1 Umum 599,200,000.00
2 Drainase 2,934,167,520.00
3 Pekerjaan Tanah dan Geosintetik 6,603,635,675.60
4 Pekerjaan Preventif 16,310,436,844.94
5 Perkerasan Berbutir Dan Perkerasan Beton Semen 20,558,199,199.85
6 Perkerasan Aspal 69,188,598,308.09
7 Struktur 27,624,902,152.11
8 Rehabilitasi Jembatan 1,462,084,760.00
9 Pekerjaan Harian Dan Pekerjaan Lain-Lain 3,523,699,170.74
10 Pekerjaan Pemeliharaan Kinerja 8,867,522,012.00
(A) Jumlah Harga Pekerjaan (termasuk Biaya Umum dan Keuntungan) - - - 157,672,445,643.33
(B) Pajak Pertambahan Nilai (PPN) = 10% x (A) - - - 15,767,244,564.33
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) - - - 173,439,690,207.66
(D) JUMLAH TOTAL HARGA PEKERJAAN (DIBULATKAN) - - - 173,439,690,000.00
Terbilang : Seratus Delapan Puluh Dua Miliar Seratus Enam Puluh Sembilan Juta Enam Ratus Delapan Puluh Lima Ribu Rupiah
Ir. Harimawan, MM
General Manager
DAFTAR KUANTITAS DAN HARGA RENCANA PERKIRAAN BIAYA
SPESIFIKASI 2018 Revisi 2
a b c d e f g h i j k l
DIVISI 1. UMUM
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 599,200,000.00 - - -
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 - 3,720.00 - - - -
2.2.(1) Pasangan Batu dengan Mortar M3 - 2,400.00 - - - -
2.3.(1) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam M1 8,224,000.00 120.00 986,880,000.00 - - -
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 200 c M1 10,193,000.00 96.00 978,528,000.00 - - -
2.3.(21) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 500 c M1 1,153,000.00 2,000.00 2,306,000,000.00 - - -
2.3.(26) Saluran berbentuk U Tipe DS 3 M1 29,416.00 3,720.00 109,427,520.00 - - -
2 3 4 5 1 2 3 4
Pelebaran Jalan Menuju Preservasi Pemeliharaan
Total Preservasi Rutin Jembatan
Standar Rutin Jalan
No. Mata
Pemba - Uraian Satuan Harga Satuan (Rupiah)
yaran Perkiraan Perkiraan Jumah Harga Perkiraan Jumah Harga Perkiraan Jumah Harga
Jumah Harga (Rupiah)
Kuantitas Kuantitas (Rupiah) Kuantitas (Rupiah) Kuantitas (Rupiah)
a b c d e f g h i j k l
2.3.(27) Saluran berbentuk U Tipe DS 3a (dengan tutup) M1 765,775.00 2,400.00 1,837,860,000.00 - - -
2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1 8,224,000.00 120.00 986,880,000.00 - - -
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 2,934,167,520.00 - - -
2 3 4 5 1 2 3 4
Pelebaran Jalan Menuju Preservasi Pemeliharaan
Total Preservasi Rutin Jembatan
Standar Rutin Jalan
No. Mata
Pemba - Uraian Satuan Harga Satuan (Rupiah)
yaran Perkiraan Perkiraan Jumah Harga Perkiraan Jumah Harga Perkiraan Jumah Harga
Jumah Harga (Rupiah)
Kuantitas Kuantitas (Rupiah) Kuantitas (Rupiah) Kuantitas (Rupiah)
a b c d e f g h i j k l
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa M3 23,358.00 70,663.20 1,650,551,025.60 - - -
3.1.(3) Galian Batu M3 102,000.00 706.63 72,076,260.00 - - -
3.1.(4) Galian Struktur dengan kedalaman 0 - 2 meter (+ pengukuran M3 24,000.00 601.88 14,445,120.00 - - -
3.1.(5) Galian Struktur dengan kedalaman 2 - 4 meter M3 37,000.00 270.00 9,990,000.00 - - -
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 145,000.00 1,993.75 289,093,750.00 - - -
3.1.(9) Galian Perkerasan berbutir M3 34,000.00 405.00 13,770,000.00 - - -
3.2.(1b) Timbunan Biasa dari hasil galian M3 30,067.00 12,000.00 360,804,000.00 - - -
Timbunan Pilihan dari sumber galian
3.2.(2a) M3 223,682.00 15,360.00 3,435,755,520.00 - - -
3.3.(1) Penyiapan Badan Jalan M2 5,000.00 151,430.00 757,150,000.00 - - -
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 6,603,635,675.60 - - -
DIVISI 4. PEKERJAAN PREVENTIF
Lapis Tipis Beton Aspal (LTBA) dan Stone Matrix Asphal t Tipis (SMA TIPIS)
4.7
4.7.(3) Lapis Tipis Beton Aspal - B Kasar (LTBA-B Kasar) Ton 1,082,074.00 15,073.31 16,310,436,844.94 - - -
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 16,310,436,844.94 - - -
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
5.1.(1) Lapis Pondasi Agregat Kelas A M3 307,625.00 41,910.00 12,892,563,750.00 - - -
5.1.(3a) Lapis Pondasi Agregat Kelas S M3 249,136.00 26,734.25 6,660,464,108.00 - - -
5.3.(1.a) Perkerasan Beton Semen M3 1,633,995.00 585.63 956,916,491.85 - - -
5.3.(3) Lapis Pondasi bawah Beton Kurus (Concrete Vibrator) M3 965,097.00 50.00 48,254,850.00 - - -
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 20,558,199,199.85 - - -
DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair Liter 13,709.00 113,483.90 1,555,750,785.10 - - -
6.1 (2a) Lapis Perekat - Aspal Cair Liter 13,322.00 145,755.48 1,941,754,504.56 - - -
6.3.(8) Bahan anti pengelupasan Kg 63,000.00 13,128.40 827,089,200.00 - - -
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 1,045,939.00 27,043.17 28,285,506,186.63 - - -
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 987,587.00 34,104.20 33,680,864,565.40 - - -
6.7.(1) Lapis Penetrasi Macadam M3 2,275,920.00 1,273.17 2,897,633,066.40 - - -
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 69,188,598,308.09 - - -
2 3 4 5 1 2 3 4
Pelebaran Jalan Menuju Preservasi Pemeliharaan
Total Preservasi Rutin Jembatan
Standar Rutin Jalan
No. Mata
Pemba - Uraian Satuan Harga Satuan (Rupiah)
yaran Perkiraan Perkiraan Jumah Harga Perkiraan Jumah Harga Perkiraan Jumah Harga
Jumah Harga (Rupiah)
Kuantitas Kuantitas (Rupiah) Kuantitas (Rupiah) Kuantitas (Rupiah)
a b c d e f g h i j k l
DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur, fc’30 Mpa M3 1,582,534.00 2,118.09 3,351,949,440.06 - - -
7.1 (7a) Beton struktur, fc’20 Mpa M3 1,285,000.00 397.94 511,352,900.00 - - -
7.1 (9) Beton Siklop, fc’15 Mpa M3 1,121,000.00 96.08 107,705,680.00 - - -
7.1 (10) Beton, fc’10 Mpa M3 982,419.00 339.18 333,216,876.42 - - -
7.3 (3) Baja Tulangan Sirip BjTS 420A Kg 16,837.00 449,556.79 7,569,187,673.23 - - -
7.6 (1) Fondasi Cerucuk, Penyediaan dan Pemancangan, dia. 12-16 M1 39,000.00 25,600.00 998,400,000.00 - - -
7.6.(10b) Penyediaan Tiang Pancang Beton Bertulang Pracetak ukur M1 292,000.00 320.00 93,440,000.00 - - -
7.6.(16b) Pemancangan Tiang Pancang Beton Bertulang Pracetak uku M1 172,000.00 320.00 55,040,000.00 - - -
7.9.(1) Pasangan Batu (menggunakan koef Tng Kerja dari SDA, modif analisis) 664,352.00 20,996.20 13,948,867,462.40 - - -
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 574,000.00 1,077.50 618,485,000.00 - - -
7.15.(1) Pembongkaran Pasangan Batu M3 115,000.00 223.20 25,668,000.00 - - -
7.15.(2) Pembongkaran Beton M3 288,000.00 40.24 11,589,120.00 - - -
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 27,624,902,152.11 - - -
DIVISI 8. REHABILITASI JEMBATAN
8.2.(1) Penambahan (Patching ), menggunakan campuran beton Pre M3 12,589,000.00 58.34 734,442,260.00 - - -
8.4.(1) Perkuatan struktur dengan bahan FRP jenis e- glass per lapis M2 1,326,000.00 548.75 727,642,500.00 - - -
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 1,462,084,760.00 - - -
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.1.(1) Mandor Jam 20,742.86 50.00 1,037,142.86 - - -
9.1.(2) Pekerja Biasa Jam 13,828.57 100.00 1,382,857.14 - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 192,500.00 100.00 19,250,000.00 - - -
9.1.(8) Motor Grader min 100 PK Jam 373,127.88 100.00 37,312,787.67 - - -
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 303,253.29 100.00 30,325,328.86 - - -
9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam 437,864.39 100.00 43,786,439.14 - - -
9.1.(17) Kompresor 4000 - 6500 Ltr/mnt Jam 163,646.94 84.00 13,746,343.06 - - -
9.1.(19) Pompa Air 70 - 100 mm Jam 55,000.00 84.00 4,620,000.00 - - -
9.2.(1) Marka Jalan Termoplastik M2 122,200.00 17,057.76 2,084,458,272.00 - - -
9.2.(5) Patok Pengarah (delineator) Buah 312,000.00 300.00 93,600,000.00 - - -
9.2.(6a) Patok Kilometer Buah 824,000.00 20.00 16,480,000.00 - - -
9.2.(7) Rel Pengaman M1 807,000.00 500.00 403,500,000.00 - - -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 159,000.00 1,000.00 159,000,000.00 - - -
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah 130,000.00 40.00 5,200,000.00 - - -
9.2.(12a) Perkerasan Blok Beton pada Trotoar M2 305,000.00 2,000.00 610,000,000.00 - - -
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 3,523,699,170.74 - - -
2 3 4 5 1 2 3 4
Pelebaran Jalan Menuju Preservasi Pemeliharaan
Total Preservasi Rutin Jembatan
Standar Rutin Jalan
No. Mata
Pemba - Uraian Satuan Harga Satuan (Rupiah)
yaran Perkiraan Perkiraan Jumah Harga Perkiraan Jumah Harga Perkiraan Jumah Harga
Jumah Harga (Rupiah)
Kuantitas Kuantitas (Rupiah) Kuantitas (Rupiah) Kuantitas (Rupiah)
a b c d e f g h i j k l
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA
10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 97,000.00 360.00 34,920,000.00 - - -
10.1.(3) Pebaikan Pasangan Batu dengan Mortar M3 713,000.00 84.90 60,533,700.00 - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 849,000.00 471.76 400,524,240.00 - - -
10.1.(6a) Perbaikan Lapis Fondasi Agregat Kelas S M3 393,000.00 317.08 124,612,440.00 - - -
10.1.(9) Perbaikan Campuran Aspal Panas (Analisis diubah) M3 2,662,900.00 1,395.00 3,714,745,500.00 - - -
10.1.(13) Residu Bitumen untuk Pemeliharaan Liter 13,000.00 49,200.00 639,600,000.00 - - -
10.1.(16) Perbaikan Pasangan Batu M3 569,000.00 600.00 341,400,000.00 - - -
10.1.(17) Pengecatan Kereb pada Trotoar atau Median M1 22,000.00 118.00 2,596,000.00 - - -
10.1.(19) Pembersihan Patok Buah 58,000.00 154.00 8,932,000.00 - - -
10.1.(21) Pembersihan Drainase M' 8,400.00 148,770.73 1,249,674,132.00 - - -
10.1.(22) Pengendalian Tanaman M2 360.00 5,951,100.00 2,142,396,000.00 - - -
10.2 (1) Pemeliharaan Kinerja Jembatan Serdang bentang 7.00 m LS 5,765,000.00 1.00 5,765,000.00 - - -
10.2 (2) Pemeliharaan Kinerja Jembatan Trumix Seruni bentang 9.00 LS 8,648,000.00 1.00 8,648,000.00 - - -
10.2 (3) Pemeliharaan Kinerja Jembatan Fly Over Seruni bentang 68. LS 46,122,000.00 1.00 46,122,000.00 - - -
10.2 (4) Pemeliharaan Kinerja Jembatan Serdang Terate bentang 36. LS 23,061,000.00 1.00 23,061,000.00 - - -
10.2 (5) Pemeliharaan Kinerja Jembatan Serdang Terate II Amnonim LS 5,765,000.00 1.00 5,765,000.00 - - -
10.2 (6) Pemeliharaan Kinerja Jembatan Terate III bentang 7.00 m LS 5,765,000.00 1.00 5,765,000.00 - - -
10.2 (7) Pemeliharaan Kinerja Jembatan Grenyang bentang 8.00 m LS 6,341,000.00 1.00 6,341,000.00 - - -
10.2 (8) Pemeliharaan Kinerja Jembatan Ragas bentang 7.10 m LS 5,765,000.00 1.00 5,765,000.00 - - -
10.2 (9) Pemeliharaan Kinerja Jembatan Ragas II bentang 7.00 m LS 5,765,000.00 1.00 5,765,000.00 - - -
10.2 (10) Pemeliharaan Kinerja Jembatan Pangoreng bentang 26 m LS 17,296,000.00 1.00 17,296,000.00 - - -
10.2 (11) Pemeliharaan Kinerja Jembatan Cicegah bentang 7.60 m LS 5,765,000.00 1.00 5,765,000.00 - - -
10.2 (12) Pemeliharaan Kinerja Jembatan Lebak Gede I bentang 6.00 LS 5,765,000.00 1.00 5,765,000.00 - - -
10.2 (13) Pemeliharaan Kinerja Jembatan Lebak Gede II bentang 6.00 LS 5,765,000.00 1.00 5,765,000.00 - - -
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 8,867,522,012.00 - - -
Daftar 5 : Mata Pembayaran Utama :
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 34,104.20 1,006,591.00 34,328,980,782.20 20.73
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 27,043.17 1,065,704.00 28,820,014,441.68 17.40
4.7.(3) Lapis Tipis Beton Aspal - B Kasar (LTBA-B Kasar) Ton 15,073.31 1,106,632.00 16,680,607,191.92 10.07
5.1.(1) Lapis Pondasi Agregat Kelas A M3 41,910.00 293,245.00 12,289,897,950.00 7.42
7.9.(1) Pasangan Batu (menggunakan koef Tng Kerja dari SDA, modif analisis) 20,996.20 673,462.00 14,140,142,844.40 8.54
7.3 (3) Baja Tulangan Sirip BjTS 420A Kg 449,556.79 16,837.00 7,569,187,673.23 4.57
5.1.(3a) Lapis Pondasi Agregat Kelas S M3 26,734.25 240,036.00 6,417,182,433.00 3.87
10.1.(9) Perbaikan Campuran Aspal Panas (Analisis diubah) M3 1,395.00 2,662,900.00 3,714,745,500.00 2.24
7.1 (5a) Beton struktur, fc’30 Mpa M3 2,118.09 1,649,640.00 3,494,085,987.60 2.11
Timbunan Pilihan dari sumber galian
3.2.(2a) M3 15,360.00 209,937.00 3,224,632,320.00 1.95
6.7.(1) Lapis Penetrasi Macadam M3 1,273.17 2,258,429.00 2,875,364,049.93 1.74
(56,996,724,069.00)
4 5 6 7
SAKTI PENYERAPAN POT UM POT RETENSI
u Lintas Umur Beton lebih dari 3 hari dan kurang dari 7 hari
52,971,081,000.00 - 338,035.00
#REF!
306,026.73 #REF! #REF! 0.70 41,921.47
809,121.66 #REF! #REF! 1.84 288,972.02
2,889,812.87 #REF! #REF! 6.57 740,977.66
2,073,907.48 #REF! #REF! 4.71 238,380.17
700,000.00 #REF! #REF! 1.59 3,500,000.00
15,955,809.00 #REF! #REF! 36.26 1,770,900.00
3,843,347.90 #REF! #REF! 8.74 1,098,099.40
3,000,000.00 #REF! #REF! 6.82 30,000.00
60,000.00 #REF! #REF! 0.14 15,000.00
2,000,000.00 #REF! #REF! 4.55 20,000.00
3,360,000.00 #REF! #REF! 7.64 700.00
- 338,034.90 - #REF! - -
#REF!
#REF! -
#REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
207,503,241.01 193,040,392.68 #REF! #REF! 100.00
#REF!
6,657,092.33 #REF! #REF! 3.45 477,210.92
#REF! #REF!
634,605.03 #REF! #REF! 0.33 15,163.80
36,434,929.17 #REF! #REF! 18.87 1,407,297.38
173,766.15 #REF! #REF! 0.09 35,535.00
#REF! #REF!
10,060,000.00 #REF! #REF! 5.21 25,000.00
#REF! #REF!
2,880,000.00 #REF! #REF! 1.49 3,000,000.00
7,500,000.00 #REF! #REF! 3.89 3,000,000.00
#REF! #REF!
700,000.00 #REF! #REF! 0.36 3,500,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
7,500,000.00 #REF! #REF! 3.89 7,500,000.00
40,000,000.00 #REF! #REF! 20.72 40,000,000.00
20,000,000.00 #REF! #REF! 10.36 20,000,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
5,500,000.00 #REF! #REF! 2.85 5,500,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
15,000,000.00 #REF! #REF! 7.77 15,000,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
2,834,306,000.76 2,562,623,398.43
1,169,677,000.11 1,059,863,599.07
B1 B2 B3 B4 B5 B6
20.00 M1
-
14,717.00 M1 - - - - 0.02 0.02
-
125.00 M2 0.18 0.18 0.16 0.16 0.16 0.16
-
20.00 M1 0.18 0.18 0.16 0.16 0.16 0.16
5.00 Buah 0.18 0.18 0.16 0.16 0.16 0.16
5.00 Buah 0.18 0.18 0.16 0.16 0.16 0.16
5.00 Buah 0.18 0.18 0.16 0.16 0.16 0.16
20.00 Buah 0.18 0.18 0.16 0.16 0.16 0.16
10.00 M2 0.18 0.18 0.16 0.16 0.16 0.16
-
114.50 M3 1.84 1.84 1.66 1.47 1.47 1.47
97.00 M3
63.40 M3 - - - - - -
3.50 M3 - - - - - -
16.40 M3 - - - - - -
112.60 M3
5,000.00 M2 - - - - - -
0.50 M3
64.05 M3 - - - - - -
21.00 M3 - - - - - -
28.40 M3 - - - - - -
200.00 M2
100.00 M1 - - - - - -
27.00 Buah - - - - - -
70.00 Buah - - - - - -
14,430.00 M1 - - - - - -
638,596.00 M2 - - - - - -
Chart Title
600.00 M1 - - - - 0.37 0.37
Chart Title
- - - - - -
- - - - - -
RK
Chart Title
-
RK -
207,197.76
Title
0.37 0.37 0.37 0.37 0.37 - 16,650.00
Title
- - - - - - 1,218,890.33
- - - - - -
- - - - - -
PL
PL
PL
PL
33,056.68 10,359.89 163,781.19 PL 20
PL -
2,656.37 832.50 13,161.13 PL 14,717
PL -
10,625.48 3,330.00 52,644.52 PL 125
PL -
19,675.76 6,166.34 97,484.64 PL 20
10,146.13 3,179.77 50,269.55 PL 5
15,582.24 4,883.44 77,203.09 PL 5
15,582.24 4,883.44 77,203.09 PL 5
13,090.12 4,102.41 64,855.74 PL 20
29,356.02 9,200.11 145,446.07 PL 10
PL -
7,423.93 2,326.64 36,782.26 PL 115
51,174.43 16,037.95 253,546.57 PL 97
131,220.69 41,124.26 650,140.26 PL 63
54,185.61 16,981.64 268,465.63 PL 4
47,943.36 15,025.34 237,538.05 PL 16
42,215.05 13,230.10 209,156.84 PL 113
1,885.22 590.82 9,340.44 PL 5,000
619,819.50 194,250.00 3,070,930.50 PL 1
313,610.96 98,284.95 1,553,803.09 PL 64
194,463.84 60,944.52 963,481.98 PL 21
131,220.69 41,124.26 650,140.26 PL 28
8,854.56 2,775.00 43,870.44 PL 200
5,312.74 1,665.00 26,322.26 PL 100
2,656.37 832.50 13,161.13 PL 27
2,656.37 832.50 13,161.13 PL 70
3,541.83 1,110.00 17,548.17 PL 14,430
123.96 38.85 614.19 PL 638,596
PKD -
PKD -
2,656.37 832.50 13,161.13 PKD 600
PKD -
7,423.93 2,326.64 36,782.26 PL 7
51,174.43 16,037.95 253,546.57 PL 3
131,220.69 41,124.26 650,140.26 PL 4
42,215.05 13,230.10 209,156.84 PL 9
619,819.50 194,250.00 3,070,930.50 PL 0
313,610.96 98,284.95 1,553,803.09 PL 9
194,463.84 60,944.52 963,481.98 PL 4
5,312.74 1,665.00 26,322.26 PL 100
2,656.37 832.50 13,161.13 PL 4
3,541.83 1,110.00 17,548.17 PL 100
123.96 38.85 614.19 PL 4,800
RJ -
RJ -
RJ -
313,610.96 98,284.95 1,553,803.09 RJ 3
2,656.37 832.50 13,161.13 RJ 400
RJ -
194,463.84 60,944.52 963,481.98 RJ 1
RJ -
2,685.38 841.59 13,304.85 RJ 1,155
249,220.10 78,105.00 1,234,774.98 RJ 715
RJ -
28,919.38 9,063.27 143,282.69 RJ 754
PKRJ -
PKRJ -
PKRJ -
PKRJ -
PKRJ -
RK
RK
RK
84,509.90 26,485.21 418,709.02 RK 14
RK -
2,685.38 841.59 13,304.85 RK 42
249,220.10 78,105.00 1,234,774.98 RK 26
6,292.94 1,972.19 31,178.72 RK 5
RK -
4,427.28 1,387.50 21,935.22 RK 402
RK -
531,273.86 166,500.00 2,632,226.14 RK 1
531,273.86 166,500.00 2,632,226.14 RK 3
RK -
619,819.50 194,250.00 3,070,930.50 RK 0
885,456.44 277,500.00 4,387,043.57 RK 1
1,328,184.65 416,250.00 6,580,565.35 RK 1
7,083,651.48 2,220,000.00 35,096,348.52 RK 1
3,541,825.74 1,110,000.00 17,548,174.26 RK 1
885,456.44 277,500.00 4,387,043.57 RK 1
885,456.44 277,500.00 4,387,043.57 RK 1
974,002.08 305,250.00 4,825,747.92 RK 1
885,456.44 277,500.00 4,387,043.57 RK 1
885,456.44 277,500.00 4,387,043.57 RK 1
2,656,369.31 832,500.00 13,161,130.70 RK 1
885,456.44 277,500.00 4,387,043.57 RK 1
885,456.44 277,500.00 4,387,043.57 RK 1
885,456.44 277,500.00 4,387,043.57 RK 1
PKRJL -
PKRJL -
PL PELEBARAN
RJ RUTIN JEMBATAN
RK RUTIN KONDISI
PKPL PK PELEBARAN
PKD PK DRAINASE
PKRK PK RUTIN KONDISI
PKRJ PK RUTIN JEMBATAN
PKRJL PK RUTIN JALAN
TAHUN 2022 %
KDN KLN
Harsat Personil Bahan Alat Total Personil Bahan Alat Total
-
-
11,845 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
-
33,104 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
228,192 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
585,126 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
188,241 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
2,763,837 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1,398,423 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
867,134 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
23,690 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
11,845 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
15,793 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
553 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
-
-
-
1,398,423 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
11,845 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
-
867,134 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
-
11,974 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1,111,297 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
-
128,954 30.00% 70.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
-
-
-
-
-
-
-
-
376,838 29.22% 65.08% 1.44% 95.74% 0.00% 3.77% 0.48% 4.26%
-
11,974 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1,111,297 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
28,061 1.43% 45.84% 39.55% 86.82% 0.00% 0.00% 13.18% 13.18%
-
19,742 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
-
2,369,004 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
2,369,004 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
-
2,763,837 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
5,922,509 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
31,586,714 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
15,793,357 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
4,343,173 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
11,845,018 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
-
-
B I A Y A (Rupiah)
KDN
Personil Bahan Alat Total
- - - -
241,659.47 - - 241,659.47
#N/A #N/A #N/A #N/A
2,281,992.30 - - 2,281,992.30
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
1,579,335.68 - - 1,579,335.68
2,653,283.95 - - 2,653,283.95
- - - -
- - - -
- - - -
- - - -
- - - -
#REF! #REF! #REF! #REF!
#N/A #REF! #REF! #REF!
- - - -
1,536,268.91 3,421,110.96 75,820.05 5,033,199.91
- - - -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
1,965.26 62,901.32 54,263.22 119,129.80
- - - -
#N/A #N/A #N/A #N/A
- - - -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
- - - -
#N/A #N/A #N/A #N/A
3,948,339.21 - - 3,948,339.21
5,922,508.81 - - 5,922,508.81
31,586,713.67 - - 31,586,713.67
15,793,356.83 - - 15,793,356.83
3,948,339.21 - - 3,948,339.21
3,948,339.21 - - 3,948,339.21
4,343,173.13 - - 4,343,173.13
3,948,339.21 - - 3,948,339.21
3,948,339.21 - - 3,948,339.21
11,845,017.63 - - 11,845,017.63
3,948,339.21 - - 3,948,339.21
3,948,339.21 - - 3,948,339.21
3,948,339.21 - - 3,948,339.21
- - - - -
- - - - 241,659.47 #REF!
#N/A #N/A #N/A #N/A #N/A
- - - - 2,281,992.30 #REF!
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - 1,579,335.68 #REF!
- - - - 2,653,283.95 #REF!
- - - - - #REF!
- - - - -
- - - - -
- - - - -
- - - - -
#REF! #REF! #REF! #REF! #REF! #REF!
#N/A #N/A #N/A #N/A #N/A #REF!
- - - - -
- 198,418.48 25,273.35 223,691.83 5,256,891.74 #REF!
- - - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
- - 18,087.74 18,087.74 137,217.54 #REF!
- - - - -
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - -
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - 3,948,339.21 #REF!
- - - - 5,922,508.81 #REF!
- - - - 31,586,713.67 #REF!
- - - - 15,793,356.83 #REF!
- - - - 3,948,339.21 #REF!
- - - - 3,948,339.21 #REF!
- - - - 4,343,173.13 #REF!
- - - - 3,948,339.21 #REF!
- - - - 3,948,339.21 #REF!
- - - - 11,845,017.63 #REF!
- - - - 3,948,339.21 #REF!
- - - - 3,948,339.21 #REF!
- - - - 3,948,339.21 #REF!
- - - - #REF!
#REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#N/A
#N/A
#N/A
#N/A
#REF!
#N/A
#N/A
#N/A
#REF!
#REF!
#N/A
#N/A
#N/A
#N/A
#N/A
#REF!
#N/A
#REF!
#N/A
#REF!
#REF!
#N/A
#N/A
#REF!
#REF!
#N/A
#N/A
#N/A
#N/A
#REF!
#REF!
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#REF!
#REF!
#REF!
#N/A
#REF!
#N/A
#N/A
#REF!
#N/A
#N/A
#N/A
#N/A
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-2.962241,119.356842 #REF! #REF! #REF!
PERBANDINGAN FISIK - KEU PL PKPL PKD
0.88505 #REF! #REF! #REF!
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
ALOKASI PER PPK/ PAKET 12,628,022,767
KODE
PROGRAM/ AKTIVITAS/ KRO/ RO/ KOMPONEN/ RENCANA REVISI
PAGU DIPA AWAL 2022 TKDN TKDN TKDN
SUBKOMP/ DETIL DIPA 2022 KONTRAK REALISASI DIPA
RINCIAN RENCANA REVISI DIPA 2022 REALISASI REALISASI REALISASI REALISASI REALISASI REALISASI REALISASI REALISASI REALISASI RINCIAN KONTRAK MYC RINCIAN REALISASI DIPA 2021 SISA KONTRAK TERMIN SD MEI
MYC 2021
TERMIN 1 TERMIN 2 TERMIN 3 TERMIN 4 TERMIN 5 TERMIN 6 TERMIN 7 TERMIN 8 TERMIN SISA SLOT
JAN - AGS 2022 SEPT - DES 2022 JAN - DES 2022 (JAN-FEB) (MAR) (APR) (MEI) (JUN) (JUL) (AUG-A) (AUG-B) S/D SAAT INI
PATCHING PAS BATU Total Total PATCHING PAS BATU PATCHING PAS BATU
A B RUTIN JEMBATAN FRP JEMBATAN Personil Bahan Alat Personil Bahan Alat Personil Bahan Alat Total C RUTIN JEMBATAN FRP JEMBATAN D RUTIN JEMBATAN FRP JEMBATAN E = C-D
JEMBATAN JEMBATAN JEMBATAN JEMBATAN JEMBATAN JEMBATAN
PPK 2.2 183,209,567,000 183,209,567,000
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #REF! #REF! #N/A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
21,100,667,080
RK 320 Pemeliharaan Rutin Kondisi 593,601,000 593,601,000 447,117,224,050 - - 447,117,224,050 - 446,976,851,760 - - - 446,976,851,760 #NAME? #NAME? #NAME? #NAME? 118,226,767 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #NAME? #NAME? 760532672.257687
CD PRESERVASI RUTIN JALAN SERDANG -
593,601,000 593,601,000 118,226,767 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
BOJONEGARA - MERAK 760532672.257687
523131 Belanja Pemeliharaan Jalan dan Jembatan
1 - Ruas Serdang - Bojonegara - Merak (22.23.K) 593,601,000 593,601,000 59,113,384 315,624,334 171,049,846 - - 545,787,564 47,813,436 4,302,336,214 3,303,981,500 998,354,714 385,794,955 385794954.628843
2409.RDC.005
Jalan Akses Simpul Transportasi (ProPN) (PEN) 87,489,226,000 87,489,226,000 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 3,906,402,786 8,844,174,235 2,989,231,440 3,212,863,803 4,902,893,172 3,464,788,519 3,728,309,804 6,182,534,083 37,231,197,842 50,258,028,158 154,936,667,969 41,918,878,000 113,017,789,969 18,952,672,264
18952672264.3709
RMNJ 322 Rehabilitasi Minor Jalan 87,489,226,000 87,489,226,000 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 3,906,402,786 8,844,174,235 2,989,231,440 3,212,863,803 4,902,893,172 3,464,788,519 3,728,309,804 6,182,534,083 37,231,197,842 50,258,028,158 154,936,667,969 41,918,878,000 113,017,789,969 18,952,672,264 #N/A #N/A 18952672264.3709
CD PRESERVASI RUTIN JALAN SERDANG - 87,489,226,000 87,489,226,000 3,906,402,786 8,844,174,235 2,989,231,440 3,212,863,803 4,902,893,172 3,464,788,519 3,728,309,804 6,182,534,083 37,231,197,842 50,258,028,158 154,936,667,969 41,918,878,000 113,017,789,969 18,952,672,264
BOJONEGARA - MERAK 18952672264.3709
534141 Belanja Penambahan Nilai Jalan dan Jembatan
1
- Ruas Serdang - Bojonegara - Merak (22.23.K) 87,373,006,000 87,489,226,000 3,906,402,786 8,844,174,235 2,989,231,440 3,212,863,803 4,902,893,172 3,464,788,519 3,728,309,804 6,182,534,083 37,231,197,842 50,258,028,158 154,936,667,969 41,918,878,000 113,017,789,969 18,952,672,264
18,952,672,264
RKJ 324 Rekonstruksi Jalan 87,489,226,000 87,489,226,000 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #NAME? #NAME? #NAME? #NAME? 3,906,402,786 8,844,174,235 2,989,231,440 3,212,863,803 4,902,893,172 3,464,788,519 3,728,309,804 6,182,534,083 37,231,197,842 50,258,028,158 154,936,667,969 41,918,878,000 113,017,789,969 18,952,672,264 #NAME? #NAME? 18952672264.3709
CD PRESERVASI RUTIN JALAN SERDANG -
87,489,226,000 87,489,226,000 3,906,402,786 8,844,174,235 2,989,231,440 3,212,863,803 4,902,893,172 3,464,788,519 3,728,309,804 6,182,534,083 37,231,197,842 50,258,028,158 154,936,667,969 41,918,878,000 113,017,789,969 18,952,672,264
BOJONEGARA - MERAK 18952672264.3709
534141 Belanja Penambahan Nilai Jalan dan Jembatan
1
- Ruas Serdang - Bojonegara - Merak (22.23.K) 87,373,006,000 87,489,226,000 3,906,402,786 8,844,174,235 2,989,231,440 3,212,863,803 4,902,893,172 3,464,788,519 3,728,309,804 6,182,534,083 37,231,197,842 50,258,028,158 154,936,667,969 41,918,878,000 113,017,789,969 18,952,672,264
18,952,672,264
2409.RDF.005
Jalan Akses Simpul Transportasi (ProPN) (PEN) 6,718,413,000 6,718,413,000 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #NAME? #NAME? #NAME? #NAME? 209,213,125 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
723294769.3784
PBJ 333 Pemeliharaan Berkala Jembatan 6,718,413,000 6,718,413,000 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #NAME? #NAME? #NAME? #NAME? 209,213,125 271,420,820 - 47,272,114 297,742,909 470,187,363 - 277,085,497 1,572,921,828 5,145,491,172 11,472,920,038 - 11,472,920,038 527,906,059 #NAME? #NAME? 527906059.3784
CB PRESERVASI RUTIN JALAN SERDANG -
6,718,413,000 6,718,413,000 209,213,125 271,420,820 - 47,272,114 297,742,909 470,187,363 - 277,085,497 1,572,921,828 5,145,491,172 11,472,920,038 - 11,472,920,038 527,906,059
BOJONEGARA - MERAK 527906059.3784
534141 Belanja Penambahan Nilai Jalan dan Jembatan
1
- Ruas Serdang - Bojonegara - Merak (22.23.K) 6,718,413,000 6,718,413,000 209,213,125 271,420,820 47,272,114 297,742,909 470,187,363 - 277,085,497 1,572,921,828 5,145,491,172 11,472,920,038 11,472,920,038 527,906,059
527,906,059
Progres sd agust
NO. MATA Sisa Alokasi 2022
2022
PEMBAYA URAIAN PEKERJAAN Ket.
RAN PERKIRAAN HARGA SATUAN BOBOT
SAT. JUMLAH HARGA (Rp)
VOLUME (Rp) (%)
Sisa 2021 & 2023 Vol Vol Jumlah Harga
a b c d e f g q
DIVISI 1. UMUM 90%
1.2 Mobilisasi LS 1.00 160,300,000.00 160,300,000.00 0.254 1.000 0.70 0.00 0.00 1,790,179,000
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 103,400,000.00 103,400,000.00 0.164 1.000 0.52 (0.32) (33,125,490.71) 178,554,000
1.17.(1a) Pengujian pH Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 34,000
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 46,000
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 46,000
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 46,000
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 46,000
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 46,000
1.17.(1g) Pengujian Coliform Buah 6.00 100,000.00 600,000.00 0.001 6.000 3.00 0.00 0.00 69,000
1.17.(1h) Pengujian E. Coli Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 415,000
1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Buah 6.00 400,000.00 2,400,000.00 0.004 6.000 3.00 0.00 0.00 46,000
1.17.(1j) Pengujian Temperatur (Suhu) Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 57,000
1.17.(2a) Pengujian Vibrasi Lin Buah 6.00 1,000,000.00 6,000,000.00 0.009 6.000 3.00 0.00 0.00 69,000
1.17.(2b) Pengujian tingkat getaran kendaraan bermotor Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 69,000
1.17.(3a) Pengujian NoX Buah 6.00 200,000.00 1,200,000.00 0.002 6.000 3.00 0.00 0.00 69,000
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 6.00 150,000.00 900,000.00 0.001 6.000 3.00 0.00 0.00 69,000
1.17.(3c) Pengujian Karbondioksida (CO2) Buah 6.00 150,000.00 900,000.00 0.001 6.000
1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 Buah 6.00 150,000.00 900,000.00 0.001 6.000 0.47 (0.15) (22,899.69) 1,188,612,200
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 6.00 500,000.00 3,000,000.00 0.005 6.000
1.17.(3g) Pengujian Timah Hitam (Pb) Buah 6.00 50,000.00 300,000.00 0.000 6.000 320.00 (320.00) (16,000,000.00) 1,436,875
1.17.(3h) Pengujian Parameter Udara Emisi dan Ambien lainnya : ………….. Buah 6.00 50,000.00 300,000.00 0.000 6.000 0.49 (0.29) (14,381.33) 293,250,000
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 174,900,000.00 174,900,000.00 0.277 1.000 0.47 (0.15) (26,701,034.61) 1,188,612,200
1.21 Manajemen Mutu LS 1.00 141,400,000.00 141,400,000.00 0.224 1.000
B. PERALATAN
Periksa lembar 1.2-2 LS 1.00 208,967,905.18 208,967,905.18 156,725,928.88 52,241,976.29
C. FASILITAS KONTRAKTOR
1 Base Camp M2 1.00 35,000,000.00 35,000,000.00 100.00 35,000,000.00 - 1,350,000.00 3.00
2 Kantor M2 1,485,000.00 - 100.00 - - 1,350,000.00 174.00
3 Barak M2 1,070,000.00 - 100.00 - - 1,000,000.00 1.00
4 Bengkel M2 1,097,000.00 - 100.00 - - 1,000,000.00 50.00
5 Gudang, dan lain-lain M2 987,000.00 - 100.00 - - 900,000.00 72.00
10,000,000.00
D. MOBILISASI FASILITAS LABORATORIUM set 1.00 5,000,000.00 5,000,000.00 100.00 5,000,000.00 - 35,000,000.00 -
1 Ruang Laboratorium (sesuai gambar) set
3 Bituminous Testing
- Marshall Asphalt Test Set
- Extraction Test, Centrifuge/Refflux Method Set
- Specific Gravity for Coarse Aggregate Set
- Specific Gravity for Fine Aggregate Set
- Mix Air Viod Content (Accurate Method) Set Termasuk dalam Harga
- Core Drill Set Satuan Mata
- Metal Thermometer Set Pembayaran
- Accessories and Tolls Set
- Penetration Test Bln
- Softening Point Set
- Refusal Density Compactor Set
4 Concrete Testing
- Slump Cone Set
- Sylinder/cube Mould for Compressive Strength Set
- Beam Mould for Flexural Strength (RIGID) Set
- Crushing Machine Set
E. MOBILISASI PERSONIL
E.I Personil sesuai struktur organisasi Ls 65,997,000.00 - 100.00 - - 60,000,000
1 .......................... LS
2 .......................... LS
3 .......................... LS
4 ..........................
5 ..........................
E.II Personil Lainnya Set 32,997,000.00 - 100.00 - - 30,000,000
1 .......................... Set -
2 .......................... Bh -
3 .......................... Bh -
4 ..........................
5 ..........................
6 ..........................
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi diatas sudah termasuk over-head dan laba 118% 32%
serta seluruh dan bea (Kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI -
Lembar 1.2-2
% TKDN KDN KLN
No. Jenis Alat KODE Sat Jumlah Harsat Jumlah Harga KETERANGAN
(Rp.) 1.1
B PERALATAN
1 ASPHALT MIXING PLANT E01 Unit 1.00 48,108,252 48,108,251.69 75.00 36,081,188.77 12,027,062.92 43,734,774.26
2 ASPHALT FINISHER E02 Unit 2.00 6,219,521 12,439,041.62 75.00 9,329,281.21 3,109,760.40 5,654,109.83
3 POWER BROOM E03 Unit 575,154 - 522,867.22
4 BULLDOZER 100-150 HP E04 Unit 1.00 3,164,753 3,164,753.00 75.00 2,373,564.75 791,188.25 2,877,048.18
5 COMPRESSOR 4000-6500 L\M E05 Unit 4.00 1,145,529 4,582,114.35 75.00 3,436,585.77 1,145,528.59 1,041,389.63
6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit 16.00 617,272 9,876,357.29 75.00 7,407,267.96 2,469,089.32 561,156.66
7 CRANE 10-15 TON E07 Unit 4,106,274 - 3,732,976.58
8 DUMP TRUCK 3 - 4 M3 E08 Unit 12.00 192,500 2,310,000.00 75.00 1,732,500.00 577,500.00 175,000.00
9 DUMP TRUCK 6-8 M3 E09 Unit 15.00 334,910 5,023,646.06 75.00 3,767,734.55 1,255,911.52 304,463.40
10 EXCAVATOR 80-140 HP E10 Unit 4.00 3,065,051 12,260,202.96 75.00 9,195,152.22 3,065,050.74 2,786,409.76
11 FLAT BED TRUCK 3-4 TON E11 Unit 2.00 2,022,596 4,045,191.58 75.00 3,033,893.68 1,011,297.89 1,838,723.45
12 GENERATOR SET E12 Unit 2.00 2,091,512 4,183,024.23 75.00 3,137,268.17 1,045,756.06 1,901,374.65
13 MOTOR GRADER >100 HP E13 Unit 2.00 2,611,895 5,223,790.27 75.00 3,917,842.71 1,305,947.57 2,374,450.12
14 TRACK LOADER 75-100 HP E14 Unit 1,892,191 - 1,720,173.25
15 WHEEL LOADER 1.0-1.6 M3 E15 Unit 2.00 2,122,773 4,245,546.04 75.00 3,184,159.53 1,061,386.51 1,929,793.65
16 THREE WHEEL ROLLER 6-8 T E16 Unit 1.00 1,434,029 1,434,028.68 75.00 1,075,521.51 358,507.17 1,303,662.44
17 TANDEM ROLLER 6-8 T. E17 Unit 2.00 2,695,000 5,390,000.00 75.00 4,042,500.00 1,347,500.00 2,450,000.00
18 TIRE ROLLER 8-10 T. E18 Unit 2.00 3,018,068 6,036,136.00 75.00 4,527,102.00 1,509,034.00 2,743,698.18
19 VIBRATORY ROLLER 5-8 T. E19 Unit 2.00 2,663,420 5,326,839.12 75.00 3,995,129.34 1,331,709.78 2,421,290.51
20 CONCRETE VIBRATOR E20 Unit 1.00 461,062 461,062.35 75.00 345,796.77 115,265.59 419,147.60
21 STONE CRUSHER E21 Unit 2.00 4,029,734 8,059,467.19 75.00 6,044,600.39 2,014,866.80 3,663,394.18
22 WATER PUMP 70-100 mm E22 Unit 2.00 452,477 904,954.54 75.00 678,715.91 226,238.64 411,342.97
23 WATER TANKER 3000-4500 L. E23 Unit 2.00 1,576,517 3,153,034.53 75.00 2,364,775.90 788,258.63 1,433,197.52
24 PEDESTRIAN ROLLER E24 Unit 834,696 - 758,814.49
25 TAMPER E25 Unit 2.00 479,570 959,140.29 75.00 719,355.22 239,785.07 435,972.86
26 JACK HAMMER E26 Unit 2.00 454,694 909,388.16 75.00 682,041.12 227,347.04 413,358.25
27 FULVI MIXER E27 Unit 7,162,882 - 6,511,710.96
28 CONCRETE PUMP E28 Unit 1,681,190 - 1,528,354.96
29 TRAILER 20 TON E29 Unit 2,666,443 - 2,424,038.75
30 PILE DRIVER + HAMMER E30 Unit 1.00 2,165,969 2,165,968.64 75.00 1,624,476.48 541,492.16 1,969,062.40
31 CRANE ON TRACK 35 TON E31 Unit 2,710,959 - 2,464,508.05
32 WELDING SET E32 Unit 2.00 508,409 1,016,817.88 75.00 762,613.41 254,204.47 462,189.94
33 BORE PILE MACHINE E33 Unit 5,197,196 - 4,724,723.48
34 ASPHALT LIQUID MIXER E34 Unit 463,687 - 421,533.67
35 TRONTON 15 TON E35 Unit 1.00 3,162,983 3,162,983.27 75.00 2,372,237.45 790,745.82 2,875,439.33
36 COLD MILLING MACHINE E36 Unit 1.00 11,496,847 11,496,846.79 75.00 8,622,635.09 2,874,211.70 10,451,678.90
37 ROCK DRILL BREAKER E37 Unit 1.00 3,371,556 3,371,555.81 75.00 2,528,666.86 842,888.95 3,065,050.74
38 COLD RECYCLER E38 Unit 24,052,921 - 21,866,292.15
39 HOT RECYCLER E39 Unit 56,741,887 - 51,583,533.35
40 AGGREGAT (CHIP) SPREADER E40 Unit 3,418,702 - 3,107,910.56
41 ASPHALT DISTRIBUTOR E41 Unit 2.00 2,978,798 5,957,595.28 75.00 4,468,196.46 1,489,398.82 2,707,997.86
42 SLIP FORM PAVER E42 Unit 4,245,646 - 3,859,677.83
43 CONCRETE PAN MIXER E43 Unit 1.00 2,849,740 2,849,740.47 75.00 2,137,305.36 712,435.12 2,590,673.16
44 CONCRETE BREAKER E44 Unit 4,528,877 - 4,117,160.68
45 ASPAHLT TANKER E45 Unit 2,901,485 - 2,637,713.60
46 CEMENT TANKER E46 Unit 2,611,965 - 2,374,513.60
47 CONDRETE MIXER (350) E47 Unit 659,989 - 599989.7728
48 VIBRATING RAMMER E48 Unit 515,798 - 468907.191939095
49 TRUK MIXER (AGITATOR) E49 Unit 2.00 3,369,488 6,738,976.91 75.00 5,054,232.68 1,684,744.23 3,063,171.32
50 BORE PILE MACHINE E50 Unit 3,772,915 - 3429922.84294956
51 CRANE ON TRACK 75-100 TON E51 Unit 1.00 15,311,450 15,311,450.18 75.00 11,483,587.63 3,827,862.54 13,919,500.16
52 ASPHALT CUTTER Unit 2.00 550,000 1,100,000.00 75.00 825,000.00 275,000.00 500,000.00
53 ASPHALT SPRAYER Unit 2.00 1,100,000 2,200,000.00 75.00 1,650,000.00 550,000.00 1,000,000.00
54 BABY ROLLER Unit 1.00 1,100,000 1,100,000.00 75.00 825,000.00 275,000.00 1,000,000.00
55 BLENDING EQUIPMENT Unit 1.00 3,850,000 3,850,000.00 75.00 2,887,500.00 962,500.00 3,500,000.00
56 WATER JET Unit 1.00 550,000 550,000.00 75.00 412,500.00 137,500.00 500,000.00
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan
selama periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu lintas sesuai schedule
pekerjan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 Shift
4 Mengalihkan lalu lintas harus izin PPK dan Pihak terkait
5 Semua rambu harus jelas dan terbaca oleh pengguna Jalan
Catatan : 1. Harga satuan personil tersebut sudah termasuk seluruh pajak dan bea (Kecuali PPN),
Asuransi Tenaga Kerja dan Pengeluaran Lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu Lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
ITEM PEMBAYARAN NO. : 1.19
JENIS PEKERJAAN : Keselamatan dan Kesehatan Kerja
SATUAN PEMBAYARAN : Lump Sum
A. DATA DANJalan
Pekerjaan ASUMSI
dan Jembatan
1 Nilai Pekerjaan Jalan Asumsi Rp
Nilai Pekerjaan Jembatan Asumsi Rp
2 Jangka Waktu Pekerjaan Jalan Merujuk Ke Masa Pe Bulan 27.00 - -
Jangka Waktu Pekerjaan Jembatan Merujuk Ke Masa Pe Bulan
3 Penyuluhan Penanggulangan HIVAIDS Jika disebutkan dala Org 290.00 - -
B. URUTAN KERJA
1 Penyedia setelah menerima SPMK mengusulkan personil
Tenaga Ahli Mutu pekerjaan sbg Manager Kendali Mutu
2 Tenaga Ahli dibantu oleh asisten kendali mutu yang
berpengalaman dibidangnya dan tenaga pendukung
3 Membuat RMK dan laporan mutu yang disetujui PPK
4 Melakukan Pengendalian Mutu semua pekerjaan dan membuat
laporan sekala berkala
C. TENAGA/PERSONIL
Masa Pelaksana Pekerjaan Bulan 27.00 - -
1 Ahli Kendali Mutu OB 27.00 7,500,000.00 202,500,000.00
2 Asisten Ahli Kendali Mutu OB - - -
3 Staff Pendukung (Support Staff) OB 24.00 3,500,000.00 84,000,000.00
4 Laporan Kendali Mutu Bulan 27.00 250,000.00 6,750,000.00
Catatan : 1. Harga satuan personil tersebut sudah termasuk seluruh pajak dan bea (Kecuali PPN),
Asuransi Tenaga Kerja dan Pengeluaran Lainnya.
2. Biaya tersebut sudah termasuk biaya pembuatan laporan yang terkait dengan mutu pekerjaan
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan pembuatan laporan mutu seperti komputer, printer, kertas, dan sebagainya
OK
DAFTAR HARGA SATUAN DASAR UPAH
u1 1 Mandor OH 132,000.00
u2 2 Kepala Tukang OH 121,000.00
u3 3 Tukang OH 110,000.00
u4 4 Pekerja OH 88,000.00
u5 5 Operator Jam 22,000.00 154,000.00
u6 6 Pembantu Operator Jam 14,000.00 98,000.00
u7 7 Mekanik Jam 22,000.00 154,000.00
u8 8 Pembantu Mekanik Jam 14,000.00 98,000.00
u9 9 Surveyor Jam 33,000.00 231,000.00
u10 10 Pembantu Surveyor Jam 17,000.00 119,000.00
u11 11 Sopir Jam 22,000.00 154,000.00
u12
DAFTAR HARGA SATUAN DASAR BAHAN
PL
Jumlah Vol
#N/A
#N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
-
-
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
-
#N/A #N/A
-
-
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A
#N/A #N/A
-
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
-
-
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
-
#N/A
#N/A
-
#N/A #N/A
#N/A #N/A
#N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
-
-
-
#N/A #N/A
#N/A #N/A
-
-
-
#N/A #N/A
1 2 34 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
ANALISA HARGA STUAN PEKERJAAN Tenaga Bahan Alat Vol Jumlah Harga
KDN KLN KDN KLN KDN KLN kode kode uba vol. realisasi
PEKERJAAN : Preservasi Jalan Surumana (Bts. Sulteng) - Pasang Kayu - Baras - Karossa (UMYC)
LOKASI : Banten/Serang
2.1.(1)
PL/PKD SUB JUMLAH I 1,068.79 1,068.79 - 4.00% 0.00% 0.00% 0.00% 72.00% 24.00% 100.00%
II BAHAN / MATERIAL :
2.1.(1)
PL/PKD SUB JUMLAH II - - -
III PERALATAN :
a1 PL/PKD 1 Excavator, 0.93 M3 Jam 0.0243 398,058.54 9,669.12 75.00 7,251.84 2,417.28 #N/A #N/A a a1PL/PKD
a22 PL/PKD 2 Dump Truck, 5 Ton Jam 0.0915 175,000.00 16,004.71 75.00 12,003.53 4,001.18 #N/A #N/A a a22PL/PKD
2.1.(1)
PL/PKD SUB JUMLAH III 25,673.83 19,255.37 6,418.46
2.1.(1) SUB JUMLAH ( I + II + III ) 26,742.62 20,324.17 6,418.46
PL/PKD IV LAIN - LAIN : 76.00% 24.00%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 1,069.70
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 1,604.56
SUB JUMLAH IV 2,674.26
JUMLAH HARGA ( I + II + III + IV ) 29,416.89 20,324.17 6,418.46
2.1.(1) PL/PKD HARGA SATUAN PEKERJAAN ( Dibulatkan ) 29,416.00 20,324.00 6,418.00
2.2.(1) PKD SUB JUMLAH I 203,445.00 203,445.00 - 29.22% 0.00% 65.08% 3.77% 1.44% 0.48% 100.00%
II BAHAN / MATERIAL :
b5 PKD 1 Batu kali m3 1.2000 98,500.00 118,200.00 100.00 118,200.00 - #N/A #N/A b b5PKD
b3 PKD 2 Pasir m3 0.4850 78,200.00 37,927.00 100.00 37,927.00 - #N/A #N/A b b3PKD
b2 PKD 3 Semen kg 202.0000 1,600.00 323,200.00 91.87 296,923.84 26,276.16 #N/A #N/A PT. Tonasa b b2PKD
III PERALATAN :
a6 PKD 1 Concrete Mixer hari 0.1670 80,165.24 13,387.59 75.00 10,040.70 3,346.90 #N/A #N/A a a6PKD
JENIS PEKERJAAN : 0
SATUAN / UNIT : 0
NOMOR PEMBAYARAN : 0 - - - -
3.1.(1) PL SUB JUMLAH I 927.68 927.68 - 4.37% 0.00% 0.00% 0.00% 71.72% 23.91% 100.00%
II BAHAN / MATERIAL :
III PERALATAN :
a1 PL 1 Excavator, 0.93 M3 Jam 0.0211 398,058.54 8,392.55 75.00 6,294.41 2,098.14 #N/A #N/A a a1PL
a22 PL 2 Dump Truck, 5 Ton Jam 0.0681 175,000.00 11,914.80 75.00 8,936.10 2,978.70 #N/A #N/A a a22PL
3.2.(1b) PL SUB JUMLAH I 4,139.78 4,139.78 - 15.15% 0.00% 0.00% 0.00% 63.64% 21.21% 100.00%
II BAHAN / MATERIAL :
b1 PL 1 Tanah timbunan m3 - 68,600.00 - #N/A #N/A b b1PL #N/A
III PERALATAN :
a1 PL 1 Excavator, 0.93 M3 Jam 0.0105 398,058.54 4,161.30 75.00 3,120.98 1,040.33 #N/A #N/A a a1PL
a22 PL 2 Dump Truck, 5 Ton Jam 0.0871 175,000.00 15,240.96 75.00 11,430.72 3,810.24 #N/A #N/A a a22PL
a5 PL 3 Motor Grader Jam 0.0027 339,207.16 906.00 75.00 679.50 226.50 #N/A #N/A a a5PL
a4 PL 4 Vibro Roller 10 Ton Jam 0.0042 345,898.64 1,447.03 75.00 1,085.27 361.76 #N/A #N/A a a4PL
a10 PL 5 Water Tank Truck Jam 0.0070 204,742.50 1,438.95 75.00 1,079.21 359.74 #N/A #N/A a a10PL
a20 PL a a20PL
3.2.(2a) PL SUB JUMLAH I 4,876.86 4,876.86 - 2.40% 0.00% 36.12% 0.00% 46.11% 15.37% 100.00%
II BAHAN / MATERIAL :
b19 PL 1 Timbunan Pilihan m3 1.1550 63,600.00 73,458.00 100.00 73,458.00 - #N/A #N/A b b19PL 1,226
III PERALATAN :
a1 PL 1 Excavator, 0.93 M3 Jam 0.0101 398,058.54 4,010.90 75.00 3,008.17 1,002.72 #N/A #N/A a a1PL
a22 PL 2 Dump Truck, 5 Ton Jam 0.6677 175,000.00 116,847.39 75.00 87,635.54 29,211.85 #N/A #N/A a a22PL
a5 PL 3 Motor Grader Jam 0.0037 339,207.16 1,268.40 75.00 951.30 317.10 #N/A #N/A a a5PL
a4 PL 4 Vibro Roller 10 Ton Jam 0.0042 345,898.64 1,447.03 75.00 1,085.27 361.76 #N/A #N/A a a4PL
a10 PL 5 Water Tank Truck Jam 0.0070 204,742.50 1,438.95 75.00 1,079.21 359.74 #N/A #N/A a a10PL
4.7.(3) PL SUB JUMLAH I 30,250.00 30,250.00 - 3.08% 0.00% 28.31% 38.85% 22.32% 7.44% 100.00%
II BAHAN / MATERIAL :
b24a PL 1 Agr 5-10 m3 0.3268 102,700.00 33,565.54 100.00 33,565.54 - #N/A #N/A Lokal b b24aPL #N/A
b25 PL 2 Agr 0-5 m3 0.3360 102,700.00 34,507.20 100.00 34,507.20 - #N/A #N/A Lokal b b25PL #N/A
b26 PL 3 Filler kg 18.9000 1,600.00 30,240.00 91.87 27,781.49 2,458.51 #N/A #N/A PT. Tonasa b b26PL #N/A
b7 PL 4 Aspal kg 61.8000 9,100.00 562,380.00 32.48 182,661.02 379,718.98 #N/A #N/A PT. Pertamina b b7PL #N/A
III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0154 275,684.81 4,256.90 75.00 3,192.67 1,064.22 #N/A #N/A sewa a a13PL
a11 PL 2 AMP Jam 0.0208 6,247,824.89 130,163.02 75.00 97,622.26 32,540.75 #N/A #N/A sewa a a11PL
a12 PL 3 Genset 250 KVA Jam 0.0208 271,624.95 5,658.85 75.00 4,244.14 1,414.71 #N/A #N/A sewa a a12PL
a2 PL 4 Dump Truck, 10 Ton Jam 0.2941 404,130.00 118,861.76 75.00 89,146.32 29,715.44 #N/A #N/A sewa a a2PL
a16 PL 5 Asphat Finisher Jam 0.0189 807,729.98 15,242.49 75.00 11,431.87 3,810.62 #N/A #N/A sewa a a16PL
a17 PL 6 Tandem Roller Jam 0.0354 350,000.00 12,387.98 75.00 9,290.98 3,096.99 #N/A #N/A sewa a a17PL
a18 PL 7 Pneumatic Tyre Roller Jam 0.0158 391,956.88 6,190.57 75.00 4,642.93 1,547.64 #N/A #N/A sewa a a18PL
5.1.(1) PL SUB JUMLAH I 4,005.35 4,005.35 - 1.43% 0.00% 45.84% 0.00% 39.55% 13.18% 100.00%
II BAHAN / MATERIAL :
b22 PL 1 Agregat Kelas A m3 1.1903 107,700.00 128,197.74 100.00 128,197.74 - #N/A #N/A b b22PL
III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0082 275,684.81 2,268.96 75.00 1,701.72 567.24 #N/A #N/A a a13PL 177
a22 PL 2 Dump Truck, 5 Ton Jam 0.7298 175,000.00 127,715.75 75.00 95,786.81 31,928.94 #N/A #N/A a a22PL 15,677
a5 PL 3 Motor Grader Jam 0.0021 339,207.16 722.42 75.00 541.82 180.61 #N/A #N/A a a5PL 46
a17 PL 4 Tandem Roller Jam 0.0054 350,000.00 1,874.16 75.00 1,405.62 468.54 #N/A #N/A a a17PL 115
a10 PL 5 Water Tank Truck Jam 0.0141 204,742.50 2,877.91 75.00 2,158.43 719.48 #N/A #N/A a a10PL 302
a27 PL 6 Blending Equipment Jam 0.0482 248,950.74 11,997.63 75.00 8,998.22 2,999.41 #N/A #N/A a a27PL 1,035
5.1.(3a) PL SUB JUMLAH I 9,243.13 9,243.13 - 4.08% 0.00% 40.68% 0.00% 41.43% 13.81% 100.00%
II BAHAN / MATERIAL :
b22a PL 1 Agregat Kelas S m3 1.1903 77,400.00 92,130.97 100.00 92,130.97 - #N/A #N/A b b22aPL
III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0073 275,684.81 2,016.85 75.00 1,512.64 504.21 #N/A #N/A a a13PL
a22 PL 2 Dump Truck, 5 Ton Jam 0.6527 175,000.00 114,226.73 75.00 85,670.05 28,556.68 #N/A #N/A a a22PL
a5 PL 3 Motor Grader Jam 0.0049 339,207.16 1,667.12 75.00 1,250.34 416.78 #N/A #N/A a a5PL
a17 PL 4 Tandem Roller Jam 0.0124 350,000.00 4,324.99 75.00 3,243.74 1,081.25 #N/A #N/A a a17PL
a10 PL 5 Water Tank Truck Jam 0.0141 204,742.50 2,877.91 75.00 2,158.43 719.48 #N/A #N/A a a10PL
JENIS PEKERJAAN : Perkerasan Jalan Beton Semen Untuk Pembukaan Lalu Lintas Umur Beton Lebih dari 3 hari kurang dar
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : SKh 1.5.3.( #N/A #N/A #N/A #N/A
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e
5.3.(1.a) PL SUB JUMLAH I 100,502.01 100,502.01 - 6.77% 0.00% 67.20% 13.12% 9.79% 3.13% 100.00%
II BAHAN / MATERIAL :
b2 PL 1 Semen kg 410.0000 1,600.00 656,000.00 91.87 602,667.20 53,332.80 #N/A #N/A PT. Tonasa b b2PL #N/A
b3 PL 2 Pasir m3 0.6237 78,200.00 48,771.23 100.00 48,771.23 - #N/A #N/A b b3PL #N/A
b4 PL 3 Batu pecah m3 0.7360 102,700.00 75,582.07 100.00 75,582.07 - #N/A #N/A b b4PL #N/A
b42 PL 4 Baja Tul (dowel) D32 Kg 15.7750 12,300.00 194,032.50 51.47 99,868.53 94,163.97 #N/A #N/A b b42PL #N/A
b43 PL 5 Join sealent Kg 0.9653 46,900.00 45,270.56 38.33 17,352.21 27,918.35 #N/A #N/A b b43PL #N/A
b44 PL 6 Cat anti karat Kg 0.0200 102,600.00 2,052.00 21.20 435.02 1,616.98 #N/A #N/A b b44PL #N/A
b45 PL 7 Expantion cap M2 0.1700 9,400.00 1,598.00 100.00 1,598.00 - #N/A #N/A b b45PL #N/A
b46 PL 8 Poliatilin 125 mikron Kg 0.4375 38,700.00 16,931.25 75.00 12,698.44 4,232.81 #N/A #N/A b b46PL #N/A
b47 PL 9 Curing compond Ltr 0.8700 2,100.00 1,827.00 75.00 1,370.25 456.75 #N/A #N/A b b47PL #N/A
b48 PL 10 Multiplek 12 mm Lbr 0.1600 206,800.00 33,088.00 100.00 33,088.00 - #N/A #N/A b b48PL #N/A
b49 PL 11 Kayu acuan M3 0.0192 1,705,200.00 32,739.84 100.00 32,739.84 - #N/A #N/A b b49PL #N/A
b11 PL 12 Paku kg 1.0240 31,700.00 32,460.80 100.00 32,460.80 - #N/A #N/A b b11PL #N/A
b50 PL 13 Additive Ltr 0.9139 57,700.00 52,733.18 75.00 39,549.89 13,183.30 #N/A #N/A b b50PL #N/A
III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0236 275,684.81 6,512.75 75.00 4,884.56 1,628.19 #N/A #N/A a a13PL
a23 PL 2 Batching Plant jam 0.0502 805,320.00 40,427.71 75.00 30,320.78 10,106.93 #N/A #N/A a a23PL
a8 PL 3 Truck Mixer Jam 0.2919 437,595.90 127,741.98 75.00 95,806.48 31,935.49 #N/A #N/A a a8PL
a7 PL 4 Concrete Vibrator hari 0.0400 59,878.23 2,395.13 75.00 1,796.35 598.78 #N/A #N/A a a7PL
a10 PL 5 Water Tank Truck Jam 0.0422 204,742.50 8,633.72 75.00 6,475.29 2,158.43 #N/A #N/A a a10PL
a9 PL 7 Concrete paver Jam 0.0112 551,382.55 6,151.08 100.00 6,151.08 - #N/A #N/A a a9PL
5.3.(3) PL SUB JUMLAH I 123,694.78 123,694.78 - 14.10% 0.00% 62.24% 3.80% 14.96% 4.91% 100.00%
II BAHAN / MATERIAL :
b2 PL 1 Semen kg 256.2500 1,600.00 410,000.00 91.87 376,667.00 33,333.00 #N/A #N/A PT. Tonasa b b2PL -
b3 PL 2 Pasir m3 0.4991 78,200.00 39,029.32 100.00 39,029.32 - #N/A #N/A b b3PL -
b20 PL 3 Sirtu saring m3 0.8248 68,600.00 56,580.14 100.00 56,580.14 - #N/A #N/A b b20PL -
b48 PL 4 Multiplek 12 mm Lbr 0.1600 206,800.00 33,088.00 100.00 33,088.00 - #N/A #N/A b b48PL -
b49 PL 5 Kayu acuan M3 0.0192 1,705,200.00 32,739.84 100.00 32,739.84 - #N/A #N/A b b49PL -
b11 PL 6 Paku kg 0.2500 31,700.00 7,925.00 100.00 7,925.00 - #N/A #N/A b b11PL -
III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0244 275,684.81 6,729.84 75.00 5,047.38 1,682.46 #N/A #N/A a a13PL
a23 PL 2 Batching Plant jam 0.0502 805,320.00 40,427.71 75.00 30,320.78 10,106.93 #N/A #N/A a a23PL
a8 PL 3 Truck Mixer Jam 0.2607 437,595.90 114,067.10 75.00 85,550.33 28,516.78 #N/A #N/A a a8PL
a7 PL 4 Concrete Vibrator hari 0.0400 59,878.23 2,395.13 75.00 1,796.35 598.78 #N/A #N/A a a7PL
a10 PL 5 Water Tank Truck Jam 0.0422 204,742.50 8,633.72 75.00 6,475.29 2,158.43 #N/A #N/A a a10PL
a9 PL 6 Concrete paver Jam 0.0037 551,382.55 2,050.36 100.00 2,050.36 - #N/A #N/A a a9PL
6.1 (1) PL SUB JUMLAH I 1,191.67 1,191.67 - 9.56% 0.00% 53.43% 32.54% 3.36% 1.12% 100.00%
II BAHAN / MATERIAL :
b57 PL 1 Emulsi Prime coat Kg - - - 100.00 - - #N/A #N/A b b57PL -
b7 PL 2 Aspal kg 0.6600 9,100.00 6,006.00 32.48 1,950.75 4,055.25 #N/A #N/A PT. Pertamina b b7PL 25,768
b8 PL 2 Minyak tanah ltr 0.4400 10,700.00 4,708.00 100.00 4,708.00 - #N/A #N/A b b8PL 17,178
III PERALATAN :
a14 PL 1 Asphat Distributor Jam 0.0010 386,856.84 402.98 75.00 302.23 100.74 #N/A #N/A a a14PL
a15 PL 2 Air Compressor Jam 0.0010 148,769.95 154.97 75.00 116.23 38.74 #N/A #N/A a a15PL
6.1 (2a) PL SUB JUMLAH I 1,191.67 1,191.67 - 9.84% 0.00% 40.91% 44.64% 3.46% 1.15% 100.00%
II BAHAN / MATERIAL :
b58 PL 1 Emulsi Tack coat Kg - - - 100.00 - - #N/A #N/A b b58PL -
b7 PL 2 Aspal kg 0.8800 9,100.00 8,008.00 32.48 2,601.00 5,407.00 #N/A #N/A PT. Pertamina b b7PL 34,631
b8 PL 2 Minyak tanah ltr 0.2200 10,700.00 2,354.00 100.00 2,354.00 - #N/A #N/A b b8PL 8,658
III PERALATAN :
a14 PL 1 Asphat Distributor Jam 0.0010 386,856.84 402.98 75.00 302.23 100.74 #N/A #N/A a a14PL
a15 PL 2 Air Compressor Jam 0.0010 148,769.95 154.97 75.00 116.23 38.74 #N/A #N/A a a15PL
JENIS PEKERJAAN : Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir)
SATUAN / UNIT : Ton
NOMOR PEMBAYARAN : 6.5.(1b) #N/A #N/A #N/A #N/A
HARGA SATUAN HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K DASAR (Rp)
OFISIEN ( Rp. ) (Rp.)
d e=cxd f=c-e
I UPAH / TENAGA :
6.5.(1b) PL SUB JUMLAH I 37,098.04 37,098.04 - 3.90% 0.00% 32.24% 31.50% 24.27% 8.09% 100.00%
II BAHAN / MATERIAL :
b25 PL 1 Agr 0-5 m3 0.2841 102,700.00 29,181.29 100.00 29,181.29 - #N/A #N/A Lokal b b25PL #N/A
b23 PL 2 Agregat Halus m3 0.3292 102,700.00 33,808.73 100.00 33,808.73 - #N/A #N/A Lokal b b23PL #N/A
b26 PL 3 Filler kg 8.9760 1,600.00 14,361.60 91.87 13,194.00 1,167.60 #N/A #N/A PT. Tonasa b b26PL #N/A
b7 PL 4 Aspal kg 47.2770 9,100.00 430,220.70 32.48 139,735.68 290,485.02 #N/A #N/A PT. Pertamina b b7PL #N/A
b27 PL 5 Asbuton Mikro kg 82.1100 1,200.00 98,532.00 91.99 90,639.59 7,892.41 #N/A #N/A PT. Asbuton Jaya Abadi b b27PL #N/A
III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0176 275,684.81 4,843.86 75.00 3,632.89 1,210.96 #N/A #N/A Sewa a a13PL
a11 PL 2 AMP Jam 0.0196 6,247,824.89 122,506.37 75.00 91,879.78 30,626.59 #N/A #N/A Sewa a a11PL
a12 PL 3 Genset 250 KVA Jam 0.0196 271,624.95 5,325.98 75.00 3,994.48 1,331.49 #N/A #N/A Sewa a a12PL
a2 PL 4 Dump Truck, 10 Ton Jam 0.3292 404,130.00 133,045.94 75.00 99,784.45 33,261.48 #N/A #N/A Sewa a a2PL
a16 PL 5 Asphat Finisher Jam 0.0301 807,729.98 24,329.22 75.00 18,246.91 6,082.30 #N/A #N/A Sewa a a16PL
a17 PL 6 Tandem Roller Jam 0.0279 350,000.00 9,778.24 75.00 7,333.68 2,444.56 #N/A #N/A Sewa a a17PL
a18 PL 7 Pneumatic Tyre Roller Jam 0.0200 391,956.88 7,821.73 75.00 5,866.30 1,955.43 #N/A #N/A Sewa a a18PL
6.5.(2b) PL SUB JUMLAH I 37,991.97 37,991.97 - 4.23% 0.00% 33.82% 29.18% 24.58% 8.19% 100.00%
II BAHAN / MATERIAL :
b25 PL 1 Agr 0-5 m3 0.2935 102,700.00 30,142.00 100.00 30,142.00 - #N/A #N/A b b25PL #N/A
b23 PL 2 Agregat Halus m3 0.3461 102,700.00 35,545.19 100.00 35,545.19 - #N/A #N/A b b23PL #N/A
b26 PL 3 Filler kg 8.9908 1,600.00 14,385.32 91.87 13,215.80 1,169.53 #N/A #N/A PT. Tonasa b b26PL #N/A
b7 PL 4 Aspal kg 40.9734 9,100.00 372,857.94 32.48 121,104.26 251,753.68 #N/A #N/A PT. Pertamina b b7PL #N/A
b27 PL 5 Asbuton Mikro kg 93.8400 1,200.00 112,608.00 91.99 103,588.10 9,019.90 #N/A #N/A PT. Asbuton Jaya Abadi b b27PL #N/A
III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0184 275,684.81 5,074.52 75.00 3,805.89 1,268.63 #N/A #N/A a a13PL
a11 PL 2 AMP Jam 0.0201 6,247,824.89 125,458.33 75.00 94,093.75 31,364.58 #N/A #N/A a a11PL
a12 PL 3 Genset 250 KVA Jam 0.0201 271,624.95 5,454.32 75.00 4,090.74 1,363.58 #N/A #N/A a a12PL
a2 PL 4 Dump Truck, 10 Ton Jam 0.2952 404,130.00 119,293.70 75.00 89,470.28 29,823.43 #N/A #N/A a a2PL
a16 PL 5 Asphat Finisher Jam 0.0301 807,729.98 24,329.22 75.00 18,246.91 6,082.30 #N/A #N/A a a16PL
a17 PL 6 Tandem Roller Jam 0.0233 350,000.00 8,148.54 75.00 6,111.40 2,037.13 #N/A #N/A a a17PL
a18 PL 7 Pneumatic Tyre Roller Jam 0.0166 391,956.88 6,518.11 75.00 4,888.58 1,629.53 #N/A #N/A a a18PL
6.7.(1) PL SUB JUMLAH I 715,662.65 715,662.65 - 34.59% 0.00% 20.71% 24.95% 14.82% 4.94% 100.00%
II BAHAN / MATERIAL :
b24a PL 1 Agr 5-10 m3 1.2138 102,700.00 124,656.55 100.00 124,656.55 - #N/A #N/A b b24aPL #N/A
b25 PL 2 Agr 0-5 m3 0.3793 102,700.00 38,955.17 100.00 38,955.17 - #N/A #N/A b b25PL #N/A
b3 PL 3 Pasir m3 0.2124 78,200.00 16,610.76 100.00 16,610.76 - #N/A #N/A b b3PL #N/A
b7 PL 4 Aspal kg 84.0000 9,100.00 764,400.00 32.48 248,277.12 516,122.88 #N/A #N/A PT. Pertamina b b7PL #N/A
III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0094 275,684.81 2,605.10 75.00 1,953.83 651.28 #N/A #N/A a a13PL
a2 PL 2 Dump Truck, 10 Ton Jam 0.3743 404,130.00 151,270.69 75.00 113,453.02 37,817.67 #N/A #N/A a a2PL
a3 PL 3 Bulldozer 15 Ton Jam - #N/A #N/A a a3PL
a17 PL 4 Tandem Roller Jam 0.0623 350,000.00 21,811.38 75.00 16,358.54 5,452.85 #N/A #N/A a a17PL
a14 PL 5 Asphat Distributor Jam 0.6024 386,856.84 233,046.29 75.00 174,784.72 58,261.57 #N/A #N/A a a14PL
2,284,350.00
(8,430.00)
JENIS PEKERJAAN : Beton Struktur, fc30 Mpa
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 7.1 (5a) PL #N/A M3 75
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e
7.1 (5a) PL SUB JUMLAH I 180,388.22 180,388.22 - 12.54% 0.00% 59.33% 4.15% 17.99% 6.00% 100.00%
II BAHAN / MATERIAL :
b2 PL 1 Semen kg 459.0000 1,600.00 734,400.00 91.87 674,693.28 59,706.72 #N/A #N/A PT. Tonasa b b2PL 34,212
b3 PL 2 Pasir m3 0.4571 78,200.00 35,744.89 100.00 35,744.89 - #N/A #N/A b b3PL 34
b25 PL 3 Agr 0-5 m3 0.7171 102,700.00 73,642.32 100.00 73,642.32 - #N/A #N/A b b25PL 53
b49 PL 4 Kayu acuan M3 0.0175 1,705,200.00 29,841.00 100.00 29,841.00 - #N/A #N/A b b49PL 1
b11 PL 5 Paku kg 1.2500 31,700.00 39,625.00 100.00 39,625.00 - #N/A #N/A b b11PL 93
III PERALATAN :
a23 PL 1 Batching Plant jam 0.1673 805,320.00 134,759.04 75.00 101,069.28 33,689.76 #N/A #N/A a a23PL
a8 PL 2 Truck Mixer Jam 0.4627 437,595.90 202,455.42 75.00 151,841.56 50,613.85 #N/A #N/A a a8PL
a10 PL 3 Water Tank Truck Jam 0.0382 204,742.50 7,811.46 75.00 5,858.60 1,952.87 #N/A #N/A a a10PL
7.1 (10) PL SUB JUMLAH I 194,587.88 194,587.88 - 21.79% 0.00% 68.43% 3.90% 4.41% 1.47% 100.00%
II BAHAN / MATERIAL :
b2 PL 1 Semen kg 267.8000 1,600.00 428,480.00 91.87 393,644.58 34,835.42 #N/A #N/A PT. Tonasa b b2PL 7,231
b3 PL 2 Pasir m3 0.5204 78,200.00 40,692.10 100.00 40,692.10 - #N/A #N/A b b3PL 14
b4 PL 3 Batu pecah m3 0.8298 102,700.00 85,221.74 100.00 85,221.74 - #N/A #N/A b b4PL 22
b13 PL 4 Kayu bekisting m3 0.0250 3,410,400.00 85,260.00 100.00 85,260.00 - #N/A #N/A b b13PL 1
b11 PL 5 Paku kg 0.2000 31,700.00 6,340.00 100.00 6,340.00 - #N/A #N/A b b11PL 5
III PERALATAN :
a6 PL 1 Concrete Mixer hari 0.5578 80,165.24 44,715.10 75.00 33,536.33 11,178.78 #N/A #N/A a a6PL
a10 PL 2 Water Tank Truck Jam 0.0382 204,742.50 7,811.46 75.00 5,858.60 1,952.87 #N/A #N/A a a10PL
JENIS PEKERJAAN : Pasangan Batu (menggunakan koef Tng Kerja dari SDA, modif analisis)
SATUAN / UNIT :
NOMOR PEMBAYARAN : 7.9.(1) PL #N/A M3 9,119
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e
7.9.(1) PKPL/RJ/PKRK/PKRJ SUB JUMLAH I 178,200.00 178,200.00 - 29.51% 0.00% 65.98% 3.51% 0.76% 0.25% 100.00%
II BAHAN / MATERIAL :
b5 PKPL/RJ/ 1 Batu kali m3 1.2000 98,500.00 118,200.00 100.00 118,200.00 - #N/A #N/A b b5PKPL/RJ/PKRK/PKRJ
b3 PKPL/RJ/ 2 Pasir m3 0.5200 78,200.00 40,664.00 100.00 40,664.00 - #N/A #N/A b b3PKPL/RJ/PKRK/PKRJ
b2 PKPL/RJ/ 3 Semen kg 163.0000 1,600.00 260,800.00 91.87 239,596.96 21,203.04 #N/A #N/A PT. Tonasa b b2PKPL/RJ/PKRK/PKRJ
III PERALATAN :
a6 PKPL/RJ/ 1 Concrete Mixer hari 0.0760 80,165.24 6,092.56 75.00 4,569.42 1,523.14 #N/A #N/A a a6PKPL/RJ/PKRK/PKRJ
JENIS PEKERJAAN : Galian pada Saluran Air atau Lereng untuk Pemeliharaan
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 10.1.(1) RK #N/A M3 84
1 2 3
RKJ 1.2 1
RKJ 1.8.(1) 2
RKJ 1.17.(1a) 3
RKJ 1.17.(1b) 4
RKJ 1.17.(1c) 5
RKJ 1.17.(1d) 6
RKJ 1.17.(1e) 7
RKJ 1.17.(1f) 8
RKJ 1.17.(1g) 9
RKJ 1.17.(1h) 10
RKJ 1.17.(1i) 11
RKJ 1.17.(1j) 12
RKJ 1.17.(2a) 13
RKJ 1.17.(2b) 14
RKJ 1.17.(3a) 15
RKJ 1.17.(3b) 16
RKJ 1.17.(3c) 17
RKJ 1.17.(3d) 18
RKJ 1.17.(3f) 19
RKJ 1.17.(3g) 20
RKJ 1.17.(3h) 21
RKJ 1.19 22
RKJ 1.21 23
PL 2.1.(1) 24
PL 2.2.(1) 25
PL 2.3.(1) 26
PL 2.3.(15) 27
PL 2.3.(21) 28
PL 2.3.(26) 29
PL 2.3.(27) 30
PL 2.3.(29) 31
PL 3.1.(1) 32
PL 3.1.(7) 33
PL 3.1.(10). 34
PL 3.2.(1a) 35
PL 3.2.(2a) 36
PL 3.3.(1) 37
PL 3.4.(2) 38
PL 3.4.(3) 39
PL 3.4.(4) 40
PL 3.4.(5) 41
PL 4.9.(3) 42
PL 4.9.(5) 43
PL 5.1.(1) 44
PL 5.1.(2) 45
PL 5.1.(3a) 46
PL 5.3.(3) 47
PL SKh-1.5.3.( 48
PL 6.1 (1) 49
PL 6.1 (2a) 50
PL 6.3(5a) 51
PL 6.3(6a) 52
PL 6.3.(8) 53
PL 7.1 (5a) 54
PL 7.1 (10) 55
PL 7.3 (1) 56
PL 7.3 (3) 57
PL 7.3 (8) 58
PKPL/RJ/PKRK/PKRJ7.4 (1b) 59
PL 7.9.(1) 60
PL 7.10.(1) 61
PL 7.10.(3a) 62
RJ 7.14.(1) 63
RJ 8.2.(2) 64
RK 8.7.(1b) 65
RK 8.7.(3a) 66
RK 8.11.(1) 67
RK 8.11.(3) 68
RK 9.2.(1) 69
RK 9.2.(3a) 70
RK 9.2.(3b) 71
RK 9.2.(6a) 72
PL 9.2.(7) 73
PL 9.2.(10b) 74
RK 9.2.(10f) 75
PL 9.2.(10g) 76
PL 9.2.(10h) 77
PL 9.2.(10i) 78
PL 9.2.(12a) 79
RK 10.1.(1) 80
RK 10.1.(2) 81
RK 10.1.(3) 82
RK 10.1.(4) 83
RK 10.1.(5) 84
RK 10.1.(6a) 85
RK 10.1.(7) 86
PKRJL 10.1.(9) 87
PKRJL 10.1.(14) 88
RK 10.1.(15) 89
PKRJL/RK 10.1.(16) 90
PKRJ 10.1.(17) 91
PKRJ 10.1.(18b) 92
PKRJ 10.1.(19b) 93
PKRJ 10.1.(20b) 94
PKRJ 10.1.(21) 95
PKRJ 10.1.(22) 96
PKRJ 10.2.(1) 97
PKRJ 10.2.(2) 98
PKRJ 10.2.(3) 99
PKRJ 10.2.(8)
PKRJ 10.2.(9)
PKRJ 10.2.(10)
PKRJ 10.2.(11)
PKRJ 10.2.(12)
PKRJ 10.2.(13)
PKRJ 0
PKRJ 0
PKRJ 0
PL
RJ
RK
PKPL
PKD
PKRK
PKRJ
PKRJL
TKDN Gabungan Barang dan Jasa untuk Konstruksi/Fabrikasi
Nama Penyedia Barang/Jasa
Personil
3 7
Mobilisasi 0.00%
Pengujian pH 100.00%
Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn 100.00%
Perkerasan Jalan Beton Semen Untuk Pembukaan Lalu Lintas Umur Beton Lebih dari 3 hari kurang dari 7 ha #N/A
Fondasi Cerucuk, Penyediaan dan Pemancangan, dia. 12-16 cm, panjang 400 cm 10.00%
Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 200 mm x 200 mm x 4000 mm 9.56%
Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 200 mm x 200 mm x 400 m 20.00%
Pasangan Batu (menggunakan koef Tng Kerja dari SDA, modif analisis) #N/A
Perkuatan struktur dengan bahan FRP jenis e- glass per lapis pada daerah kering 30.00%
Mandor 100.00%
KDN KLN
Vol Sat
Bahan Alat Total Personil Bahan Alat Total
8 9 10 11 12 13 14 15 16
KDN
Harsat Jumlah Harga
Personil Bahan
17 18 19 20
KDN KLN
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
Self Assessment
TKDN KLN
KLN TOTAL
(%) (%)
Alat Total
25 26 27 28 29 30
31 32 33 34 35 36 37
KDN
- - - - -
33,125,490.71 - - 33,125,490.71 -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
22,899.69 - - 22,899.69 -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
55,365,005.88 - - 55,365,005.88 -
32,256,543.55 - - 32,256,543.55 -
306,717,213.80 - - 306,717,213.80 -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
9,720,000.00 - - 9,720,000.00 -
453,248.56 - - 453,248.56 -
- - 364,500,000.00 364,500,000.00 -
- - 145,800,000.00 145,800,000.00 -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
3,521,403.48 - - 3,521,403.48 -
- - - - -
- - - - -
- - - - -
1,282,896,547.44 - - 1,282,896,547.44 -
- - - - -
- - - - -
56,668,800.00 - - 56,668,800.00 -
52,915,792,623.62 - - 52,915,792,623.62 -
1,199,927,839,867.27 - - 1,199,927,839,867.27 -
5,360.00 - - 5,360.00 -
3,215.63 - - 3,215.63 -
1,607.81 - - 1,607.81 -
1,804.69 - - 1,804.69 -
2,406.25 - - 2,406.25 -
84.22 - - 84.22 -
535,937.50 - - 535,937.50 -
803,906.25 - - 803,906.25 -
4,287,500.00 - - 4,287,500.00 -
2,406,250.00 - - 2,406,250.00 -
535,937.50 - - 535,937.50 -
601,562.50 - - 601,562.50 -
589,531.25 - - 589,531.25 -
#N/A #N/A #N/A #N/A #N/A
ah)
TKDN
KLN TOTAL
(%)
Bahan Alat Total
43 44 45 46 47
- - - - #N/A
- - - 33,125,490.71 #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - 22,899.69 #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - 55,365,005.88 #N/A
- - - 32,256,543.55 #N/A
- - - 306,717,213.80 #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - 314,592.59 #N/A
- - - - #N/A
- - - - #N/A
- - - 22,662,428.14 #N/A
- - - 9,720,000.00 #N/A
- - - 453,248.56 #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - 40,446,484.12 #N/A
- - - - #N/A
- - - - #N/A
- - - 3,521,403.48 #N/A
- - - - #N/A
- - - - #N/A
- - - - #N/A
- - - 1,282,896,547.44 #N/A
- - - - #N/A
- - - - #N/A
- - - 56,668,800.00 #N/A
- - - 52,915,792,623.62 #N/A
- - - 1,199,927,839,867.27 #N/A
- - - 5,360.00 #N/A
- - - 3,215.63 #N/A
- - - 1,607.81 #N/A
- - - 1,804.69 #N/A
- - - 2,406.25 #N/A
- - - 84.22 #N/A
- - - 535,937.50 #N/A
- - - 803,906.25 #N/A
- - - 4,287,500.00 #N/A
- - - 2,406,250.00 #N/A
- - - 535,937.50 #N/A
- - - 601,562.50 #N/A
- - - 589,531.25 #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A
Sisa Alokasi SD Des 2022
KLN
(%) Vol Sat Harsat Jumlah Harga
Personil
48 49 50 51 52 53 54 55
KDN KLN
- - - - -
- - (33,125,490.71) - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - (22,899.69) - -
- - - - -
- - - - -
- - - - -
- (588,414,065.08) (624,254,080.85) - -
- - (55,365,005.88) - -
- - (32,256,543.55) - -
- - (306,717,213.80) - -
- - - - -
- - - - -
- (9,714,902.61) (12,143,628.26) - -
- - - - -
- - - - -
(13,847,699.70) - (19,782,428.14) - -
- - (9,720,000.00) - -
- - 7,046,751.44 - -
- (358,875,000.00) (358,875,000.00) - -
- (145,800,000.00) (145,800,000.00) - -
- 92,335,095.55 92,335,095.55 - -
- - - - -
- - - - -
- - - - -
- - - - -
1,555,472.38 - 2,222,103.40 - -
200,526.20 - 286,466.00 - -
307,964.58 - 439,949.40 - -
(28,004,574.30) - (40,006,534.72) - -
1,034,843.18 - 1,478,347.40 - -
- - 1,584,631.57 - -
- - 28,839,407.60 - -
- - 49,867,796.52 - -
- - 1,070,914.50 - -
- - (1,253,981,032.82) - -
- - 53,227,400.00 - -
- - 3,150,000.00 - -
- - 72,713,154.00 - -
- - (52,888,889,188.32) - -
- - (1,199,906,796,101.73) - -
- - 9,994,640.00 - -
- - 5,996,784.38 - -
- - 403,392.19 - -
- - 1,108,195.31 - -
- - 290,597,593.75 - -
- - 450,377,115.78 - -
- - 4,464,062.50 - -
- - 6,696,093.75 - -
- - 35,712,500.00 - -
- - 17,593,750.00 - -
- - 4,464,062.50 - -
- - 4,398,437.50 - -
- - 4,910,468.75 - -
#N/A #N/A #N/A #N/A #N/A
TKDN KLN
KLN TOTAL
(%) (%)
Alat Total
61 62 63 64 65 66 67
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
- - - #N/A #N/A -
#N/A
kode
68
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
RKJ
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PKPL/RJ/PKRK/PKRJ
PL
PL
PL
RJ
RJ
RK
RK
RK
RK
RK
RK
RK
RK
PL
PL
RK
PL
PL
PL
PL
RK
RK
RK
RK
RK
RK
RK
PKRJL
PKRJL
RK
PKRJL/RK
PKRJ
PKRJ
PKRJ
PKRJ
PKRJ
PKRJ
PKRJ
PKRJ
PKRJ
PKRJ
PKRJ
PKRJ
PKRJ
Material Peralatan Konstruksi 2022
TOTAL
21 1000 20
#NAME?
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#NAME?
Material Peralatan Konstruksi 2022
TOTAL
21 1000 20
1,339,129 0.00%
6,718,413 0.00%
1,885,906 0.00%
606,538 0.00%
606,537 0.00%
0.00% 0.00%
#N/A #N/A
75 Semen #N/A #N/A 91.87 #N/A
75 Pasir #N/A #N/A 100.00 #N/A
- Batu pecah #N/A #N/A 100.00 #N/A
75 Batu kali - -
75 Abu Batu - - -
75 Aspal #N/A #N/A 32.48 #N/A
75 Minyak tanah #N/A #N/A 100.00 25,836.22
75 Besi beton #N/A #N/A 51.47 -
100 Kawat bendrat #N/A #N/A 100.00 -
75 Paku #N/A #N/A 100.00 #N/A
75 Minyak bekisting - - -
75 Kayu bekisting #N/A #N/A 100.00 0.68
75 Multiplex 12 mm - - -
75 Pasir Lapen - - -
75 Timbunan Pilihan #N/A #N/A 100.00 1,225.93
75 Sirtu saring #N/A #N/A 100.00 -
75 Agregat Kelas A #N/A #N/A 100.00 -
75 Agregat Kelas S - #N/A 100.00 -
- Agregat Halus #N/A #N/A 100.00 #N/A
- Agr 5-10 & 10-15 - - -
Agr 5-10 #N/A #N/A 100.00 #N/A
75 Agr 0-5 #N/A #N/A 100.00 #N/A
75 Filler #N/A #N/A 91.87 #N/A
Asbuton Mikro #N/A #N/A 91.99 #N/A
Solar Industri - - -
Beton K-300 - - -
75 Baja Tul (dowel) D32 #N/A #N/A 51.47 #N/A
Join sealent #N/A #N/A 38.33 #N/A
Cat anti karat #N/A #N/A 21.20 #N/A
Expantion cap #N/A #N/A 100.00 #N/A
Poliatilin 125 mikron #N/A #N/A 75.00 #N/A
Curing compond #N/A #N/A 75.00 #N/A
Multiplek 12 mm #N/A #N/A 100.00 #N/A
Kayu acuan #N/A #N/A 100.00 #N/A
Additive #N/A #N/A 75.00 #N/A
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
#N/A
#N/A
#N/A
-
-
#N/A
#N/A
#N/A
#N/A
#N/A
-
#N/A
-
-
#N/A
#N/A
#N/A
-
#N/A
-
#N/A
#N/A
#N/A
#N/A
-
-
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
-
DAFTAR PEKERJAAN YANG DISUBKONTRAKKAN
Ir. Harimawan, MM
General Manager
DAFTAR SPESIFIKASI TEKNIK
PPK : PPK 1.2 Provinsi Banten
No. Paket Kontrak :
Nama Paket : Preservasi Jalan Serdang - Bojonegara - Merak
Prop / Kab / Kodya : Banten / Cilegon
Ir. Harimawan, MM
General Manager
REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI
(TKDN)
Barang
I. Material Langsung (Bahan baku) 85,967,348,735.90 85,967,348,735.90 100.00% 100.00% 52.54%
II. Peralatan (Barang jadi) 11,768,880,906.82 11,768,880,906.82 100.00% 100.00% 7.19%
A. Sub Total Barang 97,736,229,642.73 - 97,736,229,642.73 100.00% 100.00% 59.74%
Jasa
III. Manajemen Proyek dan Perekayasaan 7,914,774,297.89 7,914,774,297.89 100.00% 100.00% 4.84%
IV. Alat Kerja / Fasilitas kerja 24,872,161,446.83 24,872,161,446.83 100.00% 100.00% 15.20%
V. Konstruksi dan Pabrikasi 18,530,057,116.93 - 18,530,057,116.93 100.00% 100.00% 11.33%
VI. Jasa Umum 14,561,469,166.43 14,561,469,166.43 100.00% 100.00% 8.90%
B. Sub Total Jasa 65,878,462,028.08 - 65,878,462,028.08 100.00% 100.00% 40.26%
Ir. Harimawan, MM
General Manager