A B C D E F G H I J K L

31.00

2.00 2.00 2.00 2.00 1.75 1.75 3.50 4.00 4.00 4.00 4.00
PEMERINTAH KOTA SURABAYA
DINAS CIPTA KARYA & TATA RUANG
Jl. TAMAN SURYA No. 1 SURABAYA

NAMA SUB KEGIATAN


1
1 2 2 3 3 PERENCANAAN , PEMBANGUNAN,
1 6
6 1.85 PENGAWASAN DAN PEMANFAATAN
1.72 4 6 5 6 BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
2 3.63 4 4 5 5 5 5 NAMA PEKERJAAN
1.35 6 6 1.35 BIAYA PERENCANAAN FISIK (TIDAK
SEDERHANA), NILAI PEKERJAAN 700 JT
3 (PAKET C1)

TURUN
0.55
4 6 1.35 LOKASI PEKERJAAN
0.80
5
9.33 0.78 SDN RUNGKUT MENANGGAL 2
6 6 SURABAYA
3.63 4 4 4 5 5 5 5 5 2.10
6
1.33 NAMA GAMBAR SKALA

7
0.73 0.60
8 6

2.08 6 6 6 6 6 6 6 2.20

9
KONSULTAN PERENCANA

AREA YANG DIKERJAKAN

DIBUAT OLEH TANDA TANGAN


DENAH INSTALASI LISTRIK LANTAI 3
PENANGGUNG JAWAB
SKALA 1 : 125 PERENCANAAN

Fathur Rokhman, S.T.


Drafter
LANTAI 3
PENANGGUNG JAWAB
PERENCANAAN
TABEL INSTALASI LISTRIK :

Dhani Triwardhani, S.T.


Tenaga Ahli Arsitek

PENANGGUNG JAWAB
PERENCANAAN

Agus Syarif Hamsyah, S.T.


Tenaga Ahli Struktur

DISETUJUI OLEH TANDA TANGAN

KONSULTAN PERENCANA

Martinus Bagus Wahono Adi Sasongko, S.T.


Direktur

DIPERIKSA OLEH

PROJECT MANAGEMENT UNIT (PMU)

Taufiq Junaedi, S.T. M. Djatmiko, S.T., IAI.


DIAGRAM INSTALASI LISTRIK LANTAI 3 RAB / RKS / STRUKTUR ARSITEK/ME

KODE GAMBAR NO. LEMBAR JML. LEMBAR


NTS

ARS 61
PEMERINTAH KOTA SURABAYA
DINAS CIPTA KARYA & TATA RUANG
Jl. TAMAN SURYA No. 1 SURABAYA

NAMA SUB KEGIATAN


PERENCANAAN , PEMBANGUNAN,
PENGAWASAN DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK


SEDERHANA), NILAI PEKERJAAN 700 JT
(PAKET C1)

LOKASI PEKERJAAN

SDN RUNGKUT MENANGGAL 2


SURABAYA

NAMA GAMBAR SKALA

KONSULTAN PERENCANA

DIBUAT OLEH TANDA TANGAN

PENANGGUNG JAWAB
PERENCANAAN

Fathur Rokhman, S.T.


Drafter
PENANGGUNG JAWAB
PERENCANAAN

Dhani Triwardhani, S.T.


Tenaga Ahli Arsitek

PENANGGUNG JAWAB
PERENCANAAN

4.00 4.00 4.00 4.00 3.00 1.75 1.75 4.00 4.00

30.50

J I H G F E D C B A
Agus Syarif Hamsyah, S.T.
Tenaga Ahli Struktur
RENCANA PEMASANGAN PEBANGKAL PETIR
DISETUJUI OLEH TANDA TANGAN
SKALA 1 : 150
KONSULTAN PERENCANA

Martinus Bagus Wahono Adi Sasongko, S.T.


Direktur

DIPERIKSA OLEH

PROJECT MANAGEMENT UNIT (PMU)

Taufiq Junaedi, S.T. M. Djatmiko, S.T., IAI.


RAB / RKS / STRUKTUR ARSITEK/ME

KODE GAMBAR NO. LEMBAR JML. LEMBAR

ARS 61
TEMBAGA
PEMERINTAH KOTA SURABAYA
PIPA GIP ∅1,5" KABEL BC DRAAD 10 mm
DINAS CIPTA KARYA & TATA RUANG
KABEL BC DRAAD 10 mm Jl. TAMAN SURYA No. 1 SURABAYA

BAUT ∅10MM
NAMA SUB KEGIATAN
DINDING KLEM KABEL BC DRAAD 10 mm
PERENCANAAN , PEMBANGUNAN,
PIPA PVC AW ∅ 1,5" PIPA PVC AW ∅ 1,5 PENGAWASAN DAN PEMANFAATAN

33
50
" SOCK BANGUNAN GEDUNG DAERAH
KLEM 25,4
BAUT ∅10MM KABUPATEN/KOTA
BAUT ∅10MM
NAMA PEKERJAAN
5
12
BIAYA PERENCANAAN FISIK (TIDAK
50

BATANG ELEKTRODA TEMBAGA PEJAL SEDERHANA), NILAI PEKERJAAN 700 JT


(PAKET C1)

DETAIL B (KONECTOR) LOKASI PEKERJAAN


DINDING
SKALA 1 : 2
SDN RUNGKUT MENANGGAL 2
DINDING SURABAYA
50

NAMA GAMBAR SKALA

BAUT ∅10MM
KLEM 25,4
PIPA PVC AW ∅ 1,5"
250

KABEL BC DRAAD 10 mm

70
55
50

40

KONSULTAN PERENCANA

DETAIL A
40
55
70

SKALA 1 : 2
50

DIBUAT OLEH TANDA TANGAN


SPLITZEN
PENANGGUNG JAWAB
PERENCANAAN

SOCK
25

7.5 7.5 40 7.5 7.5


Fathur Rokhman, S.T.
5

Drafter
PENANGGUNG JAWAB

B
PERENCANAAN
DI LAS/DI SEKRUP YANG KUAT
KE ELEKTRODA PENTANAHAN
40

BC 10 mm
60

Dhani Triwardhani, S.T.

100
Tenaga Ahli Arsitek
GIV
15

PENANGGUNG JAWAB
PERENCANAAN

SOCK
6 METER

CONNECTOR

PIPA PVC 1/2


Agus Syarif Hamsyah, S.T.
ELEKTRODA PENTANAHAN (BATANG TEMBAGA PEJAL ∅ 1") Tenaga Ahli Struktur

PIPA GIP ∅ 1,5"

A
DISETUJUI OLEH TANDA TANGAN

KONSULTAN PERENCANA

SOCK
BATANG TEMBAGA PEJAL

Martinus Bagus Wahono Adi Sasongko, S.T.


Direktur

DIPERIKSA OLEH

PROJECT MANAGEMENT UNIT (PMU)

DETAIL BAK KONTROL DAN KABEL PENANGKAL PETIR


SKALA 1 : 20

DETAIL C
SKALA 1 : 10
Taufiq Junaedi, S.T. M. Djatmiko, S.T., IAI.
RAB / RKS / STRUKTUR ARSITEK/ME

KODE GAMBAR NO. LEMBAR JML. LEMBAR

ARS 61
E F G
3.50
1.75 1.75
PEMERINTAH KOTA SURABAYA
DINAS CIPTA KARYA & TATA RUANG
1 Jl. TAMAN SURYA No. 1 SURABAYA

NAMA SUB KEGIATAN


PERENCANAAN , PEMBANGUNAN,
+7.95 PENGAWASAN DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
1.72 KABUPATEN/KOTA
+8.13
NAMA PEKERJAAN

BIAYA PERENCANAAN FISIK (TIDAK


SEDERHANA), NILAI PEKERJAAN 700 JT
(PAKET C1)
2
LOKASI PEKERJAAN
+7.95
SDN RUNGKUT MENANGGAL 2
1.35 +8.13 SURABAYA

TOILET PUTRI NAMA GAMBAR SKALA


+7.98
3 Ø
VC W
AP EA
PIP TYP
"
3/4 Ø
0.55 VC W
AP EA
+7.95 PIP TYP
"
3 / 4

4 Ø
VC W
AP EA
+8.13 PIP TYP
"
3/4
Ø
VC W
0.80 Ø
VC W AP EA
AP EA PIP TYP PIP
PIP "
PIP TYP AP 3/4 A IN
" LE
3/4 VC TP
Ø Ø
3/4 VC KONSULTAN PERENCANA
5 VC W
AP EA
PIP TYP
"
" TY
P EA
W
Ø
1"
TY
PEA
3/4 PIP
AP W
9.33 Ø
VC W Ø
VC W
TY VC
ROOFTANK
STAINLESS
AP EA AP EA
PE Ø 3
0.78 PIP TYP
4 " PIP TYP
"
AW /4" STEEL
3/ 3/4
Ø ROOFTANK
VC W STAINLESS
Ø
VC W AP EA
PIP TYP STEEL
6 TOILET GURU
3/ 4
AP EA
PIP TYP
"
PIP
AP
VC
3/4
" LA
NT
AI
3 DIBUAT OLEH TANDA TANGAN
+7.95 Ø
Ø
3/4
"T
VC W YP PENANGGUNG JAWAB
AP EA EA
PERENCANAAN
PIP TYP W
"
3/4 Ø
Ø VC W
VC W AP EA
1.33 AP EA PIP TYP
"
PIP TYP 3/4
/ 4"
3
Ø
VC W
AP EA
PIP TYP LA
NT
PIP "
AP 3/4 AI
2
VC Fathur Rokhman, S.T.
7 PIP
AP
VC
Ø
3/4
"T
YP
EA
Drafter
PENANGGUNG JAWAB
Ø W Ø
3/4 PERENCANAAN
SHAFT " TY VC W
AP EA
DARI TANDON
TANAM
0.73 PE
AW PIP TYP
"
3/4

8 LA
N TA
I1
LA
NT
AI
1
(KA
NT
IN) Dhani Triwardhani, S.T.
Tenaga Ahli Arsitek

PENANGGUNG JAWAB
PERENCANAAN

2.08
DIAGRAM INSTALASI AIR BERSIH
NTS
Agus Syarif Hamsyah, S.T.
Tenaga Ahli Struktur

DISETUJUI OLEH TANDA TANGAN

9 KONSULTAN PERENCANA

Martinus Bagus Wahono Adi Sasongko, S.T.


Direktur

DIPERIKSA OLEH

PROJECT MANAGEMENT UNIT (PMU)

DENAH INSTALASI AIR BERSIH LANTAI 3


SKALA 1 : 50

Taufiq Junaedi, S.T. M. Djatmiko, S.T., IAI.


RAB / RKS / STRUKTUR ARSITEK/ME

KODE GAMBAR NO. LEMBAR JML. LEMBAR

ARS 61
E F G
PEMERINTAH KOTA SURABAYA
3.50 DINAS CIPTA KARYA & TATA RUANG
Jl. TAMAN SURYA No. 1 SURABAYA
1.75 1.75
NAMA SUB KEGIATAN
1 PERENCANAAN , PEMBANGUNAN,
PENGAWASAN DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
NAMA PEKERJAAN

1.72 BIAYA PERENCANAAN FISIK (TIDAK


SEDERHANA), NILAI PEKERJAAN 700 JT
(PAKET C1)

LOKASI PEKERJAAN

2 SDN RUNGKUT MENANGGAL 2


SURABAYA

NAMA GAMBAR SKALA


1.35

3
0.55

4 100
KONSULTAN PERENCANA
0.80

5
9.33
0.78 DIBUAT OLEH TANDA TANGAN

PENANGGUNG JAWAB
PERENCANAAN
6

1.33 Fathur Rokhman, S.T.


Drafter
PENANGGUNG JAWAB
PERENCANAAN

7
0.73
Dhani Triwardhani, S.T.
Tenaga Ahli Arsitek
8 PENANGGUNG JAWAB
PERENCANAAN

DETAIL A
DIAGRAM INSTALASI AIR KOTOR NTS
2.08 Agus Syarif Hamsyah, S.T.
NTS Tenaga Ahli Struktur

DISETUJUI OLEH TANDA TANGAN

KONSULTAN PERENCANA

9
Martinus Bagus Wahono Adi Sasongko, S.T.
Direktur

DIPERIKSA OLEH

PROJECT MANAGEMENT UNIT (PMU)

DENAH INSTALASI AIR KOTOR LANTAI 3 Taufiq Junaedi, S.T. M. Djatmiko, S.T., IAI.
SKALA 1 : 50 RAB / RKS / STRUKTUR ARSITEK/ME

KODE GAMBAR NO. LEMBAR JML. LEMBAR

ARS 61
E F G
3.50 PEMERINTAH KOTA SURABAYA
DINAS CIPTA KARYA & TATA RUANG
Jl. TAMAN SURYA No. 1 SURABAYA
1.75 1.75
NAMA SUB KEGIATAN
1 PERENCANAAN , PEMBANGUNAN,
PENGAWASAN DAN PEMANFAATAN
BANGUNAN GEDUNG DAERAH
KABUPATEN/KOTA
+7.95 NAMA PEKERJAAN
1.72 BIAYA PERENCANAAN FISIK (TIDAK
+8.13 SEDERHANA), NILAI PEKERJAAN 700 JT
(PAKET C1)

LOKASI PEKERJAAN

2 SDN RUNGKUT MENANGGAL 2


SURABAYA
+7.95
NAMA GAMBAR SKALA
1.35 +8.13

TOILET PUTRI
+7.98
3
0.55
+7.95
4
+8.13
KONSULTAN PERENCANA
0.80

5
9.33
0.78 DIBUAT OLEH TANDA TANGAN

PENANGGUNG JAWAB
PERENCANAAN
6

1.33 Fathur Rokhman, S.T.


Drafter
PENANGGUNG JAWAB
PERENCANAAN

7
0.73
Dhani Triwardhani, S.T.
Tenaga Ahli Arsitek
8
PENANGGUNG JAWAB
PERENCANAAN

DIAGRAM INSTALASI AIR BEKAS


2.08 Agus Syarif Hamsyah, S.T.
NTS Tenaga Ahli Struktur

DISETUJUI OLEH TANDA TANGAN

KONSULTAN PERENCANA

9
Martinus Bagus Wahono Adi Sasongko, S.T.
Direktur

DIPERIKSA OLEH

PROJECT MANAGEMENT UNIT (PMU)

Taufiq Junaedi, S.T. M. Djatmiko, S.T., IAI.


DENAH INSTALASI AIR BEKAS LANTAI 3 RAB / RKS / STRUKTUR ARSITEK/ME

SKALA 1 : 50 KODE GAMBAR NO. LEMBAR JML. LEMBAR

ARS 61