2
SATUAN PEMBAYARAN : M1
KM
Jam
Lihat Gambar
mm
mm
mm NO. KOMPONEN SATUAN
mm
mm
mm
M3 A. TENAGA
Kg/M3
Kg/M3 1. Pekerja (L01) Jam
Kg/M3 2. Tukang (L02) Jam
Kg/M3 3. Mandor (L03) Jam
Kg/M3
Sub Total Tena
B. MATERIAL
T/M3
T/M3 1. Semen (M12) Kg
T/M3 2. Pasir Beton (M01) M3
T/M3 3. Aggregat Kasar (M03) M3
5. Formworks (M195) M2
6 Air (M170) Ltr
7 Besi Beton (M57a) Kg
8 Kawat beton (M14) Kg
Sub Total Mater
C. PERALATAN
Jam
Analisa EI - 2324
0
next page
SATUAN KETERANGAN
M3
M3
-
Kali
M3
Jam
M3
Jam
M3
Orang
Orang
Orang
Jam
Jam
Jam
continued
Analisa EI - 2324
0
next page
SATUAN KETERANGAN
Analisa EI - 2325
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : 2.3.(25)
JENIS PEKERJAAN :Saluran berbentuk U Tipe DS 2a (den
SATUAN PEMBAYARAN : M1
KM
Jam
Lihat Gambar
mm
mm
mm NO. KOMPONEN SATUAN
mm
mm
mm
M3 A. TENAGA
Kg/M3
Kg/M3 1. Pekerja (L01) Jam
Kg/M3 2. Tukang (L02) Jam
Kg/M3 3. Mandor (L03) Jam
Kg/M3
Sub Total Tena
B. MATERIAL
T/M3
T/M3 1. Semen (M12) Kg
T/M3 2. Pasir Beton (M01) M3
T/M3 3. Aggregat Kasar (M03) M3
5. Formworks (M195) M2
6 Air (M170) Ltr
7 Besi Beton (M57a) Kg
8 Kawat beton (M14) Kg
Sub Total Mater
C. PERALATAN
Analisa EI - 2325
0
next page
SATUAN KETERANGAN
M3
M3
-
Kali
M3
Jam
M3
Jam
M3
Orang
Orang
Orang
Jam
Jam
Jam
continued
Analisa EI - 2325
0
next page
SATUAN KETERANGAN
Analisa EI - 2326
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : 2.3.(26)
JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 3
SATUAN PEMBAYARAN : M1
KM
Jam
Lihat Gambar
mm
mm
mm NO. KOMPONEN SATUAN
mm
mm
mm
M3 A. TENAGA
Kg/M3
Kg/M3 1. Pekerja (L01) Jam
Kg/M3 2. Tukang (L02) Jam
Kg/M3 3. Mandor (L03) Jam
Kg/M3
Sub Total Tena
B. MATERIAL
T/M3
T/M3 1. Semen (M12) Kg
T/M3 2. Pasir Beton (M01) M3
T/M3 3. Aggregat Kasar (M03) M3
5. Formworks (M195) M2
6 Air (M170) Ltr
7 Besi Beton (M57a) Kg
8 Kawat beton (M14) Kg
Sub Total Mater
C. PERALATAN
Jam
Analisa EI - 2326
0
next page
SATUAN KETERANGAN
M3
M3
-
Kali
M3
Jam
M3
Jam
M3
Orang
Orang
Orang
Jam
Jam
Jam
continued
Analisa EI - 2326
0
next page
SATUAN KETERANGAN
Analisa EI - 2327
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : 2.3.(27)
JENIS PEKERJAAN :Saluran berbentuk U Tipe DS 3a (den
SATUAN PEMBAYARAN : M1
KM
Jam
Lihat Gambar
mm
mm
mm NO. KOMPONEN SATUAN
mm
mm
mm
M3 A. TENAGA
Kg/M3
Kg/M3 1. Pekerja (L01) Jam
Kg/M3 2. Tukang (L02) Jam
Kg/M3 3. Mandor (L03) Jam
Kg/M3
Sub Total Tena
B. MATERIAL
T/M3
T/M3 1. Semen (M12) Kg
T/M3 2. Pasir Beton (M01) M3
T/M3 3. Aggregat Kasar (M03) M3
5. Formworks (M195) M2
6 Air (M170) Ltr
7 Besi Beton (M57a) Kg
8 Kawat beton (M14) Kg
Sub Total Mater
C. PERALATAN
Jam
Analisa EI - 2327
0
next page
SATUAN KETERANGAN
M3
M3
-
Kali
M3
Jam
M3
Jam
M3
Orang
Orang
Orang
Jam
Jam
Jam
continued
Analisa EI - 2327
0
next page
SATUAN KETERANGAN
Analisa EI - 2328
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : 2.3.(28)
JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 4
SATUAN PEMBAYARAN : M1
KM
Jam
Lihat Gambar
mm
mm
mm NO. KOMPONEN SATUAN
mm
mm
mm
M3 A. TENAGA
Kg/M3
Kg/M3 1. Pekerja (L01) Jam
Kg/M3 2. Tukang (L02) Jam
Kg/M3 3. Mandor (L03) Jam
Kg/M3
Sub Total Tena
B. MATERIAL
T/M3
T/M3 1. Semen (M12) Kg
T/M3 2. Pasir Beton (M01) M3
T/M3 3. Aggregat Kasar (M03) M3
5. Formworks (M195) M2
6 Air (M170) Ltr
7 Besi Beton (M57a) Kg
8 Kawat beton (M14) Kg
Sub Total Mater
C. PERALATAN
Jam
Analisa EI - 2328
0
next page
SATUAN KETERANGAN
M3
M3
-
Kali
M3
Jam
M3
Jam
M3
Orang
Orang
Orang
Jam
Jam
Jam
continued
Analisa EI - 2328
0
next page
SATUAN KETERANGAN
Analisa EI - 2329
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : 2.3.(29)
JENIS PEKERJAAN :Saluran berbentuk U Tipe DS 4a (den
SATUAN PEMBAYARAN : M1
KM
Jam
Lihat Gambar
mm
mm
mm NO. KOMPONEN SATUAN
mm
mm
mm
M3 A. TENAGA
Kg/M3
Kg/M3 1. Pekerja (L01) Jam
Kg/M3 2. Tukang (L02) Jam
Kg/M3 3. Mandor (L03) Jam
Kg/M3
Sub Total Tena
B. MATERIAL
T/M3
T/M3 1. Semen (M12) Kg
T/M3 2. Pasir Beton (M01) M3
T/M3 3. Aggregat Kasar (M03) M3
5. Formworks (M195) M2
6 Air (M170) Ltr
7 Besi Beton (M57a) Kg
8 Kawat beton (M14) Kg
Sub Total Mater
C. PERALATAN
Jam
Analisa EI - 2329
0
next page
SATUAN KETERANGAN
M3
M3
-
Kali
M3
Jam
M3
Jam
M3
Orang
Orang
Orang
Jam
Jam
Jam
continued
Analisa EI - 2329
0
next page
SATUAN KETERANGAN
Analisa EI - 2330
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : 2.3.(30)
JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 5
SATUAN PEMBAYARAN : M1
KM
Jam
Lihat Gambar
mm
mm
mm NO. KOMPONEN SATUAN
mm
mm
mm
M3 A. TENAGA
Kg/M3
Kg/M3 1. Pekerja (L01) Jam
Kg/M3 2. Tukang (L02) Jam
Kg/M3 3. Mandor (L03) Jam
Kg/M3
Sub Total Tena
B. MATERIAL
T/M3
T/M3 1. Semen (M12) Kg
T/M3 2. Pasir Beton (M01) M3
T/M3 3. Aggregat Kasar (M03) M3
5. Formworks (M195) M2
6 Air (M170) Ltr
7 Besi Beton (M57a) Kg
8 Kawat beton (M14) Kg
Sub Total Mater
C. PERALATAN
Jam
Analisa EI - 2330
0
next page
SATUAN KETERANGAN
M3
M3
-
Kali
M3
Jam
M3
Jam
M3
Orang
Orang
Orang
Jam
Jam
Jam
continued
Analisa EI - 2330
0
next page
SATUAN KETERANGAN
Analisa EI - 2331
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : 2.3.(31)
JENIS PEKERJAAN :Saluran berbentuk U Tipe DS 5a (den
SATUAN PEMBAYARAN : M1
KM
Jam
Lihat Gambar
mm
mm
mm NO. KOMPONEN SATUAN
mm
mm
mm
M3 A. TENAGA
Kg/M3
Kg/M3 1. Pekerja (L01) Jam
Kg/M3 2. Tukang (L02) Jam
Kg/M3 3. Mandor (L03) Jam
Kg/M3
Sub Total Tena
B. MATERIAL
T/M3
T/M3 1. Semen (M12) Kg
T/M3 2. Pasir Beton (M01) M3
T/M3 3. Aggregat Kasar (M03) M3
5. Formworks (M195) M2
6 Air (M170) Ltr
7 Besi Beton (M57a) Kg
8 Kawat beton (M14) Kg
Sub Total Mater
C. PERALATAN
Jam
Berlanjut ke halaman berikut
Analisa EI - 2331
0
next page
SATUAN KETERANGAN
M3
M3
-
Kali
M3
Jam
M3
Jam
M3
Orang
Orang
Orang
Jam
Jam
Jam
continued
Analisa EI - 2331
0
next page
SATUAN KETERANGAN
Analisa EI - 2332
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : 2.3.(32)
JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 6
SATUAN PEMBAYARAN : M1
KM
Jam
Lihat Gambar
mm
mm
mm NO. KOMPONEN SATUAN
mm
mm
mm
M3 A. TENAGA
Kg/M3
Kg/M3 1. Pekerja (L01) Jam
Kg/M3 2. Tukang (L02) Jam
Kg/M3 3. Mandor (L03) Jam
Kg/M3
Sub Total Tena
B. MATERIAL
T/M3
T/M3 1. Semen (M12) Kg
T/M3 2. Pasir Beton (M01) M3
T/M3 3. Aggregat Kasar (M03) M3
5. Formworks (M195) M2
6 Air (M170) Ltr
7 Besi Beton (M57a) Kg
8 Kawat beton (M14) Kg
Sub Total Mater
C. PERALATAN
Jam
Analisa EI - 2332
0
next page
SATUAN KETERANGAN
M3
M3
-
Kali
M3
Jam
M3
Jam
M3
Orang
Orang
Orang
Jam
Jam
Jam
continued
Analisa EI - 2332
0
next page
SATUAN KETERANGAN
Analisa EI - 2333
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : 2.3.(33)
JENIS PEKERJAAN :Saluran berbentuk U Tipe DS 6a (den
SATUAN PEMBAYARAN : M1
KM
Jam
Lihat Gambar
mm
mm
mm NO. KOMPONEN SATUAN
mm
mm
mm
M3 A. TENAGA
Kg/M3
Kg/M3 1. Pekerja (L01) Jam
Kg/M3 2. Tukang (L02) Jam
Kg/M3 3. Mandor (L03) Jam
Kg/M3
Sub Total Tena
B. MATERIAL
T/M3
T/M3 1. Semen (M12) Kg
T/M3 2. Pasir Beton (M01) M3
T/M3 3. Aggregat Kasar (M03) M3
5. Formworks (M195) M2
6 Air (M170) Ltr
7 Besi Beton (M57a) Kg
8 Kawat beton (M14) Kg
Sub Total Mater
C. PERALATAN
Jam
Analisa EI - 2333
0
next page
SATUAN KETERANGAN
M3
M3
-
Kali
M3
Jam
M3
Jam
M3
Orang
Orang
Orang
Jam
Jam
Jam
continued
Analisa EI - 2333
0
next page
SATUAN KETERANGAN
Analisa LI - 2334
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.3.(34)
KM JENIS PEKERJAAN : Pasangan Batu tanpa Adukan (Aanstamp
jam SATUAN PEMBAYARAN : M3
-
%
%
A. TENAGA
Lihat Gambar
1. Pekerja Biasa (L01) jam
2. Tukang (L02) jam
B. BAHAN
Analisa EI-241
FORMULIR STANDAR UNTU
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
…………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.4.(1)
KM JENIS PEKERJAAN : Bahan Drainase Porous untuk Bahan Pen
Jam SATUAN PEMBAYARAN : M3
-
%
%
NO. KOMPONEN SATUAN
ton/M3 lepas
ton/M3
A. TENAGA
Lump Sump
C. PERALATAN
M3 1.
2. Alat Bantu Ls
orang
orang
Jam
Jam
Analisa EI-242
n Drainase Bawah
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.4.(2)
Jam JENIS PEKERJAAN : Pipa Berlubang Banyak (Perforated Pipe)
Cm SATUAN PEMBAYARAN : M1
A. TENAGA
B. BAHAN
Lump Sump
1. Pipa Porous diameter 4" (M25) M'
M'
JUMLAH HARGA BAHAN
orang
orang C. PERALATAN
orang
1. Alat Bantu Ls
Jam
Jam
Jam
Analisa EI-243
n Drainase Bawah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.4.(3)
Jam JENIS PEKERJAAN : Pipa Berlubang Banyak (Perforated Pipe)
Cm SATUAN PEMBAYARAN : M1
A. TENAGA
Analisa EI-244
n Drainase Bawah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.4.(4)
Jam JENIS PEKERJAAN : Pipa Berlubang Banyak (Perforated Pipe)
Cm SATUAN PEMBAYARAN : M1
M'
JUMLAH HARGA BAHAN
orang
orang C. PERALATAN
orang
1. Alat Bantu Ls
Jam
Jam
Jam
Analisa EI-245
n Drainase Bawah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.4.(5)
Jam JENIS PEKERJAAN : Pipa Berlubang Banyak (Perforated Pipe)
Cm SATUAN PEMBAYARAN : M1
A. TENAGA
B. BAHAN
Lump Sump
M'
JUMLAH HARGA BAHAN
orang
orang C. PERALATAN
orang
1. Alat Bantu Ls
Jam
Jam
Jam
JUMLAH HARGA PERALATAN
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
uk Selokan Drainase dan Saluran ATOTAL HARGA (Rp.) : 34,750.47
0 % THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 31,591.34
% x D 3,159.13
34,750.47
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
Batu dengan Mortar TOTAL HARGA (Rp.) : 1,286,690.82
% THD. BIAYA PROYEK : 0.02
AN PERALATAN ( A + B + C ) 1,169,718.92
% x D 116,971.89
1,286,690.82
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Pipa Beton Tanpa Tulangan TOTAL HARGA (Rp.) : 118,178.34
0 % THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 107,434.85
% x D 10,743.49
118,178.34
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Pipa Beton Tanpa Tulangan TOTAL HARGA (Rp.) : 169,209.97
0 % THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 153,827.25
% x D 15,382.72
169,209.97
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Pipa Beton Tanpa Tulangan TOTAL HARGA (Rp.) : 207,090.03
0 % THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 188,263.66
% x D 18,826.37
207,090.03
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Pipa Beton Bertulang, diame TOTAL HARGA (Rp.) : 446,772.26
0 % THD. BIAYA PROYEK : 0.01
AN PERALATAN ( A + B + C ) 406,156.60
% x D 40,615.66
446,772.26
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Pipa Beton Bertulang, diamTOTAL HARGA (Rp.) : 702,746.93
0 % THD. BIAYA PROYEK : 0.01
AN PERALATAN ( A + B + C ) 638,860.84
% x D 63,886.08
702,746.93
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Pipa Beton Bertulang, diame TOTAL HARGA (Rp.) : 1,104,308.84
% THD. BIAYA PROYEK : 0.02
AN PERALATAN ( A + B + C ) 1,003,917.12
% x D 100,391.71
1,104,308.84
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Pipa Beton Bertulang, diame TOTAL HARGA (Rp.) : 1,496,834.51
% THD. BIAYA PROYEK : 0.02
AN PERALATAN ( A + B + C ) 1,360,758.64
% x D 136,075.86
1,496,834.51
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Pipa Beton Bertulang, diame TOTAL HARGA (Rp.) : 1,496,834.51
% THD. BIAYA PROYEK : 0.02
AN PERALATAN ( A + B + C ) 1,774,615.60
% x D 177,461.56
1,952,077.16
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Pipa Beton Bertulang, diame TOTAL HARGA (Rp.) : 2,914,910.76
% THD. BIAYA PROYEK : 0.05
AN PERALATAN ( A + B + C ) 2,649,918.87
% x D 264,991.89
2,914,910.76
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
Gorong Pipa Baja Bergelombang TOTAL HARGA (Rp.) : 16,730,288.60
% THD. BIAYA PROYEK : 0.27
AN PERALATAN ( A + B + C ) 15,209,353.28
% x D 1,520,935.33
16,730,288.60
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Kotak Beton Bertulang, ukur TOTAL HARGA (Rp.) : 512,442.08
% THD. BIAYA PROYEK : 0.01
AN PERALATAN ( A + B + C ) 465,856.43
% x D 46,585.64
512,442.08
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Kotak Beton Bertulang, ukur TOTAL HARGA (Rp.) : 682,178.36
% THD. BIAYA PROYEK : 0.01
AN PERALATAN ( A + B + C ) 620,162.15
% x D 62,016.21
682,178.36
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Kotak Beton Bertulang, ukur TOTAL HARGA (Rp.) : 855,584.28
% THD. BIAYA PROYEK : 0.01
AN PERALATAN ( A + B + C ) 777,803.89
% x D 77,780.39
855,584.28
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Kotak Beton Bertulang, ukur TOTAL HARGA (Rp.) : 1,275,110.55
% THD. BIAYA PROYEK : 0.02
AN PERALATAN ( A + B + C ) 1,159,191.41
% x D 115,919.14
1,275,110.55
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
AN PERALATAN ( A + B + C ) 1,892,516.08
% x D 189,251.61
2,081,767.69
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Kotak Beton Bertulang, ukur TOTAL HARGA (Rp.) : 2,952,064.50
% THD. BIAYA PROYEK : 0.05
AN PERALATAN ( A + B + C ) 2,683,695.00
% x D 268,369.50
2,952,064.50
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Kotak Beton Bertulang, ukur TOTAL HARGA (Rp.) : 4,643,435.69
% THD. BIAYA PROYEK : 0.08
AN PERALATAN ( A + B + C ) 4,221,305.17
% x D 422,130.52
4,643,435.69
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Kotak Beton Bertulang, ukur TOTAL HARGA (Rp.) : 5,390,877.76
% THD. BIAYA PROYEK : 0.09
AN PERALATAN ( A + B + C ) 4,900,797.97
% x D 490,079.80
5,390,877.76
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Kotak Beton Bertulang, ukur TOTAL HARGA (Rp.) : 3,393,311.90
% THD. BIAYA PROYEK : #DIV/0!
AN PERALATAN ( A + B + C ) 6,158,481.99
% x D 615,848.20
6,774,330.18
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Kotak Beton Bertulang, ukur TOTAL HARGA (Rp.) : 9,350,883.80
% THD. BIAYA PROYEK : 0.15
AN PERALATAN ( A + B + C ) 8,500,803.46
% x D 850,080.35
9,350,883.80
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
rong Kotak Beton Bertulang, ukur TOTAL HARGA (Rp.) : 12,647,585.53
% THD. BIAYA PROYEK : 0.21
AN PERALATAN ( A + B + C ) 11,497,805.03
% x D 1,149,780.50
12,647,585.53
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
AN PERALATAN ( A + B + C ) 999,466.45
% x D 99,946.64
1,099,413.09
366,471.00
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
AN PERALATAN ( A + B + C ) 1,329,043.16
% x D 132,904.32
1,461,947.48
487,316.00
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
AN PERALATAN ( A + B + C ) 1,046,548.84
% x D 104,654.88
1,151,203.72
383,735.00
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
AN PERALATAN ( A + B + C ) 1,423,207.94
% x D 142,320.79
1,565,528.73
521,843.00
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
AN PERALATAN ( A + B + C ) 1,093,631.22
% x D 109,363.12
1,202,994.35
400,998.00
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
AN PERALATAN ( A + B + C ) 1,517,372.71
% x D 151,737.27
1,669,109.98
556,370.00
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
AN PERALATAN ( A + B + C ) 1,187,796.00
% x D 118,779.60
1,306,575.60
435,525.00
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
AN PERALATAN ( A + B + C ) 1,281,960.77
% x D 128,196.08
1,410,156.85
470,052.00
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
AN PERALATAN ( A + B + C ) 1,894,031.81
% x D 189,403.18
2,083,434.99
694,478.00
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
AN PERALATAN ( A + B + C ) 1,281,960.77
% x D 128,196.08
1,410,156.85
470,052.00
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
AN PERALATAN ( A + B + C ) 1,894,031.81
% x D 189,403.18
2,083,434.99
694,478.00
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
Batu tanpa Adukan (Aanstamping)TOTAL HARGA (Rp.) : 792,373.16
% THD. BIAYA PROYEK : 0.01
AN PERALATAN ( A + B + C ) 720,339.23
% x D 72,033.92
792,373.16
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-241
ORMULIR STANDAR UNTUK
ALISA MASING-MASING HARGA SATUAN
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
inase Porous untuk Bahan Penyarin
TOTAL HARGA (Rp.) : 270,350.56
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 245,773.23
% x D 24,577.32
270,350.56
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-242
AN PERALATAN ( A + B + C ) 64,577.20
% x D 6,457.72
71,034.92
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-243
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
bang Banyak (Perforated Pipe) u TOTAL HARGA (Rp.) : 101,476.05
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 92,250.95
% x D 9,225.10
101,476.05
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-244
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
bang Banyak (Perforated Pipe) u TOTAL HARGA (Rp.) : 138,865.05
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 126,240.95
% x D 12,624.10
138,865.05
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-245
ORMULIR STANDAR UNTUK
ALISA MASING-MASING HARGA SATUAN
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
bang Banyak (Perforated Pipe) u TOTAL HARGA (Rp.) : 175,687.55
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 159,715.95
% x D 15,971.60
175,687.55
erasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Faktor konversi , kedalaman 40 %-75 %, Mudah Fv
Waktu siklus Ts1
- Menggali , memuat (swing 180ᵒ) T1
- Lain lain T2
Waktu siklus = T1 + T2 Ts1
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 10,819.39 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
II. URUTAN KERJA
1 Cadas muda yg dipotong umumnya berada disisi jalan
2 Penggalian dilakukan dengan kombinasi Excavator dan Breaker untuk
uniaxial strenght 1,25 MPa - 12,5 MPa
3 Selanjutnya dimuat ke dlm Truk
4 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh : L
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 26,499.75 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
ITEM PEMBAYARAN NO. : 3.1.(3)
JENIS PEKERJAAN : Galian Batu
SATUAN PEMBAYARAN : M3
Rp. 65,030.22 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
7 Pengurugan kembali (backfill) untuk struktur Uk
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Faktor konversi , kedalaman 40 %-75 %, Mudah Fv
Berat isi material Bim
Waktu siklus
- Menggali, memuat T1
- Lain lain T2
Waktu siklus = T1 x Fv Ts1
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 16,127.67 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Pengurugan kembali (backfill) untuk struktur Uk
7 Faktor pembayaran Fp
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 x Fp (EI-322)
- Bahan pengaman tebing galian 0.2 - 0,4 M3 (kayu)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Faktor konversi , kedalaman 40 %-75 %, Mudah Fv
Berat isi material Bim
Waktu siklus
- Menggali, memuat T1
- Lain lain T2
Waktu siklus = T1 x Fv Ts1
Kap. Prod. / jam = V x Fb x Fa x 60 x Fk Q1
Ts1 x Fv
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 566,490.97 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Pengurugan kembali (backfill) untuk struktur Uk
7 Faktor pembayaran Fp
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 x Fp (EI-322)
- Bahan pengaman tebing galian 0.2 - 0,4 M3 (kayu)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Faktor konversi , kedalaman 40 %-75 %, Mudah Fv
Berat isi material Bim
Waktu siklus
- Menggali, memuat T1
- Lain lain T2
Waktu siklus = T1 x Fv Ts1
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 841,610.92 / M3
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............ bulan
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Berat volume bahan (lepas) D
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. COLD MILLING (E36)
Kapasitas lebar galian/pembongkaran b
tebal galian/pembongkaran t
kecepatan laju pembongkaran v
Faktor effesiensi kerja Fa
Kapasitas prod/jam = v x b x Fa x t x 60 Q1
Koefisien Alat / M3 = 1 : Q5
3. TENAGA
Produksi menentukan : COLD MILLING Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 132,030.21 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Tebal perkerasan aspal t
7 Berat volume perkerasan aspal (lepas) D
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. CONCRETE CUTTER E76
Kapasitas pemotongan per jam = Volume Pemotongan V
Faktor efisiensi alat Fa
Kapasitas prod/jam = V x Fa Q1
3. TENAGA
Produksi menentukan : JACK HAMMER Q2
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 472,441.13 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang/rusak
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Tebal perkerasan berbutir t
7 Berat volume perkerasan berbutir D
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Faktor konversi , kedalaman < 40 %, Agak Sulit Fv
Berat isi material Bim
Waktu siklus
- Menggali, memuat T1
- Lain lain T2
Waktu siklus = T1 x Fv Ts1
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 20,942.49 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang/rusak
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Tebal perkerasan beton t
7 Berat volume perkerasan beton D
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. CONCRETE CUTTER E76
Kapasitas pemotongan per jam = Volume Pemotongan V
Faktor efisiensi alat Fa
Kapasitas prod/jam = V x Fa Q1
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 379,831.16 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan (padat ke asli) Fv
6 Tebal hamparan padat t
7 Berat volume bahan (lepas) D
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Faktor konversi , kedalaman 40 %-75 %, Normal Fv
Waktu siklus Ts1
- Menggali , memuat T1
- Lain lain T2
Waktu siklus = T1 x Fv Ts1
Koefisien Alat / M3 = 1 : Q4
2.e TANDEM ROLLER (E19)
Kecepatan rata-rata alat v
Lebar Area Pemadatan w
Lebar efektif pemadatan b
Jumlah lintasan n
Lebar Overlap bo
Lajur lintasan = w / (b - bo) N
Faktor efisiensi alat Fa
Kapasitas Prod./Jam = pa x Fa x 60 Q5
1000 x Wc
Koefisien Alat / M3 = 1 : Q5
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Timbunan / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L02)
Rp. 92,675.50 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan (padat ke asli) Fv
6 Tebal hamparan padat t
7 Berat volume bahan (lepas) D
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Faktor konversi , kedalaman <40 %, Normal Fv
Waktu siklus Ts1
- Menggali , memuat T1
- Lain lain T2
Waktu siklus = T1 x Fv Ts1
Kapasitas Prod./Jam = pa x Fa x 60 Q5
1000 x Wc
Koefisien Alat / M3 = 1 : Q5
3. TENAGA
Produksi menentukan : MOTOR GRADER Q1
Produksi Timbunan / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L02)
Rp. 39,755.64 / M3
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............ bulan
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Faktor pengembangan bahan (padat ke asli) Fv
7 Tebal hamparan padat t
8 Berat volume bahan (lepas) D
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus Ts1
- Muat T1
Ts1
3. TENAGA
Produksi menentukan : MOTOR GRADER Q3
Produksi Timbunan / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Faktor pengembangan bahan (padat ke asli) Fv
7 Tebal hamparan padat t
8 Berat volume bahan (lepas) D
9 Retibusi Ret
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus Ts1
- Muat T1
Ts1
Koefisienalat / M3 = 1 = 1 : Q1 (E15)
3. TENAGA
Produksi menentukan : MOTOR GRADER Q3
Produksi Timbunan / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : di atas tanah rawa
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Berat volume bahan (lepas) D
Faktor kehilangan bahan Fh
II. URUTAN KERJA
1 Whell Loader memuat ke dalam Dump Truck
2 Dump Truck mengangkut material pilihan
ke lapangan dimana : jarak quari ke lapangan L
3 Dump Truck menuang material pilihan di lokasi rawa
yang telah ditetapkan mulai dari tepian rawa hingga
permukaan timbunan mencapai permukaan air rawa.
4 Sekelompok pekerja merapikan timbunan
5 Geotekstil atau batangan kayu (bila diperlukan)
dianggap telah terpasang
2. ALAT
Koefisienalat / M3 = 1 : Q1 (E15)
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi Timbunan / hari = Tk x Q1 Qt
Asumsi permukaan hamparan di permukaan rawa :
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L02)
Rp. 206,457.72 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : di atas tanah rawa
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Berat volume bahan (lepas) D
Faktor kehilangan bahan Fh
2. ALAT
Koefisienalat / M3 = 1 : Q1 (E15)
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi Timbunan / hari = Tk x Q1 Qt
Asumsi permukaan hamparan di permukaan rawa :
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L02)
Rp. 250,572.15 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Faktor pengembangan bahan (padat ke asli) Fv
7 Tebal hamparan padat t
8 Berat volume bahan (lepas) D
Faktor kehilangan bahan Fv
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus Ts1
- Muat T1
Ts1
Koefisienalat / M3 = 1 = 1 : Q1 (E15)
3. TENAGA
Produksi menentukan : DUMP TRUCK Q1
Produksi Timbunan / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I. ASUMSI
1 Pekerjaan dilaksanakan hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi Jalan : jelek / belum padat
5 Jam kerja efektif per-hari Tk
6 Faktor Pengembangan Bahan Fk
2. ALAT
2.a. MOTOR GRADER (E13)
Panjang operasi grader sekali jalan Lh
Lebar Area Pemadatan w
Lebar Efektif kerja Blade b
Lebar overlap bo
Faktor Efisiensi Alat Fa
Kecepatan rata-rata alat v
Jumlah lintasan n
Jumlah lajur lintasan = w/(b-bo) N
Waktu siklus
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1
- Lain-lain T2
Ts1
3. TENAGA
Produksi menentukan : MOTOR GRADER Q1
Produksi Pekerjaan / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L02)
Rp. 12,336.81 / M2
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang/baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Faktor pengembangan bahan Fk
7 Tebal hamparan padat t
8 Hasil bongkaran per M2 luas area d
1. BAHAN
2. ALAT
2.a BULL DOZER (E04)
Kapasitas pisau q
Faktor pisau (blade), agak sukar Fb
Faktor efisiensi kerja Fa
Kecepatan mengupas Vf
Kecepatan mundur Vr
Faktor kemiringan (grade) Fm
Jarak pengupasan L2
Waktu Siklus
- Waktu gusur = (L2 x 60) : Vf T1
- Waktu kembali = (L2 x 60) : Vr T2
- Waktu pasti (Direct Drive) T3
Ts
Koefisienalat / M3 = 1 = 1 : Q2 (E14)
Koefisienalat / M3 = 1 = 1 : Q3 (E09)
TENAGA
Produksi pembersihan dan pembongkaran/hari = Q2 x Tk Qt
Track Loader
Kebutuhan tenaga :
- Pekerja P
- Mandor M
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk
5 1 Pohon diameter 15-30 cm setara dengan volume Vp
6 Berat Jenis Kayu BjK
7 Jarak antar Pohon s
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a TRACK LOADER (E14)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus Ts1
- Muat T1
Ts1
Koefisienalat / M3 = 1 = 1 : Q1 (E14)
3. TENAGA
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk
5 1 Pohon diameter 15-30 cm setara dengan volume Vp
6 Berat Jenis Kayu BjK
7 Jarak antar Pohon s
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a TRACK LOADER (E14)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus Ts1
- Muat T1
Ts1
Koefisienalat / M3 = 1 = 1 : Q1 (E14)
3. TENAGA
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a TRACK LOADER (E14)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus Ts1
- Muat T1
Ts1
Koefisienalat / M3 = 1 = 1 : Q1 (E14)
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk
5 1 Pohon diameter 15-30 cm setara dengan volume Vp
6 Berat Jenis Kayu BjK
7 Jarak antar Pohon s
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a TRACK LOADER (E14)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus Ts1
- Muat T1
Ts1
Koefisienalat / M3 = 1 = 1 : Q1 (E14)
2.b. DUMP TRUCK (6-8 M3) (E09)
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus Ts2
- Muat = (V/Q1) x 60 T1
- Waktu tempuh isi = (L : v1) x 60 T2
- Waktu tempuh kosong = (L : v2) x 60 T3
- Lain-lain T4
Ts
3. TENAGA
Produksi Galian akar pohon / hari = Track Lo = Q1 x Tk Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
NO URAIAN KODE
I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geotekstile dibawa memakai Truck dari
base camp ke lokasi pekerjaan
4 Jarak Rata-rata dari base camp ke lokasi pekerjaan L
5 Jam kerja efektif per hari Tk
6 Nilai CBR antara 1 dan 3 % dan sambungan tumpang-tindih diambil ol
7 Geotextile dalam gulungaan roPanjang per rol Rol
Panjang per rol Pj
Lebar Lbr
A
Berat per roll = A x D2/1000 Brt.p.Rol
8 Geotekstil Filter Kelas 2 Brt.pm2
9 Faktor kehilangan bahan Fh
10 Semua bahan dan cara pemasangan mengikuti rencana gambar dan
persyaratan teknis yang harus dipenuhi
II URUTAN KERJA
1 Saluran lokasi pemasangan geotekstile digali hingga permukaan galian rata
2 Bahan Geotekstil dangkat ke atas Flat Bed Truck secara manual dan di bawa
ke lapangan
3 Geotekstile digelar secara lepas tanpa kerutan antara geotekstil atau
lipatan, dan tidak ada rongga dan permukaan tanah
4 Agregat drainase segera dihamparkan di atas hamparan geotekstile, kemudian
dipadatkan dengan menggunakan pemadat getar
5 Pembayaran untuk persiapan lereng, penggalian, dan pengurugan, lapisan dasar
(bedding) jika ada dan bahan penutup merupakan mata pembayaran terpisah
III PEMAKAIAN BAHAN, ALAT DAN BAHAN
1 BAHAN
1 Geotekstile filter untuk Drainase bawah permukaan = 1x Fh GF
Overlap = ol/Rol x 4
2 ALAT
2.a. FLAT BED TRUCK (E11)
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus Ts2
- Muat T1
- Waktu tempuh isi = (L : v1) x 60 T2
- Waktu tempuh kosong = (L : v2) x 60 T3
- Bongkar Lain-Lain T4
Ts
3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt
mandor (M) M
pekerja (P) P
Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03
pekerja (P) = (Tk x P) : Qt L01
NO URAIAN KODE
I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geitekstile dibawa memakai Truck dari
base camp ke lokasi pekrjaan
4 jarak Rata-rata dari base camp ke lokasi pekerjaan L
5 Jam kerja efektif per hari Tk
6 Nilai CBR antara 1 dan 3 % dan sambungan tumpang-tindih diambil ol
7 Geotextile dalam gulungaan roPanjang per rol Rol
Panjang per rol Pj
Lebar Lbr
A
Berat per roll = A x D2/1000 Brt.p.Rol
8 Geotekstil Separator Kelas 1 Brt.pm2
9 Faktor kehilangan bahan Fh
10 Semua bahan dan cara pemasangan mengikuti
rencana gambar dan persyaratan teknis yang
harus dipenuhi
II URUTAN KERJA
1 Bahan Geotekstil diangkat ke atas Flat Bed Truck secara manual dan di bawa
ke lapangan
2 Permukaan tanah asli diratakan dan dibersihkan
3 Geotekstil sebagai separator digelar
4 Timbunan di atas geotekstil dilaksanakan sesuai Gambar
2 ALAT
2.a. FLAT BED TRUCK (E11)
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus Ts2
- Muat T1
- Waktu tempuh isi = (L : v1) x 60 T2
- Waktu tempuh kosong = (L : v2) x 60 T3
- Bongkar Lain-Lain T4
Ts
3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt
mandor (M) M
pekerja (P) P
Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03
pekerja (P) = (Tk x P) : Qt L01
NO URAIAN KODE
I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geotekstil dibawa memakai Truck dari
base camp ke lokasi pekerjaan
4 jarak Rata-rata dari base camp ke lokasi pekerjaan L
5 Jam kerja efektif per hari Tk
6 Nilai CBR antara 1 dan 3 % dan sambungan tumpang-tindih diambil ol
7 Geotextile dalam gulungaan roPanjang per rol Rol
Panjang per rol Pj
Lebar Lbr
A
Berat per roll = A x D2/1000 Brt.p.Rol
8 Geotekstil Separator Kelas 2 Brt.pm2
9 Faktor kehilangan bahan Fh
10 Semua bahan dan cara pemasangan mengikuti
rencana gambar dan persyaratan teknis yang
harus dipenuhi
II URUTAN KERJA
1 Bahan Geotekstil diangkat ke atas Flat Bed Truck secara manual dan di bawa
ke lapangan
2 Permukaan tanah asli diratakan dan dibersihkan
3 Geotekstil sebagai separator digelar
4 Timbunan di atas geotekstil dilaksanakan sesuai Gambar
2 ALAT
2.a. FLAT BED TRUCK (E11)
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus Ts2
- Muat T1
- Waktu tempuh isi = (L : v1) x 60 T2
- Waktu tempuh kosong = (L : v2) x 60 T3
- Bongkar Lain-Lain T4
Ts
3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt
mandor (M) M
pekerja (P) P
Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03
pekerja (P) = (Tk x P) : Qt L01
NO URAIAN KODE
I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geitekstile dibawa memakai Truck dari
base camp ke lokasi pekrjaan
4 jarak Rata-rata dari base camp ke lokasi pekerjaan L
5 Jam kerja efektif per hari Tk
6 Nilai CBR antara 1 dan 3 % dan sambungan tumpang-tindih diambil ol
7 Geotextile dalam gulungaan roPanjang per rol Rol
Panjang per rol Pj
Lebar Lbr
A
Berat per roll = A x D2/1000 Brt.p.Rol
8 Geotekstil Separator Kelas 3 Brt.pm2
9 Faktor kehilangan bahan Fh
10 Semua bahan dan cara pemasangan mengikuti
rencana gambar dan persyaratan teknis yang
harus dipenuhi
II URUTAN KERJA
1 Bahan Geotekstil diangkat ke atas Flat Bed Truck secara manual dan di bawa
ke lapangan
2 Permukaan tanah asli diratakan dan dibersihkan
3 Geotekstil sebagai separator digelar
4 Timbunan di atas geotekstil dilaksanakan sesuai Gambar
2 ALAT
2.a. FLAT BED TRUCK (E11)
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus Ts2
- Muat T1
- Waktu tempuh isi = (L : v1) x 60 T2
- Waktu tempuh kosong = (L : v2) x 60 T3
- Bongkar Lain-Lain T4
Ts
3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt
mandor (M) M
pekerja (P) P
Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03
pekerja (P) = (Tk x P) : Qt L01
NO URAIAN KODE
I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geotekstile dibawa memakai Truck dari
base camp ke lokasi pekerjaan
4 jarak Rata-rata dari base camp ke lokasi pekerjaan L
5 Jam kerja efektif per hari Tk
6 Nilai CBR antara 1 dan 3 % dan sambungan tumpang-tindih diambil ol
7 Geotextile dalam gulungaan roPanjang per rol Rol
Panjang per rol Pj
Lebar Lbr
A
Berat per roll = A x D2/1000 Brt.p.Rol
8 Geotekstil Separator Kelas 3 Brt.pm2
9 Faktor kehilangan bahan Fh
10 Semua bahan dan cara pemasangan mengikuti rencana gambar dan
persyaratan teknis yang harus dipenuhi
II URUTAN KERJA
1 Bahan Geotekstil diangkat ke atas Flat Bed Truck secara manual dan di bawa
ke lapangan
2 Permukaan tanah asli diratakan dan dibersihkan
3 Geotekstil sebagai separator digelar
4 Timbunan di atas geotekstil dilaksanakan sesuai Gambar
2 ALAT
2.a. FLAT BED TRUCK (E11)
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus Ts2
- Muat T1
- Waktu tempuh isi = (L : v1) x 60 T2
- Waktu tempuh kosong = (L : v2) x 60 T3
- Bongkar Lain-Lain T4
Ts
3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt
mandor (M) M
pekerja (P) P
Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03
pekerja (P) = (Tk x P) : Qt L01
4 HARGA DASAR SATUAN UPAH, BAHAN & ALAT
(Lihat lampiran)
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(1)
1.20 - JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3
NO. KOMPONEN
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
0.93 M3
1.20 -
0.83
0.80
menit
0.240 menit
0.080 menit
0.32 menit Permen PUPR
No 28/PRT/M/2016
260.52 M3/Jam
C. PERALATAN
Analisa EI-311
260.52 M3/Jam
1,823.61 M3
2.00 orang
1.00 orang
0.0077 Jam
0.0038 Jam
Analisa EI-3112
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(2)
1.20 - JENIS PEKERJAAN : Galian batu lunak
SATUAN PEMBAYARAN : M3
NO. KOMPONEN
B. BAHAN
0.93 M3
1.00 -
0.83
1.00
menit
0.120 menit
0.040 menit JUMLAH HARGA
0.16 menit Permen PUPR
No 28/PRT/M/2016
C. PERALATAN
347.36 M3/Jam 1. Excavator (E10)
2. Dump Truck (E09)
3. Rock Drill Breaker (E37)
0.0029 Jam 4. Alat bantu
8.00 M3
0.83 - D. JUMLAH HARGA TENAGA, BAHAN DAN PERALA
25.00 KM/Jam E. OVERHEAD & PROFIT
35.00 KM/Jam F. HARGA SATUAN PEKERJAAN ( D + E )
menit Note: 1 Satuan dapat berdasarkan atas jam operasi untuk
1.38 menit berat untuk bahan-bahan.
4.80 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap
3.43 menit dari nomor mata pembayaran. Harga Satuan yang
2.00 menit terdapat Penyesuaian Harga (Eskalasi/Deskalasi) s
11.61 menit 3 Biaya satuan untuk peralatan sudah termasuk bah
4 Biaya satuan sudah termasuk pengeluaran untuk s
28.59 M3 / Jam yang dibayar dari kontrak) dan biaya-biaya lainnya
0.0350 Jam
Sesuai kondisi lapangan
11.50 cm
0.70 M3
1.00 -
0.83
menit
1.000 menit
0.100 menit
1.10 menit
31.69 M3/Jam
0.0316 Jam
Lump Sump
347.36 M3/Jam
2,431.49 M3
2.00 orang
1.00 orang
0.0058 Jam
0.0029 Jam
Analisa EI-3112
NO. KOMPONEN
A. TENAGA
Disesuaikan dengan kondisi
5.00 Km dilapangan sesuai ketentuan
Pasal 1.5.3
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
0.93 M3
0.90 -
0.83
1.00
menit
0.120 menit
0.040 menit
0.16 menit Permen PUPR
No 28/PRT/M/2016
C. PERALATAN
312.62 M3/Jam
1. Excavator (E10)
2. Rock Drill Breaker (E37)
0.0032 Jam 3. Dump Truck (E09)
Sesuai kondisi lapangan
11.50 cm
0.70 M3
1.00 -
0.83
menit
2.000 menit
0.200 menit
2.20 menit
15.85 M3/Jam
0.0631 Jam
8.00 M3
0.83 -
25.00 KM/Jam
35.00 KM/Jam
menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALA
30.29 menit E. OVERHEAD & PROFIT
4.80 menit F. HARGA SATUAN PEKERJAAN ( D + E )
3.43 menit Note: 1 Satuan dapat berdasarkan atas jam operasi untuk
1.00 menit berat untuk bahan-bahan.
39.52 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap
dari nomor mata pembayaran. Harga Satuan yang
8.40 M3/Jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) s
3 Biaya satuan untuk peralatan sudah termasuk bah
4 Biaya satuan sudah termasuk pengeluaran untuk s
0.1190 Jam yang dibayar dari kontrak) dan biaya-biaya lainnya
Lump Sump
312.62 M3/Jam
2,188.34 M3
8.00 orang
1.00 orang
0.0256 Jam
0.0032 Jam
Berlanjut ke halaman berikut
Analisa EI-313
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(4)
1.20 - JENIS PEKERJAAN : Galian Struktur dengan ke
125.00 %/M3 SATUAN PEMBAYARAN : M3
NO. KOMPONEN
5.0000 Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
1.25 M3
JUMLAH HARGA
B. BAHAN
0.93 M3
1.20 - 1. Urugan Pilihan (EI-322)
0.83 -
0.80 -
0.85 -
0.24 menit
0.08
0.32 menit Permen PUPR JUMLAH HARGA
No 28/PRT/M/2016
8.00 M3
0.83 -
25.00 KM/Jam
35.00 KM/Jam
menit JUMLAH HARGA PER
1.84 menit
4.80 menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALA
3.43 menit E. OVERHEAD & PROFIT
1.00 menit F. HARGA SATUAN PEKERJAAN ( D + E )
11.07 menit Note: 1 Satuan dapat berdasarkan atas jam operasi untuk
berat untuk bahan-bahan.
29.99 M3/Jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap
dari nomor mata pembayaran. Harga Satuan yang
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) s
0.0333 Jam 3 Biaya satuan untuk peralatan sudah termasuk bah
4 Biaya satuan sudah termasuk pengeluaran untuk s
yang dibayar dari kontrak) dan biaya-biaya lainnya
Lump Sump
Analisa EI-314
4.00 orang
1.00 orang
0.0154 Jam
0.0038 Jam
Analisa EI-315
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(5)
1.20 - JENIS PEKERJAAN : Galian Struktur dengan ke
125.00 %/M3 SATUAN PEMBAYARAN : M3
2.00 1.5 - 2
NO. KOMPONEN
0.1000 Km A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
2.50 M3
0.40 M3 JUMLAH HARGA
B. BAHAN
0.93 M3
1.20 - 1. Urugan Pilihan (EI-322)
0.83 - 2 Bahan pengaman tebing galian
0.80 -
0.85 -
0.24 menit
0.08 Permen PUPR JUMLAH HARGA
No 28/PRT/M/2016
0.32 menit
C. PERALATAN
260.52 M3/Jam 1. Excavator (E10)
2. Dump Truck 6-8 M3 (E09)
3. Alat bantu
0.0038 Jam
8.00 M3
0.83 -
25.00 KM/Jam
35.00 KM/Jam JUMLAH HARGA PER
menit
1.84 menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALA
4.80 menit E. OVERHEAD & PROFIT
3.43 menit F. HARGA SATUAN PEKERJAAN ( D + E )
1.00 menit Note: 1 Satuan dapat berdasarkan atas jam operasi untuk
11.07 menit berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap
29.99 M3/Jam dari nomor mata pembayaran. Harga Satuan yang
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) s
3 Biaya satuan untuk peralatan sudah termasuk bah
0.0333 Jam 4 Biaya satuan sudah termasuk pengeluaran untuk s
yang dibayar dari kontrak) dan biaya-biaya lainnya
Analisa EI-315
Lump Sump
260.52 M3/Jam
1,823.61 M3
10.00 orang
1.00 orang
0.0384 Jam
0.0038 Jam
Analisa EI-316
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(6)
1.20 - JENIS PEKERJAAN : Galian Struktur dengan ke
125.00 %/M3 SATUAN PEMBAYARAN : M3
1.50 1.5 - 2
NO. KOMPONEN
0.1000 Km A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
1.88 M3
0.60 M3 JUMLAH HARGA
B. BAHAN
0.93 M3
1.20 - 1. Urugan Pilihan (EI-322)
0.83 - 2 Bahan pengaman tebing galian
0.80 -
0.85 -
0.24 menit
0.08 JUMLAH HARGA
0.32 menit Permen PUPR
No 28/PRT/M/2016
C. PERALATAN
260.52 M3/Jam 1. Excavator (E10)
2. Dump Truck 6-8 M3 (E04)
3. Alat bantu
0.0038 Jam
8.00 M3
0.83 -
25.00 KM/Jam
35.00 KM/Jam JUMLAH HARGA PER
menit
1.84 menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALA
4.80 menit E. OVERHEAD & PROFIT
3.43 menit F. HARGA SATUAN PEKERJAAN ( D + E )
1.00 menit Note: 1 Satuan dapat berdasarkan atas jam operasi untuk
11.07 menit berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap
29.99 M3/Jam dari nomor mata pembayaran. Harga Satuan yang
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) s
3 Biaya satuan untuk peralatan sudah termasuk bah
0.033347 Jam 4 Biaya satuan sudah termasuk pengeluaran untuk s
yang dibayar dari kontrak) dan biaya-biaya lainnya
Analisa EI-316
Lump Sump
260.52 M3/Jam
1,823.61 M3
12.00 orang
1.00 orang
0.0461 Jam
0.0038 Jam
Analisa EI-317
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(7)
1.24 - JENIS PEKERJAAN : Galian Perkerasan Berasp
1.60 Ton/M3 SATUAN PEMBAYARAN : M3
NO. KOMPONEN
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1 m
0.15 m -
3.00 m/menit
0.70
18.90 M3
0.0529 Jam
C. PERALATAN
8.00 M3 1. Cold Milling (E36)
0.83 - 2 Dump Truck (E09)
25.00 KM/Jam 3. Water Tanker (E32)
35.00 KM/Jam 4. Alat bantu
menit
25.40 menit
4.80 menit
3.43 menit
1.00 menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALA
34.63 menit E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
9.28 M3/Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap
0.1078 Jam dari nomor mata pembayaran. Harga Satuan yang
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) s
3 Biaya satuan untuk peralatan sudah termasuk bah
4 Biaya satuan sudah termasuk pengeluaran untuk s
5.00 M3 yang dibayar dari kontrak) dan biaya-biaya lainnya
0.11 M3
100.00 liter/menit
0.83
45.27 M3
0.0221 jam
Lump Sump
18.90 M3/Jam
132.30 M2
2.00 orang
1.00 orang
Analisa EI-317
0.1058 Jam
0.0529 Jam
Analisa EI-318
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(8)
1.30 - JENIS PEKERJAAN : Galian Perkerasan Berasp
0.05 M SATUAN PEMBAYARAN : M3
1.60 Ton/M3
NO. KOMPONEN
A. TENAGA
3.00 Km Disesuaikan dengan kondisi
dilapangan sesuai ketentuan
Pasal 1.5.3 1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
6.75 M3
0.83
5.60 M3
0.1785 jam
1.0040 Jam
8.00 M3
0.83 - C. PERALATAN
25.00 KM/Jam 1. Concrete Cutter E76
35.00 KM/Jam 2. Jack Hammer E26
menit 3. Compresor E05
85.68 menit 4. Dump Truck E09
4.80 menit
3.43 menit
1.00 menit
94.90 menit
Analisa EI-318
1.00 M3/Jam
7.03 M3
6.00 orang
1.00 orang
5.9760 Jam
0.9960 Jam
Analisa EI-319
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(9)
1.20 - JENIS PEKERJAAN : Galian Perkerasan berbuti
0.30 M SATUAN PEMBAYARAN : M3
1.81 Ton/M3
NO. KOMPONEN
A. TENAGA
3.00 Km Disesuaikan dengan kondisi
dilapangan sesuai ketentuan
Pasal 1.5.3 1. Pekerja (L01)
2. Mandor (L03)
JUMLAH HARGA
B. BAHAN
0.93 M3
0.90 -
0.83 -
1.10 -
0.85 -
0.24 menit
0.08
0.32 menit Permen PUPR
No 28/PRT/M/2016
142.10 M3/Jam
0.0070 Jam
JUMLAH HARGA
8.00 M3
0.83 - C. PERALATAN
25.00 KM/Jam 1. Excavator E10
35.00 KM/Jam 2. Dump Truck E09
menit
3.38 menit
4.80 menit
3.43 menit
1.00 menit
12.61 menit JUMLAH HARGA PER
0.0422 Jam
0.0070 Jam
Analisa EI-319
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(10).
1.20 - JENIS PEKERJAAN : Galian Perkerasan Beton
0.30 M SATUAN PEMBAYARAN : M3
2.40 Ton/M3
NO. KOMPONEN
A. TENAGA
3.00 Km Disesuaikan dengan kondisi
dilapangan sesuai ketentuan
Pasal 1.5.3 1. Pekerja (L01)
2. Mandor (L03)
JUMLAH HARGA
B. BAHAN
6.75 M3
0.83
5.60 M3
0.1785 jam
1.0040 Jam
JUMLAH HARGA
8.00 M3
0.83 - C. PERALATAN
25.00 KM/Jam 1. Cocnrete Cutter E76
35.00 KM/Jam 2. Jack Hammer E26
menit 3. Compresor E05
85.68 menit 4. Dump Truck E09
4.80 menit
3.43 menit
1.00 menit
94.90 menit JUMLAH HARGA PER
6.0241 Jam
1.0040 Jam
Analisa EI-3110
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.2.(1a)
1.20 - JENIS PEKERJAAN : Timbunan Biasa Dari Sum
0.15 M SATUAN PEMBAYARAN : M3
1.25 Ton/M3 1,1-1,4
NO. KOMPONEN
1. Pekerja (L01)
2. Mandor (L02)
1.20 M3
B. BAHAN
Analisa EI-321a
50.00 M
3.50 M
0.30 M
0.80 -
4.00 Km / Jam
2 lintasan
2.00
2.6 M
0.75 menit
1.00 menit
1.75 menit
504.00 M3
0.0020 Jam
5.00 Km / Jam
3.50 M
1.48 M
6.00 lintasan
0.20 M
3.00
0.83 -
419.15 M3
0.0024 Jam
4.00 Km / jam
3.50 M
1.68 M
6.00 lintasan
0.20 M
3.00
0.83 -
2,567.47 M2
0.0004 Jam
5.00 M3
0.07 M3
200.00 liter/menit
0.83
142.29 M3
0.0070 jam
Lump Sump
23.88 M3/Jam
167.16 M3
4.00 orang
1.00 orang
0.1675 Jam
0.0419 Jam
Berlanjut ke halaman berikut
Analisa EI-321a
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.2.(1b)
1.20 - JENIS PEKERJAAN : Timbunan Biasa Dari Hasi
0.15 M SATUAN PEMBAYARAN : M3
1.25 Ton/M3 1,1-1,4
NO. KOMPONEN
Sudah termasuk dalam item
pembayaran Galian
8.70 Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L02)
0.93 M3
1.20 -
0.83
1.00
menit
0.240 menit
0.080 menit
0.32 menit Permen PUPR C. PERALATAN
No 28/PRT/M/2016
1. Excavator (E15)
217.10 M3/Jam 2. Dump Truck (E09)
3. Motor Grader (E13)
4 Vibro Roller (E19)
0.0046 Jam 5. Water tank truck (E23)
6 Alat Bantu
8.00 M3
0.83 -
1.25
25.00 KM/Jam D. JUMLAH HARGA TENAGA, BAHAN DAN PERALA
35.00 KM/Jam E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
1.47 menit Note: 1 Satuan dapat berdasarkan atas jam operasi untuk
20.88 menit berat untuk bahan-bahan.
14.91 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap
1.65 menit dari nomor mata pembayaran. Harga Satuan yang
38.92 menit terdapat Penyesuaian Harga (Eskalasi/Deskalasi) s
3 Biaya satuan untuk peralatan sudah termasuk bah
8.19 M3 4 Biaya satuan sudah termasuk pengeluaran untuk s
yang dibayar dari kontrak) dan biaya-biaya lainnya
0.1221 Jam
50.00 M
3.50
0.30 M
0.80 -
4.00 Km / Jam
2 lintasan
2.00
2.6 M
0.75 menit
1.00 menit
1.75 menit
504.00 M3
0.0020 Jam
4.00 Km / Jam
3.50 M
1.48 M
8.00 lintasan
3.00
0.30 M
0.83 -
239.04 M3
0.0042 Jam
5.00 M3
0.17 M3
100.00 liter/menit
0.83
29.29 M3
0.0341 jam
Lump Sump
504.00 M3/Jam
3,528.00 M3
4.00 orang
1.00 orang
0.0079 Jam
0.0020 Jam
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.2.(2a)
1.20 - JENIS PEKERJAAN : Timbunan Pilihan Dari Sum
1.20 - SATUAN PEMBAYARAN : M3
0.15 M
1.45 Ton/M3 1,3-1,6
NO. KOMPONEN
10.00 Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
JUMLAH HARGA
B. BAHAN
1.50 M3
0.85 -
0.83 - JUMLAH HARGA
8.00 M3
0.83 - JUMLAH HARGA PER
1.25
25.00 Km / Jam D. JUMLAH HARGA TENAGA, BAHAN DAN PERALA
35.00 Km / Jam E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
2.35 menit Note: 1 Satuan dapat berdasarkan atas jam operasi untuk
24.00 menit berat untuk bahan-bahan.
17.14 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap
1.45 menit dari nomor mata pembayaran. Harga Satuan yang
44.94 menit terdapat Penyesuaian Harga (Eskalasi/Deskalasi) s
3 Biaya satuan untuk peralatan sudah termasuk bah
7.09 M3 4 Biaya satuan sudah termasuk pengeluaran untuk s
yang dibayar dari kontrak) dan biaya-biaya lainnya
0.1410 Jam
Analisa EI-322a
50.00 m
3.50
2.60 m
0.30 m
0.80 - Panduan
4.00 Km / Jam
4.00 lintasan
2.00
0.75 menit
1.00 menit
1.75 menit
252.00 M3
0.0040 Jam
1.50 Km / jam
3.50 M
1.48 M
8.00 lintasan
3.00
0.30 m
0.83 -
89.64 M3
0.0112 Jam
4.00 M3
0.17 M3
100.00 liter/menit
0.83 -
29.29 M3
0.0341 Jam
Lump Sump
252.00 M3/Jam
1,764.00 M3
4.00 orang
1.00 orang
0.0159 Jam
0.0040 Jam
Berlanjut ke halaman berikut
Analisa EI-322a
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.2.(2b)
1.20 - JENIS PEKERJAAN : Timbunan Pilihan dari gali
1.11 - SATUAN PEMBAYARAN : M3
0.15 M
1.60 Ton/M3
Rp
NO. KOMPONEN
8.70 Km A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
JUMLAH HARGA
B. BAHAN
1. Retribusi
1.11 M3 tidak dibayar
1.50 M3
0.85 - JUMLAH HARGA
0.83 -
C. PERALATAN
0.45 menit 1. Wheel Loader (E15)
0.45 menit 2. Dump Truck (E09)
3. Motor Grader (E13)
117.58 M3 3. Tandem (E17)
4. Water Tanker (E23)
5. Alat Bantu
0.0085 Jam
0.1253 Jam
Analisa EI-322b
0.75 menit
1.00 menit
1.75 menit
252.00 M3
0.0040 Jam
1.50 Km / jam
3.50 M
1.48 M
8.00 lintasan
3.00
0.30 m
0.83 -
89.64 M3
0.0112 Jam
4.00 M3
0.17 M3
100.00 liter/menit
0.83 -
29.29 M3
0.0341 Jam
Lump Sump
252.00 M3/Jam
1,764.00 M3
4.00 orang
1.00 orang
0.0159 Jam
0.0040 Jam
Analisa EI-322b
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.2.(3a)
1.20 - JENIS PEKERJAAN : Timbunan Pilihan Berbutir
1.70 Ton/M3 1,6-1,8 SATUAN PEMBAYARAN : M3
1.05
NO. KOMPONEN
10.00 Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L02)
JUMLAH HARGA
1.05 M3
B. BAHAN
1. Sirtu (M16)
1.50 M3
0.85 -
0.83 -
menit
0.45 menit
0.45 menit JUMLAH HARGA
141.10 M3 C. PERALATAN
1. Dump Truck (E09)
2. Whell Loader (E15)
0.0071 Jam 3. Alat Bantu
8.00 M3
0.83 - JUMLAH HARGA PER
25.00 KM/Jam
35.00 KM/Jam D. JUMLAH HARGA TENAGA, BAHAN DAN PERALA
E. OVERHEAD & PROFIT
1.67 menit F. HARGA SATUAN PEKERJAAN ( D + E )
24.00 menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untu
17.14 menit berat untuk bahan-bahan.
3.00 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap
45.81 menit dari nomor mata pembayaran. Harga Satuan yang
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) s
7.25 M3/Jam 3 Biaya satuan untuk peralatan sudah termasuk bah
4 Biaya satuan sudah termasuk pengeluaran untuk s
yang dibayar dari kontrak) dan biaya-biaya lainnya
0.1380 Jam
Lump Sump
Analisa EI-323a
141.10 M3/Jam
987.70 M3
2.00 orang
1.00 orang
0.0142 Jam
0.0071 Jam
Analisa EI-323b
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.2.(3b)
1.10 - Tidak ada pemadatan JENIS PEKERJAAN : Timbunan Pilihan Berbutir
1.70 Ton/M3 1,6-1,8 SATUAN PEMBAYARAN : M3
1.05
NO. KOMPONEN
10.00 Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L02)
JUMLAH HARGA
B. BAHAN
1.16 M3
3.00 buah 1. Sirtu (M16)
Rod and Plate
1.50 M3
0.85 -
0.83 - JUMLAH HARGA
menit
0.45 menit C. PERALATAN
0.45 menit 1. Dump Truck (E09)
2. Whell Loader (E15)
141.10 M3 3. Alat Bantu
0.0071 Jam
0.2085 Jam
Lump Sump
Berlanjut ke halaman berikut
Analisa EI-323b
141.10 M3/Jam
987.70 M3
2.00 orang
1.00 orang
0.0142 Jam
0.0071 Jam
Analisa EI-324
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.2.(4)
1.20 - JENIS PEKERJAAN : Penimbunan Kembali Berb
1.10 - Tidak ada pemadatan SATUAN PEMBAYARAN : M3
0.15 M
1.70 Ton/M3 1,6-1,8
1.05
NO. KOMPONEN
8.70 Km A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
JUMLAH HARGA
B. BAHAN
1.50 M3
0.85 - JUMLAH HARGA
0.83 -
C. PERALATAN
0.45 menit 1. Wheel Loader (E15)
0.45 menit 2. Dump Truck (E09)
3. Water Tanker (E23)
117.58 M3 4. Alat Bantu
0.0085 Jam
0.1490 Jam
Analisa EI-324
142.29 M3
0.0070 Jam
Lump Sump
6.71 M3/Jam
46.97 M3
4.00 orang
1.00 orang
0.5961 Jam
0.1490 Jam
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
…………………………………
PROP / KAB / KODYA : ………………………………
ITEM PEMBAYARAN NO. : 3.3.(1)
7.00 Jam JENIS PEKERJAAN : Penyiapan Badan Jalan
1.20 SATUAN PEMBAYARAN : M2
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Mandor (L02)
JUMLAH HARGA
B. BAHAN
50.00 M
3.50 M
2.60 M
0.30 M JUMLAH HARGA
0.83 -
4.00 Km / Jam C. PERALATAN
6.00 lintasan 1. Motor Grader (E13)
2.00 lajur 2. Tandem / Vibro Roller (E17)
3 Alat Bantu
0.75 menit
1.00 menit
1.75 menit
581.00 M2
0.0244 Jam
Lump Sum
581.00 M2/Jam
4,067.00 M2
2.00 orang
1.00 orang
0.0034 Jam
0.0017 Jam
Analisa EI-331
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
PROP / KAB / KODYA : ………………………………
MATA PEMBAYARAN NO. : 3.4.(1)
8.7 KM JENIS PEKERJAAN : Pembersihan dan Pengup
7.00 jam SATUAN PEMBAYARAN : M2
1.20 -
0.15 M
0.50 ton
NO. KOMPONEN
Dibayar terpisah
A. TENAGA
B. BAHAN
2.30 M3
0.70 - JUMLAH HARGA
0.75 -
3.00 Km/Jam C. PERALATAN
4.00 Km/Jam
1.00 1 Bull Dozer E04
30 M 2 Track Loader E14
3 Dump Truck E09
0.6 menit 4 Alat Bantu
0.45 menit
0.10 menit
1.15 menit
0.0048 Jam
8.00 M3
0.83 -
25.00 KM/Jam
35.00 KM/Jam
menit
2.29 menit
20.95 menit
3.43 menit
1.00 menit
27.67 menit
40.00 M2
0.0250 Jam
Lump Sum
1,463.26 M2
10.00 orang
1.00 orang
0.0478 jam
0.0048 jam
Analisa EI-342
FORMULIR STA
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASIN
JUMLAH HARGA
B. BAHAN
0.80 M3
0.85 -
0.83 -
0.45 menit
0.45 menit
0.0090 Jam
8.0 M3
0.83
25.00 Km/Jam
35.00 Km/Jam JUMLAH HARGA
menit
4.31 menit C. PERALATAN
4.80 menit
3.43 menit 1. Track Loader E14
10.00 menit 2. Dump Truck E09
22.53 3. Chainsaw
Alat Bantu
70.72 Buah
0.0141 jam
JUMLAH HARGA PER
70 buah
780.40 buah
10.00 orang
1.00 orang
0.09 jam
0.01 jam
Analisa EI-343
FORMULIR STA
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASIN
A. TENAGA
JUMLAH HARGA
B. BAHAN
0.80 M3
0.85 -
0.83 -
0.45 menit
0.45 menit
0.0301 Jam
8.0 M3
0.83
20.00 Km/Jam
30.00 Km/Jam JUMLAH HARGA
menit
14.47 menit C. PERALATAN
6.00 menit
4.00 menit 1. Track Loader E14
10.00 menit 2. Dump Truck E09
34.47 3. Chainsaw
4. Alat Bantu
16.51 Buah
0.0606 jam
JUMLAH HARGA PER
232.19 buah
10.00 orang
1.00 orang
0.30 jam
0.03 jam
Analisa EI-344
FORMULIR STA
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASIN
A. TENAGA
JUMLAH HARGA
B. BAHAN
0.80 M3
0.85 -
0.83 -
0.45 menit
0.45 menit
0.0638 Jam
8.0 M3
0.83
20.00 Km/Jam
30.00 Km/Jam JUMLAH HARGA
menit
30.62 menit C. PERALATAN
6.00 menit
4.00 menit 1. Track Loader E14
10.00 menit 2. Dump Truck E09
50.62 3. Chainsaw
4. Alat Bantu
4.74 Buah
0.2109 jam
JUMLAH HARGA PER
Lump Sum
109.74 buah
10.00 orang
1.00 orang
0.6378 jam
0.0638 jam
Analisa EI-345
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
PROP / KAB / KODYA : ………………………………
ITEM PEMBAYARAN NO. : 3.4.(5)
7.00 Jam JENIS PEKERJAAN : Pemotongan Pohon Piliha
3.01 M3 SATUAN PEMBAYARAN : buah
0.70 ton/M3
6.00 m'
NO. KOMPONEN
A. TENAGA
JUMLAH HARGA
B. BAHAN
0.80 M3
0.85 -
0.83 -
0.45 menit
0.45 menit
0.1435 Jam
8.0 M3
0.83
20.00 Km/Jam
30.00 Km/Jam
menit JUMLAH HARGA
68.89 menit
6.00 menit C. PERALATAN
4.00 menit
15.00 menit 1. Track Loader E14
93.89 menit 2. Dump Truck E09
3. Chainsaw
1.41 Buah 4. Alat Bantu
0.7093 jam
10.00 orang
1.00 orang
1.4352 jam
0.1435 jam
Analisa EI-351
h Permukaan (Kelas 2)
URAIAN ANALISA HARGA SATUAN FORMULIR STA
PEREKAMAN ANALISA MASIN
B. BAHAN
1 Geotekstile Filter Kelas 2 GF
C. PERALATAN
1 Flat Bed Truck E11
Di bayar Terpisah 2 Alat Bantu
1.030 M2
0.012 M2 D. JUMLAH HARGA TENAGA, BAHAN & PERALATA
1.042 M2 E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN (D + E)
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk
berat untuk bahan-bahan.
4.0 M3 2 Kuantitas satuan adalah kuantitas perkiraan setiap
0.83 dari nomor mata pembayaran. Harga Satuan yang
25.00 Km/Jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) s
35.00 Km/Jam 3 Biaya satuan untuk peralatan sudah termasuk bah
menit 4 Biaya satuan sudah termasuk pengeluaran untuk s
15.00 menit yang dibayar dari kontrak) dan biaya-biaya lainnya
20.94 menit
14.96 menit
20.00 menit
70.90 menit
5.62 M2
0.1780 jam
0.00
39.34 M²
1.00 orang
8.00 orang
0.1780 jam
1.4236 jam
Analisa EI-352a
B. BAHAN
1 Geotekstile separator GSp
kelas 1
1.03 M2
0.012 M2
1.042 M2 C. PERALATAN
1 FLAT BED TRUCK E11
2 Alat Bantu
4.0 M3
0.83
25.00 Km/Jam
35.00 Km/Jam
menit
15.00 menit
20.94 menit
14.96 menit D. JUMLAH HARGA TENAGA, BAHAN & PERALATA
20.00 menit E. OVERHEAD & PROFIT
70.90 menit F. HARGA SATUAN PEKERJAAN (D + E)
39.34 M²
1.00 orang
8.00 orang
0.1780 jam
1.4236 jam
Analisa EI-352b
B. BAHAN
1 Geotekstile separator GSp
kelas 2
1.03 M2
0.012 M2
1.042 M2 C. PERALATAN
1 FLAT BED TRUCK E11
2 Alat Bantu
4.0 M3
0.83
25.00 Km/Jam D. JUMLAH HARGA TENAGA, BAHAN & PERALATA
35.00 Km/Jam E. OVERHEAD & PROFIT
menit F. HARGA SATUAN PEKERJAAN (D + E)
15.00 menit Note: 1 Satuan dapat berdasarkan atas jam operasi untuk
20.94 menit berat untuk bahan-bahan.
14.96 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap
20.00 menit dari nomor mata pembayaran. Harga Satuan yang
70.90 menit terdapat Penyesuaian Harga (Eskalasi/Deskalasi) s
3 Biaya satuan untuk peralatan sudah termasuk bah
5.62 M2 4 Biaya satuan sudah termasuk pengeluaran untuk s
yang dibayar dari kontrak) dan biaya-biaya lainnya
0.1780 jam
0.00
39.34 M²
1.00 orang
8.00 orang
0.1780 jam
1.4236 jam
Analisa EI-352c
8.7 Km
7.0 jam NO. KOMPONEN
0.3 m
100.0 m/Rol Katalog
92.4 m' 300 ft
1.93 m' 6,25 ft A. TENAGA
177.9 m2/Rol 1 Mandor (L03)
88.9 Kg/rol 2 Pekerja (L01)
500.0 Gr/m2 3
1.03
B. BAHAN
1 Geotekstile separator GSp
kelas 3
C. PERALATAN
1 FLAT BED TRUCK E11
2 Alat Bantu
1.03 M2
0.012 M2
0.1780 jam
0.00
39.34 M²
1.00 orang
8.00 orang
0.1780 jam
1.4236 jam
Analisa EI-353
8.7 Km
7.0 jam NO. KOMPONEN
0.3 m
100.0 m/Rol Katalog
92.4 m' 300 ft
1.93 m' 6,25 ft A. TENAGA
177.9 m2/Rol 1 Mandor (L03)
88.9 Kg/rol 2 Pekerja (L01)
500.0 Gr/m2 3
1.03
B. BAHAN
1 Geotekstile stabilisator GSp
kelas 1
C. PERALATAN
1 FLAT BED TRUCK
1.03 M2 2 Alat Bantu
0.01 M2
1.04 M2
0.1780 jam
0.00
39.34 M²
1.00 orang
8.00 orang
0.1780 jam
1.4236 jam
Analisa EI-311
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Biasa TOTAL HARGA (Rp.) : 10,819.39
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian batu lunak TOTAL HARGA (Rp.) : 26,499.75
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Batu TOTAL HARGA (Rp.) : 65,030.22
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Struktur dengan kedalaman 0 - 2TOTAL HARGA (Rp.) : 16,127.67
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Struktur dengan kedalaman 2 - 4TOTAL HARGA (Rp.) : 566,490.97
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Struktur dengan kedalaman 4 - 6TOTAL HARGA (Rp.) : 836,114.21
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Perkerasan Beraspal dengan ColTOTAL HARGA (Rp.) : 132,030.21
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Perkerasan Beraspal tanpa Cold TOTAL HARGA (Rp.) : 472,441.13
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Perkerasan berbutir TOTAL HARGA (Rp.) : 20,942.49
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Perkerasan Beton TOTAL HARGA (Rp.) : 379,831.16
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Timbunan Biasa Dari Sumber Galian TOTAL HARGA (Rp.) : 92,675.50
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Timbunan Biasa Dari Hasil Galian TOTAL HARGA (Rp.) : 39,755.64
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Timbunan Pilihan Dari Sumber Galian TOTAL HARGA (Rp.) : 115,846.37
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Timbunan Pilihan dari galian TOTAL HARGA (Rp.) : 77,299.53
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Timbunan Pilihan Berbutir (diukur diatasTOTAL HARGA (Rp.) : 206,457.72
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Timbunan Pilihan Berbutir (diukur dengaTOTAL HARGA (Rp.) : 250,572.15
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Penimbunan Kembali Berbutir (GranularTOTAL HARGA (Rp.) : 311,948.16
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Penyiapan Badan Jalan TOTAL HARGA (Rp.) : 12,336.81
0 % THD. BIAYA PROYEK : 0.00
n atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
: ………………………………………………
: …………………………………………………………………..
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Pembersihan dan Pengupasan Lahan TOTAL HARGA (Rp.) : 16,634.57
(diameter < 30 % THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Pemotongan Pohon Pilihan diameter 15TOTAL HARGA (Rp.) : 10,774.06
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Pemotongan Pohon Pilihan diameter > TOTAL HARGA (Rp.) : 41,701.61
% THD. BIAYA PROYEK : 0.00
PERKIRAAN HARGA JUMLAH
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
(Rp.) (Rp.)
: ………………………………………………
: …………………………………………………………………..
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Pemotongan Pohon Pilihan diameter > TOTAL HARGA (Rp.) : 325,107.90
% THD. BIAYA PROYEK : 0.01
(Rp.) (Rp.)
Analisa EI-352c
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Takaran penggunaan aspal emulsi untuk permukaan Perkerasan yang halus/
rapat dengan kedalaman tekstur rata-rata ≤ 10 cmm Ae
7 Berat isi bahan
aspal emulsi ( CSS-1h atau SS-1h ) D1
8 Faktor kehilangan bahan Fh
1. BAHAN
untuk mendapatkan 1 liter aspal emulsi = 1 x Fh = 1 x 1.03 (M31a)
2. ALAT
2a Asphalt Distributor E41
Lebar penyemprotan b
Kapasitas pompa aspal pa
Faktor effisiensi kerja Fa
Kap. Prod. / jam = = pa x Fa x 60 Q1
2d Alat Bantu
Sapu lidi
Sekop
Gerobak dorong
3. TENAGA KERJA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
1. BAHAN
untuk mendapatkan 1 liter aspal emulsi = 1 x Fh = 1 x 1.03 (M31a)
2. ALAT
2a Asphalt Distributor E41
Lebar penyemprotan b
Kapasitas pompa aspal pa
Faktor effisiensi kerja Fa
Kap. Prod. / jam = = pa x Fa x 60 Q1
3. TENAGA KERJA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Takaran penggunaan aspal emulsi untuk permukaan Perkerasan yang halus/
rapat dengan kedalaman tekstur rata-rata ≤ 10 cmm Ae
7 Berat isi bahan
aspal emulsi Modifikasi Polymer (PMCQS-1h atau PMQS-1h ) D1
8 Faktor kehilangan bahan Fh
1. BAHAN
untuk mendapatkan 1 liter aspal emulsi = 1 x Fh = 1 x 1.03 (M31a)
2. ALAT
2a Aspal Distributor E41
Lebar penyemprotan b
Kapasitas pompa aspal pa
Faktor effisiensi kerja Fa
Kap. Prod. / jam = = pa x Fa x 60 Q1
Koefisien Alat / Ltr = 1 : Q1 E41
2d Alat Bantu
Sapu lidi
Sekop
Gerobak dorong
JENIS PEKERJAAN : 4.1.(3)
JENIS PEKERJAAN : Pengabutan ( Fog Seal ) dengan Aspal Emulsi Modifikasi Polymer yang Mengikat Lebih Cepa
(PMCQS-h atau PMQS1h )
SATUAN PEMBAYARAN : Liter
3. TENAGA KERJA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Aspal yang digunakan adalah aspal emulsi dengan takaran = (0.87+1.0)/2 As
6 Agregate penutup memakai batu pecah halus (0/5) = (7.8+8.6)/2 Agg
7 Berat isi bahan
a. Aspal emulsi D1
b. Agregate (0/5) D2
8 Faktor kehilangan bahan aspal Fh1
agregat Fh2
II. URUTAN KERJA
1 Permukaan perkerasan harus dibersihkan dengan menggunakan compresor
dan bebas dari genangan air
2 Aspal emulsi disemprotkan menggunakan Aspal Distributor
3 Agregate ditebar segera setelah penyemprotan aspal
4 Agregate digilas dengan menggunakan pemadat roda karet
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN untuk pemakaian 1 M2
a. Aspal emulsi (As x Fh1) (M10)
b. Agregate(0/5) (Agg x Fh2)/D2/1000 Agg
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu Siklus : Ts1
- Waktu tempuh isi = (L : v1) x 60 menit T1
- Waktu muat = V x 60/ Q1 T3
- Waktu tempuh kosong = (L : v2) x 60 menit T2
- Lain-lain T4
Ts1
3. TENAGA KERJA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / liter :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Racangan lapisan bubur aspal tipe 1,CSS-1h/SS-1h rata-rata= (2+4)/2mm t
6 Takaran penghamparan agregate rata-rata = (6+9)/2 kg/m² Agg
7 Kadar residu aspal ( 10 + 16 ) / 2 As
8 Bahan pengisi ( filler ) PC
9 Berat isi bahan
Aspal emulsi D1
Agregate kasar D2
Agregate halus D3
PC D4
10 Faktor kehilangan bahan aspal emulsi Fh1
agregate Fh2
II. URUTAN KERJA
1 Permukaan yang akan dilapis dibersihkan dari debu/kotoran dgn Air Compressor dan Power Broom
2 Pemberian tanda di atas permukaan jalan yang akan dilapisi bubur aspal
3 Agregat dinaikkan dengan Wheel Loader ke atas Dump Truck termasuk bahan lainnya dan dibawa ke Lokasi Pekerjaa
4 Bahan campuran agregat,aspal emulsi dan bahan pengisi dimasukan ke dalam mesin Pencampur dan penghampar (S
5 Mesin Penghampar bergerak maju dengan kecepatan tertentu sehingga diperoleh tebal hamparan bubur aspal emulsi
6 Bagian-bagian yang tidak rata harus diratakan dengan alat bantu oleh sekelompok pekerja
7 Pemadatan dengan alat pemadat berat maksimum 7 Ton setelah lewat waktu seting.
1. BAHAN
1 Dari hasil gradasi pada tabel 4.4.2.2) didapatkan : a. agregate kasar (5/10) Agg.K
b. agregate halus (0/5) Agg.H
2 Untuk 1 m2 hamparan diperlukan :
a.Agregate halus (97%Agg x Fh2 )/D3/1000 (M01c)
b.PC (3% Agg X Fh1) (M12)
c.Aspal emulsi ((13/0,6) % Agg x Fh1)/D1 (M31a)
d.Air volume sama dengan volume aspal (M170)
2. ALAT
Kap. Prod./jam = V x Fa x 60 Q4
Ts2 x t
Koefisien Alat / jam = 1 : Q5 E09
3. TENAGA
Produksi menentukan Aspal Slurry Seal Truck Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L02)
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 t
6 Takaran penghamparan agregate rata-rata = (6+9)/2 kg/m² Agg
7 Kadar residu aspal (10 + 16 )/2 As
8 Bahan pengisi ( filler ) PC
9 Berat isi bahan
Aspal emulsi D1
Agregate kasar D2
Agregate halus D3
PC D4
10 Faktor kehilangan bahan Aspal Emulsi Fh1
Agregate Fh2
II. URUTAN KERJA
1 Permukaan yang akan dilapis dibersihkan dari debu/kotoran dgn Air Compressor dan Power Broom
2 Pemberian tanda di atas permukaan jalan yang akan dilapisi bubur aspal
3 Agregat dinaikkan dengan Wheel Loader ke atas Dump Truck termasuk bahan lainnya dan dibawa ke Lokasi Pekerjaa
4 Bahan campuran agregat,aspal emulsi dan bahan pengisi dimasukan ke dalam mesin Pencampur dan penghampar (S
5 Mesin Penghampar bergerak maju dengan kecepatan tertentu sehingga diperoleh hamparan bubur aspal emulsi mera
6 Bagian-bagian yang tidak rata harus diratakan dengan alat bantu oleh sekelompok pekerja
7 Pemadatan dengan alat pemadat berat maksimum 7 Ton setelah lewat waktu seting.
1. BAHAN
1 Dari hasil gradasi pada tabel 4.4.2.2) didapatkan : a. agregate kasar (5/10) Agg.K
b. agregate halus (0/5) Agg.H
2 Untuk 1 m2 hamparan diperlukan :
a.Agregate halus (97%Agg x Fh2 )/D3/1000 (M01c)
b.PC (3% AggxFh1) (M12)
c.Aspal emulsi (13%Aggx Fh1 )/D1 (M31a)
d.Air volume sama dengan volume aspal (M170)
2. ALAT
2.a Compressor E05
Asumsi dapat membersihkan permukaan per menit v
Faktor effisiensi kerja Fa
Kap. Prod. / jam = v x Fa x 60 Q1
Koefisien Alat / m2 = 1 : Q1 E05
Kapasitas prod/jam = V x Fa x Fb x 60 Q3
Ts1
Koefisien Alat / M2 = 1 : Q3 Q3
Kap. Prod./jam = V x Fa x 60 Q4
Ts2 x t
Koefisien Alat / jam = 1 : Q5 E09
3. TENAGA
Produksi menentukan Asphalt Slurry Seal Truck Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L02)
Rp. 19,545.86 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Racangan lapisan bubur aspal tipe 2,CSS-1h/SS-1h rata-rata= (4+6)/2mm t
6 Takaran penghamparan agregate rata-rata = (9+13)/2 kg/m² Agg
7 Kadar residu aspal (7.5 + 13.5 )/2 As
8 Bahan pengisi ( filler ) PC
9 Berat isi bahan
Aspal emulsi D1
Agregate kasar D2
Agregate halus D3
PC D4
10 Faktor kehilangan bahan Aspal Emulsi Fh1
Agregate Fh2
II. URUTAN KERJA
1 Permukaan yang akan dilapis dibersihkan dari debu/kotoran dgn Air Compressor dan Power Broom
2 Pemberian tanda di atas permukaan jalan yang akan dilapisi bubur aspal
3 Agregat dinaikkan dengan Wheel Loader ke atas Dump Truck termasuk bahan lainnya dan dibawa ke Lokasi Pekerjaa
4 Bahan campuran agregat,aspal emulsi dan bahan pengisi dimasukan ke dalam mesin Pencampur dan penghampar (S
5 Mesin Penghampar bergerak maju dengan kecepatan tertentu sehingga diperoleh hamparan bubur aspal emulsi mera
6 Bagian-bagian yang tidak rata harus diratakan dengan alat bantu oleh sekelompok pekerja
7 Pemadatan (bila perlu) dengan alat pemadat berat maksimum 7 Ton setelah lewat waktu seting.
2. ALAT
Kapasitas prod/jam = V x Fa x Fb x 60 Q3
Ts1
Koefisien Alat / M2 = 1 : Q3 E05
Kap. Prod./jam = V x Fa x 60 Q4
Ts2 x t
Koefisien Alat / jam = 1 : Q5 E09
3. TENAGA
Produksi menentukan Asphalt Slurry Seal Truck Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L02)
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Racangan lapisan bubur aspal tipe 2,CQS-1h/QS-1h rata-rata = (4+6)/2mm t
6 Takaran penghamparan agregate rata-rata = (9+13)/2 kg/m² Agg
7 Kadar residu aspal (7.5 + 13.5 )/2 As
8 Bahan pengisi ( filler ) PC
9 Berat isi bahan
Aspal emulsi D1
Agregate kasar D2
Agregate halus D3
PC D4
10 Faktor kehilangan bahan Aspal Emulsi Fh1
Agregate Fh2
II. URUTAN KERJA
1 Permukaan yang akan dilapis dibersihkan dari debu/kotoran dgn Air Compressor dan Power Broom
2 Pemberian tanda di atas permukaan jalan yang akan dilapisi bubur aspal
3 Agregat dinaikkan dengan Wheel Loader ke atas Dump Truck termasuk bahan lainnya dan dibawa ke Lokasi Pekerjaa
4 Bahan campuran agregat,aspal emulsi dan bahan pengisi dimasukan ke dalam mesin Pencampur dan penghampar (S
5 Mesin Penghampar bergerak maju dengan kecepatan tertentu sehingga diperoleh hamparan bubur aspal emulsi mera
6 Bagian-bagian yang tidak rata harus diratakan dengan alat bantu oleh sekelompok pekerja
7 Pemadatan dengan alat pemadat berat maksimum 7 Ton setelah lewat waktu seting.
1. BAHAN
1 Dari hasil gradasi pada tabel 4.4.2.2) didapatkan : a. agregate kasar (5/10) Agg.K
b. agregate halus (0/5) Agg.H
2 Untuk 1 m2 hamparan diperlukan :
a.Agregate halus (0/5) (97% x95% xAgg X Fh2 )/D3/1000 (M01c)
b.PC (3% x 95% Aggx Fh1) (M12)
c.Aspal emulsi (10.5% x 95%Aggx Fh1 )/D1 (M31a)
d.Air volume sama dengan volume aspal (M170)
2. ALAT
Kapasitas prod/jam = V x Fa x Fb x 60 Q3
Ts1
Koefisien Alat / M2 = 1 : Q3 v
ITEM PEMBAYARAN NO. : 4.4.(4)
JENIS PEKERJAAN : Penghamparan Lapis penutup bubur aspal emulsi tipe 2, CQS-1h/QS-1h
SATUAN PEMBAYARAN : Meter Persegi
Kap. Prod./jam = V x Fa x 60 Q4
Ts2 x t
Koefisien Alat / jam = 1 : Q5 E09
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L02)
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Racangan lapisan bubur aspal tipe 3,CSS-1h/SS-1h rata-rata = (6+9)/2mm t
6 Takaran penghamparan agregate rata-rata = (12+13)/2 kg/m² Agg
7 Kadar residu aspal (6.5 + 12 )/2 As
8 Bahan pengisi ( filler ) PC
9 Berat isi bahan
Aspal emulsi D1
Agregate kasar D2
Agregate halus D3
PC D4
10 Faktor kehilangan bahan Aspal Emulsi Fh1
Agregate Fh2
II. URUTAN KERJA
1 Permukaan yang akan dilapis dibersihkan dari debu/kotoran dgn Air Compressor dan Power Broom
2 Pemberian tanda di atas permukaan jalan yang akan dilapisi bubur aspal
3 Agregat dinaikkan dengan Wheel Loader ke atas Dump Truck termasuk bahan lainnya dan dibawa ke Lokasi Pekerjaa
4 Bahan campuran agregat,aspal emulsi dan bahan pengisi dimasukan ke dalam mesin Pencampur dan penghampar (S
5 Mesin Penghampar bergerak maju dengan kecepatan tertentu sehingga diperoleh hamparan bubur aspal emulsi mera
6 Bagian-bagian yang tidak rata harus diratakan dengan alat bantu oleh sekelompok pekerja
7 Pemadatan dengan alat pemadat berat maksimum 7 Ton setelah lewat waktu seting.
1. BAHAN
1 Dari hasil gradasi pada tabel 4.4.2.2) didapatkan : a. agregate kasar (5/10) Agg.K
b. agregate halus (0/5) Agg.H
2 Untuk 1 m2 hamparan diperlukan :
a.Agregate halus (0/5) (97% x80% xAgg X Fh2 )/D3/1000 (M01c)
b.PC (3% x 80% Agg x Fh1) (M12)
c.Aspal emulsi (9.25% x 80%Aggx Fh1 )/D1 (M31a)
d.Air volume sama dengan volume aspal (M170)
2. ALAT
Kapasitas prod/jam = V x Fa x Fb x 60 Q3
Ts1
Koefisien Alat / M2 = 1 : Q3 v
Kap. Prod./jam = V x Fa x 60 Q4
Ts2 x t
Koefisien Alat / jam = 1 : Q5 E09
3. TENAGA
Produksi menentukan Asphalt Slurry Seal Truck Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L02)
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Racangan lapisan bubur aspal tipe 3,CQS-1h/QS-1h rata-rata = (6+9)/2mm t
6 Takaran penghamparan agregate rata-rata = (12+13)/2 kg/m² Agg
7 Kadar residu aspal (6.5 + 12 )/2 As
8 Bahan pengisi ( filler ) PC
9 Berat isi bahan
Aspal emulsi D1
Agregate kasar D2
Agregate halus D3
PC D4
10 Faktor kehilangan bahan Aspal Emulsi Fh1
Agregate Fh2
II. URUTAN KERJA
1 Permukaan yang akan dilapis dibersihkan dari debu/kotoran dgn Air Compressor dan Power Broom
2 Pemberian tanda di atas permukaan jalan yang akan dilapisi bubur aspal
3 Agregat dinaikkan dengan Wheel Loader ke atas Dump Truck termasuk bahan lainnya dan dibawa ke Lokasi Pekerjaa
4 Bahan campuran agregat,aspal emulsi dan bahan pengisi dimasukan ke dalam mesin Pencampur dan penghampar (S
5 Mesin Penghampar bergerak maju dengan kecepatan tertentu sehingga diperoleh hamparan bubur aspal emulsi mera
6 Bagian-bagian yang tidak rata harus diratakan dengan alat bantu oleh sekelompok pekerja
7 Pemadatan (bila perlu) dengan alat pemadat berat maksimum 7 Ton setelah lewat waktu seting.
1. BAHAN
1 Dari hasil gradasi pada tabel 4.4.2.2) didapatkan : a. agregate kasar (5/10) Agg.K
b. agregate halus (0/5) Agg.H
2 Untuk 1 m2 hamparan diperlukan :
a.Agregate halus (0/5) (97% x80% xAgg x Fh2 )/D3/1000 (M01c)
b.PC (3% x 80% Agg x Fh1) (M12)
c.Aspal emulsi (9.25% x 80%Aggx Fh1 )/D1 (M31a)
d.Air volume sama dengan volume aspal (M170)
2. ALAT
Kapasitas prod/jam = V x Fa x Fb x 60 Q3
Ts1
Koefisien Alat / M2 = 1 : Q3 v
Kap. Prod./jam = V x Fa x 60 Q4
Ts2 x t
Koefisien Alat / jam = 1 : Q5 E09
3. TENAGA
Produksi menentukan Asphal Slurry Seal Truck Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L02)
Rp. 23,780.40 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Racangan Lapis permukaan Mikro dengan aspal emulsi modifikasi polymer PM t
6 Untuk tipe 1 digunakan takaran agregate rata-rata = (5.4+10)/2 kg/m² Agg
7 Aspal emulsi yang digunakan modifikasi polymer yang mengikat lebih cepat
(PMCQS-1h/PMQS-1h) dengan Kadar residu aspal Ae
8 Pemakaian Aspal Emulsi Ae
9 Bahan pengisi ( filler ) PC
10 Berat isi bahan
Aspal emulsi D1
Agregate kasar D2
Agregate halus D3
PC D4
11 Faktor kehilangan bahan Aspal Emulsi Fh1
Agregate Fh2
II. URUTAN KERJA
1 Permukaan yang akan dilapis dibersihkan dari debu/kotoran dgn Air Compressor dan Power Broom
2 Pemberian tanda di atas permukaan jalan yang akan dilapisi campuran micro dengan aspal emulsi
3 Agregat dinaikkan dengan Wheel Loader ke atas Dump Truck termasuk bahan lainnya dan dibawa ke Lokasi Pekerjaa
4 Bahan campuran agregat,aspal emulsi dan bahan pengisi dimasukan ke dalam mesin Pencampur dan penghampar (S
5 Mesin Penghampar bergerak maju dengan kecepatan tertentu sehingga diperoleh hamparan campuran micro aspal em
6 Bagian-bagian yang tidak rata harus diratakan dengan alat bantu oleh sekelompok pekerja
7 Pemadatan dengan alat pemadat berat maksimum 7 Ton setelah lewat waktu seting.
2. ALAT
Kapasitas prod/jam = V x Fa x Fb x 60 Q3
Ts1
Koefisien Alat / M2 = 1 : Q3 E05
Kap. Prod./jam = V x Fa x 60 Q4
Ts2 x t
Koefisien Alat / jam = 1 : Q5 E09
3. TENAGA
Produksi menentukan Asphal Slurry Seal Truck Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L02)
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Untuk kedalaman alur (8-12) mm, diperlukan campuran tipe 1 AE1
Untuk kedalaman alur (13-25) mm, diperlukan campuran tipe 1 AE2
6 Berat isi bahan
Aspal emulsi D1
Agregate kasar D2
Agregate halus D3
PC D4
Campuran Micro D5
7 Faktor kehilangan bahan Aspal Emulsi Fh1
Agregate Fh2
II. URUTAN KERJA
1 Permukaan yang akan ditutup dengan lapisan perata dibersihkan dari debu/kotoran dgn Air Compressor dan Power Br
2 Agregat dinaikkan dengan Wheel Loader ke atas Dump Truck termasuk bahan lainnya dan dibawa ke Lokasi Pekerjaa
3 Bahan campuran agregat,aspal emulsi dan bahan pengisi dimasukan ke dalam mesin Pencampur dan penghampar (S
4 Mesin Penghampar bergerak maju dengan kecepatan tertentu sehingga alur tertutup merata oleh campuran micro
5 Bagian-bagian yang tidak rata harus diratakan dengan alat bantu oleh sekelompok pekerja
6 Pemadatan dengan alat pemadat berat maksimum 7 Ton setelah lewat waktu seting.
2. ALAT
Kapasitas prod/jam = V x Fa x Fb x 60 Q3
Ts1
Koefisien Alat / M2 = 1 : Q3 Q
Kap. Prod./jam = V x Fa x 60 Q4
Ts2
Koefisien Alat / Jam = 1 : Q5 E09
3. TENAGA
Produksi menentukan Asphalt Slurry Seal Truck Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L02)
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Lapis permukaan Mikro dengan aspal emulsi modifikasi polymer PMCQS-1h a t
6 Untuk tipe 2 digunakan takaran agregate rata-rata = (8.1+16.3)/2 kg/m² Agg
7 Aspal emulsi yang digunakan modifikasi polymer yang mengikat lebih cepat
(PMCQS-1h/PMQS-1h) dengan Kadar residu aspal Ae
8 Pemakaian Aspal Emulsi Ae
9 Bahan pengisi ( filler ) PC
10 Berat isi bahan
Aspal emulsi D1
Agregate kasar D2
Agregate halus D3
PC D4
10 Faktor kehilangan bahan Aspal Emulsi Fh1
Agregate Fh2
II. URUTAN KERJA
1 Permukaan yang akan dilapis dibersihkan dari debu/kotoran dgn Air Compressor dan Power Broom
2 Pemberian tanda di atas permukaan jalan yang akan dilapisi campuran micro dengan aspal emulsi
3 Agregat dinaikkan dengan Wheel Loader ke atas Dump Truck termasuk bahan lainnya dan dibawa ke Lokasi Pekerjaa
4 Bahan campuran agregat,aspal emulsi dan bahan pengisi dimasukan ke dalam mesin Pencampur dan penghampar (S
5 Mesin Penghampar bergerak maju dengan kecepatan tertentu sehingga diperoleh hamparan campuran micro aspal em
6 Bagian-bagian yang tidak rata harus diratakan dengan alat bantu oleh sekelompok pekerja
7 Pemadatan dengan alat pemadat berat maksimum 7 Ton setelah lewat waktu seting.
2. ALAT
Kap. Prod./jam = V x Fa x 60 Q4
Ts2 x t
Koefisien Alat / jam = 1 : Q5 E09
2f Asphalt Slurriy Seal Truck; 3,5 T/mnt; Min 1,0 km/j; 2,4-4,2m w;146 HP E49a
Kapasitas pencampuram Cp
Kecepatan penghamparan v
Lebar hamparan b
Faktor efisiensi alat Fa
Kap.Prod. / jam = = v x 1000 x b x Fa Q7
Koefisien Alat / M2 = 1 : Q7 E49a
3. TENAGA
Produksi menentukan Asphalt Slurry Seal Truck Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L02)
Rp. 3,801.44 / m2
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5Untuk kedalaman alur (8-12) mm, diperlukan campuran tipe 1 AE1
Untuk kedalaman alur (13-25) mm, diperlukan campuran tipe 1 AE2
6 Berat isi bahan
Aspal emulsi D1
Agregate kasar D2
Agregate halus D3
PC D4
Campuran Micro D5
7 Faktor kehilangan bahan Aspal Emulsi Fh1
Agregate Fh2
2. ALAT
Kapasitas prod/jam = V x Fa x Fb x 60 Q3
Ts1
Koefisien Alat / M2 = 1 : Q3 v
Kap. Prod./jam = V x Fa x 60 Q4
Ts2
Koefisien Alat / Jam = 1 : Q5 E09
3. TENAGA
Produksi menentukan Asphal Slurry Seal Truck Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L02)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis Latasir padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal Fh2
Berat isi Agregat (padat) Bip
Berat Isi Agregat (lepas) Bil
9 Komposisi campuran SS Kelas A
- Pasir Kasar PK
- Pasir Halus PH
- Semen FF
- Asphalt As
10 Berat Isi bahan :
- Latasir (SS) Kelas A D1
- Pasir Kasar D2
- Pasir Halus D3
11 Jarak Stock pile ke Cold Bin l
2 Agregat dan aspal dicampur dan dipanaskan dalam AMP, lalu dituangkan
ke dalam bak Dump Truck dan diangkut ke lokasi
1. BAHAN
1.a. Pasir Kasar = (PK x Fh1) : D2 (M92)
1.b. Pasir Halus = (PH x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh1) x 1000 (M12)
1.d. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + Z Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) Z
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D3 Q4
Ts2
Kecepatan rata-rata v
Lebar efektif pemadatan b
Jumlah lintasan n
Lajur lintasan N
Lebar Overlap bo
Faktor Efisiensi alat Fa
3. TENAGA
Produksi menentukan : Asphalt Mixing Plant Q2
Produksi Latasir / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis Latasir padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal Fh2
Berat isi Agregat (padat) Bip
Berat Isi Agregat (lepas) Bil
9 Komposisi campuran SS Kelas A
- Pasir Kasar PK
- Pasir Halus PH
- Semen FF
- Asphalt As
10 Berat Isi bahan :
- Latasir (SS) Kelas A D1
- Pasir Kasar D2
- Pasir Halus D3
11 Jarak Stock pile ke Cold Bin l
2 Agregat dan aspal dicampur dan dipanaskan dalam AMP, lalu dituangkan
ke dalam bak Dump Truck dan diangkut ke lokasi
1. BAHAN
1.a. Pasir Kasar = (PK x Fh1) : D2 (M92)
1.b. Pasir Halus = (PH x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh1) x 1000 (M12)
1.d. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + Z Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) Z
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D3 Q4
Ts2
Kecepatan rata-rata v
Lebar efektif pemadatan b
Jumlah lintasan n
Lajur lintasan N
Lebar Overlap bo
Faktor Efisiensi alat Fa
3. TENAGA
Produksi menentukan : Asphalt Mixing Plant Q2
Produksi Latasir / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : MANTAP
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (LTBA-A) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran LTBA - A :
- Agr Pecah Mesin 5 - 10 & 10 - 15 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
11 Berat Isi bahan :
- LTBA-A D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
2 Agregat dan aspal dicampur dan dipanaskan dalam AMP, lalu dituangkan
ke dalam bak Dump Truck dan diangkut ke lokasi
3 Campuran panas Lapisan tipis beton aspal dihampar dengan Finisher dan
dipadatkan dengan Tandem & Pneumatic Tire Roller
1. BAHAN
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + Z Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) Z
Ts1
Kap. Prod./jam = V x Fb x Fa x 60 Q1
Ts1
Kap.Prod. / jam = V x Fa Q2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : MANTAP
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (LTBA-A) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran LTBA - A :
- Agr Pecah Mesin 5 - 10 & 10 - 15 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
11 Berat Isi bahan :
- LTBA-A D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
2 Agregat dan aspal dicampur dan dipanaskan dalam AMP, lalu dituangkan
ke dalam bak Dump Truck dan diangkut ke lokasi
3 Campuran panas Lapis tipis beton aspal dihampar dengan Finisher dan
dipadatkan dengan Tandem & Pneumatic Tire Roller
1. BAHAN
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap. Prod./jam = V x Fb x Fa x 60 Q1
Ts1
Kap.Prod. / jam = V x Fa Q2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : MANTAP
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (LTBA-A) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran LTBA - A :
- Agr Pecah Mesin 5 - 10 & 10 - 15 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
11 Berat Isi bahan :
- LTBA-A D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
2 Agregat dan aspal dicampur dan dipanaskan dalam AMP, lalu dituangkan
ke dalam bak Dump Truck dan diangkut ke lokasi
3 Campuran panas Lapis tipis beton aspal dihampar dengan Finisher dan
dipadatkan dengan Tandem & Pneumatic Tire Roller
1. BAHAN
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap. Prod./jam = V x Fb x Fa x 60 Q1
Ts1
Koefisien Alat / ton = 1 : Q1 (E15)
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D3 Q4
Ts2 x D1
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : MANTAP
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (LTBA-A) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran LTBA - A :
- Agr Pecah Mesin 5 - 10 & 10 - 15 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
11 Berat Isi bahan :
- LTBA-A D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
2 Agregat dan aspal dicampur dan dipanaskan dalam AMP, lalu dituangkan
ke dalam bak Dump Truck dan diangkut ke lokasi
3 Campuran panas Lapis tipis beton aspal dihampar dengan Finisher dan
dipadatkan dengan Tandem & Pneumatic Tire Roller
1. BAHAN
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
ITEM PEMBAYARAN NO. : 4.7.(4)
JENIS PEKERJAAN : Lapis Tipis Beton Aspal - B Modifikasi Kasar (LTBA - B Mod.Kasar )
SATUAN PEMBAYARAN : Ton
Kap. Prod./jam = V x Fb x Fa x 60 Q1
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D3 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (HRS) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran SMA Tipis
- Agr Pch Mesin 5 - 8 & 8 - 11 mm 5-8&8-11&8-16
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Filler Added (Non PC) FF
- Asphalt As
- Anti Stripping Agent Asa
- Serat Selulosa SSl
11 Berat isi bahan :
- SMA Modifikasi Halus D1
- Agr Pch Mesin 5 - 8 & 8 - 11 & 11 - 16 mm D2
- Agr Pch Mesin 0 - 5 mm D3
- Filler Added D4
12 Jarak Stock pile ke Cold Bin l
2 Agregat dan aspal dicampur dan dipanaskan dalam AMP, lalu dituangkan
ke dalam bak Dump Truck dan diangkut ke lokasi
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh1) x 1000 (M12)
1.d. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 X D1 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q5
Produksi HRS / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (HRS) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran SMA Tipis
- Agr Pch Mesin 5 - 8 & 8 - 11 mm 5-8&8-11&8-16
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Filler Added (Non PC) FF
- Asphalt Modifikasi As
- Anti Stripping Agent Asa
- Serat Selulosa SSl
11 Berat isi bahan :
- SMA Modifikasi Halus D1
- Agr Pch Mesin 5 - 8 & 8 - 11 & 11 - 16 mm D2
- Agr Pch Mesin 0 - 5 mm D3
- Filler Added D4
2 Agregat dan aspal dicampur dan dipanaskan dalam AMP, lalu dituangkan
ke dalam bak Dump Truck dan diangkut ke lokasi
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh1) x 1000 (M12)
1.d. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q5
Produksi HRS / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Bahan dasar (batu, pasir dan semen) diterima
7 seluruhnya di lokasi pekerjaan
8 Rapid Setting Material (Beton Semen Fast Track < 24 jam)
2 ALAT
2.a Concrete Cutter (0.5 - 1) m/mnt; 8,6 HP E76
Kapasitas pemotongan per jam v
Faktor efisiensi alat Fa
Kapasitas prod/jam = v x Fa x 2 x 0.05 Q1
Kapa. Prod/jam = Fa x t x bk Q1
3 TENAGA
Produksi menentukan : Concrete Cutter Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
Rp. 395,006.01 / M3
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : . . . . . . . . . . . . bulan
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Bahan dasar (batu, pasir dan semen) diterima
7 seluruhnya di lokasi pekerjaan
8 Rapid Setting Material (Beton Semen Fast Track < 3 Hari)
9
10 Ukuran Lubang Tambalan
- Panjang Tambalan Pjs
- Lebar Tambalan Lbr
- Kedalaman Tambalan Tg
- Vloume Lubang V.Lub
Panjang Gergajian = 2 x (Lbr + Panj.S) Pjs.G
Luas Permukaan lubang gergajian = Panj x Lbr L.Per
Luas bidang gergajian vertikal = Tg x Panj.Ger L.bid.G
Lebar celah sambungan Lbr.c
2 ALAT
2.a Concrete Cutter (0.5 - 1) m/mnt; 8,6 HP
Kapasitas pemotongan per jam v
Faktor efisiensi alat Fa
Kapasitas prod/jam = v x Fa x 2 x 0.05 Q1
Koefisien alat / m3 = 1 : Q1
Kapa. Prod/jam = Fa x t x bk Q1
3 TENAGA
Produksi menentukan : CONCRETE CUTTER Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Bahan dasar (batu, pasir dan semen) diterima
7 seluruhnya di lokasi pekerjaan
8 Rapid Setting Material (Beton Semen Fast Track < 24 jam)
9
10 Ukuran Lubang Tambalan
- Panjang Tambalan Pjs
- Lebar Tambalan Lbr
- Kedalaman Tambalan Tg
- Vloume Lubang V.Lub
Panjang Gergajian = 2 x (Lbr + Panj.S) Pjs.G
Luas Permukaan lubang gergajian = Panj x Lbr L.Per
Luas bidang gergajian vertikal = Tg x Panj.Ger L.bid.G
Lebar celah sambungan Lbr.c
2 ALAT
2.a Concrete Cutter (0.5 - 1) m/mnt; 8,6 HP
Kapasitas pemotongan per jam v
Faktor efisiensi alat Fa
Kapasitas prod/jam = v x Fa x 2 x 0.05 Q1
Koefisien alat / m3 = 1 : Q1
Kapa. Prod/jam = Fa x t x bk Q1
2.c Koefisien Alat / m3 = 1 : Q1 E26 & E5
Compressor AHX-10, 10 HP
Kap. Prod. / jam = Jack Hammer Q2
3 TENAGA
Produksi menentukan : CONCRETE CUTTER Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Bahan dasar (batu, pasir dan semen) diterima
7 seluruhnya di lokasi pekerjaan
8 Rapid Setting Material (Beton Semen Fast Track < 24 jam)
9
10 Ukuran Lubang Tambalan
- Panjang Tambalan Pjs
- Lebar Tambalan Lbr
- Kedalaman Tambalan Tg
- Vloume Lubang V.Lub
Panjang Gergajian = 2 x (Lbr + Panj.S) Pjs.G
Luas Permukaan lubang gergajian = Panj x Lbr L.Per
Luas bidang gergajian vertikal = Tg x Panj.Ger L.bid.G
Lebar celah sambungan Lbr.c
2 ALAT
2.a Concrete Cutter (3 - 6) m/mnt; 8,6 HP
Kapasitas pemotongan per jam v
Faktor efisiensi alat Fa
Kapasitas prod/jam = v x Fa x 2 x 0.05 Q1
Koefisien alat / m3 = 1 : Q1
Kapa. Prod/jam = Fa x t x bk Q2
Koefisien Alat / m3 = 1 : Q2
2.c Compressor AHX-10, 10 HP
Untuk Pembersihan
Kecepatan v1
Lebar penyemprotan b
Faktor efisiensi alat Fa
Jumlah penyemprotan n
Kap. Prod. / jam = v1 x 1000 x b x Fa x Tg / n Q31
3 TENAGA
Produksi menentukan : Cutter Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Bahan dasar (batu, pasir dan semen) diterima
7 seluruhnya di lokasi pekerjaan
8 Rapid Setting Material (Beton Semen Fast Track < 24 jam)
9
10 Ukuran Lubang Tambalan
- Panjang Tambalan Pjs
- Lebar Tambalan Lbr
- Kedalaman Tambalan Tg
- Vloume Lubang V.Lub
Panjang Gergajian = 2 x (Lbr + Panj.S) Pjs.G
Luas Permukaan lubang gergajian = Panj x Lbr L.Per
Luas bidang gergajian vertikal = Tg x Panj.Ger L.bid.G
Lebar celah sambungan Lbr.c
2 ALAT
2.a Concrete Cutter (3 - 6) m/mnt; 8,6 HP
Kapasitas pemotongan per jam v
Faktor efisiensi alat Fa
Kapasitas prod/jam = ((v x Fa) x V.Lub)/(Pjs.G x 60 menit) Q1
Koefisien alat/lubang = 1 : Q1
3 TENAGA
Produksi menentukan : Cutter Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Bahan dasar (batu, pasir dan semen) diterima
7 seluruhnya di lokasi pekerjaan
8 Rapid Setting Material (Beton Semen Fast Track < 24 jam)
9
10 Ukuran Lubang Tambalan
- Panjang Tambalan Pjs
- Lebar Tambalan Lbr
- Kedalaman Tambalan Tg
- Vloume Lubang V.Lub
Panjang Gergajian = 2 x (Lbr + Panj.S) Pjs.G
Luas Permukaan lubang gergajian = Panj x Lbr L.Per
Luas bidang gergajian vertikal = Tg x Panj.Ger L.bid.G
Lebar celah sambungan Lbr.c
2 ALAT
2.a Concrete Cutter (3 - 6) m/mnt; 8,6 HP
Kapasitas pemotongan per jam v
Faktor efisiensi alat Fa
Kapasitas prod/jam = ((v x Fa) x V.Lub)/(Pjs.G x 60 menit) Q1
Koefisien alat/lubang = 1 : Q1
3 TENAGA
Produksi menentukan : Cutter Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
2 ALAT
3 TENAGA
Produksi menentukan : Drilling Machine Q3
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
2 ALAT
2.a Crack filling machine; 12 Ltr/mnt; 2,92 HP
Kapasitas v
Faktor effisiensi kerja Fa
Kap. Prod. / jam = v x Fa / (2 x (Lbr.c x (Tgx0,5)) x D2) Q2
Koefisien Alat / m = 1 : Q2 0
3 TENAGA
Produksi menentukan : crack filling Q2
Produksi / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
ITEM PEMBAYARAN NO. : 4.9.(5)
JENIS PEKERJAAN : Pemasangan Sealant
SATUAN PEMBAYARAN :M
Rp. 789.78 / M.
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Ukuran Lubang untuk Dowel Retrofit
- Panjang Lubang Pjs
- Lebar lubang Lbr
- Kedalaman Lubang Tg
- Volume Lubang V.Lub
Panjang Gergajian = 2 x (Lbr + Panj.S) Pjs.G
Luas Permukaan lubang gergajian = Panj x Lbr L.Per
Luas bidang gergajian vertikal = Tg x Panj.Ger L.bid.G
Lebar celah sambungan Lbr.c
2 ALAT
2.a Concrete Cutter (3 - 6) m/mnt; 8,6 HP
Kapasitas pemotongan per jam v
Faktor efisiensi alat Fa
Kapa. Prod/jam = Fa x t x bk Q2
3 TENAGA
Produksi menentukan :Cutter Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Bahan dasar (batu, pasir dan semen) diterima
7 seluruhnya di lokasi pekerjaan
8 Ukuran Pelat dan Lubang bor
- Tebal Pelat t
- Sudut lubang bor sdt
- Jarak lubang bor dari retak J
- Jarak antar lubang bor (Untuk LL berat) J.br
- Panjang Batang Pengikat Pj
- Diameter Batang Pengikat Dia.BP
- Berat Batang Pengikat G.BjTS
- Penampang Batang Pengikat A.Bj
- Diameter mata bor dia.lub
- Lebar celah retakan Lbr.C
- Kedalaman retakan t.rtk
Luas permukaan retakan di sekitar luban = Jarak antar lubang bor (Untuk LL berat) x 0,3
2 ALAT
2.a Drill machine /gerinda; 3,32 HP (dia 20-50 mm)
Kapasitas pengeboran per jam v
Faktor efisiensi alat Fa
Kapasitas prod/jam = v x Fa / Pj Q1
Koefisien alat / lubang = 1 : Q1
3 TENAGA
Produksi menentukan : Drilling Machine Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Bahan dasar (batu, pasir dan semen) diterima
7 seluruhnya di lokasi pekerjaan
8 Bahan grouting tersedia jenis tuang panas (termoplastik)
Backer rod 1 1/8" dia.BR
Dimensi sambungan - Kedalaman sambungan gergajian T
- Lebar celah sambungan w
- Tinggi reservoir t
- Panjang Celah Sambungan Pj
Berat Isi Bahan
- Sealant D1
- Backer Rod D2
2 ALAT
2.a Crack filling machine; 12 Ltr/mnt; 2,92 HP
Kapasitas v
Faktor effisiensi kerja Fa
Kap. Prod. / jam = v x Fa / (2 x (w x (T -t)) x D2) Q2
Koefisien Alat / m = 1 : Q2 0
Koefisien alat / m3 = 1 : Q1
3 TENAGA
Produksi menentukan :Cutter Q2
Produksi / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Bahan dasar (batu, pasir dan semen) diterima
7 seluruhnya di lokasi pekerjaan
8 Bahan grouting tersedia jenis tuang panas (termoseting)
Backer rod 1 1/8" dia.BR
Dimensi sambungan - Kedalaman sambungan gergajian T
- Lebar celah sambungan w
- Tinggi reservoir t
- Panjang Celah Sambungan Pj
2 ALAT
2.a Crack filling machine; 12 Ltr/mnt; 2,92 HP
Kapasitas v
Faktor effisiensi kerja Fa
Kap. Prod. / jam = v*Fa*60/Vol.celah Q1
Koefisien Alat / m3 = 1 : Q1 0
Rp. 162,156.37 / M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Bahan dasar (batu, pasir dan semen) diterima
7 seluruhnya di lokasi pekerjaan
8 Bahan grouting tersedia jenis tuang panas (termoseting)
Backer rod 1 1/8" dia.BR
Dimensi sambungan - Kedalaman sambungan gergajian T
- Lebar celah sambungan w
- Tinggi reservoir t
- Panjang Celah Sambungan Pj
3 TENAGA
Produksi menentukan :Cutter Q2
Produksi / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
Rp. 781,707.47 / M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Ukuran segmen pelat beton 3.5 m x 5 m, tebal 30cm
a. untuk penstabilan pelat beton
b. untuk pengembalian Elevasi pelat beton
2 ALAT
2.a Drill machine ; 3,32 HP (dia 20-50 mm)
Kapasitas pengeboran per jam v
Faktor efisiensi alat Fa
Kapasitas prod/jam = v x Fa / 0.30 Q1
Koefisien alat / lubang = 1 : Q1
3 TENAGA
Produksi menentukan : Compressor Q3
Produksi / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
Rp. 20,256.23 / M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Alat bor yang digunakan berupa bor pneumatik atau hidrolik dengan
diameter 40 mm dan tebal beton 30 cm, volume lubang = π d²x t V
7 Bahan graut menggunakan bahan dasar semen
a. berat isi mortar semen D
b. faktor kehilangan Fh
2 ALAT
2.a Pompa graut
Kecepatan V
faktor efisiensi alat fa
Kap. Prod./jam = V x Fa x 60 x D Q1
Koefisien alat / kg = 1 : Q1
3 TENAGA
Produksi menentukan : Pompa Graut Q3
Produksi / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
ITEM PEMBAYARAN NO. : 4.13(2)
JENIS PEKERJAAN : Material Injeksi berbahan dasar semen
SATUAN PEMBAYARAN : kilogram
Rp. 451,156.51 / M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Alat bor yang digunakan berupa bor pneumatik atau hidrolik dengan
diameter 15 mm dan tebal beton 30 cm, volume lubang = π d²x t V
7 Bahan graut menggunakan bahan dasar semen
a. berat isi mortar semen D
b. faktor kehilangan Fh
3 TENAGA
Produksi menentukan : Compressor Q3
Produksi / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
Rp. 427,884.66 / M
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.1.(1)
7.00 Jam JENIS PEKERJAAN : Pengabutan ( Fog Seal ) d
SATUAN PEMBAYARAN : Liter
0.15 ltr/m² Tabel 4.1.3.1
1.01 kg/ltr
1.03 NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1.03 ltr
1. Aspal Emulsi (M31a)
(CSS-1h atau SS-1h
3.50 M
100.00 liter/ menit
0.83
4980.00 Ltr
0.0011 Jam
5.00 km/jam
1.80 m
0.83 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
0.150 liter/m2 E. OVERHEAD & PROFIT
1,120.50 liter F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
0.00089 Jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap k
Ls dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-411
g Mengikat Lambat ( CSS-1h atau SS-1h )
URAIAN ANALISA HARGA SATUAN
Lanjutan
4980.00 liter
34860.00 liter
4.00 orang
1.00 orang
0.0008 Jam
0.0002 Jam
Analisa EI-412
yang Mengikat Lebih Cepat (CQS-1h Aatau QS-1h )
URAIAN ANALISA HARGA SATUAN FORMULIR S
Lanjutan PEREKAMAN ANALISA MA
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.1.(2)
7.00 Jam JENIS PEKERJAAN : Pengabutan ( Fog Seal ) d
SATUAN PEMBAYARAN : Liter
0.15 ltr/m² Tabel 4.1.3.1
1.010 kg/ltr
1.03 NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1.03 ltr
1. Aspal Emulsi (M31a)
3.50 M
100.00 liter/ menit
0.83
4980.00 Ltr
0.0002 Jam
C. PERALATAN
0.00115 Jam
5.00 km/jam
1.80 m
0.83 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
0.15 liter/m2 E. OVERHEAD & PROFIT
1,120.50 liter F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
0.00089 Jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap k
Ls dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
4,980 liter
34,860 liter
4.00 orang
1.00 orang
0.0008 Jam
0.0002 Jam
Analisa EI-413
Modifikasi Polymer yang Mengikat Lebih Cepat
FORMULIR S
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MA
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.1.(3)
7.00 Jam JENIS PEKERJAAN : Pengabutan ( Fog Seal ) d
SATUAN PEMBAYARAN (PMCQS-h atau PMQS1h
0.15 ltr/m² Tabel 4.13.1
1.010 kg/ltr
1.03 NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1.03 ltr
1. Aspal Emulsi (M31a)
100.00
3.5 M
100 liter/ menit
0.830
4980.00 Ltr
0.0002 Jam
C. PERALATAN
0.00115 Jam
5.00 km/jam
1.80 m
0.83 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
0.150 liter/m2 E. OVERHEAD & PROFIT
1,120.50 liter F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
0.00089 Jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap k
Ls dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Berlanjut ke halaman berikut
Analisa EI-413
difikasi Polymer yang Mengikat Lebih Cepat
4980.00 liter
34860.00 liter
4.00 orang
1.00 orang
0.0008 Jam
0.0002 Jam
Analisa EI-421
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
8.73 Km PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 4.2.(1)
0.94 liter/m² tabel 4.2.3.1) JENIS PEKERJAAN : Laburan Aspal (Buras)
8.20 kg/m² tabel 4.2.3.1) SATUAN PEMBAYARAN : Meter Persegi
1.01 kg/liter
1.46 Ton/m³
1.03 - NO. KOMPONEN
1.05
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
0.9631 Ltr
0.0059 M³ B. BAHAN
1. Aspal (M10)
2. Agregate (M91)
8.00 M3
0.83 -
20.00 Km / Jam
30.00 Km / Jam
26.10 menit
0.01 menit C. PERALATAN
17.40 menit 1. Dump Truck (E09)
1.45 menit 2 Wheel Loader (E15)
44.96 menit 3 Phenumatic Tire Roller E18
4 Aspal Distributor E41
2,215.16 m2 5 Compresor E05
6 Power Broom E03
0.0005 m2/Jam 7 Alat Bantu
1.50 M3
0.90 -
0.83 - D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
0.10 menit E. OVERHEAD & PROFIT
0.25 menit F. HARGA SATUAN PEKERJAAN ( D + E )
0.10 menit Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
0.45 menit berat untuk bahan-bahan.
37,350.00 m2/Jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
tebal 4mm dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
0.000027 Jam 3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-421
3,922 m2
0.00025 Jam
100.00
3.50 M
100.00 liter/ menit
0.83
0.94 liter/m2
4,656 m2
0.0002 Jam
0.00018 Jam
5.00 km/jam
1.80 m
0.83
0.94 liter/m2
6,984.45 m2
0.00014 Jam
Ls
9,600 liter
67,200 liter
20.00 orang
2.00 orang
0.0021 Jam
0.0002 Jam
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
8.73 Km PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 4.4.(1)
0.30 cm JENIS PEKERJAAN : Penghamparan lapis penu
7.50 kg/m² SATUAN PEMBAYARAN : Meter Persegi
13.00 %
3.00 % terhadap agregat kering
0.00 %
100.00 %
0.005 M3
0.232 kg C. PERALATAN
1.66 ltr kadar residu 60% 1. Compressor (E05)
1.657 ltr 2 Power Boom (E03)
3 Wheel Loader (E15)
4 Dump Truck (E09)
5 Aspal Slurriy seal truck (E49a)
6 Tandem roller (E17)
7 Alat Bantu
2.00 km/jam maju + kiri & kanan
3.50 m
0.83
1.66 liter/m2
9,628.21 m2
0.00010 Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
5.00 km/jam F. HARGA SATUAN PEKERJAAN ( D + E )
1.80 m Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
0.83 berat untuk bahan-bahan.
1.66 liter/m2 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
12,379.12 m2 dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
0.00008 Jam 3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
1.500 M3
0.900 -
0.830 -
0.10 menit
0.25 menit
0.10 menit
0.45 menit
49,800 m2
tebal 3 mm
0.000020 Jam
Analisa EI-441
tipe 1, CSS-1h / SS-1h
URAIAN ANALISA HARGA SATUAN
Lanjutan
8.000 M3
0.830 -
40.000 KM/jam
60.000 KM/jam
0.010 menit
13.088 menit
8.725 menit
1.450 menit
23.272 menit
5,706.39 m2
tebal 3 mm
0.00018 M2/Jam
3.500 Ton/mnt
1.000 Km / Jam
3.500 m
0.830 -
2905.000 M2
0.0003 Jam
4.00 Km / Jam
1.68 M
2.00 lintasan
3.00
0.20 m
0.83 -
2,567.47 m2
0.0004 Jam
2905.00 M2
20335.00 M2
10.00 orang
1.00 orang
0.0034 Jam
0.0003 Jam
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
8.73 Km PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 4.4.(2)
0.30 cm JENIS PEKERJAAN : Penghamparan Lapis pen
7.50 kg/m² SATUAN PEMBAYARAN : Meter Persegi
13.00 %
3.00 %
0.00 %
100.00 %
0.005 M3
0.232 kg C. PERALATAN
0.994 ltr 1. Compressor (E05)
1.020 ltr 2 Power Boom (E03)
3 Wheel Loader (E15)
4 Dump Truck (E09)
5 Aspal Slurriy seal truck (E49a)
6 Tandem roller (E17)
100.0 Ltr/mnt asumsi 2% maks kaps 7 Alat Bantu
0.830
4980.000 m2
0.0002 Jam
149.400 m2
0.00669 Jam
8.000 M3
0.830 -
40.000 KM/jam
60.000 KM/jam
3.213 menit
13.088 menit
8.725 menit
1.450 menit
26.475 menit
5,015.99 m2
tebal 3 mm
0.00020 M2/Jam
3.500 Ton/mnt
1.000 Km / Jam
3.500 m
0.830 -
2905.000 M2
0.0003 Jam
4.00 Km / Jam
1.68 M
2.00 lintasan
3.00
0.20 m
0.83 -
2,567.47 m2
0.0004 Jam
2905.00 M2
15.20 M2
10.00 orang
1.00 orang
0.0034 Jam
0.0003 Jam
Analisa EI-442
lsi tipe 1, CQS-1h/QS-1h
URAIAN ANALISA HARGA SATUAN
Lanjutan
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
8.73 Km PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 4.4.(3)
0.50 cm JENIS PEKERJAAN : Penghamparan Lapis pen
11.00 kg/m³ SATUAN PEMBAYARAN : Meter Persegi
10.50 %
3.00 %
0.007 M3
0.323 kg C. PERALATAN
1.119 ltr
1.147 ltr 1. Air Compresor E05
2 Power Boom E94
3 Wheel Loader E15
4 Dump Truck E908
5 Asphalt Slurriy Seal T E49a
100.00 L/M Asumsi 2% Maks Kaps 6 Tandem Roller E17
0.830 7 Alat Bantu
4980.000 m2
0.0002 Jam
157.700 m2
0.0063 Jam
8.000 M3
0.830 -
40.000 KM/jam
60.000 KM/jam
3.044 menit
13.088 menit
8.725 menit
1.450 menit
26.306 menit
3,028.94 m2
tebal 5 mm
0.00033 M2/Jam
3.500 Ton/mnt
1.000 Km / Jam Asumsi
3.500 m
0.830 -
2905.000 M2
0.0003 Jam
4.00 Km / Jam
1.68 M
2.00 lintasan
3.00
0.20 m
0.83 -
2,567.47 m2
0.0004 Jam
2905.00 M2
21.18 M2
10.00 orang
1.00 orang
0.0034 Jam
0.0003 Jam
Berlanjut ke halaman berikut
Analisa EI-443
lsi tipe 2, CSS-1h/SS-1h
URAIAN ANALISA HARGA SATUAN
Lanjutan
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
8.73 Km PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 4.4.(4)
0.50 cm JENIS PEKERJAAN : Penghamparan Lapis pen
11.00 kg/m³ SATUAN PEMBAYARAN : Meter Persegi
10.50 %
3.00 %
0.007 M3
0.323 kg C. PERALATAN
1.119 ltr 1. Air Compresor E05
1.147 ltr 2 Power Boom E03
3 Wheel Loader E15
4 Dump Truck E908
5 Asphalt Slurriy Seal T E49a
6 Tandem Roller E17
100.000 Ltr/mnt Maks 2% Kaps 7 Alat Bantu
0.830
4980.000 m2
0.0002 Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
4000.000 M2/jam F. HARGA SATUAN PEKERJAAN ( D + E )
1.250 m' Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
0.830 berat untuk bahan-bahan.
3320.000 m2 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.0003 dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
1.500 M3 4 Biaya satuan sudah termasuk pengeluaran untuk se
0.950 - yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.830 -
0.450 menit
157.700 m2
0.0063 Jam
Berlanjut ke hal. berikut
Analisa EI-444
tipe 2, CQS-1h/QS-1h
URAIAN ANALISA HARGA SATUAN
Lanjutan
8.000 M3
0.830 -
40.000 KM/jam
60.000 KM/jam
3.044 menit
13.088 menit
8.725 menit
1.450 menit
26.306 menit
3,028.94 m2
tebal 5 mm
0.00033 M2/Jam
3.500 Ton/mnt
1.000 Km / Jam Asumsi
3.500 m
0.830 -
2905.000 M2
0.0003 Jam
4.00 Km / Jam
1.68 M
2.00 lintasan
3.00
0.20 m
0.83 -
2,567.47 m2
0.0004 Jam
2905.00 M2
938.04 M2
10.00 orang
1.00 orang
0.0034 Jam
0.0003 Jam
Analisa EI-444
lsi tipe 2, CQS-1h/QS-1h
URAIAN ANALISA HARGA SATUAN
Lanjutan
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
8.73 Km PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 4.4.(5)
0,75 cm JENIS PEKERJAAN : Penghamparan Lapis pen
13.00 kg/m² SATUAN PEMBAYARAN : Meter Persegi
9.25 %
3.00 %
0.007 M3
0.321 kg C. PERALATAN
0.981 ltr 1. Air Compresor E05
1.006 ltr 2 Power Boom E03
3 Wheel Loader E15
4 Dump Truck E18
5 Asphalt Slurriy Seal T E49a
6 Tandem Roller E17
100.000 L/mnt 2% maks kaps 7 Alat Bantu
0.830
4980.000 m2
0.000 Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
4000.000 M2/Jam F. HARGA SATUAN PEKERJAAN ( D + E )
1.250 m' Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
0.830 berat untuk bahan-bahan.
3320.000 m2 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.0003 dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
1.500 M3 4 Biaya satuan sudah termasuk pengeluaran untuk se
0.950 - yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.830 -
0.450 menit
157.700 m2
0.0063 Jam
Analisa EI-445
tipe 3, CSS-1h/SS-1h
URAIAN ANALISA HARGA SATUAN
Lanjutan
8.000 M3
0.830 -
40.000 KM/jam
60.000 KM/jam
3.044 menit
13.088 menit
8.725 menit
1.450 menit
26.306 menit
116.50 m2
tebal 7,5 mm
0.00858 M2/Jam
3.500 Ton/mnt
1.000 Km / Jam Asumsi
3.500 m
0.830 -
2905.000 M2
0.0003 Jam
4.00 Km / Jam
1.68 M
2.00 lintasan
3.00
0.20 m
0.83 -
2,567.47 m2
0.0004 Jam
2905.00 M2
933.55 M2
10.00 orang
1.00 orang
0.0034 Jam
0.0003 Jam
Analisa EI-445
lsi tipe 2, CQS-1h/QS-1h
URAIAN ANALISA HARGA SATUAN
Lanjutan
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
8.73 Km PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 4.4.(6)
0,75 cm JENIS PEKERJAAN : Penghamparan Lapis pen
13.00 kg/m² SATUAN PEMBAYARAN : Meter Persegi
9.25 %
3.00 %
0.007 M3
0.321 kg C. PERALATAN
1.006 ltr 1. Air Compresor E05
1.006 ltr 2 Power Boom E94
3 Wheel Loader E15
4 Dump Truck E908
5 Asphalt Slurriy Seal T E49a
6 Tandem Roller E17
100.000 Ltr/mnt maks 2% kaps 7 Alat Bantu
0.830
4980.000 m2
0.000 Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
4000.000 M2/Jam F. HARGA SATUAN PEKERJAAN ( D + E )
1.250 m' Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
0.830 berat untuk bahan-bahan.
3320.000 m2 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.0003 dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
1.500 M3 4 Biaya satuan sudah termasuk pengeluaran untuk se
0.950 - yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.830 -
0.450
157.700 m2
0.0063 Jam
Analisa EI-446
tipe 3, CQS-1h/QS-1h
URAIAN ANALISA HARGA SATUAN
Lanjutan
8.000 M3
0.830 -
40.000 KM/jam
60.000 KM/jam
3.044 menit
13.088 menit
8.725 menit
1.450 menit
26.306 menit
116.50 m2
tebal 7,5 mm
0.00858 M2/Jam
3.500 Ton/mnt
1.000 Km / Jam Asumsi
3.500 m
0.830 -
2905.000 M2
0.0003 Jam
4.00 Km / Jam
1.68 M
2.00 lintasan
3.00
0.20 m
0.83 -
2,567.47 m2
0.0004 Jam
2905.00 M2
933.55 M2
10.00 orang
1.00 orang
0.0034 Jam
0.0003 Jam
Analisa EI-446
lsi tipe 2, CSS-1h/SS-1h
URAIAN ANALISA HARGA SATUAN
Lanjutan
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
8.73 Km ………………………………
7.00 Jam PROP / KAB / KODYA : ………………………………
0.50 cm ITEM PEMBAYARAN NO. 4.5.(1)
7.70 kg/m² JENIS PEKERJAAN Lapis permukaan Mikro den
SATUAN PEMBAYARAN Meter Persegi
62.00 %
0.15 ltr/m²
3.00 %
NO. KOMPONEN
1.010 kg/ltr
1.45 ton/m³
1.46 ton/m³
1.135 ton/m³ A. TENAGA
1.03
1.05 1. Pekerja (L01)
2. Mandor (L03)
ssor dan Power Broom
o dengan aspal emulsi
an lainnya dan dibawa ke Lokasi Pekerjaan
am mesin Pencampur dan penghampar (Slurry Mobile Mixer)
eroleh hamparan campuran micro aspal emulsi merata B. BAHAN
ompok pekerja
1. Aggregat halus (M01c)
2 PC (M12)
3 Aspal Emulsi (M31a)
4 Air (M170)
5.00 %
95.00 %
0.006 M3
0.188 kg C. PERALATAN
0.155 ltr 1. Air Compresor E05
0.155 ltr 2 Power Boom E94
3 Wheel Loader E15
4 Dump Truck E908
5 Asphalt Slurriy Seal T E49a
6 Tandem Roller E17
100 Ltr/mnt maks 2% kaps 7 Alat Bantu
0.830
4980.000 m2
0.0002 Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
4000 M2/Jam F. HARGA SATUAN PEKERJAAN ( D + E )
1.250 m' Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
0.830 berat untuk bahan-bahan.
3320.000 m2 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.0003 dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
1.500 M3 4 Biaya satuan sudah termasuk pengeluaran untuk se
0.950 - yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.830 -
0.450 menit
0.10 menit
0.25 menit
0.10 menit
0.45 menit
157.700 m2
0.0063 Jam
Analisa EI-451
kasi polymer PMCQS-1h atau PMQS-1h untuk tipe 1
URAIAN ANALISA HARGA SATUAN
Lanjutan
8.000 M3
0.830 -
40.000 KM/jam
60.000 KM/jam
3.044 menit
13.088 menit
8.725 menit
1.450 menit
26.306 menit
3,028.94 m2
tebal 5 mm
0.00033 M2/Jam
3.500 Ton/mnt
1.000 Km / Jam Asumsi
3.500 m
0.830 -
2905.000 M2
0.0003 Jam
4.00 Km / Jam
1.68 M
2.00 lintasan
3.00
0.20 m
0.83 -
2,567.47 m2
0.0004 Jam
2905.00 M2
545.62 M2
10.00 orang
1.00 orang
0.0034 Jam
0.0003 Jam
Berlanjut ke halaman berikut
Analisa EI-451
ikasi polymer PMCQS-1h atau PMQS-1h untuk tipe1
URAIAN ANALISA HARGA SATUAN
Lanjutan
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
8.73 Km PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 4.5.(2)
11.35 kg/m² JENIS PEKERJAAN : Lapis permukaan Mikro P
13.65 kg/m² SATUAN PEMBAYARAN untuk tipe 1
1.010 kg/ltr
1.40 ton/m³
1.46 ton/m³ NO. KOMPONEN
1.135 ton/m³
2.32 ton/m³
1.03
1.05 A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
kotoran dgn Air Compressor dan Power Broom
an lainnya dan dibawa ke Lokasi Pekerjaan
am mesin Pencampur dan penghampar (Slurry Mobile Mixer)
tertutup merata oleh campuran micro
ompok pekerja B. BAHAN
1.030 Ton
C. PERALATAN
1. Air Compresor E05
2 Power Boom E03
3 Wheel Loader E15
100 Ltr/mnt maks 2% 4 Dump Truck E09
0.830 5 Asphalt Slurriy Seal T E49a
4980.000 m2 6 Tandem Roller E17
0.000 Jam 7 Alat Bantu
4000.000 m2/jam
1.250 m' D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
0.830 E. OVERHEAD & PROFIT
3320.000 m2 F. HARGA SATUAN PEKERJAAN ( D + E )
0.0003 Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap k
1.500 M3 dari nomor mata pembayaran. Harga Satuan yang d
0.950 - terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
0.830 - 3 Biaya satuan untuk peralatan sudah termasuk bahan
0.450 4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
157.700 m2
0.0063 Jam
Analisa EI-452
si modifikasi polymer PMCQS-1h atau PMQS-1h
URAIAN ANALISA HARGA SATUAN
Lanjutan
8.000 M³
0.830 -
40.000 KM/jam
60.000 KM/jam
3.044 menit
13.088 menit
8.725 menit
1.450 menit
26.306 menit
15.14 Ton
0.066 Ton
3.500 Ton/mnt
1.000 Km / Jam
3.500 m
0.830 -
2905.000 M2
0.0003 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan
3.00
0.20 m
0.83 -
17.12 ton
0.0584 Jam
2905.00 M2
20335.00 M2
10.00 orang
1.00 orang
0.0034 Jam
0.0003 Jam
Analisa EI-452
mulsi modifikasi polymer PMCQS-1h atau PMQS-1h
URAIAN ANALISA HARGA SATUAN
Lanjutan
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
8.73 Km ………………………………
7.00 Jam PROP / KAB / KODYA : ………………………………
0.60 cm ITEM PEMBAYARAN NO. 4.5.(3)
12.20 kg/m² JENIS PEKERJAAN Lapis permukaan Mikro den
SATUAN PEMBAYARAN Meter Persegi
62.00 %
0.15 ltr/m²
3.00 %
NO. KOMPONEN
1.010 kg/ltr
1.40 ton/m³
1.46 ton/m³
1.135 ton/m³ A. TENAGA
1.03
1.05 1. Pekerja (L01)
2. Mandor (L03)
ssor dan Power Broom
o dengan aspal emulsi
an lainnya dan dibawa ke Lokasi Pekerjaan
am mesin Pencampur dan penghampar (Slurry Mobile Mixer)
eroleh hamparan campuran micro aspal emulsi merata B. BAHAN
ompok pekerja
1. Aggregat halus M27
2 PC
3 Aspal Emulsi
4 Air
20.00 %
80.00 %
0.007 M3
0.302 kg C. PERALATAN
0.155 ltr 1. Air Compresor E05
0.155 ltr 2 Power Boom E94
3 Wheel Loader E15
4 Dump Truck E09
5 Asphalt Slurriy Seal T E49a
6 Tandem Roller E17
100.000 Ltr/mnt 2% maks kaps 7 Alat Bantu
0.830
4980.000 m2
0.000 Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
4000.000 m2/Jam F. HARGA SATUAN PEKERJAAN ( D + E )
1.250 m' Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
0.830 berat untuk bahan-bahan.
3320.000 m2 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.0003 dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
1.500 M3 4 Biaya satuan sudah termasuk pengeluaran untuk se
0.950 - yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.830 -
0.450 menit
157.700 m2
0.0063 Jam
Analisa EI-453
kasi polymer PMCQS-1h atau PMQS-1h untuk tipe 2
URAIAN ANALISA HARGA SATUAN
Lanjutan
8.0000 M³
0.830 -
40.000 KM/jam
60.000 KM/jam
3.044 menit
13.088 menit
8.725 menit
1.450 menit
26.306 menit
2,524.11 m2
tebal 5 mm
0.00040 M2/Jam
3.500 Ton/mnt
1.000 Km / Jam Asumsi
3.500 m
0.830 -
2905.000 M2
0.0003 Jam
4.00 Km / Jam
1.68 M
2.00 lintasan
3.00
0.20 m
0.83 -
2,567.47 m2
0.0004 Jam
2905.00 M2
876.10 M2
10.00 orang
1.00 orang
0.0034 Jam
0.0003 Jam
Analisa EI-453
ikasi polymer PMCQS-1h atau PMQS-1h untuk tipe 2
URAIAN ANALISA HARGA SATUAN
Lanjutan
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
8.73 Km PROP / KAB / KODYA : ………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 4.5.(4)
11.35 kg/m² tabel 4.5.5.1) JENIS PEKERJAAN : Lapis permukaan Mikro P
13.65 kg/m² tabel 4.5.5.1) SATUAN PEMBAYARAN untuk tipe 2
1.010 kg/ltr
1.40 ton/m³
1.46 ton/m³ NO. KOMPONEN
1.135 ton/m³
2.32 ton/m³
1.03
1.05 A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
kotoran dgn Air Compressor dan Power Broom
an lainnya dan dibawa ke Lokasi Pekerjaan
am mesin Pencampur dan penghampar (Slurry Mobile Mixer)
tertutup merata oleh campuran micro
ompok pekerja B. BAHAN
1.030 Ton
C. PERALATAN
1. Air Compresor E05
2 Power Boom E03
3 Wheel Loader E15
100.000 Ltr/mnt 2% maks kaps 4 Dump Truck E08
0.830 5 Asphalt Slurriy Seal T E49a
4980.000 m2 6 Tandem Roller E17
0.0002 Jam 7 Alat Bantu
4000.000 M2/jam
1.250 m' D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
0.830 E. OVERHEAD & PROFIT
3320.000 m2 F. HARGA SATUAN PEKERJAAN ( D + E )
0.0003 Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap k
1.500 M3 dari nomor mata pembayaran. Harga Satuan yang d
0.950 - terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
0.830 - 3 Biaya satuan untuk peralatan sudah termasuk bahan
0.450 menit 4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
157.700 m2
0.0063 Jam
Analisa EI-454
si modifikasi polymer PMCQS-1h atau PMQS-1h
URAIAN ANALISA HARGA SATUAN
Lanjutan
8.000 M3
0.830 -
40.000 KM/jam
60.000 KM/jam
3.044 menit
13.088 menit
8.725 menit
1.450 menit
26.306 menit
15.14 Ton
0.066 m3
3.500 Ton/mnt
1.000 Km / Jam Asumsi
3.500 m
0.830 -
2905.000 M2
0.0003 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan
3.00
0.20 m
0.83 -
855.82 M2
0.0012 Jam
2905.00 M2
20335.00 M2
10.00 orang
1.00 orang
0.0034 Jam
0.0003 Jam
Analisa EI-454
si modifikasi polymer PMCQS-1h atau PMQS-1h
URAIAN ANALISA HARGA SATUAN
Lanjutan
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.6 (1)
7.00 M Tabel 6.3.1 (2) JENIS PEKERJAAN : Latasir Kelas A (SS-A)
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
12.43 %
77.07 %
0.90 % A. TENAGA
9.60 %
1. Pekerja (L01)
2.19 ton / M3 2. Mandor (L03)
1.45 ton / M3
1.46 ton / M3
0.05 km
B. BAHAN
0.0109 Jam
Analisa EI-461
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
20.00 KM / Jam
30.00 KM / Jam
1.00 ton
1.00 menit
17.52 menit
26.18 menit
20.00 menit
17.45 menit
81.15 menit
7.17 ton
0.1395 ton
0.0001 Jam
6.90 ton
1.50 Km / Jam
1.48 M
6.00 lintasan
3.00
0.30 m
0.83 -
13,417.93 ton
0.0001 Jam
2.50 KM / jam
1.99 M
14.00 lintasan
3.00
0.30 M
0.83 -
12,208.67 ton
0.0001 Jam
Analisa EI-461
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-462
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.6 (2)
0.020 M Tabel 6.3.1 (2) JENIS PEKERJAAN : Latasir Kelas B (SS-B)
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3 NO. KOMPONEN
8.75 %
77.88 %
1.770 % A. TENAGA
11.60 %
1. Pekerja (L01)
2.21 ton / M3 2. Mandor (L03)
1.45 ton / M3
1.46 ton / M3
0.05 km
B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
0.0634 M3 6. Tandem Roller E17
0.5601 M3 7 P. Tire Roller E18
18.5850 Kg 8 Alat Bantu
119.4800 Kg
0.0087 Jam
Analisa EI-462
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3 panduan
0.83 -
20.00 KM / Jam
30.00 KM / Jam
1.00 ton
1.00 menit
8.00 menit
26.18 menit
20.00 menit
17.45 menit
71.63 menit
8.12 ton
0.1231 ton
0.0289 Jam
6.90 ton
1.50 Km / Jam
1.48 M
6.00 lintasan
3.00
0.30 m
0.83 -
42.12 ton
0.0237 Jam
2.50 KM / jam
1.99 M
4.00 lintasan
3.00
0.30 M
0.83 -
122.92 ton
0.0081 Jam
Analisa EI-462
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-471
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. :4.7.(1)
0.020 M JENIS PEKERJAAN : Lapis Tipis Beton Aspal-A
7.00 Jam SATUAN PEMBAYARAN : TON
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3 NO. KOMPONEN
5.10 %
86.67 %
0.93 % A. TENAGA
7.30 %
1. Pekerja (L01)
2.32 ton / M3 2. Mandor (L03)
1.40 ton / M3
1.46 ton / M3
0.05 km
B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
6. Tandem Roller E17
7 P. Tire Roller E18
8 Alat Bantu
0.0383 M3
0.6233 M3
9.7650 Kg D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
75.1900 Kg E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
berat untuk bahan-bahan.
1.50 M3 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.85 - dari nomor mata pembayaran. Harga Satuan yang d
0.83 - terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
20.00 km/jam panduan 4 Biaya satuan sudah termasuk pengeluaran untuk se
30.00 km/jam panduan yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.15 menit jarak tempuh 50 m
0.10 menit
0.75 menit
1.00 menit
Analisa EI-471
114.93 ton
0.0087 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 m3
0.83 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
8.00 menit
26.18 menit
20.00 menit
17.45 menit
71.63 menit
8.12 ton
0.1231 ton
5.00 m/menit
0.83 - Normal
3.15 meter
22.90 ton
0.0437 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.20 m
0.83 - Normal
74.97 ton
0.0133 Jam
2.50 KM / Jam
1.99 M
8.00 lintasan
3.00
0.30 M
0.83 -
Analisa EI-471
40.67 ton
0.0246 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-472
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.7.(2)
0.030 M JENIS PEKERJAAN : Lapis Tipis Beton Aspal-B
7.00 Jam SATUAN PEMBAYARAN : TON
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3 NO. KOMPONEN
16.48 %
76.23 %
0.94 % A. TENAGA
6.35 %
1. Pekerja (L01)
2.32 ton / M3 2. Mandor (L03)
1.40 ton / M3
1.46 ton / M3
0.05 km
B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
6. Tandem Roller E17
7 P. Tire Roller E18
8 Alat Bantu
0.1236 M3
0.5482 M3
9.8700 Kg D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
65.4050 Kg E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
berat untuk bahan-bahan.
1.50 M3 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.85 - dari nomor mata pembayaran. Harga Satuan yang d
0.83 - terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
20.00 km/jam panduan 4 Biaya satuan sudah termasuk pengeluaran untuk se
30.00 km/jam panduan yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.15 menit jarak 50 m
0.10 menit
0.75 menit
1.00 menit
Analisa EI-472
114.93 ton
0.0087 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 m3
0.83 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
8.00 menit
26.18 menit
20.00 menit
17.45 menit
71.63 menit
8.12 ton
0.1231 ton
5.00 m/menit
0.83 - Normal
3.15 meter
34.35 ton
0.0291 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.20 m
0.83 - Normal
112.46 ton
0.0089 Jam
2.50 KM / Jam
1.99 M
8.00 lintasan
3.00
0.30 M
0.83 -
Analisa EI-472
URAIAN ANALISA HARGA SATUAN
Lanjutan
61.01 ton
0.0164 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-473
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.7.(3)
0.030 M JENIS PEKERJAAN : Lapis Tipis Beton Aspal-B
7.00 Jam SATUAN PEMBAYARAN 0
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3 NO. KOMPONEN
30.75 %
63.07 %
0.95 % A. TENAGA
5.23 %
1. Pekerja (L01)
2.32 ton / M3 2. Mandor (L03)
1.40 ton / M3
1.46 ton / M3
0.05 km
B. BAHAN
1 Agregate uk.5-10 & 10-1 (M92)
2 Agregate uk.0-5 (M91)
3 Semen (M12)
4 Aspal (M10)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
6. Tandem Roller E17
7 P. Tire Roller E18
8 Alat Bantu
0.2306 M3
0.4536 M3
9.9750 Kg D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
53.8690 Kg E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
berat untuk bahan-bahan.
1.50 M3 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.85 - dari nomor mata pembayaran. Harga Satuan yang d
0.83 - terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
20.00 km/jam panduan 4 Biaya satuan sudah termasuk pengeluaran untuk se
30.00 km/jam panduan yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.15 menit
0.10 menit
0.75 menit
1.00 menit
Analisa EI-473
114.93 ton
0.0087 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 m3
0.83 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
8.00 menit
26.18 menit
20.00 menit
17.45 menit
71.63 menit
8.12 m3
0.1231 Jam
5.00 m/menit
0.83 - Normal
3.15 meter
34.35 ton
0.0291 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.20 m
0.83 - Normal
112.46 ton
0.0089 Jam
2.50 KM / Jam
1.99 M
8.00 lintasan
3.00
0.30 M
0.83 -
Analisa EI-473
61.01 ton
0.0164 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-474
TBA - B Mod.Kasar )
URAIAN ANALISA HARGA SATUAN FORMULIR
PEREKAMAN ANALISA M
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.7.(4)
0.03 M JENIS PEKERJAAN : Lapis Tipis Beton Aspal-B
7.00 Jam SATUAN PEMBAYARAN 0
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3 NO. KOMPONEN
30.66 %
62.89 %
0.95 % A. TENAGA
5.50 % asp mod > asp 60/70
1. Pekerja (L01)
2.32 ton / M3 2. Mandor (L03)
1.40 ton / M3
1.46 ton / M3
0.05 km
B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
6. Tandem Roller E17
7 P. Tire Roller E18
8 Alat Bantu
0.2300 M3
0.4523 M3
9.9750 Kg D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
56.6500 Kg E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
berat untuk bahan-bahan.
1.50 M3 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.85 - dari nomor mata pembayaran. Harga Satuan yang d
0.83 - terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
20.00 km/jam panduan 4 Biaya satuan sudah termasuk pengeluaran untuk se
30.00 km/jam panduan yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.15 menit
0.10 menit
0.75 menit
1.00 menit
Berlanjut ke hal. berikut.
Analisa EI-474
A - B Mod.Kasar )
URAIAN ANALISA HARGA SATUAN
Lanjutan
114.93 ton
0.0087 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 m3
0.83 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
8.00 menit
26.18 menit
20.00 menit
17.45 menit
71.63 menit
8.12 m3
0.1231 Jam
5.00 m/menit
0.83 - Normal
3.15 meter
34.35 ton
0.0291 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.30 m
0.83 - Normal
34.90 ton
0.0287 Jam
2.50 KM / Jam
1.99 M
8.00 lintasan
3.00
0.20 M
0.83 -
Analisa EI-474
A - B Mod.Kasar )
URAIAN ANALISA HARGA SATUAN
Lanjutan
63.28 ton
0.0158 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-475
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.7.(5)
0.02 M JENIS PEKERJAAN : Stone Matrix Asphalt Tipis
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3 NO. KOMPONEN
61.64 %
25.22 %
6.54 % A. TENAGA
6.3 %
0.30 %As 1. Pekerja (L01)
0.30 % Camp 2. Mandor (L03)
2.29 ton / M3
1.51 ton / M3
1.51 ton / M3
1.16 ton / M3
0.05 km
1. Agr 5-8 & 8-11 (M92)
2. Agregate ( 0 - 5) (M91)
3 Semen (M12)
4 Aspal (M10)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
6. Vibrator Roller E19
0.4286 M3 7 P. Tire Roller E18
0.1754 M3 8 Alat Bantu
457.8000 Kg
66.1500 Kg
Analisa EI-475
114.93 ton
0.0087 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 m3
0.83 -
20.00 KM / Jam
30.00 KM / Jam
1.00 ton
1.00 menit
8.00 menit
26.18 menit
20.00 menit
17.45 menit
71.63 menit
12.74 m3
0.0785 Jam
5.00 m/menit
0.83 -
3.15 meter
35.92 ton
0.0278 Jam
4.00 Km / Jam
1.90 M
6.00 lintasan
2.18
0.20 m
0.83 -
44.22 ton
0.0226 Jam
4.00 KM / jam
2.29 M
6.00 lintasan
3.00
0.30 M
0.83 -
158.90 M2
0.0063 Jam
Analisa EI-475
49.80 ton
348.60 ton
7.00 orang
1.00 orang
0.1406 Jam
0.0201 Jam
Analisa EI-476
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.7.(6)
0.02 M JENIS PEKERJAAN : Stone Matrix Asphalt Mod
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3 NO. KOMPONEN
61.50 %
25.17 %
6.53 % A. TENAGA
6.50 % Asp Mod > Asp 60/70
0.30 %As 1. Pekerja (L01)
0.30 % Camp 2. Mandor (L03)
2.29 ton / M3
1.51 ton / M3
1.51 ton / M3
1.16 ton / M3
B. BAHAN
0.05 km
1. Agr 5-8 & 8-11 (M92)
2. Agregate ( 0 - 5) (M91)
3 Semen (M12)
4 Aspal (M10)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
6. Vibrator Roller E19
0.4276 M3 7 P. Tire Roller E18
0.1750 M3 8 Alat Bantu
457.1000 Kg
68.2500 Kg
Analisa EI-476
114.93 ton
0.0087 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 m3
0.83 -
20.00 KM / Jam
30.00 KM / Jam
1.00 ton
1.00 menit
8.00 menit
26.18 menit
20.00 menit
17.45 menit
71.63 menit
12.74 ton
0.0785 Jam
5.00 m/menit
0.83 -
3.15 meter
35.92 ton
0.0278 Jam
4.00 Km / Jam
1.90 M
6.00 lintasan
2.18
0.20 m
0.83 -
44.22 ton
0.0226 Jam
4.00 KM / jam
2.29 M
6.00 lintasan
3.00
0.30 M
0.83 -
158.90 M2
0.0063 Jam
Analisa EI-476
Lump Sum
49.80 ton
348.60 ton
7.00 orang
1.00 orang
0.1406 Jam
0.0201 Jam
Analisa EL-481
Mengeras untuk Pembukaan Lalu Lintas Umur Beton ≤ 24
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.8.(1)
7.00 Jam JENIS PEKERJAAN : Tambalan dangkal dengan
SATUAN PEMBAYARAN : M3
Fs 45 MPa
NO. KOMPONEN
0.40 M
0.40 M
0.07 M
0.0104 M3 A. TENAGA
1.60 M
0.16 M2 1. Pekerja (L01)
0.10 M2 2. Mandor (L03)
8.00 mm
9.53 mm
0.15 Ltr/M2
0.50 Ltr/M2 B. BAHAN
C. PERALATAN
0.01 M3
0.69 Kg
0.03 Ltr
6.96 Kg
0.0002 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
45.00 m/Jam asumsi utk tebal 5 cm Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
0.83 berat untuk bahan-bahan.
5.60 M3 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
dari nomor mata pembayaran. Harga Satuan yang d
0.1785 Jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
Berlanjut ke halaman berikut yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EL-481
engeras untuk Pembukaan Lalu Lintas Umur Beton ≤ 24 jam
URAIAN ANALISA HARGA SATUAN
Lanjutan
24.00 m2/jam
0.83
0.996 M3
1.0040 Jam
0.996 liter
1.0040 Jam
5.60 M3
39.22 M3
10.00 orang
1.00 orang
1.78 Jam
0.18 Jam
Analisa EI-482
Mengeras untuk Pembukaan Lalu Lintas Umur Beton > 1
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.8.(2)
7.00 Jam JENIS PEKERJAAN : Tambalan dangkal dengan
SATUAN PEMBAYARAN : M3
Fs 45 MPa
NO. KOMPONEN
0.40 M
0.25 M
0.07 M
0.0065 M3 A. TENAGA
1.30 M
0.10 M2 1. Pekerja (L01)
0.08 M2 2. Mandor (L03)
8.00 mm
9.53 mm
100.00 μm
0.50 Ltr/M2 Seksi 5.3.5.13).d) B. BAHAN
C. PERALATAN
0.0067 M3
0.00001 Kg
0.05 Ltr
1.59 Kg
0.0002 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
45.00 m/Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
0.83 berat untuk bahan-bahan.
5.60 M3 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
dari nomor mata pembayaran. Harga Satuan yang d
0.1785 Jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
Berlanjut ke halaman berikut yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-482
engeras untuk Pembukaan Lalu Lintas Umur Beton > 1 hari dan
0.996 M3
1.0040 Jam
0.996 liter
1.0040 Jam
5.60 M3
39.22 M3
10.00 orang
1.00 orang
1.78 Jam
0.18 Jam
Analisa EI-483
Mengeras untuk Pembukaan Lalu Lintas Umur Beton > 3
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.8.(3)
7.00 Jam JENIS PEKERJAAN : Tambalan dangkal dengan
SATUAN PEMBAYARAN : M3
Fs 45 MPa
NO. KOMPONEN
0.40 M
0.25 M
0.07 M
0.0065 M3 A. TENAGA
1.30 M
0.10 M2 1. Pekerja (L01)
0.08 M2 2. Mandor (L03)
8.00 mm
9.53 mm
100.00 μm
0.50 Ltr/M2 B. BAHAN
C. PERALATAN
0.0067 M3
0.00001 Kg
0.05 Ltr
1.59 Kg
0.0002 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
45.00 m/Jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
0.83 berat untuk bahan-bahan.
5.60 M3 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
dari nomor mata pembayaran. Harga Satuan yang d
0.1785 Jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
Berlanjut ke halaman berikut yang dibayar dari kontrak) dan biaya-biaya lainnya.
0
engeras untuk Pembukaan Lalu Lintas Umur Beton > 3 hari dan
E26 & E5
24.00 m2/jam
0.83
0.996 M3
1.0040 Jam
0.996 liter
1.0040 Jam
5.60 M3
39.22 M3
10.00 orang
1.00 orang
1.78 Jam
0.18 Jam
Analisa EL-491
Mengeras untuk Pembukaan Lalu Lintas Umur Beton ≤ 24
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.9.(1)
7.00 Jam JENIS PEKERJAAN : Tambalan Penuh dengan
SATUAN PEMBAYARAN : M3
Fs 45 MPa
NO. KOMPONEN
2.40 M
1.75 M
0.30 M
1.2600 M3 A. TENAGA
8.30 M
4.20 M2 1. Pekerja (L01)
2.49 M2 2. Mandor (L03)
8.00 mm
9.53 mm
0.15 Ltr/M2
0.50 Ltr/M2 B. BAHAN
1.2978 M3
3.47 Kg AASHTO M235M/M235-13 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
0.15 Ltr E. OVERHEAD & PROFIT
140.45 Kg F. HARGA SATUAN PEKERJAAN ( D + E )
223.86 Kg Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap k
dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
Berlanjut ke halaman berikut yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EL-491
ngeras untuk Pembukaan Lalu Lintas Umur Beton ≤ 24 jam
URAIAN ANALISA HARGA SATUAN
Lanjutan
0.1785 Jam
24.00 m2/jam
0.83
0.996 M3
1.0040 Jam
2.00 km/jam
1.75 m
0.83
2.00 kali
435.75 m3
0.996 m3
1.0063 Jam
2.00 buah
2.00 buah
4.00 buah
2.00 buah
5.60 M3
39.22 M3
10.00 orang
1.00 orang
1.785 Jam
0.1785 Jam
Analisa EI-492
Mengeras untuk Pembukaan Lalu Lintas Umur Beton > 1 hari
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.9.(2)
7.00 Jam JENIS PEKERJAAN : Tambalan Penuh dengan
SATUAN PEMBAYARAN : M3
Fs 45 MPa
NO. KOMPONEN
2.40 M
1.75 M
0.30 M
1.2600 M3 A. TENAGA
8.30 M
4.20 M2 1. Pekerja (L01)
2.49 M2 2. Mandor (L03)
8.00 mm
9.53 mm
100.00 μm
0.50 Ltr/M2 B. BAHAN
1.2978 M3
0.01 Kg AASHTO M235M/M235-13 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
0.15 Ltr E. OVERHEAD & PROFIT
140.45 Kg F. HARGA SATUAN PEKERJAAN ( D + E )
223.86 Kg Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap k
dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
Berlanjut ke halaman berikut yang dibayar dari kontrak) dan biaya-biaya lainnya.
0
ngeras untuk Pembukaan Lalu Lintas Umur Beton > 1 hari dan <
270.00 Km/Jam
0.83
567.00 M3
0.0018 Jam
5.00 menit
0.83
2.99 M3
0.33 Jam
10.00 M2
0.83
149.40 M3
0.01 Jam
2.00 buah
2.00 buah
4.00 buah
2.00 buah
2.00 buah
567.00 M3
3,969.00 M3
10.00 orang
2.00 orang
0.018 Jam
0.0035 Jam
Analisa EI-493
Mengeras untuk Pembukaan Lalu Lintas Umur Beton > 3 hari
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.9.(3)
7.00 Jam JENIS PEKERJAAN : Tambalan Penuh dengan
SATUAN PEMBAYARAN : M3
Fs 45 MPa
NO. KOMPONEN
2.40 M
1.75 M
0.30 M
1.2600 M3 A. TENAGA
8.30 M
4.20 M2 1. Pekerja (L01)
2.49 M2 2. Mandor (L03)
8.00 mm
9.53 mm
100.00 μm
0.50 Ltr/M2 B. BAHAN
C. PERALATAN
1.2978 M3
0.01 Kg AASHTO M235M/M235-13 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
0.15 Ltr E. OVERHEAD & PROFIT
140.45 Kg F. HARGA SATUAN PEKERJAAN ( D + E )
223.86 Kg Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap k
dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
Berlanjut ke halaman berikut yang dibayar dari kontrak) dan biaya-biaya lainnya.
0
ngeras untuk Pembukaan Lalu Lintas Umur Beton > 3 hari dan <
270.00 Km/Jam
0.83
567.00 M3
0.0018 Jam
5.00 menit
0.83
2.99 M3
0.33 Jam
10.00 M2
0.83
149.40 M3
0.01 Jam
2.00 buah
2.00 buah
4.00 buah
2.00 buah
2.00 buah
567.00 M3
3,969.00 M3
10.00 orang
1.00 orang
0.018 Jam
0.0018 Jam
Analisa EI-494
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.9.(4)
7.00 Jam JENIS PEKERJAAN : Pemasangan ruji (dowel)
SATUAN PEMBAYARAN : Buah
2.40 M 4.8.4.1. (nilai min)
3.50 M 4.8.4.1. (nilai min)
0.30 M 4.8.4.1. (nilai min)
2.5200 M3 NO. KOMPONEN
6.32 kg/m' BJTP 280
34.00 mm selisih 2 mm utk
epoxi
1.03 Ton/M3
1.03 A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
10.80 Buah
2.84 Kg
0.73 liter 1. Dowel (32mm) (M173)
2. Graut Semen (M166)
6.00 m/Jam
0.83
11.07 lubang
0.0904 Jam
C. PERALATAN
1 Drilling Machine
2 Alat Bantu
11.07 lubang
77.47 Lubang
15.00 orang
1.00 orang
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
1.36 Jam E. OVERHEAD & PROFIT
0.09 Jam F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap k
dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Berlanjut ke halaman berikut
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.9.(5)
7.00 Jam JENIS PEKERJAAN : Pemasangan Sealant
SATUAN PEMBAYARAN :M
2.40 M
3.50 M
0.30 M NO. KOMPONEN
2.5200 M3
9.53 mm
1.03 Ton/M3
0.03 Ton/M3 A. TENAGA
1.03
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
12.00 Ltr/menit
0.83
153.49 M'
0.00652 Jam
C. PERALATAN
1 Drilling Machine
2 Alat Bantu
153.49 Lubang
1,074.43 Lubang
2.00 orang
1.00 orang
0.0130 Jam
0.0065 Jam D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap k
dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Berlanjut ke halaman berikut
Analisa EI-495
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.10
7.00 Jam JENIS PEKERJAAN : Penambahan dan/atau Pe
SATUAN PEMBAYARAN : Buah
0.650 M
0.065 M
0.200 M
0.0085 M3 NO. KOMPONEN
1.43 M
0.04 M2
0.29 M2
8.00 mm A. TENAGA
C. PERALATAN
0.00000007 Kg
0.0010 Kg 1 Jack Hammer; TEX-21 S; E26
0.0091 Kg 2 Compressor AHX-10, 10 E05
2.84 Kg 3 Alat Bantu
3.34 Buah
utk bikin celah
0.2996 Jam
Analisa EI-410.
ada Perkerasan Beton Semen dengan Epoksi
URAIAN ANALISA HARGA SATUAN
Lanjutan
24.00 m2/jam
0.83
0.996 M3
1.0040 Jam
0.996 m3
1.0040 Jam
3.34 Lubang
23.37 Lubang
4.00 orang
1.00 orang
1.1983 Jam
0.2996 Jam
Analisa EI-4111
150 - 175 mm)
URAIAN ANALISA HARGA SATUAN FORMULIR
PEREKAMAN ANALISA M
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.11(1)
7.00 Jam JENIS PEKERJAAN : Penjahitan Melintang Tipe
SATUAN PEMBAYARAN : Buah
0.15 M2
B. BAHAN
2.20 Ton/M3
1.05 Ton/M3 1. Batang Pengikat BJTS 4 (M268)
2. Epoxy (M166)
1.03
C. PERALATAN
6.00 m/Jam
0.83
24.90 lubang
0.0402 Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
2.00 km/jam Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
5.00 m berat untuk bahan-bahan.
0.83 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
2.00 kali dari nomor mata pembayaran. Harga Satuan yang d
1,106.67 lubang jarak 75 cm, tebal
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
lainnya diambil 50 cm
jarak 75 cm, tebal
0.0009 Jam lainnya diambil 50 cm 3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Berlanjut ke halaman berikut
Analisa EI-4111
0 - 175 mm)
URAIAN ANALISA HARGA SATUAN
Lanjutan
24.90 Lubang
174.30 Lubang
10.00 orang
1.00 orang
0.4016 Jam
0.0402 Jam
Analisa EI-4121
k)
URAIAN ANALISA HARGA SATUAN FORMULIR
PEREKAMAN ANALISA M
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.12(1)
7.00 Jam JENIS PEKERJAAN : Penutupan Sambungan M
SATUAN PEMBAYARAN : M'
0.029 M
0.10 M NO. KOMPONEN
0.025 M
0.025 M
1.000 M asumsi
A. TENAGA
1. Pekerja (L01)
1.005 Ton/M3 2. Mandor (L03)
0.027 Ton/M3
1.03
B. BAHAN
1.030 M'
0.018 Kg/m C. PERALATAN
1.941 Kg/m
1 Crack filling machine; 12 Ltr/mnt; 2,
2 Concrete Cutter (3 - 6) m E76
3 Compressor AHX-10, 10 E05
4 Alat Bantu
Analisa EI-4121
12.00 Ltr/menit
0.83
44.05 M'
0.02270 Jam
0.0535 Jam
2.00 km/jam
3.50 m
0.83 untuk melintang,
2.00 kali utk memanjang 5 m
830.00 M
0.0012 Jam
18.68 M
130.73 M
10.00 orang
1.00 orang
0.5355 Jam
0.0535 Jam
Analisa EI-4122
g)
URAIAN ANALISA HARGA SATUAN FORMULIR
PEREKAMAN ANALISA M
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.12(2)
7.00 Jam JENIS PEKERJAAN : Penutupan Sambungan M
SATUAN PEMBAYARAN : M'
0.029 M
0.10 M NO. KOMPONEN
0.025 M
0.025 M
1.000 M asumsi
A. TENAGA
1. Pekerja (L01)
1.005 Ton/M3 2. Mandor (L03)
0.027 Ton/M3
1.05
B. BAHAN
1. Backer Rod (M179)
2. Sealant Tuang Dingin (M180)
1.05 M'
0.018 Kg/m
1.979 Kg/m
C. PERALATAN
270.00 Km/Jam
0.83
224.10 M3
0.0045 Jam D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
10.00 M2 Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
0.83 berat untuk bahan-bahan.
498.00 M3 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.00 Jam dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
Berlanjut ke halaman berikut yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-4122
2.00 orang
1.00 orang
0.0089 Jam
0.0045 Jam
ya saja, tanpa pemanasan, siap pakai Analisa EI-4123
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.12(3)
7.00 Jam JENIS PEKERJAAN : Penutupan Sambungan M
SATUAN PEMBAYARAN : M'
0.029 M
0.10 M NO. KOMPONEN
0.025 M
0.025 M
1.000 M asumsi
A. TENAGA
1.05
B. BAHAN
1.05 M'
0.018 Kg/m
1.979 Kg/m
270.00 Km/Jam C. PERALATAN
0.83
224.10 M3 1 Concrete Cutter (3 - 6) m/mnt; 8,6 H
0.0045 Jam 2 Compressor AHX-10, 10 HP
3 Alat Bantu
10.00 M2
0.83
498.00 M3
0.00 Jam
Analisa EI-4123
224.10 M
1,568.70 M
2.00 orang
1.00 orang
0.0089 Jam
0.0045 Jam
Analisa EI-4131
URAIAN ANALISA HARGA SATUAN FORMULIR
PEREKAMAN ANALISA M
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.13(1)
7.00 Jam JENIS PEKERJAAN : Pengeboran Lubang
SATUAN PEMBAYARAN : Buah
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
2.00 bh -
6.00 bh
4.00 bh
22.00 bh
6.00 m/Jam
0.83
16.60 lubang tebal pelat 30 cm
0.0602 Jam
C. PERALATAN
Analisa EI-4131
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.13(2)
7.00 Jam JENIS PEKERJAAN : Material Injeksi berbahan
SATUAN PEMBAYARAN : kilogram
0.000377 M3
2.200 ton/m3
1.03 NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
5.50 ltr/menit
0.83
602.58 kg
0.0017 jam
C. PERALATAN
602.58 kg
4,218.06 kg 1 Pompa graut E75
2 Alat Bantu
5.00 orang
1.00 orang
0.0083 Jam
0.0017 Jam
Analisa EI-4132
PROYEK :
No. PAKET KONTRAK : ………………………………
NAMA PAKET : ………………………………
………………………………
PROP / KAB / KODYA : ………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.13(3)
7.00 Jam JENIS PEKERJAAN : Material Injeksi berbahan
SATUAN PEMBAYARAN : kilogram
0.0006 M3
2.100 ton/m3
1.03 NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
5.50 ltr/menit
0.83
273.90 JAM
0.0037
10.00 M2/menit
0.83
498.00 M2/jam
0.0020 Jam
C. PERALATAN
498.00 M
3,486.00 M
4.00 orang
1.00 orang
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
0.0080 Jam E. OVERHEAD & PROFIT
0.0020 Jam F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Te
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap k
dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk se
Berlanjut ke halaman berikut yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-4133
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Pengabutan ( Fog Seal ) dengan As TOTAL HARGA (Rp.) : 12,249.92
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Pengabutan ( Fog Seal ) dengan AspTOTAL HARGA (Rp.) : 12,249.92
(PMCQS-h atau PMQS1h ) % THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laburan Aspal (Buras) TOTAL HARGA (Rp.) : 9,663.84
: Meter Persegi % THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Penghamparan lapis penutup buburTOTAL HARGA (Rp.) : 21,044.33
: Meter Persegi % THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Penghamparan Lapis penutup buburTOTAL HARGA (Rp.) : 19,545.86
: Meter Persegi % THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Penghamparan Lapis penutup buburTOTAL HARGA (Rp.) : 19,681.54
: Meter Persegi % THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Penghamparan Lapis penutup buburTOTAL HARGA : 21,897.11
: Meter Persegi % THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Penghamparan Lapis penutup buburTOTAL HARGA : 21,547.55
: Meter Persegi % THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Penghamparan Lapis penutup buburTOTAL HARGA : 23,780.40
: Meter Persegi % THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Lapis permukaan Mikro dengan aspal TOTAL HARGA : 8,020.69
Meter Persegi % THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis permukaan Mikro Perata den TOTAL HARGA : 58,615.26
untuk tipe 1 % THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Lapis permukaan Mikro dengan aspal TOTAL HARGA : 3,801.44
Meter Persegi % THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis permukaan Mikro Perata den TOTAL HARGA : 31,803.71
untuk tipe 2 % THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Latasir Kelas A (SS-A) TOTAL HARGA (Rp.) : 1,172,632.08
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Latasir Kelas B (SS-B) TOTAL HARGA (Rp.) : 1,348,795.30
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Tipis Beton Aspal-A (LTBA-A) TOTAL HARGA (Rp.) : 1,105,795.02
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Tipis Beton Aspal-B Halus (L TOTAL HARGA (Rp.) : 1,025,541.57
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Tipis Beton Aspal-B Kasar (L TOTAL HARGA (Rp.) : 943,931.98
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Tipis Beton Aspal-B Mod. Kas TOTAL HARGA (Rp.) : 972,942.09
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Stone Matrix Asphalt Modifikasi Tip TOTAL HARGA (Rp.) : 1,791,656.13
% THD. BIAYA PROYEK : 0.03
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.0000
: Tambalan dangkal dengan Beton SeTOTAL HARGA (Rp.) : 395,006.01
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.0000
: Tambalan dangkal dengan Beton Sem
TOTAL HARGA (Rp.) : 291,385.87
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.0000
: Tambalan dangkal dengan Beton Sem
TOTAL HARGA (Rp.) : 291,768.00
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Tambalan Penuh dengan Beton Seme
TOTAL HARGA (Rp.) : 10,484,765.25
% THD. BIAYA PROYEK : 0.17
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.0000
: Tambalan Penuh dengan Beton Seme
TOTAL HARGA (Rp.) : 13,269,772.79
% THD. BIAYA PROYEK : 0.22
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.0000
: Tambalan Penuh dengan Beton Seme
TOTAL HARGA (Rp.) : 13,269,725.68
% THD. BIAYA PROYEK : 0.22
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.0000
: Pemasangan Sealant TOTAL HARGA (Rp.) : 789.78
% THD. BIAYA PROYEK : 0.00
PERKIRAAN HARGA JUMLAH
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.0000
: Penambahan dan/atau Penggantian TOTAL HARGA (Rp.) : 270,104.99
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.0000
: Penjahitan Melintang Tipe I (tebal p TOTAL HARGA (Rp.) : 23,565.04
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.0000
: Penutupan Sambungan Melintang (Te
TOTAL HARGA (Rp.) : 102,938.12
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.0000
: Penutupan Sambungan Melintang (TTOTAL HARGA (Rp.) : 162,156.37
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.0000
: Penutupan Sambungan Melintang (PTOTAL HARGA (Rp.) : 781,707.47
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.0000
: Pengeboran Lubang TOTAL HARGA (Rp.) : 20,256.23
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.0000
: Material Injeksi berbahan dasar semTOTAL HARGA (Rp.) : 451,156.51
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.0000
: Material Injeksi berbahan dasar cellulTOTAL HARGA (Rp.) : 471,010.77
% THD. BIAYA PROYEK : 0.01
PROYEK :
I. ASUMSI No. PAKET KONTRAK : ………………………………………………
1 Menggunakan alat berat (cara mekanik) NAMA PAKET : …………………………………………………………………..
2 Lokasi pekerjaan : sepanjang jalan ………………………………………………………………….
3 Kondisi existing jalan : sedang PROP / KAB / KODYA : ………………………………………………
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM ITEM PEMBAYARAN NO. : 5.1.(1) PERKIRAAN VOL. PEK. : 1.00
5 Tebal lapis agregat padat t 0.20 M Spesifikasi 5.1.3.2.d) JENIS PEKERJAAN : Lapis Fondasi Agregat Kelas A TOTAL HARGA : 379,969.14
6 Berat isi padat Bip 1.78 ton/m3 SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.01
7 Jam kerja efektif per-hari Tk 7.00 jam
25-10&10-
8 Proporsi Campuran : - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 20&20-30 69.85 % Gradasi harus
- Pasir Urug (PI ≤ 6%, LL ≤ 25%) PU 30.15 % memenuhi Spec. PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
9 Berat Isi Agregat (lepas) Bil 1.45 ton/m3 (Rp.) (Rp.)
Faktor kehilangan - Agregat A Fh1 1.05
3. TENAGA
Produksi menentukan : VIBRATORY ROLLER Q4 102.70 M3/jam
Produksi agregat / hari = Tk x Q4 Qt 718.89 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang Pengendalian kadar air
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0779 jam
- Mandor = (Tk x M) : Qt (L03) 0.0097 jam
Analisa EI-512
PROYEK :
I. ASUMSI No. PAKET KONTRAK : ………………………………………………
1 Menggunakan alat berat (cara mekanik) NAMA PAKET : …………………………………………………………………..
2 Lokasi pekerjaan : sepanjang jalan ………………………………………………………………….
3 Kondisi existing jalan : sedang PROP / KAB / KODYA : ………………………………………………
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM ITEM PEMBAYARAN NO. : 5.1.(2) PERKIRAAN VOL. PEK. : 1.00
5 Tebal lapis agregat padat t 0.20 M Spesifikasi 5.1.3.2.d) JENIS PEKERJAAN : Lapis Fondasi Agregat Kelas B TOTAL HARGA : 339,775.20
6 Berat isi padat Bip 1.78 ton/m3 SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
7 Jam kerja efektif per-hari Tk 7.00 jam
25-10&10-
8 Proporsi Campuran : - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 20&20-30 36.30 % Gradasi harus
- Pasir Batu (4 ≤ PI ≤10 ; LL ≤ 35 %) St 63.70 % memenuhi Spesifikasi PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
9 Berat volume agregat (lepas) Bil 1.47 ton/m3 (Rp.) (Rp.)
Faktor kehilangan - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 Fh1 1.05
Faktor kehilangan - Pasir Batu (4 ≤ PI ≤10 ; LL ≤ 35 %) Fh2 1.05
A. TENAGA
3. TENAGA
Produksi menentukan : VIBRATORY ROLLER Q4 102.70 M3/jam
Produksi agregat / hari = Tk x Q4 Qt 718.89 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 0.0779 jam
- Mandor = (Tk x M) : Qt - 0.0097 jam
PROYEK :
I. ASUMSI No. PAKET KONTRAK : ………………………………………………
1 Menggunakan alat berat (cara mekanik) NAMA PAKET : …………………………………………………………………..
2 Lokasi pekerjaan : sepanjang jalan ………………………………………………………………….
3 Kondisi existing jalan : sedang PROP / KAB / KODYA : ………………………………………………
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM ITEM PEMBAYARAN NO. : 5.1.(3) PERKIRAAN VOL. PEK. : 1.00
5 Tebal lapis agregat padat t 0.20 M Spesifikasi 5.1.3.2.d) JENIS PEKERJAAN : Lapis Fondasi Agregat Kelas S TOTAL HARGA : 339,726.12
6 Berat isi padat Bip 1.78 ton/m3 SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
7 Jam kerja efektif per-hari Tk 7.00 jam
25-10&10-
8 Proporsi Campuran : - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 20&20-30 36.30 % Gradasi harus
- Pasir Batu (4 ≤ PI ≤15 ; LL ≤ 35 %) St 63.70 % memenuhi Spesifikasi PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
9 Berat volume agregat (lepas) Bil 1.45 ton/m3 (Rp.) (Rp.)
Faktor kehilangan - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 Fh1 1.05
Faktor kehilangan - Pasir Batu (4 ≤ PI ≤15 ; LL ≤ 35 %) Fh2 1.05
A. TENAGA
3. TENAGA
Produksi menentukan : VIBRATORY ROLLER Q4 102.70 M3/jam
Produksi agregat / hari = Tk x Q4 Qt 718.89 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 0.0779 jam
- Mandor = (Tk x M) : Qt - 0.0097 jam
PROYEK :
I. ASUMSI No. PAKET KONTRAK : ………………………………………………
1 Menggunakan alat berat (cara mekanik) NAMA PAKET : …………………………………………………………………..
2 Lokasi pekerjaan : sepanjang jalan ………………………………………………………………….
3 Kondisi existing jalan : sedang PROP / KAB / KODYA : ………………………………………………
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM ITEM PEMBAYARAN NO. : 5.1.(4) PERKIRAAN VOL. PEK. : 1.00
5 Tebal lapis agregat padat t 0.20 M Spesifikasi 5.1.3.2.d) JENIS PEKERJAAN : Lapis Drainase TOTAL HARGA : 356,668.94
6 Berat isi padat Bip 1.78 ton/m3 SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
7 Jam kerja efektif per-hari Tk 7.00 jam
25-10&10-
8 Proporsi Campuran : - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 20&20-30 82.50 % Gradasi harus
- Coarse Sand (NP) St 17.50 % memenuhi Spesifikasi PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
9 Berat volume agregat (lepas) Bil 1.47 ton/m3 (Rp.) (Rp.)
Faktor kehilangan - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 Fh1 1.05
Faktor kehilangan - Coarse Sand (NP) Fh2 1.05
A. TENAGA
3. TENAGA
Produksi menentukan : VIBRATORY ROLLER Q4 171.16 M3/jam
Produksi agregat / hari = Tk x Q4 Qt 1,198.15 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 0.0117 jam
- Mandor = (Tk x M) : Qt - 0.0058 jam
PROYEK :
I. ASUMSI No. PAKET KONTRAK : ………………………………………………
1 Menggunakan alat berat (cara mekanik) NAMA PAKET : …………………………………………………………………..
2 Lokasi pekerjaan : sepanjang jalan ………………………………………………………………….
3 Kondisi existing jalan : sedang PROP / KAB / KODYA : ………………………………………………
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM ITEM PEMBAYARAN NO. : 5.2.(1) PERKIRAAN VOL. PEK. : 1.00
5 Tebal lapis Agregat padat t 0.10 M Spesifikasi 5.2.3.2.b) JENIS PEKERJAAN : Lapis Permukaan Agregat Tanpa PenutuTOTAL HARGA : 382,101.20
6 Berat isi padat Bip 1.78 ton/m3 SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Berat isi agregat (lepas) Bil 1.45 ton/m3
Faktor kehilangan - Agregat Fh 1.05 PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
II. URUTAN KERJA (Rp.) (Rp.)
1 Penyiapan formasi kondisi eksisting.
2 Wheel Loader memuat material Lapis Permukaan Agregat ke
dalam Dump Truck di Base Camp. A. TENAGA
3 Dump Truck mengangkut Lapis Permukaan Agregat dng kadar air
yg memenuhi ke lokasi pekerjaan dan dihampar dengan Motor Grader 1. Pekerja (L01) Jam 0.1558 14,285.71 2,225.65
4 Hamparan agregat dipadatkan dengan Vibratory Roller. 2. Mandor (L03) Jam 0.0195 24,285.71 472.95
5 Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparan dengan menggunakan Alat Bantu.
6 Bahan yang tidak terjangkau mesin gilas, harus dipadatkan dengan JUMLAH HARGA TENAGA 2,698.60
trimbis mekanis atau pemadat lain yang disetujui.
7 Pemadatan dilanjutkan sampai seluruh lokasi terpadatkan rata. B. BAHAN
1. BAHAN
Material Agregat hasil produksi di Base Camp
Setiap 1 M3 Agregat padat diperlukan : 1 x (Bip/Bil) x Fh (M26) 1.2890 M3
2. ALAT
2.a. WHEEL LOADER (E15) JUMLAH HARGA BAHAN 285,069.78
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - C. PERALATAN
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : 1. Wheel Loader (E15) Jam 0.0087 457,627.36 3,981.41
- Memuat dan lain-lain Ts1 0.45 menit Permen PUPR No 28/PRT/M/2016 2. Dump Truck (E09) Jam 0.1360 382,807.01 52,067.87
Ts1 0.45 menit 3. Motor Grader (E13) Jam 0.0019 422,701.29 809.23
4. Vibratory Roller (E19a) Jam 0.0195 262,241.51 5,107.01
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 114.94 M3 5 Alat Bantu Ls 1.0000 0.00 0.00
Ts1 x Bip/Bil
Koefisien Alat / M3 = 1 : Q1 (E15) 0.0087 Jam
3. TENAGA
Produksi menentukan : VIBRATORY ROLLER Q4 51.35 M3 / Jam
Produksi Agregat / hari = Tk x Q4 Qt 359.45 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang Pengendalian Kadar air
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1558 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0195 Jam
PROYEK :
I. ASUMSI No. PAKET KONTRAK : ………………………………………………
1 Menggunakan alat berat (cara mekanik) NAMA PAKET : …………………………………………………………………..
2 Lokasi pekerjaan : sepanjang jalan ………………………………………………………………….
3 Kondisi existing jalan : sedang PROP / KAB / KODYA : ………………………………………………
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM ITEM PEMBAYARAN NO. : ……………………… PERKIRAAN VOL. PEK. : 1.00
5 Tebal lapis agregat padat t 0.20 M Spesifikasi 5.2.3.2.b) JENIS PEKERJAAN : Lapis Fondasi Agregat Tanpa Penutup ATOTAL HARGA : 339,463.69
6 Berat isi padat Bip 1.78 ton/m3 SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
7 Jam kerja efektif per-hari Tk 7.00 jam
25-10&10-
8 Proporsi Campuran : - Fraksi Pecah Mesin 5-10 &10-20 & 20-30 20&20-30 36.30 % Gradasi harus
- Pasir Batu (4 ≤ PI ≤10 ; LL ≤ 35 %) PU 63.70 % memenuhi Spec. PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
9 Berat Isi Agregat (lepas) Bil 1.45 ton/m3 (Rp.) (Rp.)
Faktor kehilangan - Lapis Fondasi Agregat Fh1 1.05
3. TENAGA
Produksi menentukan : VIBRATORY ROLLER Q4 114.94 M3/jam
Produksi agregat / hari = Tk x Q4 Qt 804.59 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang Pengendalian w
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0696 jam
- Mandor = (Tk x M) : Qt (L03) 0.0087 jam
ITEM PEMBAYARAN NO. : 5.3.(1a) (pakai paver) Analisa EI-531a Analisa EI-531a
JENIS PEKERJAAN : Perkerasan Beton Semen FORMULIR STANDAR UNTUK
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
1. BAHAN
1.a. Semen (PPC) = = Sm x 1.03 (M12) 334.75 Kg Spesifikasi 5.3.2.4
1.b. Pasir Beton = = (Ps/1000 : D3) x 1.05 (M01a) 0.5163 M3
1.c. Agregat Kasar = = (Kr/1000 : D4) x 1.05 (M03) 0.9414 M3
1.d. Air = Air x 1.03 (M170) 163.770 Ltr
1.e. Plastizier = Plt x 1.03 (M171) 1.004 Kg
1.f. Baja Tulangan Polos (berikut dudukannya) (M39a) 15.8750 Kg
1.g. Joint Sealent (M94) 0.9900 Kg
1.h. Cat Anti Karat (M95) 0.0200 Kg
1.i. Expansion Cap (M96) 0.1700 M2
1.j. Polytene 125 mikron (M97) 0.4375 M2
1.k. Curing Compound (M98) 0.8700 Ltr 1:1
JUMLAH HARGA BAHAN 1,362,389.23
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - C. PERALATAN
Faktor efisiensi alat Fa 0.83 - 1 Wheel Loader E43 jam 0.0071 457,627.36 3,243.28
Waktu Siklus 2 Concrete Mixing Plant E43 jam 0.0502 95,036.55 4,770.91
- Muat dan lain lain Ts1 0.45 menit 3 Truck Mixer Agitator E49 jam 0.2382 593,159.42 141,316.64
Ts1 0.45 menit 4 Concrete Paver E42 jam 0.0038 2,388,230.41 9,134.56
5 Alat Bantu Ls 1.0000 0.00 0.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
Rp. 1.00 / M2
ITEM PEMBAYARAN NO. : 5.3.(1a) (tidak pakai paver) Analisa EI-531a Analisa EI-531a
JENIS PEKERJAAN : Perkerasan Beton Semen FORMULIR STANDAR UNTUK
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
2. ALAT
2.a. WHEEL LOADER (E15) JUMLAH HARGA PERALATAN 164,418.69
Kapasitas bucket V 1.50 M3 (lepas) D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,666,080.28
Faktor bucket Fb 0.85 - E. OVERHEAD & PROFIT 10.0 % x D 166,608.03
Faktor efisiensi alat Fa 0.83 - F. HARGA SATUAN PEKERJAAN ( D + E ) 1,832,688.31
Waktu Siklus G. HARGA SATUAN PEKERJAAN / M3 1,832,688.31
- Muat dan lain lain Ts1 0.45 menit Permen PUPR No 28/PRT/M/2016 Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Ts1 0.45 menit berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 141.10 M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Ts1 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
Koefisien Alat/M2 = 1 : Q1 0.0071 Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
Rp. 1.00 / M2
2. ALAT
2.a. WHEEL LOADER (E15) JUMLAH HARGA PERALATAN 164,418.69
Kapasitas bucket V 1.50 M3 (lepas) D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 3,338,590.52
Faktor bucket Fb 0.85 - E. OVERHEAD & PROFIT 10.0 % x D 333,859.05
Faktor efisiensi alat Fa 0.83 - F. HARGA SATUAN PEKERJAAN ( D + E ) 3,672,449.57
Waktu Siklus G. HARGA SATUAN PEKERJAAN / M3 3,672,449.57
- Muat dan lain lain Ts1 0.45 menit Permen PUPR No 28/PRT/M/2016 Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Ts1 0.45 menit berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 141.10 M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Ts1 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
Koefisien Alat/M2 = 1 : Q1 0.0071 Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
Berlanjut ke hal. berikut.
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
Rp. 1.00 / M2
2. ALAT
2.a. WHEEL LOADER (E15) JUMLAH HARGA PERALATAN 164,418.69
Kapasitas bucket V 1.50 M3 (lepas) D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,923,024.14
Faktor bucket Fb 0.85 - E. OVERHEAD & PROFIT 10.0 % x D 292,302.41
Faktor efisiensi alat Fa 0.83 - F. HARGA SATUAN PEKERJAAN ( D + E ) 3,215,326.56
Waktu Siklus G. HARGA SATUAN PEKERJAAN / M3 3,215,326.56
- Muat dan lain lain Ts1 0.45 menit Permen PUPR No 28/PRT/M/2016 Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Ts1 0.45 menit berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 141.10 M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Ts1 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
Koefisien Alat/M2 = 1 : Q1 0.0071 Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
Rp. 1.00 / M2
2. ALAT
2.a. WHEEL LOADER (E15) JUMLAH HARGA PERALATAN 159,647.78
Kapasitas bucket V 1.50 M3 (lepas) D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,939,354.97
Faktor bucket Fb 0.85 - E. OVERHEAD & PROFIT 10.0 % x D 193,935.50
Faktor efisiensi alat Fa 0.83 - F. HARGA SATUAN PEKERJAAN ( D + E ) 2,133,290.46
Waktu Siklus G. HARGA SATUAN PEKERJAAN / M3 2,133,290.46
- Muat dan lain lain Ts1 0.45 menit Permen PUPR No 28/PRT/M/2016 Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Ts1 0.45 menit berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 141.10 M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Ts1 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
Koefisien Alat/M2 = 1 : Q1 0.0071 Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506 jam
Rp. 2,133,290.46 / M2
2. ALAT
2.a. WHEEL LOADER (E15) JUMLAH HARGA PERALATAN 512,540.97
Kapasitas bucket V 1.50 M3 (lepas) D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 4,079,250.11
Faktor bucket Fb 0.85 - E. OVERHEAD & PROFIT 10.0 % x D 407,925.01
Faktor efisiensi alat Fa 0.83 - F. HARGA SATUAN PEKERJAAN ( D + E ) 4,487,175.12
Waktu Siklus G. HARGA SATUAN PEKERJAAN / M3 4,487,175.12
- Muat dan lain lain Ts1 0.45 menit Permen PUPR No 28/PRT/M/2016 Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Ts1 0.45 menit berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 141.10 M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Ts1 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
Koefisien Alat/M2 = 1 : Q1 0.0071 Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506 jam
Rp. 4,487,175.12 / M2
2. ALAT
2.a. WHEEL LOADER (E15) JUMLAH HARGA PERALATAN 512,540.97
Kapasitas bucket V 1.50 M3 (lepas) D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 3,687,190.86
Faktor bucket Fb 0.85 - E. OVERHEAD & PROFIT 10.0 % x D 368,719.09
Faktor efisiensi alat Fa 0.83 - F. HARGA SATUAN PEKERJAAN ( D + E ) 4,055,909.95
Waktu Siklus G. HARGA SATUAN PEKERJAAN / M3 4,055,909.95
- Muat dan lain lain Ts1 0.45 menit Permen PUPR No 28/PRT/M/2016 Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Ts1 0.45 menit berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 141.10 M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Ts1 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
Koefisien Alat/M2 = 1 : Q1 0.0071 Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506 jam
Rp. 4,055,909.95 / M2
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
Rp. 1,295,090.80 / M2
I. ASUMSI PROYEK :
1 Pekerjaan dilakukan secara manual No. PAKET KONTRAK : ………………………………………………
2 Lokasi pekerjaan : sepanjang jalan NAMA PAKET : …………………………………………………………………..
3 Kondisi Jalan : sedang / baik ………………………………………………………………….
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km PROP / KAB / KODYA : ………………………………………………
5 Jam kerja efektif per-hari Tk 7.00 Jam ITEM PEMBAYARAN NO. : 5.4.(1) PERKIRAAN VOL. PEK. : 1.00
6 Semen diangkut dari Base Camp ke lapangan JENIS PEKERJAAN : Stabilisasi Tanah Dasar dengan Se TOTAL HARGA : 165,951.26
dengan menggunakan Dump Truck SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
7 Satu hari dapat diselesaikan hamparan Soil Cement
sepanjang Ls 400.00 M 2 ruas -> Spesifikasi 5.4.5.5.b)
8 Faktor hilang Material - semen & curing membrane Fh1 1.03 -
- tanah Fh2 1.05 -
9 Tebal hamparan t 0.15 M PERKIRAAN HARGA JUMLAH
10 Kadar semen : s 4.00 % Bukan soil cement base
11 Berat isi tanah Bj 1.30 ton / M3 NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
II. URUTAN KERJA
1 Penyiapan Tanah Dasar.
2 Dump Truck mengangkut semen dari Base Camp ke lokasi pekerjaan A. TENAGA
3 Tanah digemburkan dengan Pulvimixer atau alat lainnya
4 Semen ditebar secara merata di atas tanah dengan cara manual 1. Pekerja (L01) Jam 0.0297 14,285.71 424.98
maupun mekanis. 2. Mandor (L03) Jam 0.0030 24,285.71 72.25
5 Mesin pencampur melakukan serangkaian lintasan sampai seluruh
tanah dan semen tercampur merata.
6 Penambahan air hingga mencapai kadar air optimum secara merata.
7 Pemadatan awal dengan penggilas sheepfoot atau penggilas roda karet
atau penggilas beroda baja.
8 Pembentukan dengan motor grader sebelum penggilasan akhir
(jika diperlukan).
9 Pemadatan akhir dengan penggilas roda karet atau penggilas
beroda baja
10 Pemasangan curing membrane selama 7 hari di atas hamparan
untuk perawatan.
2. ALAT B. BAHAN
2.a. DUMP TRUCK 6-8 M3 (E09) 1. Semen (M12) Kg 56.2380 1,600.00 89,980.80
Kapasitas bak V 8.00 M3 2. Curing Membrane (M259) M2 2.7111 200,000.00 542,217.67
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/jam
Kecepatan rata-rata kosong v2 40.00 KM/jam
Waktu siklus Ts1
- Waktu mengisi T1 10.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 26.18 menit JUMLAH HARGA BAHAN 632,198.47
- Waktu bongkar T3 10.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T4 13.09 menit C. PERALATAN
- Lain-lain T5 2.00 menit 1. Dump Truck (E09) Jam 0.1538 382,807.01 58,864.75
Ts1 61.26 menit 2. Motor Grader (E13) Jam 0.0006 422,701.29 269.74
3. Watertank Truck (E23) Jam 0.0462 342,249.64 15,806.71
Kap. Prod. / jam = V x Fa x 60 Q1 6.50 M3 4. Pneumatic Tire Roller (E18) Jam 0.0073 131,835.27 960.47
Ts1 5. Pulvimixer (E27) Jam 0.0030 532,814.31 1,585.05
Koefisien Alat / M3 = 1 : Q1 0.1538 jam 6 Alat Bantu Ls 1.0000 0.00 0.00
3. TENAGA
Produksi menetukan : PULVIMIXER (SOIL STABILIZER) Q7 336.15 M3/Jam
Produksi Soil Cement / hari = Tk x Q4 Qt 2,353.05 M3 Spesifikasi 5.4.3.1
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0297 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0030 Jam
PROYEK :
I. ASUMSI No. PAKET KONTRAK : ………………………………………………
1 Pekerjaan dilakukan secara mekanik NAMA PAKET : …………………………………………………………………..
2 Lokasi pekerjaan : sepanjang jalan ………………………………………………………………….
3 Kondisi Jalan : sedang / baik PROP / KAB / KODYA : ………………………………………………
4 Jarak rata-rata sumber material ke lokasi pekerjaan L 8.73 Km ITEM PEMBAYARAN NO. : 5.4.(2) PERKIRAAN VOL. PEK. : 1.00
5 Jam kerja efektif per-hari Tk 7.00 Jam JENIS PEKERJAAN : Lapis Fondasi Tanah Semen TOTAL HARGA : 337,956.14
6 Berat isi padat Bip 1.60 ton/m3 SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.02
7 Berat Isi lepas Bil 1.35 ton/m3
8 Harga pembayaran tidak termasuk semen ( semen
dibayar dalam item tersendiri) PERKIRAAN HARGA JUMLAH
9 Satu hari dapat diselesaikan hamparan Soil Cement NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
sepanjang Ls 400.00 M 2 ruas -> Spesifikasi 5.4.5.5.b) (Rp.) (Rp.)
10 Faktor kembang material (padat - lepas) Fk 1.20 -
11 Tebal hamparan padat t 0.15 M
12 Kadar semen : Spesifikasi 5.4.3 (1) = ( 3 - 8 ) % (perbandingan berat) s 8.00 % Spesifikasi 5.4.3.1, A. TENAGA
13 Faktor hilang semen & curing membrane Fh1 1.03 -
14 Faktor hilang tanah Fh2 1.05 -
1. Pekerja (L01) Jam 0.0297 14,285.71 424.98
II. URUTAN KERJA 2. Mandor (L03) Jam 0.0030 24,285.71 72.25
1 Penyiapan Tanah Dasar.
2 Dump Truck mengangkut semen dari Base Camp ke lokasi pekerjaan
3 Dump Truck mengangkut tanah yang memenuhi ketentuan ke lokasi JUMLAH HARGA TENAGA 497.23
pekerjaan jika kebutuhan semen lebih tinggi dari 8%
4 Tanah digemburkan dengan Pulvimixer atau alat lainnya B. BAHAN
5 Semen ditebar secara merata di atas tanah dengan cara manual
maupun mekanis. 1. Borrow Pit (M09) M3 1.3084 25,000.00 32,711.11
6 Mesin pencampur melakukan serangkaian lintasan sampai seluruh 2. Semen (M12) kg 128.0000 1,600.00 204,800.00
tanah dan semen tercampur merata. 3. Curing Membrane (M259) liter 1.3733 200,000.00 274,666.67
7 Penambahan air hingga mencapai kadar air optimum secara merata.
8 Pemadatan awal dengan penggilas sheepfoot atau penggilas roda karet
atau penggilas beroda baja.
9 Pembentukan dengan motor grader sebelum penggilasan akhir
(jika diperlukan).
10 Pemadatan akhir dengan penggilas roda karet atau penggilas
beroda baja
11 Pemasangan curing membrane selama 7 hari di atas hamparan
untuk perawatan.
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - JUMLAH HARGA PERALATAN 76,679.86
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 589,354.86
- Memuat dan lain-lain Ts1 0.45 menit Permen PUPR No 28/PRT/M/2016 E. OVERHEAD & PROFIT 10.0 % x D 58,935.49
F. HARGA SATUAN PEKERJAAN ( D + E ) 648,290.35
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 119.05 M3 Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Ts1 x Bip/Bil berat untuk bahan-bahan.
Koefisien Alat / M3 = 1 : Q1 (E15) 0.0084 jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
3. TENAGA
Produksi menetukan : PULVIMIXER Q6 336.15 M3/Jam
Produksi Soil Cement / hari = Tk x Q6 Qt 2,353.05 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0297 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0030 Jam
Rp. 648,290.35 / M3
2. ALAT C. PERALATAN
2.a. WHEEL LOADER (E15) 1 Wheel Loader E15 jam 0.0087 457,627.36 3,981.41
Kapasitas bucket V 1.50 M3 (lepas) 2 Self Propelled Mixer jam 0.0011 550,000.00 613.57
Faktor bucket Fb 0.85 - 3 Dump Truck E09 jam 0.1360 382,807.01 52,067.87
Faktor Efisiensi alat Fa 0.83 - 4 Vibratory Padfoot Roller 25T jam 0.0065 419,076.61 2,720.43
Waktu Siklus : 5 Watertank Truck E23 jam 0.0141 342,249.64 4,810.74
- Memuat dan lain-lain Ts1 0.45 menit Permen PUPR No 28/PRT/M/2016 6 Alat Bantu Ls 1.0000 0.00 0.00
3. TENAGA
Produksi CTB dalam 1 hari = Tk x Q2 Qt 6,274.80 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.0011 jam
Rp. 519,867.31 / M2
2. ALAT C. PERALATAN
2.a. WHEEL LOADER (E15) 1 Wheel Loader E15 jam 0.0086 457,627.36 3,927.24
Kapasitas bucket V 1.50 M3 (lepas) 2 Self Propelled Mixer jam 0.0011 550,000.00 613.57
Faktor bucket Fb 0.85 - 3 Dump Truck E09 jam 0.1339 382,807.01 51,268.91
Faktor Efisiensi alat Fa 0.83 - 4 Vibratory Padfoot Roller 25 T jam 0.0065 419,076.61 2,720.43
Waktu Siklus : 5 Watertank Truck E23 jam 0.0141 342,249.64 4,810.74
- Memuat dan lain-lain Ts1 0.45 menit Permen PUPR No 28/PRT/M/2016 6 Alat Bantu Ls 1.0000 0.00 0.00
3. TENAGA
Produksi CTB dalam 1 hari = Tk x Q2 Qt 6,274.80 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.0011 jam
Rp. 436,361.80 / M2
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Bahan :
- Kadar Residu Aspal Emulsi Ae
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat Aspal Emulsi
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Kecepatan penyemprotan V
Kapasitas pompa aspal pas
Faktor effisiensi kerja Fa
Kadar aplikasi
Kap. Prod. / jam = pas x Fa x 60 Q1
Koefisien Alat / Ltr = 1 : Q1 (E41)
Kecepatan v1
Lebar penyemprotan b
Faktor efisiensi alat = 1 : Q2 Fa
Jumlah penyemprotan n
Kadar Aspal yang digunakan Kdr
Kap. Prod. / jam = v1 x 1000 x b x Fa x Kdr / n Q2
3. TENAGA
Produksi menentukan : AIR COMPRESSOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Bahan :
- Kadar Residu Aspal Emulsi As
1. BAHAN
Untuk mendapatkan 1 liter Lapis Perekat
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Kecepatan penyemprotan v
Kapasitas pompa aspal pas
Faktor effesiensi kerja Fa
Kadar aplikasi
Kap. Prod. / jam = pas x Fa x 60 Q1
Kecepatan v1
Lebar penyemprotan b
Faktor efisiensi alat = 1 : Q2 Fa
3. TENAGA
Produksi menentukan : POWER BROOM Q4
Produksi Lapis Perekat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Bahan :
- Aspal Emulsi Modifikasi Polimer 1h Ae
1. BAHAN
Untuk mendapatkan 1 liter Lapis Perekat
diperlukan : ( 1 liter x Fh ) PC
Kecepatan v1
Lebar penyemprotan b
Faktor efisiensi alat = 1 : Q2 Fa
3. TENAGA
Produksi menentukan : POWER BROOM Q4
Produksi Lapis Perekat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pekerjaan ini tidak termasuk aspal
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L
6 Jam kerja efektif per-hari Tk
7 Berat Isi Agregat Chipping : padat Bip
lepas Bil
8 Faktor Kehilangan Fh
9 Tebal SBST t
Lebar SBST Lbr
10 Lapisan SBST yang digunakan sesuai spesifikasi seksi 6.2 adalah gradasi Grd
Menggunakan material dengan ukuran nominal maksimum Ld
11 Faktor Koreksi (Lepas ke Padat) Bip/Bil
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor Efisiensi alat Fa
Waktu Siklus : V - loading Ts1
3. TENAGA
Produksi menentukan : PNEUMATIC TIRE ROLLER Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L02)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pekerjaan ini tidak termasuk aspal
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L
6 Jam kerja efektif per-hari Tk
7 Berat Isi Agregat Chipping : padat Bip
lepas Bil
8 Faktor Kehilangan Fh
9 Tebal DBST t
Lebar SBST Lbr
10 Lapisan DBSTyang digunakan sesuai spesifikasi seksi 6.2 adalah gradasi tipe
- Lapis pertama ukuran nominal 1/2" Ld1
- Lapis kedua ukuran nominal 1/4" Ld2
11 Faktor Koreksi (Lepas ke Padat) Bip/Bil
II. URUTAN KERJA
1 Wheel Loader memuat Agregat ke dalam Dump Truck di Base Camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan
3 Permukaan jalan eksisting disemprot dengan aspal menggunakan
Asphalt Distributor sebelum kemudian agregat dihampar secara manual
4 Hamparan material dipadatkan dengan menggunakan Pneumatic Tire Roller
5 Selama pemadatan, sekelompok pekerja akan merapikan hamparan dengan
menggunakan Alat Bantu
6 Ulangi urutan 3-5 dengan aspal dan agregat lapis 2
7 Setelah pemadatan, sekelompok pekerja membersihkan sisa material
pada permukaan dengan sapu lidi
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus V - Loading Ts1
Ts1
3. TENAGA
Produksi menentukan : PNEUMATIC TIRE ROLLER Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Bahan :
- Aspal Pen 60/70 As
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc
Aspal = As x Pc x D1 (M10)
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Faktor efisiensi kerja Fa
Kapasitas pompa aspal pas
Kecepatan penyemprotan V
Kadar aplikasi
Kap. Prod. / jam = pas x Fa x 60 Q1
Kecepatan v1
Lebar penyemprotan b
Faktor efisiensi alat = 1 : Q2 Fa
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Bahan :
- Aspal Emulsi Modifikasi Polimer 2h As
1. BAHAN
Untuk mendapatkan 1 bahan aspal emulsi modifikasi polimer
untuk pekerjaan pelaburan diperlukan :
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Faktor efisiensi kerja Fa
Kapasitas pompa aspal pas
Kecepatan penyemprotan V
Kadar aplikasi
Kap. Prod. / jam = pas x Fa x 60 Q1
Kecepatan v1
Lebar penyemprotan b
Faktor efisiensi alat = 1 : Q2 Fa
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Bahan :
- Aspal Pen 60 atau Pen 80 As
- Kerosene K
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1
- Kerosene D2
8 Bahan dasar semuanya diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter aspal cair untuk precoated
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V
Faktor Efisiensi Alat Fa
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1
- Mengaduk T2
- Menuang T3
- Menunggu, dll. T4
Ts1
3. TENAGA
Produksi menentukan : CONCRETE MIXER Q4
Produksi / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Bahan :
- Aspal Emulsi As
1. BAHAN
Untuk mendapatkan 1 liter aspal cair untuk precoated
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V
Faktor Efisiensi Alat Fa
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1
- Mengaduk T2
- Menuang T3
- Menunggu, dll. T4
Ts1
3. TENAGA
Produksi menentukan : CONCRETE MIXER Q4
Produksi / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Bahan :
- Aspal Emulsi Polimer As
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V
Faktor Efisiensi Alat Fa
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1
- Mengaduk T2
- Menuang T3
- Menunggu, dll. T4
Ts1
3. TENAGA
Produksi menentukan : CONCRETE MIXER Q4
Produksi / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal & Serat Selulosa Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran SMA Halus
- Agr Pch Mesin 5 - 8 & 8 - 11 & 11 - 16 mm 5-8&8-11&8-16
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Filler Added (Non PC) FF
- Asphalt As
- Anti Stripping Agent Asa
- Serat Selulosa SSl
Berat isi bahan :
11 - SMA Halus D1
- Agr Pch Mesin 5 - 8 & 8 - 11 & 11 - 16 mm D2
- Agr Pch Mesin 0 - 5 mm D3
- Filler Added (Non PC) D4
- Aspal D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-8-11-16 = ("5-8-11-16" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Filler Added (Non Pc) = (FF x Fh2) x 1000 (M05)
1.d. Aspal = (As x Fh2) x 1000 (M10)
1.e. Serat Selulosa = (SLs x 1000 ) x Fh2 (M158)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : AAMP Q5
Produksi SMA / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal & Serat Selulosa Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran SMA Modifikasi Halus
- Agr Pch Mesin 5 - 8 & 8 - 11 & 11 - 16 mm 5-8&8-11&8-16
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Filler Added FF
- Asphalt Polimer As
- Anti Stripping Agent Asa
- Serat Selulosa SSl
Berat isi bahan :
11 - SMA Modifikasi Halus D1
- Agr Pch Mesin 5 - 8 & 8 - 11 & 11 - 16 mm D2
- Agr Pch Mesin 0 - 5 mm D3
- Filler Added D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-8-11-16 = ("5-8-11-16" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Filler Added = (FF x Fh2) x 1000 (M05)
1.d. Aspal Polimer = (As x Fh2) x 1000 (M31c)
1.e. Serat Selulosa = (SLs x 1000 ) x Fh2 (M158)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q5
Produksi SMA / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
1. BAHAN
1.a. Agr 5-8-11-16-22 = ("5-8-11-16-22'" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Filler Added (Non Pc) = (FF x Fh2) x 1000 (M05)
1.d. Aspal = (As x Fh2) x 1000 (M10)
1.e. Serat Selulosa = (SLs x 1000 ) x Fh2 (M104)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q5
Produksi SMA / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal & Serat Selulosa Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran SMA Modifikasi Kasar
- Agr Pch Mesin 5 - 8 & 8 - 11 & 11 - 16 & 16-22 mm 5-8&8-11&8-16&16-22
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Filler Added FF
- Asphalt Polimer As
- Anti Stripping Agent Asa
- Serat Selulosa SSl
Berat isi bahan :
11 - SMA Modifikasi Kasar D1
- Agr Pch Mesin 5 - 8 & 8 - 11 & 11 - 16 & 16 - 22 mm D2
- Agr Pch Mesin 0 - 5 mm D3
- Filler Added D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-8& 8-11 & 11-16 = ("5-8 & 8-11-16-22" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Filler Added = (FF x Fh2) x 1000 (M05)
1.d. Aspal Polimer = (As x Fh2) x 1000 (M31c)
1.e. Serat Selulosa = (SLs x 1000 ) x Fh2 (M158)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q5
Produksi SMA / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (HRS) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran HRS-WC
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agr Pch Mesin 0 - 5 mm 0-5
- Pasir Halus PH
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat isi bahan :
- HRS-WC D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
- Pasir Halus D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Pasir Halus = (PH x Fh1) : D4 (M01c)
1.d. Semen = (FF x Fh2) x 1000 (M12)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
ITEM PEMBAYARAN NO. : 6.3(3)
JENIS PEKERJAAN : Lataston Lapis Aus (HRS-WC)
SATUAN PEMBAYARAN : Ton
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q5
Produksi HRS / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (HRS BASE) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran HRS Base :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agr Pch Mesin 0 - 5 mm 0-5
- Pasir Halus PH
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat isi bahan :
- HRS Base D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
- Pasir Halus D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Pasir Halus = (PH x Fh1) : D4 (M01c)
1.d. Semen = (FF x Fh2) x 1000 (M12)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q5
Produksi HRS BASE / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC-WC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat isi bahan :
- AC-WC D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh2) x 1000 (M12)
1.d. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : A M P Q2
Produksi AC-WC / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC-WC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Bahan modifikasi yang digunakan:
11 Komposisi campuran AC-WC Modifikasi :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt Modifikasi As
- Anti Stripping Agent Asa
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh2) x 1000 (M12)
1.d. Aspal Modifikasi = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
ITEM PEMBAYARAN NO. : 6.3(5b)
JENIS PEKERJAAN : Laston Lapis Aus Modifikasi (AC-WC Mod)
SATUAN PEMBAYARAN : Ton
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-WC / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / ton :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC-BC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran AC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat Isi bahan :
- AC-BC D1
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D2
- Agr Pch Mesin 0 - 5 mm D3
12 Jarak Stock file ke cold bin l
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh2) x 1000 (M12)
1.d. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
Kap. Prod./jam
(v x= 1000) x (N(b-bo)+bo) x t x Fa x D1 Q6
nxN
Koefisien Alat / ton = 1 : Q6 (E17a)
Kap.Prod. / jam
(v x=1000) x (N(b-bo)+bo) x t x Fa x D1 Q7
nxN
Koefisien Alat / ton = 1 : Q7 (E18)
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC-BC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Bahan modifikasi yang digunakan:
11 Komposisi campuran AC-BC Modifikasi :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen PC
- Asphalt Modifikasi As
- Anti Stripping Agent Asa
12 Berat Isi bahan :
- AC-BC D1
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D2
- Agr Pch Mesin 0 - 5 mm D3
13 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen "PC x Fh2 x 1000" (M05)
1.d. Aspal Modifikasi = (As x Fh2) x 1000 (M31c)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC-Base) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran AC-Base :
- Agr Pch Mesin 20 - 30 mm 20-30
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat Isi bahan :
- AC-Base D1
- Agr Pch Mesin 20 - 30 mm D2
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D3
- Agr Pch Mesin 0 - 5 mm D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 20-30 = ("20-30" x Fh1) : D2 (M93)
1.b. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D3 (M92)
1.c. Agr 0-5 = ("0-5" x Fh1) : D4 (M91)
1.d. Semen = (FF x Fh2) x 1000 (M12)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC-Base) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Bahan modifikasi yang digunakan:
11 Komposisi campuran AC-Base Modifikasi :
- Agr Pch Mesin 20 - 30 mm 20-30
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen PC
- Asphalt Modifikasi As
- Anti Stripping Agent Asa
12 Berat Isi bahan :
- AC-Base Modifikasi D1
- Agr Pch Mesin 20 - 30 mm D2
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D3
- Agr Pch Mesin 0 - 5 mm D4
13 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 20-30 = ("20-30" x Fh1) : D2 (M93)
1.b. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D3 (M92)
1.c. Agr 0-5 = ("0-5" x Fh1) : D4 (M91)
1.d. Semen = "PC x Fh2 x 1000" (M12)
1.e. Aspal Modifikasi = (As x Fh2) x 1000 (M31c)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Bahan :
- Bahan anti pengelupasan
1. BAHAN
Untuk mendapatkan 1 Kg Bahan Anti Pengelupasan
diperlukan : (1 liter x Fh) Pc
2. ALAT
Tidak ada alat yang digunakan (E41)
3. TENAGA
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (WMAC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal & Zeolit Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran WMAC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
- Zeolit Ze
11 Berat isi bahan :
- WMAC-WC D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh2) x 1000 (M12)
1.d. Zeolit = (Zeo x Fh2 ) x 1000 (M159)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : A M P Q2
Produksi WMAC-WC / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (WMAC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal & Wax Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran WMAC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
- Wax Wx
11 Berat isi bahan :
- WMAC-WC D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh2) x 1000 (M12)
1.d. Wax = (Wx x As) x Fh2 (M160)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : A M P Q2
Produksi WMAC-WC / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (WMAC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal & Zeolit Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran WMAC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
- Zeolit Ze
11 Berat isi bahan :
- WMAC-BC D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
12 Jarak Stock pile ke Cold Bin l
II. URUTAN KERJA
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh2) x 1000 (M12)
1.d. Zeolit = (Zeo x Fh2 ) x 1000 (M159)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : A M P Q2
Produksi WMAC-WC / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (WMAC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal & Wax Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran WMAC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
- Wax Wx
11 Berat isi bahan :
- WMAC-BC D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh2) x 1000 (M12)
1.d. Wax = (Wx x As) xFh2 (M160)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
Koefisien Alat/ton = 1 : Q4 (E09)
3. TENAGA
Produksi menentukan : A M P Q2
Produksi WMAC-WC / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (WMAC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal & Zeolit Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran WMAC-Base :
- Agr Pch Mesin 20 - 30 mm 20-30
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
- Zeolit Ze
11 Berat isi bahan :
- WMAC-Base D1
- Agr Pch Mesin 20 - 30 mm D2
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D3
- Agr Pch Mesin 0 - 5 mm D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 20-30 = ("20-30" x Fh1) : D2 (M93)
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D3 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D4 (M91)
1.c. Semen = (FF x Fh2) x 1000 (M12)
1.d. Zeolit = (Zeo x Fh2) x 1000 (M5)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Koefisien Alat/ton = 1 : Q2 (E01a)
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : A M P Q2
Produksi WMAC-WC / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (WMAC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal & Wax Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran WMAC-Base :
- Agr Pch Mesin 20 - 30 mm 20-30
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
- Wax Ze
11 Berat isi bahan :
- WMAC-Base D1
- Agr Pch Mesin 20 - 30 mm D2
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D3
- Agr Pch Mesin 0 - 5 mm D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 20-30 = ("20-30" x Fh1) : D2 (M93)
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D3 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D4 (M91)
1.c. Semen = (FF x Fh2) x 1000 (M12)
1.d. Wax = (Wx x As) x Fh2 (M160)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : A M P Q2
Produksi AC-WC / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC-WC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran AC-WC Asb :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Aspal As
- Asbuton Butir 5/20 Asb
- Anti Stripping Agent Asa
11 Berat isi bahan :
- AC-WC Asb D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh2) x 1000 (M12)
1.d. Asbuton Butir 5/20 = (Asb x Fh2) x 1000 (M161)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : A M P Q2
Produksi AC-WC Asb / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (WMAC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran WMAC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Aspal As
- Asbuton Butir 5/20 Asb
- Anti Stripping Agent Asa
11 Berat isi bahan :
- WMAC-BC D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh2) x 1000 (M12)
1.d. Asbuton Butir 5/20 = (Asb x Fh2) x 1000 (M161)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : A M P Q2
Produksi AC-BC Asb/ hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC-Base) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran AC-Base :
- Agr Pch Mesin 20 - 30 mm 20-30
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Aspal As
- Asbuton Butir 5/20 Asb
- Anti Stripping Agent Asa
11 Berat Isi bahan :
- AC-Base D1
- Agr Pch Mesin 20 - 30 mm D2
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D3
- Agr Pch Mesin 0 - 5 mm D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 20-30 = ("20-30" x Fh1) : D2 (M93)
1.b. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D3 (M92)
1.c. Agr 0-5 = ("0-5" x Fh1) : D4 (M91)
1.d. Semen = (FF x Fh2) x 1000 (M12)
1.e. Aspal = (As x Fh2) x 1000 (M10)
1.f. Asbuton Butir 5/20 = (Asb x Fh2) x 1000 (M161)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-Base Asb / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat manual (cara manual)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (CPHMA) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : Fh1
8 Lebar penghamparan W
8 Berat isi Agregat CPHMA D1
1. BAHAN
Campuran CPHMA = CPHMA x Fh1 (M162)
2. ALAT
2.a. DUMP TRUCK (DT) (E09)
Kapasitas bak V
Faktor Efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Kapasitas angkut pekerja Qz
Waktu Siklus Ts2
- Mengisi Bak = (V x D1 x 1000) :Qz T1
- Angkut = (L : v1) x 60 menit T2
- Tunggu + dump + Putar T3
- Kembali = (L : v2) x 60 menit T4
Ts2
Kap.Prod. / jam = V x Fa x 60 x D1 Q4
Ts2
3. TENAGA
Produksi menentukan : TANDEM ROLLER Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal rata2 Lapen t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan - Agregat Fh1
Fator kehilangan - Aspal Fh2
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak
- Agregat Pengunci Ap1
- Agregat Penutup Ap2
- Aspal : - Paska Agregat Pokok As1
- Paska Agregat Pengunci As2
As
9 Lebar : Lbr
Berat isi bahan Agregat : D1
Berat isi bahan Aspal : D2
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus Ts1
Kap.Prod. / jam = V x Fa x 60 Q2
Ts2
Koefisien Alat / M3 = 1 = 1 : Q2 (E09)
Kap.Prod. / jam = V x Fa x 60 Q2
Ts2
Kap.Prod. / jam = V x Fa x 60 Q2
Ts2
2.g.
ALAT BANTU
- Kereta dorong
- Sekop
- Sapu
- Sikat
- Karung
- Cerek Aspal
- Kaleng Aspal
3. TENAGA
Produksi menentukan (Roller) Q1
Produksi Lapen / hari = Q1 x Tk Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal rata2 Lapen t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan - Agregat Fh1
Fator kehilangan - Aspal Fh2
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak
- Agregat Pengunci Ap1
- Agregat Penutup Ap2
- Residu Aspal Emulsi - Paska Agregat Pokok As1
- Paska Agregat Pengunci As2
- Asbuton 50/30 - Asbuton-1 B 50/30 Pasca Agregat Pokok Asb1
- Asbuton-2 B 50/30 Pasca Agregat Pengunci Asb2
- Kadar Residu Aspal Emulsi Ae
9 Lebar Lbr
Berat isi bahan Agregat : D1
Berat isi bahan Aspal : D2
1. BAHAN
1.a. Agregat Pokok = {(Ak/1000 : t M3) x Fh1} : D1 (M92)
1.b. Agregat Pengunci = {(Ap1/1000 : t M3) x Fh1} : D1 (M92)
1.c. Agregat Penutup = {(Ap2/1000 : t M3) x Fh1} : D1 (M92)
1.d. Aspal Emulsi = {((As1+As2) : t M3 ) x Fh2} (M31)
1.d. Asbuton B 50/30 = {((As1+As2) : t M3) x Fh2} (M163)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus Ts1
Kap.Prod. / jam = V x Fa x 60 Q2
Ts2
Kap.Prod. / jam = V x Fa x 60 Q2
Ts2
2.g.
ALAT BANTU
- Kereta dorong
- Sekop
- Sapu
- Sikat
- Karung
- Cerek Aspal
- Kaleng Aspal
3. TENAGA
Produksi menentukan (Roller) Q1
Produksi Lapen / hari = Q1 x Tk Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
8.73 KM PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 6.1 (1)
1.03 JENIS PEKERJAAN : Lapis Resap Pengikat - Aspa
SATUAN PEMBAYARAN : Liter
60 %
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1.03 liter
1.7167 Liter
C. PERALATAN
Analisa EI-611
1,365.35 liter
9,557.45 liter
2.00 orang
1.00 orang
0.0015 Jam
0.0007 Jam
Analisa EI-612a
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
8.73 KM PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 6.1 (2a)
1.03 - JENIS PEKERJAAN : Lapis Perekat - Aspal Cair/Em
SATUAN PEMBAYARAN : Liter
60 %
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1.03 liter
1.7167 Liter
C. PERALATAN
0.00020 Jam
Analisa EI-612a
5.00 km/jam
1.80 m
0.83
0.165 liter/m2 0.12-0.21
1,232.55 liter
0.00081 Jam
1,232.55 liter
8,627.85 liter
2.00 orang
1.00 orang
0.0016 Jam
0.0008 Jam
Analisa EI-612b
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
8.73 KM PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 6.1 (2b)
1.03 - JENIS PEKERJAAN : Lapis Perekat - Aspal Emulsi
SATUAN PEMBAYARAN : Liter
57 %
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1.03 liter
1.8070 Liter
C. PERALATAN
0.00020 Jam
Analisa EI-612b
0.00081 Jam
1,232.55 liter
8,627.85 liter
2.00 orang
1.00 orang
0.0016 Jam
0.0008 Jam
Analisa EI-621
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
ITEM PEMBAYARAN NO. : 6.2 (1)
8.73 Km JENIS PEKERJAAN : Agregat Penutup BURTU
7.00 Jam SATUAN PEMBAYARAN : M2
1.47 -
1.27
1.05
1.25 Cm NO. KOMPONEN
3.50 M'
2
12.5 Mm
1.16 A. TENAGA
1. Pekerja (L01)
2. Mandor (L02)
Analisa 6.2.3
B. BAHAN
1. Chipping (M41)
C. PERALATAN
0.01519 M3
1. Wheel Loader E15
2. Dump Truck E09
3. P. Tyre Roller E18
4. Alat Bantu
1.50 M3
0.85 -
0.83 -
0.45 menit lihat tabel
V - Loading
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
13,065.64 M2 Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
0 berat untuk bahan-bahan.
2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.00008 Jam 0 dari nomor mata pembayaran. Harga Satuan yang d
0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 0 Biaya satuan untuk peralatan sudah termasuk bahan
4 0 Biaya satuan sudah termasuk pengeluaran untuk se
0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-621
8.00 m3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
5.00 Km / Jam
2.94 menit
13.09 menit
2.19 menit
8.73 menit
26.95 menit
1,182.82 M2
0.0008 Jam
5.00 Km/Jam
2.29 M
6.00 lintasan
2.00
0.20 M
0.83
1,514.75 M2
0.00066 Jam
Lump Sum
1,514.75 M2
10,603.25 M2
20.00 orang
2.00 orang
0.0132 Jam
0.0013 Jam
Berlanjut ke hal. berikut.
Analisa EI-621
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
ITEM PEMBAYARAN NO. : 6.2 (2)
8.73 KM JENIS PEKERJAAN : Agregat Penutup BURDA
7.00 jam SATUAN PEMBAYARAN : M2
1.47 -
1.27
1.05
1.90 Cm NO. KOMPONEN
3.50 M'
2
12.5 mm
6.3 mm A. TENAGA
1.16
1. Pekerja (L01)
2. Mandor (L03)
Analisa 6.2.3
B. BAHAN
7.95 -
C. PERALATAN
79.84 m2/m3
1. Wheel Loader E15
0.0125 M3 2. Dump Truck 1 E09
3. Dump Truck 2 E09
0.0132 M3 4. P. Tyre Roller E18
5. Alat Bantu
0.0066 M3
0.0198 M3
Analisa EI-622
8.00 m3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
5.00 Km / Jam
4.47 menit
13.09 menit
2.19 menit
8.73 menit
28.47 menit
1,119.33 M2
0.0009 Jam
8.00 m3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
5.00 Km / Jam
8.86 menit
13.09 menit
4.35 menit
8.73 menit
35.03 menit
1,805.26 M2
0.0006 Jam
5.00 Km/Jam
2.290 M
6.00 lintasan
2.00
0.20 M
0.83
757.38 M2
0.0013 Jam
Lump Sum
757.38 M2
5,301.63 M2
20.00 orang
2.00 orang
0.0264 Jam
0.0026 Jam
Analisa EI-623a
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
8.73 KM PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 6.2 (3a)
1.03 - JENIS PEKERJAAN : Bahan Aspal Keras untuk Pe
SATUAN PEMBAYARAN : Liter
100.00 %
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1. Aspal (M10)
1.03 liter
1.030 Liter
C. PERALATAN
0.00020 Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
2.00 km/jam maju + kiri & kanan Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
3.50 m 0 berat untuk bahan-bahan.
0.83 2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
0 dari nomor mata pembayaran. Harga Satuan yang d
2.150 liter/m2 2,3-3,0 & 0,8-1,5 0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
12,491.50 liter 3 0 Biaya satuan untuk peralatan sudah termasuk bahan
4 0 Biaya satuan sudah termasuk pengeluaran untuk se
0.00008 Jam 0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
Berlanjut ke hal. berikut.
Analisa EI-623a
5.00 km/jam
1.80 m
0.83
2.150 liter/m2 0.12-0.21
16,060.50 liter
0.00006 Jam
4,980.00 liter
34,860.00 liter
0.00 orang
0.00 orang
0.0000 Jam
0.0000 Jam
Analisa EI-623b
aan Pelaburan
URAIAN ANALISA HARGA SATUAN FORMULIR STA
PEREKAMAN ANALISA MASIN
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
8.73 KM PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 6.2 (3b)
1.03 - JENIS PEKERJAAN : Bahan Aspal Emulsi Modifika
SATUAN PEMBAYARAN : Liter
65.00 %
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1.585 Liter
C. PERALATAN
0.00020 Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
2.00 km/jam maju + kiri & kanan Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
3.50 m 0 berat untuk bahan-bahan.
0.83 2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
0 dari nomor mata pembayaran. Harga Satuan yang d
2.15 liter/m2 2,3-3,0 & 0,8-1,5 0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
12,491.50 liter 3 0 Biaya satuan untuk peralatan sudah termasuk bahan
4 0 Biaya satuan sudah termasuk pengeluaran untuk se
0.00008 Jam 0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-623b
URAIAN ANALISA HARGA SATUAN
Lanjutan
5.00 km/jam
1.80 m
0.83
2.150 liter/m2 2,3-3,0 & 0,8-1,5
16,060.50 liter
0.00006 Jam
4,980.00 liter
34,860.00 liter
0.00 orang
0.00 orang
0.0000 Jam
0.0000 Jam
Analisa EI-624a
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
8.73 KM PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 6.2 (4a)
1.03 - JENIS PEKERJAAN : Aspal Cair untuk Precoated
SATUAN PEMBAYARAN : Liter
77 % Asumsi aspal setara MC 250
23 % pasal 6.1.2.2).b
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1. Aspal (M10)
2. Kerosene (M11)
1.03 Liter
500.00 Liter
0.83 -
4.00 menit
4.00 menit
1.00 menit
1.00 menit
10.00 menit
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
2,490.000 Liter E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
0.0004 jam Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
0 berat untuk bahan-bahan.
2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
2,490.00 liter 0 dari nomor mata pembayaran. Harga Satuan yang d
17,430.00 liter 0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 0 Biaya satuan untuk peralatan sudah termasuk bahan
4 0 Biaya satuan sudah termasuk pengeluaran untuk se
4.00 orang 0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
1.00 orang
0.0016 Jam
0.0004 Jam
Berlanjut ke hal. berikut.
Analisa EI-612a
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
8.73 KM PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 6.2 (4b)
1.03 - JENIS PEKERJAAN : Aspal Emulsi untuk Precoate
SATUAN PEMBAYARAN : Liter
60 %
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1.03 liter
C. PERALATAN
4.00 menit
4.00 menit
1.00 menit
1.00 menit
10.00 menit
0.0016 Jam
0.0004 Jam
Analisa EI-624b
URAIAN ANALISA HARGA SATUAN
Lanjutan
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
8.73 KM PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 6.2 (4c)
1.03 - JENIS PEKERJAAN : Aspal Emulsi Modifikasi Polim
SATUAN PEMBAYARAN : Liter
57 %
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1. Aspal Emulsi Modifikasi (M31c)
1.03 liter
C. PERALATAN
4.00 menit
4.00 menit
1.00 menit
1.00 menit
10.00 menit
0.0016 Jam
0.0004 Jam
Analisa EI-624c
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.3(1a)
0.04 M JENIS PEKERJAAN : Stone Matrix Asphalt Halus (S
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
2.29 ton / M3
1.32 ton / M3
1.32 ton / M3
1.16 ton / M3 B. BAHAN
1.03 ton / M3
0.05 km 1. Aggr 5-8 & 8-11 & 11-16 (M92)
2. Aggr 0 - 5 (M91)
3 Debu Marmer (M05)
4 Aspal (M10)
5 Serat Selulosa (M158)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
6. Tandem Roller E17a
0.5938 M3 7 Alat Bantu
0.0986 M3
67.4650 kg
62.8300 kg
3.0900 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
1.50 M3 panduan 0 berat untuk bahan-bahan.
0.85 - 2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.83 - 0 dari nomor mata pembayaran. Harga Satuan yang d
0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
15.00 km/jam panduan 3 0 Biaya satuan untuk peralatan sudah termasuk bahan
20.00 km/jam panduan 4 0 Biaya satuan sudah termasuk pengeluaran untuk se
0.20 menit 0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.15 menit
0.10 menit
0.45 menit
Analisa EI-631a
186.25 ton
0.0054 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 m3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton asumsi 1 menit
1.00 menit per batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
79.83 ton
0.0125 Jam
4.00 Km / Jam
1.68 M
16.00 lintasan 2 Awal & 2 Akhir, 12 antara
3.00
0.20 m
0.83 -
29.40 ton
0.0340 Jam
Berlanjut ke hal. berikut.
Analisa EI-631a
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-631b
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.3(1b)
0.04 M JENIS PEKERJAAN : Stone Matrix Asphalt Modifika
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
2.29 ton / M3
1.32 ton / M3
1.32 ton / M3
1.16 ton / M3 B. BAHAN
0.05 km
1. Agr Pch Mesin 5-8 & 8-1 (M92)
2. Agr Pch Mesin 0 - 5 (M91)
3 Debu Marmer (M05)
4 Aspal Modifikasi (M31c)
5 Serat Selulosa (M158)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01b
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
6. Tandem Roller E17a
0.5929 M3 7
0.0985 M3 8 Alat Bantu
67.3620 kg
64.3750 kg
3.0900 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
1.50 M3 panduan 0 berat untuk bahan-bahan.
0.85 - 2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.83 - 0 dari nomor mata pembayaran. Harga Satuan yang d
0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
15.00 km/jam panduan 3 0 Biaya satuan untuk peralatan sudah termasuk bahan
20.00 km/jam panduan 4 0 Biaya satuan sudah termasuk pengeluaran untuk se
0.20 menit 0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.15 menit
0.10 menit
0.45 menit
Analisa EI-631b
URAIAN ANALISA HARGA SATUAN
Lanjutan
186.25 ton
0.0054 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
79.83 ton
0.0125 Jam
4.00 Km / Jam
1.68 M
18.00 lintasan 2 Awal & 4 Akhir, 12 antara
3.00
0.20 m
0.83 -
26.13 ton
0.0383 Jam
Analisa EI-631b
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-632a
2.29 ton / M3
1.32 ton / M3
1.32 ton / M3
1.16 ton / M3 B. BAHAN
0.05 km
1. Agr Pch Mesin 5-8 & 8-11 (M92)
2. Agr Pch Mesin 0 - 5 (M91)
3 Debu Marmer (M05)
4 Aspal (M10)
5 Serat Selulosa (M158)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
6. Tandem Roller E17a
0.6231 M3 7. Alat Bantu
0.0701 M3
67.5680 M3
61.8000 kg
3.0900 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
1.50 M3 panduan 0 berat untuk bahan-bahan.
0.85 - 2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.83 - 0 dari nomor mata pembayaran. Harga Satuan yang d
0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
15.00 km/jam panduan 3 0 Biaya satuan untuk peralatan sudah termasuk bahan
20.00 km/jam panduan 4 0 Biaya satuan sudah termasuk pengeluaran untuk se
0.20 menit 0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.15 menit
0.10 menit
0.45 menit
Analisa EI-632a
186.25 ton
0.0054 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
99.79 ton
0.0100 Jam
4.00 Km / Jam
1.68 M
18.00 lintasan 2 Awal & 4 Akhir, 12 antara
3.00
0.20 m
0.83 -
32.66 ton
0.0306 Jam
Analisa EI-632a
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-632b
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.3(2b)
0.05 M Tabel 6.3.11 JENIS PEKERJAAN : Stone Matrix Asphalt Modifika
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
2.29 ton / M3
1.32 ton / M3
1.32 ton / M3
1.16 ton / M3 B. BAHAN
0.05 km
1. Agr Pch Mesin 5-8 & 8-1 (M92)
2. Agr Pch Mesin 0 - 5 (M91)
3 Debu Marmer (M05)
4 Aspal (M31c)
5 Serat Selulosa (M158)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01b
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
6. Tandem Roller E17a
0.6221 M3
0.0699 M3 8 Alat Bantu
67.4650 kg
63.3450 Kg
3.0900 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
1.50 M3 panduan 0 berat untuk bahan-bahan.
0.85 - 2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.83 - 0 dari nomor mata pembayaran. Harga Satuan yang d
0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
15.00 km/jam panduan 3 0 Biaya satuan untuk peralatan sudah termasuk bahan
20.00 km/jam panduan 4 0 Biaya satuan sudah termasuk pengeluaran untuk se
0.20 menit 0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.15 menit
0.10 menit
0.45 menit
Analisa EI-632b
186.25 ton
0.0054 Jam
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
99.79 ton
0.0100 Jam
4.00 Km / Jam
1.68 M
18.00 lintasan 2 Awal & 4 Akhir & 12 Antara
3.00
0.20 m
0.83 -
32.66 ton
0.0306 Jam
Berlanjut ke hal. berikut.
Analisa EI-632b
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-633a
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.3(3)
0.03 M Tabel 6.3.11 JENIS PEKERJAAN : Lataston Lapis Aus (HRS-WC
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
2.23 ton / M3
1.32 ton / M3
1.32 ton / M3
1.30 ton / M3 B. BAHAN
0.05 km
1. Agr Pch Mesin 5-10 & 1 (M92)
2. Agr Pch Mesin 0 - 5 (M91)
3 Pasir Halus (M01c)
4 Semen (M12)
5 Aspal (M10)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
6. Tandem Roller E17a
0.2581 M3 7 P. Tyre Roller E18
0.1842 M3 8 Alat Bantu
0.2807 M3
18.9520 Kg
80.3400 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
1.50 M3 panduan 0 berat untuk bahan-bahan.
0.85 - 2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.83 - 0 dari nomor mata pembayaran. Harga Satuan yang d
0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
15.00 km/jam panduan 3 0 Biaya satuan untuk peralatan sudah termasuk bahan
20.00 km/jam panduan 4 0 Biaya satuan sudah termasuk pengeluaran untuk se
0.20 menit 0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.15 menit
0.10 menit
0.45 menit
186.25 ton
0.0054 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
19.83 ton
0.0504 Jam
5.00 m/menit
0.83 -
3.50 meter
58.30 ton
0.0172 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan 2 Awal & 4 Akhir
3.00
0.20 m
0.83 -
57.25 ton
0.0175 Jam
10.00 KM / jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
86.86 ton
0.0115 Jam
Analisa EI-633a
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-634a
2.29 ton / M3
1.32 ton / M3 B. BAHAN
1.32 ton / M3
1.30 ton / M3 1. Agr Pch Mesin 5-8 & 8-1 (M92)
0.05 km 2. Agr Pch Mesin 0 - 5 (M91)
3 Pasir Halus (M01c)
4 Semen (M12)
5 Aspal (M10)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
6. Tandem Roller E17a
7 P. Tyre Roller E18
8 Alat Bantu
0.3221 M3
0.1636 M3 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
0.2493 M3 E. OVERHEAD & PROFIT
19.3640 Kg F. HARGA SATUAN PEKERJAAN ( D + E )
63.8600 Kg Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
0 berat untuk bahan-bahan.
2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
0 dari nomor mata pembayaran. Harga Satuan yang d
1.50 M3 0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
0.85 - 3 0 Biaya satuan untuk peralatan sudah termasuk bahan
0.83 - 4 0 Biaya satuan sudah termasuk pengeluaran untuk se
0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
15.00 km/jam panduan
20.00 km/jam panduan
0.20 menit
0.15 menit
0.10 menit
0.45 menit
Analisa EI-634a
186.25 ton
0.0054 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 Km / Jam
60.00 Km / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
69.85 ton
0.0143 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan 2 Awal & 4 Akhir
3.00
0.20 m
0.83 -
68.59 ton
0.0146 Jam
10.00 KM / Jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
104.06 ton
Analisa EI-634a
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-635a
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.3(5a)
0.04 M Tabel 6.3.11 JENIS PEKERJAAN : Laston Lapis Aus (AC-WC)
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
186.25 ton
0.0054 Jam
Analisa EI-635a
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
79.83 ton
0.0125 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan
3.00
0.83 -
0.20 M
0.0000 ton
78.39
0.0128 Jam
10.00 KM / jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
118.93 ton
0.0084 Jam
Analisa EI-635a
Lump Sum
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-635b
B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01b
3. Genset E12
4. Dump Truck E08
5. Asp. Finisher E02
6. Tandem Roller E17a
0.3201 M3 7 P. Tyre Roller E18
0.4186 M3 8 Alat Bantu
9.6820 Kg
63.8600 Kg
Analisa EI-635b
186.25 ton
0.0054 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
79.83 ton
0.0125 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan 2 Awal & 4 Akhir
3.00
0.20 m
0.83 -
78.39 ton
0.0128 Jam
10.00 KM / jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
118.93 ton
Analisa EI-635b
0.0084 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-636a
URAIAN ANALISA HARGA SATUANFORMULIR
STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.3(6a)
0.06 M Tabel 6.3.11 JENIS PEKERJAAN : Laston Lapis Antara (AC-BC)
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
JUMLAH HARGA
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
6. Tandem Roller E17a
0.3720 M3 7 P. Tyre Roller E18
0.3719 M3 8 Alat Bantu
9.6820 Kg
57.1650 Kg JUMLAH HARGA PERA
186.25 ton
0.0054 Jam
Analisa EI-636a
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 Km / Jam
60.00 Km / Jam
1.00 ton
1.00 menit
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 - Normal
3.50 meter
119.74 ton
0.0084 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.20 m
0.83 - Normal
117.59 ton
0.0085 Jam
10.00 KM / Jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
178.39 ton
0.0056 Jam
Analisa EI-636a
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-636b 2
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.3(6b)
0.06 M Tabel 6.3.11 JENIS PEKERJAAN : Laston Lapis Antara Modifika
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01b
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
0.3713 M3 6. Tandem Roller E17a
0.3713 M3 7 P. Tyre Roller E18
9.6820 Kg 8 Alat Bantu
58.7100 Kg
186.25 ton
Analisa EI-636b
0.0054 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 Km / Jam
60.00 Km / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 - Normal
3.50 meter
119.74 ton
0.0084 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.20 m
0.83 - Normal
117.59 ton
0.0085 Jam
10.00 KM / Jam
2.29 M
12.00 lintasan
2.00
0.20 M
0.83 -
208.13 ton
0.0048 Jam
Analisa EI-636b
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-637a
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.3(7a)
0.075 M JENIS PEKERJAAN : Laston Lapis Fondasi (AC-Ba
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
17.81 %
40.34 % Gradasi harus -
36.15 % memenuhi - A. TENAGA
0.95 % Spesifikasi
4.75 % 1. Pekerja (L01)
0.30 %As 2. Mandor (L03)
2.29 ton / M3
1.32 ton / M3 JUMLAH HARGA T
1.32 ton / M3
1.32 ton / M3 B. BAHAN
0.05 km
1 Agr Pch Mesin 20-30 (M93)
2 Agr Pch Mesin 5-10 & 1 (M92)
3 Agr Pch Mesin 0 - 5 (M91)
3 Semen (M12)
4 Aspal (M10)
JUMLAH HARGA
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E09
5. Asphalt Finisher E02
6. Tandem Roller E17a
7 P. Tyre Roller E18
8 Alat Bantu
0.1417 M3
0.3209 M3 JUMLAH HARGA PERA
0.2876 M3
9.7850 Kg D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
48.9250 Kg E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
0 berat untuk bahan-bahan.
1.50 M3 2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.85 - 0 dari nomor mata pembayaran. Harga Satuan yang d
0.83 - 0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 0 Biaya satuan untuk peralatan sudah termasuk bahan
15.00 km/jam panduan 4 0 Biaya satuan sudah termasuk pengeluaran untuk se
20.00 km/jam panduan 0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.20 menit
0.15 menit
0.10 menit
0.45 menit
Analisa EI-637a
186.25 ton
0.0054 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 Km / Jam
60.00 Km / Jam
1.00 ton
1.00 menit
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 - Normal
3.50 meter
149.68 ton
0.0067 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.30 m
0.83 - Normal
140.65 ton
0.0071 Jam
10.00 KM / Jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
Analisa EI-637a
222.99 ton
0.0045 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-637b
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.3(7b)
0.075 M JENIS PEKERJAAN : Laston Lapis Fondasi Modifik
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
17.78 %
40.28 % Gradasi harus - A. TENAGA
36.09 % memenuhi -
0.95 % Spesifikasi
4.90 % 1. Pekerja (L01)
0.30 %As 2. Mandor (L03)
2.29 ton / M3
1.32 ton / M3
1.32 ton / M3 JUMLAH HARGA T
1.32 ton / M3
0.05 km B. BAHAN
JUMLAH HARGA
C. PERALATAN
1. Wheel Loader E15
2. AMP E01b
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
6. Tandem Roller E17a
7 P. Tyre Roller E18
0.1414 M3 8 Alat Bantu
0.3204 M3
0.2871 M3
9.7850 Kg JUMLAH HARGA PERA
50.4700 Kg D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Analisa EI-637b
186.25 ton
0.0054 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 ton M3
0.83 -
40.00 Km / Jam
60.00 Km / Jam
1.00 ton
1.00 menit
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 - Normal
3.50 meter
149.68 ton
0.0067 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.30 m
0.83 - Normal
140.65 ton
0.0071 Jam
10.00 KM / Jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
Analisa EI-637b
222.99 ton
0.0045 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-638
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
8.73 KM PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 6.3.(8)
1.03 - JENIS PEKERJAAN : Bahan Anti Pengelupasan
SATUAN PEMBAYARAN : Kg
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
1.03 Kg
B. BAHAN
0.00 orang
0.00 orang
C. PERALATAN
0.0000 Jam
0.0000 Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
0 berat untuk bahan-bahan.
2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
0 dari nomor mata pembayaran. Harga Satuan yang d
0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 0 Biaya satuan untuk peralatan sudah termasuk bahan
4 0 Biaya satuan sudah termasuk pengeluaran untuk se
0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-641a
WC) dengan Zeolit
URAIAN ANALISA HARGA SATUAN FORMULIR STA
PEREKAMAN ANALISA MASIN
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.4.(1a)
0.04 M Tabel 6.3.1.1 JENIS PEKERJAAN : Laston Hangat Pen. 60-70, W
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01a
3. Genset E12
4. Dump Truck E09
5. Asp. Finisher E02
6. Tandem Roller E17a
0.3206 M3 7 P. Tyre Roller E18
0.4095 M3 8 Alat Bantu
9.6820 Kg
12.5660 Kg
62.3150 Kg
186.25 ton
0.0054 Jam
Analisa EI-635a
C) dengan Zeolit
URAIAN ANALISA HARGA SATUAN
Lanjutan
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
79.83 ton
0.0125 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan
3.00
0.83 -
0.20 M
0.0000 ton
78.39
0.0128 Jam
10.00 KM / jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
118.93 ton
0.0084 Jam
Analisa EI-635a
C) dengan Zeolit
URAIAN ANALISA HARGA SATUAN
Lanjutan
Lump Sum
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-641b
WC) dengan Wax
URAIAN ANALISA HARGA SATUAN FORMULIR STA
PEREKAMAN ANALISA MASIN
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.4.(1b)
0.04 M Tabel 6.3.11 JENIS PEKERJAAN : Laston Hangat Pen. 60-70, W
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01a
3. Genset E12
4. Dump Truck E09
5. Asp. Finisher E02
6. Tandem Roller E17a
0.3206 M3 7 P. Tyre Roller E18
0.4193 M3 8 Alat Bantu
9.6820 Kg
0.9628 Kg
62.3150 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
1.50 M3 panduan F. HARGA SATUAN PEKERJAAN ( D + E )
0.85 - Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
0.83 - 0 berat untuk bahan-bahan.
2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
15.00 km/jam panduan 0 dari nomor mata pembayaran. Harga Satuan yang d
20.00 km/jam panduan 0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
0.20 menit 3 0 Biaya satuan untuk peralatan sudah termasuk bahan
0.15 menit 4 0 Biaya satuan sudah termasuk pengeluaran untuk se
0.10 menit 0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.45 menit
186.25 ton
0.0054 Jam
Analisa EI-635a
C) dengan Wax
URAIAN ANALISA HARGA SATUAN
Lanjutan
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
79.83 ton
0.0125 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan
3.00
0.83 -
0.20 M
0.0000 ton
78.39
0.0128 Jam
10.00 KM / jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
118.93 ton
0.0084 Jam
Analisa EI-635a
C) dengan Wax
URAIAN ANALISA HARGA SATUAN
Lanjutan
Lump Sum
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-642a
C-BC) dengan Zeolit
URAIAN ANALISA HARGA SATUAN FORMULIR STA
PEREKAMAN ANALISA MASIN
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.4.(2a)
0.06 M Tabel 6.3.11 JENIS PEKERJAAN : Laston Hangat Pen. 60-70, W
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01a
3. Genset E12
4. Dump Truck E09
5. Asp. Finisher E02
6. Tandem Roller E17a
0.3719 M3 7 P. Tyre Roller E18
0.3622 M3 8 Alat Bantu
9.7850 Kg
12.6690 Kg
57.1650 Kg
186.25 ton
0.0054 Jam
Analisa EI-642a
BC) dengan Zeolit
URAIAN ANALISA HARGA SATUAN
Lanjutan
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
119.74 ton
0.0084 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan
3.00
0.83 -
0.20 M
0.0000 ton
117.59
0.0085 Jam
10.00 KM / jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
178.39 ton
0.0056 Jam
Analisa EI-642a
BC) dengan Zeolit
URAIAN ANALISA HARGA SATUAN
Lanjutan
Lump Sum
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-642b
C-BC) dengan Wax
URAIAN ANALISA HARGA SATUAN FORMULIR STA
PEREKAMAN ANALISA MASIN
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.4.(2b)
0.06 M Tabel 6.3.11 JENIS PEKERJAAN : Laston Hangat Pen. 60-70, W
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01a
3. Genset E12
4. Dump Truck E09
5. Asp. Finisher E02
6. Tandem Roller E17a
0.3719 M3 7 P. Tyre Roller E18
0.3719 M3 8 Alat Bantu
9.6820 Kg
0.8832 Kg
57.1650 Kg
186.25 ton
0.0054 Jam
Analisa EI-635a
BC) dengan Wax
URAIAN ANALISA HARGA SATUAN
Lanjutan
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
119.74 ton
0.0084 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan
3.00
0.83 -
0.20 M
0.0000 ton
117.59
0.0085 Jam
10.00 KM / jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
178.39 ton
0.0056 Jam
Analisa EI-635a
BC) dengan Wax
URAIAN ANALISA HARGA SATUAN
Lanjutan
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-643a
AC-Base) dengan Zeolit
URAIAN ANALISA HARGA SATUAN FORMULIR STA
PEREKAMAN ANALISA MASIN
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.4.(3a)
0.075 M Tabel 6.3.11 JENIS PEKERJAAN : Laston Hangat Pen. 60-70, W
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
17.81 %
40.34 % Gradasi harus -
34.91 % memenuhi -
0.95 % Spesifikasi A. TENAGA
4.75 %
0.30 %As 1. Pekerja (L01)
1.24 %
2. Mandor (L03)
2.29 ton / M3
1.32 ton / M3
1.32 ton / M3
1.32 ton / M3
0.05 km
B. BAHAN
1. Agr Pch Mesin 20-30 (M93)
2. Agr Pch Mesin 5-10 & 1 (M92)
3 Agr Pch Mesin 0 - 5 (M91)
4 Semen (M12)
5 Aspal (M10)
6 Zeolit (M159)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01a
3. Genset E12
4. Dump Truck E09
5. Asp. Finisher E02
6. Tandem Roller E17a
0.1417 M3 7 P. Tyre Roller E18
0.3209 M3 8 Alat Bantu
0.2777 M3
9.7850 Kg
12.7720 Kg
48.9250 Kg
186.25 ton
0.0054 Jam
Analisa EI-635a
C-Base) dengan Zeolit
URAIAN ANALISA HARGA SATUAN
Lanjutan
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
149.68 ton
0.0067 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan
3.00
0.83 -
0.20 M
0.0000 ton
146.99
0.0068 Jam
10.00 KM / jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
222.99 ton
0.0045 Jam
Analisa EI-635a
C-Base) dengan Zeolit
URAIAN ANALISA HARGA SATUAN
Lanjutan
Lump Sum
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-643b
AC-Base) dengan Wax
URAIAN ANALISA HARGA SATUAN FORMULIR STA
PEREKAMAN ANALISA MASIN
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.4.(3b)
0.075 M Tabel 6.3.11 JENIS PEKERJAAN : Laston Hangat Pen. 60-70, W
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
17.81 %
40.34 % Gradasi harus -
36.15 % memenuhi -
0.95 % Spesifikasi A. TENAGA
4.75 %
0.30 %As 1. Pekerja (L01)
2.00 %As
2. Mandor (L03)
2.29 ton / M3
1.32 ton / M3
1.32 ton / M3
1.32 ton / M3
0.05 km
B. BAHAN
1. Agr Pch Mesin 20-30 (M93)
2. Agr Pch Mesin 5-10 & 1 (M92)
3 Agr Pch Mesin 0 - 5 (M91)
4 Semen (M12)
5 Aspal (M10)
6 Wax (M160)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01a
3. Genset E12
4. Dump Truck E09
5. Asp. Finisher E02
6. Tandem Roller E17a
0.1417 M3 7 P. Tyre Roller E18
0.3209 M3 8 Alat Bantu
0.2876 M3
9.7850 Kg
1.0079 Kg
48.9250 Kg
186.25 ton
0.0054 Jam
Analisa EI-635a
C-Base) dengan Wax
URAIAN ANALISA HARGA SATUAN
Lanjutan
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
149.68 ton
0.0067 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan
3.00
0.83 -
0.20 M
0.0000 ton
146.99
0.0068 Jam
10.00 KM / jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
222.99 ton
0.0045 Jam
Analisa EI-635a
C-Base) dengan Wax
URAIAN ANALISA HARGA SATUAN
Lanjutan
Lump Sum
49.80 ton / Jam
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-651
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.5.(1)
0.04 M Tabel 6.3.11 JENIS PEKERJAAN : Laston Lapis Aus Asbuton (A
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01b
3. Genset E12
4. Dump Truck E09
5. Asp. Finisher E02
6. Tandem Roller E17a
0.3234 M3 7 P. Tyre Roller E18
0.4068 M3 8 Alat Bantu
0.0000 Kg
25.7500 Kg
58.7100 Kg
186.25 ton
0.0054 Jam
Analisa EI-635a
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
79.83 ton
0.0125 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan
3.00
0.83 -
0.20 M
0.0000 ton
78.39
0.0128 Jam
10.00 KM / jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
118.93 ton
0.0084 Jam
Analisa EI-635a
Lump Sum
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-652
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.5.(2)
0.06 M Tabel 6.3.11 JENIS PEKERJAAN : Laston Lapis Antara Asbuton
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01b
3. Genset E12
4. Dump Truck E09
5. Asp. Finisher E02
6. Tandem Roller E17a
0.3751 M3 7 P. Tyre Roller E18
0.3591 M3 8 Alat Bantu
0.0000 Kg
25.7500 Kg
53.5600 Kg
186.25 ton
0.0054 Jam
Berlanjut ke hal. berikut.
Analisa EI-635a
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
1.00 ton Asumsi 60 detik
1.00 menit untuk 1 batch
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 -
3.50 meter
119.74 ton
0.0084 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan
3.00
0.83 -
0.20 M
0.0000 ton
117.59
0.0085 Jam
10.00 KM / jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
178.39 ton
0.0056 Jam
Analisa EI-635a
Lump Sum
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-653
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.5.(3)
0.075 M JENIS PEKERJAAN : Laston Lapis Fondasi Asbuto
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.45 ton/m3
1.32 ton/m3 NO. KOMPONEN
17.96 %
40.70 % Gradasi harus -
34.44 % memenuhi - A. TENAGA
0.00 % Spesifikasi
4.40 % 1. Pekerja (L01)
2.50
0.30 %As 2. Mandor (L03)
2.29 ton / M3
1.32 ton / M3
1.32 ton / M3
1.32 ton / M3 B. BAHAN
0.05 km 1. Agr Pch Mesin 20-30 (M93)
2. Agr Pch Mesin 5-10 & 1 (M92)
3 Agr Pch Mesin 0 - 5 (M91)
4 Semen (M12)
5 Aspal (M10)
6 Asbuton B 5/20 (M161)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01b
3. Genset E12
4. Dump Truck E09
5. Asp. Finisher E02
6. Tandem Roller E17a
7 P. Tyre Roller E18
8 Alat Bantu
0.1429 M3
0.3238 M3
0.2740 M3
0.0000 Kg
45.3200 Kg
25.7500 Kg D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
1.50 M3 0 berat untuk bahan-bahan.
0.85 - 2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.83 - 0 dari nomor mata pembayaran. Harga Satuan yang d
0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
15.00 km/jam panduan 3 0 Biaya satuan untuk peralatan sudah termasuk bahan
20.00 km/jam panduan 4 0 Biaya satuan sudah termasuk pengeluaran untuk se
0.20 menit 0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.15 menit
0.10 menit
0.45 menit
Analisa EI-653
186.25 ton
0.0054 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
8.00 M3
0.83 -
40.00 Km / Jam
60.00 Km / Jam
1.00 ton
1.00 menit
8.00 menit
13.09 menit
15.00 menit
8.73 menit
44.81 menit
20.36 ton
0.0491 Jam
5.00 m/menit
0.83 - Normal
3.50 meter
149.68 ton
0.0067 Jam
4.00 Km / Jam
1.68 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.20 m
0.83 - Normal
146.99 ton
0.0068 Jam
10.00 KM / Jam
2.29 M
14.00 lintasan
2.00
0.20 M
0.83 -
Analisa EI-653
222.99 ton
0.0045 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-661
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.6.(1)
0.030 M Tabel 6.3.11 JENIS PEKERJAAN : CPHMA Kemasan Kantong
7.00 Jam SATUAN PEMBAYARAN : Ton
1.03 -
3.50 M
2.15 ton/m3
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1.030 Ton 1. CPHMA (M162)
6.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
300.00 kg/menit asumsi 25 kg/zak C. PERALATAN
2 zak/10 detik 1 Dump Truck E09
43.00 menit 2 Tandem Roller E17a
13.09 menit 3 P. Tyre Roller E18
15.00 menit
8.73 menit
79.81 menit
8.05 ton
0.1242 Jam
Analisa EI-661
10.00 KM / jam
2.29 M
6.00 lintasan
2.00
0.20 M
0.83 -
195.40 ton
0.0051 Jam
55.20 liter
386.40 liter
10.00 orang
1.00 orang
0.1812 Jam
0.0181 Jam
Analisa EI-671
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.7.(1)
0.050 M JENIS PEKERJAAN : Lapis Penetrasi Macadam
7.00 Jam SATUAN PEMBAYARAN : Meter Kubik
1.05 -
1.03 -
B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. Dump Truck 1 E09
1.1586 M3 3. Dump Truck 2 E09
0.3621 M3 4. Dump Truck 3 E09
0.2028 M3 5. Tandem Roller E17
82.40 Kg 6. Asphalt Distributor E41
1.50 M3
0.85 -
0.83 -
0.45 lihat tabel
V - Loading D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
141.10 M3 F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
0 berat untuk bahan-bahan.
0.0071 Jam 2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
0 dari nomor mata pembayaran. Harga Satuan yang d
0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 0 Biaya satuan untuk peralatan sudah termasuk bahan
4 0 Biaya satuan sudah termasuk pengeluaran untuk se
0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-671
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
5.00 Km / Jam
3.40 menit
13.09 menit
1.10 menit
8.73 menit
26.31 menit
15.14 M3
0.0660 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
5.00 Km / Jam
3.40 menit
13.09 menit
1.44 menit
8.73 menit
26.66 menit
14.94 M3
0.0669 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
5.00 Km / Jam
3.40 menit
13.09 menit
2.19 menit
8.73 menit
27.41 menit
14.54 M3
0.0688 Jam
4.00 Km / Jam
1.68 M
12.00 lintasan 2 fase @ 6 lintas
3.00
0.83 -
0.20 M
21.3956 M3
`
0.0467 Jam
Berlanjut ke halaman berikut
Analisa EI-671
3.50 M
30.00 Km/jam
100 liter/menit pemakaian efektif 2 %
0.83
80.00 liter/m3
62.25 liter
0.01606 Jam
Lump Sum
21.40 M3/Jam
149.77 M3
20.00 orang
2.00 orang
0.9348 Jam
0.0935 Jam
Analisa EI-672
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
……………………………………
PROP / KAB / KODYA : …………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.7.(2)
0.050 M JENIS PEKERJAAN : Lapis Penetrasi Macadam As
7.00 Jam SATUAN PEMBAYARAN : Meter Kubik
1.05 -
1.03 -
B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. Dump Truck 1 E09
3. Dump Truck 2 E09
4. Dump Truck 3 E09
1.1586 M3 5. Tandem Roller E17
0.2752 M3 6. Asphalt Distributor E41
0.1448 M3
12.36 Kg
370.80 Kg
1.50 M3
0.85 -
0.83 - D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
0.45 lihat tabel E. OVERHEAD & PROFIT
V - Loading F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Te
141.10 M3 0 berat untuk bahan-bahan.
2 0 Kuantitas satuan adalah kuantitas perkiraan setiap k
0 dari nomor mata pembayaran. Harga Satuan yang d
0.0071 Jam 0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 0 Biaya satuan untuk peralatan sudah termasuk bahan
4 0 Biaya satuan sudah termasuk pengeluaran untuk se
0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-672
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
5.00 Km / Jam
3.40 menit
13.09 menit
1.10 menit
8.73 menit
26.31 menit
15.14 M3
0.0660 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
5.00 Km / Jam
3.40 menit
13.09 menit
1.44 menit
8.73 menit
26.66 menit
14.94 M3
0.0669 Jam
8.00 M3
0.83 -
40.00 KM / Jam
60.00 KM / Jam
5.00 Km / Jam
3.40 menit
13.09 menit
2.19 menit
8.73 menit
27.41 menit
14.54 M3
0.0688 Jam
4.00 Km / Jam
1.68 M
12.00 lintasan 2 fase @ 6 lintas
3.00
0.83 -
0.20 M
21.3956 M3
`
0.0467 Jam
Analisa EI-672
3.50 M
30.00 Km/jam
100 liter/menit pemakaian efektif 2 %
0.83
12.24 liter/m3
406.94 liter
0.00246 Jam
Lump Sum
21.40 M3/Jam
22.04 M3
20.00 orang
2.00 orang
0.9348 Jam
0.0935 Jam
Analisa EI-611
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Resap Pengikat - Aspal Cair/EmulsTOTAL HARGA (Rp.) : 20,072.63
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Perekat - Aspal Cair/Emulsi TOTAL HARGA (Rp.) : 23,586.15
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Perekat - Aspal Emulsi Modifikasi TOTAL HARGA (Rp.) : 24,808.60
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Agregat Penutup BURTU TOTAL HARGA (Rp.) : 6,091.38
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Agregat Penutup BURDA TOTAL HARGA (Rp.) : 8,487.90
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Bahan Aspal Keras untuk Pekerjaan Pel TOTAL HARGA (Rp.) : 7,775.66
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Bahan Aspal Emulsi Modifikasi Polimer TOTAL HARGA (Rp.) : 21,540.35
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Aspal Cair untuk Precoated TOTAL HARGA (Rp.) : 11,195.51
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Aspal Emulsi untuk Precoated TOTAL HARGA (Rp.) : 9,481.97
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Aspal Emulsi Modifikasi Polimer untuk P TOTAL HARGA (Rp.) : 14,009.74
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Stone Matrix Asphalt Halus (SMA Halus)TOTAL HARGA (Rp.) : 1,073,644.57
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Stone Matrix Asphalt Modifikasi Halus TOTAL HARGA (Rp.) : 1,478,075.77
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Stone Matrix Asphalt Modifikasi Kasar TOTAL HARGA (Rp.) : 1,452,299.44
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lataston Lapis Aus (HRS-WC) TOTAL HARGA (Rp.) : 1,092,476.61
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lataston Lapis Pondasi (HRS-Base) TOTAL HARGA (Rp.) : 975,409.35
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Aus (AC-WC) TOTAL HARGA (Rp.) : 984,786.32
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Aus Modifikasi (AC-WC MoTOTAL HARGA (Rp.) : 1,376,424.04
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Antara Modifikasi (AC-BC TOTAL HARGA (Rp.) : 1,310,472.04
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Fondasi (AC-Base) TOTAL HARGA (Rp.) : 866,433.80
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Fondasi Modifikasi (AC-Ba TOTAL HARGA (Rp.) : 1,189,501.11
% THD. BIAYA PROYEK : 0.02
an atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Bahan Anti Pengelupasan TOTAL HARGA (Rp.) : 113,300.00
% THD. BIAYA PROYEK : 0.00
Analisa EI-641a
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Hangat Pen. 60-70, WMAC Lapi TOTAL HARGA (Rp.) : 1,064,455.44
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Hangat Pen. 60-70, WMAC Lap TOTAL HARGA (Rp.) : 1,018,765.73
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Hangat Pen. 60-70, WMAC LapisTOTAL HARGA (Rp.) : 1,006,173.68
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Hangat Pen. 60-70, WMAC Lapi TOTAL HARGA (Rp.) : 974,056.37
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Hangat Pen. 60-70, WMAC LapisTOTAL HARGA (Rp.) : 947,261.12
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Hangat Pen. 60-70, WMAC Lapi TOTAL HARGA (Rp.) : 901,856.68
% THD. BIAYA PROYEK : 0.01
PERKIRAAN HARGA JUMLAH
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Aus Asbuton (AC-WC Asb) TOTAL HARGA (Rp.) : 964,551.98
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Antara Asbuton (AC-BC AsTOTAL HARGA (Rp.) : 922,677.61
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Fondasi Asbuton (AC-BaseTOTAL HARGA (Rp.) : 845,765.83
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: CPHMA Kemasan Kantong TOTAL HARGA (Rp.) : 1,086,726.17
% THD. BIAYA PROYEK : 0.03
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Penetrasi Macadam TOTAL HARGA (Rp.) : 1,328,340.45
: Meter Kubik % THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Penetrasi Macadam Asbuton TOTAL HARGA (Rp.) : 1,180,740.84
: Meter Kubik % THD. BIAYA PROYEK : 0.02
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp/m3 beton : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
7 Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Semen (PC) = Sm x Fh1
1.b. Pasir Beton = (Ps/1000 : D3) x Fh2
1.c. Agregat Kasar = (Kr/1000 : D4) x Fh2
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku = M19 x 12
1.f. Air = Air x Fh 1
1.g. Plastizier = Plt x Fh 1
2. ALAT
2.a. CONCRETE MIXING PLANT;HZS25; 25 M3/JAM; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
No. URAIAN
- menumpahkan dll
Kap.Prod. / jam = V2 x Fa x 60
Ts2
Koefisien Alat / M3 = 1 : Q2
Koefisien Alat / M3 = 1 : Q3
Koefisien Alat / M3 = 1 : Q3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang :
Tk batu = 6
Tk Kayu = 24
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,503,314.45 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp/m3 beton : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
7 Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Semen (PC) = Sm x Fh1
1.b. Pasir Beton = (Ps/1000 : D3) x Fh2
1.c. Agregat Kasar = (Kr/1000 : D4) x Fh2
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku = M19 x 12
1.f. Air = Air x Fh1
1.g. Plastizier = Plt x Fh1
2. ALAT
2.a. CONCRETE MIXING PLANT;HZS25; 25 M3/JAM; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
No. URAIAN
- menumpahkan dll
Kap.Prod. / jam = V2 x Fa x 60
Ts2
Koefisien Alat / M3 = 1 : Q2
Koefisien Alat / M3 = 1 : Q3
Koefisien Alat / M3 = 1 : Q3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,440,002.40 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp/m3 beton : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
7 Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Semen (PC) = Sm x Fh1
1.b. Pasir Beton = (Ps/1000 : D3) x Fh2
1.c. Agregat Kasar = (Kr/1000 : D4) x Fh2
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku = M19 x 12
1.f. Air = Air x Fh1
1.g. Plastizier = Plt x Fh 1
2. ALAT
2.a. CONCRETE MIXING PLANT;HZS25; 25 M3/JAM; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
No. URAIAN
- menumpahkan dll
Kap.Prod. / jam = V2 x Fa x 60
Ts2
Koefisien Alat / M3 = 1 : Q2
Koefisien Alat / M3 = 1 : Q3
Koefisien Alat / M3 = 1 : Q3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang :
Tk batu = 6
Tk Kayu = 24
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,367,666.95 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp/m3 beton : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
7 Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
II. URUTAN KERJA
1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixing Plant
2 Beton di-cor ke dalam bekisting yang telah disiapkan
3 Penyelesaian dan perapihan setelah pemasangan
1. BAHAN
1.a. Semen (PC) = Sm x Fh1
1.b. Pasir Beton = (Ps/1000 : D3) x Fh2
1.c. Agregat Kasar = (Kr/1000 : D4) x Fh2
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku = M19 x 12
1.f. Air = Air x Fh1
1.g. Plastizier = Plt x Fh1
2. ALAT
2.a. CONCRETE MIXING PLANT;HZS25; 25 M3/JAM; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
No. URAIAN
- menumpahkan dll
Kap.Prod. / jam = V2 x Fa x 60
Ts2
Koefisien Alat / M3 = 1 : Q2
Koefisien Alat / M3 = 1 : Q3
Koefisien Alat / M3 = 1 : Q3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang :
Tk batu = 6
Tk Kayu = 24
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,295,065.49 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp/m3 beton : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
7 Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
2. ALAT
2.a. CONCRETE MIXING PLANT;HZS25; 25 M3/JAM; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
No. URAIAN
- menumpahkan dll
Kap.Prod. / jam = V2 x Fa x 60
Ts2
Koefisien Alat / M3 = 1 : Q2
2.c. CONCRETE VIBRATOR; GX 160; 5,5 HP
Kebutuhan alat penggetar beton disesuaikan dengan
kapasitas produksi alat pencampur (concrete mixing plant) dibutuhkan
Koefisien Alat / M3 = 1 : Q3
Koefisien Alat / M3 = 1 : Q3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang :
Tk batu = 6
Tk Kayu = 24
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,227,072.11 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp/m3 beton : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
7 Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Semen (PC) = Sm x Fh1
1.b. Pasir Beton = (Ps/1000 : D3) x Fh2
1.c. Agregat Kasar = (Kr/1000 : D4) x Fh2
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku = M19 x 12
1.f. Air = Air x Fh1
1.g. Plastizier = Plt x Fh1
2. ALAT
2.a. CONCRETE MIXING PLANT;HZS25; 25 M3/JAM; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
No. URAIAN
- menumpahkan dll
Kap.Prod. / jam = V2 x Fa x 60
Ts2
Koefisien Alat / M3 = 1 : Q2
Koefisien Alat / M3 = 1 : Q3
Koefisien Alat / M3 = 1 : Q3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang :
Tk batu = 4
Tk Kayu = 8
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,283,776.07 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp/m3 beton : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
: Fly ash
7 Berat Isi : - Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Semen (PC) = Sm x Fh1
1.b. Pasir Beton = (Ps/1000 : D3) x Fh2
1.c. Agregat Kasar = (Kr/1000 : D4) x Fh2
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku = M19 x 12
1.f. Air = Air x Fh1
1.g. Plastizier = Plt x Fh1
1.h. = FA x FH1
2. ALAT
2.a. CONCRETE MIXING PLANT;HZS25; 25 M3/JAM; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Kap. Prod. / jam = V1 x Fa x 60
1000 x Ts1
Koefisien Alat / M3 = 1 : Q1
No. URAIAN
- menumpahkan dll
Kap.Prod. / jam = V2 x Fa x 60
Ts2
Koefisien Alat / M3 = 1 : Q2
Koefisien Alat / M3 = 1 : Q3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang :
Tk batu = 4
Tk Kayu = 8
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,182,258.40 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp/m3 beton : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
7 Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Semen (PC) = Sm x Fh1
1.b. Pasir Beton = (Ps/1000 : D3) x Fh2
1.c. Agregat Kasar = (Kr/1000 : D4) x Fh2
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku = M19 x 12
1.f. Air = Air x Fh1
1.g. Plastizier = Plt x Fh1
2. ALAT
2.a. CONCRETE MIXING PLANT;HZS25; 25 M3/JAM; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
No. URAIAN
- menumpahkan dll
Kap.Prod. / jam = V2 x Fa x 60
Ts2
Koefisien Alat / M3 = 1 : Q2
Koefisien Alat / M3 = 1 : Q3
Koefisien Alat / M3 = 1 : Q3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang :
Tk batu = 4
Tk Kayu = 8
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,137,596.30 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp/m3 beton : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
7 Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Semen (PC) = Sm x Fh1
1.b. Pasir Beton = (Ps/1000 : D3) x Fh2
1.c. Agregat Kasar = (Kr/1000 : D4) x Fh2
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku = M19 x 12
1.f. Air = Air x Fh1
1.g. Plastizier = Plt x Fh1
2. ALAT
2.a. CONCRETE MIXING PLANT;HZS25; 25 M3/JAM; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
No. URAIAN
- menumpahkan dll
Kap.Prod. / jam = V2 x Fa x 60
Ts2
Koefisien Alat / M3 = 1 : Q2
Koefisien Alat / M3 = 1 : Q3
Koefisien Alat / M3 = 1 : Q3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang :
Tk batu = 4
Tk Kayu = 8
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp. 2,220,096.30 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp/m3 beton : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
: Fly ash
7 Berat Isi : - Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Semen (PC) = Sm x Fh1
1.b. Pasir Beton = (Ps/1000 : D3) x Fh2
1.c. Agregat Kasar = (Kr/1000 : D4) x Fh2
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku = M19 x 12
1.f. Air = Air x Fh1
1.g. Plastizier = Plt x Fh1
1.h. Fly ash = FA x Fh1
2. ALAT
2.a. CONCRETE MIXING PLANT;HZS25; 25 M3/JAM; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
No. URAIAN
- menumpahkan dll
Kap.Prod. / jam = V2 x Fa x 60
Ts2
Koefisien Alat / M3 = 1 : Q2
Koefisien Alat / M3 = 1 : Q3
Koefisien Alat / M3 = 1 : Q3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang :
Tk batu = 4
Tk Kayu = 8
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp. : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
7 Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Semen (PC) = Sm x 1.03
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku = M19 x 12
1.f. Air = Air x Fh1
1.g. Plastizier = Plt x Fh1
2. ALAT
2.a. CONCRETE MIXER; 500 L; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
Koefisien Alat / M3 = 1 : Q3
No. URAIAN
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang :
Tk batu = 4
Tk Kayu = 8
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,235,913.98 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp. : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
7 Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Semen (PC) = Sm x 1.03
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku = M19 x 12
1.f. Air = Air x Fh1
1.g. Plastizier = Plt x Fh1
2. ALAT
2.a. CONCRETE MIXER; 500 L; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
Koefisien Alat / M3 = 1 : Q3
No. URAIAN
Koefisien Alat / M3 = 1 : Q3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,318,413.98 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp/m3 beton : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
: Fly ash
7 Berat Isi : - Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Semen (PC) = Sm x Fh1
1.b. Pasir Beton = (Ps/1000 : D3) x Fh2
1.c. Agregat Kasar = (Kr/1000 : D4) x Fh2
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku = M19 x 12
1.f. Air = Air x Fh1
1.g. Plastizier = Plt x Fh1
1.h. Fly ash = FA x Fh1
2. ALAT
2.a. CONCRETE MIXER; 500 L; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
Koefisien Alat / M3 = 1 : Q3
No. URAIAN
Koefisien Alat / M3 = 1 : Q3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang :
Tk batu = 4
Tk Kayu = 8
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,277,621.76 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp. : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
7 Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Pekerjaan Dinding Turap Kayu
1.b. Semen (PC) = Sm x 1.03
1.c. Pasir Beton = (Ps/1000 : D3) x 1.05
1.d. Agregat Kasar = (Kr/1000 : D4) x 1.05
1.e. Kayu Perancah dan/atau Bekisting
1.f. Paku = M19 x 12
1.g. Air = Air x Fh1
1.h. Plastizier = Plt x Fh1
2. ALAT
2.a. CONCRETE MIXER; 500 L; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
Koefisien Alat / M3 = 1 : Q3
No. URAIAN
Koefisien Alat / M3 = 1 : Q3
Koefisien Alat / M3 = 1 : Q2
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang :
Tk batu = 4
Tk Kayu = 8
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,985,776.19 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp. : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
7 Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Semen (PC) = Sm x 1.03
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku = M19 x 12
1.f. Air = Air x Fh1
1.g. Plastizier = Plt x Fh1
2. ALAT
2.a. CONCRETE MIXER; 500 L; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
Koefisien Alat / M3 = 1 : Q3
No. URAIAN
Koefisien Alat / M3 = 1 : Q3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang :
Tk batu = 4
Tk Kayu = 8
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,233,885.57 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp. : Semen
: Pasir
: Kerikil Pecah
: Air
7 Berat Isi :
- Beton
- Semen
- Pasir
- Kerikil Pecah (Agregat Kasar)
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Semen (PC) = Sm x 0.7 x 1.03
1.b. Pasir Beton = (Ps/1000 : D3) x 0.7 x 1.05
1.c. Agregat Kasar = (Kr/1000 : D4) x 0.7 x 1.05
1.d. Batu Belah = {(Kr/1000 x D1) : D4} x 0.30 * 1.05
1.e. Air = Air x Fh1
2. ALAT
2.a. CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
Koefisien Alat / M3 = 1 : Q2
No. URAIAN
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang
- Tk Batu = 4.00
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 1,071,781.4 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Camp. : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
7 Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
- Air
8 Faktor kehilangan bahan : Semen
: Agregat/pasir beton
1. BAHAN
1.a. Semen (PC) = Sm x 1.03
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05
1.d. Kayu Perancah dan/atau Bekisting
1.e. Paku = M19 x 12
1.f. Air = Air x Fh1
1.g. Plastizier = Plt x Fh1
2. ALAT
2.a. CONCRETE MIXER; 500 L; 15 HP
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
Koefisien Alat / M3 = 1 : Q3
No. URAIAN
2.c. WATER TANK TRUCK
Volume Tanki Air
Kebutuhan air / M3 beton
Faktor Efiesiensi Alat
Kapasitas pompa air
Koefisien Alat / M3 = 1 : Q3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang :
Tk batu = 4
Tk Kayu = 8
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,271,063.54 / M3
No. URAIAN
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari
3 Bentang PC I Girder
4 Mutu beton
5 Faktor kehilangan bahan
6 Dimensi Gelagar Lebar Gelaga bagian atas
Lebar Gelagar bagian bawah
Tinggi gelagar
Tinggi Profil atas
Tinggi profil bawah
Lebar badan Gelagar
Tinggi miring atas
Tinggi miring bawah
Tinggi badan tengah gelagar = H-h1-h2-h4-h5
Panjang miring
7 Luas penampang A atas = (Ba x h1) + ((Ba + Tb) x h2 / 2)
A tengah = Tb x H3
A bawah = (Bb x h5) + ((Bb + Tb) x h4 / 2)
Luas Total
8 Baja prategang KBjP-P7 NA/NR (d12,7-A92,9-B730)
9 Berat Isi - Grout semen (tanpa campuran pasir)
- Beton
Berat jenis - Baja
2. ALAT
2.a CRANE ON TRACK 70-100 TON; 190 HP
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu memuat dan membongkar
- dan lain-lain ( termasuk mengatur dan menggeser)
No. URAIAN
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian)
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari
3 Bentang PC I Girder
4 Mutu beton
5 Faktor kehilangan bahan
6 Dimensi Gelagar Lebar Gelaga bagian atas
Lebar Gelagar bagian bawah
Tinggi gelagar
Tinggi Profil atas
Tinggi profil bawah
Lebar badan Gelagar
Tinggi miring atas
Tinggi miring bawah
Tinggi badan tengah gelagar = H-h1-h2-h4-h5
Panjang miring atas
Panjang miring bawah
7 Luas penampang A atas = (Ba x h1) + ((Ba + Tb) x h2 / 2 )
A tengah = Tb x H3
A bawah = (Bb x h5) + ((Bb + Tb) x h4 / 2 )
Luas Total
8 Baja prategang KBjP-P7 NA/NR (d12,7-A92,9-B730)
9 Berat Isi - Grout semen (tanpa campuran pasir)
- Beton
Berat jenis - Baja
2. ALAT
2.a CRANE ON TRACK 70-100 TON; 190 HP
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu memuat dan membongkar
- dan lain-lain ( termasuk mengatur dan menggeser)
No. URAIAN
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian)
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
I. ASUMSI
1 PC I Girder dicetak di pabrik
2 Jam kerja efektif per-hari
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Tinggi PC I Girder
5 Bentang PC I Girder
6 Menggunakan beton fc'=45 Mpa
7 Berat total
8 Perletakan dibayar sesuai dengan item 7.6
2. ALAT
2.a CRANE ON TRACK 70-100 TON; 190 HP
Kapasitas
Berat Girder Total
Jumlah Crane diperlukan
Faktor Efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Waktu membawa dari stock pile = (L1 : V1) x 60
- Waktu kosong = (L1 : V2) x 60
- Waktu memuat dan membongkar
- Waktu test safety
- Waktu mengangkat, meletakkan pada perletakkan dll ( termasuk mengatur dan menggeser)
No. URAIAN
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian)
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
I. ASUMSI
1 PC I Girder dicetak di pabrik
2 Jam kerja efektif per-hari
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Tinggi PC I Girder
5 Bentang PC I Girder
6 Menggunakan beton fc'=45 Mpa
7 Berat total
8 Perletakan dibayar sesuai dengan item 7.6
2. ALAT
2.a CRANE ON TRACK 70-100 TON; 190 HP
Kapasitas
Berat Girder Total
Jumlah Crane diperlukan
Faktor Efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Waktu membawa dari stock pile = (L1 : V1) x 60
- Waktu kosong = (L1 : V2) x 60
- Waktu memuat dan membongkar
- Waktu test safety
- Waktu mengangkat, meletakkan pada perletakkan dll ( termasuk mengatur dan menggeser)
No. URAIAN
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian)
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari
3 Bentang PC I Girder
4 Mutu beton
5 Faktor kehilangan bahan
6 Dimensi Gelagar Lebar Gelaga bagian atas
Lebar Gelagar bagian bawah
Tinggi gelagar
Tinggi Profil atas
Tinggi profil bawah
Lebar badan Gelagar
Tinggi miring atas
Tinggi miring bawah
Tinggi badan tengah gelagar = H-h1-h2-h4-h5
Panjang miring atas
Panjang miring bawah
7 Luas penampang A atas = (Ba x h1) + ((Ba + Tb) x h2 / 2 )
A tengah = Tb x H3
A bawah = (Bb x h5) + ((Bb + Tb) x h4 / 2 )
Luas Total
8 Baja prategang KBjP-P7 NA/NR (d12,7-A92,9-B730)
9 Berat Isi - Grout semen (tanpa campuran pasir)
- Beton
Berat jenis - Baja
2. ALAT
2.a CRANE ON TRACK 70-100 TON; 190 HP
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu memuat dan membongkar
- dan lain-lain ( termasuk mengatur dan menggeser)
No. URAIAN
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian)
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
I. ASUMSI
1 PC I Girder dicetak di pabrik
2 Jam kerja efektif per-hari
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Tinggi PC I Girder
5 Bentang PC I Girder
6 Menggunakan beton fc'=45 Mpa
7 Berat total
8 Perletakan dibayar sesuai dengan item 7.6
No. URAIAN
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian)
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
I. ASUMSI
1 Kabel Prategang dan diterima di lokasi pek.
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Faktor Kehilangan Bahan
1. BAHAN
Kabel Prategang = 1 x Fh
2. ALAT
2.a DUMP TRUCK
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi = (L : v1 ) x 60
- Waktu tempuh kosong = (L : v2) x 60
- Lain-lain (bongkar dan muat)
Koefisien Alat = 1 : Q1
2.b CRANE
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu memuat dan membongkar
- dan lain-lain ( termasuk mengatur dan menggeser)
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
Rp. 513,345 / Kg
No. URAIAN
I. ASUMSI
1 Panel Full Depth Slab dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari
3 Bentang Panel Full Depth Slab
4 Mutu beton
5 Faktor kehilangan bahan
6 Dimensi Gelagar Panjang
Lebar
Tebal
7 Luas penampang =pxl
8 Berat Isi - Beton
Berat jenis - Baja
2. ALAT
2.a CRANE ON TRACK 70-100 TON; 190 HP
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu memuat dan membongkar
- dan lain-lain ( termasuk mengatur dan menggeser)
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian)
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
No. URAIAN
I. ASUMSI
1 Panel Full Depth Slab Girder dicetak di pabrik
2 Jam kerja efektif per-hari
3 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Menggunakan beton fc'=45 Mpa
6 Berat total
2. ALAT
2.a CRANE ON TRACK 70-100 TON; 190 HP
Kapasitas
Berat Girder Total
Jumlah Crane diperlukan
Faktor Efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Waktu membawa dari stock pile = (L1 : V1) x 60
- Waktu kosong = (L1 : V2) x 60
- Waktu memuat dan membongkar
- Waktu test safety
- Waktu mengangkat, meletakkan pada perletakkan dll ( termasuk mengatur dan menggeser)
No. URAIAN
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian)
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Faktor Kehilangan Besi Tulangan
1. BAHAN
1.a. Baja Tulangan Polos BjTP 280 = 1 x Fh
1.b. Kawat beton
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja
- Kunci Pembengkok Tulangan
- Alat lainnya
3. TENAGA
Produksi kerja satu hari
dibutuhkan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt
Rp. 15,063.40 / Kg
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Faktor Kehilangan Besi Tulangan
1. BAHAN
1.a. Baja Tulangan Sirip BjTS 280 = 1 x Fh
1.b. Kawat beton
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja
- Kunci Pembengkok Tulangan
- Alat lainnya
3. TENAGA
Produksi kerja satu hari
dibutuhkan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt
Rp. 15,063.40 / Kg
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Faktor Kehilangan Besi Tulangan
II. URUTAN KERJA
1 Besi tulangan dipotong dan dibengkokkan sesuai
dengan yang diperlukan
2 Batang tulangan dipasang / disusun sesuai dengan
Gambar Pelaksanaan dan persilangannya diikat kawat
1. BAHAN
1.a. Baja Tulangan Sirip BjTS 420 A = 1 x Fh
1.b. Kawat beton
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja
- Kunci Pembengkok Tulangan
- Alat lainnya
3. TENAGA
Produksi kerja satu hari
dibutuhkan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt
Rp. 15,063.40 / Kg
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Faktor Kehilangan Besi Tulangan
1. BAHAN
1.a. Baja Tulangan Sirip BjTS 420 B = 1 x Fh
1.b. Kawat beton
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja
- Kunci Pembengkok Tulangan
- Alat lainnya
3. TENAGA
Produksi kerja satu hari
dibutuhkan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp. 15,746.38 / Kg
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Faktor Kehilangan Besi Tulangan
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari
dibutuhkan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt
Rp. 15,063.40 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Faktor Kehilangan Besi Tulangan
1. BAHAN
1.a. Baja Tulangan Sirip BjTS 550 = 1 x Fh
1.b. Kawat beton
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja
- Kunci Pembengkok Tulangan
- Alat lainnya
3. TENAGA
Produksi kerja satu hari
dibutuhkan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Faktor Kehilangan Besi Tulangan
1. BAHAN
1.a. Baja Tulangan Sirip BjTS 700 = 1 x Fh
1.b. Kawat beton
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja
- Kunci Pembengkok Tulangan
- Alat lainnya
3. TENAGA
Produksi kerja satu hari
dibutuhkan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt
Rp. 15,063.40 / Kg
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi Jembatan
3 Bahan dasar (besi) dan kawat las diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Faktor Kehilangan Besi Tulangan
1. BAHAN
1.a. Baja Tulangan = 1 x Fh
1.b. Kawat Las
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja
- Kunci Pembengkok Tulangan
- Alat lainnya
3. TENAGA
Produksi kerja satu hari
dibutuhkan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt
Rp. 17,538.40 / Kg
No. URAIAN
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Jarak pabrik ke Lokasi Jembatan
6 Berat Rangka Baja per komponen
1. BAHAN
Baja Struktur Grade 250 (Kuat Leleh 250 MPa)
2. ALAT
2.a TRAILER TRONTON 30 T; 200 HP
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi = (Ld2 : v1 ) x 60
- Waktu tempuh kosong = (Ld2 : v2) x 60
- Lain-lain (bongkar dan muat)
Koefisien Alat / kg = 1 : Q1
No. URAIAN
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp. 16,953.6 / Kg
No. URAIAN
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Jarak pabrik ke Lokasi Jembatan
6 Berat Rangka Baja per komponen
1. BAHAN
Baja Struktur Grade 345 (Kuat Leleh 345 MPa)
2. ALAT
2.a TRAILER TRONTON 30 T; 200 HP
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi = (Ld2 : v1 ) x 60
- Waktu tempuh kosong = (Ld2 : v2) x 60
- Lain-lain (bongkar dan muat)
Koefisien Alat / kg = 1 : Q1
2.b CRANE ON TRACK (75-100) T; 190 HP
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu membongkar
- dan lain-lain ( termasuk mengatur dan menggeser)
No. URAIAN
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 19,166.5 / Kg
No. URAIAN
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Jarak pabrik ke Lokasi Jembatan
6 Berat Rangka Baja per komponen
1. BAHAN
Baja Struktur Grade 485 (Kuat Leleh 485 MPa)
2. ALAT
2.a TRAILER TRONTON 30 T; 200 HP
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi = (Ld2 : v1 ) x 60
- Waktu tempuh kosong = (Ld2 : v2) x 60
- Lain-lain (bongkar dan muat)
Koefisien Alat / kg = 1 : Q1
No. URAIAN
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 20,266.5 / Kg
No. URAIAN
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Jarak pabrik ke Lokasi Jembatan
6 Berat Rangka Baja per komponen
A. PENGADAAN
1. BAHAN
Baja Struktur Grade 690 (Kuat Leleh 690 Mpa untuk Tebal Pelat ≤ 2,5 inch)
2. ALAT
2.a TRAILER TRONTON 30 T; 200 HP
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi = (Ld2 : v1 ) x 60
- Waktu tempuh kosong = (Ld2 : v2) x 60
- Lain-lain (bongkar dan muat)
Koefisien Alat / kg = 1 : Q1
No. URAIAN
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 24,666.5 / Kg
No. URAIAN
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Jarak pabrik ke Lokasi Jembatan
6 Berat Rangka Baja per komponen
1. BAHAN
Baja Struktur Grade 690 (Kuat Leleh 620 Mpa untuk Tebal Pelat > 2,5 - 4,0 inch)
2. ALAT
2.a TRAILER TRONTON 30 T; 200 HP
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi = (Ld2 : v1 ) x 60
- Waktu tempuh kosong = (Ld2 : v2) x 60
- Lain-lain (bongkar dan muat)
Koefisien Alat / kg = 1 : Q1
No. URAIAN
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 21,366.5 / Kg
No. URAIAN
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Jarak pabrik ke Lokasi Jembatan
6 Berat Rangka Baja per komponen
2. ALAT
2.b. CRANE ON TRACK (75-100) T; 190 HP
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu penggeseran
- Waktu Erection
- Waktu lain-lain ( perkuatan rangka )
3. TENAGA
Produksi Rangka baja (Prod. Crane menentukan)
Kebutuhan tenaga tambahan di lokasi :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt
Rp. 3,125.3 / Kg
No. URAIAN
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Jarak pabrik ke Lokasi Jembatan
6 Berat Rangka Baja per komponen
1. BAHAN
Baja Struktur BJ 37 (Titik Leleh 240 MPa)
2. ALAT
2.a TRAILER TRONTON 30 T; 200 HP
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi = (Ld2 : v1 ) x 60
- Waktu tempuh kosong = (Ld2 : v2) x 60
- Lain-lain (bongkar dan muat)
No. URAIAN
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 16,966.5 / Kg
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Jarak pabrik ke Lokasi Jembatan
6 Berat Rangka Baja per komponen
1. BAHAN
Sudah ada
2. ALAT
2.a. CRANE ON TRACK (75-100) T; 190 HP
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu penggeseran
- Waktu Erection
- Waktu lain-lain ( perkuatan rangka )
3. TENAGA
Produksi Rangka baja (Prod. Crane menentukan)
Kebutuhan tenaga tambahan di lokasi :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt
Rp. 3,125.3 / Kg
No. URAIAN
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Jarak pabrik ke Lokasi Jembatan
6 Berat Rangka Baja per komponen
1. BAHAN
Sudah ada
2. ALAT
2.a. CRANE ON TRACK (75-100) T; 190 HP
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu penggeseran
- Waktu Erection
- Waktu lain-lain ( perkuatan rangka )
3. TENAGA
Produksi Rangka baja (Prod. Crane menentukan)
Kebutuhan tenaga tambahan di lokasi :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt
Rp. 3,125.3 / Kg
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............
No. URAIAN
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Jarak pabrik ke Lokasi Jembatan
6 Berat Rangka Baja per komponen
1. BAHAN
Baja Struktur BJ 37 (Titik Leleh 240 MPa)
2. ALAT
2.a TRAILER TRONTON 30 T; 200 HP
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi = (Ld2 : v1 ) x 60
- Waktu tempuh kosong = (Ld2 : v2) x 60
- Lain-lain (bongkar dan muat)
Koefisien Alat / kg = 1 : Q1
No. URAIAN
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp. 16,966.5 / Kg
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Hargta Beton fc' ≥ 15 MPa SCC di lokasi Pekerjaan
3 Beton tidak menggunakan baja tulangan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Panjang tiang
7 Ukuran diameter tiang bor beton
8 Fahtor kehilangan bahan
1. BAHAN
1.a. Beton fc' 15 MPa = {1/4 Phi x (Uk)^2) x Fh1 x 1m
1.b. Penampang pile = 0,25x22/7 x d^2
1.c. Casing, diameter 800 mm
2. ALAT
2.a. Bore Pile Machine, Diameter Maks 2m; 150 HP
Koefisien Alat / kg = 1 : Q1
3. TENAGA
Produksi Tiang dalam 1 titik bor = Q1
Kebutuhan tenaga tambahan di lokasi :
- Mandor
- Tukang
- Pekerja
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Hargta Beton fc' ≥ 30 MPa SCC di lokasi Pekerjaan
3 Beton tidak menggunakan baja tulangan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Panjang tiang
7 Ukuran diameter tiang bor beton
8 Kebutuhan Baja tulangan 12mm
9 Fahtor kehilangan bahan
1. BAHAN
1.a. Beton fc' 15 MPa = {1/4 Phi x (Uk)^2) x Fh1 x 1m
1.b. Penampang pile = 0,25x22/7 x d^2
1.c. Baja Tulangan = 0,7% x A x 7850
1.d. Casing, diameter 800 mm
2. ALAT
2.a. Bore Pile Machine, Diameter Maks 2m; 150 HP
Koefisien Alat / kg = 1 : Q1
3. TENAGA
Produksi Tiang dalam 1 titik bor = Q1
Kebutuhan tenaga tambahan di lokasi :
- Mandor
- Tukang
- Pekerja
No. URAIAN
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Hargta Beton fc' ≥ 15 MPa SCC di lokasi Pekerjaan
3 Beton tidak menggunakan baja tulangan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Panjang tiang
7 Ukuran diameter tiang bor beton
8 Fahtor kehilangan bahan
1. BAHAN
1.a. Beton fc' 15 MPa = {1/4 Phi x (Uk)^2) x Fh1 x 1m
1.b. Penampang pile = 0,25x22/7 x d^2
1.c. Casing, diameter 800 mm
2. ALAT
2.a. Bore Pile Machine, Diameter Maks 2m; 150 HP
3. TENAGA
Produksi Tiang dalam 1 titik bor = Q1
Kebutuhan tenaga tambahan di lokasi :
- Mandor
- Tukang
- Pekerja
No. URAIAN
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Hargta Beton fc' ≥ 30 MPa SCC di lokasi Pekerjaan
3 Beton tidak menggunakan baja tulangan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Panjang tiang
7 Ukuran diameter tiang bor beton
8 Kebutuhan Baja tulangan 12mm
9 Fahtor kehilangan bahan
1. BAHAN
1.a. Beton fc' 15 MPa = {1/4 Phi x (Uk)^2) x Fh1 x 1m
1.b. Penampang pile = 0,25x22/7 x d^2
1.c. Baja Tulangan = 0,7% x A x 7850
1.d. Casing, diameter 800 mm
2. ALAT
2.a. Bore Pile Machine, Diameter Maks 2m; 150 HP
Koefisien Alat / kg = 1 : Q1
No. URAIAN
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Hargta Beton fc' ≥ 15 MPa SCC di lokasi Pekerjaan
3 Beton tidak menggunakan baja tulangan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Panjang tiang
7 Ukuran diameter tiang bor beton
8 Fahtor kehilangan bahan
1. BAHAN
1.a. Beton fc' 15 MPa = {1/4 Phi x (Uk)^2) x Fh1 x 1m
1.b. Penampang pile = 0,25x22/7 x d^2
1.c. Casing, diameter 800 mm
2. ALAT
2.a. Bore Pile Machine, Diameter Maks 2m; 150 HP
Koefisien Alat / kg = 1 : Q1
3. TENAGA
Produksi Tiang dalam 1 titik bor = Q1
Kebutuhan tenaga tambahan di lokasi :
- Mandor
- Tukang
- Pekerja
No. URAIAN
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Hargta Beton fc' ≥ 30 MPa SCC di lokasi Pekerjaan
3 Beton tidak menggunakan baja tulangan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Panjang tiang
7 Ukuran diameter tiang bor beton
8 Kebutuhan Baja tulangan 12mm
9 Fahtor kehilangan bahan
1. BAHAN
1.a. Beton fc' 15 MPa = {1/4 Phi x (Uk)^2) x Fh1 x 1m
1.b. Penampang pile = 0,25x22/7 x d^2
1.c. Baja Tulangan = 0,7% x A x 7850
1.d. Casing, diameter 800 mm
2. ALAT
2.a. Bore Pile Machine, Diameter Maks 2m; 150 HP
Koefisien Alat / kg = 1 : Q1
3. TENAGA
Produksi Tiang dalam 1 titik bor = Q1
Kebutuhan tenaga tambahan di lokasi :
- Mandor
- Tukang
- Pekerja
No. URAIAN
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Hargta Beton fc' ≥ 15 MPa SCC di lokasi Pekerjaan
3 Beton tidak menggunakan baja tulangan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Panjang tiang
7 Ukuran diameter tiang bor beton
8 Fahtor kehilangan bahan
1. BAHAN
1.a. Beton fc' 15 MPa = {1/4 Phi x (Uk)^2) x Fh1 x 1m
1.b. Penampang pile = 0,25x22/7 x d^2
1.c. Casing, diameter 800 mm
2. ALAT
2.a. Bore Pile Machine, Diameter Maks 2m; 150 HP
Koefisien Alat / kg = 1 : Q1
3. TENAGA
Produksi Tiang dalam 1 titik bor = Q1
Kebutuhan tenaga tambahan di lokasi :
- Mandor
- Tukang
- Pekerja
No. URAIAN
Koefisien Tenaga / m'
- Mandor = M / Qt
- Tukang = T / Qt
- Pekerja = P / Qt
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Hargta Beton fc' ≥ 30 MPa SCC di lokasi Pekerjaan
3 Beton tidak menggunakan baja tulangan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Panjang tiang
7 Ukuran diameter tiang bor beton
8 Kebutuhan Baja tulangan 12mm
9 Fahtor kehilangan bahan
1. BAHAN
1.a. Beton fc' 15 MPa = {1/4 Phi x (Uk)^2) x Fh1 x 1m
1.b. Penampang pile = 0,25x22/7 x d^2
1.c. Baja Tulangan = 0,7% x A x 7850
1.d. Casing, diameter 800 mm
2. ALAT
2.a. Bore Pile Machine, Diameter Maks 2m; 150 HP
Koefisien Alat / kg = 1 : Q1
3. TENAGA
Produksi Tiang dalam 1 titik bor = Q1
Kebutuhan tenaga tambahan di lokasi :
- Mandor
- Tukang
- Pekerja
No. URAIAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
B.
1.
2.
3.
4.
711 5.
1,138 945 6.
(M12) 516.030 Kg 1210 7.
(M01a) 0.4902 M3
(M03) 0.7850 M3
(M19) 0.4000 M3
(M18) 4.8000 Kg C.
(M170) 190.550 Ltr
(M182) 1.548 Kg 1.
2
3
(E80) 4
V1 500.00 liter 5
Fa 0.83 -
Ts
T1 0.00 menit
T2 1.10 menit
T3 0.15 menit D.
T4 0.00 menit E.
Ts1 1.25 menit F.
Note: 1
Q1 19.920 M3/jam
2
T1 15.06 menit
T2 26.18 menit
T3 13.09
Berlanjut ke hal. berikut.
Analisa EI-711
T4 5.00 menit
Ts2 59.32 menit
Q2 4.1974 M3
(E20)
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
lumpsum
Qt 139.44 M3
M 2.00 orang
Tb 30.00 orang
P 12.00 orang
Analisa EI-712
PROYEK
No. PAKET KONTRAK
NAMA PAKET
B.
1.
2.
3.
4.
724 5.
1,160 945 6.
(M12) 477.209 Kg 1210 7.
(M01a) 0.4991 M3
(M03) 0.7997 M3
(M19) 0.4000 M3
(M18) 4.8000 Kg C.
(M170) 190.550 Ltr
(M182) 1.432 Kg 1.
2
3
(E80) 4
V1 500.00 liter 5
Fa 0.83 -
Ts
T1 0.00 menit
T2 1.10 menit
T3 0.15 menit D.
T4 0.00 menit E.
Ts1 1.25 menit F.
Note: 1
Q1 19.920 M3/jam
2
(E80) 0.0502 jam
3
(E49) 4
V2 5.00 M3
Fa 0.83 -
v1 20.00 KM / Jam
v2 40.00 KM / Jam
T1 15.06 menit
T2 26.18 menit
T3 13.09
Berlanjut ke hal. berikut.
Analisa EI-712
T4 5.00 menit
Ts2 59.32 menit
Q2 4.1974 M3
(E20)
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
lumpsum
Qt 139.44 M3
M 2.00 orang
Tb 30.00 orang
P 12.00 orang
Analisa EI-713
PROYEK
No. PAKET KONTRAK
NAMA PAKET
B.
1.
2.
3.
4.
758 5.
1,164 945 6.
(M12) 433.754 Kg 1210 7.
(M01a) 0.5228 M3
(M03) 0.8030 M3
(M19) 0.4000 M3
(M18) 4.8000 Kg C.
(M170) 190.550 Ltr
(M182) 1.301 Kg 1.
2
3
(E80) 4
V1 500.00 liter 5
Fa 0.83 -
Ts
T1 0.00 menit
T2 1.10 menit
T3 0.15 menit D.
T4 0.00 menit E.
Ts1 1.25 menit F.
Note: 1
Q1 19.920 M3/jam
2
T1 15.06 menit
T2 26.18 menit
T3 13.09
Berlanjut ke hal. berikut.
Analisa EI-713
T4 5.00 menit
Ts2 59.32 menit
Q2 4.1974 M3
(E20)
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
lumpsum
Qt 139.44 M3
M 1.00 orang
Tb 30.00 orang
P 12.00 orang
Analisa EI-714
PROYEK
No. PAKET KONTRAK
NAMA PAKET
1.
2.
3.
4.
793 5.
1,169 945 6.
(M12) 389.433 Kg 1210 7.
(M01a) 0.5468 M3
(M03) 0.8061 M3
(M19) 0.4000 M3
(M18) 4.8000 Kg C.
(M170) 190.550 Ltr
(M182) 1.168 Kg 1.
2
3
4
V1 500.00 liter 5
Fa 0.83 -
Ts
T1 0.00 menit
T2 1.10 menit
T3 0.15 menit D.
T4 0.00 menit E.
Ts1 1.25 menit F.
Note: 1
Q1 19.920 M3/jam
2
T1 15.06 menit
T2 26.18 menit
T3 13.09
Berlanjut ke hal. berikut.
Analisa EI-714
Q2 4.1974 M3
(E20)
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
lumpsum
Qt 139.44 M3
M 1.00 orang
Tb 30.00 orang
P 12.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
B.
1.
2.
3.
4.
829 5.
1,172 945 6.
(M12) 346.894 Kg 1210 7.
(M01a) 0.5718 M3
(M03) 0.8080 M3
(M19) 0.4000 M3
(M18) 4.8000 Kg C.
(M170) 190.550 Ltr
(M182) 1.041 Kg 1.
2
3
(E80) 4
V1 500.00 M3/jam 5
Fa 0.83 -
Ts
T1 0.00 menit
T2 1.10 menit
T3 0.15 menit D.
T4 0.00 menit E.
Ts1 1.25 menit F.
Note: 1
Q1 19.920 M3/jam
2
T1 15.06 menit
T2 26.18 menit
T3 13.09
Berlanjut ke hal. berikut.
Analisa EI-715a
T4 5.00 menit
Ts2 59.32 menit
Q2 4.1974 M3
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
lumpsum
Qt 139.44 M3
M 2.00 orang
Tb 30.00 orang
P 12.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
B.
1.
2.
3.
4.
829 5.
1,172 945 6.
(M12) 346.894 Kg 1210 7.
(M01a) 0.5718 M3
(M03) 0.8080 M3
(M19) 0.4000 M3
(M18) 4.8000 Kg C.
(M170) 190.550 Ltr
(M182) 1.041 Kg 1.
2
3
(E80) 4
V1 500.00 M3/jam 5
Fa 0.83 - 6
Ts
T1 0.00 menit
T2 1.10 menit
T3 0.15 menit D.
T4 0.00 menit E.
Ts1 1.25 menit F.
Note: 1
Q1 19.920 M3/jam
2
T1 15.06 menit
T2 26.18 menit
T3 13.09
Berlanjut ke hal. berikut.
Analisa EI-715b
T4 5.00 menit
Ts2 59.32 menit
Q2 4.1974 M3
(E20)
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
lumpsum
Qt 139.44 M3
M 1.00 orang
Tb 12.00 orang
P 8.00 orang
Analisa EI-715c
PROYEK
No. PAKET KONTRAK
NAMA PAKET
B.
1.
2.
3.
4.
819 5.
983 945 6.
(M12) 336.810 Kg 1210 7.
(M01a) 0.5648 M3 8.
(M03) 0.6778 M3
(M19) 0.4000 M3
(M18) 4.8000 Kg
(M136) 224.540 Ltr C.
(M148) 1.010 Kg
(M05) 112.27 Kg 1.
2
(E80) 3
V1 500.00 liter 4
Fa 0.83 - 5
Ts
T1 0.00 menit
T2 1.10 menit
T3 0.15 menit
T4 0.00 menit D.
Ts1 1.25 menit E.
F.
Q1 19.920 M3/jam Note: 1
2
(E80) 0.0502 jam
(E49) 3
V2 5.00 M3 4
Fa 0.83 -
v1 20.00 KM / Jam
v2 40.00 KM / Jam
T1 15.06 menit
T2 26.18 menit
T3 13.09
Berlanjut ke hal. berikut.
Analisa EI-715c
T4 5.00 menit
Ts2 59.32 menit
Q2 4.1974 M3
(E20)
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
(E23) 0.0382 jam
lumpsum
Qt 139.44 M3
M 1.00 orang
Tb 12.00 orang
P 8.00 orang
Analisa EI-716a
PROYEK
No. PAKET KONTRAK
NAMA PAKET
B.
1.
2.
3.
4.
885 5.
1,152 945 6.
(M12) 307.970 Kg 1210 7.
(M01a) 0.6104 M3
(M03) 0.7944 M3
(M19) 0.4000 M3
(M18) 4.8000 Kg C.
(M170) 190.550 Ltr
(M182) 0.924 Kg 1.
2
3
(E80) 4
V1 500.00 liter 5
Fa 0.83 -
Ts
T1 0.00 menit
T2 1.10 menit
T3 0.15 menit D.
T4 0.00 menit E.
Ts1 1.25 menit F.
Note: 1
Q1 19.920 M3/jam
2
T1 15.06 menit
T2 26.18 menit
T3 13.09
Berlanjut ke hal. berikut.
Analisa EI-716a
T4 5.00 menit
Ts2 59.32 menit
Q2 4.1974 M3
(E20)
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
lumpsum
Qt 139.44 M3
M 1.00 orang
Tb 12.00 orang
P 8.00 orang
Analisa EI-716b
PROYEK
No. PAKET KONTRAK
NAMA PAKET
B.
1.
2.
3.
4.
885 5.
1,152 945 6.
(M12) 307.970 Kg 1210 7.
(M01a) 0.6104 M3
(M03) 0.7944 M3
(M19) 0.4000 M3
(M18) 4.8000 Kg C.
(M136) 190.550 Ltr
(M148) 0.924 Kg 1.
2
3
(E80) 4
V1 500.00 liter 5
Fa 0.83 - 6
Ts
T1 0.00 menit
T2 1.10 menit
T3 0.15 menit D.
T4 0.00 menit E.
Ts1 1.25 menit F.
Note: 1
Q1 19.920 M3/jam
2
T1 15.06 menit
T2 26.18 menit
T3 13.09
Berlanjut ke hal. berikut.
Analisa EI-716b
T4 5.00 menit
Ts2 59.32 menit
Q2 4.1974 M3
(E20)
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
lumpsum
Qt 139.44 M3
M 1.00 orang
Tb 12.00 orang
P 8.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
B.
1.
2.
3.
4.
847 5.
977 945 6.
(M12) 317.240 Kg 1210 7.
(M01a) 0.5844 M3 8.
(M03) 0.6734 M3
(M19) 0.4000 M3
(M18) 4.8000 Kg
(M170) 224.540 Ltr C.
(M182) 0.952 Kg
(M05) 105.060 Kg 1.
2
(E80) 3
V1 500.00 M3/jam 4
Fa 0.83 - 5
Ts
T1 0.00 menit
T2 1.10 menit
T3 0.15 menit
T4 0.00 menit D.
Ts1 1.25 menit E.
F.
Q1 19.920 M3/jam Note: 1
2
(E80) 0.0502 jam
(E49) 3
V2 5.00 M3 4
Fa 0.83 -
v1 20.00 KM / Jam
v2 40.00 KM / Jam
T1 15.06 menit
T2 26.18 menit
T3 13.09
Berlanjut ke hal. berikut.
Analisa EI-716c
T4 5.00 menit
Ts2 59.32 menit
Q2 4.1974 M3
(E20)
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
lumpsum
Qt 139.44 M3
M 1.00 orang
Tb 12.00 orang
P 8.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
B.
1.
2.
3.
4.
(M12) 272.950 Kg 920 5.
(M01a) 0.6343 M3 1,149 945 6.
(M03) 0.7922 M3 1210 7.
(M19) 0.4000 M3
(M18) 4.8000 Kg
(M170) 190.550 Ltr
(M182) 0.819 Kg C.
1.
(E43) 2
V 500.00 liter 3
Fa 0.83 - 4
Ts
T1 2.00 menit
T2 6.00 menit
T3 1.00 menit
T4 1.00 menit
Ts 10.00 menit D.
E.
Q1 2.490 M3/jam F.
Note: 1
(E20)
3
n vib 6 buah lihat Spesifikasi 4
butuh 6 bh utk 20m3
Q3 0.415 M3
Analisa El-717a
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
(E23) 0.0382 jam
lumpsum
Qt 17.43 M3
M 1.00 orang
Tb 12.00 orang
P 8.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
B.
1.
2.
3.
4.
(M12) 272.950 Kg 920 5.
(M01a) 0.6343 M3 1,149 945 6.
(M03) 0.7922 M3 1210 7.
(M19) 0.4000 M3
(M18) 4.8000 Kg
(M170) 190.550 Ltr
(M182) 0.819 Kg C.
1.
(E43) 2
V 500.00 liter 3
Fa 0.83 - 4
Ts 5
T1 2.00 menit
T2 6.00 menit
T3 1.00 menit
T4 1.00 menit
Ts 10.00 menit D.
E.
Q1 2.490 M3/jam F.
Note: 1
(E20)
3
n vib 6 buah lihat Spesifikasi 4
butuh 6 bh utk 20m3
Q3 0.415 M3
Analisa El-717b
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
lumpsum
Qt 17.43 M3
M 1.00 orang
Tb 12.00 orang
P 8.00 orang
Analisa EI-717c
URAIAN ANALISA HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
B.
1.
2.
3.
4.
860 5.
991 945 6.
(M12) 295.610 Kg 1210 7.
(M01a) 0.5931 M3 8.
(M03) 0.6836 M3
(M19) 0.4000 M3
(M18) 4.8000 Kg
(M170) 224.540 Ltr C.
(M182) 0.887 Kg
(M05) 98.468 Kg 1.
2
(E43) 3
V 500.00 liter 4
Fa 0.83 -
Ts
T1 2.00 menit
T2 6.00 menit
T3 1.00 menit
T4 1.00 menit D.
Ts 10.00 menit E.
F.
Q1 2.490 M3/jam Note: 1
2
(E43) 0.4016 jam
(E20) 3
4
n vib 6 buah lihat Spesifikasi
butuh 6 bh utk 20m3
Q3 0.415 M3
Analisa EI-717c
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
lumpsum
Qt 17.43 M3
M 2.00 orang
Tb 12.00 orang
P 8.00 orang
(L03) 0.8032 jam
(L02) 4.8193 jam
(L01) 3.2129 jam
Analisa El-717d
PROYEK
No. PAKET KONTRAK
NAMA PAKET
B.
1.
1.
2.
3.
920 4.
(EI763) 0.00618 M3 945 5.
(M12) 272.950 Kg 1,149 1210 6.
(M01a) 0.6343 M3 7.
(M03) 0.7922 M3
(M19) 0.4000 M3
(M18) 4.8000 Kg
(M170) 190.550 Ltr C.
(M182) 0.819 Kg
1.
2
(E43) 3
V 500.00 liter 4
Fa 0.83 - 5.
Ts
T1 2.00 menit
T2 6.00 menit
T3 1.00 menit
T4 1.00 menit D.
Ts 10.00 menit E.
F.
Q1 2.490 M3/jam Note: 1
2
(E43) 0.4016 jam
(E20) 3
4
n vib 6 buah lihat Spesifikasi
butuh 6 bh utk 20m3
Q2 0.415 M3
Analisa El-717d
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
(E23)
Pa 100.00 liter/menit
Fa 0.83 -
Q4 4.98 M3
lumpsum
Qt 17.43 M3
M 1.00 orang
Tb 12.00 orang
P 8.00 orang
Analisa El-718
PROYEK
No. PAKET KONTRAK
NAMA PAKET
B.
1.
2.
3.
4.
(M12) 271.920 Kg 941 5.
(M01a) 0.6488 M3 1,129 945 6.
(M03) 0.7784 M3 1210 7.
(M19) 0.4000 M3
(M18) 4.8000 Kg
(M170) 190.550 Ltr
(M182) 0.816 Kg C.
1.
(E43) 2
V 500.00 liter 3
Fa 0.83 - 4
Ts
T1 2.00 menit
T2 6.00 menit
T3 1.00 menit
T4 1.00 menit
Ts 10.00 menit D.
E.
Q1 2.490 M3/jam F.
Note: 1
(E20)
3
n vib 6 buah lihat Spesifikasi 4
butuh 6 bh utk 20m3
Q3 0.415 M3
Analisa El-718
(E23)
V 4.00 M3
Wc 0.19 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q3 26.21 M3
lumpsum
Qt 17.43 M3
M 1.00 orang
Tb 12.00 orang
P 8.00 orang
B.
1.
2.
3.
4.
5.
(M12) 190.344 Kg
(M01) 0.4542 M3
(M03) 0.6118 M3
(M06) 0.5769 M3 C.
(M170) 190.550 Kg
1.
2.
3.
(E06)
V 600.00 liter
Fa 0.83 -
Ts
T1 2.00 menit
T2 6.00 menit
T3 1.00 menit D.
T4 1.00 menit E.
Ts 10.00 menit F.
Note: 1
Q1 2.988 M3
2
Q2 26.21 M3
(E23) 0.0382 jam
Analisa El-719
lumpsum
Qt 20.92 M3
M 1.00 orang
Tb 4.00 orang
1 Tk = 20 m3 btn
P 8.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
1.
2.
3.
4.
(M12) 237.930 Kg 864 5.
(M01a) 0.5960 M3 1,327 945 6.
(M03) 0.9153 M3 1210 7.
(M19) 0.4000 M3
(M18) 4.8000 Kg
(M170) 166.860 Ltr
(M182) 0.714 Kg C.
1.
(E43) 2
V 500.00 liter 3
Fa 0.83 - 4
Ts
T1 2.00 menit
T2 6.00 menit
T3 1.00 menit
T4 1.00 menit
Ts 10.00 menit D.
E.
Q1 2.490 M3/jam F.
Note: 1
(E20)
3
n vib 6 buah lihat Spesifikasi 4
butuh 6 bh utk 20m3
Q3 0.415 M3
Analisa El-7110
Q3 26.21 M3
lumpsum
Qt 17.43 M3
M 1.00 orang
Tb 12.00 orang
P 8.00 orang
B.
1.
2
Vol 5.9534 M3 3
934.68 kg 4
N 4 titik/buah 5
n 4 buah 6
B. Str 192.4864 kg
8.00 Buah
D. sel 54 mm
Pj. Sel 65.92 m' C.
333.63 kg 1.
2.
3
(E51) 4.
V1 1.00 Buah sepasang
Fa 0.83 -
T1 30.00 menit
T2 15.00 menit
Ts1 45.00 menit
D.
Q1 1.11 Bh/jam E.
F.
(E51) 0.9036 jam Note: 1
(E62) 2
V2 1.00 Titik
Fa 0.83 -
N 4 Titik/ Buah 3
4
T1 15.00 menit
T2 15.00 menit
Ts2 30.00 menit
Analisa El-721a
Q2 6.64 Ttk/jam
(E56)
V3 1.00 Titik
Fa 0.83 -
T1 15.00 menit
T2 20.00 menit
Ts3 35.00 menit
Q3 5.69 Ttk/jam
Ls
Qt 7.75 Buah
M 1.00 orang
Tb 5.00 orang
P 15.00 orang
B.
1.
2
3
Vol 12.5531 M3 4
1,970.84 kg 5
N 4 titik/buah 6
n 4 buah
B. Str 300.76 kg
8.00 Buah
D. sel 54 mm C.
Pj. Sel 103 m' 1.
524.71 kg 2.
3
4.
(E51)
V1 1.00 Buah sepasang
Fa 0.83 -
T1 30.00 menit
T2 15.00 menit
Ts1 45.00 menit D.
Q1 1.11 Bh/jam E.
F.
(E51) 0.9036 jam Note: 1
(E62) 2
V2 1.00 Titik
Fa 0.83 -
N 4 Titik/ Buah 3
4
T1 15.00 menit
T2 15.00 menit
Ts2 30.00 menit
Analisa El-721a
Q2 6.64 Ttk/jam
(E56)
V3 1.00 Titik
Fa 0.83 -
T1 15.00 menit
T2 20.00 menit
Ts3 35.00 menit
Q3 5.69 Ttk/jam
Ls
Qt 7.75 Buah
M 1.00 orang
Tb 5.00 orang
P 15.00 orang
Analisa El-722a
14.29 ton
1.10
NO.
A.
1.
2.
3.
(E51)
V 1 Buah
Brt.G 14.3 Ton
N 2 Buah
Fa 0.83 Ton
v1 40.00 Km/Jam B.
v2 60.00 Km/Jam
T1 13.09 menit
T2 8.73 menit
T3 20.00 menit Asumsi
T4 15.00 menit Asumsi
T5 20.00 menit Asumsi
Ts 76.81 menit
Q1 0.65 Bh/jam
C.
(E51) 1.5424 jam 1.
2
3
D.
E.
F.
Note: 1
3
4
Analisa El-722a
Qt 4.54 Buah
M 1.00 orang
Tb 1.00 orang
P 4.00 orang
30.13 ton
1.10
NO.
A.
1.
2.
3.
(E51)
V 1 Buah
Brt.G 30.1 Ton
N 2 Buah
Fa 0.83 Ton
v1 40.00 Km/Jam B.
v2 60.00 Km/Jam
T1 13.09 menit
T2 8.73 menit
T3 30.00 menit Asumsi
T4 20.00 menit Asumsi
T5 25.00 menit Asumsi
Ts 96.81 menit
Q1 0.51 Bh/jam
C.
(E51) 1.9440 jam 1.
2
3
D.
E.
F.
Note: 1
2
3
4
Analisa El-722a
Qt 3.60 Buah
M 1.00 orang
Tb 1.00 orang
P 4.00 orang
B.
1.
2
3
Vol 50.0194 M3 4
7,853.04 kg 5
N 4 titik/buah 6
n 4 buah
B. Str 300.76 kg
8.00 Buah
D. sel 54 mm C.
Pj. Sel 103 m' 1.
524.71 kg 2.
3
4.
(E51)
V1 1.00 Buah sepasang
Fa 0.83 -
T1 30.00 menit
T2 15.00 menit
Ts1 45.00 menit D.
Q1 1.11 Bh/jam E.
F.
(E51) 0.9036 jam Note: 1
(E62) 2
V2 1.00 Titik
Fa 0.83 -
N 4 Titik/ Buah 3
4
T1 15.00 menit
T2 15.00 menit
Ts2 30.00 menit
Analisa El-721a
Q2 6.64 Ttk/jam
(E56)
V3 1.00 Titik
Fa 0.83 -
T1 15.00 menit
T2 20.00 menit
Ts3 35.00 menit
Q3 5.69 Ttk/jam
Ls
Qt 7.75 Buah
M 1.00 orang
Tb 5.00 orang
P 15.00 orang
120.05 ton
1.10
NO.
A.
1.
2.
3.
(E51)
V 1 Buah
Brt.G 120.0 Ton
N 2 Buah
Fa 0.83 Ton
v1 40.00 Km/Jam B.
v2 60.00 Km/Jam
T1 13.09 menit
T2 8.73 menit
T3 30.00 menit
T4 20.00 menit
T5 25.00 menit
Ts 96.81 menit
Q1 0.51 Bh/jam
C.
(E51) 1.9440 jam 1.
2
3
D.
E.
F.
Note: 1
3
4
Analisa El-722a
M 1.00 orang
Tb 1.00 orang
P 4.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
Lp 8.73 KM
Tk 7.00 jam PROP / KAB / KODYA
Fh 1.03 ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
1.03 Kg
A.
(E08)
V 10.00 Buah
Fa 0.83 1.
v1 20.00 Km/Jam 2.
v2 30.00 Km/Jam 3.
Ts1
T1 26.18 menit
T2 17.45 menit
T3 45.00 menit B.
Ts1 88.63 menit
1.
Q1 5.62 Bh/Jam
(E08) 0.1780 Jam
(E07)
V2 3.00 Buah
Fa 0.83 - C.
Q2 3.32 Bh/jam
Lumpsum
D.
E.
F.
Note: 1
Qt 23.24 Buah 2
M 1.00 orang
Tb 1.00 orang 3
P 10.00 orang 4
Analisa El-727
A.
1.
Vol 0.1854 M3 2.
19.10 kg 3.
(E51)
V1 1.00 Buah
Fa 0.83 -
B.
T1 3.00 menit
T2 10.00 menit 1.
Ts1 13.00 menit 2
Q1 3.83 Bh/jam
C.
1.
2.
Qt 26.82 Buah
M 1.00 orang
Tb 5.00 orang
P 15.00 orang
3
4
Analisa El-712a
NO.
A.
1.
2.
3.
(E51)
V 1 Buah
Brt.G 0.4 Ton
N 1 Buah
Fa 0.83 Ton
v1 40.00 Km/Jam B.
v2 60.00 Km/Jam
T1 13.09 menit
T2 8.73 menit
T3 2.00 menit Asumsi
T4 10.00 menit Asumsi
T5 2.00 menit Asumsi
Ts 14.00 menit
Q1 3.56 Bh/jam
C.
(E51) 0.2811 jam 1.
2
D.
E.
F.
Note: 1
3
4
Analisa El-712b
Qt 24.90 Buah
M 1.00 orang
Tb 1.00 orang
P 2.00 orang
NO.
A.
1.
2.
3.
(M57a) 1.0300 Kg
(M14) 0.0200 Kg
B.
Ls
1.
2.
Qt 200.00 Kg
M 1.00 orang
Tb 1.00 orang C.
P 3.00 orang
1.
D.
E.
F.
Note: 1
3
4
Analisa El-732
NO.
A.
1.
2.
3.
(M57a) 1.0300 Kg
(M14) 0.0200 Kg
B.
Ls
1.
2.
Qt 200.00 Kg
M 1.00 orang
Tb 1.00 orang C.
P 3.00 orang
1.
D.
E.
F.
Note: 1
3
4
Analisa EI-733
A.
1.
2.
3.
(M57a) 1.0300 Kg
(M14) 0.0200 Kg
B.
Ls
1.
2.
Qt 200.00 Kg
M 1.00 orang
Tb 1.00 orang C.
P 3.00 orang
1.
D.
E.
F.
Note: 1
3
4
Analisa EI-734
NO.
A.
1.
2.
3.
(M57a) 1.0300 Kg
(M14) 0.0200 Kg
B.
Ls
1.
2.
Qt 200.00 Kg
M 1.00 orang
Tb 1.00 orang C.
P 3.00 orang
1.
3
4
Analisa EI-735
NO.
A.
1.
2.
3.
(M57a) 1.0300 Kg
(M14) 0.0200 Kg
B.
Ls
1.
2.
Qt 200.00 Kg
M 1.00 orang
Tb 1.00 orang C.
P 3.00 orang
1.
D.
E.
F.
Note: 1
3
4
Analisa EI-736
NO.
A.
1.
2.
3.
(M57a) 1.0300 Kg
(M14) 0.0200 Kg
B.
Ls
1.
2.
Qt 200.00 Kg
M 1.00 orang
Tb 1.00 orang C.
P 3.00 orang
1.
D.
E.
F.
Note: 1
2
3
4
Analisa EI-737
NO.
A.
1.
2.
3.
(M57a) 1.0300 Kg
(M14) 0.0200 Kg
B.
Ls
1.
2.
Qt 200.00 Kg
M 1.00 orang
Tb 1.00 orang C.
P 3.00 orang
1.
D.
E.
F.
Note: 1
3
4
Analisa EI-738
NO.
A.
1.
2.
3.
(M57a) 1.0300 Kg
(M14) 0.0200 Kg
B.
Ls
1.
2.
Qt 200.00 Kg
M 1.00 orang
Tb 2.00 orang C.
P 6.00 orang
1.
D.
E.
F.
Note: 1
3
4
Analisa EI-741a
NO.
A.
1.
2.
3.
(M48) 1.0000 kg B.
(E35)
V 15,000.00 Kg 1.
Fa 0.83
v1 20.00 Km/Jam
v2 30.00 Km/Jam
Ts1
T1 90.00 menit
T2 60.00 menit
T3 180.00 menit
Ts1 330.00 menit C.
Q1 2,263.64 kg 1.
2.
3.
(E35) 0.0004 Jam
(E07)
V2 1.00 Buah
Fa 0.83 -
Lumpsum 3
4
Analisa EI-741a
Qt 69,720.00 kg
M 1.00 orang
Tb 1.00 orang
P 10.00 orang
NO.
A.
1.
2.
3.
1.0000 kg B.
(E35)
V 15,000.00 Kg 1.
Fa 0.83
v1 20.00 Km/Jam
v2 30.00 Km/Jam
Ts1
T1 90.00 menit
T2 60.00 menit
T3 180.00 menit
Ts1 330.00 menit C.
Q1 2,263.64 kg 1.
2.
3.
(E35) 0.0004 Jam
(E07)
V2 1.00 Buah
Fa 0.83 -
Lumpsum 3
4
Analisa EI-741b
Qt 69,720.00 kg
M 1.00 orang
Tb 1.00 orang
P 10.00 orang
NO.
A.
1.
2.
3.
1.0000 kg B.
(E35)
V 15,000.00 Kg 1.
Fa 0.83
v1 20.00 Km/Jam
v2 30.00 Km/Jam
Ts1
T1 90.00 menit
T2 60.00 menit
T3 180.00 menit
Ts1 330.00 menit C.
Q1 2,263.64 kg 1.
2.
3.
(E35) 0.0004 Jam
(E07)
V2 1.00 Buah
Fa 0.83 -
Lumpsum 3
4
Analisa EI-741c
Qt 69,720.00 kg
M 1.00 orang
Tb 1.00 orang
P 10.00 orang
NO.
A.
1.
2.
3.
1.0000 kg B.
(E35)
V 15,000.00 Kg 1.
Fa 0.83
v1 20.00 Km/Jam
v2 30.00 Km/Jam
Ts1
T1 90.00 menit
T2 60.00 menit
T3 180.00 menit
Ts1 330.00 menit C.
Q1 2,263.64 kg 1.
2.
3.
(E35) 0.0004 Jam
(E07)
V2 1.00 Buah
Fa 0.83 -
Lumpsum 3
4
Berlanjut ke hal. berikut.
Analisa EI-741d
Mpa untuk Tebal Pelat ≤ 2,5 inch)
URAIAN ANALISA HARGA SATUAN
Lanjutan
Qt 69,720.00 kg
M 1.00 orang
Tb 1.00 orang
P 10.00 orang
NO.
A.
1.
2.
3.
1.0000 kg B.
(E35)
V 15,000.00 Kg 1.
Fa 0.83
v1 20.00 Km/Jam
v2 30.00 Km/Jam
Ts1
T1 90.00 menit
T2 60.00 menit
T3 180.00 menit
Ts1 330.00 menit C.
Q1 2,263.64 kg 1.
2.
3.
(E35) 0.0004 Jam
(E07)
V2 1.00 Buah
Fa 0.83 -
Lumpsum 3
4
Qt 69,720.00 kg
M 1.00 orang
Tb 1.00 orang
P 10.00 orang
NO.
A.
1.
2.
3.
B.
(E31)
V2 1.00 buah 1.
Fa 0.83 -
T1 20.00 menit
T2 30.00 menit
T3 10.00 menit
Ts1 60.00 menit
Q1 996.00 Kg/jam C.
Lumpsum
Qt 6,972.0 kg
M 1.00 orang D.
T 5.00 orang E.
P 20.00 orang F.
Note: 1
(L03) 0.0010 jam
(L02) 0.0050 jam 2
(L01) 0.0201 jam
3
4
Analisa EI-743
NO.
A.
1.
2.
3.
1.0000 kg B.
(E35)
V 15,000.00 Kg 1.
Fa 0.83
v1 20.00 Km/Jam
v2 30.00 Km/Jam
Ts1
T1 90.00 menit
T2 60.00 menit
T3 180.00 menit
Ts1 330.00 menit C.
Q1 2,263.64 kg 1.
2.
3.
(E35) 0.0004 Jam
(E07)
V2 1.00 Buah
Fa 0.83 -
Lumpsum 3
4
Analisa EI-743
Qt 69,720.00 kg
M 1.00 orang
Tb 1.00 orang
P 10.00 orang
NO.
A.
1.
2.
3.
B.
(E31)
V2 1.00 buah 1.
Fa 0.83 -
T1 20.00 menit
T2 30.00 menit
T3 10.00 menit
Ts1 60.00 menit
Q1 996.00 Kg/jam C.
Lumpsum
Qt 6,972.0 kg
M 1.00 orang D.
T 5.00 orang E.
P 20.00 orang F.
Note: 1
(L03) 0.0010 jam
(L02) 0.0050 jam 2
(L01) 0.0201 jam
3
4
Analisa EI-745a
an Pengguna Jasa
URAIAN ANALISA HARGA SATUAN
NO.
A.
1.
2.
3.
B.
1.
(E31)
V2 1.00 buah
Fa 0.83 -
T1 20.00 menit
T2 30.00 menit
T3 10.00 menit
Ts1 60.00 menit
Q1 996.00 Kg/jam C.
Lumpsum
Qt 6,972.0 kg
M 1.00 orang D.
T 5.00 orang E.
P 20.00 orang F.
Note: 1
(L03) 0.0010 jam
(L02) 0.0050 jam 2
(L01) 0.0201 jam
3
4
Analisa EI-745b
engguna Jasa
URAIAN ANALISA HARGA SATUAN
NO.
A.
1.
2.
3.
1.0000 kg B.
(E35)
V 15,000.00 Kg 1.
Fa 0.83
v1 20.00 Km/Jam
v2 30.00 Km/Jam
Ts1
T1 90.00 menit
T2 60.00 menit
T3 180.00 menit
Ts1 330.00 menit C.
Q1 2,263.64 kg 1.
2.
3.
(E35) 0.0004 Jam
(E07)
V2 1.00 Buah
Fa 0.83 -
Lumpsum 3
4
Analisa EI-745b
Qt 69,720.00 kg
M 1.00 orang
Tb 1.00 orang
P 10.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
fc'15 2,233,885.57 Rp/m3 Item pemb. 7.1
L 8.73 KM PROP / KAB / KODYA
Lp 8.73 KM ITEM PEMBAYARAN NO.
Tk 7.00 jam JENIS PEKERJAAN
p 12.00 M SATUAN PEMBAYARAN
Uk 0.80 M
Fh1 1.03
NO.
A.
1.
2.
3.
1.
2.
(E31)
v1 1.00 Titik
Fa 0.83 -
Q1 4.60 m'
Qt 4.60 M'/jam
M 1.00 orang
T 1.00 orang 1 alat Concete Pump
P 6.00 orang 3 alat berat @ 2 orang
Analisa EI-751
PROYEK
No. PAKET KONTRAK
NAMA PAKET
fc'30 2,227,072.11 Rp/m3 Item pemb. 7.1
L 8.73 KM PROP / KAB / KODYA
Lp 8.73 KM ITEM PEMBAYARAN NO.
Tk 7.00 jam JENIS PEKERJAAN
p 12.00 M SATUAN PEMBAYARAN
Uk 0.80 M
Brt.BjT 0.89 Kg/M1 Pd AHSP 2018,Tb A.6a
Fh1 1.03
NO.
A.
1.
2.
3.
(E31)
v1 1.00 Titik
Fa 0.83 -
Q1 4.12 m'
E07b D.
V1 1.00 batang E.
Fa 0.83 - F.
Note: 1
T1 25.00 menit Asumsi
T2 2.00 menit Asumsi 2
Ts 27.00 menit
Q1 0.93 M1 3
4
E07b 1.0782 jam
jam
jam
jam
Qt 4.12 M'/jam
M 1.00 orang
T 1.00 orang 1 alat Concete Pump
P 6.00 orang 3 alat berat @ 2 orang
Berlanjut ke hal. berikut.
Analisa EI-752
PROYEK
No. PAKET KONTRAK
NAMA PAKET
fc'15 2,233,885.57 Rp/m3 Item pemb. 7.1
L 8.73 KM PROP / KAB / KODYA
Lp 8.73 KM ITEM PEMBAYARAN NO.
Tk 7.00 jam JENIS PEKERJAAN
p 12.00 M SATUAN PEMBAYARAN
Uk 1.00 M
Fh1 1.03
NO.
A.
1.
2.
3.
1.
2.
(E31)
v1 1.00 Titik
Fa 0.83 -
Q1 4.60 m'
E07b
V1 1.00 batang
Fa 0.83 - D.
E.
T1 10.00 menit Asumsi F.
T2 2.00 menit Asumsi Note: 1
Ts 12.00 menit
2
Q1 2.09 M1
E07b 0.4792 jam 3
4
jam
jam
jam
Qt 4.60 M'/jam
M 1.00 orang
T 1.00 orang 1 alat Concete Pump
P 6.00 orang 3 alat berat @ 2 orang
Analisa EI-753
PROYEK
No. PAKET KONTRAK
NAMA PAKET
fc'30 2,227,072.11 Rp/m3 Item pemb. 7.1
L 8.73 KM PROP / KAB / KODYA
Lp 8.73 KM ITEM PEMBAYARAN NO.
Tk 7.00 jam JENIS PEKERJAAN
p 12.00 M SATUAN PEMBAYARAN
Uk 1.00 M
Brt.BjT 0.89 Kg/M1 Pd AHSP 2018,Tb A.6a
Fh1 1.03
NO.
A.
1.
2.
3.
(E31)
v1 1.00 Titik
Fa 0.83 -
Q1 4.12 m'
E07b D.
V1 1.00 batang E.
Fa 0.83 - F.
Note: 1
T1 25.00 menit Asumsi
T2 2.00 menit Asumsi 2
Ts 27.00 menit
Q1 1.45 M1 3
4
E07b 0.6900 jam
jam
jam
jam
Qt 4.12 M'/jam
M 1.00 orang
T 1.00 orang 1 alat Concete Pump
P 6.00 orang 3 alat berat @ 2 orang
Berlanjut ke hal. berikut.
Analisa EI-754
PROYEK
No. PAKET KONTRAK
NAMA PAKET
fc'15 2,233,885.57 Rp/m3 Item pemb. 7.1
L 8.73 KM PROP / KAB / KODYA
Lp 8.73 KM ITEM PEMBAYARAN NO.
Tk 7.00 jam JENIS PEKERJAAN
p 12.00 M SATUAN PEMBAYARAN
Uk 1.20 M
Fh1 1.03
NO.
A.
1.
2.
3.
1.
2.
(E31)
v1 1.00 Titik
Fa 0.83 -
Q1 4.60 m'
E07b
V1 1.00 batang
Fa 0.83 - D.
E.
T1 10.00 menit Asumsi F.
T2 2.00 menit Asumsi Note: 1
Ts 12.00 menit
2
Q1 2.09 M1
Qt 4.60 M'/jam
M 1.00 orang
T 1.00 orang 1 alat Concete Pump
P 6.00 orang 3 alat berat @ 2 orang
Analisa EI-755
PROYEK
No. PAKET KONTRAK
NAMA PAKET
fc'30 2,227,072.11 Rp/m3 Item pemb. 7.1
L 8.73 KM PROP / KAB / KODYA
Lp 8.73 KM ITEM PEMBAYARAN NO.
Tk 7.00 jam JENIS PEKERJAAN
p 12.00 M SATUAN PEMBAYARAN
Uk 1.20 M
Brt.BjT 0.89 Kg/M1 Pd AHSP 2018,Tb A.6a
Fh1 1.03
NO.
A.
1.
2.
3.
(E31)
v1 1.00 Titik
Fa 0.83 -
Q1 4.12 m'
E07b D.
V1 1.00 batang E.
Fa 0.83 - F.
Note: 1
T1 25.00 menit Asumsi
T2 2.00 menit Asumsi 2
Ts 27.00 menit
Q1 2.09 M1 3
4
E07b 0.4792 jam
jam
jam
jam
Qt 4.12 M'/jam
M 1.00 orang
T 1.00 orang 1 alat Concete Pump
P 6.00 orang 3 alat berat @ 2 orang
Berlanjut ke hal. berikut.
Analisa EI-756
URAIAN ANALISA HARGA SATUAN
Lanjutan
PROYEK
No. PAKET KONTRAK
NAMA PAKET
fc'15 2,233,885.57 Rp/m3 Item pemb. 7.1
L 8.73 KM PROP / KAB / KODYA
Lp 8.73 KM ITEM PEMBAYARAN NO.
Tk 7.00 jam JENIS PEKERJAAN
p 12.00 M SATUAN PEMBAYARAN
Uk 1.50 M
Fh1 1.03
NO.
A.
1.
2.
3.
1.
2.
(E31)
v1 1.00 Titik
Fa 0.83 -
Q1 4.60 m'
E07b
V1 1.00 batang
Fa 0.83 - D.
E.
T1 10.00 menit Asumsi F.
T2 2.00 menit Asumsi Note: 1
Ts 12.00 menit
2
Q1 2.09 M1
Qt 4.60 M'/jam
M 1.00 orang
T 1.00 orang 1 alat Concete Pump
P 6.00 orang 3 alat berat @ 2 orang
Analisa EI-757
PROYEK
No. PAKET KONTRAK
NAMA PAKET
fc'30 2,227,072.11 Rp/m3 Item pemb. 7.1
L 8.73 KM PROP / KAB / KODYA
Lp 8.73 KM ITEM PEMBAYARAN NO.
Tk 7.00 jam JENIS PEKERJAAN
p 12.00 M SATUAN PEMBAYARAN
Uk 1.50 M
Brt.BjT 0.89 Kg/M1 Pd AHSP 2018,Tb A.6a
Fh1 1.03
NO.
A.
1.
2.
3.
Q1 4.12 m'
E07b D.
V1 1.00 batang E.
Fa 0.83 - F.
Note: 1
T1 25.00 menit Asumsi
T2 2.00 menit Asumsi 2
Ts 27.00 menit
Q1 3.26 M1 3
4
E07b 0.3067 jam
jam
jam
jam
Qt 4.12 M'/jam
M 1.00 orang
T 1.00 orang 1 alat Concete Pump
P 6.00 orang 3 alat berat @ 2 orang
Berlanjut ke hal. berikut.
Analisa EI-758
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.1 (1)
JENIS PEKERJAAN : Beton struktur, fc’50 Mpa
SATUAN PEMBAYARAN : M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (2)
JENIS PEKERJAAN :Beton struktur fc’ 45 Mpa
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (3)
JENIS PEKERJAAN :Beton struktur fc’ 40 Mpa
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (4)
JENIS PEKERJAAN :Beton struktur fc’ 35 Mpa
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (5a)
JENIS PEKERJAAN :Beton struktur fc’ 30 Mpa
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (5b)
JENIS PEKERJAAN :Beton struktur bervolume besar, fc’ 30 Mpa
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (6a)
JENIS PEKERJAAN :Beton struktur fc’ 25 Mpa
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (6b)
JENIS PEKERJAAN :Beton struktur bervolume besar, fc’ 25 Mpa
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (6c)
JENIS PEKERJAAN :Beton struktur memadat sendiri, fc’ 25 Mpa
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Semen (M12) Kg 317.2400
Pasir Beton (M01a) M3 0.5844
Agregat Kasar (M03) M3 0.6734
Kayu Perancah (M19) M3 0.4000
Paku (M18) Kg 4.8000
Air (M170) Ltr 224.5400
Plastizier (M182) Kg 0.9517
Fly ash (M05) Kg 105.060
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (7a)
JENIS PEKERJAAN :Beton struktur fc’ 20 Mpa
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (7b)
JENIS PEKERJAAN :Beton struktur bervolume besar, fc’ 20 Mpa
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
Concrete Mixer (E43) jam 0.4016
Concrete Vibrator (E20) jam 2.4096
Water Tank Truck (E23) jam 0.0382
Thermocouple (M184) buah 3.0000
Alat Bantu Ls 1.0000
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (7c)
JENIS PEKERJAAN :Beton struktur memadat sendiri, fc’ 20 Mpa
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (7d)
JENIS PEKERJAAN :Beton struktur, fc’20 Mpa yang dilaksanakan di a
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (8)
JENIS PEKERJAAN :Beton struktur fc’ 15 Mpa
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (9)
JENIS PEKERJAAN :Beton Siklop fc’15 Mpa
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (10)
JENIS PEKERJAAN :Beton struktur fc’ = 10 Mpa
SATUAN PEMBAYARAN :M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2 (1a)
JENIS PEKERJAAN : Penyediaan Unit Pracetak Gelagar Tipe I Bent
SATUAN PEMBAYARAN : Buah
PERKIRAAN
TENAGA
BAHAN
Beton fc'=45MPa (M185) M3 5.9534
Baja tulangan (M57a) kg 934.6838
Baja prategang (M56) kg 192.49
Anchorage (M113) buah 8.00
Selongsong (duct) diameter 54 mm (M117) m' 65.9200
Grouting non shrinkage wcR 0,45 (M119) kg 333.6322
PERALATAN
Crane On Track (70-100) T; 190 HP (E51) Jam 0.9036
Stressing Jack; 46--100 Ton; 89 HP (E62) Jam 0.1506
Grouting Pump; 100 HP (E56) Jam 0.1757
Alat Bantu Ls 1.0000
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2 (1b)
JENIS PEKERJAAN : Penyediaan Unit Pracetak Gelagar Tipe I Bent
SATUAN PEMBAYARAN : Buah
PERKIRAAN
TENAGA
BAHAN
PERKIRAAN
TENAGA
BAHAN
PERALATAN
Crane On Track (70-100) T; 190 HP (E51) jam 1.5424
Crane On Track (70-100) T; 190 HP (E51) jam 1.5424
Alat Bantu Ls 1.0000
JUMLAH HARGA PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2(2b)
JENIS PEKERJAAN : Pemasangan Unit Pracetak Gelagar Tipe I Ben
SATUAN PEMBAYARAN : Buah 00
PERKIRAAN
TENAGA
BAHAN
PERALATAN
Crane On Track (70-100) T; 190 HP (E51) jam 1.9440
Crane On Track (70-100) T; 190 HP (E51) jam 1.9440
Alat Bantu Ls 1.0000
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2 (3a)
JENIS PEKERJAAN : Penyediaan Unit Pracetak Gelagar Tipe U Bent
SATUAN PEMBAYARAN : Buah
PERKIRAAN
BAHAN
PERALATAN
Crane On Track (70-100) T; 190 HP (E51) Jam 0.9036
Stressing Jack; 46--100 Ton; 89 HP (E62) Jam 0.1506
Grouting Pump; 100 HP (E56) Jam 0.1757
Alat Bantu Ls 1.0000
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2(4a)
JENIS PEKERJAAN : Pemasangan Unit Pracetak Gelagar Tipe U Ben
SATUAN PEMBAYARAN : Buah 00
PERKIRAAN
TENAGA
BAHAN
PERALATAN
Crane On Track (70-100) T; 190 HP (E51) jam 1.9440
Crane On Track (70-100) T; 190 HP (E51) jam 1.9440
Alat Bantu Ls 1.0000
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2.(7)
JENIS PEKERJAAN : Baja Prategang
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2 (12a)
JENIS PEKERJAAN : Penyediaan Panel Full Depth Slab
SATUAN PEMBAYARAN : Buah
PERKIRAAN
TENAGA
BAHAN
PERALATAN
Crane On Track (70-100) T; 190 HP (E51) Jam 0.2610
Alat Bantu Ls 1.0000
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2(12b)
JENIS PEKERJAAN : Pemasangan Panel Full Depth Slab
SATUAN PEMBAYARAN : Buah 00
PERKIRAAN
TENAGA
BAHAN
PERALATAN
Crane On Track (70-100) T; 190 HP (E51) jam 0.2811
Alat Bantu Ls 1.0000
JUMLAH HARGA PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (1)
JENIS PEKERJAAN : Baja Tulangan Polos BjTP 280
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (2)
JENIS PEKERJAAN : Baja Tulangan Sirip BjTS 280
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (3)
JENIS PEKERJAAN : Baja Tulangan Sirip BjTS 420 A
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (4)
JENIS PEKERJAAN : Baja Tulangan Sirip BjTS 420 B
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (5)
JENIS PEKERJAAN : Baja Tulangan Sirip BjTS 520
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (7)
JENIS PEKERJAAN : Baja Tulangan Sirip BjTS 700
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (8)
JENIS PEKERJAAN : Anyaman Kawat Yang Dilas (Welded Wire Mes
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.4 (1a)
JENIS PEKERJAAN : Penyediaan Baja Struktur Grade 250 (Kuat Lel
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Baja Struktur Grade 250 (Kuat Leleh 250 MPa) (M48) Buah 1.0000
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.4 (1b)
JENIS PEKERJAAN : Penyediaan Baja Struktur Grade 345 (Kuat Lel
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Baja Struktur Grade 345 (Kuat Leleh 345 MPa) Buah 1.0000
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Baja Struktur Grade 485 (Kuat Leleh 485 MPa) Buah 1.0000
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.4 (1d)
JENIS PEKERJAAN : Penyediaan Baja Struktur Grade 690 (Kuat Lele
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Baja Struktur Grade 690 (Kuat Leleh 690 Mpa untuk Tebal Pelat ≤ 2,5 Buah 1.0000
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.4 (1e)
JENIS PEKERJAAN : Penyediaan Baja Struktur Grade 690 (Kuat Lele
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
Pekerja (L01) jam 0.0010
Tukang (L02) jam 0.0001
Mandor (L03) jam 0.0001
BAHAN
Baja Struktur Grade 690 (Kuat Leleh 620 Mpa untuk Tebal Pelat > 2,5 Buah 1.0000
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.4 (2)
JENIS PEKERJAAN : Pemasangan Baja Struktur
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Sudah ada
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.4 (3)
JENIS PEKERJAAN : Penyediaan Struktur Jembatan Rangka Baja St
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Sudah ada
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.4 (5a)
JENIS PEKERJAAN : Pemasangan Jembatan Rangka Baja yang dise
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
Pekerja (L01) jam 0.0010
Tukang (L02) jam 0.0050
Mandor (L03) jam 0.0201
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.4 (5b)
JENIS PEKERJAAN : Pengangkutan Bahan Jembatan yang disediak
SATUAN PEMBAYARAN : Kg
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
Bore Pile Machine, Diameter Maks 2m; 150 HP E33 jam 0.2175
Crane 10-15 Ton; PM 36524 S, Crane On Truck; 260 E07b jam 0.4792
Alat Bantu Ls 1.0000
JUMLAH HARGA PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
Bore Pile Machine, Diameter Maks 2m; 150 HP E33 jam 0.2426
Crane 10-15 Ton; PM 36524 S, Crane On Truck; 260 E07b jam 1.0782
Alat Bantu Ls 1.0000
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
Bore Pile Machine, Diameter Maks 2m; 150 HP E33 jam 0.2175
Crane 10-15 Ton; PM 36524 S, Crane On Truck; 260 E07b jam 0.4792
Alat Bantu Ls 1.0000
TENAGA
BAHAN
PERALATAN
Bore Pile Machine, Diameter Maks 2m; 150 HP E33 jam 0.2426
Crane 10-15 Ton; PM 36524 S, Crane On Truck; 260 E07b jam 0.6900
Alat Bantu Ls 1.0000
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
Bore Pile Machine, Diameter Maks 2m; 150 HP E33 jam 0.2175
Crane 10-15 Ton; PM 36524 S, Crane On Truck; 260 E07b jam 0.4792
Alat Bantu Ls 1.0000
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
Bore Pile Machine, Diameter Maks 2m; 150 HP E33 jam 0.2426
Crane 10-15 Ton; PM 36524 S, Crane On Truck; 260 E07b jam 0.4792
Alat Bantu Ls 1.0000
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
PERALATAN
Bore Pile Machine, Diameter Maks 2m; 150 HP E33 jam 0.2175
Crane 10-15 Ton; PM 36524 S, Crane On Truck; 260 E07b jam 0.4792
Alat Bantu Ls 1.0000
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
Bore Pile Machine, Diameter Maks 2m; 150 HP E33 jam 0.2426
Crane 10-15 Ton; PM 36524 S, Crane On Truck; 260 E07b jam 0.3067
Alat Bantu Ls 1.0000
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 8,605.85
21,428.57 32,271.94
24,285.71 2,438.32
43,316.12
1,600.00 825,648.00
375,000.00 183,840.52
400,000.00 313,986.21
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 4,763.75
40,000.00 61,923.60
2,062,962.07
0.00 0.00
593,159.42 141,316.64
50,091.68 15,087.86
342,249.64 13,057.72
0.00 0.00
169,462.21
2,275,740.41
227,574.04
2,503,314.45
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-712
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 8,605.85
21,428.57 32,271.94
24,285.71 2,438.32
43,316.12
1,600.00 763,534.88
375,000.00 187,167.03
400,000.00 319,874.90
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 4,763.75
40,000.00 57,265.12
2,005,405.67
0.00 0.00
593,159.42 141,316.64
50,091.68 15,087.86
342,249.64 13,057.72
0.00 0.00
169,462.21
2,218,184.00
221,818.40
2,440,002.40
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-713
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 8,605.85
21,428.57 32,271.94
24,285.71 1,219.16
42,096.96
1,600.00 694,005.76
375,000.00 196,046.77
400,000.00 321,198.62
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 4,763.75
40,000.00 52,050.43
1,940,865.33
0.00 0.00
593,159.42 141,316.64
50,091.68 15,087.86
342,249.64 13,057.72
0.00 0.00
169,462.21
2,152,424.50
215,242.45
2,367,666.95
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-714
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 8,605.85
21,428.57 32,271.94
24,285.71 1,219.16
42,096.96
1,600.00 623,092.32
375,000.00 205,040.56
400,000.00 322,435.45
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 4,763.75
40,000.00 46,731.92
1,874,864.00
0.00 0.00
593,159.42 141,316.64
50,091.68 15,087.86
342,249.64 13,057.72
0.00 0.00
169,462.21
2,086,423.17
208,642.32
2,295,065.49
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-715a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 8,605.85
21,428.57 32,271.94
24,285.71 2,438.32
43,316.12
1,600.00 555,029.92
375,000.00 214,414.53
400,000.00 323,197.24
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 4,763.75
40,000.00 41,627.24
1,811,832.68
0.00 0.00
593,159.42 141,316.64
50,091.68 15,087.86
342,249.64 13,057.72
0.00 0.00
169,462.21
2,024,611.01
202,461.10
2,227,072.11
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-715b
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 5,737.23
21,428.57 12,908.78
24,285.71 1,219.16
19,865.17
1,600.00 555,029.92
375,000.00 214,414.53
400,000.00 323,197.24
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 4,763.75
40,000.00 41,627.24
1,811,832.68
0.00 0.00
593,159.42 141,316.64
50,091.68 15,087.86
342,249.64 13,057.72
25,000.00 75,000.00
0.00 0.00
244,462.21
2,076,160.07
207,616.01
2,283,776.07
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-715c
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 5,737.23
21,428.57 12,908.78
24,285.71 1,219.16
19,865.17
1,600.00 538,896.00
375,000.00 211,810.34
400,000.00 271,117.24
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 5,613.50
40,000.00 40,417.20
480.00 53,889.60
1,794,543.89
0.00 0.00
593,159.42 141,316.64
50,091.68 15,087.86
342,249.64 13,057.72
0.00 0.00
169,462.21
1,983,871.27
198,387.13
2,182,258.40
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-716a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 5,737.23
21,428.57 12,908.78
24,285.71 1,219.16
19,865.17
1,600.00 492,752.00
375,000.00 228,918.10
400,000.00 317,751.72
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 4,763.75
40,000.00 36,956.40
1,753,941.98
0.00 0.00
593,159.42 141,316.64
50,091.68 15,087.86
342,249.64 13,057.72
0.00 0.00
169,462.21
1,943,269.36
194,326.94
2,137,596.30
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-716b
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 5,737.23
21,428.57 12,908.78
24,285.71 1,219.16
19,865.17
1,600.00 492,752.00
375,000.00 228,918.10
400,000.00 317,751.72
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 4,763.75
40,000.00 36,956.40
1,753,941.98
0.00 0.00
593,159.42 141,316.64
50,091.68 15,087.86
342,249.64 13,057.72
25,000.00 75,000.00
0.00 0.00
244,462.21
2,018,269.36
201,826.94
2,220,096.30
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-716c
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 5,737.23
21,428.57 12,908.78
24,285.71 1,219.16
19,865.17
1,600.00 507,584.00
375,000.00 219,142.24
400,000.00 269,379.31
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 5,613.50
40,000.00 38,068.80
480.00 50,428.80
1,763,016.65
0.00 0.00
593,159.42 141,316.64
50,091.68 15,087.86
342,249.64 13,057.72
0.00 0.00
169,462.21
1,952,344.04
195,234.40
2,147,578.44
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-717a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 45,897.88
21,428.57 103,270.22
24,285.71 9,753.30
158,921.40
1,600.00 436,720.00
375,000.00 237,879.31
400,000.00 316,882.76
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 4,763.75
40,000.00 32,754.00
1,701,799.82
95,036.55 38,167.29
50,091.68 120,702.85
342,249.64 13,057.72
0.00 0.00
171,927.86
2,032,649.08
203,264.91
2,235,913.98
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-717a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 45,897.88
21,428.57 103,270.22
24,285.71 9,753.30
158,921.40
1,600.00 436,720.00
375,000.00 237,879.31
400,000.00 316,882.76
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 4,763.75
40,000.00 32,754.00
1,701,799.82
95,036.55 38,167.29
50,091.68 120,702.85
342,249.64 13,057.72
25,000.00 75,000.00
0.00 0.00
246,927.86
2,107,649.08
210,764.91
2,318,413.98
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-717c
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 45,897.88
21,428.57 103,270.22
24,285.71 19,506.60
168,674.70
1,600.00 472,976.00
375,000.00 222,400.86
400,000.00 273,434.48
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 5,613.50
40,000.00 35,473.20
480.00 47,264.64
1,729,962.68
95,036.55 38,167.29
50,091.68 120,702.85
342,249.64 13,057.72
0.00 0.00
171,927.86
2,070,565.24
207,056.52
2,277,621.76
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-717a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 171,428.57
21,428.57 21,428.57
24,285.71 423,300.00
616,157.14
157,608.57 157,608.57
1,600.00 436,720.00
375,000.00 237,879.31
400,000.00 316,882.76
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 4,763.75
40,000.00 32,754.00
1,859,408.39
95,036.55 38,167.29
50,091.68 120,702.85
342,249.64 13,057.72
332,906.02 66,848.60
0.00 0.00
238,776.46
2,714,341.99
271,434.20
2,985,776.19
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-717a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 45,897.88
21,428.57 103,270.22
24,285.71 9,753.30
158,921.40
1,600.00 435,072.00
375,000.00 243,310.34
400,000.00 311,379.31
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 4,763.75
40,000.00 32,630.40
1,699,955.81
95,036.55 38,167.29
50,091.68 120,702.85
342,249.64 13,057.72
0.00 0.00
171,927.86
2,030,805.06
203,080.51
2,233,885.57
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-719
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 66,924.60
25,827.27 34,574.65
30,066.21 10,062.32
1,600.00 304,550.40
375,000.00 170,317.24
400,000.00 244,729.66
167,600.00 96,682.20
25.00 4,763.75
85,708.29 28,684.17
342,249.64 13,057.72
0.00 0.00
41,741.88
974,346.70
97,434.67
1,071,781.37
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-717a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 80,309.52
25,827.27 124,468.75
30,066.21 12,074.78
216,853.05
1,600.00 380,688.00
375,000.00 223,487.07
400,000.00 366,124.14
1,250,000.00 500,000.00
36,000.00 172,800.00
25.00 4,171.50
40,000.00 28,551.60
1,675,822.31
95,036.55 38,167.29
50,091.68 120,702.85
342,249.64 13,057.72
0.00 0.00
171,927.86
2,064,603.22
206,460.32
2,271,063.54
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-721a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 193,631.67
21,428.57 96,815.83
24,285.71 21,944.92
312,392.43
2,218,184.00 13,205,736.63
9,800.0000 9,159,901.24
466,676.94 89,828,963.42
255,750.00 2,046,000.00
98,400.00 6,486,528.00
6,759.16 2,255,073.16
122,982,202.44
2,074,385.74 1,874,444.94
220,935.07 33,273.35
185,741.30 32,635.27
0.00 0.00
1,940,353.57
125,234,948.43
12,523,494.84
137,758,443.28
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-721b
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 193,631.67
21,428.57 96,815.83
24,285.71 21,944.92
312,392.43
2,218,184.00 27,845,141.03
9,800.0000 19,314,238.13
466,676.94 140,357,755.34
255,750.00 2,046,000.00
98,400.00 10,135,200.00
6,759.16 3,546,567.09
203,244,901.58
2,074,385.74 1,874,444.94
220,935.07 33,273.35
185,741.30 32,635.27
0.00 0.00
1,940,353.57
205,497,647.58
20,549,764.76
226,047,412.33
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-722a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 22,034.57
21,428.57 33,051.85
24,285.71 149,835.05
204,921.47
0.00
2,074,385.74 3,199,573.38
2,074,385.74 3,199,573.38
0.00 0.00
6,399,146.76
6,604,068.24
660,406.82
7,264,475.06
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-722a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 27,771.80
21,428.57 41,657.70
24,285.71 188,848.25
258,277.75
0.00
2,074,385.74 4,032,660.02
2,074,385.74 4,032,660.02
0.00 0.00
8,065,320.05
8,323,597.80
832,359.78
9,155,957.58
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-723a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 193,631.67
21,428.57 96,815.83
24,285.71 21,944.92
312,392.43
2,218,184.00 110,952,177.33
9,800.0000 76,959,810.38
466,676.94 140,357,755.34
255,750.00 2,046,000.00
98,400.00 10,135,200.00
6,759.16 3,546,567.09
343,997,510.14
2,074,385.74 1,874,444.94
220,935.07 33,273.35
185,741.30 32,635.27
0.00 0.00
1,940,353.57
346,250,256.13
34,625,025.61
380,875,281.74
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-722a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 27,771.80
21,428.57 41,657.70
24,285.71 188,848.25
258,277.75
0.00
2,074,385.74 4,032,660.02
2,074,385.74 4,032,660.02
0.00 0.00
8,065,320.05
8,323,597.80
832,359.78
9,155,957.58
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-727
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 43,029.26
21,428.57 6,454.39
24,285.71 7,314.97
56,798.62
192,256.00 198,023.68
198,023.68
241,419.48 42,963.46
560,718.71 168,891.18
0.00 0.00
211,854.63
466,676.94
46,667.69
513,344.63
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-712a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 97,877.22
25,827.27 33,710.29
30,066.21 7,848.61
139,436.12
2,218,184.00 411,251.31
9,800.00 187,142.76
598,394.07
2,074,385.74 541,506.32
0.00 0.00
541,506.32
1,279,336.51
127,933.65
1,407,270.16
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-712b
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 4,016.06
21,428.57 6,024.10
24,285.71 13,654.62
23,694.78
0.00
2,074,385.74 583,160.65
0.00 0.00
583,160.65
606,855.43
60,685.54
667,540.97
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-731
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 1,500.00
21,428.57 750.00
24,285.71 850.00
3,100.00
9,800.00 10,094.00
25,000.00 500.00
10,594.00
0.00 0.00
0.00
13,694.00
1,369.40
15,063.40
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa El-732
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 1,500.00
21,428.57 750.00
24,285.71 850.00
3,100.00
9,800.00 10,094.00
25,000.00 500.00
10,594.00
0.00 0.00
0.00
13,694.00
1,369.40
15,063.40
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-733
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 1,500.00
21,428.57 750.00
24,285.71 850.00
3,100.00
9,800.00 10,094.00
25,000.00 500.00
10,594.00
0.00 0.00
0.00
13,694.00
1,369.40
15,063.40
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-734
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 2,624.62
25,827.27 903.95
30,066.21 1,052.32
4,580.89
9,450.00 9,733.50
25.00 0.50
9,734.00
0.00 0.00
0.00
14,314.89
1,431.49
15,746.38
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-735
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 1,500.00
21,428.57 750.00
24,285.71 850.00
3,100.00
9,800.00 10,094.00
25,000.00 500.00
10,594.00
0.00 0.00
0.00
13,694.00
1,369.40
15,063.40
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-736
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 1,500.00
21,428.57 750.00
24,285.71 850.00
3,100.00
9,800.00 10,094.00
25,000.00 500.00
10,594.00
0.00 0.00
0.00
13,694.00
1,369.40
15,063.40
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-737
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 1,500.00
21,428.57 750.00
24,285.71 850.00
3,100.00
9,800.00 10,094.00
25,000.00 500.00
10,594.00
0.00 0.00
GA PERALATAN 0.00
13,694.00
1,369.40
15,063.40
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-738
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 3,000.00
21,428.57 1,500.00
24,285.71 850.00
5,350.00
9,800.00 10,094.00
25,000.00 500.00
10,594.00
$ - 0.00
0.00
15,944.00
1,594.40
17,538.40
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-741a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 14.34
21,428.57 2.15
24,285.71 2.44
18.93
15,000.00 15,000.00
15,000.00
419,076.61 185.13
2,074,385.74 208.27
0.00 0.00
393.41
15,412.34
1,541.23
16,953.57
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-741b
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 25.10
25,827.27 2.59
30,066.21 3.02
30.71
17,000.00 17,000.00
17,000.00
419,076.61 185.13
2,074,385.74 208.27
0.00 0.00
393.41
17,424.11
1,742.41
19,166.53
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-741c
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 25.10
25,827.27 2.59
30,066.21 3.02
30.71
18,000.00 18,000.00
18,000.00
419,076.61 185.13
2,074,385.74 208.27
0.00 0.00
393.41
18,424.11
1,842.41
20,266.53
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-741d
GA SATUAN
…………………………..
……………………….
24,996.34 25.10
25,827.27 2.59
30,066.21 3.02
30.71
22,000.00 22,000.00
22,000.00
419,076.61 185.13
2,074,385.74 208.27
0.00 0.00
393.41
22,424.11
2,242.41
24,666.53
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-741e
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 25.10
25,827.27 2.59
30,066.21 3.02
30.71
19,000.00 19,000.00
19,000.00
419,076.61 185.13
2,074,385.74 208.27
0.00 0.00
393.41
19,424.11
1,942.41
21,366.53
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-742
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 25.10
25,827.27 129.65
30,066.21 603.74
758.49
0.00
2,074,385.74 2,082.72
0.00 0.00
2,082.72
2,841.21
284.12
3,125.33
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-743
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 25.10
25,827.27 2.59
30,066.21 3.02
30.71
15,000.00 15,000.00
15,000.00
419,076.61 185.13
2,074,385.74 208.27
0.00 0.00
393.41
15,424.11
1,542.41
16,966.53
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-744
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 25.10
25,827.27 129.65
30,066.21 603.74
758.49
0.00
2,074,385.74 2,082.72
0.00 0.00
2,082.72
2,841.21
284.12
3,125.33
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-745a
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 25.10
25,827.27 129.65
30,066.21 603.74
2,074,385.74 2,082.72
0.00 0.00
2,841.21
284.12
3,125.33
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-745b
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 25.10
25,827.27 2.59
30,066.21 3.02
30.71
15,000.00 15,000.00
15,000.00
419,076.61 185.13
2,074,385.74 208.27
0.00 0.00
393.41
15,424.11
1,542.41
16,966.53
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-751
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 32,625.74
25,827.27 5,618.38
30,066.21 6,540.51
2,233,885.57 1,156,559.56
42,464.64 42,464.64
550,001.54 119,645.58
841,410.52 403,195.08
0.00 0.00
JUMLAH HARGA PERALATAN 522,840.66
1,766,649.49
176,664.95
1,943,314.43
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-752
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 32,625.74
25,827.27 5,618.38
30,066.21 6,540.51
2,227,072.11 1,153,032.00
13,676.5 377,907.81
42,464.64 42,464.64
550,001.54 133,450.84
841,410.52 907,188.92
0.00 0.00
2,658,828.84
265,882.88
2,924,711.72
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-753
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 32,625.74
25,827.27 5,618.38
30,066.21 6,540.51
2,233,885.57 1,807,124.31
42,464.64 42,464.64
550,001.54 119,645.58
841,410.52 403,195.08
0.00 0.00
2,417,214.24
241,721.42
2,658,935.66
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-754
GA SATUAN
…………………………..
……………………….
24,996.34 32,625.74
25,827.27 5,618.38
30,066.21 6,540.51
2,227,072.11 1,801,612.50
13,676.5 590,480.95
42,464.64 42,464.64
550,001.54 133,450.84
841,410.52 580,600.91
0.00 0.00
3,193,394.47
319,339.45
3,512,733.92
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-755
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 32,625.74
25,827.27 5,618.38
30,066.21 6,540.51
2,233,885.57 2,602,259.01
42,464.64 42,464.64
550,001.54 119,645.58
841,410.52 403,195.08
0.00 0.00
3,212,348.93
321,234.89
3,533,583.83
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-756
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 32,625.74
25,827.27 5,618.38
30,066.21 6,540.51
2,227,072.11 2,594,322.00
13,676.5 850,292.57
42,464.64 42,464.64
550,001.54 133,450.84
841,410.52 403,195.08
0.00 0.00
4,068,509.75
406,850.98
4,475,360.73
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-757
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 32,625.74
25,827.27 5,618.38
30,066.21 6,540.51
550,001.54 119,645.58
841,410.52 403,195.08
0.00 0.00
4,676,119.63
467,611.96
5,143,731.59
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
Analisa EI-758
GA SATUAN
…………………………..
……………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
24,996.34 32,625.74
25,827.27 5,618.38
30,066.21 6,540.51
2,227,072.11 4,053,628.12
13,676.5 1,328,582.14
42,464.64 42,464.64
JUMLAH HARGA BAHAN 5,424,674.90
550,001.54 133,450.84
841,410.52 258,044.85
0.00 0.00
5,860,955.22
586,095.52
6,447,050.74
n/atau ukuran
atuan pekerjaan
diubah kecuali
a Peserta Lelang
termasuk PPN
ITEM PEMBAYARAN NO. : 7.6 (1)
JENIS PEKERJAAN : Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk
SATUAN PEMBAYARAN :M
No. URAIAN
I. ASUMSI
1 Dilakukan secara manual
2 Bahan diterima di lokasi Jembatan
3 Jam kerja efektif per-hari
4 Faktor kehilangan
1. BAHAN
1.a. Bahan pondasi cerucuk dolken dia.8 -10 cm = 1 x Fh
2. ALAT
2.e. ALAT BANTU
Diperlukan alat bantu untuk pek pondasi cerucuk
- 1 set palu tripot
- Alat pertukangan
3. TENAGA
Produksi Tiang dalam 1 hari
Rp. 59,360.71 / M
No. URAIAN
I. ASUMSI
1 Bahan diterima di lokasi Jembatan
2 Jam kerja efektif per-hari
3 Ukuran turap kayu sesuai gambar Lebar
Tebal
Panjang
4 Faktor kehilangan
5 Berat isi Kayu
1. BAHAN
1.a. Bahan turap kayu tanpa pengawetan
Penampang kayu = Lbr x tbl x Fh
Vol satu meter batang =Ax1
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 hari
Kebutuhan tenaga tambahan di lokasi ::
- Mandor
- Tukang
- Pekerja
Rp. 136,294.71 / M2
No. URAIAN
I. ASUMSI
1 Bahan diterima di lokasi Jembatan
2 Jam kerja efektif per-hari
3 Ukuran turap kayu sesuai gambar Lebar
Tebal
Panjang
4 Faktor kehilangan
1. BAHAN
1.a. Bahan turap kayu dengan pengawetan
Penampang kayu = Lbr x tbl x Fh2
Vol satu meter batang =Ax1
Kreosot = Brt x Kr x 1000 x Fh1
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 hari
Kebutuhan tenaga tambahan di lokasi ::
- Mandor
- Tukang
- Pekerja
Rp. 173,369.43 / M2
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............ bulan
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di sepanjang jalan
3 Turap baja diterima di base camp
4 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Ukuran dan tipe turap baja sesuai keperluan, diambil Tipe Larsen SJ III
Tebal tiang
Tebal pelat baja
Berat tiang
Berat per-meter tiang
Panjang Turap Baja (sesuai keperluan)
Luas turap per batang = Panj x Lebar/1000
Berat per m2 = Brt.pm1 x
6 Faktor kehilangan (Fh)
7 Kondisi sekitar
1. BAHAN
1.a. Turap Baja, berat per m2 = 1 x Brt.p.m2 x Fh
1.b. Plat Baja (untuk penyambungan)
1.c. Kawat Las (untuk penyambungan) = W-Leb + 2 x H
2. ALAT
2.a. TRAILER
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi = (L : v1 ) x 60
- Waktu tempuh kosong = (L : v2) x 60
- Lain-lain (bongkar dan muat)
Koefisien Alat / M2 = 1 : Q1
2.b. CRANE 1
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu muat
- Lain-Lain
No. URAIAN
2.c. CRANE 2
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu menurunkan
- dan lain-lain ( termasuk mengatur dan menggeser)
3. TENAGA
Produksi menentukan : PILE HAMMER
Produksi Turap Baja / hari = Tk x Q3
Kebutuhan tenaga tambahan di lokasi ::
- Mandor
- Tukang
- Pekerja
Rp. 2,697,060.30 M2
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............ bulan
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di sepanjang jalan
3 Turap beton diterima di base camp
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Panjang turap (sesuai kebutuhan)
7 Ukuran turap beton diambil Tipe W-400 B 1000
Tinggi
Tebal
Lebar
Berat/M'
8 Berat Isi :
- Beton
- Baja tulangan
9 Faktor kehilangan (Fh)
1. BAHAN
1.a. Turap Beton Pracetak fc'35 = Brt.m' x Leb / D1 x Fh
Penampang turap = Vol.Btn / Leb
1.b. Baja tulangan 1,5% = 1,5/100 x A x Fh x D2
2. ALAT
2.a. TRAILER
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi = (L : v1 ) x 60
- Waktu tempuh kosong = (L : v2) x 60
- Lain-lain (bongkar dan muat)
Koefisien Alat / M2 = 1 : Q1
2.b CRANE 1
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu muat
- Lain-Lain
No. URAIAN
2.c CRANE 2
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu menurunkan
- dan lain-lain ( termasuk mengatur dan menggeser)
Koefisien Alat / M2 = 1 : Q3
2.d. Pile Hammer, 2,5 Ton; 1 HP
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu penggeseran dan penyetelan turap
- Waktu pemancangan
- Waktu penyambungan tiang
3. TENAGA
Produksi menentukan : PILE HAMMER
Produksi Turap Beton / hari = Tk x Q4
Kebutuhan tenaga tambahan di lokasi ::
- Mandor
- Tukang
- Pekerja
Rp. 700,403.74 / M2
No. URAIAN
I. ASUMSI
1 Bahan diterima di lokasi Jembatan
2 Jam kerja efektif per-hari
3 Diameter tiang pancang kayu sesuai keperluan
4 Faktor kehilangan (Fh)
1. BAHAN
1.a. - Bahan tiang pancang kayu = 3.14 x (dia/1000)^2 / 4 x 1 x Fh
1.b. - Besi untuk sepatu & penyambung (jika ada) = Vol. x 15
2. ALAT
-
3. TENAGA
Produksi Tiang dalam 1 hari
Rp. 63,199.08 / M
No. URAIAN
I. ASUMSI
1 Bahan diterima di lokasi Jembatan
2 Jam kerja efektif per-hari
3 Diameter tiang pancang kayu sesuai keperluan
4 Faktor kehilangan (Fh)
1. BAHAN
1.a. - Bahan tiang pancang kayu = 3.14 x (dia/1000)^2 / 4 x 1 x Fh2
1.b. - Besi untuk sepatu & penyambung (jika ada) = Vol. x 15
1.c. - Bahan pengawet: kreosot = Vol x Kr x Fh1
2. ALAT
2.e. ALAT BANTU
- Alat bantu
3. TENAGA
Produksi Tiang dalam 1 hari
Rp. 65,947.78 / M
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
4 Ukuran diameter tiang pancang (sesuai keperluan)
5 Tebal tiang
6 Berat per-meter tiang
7 Panjang Tiang (sesuai keperluan)
8 Faktor kehilangan (Fh)
1. BAHAN
1.a. Pipa baja tiang pancang = 1 x b x Fh
1.b Plat Baja (untuk penyambungan)
2. ALAT
2.a. TRAILER
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi = (L : v1 ) x 60
- Waktu tempuh kosong = (L : v2) x 60
- Lain-lain (bongkar dan muat)
Koefisien Alat / M = 1 : Q1
2.b CRANE 1
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu menurunkan
- dan lain-lain ( termasuk mengatur dan menggeser)
No. URAIAN
2.c CRANE 2
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu menaikkan
- dan lain-lain ( termasuk mengatur dan menggeser)
Koefisien Alat / M = 1 : Q3
3. TENAGA
Produksi menentukan : TRAILER
Penyediaan Tiang Pancang Baja Dia.500mm / hari = Tk x Q1
Kebutuhan tenaga tambahan di lokasi ::
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp. 2,696,671.16 / M
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Ukuran diameter tiang pancang H Beam (sesuai gambar)
Tinggi profil = lebar sayap
Tebal badan
Tebal sayap
Panjang kaki las
6 Panjang Tiang (sesuai keperluan)
7 Tebal strip penyambungan
8 Faktor kehilangan
1. BAHAN
1.a. Berat H Beam per m' = {(2 x b x tg) + (b x (h - 2 x tg) + ( 2 x s^2)} x 7850/(10^6) x Fh
Berat H Beam per unit = p x Brt.pm'
2. ALAT
2.a CRANE 1
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu menaikkan
- dan lain-lain ( termasuk mengatur dan menggeser)
Koefisien Alat / M = 1 : Q1
Koefisien Alat / M = 1 : Q2
ITEM PEMBAYARAN NO. : 7.6.(9a)
JENIS PEKERJAAN : Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm
SATUAN PEMBAYARAN :M
No. URAIAN
2.c CRANE 2
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu menaikkan
- dan lain-lain ( termasuk mengatur dan menggeser)
Koefisien Alat / M = 1 : Q3
3. TENAGA
Produksi menentukan : TRAILER
Penyediaan Tiang Pancang Baja H Beam / hari = Tk x Q1
Kebutuhan tenaga tambahan di lokasi ::
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 821,321.59 / M
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Ukuran tiang pancang sama sisi (sesuai gambar)
6 Mutu beton
7 Panjang tiang
8 Faktor kehilangan
1. BAHAN
1.a. Volume tiang pancang / m' = uk^2 x 1m' x Fh
Vol sepatu tiang pancang / m' = uk^3 x 1m' x Fh / p
Vol tiang pancang beton pracetak lengkap (Beton Fc' 40 MPa) = vol1 + vol2
1.b. Berat baja tulangan / m' = 2/100 x A x 7850
2. ALAT
2.a CRANE 1
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu menaikkan
- dan lain-lain ( termasuk mengatur dan menggeser)
Koefisien Alat / M = 1 : Q1
Koefisien Alat / M = 1 : Q2
2.c CRANE 2
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu menaikkan
- dan lain-lain ( termasuk mengatur dan menggeser)
Koefisien Alat / M = 1 : Q3
3. TENAGA
Produksi menentukan : TRAILER
Penyediaan Tiang Pancang Baja H Beam / hari = Tk x Q1
Kebutuhan tenaga tambahan di lokasi ::
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 701,330.78 / M
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Ukuran tiang pancang sama sisi (sesuai gambar)
6 Mutu beton
7 Panjang tiang
8 Faktor kehilangan
1. BAHAN
1.a. Volume tiang pancang / m' = uk^2 x 1m' x Fh
Vol sepatu tiang pancang / m' = uk^3 x 1m' x Fh / p
Vol tiang pancang beton pracetak lengkap (Beton Fc' 40 MPa) = vol1 + vol2
1.b. Berat baja tulangan / m' = 1/100 x A x 7850
1.c. Strand 1/2 inci
Jumlah Strand 1/2 inci
Berat 8 buah Strand 1/2 inci per m' = n x 0,729
2. ALAT
2.a CRANE 1
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu menaikkan
- dan lain-lain ( termasuk mengatur dan menggeser)
Koefisien Alat / M = 1 : Q1
Koefisien Alat / M = 1 : Q2
No. URAIAN
2.c CRANE 2
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu menaikkan
- dan lain-lain ( termasuk mengatur dan menggeser)
Koefisien Alat / M = 1 : Q3
3. TENAGA
Produksi menentukan : TRAILER
Penyediaan Tiang Pancang Beton Pracetak / hari = Tk x Q1
Kebutuhan tenaga tambahan di lokasi ::
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 1,141,057.63 / M
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Diameter tiang pancang (sesuai gambar)
6 Mutu beton
7 Panjang tiang
8 Faktor kehilangan
1. BAHAN
1.a. Volume tiang pancang / m' = 0.25 x 22/7 x D^2 x 1m' x Fh
Vol sepatu tiang pancang / m' = D^3 x 1m' x Fh / p
Vol tiang pancang beton pracetak lengkap (Beton F'c 40 MPa) = vol1 + vol2
1.b. Berat baja tulangan / m' = 1/100 x A x 7850
1.c. Strand 1/2 inci
Jumlah Strand 1/2 inci
Berat 8 buah Strand 1/2 inci per m' = n x 0,729
2. ALAT
2.a CRANE 1
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu menaikkan
- dan lain-lain ( termasuk mengatur dan menggeser)
Koefisien Alat / M = 1 : Q1
Koefisien Alat / M = 1 : Q2
No. URAIAN
2.c CRANE 2
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu menaikkan
- dan lain-lain ( termasuk mengatur dan menggeser)
Koefisien Alat / M = 1 : Q3
3. TENAGA
Produksi menentukan : TRAILER
Penyediaan Tiang Pancang Beton Pracetak / hari = Tk x Q1
Kebutuhan tenaga tambahan di lokasi ::
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 777,130.05 / M
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Tiang pancang kayu diterima di lokasi jembatan
3 Lokasi pekerjaan : di lokasi jembatan
4 Jam kerja efektif per-hari
5 Panjang Tiang
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
2. ALAT
3. TENAGA
Produksi menentukan : PLIE HAMMER
Pemancangan Tiang Pancang Kayu / hari = Tk x Q1
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M1 :
- Mandor = ( Tk x M ) : Qt
- Tukang = ( Tk x Tb ) : Qt
- Pekerja = ( Tk x P ) : Qt
No. URAIAN
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi
3 Jam kerja efektif per-hari
4 Panjang Tiang
5 Pemakaian Kawat las dan alat Las utk penyambungan
termasuk dalam item Penyediaan Tiang Pancang
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
2. ALAT
2.a CRANE ON TRACK (10-15) TON; 260 HP
Kapasitas
Faktor Efisiensi alat (Fa)
Waktu siklus
- Waktu mengangkat, memindahkan dan memancang
- Uji keselamatan (safe test)
Koefisien Alat / M = 1 : Q4
ITEM PEMBAYARAN NO. : 7.6.(14a)
JENIS PEKERJAAN : Pemancangan Tiang Pancang Baja Diameter 500 mm
SATUAN PEMBAYARAN :M
No. URAIAN
3. TENAGA
Produksi menentukan : PILE HAMMER
Produksi Pemancangan Tiang Pancang Baja / hari = Tk x Q2
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M1 :
- Mandor = ( Tk x M ) : Qt
- Tukang = ( Tk x Tb ) : Qt
- Pekerja = ( Tk x P ) : Qt
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi
3 Jam kerja efektif per-hari
4 Panjang Tiang
5 Pemakaian Kawat las dan alat Las utk penyambungan
termasuk dalam item Penyediaan Tiang Pancang
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
2. ALAT
2.a CRANE ON TRACK (10-15) TON; 260 HP
Kapasitas
Faktor Efisiensi alat (Fa)
Waktu siklus
- Waktu mengangkat, memindahkan dan memancang
- Uji keselamatan (safe test)
Koefisien Alat / M = 1 : Q4
ITEM PEMBAYARAN NO. : 7.6.(15a)
JENIS PEKERJAAN : Pemancangan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 m
SATUAN PEMBAYARAN :M
No. URAIAN
3. TENAGA
Produksi menentukan : PILE HAMMER
Produksi Pemancangan Tiang Pancang Baja / hari = Tk x Q2
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M1 :
- Mandor = ( Tk x M ) : Qt
- Tukang = ( Tk x Tb ) : Qt
- Pekerja = ( Tk x P ) : Qt
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi
3 Jam kerja efektif per-hari
4 Panjang Tiang
5 Pemakaian Kawat las dan alat Las utk penyambungan
termasuk dalam item Penyediaan Tiang Pancang
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
2. ALAT
2.a CRANE ON TRACK (10-15) TON; 260 HP
Kapasitas
Faktor Efisiensi alat (Fa)
Waktu siklus
- Waktu mengangkat, memindahkan dan memancang
- Uji keselamatan (safe test)
Koefisien Alat / M = 1 : Q4
No. URAIAN
3. TENAGA
Produksi menentukan : PILE HAMMER
Produksi Pemancangan Tiang Pancang Baja / hari = Tk x Q2
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M1 :
- Mandor = ( Tk x M ) : Qt
- Tukang = ( Tk x Tb ) : Qt
- Pekerja = ( Tk x P ) : Qt
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi
3 Jam kerja efektif per-hari
4 Panjang Tiang
5 Pemakaian Kawat las dan alat Las utk penyambungan
termasuk dalam item Penyediaan Tiang Pancang
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
2. ALAT
2.a CRANE ON TRACK (10-15) TON; 260 HP
Kapasitas
Faktor Efisiensi alat (Fa)
Waktu siklus
- Waktu mengangkat, memindahkan dan memancang
- Uji keselamatan (safe test)
Koefisien Alat / M = 1 : Q4
No. URAIAN
3. TENAGA
Produksi menentukan : PILE HAMMER
Produksi Pemancangan Tiang Pancang Baja / hari = Tk x Q2
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M1 :
- Mandor = ( Tk x M ) : Qt
- Tukang = ( Tk x Tb ) : Qt
- Pekerja = ( Tk x P ) : Qt
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi
3 Jam kerja efektif per-hari
4 Panjang Tiang
5 Pemakaian Kawat las dan alat Las utk penyambungan
termasuk dalam item Penyediaan Tiang Pancang
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
2. ALAT
2.a CRANE ON TRACK (10-15) TON; 260 HP
Kapasitas
Faktor Efisiensi alat (Fa)
Waktu siklus
- Waktu mengangkat, memindahkan dan memancang
- Uji keselamatan (safe test)
Koefisien Alat / M = 1 : Q4
No. URAIAN
3. TENAGA
Produksi menentukan : PILE HAMMER
Produksi Pemancangan Tiang Pancang Baja / hari = Tk x Q2
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M1 :
- Mandor = ( Tk x M ) : Qt
- Tukang = ( Tk x Tb ) : Qt
- Pekerja = ( Tk x P ) : Qt
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Beton berdasarkan analisa item pekerjaan ybs
3 Baja tulangan berdasarkan analisa item ybs
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Panjang Tiang
7 Ukuran diameter tiang bor beton
8 Kebutuhan Baja tulangan
9 Faktor kehilangan
1. BAHAN
1.a. Beton Memadat Sendiri fc 20 MPa = {1/4 Phi x (Uk)^2) x 1m x Fh
1.b. Baja Tulangan = (EI-715 x Mb)
1.c. Casing = Phi x Uk
2. ALAT
No. URAIAN
3. TENAGA
Produksi menentukan : BORE PILE MACHINE
Pengeboran Tiang Bor Beton / hari = Tk x Q1
- Mandor
- Tukang
- Pekerja
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan diatas air/sungai
3 Menggunakan ponton ditarik tag boat
4 Pengangkutan tiang pancang menggunakan crane
5 Jam kerja efektif per-hari
6 Panjang Tiang sesuai kebutuhan
7 Ukuran diameter tiang pancang sesuai kebutuhan
II. URUTAN KERJA
1 Dibutuhkan ponton dalam pelaksanaan pemancangan
2 Dengan bantuan Crane, tiang pancang diangkut diatas ponton
kemudian ponton ditarik tug boat ke titik pemancangan
3 Ponton menunggu hingga tiang selesai dipancangkan
1. BAHAN
2. ALAT
Koefisien Alat / m = 1 : Q1
3. TENAGA
Produksi menentukan : PONTON + TUG BOAT; 40 TON; 80 HP
Ponton untuk Pemancangan Tiang Pancang / hari = Tk x Q1
- Mandor
- Tukang
- Pekerja
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan diatas air/sungai
3 Menggunakan ponton ditarik tag boat
4 Pengangkutan beton segar menggunakan crane
5 Jam kerja efektif per-hari
6 Panjang Tiang sesuai kebutuhan
7 Ukuran diameter tiang pancang sesuai kebutuhan
1. BAHAN
-
2. ALAT
No. URAIAN
3. TENAGA
Produksi menentukan : PONTON + TUG BOAT; 40 TON; 80 HP
Ponton untuk Pengeboran Tiang Bor Beton / hari = Tk x Q1
- Mandor
- Tukang
- Pekerja
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan
4 Jam kerja efektif per-hari
5 Beton mutu sedang cincin silinder sesuai item 7.1.(6)
6 Diameter luar cincin silinder
7 Tebal dinding silinder pracetak
8 Tinggi galian sampai ujung atas silinder pracetak
9 Faktor kehilangan:
- Pengembangan tanah
- Beton
10 Berat isi:
- Baja tulangan
- Beton
1. BAHAN
1.a. Cincin/silinder beton mutu sedang (fc' 25 MPa)
Volume = 0.25 x 22/7 x (dl-tb/2)^2 x tb x 1 x Fh
1.b. Baja tulangan sirip BjTS 280 = vol.cin x D1
1.c. Volume galian tanah per kedalaman 1 m' = 0.25 x 22/7 x (dL+0.1)^2
2. ALAT
2.a. EXCAVATOR 0,80 M3; 170 HP
Kapasitas bucket
Faktor Bucket, kondisi Sedang
Faktor Efisiensi alat, Sedang
Faktor konversi-galian, normal, kedalaman < 4m (40 - 75) %
Waktu siklus = Ts
- Menggali, memuat dan berputar
- Lain lain
PROYEK : 7.7.(1)
JENIS PEKERJAAN : Dinding Sumuran Silinder Terpasang, Diameter …
SATUAN PEMBAYARAN :M
No. URAIAN
3. TENAGA
Produksi menetukan : Produksi Crane
Produksi crane / hari = Tk x Q2
Kebutuhan tenaga : - Mandor
- Tukang Batu
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Perbandingan Pasir & Semen : - Volume Semen
: - Volume Pasir
7 Perbandingan Batu & Mortar :
- Batu
- Mortar (campuran semen & pasir)
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar
- Batu
- Adukan (mortar)
- Pasir
- Semen Portland
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.05
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.03
x {D5 x (1000)}
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05
2. ALAT
2.a. CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
Koefisien Alat / M3 = 1 : Q2
PROYEK : 7.9.(1)
JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3
No. URAIAN
3. TENAGA
Produksi menetukan : Produksi Concrete Mxer
Produksi Pasangan Batu dengan Mortar / hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang Batu
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 1,033,503.67 / M3
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Pengisi celah Pasangan Batu Kosong adalah beton 15 MPa
Perbandingan Camp. : Semen
: Pasir
: Agregat Kasar
: Air
: Plasticizer
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 x Ae/100
1.b. Pasir = (Ps/1000 : D3) x 1.05 x Ae/100
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 x Ae/100
1.d. Air = W x 1.03 x Ae/100
1.e. Plastizier = Plt x 1.03 x Ae/100
1.f. Batu Belah = Bt/100 x D1/D5 x 1.05
2. ALAT
2.a. CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3 = 1 : Q1
Koefisien Alat / M3 = 1 : Q2
No. URAIAN
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 582,196.20 / M3
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu dan pasir) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Faktor kehilangan material
1. BAHAN
1.a. Batu Belah = 1 x 1.23 x Fh
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gerobak Dorong
- Palu Batu
3. TENAGA
Produksi pasangan batu kosong dalam 1 hari
Kebutuhan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 534,145.87 / M3
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............ bulan
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bronjong dengan kawat dilapisi galvanis diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Faktor Kehilangan Material
1. BAHAN
1.a. Bronjong dengan kawat dilapisi galvanis
1.b. Batu
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Tang = 2 buah
- Pemotong kawat = 2 buah
- Palu pemecah batu = 2 buah
3. TENAGA
Produksi pekerjaan per hari
dibutuhkan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M3
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt
Rp. 786,500.00 / M3
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bronjong dengan kawat dilapisi galvanis diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Faktor Kehilangan Material
1. BAHAN
1.a. Bronjong dengan kawat dilapisi PVC ukuran 2m x 1m x 0.5m
1.b. Batu =1.23 x 1 x Fh
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Tang
- Pemotong kawat
- Palu pemecah batu
3. TENAGA
Produksi pekerjaan per hari
dibutuhkan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M3
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt
Rp. 1,049,663.16 / M3
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bronjong dengan kawat dilapisi galvanis diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
6 Faktor Kehilangan Material
1. BAHAN
1.a. Anyaman Penulangan Tanah dengan Kawat yang Dilapisi PVC per meter persegi
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Tang
- Pemotong kawat
- Palu pemecah batu
3. TENAGA
Produksi pekerjaan per hari
dibutuhkan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt
- Tukang = ( Tb x Tk ) : Qt
- Pekerja = ( P x Tk ) : Qt
Rp. 241,043.00 / M3
No. URAIAN
1. BAHAN
1.a. Bridging Plate PL 125 x 6 = Lbp x Tbp x 1 x 7850 x Fh
1.b Backer rod = 1 x Fh
1.c Asphaltic plug (40 x 7,5 x 100) cm3 = L.ap x T.ap x 1 x 1000 x Bi.Ap x Fh
Penggantianpelat (bila perlu diganti) = L.ap x 2 m x 0,02 m x 7850
Pengelasan pelat (bila perlu diganti)
2. ALAT
2.b. TAMPER; 121 KG; 1 KM/JAM; T=20 CM; W 635X500 MM; 4,7 HP
Tamper
1 group kerja menghasilkan (Out put)
Koefisien alat = 1 : Q2
No. URAIAN
3. TENAGA
Koefisien Tenaga / M :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,154,365 / M
No. URAIAN
1. BAHAN
1.a. Bridging Plate PL 125 x 6 = Lbp x Tbp x 1 x 7850 x Fh
Asphaltic plug. Movable = L.ap x T.ap x 1 x 1000 x Bi.Ap x Fh
Baja profil L=149x125 dan profil C=75x45x15x2,3
Bout dia 23 mm = 8 x 0,15 kg
Beton fc 25 MPa = 0,25 x 0,30 x 1,00
2. ALAT
2.a. TAMPER; 121 KG; 1 KM/JAM; T=20 CM; W 635X500 MM; 4,7 HP
Tamper
1 group kerja menghasilkan (Out put)
Koefisien alat = S : Qt x Tk
No. URAIAN
3. TENAGA
Produksi pasang Exp. Joint dalam 1 hari
Koefisien Tenaga / M :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Koefisien Tenaga / M :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp. 3,062,311 / M
No. URAIAN
II URUTAN KERJA
1 Pasang ganjalan untuk membuat celah pada sambungan jembatan
2 Cor sambungan dengan menggunakan beton fast track
3 Lepas ganjalan, sehingga terdapat celah pada sambungan jembatan
4 Pasang batang penyokong (backer rod) pada celah sambungan jembatan
5 Tuangkan silicon seal pada celah sambungan diatas backer rod hingga menutupi seluruh backer rod
3. TENAGA
Alat yang mementukan pekerjaan, Q3
Produksi lubang per hari = Tk x Q3
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 747,833.77 / M3
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............ bulan
No. URAIAN
2. ALAT
Linggis Kecil (Alat Bantu)
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu melepas karet pengisi yang akan diganti
- Waktu membersihkan celah sambungan
- Waktu memberi pelumas pada area pekerjaan
- Waktu pemasangan karet pengisi
2. Alat Bantu
Obeng
Linggis
3. TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 1,377,321.45 / M3
No. URAIAN
2. ALAT
Linggis Kecil (Alat Bantu)
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu melepas karet pengisi yang akan diganti
- Waktu membersihkan celah sambungan
- Waktu memberi pelumas pada area pekerjaan
- Waktu pemasangan karet pengisi
2. Alat Bantu
Obeng
Linggis
3. TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 1,385,646.42 / M3
No. URAIAN
II URUTAN KERJA
1 Buat tanda dan potong perkerasan 20 cm ke kanan dan kiri celah
2 Pasang sambungan siar muai, beserta dengan karet pengisi celah sambungan
3 Cor sambungan dengan menggunakan beton fast track
4 Lakukan perawatan beton
2. ALAT
2.a Asphalt cutter 130 feet/mnt; 22 HP
Kapasitas per jam 130 ft/mnt dia. 22,6" = 130 x 0,34
Faktor efisiensi alat
Kapasitas prod/jam V1 x Fa x 60
2 x ( 2 x Le + 1 )
Koefisien alat/lubang = 1 : Q1
3. TENAGA
Alat yang mementukan pekerjaan, JACK HAMMER + AIR COMPRESSOR
Produksi lubang per hari = Tk x Q2
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 1,193,297.40 / M
No. URAIAN
II URUTAN KERJA
1 Buat tanda dan potong perkerasan 20 cm ke kanan dan kiri celah
2 Pasang sambungan siar muai, beserta dengan karet pengisi celah sambungan
3 Cor sambungan dengan menggunakan beton fast track
4 Lakukan perawatan beton
2. ALAT
2.a Asphalt cutter 130 feet/mnt; 22 HP
Kapasitas per jam 130 ft/mnt dia. 22,6" = 130 x 0,34
Faktor efisiensi alat
Kapasitas prod/jam V1 x Fa x 60
2 x ( 2 x Le + 1 )
Koefisien alat/lubang = 1 : Q1
3. TENAGA
Alat yang mementukan pekerjaan, JACK HAMMER + AIR COMPRESSOR
Produksi lubang per hari = Tk x Q2
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
ITEM PEMBAYARAN NO. : 7.11.(6)
JENIS PEKERJAAN : Penggantian Sambungan Siar Muai Tipe Finger Plate, lebar
SATUAN PEMBAYARAN :M
No. URAIAN
Rp. 4,152,979.30 / M
No. URAIAN
1. BAHAN
1.a. Sambungan siar muai tipe Karet (Preformed T-shape)
Penampang atas = Lbr.a x Tbl.a
Penampang bawah = Lbr.c x Tbl.c
Berat pe m' = A x 1 x D1
2. ALAT
2.a. TAMPER; 121 KG; 1 KM/JAM; T=20 CM; W 635X500 MM; 4,7 HP
Welding Set
1 group kerja menghasilkan (Out put)
Koefisien alat = 1 / Q1
3. TENAGA
Produksi pasang Exp. Joint dalam 1 hari
Koefisien Tenaga / M :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
Rp. 1,927,010 / M
No. URAIAN
1. BAHAN
1.a Bridging Plate PL 125 x 6 = Lbp x Tbp x 1 x 7850 x Fh
1.b Asphaltic plug = L.ap x T.ap x 1 x 1000 x Bi.Ap x Fh
1.c Backer rod diameter 3/8 inch
1.d Joint Sealant = T.seal x 0,02 x 1 x 1000 x 1,04 x Fh
2. ALAT
2.a. DRUM MIXER
Welding Set
1 group kerja menghasilkan (Out put)
Koefisien alat = Ml : Qt x Tk
2.b. TAMPER; 121 KG; 1 KM/JAM; T=20 CM; W 635X500 MM; 4,7 HP
Tamper
1 group kerja menghasilkan (Out put)
Koefisien alat = S : Qt x Tk
3. TENAGA
Koefisien Tenaga / M :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 2,532,716 / M
No. URAIAN
1. BAHAN
1.a. Expansion Joint Tipe Modular (steel grid)
2. ALAT
2.a. DRUM MIXER
Welding Set
1 group kerja menghasilkan (Out put)
Koefisien alat = 1 / Q1
3. TENAGA
Koefisien Tenaga / M :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 310,516.88 / M
No. URAIAN
1. BAHAN
1.a. Perletakan logam tipe fixed 150 Ton
2. ALAT
2.a. JACK HYDRAULIC; 10 HP
Kapasitas
Faktor efisiemsi alat
Siklus time
- Penempatan, penyetelan jack hidrolic yang stabil
- Pelurusan
- Pengangkatan /penurunan girder
Kapasitas produksi = Ca x 60 x Fa
Ts
Koefisiean alat = 1 : Q2
3. TENAGA
Produksi pasang Elastomerik dalam 1 hari = Q1
Kebutuhan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
2. ALAT
2.a. ALAT BANTU
Dongkrak hidrolik dan alat pertukangan
3. TENAGA
Produksi pasang Elastomerik dalam 1 hari
Kebutuhan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
2. ALAT
2.a. ALAT BANTU
Dongkrak hidrolik dan alat pertukangan
3. TENAGA
Produksi pasang Elastomerik dalam 1 hari
Kebutuhan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
2. ALAT
2.a. ALAT BANTU
Dongkrak hidrolik dan alat pertukangan
3. TENAGA
Produksi pasang Elastomerik dalam 1 hari
Kebutuhan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
2. ALAT
2.a. ALAT BANTU
Dongkrak hidrolik dan alat pertukangan
3. TENAGA
Produksi pasang Elastomerik dalam 1 hari
Kebutuhan tenaga : - Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 301,950.00 / M
II URUTAN KERJA
1 Memasang dudukan Jack pada lokasi titik angkat Jembatan
2 Hydraulic Jack sesuai kapasitas beban ditempatkan dan dihubungkan dengan Electric Hydraulic Pump
3 Pengangkatan dilakukan bertahap beberapa kali dengan memasang pengganjal di bawah Huyd Jack
4 Dilakukan pembersihan dan/atau perbaikan dudukan bearing pad
5 Pemasangan bearing pad yang
6 Jembatan diturunkan perlahan dengan melepas jack pengangkat
7 Selama pekerjaan berlangsung dipasang rambu dan penjaga lalu lintas di atas Jembatan
2 ALAT
2.a Hydraulic Jack
kapasitas
Beban mati tiap Landasan
Beban Hidup tiap landasan (asumsi)
Faktor keamanan
Faktor Evisiensi Alat
Keperluan alat tiap tumpuan
2.b Manifold
Koefisien alat mengikuti Hydrolic Jack
2.b Hose
Koefisien alat mengikuti Hydrolic Jack
No. URAIAN
3. TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Kepala Tim
Ahli Mekanikal
Assisten tenaga Ahli
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Mandor (Tk x M) : Qt Mandor
Kepala Tim (Tk x Kt) : Qt Kepala Tim
Ahli Mekanikal (Tk x Am) : Qt Ahli Mekanikal
Assisten tenaga Ahli (Tk x Ata) : Qt Assisten tenaga Ahli
No. URAIAN
II URUTAN KERJA
1 Memasang dudukan Jack pada lokasi titik angkat Jembatan
2 Hydraulic Jack sesuai kapasitas beban ditempatkan dan dihubungkan dengan Electric Hydraulic Pump
3 Pengangkatan dilakukan bertahap beberapa kali dengan memasang pengganjal di bawah Huyd Jack
4 Dilakukan pembersihan dan/atau perbaikan dudukan bearing pad
5 Pemasangan bearing pad
6 Jembatan diturunkan perlahan dengan melepas jack pengangkat
7 Selama pekerjaan berlangsung dipasang rambu dan penjaga lalu lintas di atas Jembatan
2 ALAT
2.a Hydraulic Jack
kapasitas
Beban mati tiap Landasan
Beban Hidup tiap landasan (asumsi)
Faktor keamanan
Faktor Evisiensi Alat
Keperluan alat tiap tumpuan
2.b Manifold
Koefisien alat mengikuti Hydrolic Jack
2.b Hose
Koefisien alat mengikuti Hydrolic Jack
No. URAIAN
3. TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Kepala Tim
Ahli Mekanikal
Assisten tenaga Ahli
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Mandor (Tk x M) : Qt Mandor
Kepala Tim (Tk x Kt) : Qt Kepala Tim
Ahli Mekanikal (Tk x Am) : Qt Ahli Mekanikal
Assisten tenaga Ahli (Tk x Ata) : Qt Assisten tenaga Ahli
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jembatan
3 Bahan / material diterima seluruhnya di lokasi pekerjaan proyek
4 Faktor Pengembangan Bahan
5 Jarak rata-rata Base camp ke lokasi pekerjaan
6 Jam kerja efektif per-hari
2. ALAT
2.a. Alat pertukangan dan lain-lain
3. TENAGA
Produksi pasang Railingk dalam 1 hari
= Tk x Q1 =
Koefisien Tenaga / M :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 88,151 / M1
No. URAIAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan di lokasi jembatan
3 Bahan / material diterima seluruhnya di lokasi
pekerjaan proyek
4 Jarak rata-rata Base camp ke lokasi pekerjaan
5 Jam kerja efektif per-hari
1. BAHAN
1.a. Marmer
1.b. Adukan Semen
2. ALAT
2.a. Alat bantu pertukangan
3. TENAGA
Produksi Papan Nama dalam 1 hari
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari
5 Faktor pengembangan bahan
6 Berat volume pasangan batu lepas
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. JACK HAMMER; 1 M2 / 5 MENIT
Kapasitas bongkar
Faktor efesiensi
Kapasitas prod/jam = Fa x 60
bk
Koefesien alat = 1 : Q1
Koefisien Alat = 1 : Q3
No. URAIAN
3. TENAGA
Produksi menentukan : JACK HAMMER
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt
- Mandor = (Tk x M) : Qt
Rp. 328,111.62 / M3
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari
5 Faktor pengembangan bahan
6 Berat volume beton lepas
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. JACK HAMMER; 1 M2 / 5 MENIT
Kapasitas bongkar
Faktor efesiensi
Kapasitas prod/jam = Fa x 60
bk
Koefesien alat = 1 : Q1
Koefisien Alat = 1 : Q3
No. URAIAN
3. TENAGA
Produksi menentukan : JACK HAMMER
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt
- Mandor = (Tk x M) : Qt
Rp. 482,442.50 / M3
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari
5 Faktor pengembangan bahan
1. BAHAN
Tidak ada bahan yang diperlukan
`
2. ALAT
2.a EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Faktor konversi , kedalaman 40 %-75 %, Normal
Waktu siklus
- Menggali , memuat
- Lain lain
Waktu siklus = T1 x Fv
Koefisien Alat / M3 = 1 : Q1
Koefisien Alat / M3 = 1 : Q2
No. URAIAN
Koefisien Alat = 1 : Q3
3. TENAGA
Produksi menentukan : ROCK DRILL BREAKER
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt
- Mandor = (Tk x M) : Qt
Rp. 466,401.50 / M3
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari
5 Faktor pengembangan bahan
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Faktor konversi , kedalaman 40 %-75 %, Normal
Waktu siklus
- Menggali , memuat
- Lain lain
Waktu siklus = T1 x Fv
Koefisien Alat / M3 = 1 : Q1
Koefisien Alat / M3 = 1 : Q2
ITEM PEMBAYARAN NO. : 7.15 (4)
JENIS PEKERJAAN : Pembongkaran Bangunan Gedung
SATUAN PEMBAYARAN : M2
No. URAIAN
Koefisien Alat = 1 : Q3
3. TENAGA
Produksi menentukan : ROCK DRILL BREAKER
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M2 :
- Pekerja = (Tk x P) : Qt
- Mandor = (Tk x M) : Qt
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari
5 Faktor pengembangan bahan
6 Berat balok baja
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. KUNCI TORSI
Produksi membuka seluruh baut per jam sepanjang balok baja
Koefisien Alat = 1 : Q1
Koefisien Alat = 1 : Q3
No. URAIAN
3. TENAGA
Produksi menentukan : KUNCI TORSI
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M2 :
- Pekerja = (Tk x P) : Qt
- Mandor = (Tk x M) : Qt
Rp. 1,142,845.93 / M2
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari
5 Faktor konversi bahan
6 Berat balok baja
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. KUNCI TORSI
Produksi membuka seluruh baut per jam sepanjang balok baja
Koefisien Alat = 1 : Q1
Koefisien Alat = 1 : Q3
PROYEK : 7.15.(6)
JENIS PEKERJAAN : Pembongkaran Balok Baja (Steel Stringers)
SATUAN PEMBAYARAN : M'
No. URAIAN
3. TENAGA
Produksi menentukan : KUNCI TORSI
Produksi Bongkar / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari
5 Faktor pengembangan bahan
6 Berat volume kayu
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
3. TENAGA
Produksi menentukan : DUMP TRUCK
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M2 :
- Pekerja = (Tk x P) : Qt
- Mandor = (Tk x M) : Qt
No. URAIAN
Rp. 142,774.89 / M2
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari
5 Faktor pengembangan bahan
6 Berat volume kayu
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. MESIN POTONG KAYU (CHAINSAW)
Memotong diperkirakan = 0.50 jam per m2
2.b. CRANE ON TRUCK (10-15) TON; 260 HP
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu muat
- Waktu bongkar
- Lain-Lain
No. URAIAN
3. TENAGA
Produksi menentukan : alat bantu
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M2 :
- Pekerja = (Tk x P) : Qt
- Mandor = (Tk x M) : Qt
Rp. 45,753.30 / M2
1. BAHAN
1.a. Deck drain baja diameter 150 mm
1.b. Baja Tulangan (angkur) penggantung/hanger L60.60.6
2. ALAT
3. TENAGA
Produksi pasang deck drain dalam 1 hari
Kebutuhan tenaga:
- Pekerja
- Tukang
- Mandor
Koefisien Tenaga / buah :
- Pekerja = (Tk x P) : Qt
- Tukang = (Tk x T) : Qt
- Mandor = (Tk x M) : Qt
No. URAIAN
1. BAHAN
1.a. Pipa baja 150 mm
Jumlah per 1 m
1.b. Baja (ducting, klem)
1.c. Pengelasan terpasang
2. ALAT
2.a. Welding set
Welding Set
1 group kerja menghasilkan (Out put)
Koefisien alat = 1 : Q1
3. TENAGA
Produksi pasang deck drain dalam 1 hari
Kebutuhan tenaga:
- Pekerja
- Tukang
- Mandor
Koefisien Tenaga / M :
- Pekerja = (Tk x P) : Qt
- Tukang = (Tk x T) : Qt
- Mandor = (Tk x M) : Qt
Rp. 222,518 / M
No. URAIAN
1. BAHAN
1.a. Pipa PVC AW Dia 150 mm
1.b. Baja Tulangan (ankur)
1.c. Lem PVC
2. ALAT
2.a. ALAT BANTU
Alat Pertukangan dan lain-lain
3. TENAGA
Produksi pasang deck drain dalam 1 hari
Kebutuhan tenaga:
- Pekerja
- Tukang
- Mandor
Koefisien Tenaga / M :
- Pekerja = (Tk x P) : Qt
- Tukang = (Tk x T) : Qt
- Mandor = (Tk x M) : Qt
Rp. 87,466 / M
No. URAIAN
1. BAHAN
1.a. Pipa PVC AW Dia 8 inch
1.b. Baja Tulangan (ankur)
1.d. Lem PVC
2. ALAT
3. TENAGA
Produksi pasang deck drain dalam 1 hari
Kebutuhan tenaga:
- Pekerja
- Tukang
- Mandor
Koefisien Tenaga / M :
- Pekerja = (Tk x P) : Qt
- Tukang = (Tk x T) : Qt
- Mandor = (Tk x M) : Qt
Rp. 87,466 / M
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
(M61) 1.0500 M1
A.
1.
2.
3.
Lumpsum
B.
Qt 28.00 M1 1.
M 1.00 orang
Tb 2.00 orang
P 6.00 orang
C.
1
(L03) 0.2500 jam
(L02) 0.5000 jam
(L01) 1.5000 jam
D.
E.
F.
Note: 1
3
4
Analisa EI-762
Penyediaan dan Pemancangan
URAIAN ANALISA HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
Tk 7.00 jam
Lbr 0.20 M' PROP / KAB / KODYA
Tbl 0.03 M' ITEM PEMBAYARAN NO.
P 6.00 M' JENIS PEKERJAAN
Fh 1.05 SATUAN PEMBAYARAN
D1 0.650
NO.
A.
(M192) 1.0000 M1
A 0.0063 M2 1.
Brt 0.0063 M3/M' Berat = 24.6 Kg 2.
3.
B.
1.
Qt 14.00 M2
D.
E.
F.
Note: 1
3
4
Analisa EI-763
, Penyediaan dan Pemancangan
URAIAN ANALISA HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
Tk 7.00 jam
Lbr 0.20 M' PROP / KAB / KODYA
Tbl 0.03 M' ITEM PEMBAYARAN NO.
P 6.00 M' JENIS PEKERJAAN
Fh1 1.03 SATUAN PEMBAYARAN
Fh2 1.05
Kr 5.00 Kg
NO.
A.
(M192) 1.0000 M1 1.
A 0.0062 M2 2.
Brt 0.0062 M3/M' Berat = 185.4 Kg 3.
Kreo 31.827 kg
B.
1.
2.
Qt 14.00 M2
C.
M 1.00 orang pakai tripot
Tb 3.00 orang
P 15.00 orang 1.
D.
E.
F.
Note: 1
2
3
4
Analisa EI-764
PROYEK
No. PAKET KONTRAK
NAMA PAKET
1.
2.
3.
B.
1.
2.
(M52) 154.50 Kg 3.
(M48) 0.03 Kg
(M51) 0.65 M
(E29)
V1 14.00 batang C.
Fa 0.83
v1 20.00 Km/Jam 1.
v2 30.00 Km/Jam 2.
Ts1 3.
T1 26.18 menit 4.
T2 17.45 menit 5.
T3 80.00 menit 6.
Ts1 123.63 menit
Q1 27.07 M2
D.
(E29) 0.0369 Jam E.
F.
(E07) Note: 1
V2 1.00 batang
Fa 0.83 - 2
T1 5.00 menit
T2 5.00 menit 3
Ts2 10.00 menit 4
Q2 23.90 M2
Analisa EI-764
(E07)
V3 1.00 batang
Fa 0.83 -
T4 10.00 menit
T5 20.00 menit
Ts3 30.00 menit
Q3 7.97 M2
(E07) 0.1255 jam
(E32)
p 12.00 M
Ts4 60.00 Menit
Fa 0.83
Q4 9.96 M2
(E32) 0.1004 jam
(E61)
V5 1.00 Buah
Fa 0.83
T1 3.00 menit
T2 3.00 menit
T3 2.00 menit
Ts5 8.00 menit
Q5 29.88 M2
Q3 29.88 M2/Jam
Qt 209.16 M2
M 1.00 orang
Tb 2.00 orang
P 8.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
Ti 0.400 M'
Tbl 0.120 M'
Leb 0.996 M' NO.
Brt.m' 0.400 T/M'
D1 2.200 T/M3
D2 7.856 T/M3 A.
Fh 1.030
1.
2.
3.
B.
1.
2.
(M234) 0.1865 M3 3.
A 0.1873 M2 4.
(M57a) 0.0484 T
(E29)
V1 8.00 buah C.
Fa 0.83
v1 20.00 Km/Jam 1.
v2 30.00 Km/Jam 2.
Ts1 3.
T1 26.18 menit 4.
T2 17.45 menit 5.
T3 80.00 menit 6.
Ts1 123.63 menit
b x Fa x 60 Q1 19.26 M2
Kg
D.
(E29) 0.0519 Jam E.
F.
(E07) Note: 1
V2 1.00 batang
Fa 0.83 - 2
T1 5.00 menit
T2 5.00 menit 3
Ts2 10.00 menit 4
b x Fa x 60 Q2 29.76 m2
Analisa EI-765
(E07)
V3 1.00 batang
Fa 0.83 -
T4 10.00 menit
T5 20.00 menit
Ts3 30.00 menit
Q3 9.92 m2
T1 3.0 menit
T2 3.0 menit
T3 2.0 menit
Ts4 8.0 menit
Q4 37.2006 m2
Lumpsum
Q4 37.20 M2/jam
Qt 260 M2
M 1.00 orang
Tb 2.00 orang
P 6.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
Tk 7.00 jam
Dia 200 MM PROP / KAB / KODYA
Fh 1.050 ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
(M235) 0.0330 M3
(M236) 0.4946 Kg A.
1.
2.
3.
B.
Qt 22.00 M1 1.
2.
M 1.00 orang
Tb 0.00 orang
P 2.00 orang
C.
3
4
Analisa EI-767
Pengawetan Ukuran …. mm
URAIAN ANALISA HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
Tk 7.00 jam
Dia 200 MM PROP / KAB / KODYA
Fh1 1.030 ITEM PEMBAYARAN NO.
Fh2 1.050 JENIS PEKERJAAN
Kr 5.00 kg SATUAN PEMBAYARAN
NO.
A.
Vol 0.0330 M3
Spt 0.4946 Kg 1.
Kreo 0.1698 Kg 2.
3.
Lumpsum
B.
1.
Qt 21.00 M1 2.
3.
M 1.00 orang
Tb 0.00 orang
P 2.00 orang
C.
D.
E.
F.
Note: 1
3
4
Analisa EI-768a
r 500 mm dengan tebal 10 mm
URAIAN ANALISA HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
A.
1.
2.
3.
(M52) 159.65 Kg
(M48) 0.21 Kg B.
1.
2.
(E29)
V 12.00 batang
Fa 0.83
v1 20 Km/Jam
v2 30 Km/Jam
Ts1
T1 26.18 menit C.
T2 17.45 menit
T3 80 menit 1.
Ts1 123.63 menit 2.
3.
Q1 58.0077 M 4
(E07)
V2 3.00 batang
Fa 0.83 - D.
E.
T4 10.00 menit Lumpsum F.
T5 20.00 menit Note: 1
Ts2 30.00 menit
2
Q2 59.76 M
3
(E07) 0.0167 jam 4
Analisa EI-768a
500 mm dengan tebal 10 mm
URAIAN ANALISA HARGA SATUAN
Lanjutan
(E07)
V2 3.00 batang
Fa 0.83 -
T4 10.00 menit
T5 20.00 menit
Ts2 30.00 menit
Q3 59.76 M
Lumpsum
Q1 58.01 M/jam
Qt 406.05 M
M 1.00 orang
Tb 10.00 orang
P 20.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
A.
1.
2.
3.
B.
Brt.pm' 75.36 Kg/m'
904.28 Kg/Batang 1.
(E07)
V2 3.00 batang
Fa 0.83 -
T4 10.00 menit C.
T5 20.00 menit
Ts2 30.00 menit 1.
2.
Q1 59.76 M 3.
4
(E29)
V2 18.00 batang
Fa 0.83 D.
v1 20 Km/Jam E.
v2 30 Km/Jam F.
Note: 1
T1 26.175 menit
T2 17.45 menit 2
T3 80 menit
Ts2 123.63 menit
3
Q2 87.0115 m' 4
Analisa EI-769a
kuran 300 mm x 300 mm x 10 mm x 15 mm
URAIAN ANALISA HARGA SATUAN
Lanjutan
(E07)
V2 3.00 batang
Fa 0.83 -
T4 10.00 menit
T5 20.00 menit
Ts2 30.00 menit
Q3 59.76 M
Lumpsum
Q2 87.01 M/jam
Qt 609.08 M
M 1.00 orang
Tb 10.00 orang
P 20.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
vol1 0.126 m3 3.
vol2 0.004 m3
(M69) 0.130 m3
(M57b) 19.81 kg/m'
B.
(E07) 1.
V2 3.00 batang 2
Fa 0.83 -
T4 10.00 menit
T5 20.00 menit
Ts2 30.00 menit
Q1 59.76 M C.
1.
(E07) 0.0167 jam 2.
3.
(E29) 4.
V2 5 batang
Fa 0.83
v1 20 Km/Jam
v2 30 Km/Jam
T1 26.175 menit
T2 17.45 menit D.
T3 20 menit E.
Ts2 63.63 menit F.
Note: 1
Q2 46.9627 m'
2
Analisa EI-7610a
Pracetak Ukuran 350 mm x 350 mm
URAIAN ANALISA HARGA SATUAN
Lanjutan
KODE KOEF. SATUAN KETERANGAN
(E07)
V2 3.00 batang
Fa 0.83 -
T4 10.00 menit
T5 20.00 menit
Ts2 30.00 menit
Q3 59.76 M
Lumpsum
Q2 46.96 M/jam
Qt 328.739 M
M 1.00 orang
Tb 5.00 orang
P 10.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
vol1 0.165 m3 3.
vol2 0.005 m3
(M69) 0.170 m3
12.94 kg/m'
(M194) 0.729 kg/m' B.
n 8 buah
Bst 5.83 kg 1.
2
3
(E07)
V2 3.00 batang
Fa 0.83 -
T4 10.00 menit
T5 20.00 menit C.
Ts2 30.00 menit
1.
Q1 59.76 M 2.
3.
3.
(E07) 0.0167 jam
(E29)
V2 5 batang
Fa 0.83
v1 20 Km/Jam
v2 30 Km/Jam D.
E.
T1 26.175 menit F.
T2 17.45 menit Note: 1
T3 20 menit
Ts2 63.63 menit 2
Q2 46.9627 m'
3
4
(E29) 0.0213 jam
Analisa EI-7611a
g Pratekan Pracetak Ukuran 400 mm x 400 mm
URAIAN ANALISA HARGA SATUAN
Lanjutan
(E07)
V2 3.00 batang
Fa 0.83 -
T4 10.00 menit
T5 20.00 menit
Ts2 30.00 menit
Q3 59.76 M
Lumpsum
Q2 46.96 M/jam
Qt 328.739 M
M 1.00 orang
Tb 5.00 orang
P 10.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
vol1 0.164 m3 3.
vol2 0.008 m3
vol3 0.172 m3
12.86 kg/m'
(M194) 0.729 kg/m' B.
n 8 buah
Bst 5.83 kg 1.
2
3
(E07)
V2 3.00 batang
Fa 0.83 -
T4 10.00 menit
T5 20.00 menit C.
Ts2 30.00 menit
1.
Q1 59.76 M 2.
3.
3.
(E07) 0.0167 jam
(E29)
V2 5 batang
Fa 0.83
v1 20 Km/Jam
v2 30 Km/Jam D.
E.
T1 26.175 menit F.
T2 17.45 menit Note: 1
T3 20 menit
Ts2 63.63 menit 2
Q2 46.9627 m'
3
4
(E29) 0.0213 jam
Analisa EI-7612a
g Pratekan Pracetak Diameter 450 mm
URAIAN ANALISA HARGA SATUAN
Lanjutan
(E07)
V2 3.00 batang
Fa 0.83 -
T4 10.00 menit
T5 20.00 menit
Ts2 30.00 menit
Q3 59.76 M
Q2 46.96 M/jam
Qt 328.739 M
M 1.00 orang
Tb 2.00 orang
P 5.00 orang
Analisa EI-7613
URAIAN ANALISA HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
3.
(E30) B.
V1 1.00 Titik
Fa 0.83 -
T1 45.00 menit
T2 60.00 menit
T3 30.00 menit
Ts1 135.00 menit
Q1 2.2133 M1
C.
(E30) 0.4518 Jam
1.
2.
Lumpsum
Q1 2.21 M/jam
Qt 15.49 M'
M 1.00 orang
Tb 0.00 orang D.
P 2.00 orang E.
F.
Note: 1
(L03) 3.1627 jam
(L02) 0.0000 jam 2
(L01) 6.3253 jam
3
4
PROYEK
No. PAKET KONTRAK
NAMA PAKET
Tk 7.00 jam PROP / KAB / KODYA
p 12.00 m ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
A.
1.
2.
3.
(E07b)
V1 1.00 Buah
Fa 0.83 B.
T1 116.00 menit
T2 3.00 menit
Ts1 119.00 menit
Q1 5.02 m'
(E30)
V2 1.00 Titik C.
Fa 0.83 -
1.
T1 5.00 menit 2.
T2 80.00 menit 3
T3 15.00 menit 4.
T4 15.00 menit
Ts2 115.00 menit
Q2 5.20 m'/jam
Lumpsum
Q2 5.20 M/Jam
Qt 36.38 M
M 1.00 orang
Tb 0.00 orang
P 4.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
3.
(E07b)
V1 1.00 Buah
Fa 0.83 B.
T1 116.00 menit
T2 3.00 menit
Ts1 119.00 menit
Q1 5.02 m'
(E30)
V2 1.00 Titik C.
Fa 0.83 -
1.
T1 5.00 menit 2.
T2 80.00 menit 3
T3 15.00 menit 4.
T4 15.00 menit
Ts2 115.00 menit
Q2 5.20 m'/jam
Lumpsum
Q2 5.20 M/Jam
Qt 36.38 M
M 1.00 orang
Tb 0.00 orang
P 4.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
3.
(E07b)
V1 1.00 Buah
Fa 0.83 B.
T1 116.00 menit
T2 3.00 menit
Ts1 119.00 menit
Q1 5.02 m'
(E30)
V2 1.00 Titik C.
Fa 0.83 -
1.
T1 5.00 menit 2.
T2 80.00 menit 3
T3 15.00 menit 4.
T4 15.00 menit
Ts2 115.00 menit
Q2 5.20 m'/jam
Lumpsum
Q2 5.20 M/Jam
Qt 36.38 M
M 1.00 orang
Tb 0.00 orang
P 4.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
3.
(E07b)
V1 1.00 Buah
Fa 0.83 B.
T1 116.00 menit
T2 3.00 menit
Ts1 119.00 menit
Q1 5.02 m'
(E30)
V2 1.00 Titik C.
Fa 0.83 -
1.
T1 5.00 menit 2.
T2 80.00 menit 3
T3 15.00 menit 4.
T4 15.00 menit
Ts2 115.00 menit
Q2 5.20 m'/jam
Lumpsum
Q2 5.20 M/Jam
Qt 62.36 M
M 1.00 orang
Tb 0.00 orang
P 4.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
3.
(E07b)
V1 1.00 Buah
Fa 0.83 B.
T1 116.00 menit
T2 3.00 menit
Ts1 119.00 menit
Q1 5.02 m'
(E30)
V2 1.00 Titik C.
Fa 0.83 -
1.
T1 5.00 menit 2.
T2 80.00 menit 3
T3 15.00 menit 4.
T4 15.00 menit
Ts2 115.00 menit
Q2 5.20 m'/jam
(E30) 0.1924 Jam
D.
(E32) E.
p 12.00 M Lumpsum F.
Ts4 60.00 menit Note: 1
Fa 0.83
2
Q3 9.96 M
Lumpsum
Q2 5.20 M/Jam
Qt 62.36 M
M 1.00 orang
Tb 4.00 orang
P 8.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
A.
1.
2.
3.
(M252) 0.5177 M3
(M57a) 62.1281 Kg B.
2.5133 M2
1.
2.
3.
(E33)
V1 1.00 titik
Fa 0.83 -
T1 1.00 menit
T2 20.00 menit C.
T3 15.00 menit
T4 20.00 menit 1.
T5 45.00 menit 2.
T6 15.00 menit 3.
Ts1 116.00 menit
Q1 5.15 M'
Lumpsum
Q1 5.15 M'/jam
Qt 36.06 M
M 1.00 orang
T 3.00 orang
P 6.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
A.
1.
2.
3.
B.
(E64)
V 36.00 M'
Qa 5.20 M'
T1 0.00 menit
T2 15.00 menit
T3 415.66 menit C.
T4 10.00 menit
T5 11.82 menit 1.
Ts1 437.48 menit 2.
Q1 4.94 M'
D.
E.
F.
Note: 1
Lumpsum
Q1 4.94 M'/jam
Qt 34.56 M
M 1.00 orang
T 2.00 orang
P 6.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
3.
B.
(E64)
V 36.00 M'
Qa 5.15 M'
T1 20.00 menit
T2 20.00 menit
T3 419.28 menit C.
T4 15.00 menit
T5 23.18 menit 1.
Ts1 497.46 menit 2.
3.
Q1 4.34 M'
(E64) 0.2303 Jam
(E51)
V2 15.00 Ton
Fa 0.83 - D.
E.
T4 14.00 menit F.
T5 6.00 menit Note: 1
Ts2 20.00 menit
2
Q2 89.64 M'
Lumpsum
Q1 4.34 M'/jam
Qt 30.39 M
M 1.00 orang
T 2.00 orang
P 6.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
Fk 1.250 NO.
Fh1 1.030
D1 150.00 Kg/m3
D2 1,300.00 T/m3 A.
1.
2.
3.
B.
1.
2.
1.
E10 2.
V 0.80 m3 3.
Fb 1.00
Fa 0.75
Fv 1.00
T1 0.30 menit
T2 0.00 menit
Ts1 0.30 menit
D.
Q1 12.71 m3 E.
F.
E10 0.0787 jam Note: 1
E07 2
V 1.00 buah
Fa 0.83
3
T1 5.00 menit 4
T2 2.00 menit
Ts2 7.00
Q2 4.25 m'
PROYEK
No. PAKET KONTRAK
NAMA PAKET
Bt 65 % NO.
Mr 35 %
D1 2.40 ton/M3
D2 1.60 ton/M3 A.
D3 1.80 ton/M3
D4 1.45 ton/M3 1.
D5 1.44 ton/M3 2.
3.
B.
1.
2.
3.
1.
(E06) 2.
V 500.00 liter 3.
Fa 0.83 -
Ts
T1 4.00 menit
T2 4.00 menit
T3 1.00 menit
T4 1.00 menit
Ts 10.00 menit
D.
Q1 2.490 M3 E.
F.
Note: 1
(E06) 0.4016 jam
2
(E23)
V 4.00 M3
Wc 0.007 M3 3
Fa 0.83 - 4
Pa 100.00 liter/menit
Q2 711.43 M3
Q1 2.490 M3/Jam
Qt 17.43 M3
M 1.00 orang
Tb 2.00 orang
P 8.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
A.
D1 2.20 T/M3
D2 3.14 T/M3 Berat Jenis 1.
D3 1.45 T/M3 2.
D4 1.45 T/M3 3.
D5 1.30 T/M3
Bt 73 %
Ae 27 %
B.
1.
2.
3.
4
5
6
(M12) 73.418 Kg
(M01) 0.2419 M3
(M03) 0.2102 M3
(M170) 51.45 Ltr C.
(M182) 0.2203 Kg
(M06) 1.2972 M3 1.
2.
3.
(E06)
V 500.00 liter
Fa 0.83 -
Ts
T1 2.00 menit sudah diselesaikan
T2 6.00 menit
T3 1.00 menit
T4 1.00 menit D.
Ts 10.00 menit E.
F.
Q1 2.490 M3 Note: 1
2
(E06) 0.4016 jam
(E23) 3
V 4.00 M3 4
Wc 0.05 M3
Fa 0.83 -
Pa 100.00 liter/menit
Q2 96.80 M3
Qt 17.43 M3
M 1.00 orang
Tb 7.00 orang
P 14.00 orang
(L03) 0.4016 jam
(L02) 2.8112 jam
(L01) 5.6225 jam
Analisa LI-7102
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
(M06) 1.2915 M3 1.
2.
3.
B.
1.
Qt 12.00 M3
M 1.00 orang
Tb 5.00 orang
P 10.00 orang
1.
D.
E.
F.
Note: 1
3
4
Analisa LI-7103a
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
3.
(M15a) 15.00 Kg
(M02) 1.1000 M3
B.
1.
2.
Qt 8.00 M3
M 1.00 orang
Tb 3.00 orang C.
P 6.00 orang
1.
D.
E.
F.
Note: 1
3
4
Analisa LI-7103b
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
3.
(M15) 15.10 Kg
(M02) 1.2915 M3
B.
1.
2.
Qt 12.00 M3
M 1.00 orang
Tb 8.00 orang C.
P 14.00 orang
1.
D.
E.
F.
Note: 1
3
4
Analisa LI-7104
ngan Tanah dengan Kawat yang Dilapisi PVC
URAIAN ANALISA HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
3.
(M15b) 1.03 Kg
B.
1.
Qt 12.00 M3
M 1.00 orang
Tb 8.00 orang C.
P 10.00 orang
1.
D.
E.
F.
Note: 1
3
4
Analisa EI-7111a
PROYEK
No. PAKET KONTRAK
NAMA PAKET
1.
2.
eratur petunjuk pabrik 3.
B.
1.
(M133) 6.182 Kg/m1 2.
(M165) 1.050 m' 3
(M255) 45.675 Kg/m1
125.600 Kg/m1
E06 C.
V 500.00 liter
Fa 0.83 1.
Ts 2.
T1 2.00 Menit 3
T2 30.00 Menit
T3 6.00 Menit
Ts 38.00 Menit
Q1 655.263 liter/Jam
D.
21.84 m/jam E.
E06 0.0458 Jam F.
Note: 1
E25
S 1.00 buah 2
20.000 M'/hari
Q2 2.857 M'/jam
E25 0.35 jam 3
4
Qt 20.00 m
M 1.000 orang
Tb 2.000 orang
P 4.000 orang 2 alat @ 2 Orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
L 8.73 KM
Tk 7.00 jam A.
Fh 1.050
1.
2.
3.
B.
1.
2.
3.
(M133) 6.182 Kg 4.
(M256) 45.675 Kg 5
(M122) 69.5 Kg
(M223) 1.2 Kg
(M253) 0.075 m3 C.
1.
2.
E06 3.
V 500.00 liter
Fa 0.83
Ts
T1 2.00 Menit D.
T2 30.00 Menit E.
T3 6.00 Menit F.
Ts 38.00 Menit Note: 1
Q1 655.263 liter/Jam 2
21.84 m/jam
E06 0.0458 Jam 3
4
E25
S 1.000 buah
Qt 8.200 M'/hari
Ks 0.85 jam
M 1.000 orang
Tb 2.000 orang
P 5.000 orang
B.
1
2
3
C.
(M226) 0.0494 m3
(M165) 1.0300 m 1
(M227) 2
Ts 0.10 m Asumsi
Vs 0.0050 m
Ws 7.50 kg
(E65) D.
V3 10.0 kg/jam Asumsi E.
Fa 0.83 F.
Q3 1.11 m/jam Note: 1
3
4
Q3 1.107 M/Jam
Qt 7.75 M
P 6.00 Orang
T 3.00 Orang
M 1.00 Orang
A.
1.
1.
2.
B.
1
2
(M228) 1.0300 m
(M22)
Tp 0.10 m asumsi
Wp 0.2060 kg C.
1
E63
V1 1.00 m
Fa 0.83 - D.
E.
T1 1.00 menit Asumsi F.
T2 0.50 menit Asumsi Note: 1
T3 0.50 menit
T4 3.00 menit 2
Ts1 5.00 menit
Q1 9.96 m/jam 3
4
0.1004 jam
Q1 9.960 M/Jam
Qt 69.72 M
P 2.00 Orang
T 1.00 Orang
M 1.00 Orang
A.
1.
1.
2.
B.
1
2
(M229) 1.03 m
(M125) C.
Tp 0.10 m asumsi 1
Wp 0.2060 kg 2
E63 D.
V1 1.00 m E.
Fa 0.83 - F.
Note: 1
T1 1.00 menit Asumsi
T2 0.50 menit Asumsi 2
T3 0.50 menit
T4 3.00 menit
Ts1 5.00 menit 3
4
Q1 9.96 m/jam
0.1004 jam
Q1 9.960 M/Jam
Qt 69.72 M2
P 6.00 Orang
T 3.00 Orang
M 1.00 Orang
B.
1
2
C.
(M230) 1.0300 m 1
(M226) 0.0494 m3 2
3
4
E76 Dia 30 - 500 mm
V1 39.6 m/mnt Asumsi
Fa 0.83 D.
Q1 704.74 m/jam E.
F.
E76 0.0014 jam Note: 1
(E26) 2
V2 6.00 m3/jam
Fa 0.83
Q2 103.750 m 3
4
0.0096 Jam
(E12)
0.0096 Jam
Q2 103.750 M/Jam
Qt 726.25 M
P 6.00 Orang
T 3.00 Orang
M 1.00 Orang
L01 0.0578 Jam
L02 0.0289 Jam
L03 0.0096 Jam
B.
1
2
C.
Le 1.0300 m 1
Vb 0.0494 m3 2
3
4
E76 Dia 30 - 500 mm
V1 39.6 m/mnt Asumsi
Fa 0.83 D.
Q1 704.74 m/jam E.
F.
E76 0.0014 jam Note: 1
2
V2 6.00 m3/jam
Fa 0.83
Q2 103.750 m 3
4
(E05/260 0.0096 Jam
E12
0.0096 Jam
Q2 103.750 M/Jam
Qt 726.25 M
P 6.00 Orang
T 3.00 Orang
M 1.00 Orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
D1 1.054 T/m3
L 8.73 KM
Tk 7.00 jam NO.
Fh 1.050
A.
1.
2.
3.
A1 0.030 M2 B.
A2 0.005 M2 1.
Ju A 0.035 M2
M260 36.89 Kg
E32b
Ml 1.000 buah
Qt 8.200 M'/hari C.
Q1 1.17 M'/jam
E32b 0.85 jam 1.
2.
Qt 8.20 m D.
E.
M 1.000 orang F.
Tb 2.000 orang Note: 1
P 5.000 orang
2
PROYEK
No. PAKET KONTRAK
NAMA PAKET
1.
2.
3.
B.
(M261) 6.182 Kg 1.
(M255) 45.675 Kg 2.
(M165) 1.000 m/kg 3.
(M94) 0.437 Kg 4.
E32b
Ml 1.000 buah C.
Qt 8.200 M'/hari
Kl 0.85 jam 1.
2.
E25 3.
S 1.000 buah
Qt 8.200 M'/hari
Ks 0.85 jam
D.
E.
F.
Note: 1
2
Qt 8.20 m
M 1.000 orang 3
Tb 2.000 orang 4
P 5.000 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
C.
Qt 8.20 m
1.
M 1.000 orang 2
Tb 2.000 orang
P 5.000 orang
3
4
Analisa EI-7121a
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.000 buah 1.
2.
3.
E57
Ca 1.00 buah
Fa 0.83
B.
T1 10.000 menit
T2 5.000 menit 1.
T3 10.000 menit
Ts 25.00 menit
Q2 1.99 buah
C.
0.50 Jam
1.
2
Ls
Qt 1.99 buah
M 1.000 orang D.
Tb 1.000 orang E.
P 4.000 orang F.
Note: 1
(L03) 3.514 jam
(L02) 3.514 jam 2
(L01) 14.056 jam
3
4
Analisa EI-7121b
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
1.000 buah A.
4.000 buah
1.
2.
3.
Qt 12.000 buah B.
M 1.000 orang
Tb 1.000 orang 1.
P 4.000 orang
1.
D.
E.
F.
Note: 1
3
4
Analisa EI-7123
is Baja ukuran 450 mm x 400 mm x 45 mm
URAIAN ANALISA HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
1.000 buah A.
4.000 buah
1.
2.
3.
Qt 12.000 buah B.
M 1.000 orang
Tb 1.000 orang 1.
P 4.000 orang
1.
D.
E.
F.
Note: 1
3
4
Analisa EI-7123
apis Baja ukuran 450 mm x 400 mm x 45 mm
URAIAN ANALISA HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
Qt 12.000 buah B.
M 1.000 orang
Tb 1.000 orang 1.
P 4.000 orang
1.
D.
E.
F.
Note: 1
3
4
Analisa EI-7124
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
1.000 m' A.
4.000 buah
1.
2.
3.
Qt 16.000 buah B.
M 1.000 orang
Tb 1.000 orang 1.
P 4.000 orang
1.
D.
E.
F.
Note: 1
3
4
Analisa EI-7125
1
2
3
4
5
B.
1
(M234) 1.00 bh
(E57) C.
A 50.00 ton
L1 50.00 ton 1
L2 1.00 ton 2
Sf 1.50 3
Fa 0.83 4
((L1 + L2) x Sf 1.53 buah 5
di V 1.00 buah 6
T1 0.75 Jam
T2 1.25 Jam
T3 2.00 Jam D.
T4 2.00 Jam E.
T5 2.00 Jam F.
T6 0.50 Jam Note: 1
T7 0.50 Jam
T8 3.00 Jam 2
Ts 1 12.00 Jam
Q1 0.083 bh/jam 3
4
12.0000 Jam
12.0000 Jam
12.0000 Jam
12.0000 Jam
E12
12.0000 Jam
Q1 0.083 bh/Jam
Qt 0.58 bh
P 6.00 Orang
M 1.00 Orang
Kt 1.00 Orang
Am 1.00 Orang
Ata 2.00 Orang
1
2
3
4
5
B.
1
1.00 bh
C.
A 50.00 ton
L1 50.00 ton 1
L2 1.00 ton 2
Sf 1.50 3
Fa 0.83 4
((L1 + L2) x Sf 1.53 buah 5
di V 1.00 buah 6
T1 0.75 Jam
T2 1.25 Jam
T3 2.00 Jam D.
T4 2.00 Jam E.
T5 2.00 Jam F.
T6 0.50 Jam Note: 1
T7 0.50 Jam
T8 3.00 Jam 2
Ts 1 12.00 Jam
Q1 0.083 bh/jam 3
4
12.0000 Jam
12.0000 Jam
12.0000 Jam
12.0000 Jam
E12
12.0000 Jam
Q1 0.083 bh/Jam
Qt 0.58 bh
P 6.00 Orang
M 1.00 Orang
Kt 1.00 Orang
Am 1.00 Orang
Ata 2.00 Orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.03 M 1.
0.77 M 2.
3.
B.
Qt 25.00 M
1.
2.
M 1.00 orang
Tb 2.00 orang
P 6.00 orang
C.
(L03) 0.280 jam
(L02) 0.560 jam 1.
(L01) 1.680 jam
D.
E.
F.
Note: 1
3
4
Analisa EI-7141
URAIAN ANALISA HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
0.750 M2 1.
0.0015 M3 2.
3.
B.
Qt 3.00 Buah
1.
2.
M 1.00 orang
Tb 1.00 orang
P 2.00 orang
C.
(L03) 2.33 jam
(L02) 2.33 jam 1.
(L01) 4.67 jam
D.
E.
F.
Note: 1
3
4
Analisa EI-7151
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
L 4.00 Km
A.
1.
2.
(E26)
bk 60.00 Menit/M3
Fa 0.83 B.
Q1 0.830 M3
(E15)
V 1.50 M3
Fb 0.85
Fa1 0.80
Ts1 0.50 Menit
Q2 98.71 M3 C.
Q3 3.24 M3 padat 2
3
(E08) 0.3085 Jam 4
Lump Sump
Q1 0.83 M3/Jam
Qt 5.81 M3
P 8.00 orang
M 1.00 orang
Analisa EI-7152
NO.
L 4.00 Km
A.
1.
2.
(E26)
bk 90.00 Menit/M3 (padat)
Fa 0.83 B.
Q1 0.553 M3
(E15)
V 1.50 M3
Fb 0.85
Fa1 0.80
Ts1 0.50 Menit
Q2 98.71 M3 (padat) C.
3
(E08) 0.4357 Jam 4
Lump Sump
Q1 0.55 M3/Jam
Qt 3.87 M3
P 8.00 orang
M 1.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
Tk 7.00 Jam JENIS PEKERJAAN
Fk 1.20 - SATUAN PEMBAYARAN
NO.
L 4.00 Km
A.
1.
2.
(E10)
V 0.93 M3 B.
Fb 1.00 -
Fa 0.83
Fv 1.00
Ts1 menit
T1 0.240 menit
T2 0.080 menit
Permen PUPR
Ts1 0.32 menit No 28/PRT/M/2016
Q1 173.68 M3/Jam
C.
1.
(E10) 0.0058 Jam 2.
3.
(E37) Sesuai kondisi lapangan 4.
11.50 cm
V 0.70 M3
Fb 1.00 -
Fa 0.83
Ts1 menit
T1 1.000 menit
T2 0.100 menit
Ts1 1.10 menit D.
E.
Q2 31.69 M3/Jam F.
Note: 1
3
Berlanjut ke halaman berikut 4
Analisa EI-7153
(E08)
V 4.00 M3
Fa 0.80 -
v1 40.00 KM/Jam
v2 60.00 KM/Jam
Ts1 menit
T1 6.00 menit
T2 4.00 menit
T3 258.06 menit
T4 2.00 menit
Ts1 270.06 menit
Q3 0.59 M3 / Jam
Lump Sump
Q1 173.68 M3/Jam
Qt 1,215.74 M3
P 12.00 orang
M 1.00 orang
Analisa EI-7154
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
Tk 7.00 Jam JENIS PEKERJAAN
Fk 1.20 - SATUAN PEMBAYARAN
NO.
L 4.00 Km
A.
1.
2.
(E10) B.
V 0.93 M3
Fb 1.00 -
Fa 0.83
Fv 1.00
Ts1 menit
T1 0.240 menit
T2 0.080 menit
Permen PUPR
Ts1 0.32 menit No 28/PRT/M/2016
Q1 173.68 M3/Jam C.
1.
2.
(E10) 0.0058 Jam 3.
4.
(E37) Sesuai kondisi lapangan
11.50 cm
V 0.70 M3
Fb 1.00 -
Fa 0.83
Ts1 menit
T1 1.000 menit
T2 0.100 menit D.
Ts1 1.10 menit E.
F.
Q2 31.69 M3/Jam Note: 1
2
(E37) 0.0316 Jam
3
Berlanjut ke halaman berikut 4
Analisa EI-7154
(E08)
V 4.00 M3
Fa 0.80 -
v1 30.00 KM/Jam
v2 40.00 KM/Jam
Ts1 menit
T1 8.00 menit
T2 6.00 menit
T3 1.38 menit
T4 5.00 menit
Ts1 20.38 menit
Q3 7.85 M3 / Jam
Lump Sump
Q1 31.69 M3/Jam
Qt 221.84 M3
P 12.00 orang
M 1.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
L 8.00 Km
A.
1.
2.
B.
(E72)
Q1 12.00 M' / Jam
(E07b)
v 1.00 buah
Fa 0.83
C.
T1 3.00 menit
T2 1.00 menit 1.
Ts 4.00 2.
Q2 12.45 M' / Jam 3.
4.
(E07b) 0.0803 Jam
(E08)
V 4.00 M3
Fa 0.83 -
v1 40.00 KM/Jam D.
v2 60.00 KM/Jam E.
Ts1 menit F.
T1 20.00 menit Note: 1
T2 12.00 menit
T3 8.00 menit 2
T4 2.00 menit
Ts1 42.00 menit
3
4
Q3 3.95 M3 / Jam
Lump Sump
Q1 12.00 M2/Jam
Qt 84.00 M3
P 8.00 orang
M 2.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
L 8.73 Km
A.
1.
2.
(E74)
Q1 12.00 M' / Jam
(E07b)
v 1.00 buah
Fa 0.83
T1 3.00 menit
T2 1.00 menit
Ts 4.00
Q2 149.40 M' / Jam
C.
(E07b) 0.0067 Jam 1.
2.
(E08) 3.
V 4.00 M3 4
Fa 0.83 -
v1 40.00 KM/Jam
v2 60.00 KM/Jam
Ts1 menit
T1 20.00 menit
T2 134.40 menit
T3 89.60 menit
T4 2.00 menit D.
Ts1 246.00 menit E.
F.
Note: 1
Q3 0.67 M3 / Jam
2
Lump Sump
Q1 12.00 M'/Jam
Qt 84.00 M3
P 10.00 orang
M 1.00 orang
NO.
L 5.00 Km
A.
1.
2.
(E08)
V1 3.50 M3 B.
Fa 0.83 -
v1 20.00 KM/Jam
v2 40.00 KM/Jam
Ts2 menit
T1 60.00 menit
T2 15.00 menit
T3 7.50 menit
T4 10.00 menit
Ts2 92.50 menit
C.
Q3 1.14 M3 1
Q3' 28.55 M2
Lump Sump
D.
E.
Q1 1.14 M2/Jam F.
Qt 7.99 M2 Note: 1
P 8.00 orang 2
M 1.00 orang
3
(L01) 7.0052 Jam 4
(L03) 0.8756 Jam
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
L 5.00 Km
A.
1.
2.
0.50 jam/m2
B.
(E07)
V1 35.00 M2
Fa 0.83 -
T1 12.00 menit
T2 8.00 menit
T3 5.00 menit
Ts 25.00 menit
Q2 69.72 M2/jam C.
Q3 3.80 M3 2
Q3' 95.12 M2
3
(E08) 0.0105 Jam 4
Lump Sump
Q3 69.72 M2/Jam
Qt 488.04 M3
P 8.00 orang
M 1.00 orang
Analisa EI-7.16.(1)
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
B.
1.
Qt 20 Buah/hari 2.
P 1.00 orang
T 0.00 orang
M 1.00 orang
C.
L01 0.3500 jam
L02 0.0000 jam 1.
L03 0.3500 jam
D.
E.
F.
Note: 1
3
4
Analisa EI-7.16.(2a)
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
Qt 60.00 M'/hari B.
Q1 8.6 M'/jam 1.
Kl 0.12 jam 2.
3.
C.
Qt 60 M'/hari
1.
P 12.00 orang 2.
T 3.00 orang
M 1.00 orang
3
4
Analisa EI-7.16.(3a)
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
L 8.73 KM JENIS PEKERJAAN
Tk 7.00 jam SATUAN PEMBAYARAN
NO.
A.
3.00 M/batang
(M240) 0.33 batang/m' 1.
(M267) 1.50 Kg 2.
(M237) 0.10 Kg 3.
B.
1.
Qt 20 M'/hari 2.
3.
P 1.00 orang
T 1.00 orang
M 2.00 orang
D.
E.
F.
Note: 1
3
4
Analisa EI-7.16.(4)
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
3.00 M/batang
(M240) 0.33 batang/m' 1.
(M267) 1.50 Kg 2.
(M237) 0.10 Kg 3.
B.
1.
2.
Qt 20 M'/hari 3.
P 1.00 orang
T 1.00 orang
M 2.00 orang
C.
L01 0.3500 jam
L02 0.3500 jam 1.
L03 0.7000 jam
D.
E.
F.
Note: 1
3
4
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6 (1)
JENIS PEKERJAAN : Fondasi Cerucuk Penyedian dan Pemancangan C
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6 (2)
JENIS PEKERJAAN : Dinding Turap Kayu Tanpa Pengawetan, Penyed
SATUAN PEMBAYARAN : M2
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6 (3)
JENIS PEKERJAAN : Dinding Turap Kayu Dengan Pengawetan, Penye
SATUAN PEMBAYARAN : M2
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6 (4)
JENIS PEKERJAAN : Dinding Turap Baja, Penyediaan dan Pemancang
SATUAN PEMBAYARAN : M2
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6 (5)
JENIS PEKERJAAN : Dinding Turap Beton, Penyediaan dan Pemancan
SATUAN PEMBAYARAN : M2
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
Trailer E29 jam 0.0519
Crane 1 E07 jam 0.0336
Crane 2 E07 jam 0.1008
Welding Set E32 jam 3.0000
Pile Hammer, 2,5 Ton; 1 HP (E61) jam 0.0269
Alat Bantu Ls 1.0000
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6 (6)
JENIS PEKERJAAN : Penyediaan Tiang Pancang Kayu Tanpa Pengaw
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6 (7)
JENIS PEKERJAAN : Penyediaan Tiang Pancang Kayu dengan Penga
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6.(8a)
JENIS PEKERJAAN : Penyediaan Tiang Pancang Baja Diameter 500 m
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6.(9a)
JENIS PEKERJAAN : Penyediaan Tiang Pancang Baja H Beam Ukuran
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6.(10a)
JENIS PEKERJAAN : Penyediaan Tiang Pancang BetonBertulang Prac
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6.(11a)
JENIS PEKERJAAN : Penyediaan Tiang Pancang Beton Bertulang Pra
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6.(12a)
JENIS PEKERJAAN : Penyediaan Tiang Pancang Beton Bertulang Prat
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6.(13)
JENIS PEKERJAAN : Pemancangan Tiang Pancang Kayu Ukuran ….
SATUAN PEMBAYARAN :M 0
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6.(14a)
JENIS PEKERJAAN : Pemancangan Tiang Pancang Baja Diameter 500
SATUAN PEMBAYARAN :M 0
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6.(15a)
JENIS PEKERJAAN : Pemancangan Tiang Pancang Baja H Beam Ukur
SATUAN PEMBAYARAN :M 0
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6.(16a)
JENIS PEKERJAAN : Pemancangan Tiang Pancang Beton Bertulang P
SATUAN PEMBAYARAN :M 0
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6.(17a)
JENIS PEKERJAAN : Pemancangan Tiang Pancang Beton Pratekan Pr
SATUAN PEMBAYARAN :M 0
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6.(18a)
JENIS PEKERJAAN : Pemancangan Tiang Pancang Beton Pratekan Pr
SATUAN PEMBAYARAN :M 0
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6.(19a)
JENIS PEKERJAAN : Tiang Bor Beton, diameter 800 mm
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6.(20)
JENIS PEKERJAAN : Tambahan Biaya untuk Nomor Mata Pembayaran 7.6
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6.(21)
JENIS PEKERJAAN : Tambahan Biaya untuk Nomor Mata Pembayaran 7.6
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.7.(1)
JENIS PEKERJAAN : Dinding Sumuran Silinder Terpasang, Diameter …
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.9.(1)
JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.10 (1)
JENIS PEKERJAAN : Pasangan Batu Kosong Yang Diisi Adukan
SATUAN PEMBAYARAN : M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.10 (2)
JENIS PEKERJAAN : Pasangan Batu Kosong
SATUAN PEMBAYARAN : M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.10.(3a)
JENIS PEKERJAAN : Bronjong dengan kawat yang dilapisi galvanis
SATUAN PEMBAYARAN : M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.10.(3b)
JENIS PEKERJAAN : Bronjong dengan kawat yang dilapisi PVC
SATUAN PEMBAYARAN : M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.10.(4)
JENIS PEKERJAAN : Tambahan Biaya untuk Anyaman Penulangan Tan
SATUAN PEMBAYARAN : M2
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
Alat Bantu Ls 1.0000
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.11.(1a)
JENIS PEKERJAAN : Sambungan Siar Muai Tipe Asphaltic Plug, Fixed
SATUAN PEMBAYARAN : M'
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Bridging Plate PL 125 x 6 (M133) Kg/m1 6.182
Backer rod (M165) m' 1.050
Asphaltic plug (40 x 7,5 x 100) cm3 (M255) kg 45.675
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.11.(1b)
JENIS PEKERJAAN : Sambungan Siar Muai Tipe Asphaltic Plug, Movab
SATUAN PEMBAYARAN : M'
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
PERALATAN
:
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 7.11.(2)
JENIS PEKERJAAN : Sambungan Siar Muai Tipe Silicone Seal
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Beton fast track 8 jam (M226) m3 0.049
Batang Penyokong (Backer Rod) (M165) m3 1.030
Silicon Seal (M227) kg 7.500
:
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 7.11.(3)
JENIS PEKERJAAN : Sambungan Siar Muai Tipe Strip Seal
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Karet Sambungan Strip Seal (M228) m 1.030
Pelumas PVC (M22) kg 0.206
:
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 7.11.(4)
JENIS PEKERJAAN : Sambungan Siar Muai Tipe Compression Seal
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
Pekerja L01 jam 0.6024
Tukang L02 jam 0.3012
Mandor L03 jam 0.1004
:
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 7.11.(5)
JENIS PEKERJAAN : Siar Muai Tipe Modular, lebar …
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
Pekerja L01 jam 0.0578
Tukang L02 jam 0.0289
Mandor L03 jam 0.0096
:
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 7.11.(6)
JENIS PEKERJAAN : Penggantian Sambungan Siar Muai Tipe Finger Pla
SATUAN PEMBAYARAN :M
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
Pekerja L01 jam 0.0578
Tukang L02 jam 0.0289
Mandor L03 jam 0.0096
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.11.(7)
JENIS PEKERJAAN : Sambungan Siar Muai Tipe Karet Dengan Lebar Cel
SATUAN PEMBAYARAN : M'
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Sambungan siar muai tipe Karet (Preformed M260 kg 36.890
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.11.(8)
JENIS PEKERJAAN : Joint Filler untuk Sambungan Konstruksi
SATUAN PEMBAYARAN : M'
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Bridging Plate PL 125 x 6 (M261) kg 6.182
Asphaltic plug (M255) kg 45.675
Backer rod diameter 3/8 inch (M165) m' 1.000
Joint Sealant (M94) kg 0.437
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.11.(9)
JENIS PEKERJAAN : Sambungan siar muai Tipe Modular Lebar .....
SATUAN PEMBAYARAN : M'
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.12.(1a)
JENIS PEKERJAAN : Landasan Logam Tipe Fixed
SATUAN PEMBAYARAN : Buah
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.12.(1b)
JENIS PEKERJAAN : Landasan Logam Tipe Moveable
SATUAN PEMBAYARAN : Buah
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.12.(2)
JENIS PEKERJAAN : Landasan Elastomerik Karet Alam Berlapis Baja
SATUAN PEMBAYARAN : Buah
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.12.(3)
JENIS PEKERJAAN : Landasan Elastomerik Karet Sintetis Berlapis B
SATUAN PEMBAYARAN : Buah
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
:
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.12.(4)
JENIS PEKERJAAN : Landasan Karet Strip
SATUAN PEMBAYARAN : Meter Panjang
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Landasan logam berongga (Pot Bearing) (M234) bh 1.000
:
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 7.12.(5)
JENIS PEKERJAAN : Landasan Logam Jenis Spherical
SATUAN PEMBAYARAN : Buah
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Landasan logam jenis Spherical (M235) bh 1.000
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Marmer m2 0.75
Adukan Semen m3 0.0015
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
JUMLAH HARGA BAHAN
PERALATAN
Excavator (E10) Jam 0.0058
Rock Drill Breaker (E37) Jam 0.0316
Dump Truck (E08) Jam 1.6879
Alat Bantu Ls 1.0000
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
Compressor E05 Jam 1.0000
Jack Hammer E26 Jam 1.0000
Dump Truck E08 Jam 0.1274
Alat Bantu Ls 1.0000
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
JUMLAH HARGA BAHAN
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
Kunci Torsi (E74) Jam 0.0833
Crane On Truck (10-15) T; 260 HP (E07b) Jam 0.0067
Dump Truck (E08) Jam 1.4819
Alat Bantu Ls 1.0000
JUMLAH HARGA PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Deck drain baja diameter 150 mm (M239) Unit 1.000
Baja Tulangan (angkur) penggantung/hanger (M134) Kg 0.500
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Pipa baja 150 mm (M241) batang/m' 0.33
Baja (ducting, klem) (M267) Kg 1.000
Kawat Las (M51) m' 0.500
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Pipa PVC AW Dia 150 mm (M240) batang/m' 0.33
Baja Tulangan (ankur) (M267) Kg 1.50
Lem PVC (M237) Kg 0.10
PERALATAN
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
Pipa PVC AW Dia 8 inch (M240) batang/m' 0.33
Baja Tulangan (ankur) (M267) Kg 1.50
Lem PVC (M237) Kg 0.10
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 21,428.57
21,428.57 10,714.29
24,285.71 6,071.43
15,000.00 15,750.00
0.00 0.00
0.00
53,964.29
5,396.43
59,360.71
me dan/atau ukuran
Analisa EI-762
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 71,428.57
21,428.57 32,142.86
24,285.71 12,142.86
115,714.29
1,300,000.00 8,190.00
8,190.00
0.00 0.00
0.00
123,904.29
12,390.43
136,294.71
me dan/atau ukuran
Analisa EI-763
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 107,142.86
21,428.57 32,142.86
24,285.71 12,142.86
151,428.57
1,000,000.00 6,180.00
10,000.00
6,180.00
0.00 0.00
0.00
157,608.57
15,760.86
173,369.43
me dan/atau ukuran
Analisa EI-764
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 3,824.82
21,428.57 1,434.31
24,285.71 812.77
15,000.00 2,317,500.00
15,000.00 503.46
16,000.00 10,400.00
JUMLAH HARGA BAHAN 2,328,403.46
419,076.61 15,481.07
560,718.71 23,457.11
560,718.71 70,371.32
53,660.58 5,387.61
80,691.40 2,700.52
0.00 0.00
2,451,873.00
245,187.30
2,697,060.30
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 16,128.77
21,428.57 8,064.39
24,285.71 4,569.82
1,842,315.81 343,635.44
9,800.00 473.89
15,000.00 2,809.09
16,000.00 773.69
636,730.67
63,673.07
700,403.74
me dan/atau ukuran
RGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 9,090.91
21,428.57 0.00
24,285.71 7,727.27
16,818.18
1,000,000.00 32,970.00
15,500.00 7,665.53
40,635.53
0.00
57,453.71
5,745.37
63,199.08
me dan/atau ukuran
Analisa EI-767
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 9,523.81
21,428.57 0.00
24,285.71 8,095.24
17,619.05
1,000,000.00 32,970.00
15,500.00 7,665.53
10,000.00 1,697.96
42,333.48
0.00
59,952.53
5,995.25
65,947.78
me dan/atau ukuran
Analisa EI-768a
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 4,925.46
21,428.57 3,694.09
24,285.71 418.66
9,038.21
15,000.00 2,394,750.00
15,000.00 3,166.93
2,397,916.93
419,076.61 7,224.50
1,115,707.01 18,669.80
1,115,707.01 18,669.80
0.00 0.00
44,564.09
2,451,519.23
245,151.92
2,696,671.16
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
14,285.71 22,985.46
21,428.57 17,239.10
24,285.71 1,953.76
42,178.32
8,789.14 662,321.75
662,321.75
419,076.61 4,816.33
1,115,707.01 18,669.80
1,115,707.01 18,669.80
0.00 0.00
42,155.93
746,655.99
74,665.60
821,321.59
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 21,293.51
21,428.57 15,970.13
24,285.71 3,619.90
40,883.53
2,152,424.50 279,503.31
13,676.46 270,923.40
550,426.70
1,115,707.01 18,669.80
419,076.61 8,923.61
1,115,707.01 18,669.80
0.00 0.00
46,263.20
637,573.44
63,757.34
701,330.78
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 0.00
21,428.57 214,285.71
24,285.71 121,428.57
335,714.29
2,152,424.50 366,543.54
13,676.46 176,929.56
19,182.87 111,874.52
655,347.63
1,115,707.01 18,669.80
419,076.61 8,923.61
1,115,707.01 18,669.80
0.00 0.00
46,263.20
1,037,325.12
103,732.51
1,141,057.63
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 1,566.59
21,428.57 939.96
24,285.71 532.64
3,039.19
2,152,424.50 369,433.50
13,676.46 175,871.45
19,182.87 111,874.52
657,179.47
1,115,707.01 18,669.80
419,076.61 8,923.61
1,115,707.01 18,669.80
0.00 0.00
46,263.20
706,481.86
70,648.19
777,130.05
me dan/atau ukuran
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 90,361.45
21,428.57 0.00
24,285.71 76,807.23
167,168.67
0.00
138,510.33 62,579.97
0.00 0.00
62,579.97
229,748.64
22,974.86
252,723.51
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 76,974.56
21,428.57 0.00
24,285.71 32,714.19
109,688.76
0.00
138,510.33 26,654.43
1,115,707.01 222,170.57
53,660.58 5,387.61
0.00 0.00
254,212.61
363,901.37
36,390.14
400,291.51
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 76,974.56
21,428.57 0.00
24,285.71 32,714.19
109,688.76
0.00
138,510.33 26,654.43
219,605.94 43,730.10
53,660.58 5,387.61
0.00 0.00
75,772.14
185,460.89
18,546.09
204,006.98
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 76,974.56
21,428.57 0.00
24,285.71 32,714.19
109,688.76
0.00
138,510.33 26,654.43
219,605.94 43,730.10
53,660.58 5,387.61
0.00 0.00
75,772.14
185,460.89
18,546.09
204,006.98
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 76,974.56
21,428.57 0.00
24,285.71 32,714.19
109,688.76
0.00
138,510.33 26,654.43
219,605.94 43,730.10
53,660.58 5,387.61
0.00 0.00
75,772.14
185,460.89
18,546.09
204,006.98
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 153,949.13
21,428.57 115,461.85
24,285.71 32,714.19
302,125.17
0.00
138,510.33 26,654.43
219,605.94 43,730.10
53,660.58 5,387.61
0.00 0.00
75,772.14
377,897.30
37,789.73
415,687.04
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 16,637.98
21,428.57 12,478.49
24,285.71 4,714.09
33,830.56
2,070,565.24 1,072,003.00
9,800.00 608,855.74
9,000.00 22,619.47
1,703,478.20
863,559.48 167,625.34
-
0.00 0.00
167,625.34
1,904,934.09
190,493.41
2,095,427.50
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
14,285.71 1,142.86
21,428.57 571.43
24,285.71 323.81
2,038.10
0.00
370,361.46 75,012.37
0.00 0.00
75,012.37
77,050.46
7,705.05
84,755.51
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 2,820.05
21,428.57 1,410.03
24,285.71 799.01
5,029.09
0.00
370,361.46 85,295.81
2,882,675.96 32,158.37
0.00 0.00
117,454.17
122,483.26
12,248.33
134,731.59
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 13,432.23
21,428.57 5,037.09
24,285.71 5,708.70
24,178.02
2,086,423.17 3,489,152.72
13,694.00 3,435,098.25
6,924,250.97
412,240.54 32,424.07
560,718.71 131,804.83
0.00 0.00
164,228.90
7,112,657.89
711,265.79
7,823,923.67
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 45,897.88
21,428.57 17,211.70
24,285.71 9,753.30
72,862.88
375,000.00 383,906.25
1,600.00 276,800.00
375,000.00 171,077.59
831,783.84
85,708.29 34,421.00
342,249.64 481.07
0.00 0.00
34,902.07
939,548.79
93,954.88
1,033,503.67
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 80,321.29
21,428.57 60,240.96
24,285.71 9,753.30
150,315.55
1,600.00 117,469.44
375,000.00 90,720.00
400,000.00 96,768.00
25.00 1,286.21
40,000.00 8,810.21
20,000.00 25,943.08
340,996.94
85,708.29 34,421.00
342,249.64 3,535.79
0.00 0.00
37,956.79
529,269.27
52,926.93
582,196.20
me dan/atau ukuran
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 83,333.33
21,428.57 62,500.00
24,285.71 14,166.67
160,000.00
252,100.00 325,587.15
325,587.15
0.00 0.00
0.00
485,587.15
48,558.72
534,145.87
me dan/atau ukuran
Analisa LI-7103a
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 75,000.00
21,428.57 56,250.00
24,285.71 21,250.00
152,500.00
10,000.00 150,000.00
375,000.00 412,500.00
562,500.00
0.00 0.00
0.00
715,000.00
71,500.00
786,500.00
me dan/atau ukuran
Analisa LI-7103b
ARGA SATUAN
……………………..
…………………….
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 1,049,663.16
% THD. BIAYA PROYEK : 0.02
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 116,666.67
21,428.57 100,000.00
24,285.71 14,166.67
21,000.00 317,100.00
314,600.00 406,305.90
0.00 0.00
954,239.23
95,423.92
1,049,663.16
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 83,333.33
21,428.57 100,000.00
24,285.71 14,166.67
21,000.00 21,630.00
219,130.00
21,913.00
241,043.00
me dan/atau ukuran
Analisa EI-7111a
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 20,000.00
21,428.57 15,000.00
24,285.71 8,500.00
43,500.00
0.00 0.00
10,833.33 11,375.00
41,000.00 1,872,675.00
1,884,050.00
85,708.29 3,923.99
77,255.27 27,039.34
0.00 0.00
30,963.34
1,958,513.34
195,851.33
2,154,364.67
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 213,414.63
21,428.57 128,048.78
24,285.71 145,121.95
486,585.37
0.00 0.00
45,000.00 2,055,375.00
0.00 0.00
13,000.00 15,600.00
2,086,423.17 156,481.74
2,227,456.74
85,708.29 3,923.99
77,255.27 65,952.82
0.00 0.00
69,876.82
2,783,918.92
278,391.89
3,062,310.81
me dan/atau ukuran
ARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 77,452.67
21,428.57 58,089.50
24,285.71 21,944.92
3,338,590.52 165,059.92
10,833.33 11,158.33
30,000.00 225,000.00
134,065.52 121,143.55
0.00 0.00
JUMLAH HARGA PERALATAN 121,143.55
679,848.89
67,984.89
747,833.77
me dan/atau ukuran
ARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 2,868.62
21,428.57 2,151.46
24,285.71 2,438.32
1,200,000.00 1,236,000.00
42,000.00 8,652.00
0.00 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 8,605.85
21,428.57 6,454.39
24,285.71 2,438.32
1,200,000.00 1,236,000.00
30,000.00 6,180.00
0.00 0.00
0.00 0.00
ARGA SATUAN
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 1,193,297.40
% THD. BIAYA PROYEK : 0.02
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 826.16
21,428.57 619.62
24,285.71 234.08
40,000.00 41,200.00
21,000,000.00 1,038,240.00
48,991.00 69.52
43,336.89 417.70
332,906.02 3,208.73
0.00 0.00
ARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 826.16
21,428.57 619.62
24,285.71 234.08
3,500,000.00 3,605,000.00
3,338,590.52 165,059.92
48,991.00 69.52
43,336.89 417.70
332,906.02 3,208.73
0.00 0.00
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 60,975.61
21,428.57 36,585.37
24,285.71 20,731.71
118,292.68
40,920.00 1,509,538.80
1,509,538.80
145,251.75 123,995.39
0.00 0.00
123,995.39
1,751,826.88
175,182.69
1,927,009.56
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 60,975.61
21,428.57 36,585.37
24,285.71 20,731.71
118,292.68
15,500.00 95,819.06
41,000.00 1,872,675.00
10,833.33 10,833.33
34,100.00 14,894.88
1,994,222.28
145,251.75 124,001.42
77,255.27 65,952.82
0.00 0.00
189,954.24
2,302,469.20
230,246.92
2,532,716.12
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 60,975.61
21,428.57 36,585.37
24,285.71 20,731.71
118,292.68
40,000.00 40,000.00
40,000.00
145,251.75 123,995.39
0.00 0.00
123,995.39
282,288.08
28,228.81
310,516.88
ume dan/atau ukuran
Analisa EI-7121a
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 200,803.21
21,428.57 75,301.20
24,285.71 85,341.37
361,445.78
1,500,000.00 1,500,000.00
1,500,000.00
52,307.79 26,258.93
0.00 0.00
26,258.93
1,887,704.71
188,770.47
2,076,475.19
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 33,333.33
21,428.57 12,500.00
24,285.71 14,166.67
60,000.00
2,000,000.00 2,000,000.00
2,000,000.00
0.00 0.00
0.00
2,060,000.00
206,000.00
2,266,000.00
me dan/atau ukuran
Analisa EI-7123
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 33,333.33
21,428.57 12,500.00
24,285.71 14,166.67
60,000.00
1,071,000.00 1,071,000.00
1,071,000.00
0.00 0.00
0.00
1,131,000.00
113,100.00
1,244,100.00
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 33,333.33
21,428.57 12,500.00
24,285.71 14,166.67
60,000.00
838,000.00 838,000.00
838,000.00
0.00 0.00
0.00
898,000.00
89,800.00
987,800.00
me dan/atau ukuran
Analisa EI-7124
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 25,000.00
21,428.57 9,375.00
24,285.71 10,625.00
45,000.00
229,500.00 229,500.00
229,500.00
0.00 0.00
0.00
274,500.00
27,450.00
301,950.00
me dan/atau ukuran
Analisa EI-7125
ARGA SATUAN
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 12,975,668.37
% THD. BIAYA PROYEK : 0.21
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 1,028,571.43
14,285.71 171,428.57
75,214.29 902,571.43
28,271.29 339,255.43
77,071.43 1,849,714.29
3,331,619.28 3,331,619.28
52,307.79 627,693.51
40,135.86 481,630.27
38,267.50 459,210.00
38,267.50 459,210.00
332,906.02 3,994,872.25
0.00 0.00
ARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 1,028,571.43
14,285.71 171,428.57
75,214.29 902,571.43
28,271.29 339,255.43
77,071.43 1,849,714.29
4,500,000.00 4,500,000.00
52,307.79 627,693.51
40,135.86 481,630.27
38,267.50 459,210.00
38,267.50 459,210.00
332,906.02 3,994,872.25
0.00 0.00
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 24,000.00
21,428.57 12,000.00
24,285.71 6,800.00
17,500.00 18,025.00
25,000.00 19,312.50
37,337.50
0.00 0.00
0.00
80,137.50
8,013.75
88,151.25
me dan/atau ukuran
Analisa EI-7141
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 66,666.67
21,428.57 50,000.00
24,285.71 56,666.67
173,333.33
200,000 150,000.00
1,625.00 2.44
150,002.44
0.00 0.00
0.00
323,335.77
32,333.58
355,669.35
me dan/atau ukuran
Analisa EI-7151
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 137,693.63
24,285.71 29,259.90
166,953.53
0.00
43,336.89 52,213.12
457,627.36 4,636.09
241,419.48 74,480.54
0.00 0.00
131,329.76
298,283.29
29,828.33
328,111.62
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 206,540.45
24,285.71 43,889.85
250,430.29
0.00
43,336.89 78,319.69
457,627.36 4,636.09
241,419.48 105,198.02
0.00 0.00
188,153.80
438,584.09
43,858.41
482,442.50
me dan/atau ukuran
satu satuan pekerjaan
dapat diubah kecuali
Kepada Peserta Lelang
ARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 987.05
24,285.71 139.83
1,126.88
0.00
412,240.54 2,373.60
412,240.54 13,008.16
241,419.48 407,492.72
0.00 0.00
422,874.48
424,001.36
42,400.14
466,401.50
me dan/atau ukuran
ARGA SATUAN
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 251,678.97
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 5,409.39
24,285.71 766.33
148,532.82 148,532.82
43,336.89 43,336.89
241,419.48 30,753.63
0.00 0.00
228,799.07
22,879.91
251,678.97
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 9,523.81
24,285.71 4,047.62
13,571.43
0.00
43,373.93 3,614.49
841,410.52 67,583.17
241,419.48 954,181.74
0.00 0.00
1,025,379.41
1,038,950.84
103,895.08
1,142,845.93
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 11,904.76
24,285.71 2,023.81
43,373.93 3,614.49
841,410.52 5,631.93
241,419.48 357,766.21
0.00 0.00
JUMLAH HARGA PERALATAN 367,012.64
380,941.21
38,094.12
419,035.33
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 100,073.76
24,285.71 21,265.67
121,339.44
0.00
241,419.48 8,455.91
8,455.91
129,795.35
12,979.54
142,774.89
me dan/atau ukuran
satu satuan pekerjaan
dapat diubah kecuali
Kepada Peserta Lelang
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 1,639.21
24,285.71 348.33
1,987.54
0.00
50,000.00 25,000.00
841,410.52 12,068.42
241,419.48 2,537.94
0.00 0.00
39,606.37
41,593.91
4,159.39
45,753.30
ume dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 5,000.00
21,428.57 0.00
24,285.71 8,500.00
13,500.00
100,000.00 100,000.00
25,000.0 12,500.00
112,500.00
0.00 0.00
0.00
126,000.00
12,600.00
138,600.00
me dan/atau ukuran
Analisa EI-7.16.(2a)
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 20,000.00
21,428.57 7,500.00
24,285.71 2,833.33
30,333.33
400,000.00 133,333.33
13,676.5 13,676.46
16,000.00 8,000.00
155,009.79
145,251.75 16,946.04
0.00 0.00
16,946.04
202,289.16
20,228.92
222,518.07
me dan/atau ukuran
Analisa EI-7.16.(3a)
ARGA SATUAN
……………………..
…………………….
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 87,466.15
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 5,000.00
21,428.57 7,500.00
24,285.71 17,000.00
29,500.00
75,000.00 25,000.00
13,676.5 20,514.68
45,000.00 4,500.00
50,014.68
0.00 0.00
0.00
79,514.68
7,951.47
87,466.15
me dan/atau ukuran
ARGA SATUAN
……………………..
…………………….
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
14,285.71 5,000.00
21,428.57 7,500.00
24,285.71 17,000.00
29,500.00
75,000.00 25,000.00
13,676.5 20,514.68
45,000.00 4,500.00
50,014.68
0.00 0.00
0.00
79,514.68
7,951.47
87,466.15
me dan/atau ukuran
No. URAIAN
1 Lebar retak yang terjadi pada beton struktur min 0,15 mm, maks 1 mm
2 Bahan diterima di Lokasi Pekerjaan
3 Lokasi Pekerjaan: Base Camp/ Lokasi Jembatan
4 Bond strength epoxy minimum 7 MPa pada umur 2 hari dan 10 MPa pada umur 40 Hari
5 Kuat tekan leleh epoxy ≥70 MPa pada umur 7 hari
6 Jam kerja efektif per hari
7 Faktor kehilangan bahan
1. Bahan
1a Epoxy resin = 1 x Fh
2. ALAT
2a Pompa (+Mixer) pengisi bahan perekat epoxy, 600 Watt
Kapasitas alat
Koefisien alat
Kapasitas produksi = V x Fa
Koefisien alat = 1 : Q1
2b Generator Set
Kapasitas genset mengikuti Pompa
Koefisien alat
3. TENAGA KERJA
Produksi membutuhkan = Pompa pencampur/ injeksi
Produksi per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Koefisien tenaga/kg
pekerja (Tk x P) : Qt
mandor (Tk x M) : Qt
Rp. 149,412.38 / Kg
No. URAIAN
1 Lebar retak yang terjadi pada beton struktur min 0,15 mm, maks 1 mm
2 Pekerjaan dilakukan secara manual dan mekanis
3 Bahan diterima di Lokasi Pekerjaan
4 Dimensi sealant Lebar
Tebal
5 Panjang retakan per m2
6 Berat volume sealant
7 Pemasangan sealant di bawah jembatan dengan tinggi
8 Jam kerja efektif per hari
9 Faktor kehilangan
2 ALAT
2.a Compressor, 5000 L/Mnt; 75 HP
Kapasitas membersihkan per menit
Faktor alat
Kapasitas prod / jam = Cap x Fa x 60 x Brt.Seal
Koefisien alat/kg= 1 : Q1
No. URAIAN
3 Tenaga Kerja
Produksi yang menentukan
Produksi per hari = Tk x Q2
Kebutuhan tenaga:
Pekerja
Mandor
Koefisien tenaga/kg
Pekerja (Tk x P) : Qt
Mandor (Tk x M) : Qt
Rp. 143,168.93 / Kg
No. URAIAN
1 Bahan
1a Tabung penyuntik kosong termasuk nipple = 1 x 60%
2 Alat
-
3 Tenaga Kerja
Kebutuhan tenaga:
Pekerja
Mandor
Koefisien tenaga
Pekerja = Tk x P / Qt
Mandor = Tk x M / Qt
5. ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp. 95,410.96 / Kg
No. URAIAN
2 ALAT
2a Pompa (+Mixer) pengisi bahan perekat epoxy, 600 Watt
Kapasitas pengisian ke dalam tabung injeksi
Faktor efisienasi alat
Siklus time:
- Pencampuran epoxy dan hardener
- Pengisian epoxy resin ke dalam tabung dan pengisian kembali
- Pemasangan jarum tabung penyuntik terisi epoxy melalui niplle
2b Generator Set
Kapasitas genset mengikuti Pompa Pompa (+Mixer) pengisi bahan perekat epoxy, 600 Watt
Koefisien alat =1/Q1 + 1/Q2
3 Tenaga Kerja
Alat yang mementukan pekerjaan, Q1 = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga/lubang
Pekerja = Tk x P / Qt
Tukang = Tk x T / Qt
Mandor = Tk x M / Qt
Rp. 118,339.86 / Kg
No. URAIAN
2b Generator Set
Kapasitas genset mengikuti Concrete cutter dan Compressor
Koefisien alat
No. URAIAN
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Concrete cutter
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Koefisien tenaga/m3
Pekerja = (Tk x P) : Qt
Mandor = (Tk x M) : Qt
Rp. 3,151,409.96 / M3
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............ bulan
No. URAIAN
No. URAIAN
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q2
Produksi lubang per hari = Tk x Q2
Kebutuhan tenaga:
Pekerja
Mandor
Koefisien tenaga
pekerja (Tk x P) : Qt Pekerja
mandor (Tk x M) : Qt Mandor
Rp. 3,718,488.10 / M3
No. URAIAN
II URUTAN KERJA
1 Permukaan elemen beton dibersihkan dengan cara mekanik/kimia
2 Permukaan elemen beton dibersihkan lebih lanjut dengan amplas no 60.
3 Pengecatan pertama dengan cat dasar setelah komponen binder dan primer dicampur
4 Pengecatan kedua dengan cat penutup setelah lapisan cat pertama kering
5 Pengecatan ketiga dengan cat penutup setelah lapisan cat kedua kering (jika diperlukan)
III Alat
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Koefisien tenaga
pekerja (Tk x P) : Qt
mandor (Tk x M) : Qt
No. URAIAN
Rp. 33,032.85 / M3
No. URAIAN
II URUTAN KERJA
1 Permukaan elemen beton dibersihkan dengan cara mekanik/kimia
2 Permukaan elemen beton dibersihkan lebih lanjut dengan amplas no 150
3 Pengecatan pertama dengan cat dasar setelah komponen binder dan primer dicampur
4 Pengecatan kedua dengan cat penutup setelah lapisan cat pertama kering
III Alat
2b Alat bantu:
Kuas cat
Sikat kawat
Amplas
Soda api
dsb
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Koefisien tenaga
pekerja (Tk x P) : Qt Pekerja
mandor (Tk x M) : Qt Mandor
No. URAIAN
No. URAIAN
2 ALAT
2.a Gerinda tangan GWS 750-100 4"; 1 HP
Kapasitas per jam
Faktor efisiensi alat
Kapasitas prod/jam = V x Fa
Koefisien alat/kg = 1 : Q2
No. URAIAN
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
pekerja (Tk x P) : Qt Pekerja
tukang (Tk x T) : Qt Tukang
mandor (Tk x M) : Qt Mandor
5. ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp. 529,077.68 / M3
2 ALAT
2.a Gerinda tangan GWS 750-100 4"; 1 HP
Kapasitas per jam
Faktor efisiensi alat
Kapasitas prod/jam = V x Fa
Koefisien alat/kg = 1 : Q2
No. URAIAN
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
pekerja (Tk x P) : Qt Pekerja
tukang (Tk x T) : Qt Tukang
mandor (Tk x M) : Qt Mandor
Rp. 529,077.68 / M3
No. URAIAN
2 ALAT
2.a Gerinda tangan GWS 750-100 4"; 1 HP
Kapasitas per jam
Faktor efisiensi alat
Kapasitas prod/jam = V x Fa
Koefisien alat/kg = 1 : Q2
No. URAIAN
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
pekerja (Tk x P) : Qt Pekerja
tukang (Tk x T) : Qt Tukang
mandor (Tk x M) : Qt Mandor
Rp. 529,077.68 / M3
No. URAIAN
2 ALAT
2.a Gerinda tangan GWS 750-100 4"; 1 HP
Kapasitas per jam
Faktor efisiensi alat
Kapasitas prod/jam = V x Fa
Koefisien alat/kg = 1 : Q2
No. URAIAN
2.c Alat Bantu
rol
kuas
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
pekerja (Tk x P) : Qt Pekerja
tukang (Tk x T) : Qt Tukang
mandor (Tk x M) : Qt Mandor
Rp. 529,077.68 / M3
No. URAIAN
2 ALAT
2.a Gerinda tangan GWS 750-100 4"; 1 HP
Kapasitas per jam
Faktor efisiensi alat
Kapasitas prod/jam = V x Fa
Koefisien alat/kg = 1 : Q2
No. URAIAN
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
pekerja (Tk x P) : Qt Pekerja
tukang (Tk x T) : Qt Tukang
mandor (Tk x M) : Qt Mandor
Rp. 49,587.68 / M3
No. URAIAN
Kapasitas prod/jam = V3 x 60 x Fa
Ts x Nb1
Koefisien alat/m3 = 1 : Q3
No. URAIAN
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
pekerja (Tk x P) : Qt Pekerja
tukang (Tk x T) : Qt Tukang
mandor (Tk x M) : Qt Mandor
Rp. 1,098,982.00 / M3
II URUTAN KERJA
1 Lakukan pengukurna chamber atau lendutan sebelum dilakukan perkuatan
2 Buat lubang untuk pelat buhul dan pelat ganjal pada girder , sesuai Gambar
3 Lakukan kalibrasi untuk peralatan penarikan kabel (jack)
4 Beri perlindungan pada kabel dengan HDPE atau bahan sejenis yang setara
5 Pasang kabel sesuai dengan lubang yang telah dibuat sebelumnya
6 Lakukan penarikan kabel sedemikian rupa sehingga tidak terjadi puntir pada jembatan
7 Lakukan pengawasan chamber secara terus menerus pada saat penarikan berlangsung
8 Setelah proses penarikan selesai, kabel diberi penutup dan diberi gemuk pada bagian dalamnya
9 Berikan perlindungan pada deviator dan angkur dengan galvanis atau pengecatan
10 Cek kondisi elemen elemen jembatan untuk memastikan tiap elemen dalam kondisi baik
No. URAIAN
2 ALAT
2.a Mesin Bor
Pemboran
Faktor efisiensi alat
Jumlah titik bor Nbr = Nb + 4 x Nk
Waktu siklus:
Persiapan dan penandaan
Waktu pemboran:
Kapasitas prod/jam = V1 x 60 x Fa
Ts1 x Nbr
Koefisien alat/Buah = 1 : Q1
3 Tenaga Kerja
Produksi menentukan
Produksi goruting per hari = Tk x Q3
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga/m2
Pekerja (Tk x P) : Qt
Tukang (Tk x T) : Qt
Mandor (Tk x M) : Qt
No. URAIAN
No. URAIAN
2 ALAT
2a Kunci Torsi (Torque Wrench)
Koefisien alat
Waktu siklus
- Memeriksa kondisi baut
- Melepaskan baut lama, membersihkan lubang
- Memasang ring dan mur pada lubang dan dikencangkan sampai kondisi snug tightened
- Mengencangkan sampai kondisi pretensioning
No. URAIAN
No. URAIAN
I. DATA DAN ASUMSI
1 Bahan untuk penggantian sudah tersedia di Lokasi Pekerjaan
2 Menggunakan peralatan cara manual dan mekanis
3 Lokasi Pekerjaan setempat
4 Kondisi existing Struktur rangka baja
5 Jam kerja per hari efektif
6 Peralatan yang dipakai bisa berpindah-pindah (mobile)
2 ALAT
2a Kunci Torsi (Torque Wrench)
Koefisien alat
Waktu siklus
- Memeriksa kondisi baut
- Melepaskan baut lama, membersihkan lubang
- Memasang ring dan mur pada lubang dan dikencangkan sampai kondisi snug tightened
- Mengencangkan sampai kondisi pretensioning
3 Tenaga Kerja
Produksi membutuhkan = Alat Pengencang Baut (Q1)
Produksi per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Koefisien tenaga/Buah
Pekerja (Tk x P) : Qt
Mandor (Tk x M) : Qt
ITEM PEMBAYARAN NO. : 8.5.(2a)
JENIS PEKERJAAN : Penggantian Baut Mutu Tinggi A490 Tipe 1 diameter M25
SATUAN PEMBAYARAN : Buah
No. URAIAN
No. URAIAN
2 ALAT
2a Kunci Torsi (Torque Wrench)
Koefisien alat
Waktu siklus
- Memeriksa kondisi baut
- Melepaskan baut lama, membersihkan lubang
- Memasang ring dan mur pada lubang dan dikencangkan sampai kondisi snug tightened
- Mengencangkan sampai kondisi pretensioning
3 Tenaga Kerja
Produksi membutuhkan = Alat Pengencang Baut (Q1)
Produksi per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Koefisien tenaga/Buah
Pekerja (Tk x P) : Qt
Mandor (Tk x M) : Qt
ITEM PEMBAYARAN NO. : 8.5.(3a)
JENIS PEKERJAAN : Penggantian Baut Biasa Grade A diameter M25
SATUAN PEMBAYARAN : Buah
No. URAIAN
No. URAIAN
2 ALAT
2a Kunci Torsi (Torque Wrench)
Koefisien alat
Waktu siklus
- Memeriksa kondisi baut
- Melepaskan baut lama, membersihkan lubang
- Memasang ring dan mur pada lubang dan dikencangkan sampai kondisi snug tightened
- Mengencangkan sampai kondisi pretensioning
3 Tenaga Kerja
Produksi membutuhkan = Alat Pengencang Baut (Q1)
Produksi per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Koefisien tenaga/Buah
Pekerja (Tk x P) : Qt
Mandor (Tk x M) : Qt
No. URAIAN
No. URAIAN
2 ALAT
2a Kunci Torsi (Torque Wrench)
Koefisien alat
Waktu siklus
- Memeriksa kondisi baut
- Melepaskan baut lama, membersihkan lubang
- Memasang ring dan mur pada lubang dan dikencangkan sampai kondisi snug tightened
- Mengencangkan sampai kondisi pretensioning
3 Tenaga Kerja
Produksi membutuhkan = Alat Pengencang Baut (Q1)
Produksi per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Koefisien tenaga/Buah
Pekerja (Tk x P) : Qt
Mandor (Tk x M) : Qt
No. URAIAN
No. URAIAN
1 Bahan
-
2 ALAT
3 TENAGA KERJA
Produksi membutuhkan = KUNCI TORSI
Produksi per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Koefisien tenaga/Buah
Pekerja (Tk x P) : Qt
Mandor (Tk x M) : Qt
No. URAIAN
No. URAIAN
1 Bahan
-
2 ALAT
3 TENAGA KERJA
Produksi membutuhkan = KUNCI TORSI
Produksi per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Koefisien tenaga/Buah
Pekerja (Tk x P) : Qt
Mandor (Tk x M) : Qt
No. URAIAN
No. URAIAN
II URUTAN KERJA
1 Bersihkan permukaan baja yang akan dilas sampai bersih
2 Siapkan peralatan dan bahan untuk proses pengelasan
3 Lakukan pengelasan
4 Jika akan dilakukan pengelasan lebih dari satu lapis, bersihkan lapisan sebelumnya dari terak pada permu
5 Lakukan pendinginan dengan menggunakan udara
6 Pastikan tidak ada rongga pada hasil pengelasan dan jika ada permukaan las yang menonjol diratakan
2 ALAT
2.a Gerinda GWS 750-100 4"; 1 HP
Kapasitas per jam
Faktor efisiensi alat
Lebar pembersihan (asumsi pembersihan sampai 3 cm ke kanan kiri titik las)
Kapasitas prod/jam = V x Fa / Lg
Koefisien alat/kg = 1 : Q2
No. URAIAN
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
pekerja (Tk x P) : Qt Pekerja
tukang (Tk x T) : Qt Tukang
mandor (Tk x M) : Qt Mandor
Rp. 88,141.83 / M3
No. URAIAN
II URUTAN KERJA
1 Bersihkan permukaan baja yang akan dilas sampai bersih
2 Siapkan peralatan dan bahan untuk proses pengelasan
3 Lakukan pengelasan
4 Jika akan dilakukan pengelasan lebih dari satu lapis, bersihkan lapisan sebelumnya dari terak pada permu
5 Lakukan pendinginan dengan menggunakan udara
6 Pastikan tidak ada rongga pada hasil pengelasan dan jika ada permukaan las yang menonjol diratakan
2 ALAT
2.a Gerinda GWS 750-100 4"; 1 HP
Kapasitas per jam
Faktor efisiensi alat
Luas pembersihan per m pengelasan (asumsi pembersihan sampai 3 cm ke kanan kiri titik la
Kapasitas prod/jam = V x Fa / Lg
Koefisien alat/kg = 1 : Q2
No. URAIAN
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
pekerja (Tk x P) : Qt Pekerja
tukang (Tk x T) : Qt Tukang
mandor (Tk x M) : Qt Mandor
Rp. 78,311.59 / M3
No. URAIAN
II URUTAN KERJA
1 Bersihkan permukaan baja yang akan dilas sampai bersih
2 Siapkan peralatan dan bahan untuk proses pengelasan
3 Lakukan pengelasan
4 Jika akan dilakukan pengelasan lebih dari satu lapis, bersihkan lapisan sebelumnya dari terak pada permu
5 Lakukan pendinginan dengan menggunakan udara
6 Pastikan tidak ada rongga pada hasil pengelasan dan jika ada permukaan las yang menonjol diratakan
2 ALAT
2.a Gerinda GWS 750-100 4"; 1 HP
Kapasitas per jam
Faktor efisiensi alat
Luas pembersihan per m pengelasan (asumsi pembersihan sampai 3 cm ke kanan kiri titik la
Kapasitas prod/jam = V x Fa / Lg
Koefisien alat/kg = 1 : Q2
No. URAIAN
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
pekerja (Tk x P) : Qt Pekerja
tukang (Tk x T) : Qt Tukang
mandor (Tk x M) : Qt Mandor
Rp. 77,109.98 / M3
II URUTAN KERJA
1 Bersihkan permukaan baja yang akan dilas sampai bersih
2 Siapkan peralatan dan bahan untuk proses pengelasan
3 Lakukan pengelasan
4 Jika akan dilakukan pengelasan lebih dari satu lapis, bersihkan lapisan sebelumnya dari terak pada permu
5 Lakukan pendinginan dengan menggunakan udara
6 Pastikan tidak ada rongga pada hasil pengelasan dan jika ada permukaan las yang menonjol diratakan
2 ALAT
2.a Gerinda GWS 750-100 4"; 1 HP
Kapasitas per jam
Faktor efisiensi alat
Luas pembersihan per m pengelasan (asumsi pembersihan sampai 3 cm ke kanan kiri titik la
Kapasitas prod/jam = V x Fa / Lg
Koefisien alat/kg = 1 : Q2
No. URAIAN
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
pekerja (Tk x P) : Qt Pekerja
tukang (Tk x T) : Qt Tukang
mandor (Tk x M) : Qt Mandor
Rp. 77,109.98 / M3
No. URAIAN
II URUTAN KERJA
2 Alat
2.a Sand Blaster
Kapasitas pembersihan
Faktor Efisiensi alat
Kap. Prod. / jam = Q1 = V x Fa
Koefisien Alat / M3 = 1 : Q1
2b Alat bantu:
Kuas cat
Sikat kawat
Amplas
Kape
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 102,160.36 / M3
No. URAIAN
1 Permukaan elemen baja dibersihkan dengan menyemprotkan bahan abrasif sampai permukaan logam ber
2 Lakukan pengukuran kelembaban udara, dimana kelembaban yang diizinkan untuk pengecatan maksimal
3 Pengecatan pertama dengan cat dasar setelah komponen binder dan primer dicampur
4 Pengecatan kedua dengan cat penutup setelah lapisan cat pertama kering
5 Pengecatan ketiga dengan cat penutup setelah lapisan cat kedua kering (jika diperlukan)
2 Alat
2.a Sand Blaster
Kapasitas pembersihan
Faktor Efisiensi alat
Kap. Prod. / jam = Q1 = V x Fa
Koefisien Alat / M3 = 1 : Q1
2b Alat bantu:
Kuas cat
Sikat kawat
Amplas
Kape
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 178,405.91 / M3
No. URAIAN
II URUTAN KERJA
2 Alat
2.a Sand Blaster
Kapasitas pembersihan
Faktor Efisiensi alat
Kap. Prod. / jam = Q1 = V x Fa
Koefisien Alat / M3 = 1 : Q1
2b Alat bantu:
Kuas cat
Sikat kawat
Amplas
Kape
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 178,405.91 / M3
No. URAIAN
II URUTAN KERJA
2b Alat bantu:
Kuas cat
Sikat kawat
Amplas
Kape
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 178,405.91 / M3
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............ bulan
No. URAIAN
II URUTAN KERJA
2 Alat
2.a Sand Blaster
Kapasitas pembersihan
Faktor Efisiensi alat
Kap. Prod. / jam = Q1 = V x Fa
Koefisien Alat / M3 = 1 : Q1
2.b Generator Set
Kapasitas genset mengikuti Sand Blaster
Koefisien alat
2b Alat bantu:
Kuas cat
Sikat kawat
Amplas
Kape
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 178,405.91 / M3
II URUTAN KERJA
1 Permukaan elemen baja dibersihkan dengan menyemprotkan bahan abrasif sampai permukaan logam ber
2 Lakukan pengukuran kelembaban udara, dimana kelembaban yang diizinkan untuk pengecatan maksimal
3 Pengecatan pertama dengan cat dasar setelah komponen binder dan primer dicampur
4 Pengecatan kedua dengan cat penutup setelah lapisan cat pertama kering
5 Pengecatan ketiga dengan cat penutup setelah lapisan cat kedua kering (jika diperlukan)
2 Alat
2.a Sand Blaster
Kapasitas pembersihan
Faktor Efisiensi alat
Kap. Prod. / jam = Q1 = V x Fa
Koefisien Alat / M3 = 1 : Q1
2b Alat bantu:
Kuas cat
Sikat kawat
Amplas
Kape
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 178,405.91 / M3
No. URAIAN
II URUTAN KERJA
1 Pasang perancah untuk menahan beban jembatan saat dilakukan perbaikan elemen struktur baja
2 Lepaskan elemen rangka yang bengkok dengan melepaskan baut dan mur dari titik-titik buhul
3 Elemen yang bengkok diluruskan hingga lurus kembali
4 Pasang rangka batang yang sudah diluruskan
5 Pasang bout, ring dan mur, kemudian kencangkan sesuai dengan persyaratan
2 Alat
2.a Kunci Torsi (Torque Wrench)
Kapasitas Alat
Koefisien alat
Waktu siklus
- Memeriksa dan melepas baut
- Memasang ring dan mur pada lubang dan dikencangkan sampai kondisi snug tightened
- Mengencangkan sampai kondisi pretensioning
Kapasitas produksi V2 x 60 x Fa
Ts2
Koefisiean alat = 1 : Q2
No. URAIAN
2b Generator Set
Kapasitas genset mengikutu Jack Hidrolic; 10 HP
Koefisien alatmengikuti Weldingset Jack Hidrolic; 10 HP = 1 : Q2
2f Alat Bantu
Diperlukan:
Sikat kawat
Kuas
Kereta dorong, dll
3 Tenaga Kerja
Produksi menentukan Crane (Q3)
Produksi goruting per hari = Tk x Q3
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga/m2
Pekerja (Tk x P) : Qt
Tukang (Tk x T) : Qt
Mandor (Tk x M) : Qt
Rp. 6,217,295.57 / M3
No. URAIAN
II URUTAN KERJA
1 Pasang perancah untuk menahan beban jembatan saat dilakukan perbaikan elemen struktur baja
2 Lepaskan elemen rangka yang akan diganti dengan melepaskan baut dan mur dari titik-titik buhul
3 Ukur jarak titik buhul yang tepat, buat lubang baut pada rangka baja yang baru sesuai dengan pelat buhul
4 Pasang rangka batang yang sudah diluruskan
5 Pasang baut, ring dan mur, kemudian kencangkan sesuai dengan persyaratan
III PEMAKAIAN BAHAN, ALAT, DAN TENAGA KERJA
1 Bahan
1.a Baja Grade 250 Wb1 = 1 x Fh
1.b Baut mutu tinggi A325 Tipe 1 diameNba1 = Nba/Wb
1.c Perancah Lp = 2 x Lj
2 Alat
2.a Kunci Torsi (Torque Wrench)
Kapasitas Alat
Koefisien alat
Waktu siklus
- Memeriksa dan melepas baut
- Memasang ring dan mur pada lubang dan dikencangkan sampai kondisi snug tightened
- Mengencangkan sampai kondisi pretensioning
Kapasitas prod/jam = C x 60 x Fa
Ts2 x Nba1
Koefisien alat/Buah = 1 : Q2
No. URAIAN
2.c Crane 10-15 Ton
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Memutar lengan mobile crane, mengikat dan menambatkan baja struktur
- Waktu tunggu crane melepas dan memasang baut pada struktur
- Menurunkan baja struktur dan melepaskan ikatan
- Memasang ikatan dan menaikkan dan memasang kembali struktur baja baru
- Melepaskan ikatan dari baja struktur
3 Tenaga Kerja
Produksi menentukan Crane (Q3)
Produksi goruting per hari = Tk x Q3
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga/m2
Pekerja (Tk x P) : Qt
Tukang (Tk x T) : Qt
Mandor (Tk x M) : Qt
Rp. 1,148,034.04 / Kg
No. URAIAN
II URUTAN KERJA
1 Pasang perancah untuk menahan beban jembatan saat dilakukan perbaikan elemen struktur baja
2 Lepaskan elemen rangka yang akan diganti dengan melepaskan baut dan mur dari titik-titik buhul
3 Ukur jarak titik buhul yang tepat, buat lubang baut pada rangka baja yang baru sesuai dengan pelat buhul
4 Pasang rangka batang yang sudah diluruskan
5 Pasang baut, ring dan mur, kemudian kencangkan sesuai dengan persyaratan
2 Alat
2.a Kunci Torsi (Torque Wrench)
Kapasitas Alat
Koefisien alat
Waktu siklus
- Memeriksa dan melepas baut
- Memasang ring dan mur pada lubang dan dikencangkan sampai kondisi snug tightened
- Mengencangkan sampai kondisi pretensioning
Kapasitas prod/jam = C x 60 x Fa
Ts2 x Nba1
Koefisien alat/Buah = 1 : Q2
No. URAIAN
3 Tenaga Kerja
Produksi menentukan Crane (Q3)
Produksi goruting per hari = Tk x Q3
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga/m2
Pekerja (Tk x P) : Qt
Tukang (Tk x T) : Qt
Mandor (Tk x M) : Qt
Rp. 1,150,779.64 / Kg
No. URAIAN
II URUTAN KERJA
1 Pasang perancah untuk menahan beban jembatan saat dilakukan perbaikan elemen struktur baja
2 Lepaskan elemen rangka yang akan diganti dengan melepaskan baut dan mur dari titik-titik buhul
3 Ukur jarak titik buhul yang tepat, buat lubang baut pada rangka baja yang baru sesuai dengan pelat buhul
4 Pasang rangka batang yang sudah diluruskan
5 Pasang baut, ring dan mur, kemudian kencangkan sesuai dengan persyaratan
2 Alat
2.a Kunci Torsi (Torque Wrench)
Kapasitas Alat
Koefisien alat
Waktu siklus
- Memeriksa dan melepas baut
- Memasang ring dan mur pada lubang dan dikencangkan sampai kondisi snug tightened
- Mengencangkan sampai kondisi pretensioning
Kapasitas prod/jam = C x 60 x Fa
Ts2 x Nba1
Koefisien alat/Buah = 1 : Q2
No. URAIAN
3 Tenaga Kerja
Produksi menentukan Crane (Q3)
Produksi goruting per hari = Tk x Q3
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga/m2
Pekerja (Tk x P) : Qt
Tukang (Tk x T) : Qt
Mandor (Tk x M) : Qt
Rp. 1,128,449.16 / Kg
No. URAIAN
II URUTAN KERJA
1 Lakukan pengukuran chamber atau lendutan sebelum dilakukan perkuatan
2 Buat lubang untuk selongsong strand pada flens baja , sesuai Gambar
3 Lakukan kalibrasi untuk peralatan penarikan kabel (jack)
4 Beri perlindungan pada kabel dengan HDPE atau bahan sejenis yang setara
5 Pasang kabel sesuai dengan lubang yang telah dibuat sebelumnya
6 Lakukan penarikan kabel sedemikian rupa sehingga tidak terjadi puntir pada jembatan
7 Lakukan pengawasan chamber secara terus menerus pada saat penarikan berlangsung
8 Setelah proses penarikan selesai, kabel diberi penutup dan diberi gemuk pada bagian dalamnya
9 Berikan perlindungan pada deviator dan angkur dengan galvanis atau pengecatan
10 Cek kondisi elemen elemen jembatan untuk memastikan tiap elemen dalam kondisi baik
No. URAIAN
2 ALAT
2.a Mesin Bor
Pemboran
Faktor efisiensi alat
Kapasitas prod/jam = V1 x 60 x Fa
Ts1 x Nbr
Koefisien alat/Buah = 1 : Q1
3 Tenaga Kerja
Produksi menentukan
Produksi goruting per hari = Tk x Q3
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga/m2
Pekerja (Tk x P) : Qt
Tukang (Tk x T) : Qt
Mandor (Tk x M) : Qt
No. URAIAN
No. URAIAN
1. BAHAN
1.a Kayu Kelas 1
-Lantai jembatan (7/18) = Pj x Lj x 0,07
Volume kayu untuk 1 m3 lantai = 1 x Fh
2 ALAT
2.a Mesin Bor
Pemboran
Faktor efisiensi alat
Waktu siklus:
Persiapan
Waktu pemboran:
Kapasitas prod/jam = V x 60 x Fa
Ts x Nb1
Koefisien alat/m3 = 1 : Q1
2.b Generator Set 332 HP
Kapasitas genset mengikuti Mesin Bor
Koefisien alat = 1/Q2
No. URAIAN
3 TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
Rp. 7,265,350.43 / M
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............ bulan
No. URAIAN
1. BAHAN
1.a Kayu Kelas 1
-Lantai jembatan (7/18) = P x L x 0,07
Volume kayu untuk 1 m3 lantai = 1 x Fh
2 ALAT
2.a Mesin Bor
Pemboran
Faktor efisiensi alat
Waktu siklus:
Persiapan
Waktu pemboran:
Kapasitas prod/jam = V x 60 x Fa
Ts x Nb1
Koefisien alat/m3 = 1 : Q1
No. URAIAN
3 TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
Rp. 8,916,233.96 / M
No. URAIAN
1. BAHAN
1.a Kayu Kelas 1
2 ALAT
2.a Mesin Bor
Pemboran
Faktor efisiensi alat
Waktu siklus:
Persiapan
Waktu pemboran:
Kapasitas prod/jam = C x 60 x Fa
Ts x Nb1
Koefisien alat/m3 = 1 : Q1
No. URAIAN
3 TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
Rp. 6,281,139.71 / M
No. URAIAN
1. BAHAN
1.a Kayu Kelas 1
2 ALAT
2.a Mesin Bor
Pemboran
Faktor efisiensi alat
Waktu siklus:
Persiapan
Waktu pemboran:
Kapasitas prod/jam = V x 60 x Fa
Ts x Nb1
Koefisien alat/m3 = 1 : Q1
No. URAIAN
3 TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
Rp. 6,227,104.39 / M
No. URAIAN
1. BAHAN
1.a Kayu Kelas 1
2 ALAT
2.a Mesin Bor
Pemboran
Faktor efisiensi alat
Waktu siklus:
Persiapan
Waktu pemboran:
Kapasitas prod/jam = V x 60 x Fa
Ts x Nb1
Koefisien alat/m3 = 1 : Q1
No. URAIAN
3 TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
Rp. 5,983,945.44 / M
1. BAHAN
1.a Kayu Kelas 1
2 ALAT
2.a Mesin Bor
Pemboran
Faktor efisiensi alat
Waktu siklus:
Persiapan
Waktu pemboran:
Kapasitas prod/jam = V x 60 x Fa
Ts x Nb1
Koefisien alat/m3 = 1 : Q1
No. URAIAN
3 TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
Rp. 6,470,263.33 / M
No. URAIAN
1. BAHAN
1.a Kayu Kelas 1
-Alur roda kendaraan (5/15) = Pj x 0,05 x 0,15 x 10 (buah)
Volume kayu untuk 1 m3 lantai = 1 x Fh
2 ALAT
2.a Mesin Bor
Pemboran
Faktor efisiensi alat
Waktu siklus:
Persiapan
Waktu pemboran:
Kapasitas prod/jam = C x 60 x Fa
Ts x Nb1
Koefisien alat/m3 = 1 : Q2
No. URAIAN
3 TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
Rp. 7,243,815.00 / M
No. URAIAN
1. BAHAN
1.a Kayu Kelas 1
Jumlah batang kayu
-Kerb (6/12) = Pj x 0,06 x 0,12 x 2 (buah)
Volume kayu untuk 1 m3 lantai = 1 x Fh
2 ALAT
2.a Mesin Bor
Pemboran
Faktor efisiensi alat
Waktu siklus:
Persiapan
Waktu pemboran:
Kapasitas prod/jam = C x 60 x Fa
Ts x Nb1
Koefisien alat/m3 = 1 : Q1
3 TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
Rp. 11,327,266.40 / M
No. URAIAN
1. BAHAN
1.a Kayu Kelas 1
Sandaran (15/15) = Pj x 0,15 x 0,15 x Ns x Fh x 2 (buah)
Volume kayu untuk 1 m3 lantai = 1 x Fh
2 ALAT
2.a Mesin Bor
Pemboran
Faktor efisiensi alat
Waktu siklus:
Persiapan
Waktu pemboran:
Kapasitas prod/jam = C x 60 x Fa
Ts x Nb1
Koefisien alat/m3 = 1 : Q1
No. URAIAN
3 TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
Rp. 7,127,522.52 / M
No. URAIAN
1. BAHAN
1.a Cat Dasar Kayu = Kd x Fh
1.b Cat Protektif Kayu = Kp x Fh
Pengencer (thinner) =10% x (Vol cat dasar+vol cat protektif)
2 ALAT
2.a Mesin Amplas kayu
Kapasitas per jam
Faktor efisiensi alat
Kapasitas prod/jam = V x Fa
Koefisien alat/kg = 1 : Q2
3 TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 40,020.20 / M2
No. URAIAN
I. DATA DAN ASUMSI
1 Pekerjaan dilakukan secara manual dan mekanis
2 Bahan diterima di Lokasi Pekerjaan
3 Cat Dasar Kebutuhan
Berat volume
4 Cat Protektif Kebutuhan
Berat volume
7 Jam kerja efektif per-hari
8 Faktor kehilangan bahan termasuk dalam komponen bahan
1. BAHAN
1.a Cat Dasar Kayu = Kd x Fh
1.b Cat Protektif Kayu = Kp x Fh
Pengencer (thinner) =10% x (Vol cat dasar+vol cat protektif)
2 ALAT
2.a Mesin Amplas kayu
Kapasitas per jam
Faktor efisiensi alat
Kapasitas prod/jam = V x Fa
Koefisien alat/kg = 1 : Q2
3 TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 40,020.20 / M2
No. URAIAN
1. BAHAN
1.a Cat Dasar Kayu = Kd x Fh
1.b Cat Protektif Kayu = Kp x Fh
Pengencer (thinner) =10% x (Vol cat dasar+vol cat protektif)
2 ALAT
2.a Mesin Amplas kayu
Kapasitas per jam
Faktor efisiensi alat
Kapasitas prod/jam = V x Fa
Koefisien alat/kg = 1 : Q2
3 TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
ITEM PEMBAYARAN NO. : 8.10.(12)
JENIS PEKERJAAN : Pengecatan/Perlindungan Tiang Pancang Kayu
SATUAN PEMBAYARAN : M2
No. URAIAN
Rp. 40,020.20 / M2
No. URAIAN
1. BAHAN
1.a Cat Dasar Kayu = Kd x Fh
1.b Cat Protektif Kayu = Kp x Fh
Pengencer (thinner) =10% x (Vol cat dasar+vol cat protektif)
2 ALAT
2.a Mesin Amplas kayu
Kapasitas per jam
Faktor efisiensi alat
Kapasitas prod/jam = V x Fa
Koefisien alat/kg = 1 : Q2
3 TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 40,020.20 / M2
No. URAIAN
1. BAHAN
1.a Cat Dasar Kayu = Kd x Fh
1.b Cat Protektif Kayu = Kp x Fh
Pengencer (thinner) =10% x (Vol cat dasar+vol cat protektif)
2 ALAT
2.a Mesin Amplas kayu
Kapasitas per jam
Faktor efisiensi alat
Kapasitas prod/jam = V x Fa
Koefisien alat/kg = 1 : Q2
2.b Generator Set
Kapasitas genset mengikuti Mesin Amplas kayu
Koefisien alat = 1/Q2
3 TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 40,020.20 / M2
No. URAIAN
II URUTAN KERJA
1 Buat tanda dan potong perkerasan 20 cm ke kanan dan kiri celah
2 Bongkar expansion joint, kemudian bersihkan sisa sisa pembongkaran
3 Pasang batang angkur pada dasar celah sambungan jembatan
4 Tempatkan pelat baja pada dasar sambungan
5 Panaskan agregat dan asphaltic plug pada suhu 199-216°C dengan perbandingan berat 2:1
6 Tuangkan campuran tersebut dan padatkan menjadi 20-30 mm (suhu aplikasi 182-199°C)
7 Lakukan tahapan pekerjaan yang sama untuk lapis berikutnya
8 Lakukan pencampuran agregat dan asphaltic plug untuk lapisan penutup pada lapisan paling atas dengan
9 Tuangkan campuran tersebut dan padatkan
2. ALAT
2.a Jack Hammer
Kapasitas bongkar
Effesiensi kerja
Kapa. Prod/jam = V2 x Fa
Te x Le x 1
Koefisien Alat / m3 = 1 : Q1
2.b Compressor
Koefisien Alat mengikuti Jack Hammer
Koefisien Alat / m = 1 : Q3
No. URAIAN
2.e STAMPER
Ukuran plate
Kapasitas pemadatan
Faktor efesiensi
Kapasitas prod/jam = bp x Fa 7470
L.Ej
Koefesien alat/M3 = 1 : Q1
3. TENAGA
Alat yang mementukan pekerjaan, Q2
Produksi per hari = Tk x Q2
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
Rp. 4,448,235.72 / M
No. URAIAN
II URUTAN KERJA
1 Buat tanda dan potong perkerasan 20 cm ke kanan dan kiri celah
2 Bongkar expansion joint, kemudian bersihkan sisa sisa pembongkaran
3 Pasang ganjalan untuk membuat celah pada sambungan jembatan
4 Cor sambungan dengan menggunakan beton fast track
5 Lepas ganjalan, sehingga terdapat celah pada sambungan jembatan
6 Pasang batang penyokong (backer rod) pada celah sambungan jembatan
7 Tuangkan silicon seal pada celah sambungan diatas backer rod hingga menutupi seluruh backer rod
2. ALAT
2.a Asphalt cutter 130 feet/mnt; 22 HP
Kapasitas per jam 130 ft/mnt dia. 22,6" = 130 x 0,34
Faktor efisiensi alat
Kapasitas prod/jam V1 x Fa x 60
2 x ( 2 x Le + 1 )
Koefisien alat/lubang = 1 : Q1
2.c Compressor
Koefisien Alat mengikuti Jack Hammer
Koefisien Alat / m = 1 : Q3
No. URAIAN
3. TENAGA
Alat yang mementukan pekerjaan, Q3
Produksi lubang per hari = Tk x Q3
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
Rp. 756,427.01 / M3
No. URAIAN
2. ALAT
Linggis Kecil (Alat Bantu)
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu melepas karet pengisi yang akan diganti
- Waktu membersihkan celah sambungan
- Waktu memberi pelumas pada area pekerjaan
- Waktu pemasangan karet pengisi
2. Alat Bantu
Obeng
Linggis
3. TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 1,367,804.25 / M3
No. URAIAN
2. ALAT
Linggis Kecil (Alat Bantu)
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu melepas karet pengisi yang akan diganti
- Waktu membersihkan celah sambungan
- Waktu memberi pelumas pada area pekerjaan
- Waktu pemasangan karet pengisi
2. Alat Bantu
Obeng
Linggis
3. TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 1,385,646.42 / M3
No. URAIAN
II URUTAN KERJA
1 Buat tanda dan potong perkerasan 20 cm ke kanan dan kiri celah
2 Bongkar expansion joint, kemudian bersihkan sisa sisa pembongkaran
3 Pasang sambungan siar muai, beserta dengan karet pengisi celah sambungan
4 Cor sambungan dengan menggunakan beton fast track
5 Lakukan perawatan beton
2. ALAT
2.a Asphalt cutter 130 feet/mnt; 22 HP
Kapasitas per jam 130 ft/mnt dia. 22,6" = 130 x 0,34
Faktor efisiensi alat
Kapasitas prod/jam V1 x Fa x 60
2 x ( 2 x Le + 1 )
Koefisien alat/m = 1 : Q1
2.c Compressor
Koefisien Alat mengikuti Jack Hammer
Koefisien Alat / m = 1 : Q3
3. TENAGA
Alat yang mementukan pekerjaan, Jack Hammer
Produksi lubang per hari = Tk x Q2
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 234,374.11 / M
II URUTAN KERJA
1 Buat tanda dan potong perkerasan 20 cm ke kanan dan kiri celah
2 Bongkar expansion joint, kemudian bersihkan sisa sisa pembongkaran
3 Pasang sambungan siar muai, beserta dengan karet pengisi celah sambungan
4 Cor sambungan dengan menggunakan beton fast track
5 Lakukan perawatan beton
2. ALAT
2.a Asphalt cutter 130 feet/mnt; 22 HP
Kapasitas per jam 130 ft/mnt dia. 22,6" = 130 x 0,34
Faktor efisiensi alat
Kapasitas prod/jam V1 x Fa x 60
2 x ( 2 x Le + 1 )
Koefisien alat/lubang = 1 : Q1
2.c Compressor
Koefisien Alat mengikuti Jack Hammer
Koefisien Alat / m = 1 : Q3
No. URAIAN
Rp. 4,154,554.11 / M
No. URAIAN
II URUTAN KERJA
1 Buat tanda dan potong perkerasan 20 cm ke kanan dan kiri celah
2 Bongkar expansion joint, kemudian bersihkan sisa sisa pembongkaran
3 Pasang sambungan siar muai, beserta dengan karet pengisi celah sambungan
4 Cor sambungan dengan menggunakan beton fast track
5 Lakukan perawatan beton
2. ALAT
2.a Asphalt cutter 130 feet/mnt; 22 HP
Kapasitas per jam 130 ft/mnt dia. 22,6" = 130 x 0,34
Faktor efisiensi alat
Kapasitas prod/jam V1 x Fa x 60
2 x ( 2 x Le + 1 )
Koefisien alat/lubang = 1 : Q1
2.c Compressor
Koefisien Alat mengikuti Jack Hammer
Koefisien Alat / m = 1 : Q3
3. TENAGA
Alat yang mementukan pekerjaan, Jack Hammer
Produksi lubang per hari = Tk x Q2
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 218,701.05 / M
No. URAIAN
II URUTAN KERJA
1 Memasang dudukan Jack pada lokasi titik angkat Jembatan
2 Hydraulic Jack sesuai kapasitas beban ditempatkan dan dihubungkan dengan Electric Hydraulic Pump
3 Pengangkatan dilakukan bertahap beberapa kali dengan memasang pengganjal di bawah Huyd Jack
4 Setelah didapat space yang cukup maka Bearing Pad lama dilepas dari dudukan
5 Dilakukan pembersihan dan/atau perbaikan dudukan bearing pad
6 Pemasangan bearing pad yang baru
7 Jembatan diturunkan perlahan dengan melepas jack pengangkat
8 Selama pekerjaan berlangsung dipasang rambu dan penjaga lalu lintas di atas Jembatan
2 ALAT
2.a Jack Hidrolic
kapasitas
Beban mati tiap Landasan
Beban Hidup tiap landasan (asumsi)
Faktor keamanan
Faktor Evisiensi Alat
Keperluan alat tiap tumpuan = ((L1 + L2) x Sf)/(A)
2.b Manifold
Koefisien alat mengikuti Hydrolic Jack
2.b Hose
Koefisien alat mengikuti Hydrolic Jack
3. TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Mekanik
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Mandor (Tk x M) : Qt Mandor
Mekanik (Tk x Mk) : Qt Mekanik
No. URAIAN
II URUTAN KERJA
1 Memasang dudukan Jack pada lokasi titik angkat Jembatan
2 Hydraulic Jack sesuai kapasitas beban ditempatkan dan dihubungkan dengan Electric Hydraulic Pump
3 Pengangkatan dilakukan bertahap beberapa kali dengan memasang pengganjal di bawah Huyd Jack
4 Setelah didapat space yang cukup maka Bearing Pad lama dilepas dari dudukan
5 Dilakukan pembersihan dan/atau perbaikan dudukan bearing pad
6 Pemasangan bearing pad yang baru
7 Jembatan diturunkan perlahan dengan melepas jack pengangkat
8 Selama pekerjaan berlangsung dipasang rambu dan penjaga lalu lintas di atas Jembatan
2 ALAT
2.a Hydraulic Jack
kapasitas
Beban mati tiap Landasan
Beban Hidup tiap landasan (asumsi)
Faktor keamanan
Faktor Evisiensi Alat
Keperluan alat tiap tumpuan = ((L1 + L2) x Sf)/(A)
2.b Manifold
Koefisien alat mengikuti Hydrolic Jack
2.b Hose
Koefisien alat mengikuti Hydrolic Jack
No. URAIAN
3. TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Mekanik
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Mandor (Tk x M) : Qt Mandor
Mekanik (Tk x Mk) : Qt Mekanik
No. URAIAN
II URUTAN KERJA
1 Memasang dudukan Jack pada lokasi titik angkat Jembatan
2 Hydraulic Jack sesuai kapasitas beban ditempatkan dan dihubungkan dengan Electric Hydraulic Pump
3 Pengangkatan dilakukan bertahap beberapa kali dengan memasang pengganjal di bawah Huyd Jack
4 Setelah didapat space yang cukup maka Bearing Pad lama dilepas dari dudukan
5 Dilakukan pembersihan dan/atau perbaikan dudukan bearing pad
6 Pemasangan bearing pad yang baru
7 Jembatan diturunkan perlahan dengan melepas jack pengangkat
8 Selama pekerjaan berlangsung dipasang rambu dan penjaga lalu lintas di atas Jembatan
2 ALAT
2.a Hydraulic Jack
kapasitas
Beban mati tiap Landasan
Beban Hidup tiap landasan (asumsi)
Faktor keamanan
Faktor Evisiensi Alat
Keperluan alat tiap tumpuan = ((L1 + L2) x Sf)/(A)
2.b Manifold
Koefisien alat mengikuti Hydrolic Jack
2.b Hose
Koefisien alat mengikuti Hydrolic Jack
No. URAIAN
3. TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Mekanik
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Mandor (Tk x M) : Qt Mandor
Mekanik (Tk x Mk) : Qt Mekanik
No. URAIAN
I. DATA DAN ASUMSI
1 Pekerjaan dilakukan secara manual dan mekanis
2 Bahan diterima di Lokasi Pekerjaan
3 Dimensi landasan logam berongga (Pot Bearing) Panjang
Lebar
Tebal
4 Jam kerja efektif per-hari
5 Faktor kehilangan bahan termasuk dalam komponen bahan
II URUTAN KERJA
1 Memasang dudukan Jack pada lokasi titik angkat Jembatan
2 Hydraulic Jack sesuai kapasitas beban ditempatkan dan dihubungkan dengan Electric Hydraulic Pump
3 Pengangkatan dilakukan bertahap beberapa kali dengan memasang pengganjal di bawah Huyd Jack
4 Setelah didapat space yang cukup maka Bearing Pad lama dilepas dari dudukan
5 Dilakukan pembersihan dan/atau perbaikan dudukan bearing pad
6 Pemasangan bearing pad yang baru
7 Jembatan diturunkan perlahan dengan melepas jack pengangkat
8 Selama pekerjaan berlangsung dipasang rambu dan penjaga lalu lintas di atas Jembatan
2 ALAT
2.a Hydraulic Jack
kapasitas
Beban mati tiap Landasan
Beban Hidup tiap landasan (asumsi)
Faktor keamanan
Faktor Evisiensi Alat
Keperluan alat tiap tumpuan = ((L1 + L2) x Sf)/(A)
2.b Hose
Koefisien alat mengikuti Hydrolic Jack
No. URAIAN
3. TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Mekanik
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Mandor (Tk x M) : Qt Mandor
Mekanik (Tk x Mk) : Qt Mekanik
No. URAIAN
II URUTAN KERJA
1 Memasang dudukan Jack pada lokasi titik angkat Jembatan
2 Hydraulic Jack sesuai kapasitas beban ditempatkan dan dihubungkan dengan Electric Hydraulic Pump
3 Pengangkatan dilakukan bertahap beberapa kali dengan memasang pengganjal di bawah Huyd Jack
4 Setelah didapat space yang cukup maka Bearing Pad lama dilepas dari dudukan
5 Dilakukan pembersihan dan/atau perbaikan dudukan bearing pad
6 Pemasangan bearing pad yang baru
7 Jembatan diturunkan perlahan dengan melepas jack pengangkat
8 Selama pekerjaan berlangsung dipasang rambu dan penjaga lalu lintas di atas Jembatan
2 ALAT
2.a Hydraulic Jack
kapasitas
Beban mati tiap Landasan
Beban Hidup tiap landasan (asumsi)
Faktor keamanan
Faktor Evisiensi Alat
Keperluan alat tiap tumpuan = ((L1 + L2) x Sf)/(A)
2.b Manifold
Koefisien alat mengikuti Hydrolic Jack
2.b Hose
Koefisien alat mengikuti Hydrolic Jack
No. URAIAN
3. TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Mekanik
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Mandor (Tk x M) : Qt Mandor
Mekanik (Tk x Mk) : Qt Mekanik
No. URAIAN
II URUTAN KERJA
1 Memasang dudukan Jack pada lokasi titik angkat Jembatan
2 Hydraulic Jack sesuai kapasitas beban ditempatkan dan dihubungkan dengan Electric Hydraulic Pump
3 Pengangkatan dilakukan bertahap beberapa kali dengan memasang pengganjal di bawah Huyd Jack
4 Setelah didapat space yang cukup maka Bearing Pad lama dilepas dari dudukan
5 Dilakukan pembersihan dan/atau perbaikan dudukan bearing pad
6 Pemasangan bearing pad yang baru
7 Jembatan diturunkan perlahan dengan melepas jack pengangkat
8 Selama pekerjaan berlangsung dipasang rambu dan penjaga lalu lintas di atas Jembatan
2 ALAT
2.a Hydraulic Jack
kapasitas
Beban mati tiap Landasan
Beban Hidup tiap landasan (asumsi)
Faktor keamanan
Faktor Evisiensi Alat
Keperluan alat tiap tumpuan = ((L1 + L2) x Sf)/(A)
2.b Manifold
Koefisien alat mengikuti Hydrolic Jack
2.b Hose
Koefisien alat mengikuti Hydrolic Jack
No. URAIAN
3. TENAGA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Mandor
Mekanik
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Mandor (Tk x M) : Qt Mandor
Mekanik (Tk x Mk) : Qt Mekanik
No. URAIAN
II URUTAN KERJA
1 Permukaan elemen baja dibersihkan permukaan logam bersih
2 Pengecatan pertama dengan cat dasar setelah komponen binder dan primer dicampur
3 Pengecatan kedua dengan cat penutup setelah lapisan cat pertama kering
4 Pengecatan ketiga dengan cat penutup setelah lapisan cat kedua kering (jika diperlukan)
2 Alat
Satu set alat pembersihan dan pengecatan ulang
Faktor alat
Waktu siklus per m
- Membersihkan sandaran baja dari karat dan cat lama
- Melakukan pengecatan dengan cat dasar
- Melakukan pengecatan dengan cat akhir
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Q1
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 215,507.01 / M3
No. URAIAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Bahan diterima di Lokasi Pekerjaan
3 Terdapat 2 batang baja pada setiap sisi jembatan
3 Jam kerja efektif per-hari
4 Faktor kehilangan bahan termasuk dalam komponen bahan
1. BAHAN
1.a. Pipa d = 3" cm Galvanised Lp = Ns x Fh
1.b. Dudukan, mur, baut dll, diasumsikan 75 % pipa
2. ALAT
2.a. Alat pertukangan dan lain-lain
3. TENAGA
Produksi pasang Railingk dalam 1 hari
= Tk x Q1 =
Koefisien Tenaga / M :
- Mandor = (Tk x M) : Qt
- Tukang = (Tk x Tb) : Qt
- Pekerja = (Tk x P) : Qt
Rp. 168,878 / M
No. URAIAN
II URUTAN KERJA
1 Sandaran beton yang akan diperbaiki dibongkar kemudian dibersihkan dari sisa sisa pembongkaran
2 Pasang bekisting sesuai dengan gambar
3 Lakukan pengecoran setelah bekisting selesai dibuat
4 Lakukan perawatan beton
2 Alat
-
2.a Alat Bantu
Diperlukan alat-alat bantu kecil
- Pahat / Tatah
- Palu Besar
3 TENAGA KERJA
Rp. 656,415.48 / M3
No. URAIAN
II URUTAN KERJA
1 Lepaskan sandaran baja dan tiang sandaran baja
2 Sandaran beton yang akan diperbaiki dibongkar kemudian dibersihkan dari sisa sisa pembongkaran
3 Pasang bekisting sesuai dengan gambar
4 Lakukan pengecoran setelah bekisting selesai dibuat
5 Lakukan perawatan beton
6 Pasang kembali/ ganti sandaran baja dengan baut
2 Alat
-
3 TENAGA KERJA
No. URAIAN
Rp. 2,784,222.96 / M3
No. URAIAN
II URUTAN KERJA
1 Lepaskan sandaran baja dan tiang sandaran baja
2 Sandaran beton yang akan diperbaiki dibongkar kemudian dibersihkan dari sisa sisa pembongkaran
3 Pasang bekisting sesuai dengan gambar
4 Lakukan pengecoran setelah bekisting selesai dibuat
5 Lakukan perawatan beton
6 Pasang kembali/ ganti sandaran baja dengan baut
2 Alat
-
3 TENAGA KERJA
No. URAIAN
Rp. 3,126,565.21 / M3
No. URAIAN
II URUTAN KERJA
1 Bongkar deck drain lama yang akan di ganti
2 Pasang deck drain pengganti, pastikan pemasangan pas dengan sambungan pipa dan beri perekat
3 Isi celah drainase lantai jembatan dengan mortar
1 BAHAN
1.a Deck Drain
Dimensi deck drain Tinggi
Panjang
Lebar
Diameter pipa
Volume Vd = Td x Pd x Ld
1.b Perekat
Panjang sambungan
Tebal perekat
Luas bidang yang diberi perekat Lp = π x ø x Ps
Berat perekat Wp = Lp x Tp x Dp x Fh
2 ALAT
2.a Jack Hammer
Kapasitas bongkar
Effesiensi kerja
Kap. Prod/jam = Fa x V
Vd+Vm
Koefisien Alat / m3 = 1 : Q1
2.b Compressor
Koefisien Alat mengikuti Jack Hammer
Koefisien Alat / m = 1 : Q3
No. URAIAN
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Jack Hammer
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
Rp. 71,433,246.46 / M3
No. URAIAN
II URUTAN KERJA
1 Bongkar pipa lama yang akan di ganti
2 Pasang pipa pengganti, pastikan pemasangan pas dengan sambungan pipa dan beri perekat
3 Isi celah drainase lantai jembatan dengan mortar fast track
1 BAHAN
1.a Pipa PVC
1.c Perekat
Panjang sambungan
Tebal perekat
Luas bidang yang diberi perekat Lp = π x ø x Ps
Berat perekat Wp = Lp x Tp x Dp x Fh
2.b Compressor
Koefisien Alat mengikuti Jack Hammer
Koefisien Alat / m = 1 : Q3
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Jack Hammer
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 500,554,675.66 / M
No. URAIAN
II URUTAN KERJA
1 Bongkar pipa lama yang akan di ganti
2 Pasang pipa pengganti, pastikan pemasangan pas dengan sambungan pipa dan beri perekat
3 Isi celah drainase lantai jembatan dengan mortar fast track
1 BAHAN
1.a Pipa Baja
1.c Perekat
Panjang sambungan
Tebal perekat
Luas bidang yang diberi perekat Lp = π x ø x Ps
Berat perekat Wp = Lp x Tp x Dp x Fh
2 ALAT
2.a Jack Hammer
Kapasitas bongkar
Effesiensi kerja
Kap. Prod/jam = Fa x V
Tb x Lb
Koefisien Alat / m3 = 1 : Q1
2.b Compressor
Koefisien Alat mengikuti Jack Hammer
Koefisien Alat / m = 1 : Q3
3 TENAGA KERJA
Alat yang mementukan pekerjaan, Jack Hammer
Produksi lubang per hari = Tk x Q1
Kebutuhan tenaga:
Pekerja
Tukang
Mandor
Koefisien tenaga
Pekerja (Tk x P) : Qt Pekerja
Tekerja (Tk x P) : Qt Tukang
Mandor (Tk x M) : Qt Mandor
No. URAIAN
Rp. 500,966,900.66 / M3
A.
1.
2.
B.
1
(M125) 1.03 kg
E68 C.
V 5 Kg/jam
Fa 0.83 1
Q1 4.15 Kg/jam 2
E68 0.24 Jam 3
E12
Q2 4.15 Kg/jam D.
E12 0.24 Jam E.
F.
Note: 1
Q1 4.15 kg/jam 3
Qt 29.05 kg/hari 4
P 3.00 orang
M 1.00 orang
Analisa EI-81.2
Ls 0.050 M'
Ts 0.003 M' NO.
Pr 3 M'/M2
Ds 1.7 T/m3 A.
Ts 7 M'
Tk 7.00 Jam 1.
Fh 1.03 2.
B.
1
2
C.
(M126) 1.03 Kg 1
Ws 0.7880 Kg/M2 2
As 1.27 M2/Kg 3
4
(M195) 1.27 m2
E05
Cap 10 m2/mnt
Fa 0.83
Q1 392.4 Kg
E 05 0.0025 Jam D.
E.
E69 Dia 30 - 500 mm F.
V 20.00 m2/jam Note: 1
Fa 0.83
Q2 13.080 kg/jam 2
E69 0.0765 jam
E12 3
4
E12 0.079 Jam
Q2 13.08 kg/jam
Qt 91.56 kg
P 6 orang
M 1 orang
A.
1.
2.
C.
1
Qt 35 buah/hari Item Pemb 8.1.(3b)
P 2 orang
M - orang D.
E.
F.
L01 0.4016 jam Note: 1
L03 0.0000 jam
2
3
4
Analisa EI-81.3b
A.
1
E68
V 1 buah
Fa 0.83
C.
T1 2.0 menit
T2 5.0 menit 1.
T3 2.0 menit 2.
T4 1.0 menit
Ts 10.0 menit
Q1 5.0 buah/jam
buah/jam D.
E68 0.2008 buah/jam E.
F.
E12 Note: 1
Q2 4.98
E12 0.2008 Jam 2
3
4
Qt 35 buah/hari
PROYEK
No. PAKET KONTRAK
NAMA PAKET
D1 2.20 Ton/M³
D2 1.68 kg/liter
D3 1.50 kg/liter NO.
D 16.00 mm
Kb 1.00 kg/m2
Ka 1.00 kg/m2 A.
ρ 1.50 %
Tk 7.00
Fh 1.03 1.
2.
B.
1
n permukaan sekelilingnya. 2
3
(M69)
Vt 0.60 m3
Vb1 1.03 m3 C.
(M198) 1
Lb 8.86 m2 2
Wb 15.21 kg/m3 3
4
(M129)
Ab 0.0012 m2
Nb 5.9683 buah
Abs 2.2500 m2 D.
Wa 3.8625 kg/m3 E.
F.
Note: 1
E76 Dia 30 - 500 mm
V 39.6 m/mnt Asumsi 2
Fa 0.83
Q1 15.48 m3/jam
3
E76 0.0646 jam 4
E05
Q2 15.48 m3/jam
E 05 0.0646 Jam
E12
Analisa EI-82.1
Q1 15.48 m3/jam
Qt 108 m3/hari
Db 2.27 T/m3 A.
Da 1.500 kg/liter
Da 16.00 mm 1.
Ka 1.000 kg/m2 2.
ρ 1.5 %
Tk 7.00 Jam
1.03
B.
1
2
3
4
5
6
C.
1
2
3
4
(M141)
Vp 0.60 M3
Vg 1.03 M3
D.
(M129) E.
Ab 0.001 m2 F.
Nb 5.9683 buah Note: 1
Abs 2.250 m2
Wa 3.863 kg/m3 2
(M132) 9.750 m2
3
4
E05
Cap 10 m2/mnt
Fa 0.83
Q1 7.49 m3/jam
E 05 0.1334 Jam
E57a
Cap 50 Kg
Fa 0.83
T1 0.75 menit
T2 5.00 menit
Ts 5.75 menit
Q2 0.19 M3/jam
5.2420 Jam
E12
Q2 0.19 m3/jam
Qt 1.34 m3
P 4.00 orang
M 1.00 orang
Kd 0.28 Kg / m2
Dd 1.30 Ton/m3 NO.
Kp 0.25 Kg / m2
Dp 1.40 Ton/m3 A.
Tk 7.00 Jam
Fh 1.03 1.
2.
B.
1
2
3
4
Wd 0.288 Kg C.
Wp 0.258 Kg
Wt 0.041 liter 1
2
Qa 41.00 liter/m 3
Va 148.19 liter
D.
E64 E.
V 20 m2/jam Asumsi F.
Fa 0.83 - Note: 1
Q1 16.60 M2/Jam
E64 0.06 Jam 2
E12
Q2 16.60 3
E12 0.06 Jam 4
Q1 16.60 m2/jam
Qt 116.20 m2
P 4.00 orang
M 1.00 orang
Kd 0.28 Kg / m2
Dd 1.30 Ton/m3 NO.
Kde 0.25 Kg / m2
Dde 1.40 Ton/m3 A.
Tk 7.00 Jam
Fh 1.03 1.
2.
B.
1
2
3
4
Wd 0.288 Kg
Wde 0.258 Kg
Wt 0.041 liter
C.
Qa 41.00 liter/m
Va 148.19 liter 1
2
3
E64
V 20 m2/jam
Fa 0.83 - D.
Q1 16.60 M2/Jam E.
E64 0.06 Jam F.
Note: 1
E12
Q2 16.60 2
E12 0.06 Jam
3
4
Q1 16.60 m2/jam
Qt 116.20 m2
P 4.00 orang
M 1.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
Ke 1.00 kg/m2
P 1.00 m
L 1.00 m NO.
Tk 7.00 Jam
Fh 1.03 A.
1.
2.
3.
B.
1
2
3
Lf 1.03 m2
We 1.03 kg/m2 C.
Lp 9.00 m2
1.
2.
3.
E98d Dia 30 - 500 mm 4.
V 20.00 m2/jam 5.
Fa 0.83
Q1 16.600 m2/jam
E98d 0.0602 jam
D.
E05 E.
F.
Q2 16.60 m2/jam Note: 1
E 05 0.0602 Jam
2
V 6.00 Kg
Fa 0.83 3
Ts1 Menit 4
T1 5.00 Menit
T2 5.00 Menit
Ts 1 10.00 Menit
Q1 29.880 m2/Jam
0.0335 Jam
E12
Q2 16.60 m2/Jam
E12 0.060 Jam
Q1 16.60 m2/jam
Qt 116.20 m2
P 6.00 orang
T 3.00 orang
M 1.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
Ke 1.00 kg/m2
P 1.00 m
L 1.00 m NO.
Tk 7.00 Jam
Fh 1.03 A.
1.
2.
3.
B.
1
2
3
Lf 1.03 m2
We 1.03 kg/m2 C.
Lp 9.00 m2
1.
2.
3.
E98d Dia 30 - 500 mm 4.
V 20.00 m2/jam 5.
Fa 0.83
Q1 16.600 m2/jam
E98d 0.0602 jam
D.
E05 E.
F.
Q2 16.60 m2/jam Note: 1
E 05 0.0602 Jam
2
V 6.00 Kg
Fa 0.83 3
Ts1 Menit 4
T1 5.00 Menit
T2 5.00 Menit
Ts 1 10.00 Menit
Q1 29.880 m2/Jam
0.0335 Jam
E12
Q2 16.60 m2/Jam
E12 0.060 Jam
Q1 16.60 m2/jam
Qt 116.20 m2
P 6.00 orang
T 3.00 orang
M 1.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
1.
2.
3.
B.
1
2
3
Lf 1.03 m2
We 1.03 kg/m2 C.
Lp 9.00 m2
1.
2.
3.
E98d Dia 30 - 500 mm 4.
V 20.00 m2/jam 5.
Fa 0.83
Q1 16.600 m2/jam
E98d 0.0602 jam
D.
E05 E.
F.
Q2 16.60 m2/jam Note: 1
E 05 0.0602 Jam
2
V 6.00 Kg
Fa 0.83 3
Ts1 Menit 4
T1 5.00 Menit
T2 5.00 Menit
Ts 1 10.00 Menit
Q1 29.880 m2/Jam
0.0335 Jam
E12
Q2 16.60 m2/Jam
E12 0.060 Jam
Q1 16.60 m2/jam
Qt 116.20 m2
P 6.00 orang
T 3.00 orang
M 1.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
Ke 1.00 kg/m2
P 1.00 m
L 1.00 m NO.
Tk 7.00 Jam
Fh 1.03 A.
1.
2.
3.
emudian tekan satu arah dengan rol
B.
1
2
3
Lf 1.03 m2
We 1.03 kg/m2 C.
Lp 9.00 m2
1.
2.
3.
E98d Dia 30 - 500 mm 4.
V 20.00 m2/jam Asumsi 5.
Fa 0.83
Q1 16.600 m2/jam
E98d 0.0602 jam
D.
E05 E.
F.
Q2 16.60 m2/jam Note: 1
E 05 0.0602 Jam
2
V 6.00 Kg
Fa 0.83 3
Ts1 Menit 4
T1 5.00 Menit
T2 5.00 Menit
Ts 1 10.00 Menit
Q1 29.880 m2/Jam
0.0335 Jam
E12
Q2 16.60 m2/Jam
E12 0.060 Jam
P 6.00 orang
T 3.00 orang
M 1.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
Ke 1.00 kg/m2
P 1.00 m
L 1.00 m NO.
Tk 7.00 Jam
Fh 1.03 A.
1.
2.
3.
B.
1
2
3
Lf 1.03 m2
We 1.03 kg/m2 C.
Lp 9.00 m2
1.
2.
3.
E98d Dia 30 - 500 mm 4.
V 20.00 m2/jam Asumsi 5.
Fa 0.83
Q1 16.600 m2/jam
E98d 0.0602 jam
D.
E05 E.
F.
Q2 16.60 m2/jam Note: 1
E 05 0.0602 Jam
2
V 6.00 Kg
Fa 0.83 3
Ts1 Menit 4
T1 5.00 Menit
T2 5.00 Menit
Ts 1 10.00 Menit
Q1 29.880 m2/Jam
0.0335 Jam
E12
Q2 16.60 m2/Jam
E12 0.060 Jam
Q1 16.60 m2/jam
Qt 116.20 m2
P 6.00 orang
T 3.00 orang
M 1.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
3.
B.
1
2
Lb 0.10 m 3
Wb 31.40 kg 4
Wb1 1.03 kg 5
6
Te 0.002 m
We 0.002 m3
We1 0.0001 kg C.
Nb 2 buah 1.
Nb1 0.6369 buah 2.
C 0.0328 m2 3.
Tp1 5.00 buah 4.
Tp2 5.00 buah 5.
E98d Dia 30 - 500 mm D.
V1 20.00 m2/jam E.
Fa 0.83 F.
Q1 521.240 kg/jam Note: 1
E98d 0.0019 jam
2
E05
Q2 521.24 kg/jam 3
E 05 0.0019 Jam 4
E65
V3 1 Lubang
Fa 0.83
Q3 78.19 kg/jam
0.013 jam
E12
Q4 78.19 m2/Jam
E12 0.013 Jam
Q1 521.24 m2/jam
Qt 3,648.68 m2
P 6.00 orang
T 3.00 orang
M 1.00 orang
Analisa EI-8.48
n beton bentang .…. m
URAIAN ANALISA HARGA SATUAN
PEREKAMA
KODE KOEF. SATUAN KETERANGAN PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
L 30.00 m SATUAN PEMBAYARAN
ø 12.70 mm
Nk 2.00 buah
Ng 5.00 buah NO.
Tk 7.00 Jam A.
Fh 1.03
1.
1.
2.
B.
1
2
agian dalamnya 3
4
5
6
C.
Nk 10.00 buah 1
Wk 307.2737 kg 2
Na 20.00 buah 3
Ls 309.00 m 4
5
Npb 10.00 buah
Pb 0.60 m
Lb 0.50 m
Tb 0.028 m
Wb 679.182 kg D.
Npg 5.00 buah E.
Vpg 0.0157 m3 F.
Wpg 633.9032 kg Note: 1
Wbj 1313.0852 kg
2
E65 Dia 20 - 50 mm
V1 1 Lubang
Fa 0.83
Nbr 160.00 Lubang lubang 4 titik untuk jalur
kabel
T1 0.50 menit
T2 0.50 menit
Ts1 1.00
3.21 jam
E83
V2 1.00
Fa 0.83
T1 1.00 menit
T2 0.50 menit
Ts2 1.50
3.614 Jam
E63
V3 2.00 Titik
Fa 0.83 -
T1 5.00 menit
T2 3.00 menit
Ts3 8.00 menit
Q3 1.25 Jembatan/jam
E12
4.016 Jam
Q3 3.00
Qt 21.00
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
M25 1 Buah
B.
1
E74
Fa 0.83
C.
T1 1.00 menit 1.
T2 1.00 menit 2
T3 1.00 menit 3
T4 0.50 menit
Ts 3.50 menit
Q1 14.2 Buah/jam D.
E.
E74 0.070 Jam F.
Note: 1
E78
2
E78 0.0703 jam
3
4
Q1 14.23 Buah 20 alat 20 orang
Qt 99.60 Buah
P 20 orang
M 1 orang
NO.
A.
1.
2.
M25 1 Buah
B.
1
E74
Fa 0.83
C.
T1 1.00 menit 1.
T2 1.00 menit 2
T3 1.00 menit 3
T4 0.50 menit
Ts 3.50 menit
Q1 14.2 Buah/jam D.
E.
E74 0.070 Jam F.
Note: 1
E78
2
E78 0.0703 jam
3
4
P 20 orang
M 1 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
A.
1.
2.
M25 1 Buah
B.
1
E74
Fa 0.83
C.
T1 1.00 menit 1.
T2 1.00 menit 2
T3 1.00 menit 3
T4 0.50 menit
Ts 3.50 menit
Q1 14.2 Buah/jam D.
E.
E74 0.070 Jam F.
Note: 1
E78
2
E78 0.0703 jam
3
4
P 20 orang
M 1 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
M25 1 Buah
B.
1
E74
Fa 0.83
C.
T1 1.00 menit 1.
T2 1.00 menit 2
T3 1.00 menit 3
T4 0.50 menit
Ts 3.50 menit
Q1 14.2 Buah/jam D.
E.
E74 0.070 Jam F.
Note: 1
E78
2
E78 0.0703 jam
3
4
P 20 orang
M 1 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2.
M25 1 Buah
B.
1
E74
Fa 0.83
C.
T1 1.00 menit 1.
T2 1.00 menit 2
T3 1.00 menit 3
T4 0.50 menit
Ts 3.50 menit
Q1 14.2 Buah/jam D.
E.
E74 0.070 Jam F.
Note: 1
E78
2
E78 0.0703 jam
3
4
P 20 orang
M 1 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
1.
2
B.
1
E74
Fa 0.83
C.
T1 1.00 menit
T3 1.00 menit 1.
T4 0.50 menit 2
Ts 2.50 3
Q1 19.9 Buah/jam
E74 0.050 Jam
D.
E78 E.
F.
E78 0.0502 jam Note: 1
3
Q1 19.92 Buah 20 alat @ 20 pekerja 4
Qt 139.44 Buah
P 20 orang
M 1 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
Tk 7.00 Jam ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
A.
1.
2
B.
E74
Fa 0.83
C.
T1 1.00 menit
T3 1.00 menit 1.
T4 0.50 menit 2
Ts 2.50 3
Q1 19.9 Buah/jam
E74 0.050 Jam
D.
E78 E.
F.
E78 0.0502 jam Note: 1
3
Q1 19.92 Buah 20 alat @ 20 pekerja 4
Qt 139.44 Buah
P 20 orang
M 1 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
ng menonjol diratakan B.
1
E12 3
Q3 8.30 m/jam 4
E12 0.120 jam
Q1 8.30 m/jam
Qt 58.10 m
P 6.00 orang
T 3.00 orang
M 1.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
ng menonjol diratakan B.
1
E12 3
V 135.00 KVA 4
Fa 0.83
Q3 8.30 m/jam
E12 0.120 jam
Q1 8.30 m/jam
Qt 58.10 m
P 6.00 orang
T 3.00 orang
M 1.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
ng menonjol diratakan B.
1
(M217)
Vl 9.00 cm3 Permukaan bidang baja C.
We 0.073 kg yang disambung 90°
1.
2
E69 Dia 30 - 500 mm 3
V 10.00 m2/jam 4
Fa 0.83
Lg 0.0600 m2/m
Q1 138.333 m/jam
E69 0.0072 jam D.
E.
E32 F.
Cap 10 m/jam Note: 1
Fa 0.83
Q2 8.30 m/jam 2
E32 0.120 jam
E12 3
V 135.00 KVA 4
Fa 0.83
Q3 8.30 m/jam
E12 0.120 jam
Q1 8.30 m/jam
Qt 58.10 m
P 6.00 orang
T 3.00 orang
M 1.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
ng menonjol diratakan B.
1
(M218)
Vl 9.00 cm3 permukaan bidang baja C.
We 0.073 kg yang disambung 90°
1.
2
E69 Dia 30 - 500 mm 3
V 10.00 m2/jam 4
Fa 0.83
Lg 0.0600 m2/m
Q1 138.333 m/jam
E69 0.0072 jam D.
E.
E32 F.
Cap 10 m/jam Note: 1
Fa 0.83
Q2 8.30 m/jam 2
E32 0.120 jam
E12 3
V 135.00 KVA 4
Fa 0.83
Q3 8.30 m/jam
E12 0.120 jam
Berlanjut ke hal. berikut.
Analisa EI-864a
Q1 8.30 m/jam
Qt 58.10 m
P 6.00 orang
T 3.00 orang
M 1.00 orang
A.
Tk 7.00 Jam 1.
Fh 1.03 2.
3.
B.
1
2
3
4
C.
Wd 0.288 Kg
Wa 0.258 Kg 1
Wt 0.041 liter 2
3
E77 D.
V 10 m2/jam Asumsi E.
Fa 0.83 - F.
Q1 8.30 M2/Jam Note: 1
E77 0.12 Jam
2
E12
Q2 8.30
E12 0.12 Jam 3
4
Q1 8.30 m2/jam
Qt 58.10 m2
P 5.00 orang
T 5.00 orang
M 1.00 orang
C.
Wd 0.288 Kg
Wa 0.258 Kg 1
Wt 0.041 liter 2
3
E77 D.
V 5 m2/jam Asumsi E.
Fa 0.83 - F.
Q1 4.15 M2/Jam Note: 1
E77 0.24 Jam
2
E12
Q2 4.15
E12 0.24 Jam 3
4
Q1 4.15 m2/jam
Qt 29.05 m2
P 5.00 orang
T 5.00 orang
M 1.00 orang
B.
1
2
3
4
C.
Wd 0.288 Kg
Wa 0.258 Kg 1
Wt 0.041 liter 2
3
E77 D.
V 5 m2/jam Asumsi E.
Fa 0.83 - F.
Q1 4.15 M2/Jam Note: 1
E77 0.24 Jam
2
E12
Q2 4.15
E12 0.24 Jam 3
4
Q1 4.15 m2/jam
Qt 29.05 m2
P 5.00 orang
T 5.00 orang
M 1.00 orang
Tk 7.00 Jam 1.
Fh 1.03 1.
2.
B.
1
2
3
4
C.
Wd 0.288 Kg
Wa 0.258 Kg 1
Wt 0.041 liter 2
3
E77 D.
V 5 m2/jam Asumsi E.
Fa 0.83 - F.
Q1 4.15 M2/Jam Note: 1
E77 0.24 Jam
2
E12
Q2 4.15
E12 0.24 Jam 3
4
Q1 4.15 m2/jam
Qt 29.05 m2
P 5.00 orang
T 5.00 orang
M 1.00 orang
A.
Tk 7.00 Jam 1.
Fh 1.03 2.
3.
B.
1
2
3
4
C.
Wd 0.288 Kg
Wa 0.258 Kg 1
Wt 0.041 liter 2
3
E77 D.
V 5 m2/jam Asumsi E.
Fa 0.83 - F.
Q1 4.15 M2/Jam Note: 1
E77 0.24 Jam
2
E12
Q2 4.15
E12 0.24 Jam 3
4
Q1 4.15 m2/jam
Qt 29.05 m2
P 5.00 orang
T 5.00 orang
M 1.00 orang
C.
Wd 0.288 Kg
Wa 0.258 Kg 1
Wt 0.041 liter 2
3
E77 D.
V 5 m2/jam Asumsi E.
Fa 0.83 - F.
Q1 4.15 M2/Jam Note: 1
E77 0.24 Jam
2
E12
Q2 4.15
E12 0.24 Jam 3
4
Q1 4.15 m2/jam
Qt 29.05 m2
P 5.00 orang
T 5.00 orang
M 1.00 orang
1.
2.
men struktur baja 3.
itik-titik buhul
B.
1
(M195) 0.420 M3
E74 C.
V1 1.00
Fa 0.83 1
2
T1 1.50 menit 3
T2 1.00 menit 4
T3 0.50 menit 5
Ts1 3.00 menit
Q1 16.6 Buah/jam
0.060 Jam
D.
E57 E.
V2 1.00 Buah F.
Fa 0.83 Note: 1
T1 30.00 menit 2
T2 40.00 menit
Ts2 70.00 menit
Q2 0.71 batang/jam 3
4
1.41 Jam
E07
V3 1.00 Buah
Fa 0.83 -
T1 3.00
T2 192.00 menit
T3 1.00 menit
T4 70.00 menit
T5 2.00 menit
T6 1.00 menit
Ts3 269.00 menit
Q3 0.19 Buah
E07 5.4016 jam
E12
Q2 0.71
E12 1.406 Jam
Q3 0.19 Buah
Qt 1.30 Buah
P 10 orang
Tk,K 10 orang
M 1 orang
Lj 10 m A.
Tk 7.00 Jam
Fh 1.03 1.
2.
3.
men struktur baja
ari titik-titik buhul
esuai dengan pelat buhul
B.
1
2
3
Wb1 1.03 kg
Nba1 0.13 buah/kg
Lp 20.000 m2
C.
E74 1
V1 1.00 buah 2
Fa 0.83 3
4
T1 1.50 menit 5
T2 1.00 menit
T3 0.50 menit
Ts1 3.00 menit
Q1 129.7 kg/jam
D.
0.008 Jam E.
F.
E71 Dia 20 - 50 mm Note: 1
V2 1 Lubang
Fa 0.83 2
T1 0.50 menit
T2 0.50 menit 3
Ts2 1.00 4
Q2 389.06 kg/jam
0.0026 jam
T1 3.00
T2 0.46 menit
T3 1.00 menit
T4 2.00 menit
T5 1.00 menit
Ts3 7.46 menit
Q3 7.73 kg/jam
E12
Q2 389.06 kg/jam
E12 0.003 Jam
Q3 7.73 Buah
Qt 54.09 Buah
P 10 orang
Tk,K 10 orang
M 1 orang
Lj 10 m A.
Tk 7.00 Jam
Fh 1.03 1.
2.
3.
men struktur baja
ari titik-titik buhul
esuai dengan pelat buhul
B.
1
2
3
Wb1 1.03 kg
Nba1 0.13 buah/kg
Lp 20.000 m2
C.
E74 1
V1 1.00 buah 2
Fa 0.83 3
4
T1 1.50 menit 5
T2 1.00 menit
T3 0.50 menit
Ts1 3.00 menit
Q1 129.7 kg/jam
D.
E74 0.008 Jam E.
F.
E71 Note: 1
V2 1 Lubang
Fa 0.83 2
T1 0.50 menit
T2 0.50 menit 3
Ts2 1.00 4
Q2 389.06 kg/jam
0.0026 jam
E07
V3 1.00 elemen
Fa 0.83 -
T1 3.00
T2 0.46 menit
T3 1.00 menit
T4 2.00 menit
T5 1.00 menit
Ts3 7.46 menit
Q3 7.73 kg/jam
E12
Q2 389.06 kg/jam
E12 0.003 Jam
Q3 7.73 Buah
Qt 54.09 Buah
P 10 orang
Tk,K 10 orang
M 1 orang
Lj 10 m A.
Tk 7.00 Jam
Fh 1.03 1.
2.
3.
men struktur baja
ari titik-titik buhul
esuai dengan pelat buhul
B.
1
2
3
Wb1 1.03 kg
Nba1 0.13 buah/kg
Lp 20.000 m2
C.
E74 1
V1 1.00 buah 2
Fa 0.83 3
4
T1 1.50 menit 5
T2 1.00 menit
T3 0.50 menit
Ts1 3.00 menit
Q1 129.7 kg/jam
D.
E74 0.008 Jam E.
F.
E71 Dia 20 - 50 mm Note: 1
V2 1 Lubang
Fa 0.83 2
T1 0.50 menit
T2 0.50 menit 3
Ts2 1.00 4
Q2 389.06 kg/jam
0.0026 jam
E07
V3 1.00 elemen
Fa 0.83 -
T1 3.00
T2 0.46 menit
T3 1.00 menit
T4 2.00 menit
T5 1.00 menit
Ts3 7.46 menit
Q3 7.73 kg/jam
E12
Q2 389.06 kg/jam
E12 0.003 Jam
Q3 7.73 Buah
Qt 54.09 Buah
P 10 orang
Tk,K 10 orang
M 1 orang
Analisa EI-891
tuk jembatan baja dengan bentang …..m
URAIAN ANALISA HARGA SATUAN
PEREKAMA
Tk 7.00 Jam A.
Fh 1.03
1.
1.
2.
B.
1
2
agian dalamnya 3
4
5
6
C.
Nk 10.00 buah 1
Wk 0.3073 Ton 2
Na 20.00 buah 3
Ls 309.00 m 4
5
Npb 10.00 buah
Pb 0.60 m
Lb 0.50 m
Tb 0.028 m
Wb 679.182 kg D.
Npg 5.00 buah E.
Vpg 0.0157 m3 F.
Wpg 633.9032 kg Note: 1
Wbj 1313.0852 kg
2
Nbb1 8 baut
Nbb 80.00 buah 3
Nbg1 8 baut 4
Nbg 40.00 buah
Nb 120.00 buah
18.00 m2
Berlanjut ke hal. berikut.
Analisa EI-891
jembatan baja dengan bentang …..m
URAIAN ANALISA HARGA SATUAN
E65 Dia 20 - 50 mm
V1 1 Lubang
Fa 0.83
T1 0.50 menit
T2 0.50 menit
Ts1 1.00
3.21 jam
E74
V2 1.00
Fa 0.83
T1 1.00 menit
T2 0.50 menit
Ts2 1.50
E63
V3 2.00 Titik
Fa 0.83 -
T1 5.00 menit
T2 3.00 menit
Ts3 8.00 menit
Q3 1.25 Jembatan/jam
E12
4.016 Jam
Q3 3.00
Qt 21.00
Analisa EI-891
jembatan baja dengan bentang …..m
URAIAN ANALISA HARGA SATUAN
1.
1.
2.
B.
1
2
Vk 3.15 m3
(M142) 1.05 m3
C.
Nba 4.00 buah
Nb 224.00 buah 4 baut/baris kayu 1
(M223) 72.00 buah/m3 2
T1 0.50 menit
T2 0.50 menit D.
Ts 1.00 menit E.
F.
Q1 0.69 M3 Note: 1
1.446 jam 2
E12e
Q2 0.69 3
E12e 1.446 Jam 4
Lumpsum
Q1 0.69 m3/jam
Qt 4.84 m3
P 7.00 orang
T 7.00 orang
M 1.00 orang
A.
1.
1.
2.
B.
1
2
Vk 0.07 m3
(M142) 1.05 m3
E65
V 1 Lubang
Fa 0.83
T1 0.50 menit
T2 0.50 menit
Ts 1.00 menit D.
E.
Q1 0.29 M3 F.
Note: 1
3.454 jam
2
E12e
Q2 0.29
E12e 3.454 Jam 3
4
Lumpsum
Berlanjut ke hal. berikut.
Analisa EI-810.1
Q1 0.29 m3/jam
Qt 2.03 m3
P 7.00 orang
T 7.00 orang
M 1.00 orang
1.
1.
2.
B.
1
2
C.
Vk 2.50 m3 1
(M142) 1.05 m3 2
3
T1 0.50 menit
T2 0.50 menit 3
Ts 1.00 menit 4
Q1 3.11 M3
0.321 jam
E12e
Q2 3.11
E12e 0.321 Jam
Lumpsum
Q1 3.11 m3/jam
Qt 21.79 m2
P 10.00 orang
T 2.00 orang
M 1.00 orang
1.
1.
2.
B.
1
2
C.
Vk 0.30 m3
(M142) 1.05 m3 1
2
3
Nb 4.00 buah
(M223) 14.00 buah/m3
D.
E71 Mata bor kayu E.
V 1.000 lubang F.
Fa 0.83 Note: 1
T1 0.50 menit 2
T2 0.50 menit
Ts 1.00 menit
3
Q1 3.56 M3 4
0.281 jam
E12
Q2 3.56
E12 0.281 Jam
Lumpsum
Q1 3.56 m3/jam
Qt 24.90 m2
P 10.00 orang
T 2.00 orang
M 1.00 orang
1.
1.
2.
B.
1
2
C.
Vk 0.90 m3
(M142) 1.05 m3 1
2
3
Nb 4.00 buah
(M223) 5.00 buah/m3
D.
E71 Mata bor kayu E.
V 1.000 lubang F.
Fa 0.83 Note: 1
T1 0.50 menit 2
T2 0.50 menit
Ts 1.00 menit
3
Q2 9.96 M3 4
0.100 jam
E12
Q1 9.96
E12 0.100 Jam
Lumpsum
Q1 9.96 m3/jam
Qt 69.72 m2
P 10.00 orang
T 2.00 orang
M 1.00 orang
1.
1.
2.
B.
1
2
C.
Vk 0.18 m3
(M142) 1.05 m3 1
2
3
Nb 4.00 buah
(M223) 23.00 buah/m3
D.
E65 Mata bor kayu E.
V 1.000 lubang F.
Fa 0.83 Note: 1
T1 0.50 menit 2
T2 0.50 menit
Ts 1.00 menit
3
Q2 2.17 M3 4
0.462 jam
E12e
Q1 2.17
E12e 0.462 Jam
Lumpsum
Q1 2.17 m3/jam
Qt 15.16 m2
P 10.00 orang
T 2.00 orang
M 1.00 orang
1.
1.
2.
B.
1
2
3
4
0.75 m3
(M142) 1.05 m3
D.
Pl 1.60 m E.
F.
Note: 1
E71 Mata bor kayu
C 1 Lubang 2
Fa 0.83
T1 0.50 menit 3
T2 0.50 menit 4
Ts 1.00 menit
Q2 1.16 M3
0.863 jam
E12
Lumpsum
Berlanjut ke hal. berikut.
Analisa EI-8107
Q1 0.00 m2/jam
Qt 0.00 m2
P 7.00 orang
T 7.00 orang
M 1.00 orang
1.
1.
2.
B.
1
2
T1 0.50 menit D.
T2 0.50 menit E.
Ts 1.00 menit F.
Note: 1
Q1 0.22 M3
2
4.478 jam
E12 3
Q2 0.22 4
E12 4.478 Jam
Lumpsum
Q1 0.22 m2/jam
Qt 1.56 m2
P 10.00 orang
T 2.00 orang
M 1.00 orang
1.
1.
2.
B.
1
2
Vk 0.95 m3
Vk1 1.05 m3
C.
Nt 11.00 buah 1
Nb 44.00 buah 2
Nb1 47.00 buah/m3 3
T1 0.50 menit D.
T2 0.50 menit E.
Ts 1.00 menit F.
Note: 1
Q1 1.06 M3
2
0.944 jam
E12e 3
Q2 1.06 4
E12e 0.944 Jam
Lumpsum
Q1 1.06 m2/jam
Qt 7.42 m2
P 10.00 orang
T 2.00 orang
M 1.00 orang
L01 9.4378 jam
L02 1.8876 jam
L03 0.9438 jam
Analisa EI-81010
1.
1.
2.
B.
1
2
3
(M224) 0.288 Kg
(M225) 0.258 Kg C.
(M33) 0.206 liter
1
2
E73 Dia 30 - 500 mm 3
V 20.00 m2/jam
Fa 0.83
Q1 16.600 m2/jam
E73 0.0602 jam D.
E.
E12 F.
Q2 16.60 Note: 1
E12 0.0602 Jam
2
Lumpsum
3
4
Q1 16.60 m2/jam
Qt 116.20 m2
P 10.00 orang
T 2.00 orang
M 1.00 orang
1.
1.
2.
B.
1
2
3
Wd 0.288 Kg
Wp 0.258 Kg C.
Wt 0.206 liter
1
2
E98d Dia 30 - 500 mm 3
V 20.00 m2/jam
Fa 0.83
Q1 16.600 m2/jam
E98d 0.0602 jam D.
E.
E12e F.
Q2 16.60 Note: 1
E12e 0.0602 Jam
2
Lumpsum
3
4
Q1 16.60 m2/jam
Qt 116.20 m2
P 10.00 orang
T 2.00 orang
M 1.00 orang
L01 0.6024 jam
L02 0.1205 jam
L03 0.0602 jam
B.
1
2
3
(M224) 0.288 Kg
(M225) 0.258 Kg C.
(M33) 0.206 liter
1
2
E73 Dia 30 - 500 mm 3
V 20.00 m2/jam Asumsi
Fa 0.83
Q1 16.600 m2/jam
E73 0.0602 jam D.
E.
E12 F.
Q2 16.60 Note: 1
E12 0.0602 Jam
2
Lumpsum
3
4
Q1 16.60 m2/jam
Qt 116.20 m2
P 10.00 orang
T 2.00 orang
M 1.00 orang
1.
1.
2.
B.
1
2
3
(M224) 0.288 Kg
(M225) 0.258 Kg C.
(M33) 0.206 liter
1
2
E73 Dia 30 - 500 mm 3
V 20.00 m2/jam
Fa 0.83
Q1 16.600 m2/jam
E73 0.0602 jam D.
E.
E12 F.
Q2 16.60 Note: 1
E12 0.0602 Jam
2
Lumpsum
3
4
Q1 16.60 m2/jam
Qt 116.20 m2
P 10.00 orang
T 2.00 orang
M 1.00 orang
1.
1.
2.
B.
1
2
3
(M224) 0.288 Kg
(M225) 0.258 Kg C.
(M33) 0.206 liter
1
2
E73 Dia 30 - 500 mm 3
V 20.00 m2/jam Asumsi
Fa 0.83
Q1 16.600 m2/jam
E73 0.0602 jam D.
E.
E12 F.
Q2 16.60 Note: 1
E12 0.0602 Jam
2
Lumpsum
3
4
Q1 16.60 m2/jam
Qt 116.20 m2
P 10.00 orang
T 2.00 orang
M 1.00 orang
1.
1.
2.
B.
1
pisan paling atas dengan perbandingan 10:1 2
C.
1
Tab 0.03 m 2
Nlb 3 lapis 3
Vab 0.0371 m3 4
Wab 74.1600 kg 5
6
Taa 0.03 m 7
Vaa 0.0124 m3
Waa 24.7200 kg
(M92) 0.0494 M3 D.
Waa 98.8800 kg E.
F.
Note: 1
Web 37.0800 kg/m
Wea 2.4720 kg/m 2
(M255) 39.5520 kg/m
Pa 1.03 m 3
4
Tp 0.003 m
Lp 0.1 m
Ol 20 %
Wp 2.91078 kg
E26
V 6.00 m3/jam
Fa 0.83
Q2 103.750 m
E05
Q3 103.750 m/jam
E05 0.00964 jam
E79
V 500.00 liter
Fa 0.83
Ts Menit
T1 2.00 Menit
T2 30.00 Menit
T3 6.00 Menit
Ts 38.00 Menit
Q2 655.263 liter/Jam
13.65 m/jam
E79 0.0733 Jam
d 0.10 M2
bp 60.00 m2/jam
Fa 0.83
Q1 124.500 m/jam
0.0080 jam
E12
0.0014 Jam
Q2 0.073 M/Jam
Qt 0.51 M
P 6.00 Orang
T 3.00 Orang
M 1.00 Orang
Analisa EI-8112
Siar Muai Tipe Silicone Seal
URAIAN ANALISA HARGA SATUAN
PEREKAMA
B.
1
2
i seluruh backer rod 3
C.
(M226) 0.0494 m3
(M179) 1.0300 m 1
2
Ts 0.10 m 3
Vs 0.0050 m 4
(M227) 7.50 kg 5
6
V2 6.00 m3/jam
Fa 0.83 3
Q2 103.750 m 4
E26
Q3 103.750 m/jam
E26 0.00964 jam
E67
V3 10.0 kg/jam
Fa 0.83
Q3 1.11 m/jam
0.9036 jam
E12
0.0096 Jam
Q3 1.107 M/Jam
Qt 7.75 M
P 6.00 Orang
T 3.00 Orang
M 1.00 Orang
NO.
A.
E63
V1 1.00 m C.
Fa 0.83 -
1
T1 1.00 menit
T2 0.50 menit
T3 0.50 menit D.
T4 3.00 menit E.
Ts1 5.00 menit F.
Note: 1
Q1 9.96 m/jam
2
0.1004 jam
3
4
Q1 9.960 M/Jam
Qt 69.72 M
P 2.00 Orang
T 1.00 Orang
M 1.00 Orang
A.
1.
ang menempel 1.
2.
B.
1
2
Pk 1.03 m
C.
Tp 0.10 m asumsi
Wp 0.2060 kg 1
E63 D.
V1 1.00 m E.
Fa 0.83 - F.
Note: 1
T1 1.00 menit Asumsi
T2 0.50 menit Asumsi 2
T3 0.50 menit
T4 3.00 menit
Ts1 5.00 menit 3
4
Q1 9.96 m/jam
0.1004 jam
Q1 9.960 M/Jam
Qt 69.72 M2
P 6.00 Orang
T 3.00 Orang
M 1.00 Orang
B.
1
2
C.
Le 1.0300 m 1
Vb 0.0494 m3 2
3
4
E76 Dia 30 - 500 mm 5
V1 39.6 m/mnt Asumsi
Fa 0.83
Q1 704.74 m/jam D.
E.
E76 0.0014 jam F.
Note: 1
E26
V2 6.00 m3/jam 2
Fa 0.83
Q2 103.750 m/jam
3
E26 0.0096 Jam 4
E05
Q3 103.750 m/jam
E05 0.00964 jam
E12
Q4 103.7500 m/jam
E12 0.0096 jam
Q2 103.750 M/Jam
Qt 726.25 M
P 6.00 Orang
T 3.00 Orang
M 1.00 Orang
B.
1
2
C.
Le 1.0300 m 1
Vb 0.0494 m3 2
3
4
E76 Dia 30 - 500 mm 5
V1 39.6 m/mnt
Fa 0.83
Q1 704.74 m/jam D.
E.
E76 0.0014 jam F.
Note: 1
E26
V2 6.00 m3/jam 2
Fa 0.83
Q2 103.750 m/jam
3
E26 0.0096 Jam 4
E05
Q3 103.750 m/jam
E05 0.00964 jam
E12
0.0096 Jam
Q2 103.750 M/Jam
Qt 726.25 M
P 6.00 Orang
T 3.00 Orang
M 1.00 Orang
B.
1
2
3
Le 1.0300 m C.
Lk 1.0300 m 1
Vb 0.0494 m3 2
3
4
E76 Dia 30 - 500 mm 5
V1 39.6 m/mnt
Fa 0.83
Q1 704.74 m/jam D.
E.
E76 0.0014 jam F.
Note: 1
E26
V2 6.00 m3/jam 2
Fa 0.83
Q2 20.750 m/jam
3
E26 0.0482 Jam 4
E05
Q3 20.750 m/jam
E05 0.04819 jam
E12
0.0482 Jam
Q2 20.750 M/Jam
Qt 145.25 M
P 6.00 Orang
T 3.00 Orang
M 1.00 Orang
1
ectric Hydraulic Pump 2
di bawah Huyd Jack 3
B.
1
(M11) 1.00 bh
E82 C.
A 50.00 ton
L1 50.00 ton 1
L2 1.00 ton 2
Sf 1.50 3
Fa 0.83 4
1.53 buah 5
V 1.00 buah 6
T1 0.75 Jam
T2 1.25 Jam
T3 2.00 Jam D.
T4 2.00 Jam E.
T5 2.00 Jam F.
T6 0.50 Jam Note: 1
T7 0.50 Jam
T8 3.00 Jam 2
Ts 1 12.00 Jam
Q1 0.083 bh/jam 3
4
E82 12.0000 Jam
E83
12.0000 Jam
E84
12.0000 Jam
12.0000 Jam
E12
12.0000 Jam
Q1 0.083 bh/Jam
Qt 0.58 bh
P 6.00 Orang
M 1.00 Orang
Mk 1.00 Orang
1
ectric Hydraulic Pump 2
di bawah Huyd Jack 3
B.
1
1.00 bh
E82 C.
A 50.00 ton
L1 50.00 ton 1
L2 1.00 ton 2
Sf 1.50 3
Fa 0.83 4
1.53 buah 5
V 1.00 buah 6
T1 0.75 Jam
T2 1.25 Jam
T3 2.00 Jam D.
T4 2.00 Jam E.
T5 2.00 Jam F.
T6 0.50 Jam Note: 1
T7 0.50 Jam
T8 3.00 Jam 2
Ts 1 12.00 Jam
Q1 0.083 bh/jam 3
4
E82 12.0000 Jam
E84
12.0000 Jam
12.0000 Jam
E12
12.0000 Jam
Q1 0.083 bh/Jam
Qt 0.58 bh
P 6.00 Orang
M 1.00 Orang
Mk 1.00 Orang
L01 72.0000 Jam
L02 12.0000 Jam
L08 12.0000 Jam
Analisa EI-8124
1
ectric Hydraulic Pump 2
di bawah Huyd Jack 3
B.
1
(M81) 1.00 bh
E82 C.
A 50.00 ton
L1 50.00 ton 1
L2 1.00 ton 2
Sf 1.50 3
Fa 0.83 4
1.53 buah 5
V 1.00 buah 6
T1 0.75 Jam
T2 1.25 Jam
T3 2.00 Jam D.
T4 2.00 Jam E.
T5 2.00 Jam F.
T6 0.50 Jam Note: 1
T7 0.50 Jam
T8 3.00 Jam 2
Ts 1 12.00 Jam
Q1 0.083 bh/jam 3
4
E82 12.0000 Jam
E83
12.0000 Jam
E84
12.0000 Jam
12.0000 Jam
E12
12.0000 Jam
Q1 0.083 bh/Jam
Qt 0.58 bh
P 6.00 Orang
M 1.00 Orang
Mk 1.00 Orang
1
ectric Hydraulic Pump 2
di bawah Huyd Jack 3
B.
1
(M234) 1.00 bh
E82 C.
A 50.00 ton
L1 50.00 ton 1
L2 1.00 ton 2
Sf 1.50 3
Fa 0.83 4
1.53 buah 5
V 1.00 buah 6
T1 0.75 Jam
T2 1.25 Jam
T3 2.00 Jam D.
T4 2.00 Jam E.
T5 2.00 Jam F.
T6 0.50 Jam Note: 1
T7 0.50 Jam
T8 3.00 Jam 2
Ts 1 12.00 Jam
Q1 0.083 bh/jam 3
4
E82 12.0000 Jam
E83
12.0000 Jam
E83
12.0000 Jam
12.0000 Jam
E12
12.0000 Jam
Q1 0.083 bh/Jam
Qt 0.58 bh
P 6.00 Orang
M 1.00 Orang
Mk 1.00 Orang
B.
1
(M235) 1.00 bh
E82 C.
A 50.00 ton
L1 50.00 ton 1
L2 1.00 ton 2
Sf 1.50 3
Fa 0.83 4
1.53 buah 5
V 1.00 buah 6
T1 0.75 Jam
T2 1.25 Jam
T3 2.00 Jam D.
T4 2.00 Jam E.
T5 2.00 Jam F.
T6 0.50 Jam Note: 1
T7 0.50 Jam
T8 3.00 Jam 2
Ts 1 12.00 Jam
Q1 0.083 bh/jam 3
4
E82 12.0000 Jam
12.0000 Jam
E12
12.0000 Jam
Berlanjut ke hal. berikut.
Analisa EI-8125
Q1 0.083 bh/Jam
Qt 0.58 bh
P 6.00 Orang
M 1.00 Orang
Mk 1.00 Orang
NO.
B.
(M236) 1.00 bh 1
E82 C.
A 50.00 ton 1
L1 50.00 ton 2
L2 1.00 ton 3
Sf 1.50 4
Fa 0.83 5
1.53 buah 6
V 1.00 buah
T1 0.75 Jam D.
T2 1.25 Jam E.
T3 2.00 Jam F.
T4 2.00 Jam Note: 1
T5 2.00 Jam
T6 0.50 Jam 2
T7 0.50 Jam
T8 3.00 Jam
Ts 1 12.00 Jam 3
4
Q1 0.083 bh/jam
12.0000 Jam
E12
12.0000 Jam
P 6.00 Orang
M 1.00 Orang
Mk 1.00 Orang
B.
1
2
(M202) 0.288 Kg 3
(M203) 1.339 Kg
(M33) 0.118 liter
C.
Fa 0.83
1
T1 15.00 menit Asumsi 2
T2 15.00 menit Asumsi
T3 15.00 menit Asumsi
Ts 45.00 menit
Q1 1.1 m/jam
0.904 Jam
D.
E.
F.
Note: 1
Q1 1.11 m2/jam
Qt 7.75 m2 3
4
P 2.00 orang
T 2.00 orang
M 1.00 orang
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO.
A.
(M24a) 2.06 M 1.
(M237) 1.55 M 2.
3.
B.
Qt 25.00 M 1.
2.
M 1.00 orang
Tb 2.00 orang
P 6.00 orang
C.
D.
E.
F.
Note: 1
3
4
Analisa EI-8133
sisa pembongkaran 1.
1.
2.
B.
Vb 0.148 m3 1
Ab 1.350 m2 2
C.
Qt 10.00 M D.
E.
P 2.00 orang F.
T 2.00 orang Note: 1
M 1.00 orang
2
L01 1.4000 jam
L02 1.4000 jam
L03 0.7000 jam 3
4
Analisa EI-8134
B.
1
2
3
4
5
(M59) 0.041 m3 6
(M130) 0.536 m2
(M24a) 0.412 m
Vt 0.004 m3 C.
(M238) 14.958 kg
Ll 0.100 m 1
Nb 8.000 buah
(M223) 4.000 buah
D.
E.
F.
Note: 1
3
4
Qt 15.00 M
P 2.00 orang
T 2.00 orang
M 1.00 orang
Vt 0.004 m3 C.
(M238) 14.958 kg
1
Nb 8.000 buah
(M223) 4.000 buah
D.
E.
F.
Note: 1
3
4
Qt 15.00 M
P 2.00 orang
T 2.00 orang
M 1.00 orang
1.
pa dan beri perekat 1.
2.
Ps 0.1000 m
Tp 0.0020 m C.
Lp 0.0471 m2
(M125) 0.0951 kg 1
2
3
Vm 0.01 m3
Wm 22.01 kg
Rb 30
Ra 4
(M226) 19.4 kg
Q1 101.59 m2/jam
Qt 711.14 m2
P 2.00 orang
T 2.00 orang
M 1.00 orang
1.
beri perekat 1.
2.
(M242) 1.030 m
B.
(M244) 2 buah
1
2
Ps 0.1000 m 3
Tp 0.0020 m 4
Lp 0.0471 m2 5
Wp 0.0951 kg
C.
Tb 0.3 m
Lb 0.25 m 1
Vm 0.0573 m3 2
Wm 154.4343 kg 3
Rb 30
Ra 4
(M226) 136.3 kg D.
E.
(M170) 18.2 liter F.
Note: 1
E26 2
V 6.00 m3/jam
Fa 0.83
Q1 66.400 buah/jam 3
4
E26 0.0151 Jam
E05
Q3 66.400 m/jam
E05 0.0151 jam
Q1 66.40 m2/jam
Qt 464.80 m2
P 2.00 orang
T 2.00 orang
M 1.00 orang
1.
beri perekat 1.
2.
(M241) 1.030 m
B.
(M243) 2 buah
1
2
Ps 0.1000 m 3
Tp 0.0020 m 4
Lp 0.0471 m2 5
(M125) 0.0951 kg
C.
Tb 0.3 m
Lb 0.25 m 1
Vm 0.0573 m3 2
Wm 154.4343 kg 3
Rb 30
Ra 4
(M226) 136.3 kg D.
E.
(M170) 18.2 liter F.
Note: 1
E26 2
V 6.00 m3/jam
Fa 0.83
Q1 66.400 buah/jam 3
4
E26 0.0151 Jam
E05
Q3 66.400 m/jam
E05 0.0151 jam
Q1 66.40 m2/jam
Qt 464.80 m2
P 2.00 orang
T 2.00 orang
M 1.00 orang
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.1.(1) PERKIRAAN VOL.
JENIS PEKERJAAN : Cairan perekat epoxy resin TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Kg % THD. BIAYA PR
TENAGA
BAHAN
Pompa (+Mixer) pengisi bahan perekat epo (E68) jam 0.2410 35,408.27
Generator Set (E12) jam 0.2410 332,906.02
Alat Bantu Ls 1.0000 0.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.1.(2) PERKIRAAN VOL.
JENIS PEKERJAAN : Bahan Penutup (Sealant) TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Kg % THD. BIAYA PR
BAHAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.1.(3a) PERKIRAAN VOL.
JENIS PEKERJAAN : Tabung Penyuntik, penyediaan TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
BAHAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.1.(3b) PERKIRAAN VOL.
JENIS PEKERJAAN : Tabung Penyuntik, penggunaan TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
BAHAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.2.(1) PERKIRAAN VOL.
JENIS PEKERJAAN : Penambalan (Patching) TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M3 % THD. BIAYA PR
TENAGA
BAHAN
Beton 40 Mpa (M69) M3 1.030 2,152,424.50
Bonding Agent (M198) kg 15.210 40,000.00
Anti Korosi (M129) kg 3.86 0.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.2.(2) PERKIRAAN VOL.
JENIS PEKERJAAN : Perbaikan dengan Cara Graut TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M3 % THD. BIAYA PR
BAHAN
Bahan Graut (M141) M3 1.030 0.00
Anti Korosi (M129) Kg 3.8625 0.00
Acuan, Multipleks (M132) m3 9.7500 17,500.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.3.(1a) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengecatan Protektif pada elemen struktur beton, TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.3.(2a) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengecatan dekoratif pada elemen struktur beton, TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
BAHAN
Cat Dasar (M199) Kg 0.288 29,387.76
Cat Protektif (M200) Kg 0.258 16,428.57
Pengencer (M33) liter 0.041 12,000.00
Air (M170) liter 0.000 25.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.4.(1) PERKIRAAN VOL.
JENIS PEKERJAAN : Perkuatan Struktur dengan bahan FRP jenis e-glasTOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
BAHAN
FRP jenis E-glass untuk daerah kering (M204) m2 1.030 -
Epoxy (M125) kg 1.0300 30,000.0
Perancah (Scafolding) (M195) m3 9.0000 45,000.0
BAHAN
FRP jenis E-glass untuk daerah basah (M205) m2 1.030 -
Epoxy (M125) kg 1.0300 30,000.0
Perancah (Scafolding) (M195) m3 9.0000 45,000.0
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.4.(3) PERKIRAAN VOL.
JENIS PEKERJAAN : Perkuatan Struktur dengan bahan FRP laminasi jeTOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
PERKIRAAN HARGA JUMLA
KOMPONEN SATUAN KUANTITAS SATUAN HARG
(Rp.) (Rp.)
TENAGA
BAHAN
FRP jenis glass untuk daerah kering (M204) m2 1.030 -
Epoxy (M125) kg 1.0300 30,000.0
Perancah (Scafolding) (M195) m3 9.0000 45,000.0
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.4.(4) PERKIRAAN VOL.
JENIS PEKERJAAN : Perkuatan Struktur dengan bahan FRP jenis carbonTOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
BAHAN
FRP jenis carbon untuk daerah kering (M204) m2 1.030 -
Epoxy (M125) kg 1.0300 30,000.0
Perancah (Scafolding) (M195) m3 9.0000 45,000.0
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.4.(5) PERKIRAAN VOL.
JENIS PEKERJAAN : Perkuatan Struktur dengan bahan FRP jenis carbo TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
BAHAN
FRP jenis carbon untuk daerah basah (M205) m2 1.030 -
Epoxy (M125) kg 1.0300 30,000.0
Perancah (Scafolding) (M195) m3 9.0000 45,000.0
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.4.(7) PERKIRAAN VOL.
JENIS PEKERJAAN : Pemasangan perkuatan pelat lantai dengan steel pTOTAL HARGA (Rp
SATUAN PEMBAYARAN : kg % THD. BIAYA PR
TENAGA
BAHAN
Pelat Baja (M133) kg 1.0300 -
Epoxy kg 0.0001 135,829.4
Baut Angkur (M134) buah 0.6369 25,000.0
Pengecatan Protektif m2 0.0328 162,187.2
Tabung penyuntik (penyediaan) buah 5.0000 86,737.2
Tabung penyuntik (penggunaan) buah 5.0000 107,581.7
BAHAN
Baja prategang 7 wires/ Strands, 1/2 inci (M56) kg 307.274 466,676.94
Kopel set, angkur (M120) buah 20.000 0.00
Selongsong HDPE (M117) m 309.000 98,400.00
Baja untuk pelat buhul dan pelat ganjal (M209) buah 1,313.085 0.00
Baut mutu tinggi A325 Tipe 1 diameter M2 (M210) buah 120.0000 0.00
Scafolding 2 buah uk 3 x 3 x 6 m (M195) buah 18.0000 45,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.5.(1a) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian baut mutu tinggi A325 Tipe 1 diamet TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.5.(3a) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Baut Biasa Grade A diameter M25 TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.5.(4a) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Baut Biasa Grade B diameter M25 TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.5.(5a) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Baut Biasa Grade C untuk anchor bolTOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.5.(6a) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengencangan Baut Biasa Grade A diameter M25 TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
BAHAN
-
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.5.(7a) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengencangan Baut Biasa Grade B diameter M25 TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
BAHAN
-
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.6.(1a) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengelasan SMAW pada baja Grade 30 TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
BAHAN
Elektroda untuk pengelasan SMAW (M215) kg 0.073 -
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.6.(2a) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengelasan SAW pada baja Grade 30 TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
BAHAN
Elektroda untuk pengelasan SAW (M216) kg 0.073 15,000.0
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.6.(3a) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengelasan GMAW pada baja Grade 30 TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
BAHAN
Elektroda untuk pengelasan GMAW (M217) kg 0.073 -
BAHAN
Elektroda untuk pengelasan FCAW (M218) kg 0.073 -
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.7.(1a) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengecatan struktur baja pada daerah kering tebalTOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
TENAGA
Pekerja (L01) jam 0.6024 14,285.71
Tukang (L02) jam 0.6024 21,428.57
Mandor (L03) jam 0.1205 24,285.71
BAHAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.7.(1b) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengecatan struktur baja pada daerah kering tebalTOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
BAHAN
Cat Dasar (M202) Kg 0.288 80,000.00
Cat Lapisan Akhir (M203) Kg 0.258 0.00
Pengencer (M33) liter 0.041 12,000.00
Pasir untuk sand blasting (M219) Kg 0.000 0.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.7.(2a) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengecatan struktur baja pada daerah basah/pasaTOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
BAHAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.7.(2b) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengecatan struktur baja pada daerah basah/pasaTOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
BAHAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.7.(3a) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengecatan pada elemen sandaran dan/atau pagarTOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
TENAGA
Pekerja (L01) jam 1.2048 14,285.71
Tukang (L02) jam 1.2048 21,428.57
Mandor (L03) jam 0.2410 24,285.71
BAHAN
BAHAN
Cat Dasar (M202) Kg 0.288 80,000.00
Cat Lapisan Akhir (M203) Kg 0.258 0.00
Pengencer (M33) liter 0.041 12,000.00
Pasir untuk sand blasting (M219) Kg 0.000 15,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.8.(1) PERKIRAAN VOL.
JENIS PEKERJAAN : Perbaikan Elemen Struktur Baja dengan Cara PeluTOTAL HARGA (Rp
SATUAN PEMBAYARAN : Lump Sum % THD. BIAYA PR
BAHAN
Perancah (M195) m3 0.420 45,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.8.(2) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Elemen Struktur Baja Grade 250 (KuaTOTAL HARGA (Rp
SATUAN PEMBAYARAN : Kg % THD. BIAYA PR
BAHAN
Baja Grade 250 (M220) kg 1.030 0.00
Baut mutu tinggi A325 Tipe 1 diameter M2 (M210) buah/kg 0.128 0.00
Perancah (M195) m2 20.000 45,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.8.(3) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Elemen Struktur Baja Grade 345 (KuaTOTAL HARGA (Rp
SATUAN PEMBAYARAN : Kg % THD. BIAYA PR
BAHAN
Baja Grade 345 (M221) kg 1.030 0.00
Baut Mutu Tinggi A490 Tipe 1 diameter M2 (M211) buah/kg 0.128 19,500.00
Perancah (M195) m2 20.000 45,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.8.(4) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Elemen Struktur Baja Grade 485 (KuaTOTAL HARGA (Rp
SATUAN PEMBAYARAN : Kg % THD. BIAYA PR
BAHAN
Baja Grade 485 (M222) kg 1.030 0.00
Baut Mutu Tinggi A490 Tipe 1 diameter M2 (M211) buah/kg 0.128 19,500.00
Perancah (M195) m2 20.000 45,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.9.(1) PERKIRAAN VOL.
JENIS PEKERJAAN : Perkuatan dengan external stressing untuk jemba TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
BAHAN
Baja prategang 7 wires/ Strands, 1/2 inci (M56) Ton 0.307 466,676.94
Kopel set, angkur (M120) buah 20.000 0.00
Selongsong HDPE (M117) m 309.000 98,400.00
Baja untuk pelat buhul dan pelat ganjal (M209) buah 1,313.085 0.00
Baut mutu tinggi A325 Tipe 1 diameter M2(M210) buah 120.0000 0.00
Scafolding 2 buah uk 3 x 3 x 6 m buah 18.0000 45,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.10.(1) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Lantai Kayu TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M3 % THD. BIAYA PR
BAHAN
Kayu Kelas 1 (M142) m3 1.050 5,000,000.00
Baut dan Mur (M223) buah 72.000 13,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.10.(2) PERKIRAAN VOL.
JENIS PEKERJAAN : Perbaikan Lantai Kayu TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M3 % THD. BIAYA PR
BAHAN
Kayu Kelas 1 (M142) m3 1.050 5,000,000.00
Baut dan Mur (M223) buah 172.000 13,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.10.(3) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Gelagar Kayu TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M3 % THD. BIAYA PR
BAHAN
Kayu Kelas 1 (M142) m3 1.050 5,000,000.00
Baut dan Mur (M223) buah 16.000 13,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.10.(4) PERKIRAAN VOL.
JENIS PEKERJAAN : Perbaikan Gelagar Kayu TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M3 % THD. BIAYA PR
BAHAN
Kayu Kelas 1 (M142) m3 1.050 5,000,000.00
Baut dan Mur (M223) buah 14.000 13,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.10.(5) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Balok Kepala Tiang Kayu TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M3 % THD. BIAYA PR
BAHAN
Kayu Kelas 1 (M142) m3 1.050 5,000,000.00
Baut dan Mur (M223) buah 5.000 13,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.10.(6) PERKIRAAN VOL.
JENIS PEKERJAAN : Perbaikan Papan Lajur Kendaraan TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M3 % THD. BIAYA PR
BAHAN
Kayu Kelas 1 (M142) m3 1.050 5,000,000.00
Baut dan Mur (M223) buah 23.000 13,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.10.(7) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Papan Lajur Kendaraan TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M3 % THD. BIAYA PR
BAHAN
Kayu Kelas 1 (M142) m3 1.050 5,000,000.00
Pelat Baja (M133) kg 104.660 0.00
Baut dan Mur (M223) buah 43.000 13,000.00
Pengelasan Pelat m3 1.600 80,128.93
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.10.(8) PERKIRAAN VOL.
JENIS PEKERJAAN : Perbaikan dan/atau Penggantian Kerb Kayu TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M3 % THD. BIAYA PR
BAHAN
Kayu Kelas 1 (M142) m3 1.050 5,000,000.00
Baut dan Mur (M223) buah 223.000 13,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.10.(9) PERKIRAAN VOL.
JENIS PEKERJAAN : Perbaikan dan/atau Penggantian Sandaran Kayu TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M3 % THD. BIAYA PR
BAHAN
Kayu Kelas 1 (M142) m3 1.050 5,000,000.00
Baut dan Mur (M223) buah 47.000 13,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.10.(10) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengecatan/Perlindungan Gelagar TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
BAHAN
Cat Dasar Kayu (M224) Kg 0.288 0.00
Cat Protektif Kayu (M225) Kg 0.258 0.00
Pengencer (thinner) (M33) liter 0.206 12,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.10.(11) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengecatan/Perlindungan Lantai Kayu TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
BAHAN
Cat Dasar Kayu (M224) Kg 0.288 0.00
Cat Protektif Kayu (M225) Kg 0.258 0.00
Pengencer (thinner) (M33) liter 0.206 12,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.10.(12) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengecatan/Perlindungan Tiang Pancang Kayu TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
BAHAN
Cat Dasar Kayu (M224) Kg 0.288 0.00
Cat Protektif Kayu (M225) Kg 0.258 0.00
Pengencer (thinner) (M33) liter 0.206 12,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.10.(13) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengecatan/Perlindungan Balok Kepala Kayu TOTAL HARGA (Rp
SATUAN PEMBAYARAN : M2 % THD. BIAYA PR
BAHAN
Cat Dasar Kayu (M224) Kg 0.288 0.00
Cat Protektif Kayu (M225) Kg 0.258 0.00
Pengencer (thinner) (M33) liter 0.206 12,000.00
JUMLAH HARGA BAHAN
PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.10.(14) PERKIRAAN VOL.
JENIS PEKERJAAN : Pengecatan/Perlindungan Sandaran TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
BAHAN
Cat Dasar Kayu (M224) Kg 0.288 0.00
Cat Protektif Kayu (M225) Kg 0.258 0.00
Pengencer (thinner) (M33) liter 0.206 12,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.11.(1) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian dan Perbaikan Sambungan Siar MuaiTOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
BAHAN
Agregat ukuran 14, 20, 28 mm (M92) M3 0.049 305,993.56
Asphaltic Plug (M255) kg 39.552 41,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.11.(2) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian dan Perbaikan Sambungan Siar MuaiTOTAL
T HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
BAHAN
Beton fast track 8 jam (M226) m3 0.049 3,338,590.52
Batang Penyokong (Backer Rod) (M179) m3 1.030 16,554.86
Silicon Seal (M227) kg 7.500 30,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.11.(3) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Karet Pengisi Sambungan Siar Muai TTOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
BAHAN
Karet Pengisi Sambungan Strip Seal (M228) m 1.030 1,200,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.11.(4) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Karet Pengisi Sambungan Siar Muai TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.11.(5) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Sambungan Siar Muai Tipe Modular, TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.11.(6) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Sambungan Siar Muai Tipe Finger Plat
TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.11.(7) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Sambungan Siar Muai Tipe Dobel Si TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.12.(2) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Landasan Elastomer Karet Alam Be TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
BAHAN
Elastomer karet alam berlapis baja (M111) bh 1.000 30,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.12.(3) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Landasan Elastomer Sintetis Berl TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
BAHAN
Elastomer sintetis berlapis baja (M112) bh 1.000 30,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.12.(4) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Landasan Karet Strip Tebal …..mm TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
BAHAN
Landasan karet strip (M81) bh 1.000 229,500.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.12.(5) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Landasan Logam Berongga (Pot BearTOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
BAHAN
Landasan logam berongga (Pot Bearing) (M234) bh 1.000 3,331,619.28
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.12.(5) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Landasan Logam Jenis Spherical TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
BAHAN
Landasan logam jenis Spherical (M235) bh 1.000 4,500,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.12.(6) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Stopper Lateral dan Horizontal TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.13.(1) PERKIRAAN VOL.
JENIS PEKERJAAN : Perbaikan Sandaran Baja TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
BAHAN
Cat Dasar (M202) Kg 0.288 80,000.00
Cat Akhir (M203) Kg 1.339 0.00
Pengencer (M33) liter 0.118 12,000.00
Satu set alat pembersihan dan pengecatan E80 jam 1.1067 134,065.52
Alat Bantu Ls 1.0000 0.00
JUMLAH HARGA PERALATAN
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
OVERHEAD & PROFIT 10.0 % x D
HARGA SATUAN PEKERJAAN ( D + E )
Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.13.(2) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Penggantian Sandaran Baja TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN :M % THD. BIAYA PROYEK
TENAGA
BAHAN
PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.13.(3) PERKIRAAN VOL.
JENIS PEKERJAAN : Perbaikan Tembok Sandaran Beton TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
BAHAN
Beton fc' 30 MPa (M59) m3 0.148 2,024,611.01
Acuan / bekisting (M130) m2 1.350 170,000.00
JUMLAH HARGA BAHAN
PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.13.(4) PERKIRAAN VOL.
JENIS PEKERJAAN : Perbaikan Sandaran Beton-Baja TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
BAHAN
Beton fc' 30 MPa (M59) m3 0.041 2,024,611.01
Acuan / bekisting (M130) m2 0.536 170,000.00
Sandaran Baja Pipa Galvanis 3" (M24a) m 0.412 20,000.00
Tiang Sandaran Baja (M238) kg 14.958 150,000.00
Pengelasan m 0.100 80,128.93
Baut dan Mur (M223) buah 4.000 13,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.13.(5) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Sandaran Beton-Baja TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
BAHAN
Beton fc' 30 MPa (M59) m3 0.103 2,024,611.01
Acuan / bekisting (M130) m2 1.339 170,000.00
Pekerjaan Pembongkaran (EI7152) m3 0.103 438,584.09
Sandaran Baja Pipa Galvanis 3" (M24a) m 1.030 20,000.00
Tiang Sandaran Baja (M238) kg 14.958 150,000.00
Baut dan Mur (M223) buah 4.000 13,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.14.(1) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Deck Drain TOTAL HARGA (Rp
SATUAN PEMBAYARAN : Buah % THD. BIAYA PR
BAHAN
Deck Drain (M239) buah 1.000 100,000.00
Perekat (M125) kg 0.095 30,000.00
Mortar fast track (8 jam) (M226) kg 19.419 3,338,590.52
air (M170) liter 2.6 25.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.14.(2) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Pipa Penyalur, Pipa Cucuran PVC d TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
BAHAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 8.14.(3) PERKIRAAN VOL.
JENIS PEKERJAAN : Penggantian Pipa Penyalur, Pipa Cucuran Baja d TOTAL HARGA (Rp
SATUAN PEMBAYARAN :M % THD. BIAYA PR
BAHAN
: 1.00
: 149,412.38
: 0.00
JUMLAH
HARGA
(Rp.)
10,327.02
5,851.98
16,179.00
30,900.00
30,900.00
8,532.11
80,218.32
0.00
88,750.43
135,829.43
13,582.94
149,412.38
Analisa EI-81.2
: 1.00
: 40,020.20
: 0.00
JUMLAH
HARGA
(Rp.)
6,553.09
1,856.71
8,409.81
35,123.00
57,110.22
92,233.22
378.52
2,832.04
26,299.98
0.00
29,510.54
130,153.57
13,015.36
143,168.93
Analisa EI-81.3
: 1.00
: 95,410.96
: 0.00
JUMLAH
HARGA
(Rp.)
5,737.23
0.00
5,737.23
81,000.00
81,000.00
0.00
0.00
86,737.23
8,673.72
95,410.96
Analisa EI-81.3b
: 1.00
: 118,339.86
: 0.00
JUMLAH
HARGA
(Rp.)
20,080.32
21,514.63
4,876.65
46,471.60
54,000.00
54,000.00
7,110.09
0.00
7,110.09
107,581.69
10,758.17
118,339.86
Analisa EI-82.1
: 1.00
: 3,151,409.96
: 0.05
JUMLAH
HARGA
(Rp.)
3,692.19
1,569.18
5,261.38
2,216,997.23
608,386.67
0.00
2,825,383.90
3,165.47
9,597.21
21,510.19
0.00
34,272.87
2,864,918.15
286,491.81
3,151,409.96
Analisa EI-82.2
: 1.00
: 3,718,488.10
: 0.06
JUMLAH
HARGA
(Rp.)
299,541.02
127,304.93
426,845.96
0.00
0.00
170,625.00
170,625.00
19,819.29
973,649.92
1,789,503.56
0.00
2,782,972.77
3,380,443.72
338,044.37
3,718,488.10
Analisa EI-8.3.1a
: 1.00
: 33,032.85
: 0.00
JUMLAH
HARGA
(Rp.)
3,442.34
1,462.99
4,905.34
8,475.43
4,230.36
486.93
0.00
13,192.72
2,984.05
8,947.76
0.00
11,931.81
30,029.86
3,002.99
33,032.85
Analisa EI-8.3.2a
: 1.00
: 33,032.85
: 0.00
JUMLAH
HARGA
(Rp.)
3,442.34
1,462.99
4,905.34
8,475.43
4,230.36
486.93
0.00
13,192.72
2,984.05
8,947.76
0.00
11,931.81
30,029.86
3,002.99
33,032.85
Analisa EI-8.41
: 1.00
: 529,077.68
: 0.01
JUMLAH
HARGA
(Rp.)
5,163.51
3,872.63
1,462.99
10,499.14
0.00
30,900.00
405,000.00
435,900.00
2,231.51
8,947.76
3,346.72
20,054.58
0.00
34,580.57
480,979.71
48,097.97
529,077.68
Analisa EI-8.42
: 1.00
: 529,077.68
: 0.01
JUMLAH
HARGA
(Rp.)
5,163.51
3,872.63
1,462.99
10,499.14
0.00
30,900.00
405,000.00
435,900.00
2,231.51
8,947.76
3,346.72
20,054.58
0.00
34,580.57
480,979.71
48,097.97
529,077.68
Analisa EI-8.43
: 1.00
: 529,077.68
: 0.01
JUMLAH
HARGA
(Rp.)
5,163.51
3,872.63
1,462.99
10,499.14
0.00
30,900.00
405,000.00
435,900.00
2,231.51
8,947.76
3,346.72
20,054.58
0.00
34,580.57
480,979.71
48,097.97
529,077.68
Analisa EI-8.44
: 1.00
: 529,077.68
: 0.01
JUMLAH
HARGA
(Rp.)
5,163.51
3,872.63
1,462.99
10,499.14
0.00
30,900.00
405,000.00
435,900.00
2,231.51
8,947.76
3,346.72
20,054.58
0.00
34,580.57
480,979.71
48,097.97
529,077.68
Analisa EI-8.45
: 1.00
: 49,587.68
: 0.00
JUMLAH
HARGA
(Rp.)
5,163.51
3,872.63
1,462.99
10,499.14
0.00
0.00
2,231.51
8,947.76
3,346.72
20,054.58
0.00
34,580.57
45,079.71
4,507.97
49,587.68
Analisa EI-8.47
: 1.00
: 1,098,982.00
: 0.02
JUMLAH
HARGA
(Rp.)
164.44
123.33
46.59
334.37
0.00
8.91
15,923.57
5,320.15
433,686.17
537,908.47
992,847.28
71.07
284.96
1,279.00
4,257.87
0.00
5,892.90
999,074.55
99,907.45
1,098,982.00
Analisa EI-8.48
: 1.00
: 193,173,619.47
: 3.14
JUMLAH
HARGA
(Rp.)
57,142.86
85,714.29
8,095.24
150,952.38
143,397,571.84
0.00
30,405,600.00
0.00
0.00
810,000.00
173,803,171.84
321,285.14
0.00
0.00
1,336,971.97
1,658,257.11
175,612,381.34
17,561,238.13
193,173,619.47
Analisa EI-85.1a
: 1.00
: 41,609.86
: 0.00
JUMLAH
HARGA
(Rp.)
20,080.32
1,706.83
21,787.15
0.00
0.00
3,048.37
12,991.63
0.00
16,039.99
37,827.14
3,782.71
41,609.86
Analisa EI-852a
: 1.00
: 63,059.86
: 0.00
JUMLAH
HARGA
(Rp.)
20,080.32
1,706.83
21,787.15
19,500.00
19,500.00
3,048.37
12,991.63
0.00
16,039.99
57,327.14
5,732.71
63,059.86
Analisa EI-853a
: 1.00
: 41,609.86
: 0.00
JUMLAH
HARGA
(Rp.)
20,080.32
1,706.83
21,787.15
0.00
0.00
3,048.37
12,991.63
0.00
16,039.99
37,827.14
3,782.71
41,609.86
Analisa EI-85.1a
: 1.00
: 41,609.86
: 0.00
JUMLAH
HARGA
(Rp.)
20,080.32
1,706.83
21,787.15
0.00
0.00
3,048.37
12,991.63
0.00
16,039.99
37,827.14
3,782.71
41,609.86
Analisa EI-855a
: 1.00
: 41,609.86
: 0.00
JUMLAH
HARGA
(Rp.)
20,080.32
1,706.83
21,787.15
0.00
0.00
3,048.37
12,991.63
0.00
16,039.99
37,827.14
3,782.71
41,609.86
Analisa EI-85.6a
: 1.00
: 29,721.33
: 0.00
JUMLAH
HARGA
(Rp.)
14,343.09
1,219.16
15,562.25
0.00
2,177.41
9,279.73
0.00
11,457.14
27,019.39
2,701.94
29,721.33
Analisa EI-857a
: 1.00
: 29,721.33
: 0.00
JUMLAH
HARGA
(Rp.)
14,343.09
1,219.16
15,562.25
0.00
2,177.41
9,279.73
0.00
11,457.14
27,019.39
2,701.94
29,721.33
Analisa EI-861a
: 1.00
: 88,141.83
: 0.00
JUMLAH
HARGA
(Rp.)
18,069.64
9,335.16
3,622.44
31,027.23
0.00
0.00
267.78
8,724.76
40,109.16
49,101.70
80,128.93
8,012.89
88,141.83
Analisa EI-862a
: 1.00
: 78,311.59
: 0.00
JUMLAH
HARGA
(Rp.)
10,327.02
7,745.27
2,925.99
20,998.28
1,092.38
1,092.38
267.78
8,724.76
40,109.16
49,101.70
71,192.36
7,119.24
78,311.59
Analisa EI-863a
: 1.00
: 77,109.98
: 0.00
JUMLAH
HARGA
(Rp.)
10,327.02
7,745.27
2,925.99
20,998.28
0.00
0.00
267.78
8,724.76
40,109.16
49,101.70
70,099.98
7,010.00
77,109.98
Analisa EI-864a
: 1.00
: 77,109.98
: 0.00
JUMLAH
HARGA
(Rp.)
10,327.02
7,745.27
2,925.99
20,998.28
0.00
0.00
267.78
8,724.76
40,109.16
49,101.70
70,099.98
7,010.00
77,109.98
Analisa EI-871a
: 1.00
: 102,160.36
: 0.00
JUMLAH
HARGA
(Rp.)
8,605.85
12,908.78
2,925.99
24,440.62
23,072.00
0.00
486.93
0.00
23,558.93
4,764.35
40,109.16
0.00
44,873.51
92,873.06
9,287.31
102,160.36
Analisa EI-871b
: 1.00
: 178,405.91
: 0.00
JUMLAH
HARGA
(Rp.)
17,211.70
25,817.56
5,851.98
48,881.24
23,072.00
0.00
486.93
0.00
23,558.93
9,528.70
80,218.32
0.00
89,747.02
162,187.19
16,218.72
178,405.91
Analisa EI-872a
: 1.00
: 178,405.91
: 0.00
JUMLAH
HARGA
(Rp.)
17,211.70
25,817.56
5,851.98
48,881.24
23,072.00
0.00
486.93
0.00
23,558.93
9,528.70
80,218.32
0.00
89,747.02
162,187.19
16,218.72
178,405.91
Analisa EI-872b
: 1.00
: 178,405.91
: 0.00
JUMLAH
HARGA
(Rp.)
17,211.70
25,817.56
5,851.98
48,881.24
23,072.00
0.00
486.93
0.00
23,558.93
9,528.70
80,218.32
0.00
89,747.02
162,187.19
16,218.72
178,405.91
Analisa EI-873a
: 1.00
: 178,405.91
: 0.00
JUMLAH
HARGA
(Rp.)
17,211.70
25,817.56
5,851.98
48,881.24
23,072.00
0.00
486.93
0.00
23,558.93
9,528.70
80,218.32
0.00
89,747.02
162,187.19
16,218.72
178,405.91
Analisa EI-873b
: 1.00
: 178,405.91
: 0.00
JUMLAH
HARGA
(Rp.)
17,211.70
25,817.56
5,851.98
48,881.24
23,072.00
0.00
486.93
0.00
23,558.93
9,528.70
80,218.32
0.00
89,747.02
162,187.19
16,218.72
178,405.91
Analisa EI-881
: 1.00
: 6,217,295.57
: 0.10
JUMLAH
HARGA
(Rp.)
771,658.06
1,157,487.09
131,181.87
2,060,327.02
18,900.00
18,900.00
2,612.89
73,525.01
3,028,781.77
467,940.19
0.00
3,572,859.86
5,652,086.88
565,208.69
6,217,295.57
Analisa EI-882
: 1.00
: 1,148,034.04
: 0.02
JUMLAH
HARGA
(Rp.)
32,346.82
33,422.09
3,890.76
69,659.67
0.00
0.00
900,000.00
900,000.00
334.45
257.03
72,560.50
855.66
0.00
74,007.64
1,043,667.31
104,366.73
1,148,034.04
Analisa EI-883
: 1.00
: 1,150,779.64
: 0.02
JUMLAH
HARGA
(Rp.)
32,346.82
33,422.09
3,890.76
69,659.67
0.00
2,496.00
900,000.00
902,496.00
334.45
257.03
72,560.50
855.66
0.00
74,007.64
1,046,163.31
104,616.33
1,150,779.64
Analisa EI-882
: 1.00
: 1,128,449.16
: 0.02
JUMLAH
HARGA
(Rp.)
18,486.61
27,729.91
3,142.72
49,359.24
0.00
2,496.00
900,000.00
902,496.00
334.45
257.03
72,560.50
855.66
0.00
74,007.64
1,025,862.87
102,586.29
1,128,449.16
Analisa EI-891
: 1.00
: 35,961,682.01
: 0.58
JUMLAH
HARGA
(Rp.)
57,142.86
85,714.29
8,095.24
150,952.38
143,397.57
0.00
30,405,600.00
0.00
0.00
810,000.00
30,548,997.57
321,285.14
156,773.24
177,457.89
1,336,971.97
0.00
1,992,488.24
32,692,438.19
3,269,243.82
35,961,682.01
Analisa EI-810.1
: 1.00
: 7,265,350.43
: 0.12
JUMLAH
HARGA
(Rp.)
100,000.00
150,000.00
24,285.71
274,285.71
5,250,000.00
936,000.00
6,186,000.00
144,578.31
0.00
144,578.31
6,604,864.03
660,486.40
7,265,350.43
Analisa EI-810.1
: 1.00
: 8,916,233.96
: 0.14
JUMLAH
HARGA
(Rp.)
100,000.00
150,000.00
24,285.71
274,285.71
5,250,000.00
2,236,000.00
7,486,000.00
345,381.53
0.00
345,381.53
8,105,667.24
810,566.72
8,916,233.96
Analisa EI-810.3
: 1.00
: 6,281,139.71
: 0.10
JUMLAH
HARGA
(Rp.)
45,897.88
42,857.14
24,285.71
113,040.73
5,250,000.00
208,000.00
5,458,000.00
32,128.51
106,957.76
0.00
139,086.27
5,710,127.01
571,012.70
6,281,139.71
Analisa EI-810.4
: 1.00
: 6,227,104.39
: 0.10
JUMLAH
HARGA
(Rp.)
40,160.64
42,857.14
24,285.71
107,303.50
5,250,000.00
182,000.00
5,432,000.00
28,112.45
93,588.04
0.00
121,700.49
5,661,003.99
566,100.40
6,227,104.39
Analisa EI-810.5
: 1.00
: 5,983,945.44
: 0.10
JUMLAH
HARGA
(Rp.)
14,343.09
42,857.14
24,285.71
81,485.94
5,250,000.00
65,000.00
5,315,000.00
10,040.16
33,424.30
0.00
43,464.46
5,439,950.40
543,995.04
5,983,945.44
Analisa EI-810.6
: 1.00
: 6,470,263.33
: 0.11
JUMLAH
HARGA
(Rp.)
65,978.20
42,857.14
24,285.71
133,121.06
5,250,000.00
299,000.00
5,549,000.00
46,184.74
153,751.78
0.00
199,936.52
5,882,057.57
588,205.76
6,470,263.33
Analisa EI-8107
: 1.00
: 7,243,815.00
: 0.12
JUMLAH
HARGA
(Rp.)
100,000.00
150,000.00
24,285.71
274,285.71
5,250,000.00
0.00
559,000.00
128,206.29
5,937,206.29
86,345.38
287,448.97
0.00
373,794.36
6,585,286.36
658,528.64
7,243,815.00
Analisa EI-8108
: 1.00
: 11,327,266.40
: 0.18
JUMLAH
HARGA
(Rp.)
142,857.14
42,857.14
24,285.71
210,000.00
5,250,000.00
2,899,000.00
8,149,000.00
447,791.16
1,490,723.75
0.00
1,938,514.91
10,297,514.91
1,029,751.49
11,327,266.40
Analisa EI-8109
: 1.00
: 7,127,522.52
: 0.12
JUMLAH
HARGA
(Rp.)
142,857.14
42,857.14
24,285.71
210,000.00
5,250,000.00
611,000.00
5,861,000.00
94,377.51
314,188.41
0.00
408,565.92
6,479,565.92
647,956.59
7,127,522.52
Analisa EI-81010
: 1.00
: 40,020.20
: 0.00
JUMLAH
HARGA
(Rp.)
8,605.85
2,581.76
1,462.99
12,650.60
0.00
0.00
2,472.00
2,472.00
1,204.82
20,054.58
0.00
21,259.40
36,382.00
3,638.20
40,020.20
Analisa EI-81011
: 1.00
: 40,020.20
: 0.00
JUMLAH
HARGA
(Rp.)
8,605.85
2,581.76
1,462.99
12,650.60
0.00
0.00
2,472.00
2,472.00
1,204.82
20,054.58
0.00
21,259.40
36,382.00
3,638.20
40,020.20
Analisa EI-81012
: 1.00
: 40,020.20
: 0.00
JUMLAH
HARGA
(Rp.)
8,605.85
2,581.76
1,462.99
12,650.60
0.00
0.00
2,472.00
2,472.00
1,204.82
20,054.58
0.00
21,259.40
36,382.00
3,638.20
40,020.20
Analisa EI-81013
: 1.00
: 40,020.20
: 0.00
JUMLAH
HARGA
(Rp.)
8,605.85
2,581.76
1,462.99
12,650.60
0.00
0.00
2,472.00
2,472.00
1,204.82
20,054.58
0.00
21,259.40
36,382.00
3,638.20
40,020.20
Analisa EI-81014
: 1.00
: 40,020.20
: 0.00
JUMLAH
HARGA
(Rp.)
8,605.85
2,581.76
1,462.99
12,650.60
0.00
0.00
2,472.00
2,472.00
1,204.82
20,054.58
0.00
21,259.40
36,382.00
3,638.20
40,020.20
Analisa EI-8111
: 1.00
: 4,448,235.72
: 0.07
JUMLAH
HARGA
(Rp.)
1,170,112.78
877,584.59
331,531.95
2,379,229.32
15,128.32
1,621,632.00
1,636,760.32
417.70
1,431.64
69.52
25,059.86
409.91
472.38
0.00
27,861.01
4,043,850.65
404,385.07
4,448,235.72
Analisa EI-8112
: 1.00
: 756,427.01
: 0.01
JUMLAH
HARGA
(Rp.)
77,452.67
58,089.50
21,944.92
157,487.09
165,059.92
17,051.51
225,000.00
407,111.42
69.52
417.70
1,431.64
121,143.55
0.00
0.00
123,062.41
687,660.92
68,766.09
756,427.01
Analisa EI-8113
: 1.00
: 1,367,804.25
: 0.02
JUMLAH
HARGA
(Rp.)
2,868.62
2,151.46
2,438.32
7,458.41
1,236,000.00
1,236,000.00
0.00
0.00
1,243,458.41
124,345.84
1,367,804.25
Analisa EI-8114
: 1.00
: 1,385,646.42
: 0.02
JUMLAH
HARGA
(Rp.)
8,605.85
6,454.39
2,438.32
17,498.57
1,236,000.00
6,180.00
1,242,180.00
0.00
0.00
1,259,678.57
125,967.86
1,385,646.42
Analisa EI-8115
: 1.00
: 234,374.11
: 0.00
JUMLAH
HARGA
(Rp.)
826.16
619.62
234.08
1,679.86
41,200.00
165,059.92
206,259.92
69.52
417.70
1,431.64
3,208.73
0.00
5,127.60
213,067.37
21,306.74
234,374.11
Analisa EI-8116
: 1.00
: 4,154,554.11
: 0.07
JUMLAH
HARGA
(Rp.)
826.16
619.62
234.08
1,679.86
3,605,000.00
165,059.92
3,770,059.92
69.52
417.70
1,431.64
3,208.73
0.00
5,127.60
3,776,867.37
377,686.74
4,154,554.11
Analisa EI-8116
: 1.00
: 218,701.05
: 0.00
JUMLAH
HARGA
(Rp.)
4,130.81
3,098.11
1,170.40
8,399.31
0.00
0.00
165,059.92
165,059.92
69.52
2,088.52
7,158.21
16,043.66
0.00
25,359.91
198,819.14
19,881.91
218,701.05
Analisa EI-8122
: 1.00
: 3,849,560.99
: 0.06
JUMLAH
HARGA
(Rp.)
1,028,571.43
291,428.57
339,255.43
1,659,255.43
30,000.00
30,000.00
677,284.73
481,630.27
459,210.00
192,220.48
0.00
1,810,345.47
3,499,600.90
349,960.09
3,849,560.99
Analisa EI-8123
: 1.00
: 8,243,920.47
: 0.13
JUMLAH
HARGA
(Rp.)
1,028,571.43
291,428.57
339,255.43
1,659,255.43
30,000.00
30,000.00
677,284.73
481,630.27
459,210.00
192,220.48
3,994,872.25
0.00
5,805,217.73
7,494,473.15
749,447.32
8,243,920.47
Analisa EI-8124
: 1.00
: 4,069,010.99
: 0.07
JUMLAH
HARGA
(Rp.)
1,028,571.43
291,428.57
339,255.43
1,659,255.43
229,500.00
229,500.00
677,284.73
481,630.27
459,210.00
192,220.48
0.00
1,810,345.47
3,699,100.90
369,910.09
4,069,010.99
Analisa EI-8125
: 1.00
: 11,875,701.67
: 0.19
JUMLAH
HARGA
(Rp.)
1,028,571.43
291,428.57
339,255.43
1,659,255.43
3,331,619.28
3,331,619.28
677,284.73
481,630.27
459,210.00
192,220.48
3,994,872.25
0.00
5,805,217.73
10,796,092.43
1,079,609.24
11,875,701.67
Analisa EI-8125
: 1.00
: 11,875,701.67
: 0.19
JUMLAH
HARGA
(Rp.)
1,028,571.43
291,428.57
339,255.43
1,659,255.43
4,500,000.00
4,500,000.00
677,284.73
481,630.27
459,210.00
192,220.48
1,810,345.47
7,969,600.90
796,960.09
8,766,560.99
Analisa EI-8126
: 1.00
: 8,210,920.47
: 0.13
JUMLAH
HARGA
(Rp.)
1,028,571.43
291,428.57
339,255.43
1,659,255.43
0.00
0.00
677,284.73
481,630.27
459,210.00
192,220.48
3,994,872.25
0.00
5,805,217.73
7,464,473.15
746,447.32
8,210,920.47
Analisa EI-8131
: 1.00
: 215,507.01
: 0.00
JUMLAH
HARGA
(Rp.)
6,884.68
10,327.02
5,851.98
23,063.68
23,072.00
0.00
1,413.93
0.00
24,485.93
148,365.85
0.00
148,365.85
195,915.46
19,591.55
215,507.01
Analisa EI-713
: 1.00
: 168,877.50
: 0.00
JUMLAH
HARGA
(Rp.)
24,000.00
12,000.00
6,800.00
42,800.00
41,200.00
69,525.00
110,725.00
0.00
0.00
153,525.00
15,352.50
168,877.50
Analisa EI-8133
: 1.00
: 656,415.48
: 0.01
JUMLAH
HARGA
(Rp.)
20,000.00
30,000.00
17,000.00
67,000.00
300,290.31
229,451.04
529,741.35
0.00
0.00
596,741.35
59,674.13
656,415.48
Analisa EI-8134
: 1.00
: 2,784,222.96
: 0.05
JUMLAH
HARGA
(Rp.)
13,333.33
20,000.00
11,333.33
44,666.67
83,413.97
91,052.00
8,240.00
2,243,726.25
8,012.89
52,000.00
2,486,445.12
0.00
0.00
2,531,111.78
253,111.18
2,784,222.96
Analisa EI-8135
: 1.00
: 3,126,565.21
: 0.05
JUMLAH
HARGA
(Rp.)
13,333.33
20,000.00
11,333.33
44,666.67
208,534.93
227,630.00
45,174.16
20,600.00
2,243,726.25
52,000.00
2,797,665.35
0.00
0.00
2,842,332.01
284,233.20
3,126,565.21
Analisa EI-8141
: 1.00
: 71,433,246.46
: 1.16
JUMLAH
HARGA
(Rp.)
281.24
421.86
239.05
942.15
100,000.00
2,854.01
64,833,630.15
64,936,484.16
426.58
1,462.06
0.00
1,888.65
64,939,314.96
6,493,931.50
71,433,246.46
Analisa EI-8142
: 1.00
: 500,554,675.66
: 8.14
JUMLAH
HARGA
(Rp.)
430.29
645.44
365.75
1,441.48
77,250.00
30,000.00
2,854.01
454,934,815.83
454.22
455,045,374.06
652.66
2,236.94
0.00
2,889.60
455,049,705.14
45,504,970.51
500,554,675.66
Analisa EI-8143
: 0.00
: 0.00
: 0.00
JUMLAH
HARGA
(Rp.)
430.29
645.44
365.75
1,441.48
412,000.00
70,000.00
2,854.01
454,934,815.83
454.22
455,420,124.06
652.66
2,236.94
0.00
2,889.60
455,424,455.14
45,542,445.51
500,966,900.66
ITEM PEMBAYARAN No. : 9.1.(1)
JENIS PEKERJAAN : Mandor
SATUAN PEMBAYARAN : Jam URAIAN ANALISA HA
B. TENAGA
Upah =((Tk.bln*12)+Tj.bln+Tk.bln)/12/ upH 214,657.94
Tenaga M 1.00
B. TENAGA
Upah =((Tk.bln*12)+Tj.bln+Tk.bln)/12/ upH 174,141.03
Tenaga P 1.00
B. TENAGA
Upah =((Tk.bln*12)+Tj.bln+Tk.bln)/12/ upH 183,984.19
Tenaga T 1.00
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 10 TON
2. Tenaga Pw 190.0
3. Kapasitas Cp 8.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 420,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir / Mekanik U1 21,428.57
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 14,285.71
4. Bahan Bakar Bensin Mb 7,000.00
5. Bahan Bakar Solar Ms 14,500.00
6. Minyak Pelumas Mp 42,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 21,428.57
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71
4. Bahan Bakar Bensin Mb 7,000.00
5. Bahan Bakar Solar Ms 14,500.00
6. Minyak Pelumas Mp 42,000.00
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3
2. Tenaga Pw 20.0
3. Kapasitas Cp 500.0
4. Umur Ekonomis A 2.0
5. Jam Operasi Dalam 1 Tahun W 1,500
6. Harga Alat B 35,000,000
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
SATUAN KET.
PROYEK :
ANDOR LO3 No. PAKET KONTRAK :
Jam NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.1.(1)
Rp/hr JENIS PEKERJAAN : Mandor
Rp/Bln
SATUAN PEMBAYARAN : Jam
Rp/thn
Rp/thn NO. KOMPONEN
Rp/thn
Rp/thn
Rp/thn
Rp/thn A. TENAGA
Rp/thn
1. Mandor (L03)
Rp/thn
Rp/bln B. BAHAN
Rp/hr
1. -
2. -
Rp/Hari C. ALAT
orang 1. -
2. -
Rupiah
Analisa EI-912
SATUAN KET.
PROYEK :
EKERJA LO1 No. PAKET KONTRAK :
Jam NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.1.(2)
Rp/hr JENIS PEKERJAAN : Pekerja Biasa
Rp/Bln
SATUAN PEMBAYARAN : Jam
Rp/thn
Rp/thn NO. KOMPONEN
Rp/thn
Rp/thn
Rp/thn
Rp/thn A. BIAYA MANDOR PER BULAN
Rp/thn
1. Pekerja Biasa (L01)
Rp/thn
Rp/bln B. BAHAN
Rp/hr
1. -
2. -
Rp/Hari C. ALAT
orang 1. -
2. -
Rupiah
Analisa EI-913
SATUAN KET.
PROYEK :
UKANG L02 No. PAKET KONTRAK :
Jam NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.1.(3)
Rp/hr JENIS PEKERJAAN : Tukang Kayu, Tukang Batu, dsb
Rp/Bln
SATUAN PEMBAYARAN : Jam
Rp/thn
Rp/thn NO. KOMPONEN
Rp/thn
Rp/thn
Rp/thn
Rp/thn A. BIAYA MANDOR PER BULAN
Rp/thn
1. Tukang Kayu, Tukang Batu, dsb (L02)
Rp/thn
Rp/bln B. BAHAN
Rp/hr
1. -
2. -
Rp/Hari C. ALAT
orang 1. -
2. -
Rupiah
D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C )
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Per
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedi
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-914a
SATUAN KET.
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
TRUCK 4 TON E08 PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(4a)
M3 JENIS PEKERJAAN : Dump Truck 3 - 4 M3
Tahun
Jam SATUAN PEMBAYARAN : Jam
Rupiah
NO. KOMPONEN
Rupiah
-
A. PEKERJA
Rupiah 1. -
2. -
Rupiah B. BAHAN
1. -
Rupiah 2. -
C. ALAT
Rupiah
Rupiah
Analisa EI-914b
SATUAN KET.
PROYEK :
No. PAKET KONTRAK :
RUCK 10 TON E09 NAMA PAKET :
HP PROP / KAB / KODYA :
M3 ITEM PEMBAYARAN NO. : 9.1.(4b)
Tahun JENIS PEKERJAAN : Dump Truck 6 - 8 M3
Jam
Rupiah SATUAN PEMBAYARAN : Jam
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
B. BAHAN
Rupiah
1. -
2. -
Rupiah
C. ALAT
Rupiah
Rupiah
Rupiah
D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C )
E. OVERHEAD & PROFIT
Rupiah F. HARGA SATUAN PEKERJAAN ( D + E )
Rupiah Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Per
berat untuk bahan-bahan.
Rupiah 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedi
Rupiah terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Analisa EI-915a
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
D TRUCK 4 TON (E11) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(5a)
M3 JENIS PEKERJAAN : Truck Bak Datar 3-4 M3
Tahun FLAT BED TRUCK 4 TON
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah C. ALAT
Rupiah
Rupiah
Rupiah
Rupiah D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C )
E. OVERHEAD & PROFIT
Rupiah F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Per
Rupiah berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedi
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
% / Tahun yang dibayar dari kontrak) dan biaya-biaya lainnya.
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Analisa EI-915a
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
D TRUCK 6-8 M3 (E11) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(5b)
M3 JENIS PEKERJAAN : Truck Bak Datar 6-8 M3
Tahun FLAT BED TRUCK 6-8 M3
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah C. ALAT
Rupiah
Rupiah
Rupiah D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C )
E. OVERHEAD & PROFIT
Rupiah F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Per
Rupiah berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedi
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
% / Tahun yang dibayar dari kontrak) dan biaya-biaya lainnya.
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Analisa EI-916
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
R 3000-4500 L. (E23) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(6)
Liter JENIS PEKERJAAN : Truk Tangki 3000-4500 Liter
Tahun WATER TANKER 3000-4500 L.
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah C. ALAT
Rupiah
Rupiah
Rupiah
Analisa EI-917
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
ZER 100-150 HP (E04) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(7)
- JENIS PEKERJAAN : Bulldozer 100-150 PK
Tahun BULLDOZER 100-150 HP
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
C. ALAT
Rupiah
1. BULLDOZER 100-150 HP (E04)
Rupiah
Rupiah
Rupiah
Analisa EI-918
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
(E13) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(8)
- JENIS PEKERJAAN : Motor Grader Min . 100 PK
Tahun MOTOR GRADER >100 HP
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. MOTOR GRADER >100 HP (E13)
Rupiah
Rupiah
Rupiah
Rupiah
Analisa EI-919
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
OADER 1.0-1.6 M3 (E15) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(9)
M3 JENIS PEKERJAAN : Loader Roda Karet 1,0 - 1,6 M3
Tahun WHEEL LOADER 1.0-1.6 M3
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
C. ALAT
Rupiah
1. WHEEL LOADER 1.0-1.6 M3 (E15)
Rupiah
Rupiah
Rupiah
Rupiah
Analisa EI-9110
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
OADER 75-100 HP (E14) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1. (10)
M3 JENIS PEKERJAAN : Loader Roda Berantai 75-100 PK
Tahun TRACK LOADER 75-100 HP
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. TRACK LOADER 75-100 HP (E14)
Rupiah
Rupiah
Rupiah
Rupiah
Analisa EI-9111
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
TOR 80-140 HP (E10) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(11)
M3 JENIS PEKERJAAN : Alat Penggali (Excavator) 80-140 PK
Tahun EXCAVATOR 80-140 HP
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. EXCAVATOR 80-140 HP (E10)
Rupiah
Rupiah
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
E 10-15 TON (E07) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(12)
Ton JENIS PEKERJAAN : Crane 10-15 Ton
Tahun CRANE 10-15 TON
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. CRANE 10-15 TON (E07)
Rupiah
Rupiah
Rupiah
Rupiah
Analisa EI-9113
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
M ROLER 6-8 T. (E16) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(13)
Ton JENIS PEKERJAAN : Penggilas Roda Besi 6-9 Ton
Tahun TANDEM ROLER 6-8 T.
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. TANDEM ROLER 6-8 T. (E17)
Rupiah
Rupiah
Rupiah
Rupiah
Analisa EI-9114
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
RY ROLLER 5-8 T. (E19) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(14)
Ton JENIS PEKERJAAN : Penggilas Bervibrasi 5-8 Ton
Tahun VIBRATORY ROLLER 5-8 T.
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. VIBRATORY ROLLER 5-8 T. (E19)
Rupiah
Rupiah
Rupiah
Rupiah
Analisa EI-9115
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
AMPER (E25) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(15)
Ton JENIS PEKERJAAN : Pemadat Bervibrasi 1,5-3,0 PK
Tahun TAMPER
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. TAMPER (E25)
Rupiah
Rupiah
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
OLLER 8-10 T (E18) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(16)
Ton JENIS PEKERJAAN Penggilas Roda Karet 8-10 Ton
Tahun TIRE ROLLER 8-10 T
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. TIRE ROLLER 8-10 T (E18)
Rupiah
Rupiah
Rupiah
Rupiah
Analisa EI-9117
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
OR 4000-6500 L\M (E05) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(17)
- JENIS PEKERJAAN : Kompresor 4000-6500 liter/menit
Tahun COMPRESSOR 4000-6500 L\M
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. COMPRESSOR 4000-6500 L\M (E05)
Rupiah
Rupiah
Rupiah
Rupiah
Analisa EI-9118
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
MIXER 0.3-0.6 M3 (E06) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(18)
Liter JENIS PEKERJAAN : Mesin Pengaduk Beton (Molen) 0,3-0,6 M3
Tahun CONCRETE MIXER 0.3-0.6 M3
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. CONCRETE MIXER 0.3-0.6 M3 (E06)
Rupiah
Rupiah
Rupiah
Rupiah
Analisa EI-9119
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
UMP 70-100 mm (E22) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(19)
- JENIS PEKERJAAN : Pompa Air 70-100 mm
Tahun WATER PUMP 70-100 mm
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. WATER PUMP 70-100 mm (E22)
Rupiah
Rupiah
Rupiah
Rupiah
Analisa EI-9120
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
K HAMMER E26 PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.1.(20)
- JENIS PEKERJAAN : Jack Hammer
Tahun JACK HAMMER
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. JACK HAMMER (E26)
Rupiah
Rupiah
Rupiah
Rupiah
- - - -
- - - -
- - - -
- - - -
Analisa EI-912
- - - -
- - - -
- - - -
- - - -
Analisa EI-913
- - - -
- - - -
- - - -
- - - -
N DAN ALAT ( A + B + C ) 26,283.46
10.0 % x D 2,628.35
28,911.80
operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-914a
- - -
- - -
- - -
- - -
Analisa EI-914b
- - -
- - -
- - -
- - -
Analisa EI-915a
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Analisa EI-96
- - -
- - -
- - -
- - -
Analisa EI-917
- - -
- - -
- - -
- - -
Analisa EI-918
- - -
- - -
- - -
- - -
Analisa EI-919
- - -
- - -
- - -
- - -
jam 1.0000 232,037.99 232,037.99
Analisa EI-9110
- - -
- - -
- - -
- - -
Analisa EI-9111
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Analisa EI-9113
- - -
- - -
- - -
- - -
jam 1.0000 425,712.77 425,712.77
Analisa EI-9114
- - -
- - -
- - -
- - -
Analisa EI-9115
- - -
- - -
- - -
- - -
Analisa EI-916
- - -
- - -
- - -
- - -
jam 1.0000 469,016.92 469,016.92
Analisa EI-9117
- - -
- - -
- - -
- - -
Analisa EI-9118
- - -
- - -
- - -
- - -
Analisa EI-9119
- - -
- - -
- - -
- - -
Analisa EI-9120
- - -
- - -
- - -
- - -
42,000 42,000
E26 41,999
41,998
41,997
41,996
41,995
41,994
41,993
41,992
41,991
41,990
41,989
41,988
41,987
41,986
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
14,286 14,286
E27 14,285
14,284
14,283
14,282
14,281
14,280
14,279
14,278
14,277
14,276
14,275
14,274
14,273
14,272
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
- 0
E28 -1
-2
-3
-4
-5
-6
-7
-8
-9
-10
-11
1 #DIV/0!
2 #DIV/0!
0 1
1
0
0
0 #REF! #REF!
1 #DIV/0!
2 #DIV/0!
3 #DIV/0!
4 #DIV/0!
5 #DIV/0!
6 #DIV/0!
7 #DIV/0!
8 #DIV/0!
9 #DIV/0!
10 #DIV/0!
11 #DIV/0!
12 #DIV/0!
13 #DIV/0!
14 #DIV/0!
> 15th ? 2
2
#REF!
#REF!
#REF!
0 #REF! #REF!
1 #DIV/0!
2 #DIV/0!
3 #DIV/0!
4 #DIV/0!
5 #DIV/0!
6 #DIV/0!
7 #DIV/0!
8 #DIV/0!
9 #DIV/0!
10 #DIV/0!
11 #DIV/0!
12 #DIV/0!
13 #DIV/0!
14 #DIV/0!
> 15th ? 2
2
#REF!
#REF!
#REF!
0 #REF! #REF!
1 #DIV/0!
2 #DIV/0!
3 #DIV/0!
4 #DIV/0!
5 #DIV/0!
6 #DIV/0!
7 #DIV/0!
8 #DIV/0!
9 #DIV/0!
10 #DIV/0!
11 #DIV/0!
ITEM PEMBAYARAN NO. : 9.2.(1)
JENIS PEKERJAAN : Marka Jalan Termoplastik
SATUAN PEMBAYARAN : M2 URAIAN ANALISA
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor Kehilangan Material Fh 1.03
7 Tebal lapisan cat secara manual t 0.0015
8 Berat Jenis Bahan Cat BJ.Cat
9 Perbandingan pemakaian bahan : - Cat C 100.00
1. BAHAN
1.a. Cat Marka Thermoplastic = 1x1x t x Fh (M17b) 1.5450
1.b. Glass Bead = 0,45 x Fh 0.4635
2. ALAT
2.a. THERMOPLASTIC SPREADING MACHINE
Kapasitas penyemprotan V 40.00
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00
Waktu siklus: Ts
- Pemanasan T1 10.00
- Penyemprotan T2 3.00
- Lain-lain T3 2.00
Ts 15.00
Kap. Prod. / Jam = V:R Q1 13.33
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33
dibutuhkan tenaga : - Mandor M 1.00
- Tukang Cat Tb 1.00
- Pekerja P 8.00
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0750
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000
Rp. 335,879.00 / M2
1. BAHAN
1.a. Cat Marka Non Thermoplastic = (1 x 1 x t x Fh) : BJ. Cat (M17a) 0.2609
1.b. Minyak Pencair (Thinner) = T:C x Vol cat (M33) 0.0870
1.c. Glass Bead 0.4500
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33
dibutuhkan tenaga : - Mandor M 1.00
- Tukang Cat Tb 3.00
- Pekerja P 8.00
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000
Rp. 124,503.07 / M2
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ........... bulan
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
II. URUTAN KERJA
1 Kesatuan pondasi, pelat & tiang rambu disiapkan dan
dipasang di tempat yang telah ditentukan
1. BAHAN
1.a. Pelat Rambu Jadi (Engineering Grade) (M35a) 1.00
1.b. Pipa Galvanis Dia. 5" (M24) 1.00
1.c. Beton fc 20 MPa (M60) 0.016
2. ALAT
2.a. DUMP TRUCK 4m3 (E08)
Kapasitas 1 kali Angkut Cp 30.0
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9
- Menurunkan = Rata-rata 0,5 menit / buah T3 15.0
- Lain-lain = geser, atur, tunggu, dll. T4 30.0
Ts 116.9
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 107.80
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 15.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.0649
- Tukang = (Tk x Tb) : Qt (L02) 0.1299
- Pekerja = (Tk x P) : Qt (L01) 0.9740
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
1. BAHAN
1.a. Pelat Rambu Jadi (Engineering Grade) (M35a) 2.00
1.b. Pipa Galvanis Dia.5" (M24) 1.00
1.c. Beton fc 20 Mpa (M60) 0.016
2. ALAT
2.a. DUMP TRUCK 3- 4 M3 (E08)
Kapasitas 1 kali Angkut Cp 20.0
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9
- Menurunkan = Rata-rata 2.5 menit / buah T3 10.0
- Lain-lain = geser, atur, tunggu, dll. T4 30.0
Ts 111.9
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 75.08
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 15.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.0932
- Tukang = (Tk x Tb) : Qt (L02) 0.1865
- Pekerja = (Tk x P) : Qt (L01) 1.3985
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
1. BAHAN
1.a. Pelat Rambu Jadi (High Intensity Grade) (M35b) 1.00
1.b. Pipa Galvanis Dia. 5" (M24) 1.00
1.c. Beton Fc 20 Mpa (M60) 0.016
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 30.0
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9
- Menurunkan = Rata-rata 2.5 menit / buah T3 15.0
- Lain-lain = geser, atur, tunggu, dll. T4 30.0
Ts 116.9
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 107.80
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 10.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.0649
- Tukang = (Tk x Tb) : Qt (L02) 0.1299
- Pekerja = (Tk x P) : Qt (L01) 0.6493
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 20.0
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9
- Menurunkan = Rata-rata 2.5 menit / buah T3 10.0
- Lain-lain = geser, atur, tunggu, dll. T4 30.0
Ts 111.9
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 75.08
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 10.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.0932
- Tukang = (Tk x Tb) : Qt (L02) 0.1865
- Pekerja = (Tk x P) : Qt (L01) 0.9323
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok beton cetak, dll) diangkut dengan
Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.03
7 Tulangan praktis Rc 50.00
II. URUTAN KERJA
1 Patok yang sudah disiapkan sesuai dengan gambar, dibawa ke lapangan
2 Patok dipasang sesuai dengan lokasi pekerjaan
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 50.0
Faktor Efisiensi Alat Fa 0.83
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 20.0
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9
- Menurunkan = Rata-rata 1 menit / buah T3 40.0
- Lain-lain = geser, atur, tunggu, dll. T4 10.0
Ts 111.9
3. TENAGA
Produksi pasang patok pengarah / hari = Tk x Q1 Qt 155.79
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 15.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.0449
- Tukang = (Tk x Tb) : Qt (L02) 0.0899
- Pekerja = (Tk x P) : Qt (L01) 0.6740
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.03
7 Tulangan praktis Rc 50.00
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88
- Menurunkan = Rata-rata 1.5 menit / buah T3 22.5
- Lain-lain = geser, tunggu, dll T4 10.0
Ts 94.4
3. TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1 Qt 66.75
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 5.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.1049
- Tukang = (Tk x Tb) : Qt (L02) 0.2097
- Pekerja = (Tk x P) : Qt (L01) 0.5243
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
7 Tulangan praktis Rc 125.00
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88
- Menurunkan = Rata-rata 1.5 menit / buah T3 22.5
- Lain-lain = geser, tunggu, dll T4 10.0
Ts 94.4
3. TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1 Qt 66.75
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 5.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.1049
- Tukang = (Tk x Tb) : Qt (L02) 0.2097
- Pekerja = (Tk x P) : Qt (L01) 0.5243
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar rel pengaman diterima di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.03
2. ALAT
2.a DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0
Waktu Siklus : Ts
- Memuat T1 50.0
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88
- Menurunkan T3 60.0
- Lain-lain T4 30.0
Ts 181.9
3. TENAGA
Produksi pasang pagar pengaman / hari = Tk x Q1 Qt 34.64
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 8.00
Koefisien Tenaga / M' :
- Mandor = (Tk x M) : Qt (L03) 0.2021
- Tukang = (Tk x Tb) : Qt (L02) 0.4042
- Pekerja = (Tk x P) : Qt (L01) 1.6167
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar paku jalan diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fh 1.05
2. ALAT
Bor
Screw Machine
2.a ALAT BANTU
- Pacul / Sekop
- Alat pertukangan
3. TENAGA
Produksi pasang paku jalan/ hari = Tk x Q1 Qt 20.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 5.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.3500
- Tukang = (Tk x Tb) : Qt (L02) 0.7000
- Pekerja = (Tk x P) : Qt (L01) 1.7500
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar paku jalan diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fh 1.05
3. TENAGA
Produksi pasang paku jalan/ hari = Tk x Q1 Qt 20.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 5.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.3500
- Tukang = (Tk x Tb) : Qt (L02) 0.7000
- Pekerja = (Tk x P) : Qt (L01) 1.7500
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar paku jalan diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fh 1.05
2. ALAT
2.a ALAT BANTU
- Pacul / Sekop
- Alat pertukangan
3. TENAGA
Produksi pasang paku jalan/ hari = Tk x Q1 Qt 20.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 5.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.3500
- Tukang = (Tk x Tb) : Qt (L02) 0.7000
- Pekerja = (Tk x P) : Qt (L01) 1.7500
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar mata kucing diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fh 1.05
2. ALAT
2.b. ALAT BANTU
- Pacul / Sekop
- Alat pertukangan
3. TENAGA
Produksi pasang mata kucing/ hari = Tk x Q1 Qt 20.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 5.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.3500
- Tukang = (Tk x Tb) : Qt (L02) 0.7000
- Pekerja = (Tk x P) : Qt (L01) 1.7500
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.03
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 40.00
Waktu Siklus : Ts
- Memuat = naik & atur rata-rata 3 menit/m T1 26.67
- Angkut V=30 Km/jam = Lef x V x 60 T2 17.45
- Kembali V=50 Km/jam= Lef x V x 60 T3 10.47
- Menurunkan = Rata-rata 2 menit/m T4 40.00
- Lain-lain = geser, atur, tunggu dll T5 7.00
Ts 101.59
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 165.38
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.0423
- Tukang = (Tk x Tb) : Qt (L02) 0.1693
- Pekerja = (Tk x P) : Qt (L01) 0.4233
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 36.00
Waktu Siklus : Ts
- Memuat = naik & atur rata-rata 3 menit/m T1 24.00
- Angkut V=30 Km/jam = Lef x V x 60 T2 17.45
- Kembali V=50 Km/jam= Lef x V x 60 T3 10.47
- Menurunkan = Rata-rata 2 menit/m T4 36.00
- Lain-lain = geser, atur, tunggu dll T5 7.00
Ts 94.92
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 159.29
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.0439
- Tukang = (Tk x Tb) : Qt (L02) 0.1758
- Pekerja = (Tk x P) : Qt (L01) 0.4394
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 36.00
Waktu Siklus : Ts
- Memuat = naik & atur rata-rata 3 menit/m T1 24.00
- Angkut V=30 Km/jam = Lef x V x 60 T2 17.45
- Kembali V=50 Km/jam= Lef x V x 60 T3 10.47
- Menurunkan = Rata-rata 2 menit/m T4 36.00
- Lain-lain = geser, atur, tunggu dll T5 7.00
Ts 94.92
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 159.29
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.0439
- Tukang = (Tk x Tb) : Qt (L02) 0.1758
- Pekerja = (Tk x P) : Qt (L01) 0.4394
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 32.00
Waktu Siklus : Ts
- Memuat = naik & atur rata-rata 3 menit/m T1 21.33
- Angkut V=30 Km/jam = Lef x V x 60 T2 17.45
- Kembali V=50 Km/jam= Lef x V x 60 T3 10.47
- Menurunkan = Rata-rata 2 menit/m T4 32.00
- Lain-lain = geser, atur, tunggu dll T5 7.00
Ts 88.25
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 152.29
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.0460
- Tukang = (Tk x Tb) : Qt (L02) 0.1839
- Pekerja = (Tk x P) : Qt (L01) 0.4597
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 32.00
Waktu Siklus : Ts
- Memuat = naik & atur rata-rata 3 menit/m T1 21.33
- Angkut V=30 Km/jam = Lef x V x 60 T2 17.45
- Kembali V=50 Km/jam= Lef x V x 60 T3 10.47
- Menurunkan = Rata-rata 2 menit/m T4 32.00
- Lain-lain = geser, atur, tunggu dll T5 7.00
Ts 88.25
Kap. Prod. / Jam Cp Q1 21.756
Ts : 60
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 152.29
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.0460
- Tukang = (Tk x Tb) : Qt (L02) 0.1839
- Pekerja = (Tk x P) : Qt (L01) 0.4597
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
2. ALAT
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 109.11
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.0642
- Tukang = (Tk x Tb) : Qt (L02) 0.2566
- Pekerja = (Tk x P) : Qt (L01) 0.6415
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
2. ALAT
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 109.11
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.0642
- Tukang = (Tk x Tb) : Qt (L02) 0.2566
- Pekerja = (Tk x P) : Qt (L01) 0.6415
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
2. ALAT
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 109.11
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Buah :
- Mandor = (Tk x M) : Qt (L03) 0.0642
- Tukang = (Tk x Tb) : Qt (L02) 0.2566
- Pekerja = (Tk x P) : Qt (L01) 0.6415
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
2. ALAT