Anda di halaman 1dari 24

GAMBAR STRUKTUR

KILANG PADI KISARAN

KONSULTAN PERENCANA :
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
A325

K1
K1
K1
K1
I

K2

K1
H

K1
K2

K1
G

K1
K2

K1
K1
F

K2

B
K1
K1
E

K2

K1
K1
D

K2

A
KILANG PADI YANG

K1
C

K1
K2
SUDAH BERDIRI

K1
K1
B

K2

K1
K1
K1
K1
A

K2

1
2
3
4
5
6

B
A
RENCANA KILANG PADI
YANG AKAN DIBANGUN

LAHAN
SIMPANG KEDAI
LEDANG

KILANG PADI KISARAN

JALAN JENDRAL GATOT SUBROTO


NO.152 (JALAN LINTAS SUMATERA)
PT.MEDAN GEOTEKNIK
DAN STRUKTUR

IBU SUN PHUE ENG

SITE PLAN
SITE PLAN
NTS
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

B MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa
A MUTU BAUT
A325

1
K1 K1 K1 K1 K1 K1 K1 K1 K1

K1 K1
B 2 B

K1 K1
3

A
K1 K1 K1 K1 K1 K1 K1 K1 K1
4

KILANG PADI KISARAN

PT.MEDAN GEOTEKNIK
DAN STRUKTUR
K2 K2 K2 K2 K2 K2 K2 K2 K2
5

IBU SUN PHUE ENG


6

I H G F E D C B A

A DENAH GROUND PLAN

DENAH GROUND PLAN


SKALA 1 : 100
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

B MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa
A MUTU BAUT
A325

P1 P1 P1 P1 P1 P1 P1 P1 P1
SLOOF 30/50 SLOOF 30/50 SLOOF 30/50 SLOOF 30/50 SLOOF 30/50 SLOOF 30/50 SLOOF 30/50 1

SLOOF 30/50

SLOOF 30/50
B 2 B
SLOOF 30/50

SLOOF 30/50
3
SLOOF 30/50

SLOOF 30/50
A
P1 SLOOF 30/50 SLOOF 30/50 P1 SLOOF 30/50 P1 SLOOF 30/50 P1 SLOOF 30/50 P1 SLOOF 30/50 P1 SLOOF 30/50 P1 SLOOF 30/50 P1
4

KILANG PADI KISARAN


SLOOF 30/50

SLOOF 30/50
PT.MEDAN GEOTEKNIK
DAN STRUKTUR
P1 SLOOF 30/50 P1 SLOOF 30/50 P1 SLOOF 30/50 P1 SLOOF 30/50 P1 SLOOF 30/50 P1 SLOOF 30/50 P1 SLOOF 30/50 P1 SLOOF 30/50 P1
5

IBU SUN PHUE ENG


6

I H G F E D C B A

A DENAH PONDASI DAN


SLOOF
DENAH PONDASI DAN SLOOF
SKALA 1 : 100
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

B MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa
A
MUTU BAUT
A325

Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm
1

Balok 20 x 150 mm

Balok 20 x 150 mm
B 2 B
Balok 20 x 150 mm

Balok 20 x 150 mm
3
Balok 20 x 150 mm

Balok 20 x 150 mm
A
Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm
4

KILANG PADI KISARAN

PT.MEDAN GEOTEKNIK
WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7
DAN STRUKTUR
5

IBU SUN PHUE ENG


6

I H G F E D C B A

A DENAH BALOK ELEVASI


DENAH BALOK ELV.6m 6M

SKALA 1 : 100
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

B MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
A A325

WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7
1

WF. 150.75.5.7

WF. 150.75.5.7
B 2 B
WF. 150.75.5.7

WF. 150.75.5.7
3

A
WF. 150.75.5.7

WF. 150.75.5.7
WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7
4

KILANG PADI KISARAN

PT.MEDAN GEOTEKNIK
DAN STRUKTUR

IBU SUN PHUE ENG

I H G F E D C B A
DENAH BALOK ELEVASI
A 12M
DENAH BALOK ELV.12 m
SKALA 1 : 100
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

B MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
A325
A

WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7
1

WF. 150.75.5.7

WF. 150.75.5.7
B 2 B
WF. 150.75.5.7

WF. 150.75.5.7
3

A
WF. 150.75.5.7

WF. 150.75.5.7
WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7 WF. 150.75.5.7
4
KILANG PADI KISARAN

PT.MEDAN GEOTEKNIK
DAN STRUKTUR

IBU SUN PHUE ENG

I H G F E D C B A
DENAH BALOK ELEVASI
19,708
DENAH BALOK ELV.19,708 m A
SKALA 1 : 100
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

TALANG AIR RAFTER WF 300.150.6,5.9


B
CANAL C 125.50.2,3 ZAG ROD Ø12 IKATAN ANGIN Ø16
MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
A A325

4
1

3
B 2 B

A
4

KILANG PADI KISARAN

PT.MEDAN GEOTEKNIK
DAN STRUKTUR

IBU SUN PHUE ENG

I H G F E D C B A
DENAH RANGKA ATAP
A
DENAH RANGKA ATAP
SKALA 1 : 100
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

B MUTU BAJA
BJ37; Fy 2400 MPa
A Fu 3700 MPa

MUTU BAUT
A325

Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm
1

Balok 20 x 150 mm

Balok 20 x 150 mm
B Balok 20 x 150 mm
2 B

Balok 20 x 150 mm
3
Balok 20 x 150 mm

Balok 20 x 150 mm
Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm
4
A

KILANG PADI KISARAN

PT.MEDAN GEOTEKNIK
5 DAN STRUKTUR

IBU SUN PHUE ENG


6

I H G F E D C B A

A
DENAH RANGKA KANOPI

DENAH RANGKA KANOPI


SKALA 1 : 100
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

B ATAP GALVALUM 0.4mm


MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

A MUTU BAUT
A325

4
1

3
B 2 B

A
4

KILANG PADI KISARAN

PT.MEDAN GEOTEKNIK
DAN STRUKTUR
5

IBU SUN PHUE ENG

I H G F E D C B A

A DENAH ATAP

DENAH ATAP
SKALA 1 : 100
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

B MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa
A
MUTU BAUT
A325

Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm
1

Balok 20 x 150 mm

Balok 20 x 150 mm
B Balok 20 x 150 mm 2 B

Balok 20 x 150 mm
3
Balok 20 x 150 mm

Balok 20 x 150 mm
Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm Balok 200 x150 mm
A
4

KILANG PADI KISARAN

PT.MEDAN GEOTEKNIK
DAN STRUKTUR
5

IBU SUN PHUE ENG


6
ATAP GALVALUM 0.4mm

I H G F E D C B A

A
DENAH ATAP KANOPI
DENAH ATAP KANOPI
SKALA 1 : 100
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
SENG GALVALUM T = 0,4mm A325
ZAGROD Ø12

GORDING CNP 125.50.20.2,3

RAFTER WF 300.150.6,5.9

STIFFNER MS PLATE 10 MM

TALANG AIR HUJAN

BALOK WF 150.75.5.7
ELV. 19.348m

BALOK WF 150.75.5.7
GORDING CNP 125.50.20.2,3 ELV. 12.674m

SENG GALVALUM T = 0,4mm

ZAGROD Ø12
RAFTER WF 250.125.5.8

STIFFNER MS PLATE 10 MM

RAFTER WF 200.100.5,5.8

BALOK WF 150.75.5.7 Balok Beton 200mm x150mm

KILANG PADI KISARAN


STIFFNER T10
KOLOM WF 250.125.5.8
KOLOM WF 346.148.6.9

STIFFNER T8 WIRE MESH M6 ( 1 LAYER ) +


BETON K-300+PLASTIK COR
4- Ø25 mm x 600 6- Ø25 mm x 600 LONG
HD BOLTS HD BOLTS
PASIR URUG T=5 CM PT.MEDAN GEOTEKNIK
8 THK MS BASE PLATE SIRTU T=10 CM
SLOOF 300/500 260x200x8
10 THK MS BASE PLATE
396x210x10 ELEV. LANTAI PABRIK 0.00
DAN STRUKTUR
ELEV. TANAH ASLI

Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm


L=1350 CM L=1350 CM L=1350 CM
6D13 6D13 6D13
sengkang Ø8-150 sengkang Ø8-150 sengkang Ø8-150

IBU SUN PHUE ENG


6 5 4 1

POTONGAN A-A
SKALA 1 : 75
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
SENG GALVALUM T = 0,4mm
A325
ZAGROD Ø12

GORDING CNP 125.50.20.2,3

RAFTER WF 300.150.6,5.9

STIFFNER MS PLATE 10 MM

TALANG AIR HUJAN

CLADING CNP 125.50.20.2,3

BALOK WF 150.75.5.7 BALOK WF 150.75.5.7 BALOK WF 150.75.5.7

CLADING CNP 125.50.20.2,3

ZAGROD Ø12

ZAGROD Ø12

ZAGROD Ø12
BALOK WF 150.75.5.7 BALOK WF 150.75.5.7 BALOK WF 150.75.5.7
GORDING CNP 125.50.20.2,3

SENG GALVALUM T = 0,4mm

ZAGROD Ø12 CLADING CNP 125.50.20.2,3

RAFTER WF 250.125.5.8

STIFFNER MS PLATE 10 MM

ZAGROD Ø12

ZAGROD Ø12

ZAGROD Ø12
RAFTER WF 200.100.5,5.8

BALOK WF 150.75.5.7
Balok Beton 200mm x150mm Balok Beton 200mm x150mm Balok Beton 200mm x150mm

KILANG PADI KISARAN


STIFFNER T10
KOLOM WF 250.125.5.8
KOLOM WF 346.148.6.9
DINDING BATA DINDING BATA DINDING BATA

STIFFNER T8
4- Ø25 mm x 600 6- Ø25 mm x 600 LONG
HD BOLTS
8 THK MS BASE PLATE
HD BOLTS
10 THK MS BASE PLATE
PT.MEDAN GEOTEKNIK
ELEV. TANAH ASLI
SLOOF 300/500 260x200x8 396x210x10 DAN STRUKTUR

Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm
L=1350 CM L=1350 CM L=1350 CM L=1350 CM L=1350 CM
6D13 6D13 6D13 6D13 6D13
sengkang Ø8-150 sengkang Ø8-150 sengkang Ø8-150 sengkang Ø8-150 sengkang Ø8-150

6 5 4 3 2 1 IBU SUN PHUE ENG

DETAIL A CLADING
DETAIL A CLADING
SKALA 1 : 75
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

SENG GALVALUM T = 0,4mm MUTU BAUT


ZAGROD Ø12 A325
GORDING CNP 125.50.20.2,3

RAFTER WF 300.150.6,5.9

STIFFNER MS PLATE 10 MM

TALANG AIR HUJAN

GORDING CNP 125.50.20.2,3

SENG GALVALUM T = 0,4mm

ZAGROD Ø12
RAFTER WF 250.125.5.8

STIFFNER MS PLATE 10 MM

RAFTER WF 200.100.5,5.8

BALOK WF 150.75.5.7

KILANG PADI KISARAN


KOLOM WF 250.125.5.8

STIFFNER T8
4- Ø25 mm x 600
HD BOLTS
8 THK MS BASE PLATE
SLOOF 300/500 260x200x8 PT.MEDAN GEOTEKNIK
ELEV. TANAH ASLI
DAN STRUKTUR

Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm
L=1350 CM L=1350 CM L=1350 CM L=1350 CM L=1350 CM
6D13 6D13 6D13 6D13 6D13
sengkang Ø8-150 sengkang Ø8-150 sengkang Ø8-150 sengkang Ø8-150 sengkang Ø8-150

6 5 4 3 2 1 IBU SUN PHUE ENG

VIEW A
VIEW A
SKALA 1 : 75
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
RAFTER WF 300.150.6,5.9 CANAL C 125.50.2,3 ZAG ROD Ø12 IKATAN ANGIN Ø16 A325

BALOK WF 150.75.5.7 BALOK WF 150.75.5.7 BALOK WF 150.75.5.7 BALOK WF 150.75.5.7 BALOK WF 150.75.5.7 BALOK WF 150.75.5.7 BALOK WF 150.75.5.7 BALOK WF 150.75.5.7

CLADING CNP 125.50.20.2,3 CLADING CNP 125.50.20.2,3 CLADING CNP 125.50.20.2,3 CLADING CNP 125.50.20.2,3 CLADING CNP 125.50.20.2,3 CLADING CNP 125.50.20.2,3 CLADING CNP 125.50.20.2,3 CLADING CNP 125.50.20.2,3
ZAGROD Ø12

ZAGROD Ø12

ZAGROD Ø12

ZAGROD Ø12

ZAGROD Ø12

ZAGROD Ø12

ZAGROD Ø12

ZAGROD Ø12
BALOK WF 150.75.5.7 BALOK WF 150.75.5.7 BALOK WF 150.75.5.7 BALOK WF 150.75.5.7 BALOK WF 150.75.5.7 BALOK WF 150.75.5.7 BALOK WF 150.75.5.7 BALOK WF 150.75.5.7
ZAGROD Ø12

ZAGROD Ø12

ZAGROD Ø12

ZAGROD Ø12

ZAGROD Ø12

ZAGROD Ø12

ZAGROD Ø12

ZAGROD Ø12
Balok Beton 200mm x150mm Balok Beton 200mm x150mm Balok Beton 200mm x150mm Balok Beton 200mm x150mm

KILANG PADI KISARAN

SLOOF 300/500 SLOOF 300/500 SLOOF 300/500 SLOOF 300/500 SLOOF 300/500 SLOOF 300/500 SLOOF 300/500 SLOOF 300/500

Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm
L=1350 CM L=1350 CM L=1350 CM L=1350 CM L=1350 CM L=1350 CM L=1350 CM L=1350 CM L=1350 CM
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
10D16
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
PT.MEDAN GEOTEKNIK
DAN STRUKTUR
I H G F E D C B A
ELEV. LANTAI PABRIK 0.00

IBU SUN PHUE ENG

POTONGAN B-B
POTONGAN B-B
SKALA 1 : 85
MUTU BETON : K300/ Fc'25
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
RAFTER WF 300.150.6,5.9 CANAL C 125.50.2,3 ZAG ROD Ø12 IKATAN ANGIN Ø16 A325

Balok Beton 200mm x150mm Balok Beton 200mm x150mm Balok Beton 200mm x150mm Balok Beton 200mm x150mm

KILANG PADI KISARAN

SLOOF 300/500 SLOOF 300/500 SLOOF 300/500 SLOOF 300/500 SLOOF 300/500 SLOOF 300/500 SLOOF 300/500 SLOOF 300/500

Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm Bore Pile Ø30cm
L=1350 CM L=1350 CM L=1350 CM L=1350 CM L=1350 CM L=1350 CM L=1350 CM L=1350 CM L=1350 CM
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
6D13
sengkang Ø8-150
PT.MEDAN GEOTEKNIK
DAN STRUKTUR
I H G F E D C B A
ELEV. LANTAI PABRIK 0.00

IBU SUN PHUE ENG

VIEW B
VIEW B
SKALA 1 : 85
CATATAN

MUTU BETON : K225


MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
A325

RAFTER WF 300.150.6,5.9

BAUT+MUR+
RING Ø19

5 0. 6,5.9 PLATE T=2x10 MM


0.1
WF 30
AFTER
R

NAMA PEKERJAAN:

KILANG PADI KISARAN

STIFNEER T=10 MM KOLOM WF 346.174.6.9 PERENCANA:

PT.MEDAN GEOTEKNIK
STIFFNER T 10 DAN STRUKTUR
PIPA 3"

DISETUJUI OLEH:

KOLOM WF 346.174.6.9
IBU SUN PHUE ENG

NAMA GAMBAR

DETAIL SAMBUNGAN RAFTER & KOLOM


SKALA : NTS
NO. GAMBAR SKALA NO. LEMBAR JLH LEMBAR
CATATAN

MUTU BETON : K225


MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
A325
RAFTER WF RAFTER WF 250.125.5.8
200.100.5,5.8

PLAT T 8mm
NAMA PEKERJAAN:

BAUT+MUR+
RING Ø16 KILANG PADI KISARAN

PERENCANA:
STIFNEER T=10 MM

PT.MEDAN GEOTEKNIK
KOLOM WF 250.125.5.8 DAN STRUKTUR

DISETUJUI OLEH:

IBU SUN PHUE ENG

DETAIL SAMBUNGAN RAFTER & KOLOM NAMA GAMBAR

KANOPI
SKALA : NTS
NO. GAMBAR SKALA NO. LEMBAR JLH LEMBAR
CATATAN

MUTU BETON : K225


MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

MUTU BAJA
RABUNG ZINC ALUMINIUM T=0.35 BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
A325

ATAP ZINC ALUMINIUM T=0.45


GORDING CNP 125.50.20.2,3

RAFTER WF 300.150.6,5.9
ZAGROD Ø12

RAFTER WF 300.150.6,5.9

NAMA PEKERJAAN:

BAUT+MUR+
RING Ø19
KILANG PADI KISARAN

PERENCANA:

PT.MEDAN GEOTEKNIK
PLATE T=2x10 MM DAN STRUKTUR

DISETUJUI OLEH:

IBU SUN PHUE ENG

NAMA GAMBAR

DETAIL SAMBUNGAN RAFTER


SKALA : NTS
NO. GAMBAR SKALA NO. LEMBAR JLH LEMBAR
CATATAN

MUTU BETON : K225


MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

BAUT+MUR+ MUTU BAJA


RING Ø16 BJ37; Fy 2400 MPa
Fu 3700 MPa

RAFTER WF 250.125.5.8 MUTU BAUT


A325

STIFNEER T=8 MM

KOLOM WF 346.174.6.9
NAMA PEKERJAAN:

KILANG PADI KISARAN

KOLOM WF 346.174.6.9 PERENCANA:

BAUT+MUR+
PT.MEDAN GEOTEKNIK
RING Ø16
DAN STRUKTUR

DISETUJUI OLEH:

STIFNEER T=10 MM
IBU SUN PHUE ENG

NAMA GAMBAR

NO. GAMBAR SKALA NO. LEMBAR JLH LEMBAR


MUTU BETON : K225
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
A325

2
Ø16-150
Ø16-150

Ø16-150
Ø16-150
1

NAMA PEKERJAAN:

KILANG PADI KISARAN

PERENCANA:

PT.MEDAN GEOTEKNIK
DAN STRUKTUR

DISETUJUI OLEH:

Bore Pile Ø30cm


L=1350 CM
6D13 IBU SUN PHUE ENG
sengkang Ø8-150

NAMA GAMBAR

DENAH PONDASI
SKALA : NTS NO. GAMBAR SKALA NO. LEMBAR JLH LEMBAR
MUTU BETON : K225
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
A325

STIFNEER T=10 MM

KOLOM WF 346.174.6.9

NAMA PEKERJAAN:

KILANG PADI KISARAN

PERENCANA:

PT.MEDAN GEOTEKNIK
DAN STRUKTUR

DISETUJUI OLEH:

IBU SUN PHUE ENG

NAMA GAMBAR

DETAIL ANGKUR & BASE PLATE


SKALA : NTS NO. GAMBAR SKALA NO. LEMBAR JLH LEMBAR
MUTU BETON : K225
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa (BJTS 400)
2. <12mm : Fy 240 Mpa (BJTP 240)

MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
A325

STIFNEER T=8 MM

NAMA PEKERJAAN:

KILANG PADI KISARAN

PERENCANA:

PT.MEDAN GEOTEKNIK
DAN STRUKTUR

DISETUJUI OLEH:

IBU SUN PHUE ENG

NAMA GAMBAR

DETAIL ANGKUR & BASE PLATE


KOLOM KANOPI
SKALA : NTS
NO. GAMBAR SKALA NO. LEMBAR JLH LEMBAR
MUTU BETON : K225
MUTU TULANGAN
1. > 12mm : Fy 400 Mpa
(BJTS 400)
2. <12mm : Fy 240 Mpa
(BJTP 240)

MUTU BAJA
BJ37; Fy 2400 MPa
Fu 3700 MPa

MUTU BAUT
A325

FLOOR HARDENER
BETON K-225 + WIREMESH M8 + PLASTIS COR
PASIR URUG T=5 CM
SIRTU T=10 CM
LANTAI KERJA

NAMA PEKERJAAN:

KILANG PADI KISARAN

PERENCANA:

TANAH URUG PT.MEDAN GEOTEKNIK


DAN STRUKTUR

DISETUJUI OLEH:

IBU SUN PHUE ENG

NAMA GAMBAR

DETAIL LANTAI
SKALA : NTS NO. GAMBAR SKALA NO. LEMBAR JLH LEMBAR