Pelaksana Kegiatan
Bagian Pelaksana Kegiatan : Dinas
SumberLingkungan Hidup
Daya Air (SDA)
Pekerjaan : Pembangunan Paving Blok Dinas Lingkungan Hidup
Lokasi : Distrik Bintuni Kab. Teluk Bintuni
Sumber Dana : DAU
Tahun Anggaran : 2021
Jumlah Biaya
No Uraian Pekerjaan
(Rp.)
I. Peralatan
Mobilisasi
1 Wheel Loder unit 0.00 0.00
2 Beton molen unit 0.00 200,000.00 0.00
3 Stamper unit 0.00 0.00
4 Dump truck unit 2.00 500,000.00 1,000,000.00
5 Pompa air unit 0.00 200,000.00 0.00
6 Bulldozer unit 0.00 0.00
7 Excavator unit 0.00 5,000,000.00 0.00
8 Vibrator roller unit 0.00 0.00
9 Vibrator concrete unit 0.00 200,000.00 0.00
10 Water Tank unit 0.00 500,000.00 0.00
10 Greder unit 0.00 0.00
II. Demobilisasi 1,000,000.00
I Bahan
1 Kertas HVS rim 6.0000 80,000.00 480,000.00
2 Alat tulis dll ls 1.0000 600,000.00 600,000.00
II Tenaga
1 Pekerja hari 30.0000 160,000.00 4,800,000.00
III Peralatan
1 Alat ukur bln 1.0000 715,000.00 715,000.00
I Bahan
1
2
3
II Tenaga
1 Mandor hari 0.0600 292,900.00 17,574.00
2 Pekerja hari 0.0060 160,000.00 960.00
3
III Peralatan
1 Alat Bantu LS 1.0000 5,000.00 5,000.00
I Bahan
1
2
3
II Tenaga
1 Mandor hari 0.0200 292,900.00 5,858.00
2 Pekerja hari 0.0400 160,000.00 6,400.00
3
III Peralatan
1 Dump Truck jam 0.0612 416,000.00 25,475.21
2 Bulldozer D3 jam 0.0039 270,900.00 1,047.76
I Bahan
1 Pasir Urug M3 1.2000 500,000.00 600,000.00
2
3
II Tenaga
1 Mandor hari 0.0100 292,900.00 2,929.00
2 Pekerja hari 0.3000 160,000.00 48,000.00
3
4
III Peralatan
1
2
I Bahan
1 Paving Blok Bh 36.0000 7,000.00 252,000.00
2 Pasir m3 0.0800 500,000.00 40,000.00
###
II Tenaga
1 Mandor hari 0.0225 292,900.00 6,590.25
2 Pekerja hari 0.2250 160,000.00 36,000.00
3 Tukang Batu hari 0.2250 213,000.00 47,925.00
4 Kepala Tukang hari 0.0225 266,300.00 5,991.75
###
III Peralatan
I Bahan
1 Kerikil m3 0.4964 650,000.00 322,673.03
2 Pasir m3 0.3222 500,000.00 161,097.85
3 Semen PC zak 6.0000 124,000.00 744,000.00
II Tenaga
1 Mandor hari 0.0789 292,900.00 23,106.00
2 Pekerja hari 2.5244 160,000.00 403,901.32
3 Kepala Tukang hari 0.1578 266,300.00 42,015.20
3 Tukang hari 0.8678 213,000.00 184,832.19
III Peralatan
1 Concrete Mixer jam 0.4418 70,800.00 31,277.11
2 Concrete Vibrator jam 0.2209 23,800.00 5,257.03
3
HARGA
NO URAIAN BAHAN SATUAN
(Rp)
I. TENAGA KERJA
1 Tukang Batu/Besi Hari 213,000
2 Tukang Kayu Hari 213,000
3 Kepala Tukang Hari 266,300
4 Pekerja Hari 160,000
5 Mandor Hari 292,900
6 Tenaga Terampil Hari 170,000
7 Operator/Sopir ( Alat Berat ) Hari 210,000
8 Pembantu Operator/Sopir Hari 160,000
9 Operator ( Alat Ringan ) Hari 190,000
10 Pembantu Operator Hari 160,000
II. BAHAN
1 Semen Potland (pc) 50 kg zak 124,000
2,480
2 Sirtu m3 500,000
3 Pasir Pasangan m3 500,000
4 Pasir Beton m3 500,000
5 Kerikil m3 650,000
6 Batu Pecah 2/3 m3 1,150,000
7 Batu Pecah 3/5 m3 900,000
8 Batu Pecah 5/7 m3 800,000
9 Paving Blok Bh 7,000
10 Batu Gunung m3 250,000
8 Tanah Timbunan m3 500,000
9 Tanah Timbunan (Urpil) m3 500,000
10 Kayu Kelas I m3 4,300,000
11 Kayu Kelas II m3 2,700,000
12 Kayu Kelas III m3 2,500,000
13 Multiplek 9 mm, 4' x 8' Lbr 200,000
14 Multiplek 6 mm, 4' x 8' Lbr 150,000
15 Multiplek 3 mm, 4' x 8' Lbr 80,000
16 Pipa PVC dia1-1/2" m' 50,000
17 Baja Tulangan kg 19,000
18 Kawat Beton kg 30,000
19 Paku kg 30,000
20 Bahan bakar Bensin ltr 10,400
21 Bahan bakar Solar ltr 14,061
22 Minyak Pelumas ltr 45,000
23 Gebalan rumput m2 1,500
24 Ijuk kg 10,000
33 Cat kilap kg 95,000
25 Bambu btg 25,000
III. PERALATAN
1 Excavator jam 931,400
2 Dump Truck jam 416,000
3 Concrete Mixer jam 70,800
4 Concrete vibrator jam 23,800
5 Water Pump jam 18,200
I Bahan
1 Bahan konstruksi :
- Besi siku kg 247.00 - -
- Besi kanal kg 60.00 10,300 618,000.00
- Besi plate kg 156.00 - -
- Besi plate strip kg 34.00 - -
- Besi beton kg 13.00 - -
4 Bahan-bahan lain :
- Mur baut 1/2", 5/8", 7/8" kg 7.00 - -
- Nipple bh 3.00 - -
- Spie bh 2.00 - -
- Gembok bh 1.00 - -
- Drucklager kecil/besar bh 2.00 - -
- Angker bolt (20 kg) bh 8.00 - -
- Splite pen/pengunci bh 1.00 - -
- Na F + ring bh 2.00 180,200 360,400.00
II Ongkos Kerja
- Ongkos kerja konst. kg 510.00 - -
- Ongkos kerja mesin kg 116.00 - -
- Sandblasting & cat m2 1.50 93,600 140,400.00
V Jumlah 7,744,300.00
VI Keuntungan (10%) 10% 774,430.00
VII Harga Satuan 8,518,730.00
DAFTAR KUANTITAS DAN HARGA
I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi LS 1.00
1.2 Survey/Mutual Check dan Asbuild Drawing Bulan 12.00
1.3 Pekerjaan sementara dan dewatering Bulan 12.00
II PEKERJAAN BENDUNG
2.1 Pekerjaan Tanah
2.1.1 Kosrekan 20 cm m2 4,325.00
2.1.2 Galian Tanah Biasa m 3
3,450.00
2.1.3 Galian Batu Lapuk m3 115.00
2.1.4 Galian Batu Keras m3 16.00
2.1.5 Timbunan Tanah dari Hasil Galian m 3
565.00
2.1.6 Timbunan Tanah dari Borrow Area m3 315.00
2.1.7 Timbunan Kembali m 3
365.00
2.1.8 Gebalan Rumput m3 625.00
2.1.9 Pembuangan Hasil Galian tak Terpakai m3 3,167.50
X. PEKERJAAN PELENGKAP
pembesian
10 meter alas utama 2.98 6.67 19.87
105.00
atas utama 7.55 6.67 50.33
BAKESTING
100.00 2.80 1.00 1.00 2.30 0.50 1.04 2.38
0.00 100.00 100.00 230.00 50.00 104.00 238.00
0.50 2.38
1.54 0.35
111.78 141.78
30.00
327.60
680.33
314.40
641.90
1,964.23
163.69 1,744.89 kg
2,086.00
5,285.00
24,759.00
64,648.50
96,778.50
8,064.88 85,971.57 kg
87,716.46
0.40
822.00
0.40
822.00
39.00
39.00
18.00
9.00
105.00 118.00
9.00 44.00
0.30
0.60
3.00
1.35
12.15
volume
25.00 65.92 44.82
25.00 71.07 48.60
5.00 15.18 19.44
152.17 112.86 265.03