Anda di halaman 1dari 1

RING BALK 15/20

BALOK KAKI KUDA-KUDA 8/12


DOSEN PENGAMPU
RENG 2/3

KASO 5/7

+5,95
GORDING 8/12 GEORGE WINAKTU, ST.,MT.
20 25

+5,70
+5,50
MATA KULIAH
190

MANAGEMEN PROYEK

+3,60 NAMA
40 20

+3,40

+3,00
595

Plafond Gypsum Plafond Gypsum Plafond Gypsum Plafond Gypsum Plafond Gypsum DELCIA VIRGINIA FATIMA
9 MM CH +3,00 9 MM CH +3,00 9 MM CH +3,00 9 MM CH +3,00 WR 9 MM CH +3,00
AMARAL GODINHO
85

+2,15
NPM
21901051208
165

HARI/JAM
+0,50 KM/WC PASANGAN 1/2 BATA
DAPUR R. KELUARGA -0.05 TAMAN
PASIR URUG
50

±0,00 ±0.00 ± 0.00 -0.10 RABU,14.10-15.50


SLOFF 15/25
MUKA
50

-0,50 MUKA TANAH


TANAH
TANAH URUG DIPADATKAN JUDUL GAMBAR
60

PASANGAN BATU KALI 1:1:2


-1,10
15
15
15
ANSTAMPING
30
25 25 PASIR URUG 10 CM
45
50
70
80
45
50
POTONGAN A-A
600 150 250
1000
DIPERIKSA

POTONGAN A-A GEORGE WINAKTU, ST.,MT.

SKALA 1:50 NO.GAMBAR SKALA

1:50

Anda mungkin juga menyukai