PROGRAM DAN REALISASI PRODUKSI SARANA

UPT BALAI YASA YOGYAKARTA


TANGGAL : 08 JULI 2022

LOK KRD/E/I
BULAN PROGRAM REALISASI PROGRAM REALISASI
BACKLOG BACKLOG
KOMULATIF
% TW % SM KOMULATIF
% TW % SM
MO GO P24 P48 P72 JLH MO GO P24 P48 P72 JLH P48 P6K P9K P24+P6K P48+P6K P24 P48 JLH P24 P48 P6K P6K+P24 P6K+P48 P9K MODIF PAB JLH
JAN 3 5 8 0 -8 4 4 0 -4
FEB 3 8 11 1 7 8 -11 62% 4 1 2 7 4 4 5 13 2 131%
MAR 4 2 4 10 1 9 10 -11 4 1 5 2 1 5 8 5
94% 150%
APR 0 6 1 1 8 -3 0 4 4 5 1 14 19
MEI 5 4 9 0 -12 144% 4 4 0 15 188%
JUNI 5 4 9 8 10 18 -3 4 4 1 1 12
JULI 5 4 9 1 1 -11 4 4 0 8
AGUST 5 4 9 0 4% 1 1 0 0%
SEP 5 4 9 0 4 3 7 0
2% 0%
OKT 14 14 0 1 1 0
NOV 13 13 0 0% 5 5 0 0%
DES 3 3 0 0 0
TOTAL 0 35 30 2 37 104 0 16 0 2 27 45 43% 43% 12 8 0 8 4 5 42 4 10 4 2 0 15 1 35 83% 83%
1

REKAPITULASI SARANA PERBAIKAN,GENERAL CHECK UP,BUBUT RODA DAN TANGGUNGAN BYYK


UPT BALAI YASA YOGYAKARTA

LOK KRD/E/I
PANTAUAN PROGRAM & REALISASI 2022
KERETA
BULAN JLH BULAN JLH BULAN LOK 201/3/4 LOK 206 KRD/E/I
BR BULAN
PB GCU BR TB PB GCU BR TB P R P R P R
JAN 11 2 13 JAN 0 JAN 13 JANUARI 5 0 3 0 4 0
FEB 12 4 16 FEB 0 FEB 7 FEBRUARI 8 7 3 1 7 13
MAR 10 7 17 MAR 4 3 7 MAR 20 MARET 6 10 4 0 5 8
APR 18 2 8 1 29 APR 0 APR 9 APRIL 0 2 0 6 0 14
MEI 8 1 9 MEI 0 MEI MEI 4 0 5 0 4 0
JUNI 14 1 15 JUNI 0 JUNI 4 JUNI 4 10 5 8 4 1
JULI 3 1 1 5 JULI 0 JULI 2 JULI 4 0 5 1 4 0
AGUST 0 AGUST 0 AGUST AGUSTUS 4 0 5 0 1 0
SEPT 0 SEPT 0 SEPT SEPTEMBER 4 0 5 0 7 0
OKT 0 OKT 0 OKT OKTOBER 14 0 0 0 1 0
NOV 0 NOV 0 NOV NOVEMBER 13 0 0 0 5 0
DES 0 DES 0 DES DESEMBER 3 0 0 0 0 0
TOTAL 76 3 24 1 104 TOTAL 4 3 0 0 7 TOTAL 55 JUMLAH 69 29 35 16 42 36
% 42% 46% 86%
GRAND TOTAL 45 43%
PANTAUAN PROGRAM PERAWATAN LOKOMOTIF TAHUN 2022
UPT BALAI YASA YOGYAKARTA
REALISASI
NO NO SERI SARANA PROGRAM BULAN PRODUKSI BULAN SIFAT PEKERJAAN DIPO TANGGAL MASUK TANGGAL KELUAR HARI BYYK
1 CC 201 92 03 JANUARI FEBRUARI P72 BD 17-Jan-2022 11-Feb-2022 19
2 CC 201 92 14 JANUARI FEBRUARI P72 CPN 14-Jan-2022 17-Feb-2022 24
3 CC 203 98 10 JANUARI FEBRUARI P72 SDT 21-Jan-2022 18-Feb-2022 20
4 CC 201 77 09 JANUARI FEBRUARI P72 SDT 24-Jan-2022 22-Feb-2022 21
5 CC 201 92 18 JANUARI FEBRUARI P72 CPN 31-Jan-2022 24-Feb-2022 18
6 CC 201 04 07 FEBRUARI FEBRUARI P72 SMC 02-Feb-2022 2/25/2022 18
7 CC 203 95 09 FEBRUARI FEBRUARI P72 PWT 03-Feb-2022 2/28/2022 17
8 CC 201 83 02 FEBRUARI MARET P72 YK 03-Feb-2022 3/7/2022 21
9 CC 201 83 54 FEBRUARI MARET P72 JR 07-Feb-2022 3/8/2022 20
10 CC 201 83 16 MARET MARET P72 PWT 18-Feb-2022 3/9/2022 12
11 CC 201 83 07 MARET MARET P72 MN 17-Feb-2022 3/11/2022 15
12 CC 201 92 17 FEBRUARI MARET P72 CPN 17-Feb-2022 3/16/2022 18
13 CC 201 77 12 FEBRUARI MARET P72 SDT 21-Feb-2022 3/18/2022 18
14 CC 201 92 09 FEBRUARI MARET P72 BD 21-Feb-2022 3/22/2022 20
15 CC 201 77 10 FEBRUARI MARET P72 SDT 23-Feb-2022 3/22/2022 18
16 CC 204 03 01 MARET MARET P48 YK 25-Feb-2022 3/25/2022 19
17 CC 203 95 10 MARET MARET P72 SDT 03-Mar-2022 3/30/2022 19
18 CC 204 03 03 MARET APRIL P48 YK 02-Mar-2022 4/1/2022 22
19 CC 203 95 03 MARET APRIL P72 BD 07-Mar-2022 4/5/2022 22
20 CC 201 83 06 JUNI JUNI P72 YK 19-May-2022 6/7/2022 12
21 CC 201 83 09 MEI JUNI P72 SDT 18-May-2022 6/8/2022 14
22 CC 201 77 21 MEI JUNI P72 BD 19-May-2022 6/5/2022 10
23 CC 201 77 15 JUNI JUNI P72 SDT 23-May-2022 6/16/2022 17
24 CC 201 92 20 MEI JUNI P72 CPN 18-May-2022 6/17/2022 21
25 CC 203 95 07 MEI JUNI P72 PWT 30-May-2022 6/22/2022 17
26 CC 201 92 11 JUNI JUNI P72 JR 20-May-2022 6/22/2022 22
27 CC 201 92 04 JUNI JUNI P72 BD 13-Jun-2022 6/30/2022 14

RATA-RATA HARI BYYK P24/P48 21


RATA-RATA HARI BYYK P72 18

PROSES PENGERJAAN
NO NO SERI SARANA PROGRAM BULAN PRODUKSI BULAN SIFAT PEKERJAAN DIPO TANGGAL MASUK TANGGAL KELUAR HARI BYYK
1 CC 201 77 16 JULI P72 SDT 18-Jun-2022
2 CC 201 78 01 JULI P72 SMC 22-Jun-2022
3 CC 201 83 25 JULI P72 PWT 24-Jun-2022
4 CC 201 83 18 JULI P72 PWT 02-Jul-2022

BELUM MASUK
NO NO SERI SARANA PROGRAM BULAN PRODUKSI BULAN SIFAT PEKERJAAN DIPO TANGGAL MASUK TANGGAL KELUAR HARI BYYK
1 CC 201 92 02 AGUSTUS P72 JR
2 CC 201 83 21 AGUSTUS P72 PWT
3 CC 201 83 33 AGUSTUS P72 SMC
4 CC 201 78 03 AGUSTUS P72 YK
5 CC 201 77 20 SEPTEMBER P72 CN
6 CC 201 83 08 SEPTEMBER P72 JR
7 CC 201 78 02 SEPTEMBER P72 YK
8 CC 201 92 01 SEPTEMBER P72 JR
9 CC 201 77 22 OKTOBER P24+ BD
10 CC 201 92 15 OKTOBER P24+ CPN
11 CC 201 92 16 OKTOBER P24+ CPN
12 CC 201 89 06 OKTOBER P24+ MN
13 CC 201 77 07 OKTOBER P24+ SDT
14 CC 201 77 01 OKTOBER P24+ SDT
15 CC 201 83 11 OKTOBER P24+ SDT
16 CC 201 04 05 OKTOBER P24+ SMC
17 CC 201 89 01 OKTOBER P24 THB
18 CC 201 83 05 OKTOBER P24+ YK
19 CC 201 83 03 OKTOBER P24+ YK
20 CC 203 98 07 OKTOBER P24 CPN
21 CC 203 95 01 OKTOBER P24+ YK
22 CC 201 77 18 OKTOBER P24 CN
23 CC 201 92 19 NOVEMBER P24+ CPN
24 CC 201 83 47 NOVEMBER P24+ JR
25 CC 201 99 01 NOVEMBER P24+ JR
26 CC 201 83 19 NOVEMBER P24+ PWT
27 CC 201 77 14 NOVEMBER P24+ SDT
28 CC 201 78 05 NOVEMBER P24+ YK
29 CC 201 83 04 NOVEMBER P24+ YK
30 CC 201 78 04 NOVEMBER P24+ YK
31 CC 203 95 06 NOVEMBER P24+ BD
32 CC 203 98 05 NOVEMBER P24+ CPN
33 CC 203 95 12 NOVEMBER P24+ PWT
34 CC 203 98 01 NOVEMBER P24 PWT
35 CC 203 98 13 NOVEMBER P24 SDT
36 CC 201 92 10 DESEMBER P24 BD
37 CC 201 89 09 DESEMBER P24 MN
38 CC 203 98 18 DESEMBER P24 MN
AM PERAWATAN LOKOMOTIF TAHUN 2022
BALAI YASA YOGYAKARTA

KETERANGAN

Eks konservasi sementara


Eks konservasi sementara
Eks konservasi sementara

Eks konservasi sementara


Eks konservasi sementara

Eks konservasi sementara

KETERANGAN

Eks konservasi sementara

Eks konservasi sementara

KETERANGAN

Eks konservasi sementara


Eks konservasi sementara
Eks konservasi sementara
Eks konservasi sementara
Eks konservasi sementara
Eks konservasi sementara
Eks konservasi sementara
PANTAUAN PROGRAM PERAWATAN GO LOKOMOTIF 206 TAHUN 2022
UPT BALAI YASA YOGYAKARTA

REALISASI
NO NO SERI SARANA PROGRAM BULAN PRODUKSI BULAN SIFAT PEKERJAAN DIPO TANGGAL MASUK TANGGAL KELUAR HARI BYYK KETERANGAN
1 CC 206 13 80 JANUARI FEBRUARI GO CPN 10-Jan-2022 11-Feb-2022 24
2 CC 206 13 40 FEBRUARI APRIL GO SDT 06-Jan-2022 01-Apr-2022 59
3 CC 206 13 95 MARET APRIL GO BD 01-Mar-2022 07-Apr-2022 27
4 CC 206 13 58 MARET APRIL GO YK 23-Mar-2022 08-Apr-2022 13
5 CC 206 13 44 FEBRUARI APRIL GO PWT 24-Mar-2022 08-Apr-2022 12
6 CC 206 13 50 JANUARI APRIL GO SDT 06-Jan-2022 12-Apr-2022 66
7 CC 206 13 82 JANUARI APRIL GO BD 10-Jan-2022 14-Apr-2022 66
8 CC 206 13 20 MEI JUNI GO PWT 17-May-2022 01-Jun-2022 10
9 CC 206 13 83 FEBRUARI JUNI GO SDT 18-May-2022 02-Jun-2022 10
10 CC 206 13 96 MEI JUNI GO BD 17-May-2022 07-Jun-2022 14
11 CC 206 13 57 MARET JUNI GO PWT 20-May-2022 15-Jun-2022 17
12 CC 206 13 68 MARET JUNI GO CN 24-May-2022 18-Jun-2022 17
13 CC 206 13 22 MEI JUNI GO PWT 26-May-2022 21-Jun-2022 17
14 CC 206 13 03 MEI JUNI GO CN 30-May-2022 23-Jun-2022 18
15 CC 206 13 55 JUNI JUNI GO CPN 07-Jun-2022 25-Jun-2022 14
16 CC 206 13 98 MEI JUNI GO BD 09-Jun-2022 30-Jun-2022 16
17 CC 206 13 13 JUNI JUNI GO SDT 11-Jun-2022 30-Jun-2022 14
18 CC 206 15 02 JULI JULI GO CPN 10-Jun-2022 06-Jul-2022 19
,
RATA-RATA HARI BYYK GO 24

PROSES PENGERJAAN
NO NO SERI SARANA PROGRAM BULAN PRODUKSI BULAN SIFAT PEKERJAAN DIPO TANGGAL MASUK TANGGAL KELUAR HARI BYYK KETERANGAN
1 CC 206 13 61 JULI GO YK 20-Jun-2022
2 CC 206 13 05 JUNI GO CN 21-Jun-2022
3 CC 206 15 01 JULI GO CPN 27-Jun-2022
4 CC 206 13 91 JUNI GO CN 05-Jul-2022

BELUM MASUK
NO NO SERI SARANA PROGRAM BULAN PRODUKSI BULAN SIFAT PEKERJAAN DIPO TANGGAL MASUK TANGGAL KELUAR HARI BYYK KETERANGAN
1 CC 206 13 56 JUNI GO CN
2 CC 206 15 05 JULI GO CPN
3 CC 206 13 97 JULI GO BD
4 CC 206 13 43 AGUSTUS GO PWT
5 CC 206 15 04 AGUSTUS GO CPN
6 CC 206 13 23 AGUSTUS GO PWT
7 CC 206 15 03 AGUSTUS GO CPN
8 CC 206 13 69 AGUSTUS GO YK
9 CC 206 13 77 SEPTEMBER GO CPN
10 CC 206 15 08 SEPTEMBER GO BD
11 CC 206 15 07 SEPTEMBER GO BD
12 CC 206 13 29 SEPTEMBER GO SDT
13 CC 206 13 64 SEPTEMBER GO CPN
PANTAUAN PROGRAM KRD/E/I TAHUN 2022
UPT BALAI YASA YOGYAKARTA
REALISASI
PROGRAM PRODUKSI SIFAT REALISASI TANGGAL TANGGAL
NO NO SERI KRD DIPO HARI BYYK
BULAN BULAN PEKERJAAN PEKERJAAN MASUK KELUAR
1 K1 2 18 05 JANUARI FEBRUARI P48 P48 YK 1/10/2022 2/4/2022 19
2 K1 2 18 06 JANUARI FEBRUARI P48 P48 YK 1/10/2022 2/4/2022 19
3 K1 2 18 07 JANUARI FEBRUARI P48 P48 YK 1/10/2022 2/4/2022 19
4 K1 2 18 08 JANUARI FEBRUARI P48 P48 YK 1/10/2022 2/4/2022 19
5 K3 2 12 06 FEBRUARI MODIF YK 8/2/2021 2/8/2022 136
6 K3 2 12 07 FEBRUARI MODIF YK 8/2/2021 2/8/2022 136
7 K3 2 12 08 FEBRUARI MODIF YK 8/2/2021 2/8/2022 136
8 K3 2 12 09 FEBRUARI MODIF YK 8/2/2021 2/8/2022 136
9 K3 2 12 10 FEBRUARI MODIF YK 8/2/2021 2/8/2022 136
10 K3 3 13 05 FEBRUARI FEBRUARI P6000 P6000 SDT 2/2/2022 2/22/2022 15
11 K3 3 13 06 FEBRUARI FEBRUARI P6000 P6000 SDT 2/2/2022 2/22/2022 15
12 K3 3 13 07 FEBRUARI FEBRUARI P6000 P6000 SDT 2/2/2022 2/22/2022 15
13 K3 3 13 08 FEBRUARI FEBRUARI P6000 P6000 SDT 2/2/2022 2/22/2022 15
14 K3 2 12 16 MARET MODIF YK 12/29/2021 3/11/2022 50
15 K3 2 12 17 MARET MODIF YK 12/29/2021 3/11/2022 50
16 K3 2 12 18 MARET MODIF YK 12/29/2021 3/11/2022 50
17 K3 2 12 19 MARET MODIF YK 12/29/2021 3/11/2022 50
18 K3 2 12 20 MARET MODIF YK 12/29/2021 3/11/2022 50
19 SI 3 80 01 FEBRUARI MARET P48 P48 THB 2/8/2022 3/11/2022 22
20 SI 3 82 04 FEBRUARI MARET P48 P48 THB 2/8/2022 3/11/2022 22
21 K1 3 80 02 FEBRUARI MARET P48 + P6000 P48 + P6000 SMC 2/25/2022 3/25/2022 19
22 K3 3 13 01 MARET APRIL P24 + P6000 P24 SDT 3/4/2022 4/8/2022 26
23 K3 3 13 02 MARET APRIL P24 + P6000 P24 SDT 3/4/2022 4/8/2022 26
24 K3 3 13 03 MARET APRIL P24 + P6000 P24 SDT 3/4/2022 4/8/2022 26
25 K3 3 13 04 MARET APRIL P24 + P6000 P24 SDT 3/4/2022 4/8/2022 26
26 K1 2 18 09 MEI APRIL P48 P48 YK 3/28/2022 4/13/2022 13
27 K1 2 18 10 MEI APRIL P48 P48 YK 3/28/2022 4/13/2022 13
28 K1 2 18 11 MEI APRIL P48 P48 YK 3/28/2022 4/13/2022 13
29 K1 2 18 12 MEI APRIL P48 P48 YK 3/28/2022 4/13/2022 13
30 K1 3 82 05 MARET APRIL P48 + P6000 PAB SMC 4/16/2022 4/20/2022 3
31 K3 2 12 21 NOVEMBER APRIL P24 MODIF YK 2/9/2022 4/29/2022 55
32 K3 2 12 22 NOVEMBER APRIL P24 MODIF YK 2/9/2022 4/29/2022 55
33 K3 2 12 23 NOVEMBER APRIL P24 MODIF YK 2/9/2022 4/29/2022 55
34 K3 2 12 24 NOVEMBER APRIL P24 MODIF YK 2/9/2022 4/29/2022 55
35 K3 2 12 25 NOVEMBER APRIL P24 MODIF YK 2/9/2022 4/29/2022 55
36 K1 3 82 05 MARET P48 + P6000 P48 + P6000 SMC 5/23/2022 6/17/2022 18

RATA-RATA HARI BYYK P6000 15


RATA-RATA HARI BYYK P24+GCU
RATA-RATA HARI BYYK P6000+P24
RATA-RATA HARI BYYK P24 26
RATA-RATA HARI BYYK P48 28
RATA-RATA HARI BYYK P9000+P24
RATA-RATA HARI BYYK P6000+P48 19
RATA-RATA HARI BYYK PAB 3
RATA-RATA HARI BYYK MODIF 93

PROSES PENGERJAAN
PROGRAM PRODUKSI SIFAT REALISASI TANGGAL TANGGAL
NO NO SERI KRD DIPO HARI BYYK
BULAN BULAN PEKERJAAN PEKERJAAN MASUK KELUAR
1 K3 2 07 06 MODIF YK 4/15/2022
2 K3 2 07 07 MODIF YK 4/15/2022
3 K3 2 07 08 MODIF YK 4/15/2022
4 K3 2 07 09 MODIF YK 4/15/2022
5 K3 2 07 10 MODIF YK 4/15/2022
6 K3 3 11 01 JUNI P24 + P6000 SLO 6/15/2022
7 K3 3 11 02 JUNI P24 + P6000 SLO 6/15/2022
8 K3 3 11 03 JUNI P24 + P6000 SLO 6/15/2022
9 K3 3 11 04 JUNI P24 + P6000 SLO 6/15/2022

BELUM MASUK
PROGRAM PRODUKSI SIFAT REALISASI TANGGAL TANGGAL
NO NO SERI KRD DIPO HARI BYYK
BULAN BULAN PEKERJAAN PEKERJAAN MASUK KELUAR
1 K3 3 11 05 JULI P6000 SLO
2 K3 3 11 06 JULI P6000 SLO
3 K3 3 11 07 JULI P6000 SLO
4 K3 3 11 08 JULI P6000 SLO
5 K1 3 82 04 AGUSTUS P48 + P6000 SMC
6 K3 3 09 17 SEPTEMBER P6000 SLO
7 K3 3 09 18 SEPTEMBER P6000 SLO
8 K3 3 09 19 SEPTEMBER P6000 SLO
9 K3 3 09 20 SEPTEMBER P6000 SLO
10 SI 3 82 06 SEPTEMBER P48 THB
11 SI 3 82 05 SEPTEMBER P48 THB
12 SI 3 82 07 SEPTEMBER P48 THB
13 K1 3 82 03 OKTOBER P48 + P6000 SMC
KETERANGAN

YIA
YIA
YIA
YIA
FEEDER I
FEEDER I
FEEDER I
FEEDER I
FEEDER I
JENGGALA
JENGGALA
JENGGALA
JENGGALA
FEEDER II
FEEDER II
FEEDER II
FEEDER II
FEEDER II
KERIS
KERIS
KEDUNG SEPUR
JENGGALA
JENGGALA
JENGGALA
JENGGALA
YIA
YIA
YIA
YIA
KEDUNG SEPUR
FEEDER III
FEEDER III
FEEDER III
FEEDER III
FEEDER III
KEDUNG SEPUR

KETERANGAN

FEEDER IV
FEEDER IV
FEEDER IV
FEEDER IV
FEEDER IV
KETERANGAN
DI BYYK TAHUN 2022

JANUARI
N0
SERI SARANA NO WO SIFAT DIPO TANGGAL MASUK TANGGAL KELUAR HARI BYYK LAP MENURUT T.175 REALISASI PENGERJAAN
PERBAIKAN
15066511 Selesai PB Ganti roda menjadi Ø 920 mm, Revisi TM, Ganti nozzel ring turbo, start, test, self load,
1 CC 206 13 74 PB CPN 28/12/21 04/01/22 6 Pb Ganti roda
15066515 running test
15070681 Selesai PB Ganti roda menjadi Ø 920 mm, Ganti wick assy no 6, Pipa tembaga angin ke ADV,
2 CC 206 13 84 PB YK 29/12/21 06/01/22 7 Pb Ganti roda
15070683 Perbaikan Auxiliary generator, Traksi motor, Bocoran pada MD, start, test, running test

Selesai PB Base kompressor (Retak), Ganti Selang flexible air LOC, Deepstik MD sisi R, Kaca pinto kabin
3 CC 206 13 100 15080555 PB BD 03/01/22 07/01/22 5 Pb Base kompresor (retak) 1B, Pen BC 3b, Perbaikan Base kompresor, Bocoran pada MD, start, test, self test EAB

4 CC 206 15 04 15081834 PB CPN 05/01/22 12/01/22 6 Pb Base kompresor (retak) Selesai PB Base kompressor (Retak), Ganti Nozle ring 16", Perbaikan Base kompresor, Exhauster,
Bocoran pada MD, start, test, self load

5 CC 201 92 04 15085887 PB BD 06/01/22 14/01/22 7 Pb Oil cooler Selesai PB Oil cooler, Ganti intercooler sisi R, LOC, Packing LCP, gasket STR sisi A, perbaikan bocoran
pada MD & gear box TM, start, test

6 CC 203 01 07 15092139 PB YK 10/01/22 17/01/22 6 Pb Radiator + normalisasi pemasir Selesai PB Radiator + normalisasi pemasir, Ganti radiator, MG, Gear box MG, Blower TM, Normalisasi
pemasir, start, test, load test

7 CC 206 13 33 15098032 PB CN 13/01/22 17/01/22 3 Pb TM + radiator Selesai PB TM + radiator, Ganti bogie set, Perbaikan radiator, start, test, self load, running test

Selesai PB Engine (cyl assy retak), Ganti Cyl assy MD 7bh, Sambungan rantai rem parkir, magnet
8 CC 203 02 03 15104215 PB SDT 15/01/22 21/01/22 5 Pb Engine (cyl assy retak) pemasir uj.2 2bh, Cell baterai 2bh, Perbaikan Suling lokomotif, Bocoran pada MD & gear box TM,
Pengelasan pada Longhood, start, test, load test

Selesai PB TM, Ganti 2 Bogie set diameter roda 908 mm, Auxiliary generator, tarikan buffer uj 1& 2,
9 CC 206 13 34 15111303 PB CN 20/01/22 21/01/22 2 Pb TM perbaikan Bocoran pada MD, Pengelasan pada Longhood, start, test, load test, running test

10 CC 206 13 36 15118120 PB SDT 24/01/22 26/01/22 3 Pb TM + aspan Selesai PB TM, Ganti 2 Bogie set Ex CC 2061350, ganti Auxiliary, start, test, running test
15125775 Selesai Pb TM, ganti bogie set, Ø roda 918 mm, perb claw buffer uj 1 & 2, pengelasan long hood, running test,
11 CC 206 13 61 PB YK 27/01/22 31/01/22 3 Pb TM + ganti roda self test EAB
15125778
BUBUT RODA
15092014 Selesai PB Bubut roda menjadi Ø 870mm, Ganti Blower Tm, Pen BC : 6 bh, Tambah minyak pelumas
1 CC 201 83 27 PB PWT 10/01/22 13-01-22 4 Pb Bubut roda
15092018 MD, Perbaikan Claw buffer uj.1 & 2 , Bocoran pada MD & gear box TM, start, test
15118006 Selesai PB Bubut roda menjadi Ø 900 mm, Ganti lampu kabin 1 bh, Pen BC 1 - 6 sisi A / B, perb claw
2 CC 204 03 03 PB YK 24/01/22 26-01-22 3 Pb Bubut roda
15118009 buffer, bocoran pada MD & gear box TM, pengelasan long hood
FEBRUARI
N0
SERI SARANA NO WO SIFAT DIPO TANGGAL MASUK TANGGAL KELUAR HARI BYYK LAP MENURUT T.175 REALISASI PENGERJAAN
PERBAIKAN

1 CC 206 13 46 15124087 PB SDT 27/01/22 02/02/22 4 Pb TM + seal output MD Selesai PB TM + seal output MD, Ganti 2 bogie set, roda Ø 920 mm, rubber no cutting uj.1A, seal output
MD, perbaikan claw buffer uj. 1 & 2, start, test, self test EAB, running test

2 CC 201 89 08 15134760 PB MN 01/02/22 04/02/22 3 Pb Radiator + fan radiator Selesai PB Radiator + fan radiator, Ganti radiator, fan radiator, perbaikan kerodong fan blade,
exhauster, bocoran pada MD, start, test, load test
15124088
3 CC 206 15 02 PB CPN 27/01/22 04-02-22 6 Pb Ganti roda Selesai Pb ganti roda Ø873mm, Selfload,Running test, perbaikan base kompressor.
15124089

4 CC 203 98 02 15122467 PB JR 26/01/22 08/02/22 9 Pb Normalisasi pemasir Selesai PB Normalisasi pemasir, Selesai normalisasi pemasir, ganti sambungan rantai rem parkir, pen
BC, perbaikan claw buffer 1, 2, start, test

5 CC 206 13 49 15144367 PB SDT 07/02/22 09/02/22 3 Pb TM Selesai Pb TM, ganti bogie set, Ø roda 865 mm, ganti auxiliary generator, perb claw buffer uj 1 & 2,
running test, self test EAB

6 CC 201 92 04 15137525 PB BD 03/02/22 10/02/22 6 Pb Main generator Selesai PB Main generator, Ganti main generator, Auxiliary generatorm , perbaikan bocoran pada MD
& Gear box TM, pengelasan longhood, start, test, load test

7 CC 206 13 15 15149431 PB SDT 09/02/22 15/02/22 5 Pb TM + alternator ground Selesai Pb Alternator, ganti stator alternator, bogie set, roda Ø 865 mm, filter coalster, perb claw
buffer uj 1,2, self load, running test
8 CC 206 13 01 15163546 PB CN 17/02/22 22/02/22 4 Pb TM + kompresor Selesai Pb TM, ganti bogie set, cek & revisi kompresor, running test , self test EAB
9 CC 206 13 16 15164993 PB SDT 18/02/22 22/02/22 3 Pb TM Selesai Pb TM, ganti bogie set roda Ø 880 mm, perb base kompresor, running test
10 CC 201 83 29 15164989 PB SMC 18/02/22 24/02/22 5 Pb Turbo Selesai Pb Turbo, ganti turbo, perb long hood, load test, running test

11 CC 206 13 65 15163759 PB SMC 17/02/22 24/02/22 6 Pb TM + alternator Selesai Ganti 2bh bogie set diameter orda 885mm, Alternator,lampu TH MC kabin 1. Perbaikan
bocoran pada MD,Loadtest,running test
12 CC 206 15 01 15160149 PB CPN 15/02/22 25/02/22 9 Pb Turbo Selesai Pb Turbo, ganti turbo, soft ware 3,23, perb pipa air brake, self EAB, self load, running test,
BUBUT RODA
15124288 Selesai PB Bubut roda + instalasi pemasir, Bubut roda menjadi Ø 860 mm, ganti seal outpur, exhauster,
1 CC 201 83 19 PB PWT 27/01/22 03-02-22 5 Pb Bubut roda + instalasi pemasir gelas duga tangki air, start, test
15124299
15144349 Selesai PB Bubut roda menjadi Ø 890 mm, instalasi pemasir, ganti manometer HSD, seal coupling gardan,
2 CC 201 83 23 PB PWT 07/02/22 11/02/22 5 Pb Bubut roda + instalasi pemasir krang BC bogie 2, perbaikan pipa bogie 1, bocoran pada MD & TN, pengelasan pada longhood, start, test
15144357
15150052 Selesai ganti seal coupling gardan,seal shaft governor, manometer HSD,membran suling 2bh.
3 CC 203 01 07 PB YK 09/02/22 11/02/22 3 Pb Bubut roda
15150055 Perbaikan claw buffer uj.1 dan 2. Bubut roda dgn hasil diameter 875mm
15150455
4 CC 206 13 13 PB SDT 10/02/22 15/02/22 4 Pb Ganti roda Selesai ganti roda, ganti roda Ø 865 mm, kaca kabin 1A, perb claw buffer uj 1,2, running test, self EAB
15150456
MARET
N0
SERI SARANA NO WO SIFAT DIPO TANGGAL MASUK TANGGAL KELUAR HARI BYYK LAP MENURUT T.175 REALISASI PENGERJAAN
Selesai PB TM, Ganti 2 bogie set Ø roda 869 mm, mounting karet not cutting 1A, lem kabel atas
PERBAIKAN exhauster, pen BC 2 bh, pernafasan STR 2 bh, pernafasan STR kompressor sisi A, perbaikan claw uj 1 &
1 CC 206 13 08 15184920 PB SDT 25/02/22 02/03/22 3 Pb TM 2, start,PB
Selesai test
Delution, Ganti art rod 2R, cylinder assy 2R, ring piston 2R, lampu semboyan 2 bh,
2 CC 201 92 04 15174208 PB BD 22/02/22 04/03/22 7 Pb Delution perbaikan clow buffer ujung 1 & 2, start, test
15184911
3 CC 206 13 78 PB CPN 28/02/22 05/03/22 3 Pb Ganti roda + oven TM Pb Ganti
Selesai PB roda
Bocoran airmenjadi Ø882mm,
di right bank oven Traksi
intercooler, GantiMotor,reyen.
Exhauster, Seal gardan sisi MD, Vbelt exhauster,
15184876 Seal right bank Intercooler MD sisi R, Pen BC 12bh, Manometer HSD, Gelas duga air, perbaikan Claw
4 CC 204 03 02 15211371 PB YK 15/03/22 17/03/22 3 Pb Bocoran air di right bank intercooler uj. 1 & 2, Lampu sein box 1 & 2, Bocoran pada MD, start, test
15211349 Selesai PB. Ganti Roda + Oven TM . Ganti 2 bogie set diameter 870, kaca pintu kabin 1 B. Perbaiki Claw
5 CC 206 13 75 PB CPN 15/03/22 18/03/22 4 Pb Ganti roda + oven TM Selesai
15211353 buffer ujPB. Turbo
1&2. Self+test
exhauster, Ganti seal
EAB. Running test gardan sisi MD, pen BC, sambungan rantai rem parkir, seal
out put MD, intercooler MD, turbo, seal gardan sisi kompressor, perbaikan claw buffer uj 1&2,
6 CC 201 83 03 15213288 PB YK 16/03/22 22/03/22 5 Pb Turbo + exhauster instalasi pemasir, pully exhauster, start, test, load test
15223840 Selesai Ganti roda Ø920mm,Snubber 4A,Manometer HSD,Pen BC. Penggantian Claw Buffer uj1
7 CC 203 95 07 PB PWT 21/03/22 25/03/22 5 Pb Ganti roda
15223842 &2,Bocoran pada MD dan Gearbox,Pengelasan pada longhood. Running test
15224099
8 CC 201 92 16 PB CPN 22/03/22 25/03/22 4 Pb Ganti roda + TM4 Selesai PB Ganti roda + TM4 , Ganti roda no.1 Ø 869 mm, ganti TM no 4, start, test, running test
15224101
Selesai Pb Ex tertemper, Ganti, Ganti Dinding kabin dan pintu ujung 1; pintu dan frame pintu ruang
kompartemen airbrake;
Selesai Pb As roda + ovenlantai dan meja
TM, ganti bogieairset
rack;
2 bhframe.
dgn Økaret dan cow
875 mm, kacahanger
kabin ujung 1; motor
uj 2, perb claw uj 1& 2,
9 CC 206 13 60 15226762 PB CPN 23/03/22 25/03/22 3 Pb As roda no.6 + oven TM wiper,hose dan
running test, selflengan
EAB wiper kaca kabin ujung 1; mounting dan lampu kabut ujung 1, lampu
semboyan ujung 1; lengan pembuka claw buffer ujung 1, buffer bulk dan cowhanger ujung 1; kotak
10 CC 203 98 10 15187932 PB SDT 02/03/22 31/03/22 21 Pb Ex tertemper pasir ujung 1.A, perbaikan Auxiliary generator; buffer dan penahan buffer ujung 1; cable harness
lampu kabin dan sistem pemasir; pengecatan di dalam kabin dan ujung 1, start, test, running test
BUBUT RODA
15174207 Selesai PB Bubut roda + dudukan tanki air, Bubut roda menjadi Ø 895 mm, buffer plate uj.1, Ganti
1 CC 204 03 07 PB YK 22/02/22 02/03/22 6 Pb Bubut roda + dudukan tanki air Governor MD, turbo, injector 8 bh, seal coupling gardan, sambungan rantai rem parkir, filter sparator,
15174206 starr, test, load test
15174205 Selesai PB Bubut roda, MG & TM, Bubut roda menjadi Ø 865 mm, Ganti seal gardan sisi MD,
2 CC 203 02 02 PB SDT 19/02/22 04/03/22 8 Pb Bubut roda, MG & TM manometer HSD, generator, TM 3, exhauster, perbaikan handle rem parkir, clauow ujung 1 & 2, start,
15169787 test, load test, running test
15190529 Selesai Pb Bubut roda, bubut roda menjadi Ø 905 mm, ganti fan radiator, membran klakson 4 bh,
3 CC 201 83 13 PB PWT 03/03/22 08/03/22 3 Pb Bubut roda + fan radiator
15190532 pengelasan
15198290
Selesai PB. Bubut roda menjadi Ø 900 mm, Ganti pen BC 5 bh, seal couplinggardan sisi MD &
4 CC 201 83 04 PB YK 08/03/22 11/03/22 4 Pb Bubut roda
15198291 kompressor, lengan S.26siang, perbaikan buffer balk uj1.A, pemasangan ADV sparator, start, test
15194940 Selesai PB Bubut roda, alternator + oven TM, Ganti 2 bogie set Ø roda 898 mm, Alternator, nozzle
5 CC 206 13 64 PB CPN 06/03/22 16/03/22 8 Pb Bubut roda, alternator + oven TM pemasir 1 bh, perbaikan claw buffer uj.1 & 2, tangga 1 A, pintu kabin 2 A&B, bocoran pada MD, start,
15194945 test, load test, running test
15184886 Selesai PB Bubut roda + Engine, Bubut roda menjadi Ø 905 mm, Ganti minyak MD, ESS 1, cylinder assy
6 CC 201 83 14 PB PWT 26/02/22 17/03/22 12 Pb Bubut roda + engine 3R 4R 4L, pinston assy 4R 4L, master rod 4L, art rod 4R, cam shaft 4R 4L 3R, pemasangan ADV
15184898 separator, perbaikan buffer uj 1 & 2, start, test, load test
15222086
7 CC 203 98 06 PB CPN 19/03/22 23/03/22 3 Pb Bubut roda Selesai Pb Bubut roda, bubut roda menjadi Ø 895 mm, start, test
15222088
APRIL
N0
SERI SARANA NO WO SIFAT DIPO TANGGAL MASUK TANGGAL KELUAR HARI BYYK LAP MENURUT T.175 REALISASI PENGERJAAN
PERBAIKAN
15241485
Ganti
Selesai Pb Ex roda menjadi
tertemper, Ganti Ø 915 mm
Buffer plate+ 1A,Tangga
cooler, Ganti lube oil cooler,
1A,Lampu TM no 2,coupling
kabut 1A,Seal gelas duga tangki air,
gardan
1 CC 201 83 19 PB PWT 30/03/22 04/04/22 4 Pb Ganti roda + cooler Perbaikan rembesan MD, tutup gear box, waterujmur, balk
15240509 MD,Seal coupling kompresor,ACPS,Cowhanger 1,Kran & buffer,
selang start,
BP uj test, running
1,Gelas duga test
tangki air,Rubber
bondet pada rantai penarik 1A,Pipa BC bogie1, perbaikan Buffer uj 1,Bocoran pada MD, start, test,
2 CC 201 83 24 15249246 PB PWT 02/04/22 08/04/22 5 Pb Ex tertemper running test
15253720 Selesai PB Ganti roda + oven TM, Ganti Bogie set Ø roda 920mm, Perbaikan Tanganan buffer sisi A,
3 CC 206 13 66 PB SMC 06/04/22 08/04/22 3 Pb Ganti roda + oven TM start, test, running test
15253722
15257437 Selesai PB Ganti roda menjadi Ø 920 mm, Ganti Setang piston BC 2bh, Seal coupling kompresor, pully
4 CC 201 83 03 PB YK 07/04/22 11/04/22 3 Pb Ganti roda
15257439 exhasuter, perbaikan Caw hanger uj.1 & 2, Bocoran pada MD, start, test, running test

5 CC 201 92 07 15263048 PB BD 11/04/22 14/04/22 4 Pb LOF + GCU Selesai PB LOF + GCU, Ganti seal gardan sisi MD, rumah LOF, exhauster, oil pump, sambungan rem
parkir 4 bh, perbaikan bocoran pada MD & gearbox TM, pengelasan longhood, pengecatan, start, test
15267320 Selesai Pb Ganti roda, ganti roda baru Ø 920 mm, manometer HSD, seal output MD, seal coupling
6 CC 204 03 06 PB YK 13/04/22 14/04/22 2 Pb Ganti roda
15267324 gardan MD, sambungan rem parkir, perb klakson, running test
7 CC 206 13 71 15266899 PB CPN 12/04/22 14/04/22 3 Pb Oven TM Selesai Pb Oven TM, ganti TM 6 bh, kaca pintu kabin 2 bh, seal oring dipstik, roda Ø 920 mm, running
test, test EAB

Selesai Pb Ex tertemper, Ganti Kabin , Pintu 2bh, Kaca kabin masinis, Kotak & Instalasi pemasir uj 1,
8 CC 203 98 14 15211413 PB SDT 12/03/22 18/04/22 25 Pb Ex tertemper Buffer plate uj1, Kompartemen air brake,Wifer ,Meja pelayan MC 1, Lampu utama, Lampu kabut,
Lampu semboyan, Control unit, Display unit govenor medha, eadman, Pedal deadman, Pintu longhood
2bh, Automatic brake MC 1, Mounting lampu kabut, Magnet pemasir 1bh, perbaikan Pengelasan,
Pengecatan pintu long hood PDC , Sistem peranginan dalam air rack, start, test, running test
9 CC 206 13 100 15275506 PB BD 14/04/22 20/04/22 4 Pb Oven TM Selesai PB Oven TM, ganti TM 6 bh, perbaikan bocoran pada MD, start, test, running test

10 CC 206 13 17 15267330 PB SDT 13/04/22 21/04/22 6 Pb Fan radiator + oven TM Selesai PB Fan radiator + oven TM, Ganti Fan Radiator, Roda 920 mm, TM 1-6, Perbaikan Bogie 1& 2,
Pengelasan, start, test, running test

Selesai PB Turbo, MG & TM no 3, ganti turbo, traksi motor no.3 , seal coupling gardan &
11 CC 203 95 07 15276422 PB PWT 15/04/22 22/04/22 5 Pb Turbo, MG & TM no.3 kompressor,manometer hsd,intercooler MD 2bh,seal shaft MD. Perbaikan metal spray crank
shaf,gelas duga tangki hsd,bocoran pada MD. Loadtes,Running test.

12 CC 201 92 16 15292234 PB CPN 26/04/22 26/04/22 1 Pb Ganti TM no.1 Selesai Pb TM, ganti TM no.1, roda no.1, seal output MD, seal gardan sisi MD, kompresor, CMV, vbelt
exhauster 2 bh, kabel arde TM 2, lampu sein box 2 bh, perb claw uj 1 & 2
15295152
13 CC 206 13 24 PB SDT 27/04/22 27/04/22 1 Pb Ganti roda + oven TM Selesai Pb Ganti roda, ganti roda baru Ø 920 mm, ganti TM 6 bh, test EAB, running test
15295163

Selesai PB Ex tertemper, Ganti lampu&mika lampu semboyan 8 bh uj 2, Rumah&maunting lampu


14 CC 206 15 06 15295897 PB BD 27/04/22 28-04-22 2 Pb Ex tertemper kabut uj 2AB, Lampu kabut Uj 2AB, Cow Hnager uj 2, nozzle pemasir 6B, pengunci boffer uj 2, hose
BCE,ACT,MRE uj 2B. Perbaikan: Tangga 2B, Buffer 2B, Frame lantai bordes 2B,rumah lampu semboyan
uj 2, tanganan tarikan boffer uj 2AB. hand grid uj 2, Engsel pintu 2 B, dinding tangki pasir uj 2A,
Pengecatan kabin dan logo kabin 1 dan 2.

15 CC 203 98 01 15295147 PB PWT 27/04/22 28-04-22 2 Pb Ganti TM no.3 Selesai PB TM. Ganti TM no.3, seal output MD, Seal intake arah intercooler MD, Packing COPS,
Manometer Turbo, membran Horn, WSR 4 & 5. Perbaikan: kontak BKT 5/A3, Pemberian skat rel BKT-
RE, pindahkan jalur FSR, rembesan pada MD, Pipa BC diruang air rack.

16 CC 203 01 07 15296779 PB YK 28/04/22 28-04-22 1 Pb Main generator Selesai PB MG. Ganti Generator, Lampu sein box 2 bh, seal gardan sisi MD. Perbaikan: Claw buffer uj 1
dan 2 , vet dop gardan kompressor, tanganan tangga 2 B , bocoran & rembesan MD.
15298876 Selesai PB Ganti roda & Oven TM, Ganti roda Roda 6 gandar diameter 920 mm, TM no. 1 - 6,
17 CC 206 13 11 PB SDT 29/04/22 29/04/22 1 pb Ganti roda & oven TM
15298879 perbaikan Bocoran pada MD, start, test, running test

18 CC 201 04 06 15300952 PB SMC 30/04/22 30-04-22 0 Pb Traksi motor no.1


Selesai PB ganti TM no.1 , packing crank manual. Perbaikan tangga uj.1A , buffer balk 1A. Running test
GCU

1 CC 201 83 48 15249248 PB SDT 02/04/22 08/04/22 5 Pb GCU Selesai PB GCU , Ganti Automatic brake 1bh,Exhauster,Filter separator,Oring blower MD,Seal coupling
gardan, Perbaikan Pembersihan saluran air brake,Bocoran pada MD,Pengelasan pada longhood,
start, test, running test
15278366 Selesai PB GCU & bubut roda menjadi Ø 893 mm, Ganti Exhauster, COPS, Sambungan rantai rem
2 CC 203 95 02 PB BD 18/04/22 21/04/22 4 Pb GCU + bubut roda parkir, Seal coupling gardan sisi MD, Sandtrap pemasir uj 2A, perbaikan Bocoran pada MD & gear box
15278369 TM, Pengelasan longhood, normalisasi pemasir, start, test, load test, running test
BUBUT RODA
15238333 Selesai Pb Bubut roda, bubut roda menjadi Ø 895 mm, Ganti manometer HSD, manometer MP, seal
1 CC 204 03 05 PB YK 29/03/22 01/04/22 4 Pb Bubut roda coupling kompressor, safety valve intercooler, sambungan rantai rem parkir, perbaikan bocoran pada
15238336 MD, start, test
15251693 Selesai PB Bubut roda menjadi Ø 905 mm, Ganti gelas duga tangki air, sambungan rantai rem parkir,
2 CC 201 83 25 PB PWT 05/04/22 08/04/22 4 Pb Bubut roda pengelasan pada longhood, pengecatan logo, start, test
15253371
15263049 Selesai PB Bubut roda menjadi Ø 892 mm, Ganti manometer HSD, sambungan rantai rem parkir,
3 CC 203 98 01 PB PWT 11/04/22 13/04/22 3 Pb Bubut roda
15263051 perbaikan tutup atas fan radiator, buffer balk 1A, exle pot TM 1, start, test
15265601 Selesai PB Bubut roda menjadi Ø 885 mm, Ganti seal coupling gardan MD, v-belt exhauster 2 bh, gelas
4 CC 203 98 09 PB SMC 12/04/22 14/04/22 3 Pb Bubut roda duga air, sambungan rantai rem parkir, perbaikan cow hanger uj 1, start, test
Selesai PB Bubut roda menjadi Ø 885 mm, Ganti seal coupling gardan MD, v-belt exhauster 2 bh, gelas
4 CC 203 98 09 PB SMC 12/04/22 14/04/22 3 Pb Bubut roda
15265603 duga air, sambungan rantai rem parkir, perbaikan cow hanger uj 1, start, test
15265625 Selesai PB Bubut roda menjadi Ø 885 mm, Ganti buffer balk uj1A, tangga 3 bh, mounthing lampu
5 CC 201 83 22 PB PWT 12/04/22 14/04/22 3 Pb Bubut roda
15265627 kabut 1A, perb sein box uj 1, tambah minyak pelumas
15275511 Selesai PB Bubut roda menjadi Ø 874 mm, Ganti gear box TM no 1, seal coupling gardan sisi MD &
6 CC 201 83 15 PB PWT 16/04/22 20/04/22 3 Pb Bubut roda
15275514 Kompressor, gelas duga tangki air, sambungan rantai rem parkir, start, test
15285347
7 CC 206 13 69 PB YK 22/04/22 23/04/22 1 Pb Bubut roda Selesai PB Bubut roda menjadi Ø 873 mm, perb claw buffer uj 1 & 2, ganti lampu sein
15285345
15298925 Selesai PB Bubut roda menjadi diameter 888 mm, ganti Lampu semboyan 1 bh, Dust Guard TM no. 5,
8 CC 206 13 43 PB PWT 29/04/22 29/04/22 1 Pb Bubut roda
15298929 perbaikan claw buffer ujung 1 & 2, bocoran pada MD, start, test
TB

1 CC 206 13 82 15290093 TB BD 25/04/22 26/04/22 2 Pb As roda no.2 a. Ganti : Wick assy, Axlening, As roda 1 gandar no 2, Aux-Gen, Kran angin arah sensor MR,Filter
pelumas kompresor & Packing, b. Perbaikan : Bocoran pada MD, c. Running test
MEI
N0
SERI SARANA NO WO SIFAT DIPO TANGGAL MASUK TANGGAL KELUAR HARI BYYK LAP MENURUT T.175 REALISASI PENGERJAAN
PERBAIKAN

Selesai PB Governor & AC, Ganti Kontak HIR no 3, Actuator governoor, Lampu seinbox 2bh, Motor
1 CC 201 92 03 15306754 PB BD 04/05/22 04/05/22 1 Pb Governor & AC condensor (ava), perbaikan Bocoran pada MD, Bocoran di watermur pipa pengurasan oli, Normalisasi
SV, CUT IN CUT OUT, EPS & OS, start, test, load test

Selesai Pb MD. Ganti: Bulgear MD, Waterpump MD, Oil Pump MD, Seal output MD, Pipa BCE sisi
2 CC 206 13 72 15311146 PB CPN 06/05/22 09/05/22 2 PB MD (bullgear, oil pump, water pump) dalam uj 2B, Seal Coupling gardan sisi MD. Perbaikan : tangga uj 2B, pengelas skin plate BJ, Dudukan
pipa BCE uj 2B.

Selesai Ganti seal crank case 2bh,sel pipa intake, tutup TB Auxgen,Lampu seinbox 4bh. Penggantian
3 CC 206 13 55 15316006 PB CPN 09/05/22 09/05/22 1 PB Dudukan Kompressor Retak pintu kabin 3bh,tanganan tarikan buffer uj 2,jaring2 tutup samping fan radiator,dudukan kompressor.

Selesai Pb Ex tertemper, ganti auxiliary generator, lampu kabut dan housing lampu kabut, lampu sein
4 CC 206 13 12 15317356 PB SDT 10/05/22 10/05/22 1 Pb Ex tertemper 5 bh, perbaikan buffer plate 2B, tangga 2B, hand grip tangga 2B, dinding kabin dan tangki pemasir,
frame bawah kabin 2B, pipa cyl brake 2B, pengecatan kabin dan dinding luar kabin. start, test,
running test

5 CC 206 13 76 15332508 PB CPN 17/05/22 19/05/22 3 Pb Oven TM + ganti water pump Selesai PB Oven TM + water pump, Ganti roda menjadi Ø 865 mm, TM 6 bh, water pump, lampu sein 2
bh, perbaikan claw buffer uj.1 & uj.2, start, test EAB, running test
Selesai PB Gardan, Ganti Gardan, exhauster, pen BC 7 bh, sambungan rantai rem parkir, rubber rantai
6 CC 201 83 30 15347159 PB CPN 25/05/22 25/05/22 1 Pb Gardan
not cuting 1A, perbaikan clow buffer uj 1 & uj 2, buufer balk uj 2A, start, test

7 CC 206 13 15 15343713 PB SDT 23/05/22 25/05/22 3 Pb Alternator Selesai Pb Alternator, ganti stator alternator,perbaikan bocoran MD & kompressor, self load

8 CC 201 78 04 15350956 PB YK 25/05/22 27/05/22 2 Pb Radiator Selesai PB Radiator: Ganti: radiator, seal gardan sisi MD, Gelas duga tangki HSD sisi B. Perbaikan Clow
buffer uj 1&2, Bocoran minyak pada watermur pengurasan LOC. Load test
BUBUT RODA
15336461 Selesai PB Bubut roda menjadi Ø 888 mm, Perbaikan tangga 1A, pintu kabin 1&2, update parameter
1 CC 206 13 56 PB CN 19/05/22 20/05/22 2 Pb Bubut roda
15336463 & test control, test EAB
JUNI
N0
SERI SARANA NO WO SIFAT DIPO TANGGAL MASUK TANGGAL KELUAR HARI BYYK LAP MENURUT T.175 REALISASI PENGERJAAN
PERBAIKAN
15351966 Selesai penggantian fan radiator, roda diameter 920mm, Perbaikan claw buffer ui.1 dan 2, selfload,
1 CC 206 13 31 PB YK 27/05/22 01/06/22 3 Pb Ganti roda + fan radiator
15351922 running test
15353455 Selesai penggantian roda diameter 875mm,kran pengurasab LOC,seal jumper pipa air cyl assy 1R.
2 CC 206 13 19 PB SDT 28/05/22 01/06/22 2 Pb Ganti roda
15357901 Perbaikan claw buffer uj.1 dan uj.2, running test

Selesai PB Turbo. Ganti: Nozzle 5 bh, ring piston 5bh, dexel engine, intercooler 2bh, Turbo, HWTS,HTS,
sambungan rantai rem parkir, Tangki air, gelas duga tangki air, seal oring, seal caupling gardan MD,
3 CC 203 98 12 15338673 PB JR 20/05/22 04/06/22 9 Pb Turbo
termometer suhu, Pen BC, kancing pintu Longhood 1 bh. Perb;cyl assy 5bh, krodong exouster, saluran
isap, pengelasan keroposan, tarikan buffer 1a, stel fuel rack. Load test, running test

4 CC 201 77 13 15365458 PB SDT 03/06/22 08/06/22 4 Pb Turbo Selesai PB Turbo, Ganti turbo, intercooler MD sisi R dan L, card input medha, water pump, pen BC,
Perbaikan claw buffer uj.1 dan 2, tarikan buffer uj.1, start, test, load test
Selesai PB Ganti roda + TM 4, Ganti roda menjadi Ø 873 mm, TM No.4, link OS MD, seal shaft
15365654 governor MD, carbon brush MD 1 bh, kontaktif S41, ganti pen BC, perbaikan claw buffer uj.1 dan
5 CC 201 92 19 PB CPN 03/06/22 08/06/22 4 Pb Ganti roda + TM 4
15365844 uj.2, baut nut cutting uj.1A, start, test, running test

6 CC 203 01 06 15369831 PB SDT 06/06/22 09/06/22 4 Pb Governor Selesai PB Governor, Ganti Governor, seal output, cowhanger uj.1, Perbaikan clow buffer uj.1 & 2,
metal spray crank shaft, buffer balk uj.1A, start, test, load test
15369773 Selesai PB Ganti roda menjadi Ø 863 mm, Sunvisor kabin 2B, Anting tarikan buffer uj.1 & 2,
7 CC 206 15 11 PB SDT 06/06/22 09/06/22 4 Pb Ganti roda
15369812 Perbaikan Clow buffer uj.1 & 2, Bocoran pada MD start, test, running test, test EAB
Selesai Ganti seal output MD, nozzle imjector,water pump, v-belt exhauster, seal gardan. Perbaikan
8 CC 201 77 23 15361794 PB BD 01/06/22 10/06/22 7 Pb Motor diesel
las blok MD, metal spray crankshaft, claw buffer uj.1 dan 2.

9 CC 206 13 65 15372393 PB SMC 07/06/22 10/06/22 4 Pb Alternator Selesai Ganti auxiliary generator, blower TM, dipstik MD sisi R , alternator. Perbaikan claw buffer uj. 1
dan 2. Selfload, Selftest EAB
15389749 Selesai PB Bubut roda menjadi Ø 880 mm, ganti MG, stel cow hanger, buffer, pengelasan long hood,
10 CC 203 98 04 PB CPN 16/06/22 18/06/22 2 Pb Bubut roda + ganti MG
15389750 perbaiki bocoran minyak, start, test load test
Selesai Penggantian Turbo,oil pump,water pump. Perbaikan bocoran pada MD,normalisasi pen
11 CC 203 95 11 15397007 PB MN 20/06/22 22/06/22 3 Pb Turbo
BC,pengelasan longhood.Loadtest

Selesai PB Ex Tertemper, GantiBrake cylinder & stang piston BC no 4, Vertical snubber no 6, Gelas
12 CC 206 13 87 15397170 PB CPN 18/06/22 23/06/22 4 Pb Ex tertemper duga HSD, Foglamp 2bh, Mounting foglamp 2bh, Tutup tangki HSD sisi B, perbaikan Roll & rumah roll
rantai rem parkir, Hand grip 1B, Tarikan buffer uj.2, Pintu MV uj.2,Buffer balk uj.2, Topi lampu sein
box, Pintu sand trap uj.2, Sein box uj.2, start, test, self load, running test
Selesai Pb Ganti Roda diameter 920 mm, V-Belt exhauster, Manometer BC & BP MC 1, Cut off valve
15405098 automatic brake MC 1, Tutup timing kotak 1R,Tutup bosh pump 1R &3R, Seal kancing crank case 1R,
13 CC 201 89 08 PB MN 24/06/22 29/06/22 4 Pb Ganti roda
15405380 Clow buffer 1 & 2, Tambah HSD 500 liter & Pelumas MD 200 liter, start, test, running test
Selesai Pb Fan Radiator, ganti fan radiator, pen BC 12 bh, lampu sein box 6 bh, seal gardan konpessor,
14 CC 201 92 13 15410093 PB CPN 27/06/22 30/06/22 4 Pb Fan radiator pengelasan longhood, start, test
BUBUT RODA
15353422 Selesai penggantian gardan, exhauster,antena GPS, Perbaikan bubut roda diameter 890mm,claw
1 CC 203 98 07 PB CPN 28/05/22 01/06/22 2 Pb Bubut Roda + cover seal gardan
15353445 buffer uj.1 dan 2
JULI
N0
SERI SARANA NO WO SIFAT DIPO TANGGAL MASUK TANGGAL KELUAR HARI BYYK LAP MENURUT T.175 REALISASI PENGERJAAN
PERBAIKAN

Selesai PB Bushing gardan + seal output MD, Ganti Bushing gardan kompresor 16 bh, Seal out put MD,
1 CC 206 13 93 15410088 PB CN 27/06/22 01/07/22 5 Pb Bushing gardan + seal output MD
ganti packing tutup HSD, pengerjaan metal spray, Perbaikan Clow bupper uj 1 & 2, start, test

Selesai PB Bocoran pelumas ruang MG, Perbaikan bocoran pelumas di ruang MG, pebersihan tangki
2 CC 203 01 05 15418401 PB MN 01/07/22 05/07/22 3 Pb Bocoran pelumas ruang MG + pembersi
HSD, cek seal out put MD, start, test
Selesai PB Gearbox alternator, Ganti Alternator, perbaikan bocoran pada MD & gear box TM, start,
3 CC 206 13 50 15425760 PB SDT 05/07/22 07/07/22 3 Pb Gearbox alternator test, load test
GCU

Selesai PB GCU, Ganti gardan, seal out put MD, magnet valve P.22, terminal board 1C, lampu
1 CC 201 78 05 15416725 PB YK 30/06/22 07/07/22 6 Pb GCU semboyan 4 bh, perbaikan metal spray crank shaft sisi out put MD, bocoran pada MD & gear box TM,
pengelasan longhood, start, test, load test
BUBUT RODA
15410370 Selesai PB Bubut roda menjadi Ø 859 mm, Ganti gardan, kompressor, perbaikan clow buffer uj 1&2, start,
1 CC 206 13 08 PB SDT 25/06/22 01/07/22 5 Pb Bubut roda + gardan
15410372 test, self test EAB, self load
PANTAUAN KRD/E/I PB, GCU, BR DAN TB
DI BYYK TAHUN 2022

MARET
N0
SERI SARANA NO WO SIFAT DIPO TANGGAL MASUK TANGGAL KELUAR
PERBAIKAN

1 K3 3 11 01 ( Bias ) 15211361 PB SLO 15/03/22 24/03/22

2 K3 3 11 02 ( Bias ) 15211365 PB SLO 15/03/22 24/03/22

3 K3 3 11 03 ( Bias ) 15211367 PB SLO 15/03/22 24/03/22

4 K3 3 11 04 ( Bias ) 15211369 PB SLO 15/03/22 24/03/22

GCU
1 SI 3 82 06 (kais 3) 15187728 PB THB 01/03/22 16/03/22
2 SI 3 82 05 (kais 3) 15187732 PB THB 01/03/22 16/03/22
3 SI 3 82 07 (kais 3) 15187737 PB THB 01/03/22 16/03/22
PANTAUAN KRD/E/I PB, GCU, BR DAN TB
DI BYYK TAHUN 2022

MARET
HARI BYYK LAP MENURUT T.175 REALISASI PENGERJAAN
PERBAIKAN
Selesai PB Ganti roda & Air spring, Ganti roda Ø 860 mm, air spring 3 bh, klem BP
8 Pb Ganti roda + air spring antar kereta, minyak kompressor, mounting genset, Perbaikan exhaust MD, start, test,
running test
Selesai PB Ganti roda & Air spring, Ganti roda Ø 860 mm, air spring 3 bh, klem BP
8 Pb Ganti roda + air spring antar kereta, minyak kompressor, mounting genset, Perbaikan exhaust MD, start, test,
running test
Selesai PB Ganti roda & Air spring, Ganti roda Ø 860 mm, air spring 3 bh, klem BP
8 Pb Ganti roda + air spring antar kereta, minyak kompressor, mounting genset, Perbaikan exhaust MD, start, test,
running test
Selesai PB Ganti roda & Air spring, Ganti roda Ø 860 mm, air spring 3 bh, klem BP
8 Pb Ganti roda + air spring antar kereta, minyak kompressor, mounting genset, Perbaikan exhaust MD, start, test,
running test
GCU
11 Pb GCU + interior/eksterior kereta Selesai PB GCU + interior/eksterior kereta, start, test, running test
11 Pb GCU + interior/eksterior kereta Selesai PB GCU + interior/eksterior kereta, start, test, running test
11 Pb GCU + interior/eksterior kereta Selesai PB GCU + interior/eksterior kereta, start, test, running test
PANTAUAN KERETA, GERBONG, BA
DI BYYK TAHUN 20

JANUARI
N0
SERI SARANA NO NPK SIFAT DIPO TANGGAL MASUK TANGGAL KELUAR
1 K1 0 95 07 15073891 PB SMC 31/12/21 01/01/22
2 K3 0 06 22 15073893 PB BD 31/12/21 03/01/22
3 KP3 0 94 03 15078130 PB SLO 03/01/22 04/01/22
4 K3 0 19 29 15081997 PB YK 05/01/22 06/01/22
5 K3 0 11 02 15086107 PB YK 07/01/22 10/01/22
6 K1 0 18 118 15086082 PB SLO 07/01/22 10/01/22
7 K3 0 06 05 15086078 PB SLO 07/01/22 10/01/22
8 K3 0 09 22 15086075 PB SLO 07/01/22 10/01/22
9 K3 0 85 36 15106542 PB SLO 14/01/22 21/01/22
10 K1 0 80 04 15106585 PB SLO 17/01/22 21/01/22
11 K3 0 10 04 15107467 PB YK 18/01/22 21/01/22
12 K3 0 07 13 15109222 PB YK 19/01/22 21/01/22
13 K3 0 18 29 15130679 PB SLO 29/01/22 31/01/22
FEBRUARI
N0
SERI SARANA NO NPK SIFAT DIPO TANGGAL MASUK TANGGAL KELUAR
1 K1 0 82 02 15135512 PB SLO 01/02/22 03/02/22
2 K3 0 07 12 15136841 PB YK 02/02/22 04/02/22
3 MP3 0 16 03 15161154 PB SLO 16/02/22 17/02/22
4 M1 0 19 10 15163582 PB YK 17/02/22 18/02/22
5 K3 0 18 64 15166663 PB SLO 21/02/22 22/02/22
6 B 0 07 16 15164976 PB SLO 18/02/22 23/02/22
7 K3 0 00 02 15173897 PB YK 22/02/22 24/02/22
MARET
N0
SERI SARANA NO NPK SIFAT DIPO TANGGAL MASUK TANGGAL KELUAR
1 K3 0 93 20 15190535 PB YK 02/03/22 04/03/22
2 K3 0 19 03 15195907 PB JAKK 06/03/22 08/03/22
3 K3 0 19 04 15195912 PB JAKK 06/03/22 08/03/22
4 K3 0 07 04 15195914 PB YK 07/03/22 09/03/22
5 K3 0 66 23 15201110 PB BD 09/03/22 10/03/22
6 K3 0 18 62 15201706 PB SLO 10/03/22 11/03/22
7 P 0 67 03 15205660 PB BD 11/03/22 12/03/22
8 K3 0 19 56 15205796 PB SLO 11/03/22 14/03/22
9 K1 0 18 99 15214403 PB SLO 16/03/22 21/03/22
10 K1 0 19 14 15218911 PB SLO 19/03/22 22/03/22
11 K3 0 14 12 15222097 PB PWT 19/03/22 24/03/22
12 K3 0 93 43 15222105 PB PWT 21/03/22 24/03/22
13 K3 0 07 14 15226888 PB YK 23/03/22 25/03/22
14 K1 0 01 10 15224103 PB SLO 22/03/22 25/03/22
15 K1 0 95 23 15224689 PB JAKK 22/03/22 25/03/22
16 K3 0 18 66 15228782 PB SLO 24/03/22 29/03/22
17 K1 0 19 30 15228783 PB SLO 24/03/22 29/03/22
18 K3 0 19 58 15236263 PB YK 26/03/22 30/03/22
19 M1 0 18 21 15236264 PB YK 28/03/22 30/03/22
20 K3 0 19 36 15236447 PB YK 25/03/22 30/03/22
APRIL
N0
SERI SARANA NO NPK SIFAT DIPO TANGGAL MASUK TANGGAL KELUAR
1 K3 0 17 45 15253527 PB PWT 01/04/22 05/04/22
2 K3 0 19 37 15253697 PB YK 05/04/22 06/04/22
3 K1 0 18 123 15254719 PB JAKK 06/04/22 08/04/22
4 K1 0 18 79 15257566 PB JAKK 07/04/22 08/04/22
5 K3 0 66 96 15267309 PB BD 13/04/22 14/04/22
6 K3 0 09 35 15267306 PB BD 13/04/22 14/04/22
7 K3 0 09 13 15269390 PB BD 14/04/22 15/04/22
8 K3 0 65 67 15269394 PB BD 14/04/22 15/04/22
9 K3 0 19 66 15280622 PB SDT 19/04/22 20/04/22
JUNI
N0
SERI SARANA NO NPK SIFAT DIPO TANGGAL MASUK TANGGAL KELUAR
1 K1 0 02 40 15384877 PB JAKK 11/06/22 13/06/22
2 K1 0 95 13 15384878 PB JAKK 11/06/22 13/06/22
3 K3 0 14 32 15391281 PB JAKK 16/06/22 16/06/22
4 K1 0 86 16 15415253 PB KTG 29/06/22 30/06/22
JULI
N0
SERI SARANA NO NPK SIFAT DIPO TANGGAL MASUK TANGGAL KELUAR
1 K1 0 18 132 15419874 PB JAKK 02/07/22 05/07/22
2 K1 0 18 124 15419876 PB JAKK 02/07/22 05/07/22
AUAN KERETA, GERBONG, BAGASI BUBUT RODA
DI BYYK TAHUN 2022

JANUARI
HARI BYYK LAP MENURUT G.208/G.209
1 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
6 Pb Bubut roda
5 Pb Bubut roda
4 Pb Bubut roda
3 Pb Bubut roda
1 Pb Bubut roda
FEBRUARI
HARI BYYK LAP MENURUT G.208/G.209
2 Pb Bubut roda
3 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
4 Pb Bubut roda
3 Pb Bubut roda
MARET
HARI BYYK LAP MENURUT G.208/G.209
2 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
3 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
1 Pb Bubut roda
2 Pb Bubut roda
4 Pb Bubut roda
2 Pb Bubut roda
4 Pb Bubut roda
4 Pb Bubut roda
3 Pb Bubut roda
4 Pb Bubut roda
4 Pb Bubut roda
4 Pb Bubut roda
4 Pb Bubut roda
3 Pb Bubut roda
3 Pb Bubut roda
4 Pb Bubut roda
APRIL
HARI BYYK LAP MENURUT G.208/G.209
3 Pb Bubut roda
2 Pb Bubut roda
3 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
2 Pb Bubut roda
JUNI
HARI BYYK LAP MENURUT G.208/G.209
1 Pb Bubut roda
1 Pb Bubut roda
1 Pb Bubut roda
2 Pb Bubut roda
JULI
HARI BYYK LAP MENURUT G.208/G.209
2 Pb Bubut roda
2 Pb Bubut roda
REALISASI PENGERJAAN
Selesai Bubut Roda menjadi Ø 743 mm
Selesai Bubut Roda menjadi Ø 752 mm
Selesai Bubut Roda menjadi Ø 740 mm
Selesai Bubut Roda menjadi Ø 740 mm
Selesai Bubut Roda menjadi Ø 748 mm
Selesai Bubut Roda menjadi Ø 734 mm
Selesai Bubut Roda menjadi Ø 755 mm
Selesai Bubut Roda menjadi Ø 735 mm
Selesai Bubut Roda menjadi Ø 745 mm
Selesai Bubut Roda menjadi Ø 755 mm
Selesai Bubut Roda menjadi Ø 750 mm
Selesai Bubut Roda menjadi Ø 740 mm
Selesai Bubut Roda menjadi Ø 715 mm

REALISASI PENGERJAAN
Selesai Bubut Roda menjadi Ø 765 mm
Selesai Bubut Roda menjadi Ø 760 mm
Selesai Bubut Roda menjadi Ø 760 mm
Selesai Bubut Roda menjadi Ø 756 mm
Selesai Bubut Roda menjadi Ø 732 mm
Selesai Bubut Roda menjadi Ø 742 mm
Selesai Bubut Roda menjadi Ø 760 mm

REALISASI PENGERJAAN
Selesai Bubut Roda menjadi Ø 759 mm
Selesai Bubut Roda menjadi Ø 748 mm
Selesai Bubut Roda menjadi Ø 739 mm
Selesai Bubut Roda menjadi Ø 765 mm
Selesai Bubut Roda menjadi Ø 743 mm
Selesai Bubut Roda menjadi Ø 725 mm
Selesai Bubut Roda menjadi Ø 755 mm
Selesai Bubut Roda menjadi Ø 735 mm
Selesai Bubut Roda menjadi Ø 763 mm
Selesai Bubut Roda menjadi Ø 722 mm
Selesai Bubut Roda menjadi Ø 760/759 mm
Selesai Bubut Roda menjadi Ø 733/735 mm
Selesai Bubut Roda menjadi Ø 729 mm
Selesai Bubut Roda menjadi Ø 754 mm
Selesai Bubut Roda menjadi Ø 740 mm
Selesai Bubut Roda menjadi Ø 736/738 mm
Selesai Bubut Roda menjadi Ø 725 mm
Selesai Bubut Roda menjadi Ø 750 mm
Selesai Bubut Roda menjadi Ø 740 mm
Selesai Bubut Roda menjadi Ø 730 mm

REALISASI PENGERJAAN
Selesai Bubut Roda menjadi Ø 733 mm
Selesai Bubut Roda menjadi Ø 747 mm
Selesai Bubut Roda menjadi Ø 750 mm
Selesai Bubut Roda menjadi Ø 734 mm
Selesai Bubut Roda menjadi Ø 745 mm
Selesai Bubut Roda menjadi Ø 738 mm
Selesai Bubut Roda menjadi Ø 739 mm
Selesai Bubut Roda menjadi Ø 748 mm
Selesai Bubut Roda menjadi Ø 760 mm

REALISASI PENGERJAAN
Selesai Bubut Roda menjadi Ø 765 mm
Selesai Bubut Roda menjadi Ø 735 mm
Selesai Bubut Roda menjadi Ø 763 mm
Selesai Bubut Roda menjadi Ø 754 mm

REALISASI PENGERJAAN
Selesai Bubut Roda menjadi Ø 735 mm
Selesai Bubut Roda menjadi Ø 739 mm
PANTAUAN PROGRAM PERAWATAN LOKOMOTIF SAMPAI ANGKUTAN LEBARANTAHUN 2020
UPT BALAI YASA YOGYAKARTA
REALISASI
PROGRAM SIFAT TANGGAL HARI
NO NO SERI SARANA PRODUKSI BULAN DIPO TANGGAL MASUK
BULAN PEKERJAAN KELUAR BYYK
1 CC 206 13 14 JANUARI MARET GO SDT 08-Jan-2020 04-Mar-2020 56
2 CC 201 83 14 (52) JANUARI FEBRUARI P72 PWT 09-Jan-2020 11-Feb-2020 33
3 CC 203 98 18 (30) APRIL FEBRUARI P72 MN 09-Jan-2020 19-Feb-2020 41
4 CC 206 13 70 FEBRUARI MARET GO JNG 17-Jan-2020 07-Mar-2020 50
5 CC 203 02 02 (39) FEBRUARI FEBRUARI P48 SDT 29-Jan-2020 26-Feb-2020 28
6 CC 201 83 29 (67) FEBRUARI FEBRUARI P72 SMC 27-Jan-2020 28-Feb-2020 32
7 CC 204 03 07 (07) FEBRUARI FEBRUARI P24 YK 30-Jan-2020 29-Feb-2020 30
8 CC 203 95 12 (12) FEBRUARI MARET P48 PWT 07-Feb-2020 04-Mar-2020 26
9 CC 201 89 09 (81) FEBRUARI MARET P72 MN 29-Jan-2020 19-Mar-2020 50
10 CC 201 89 01 (73) FEBRUARI MARET P72 THB 06-Feb-2020 21-Mar-2020 44

PROSES PENGERJAAN
PROGRAM SIFAT TANGGAL HARI
NO NO SERI SARANA PRODUKSI BULAN DIPO TANGGAL MASUK
BULAN PEKERJAAN KELUAR BYYK
1 CC 206 13 71 JANUARI GO JNG 24-Feb-2020
2 CC 206 13 18 MARET GO SDT 28-Feb-2020
3 CC 201 92 07 (97) MARET P72 BD 27-Feb-2020
4 CC 204 03 02 (02) MARET P72 YK 02-Mar-2020
5 CC 201 83 17 (55) MARET P72 PWT 03-Mar-2020
6 CC 201 77 18 (23) MARET P72 CN 04-Mar-2020
7 CC 204 03 05 (05) MARET P48 YK 11-Mar-2020
8 CC 203 98 07 (19) MARET P72 JNG 16-Mar-2020
9 CC 203 02 01 (38) MARET P72 SDT 16-Mar-2020
10 CC 201 92 05 (05) APRIL P72 BD 16-Mar-2020
11 CC 201 83 13 (51) MARET P72 PWT 16-Mar-2020
12 CC 203 98 16 (28) MARET P48 SMC 17-Mar-2020
13 CC 203 01 05 (35) FEBRUARI P72 MN 26-Mar-2020
14 CC 203 01 06 (36) APRIL P72 SDT 26-Mar-2020
15 CC 201 89 08 (80) MARET P72 MN 26-Mar-2020

BELUM MASUK
PROGRAM SIFAT TANGGAL HARI
NO NO SERI SARANA PRODUKSI BULAN DIPO TANGGAL MASUK
BULAN PEKERJAAN KELUAR BYYK
1 CC 201 92 10 (100) MARET P72 BD
2 CC 201 78 06 (38) APRIL P72 JNG
3 CC 201 83 26 (64) APRIL P72 PWT
4 CC 201 83 27 (65) APRIL P72 PWT
5 CC 201 77 02 (02) APRIL P72 SDT
6 CC 203 98 09 (21) APRIL P72 SMC
7 CC 203 02 03 (40) APRIL P48 SDT
8 CC 203 98 02 (14) APRIL P72 JR

CC 206 dimasukan setelen Lebaran


1 CC 206 13 60 FEBRUARI GO JNG
2 CC 206 13 06 FEBRUARI GO SMC
3 CC 206 13 76 MARET GO JNG
4 CC 206 13 08 MARET GO SDT
5 CC 206 13 88 APRIL GO JNG
6 CC 206 13 81 APRIL GO BD
7 CC 206 13 24 APRIL GO SDT
8 CC 206 13 66 MEI GO SMC
9 CC 206 13 25 MEI GO SDT