Anda di halaman 1dari 10

120 PIPA HITAM D : 2,5 ” 120

FIN DAT DUKO

ATAP POLYCARBONART

400

350 1. Posisi rangka atap diturunkan


300
2. Atap Polycarbonart
PIPA HITAM D : 4”
FIN DAT DUKO 3. Cat Ulang tiang dan rangka
250
4. Penurunan rangka Atap

Note :
1. Harus di survey vendor canopy untuk memastikan
2. Teknis kerja dan material yang dibutuhkan
30 30
20 20
000

245 110 270 110

735

TAMPAK DEPAN

245 110 270 110

80
ATAP POLYCARBONART

PIPA HITAM D : 2,5 ”


FIN DAT DUKO

300

300
PIPA HITAM D : 4”
FIN DAT DUKO

80
300 400 60

760

TAMPAK ATAS

MANAGEMENT
PROJECT TITLE NOTES DATE: DRAFTER BY CHECKED BY
APPROVAL

REV DATE:
CANOPY
FILE NAME:
PK MOBIL 01 - 02
( RENOVASI ) REV NO: DATE: DATE: DATE:
90 PIPA HITAM D : 2,5 ” 90
FIN DAT DUKO
ATAP POLYCARBONART

300

250

PIPA HITAM D : 4”
FIN DAT DUKO

30 30
20 20
000

245 110 270 110

735

TAMPAK DEPAN

245 110 270 110

80
ATAP POLYCARBONART

PIPA HITAM D : 2,5 ”


FIN DAT DUKO

300

300
PIPA HITAM D : 4”
FIN DAT DUKO

80
300 400 60

760

TAMPAK ATAS

MANAGEMENT
PROJECT TITLE NOTES DATE: DRAFTER BY CHECKED BY
APPROVAL

REV DATE:
CANOPY
FILE NAME:
PK MOBIL 03 - 04
( BUAT BARU ) REV NO: DATE: DATE: DATE:
90 PIPA HITAM D : 2,5 ” 90
FIN DAT DUKO
ATAP POLYCARBONART

300

250

PIPA HITAM D : 4”
FIN DAT DUKO

30 30
20 20
000

245 110 270 110

735

TAMPAK DEPAN

245 110 270 110

80
ATAP POLYCARBONART

PIPA HITAM D : 2,5 ”


FIN DAT DUKO

300

300
PIPA HITAM D : 4”
FIN DAT DUKO

80
300 400 60

760

TAMPAK ATAS

MANAGEMENT
PROJECT TITLE NOTES DATE: DRAFTER BY CHECKED BY
APPROVAL

REV DATE:
CANOPY
FILE NAME:
PK MOBIL 05 - 06
( BUAT BARU ) REV NO: DATE: DATE: DATE:
ATAP POLYCARBONART PIPA HITAM D : 2,5 ”
FIN DAT DUKO
120 120 120

300

250

PIPA HITAM D : 4”
FIN DAT DUKO

30
20
000

120 110 120 110 120 110 120 110

TAMPAK DEPAN

120 110 120 110 120 110 120 110

ATAP POLYCARBONART

80
PIPA HITAM D : 2,5 ”
FIN DAT DUKO

300
PIPA HITAM D : 4”
FIN DAT DUKO

80
405 480 60

945

TAMPAK ATAS

MANAGEMENT
PROJECT TITLE NOTES DATE: DRAFTER BY CHECKED BY
APPROVAL

CANOPY REV DATE:


PK MOTOR
FILE NAME:
01,02,03,04
( RENOVASI ) REV NO: DATE: DATE: DATE:
ATAP POLYCARBONART PIPA HITAM D : 2,5 ”
FIN DAT DUKO
120 120 120

300

250

PIPA HITAM D : 4”
FIN DAT DUKO

30
20
000

120 110 120 110 120 110 120 110

TAMPAK DEPAN

120 110 120 110 120 110 120 110

ATAP POLYCARBONART

80
PIPA HITAM D : 2,5 ”
FIN DAT DUKO

300
PIPA HITAM D : 4”
FIN DAT DUKO

80
405 480 60

945

TAMPAK ATAS

MANAGEMENT
PROJECT TITLE NOTES DATE: DRAFTER BY CHECKED BY
APPROVAL

CANOPY REV DATE:


PK MOTOR
FILE NAME:
05,06,07,08
( RENOVASI ) REV NO: DATE: DATE: DATE:
120 120
1. Penambahan ketinggian tiang 1 m
500
2. Penambahan rangka penguat
450
3. Penutup atap Existing
PIPA HITAM D : 2,5 ”
FIN DAT DUKO 4. Cat Ulang tiang dan rangka
ATAP POLYCARBONART

350

300

PIPA HITAM D : 4”
FIN DAT DUKO

30 30
20 20
000

525 110

735

TAMPAK DEPAN

360 110

80
ATAP POLYCARBONART

PIPA HITAM D : 2,5 ”


FIN DAT DUKO

300
PIPA HITAM D : 4”
FIN DAT DUKO

80
99.5 605 60

765

TAMPAK ATAS

MANAGEMENT
PROJECT TITLE NOTES DATE: DRAFTER BY CHECKED BY
APPROVAL

REV DATE:
CANOPY
KONTAINER FILE NAME:
( RENOVASI )
REV NO: DATE: DATE: DATE:
120 120

500
120
1. Bongkar pasang tiang
450

120 2. Tambah ketinggian tiang kanan 1 M


400
3. Pengecatan
350 4. Reposisi tiang sisi kanan 165 cm
5. Tambah rangka atap
6. Atap baru
Note :
HARUS DI SURVEY OLEH VENDOR

30
20
000

290 120 300 100 400 120 30 120

TAMPAK DEPAN

380 400 520 60

80
300

300

300
80
290 120 300 100 400 120 30

165

1360 135 30

MANAGEMENT
PROJECT TITLE NOTES DATE: DRAFTER BY CHECKED BY
APPROVAL

CANOPY REV DATE:


MASUK MOBIL
FILE NAME:
01,02,03
( RENOVASI ) REV NO: DATE: DATE: DATE:
60
pipa 3 “ pipa 2 “
70

pipa 2 “

80 80

TITIK VISUAL
200

pipa 3 “
70

VISUAL
pipa 3 “ pipa 2 “

TAMPAK ATAS
atap carbonart

pipa 2 “ pipa 3 “

80 80

260
250

200

SPESIFIKASI TEKNIS

1. Pipa 3”
2. Pipa 2”
3. Pondasi cakar ayam 50x50
000 4. Atap polycarbonart
5. Fin. Cat Minyak
60 550 60

MANAGEMENT
PROJECT TITLE NOTES DATE: DRAFTER BY CHECKED BY
APPROVAL

TAMPAK DEPAN CANOPY REV DATE:


MASUK MOTOR
01,02,03 FILE NAME:
( BUAT BARU ) REV NO: DATE: DATE: DATE:
TUTUP TIANG BRC T:90
D : 9 mm TUTUP TIANG
TIANG PIPA GALVANIS 2”

KLEM / U CLIP

KLEM / U CLIP
TIANG PIPA GALVANIS 2”

90 90 90
KLEM / U CLIP

30 30 30
PONDASI

20 20 20
240 70

Pagar BRC Pagar BRC


24 Unit 1 Unit

MANAGEMENT
PROJECT TITLE NOTES DATE: DRAFTER BY CHECKED BY
APPROVAL

PAGAR BRC REV DATE:


UNTUK PEMBATAS
AKSES MASUK FILE NAME:
DAN KELUAR MOTOR REV NO: DATE: DATE: DATE:
92
SPESIFIKASI TEKNIS:
1. PIPA HITAM 2.5”
2. RANGKA SIKU 30
3. COR BETON
4. FIN. CAT DUCO

8
5. RANTAI 8MM
40

MANAGEMENT
PROJECT TITLE NOTES DATE: DRAFTER BY CHECKED BY
APPROVAL

REV DATE:
SAFETY POOL MOVEABEL
UNTUK PEMBATAS
KELUAR MOTOR FILE NAME:
DAN KELUAR MOBIL
REV NO: DATE: DATE: DATE:

Anda mungkin juga menyukai