JUDUL : REKAP LAPORAN PENGGUNAAN DAN ALOKASI READY MIX

S.D TANGGAL : 26 Agustus 2022

1. PENJUALAN
A. Pengiriman Untuk Penjualan
Tujuan GTS DBI Total
Supplay Tambang SDE 144 1,345 1,489
Supplay Sumur Tambang SDE - 60 60
Supplay Dinding Tambang SDE - 165 165
Total Suplai 144 1,570 1,714

B. Kontrak Penjualan vs Suplai Penjualan


Kontrak Kontrak Suplai Sisa
002 dan 003
2,000 1,714 286
MUTU K250

2. PEMAKAIAN SENDIRI
A. Pengiriman Untuk Pemakaian Sendiri
SUPLAI BETON KONTRAK QINFA
TUJUAN Inc. Arm Exc. Arm Sisa
Total Total Kontrak Add
GTS DBI BBA
Jalan Beton 426 66 245 737 847 1,584 1,272 312
Areal Industri 96 150 50 296 1,279 1,575 1,575 -
Total Suplai 522 216 295 1,033 1,544 3,159 2,847 312

3. KONTRAK KESELURUHAN vs SUPLAI


Kontrak Kontrak Suplai Sisa
GTS (Kontrak Langsung) 1,000 270 730
GTS (Kontrak Via RPM ) 500 396 104
BBA (Kontrak Via KAL ) 500 295 205
DBI (Kontrak Langsung ) 2,000 1,786 214
Total 2,747

D. RITASE ARMADA RENTAL


DBI BBA TOTAL
NO. LAMBUNG
Kubikasi Ritase Kubikasi Ritase Kubikasi Ritase
LV 6 61 12 95 19 107 31 Dibuat Cek
LV 7 45 9 60 12 69 21
LV 8 55 11 65 13 76 24
LV 9 55 11 75 15 86 26
Total 216 43 295 59 338 102 Putri D.I.K
Nama : Laporan Progress Penjualan Beton
Asal Suplai : Daya Beton

Tujuan DBI
Supplay Tambang SDE 1,345
Supplay Sumur Tambang SDE 60
Supplay Dinding Tambang SDE 165
Total Suplai 1,570

Tanggal Satuan Vol Tujuan Ket


3
16 Juli 2022 M 5 Area A Supplay Tambang SDE
3
16 Juli 2022 M 5 Area A Supplay Tambang SDE
3
16 Juli 2022 M 5 Area A Supplay Tambang SDE
3
16 Juli 2022 M 5 Area A Supplay Tambang SDE
3
16 Juli 2022 M 5 Area A Supplay Tambang SDE
3
16 Juli 2022 M 5 Area A Supplay Tambang SDE
3
16 Juli 2022 M 5 Area A Supplay Tambang SDE
3
16 Juli 2022 M 5 Area A Supplay Tambang SDE
3
16 Juli 2022 M 5 Area A Supplay Tambang SDE
3
16 Juli 2022 M 5 Area A Supplay Tambang SDE
3
16 Juli 2022 M 5 Area A Supplay Tambang SDE
3
16 Juli 2022 M 5 Area A Supplay Tambang SDE
3
17 Juli 2022 M 5 Area A Supplay Tambang SDE
3
17 Juli 2022 M 5 Area A Supplay Tambang SDE
3
17 Juli 2022 M 5 Area A Supplay Tambang SDE
3
17 Juli 2022 M 5 Area A Supplay Tambang SDE
3
17 Juli 2022 M 5 Area B Supplay Dinding Tambang SDE
3
17 Juli 2022 M 5 Area A Supplay Tambang SDE
3
17 Juli 2022 M 5 Area A Supplay Tambang SDE
3
17 Juli 2022 M 5 Area A Supplay Tambang SDE
3
17 Juli 2022 M 5 Area A Supplay Tambang SDE
3
17 Juli 2022 M 5 Area A Supplay Tambang SDE
3
17 Juli 2022 M 5 Area A Supplay Tambang SDE
3
17 Juli 2022 M 5 Area A Supplay Tambang SDE
3
17 Juli 2022 M 5 Area A Supplay Tambang SDE
3
17 Juli 2022 M 5 Area A Supplay Tambang SDE
3
18 Juli 2022 M 5 Area A Supplay Tambang SDE
3
18 Juli 2022 M 5 Area A Supplay Tambang SDE
3
18 Juli 2022 M 5 Area A Supplay Tambang SDE
3
18 Juli 2022 M 5 Area A Supplay Tambang SDE
3
18 Juli 2022 M 5 Area A Supplay Tambang SDE
Nama : Laporan Progress Penjualan Beton
Asal Suplai : Daya Beton

Tujuan DBI
Supplay Tambang SDE 1,345
Supplay Sumur Tambang SDE 60
Supplay Dinding Tambang SDE 165
Total Suplai 1,570

Tanggal Satuan Vol Tujuan Ket


3
18 Juli 2022 M 5 Area A Supplay Tambang SDE
3
18 Juli 2022 M 5 Area A Supplay Tambang SDE
3
18 Juli 2022 M 5 Area A Supplay Tambang SDE
3
18 Juli 2022 M 5 Area A Supplay Tambang SDE
3
18 Juli 2022 M 5 Area A Supplay Tambang SDE
3
19 Juli 2022 M 5 Area A Supplay Tambang SDE
3
19 Juli 2022 M 5 Area A Supplay Tambang SDE
3
19 Juli 2022 M 5 Area A Supplay Tambang SDE
3
19 Juli 2022 M 5 Area A Supplay Tambang SDE
3
19 Juli 2022 M 5 Area A Supplay Tambang SDE
3
19 Juli 2022 M 5 Area A Supplay Tambang SDE
3
19 Juli 2022 M 5 Area A Supplay Tambang SDE
3
19 Juli 2022 M 5 Area A Supplay Tambang SDE
3
19 Juli 2022 M 5 Area A Supplay Tambang SDE
3
19 Juli 2022 M 5 Area A Supplay Tambang SDE
3
19 Juli 2022 M 5 Area A Supplay Tambang SDE
3
19 Juli 2022 M 5 Area A Supplay Tambang SDE
3
20 Juli 2022 M 5 Area A Supplay Tambang SDE
3
20 Juli 2022 M 5 Area A Supplay Tambang SDE
3
20 Juli 2022 M 5 Area A Supplay Tambang SDE
3
20 Juli 2022 M 5 Area A Supplay Tambang SDE
3
20 Juli 2022 M 5 Area A Supplay Tambang SDE
3
20 Juli 2022 M 5 Area A Supplay Tambang SDE
3
20 Juli 2022 M 5 Area A Supplay Tambang SDE
3
20 Juli 2022 M 5 Area A Supplay Tambang SDE
3
20 Juli 2022 M 5 Area A Supplay Tambang SDE
3
20 Juli 2022 M 5 Area A Supplay Tambang SDE
3
20 Juli 2022 M 5 Area A Supplay Tambang SDE
3
20 Juli 2022 M 5 Area A Supplay Tambang SDE
3
21 Juli 2022 M 5 Area A Supplay Tambang SDE
3
21 Juli 2022 M 5 Area A Supplay Tambang SDE
Nama : Laporan Progress Penjualan Beton
Asal Suplai : Daya Beton

Tujuan DBI
Supplay Tambang SDE 1,345
Supplay Sumur Tambang SDE 60
Supplay Dinding Tambang SDE 165
Total Suplai 1,570

Tanggal Satuan Vol Tujuan Ket


3
21 Juli 2022 M 5 Area A Supplay Tambang SDE
3
21 Juli 2022 M 5 Area A Supplay Tambang SDE
3
21 Juli 2022 M 5 Area A Supplay Tambang SDE
3
21 Juli 2022 M 5 Area A Supplay Tambang SDE
3
21 Juli 2022 M 5 Area A Supplay Tambang SDE
3
21 Juli 2022 M 5 Area A Supplay Tambang SDE
3
21 Juli 2022 M 5 Area A Supplay Tambang SDE
3
21 Juli 2022 M 5 Area A Supplay Tambang SDE
3
22 Juli 2022 M 5 Area A Supplay Tambang SDE
3
22 Juli 2022 M 5 Area A Supplay Tambang SDE
3
22 Juli 2022 M 5 Area A Supplay Tambang SDE
3
22 Juli 2022 M 5 Area A Supplay Tambang SDE
3
22 Juli 2022 M 5 Area A Supplay Tambang SDE
3
22 Juli 2022 M 5 Area A Supplay Tambang SDE
3
22 Juli 2022 M 5 Area A Supplay Tambang SDE
3
22 Juli 2022 M 5 Area A Supplay Tambang SDE
3
22 Juli 2022 M 5 Area A Supplay Tambang SDE
3
22 Juli 2022 M 5 Area A Supplay Tambang SDE
3
23 Juli 2022 M 5 Area A Supplay Tambang SDE
3
23 Juli 2022 M 5 Area A Supplay Tambang SDE
3
23 Juli 2022 M 5 Area A Supplay Tambang SDE
3
23 Juli 2022 M 5 Area A Supplay Tambang SDE
3
23 Juli 2022 M 5 Area A Supplay Tambang SDE
3
23 Juli 2022 M 5 Area A Supplay Tambang SDE
3
23 Juli 2022 M 5 Area A Supplay Tambang SDE
3
23 Juli 2022 M 5 Area A Supplay Tambang SDE
3
23 Juli 2022 M 5 Area A Supplay Tambang SDE
3
27 Juli 2022 M 5 Area A Supplay Tambang SDE
3
27 Juli 2022 M 5 Area A Supplay Tambang SDE
3
27 Juli 2022 M 5 Area A Supplay Tambang SDE
3
27 Juli 2022 M 5 Area A Supplay Tambang SDE
Nama : Laporan Progress Penjualan Beton
Asal Suplai : Daya Beton

Tujuan DBI
Supplay Tambang SDE 1,345
Supplay Sumur Tambang SDE 60
Supplay Dinding Tambang SDE 165
Total Suplai 1,570

Tanggal Satuan Vol Tujuan Ket


3
27 Juli 2022 M 5 Area A Supplay Tambang SDE
3
27 Juli 2022 M 5 Area A Supplay Tambang SDE
3
27 Juli 2022 M 5 Area A Supplay Tambang SDE
3
27 Juli 2022 M 5 Area A Supplay Tambang SDE
3
27 Juli 2022 M 5 Area A Supplay Tambang SDE
27 Juli 2022 V 5 Area A Supplay Tambang SDE
3
28 Juli 2022 M 5 Area B Supplay Sumur Tambang SDE
3
28 Juli 2022 M 5 Area B Supplay Sumur Tambang SDE
3
28 Juli 2022 M 5 Area B Supplay Sumur Tambang SDE
3
28 Juli 2022 M 5 Area B Supplay Sumur Tambang SDE
3
28 Juli 2022 M 5 Area B Supplay Sumur Tambang SDE
3
28 Juli 2022 M 5 Area B Supplay Sumur Tambang SDE
3
28 Juli 2022 M 5 Area B Supplay Sumur Tambang SDE
3
28 Juli 2022 M 5 Area B Supplay Sumur Tambang SDE
3
28 Juli 2022 M 5 Area B Supplay Sumur Tambang SDE
3
28 Juli 2022 M 5 Area B Supplay Sumur Tambang SDE
3
28 Juli 2022 M 5 Area B Supplay Sumur Tambang SDE
3
28 Juli 2022 M 5 Area B Supplay Sumur Tambang SDE
3
29 Juli 2022 M 5 Area A Supplay Tambang SDE
3
29 Juli 2022 M 5 Area A Supplay Tambang SDE
3
29 Juli 2022 M 5 Area A Supplay Tambang SDE
3
29 Juli 2022 M 5 Area A Supplay Tambang SDE
3
29 Juli 2022 M 5 Area A Supplay Tambang SDE
3
29 Juli 2022 M 5 Area A Supplay Tambang SDE
3
29 Juli 2022 M 5 Area A Supplay Tambang SDE
3
30 Juli 2022 M 5 Area B Supplay Dinding Tambang SDE
3
30 Juli 2022 M 5 Area B Supplay Dinding Tambang SDE
3
30 Juli 2022 M 5 Area B Supplay Dinding Tambang SDE
3
30 Juli 2022 M 5 Area B Supplay Dinding Tambang SDE
3
30 Juli 2022 M 5 Area B Supplay Dinding Tambang SDE
3
30 Juli 2022 M 5 Area A Supplay Tambang SDE
Nama : Laporan Progress Penjualan Beton
Asal Suplai : Daya Beton

Tujuan DBI
Supplay Tambang SDE 1,345
Supplay Sumur Tambang SDE 60
Supplay Dinding Tambang SDE 165
Total Suplai 1,570

Tanggal Satuan Vol Tujuan Ket


3
30 Juli 2022 M 5 Area A Supplay Tambang SDE
3
30 Juli 2022 M 5 Area A Supplay Tambang SDE
3
30 Juli 2022 M 5 Area A Supplay Tambang SDE
3
30 Juli 2022 M 5 Area A Supplay Tambang SDE
3
01 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
01 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
01 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
01 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
01 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
01 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
01 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
01 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
01 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
01 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
01 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
01 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
03 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
03 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
03 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
03 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
03 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
03 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
03 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
03 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
03 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
04 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
04 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
04 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
04 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
04 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
04 Agustus 2022 M 5 Area A Supplay Tambang SDE
Nama : Laporan Progress Penjualan Beton
Asal Suplai : Daya Beton

Tujuan DBI
Supplay Tambang SDE 1,345
Supplay Sumur Tambang SDE 60
Supplay Dinding Tambang SDE 165
Total Suplai 1,570

Tanggal Satuan Vol Tujuan Ket


3
05 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
05 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
05 Agustus 2022 M 5 Area B Supplay Tambang SDE
3
05 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
05 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
05 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
05 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
05 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
05 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
05 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
05 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
08 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
08 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
08 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
08 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
08 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
08 Agustus 2022 M 5 Area B Supplay Tambang SDE
3
08 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
08 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
08 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
08 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
08 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
09 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
09 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
09 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
09 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
09 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
09 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
09 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
09 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
09 Agustus 2022 M 5 Area A Supplay Tambang SDE
Nama : Laporan Progress Penjualan Beton
Asal Suplai : Daya Beton

Tujuan DBI
Supplay Tambang SDE 1,345
Supplay Sumur Tambang SDE 60
Supplay Dinding Tambang SDE 165
Total Suplai 1,570

Tanggal Satuan Vol Tujuan Ket


3
09 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
11 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
11 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
11 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
11 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
11 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
11 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
11 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
11 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
11 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
11 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
12 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
12 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
12 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
12 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
12 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
12 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
12 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
12 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
12 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
13 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
13 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
13 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
13 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
13 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
13 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
15 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
15 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
15 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
15 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
15 Agustus 2022 M 5 Area A Supplay Tambang SDE
Nama : Laporan Progress Penjualan Beton
Asal Suplai : Daya Beton

Tujuan DBI
Supplay Tambang SDE 1,345
Supplay Sumur Tambang SDE 60
Supplay Dinding Tambang SDE 165
Total Suplai 1,570

Tanggal Satuan Vol Tujuan Ket


3
15 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
15 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
15 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
15 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
15 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
16 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
16 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
16 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
18 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
18 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
18 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
18 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
18 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
18 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
18 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
18 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
18 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
18 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
18 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
18 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
19 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
19 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
19 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
19 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
19 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
19 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
19 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
19 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
19 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
19 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
19 Agustus 2022 M 5 Area A Supplay Tambang SDE
Nama : Laporan Progress Penjualan Beton
Asal Suplai : Daya Beton

Tujuan DBI
Supplay Tambang SDE 1,345
Supplay Sumur Tambang SDE 60
Supplay Dinding Tambang SDE 165
Total Suplai 1,570

Tanggal Satuan Vol Tujuan Ket


3
19 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
20 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
20 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
20 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
20 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
20 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
20 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
20 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
20 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
20 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
20 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
20 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
22 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
22 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
22 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
22 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
22 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
22 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
22 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
22 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
22 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
22 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
22 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
22 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
23 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
23 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
23 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
23 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
23 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
23 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
23 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
Nama : Laporan Progress Penjualan Beton
Asal Suplai : Daya Beton

Tujuan DBI
Supplay Tambang SDE 1,345
Supplay Sumur Tambang SDE 60
Supplay Dinding Tambang SDE 165
Total Suplai 1,570

Tanggal Satuan Vol Tujuan Ket


3
23 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
24 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
24 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
24 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
24 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
24 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
24 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
24 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
24 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
24 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
24 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
24 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
25 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
25 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
25 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
25 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
25 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
25 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
25 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
25 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
25 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
25 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
25 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
25 Agustus 2022 M 5 Area B Supplay Dinding Tambang SDE
3
26 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
26 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
26 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
26 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
26 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
26 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
26 Agustus 2022 M 5 Area A Supplay Tambang SDE
Nama : Laporan Progress Penjualan Beton
Asal Suplai : Daya Beton

Tujuan DBI
Supplay Tambang SDE 1,345
Supplay Sumur Tambang SDE 60
Supplay Dinding Tambang SDE 165
Total Suplai 1,570

Tanggal Satuan Vol Tujuan Ket


3
26 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
26 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
26 Agustus 2022 M 5 Area A Supplay Tambang SDE
3
26 Agustus 2022 M 5 Area A Supplay Tambang SDE
Nama : Laporan Progress Penjualan Beton
Asal Suplai : GTS

Tujuan GTS
Supplay Tambang SDE 144
Supplay lobang Tambang SDE -
Supplay Dinding Tambang SDE -
Total Suplai 144

Tanggal Satuan Vol Tujuan Ket


3
12 Juli 2022 M 6 Area A Supplay Tambang SDE
3
12 Juli 2022 M 6 Area A Supplay Tambang SDE
3
12 Juli 2022 M 6 Area A Supplay Tambang SDE
3
12 Juli 2022 M 6 Area A Supplay Tambang SDE
3
12 Juli 2022 M 6 Area A Supplay Tambang SDE
3
12 Juli 2022 M 6 Area A Supplay Tambang SDE
3
12 Juli 2022 M 6 Area A Supplay Tambang SDE
3
12 Juli 2022 M 6 Area A Supplay Tambang SDE
3
12 Juli 2022 M 6 Area A Supplay Tambang SDE
3
13 Juli 2022 M 6 Area A Supplay Tambang SDE
3
13 Juli 2022 M 6 Area A Supplay Tambang SDE
3
13 Juli 2022 M 6 Area A Supplay Tambang SDE
3
13 Juli 2022 M 6 Area A Supplay Tambang SDE
3
13 Juli 2022 M 6 Area A Supplay Tambang SDE
3
13 Juli 2022 M 6 Area A Supplay Tambang SDE
3
13 Juli 2022 M 6 Area A Supplay Tambang SDE
3
13 Juli 2022 M 6 Area A Supplay Tambang SDE
3
13 Juli 2022 M 6 Area A Supplay Tambang SDE
3
14 Juli 2022 M 6 Area A Supplay Tambang SDE
3
14 Juli 2022 M 6 Area A Supplay Tambang SDE
3
14 Juli 2022 M 6 Area A Supplay Tambang SDE
3
14 Juli 2022 M 6 Area A Supplay Tambang SDE
3
14 Juli 2022 M 6 Area A Supplay Tambang SDE
3
14 Juli 2022 M 6 Area A Supplay Tambang SDE
Nama : Laporan Pengambilan Beton Dengan Armada Rental
Asal Suplai : BBA
No Lamb Kubikasi Ritase
Tujuan BBA LV 6 95 19
Jalan Beton 245 LV 7 60 12
Areal Industri 50 LV 8 65 13
Total Suplai 295 LV 9 75 15
Total 295 59

Tanggal Satuan Vol No. Lambung Tujuan Ket


3
08 Agustus 2022 M 5 LV 8 SITE B Jalan Beton
3
08 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
08 Agustus 2022 M 5 LV 7 SITE B Jalan Beton
3
08 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
09 Agustus 2022 M 5 LV 7 SITE B Jalan Beton
3
09 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
09 Agustus 2022 M 5 LV 8 SITE B Jalan Beton
3
09 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
09 Agustus 2022 M 5 LV 8 SITE B Jalan Beton
3
09 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
09 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
09 Agustus 2022 M 5 LV 7 SITE B Jalan Beton
3
10 Agustus 2022 M 5 LV 8 SITE B Jalan Beton
3
10 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
10 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
10 Agustus 2022 M 5 LV 8 SITE B Jalan Beton
3
10 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
10 Agustus 2022 M 5 LV 7 SITE B Jalan Beton
3
10 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
10 Agustus 2022 M 5 LV 7 SITE B Jalan Beton
3
11 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
11 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
12 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
13 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
13 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
13 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
13 Agustus 2022 M 5 LV 8 SITE B Jalan Beton
3
13 Agustus 2022 M 5 LV 7 SITE B Jalan Beton
3
13 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
13 Agustus 2022 M 5 LV 8 SITE B Jalan Beton
3
13 Agustus 2022 M 5 LV 7 SITE B Jalan Beton
Nama : Laporan Pengambilan Beton Dengan Armada Rental
Asal Suplai : BBA
No Lamb Kubikasi Ritase
Tujuan BBA LV 6 95 19
Jalan Beton 245 LV 7 60 12
Areal Industri 50 LV 8 65 13
Total Suplai 295 LV 9 75 15
Total 295 59

Tanggal Satuan Vol No. Lambung Tujuan Ket


3
14 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
14 Agustus 2022 M 5 LV 8 SITE B Jalan Beton
3
14 Agustus 2022 M 5 LV 7 SITE B Jalan Beton
3
14 Agustus 2022 M 5 LV 7 SITE B Jalan Beton
3
14 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
14 Agustus 2022 M 5 LV 8 SITE B Jalan Beton
3
15 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
15 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
15 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
15 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
16 Agustus 2022 M 5 LV 7 SITE B Jalan Beton
3
16 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
16 Agustus 2022 M 5 LV 8 SITE B Jalan Beton
3
16 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
16 Agustus 2022 M 5 LV 8 SITE B Jalan Beton
3
16 Agustus 2022 M 5 LV 7 SITE B Jalan Beton
3
16 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
16 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
18 Agustus 2022 M 5 LV 8 SITE B Areal Industri
3
18 Agustus 2022 M 5 LV 7 SITE B Areal Industri
3
18 Agustus 2022 M 5 LV 9 SITE B Areal Industri
3
18 Agustus 2022 M 5 LV 6 SITE B Areal Industri
3
18 Agustus 2022 M 5 LV 8 SITE B Areal Industri
3
18 Agustus 2022 M 5 LV 9 SITE B Areal Industri
3
18 Agustus 2022 M 5 LV 6 SITE B Areal Industri
3
25 Agustus 2022 M 5 LV 6 SITE B Areal Industri
3
25 Agustus 2022 M 5 LV 6 SITE B Areal Industri
3
26 Agustus 2022 M 5 LV 6 SITE B Areal Industri
Nama : Laporan Pengambilan Beton Dengan Armada Rental
Asal Suplai : DBI
No Lamb Kubikasi Ritase
Tujuan DBI LV 6 61 12
Jalan Beton 66 LV 7 45 9
Areal Industri 150 LV 8 55 11
Total Suplai 216 LV 9 55 11
Total 216 43

Tanggal Satuan Vol No. Lambung Tujuan Ket


3
03 Agustus 2022 M 6 LV 6 SITE B Jalan Beton
3
04 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
04 Agustus 2022 M 5 LV 7 SITE B Jalan Beton
3
04 Agustus 2022 M 5 LV 8 SITE B Jalan Beton
3
04 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
05 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
05 Agustus 2022 M 5 LV 7 SITE B Jalan Beton
3
05 Agustus 2022 M 5 LV 8 SITE B Jalan Beton
3
05 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
05 Agustus 2022 M 5 LV 6 SITE B Jalan Beton
3
05 Agustus 2022 M 5 LV 7 SITE B Jalan Beton
3
05 Agustus 2022 M 5 LV 8 SITE B Jalan Beton
3
05 Agustus 2022 M 5 LV 9 SITE B Jalan Beton
3
19 Agustus 2022 M 5 LV 6 SITE B Areal Industri
3
19 Agustus 2022 M 5 LV 9 SITE B Areal Industri
3
19 Agustus 2022 M 5 LV 8 SITE B Areal Industri
3
19 Agustus 2022 M 5 LV 6 SITE B Areal Industri
3
19 Agustus 2022 M 5 LV 8 SITE B Areal Industri
3
19 Agustus 2022 M 5 LV 9 SITE B Areal Industri
3
20 Agustus 2022 M 5 LV 9 SITE B Areal Industri
3
20 Agustus 2022 M 5 LV 7 SITE B Areal Industri
3
20 Agustus 2022 M 5 LV 9 SITE B Areal Industri
3
20 Agustus 2022 M 5 LV 8 SITE B Areal Industri
3
20 Agustus 2022 M 5 LV 6 SITE B Areal Industri
3
20 Agustus 2022 M 5 LV 7 SITE B Areal Industri
3
20 Agustus 2022 M 5 LV 6 SITE B Areal Industri
3
20 Agustus 2022 M 5 LV 8 SITE B Areal Industri
3
22 Agustus 2022 M 5 LV 6 SITE B Areal Industri
3
22 Agustus 2022 M 5 LV 8 SITE B Areal Industri
3
22 Agustus 2022 M 5 LV 7 SITE B Areal Industri
3
22 Agustus 2022 M 5 LV 9 SITE B Areal Industri
Nama : Laporan Pengambilan Beton Dengan Armada Rental
Asal Suplai : DBI
No Lamb Kubikasi Ritase
Tujuan DBI LV 6 61 12
Jalan Beton 66 LV 7 45 9
Areal Industri 150 LV 8 55 11
Total Suplai 216 LV 9 55 11
Total 216 43

Tanggal Satuan Vol No. Lambung Tujuan Ket


3
22 Agustus 2022 M 5 LV 6 SITE B Areal Industri
3
22 Agustus 2022 M 5 LV 8 SITE B Areal Industri
3
22 Agustus 2022 M 5 LV 7 SITE B Areal Industri
3
22 Agustus 2022 M 5 LV 9 SITE B Areal Industri
3
23 Agustus 2022 M 5 LV 8 SITE B Areal Industri
3
23 Agustus 2022 M 5 LV 9 SITE B Areal Industri
3
23 Agustus 2022 M 5 LV 9 SITE B Areal Industri
3
23 Agustus 2022 M 5 LV 7 SITE B Areal Industri
3
23 Agustus 2022 M 5 LV 6 SITE B Areal Industri
3
23 Agustus 2022 M 5 LV 7 SITE B Areal Industri
3
23 Agustus 2022 M 5 LV 6 SITE B Areal Industri
3
23 Agustus 2022 M 5 LV 8 SITE B Areal Industri
Nama : Laporan Suplai Beton
Asal Suplai : GTS

Tujuan GTS
Jalan Beton 426
Areal Industri 96
Total Suplai 522

Tanggal Satuan Vol Tujuan Ket


07 Juli 2022 3
M 6 SITE B Jalan Beton
3
07 Juli 2022 M 6 SITE B Jalan Beton
3
07 Juli 2022 M 6 SITE B Jalan Beton
3
07 Juli 2022 M 6 SITE B Jalan Beton
3
07 Juli 2022 M 6 SITE B Jalan Beton
3
07 Juli 2022 M 6 SITE B Jalan Beton
3
07 Juli 2022 M 6 SITE B Jalan Beton
3
07 Juli 2022 M 6 SITE B Jalan Beton
3
08 Juli 2022 M 6 SITE B Jalan Beton
3
08 Juli 2022 M 6 SITE B Jalan Beton
3
08 Juli 2022 M 6 SITE B Jalan Beton
3
08 Juli 2022 M 6 SITE B Jalan Beton
3
08 Juli 2022 M 6 SITE B Jalan Beton
3
08 Juli 2022 M 6 SITE B Jalan Beton
3
08 Juli 2022 M 6 SITE B Jalan Beton
3
08 Juli 2022 M 6 SITE B Jalan Beton
3
08 Juli 2022 M 6 SITE B Jalan Beton
3
14 Juli 2022 M 6 SITE B Jalan Beton
3
14 Juli 2022 M 6 SITE B Jalan Beton
3
14 Juli 2022 M 6 SITE B Jalan Beton
3
14 Juli 2022 M 6 SITE B Jalan Beton
3
09 Agustus 2022 M 6 SITE B Jalan Beton
3
09 Agustus 2022 M 6 SITE B Jalan Beton
3
09 Agustus 2022 M 6 SITE B Jalan Beton
3
09 Agustus 2022 M 6 SITE B Jalan Beton
3
09 Agustus 2022 M 6 SITE B Jalan Beton
3
09 Agustus 2022 M 6 SITE B Jalan Beton
3
09 Agustus 2022 M 6 SITE B Jalan Beton
3
10 Agustus 2022 M 6 SITE B Jalan Beton
3
10 Agustus 2022 M 6 SITE B Jalan Beton
3
10 Agustus 2022 M 6 SITE B Jalan Beton
3
10 Agustus 2022 M 6 SITE B Jalan Beton
Nama : Laporan Suplai Beton
Asal Suplai : GTS

Tujuan GTS
Jalan Beton 426
Areal Industri 96
Total Suplai 522

Tanggal Satuan Vol Tujuan Ket


07 Juli 2022 3
M 6 SITE B Jalan Beton
3
10 Agustus 2022 M 6 SITE B Jalan Beton
3
10 Agustus 2022 M 6 SITE B Jalan Beton
3
10 Agustus 2022 M 6 SITE B Jalan Beton
3
10 Agustus 2022 M 6 SITE B Jalan Beton
3
11 Agustus 2022 M 6 SITE B Jalan Beton
3
11 Agustus 2022 M 6 SITE B Jalan Beton
3
11 Agustus 2022 M 6 SITE B Jalan Beton
3
11 Agustus 2022 M 6 SITE B Jalan Beton
3
11 Agustus 2022 M 6 SITE B Jalan Beton
3
11 Agustus 2022 M 6 SITE B Jalan Beton
3
11 Agustus 2022 M 6 SITE B Jalan Beton
3
11 Agustus 2022 M 6 SITE B Jalan Beton
3
12 Agustus 2022 M 6 SITE B Jalan Beton
3
12 Agustus 2022 M 6 SITE B Jalan Beton
3
12 Agustus 2022 M 6 SITE B Jalan Beton
3
12 Agustus 2022 M 6 SITE B Jalan Beton
3
13 Agustus 2022 M 6 SITE B Jalan Beton
3
13 Agustus 2022 M 6 SITE B Jalan Beton
3
13 Agustus 2022 M 6 SITE B Jalan Beton
3
13 Agustus 2022 M 6 SITE B Jalan Beton
3
13 Agustus 2022 M 6 SITE B Jalan Beton
3
13 Agustus 2022 M 6 SITE B Jalan Beton
3
13 Agustus 2022 M 6 SITE B Jalan Beton
3
13 Agustus 2022 M 6 SITE B Jalan Beton
3
14 Agustus 2022 M 6 SITE B Jalan Beton
3
14 Agustus 2022 M 6 SITE B Jalan Beton
3
14 Agustus 2022 M 6 SITE B Jalan Beton
3
14 Agustus 2022 M 6 SITE B Jalan Beton
3
14 Agustus 2022 M 6 SITE B Jalan Beton
3
14 Agustus 2022 M 6 SITE B Jalan Beton
3
15 Agustus 2022 M 6 SITE B Jalan Beton
Nama : Laporan Suplai Beton
Asal Suplai : GTS

Tujuan GTS
Jalan Beton 426
Areal Industri 96
Total Suplai 522

Tanggal Satuan Vol Tujuan Ket


07 Juli 2022 3
M 6 SITE B Jalan Beton
3
15 Agustus 2022 M 6 SITE B Jalan Beton
3
15 Agustus 2022 M 6 SITE B Jalan Beton
3
15 Agustus 2022 M 6 SITE B Jalan Beton
3
15 Agustus 2022 M 6 SITE B Jalan Beton
3
15 Agustus 2022 M 6 SITE B Jalan Beton
3
16 Agustus 2022 M 6 SITE B Jalan Beton
3
16 Agustus 2022 M 6 SITE B Jalan Beton
3
16 Agustus 2022 M 6 SITE B Jalan Beton
3
25 Agustus 2022 M 6 SITE B Areal Industri
3
25 Agustus 2022 M 6 SITE B Areal Industri
3
25 Agustus 2022 M 6 SITE B Areal Industri
3
25 Agustus 2022 M 6 SITE B Areal Industri
3
25 Agustus 2022 M 6 SITE B Areal Industri
3
25 Agustus 2022 M 6 SITE B Areal Industri
3
25 Agustus 2022 M 6 SITE B Areal Industri
3
25 Agustus 2022 M 6 SITE B Areal Industri
3
26 Agustus 2022 M 6 SITE B Areal Industri
3
26 Agustus 2022 M 6 SITE B Areal Industri
3
26 Agustus 2022 M 6 SITE B Areal Industri
3
26 Agustus 2022 M 6 SITE B Areal Industri
3
26 Agustus 2022 M 6 SITE B Areal Industri
3
26 Agustus 2022 M 6 SITE B Areal Industri
3
26 Agustus 2022 M 6 SITE B Areal Industri
3
26 Agustus 2022 M 6 SITE B Areal Industri

Anda mungkin juga menyukai