COFIRING BIOMASSA PADA

PLTU BATUBARA
PT. PEMBANGKITAN JAWA-BALI
​ PEKAN INOVASI ENERGI BARU & TERBARUKAN INDONESIA

BPPT, 29 Juli 2021

​ TEGUH WIDJAJANTO

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or distribute this document
without permission of PEMBANGKITAN JAWA-BALI, PT
WILAYAH OPERASIONAL PT.PJB
PJB Mengelola 20.941 MW Pada Tahun 2020
1 1

2 15 11
2 4
3 3
8 16 12
8
6
4 7 5
5 2
8 1
2 10
9
2 10 2
3 5 1
3 1 2 1 7
3 4 1
3 5 1
5
4 3 4 6
9 4 5
2 3 13
4
7
14

Beroperasi 18.336 MW

Konstruksi 2.605 MW
Arahan Pemerintah dalam NDC & Isue Strategis CoFiring
Latar Belakang & Permasalahan
Arahan Pemerintah dalam Isue Strategis
NDC CoFiring
RUPTL 2019-2028 (berdasarkan Potensi Energi Terbarukan
KEN)
Potensi EBT menjadi energi sebesar
Target bauran Energy nasional untuk 443,208 MW dan pemanfaatan masih
EBT 23% di tahun 2025 rendah (1,9%) = 8215,5 MW *

COP21 Paris Net Zero Emission


Agreement
03 04
Pemerintah mempersiapkan
Target pengurangan emisi komitmen net zero emission
Gas Rumah Kaca (GRK)
02 05 Indonesia, khususnya program
29% di tahun 2030 (BAU) penurunan emisi di subsector
pembangkitan listrik **

NDC dalam UNFCCC 01 06


Program Green Booster
The Indonesian government is committed to reducing Komitmen Pemerintah
Mengisi GAP RPJMN - RJPP
Indonesia dalam
greenhouse gas emissions as set out in the Nationally memberikan kontribusi
dengan “Green Booster”
Determined Contribution (NDC) in reaching Indonesia's melalui 4 program : CoFiring
terhadap solusi perubahan
Biomassa, PLTD Hybrid, Solar
net zero emission goal. To support the realization of net iklim global
PV dan Multi purpose Dams
zero emission, Ministry of EMR has prepared a number of
strategies, one of which is co-firing of coal-fired power
plants. Currently, the government are preparing ❑ * Menurut ESDM cadangan biomass nasional memiliki potensi 32.6 GW dan mengandung sulfur yang lebih
rendah dari batubara, namun masalah fuel supply masih jadi kendala untuk pengembangan potensi
Indonesia's net zero emission commitment, especially the Biomassa
emission reduction program in the electricity generation ❑ ** Program penurunan emisi di subsektor pembangkitan tenaga listrik dengan penghentian pengoperasian
pembangkit listrik tenaga batubara sebesar 53 GW antara tahun 2025-2045
subsector by terminating the operation of coal-fired power 3
PT Pembangkitan Jawa Bali
plants by 53 GW between 2025—2045.
PT Pembangkitan Jawa Bali
PJB Biomass Co-Firing Road Map

Study / Kerjasama Implementasi Biomass Progresive


Kerjasama Pemodelan Co-Firing Business Cofiring
❖ Penelitian
MHPS & SUMITIMO ❖
Numerik
ITS (Paiton 1,2,9) PC ❖ Uji Bakar di 14 PLTU ❖ Ecosystem
100% PLTU Batubara ❖ 100% PLTU Batubara
Cofiring di Jepang & ❖ UGM (Tenayan) CFB (PC,CFB,STOKER) direncanakan selesai direncanakan GoLive
Korea mencapai 30% ❖ UB (Ropa,Bolok) Kapasitas 7MW ujicoba Cofiring (s/d dan Sustain
Biomass (W) Stoker & CFB (Tembilahan,Ropa) s/d Juli 2021 : uji 19/20) Operation PC Boiler
❖ LEMTEK UI ❖ UNDIP (Ketapang) 660MW (Paiton9) ❖ 100% type PLTU (PC, 2%
Penelitian & CFB ❖ Menggunakan lebih CFB,STOKER) CFB Boiler 5%
Pengembangan mobile 10 Jenis Biomassa GoLive dan Sustain STOKER 10%
gasifier dan pemetaan Survey Feedstock (Pellet kayu,Pellet Operation (s/d Juni ❖ Biomass Ecosystem
potensi Biomassa organik, Sawdust, 2021 : Golive Feedstock Proven for
❖ PT. PGI ❖ Perhutani PKS, Lamtoro, komersial 6 PLTU Sustain Operation
PLTBm Gasifikasi ❖ Inhutani Rabasan, Brown fiber, JMB) ❖ Listrik kerakyatan
biomassa & ❖ Pemasok WP di Jawa & Kayu sagu, sengon) ❖ Biomass alternative dan sinergi BUMN
Perkebunan Tanaman Sulawesi (EFB & Rice husk)
❖ Cangkang Sawit di
Go Live / Sustain Proven (Perhutani,
Energi study & uji. ❖ PTPN)
Dedieselisasi PLTD
❖ DRAX POWER UK Sumatera & Kalimantan Operation ❖ Biomass Feedstock dengan Biomass
Co-firing PLTU 6 x ❖ MOU dgn Perhutani ❖ Paiton 1,2 (Sawdust) straightening Gasifier proven untuk
660MW 🡪 100% ❖ Pacitan (Sawdust) daerah 3T
Wood Pellet selama 8 ❖ Ketapang (Palm ❖ PJB & Japan
tahun untuk studi & Shell) (JCOAL) biomass Co-
Modifikasi firing study by PC
Boiler and USC-CFB
Boiler 55
2018 2019 2020 2021 2022
Tahapan Co-Firing PLTU

1. Review Teknologi Co-firing 2. Survey Feedstock & Uji 3. Simulasi Numerik


Laboratorium

4. Uji Bakar 5. Go live Komersial 6. Analisa Durabilitas 7. Sustainability feedstock

PT Pembangkitan Jawa Bali


Type PLTU & Jenis Biomass Cofiring
PC Boiler CFB Boiler Stoker Boiler

Coal Crusher Coal Spreader

Coal Mill

PLTU PC CFB Stoker


PC Boiler CFB Boiler Coal Equipment Coal Mill Coal Crusher Coal Spreader

Feeding Particle
Mesh 20 (0.841) ≤ 30 ≤ 100
size (mm)
Particle size of
Mesh 200 (0.074) ≤8 ≤ 25
discharging (mm)
Types of Biomass
Pellet, sawdust Pellet, chips Pellet, chips
cofiring

Stoker Boiler
PT Pembangkitan Jawa Bali
PLTU Paiton sebagai Pioneer CoFiring Biomassa di PLN Group
Pioneer dan Benchmark Leader
PLTU Paiton sebagai Pioneer
CoFiring Biomassa di PLN
Group,
1. Pengujian Pertama
CoFiring PC Boiler dg
Wood Pellet di PLN Group
pada September 2019
2. GoLive Komersial
Pertama di PLN Group
pada 10 Juni 2020 dan
menginspirasi PLTU
Batubara lainnya 6 bulan
kemudian (Pacitan,
Suralaya 1-4, Ketapang) di
akhir 2020

3 Jenis PLTU CoFiring :


PC, CFB, Stoker

PLTU Paiton sebagai


Benchmark Leader :
1. S2P
2. PLN Group : (IP, Pusenlis,
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or distribute this document Puslitbang, UIW, UPDK)
without permission of
The information PEMBANGKITAN
contained JAWA-BALI,
in this document PTconfidential. It is strictly forbidden to use, disclose, copy, modify, or distribute this document
is strictly 3. PLN BB & Niaga
without permission of PEMBANGKITAN JAWA-BALI, PT
4. Komtek Bioenergi ESDM
Uji Bakar : 8/19/20 (8 Komersial/ 19 Uji/ 20 PLTU)
Periode Uji 2019 – Juli 2021
REGIONAL JMB SumKal SumKal JMB JMB SumKal Sulmapa SumKal JMB JMB Sulmapa Sulmapa SumKal SumKal Sulmapa
02 08
01 03 04 05 06 07 09 10 11 12 13 14 15
No Parameter Satuan KETAPAN KALTIMTL
PAITON 1-2 TENAYAN INDRMY REMBANG BELITUNG ANGGREK PACITAN PAITON 9 ROPA BOLOK TMBLHN PULPIS KENDARI
G K
2 x 110 2 x 16,5 2 x 110 2x7 2 x 16,5 2x7 3 X 10
1 Intall Capacity MW 2 x 400 PC 2 x 10 CFB 3 x 330 PC 2 x 315 PC 2 x 25 CFB 2 x 315 PC 1 x 660 MW 2 x 60 CFB
CFB CFB CFB STOKER CFB STOKER STOKER
DMN MW 2 x 360 2x8 2 x 87,5 3 x 290 2 x 280 2 x 15,85 2 x 22,5 2 x 84 2 x 280 1 x 615 2x6 2 x 15 2 x 6,2 2 x 45 3x8
2 GCV Coal kcal/kg 4552 4145 4134 4273 4600 4200 4216 4282 4200 4237 4152 4262 4100 4210 4200
3 Capacity test MW 400 10 90 310 300 16 25 93 300 635 7 16.5 7 55 10
4 Fuel cons ton/jam 200 11 80 186 180 13.5 22 70 180 380 7.5 14.58 8 50 11
1%, 3%, 1%, 3%, 1%, 3%,
5 Uji Co-Firing % 1%, 3%, 5% 5% 5% 3%, 5% 1%, 5% 3%, 5% 5% 5% 10%, 15% 10%, 15% 3%, 5% 1%, 5%
5% 5% 5%
6 Lama Uji jam 10 10 8 6 6 12 8 8 8 7.5 12 12 12 10 6
7 Kebutuhan Uji ton 160 12 32 89 54 13 11 34 72 143 14 14 14 40 4
8 Biomass:
Palm K
Wood
Wood Pellet Palm K shell Wood Palm K Woodchip Palm K Pellet Woodchip Palm K
Type Pellet Sawdust Sawdust Wood chips Woodchip
Sawdust shell Brown Pellet shell Lamtoro shell Organik Sagu shell
Sawdust
Fiber
4449 4264 4486
GCV kcal/kg 4280 4189 4300 4200 4300 2694 4294 4131 4141 2744 3303.5 4711
2694 (2700) 1867
Uji Bakar Uji Bakar Uji Bakar Uji Bakar Uji Bakar Uji Bakar Uji Bakar Uji Bakar Uji Bakar Uji Bakar Uji Bakar Uji Bakar Uji Bakar Uji Bakar Uji Bakar
selesai selesai Selesai Selesai Selesai Selesai Selesai selesai 30T Selesai Selesai Selesai Selesai Selesai Selesai Selesai
Sep19 Uji 1% Lap selesai (40T) Lap 8 PLTU Lap Selesai Lap Selesai Lap Selesai Lap Selesai Lap Selesai Lap Selesai Lap Selesai Lap Selesai Derating Lap Selesai 23 Des Uji
WP 20Des19 Uji Lap Selesai 13-17 Jan 3-5 Feb2020 11 Juni Uji 11 Juni Uji 24 Juni Uji 2 Sept Uji 8 Sep Uji 5% 14-15 Sep 29 Sept Uji 15 Okt Uji 21 Des Uji 1%
Okt19 Uji 3% 5% PKS 21 Juni Uji 2020 Uji 1 3 5% 3%, lanjut // 1%, lanjut // 0% 5% Golive Uji 10% 5% 20% 3% 28 Des Uji
WP Go Live 5% Uji 1 3 5% (WP) 12MW 25MW. 25 Juni Uji 3 Sept Uji 21/6/2021 16 Okt Uji 22 Des Uji 5%
9 PROGRESS Nop19 Uji 5% 29Des20 brownfiber Golive 21 Jan 2021 18 Juni Uji 24 Juni Uji 5% 0% 0% 5%
WP 30T 21/6/2021 Uji 5% (Saw) 5%, lanjut // 5%, lanjut // Go Live
6Mei20 Uji 5% Golive 12MW 25MW 7Des20
SD
21/6/2021 Komersial
Lap selesai
Jan21
Go Live
10Juni20
10 Evaluasi:
PKS : Aman
Aspek Ops Aman Aman Aman Aman Aman Aman Aman Aman Aman Aman Aman Derating Aman Aman
BF : Derating
Aspek WP : TM
Memenuhi Memenuhi Memenuhi TM Memenuhi Memenuhi Memenuhi Memenuhi Memenuhi Memenuhi Memenuhi TM Memenuhi Progress
Financial Saw : Mem
BME 9
Aspek Lingk Memenuhi Memenuhi Memenuhi Memenuhi Memenuhi Memenuhi Memenuhi Memenuhi Memenuhi Memenuhi Memenuhi Memenuhi Memenuhi Memenuhi Memenuhi
LHK
11 Feedstock:
Uji Bakar : 8/18/20 (8 Komersial /18 Uji /20 PLTU) - Cont 3 Jenis PLTU :
Periode Uji 2019 – 21 Juni 2021 PC, CFB, Stoker
REGIONAL Sulmapa SumKal JMB Sulmapa Sulmapa
No Parameter Satuan
16 17 18 19 20 3 Regional :
TIDORE BANGKA TJA AMURANG AMPANA JMB, SumKal, Sulmapana
2x7 2X3
1 Intall Capacity MW 2 x 30 CFB 2 x 350 PC 2 X 25 CFB
STOKER STOKER
DMN MW 2x6 2 x 27 2 x 315 8 Komersial :
2 GCV Coal kcal/kg 4023 4233 4552 4200 4200
3 Capacity test MW 7 23 400 25 3 PLTU Paiton 1-2, PLTU Pacitan,
4 Fuel cons ton/jam 8 22 200 22 4 PLTU Ketapang, PLTU Anggrek,
5 Uji Co-Firing % 5% 3%, 5% 5% 5% 5%
6 Lama Uji jam 6 8 10 6 6
PLTU Rembang, PLTU Paiton 9,
7 Kebutuhan Uji ton 2 14 160 7 1 PLTU Tj.Awar-Awar, PLTU
8 Biomass: Indramayu
Batok
Type Woodchip Sawdust
Kelapa
GCV kcal/kg 3975 19 Uji dari 20 PLTU batubara
Uji Bakar survey Golive Tahap survey Tahap survey
Selesai feedstock Komersial: feedstock & feedstock &
Lap Selesai- Direncanakan 21 Juni 2021 Uji Labor Uji Labor
10 lebih Biomassa :
Feb 2021
13
setelah OH#2
biomassa biomassa Pellet Kayu, Cangkang sawit,
8 Jan Uji 0%
9 PROGRESS
12 Jan Uji
dan Siaga Sawdust, Pellet Organik,
Nataru, 10Feb
5% #2 Syncron. Woodchip Kayu Lamtoro,
Siap 40 Ton,
menunggu ijin
Woodchip Kayu Sagu, Batok
pengujian Kelapa, Woodchip Rabasan,
10 Evaluasi:
Aspek Ops Aman
Woodchip Kayu Gamal, Sekam
Aspek Financial Memenuhi
padi, Pellet EFB
BME
Aspek Lingk Memenuhi
LHK Prosentase CoFiring 1 – 20% :
11 Feedstock:
AMC / Asset Uji coba dilakukan berhahap dari
Opr prosentase rendah hingga 20%,
Kebutuhan bio ton/day 19.2
(5% CoFiring) ton/bl 576
mengikuti jenis boiler dan potensi 10

ton/th 6,912 biomassa sekitar PLTU


Resume CoFiring PJB
s/d Bulan Juni 2021

Parameter 2020 2021


Komersial
3 8
(Total PLTU)
Biomass
Consumption 9,398.04 34,401.10
(MT)
Green
Energy 11,142.03 33,886.80
(MWh)
MW Green - 103.91
(MW)
Green Energy
CO2 Eq Avoid
(MT)
15,752.83 57,662.53 Program Biomass Cofiring di PLTU PJB meningkatkan
konsumsi biomassa hingga 43,799 MT biomassa sejak
CAPEX - - tahun 2020 sampai Juni 2021 dan mereduksi 73,415 MT
(Rp) CO2 equivalen.
Menambah kapasitas menjadi 103.91 MW Green dari 8
Performance Top Ten Top Ten PLTU (4,013,5 MW), tanpa CAPEX
Unit PLTU contained in this
The information NERC document is strictlyNERC
confidential. It is strictly forbidden to use, disclose, copy, modify, or distribute this document
without permission of PEMBANGKITAN JAWA-BALI, PTconfidential. It is strictly forbidden to use, disclose, copy, modify, or distribute this document
(EAF, EFOR)
The information contained in this document is strictly
without permission of PEMBANGKITAN JAWA-BALI, PT
Proyeksi MWH dan MW Green CoFiring 2020 - 2035
CoFiring Biomassa PT PJB di Regional JMB

Developing Developing Developed


Stage Stage Stage
No CAPEX + CAPEX
MWH Green

MW Green
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Kebutuhan Bio 9.216 103.680 291.600 291.600 291.600 518.400 648.000 1.010.880 1.765.152 1.765.152 1.765.152 1.765.152 1.765.152 1.765.152 1.765.152 1.765.152
MWH Green 10.138 114.048 320.760 320.760 320.760 570.240 712.800 1.111.96 1.941.66 1.941.66 1.941.66 1.941.66 1.941.66 1.941.66 1.941.66 1.941.66
MW Green 8 52 146 Kebutuhan
146 146 Bio
259 324MWH505 Green863 MW863 Green 863 863 863 863 863 863

Developing Stage (No CAPEX) Developing Stage Developed Stage


- Kebutuhan Bio sd 291 rb (+CAPEX)
- Kebutuhan Bio sustain di 1765 rb Ton/th
Ton/th - Kebutuhan Bio sd 1765
- MW Green sd 146 MW (5% rb Ton/th - MW Green sustain di 863 MW (20%
CoFiring) - MW Green sd 863 MW CoFiring)

PT Pembangkitan Jawa Bali 12


Terima Kasih

Landscape Pembangkit Listrik


Suppa
7/28/2021 16 Pembangkitan Jawa Bali
PT 16
Lokasi Cofiring PLTU PJB di Regional JMB

Daya Terpasang PLTU BB PJB Konsumsi Bio 1% cofiring Jenis Boiler


PLTU Jenis Biomass
Regional JMB : 4.110 MW Regional JMB : 17.354 ton/bln Pulverized Coal (PC) Wood Pellet /
Pantura : 3.780 MW Pantura : 14.857 ton/bln Sawdust
PT Pembangkitan Jawa Bali
BIOMASS
COFIRING
RATIO ~ 5%
Co-
Firing

5 ~ 50%
Co-Firing

50 ~
100% PT Pembangkitan Jawa Bali 18
Co-Firing
PT PJB PRODUCT PLATFORM

PARTNERSHIP
a. Co-Firing Power Plant
b. Solar Power Plant a. Thermal Project
c. PV Rooftop b. Captive Power
c. EBT Project
d. Project
Assesment
Renewable Energy ASSET
MANAGEMENT
a. Set Up IMAP/EAM
b. Workshop Asset Optimalization
c. Safety Management System

a. Reliability Optimazion
b. Efficiency Customer Driven
Optimazion Product Platform
c. Plant Assesment

ADVANCE
LEARNING
ANALYTIC

MRO
a. Maintenance a. OM Training
b. Repair b. Non Technical Training
c. Overhaul c. EBT Training
d. Engineering Training

19
19
Progress 2021 : 8/19/20 (8 Komersial / 19 Uji/ 20 Power Plant) 1. PLTU Paiton 2x400MW PC
Periode Test : 2019 – Juli 2021 5% WP-SD, Uji Sep-Nop 2019, GoLive 10Jun 2020

2. PLTU Ketapang 2x10MW CFB


5% PKS, Uji 25-26 Nop 2019, GoLIve 29Des 2020

3. PLTU Indramayu 3x330MW PC


5% WP, Uji 14-17 Jan 2020

4. PLTU Tenayan 2x100MW CFB


5% PKS-1% Brown Fiber, Uji 27-29 Jan 2020

5. PLTU Rembang 2x300MW PC


5% WP-SD, Uji 3-5 Feb20. 21 Jan21, GoLive 19Mar2021

1 6. PLTU Anggrek 2x25MW CFB


4 6 1 5% WChip Lamtoro, Uji 9&25 Jun 2020
1 9
6 7. PLTU Belitung 2x16.5MW CFB
3 8 5% PKS, Uji 9&18 Jun 2020
2 8. PLTU Kaltim 2x110MW CFB
2
1 0 5% PKS, Uji 24-25 Sep 2020

8 7 1 9. PLTU Pacitan 2x300MW PC


5% Sawdust, Uji 2-4 Sep 2020, GoLive 7Des 2020
4
1 10. PLTU Paiton 9 1x660MW PC
5 5% Sawdust, Uji 9-11 Sep 2020

16. PLTU Tidore 2x7MW Stoker 11. PLTU Ropa 2x7MW Stoker
5% Batok Kelapa, Uji 12 Jan 2021 10% Organic Pellet, Uji 14-17 Sep 2020
3 5
17. PLTU TJA 2x350MW PC 1 12. PLTU Bolok 2x16.5MW CFB
5% Sawdust, Uji 21 Maret 2021 10% WChip, Uji 28-30 Sep 2020
7 1-
18. PLTU Bangka 2x30MW CFB 9 13. PLTU Tembilahan 2x7MW Stoker
5% WChip, Uji 19-20 April 2021 10 1 20% WChip Sagu, Uji 14-16 Okt 2020
1
19. PLTU Amurang 2x25MW CFB Rencana Uji 14. PLTU Pulpis 2x60MW CFB
5% Woodchip+EG, 25-27 Juni 2021 1 5% WChip, Uji 21-22 Des 2020
Selesai Uji 2 20
20. PLTU Ampana 2x3MW Stoker PT Pembangkitan JawaKendari
15. PLTU Bali 3x10MW Stoker
Renc 5% BIo, 2021, EPC, commisioning
Commercial 5% PKS, Uji 23-28 Des 2021
21 Studi Potensi Biomassa sebagai Energi Alternatif
PJB – Lemtek UI : 2018
Nilai Kalor Moisture Content
Point of Study : Jenis Biomasa
(Kkal/kg) (%)
1. Potensi Biomassa Serat Sawit (fiber) 3.340 30
2. Neraca Biomasa Cangkang Sawit (Shell) 4.300 15
❑ Produk Utama
❑ Produk Samping Tandan Kosong (EFB) 1.200 45
3. Kajian dan Analisis Pelepah Sawit (Frond) 3.350 20
Finansial Batang replanting Sawit
3.500 20
4. Kajian dan Analisis (Trunk)
Resiko Ampas Tebu (Bagasse) 1.850 50
❑ Resiko Supply Daun dan pucuk tebu 3.000 30
Bahan Baku
Sabut Kelapa 3.300 30
❑ Resiko Teknologi
❑ Resiko Sosial Tempurung Kelapa 4.300 15
Ekonomi Batang replanting Karet 4.400 15
Sekam Padi (rice husk) 3.350 12
Jerami Padi 2.800 50
Tongkol Jagung (corn cob) 3.500 14
Tongkol Jagung (corn cob) 3.227 20
Batang dan daun jagung 2.500 40
Limbah Kayu Industri (wood
4.400 15
waste)
Sampah Kota (RDF dari MSW) 2.200 20
Bambu 4.100 16
Kaliandra Merah 4.600 15
Wood Pellet 5.300 5

21
TECHNOLOGY
REVIEW Review Teknologi CoFiring
PJB Study 2018-2020 1. Direct Co Firing
Direct co-firing : bio pellet dicampur melalui peralatan penggiling/grinding dan pengumpan/feeder yang 2. Indirect Co
METODE
sama atau terpisah kemudian dimixing dengan batubara ke dalam boiler yang sama untuk dibakar, Firing
FIRING : 3. Paralel Co
maupun menggunakan boiler terpisah. Umumnya tidak ada investasi biaya peralatan khusus dengan
metode ini, dan merupakan cara pembakaran bersama secara langsung dan hemat biaya. Metode ini TIPE 1. Firing
PC Boiler
merupakan cara pembakaran bersama yang paling banyak diadopsi oleh pulverized coal boiler. BOILER 2. CFB Boiler
SURVEY & UJI

Indirect co-firing : pada metode ini memerlukan peralatan tambahan seperti gasifier bio-pellet. Bio-pellet
: 3. Stoker Boiler
terlebih dahulu di gasifikasi menjadi syngas dalam mesin gasifier sebelum akhirnya masuk ke boiler batubara untuk pembakaran.
LABOR

Kelebihan dari metode ini adalah proses pemurnian syngas dengan metode gasifikasi ini meminimalkan dampak pencemaran
dari pembakaran langsung
Parallel co-firing: pada metode ini memerlukan investasi pembangunan boiler berbahan bakar bio-pellet yang terpisah,
kemudian uap yang dihasilkan dari boiler bio-pellet diumpankan ke dalam sistem uap boiler berbahan bakar batubara eksisting.
Pendekatan ini menggunakan boiler bio-pelet yang terpisah dari boiler batubara yang memungkinkan pemanfaatan bio-pelet lebih
maksimal, namun biasanya digunakan pada produk sampingan untuk pabrik kertas (mis., kulit kayu, limbah kayu).
Reference :
[1] D. A. Tilman, "Final Report : EPRI-
USDOE Cooperative Agreement Co-firing
SIMULASI
NUMERIK

Biomass with Coal," Perryville Corporate


Park, Clinton, New Jersey, 2001.
[2] N. Burdett, "The Development of the
500MW Co-firing facility at Drax Power
Station," in Drax Power, North Yorkshire,
2010.
[3] Prof. Adi Surjosatyo, “Penelitian dan
UJI BAKAR

Pengembangan Gasifikasi Biomassa


Bergerak (Mobile Gasifier)” Lemtek
Universitas Indonesia, 2018
[4] G. Prabowo, "Laporan Kajian Co-firing
PC Boiler CFB Boiler Stoker Boiler Bahan Bakar Batubara dengan Biomassa
pada PLTU Paiton 1-2," ITS Tekno Sains,
22
PT Pembangkitan
Surabaya, 2019. Jawa Bali
Survey Feedstock & Uji Laboratorium
TECHNOLOGY
REVIEW
PJB Joint Study
POINT OF SURVEY : Contoh resume Survey Feedstock biomassa sawdust, cangkang
[1] Skenario uji bakar & kebutuhan uji sawit dan woodchip
bakar sesuai EPRI min requirement
[2] Lokasi terdekat PLTU, karena Survey Survey Survey
Cofiring berbasis ekonomi kerakyatan PLTU Paiton 1-2 PLTU Tenayan PLTU Anggrek
[3] Kapasitas /Mampu pasok dan
SURVEY & UJI

sustaianblity, pengaruh musim Biomassa : Sawdust Biomassa : Cngkng Biomassa : Woodchip


[4] Harga biomassa dan batubara Sawit
LABOR

Uji Bakar : Uji Bakar : Uji Bakar :


referensi 3 bulan terakhir 160 ton (1%, 3%, 5%) 12 ton (1%, 5%)
32 ton (5%)
[5] Sample u/ Uji Laboratorium
Uji Laboratorium Batubara & Biomassa Dasar Rencana kebutuhan Rencana kebutuhan Rencana kebutuhan
Parameter Unit H. Vol. B H. Vol. C Wood Cngkng Wood Sawdust Per hari : 240 ton / unit Per hari : 95 ton / unit Per hari : 25 ton / unit
Bituminus Bituminus Pellet Sawit chip sawmill untuk 5% Cofiring untuk 5% Cofiring untuk 5% CoFiring

Ultimate
Ar Ar Ar Ar Ar Ar Total kebutuhan per
bulan untuk 2 Unit :
Pengujian
Total kebutuhan per
bulan untuk 2 Unit :
Total kebutuhan per
tahun untuk 2 Unit :
Carbon % 48,61 43,82 47,78 48,01 49,03 28,06 1500 Ton/ bulan
14000 Ton/ bulan
Uji Bakar :
5700Ton/ bulan
SIMULASI
NUMERIK

Hydrogen % 3,75 3,37 6,07 5,51 6,03 3,17


Nitrogen % 1,09 0,68 0,15 0,18 0,22 0,15
Oxygen % 13,95 13,22 39,39 33,30 44,12 24,80 Sumber & Kapasitas Sumber & Kapasitas Sumber & Kapasitas

Proximate
pasokan berasal dari 7
lokasi +60km yg
160 ton
pasokan berasal dari 2
lokasi yg disurvey yakni
pasokan berasal dari
hutan lamtoro milik
Total % 24,32 35,84 5,46 12,21 9,52 41,74
Moisture
Ash content % 7,66 2,96 1,08 0,74 0,49 2,01
disurvey yakni : 1.
paiton, probolinggo, 2.
(1%,
: 1. PT. ATM3%,
terletak di
Perawang-Siak dan
masyarakat Gorontalo
Ketersediaan lahan ±
condong, gading, 100 Ha
Volatile
matter
Fixed carbon
%

%
34,43

33,59
30,97

30,24
79,41

14,05
68,67

18,38
83,160

16,35
46,25

10,00
probolinggo, 3. sumber 5%)
berjarak sekitar 80 km
dari PLTU, 2. PT. EPE 1 Ha terdapat ± 312
Ton kayu
UJI BAKAR

jambe, Jember, 4. terletak di Rumbai-Riau


Total sulphur % 0,63 0,11 0,07 0,05 0,096 0,07 Total ketersediaan ±
Wonomerto, berjarak sekitar 160 km
HHV kCal/kg 4897 4199 4487 4543 4140 2694
HGI - 47,00 55,00 <32 <32 <32 probolinggo kota, 6. dari PLTU, dengan 31.200 Ton/th
Bulk Density kg/m3 900,00 890,00 779 585 141 Lumajang, 7. Menganti, kemampuan pasok
AFT IT Red. oC 1180 1200 >1500 1160 >1500 1210 Gresik dengan total 400-600ton/hari Estimasi biaya : 350
AFT ST Red. oC 1190 1220 >1500 1180 >1500 1250 kemampuan pasok Rp/kg 23
AFT HT Red. oC 1210 1240 >1500 1200 >1500 1270
oC total 150-200ton/hari Estimasi biaya : 23
AFT FT Red. 1230 1250 >1500 1210 >1500 1290 PT Pembangkitan Jawa Bali
900Rp/kg
Estimasi biaya :
Simulasi Numerik
TECHNOLOGY

PJB – ITS – UNDIP – UNIBRAW Numerical Study : 2019


REVIEW

100% Batubara
Model PC / CFB Boiler Post Processing Analysis :
1. Kondisi Fireball -> Vektor Velocity
2. Hot spot / distribusi temperature -> Temperature Countour
3. Mixing / distribusi kecepatan -> Velocity Countour
4. Perubahan particle tracking -> Resident time
SURVEY & UJI

Exsum PC Boiler (Paiton 1-2) : Hasil simulasi CFD untuk kontur


LABOR

temperatur secara umum menunjukkan antara kondisi eksisting 100%


batubara dengan kondisi 95% batubara -5% biomass, terdapat penurunan
temperatur pada boiler furnace mulai nose hingga economizer. Kontur
temperatur untuk kondisi 5% biomassa lebih mendekati kondisi 95%
batubara. Fenomena ini selaras dengan hasil pengujian 3% biomassa
yang menunjukkan temperatur FEGT cenderung turun.

95% Batubara + 5% Wood Pellet pada


SIMULASI
NUMERIK

elevasi A
UJI BAKAR

Exsum CFB Boiler (Ketapang) : Pemberian 30% Biomassa mampu


menurunkan temperatur di seal pot sebesar 5% (dari 8940C ke 8580C). Ini
sejalan dengan hasil simulasi berbasis porous media (pasir). Pemberian
24
30% Biomassa memberikan distribusi temperatur yang lebih seragam
dibanding 0% Biomassa. Ini akan mengurangi potensi hot spot di daerah 24
PT Pembangkitan Jawa Bali
tertentu.
Rencana Pasokan Biomassa CoFiring 2020 - 2035
CoFiring Biomassa PT PJB di Regional JMB

Prosentase 2020 - 2024 2025 - 2028 2029 - 2035


BIomassa Developing Stage (No CAPEX) Developing Stage Developed Stage
(+CAPEX)
1. Prosentase 1. 1% sd 5% 1. Sustain 20%
BIomassa 1. 5% sd 20%
2. Jenis 1. Serbuk Kayu / sawdust 1. Serbuk Kayu / sawdust
Biomassa 2. Saw brick 1. Serbuk Kayu / sawdust 2. Sawbrick
3. Woodchip Halus 2. Sawbrick 3. Woodchip Halus
3. Woodchip Halus 4. Sekam padi
4. Sekam padi 5. EFB Pellet/ brick
5. EFB Pellet/ brick
3. Pemasok 1. Lokal Supplier Serbuk Kayu 1. Lokal Supplier Serbuk Kayu
Biomassa 2. Sawmill factory 1. Lokal Supplier Serbuk 2. Sawmill factory
3. Perhutani (Woodchip Halus Kayu Kayu 3. Perhutani (Woodchip Halus Kayu
Gamal/Kaliandra) 2. Sawmill factory Gamal/Kaliandra)
3. Perhutani (Woodchip 4. SHS
Halus Kayu 5. PTPN
Gamal/Kaliandra) 6. HTI – HTE dedicated for Power Plant
4. SHS PT Pembangkitan Jawa Bali 25
5. PTPN
Kementrian ESDM & PLN Co-Firing
Road Map
ICORER - Implementasi Biomass
International Pertemuan Ilmiah Cofiring Business
Bio-Energi Progresive
Conference on Ecosystem Cofiring
Renewable Energy Kementrian ❖ Pemanfaatan Lahan
Research and ESDM disekitar Pembangkit
PLN
Challenge ❖ Skema bisnis dan
rantai pasok
PerDir PLN: 001 /2020 biomassa mulai
Penandatanganan
dibangun dari HTE
Kesepakatan Bersama
❖ Dukungan Regulasi :
PLN – PERHUTANI –
dari adaptasi ke
PTPN Pengadaan
perubahan dan
Biomassa untuk Program
penyesuaian regulasi
Cofiring PLTU Batubara

Rencana PerMen
Program PLN ESDM :
Green Booster Program Cofiring
PLTU Batubara

26
26
2019 Awal 2020 2020 2021 2022
Carbon Positive – Carbon Neutral – Carbon Negative
Definition

Pembakaran bahan bakar fosil akan membuat Ketika gas CO2 di atmosfer tidak bertambah akibat Secara alami pohon mampu menyerap gas CO2 dari
kandungan gas terutama CO2 di atmosfer akan pembangkitan energi dari suatu sumber energi atmosfer, semakin banyak menanam pohon maka
meningkat. Peningkatan gas CO2 di atmosfer inil maka dikatakan sumber energi tersebut Carbon akan semakin banyak gas CO2 tereduksi. Biochar atau
menjadi salah satu penyebab pemanasan global. Neutral. Karena secara neraca tidak menambah arang pertanian, adalah material yang mampu
Oleh karena itu bahan bakar fossil atau bahan ataupun mengurangi gas CO2 diatmosfer maka menyerap gas CO2 dari atmosfer dan menyuburkan
bakar tambang termasuk dalam kelompok bahan energi ini dikatakan ramah lingkungan. Sumber tanah, karena kandungan nutrisi dan media
bakar energi terbarukan seperti biomasa, angin, air dan perkembangbiakkan mikroba tanah. Biomass dg
Carbon Positive matahari adalah Carbon Neutral Biochar sequestration, Carbon Capture and Storage
(CSS) adalah teknologi Carbon Negative

27
Proses Produksi Bamboo
From Raw Material to Sawdust or Pellet
PLTU
PLTU PC Boiler : Stoker
Biaya produksi serbuk & pellet bamboo
tinggi, tidak ekonomis untuk cofiring.

HAMMER MILL BAMBOO SERBUK BAMBOO PELLET


BAMBOO BAMBOO CHIPS
BAMBOO

DRIER

WOOD CHIPPER BAMBOO CHIPS PELLET MACHINE DRIER


WOOD CHIPPER

PT Pembangkitan Jawa Bali 28


Mendukung Program PLN “GREEN BOOSTER”
Latar Belakang
KPI PLN : Penambahan Kapasitas Pembangkit EBT (Terget : 235 MW di 2020), #
#TransformasiPLN Unit Implementasi CoFiring Biomass (Target : 2 Unit di 2020)
“GREEN
BOOSTER” :
1.BIOMASS
COFIRING
2.PLTD HYBRID
3.SOLAR PV
4.MULTI PURPOSE
DAMS

Mengisi GAP RPJMN - RJPP =


~3.5 GW

29
TARGET BAURAN ENERGI PT Pembangkitan Jawa Bali