HARGA SATUAN
No. URAIAN JUMLAH
Bahan/Material Upah
I PRELIMINARY Rp - Rp 1,500,000.00 Rp 1,500,000.00
NB :
Luas Bangunan = 134.4645 m2
Harga Per m2 Bangunan = Rp 2,209,520.73