JEMBATAN ORANG

Existing Road
2.22
2.218

BP.4.1c

Existing Road
2.139 2.124
2.063
2.1

FOOTBRIDGE

Road
Existing

Existing Road
Road

Existing Road
Existing
Road
Existing

Existing Road

Existing Road
2.1 2.18 2.091
2.156

2.525 2.447 2.43 2.227


2.18
2.142 2.137
2.087 2.034 2.13 2.033 2.035 1.984 2.031 2.053
Existing 1.952
2.03 Road
Existing Road Existing Road
2.1742.225 2.138 Existing Road Existing Road
1.227 2.02
2.152 2.111 2.086 2.083 1.968 1.909 1.995 2.115 2.096
2.009 1.9982.004 2.16 1.913 2.011 2.023 2.005
1.026 2.053 2.048 1.027 1.905 2.129 2.073 1.968
0.966
1.032
1.021 1.0211.009 1.024 0.99 0.981 0.991 0.939
A 0.968
1.006
A
Saluran sekunder A
1.219 Pengulu 1.002
Pengulu secondary Saluran sekunder Pengulu Saluran sekunder Pengulu Saluran sekunder Pengulu 0.977 Saluran sekunder Pengulu
1.152
A 2.224 canal
Pengulu secondary canal Pengulu secondary canal Pengulu secondary canal Pengulu secondary canal
1.121
2.189 2.177 A A

0.984
2.137 1.028 1.024 1.017 1.028
2.248 2.196 1.035 0.984 1.002 0.956
1.022 1.022
2.244
2.189 2.046 2.057 2.009 1.858 2.02
2.02 1.994 2.021 2.055 2.021
2.033 2.015 1.967 2.026 2.042 2.16 2.031 2.01
Existing
Road
Existing Road
2.37 2.315 Existing Road Existing Road
2.223 Existing Road

1.907 1.916 1.886


1.937 1.843
1.976
1.919 1.996 1.98 1.94
2.062

N
SITUASI BANGUNAN
KEY PLAN

Existing Road

Existing Road
2.227 JEMBATAN ORANG
2.18
BP.4.1c
FOOTBRIDGE
2.034 2.137 1.984
2.087 2.13 2.033 2.035
1.952
Existing Road
Existing Road Existing Road
2.086 2.02 2.083 1.995
1.9982.004 2.16 1.968 1.909 2.115 2.096
2.011
2.009 2.048 1.027 1.905 1.913 2.129

1.021 1.0211.009 1.024 0.99 0.981 0.968

A
Saluran seku A
nder Pengul 1.002
Pengulu seco u Saluran sekunder Pengulu Saluran sekunder Pengulu
ndary canal Saluran sekunder Pengulu 0.977
Pengulu secondary canal Pengulu secondary canal Pengulu secondary canal
A
A

1.028 1.024 1.017 1.028


1.035 1.002
0.984 1.022
2.046 2.057 2.009 1.858 2.02
2.02 1.994 2.021
2.033 2.015 1.967 2.026 2.042 2.16

Existing Road
Existing Road Existing Road

1.907 1.916 1.886


1.937 1.843
1.976
1.919 1.996

2.062

SITUASI
SITUASTION

GOVERNMENT OF THE REPUBLIC OF INDONESIA RIMP


Rentang Irrigation Modernization Project
MINISTRY OF PUBLIC WORKS AND HOUSING
DIRECTORATE GENERAL OF WATER RESOURCES Province : West Java
SNVT PJPA CIMANUK-CISANGGARUNG Project : ICB Package LSS-06
Secondary Canal and Drains
PENGULU SECONDARY CANAL CONSTRUCTION DRAWING
Upgrading Works Left Bank VI
NO DATE REVISION REVISED CHECKED APPROVED
for Rentang Irrigation
FOOT BRIDGE B.P.4.1c Modernization Project
District : Indramayu
Surveyor/Designer
ST ,hal l id
A
bniduf iaS
ydatU
s
Register :
PT.Jaya Konstruksi MP, Tbk. Checked by Site Mgr Haryadi, ST
SCALE Project Manager Ir. Rustam Ramli Arief Sheet No. :
0 2.0 4.0 6.0 8.0 10.0 m Design/QS Engineer Ir. Imam Sugito
S,A Checked by
Co. Group Leader - II - 1 Audy Parowung
Date : Contract No. :
Approved by
May 18, 2020 HK.02.03-At/3.3/37
Group - II - 1 - Management Leader Takahiro KATO
Site Direction Zakiyatun Nafisah, ST
Acknowledged by Notice to Proceed : August 07, 2020
PPK of Irrigation and Lowland VIII Danny Mardiansyah, ST
5+3
5+3

P.1 20.2
P.12 5.5

70

5+4
30
9

4
P.12

8
2.132 2.133

JEMBATAN ORANG

R
E
2.22
2.218

BP.4.1c
2.02.139
3 2.124

R
2.1

FOOTBRIDGE

E
E

R
E
R

R
E

E
R
E

R
2.1 2.18 2.152.091

R
E
2.525 2.447 2.43 2.227

E
2.18
2.142 2.137
2.087 2.034 2.13 2.033 2.035 1.984 2.031 2.053
E 1.952
2.03 R
E R E R
2.1742.225 2.138 E R E R
1.227 2.02
2.152 2.111 2.08 2.083 1.9 8 1.909 1.995 2.115 2.09
2.009 1.9982.004 2.1 1.913 2.011 2.023 2.005
1.02 2.053 2.048 1.027 1.905 2.129 2.073 1.9 8
0.9
1.032
1.021 1.0211.009 1.024 0.99 0.981 0.991 0.939
A 0.9 8
1.00
A
S A
1.219 P 1.002
P c S P S P S P 0.977 S P
1.152
A 2.224 c
P c c P c c P c c P c c
1.121
2.189 2.177 A A

0.984
2.137 1.028 1.024 1.017 1.028
2.248 2.19 1.035 0.984 1.002 0.95
1.022 1.022
2.244
2.189 2.04 2.057 2.009 1.858 2.02
2.02 1.994 2.021 2.055 2.021
2.033 2.015 1.9 7 2.02 2.042 2.1 2.031 2.01
E
R
E R
2.37 2.315 E R E R
2.223 E R

1.907 1.91 1.88


1.937 1.843
1.97
1.919 1.99 1.98 1.94
2.0 2

N
SIT ASI BANG NAN
E PLAN

R
E
2.227 JEMBATAN ORANG
BP.4.1c

E
2.18 FOOTBRIDGE
2.142 2.137
2.034 2.13 2.033 1.984
2.087 1.952 2.035

E R
E R E R
2.08 2.02 2.083 1.995
1.9982.004 2.1 1.9 8 1.909 2.115 2.09
2.011
2.009 2.048 1.027 1.913 2.129
1.905

A1
1.021 1.0211.009 1.024 0.99 0.981 0.9 8

A
S A
P 1.002
P S P S P S 0.977
c c P
P c c P c c P c c
A
A

1.028 1.024 1.028


1.035 1.017 1.002
0.984 1.022
2.04 2.057 2.009 1.858 2.02
2.02 1.994 2.021

A2
2.033 2.015 1.9 7 2.02 2.042 2.1

E R
E R E R

1.907 1.91 1.88


1.937 1.843
1.97
1.99
1.919
2.0 2

SIT ASI
GO ERNMENT OF T E REP BLIC OF INDONESIA RIMP
SIT ASTION R I M P c
MINISTR OF P BLIC OR S AND O SING
DIRECTORATE GENERAL OF ATER RESO RCES P c J
SN T PJPA CIMAN CISANGGAR NG P c ICB P c LSS 0
S c C D
PENG L SECONDAR CANAL CONSTR CTION DRA ING
L B I
NO DATE RE ISION RE ISED C EC ED APPRO ED
R I
FOOT BRIDGE B.P.4.1c M P c
D c I
S D S
T A S
R
PT.J MP T . C c S M ST
SCALE P c M I.R R A S N .
0 2.0 4.0 .0 8.0 10.0 D SE I.I S
SA C c
C .G L II 1 A P
D C c N .
A
M 18 2020 .02.03 A 3.3 37
G II 1 M L T ATO
S D c N ST
Ac N c P c A 07 2020
PP I L III D M ST
A1 A2

P.BH-04
SPT N-Value

DEPTH

Selection
Coloum
GWL
(m)
Number of Blows per 15

Value
cm Penetration

+1.979 10 20 30 40

0
11
11

1 4

1
3

4
4

3
5

4
6

7 14

8 15

9 1

10 1

11 5

12 5

13

2
14

G VE N ENT THE EP BL C ND NES A RIMP


entan rri ation o erni ation Pro ect
N ST P BL C W S AND H S NG
D ECT ATE GENE AL WATE ES CES Pro ince West a a
SNVT P PA C AN -C SANGGA NG Pro ect CB Pac a e LSS-06
Secon ar Canal an Drains
PENG L SEC NDA CANAL C NST CT N D AW NG
p ra in Wor s Left Ban V
N DATE EV S N EV SED CHEC ED APP VED
for entan rri ation
T B DGE B.P.4.1c o erni ation Pro ect
District n rama u
Sur e or DesiS
Tner
al l iA
bniuf iaSats
e ister
PT. a a onstru si P Tb . C ec e b Site r Har a i ST
Pro ect ana er r. ustam amli Arief S eet No.
SCALE Desi n S En ineer r. mam Su ito
C ec e b Date Contract No.
0 0.8 1.6 2.4 3.2 4.0m Co. Group Lea er - -1 Au Parowun
SA
Appro e b
a 18 2020 H .02.03-At 3.3 37
Group - -1- ana ement Lea er Ta a iro AT
Site Direction a i atun Nafisa ST
Ac nowle e b Notice to Procee Au ust 07 2020
PP of rri ation an Lowlan V Dann ar ians a ST
A1 A2
C

A1 A2
11
11

B B

A
B B SA
SEC

CL
A A

C
E A
SA
LA

.12

11
11

A A
A A SA C CS B
SEC SEC
E E E E BL C ES A RIMP
S BL C SA S
EC A E E E AL A E ES CES
S AC A C SA A CB LSS 06
S C
E L SEC A CA AL C S C A
L B
A E E S E SE C EC E A E
B E B. .4.1

SCALE S S A S

0 0.8 1.6 2.4 3.2 4.0m . . C S S


SA . m m A S .
SCALE SE . m mS
C C .
0 0.4 0.8 1.2 1.6 2.0m C . L 1 A
SB
A
18 2020 .02.03 A 3.3 3
1 m L A
S S
A A 0 2020
L S
DETAIL TIANG SANDARAN SB

DENAH ABUTMENT S D DETAIL OF HAND POST


PLAN OF ABUTMENT

DETAIL BEARING PAD (FIX) SC DETAIL BEARING PAD (MOVABLE) SC

CL

DETAIL LANTAI JEMBATAN S E


DETAIL OF SLAB BRIDGE
DETAIL EXPANTION JOINT SC

GOVERNMENT OF THE REPUBLIC OF INDONESIA RIMP


Rentang Irrigation Modernization Project
DETAIL ABUTMENT MINISTRY OF PUBLIC WORKS AND HOUSING
SD DIRECTORATE GENERAL OF WATER RESOURCES Province : West Java
SNVT PJPA CIMANUK-CISANGGARUNG Project : ICB Package LSS-06
SCALE Secondary Canal and Drains
PENGULU SECONDARY CANAL CONSTRUCTION DRAWING
0 0.4 0.8 1.2 1.6 2.0m Upgrading Works Left Bank VI
SB NO DATE REVISION REVISED CHECKED APPROVED
for Rentang Irrigation
FOOT BRIDGE B.P.4.1c Modernization Project
SCALE
0 0.1 0.2 0.3 0.4 0. m District : Indramayu
SC
Surveyor/Designer
ST ,hal l id
A
bniduf iaS
ydatU
s
SCALE Register :
0 0. 1.0 1. 2.0 2. m PT.Jaya Konstruksi MP, Tbk. Checked by Site Mgr Haryadi, ST
SD Project Manager Ir. Rustam Ramli Arief Sheet No. :
SCALE Design/QS Engineer Ir. Imam Sugito
Checked by Date : Contract No. :
0 0.2 0.4 0.6 0.8 1.0m Co. Group Leader - II - 1 Audy Parowung
SE
Approved by
May 18, 2020 HK.02.03-At/3.3/37
Group - II - 1 - Management Leader Takahiro KATO
Site Direction Zakiyatun Nafisah, ST
Acknowledged by Notice to Proceed : August 07, 2020
PPK of Irrigation and Lowland VIII Danny Mardiansyah, ST
DA A LA A 1 A AL E BA A
EI CI BA SC ED LE E AB E

D m S L
mm m m m

I
B
1 D1 2.40 1 1.042 4 .515

II II
I 2 D1 2.06 11 1.042 2 .611

A A
SEC I A ASD SEC I I ISD
D1 1.5 11 1.042 1 .5 6

4 D1 1. 6 11 1.042 15.588

A A

5 D1 1.26 10 1.042 1 .12

A
SEC I II II S D
6 D1 1.26 10 1.042 1 .12

D1 0.80 28 1.042 2 . 41

III

AL 15 .84
B

E LA A A AL E BA A SE
EI CE E AB E III

A A
SEC I B B SD SEC I III III S D

E E E E BLIC I D ESIA RIMP


I
I IS BLIC SA D SI
DI EC A E E E AL A E ES CES
S A CI A CISA A ICB LSS 06
S C D
E L SEC DA CA AL C S C I D A I
L B I
DA E E ISI E ISED C EC ED A ED
I
B ID E B. .4.1
D I m

SCALE S D S A S

0 0.5 1.0 1.5 2.0 2.5m . . C S S


SD I. m m A S .
SCALE D SE I . Im m S
C D C .
0 0.2 0.4 0.6 0.8 1.0m C . L II 1 A
SE
A
18 2020 .02.0 A .
II 1 m L A
S D S
A A 0 2020
I L III D S
CL

I I

II II

A ELI A A ELI A DIA A A


SD SD
C SS SEC I C SS SEC I DIA A

DA A LA A LA AI DA DIA A A
EI CI A SC ED LE SLA A D DIA A

D m S L
mm m m m

1 D1 . 0 1 1.0 2 155.

2 D1 2.10 1.0 2 1 .

D1 1. 2 12 1.0 2 1 . 5

D10 0. 0 2 0. 1 1 . 2
A A
SEC I I ISD SEC I II II S D

AL 5.55

E E E E LIC I D ESIA RIMP


I
I IS LIC SA D SI
DI EC A E E E AL A E ES CES
S A CI A CISA A IC LSS 0
S C D
E L SEC DA CA AL C S C I D A I
L I
DA E E ISI E ISED C EC ED A ED
I
ID E . . .1
D I m
S D S A S
. . C S S
I. m m A S .
SCALE D SE I . Im m S
C D C .
0 0.5 1.0 1.5 2.0 2.5m C . L II 1 A
SD
A
1 2020 .02.0 A .
II 1 m L A
S D S
A A 0 2020
I L III D S
DAFTAR TULANGAN UNTUK BALOK-T
REINFORCING BAR SCHEDULE FOR T-BEAM
CL Total Weight
Diameter Shape Lenght Weight (Kg)
Mark (mm) (m) (m) QTY (Kg/m)

I II
1 D16 8.76 4 1.580 53.467

I II
2 D19 8.06 16 2.230 276.877

3 D13 1.36 128 1.042 181.391

PENULANGAN BALOK-T TOTAL 511.735


SB
T-BEAM REINFORCEMENT

POTONGAN POTONGAN
I-I SB II - II S B
SECTION SECTION

TAMPAK DAN POTONGAN MEMANJANG DETAIL PENULANGAN TIANG SANDARAN SB


SA REINFORCEMENT OF HAND POST DETAIL
VIEW AND SECTION

∑L

GOVERNMENT OF THE REPUBLIC OF INDONESIA RIMP


Rentang Irrigation Modernization Project
MINISTRY OF PUBLIC WORKS AND HOUSING
DIRECTORATE GENERAL OF WATER RESOURCES Province : West Java
SNVT PJPA CIMANUK-CISANGGARUNG Project : ICB Package LSS-06
Secondary Canal and Drains
PENGULU SECONDARY CANAL CONSTRUCTION DRAWING
Upgrading Works Left Bank VI
NO DATE REVISION REVISED CHECKED APPROVED
for Rentang Irrigation
SCALE FOOT BRIDGE B.P.4.1c Modernization Project
0 0.8 1.6 2.4 3.2 4.0m District : Indramayu
SA
Surveyor/Designer
ST ,hal l id
A
bniduf iaS
ydatU
s
SCALE Register :
0 0.4 0.8 1.2 1.6 2.0m PT.Jaya Konstruksi MP, Tbk. Checked by Site Mgr Haryadi, ST
SB Project Manager Ir. Rustam Ramli Arief Sheet No. :
SCALE Design/QS Engineer Ir. Imam Sugito
Checked by Date : Contract No. :
0 0.5 1.0 1.5 2.0 2.5m Co. Group Leader - II - 1 Audy Parowung
SD
Approved by
May 18, 2020 HK.02.03-At/3.3/37
Group - II - 1 - Management Leader Takahiro KATO
Site Direction Zakiyatun Nafisah, ST
Acknowledged by Notice to Proceed : August 07, 2020
PPK of Irrigation and Lowland VIII Danny Mardiansyah, ST
7 4.180
7 4.179

7 5.181
P
7 3.178

P
P

81.
P

31.

22.
80.

3
7

7
2
JEMBATAN ORANG
FOOTBRIDGE BP.5b

1.405

1.065

1.664
1.48

1.336

1.466
1.606
0.436
1.539 1.568
1.768

0.554

0.451

1.35
0.53
1.696
1.57

1.518

1.537
Existing Road
Existing Road

1.488
1.412

1.472

SITUASI BANGUNAN
KEY PLAN

JEMBATAN ORANG
BP.5b
FOOTBRIDGE

Sawah

1.405
Sawah

1.065

1.664
1.48

Tanggul Tanggul 1.336

1.466
1.606
0.436
1.539 1.568
1.7

0.554

0.451

1.35
0.53
1.696
1.57 Tanggul Tanggul

1.518

1.537
Existing Road
Existing Road

1.488
1.412

1.472

SITUASI
SITUASTION
GOVERNMENT OF THE REPUBLIC OF INDONESIA RIMP
Rentang Irrigation Modernization Project
MINISTRY OF PUBLIC WORKS AND HOUSING
DIRECTORATE GENERAL OF WATER RESOURCES Province : West Java
SNVT PJPA CIMANUK-CISANGGARUNG Project : ICB Package LSS-06
Secondary Canal and Drains
PENGULU SECONDARY CANAL CONSTRUCTION DRAWING
Upgrading Works Left Bank VI
NO DATE REVISION REVISED CHECKED APPROVED
for Rentang Irrigation
FOOT BRIDGE B.P.5b Modernization Project
District : Indramayu
Surveyor/Designer
ST ,hal l id
A
bniduf iaS
ydatU
s
Register :
PT.Jaya Konstruksi MP, Tbk. Checked by Site Mgr Haryadi, ST
SCALE Project Manager Ir. Rustam Ramli Arief Sheet No. :
S,A 0 2.0 4.0 6.0 8.0 10.0 m Design/QS Engineer Ir. Imam Sugito
Checked by Date : Contract No. :
Co. Group Leader - II - 1 Audy Parowung
Approved by
May 18, 2020 HK.02.03-At/3.3/37
Group - II - 1 - Management Leader Takahiro KATO
Site Direction Zakiyatun Nafisah, ST
Acknowledged by Notice to Proceed : August 07, 2020
PPK of Irrigation and Lowland VIII Danny Mardiansyah, ST
7 4.180
7 4.179

7 5.181
P
7 3.178

P
P

81.
P

31.

22.
80.

3
7

7
2
JEMBATAN ORANG
FOOTBRIDGE BP.5b

1.405

1.065

1.664
1.48

1.336

1.466
1.606
0.436
1.539 1.568
1.768

0.554

0.451

1.35
0.53
1.696
1.57

1.518

1.537
Existing Road
Existing Road

1.488
1.412

1.472

SITUASI BANGUNAN
KEY PLAN

JEMBATAN ORANG
BP.5b
FOOTBRIDGE

Sawah

1.405
Sawah

1.065

1.664
1.48

Tanggul Tanggul 1.336

A1
1.466
1.606
0.436
1.539 1.7
1.568

0.554

0.451

1.35
0.53

A2
1.696
1.57 Tanggul Tanggul

1.518

1.537
Existing Road Existing Road
Existing Road

1.488
1.412

1.472

SITUASI
SITUASTION
GOVERNMENT OF THE REPUBLIC OF INDONESIA RIMP
Rentang Irrigation Modernization Project
MINISTRY OF PUBLIC WORKS AND HOUSING
DIRECTORATE GENERAL OF WATER RESOURCES Province : West Java
SNVT PJPA CIMANUK-CISANGGARUNG Project : ICB Package LSS-06
Secondary Canal and Drains
PENGULU SECONDARY CANAL CONSTRUCTION DRAWING
Upgrading Works Left Bank VI
NO DATE REVISION REVISED CHECKED APPROVED
for Rentang Irrigation
FOOT BRIDGE B.P.5b Modernization Project
District : Indramayu
Surveyor/Designer
ST ,hal l id
A
bniduf iaS
ydatU
s
Register :
PT.Jaya Konstruksi MP, Tbk. Checked by Site Mgr Haryadi, ST
SCALE Project Manager Ir. Rustam Ramli Arief Sheet No. :
S,A 0 2.0 4.0 6.0 8.0 10.0 m Design/QS Engineer Ir. Imam Sugito
Checked by Date : Contract No. :
Co. Group Leader - II - 1 Audy Parowung
Approved by
May 18, 2020 HK.02.03-At/3.3/37
Group - II - 1 - Management Leader Takahiro KATO
Site Direction Zakiyatun Nafisah, ST
Acknowledged by Notice to Proceed : August 07, 2020
PPK of Irrigation and Lowland VIII Danny Mardiansyah, ST
A1 A2

P.BH-05
SPT N-Value

DEPTH

Selection
Coloum
(m)

GWL
Number of Blows per 15

Value
cm Penetration
+1.594 10 20 30 40

11
0
11

1 4

2 4

3 4

4
1
5
1
6
4
7
3
8

9 1

10 1

11
1
12
1
13
1
14
1

G VE N ENT THE EP BL C ND NES A RIMP


entan rri ation o erni ation Pro ect
N ST P BL C W S AND H S NG
D ECT ATE GENE AL WATE ES CES Pro ince West a a
SNVT P PA C AN -C SANGGA NG Pro ect CB Pac a e LSS-06
Secon ar Canal an Drains
PENG L SEC NDA CANAL C NST CT N D AW NG
p ra in Wor s Left Ban V
N DATE EV S N EV SED CHEC ED APP VED
for entan rri ation
T B DGE B.P.5b o erni ation Pro ect
District n rama u
Sur e or DesiS
Tner
al l iA
bniuf iaSats
e ister
PT. a a onstru si P Tb . C ec e b Site r Har a i ST
Pro ect ana er r. ustam amli Arief S eet No.
SCALE Desi n S En ineer r. mam Su ito
C ec e b Date Contract No.
0 0.8 1.6 2.4 3.2 4.0m Co. Group Lea er - -1 Au Parowun
SA
Appro e b
a 18 2020 H .02.03-At 3.3 37
Group - -1- ana ement Lea er Ta a iro AT
Site Direction a i atun Nafisa ST
Ac nowle e b Notice to Procee Au ust 07 2020
PP of rri ation an Lowlan V Dann ar ians a ST
A1 A2

1:1
1:1

POTONGAN
B - B SA
SECTION

POTONGAN
C - CS B
SECTION

GOVERNMENT OF THE REPUBLIC OF INDONESIA RIMP


Rentang Irrigation Modernization Project
MINISTRY OF PUBLIC WORKS AND HOUSING
DIRECTORATE GENERAL OF WATER RESOURCES Province : West Java
SNVT PJPA CIMANUK-CISANGGARUNG Project : ICB Package LSS-06
Secondary Canal and Drains
PENGULU SECONDARY CANAL CONSTRUCTION DRAWING
Upgrading Works Left Bank VI
NO DATE REVISION REVISED CHECKED APPROVED
for Rentang Irrigation
FOOT BRIDGE B.P.5b Modernization Project
District : Indramayu

SCALE Surveyor/Designer
ST ,hal l id
A
bniduf iaS
ydatU
s
Register :
0 0.8 1.6 2. 3.2 .0m PT.Jaya Konstruksi MP, Tbk. Checked by Site Mgr Haryadi, ST
SA Project Manager Ir. Rustam Ramli Arief Sheet No. :
SCALE Design/QS Engineer Ir. Imam Sugito
Checked by Date : Contract No. :
0 0. 0.8 1.2 1.6 2.0m Co. Group Leader - II - 1 Audy Parowung
SB
Approved by
May 18, 2020 HK.02.03-At/3.3/37
Group - II - 1 - Management Leader Takahiro KATO
Site Direction Zakiyatun Nafisah, ST
Acknowledged by Notice to Proceed : August 07, 2020
PPK of Irrigation and Lowland VIII Danny Mardiansyah, ST
DETAIL TIANG SANDARAN SB

DENAH ABUTMENT S D DETAIL OF HAND POST


PLAN OF ABUTMENT

DETAIL BEARING PAD (FIX) SC DETAIL BEARING PAD (MOVABLE) SC

CL

DETAIL LANTAI JEMBATAN S E


DETAIL OF SLAB BRIDGE DETAIL EXPANTION JOINT SC

GOVERNMENT OF THE REPUBLIC OF INDONESIA RIMP


Rentang Irrigation Modernization Project
DETAIL ABUTMENT MINISTRY OF PUBLIC WORKS AND HOUSING
SD DIRECTORATE GENERAL OF WATER RESOURCES Province : West Java
SNVT PJPA CIMANUK-CISANGGARUNG Project : ICB Package LSS-06
SCALE Secondary Canal and Drains
PENGULU SECONDARY CANAL CONSTRUCTION DRAWING
0 0. 0.8 1.2 1.6 2.0m Upgrading Works Left Bank VI
SB NO DATE REVISION REVISED CHECKED APPROVED
for Rentang Irrigation
FOOT BRIDGE B.P.5b Modernization Project
SCALE
0 0.1 0.2 0.3 0. 0.5m District : Indramayu
SC
Surveyor/Designer
ST ,hal l id
A
bniduf iaS
ydatU
s
SCALE Register :
0 0.5 1.0 1.5 2.0 2.5m PT.Jaya Konstruksi MP, Tbk. Checked by Site Mgr Haryadi, ST
SD Project Manager Ir. Rustam Ramli Arief Sheet No. :
SCALE Design/QS Engineer Ir. Imam Sugito
Checked by Date : Contract No. :
0 0.2 0. 0.6 0.8 1.0m Co. Group Leader - II - 1 Audy Parowung
SE
Approved by
May 18, 2020 HK.02.03-At/3.3/37
Group - II - 1 - Management Leader Takahiro KATO
Site Direction Zakiyatun Nafisah, ST
Acknowledged by Notice to Proceed : August 07, 2020
PPK of Irrigation and Lowland VIII Danny Mardiansyah, ST
DA A LA A 1 A AL E BA A
EI CI BA SC ED LE E AB E

S L
D m
mm m m m

B I
1 D1 2.40 1 1.042 42.514

II II
I D1 1.64 11 1.042 18. 8
2

A A
SEC I A ASD SEC I I ISD
D1 1. 6 11 1.042 15.588

4 D1 1.04 11 1.042 11. 20

A A

5 D1 1.04 10 1.042 10.8

A
SEC I II II S D
6 D1 1.04 10 1.042 10.8

D1 0. 0 24 1.042 1 .505

III
AL 12 .
B

E LA A A AL E BA A SE
EI CE E AB E III

A A
SEC I B B SD SEC I III III S D

E E E E BLIC I D ESIA RIMP


I
I IS BLIC SA D SI
DI EC A E E E AL A E ES CES
S A CI A CISA A ICB LSS 06
S C D
E L SEC DA CA AL C S C I D A I
L B I
DA E E ISI E ISED C EC ED A ED
I
B ID E B. .5
D I m

SCALE S D S A S

0 0.5 1.0 1.5 2.0 2.5m . . C S S


SD I. m m A S .
SCALE D SE I . Im m S
C D C .
0 0.2 0.4 0.6 0.8 1.0m C . L II 1 A
SE
A
18 2020 .02.0 A .
II 1 m L A
S D S
A A 0 2020
I L III D S
B I II

A A

B I II

DE A A
SD
LA SEC I B BSD

A
SEC I A ASD

DA A LA A LA AI DA DIA A A
EI CI BA SC ED LE SLAB A D DIA A

D m S L
mm m m m

A A
SEC I I ISD SEC I II II S D

1 D1 5. 2 1.5 0 22 . 5

2 D1 2.10 2 1.5 0 . 1

D1 2.10 2 1.0 2 50. 2

AL 50.11

E E E E BLIC I D ESIA RIMP


I
I IS BLIC SA D SI
DI EC A E E E AL A E ES CES
S A CI A CISA A ICB LSS 0
S C D
E L SEC DA CA AL C S C I D A I
L B I
DA E E ISI E ISED C EC ED A ED
I
B ID E B. .5
D I m
S D S A S
. . C S S
I. m m A S .
SCALE D SE I . Im m S
C D C .
0 0.5 1.0 1.5 2.0 2.5m C . L II 1 A
SD
A
1 2020 .02.0 A .
II 1 m L A
S D S
A A 0 2020
I L III D S
∑L

TAMPAK DAN POTONGAN MEMANJANG DETAIL PENULANGAN TIANG SANDARAN SB


SA REINFORCEMENT OF HAND POST DETAIL
VIEW AND SECTION

GOVERNMENT OF THE REPUBLIC OF INDONESIA RIMP


Rentang Irrigation Modernization Project
MINISTRY OF PUBLIC WORKS AND HOUSING
DIRECTORATE GENERAL OF WATER RESOURCES Province : West Java
SNVT PJPA CIMANUK-CISANGGARUNG Project : ICB Package LSS-06
Secondary Canal and Drains
PENGULU SECONDARY CANAL CONSTRUCTION DRAWING
Upgrading Works Left Bank VI
NO DATE REVISION REVISED CHECKED APPROVED
for Rentang Irrigation
SCALE FOOT BRIDGE B.P.5b Modernization Project
0 0.8 1.6 2. 3.2 .0m District : Indramayu
SA
Surveyor/Designer
ST ,hal l id
A
bniduf iaS
ydatU
s
SCALE Register :
0 0. 0.8 1.2 1.6 2.0m PT.Jaya Konstruksi MP, Tbk. Checked by Site Mgr Haryadi, ST
SB Project Manager Ir. Rustam Ramli Arief Sheet No. :
Design/QS Engineer Ir. Imam Sugito
Checked by Date : Contract No. :
Co. Group Leader - II - 1 Audy Parowung
Approved by
May 18, 2020 HK.02.03-At/3.3/37
Group - II - 1 - Management Leader Takahiro KATO
Site Direction Zakiyatun Nafisah, ST
Acknowledged by Notice to Proceed : August 07, 2020
PPK of Irrigation and Lowland VIII Danny Mardiansyah, ST