DIKIRIM KONTRA JT NAMA PROYEK NOMINAL PENGIRIM NO. INVOICE KONTRA JATUH TEMPO NAMA PROYEK NOMINAL TOTAL
18/02/17 WEAR PLATE Rp 4,500,000 117/CI/XII/2021 30/12/21 2/28/2022 JASA INSTALASI CEROBONG GENSET & PLATFORM
13/01/18 WEAR RESISTANCE 6MM 4" X 8" & PLAT BAJA Rp 24,300,000 Rp 84,800,000
TAHAN PANAS
STEFANUS TEHNIK
Rp 70,708,100
A'RIZAL 10/05/19 9/23/2019 RETENSI 5% ADENDUM I PEMIPAAN STEAM BOILER Rp
UNTUK CENTRAL KITCHEN MOH. TOHA 2,900,000
BAPAK TATANG
25/11/21 MATERIAL PIPA & FITTING INSTALASI POMPA Rp 15,410,385 SUDAH DIBAYAR
VACCUM
25/11/21 UPAH KERJA, MOB DEMOB & MATERIAL Rp 7,650,000 BLM DIBAYAR 4.942.585
KONSUMEBEL
10/12/21 MATERIAL DAN JASA PERBAIKAN ATAP PMKP Rp 23,000,000 SUDAH DIBAYAR
JATIMUNGGUL III
10/12/21 MATERIAL DAN JASA PERBAIKAN CEROBONG PGT Rp 15,000,000 SUDAH DIBAYAR
SINDANGWANGI
DIKIRIM KONTRA JT NAMA PROYEK NOMINAL PENGIRIM NO. INVOICE KONTRA JATUH TEMPO NAMA PROYEK NOMINAL
03/11/17 INSTALASI GAS CNG (LOJI) Rp 20,000,000 039/CI/III/2022 18/03/22 4/17/2022 4 PCS INCHIAN DOUBLE DRAT GALVANIS 1/2" X Rp 413,600
18 CM
13/01/18 WEAR RESISTANCE 6MM 4" X 8" & PLAT BAJA Rp 24,300,000 Rp 84,800,000
TAHAN PANAS
20/02/18 WEAR RESISTANCE 6MM 4" X 8" Rp 27,500,000 PT. KALDU SARI NABATI INDONESIA
JNE 13/11/18 12/13/2018 TANGKI 600 MM SS304 Rp 10,000,000 057/CI/IV/2022 20/04/22 6/19/2022 TERMIN III 10% INSTALASI FLOW METER AIR Rp 7,121,971
UTAMA & RIJECT RO
D' EMPIRE LAUNDRY
13/02/18 3/13/2018 INSTALASI PIPA CNG Rp 28,631,250
CITA RASA PRIMA/ BASO BUJANGAN
A'RIZAL 10/05/19 9/23/2019 RETENSI 5% PEMIPAAN STEAM BOILER UNTUK
CENTRAL KITCHEN MOH. TOHA Rp 12,808,100 CV. AMANDA
10/12/21 MATERIAL DAN JASA PERBAIKAN ATAP PMKP Rp 23,000,000 SUDAH DIBAYAR PT. NUTRIBEV NABATI INDONESIA
JATIMUNGGUL III
MATERIAL DAN JASA PERBAIKAN CEROBONG PGT TERMIN III 30% INSTALASI PIPA AIR UTAMA
10/12/21 SINDANGWANGI Rp 15,000,000 SUDAH DIBAYAR 058/CI/IV/2022 20/04/22 5/20/2022 NOODLE Rp 118,505,276
TOTAL Rp 510,147,174
PIUTANG 2022 Rp 530,791,338
(20,644,163)
Rp 307,498,774
JTM 2 TERMIN I 90% TERMIN II 10%
PO DPP 185,357,000 DPP 90% 166,821,300 DPP 10%
PPN 10% 18,535,700 PPN 10% 18,535,700 PPN 10%
PPH 2% 3,707,140 PPH 2% 3,336,426 PPH 2%
TOTAL DITERIMA 181,649,860 TOTAL DITERIMA TAHAP I 163,484,874 TOTAL DITERIMA TAHAP 2
BIAYA : PENGEMBALIAN 65,771,000
CHIWA 67,713,874
GRAHAM 65,771,000 BAGI HASIL GRAHAM 6,577,100 BAGI HASIL GRAHAM
FEE USER 18,164,986
BAGI HASIL :
CHIWA 15,000,000
GRAHAM 15,000,000
274,562,266
87,929,388
186,632,878
18,535,700 119,586,000
-
370,714
18,164,986
8,422,900 15,000,000.00
9,082,493.0 10,900,000
15,659,593.0
22,610,600
-
452,212
22,158,388
12,500,000 11,079,194.00
9,658,388
10,432,700
-
208,654
10,224,046
29,624,520
254,186,786
JTM 2 TERMIN I 90% TERMIN II 10%
PO DPP 185,357,000 DPP 90% 166,821,300 DPP 10%
PPN 10% 18,535,700 PPN 10% 18,535,700 PPN 10%
PPH 2% 3,707,140 PPH 2% 3,336,426 PPH 2%
TOTAL 181,649,860 TOTAL 163,484,874 TOTAL
65,771,000
15,000,000
3,164,986
22,610,600
-
452,212
22,158,388
12,500,000
9,658,388
10,432,700
-
208,654
10,224,046
JTM 2 TERMIN I 90% TERMIN II 10%
PO DPP 185,357,000 DPP 90% 166,821,300 DPP 10%
PPN 10% 18,535,700 PPN 10% 18,535,700 PPN 10%
PPH 2% 3,707,140 PPH 2% 3,336,426 PPH 2%
TOTAL 181,649,860 TOTAL 163,484,874 TOTAL
65,771,000
15,000,000
3,164,986
22,610,600
-
452,212
22,158,388
12,500,000
9,658,388
10,432,700
-
208,654
10,224,046