Anda di halaman 1dari 5

No.

Uraian
No. Uraian Valume Satuan Harga Satuan Jumlah Harga
1 Sekop 3 pcs Rp 30,000 Rp 90,000 1 Tukang
2 Cangkul 3 pcs Rp 50,000 Rp 150,000 2 Laden
3 Ember 10 pcs Rp 7,500 Rp 75,000 3 Konsumsi
4 Cethok 3 pcs Rp 18,000 Rp 54,000 Total
5 Angkong 1 pcs Rp 575,000 Rp 575,000
6 Graji besi 1 pcs Rp 40,000 Rp 40,000
7 Graji kayu 1 pcs Rp 55,000 Rp 55,000
8 Tang/Catut 2 pcs Rp 45,000 Rp 90,000
9 Meteran 1 pcs Rp 20,000 Rp 20,000
Total Rp 1,149,000
Waktu No. Uraian Volume Satuan
Volume Satuan Upah/Hari Total Upah
(Hari)
5 orang Rp 100,000 20 Rp 10,000,000 1 Anakan Sapi 10 Ekor
5 orang Rp 90,000 20 Rp 9,000,000 Total
1 Hari Rp 150,000 20 Rp 3,000,000
Total Rp 22,000,000
Harga Satuan Jumlah Harga Total Harga

Rp 15,500,000 Rp 155,000,000 A Rp 1,149,000


otal Rp 155,000,000 B Rp 22,000,000
C Rp 155,000,000
Jumlah Rp 178,149,000
Jangka Waktu
No. Uraian Volume Satuan Upah/Hari Total Upah
(Hari)
1 Tukang 5 orang Rp 100,000 20 Rp 10,000,000
2 Laden 5 orang Rp 90,000 20 Rp 9,000,000
3 Konsumsi 1 Hari Rp 150,000 20 Rp 3,000,000
Total Rp 22,000,000
No. Uraian Volume Satuan Harga Satuan Jumlah Harga
1 Anakan Sapi 10 Ekor Rp 15,500,000 Rp 155,000,000
Total Rp 155,000,000

Anda mungkin juga menyukai