Data LHR
a. Mobil penumpang = 2002 kend/hari
b. Mobil Pick up (6 ton) = 46 kend/hari
c. Bus sedang (6 t0n) = 44 kend/hari
d. Bus besar (9ton) = 57 kend/hari
e. Truck sedang (13 ton) = 74 kend/hari
f. Truck 2 As (18 ton) = 96 kend/hari
g. Truck 3 As (25 ton) = 119 kend/hari
h. Trailler (40 ton) = 58 kend/hari
2496 494
Tekanan angin ban rata-rata (Ta) = 5.65
Data CBR
No Nilai CBR
1 5.6
2 2
3 2.4
4 4
5 4.7
6 7.6
7 8.2
8 4.9
9 3.8
10 2.9
11 4.5
12 6.9
13 4.7
14 4.3
15 7.7
16 8.5
17 3.9
18 4.8
19 5.5
20 3.5
21 4
22 3.2
23 4.5
24 7.5
Pengolahan LHR
dianggap kondisi medan datar, sehingga :
kendaraan koef SMP
a. Mobil penumpang = 2018 kend/hari 1 2018 SMP/hari VLHR = 5917.774
b. Mobil Pick up (6 ton) = 109 kend/hari 2 218 SMP/hari = 5918
c. Bus sedang (6 t0n) = 50 kend/hari 2 100 SMP/hari
d. Bus besar (9ton) = 52 kend/hari 2.5 130 SMP/hari
e. Truck sedang (13 ton) = 77 kend/hari 2 154 SMP/hari
f. Truck 2 As (18 ton) = 92 kend/hari 3 276 SMP/hari
g. Truck 3 As (25 ton) = 113 kend/hari 4 452 SMP/hari
h. Trailler (40 ton) = 57 kend/hari 5 285 SMP/hari
Total SMP = 3633 SMP/hari
Menghitung ESAL
berat beban sumbu
Kendaraan
(ton) depan 1 depan 2 belakang 1
a. Mobil penumpang 4 2 2 50 50
b. Mobil Pick up 6 2.04 3.96 34 66
c. Bus sedang 6 2.04 3.96 25 75
d. Bus besar 9 3.06 5.94 12.5 37.5 50
e. Truck sedang 13 4.42 8.58
f. Truck 2 As 18 6.12 11.88
g. Truck 3 As 25 6.25 18.75
h. Trailler 40 5 15 20
Menghitung LEP
massa konstruksi 2013 - 2010 = 3 tahun
pertumbuhan kendaraan massa konstruksi (i) = 7%
Menghitung LEA
umur rencana = 10 tahun
pertumbuhan selama masa layan = 5%
(1+r)^n = 1.629
LEA = LEP x (1+r)^10
LEA = 1018.078
Menghitung LET
LET = 0.5*(LEP+LEA)
LET = 821.5445
Menghitung LER
LER = LET*FP
LER = 821.5445
Segmen 3
1 3.9 R 2.96 Segmen 3
2 4.8 CBR rata-rata 4.613 CBR jumlah > CBR %
3 5.5 CBR max 7.5 3 8 100
4 3.5 CBR min 3.2 4 5 62.50
5 4 CBR segmen 3.160 5 2 25.00
6 3.2 6 1 12.50
7 4.5 7 1 12.50
8 7.5
segmen 1
a1 (aspal beton kelas A) = 2 d1 = 5
a2 (base course CBR) = 1 d2 = 15
a3(base course CBR) = 0.75
CBR = 2.738
itung sendiri = 49080.21
h ek = 44.57
d3 = 26.0937531 27
segmen 2
a1 (aspal beton kelas A) = 2 d1 = 5
a2 (base course CBR) = 1 d2 = 15
a3(base course CBR) = 0.75
CBR = 3.595
itung sendiri = 49080.21
h ek = 36.97
d3 = 15.956 16
segmen 3
a1 (aspal beton kelas A) = 2 d1 = 5
a2 (base course CBR) = 1 d2 = 15
a3(base course CBR) = 0.75
CBR = 3.160
itung sendiri = 49080.21
h ek = 40.44
d3 = 20.584 21
Perhitungan Bina Marga Konstruksi Langsung
Perhitungan DDT
segmen 1
CBR = 2.97 log CBR = 0.472756
DDT = 3.732853
segmen 2
CBR = 3.19 log CBR = 0.503791
DDT = 3.866
segmen 3
CBR = 3.1 log CBR = 0.491362
DDT = 3.813
Faktor Regional
Total LHR = 2592 kend/hari
total kend berat = 534 kend/hari
% kend berat = 20.60 %
kemiringan medan = 1.037 %
FR = 0.5
IPt = 2.5
IPo = ≥4
menggunakan nomogram no 1
segmen 1
berdasarkan nilai ITP, sesuai dengan tabel 3.16 dan 3.17
d1 = 10 (laston)
d2 = 25 (batu pecah kelas A)
ITP = 13.344
d3 = 44.95385 = 45 cm
segmen 2
ITP = 12.956
d3 = 41.96923 = 40 cm
segmen 3
ITP = 12.9900
d3 = 42.23077 = 40 cm
Perhitungan Bina Marga Konstruksi Bertahap
LEPtotal = 624.770
LEA = 703.184
LET = 663.977
LER = 265.591
LER = 443.537
LEA = 839.639
LET = 771.412
LER = 462.847
LER = 1157.118
Tebal perkerasan
segmen 1
CBR = 2.6
DDT = 3.480
FR = 0.5
IPt = 2.5
IPo = 4
tahap 1
x.LER = 443.537
ITP = 10.340
ruas kiri = ruas kanan
5.811 = ruas 1 6.333018
= ruas 2 -0.25527 0.639686 -0.39906
= ruas 3 0.30103 0.17808
= total 5.811
a1 = 0.4 (laston)
a2 = 0.14 (batu pecah kelas A)
a3 = 0.13 (sirtu kelas A)
d1 = 10
d2 = 20
d3 = 27.231 = 34
tahap 2
y.LER = 1157.1180
ITP = 12.810
ruas kiri = ruas kanan
6.404 = ruas 1 7.041508
= ruas 2 -0.25527 0.496428 -0.51422
= ruas 3 0.30103 0.17808
= total 6.404
ITP2 = 2.47
d0 = 6.175 = 3
segmen 2
CBR = 3.3
DDT = 3.930
FR = 0.5
IPt = 2.5
IPo = 4
tahap 1
x.LER = 443.537
ITP = 9.695
ruas kiri = ruas kanan
5.811 = ruas 1 6.125417
= ruas 2 -0.25527 0.712926 -0.35806
= ruas 3 0.30103 0.34503
= total 5.811
a1 = 0.4 (laston)
a2 = 0.14 (batu pecah kelas A)
a3 = 0.13 (sirtu kelas A)
d1 = 10
d2 = 20
d3 = 22.269 = 28
tahap 2
y.LER = 1157.1180
ITP = 12.090
ruas kiri = ruas kanan
6.404 = ruas 1 6.847472
= ruas 2 -0.25527 0.523734 -0.48741
= ruas 3 0.30103 0.34503
= total 6.404
ITP2 = 2.40
d0 = 5.9875 = 3
segmen 3
CBR = 3.14
DDT = 3.840
FR = 0.5
IPt = 2.5
IPo = 4
tahap 1
x.LER = 443.537
ITP = 9.822
ruas kiri = ruas kanan
5.811 = ruas 1 6.167125
= ruas 2 -0.25527 0.696596 -0.36646
= ruas 3 0.30103 0.31164
= total 5.811
a1 = 0.4 (laston)
a2 = 0.14 (batu pecah kelas A)
a3 = 0.13 (sirtu kelas A)
d1 = 10
d2 = 20
d3 = 23.2461538 = 30
tahap 2
y.LER = 1157.1180
ITP = 12.230
ruas kiri = ruas kanan
6.404 = ruas 1 6.885939
= ruas 2 -0.25527 0.517766 -0.49303
= ruas 3 0.30103 0.31164
= total 6.404
ITP2 = 2.408
d0 = 6.02 = 3
menentukan W18
W18 = Dd x Dl x w18