REVIEW PERUBAHAN PSA PIPELINE 12" CLUSTER I TO CENTRAL SPARATOR

PSA AWAL PSA AKTUAL


DEVIASI
(sebelum perubahan/sudah AFC signed) (setelah perubahan aktual di lapangan)

CALCULATED ALLOWABLE CALCULATED ALLOWAB CALCULAT


LOAD STRES STRESS RATIO LOAD STRES LE STRESS RATIO ED STRESS REMARK
NODE LOCATION CASES (Kg/cm ²) (Kg/cm²) (%) REMARK NODE LOCATION CASES (Kg/cm ²) (Kg/cm²) (%) REMARK (Kg/cm²)
beban sustain lebih kecil 130 kg/cm² dari
57050 12" PIPELINE W+P1 702,8 1310,0 53 PASSED 10 12" PIPELINE W+P1 572,8 1310,0 44,40 PASSED -130
data PSA awal
beban occacional 1 sama dengan data
7558 12" PIPELINE W+P1+U1 1289,5 1506,5 86 PASSED 3460 12" PIPELINE W+P1+U1 1289,6 1506,5 89,50 PASSED 0
PSA awal
beban occacional 2 sama dengan data
7558 12" PIPELINE W+P1-U1 1261,7 1506,5 84 PASSED 3460 12" PIPELINE W+P1-U1 1261,8 1506,5 89,60 PASSED 0
PSA awal
beban occacional 4 lebih besar 36 kg/cm²
6390 12" PIPELINE W+P1+U2 1292,7 1506,5 86 PASSED 4259 12" PIPELINE W+P1+U2 1328,8 1506,5 88,20 PASSED 36
dari data PSA awal
beban occacional 5 lebih besar 53 kg/cm²
6390 12" PIPELINE W+P1-U2 1268,8 1506,5 84 PASSED 4259 12" PIPELINE W+P1-U2 1321,8 1506,5 87,70 PASSED 53
dari data PSA awal
beban ekspansion lebih kecil 35 kg/cm²
4819 12" PIPELINE L2-L3 2901,3 3164,7 92 PASSED 4820 12" PIPELINE L2-L3 2866,3 3150,0 86,10 PASSED -35
dari data PSA awal

NOTES :
* form FCR sudah lengkap dengan lampiran data sebelum dan sesudah perubahan, diantaranya:
1. Pipeline Alignment Sheet junction B to Central Sparator lengkap dengan titik perubahan support
2. PSA pipeline 12" hot brine cluster I to Central Sparator
3. Rekapitulasi displacement tiap support
4. Pipe Support Schedule Cluster I to B dan junction B to Central Sparator
* dari data perubahan PSA dan Pipeline Alignment Sheet untuk jalur hot brine junc. B to central sparator bisa disimpulkan masih relevan dengan PSA awal

Reviewed
PMC

Imam. Z
Date: 20 Juli 2022