Anda di halaman 1dari 163

REKAPITULASI

PERKIRAAN HARGA PEKERJAAN

PPK : PPK 1.2 Provinsi Banten


No. Paket Kontrak :
Nama Paket : Preservasi Jalan Serdang - Bojonegara - Merak
Prop / Kab / Kodya : Banten / Cilegon

Pelebaran Jalan Menuju Preservasi Pemeliharaan Preservasi Rutin


No. Divisi Uraian TOTAL
Standar Rutin Jalan Jembatan

1 Umum 599,200,000.00
2 Drainase 2,934,167,520.00
3 Pekerjaan Tanah dan Geosintetik 6,603,635,675.60
4 Pekerjaan Preventif 16,310,436,844.94
5 Perkerasan Berbutir Dan Perkerasan Beton Semen 20,558,199,199.85
6 Perkerasan Aspal 69,188,598,308.09
7 Struktur 27,624,902,152.11
8 Rehabilitasi Jembatan 1,462,084,760.00
9 Pekerjaan Harian Dan Pekerjaan Lain-Lain 3,523,699,170.74
10 Pekerjaan Pemeliharaan Kinerja 8,867,522,012.00

(A) Jumlah Harga Pekerjaan (termasuk Biaya Umum dan Keuntungan) - - - 157,672,445,643.33
(B) Pajak Pertambahan Nilai (PPN) = 10% x (A) - - - 15,767,244,564.33
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) - - - 173,439,690,207.66
(D) JUMLAH TOTAL HARGA PEKERJAAN (DIBULATKAN) - - - 173,439,690,000.00
Terbilang : Seratus Delapan Puluh Dua Miliar Seratus Enam Puluh Sembilan Juta Enam Ratus Delapan Puluh Lima Ribu Rupiah

Jakarta, 18 Februari 2021

PT. ADHI KARYA (Persero) Tbk


Departemen Infrastruktur II

Ir. Harimawan, MM
General Manager
DAFTAR KUANTITAS DAN HARGA RENCANA PERKIRAAN BIAYA
SPESIFIKASI 2018 Revisi 2

PPK : PPK 1.2 Provinsi Banten


No. Paket Kontrak :
Nama Paket : Preservasi Jalan Serdang - Bojonegara - Merak
Prop / Kab / Kodya : Banten / Cilegon
2 3 4 5 1 2 3 4
Pelebaran Jalan Menuju Preservasi Pemeliharaan
Total Preservasi Rutin Jembatan
Standar Rutin Jalan
No. Mata
Pemba - Uraian Satuan Harga Satuan (Rupiah)
yaran Perkiraan Perkiraan Jumah Harga Perkiraan Jumah Harga Perkiraan Jumah Harga
Jumah Harga (Rupiah)
Kuantitas Kuantitas (Rupiah) Kuantitas (Rupiah) Kuantitas (Rupiah)

a b c d e f g h i j k l
DIVISI 1. UMUM

1.2 Mobilisasi LS 160,300,000.00 1.00 160,300,000.00 - - -


1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 103,400,000.00 1.00 103,400,000.00
1.17.(1a) Pengujian pH Buah 50,000.00 6.00 300,000.00 - - -
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 50,000.00 6.00 300,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 50,000.00 6.00 300,000.00 - - -
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 50,000.00 6.00 300,000.00 - - -
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 50,000.00 6.00 300,000.00 - - -
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 50,000.00 6.00 300,000.00 - - -
1.17.(1g) Pengujian Coliform Buah 100,000.00 6.00 600,000.00 - - -
1.17.(1h) Pengujian E. Coli Buah 50,000.00 6.00 300,000.00 - - -
1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Buah 400,000.00 6.00 2,400,000.00 - - -
1.17.(1j) Pengujian Temperatur (Suhu) Buah 50,000.00 6.00 300,000.00 - - -
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Keseh Buah 1,000,000.00 6.00 6,000,000.00 - - -
1.17.(2b) Pengujian tingkat getaran kendaraan bermotor Buah 50,000.00 6.00 300,000.00 - - -
1.17.(3a) Pengujian NoX Buah 200,000.00 6.00 1,200,000.00 - - -
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 150,000.00 6.00 900,000.00 - - -
1.17.(3c) Pengujian Karbondioksida (CO2) Buah 150,000.00 6.00 900,000.00 - - -
1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 Buah 150,000.00 6.00 900,000.00 - - -
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 500,000.00 6.00 3,000,000.00
1.17.(3g) Pengujian Timah Hitam (Pb) Buah 50,000.00 6.00 300,000.00 - - -
1.17.(3h) Pengujian Parameter Udara Emisi dan Ambien lainnya : Buah 50,000.00 6.00 300,000.00
1.19 Keselamatan dan Kesehatan Kerja LS 174,900,000.00 1.00 174,900,000.00
1.21 Manajemen Mutu LS 141,400,000.00 1.00 141,400,000.00

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 599,200,000.00 - - -
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 - 3,720.00 - - - -
2.2.(1) Pasangan Batu dengan Mortar M3 - 2,400.00 - - - -
2.3.(1) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam M1 8,224,000.00 120.00 986,880,000.00 - - -
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 200 c M1 10,193,000.00 96.00 978,528,000.00 - - -
2.3.(21) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 500 c M1 1,153,000.00 2,000.00 2,306,000,000.00 - - -
2.3.(26) Saluran berbentuk U Tipe DS 3 M1 29,416.00 3,720.00 109,427,520.00 - - -
2 3 4 5 1 2 3 4
Pelebaran Jalan Menuju Preservasi Pemeliharaan
Total Preservasi Rutin Jembatan
Standar Rutin Jalan
No. Mata
Pemba - Uraian Satuan Harga Satuan (Rupiah)
yaran Perkiraan Perkiraan Jumah Harga Perkiraan Jumah Harga Perkiraan Jumah Harga
Jumah Harga (Rupiah)
Kuantitas Kuantitas (Rupiah) Kuantitas (Rupiah) Kuantitas (Rupiah)

a b c d e f g h i j k l
2.3.(27) Saluran berbentuk U Tipe DS 3a (dengan tutup) M1 765,775.00 2,400.00 1,837,860,000.00 - - -
2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1 8,224,000.00 120.00 986,880,000.00 - - -

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 2,934,167,520.00 - - -
2 3 4 5 1 2 3 4
Pelebaran Jalan Menuju Preservasi Pemeliharaan
Total Preservasi Rutin Jembatan
Standar Rutin Jalan
No. Mata
Pemba - Uraian Satuan Harga Satuan (Rupiah)
yaran Perkiraan Perkiraan Jumah Harga Perkiraan Jumah Harga Perkiraan Jumah Harga
Jumah Harga (Rupiah)
Kuantitas Kuantitas (Rupiah) Kuantitas (Rupiah) Kuantitas (Rupiah)

a b c d e f g h i j k l
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa M3 23,358.00 70,663.20 1,650,551,025.60 - - -
3.1.(3) Galian Batu M3 102,000.00 706.63 72,076,260.00 - - -
3.1.(4) Galian Struktur dengan kedalaman 0 - 2 meter (+ pengukuran M3 24,000.00 601.88 14,445,120.00 - - -
3.1.(5) Galian Struktur dengan kedalaman 2 - 4 meter M3 37,000.00 270.00 9,990,000.00 - - -
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 145,000.00 1,993.75 289,093,750.00 - - -
3.1.(9) Galian Perkerasan berbutir M3 34,000.00 405.00 13,770,000.00 - - -
3.2.(1b) Timbunan Biasa dari hasil galian M3 30,067.00 12,000.00 360,804,000.00 - - -
Timbunan Pilihan dari sumber galian
3.2.(2a) M3 223,682.00 15,360.00 3,435,755,520.00 - - -
3.3.(1) Penyiapan Badan Jalan M2 5,000.00 151,430.00 757,150,000.00 - - -
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 6,603,635,675.60 - - -
DIVISI 4. PEKERJAAN PREVENTIF
Lapis Tipis Beton Aspal (LTBA) dan Stone Matrix Asphal t Tipis (SMA TIPIS)
4.7
4.7.(3) Lapis Tipis Beton Aspal - B Kasar (LTBA-B Kasar) Ton 1,082,074.00 15,073.31 16,310,436,844.94 - - -
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 16,310,436,844.94 - - -
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
5.1.(1) Lapis Pondasi Agregat Kelas A M3 307,625.00 41,910.00 12,892,563,750.00 - - -
5.1.(3a) Lapis Pondasi Agregat Kelas S M3 249,136.00 26,734.25 6,660,464,108.00 - - -
5.3.(1.a) Perkerasan Beton Semen M3 1,633,995.00 585.63 956,916,491.85 - - -
5.3.(3) Lapis Pondasi bawah Beton Kurus (Concrete Vibrator) M3 965,097.00 50.00 48,254,850.00 - - -
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 20,558,199,199.85 - - -
DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair Liter 13,709.00 113,483.90 1,555,750,785.10 - - -
6.1 (2a) Lapis Perekat - Aspal Cair Liter 13,322.00 145,755.48 1,941,754,504.56 - - -
6.3.(8) Bahan anti pengelupasan Kg 63,000.00 13,128.40 827,089,200.00 - - -
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 1,045,939.00 27,043.17 28,285,506,186.63 - - -
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 987,587.00 34,104.20 33,680,864,565.40 - - -
6.7.(1) Lapis Penetrasi Macadam M3 2,275,920.00 1,273.17 2,897,633,066.40 - - -
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 69,188,598,308.09 - - -
2 3 4 5 1 2 3 4
Pelebaran Jalan Menuju Preservasi Pemeliharaan
Total Preservasi Rutin Jembatan
Standar Rutin Jalan
No. Mata
Pemba - Uraian Satuan Harga Satuan (Rupiah)
yaran Perkiraan Perkiraan Jumah Harga Perkiraan Jumah Harga Perkiraan Jumah Harga
Jumah Harga (Rupiah)
Kuantitas Kuantitas (Rupiah) Kuantitas (Rupiah) Kuantitas (Rupiah)

a b c d e f g h i j k l
DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur, fc’30 Mpa M3 1,582,534.00 2,118.09 3,351,949,440.06 - - -
7.1 (7a) Beton struktur, fc’20 Mpa M3 1,285,000.00 397.94 511,352,900.00 - - -
7.1 (9) Beton Siklop, fc’15 Mpa M3 1,121,000.00 96.08 107,705,680.00 - - -
7.1 (10) Beton, fc’10 Mpa M3 982,419.00 339.18 333,216,876.42 - - -
7.3 (3) Baja Tulangan Sirip BjTS 420A Kg 16,837.00 449,556.79 7,569,187,673.23 - - -
7.6 (1) Fondasi Cerucuk, Penyediaan dan Pemancangan, dia. 12-16 M1 39,000.00 25,600.00 998,400,000.00 - - -
7.6.(10b) Penyediaan Tiang Pancang Beton Bertulang Pracetak ukur M1 292,000.00 320.00 93,440,000.00 - - -
7.6.(16b) Pemancangan Tiang Pancang Beton Bertulang Pracetak uku M1 172,000.00 320.00 55,040,000.00 - - -
7.9.(1) Pasangan Batu (menggunakan koef Tng Kerja dari SDA, modif analisis) 664,352.00 20,996.20 13,948,867,462.40 - - -
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 574,000.00 1,077.50 618,485,000.00 - - -
7.15.(1) Pembongkaran Pasangan Batu M3 115,000.00 223.20 25,668,000.00 - - -
7.15.(2) Pembongkaran Beton M3 288,000.00 40.24 11,589,120.00 - - -
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 27,624,902,152.11 - - -
DIVISI 8. REHABILITASI JEMBATAN
8.2.(1) Penambahan (Patching ), menggunakan campuran beton Pre M3 12,589,000.00 58.34 734,442,260.00 - - -
8.4.(1) Perkuatan struktur dengan bahan FRP jenis e- glass per lapis M2 1,326,000.00 548.75 727,642,500.00 - - -
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 1,462,084,760.00 - - -
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.1.(1) Mandor Jam 20,742.86 50.00 1,037,142.86 - - -
9.1.(2) Pekerja Biasa Jam 13,828.57 100.00 1,382,857.14 - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 192,500.00 100.00 19,250,000.00 - - -
9.1.(8) Motor Grader min 100 PK Jam 373,127.88 100.00 37,312,787.67 - - -
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 303,253.29 100.00 30,325,328.86 - - -
9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam 437,864.39 100.00 43,786,439.14 - - -
9.1.(17) Kompresor 4000 - 6500 Ltr/mnt Jam 163,646.94 84.00 13,746,343.06 - - -
9.1.(19) Pompa Air 70 - 100 mm Jam 55,000.00 84.00 4,620,000.00 - - -
9.2.(1) Marka Jalan Termoplastik M2 122,200.00 17,057.76 2,084,458,272.00 - - -
9.2.(5) Patok Pengarah (delineator) Buah 312,000.00 300.00 93,600,000.00 - - -
9.2.(6a) Patok Kilometer Buah 824,000.00 20.00 16,480,000.00 - - -
9.2.(7) Rel Pengaman M1 807,000.00 500.00 403,500,000.00 - - -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 159,000.00 1,000.00 159,000,000.00 - - -
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah 130,000.00 40.00 5,200,000.00 - - -
9.2.(12a) Perkerasan Blok Beton pada Trotoar M2 305,000.00 2,000.00 610,000,000.00 - - -
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 3,523,699,170.74 - - -
2 3 4 5 1 2 3 4
Pelebaran Jalan Menuju Preservasi Pemeliharaan
Total Preservasi Rutin Jembatan
Standar Rutin Jalan
No. Mata
Pemba - Uraian Satuan Harga Satuan (Rupiah)
yaran Perkiraan Perkiraan Jumah Harga Perkiraan Jumah Harga Perkiraan Jumah Harga
Jumah Harga (Rupiah)
Kuantitas Kuantitas (Rupiah) Kuantitas (Rupiah) Kuantitas (Rupiah)

a b c d e f g h i j k l
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA
10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 97,000.00 360.00 34,920,000.00 - - -
10.1.(3) Pebaikan Pasangan Batu dengan Mortar M3 713,000.00 84.90 60,533,700.00 - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 849,000.00 471.76 400,524,240.00 - - -
10.1.(6a) Perbaikan Lapis Fondasi Agregat Kelas S M3 393,000.00 317.08 124,612,440.00 - - -
10.1.(9) Perbaikan Campuran Aspal Panas (Analisis diubah) M3 2,662,900.00 1,395.00 3,714,745,500.00 - - -
10.1.(13) Residu Bitumen untuk Pemeliharaan Liter 13,000.00 49,200.00 639,600,000.00 - - -
10.1.(16) Perbaikan Pasangan Batu M3 569,000.00 600.00 341,400,000.00 - - -
10.1.(17) Pengecatan Kereb pada Trotoar atau Median M1 22,000.00 118.00 2,596,000.00 - - -
10.1.(19) Pembersihan Patok Buah 58,000.00 154.00 8,932,000.00 - - -
10.1.(21) Pembersihan Drainase M' 8,400.00 148,770.73 1,249,674,132.00 - - -
10.1.(22) Pengendalian Tanaman M2 360.00 5,951,100.00 2,142,396,000.00 - - -
10.2 (1) Pemeliharaan Kinerja Jembatan Serdang bentang 7.00 m LS 5,765,000.00 1.00 5,765,000.00 - - -
10.2 (2) Pemeliharaan Kinerja Jembatan Trumix Seruni bentang 9.00 LS 8,648,000.00 1.00 8,648,000.00 - - -
10.2 (3) Pemeliharaan Kinerja Jembatan Fly Over Seruni bentang 68. LS 46,122,000.00 1.00 46,122,000.00 - - -
10.2 (4) Pemeliharaan Kinerja Jembatan Serdang Terate bentang 36. LS 23,061,000.00 1.00 23,061,000.00 - - -
10.2 (5) Pemeliharaan Kinerja Jembatan Serdang Terate II Amnonim LS 5,765,000.00 1.00 5,765,000.00 - - -
10.2 (6) Pemeliharaan Kinerja Jembatan Terate III bentang 7.00 m LS 5,765,000.00 1.00 5,765,000.00 - - -
10.2 (7) Pemeliharaan Kinerja Jembatan Grenyang bentang 8.00 m LS 6,341,000.00 1.00 6,341,000.00 - - -
10.2 (8) Pemeliharaan Kinerja Jembatan Ragas bentang 7.10 m LS 5,765,000.00 1.00 5,765,000.00 - - -
10.2 (9) Pemeliharaan Kinerja Jembatan Ragas II bentang 7.00 m LS 5,765,000.00 1.00 5,765,000.00 - - -
10.2 (10) Pemeliharaan Kinerja Jembatan Pangoreng bentang 26 m LS 17,296,000.00 1.00 17,296,000.00 - - -
10.2 (11) Pemeliharaan Kinerja Jembatan Cicegah bentang 7.60 m LS 5,765,000.00 1.00 5,765,000.00 - - -
10.2 (12) Pemeliharaan Kinerja Jembatan Lebak Gede I bentang 6.00 LS 5,765,000.00 1.00 5,765,000.00 - - -
10.2 (13) Pemeliharaan Kinerja Jembatan Lebak Gede II bentang 6.00 LS 5,765,000.00 1.00 5,765,000.00 - - -
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 8,867,522,012.00 - - -
Daftar 5 : Mata Pembayaran Utama :

Satuan Harga Total Nilai Bobot


No. Uraian Pekerjaan Kuantitas
Ukuran satuan Harga Komulatif (%)

6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 34,104.20 1,006,591.00 34,328,980,782.20 20.73
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 27,043.17 1,065,704.00 28,820,014,441.68 17.40
4.7.(3) Lapis Tipis Beton Aspal - B Kasar (LTBA-B Kasar) Ton 15,073.31 1,106,632.00 16,680,607,191.92 10.07
5.1.(1) Lapis Pondasi Agregat Kelas A M3 41,910.00 293,245.00 12,289,897,950.00 7.42
7.9.(1) Pasangan Batu (menggunakan koef Tng Kerja dari SDA, modif analisis) 20,996.20 673,462.00 14,140,142,844.40 8.54
7.3 (3) Baja Tulangan Sirip BjTS 420A Kg 449,556.79 16,837.00 7,569,187,673.23 4.57
5.1.(3a) Lapis Pondasi Agregat Kelas S M3 26,734.25 240,036.00 6,417,182,433.00 3.87
10.1.(9) Perbaikan Campuran Aspal Panas (Analisis diubah) M3 1,395.00 2,662,900.00 3,714,745,500.00 2.24
7.1 (5a) Beton struktur, fc’30 Mpa M3 2,118.09 1,649,640.00 3,494,085,987.60 2.11
Timbunan Pilihan dari sumber galian
3.2.(2a) M3 15,360.00 209,937.00 3,224,632,320.00 1.95
6.7.(1) Lapis Penetrasi Macadam M3 1,273.17 2,258,429.00 2,875,364,049.93 1.74

Total Daftar 5 133,554,841,173.96 80.64


1 2 3
URIAN BERDASARKAN KOMPONEN DEVIASI

A. Preservasi Pemeliharaan Rutin Jalan


1 Pemeliharaan Rutin 121,970,731.00
DIVISI 2. DRAINASE

Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm


DIVISI 4. PEKERJAAN PREVENTIF
Pemasangan Sealant
DIVISI 8. REHABILITASI JEMBATAN
Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail) 80 mikron
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
Kereb Pracetak Jenis 2 (Penghalang/Barrier)
Kereb Pracetak Jenis 6 (Kereb dengan Bukaan)
Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar)
Kereb Pracetak Jenis 8 (Kereb pada Pelandaian Trotoar)
Kereb Pracetak Jenis 9 (Kereb pada Pelandaian Trotoar)
Perkerasan Blok Beton pada Trotoar dan Median
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA
Galian pada Saluran Air atau Lereng untuk Pemeliharaan
Timbunan Pilihan pada Lereng Tepi Saluran untuk Pemeliharaan
Pebaikan Pasangan Batu dengan Mortar
Perbaikan Lapis Fondasi Agregat Kelas A
Perbaikan Lapis Fondasi Agregat Kelas B
Perbaikan Lapis Fondasi Agregat Kelas S
Perbaikan dan Perataan Permukaan JalanTanah
Perbaikan Campuran Aspal Panas
Perbaikan Perkerasan Beton Semen
Perbaikan Lapis Fondasi Bawah Beton Kurus
Perbaikan Pasangan Batu
Pengecatan Kereb pada Trotoar atau Median
Perbaikan Rel Pengaman
Pembersihan Patok
Pembersihan Rambu
Pembersihan Drainase
Pengendalian Tanaman

2 Pemeliharaan Rutin Kondisi 3,485,990.00


DIVISI 4. PEKERJAAN PREVENTIF
Pemasangan Sealant

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


Galian pada Saluran Air atau Lereng untuk Pemeliharaan
Timbunan Pilihan pada Lereng Tepi Saluran untuk Pemeliharaan
Pebaikan Pasangan Batu dengan Mortar
Perbaikan Lapis Fondasi Agregat Kelas S
Perbaikan Campuran Aspal Panas
Perbaikan Perkerasan Beton Semen
Perbaikan Lapis Fondasi Bawah Beton Kurus
Perbaikan Rel Pengaman
Pembersihan Rambu
Pembersihan Drainase
Pengendalian Tanaman

B. Jalan Akses Simpul Transportasi (ProPN) (PEN)


1 Rehabilitasi Minor Jalan (4,181,766,996.00)
DIVISI 4. PEKERJAAN PREVENTIF
Tambalan Penuh dengan Beton Semen Cepat Mengeras untuk Pembukaan Lalu Lintas Umur Beton lebi
Pemasangan Sealant
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
Lapis Fondasi bawah Beton Kurus
DIVISI 6. PERKERASAN ASPAL
Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-WC)
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
Marka Jalan Termoplastik

2 Rekonstruksi Jalan (52,971,419,035.00)


DIVISI 7. STRUKTUR

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA

C Preservasi Rutin Jembatan


1 Pemeliharaan Rutin Jembatan 31,005,241.00
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
Galian Perkerasan Beraspal dengan Cold Milling Machine
DIVISI 6. PERKERASAN ASPAL
Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-WC)
Bahan anti pengelupasan
DIVISI 7. STRUKTUR
Penyediaan Baja Struktur Grade 345 (Kuat Leleh 345 MPa)
DIVISI 8. REHABILITASI JEMBATAN
Perbaikan Dengan Cara Graut
Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA
Perbaikan Campuran Aspal Panas
Pemeliharaan Kinerja Jembatan Serdang bentang 7.00 m
Pemeliharaan Kinerja Jembatan Trumix Seruni bentang 9.00 m
Pemeliharaan Kinerja Jembatan Fly Over Seruni bentang 68.30 m
Pemeliharaan Kinerja Jembatan Serdang Terate bentang 36.50 m
Pemeliharaan Kinerja Jembatan Terate II Amnonim II bentang 7.00 m
Pemeliharaan Kinerja Jembatan Terate III bentang 7.00 m
Pemeliharaan Kinerja Jembatan Grenyang bentang 8.00 m
Pemeliharaan Kinerja Jembatan Ragas bentang 7.10 m
Pemeliharaan Kinerja Jembatan Ragas II bentang 7.00 m
Pemeliharaan Kinerja Jembatan Pangoreng bentang 26.00 m
Pemeliharaan Kinerja Jembatan Cicegah bentang 7.60 m
Pemeliharaan Kinerja Jembatan Lebak Gede I bentang 6.00 m
Pemeliharaan Kinerja Jembatan Lebak Gede II bentang 6.00 m

C Jalan Akses Simpul Transportasi (ProPN) (PEN)


1 Pemeliharaan Berkala Jembatan -

(56,996,724,069.00)
4 5 6 7
SAKTI PENYERAPAN POT UM POT RETENSI

#REF! #REF! #REF!


1,033,692,000.00 1,155,662,731.00 216,686,762.01 72,228,920.67

33,342,000.00 36,827,990.00 7,433,156.36 2,329,534.02


1,018,716,969.00 191,072,813.25 63,690,937.75
5,200,822,000.00 1,019,055,004.00 191,072,813.25 63,690,937.75

u Lintas Umur Beton lebih dari 3 hari dan kurang dari 7 hari

52,971,081,000.00 - 338,035.00

#REF! #REF! #REF!


176,498,000.00 207,503,241.00
2,834,306,000.00 - -
207,563,000.00 1,169,677,000.00

59,622,998,000.00 #REF! #REF! #REF!


8 9 10 11 12 13
FISIK + PPN FISIK % GAB % OUT % KOMP H.SATUAN

#REF! #REF! #REF! #REF!


1,444,578,413.41 1,313,253,103.10 #REF! #REF! 100.00

3,733,293.00 #REF! #REF! 0.28 186,664.65


#REF! #REF! -
220,755,000.00 #REF! #REF! 16.81 15,000.00
#REF! #REF! -
7,500,000.00 #REF! #REF! 0.57 60,000.00
#REF! #REF! -
2,222,103.40 #REF! #REF! 0.17 111,105.17
286,466.00 #REF! #REF! 0.02 57,293.20
439,949.40 #REF! #REF! 0.03 87,989.88
439,949.40 #REF! #REF! 0.03 87,989.88
1,478,347.40 #REF! #REF! 0.11 73,917.37
1,657,677.50 #REF! #REF! 0.13 165,767.75
#REF! #REF! -
4,800,008.32 #REF! #REF! 0.37 41,921.47
28,030,285.94 #REF! #REF! 2.13 288,972.02
46,977,983.64 #REF! #REF! 3.58 740,977.66
1,070,914.50 #REF! #REF! 0.08 305,975.57
4,439,919.52 #REF! #REF! 0.34 270,726.80
26,841,607.14 #REF! #REF! 2.04 238,380.17
53,227,400.00 #REF! #REF! 4.05 10,645.48
1,750,000.00 #REF! #REF! 0.13 3,500,000.00
113,426,145.00 #REF! #REF! 8.64 1,770,900.00
23,060,087.40 #REF! #REF! 1.76 1,098,099.40
21,043,765.54 #REF! #REF! 1.60 740,977.66
10,000,000.00 #REF! #REF! 0.76 50,000.00
3,000,000.00 #REF! #REF! 0.23 30,000.00
405,000.00 #REF! #REF! 0.03 15,000.00
1,050,000.00 #REF! #REF! 0.08 15,000.00
288,600,000.00 #REF! #REF! 21.98 20,000.00
447,017,200.00 #REF! #REF! 34.04 700.00

46,590,680.44 43,998,025.64 #REF! #REF! 100.00


#REF!
9,000,000.00 #REF! #REF! 20.46 15,000.00

#REF!
306,026.73 #REF! #REF! 0.70 41,921.47
809,121.66 #REF! #REF! 1.84 288,972.02
2,889,812.87 #REF! #REF! 6.57 740,977.66
2,073,907.48 #REF! #REF! 4.71 238,380.17
700,000.00 #REF! #REF! 1.59 3,500,000.00
15,955,809.00 #REF! #REF! 36.26 1,770,900.00
3,843,347.90 #REF! #REF! 8.74 1,098,099.40
3,000,000.00 #REF! #REF! 6.82 30,000.00
60,000.00 #REF! #REF! 0.14 15,000.00
2,000,000.00 #REF! #REF! 4.55 20,000.00
3,360,000.00 #REF! #REF! 7.64 700.00

1,273,480,720.08 1,158,017,049.98 #REF! 89.37


1,273,818,754.98 1,158,017,049.98 #REF! 89.37 89.37
#REF!
4,692,885.00 #REF! 0.41 0.41 1,770,900.00
6,000,000.00 #REF! 0.52 0.52 15,000.00
#REF!
1,098,099.40 #REF! 0.09 0.09 1,098,099.40
#REF!
17,514,189.00 #REF! 1.51 1.51 15,163.80
1,005,598,415.85 #REF! 86.84 86.84 1,407,297.38
#REF!
123,113,460.73 #REF! 10.63 10.63 163,302.11

- 338,034.90 - #REF! - -
#REF!

#REF! -
#REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
207,503,241.01 193,040,392.68 #REF! #REF! 100.00
#REF!
6,657,092.33 #REF! #REF! 3.45 477,210.92
#REF! #REF!
634,605.03 #REF! #REF! 0.33 15,163.80
36,434,929.17 #REF! #REF! 18.87 1,407,297.38
173,766.15 #REF! #REF! 0.09 35,535.00
#REF! #REF!
10,060,000.00 #REF! #REF! 5.21 25,000.00
#REF! #REF!
2,880,000.00 #REF! #REF! 1.49 3,000,000.00
7,500,000.00 #REF! #REF! 3.89 3,000,000.00
#REF! #REF!
700,000.00 #REF! #REF! 0.36 3,500,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
7,500,000.00 #REF! #REF! 3.89 7,500,000.00
40,000,000.00 #REF! #REF! 20.72 40,000,000.00
20,000,000.00 #REF! #REF! 10.36 20,000,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
5,500,000.00 #REF! #REF! 2.85 5,500,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
15,000,000.00 #REF! #REF! 7.77 15,000,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00
5,000,000.00 #REF! #REF! 2.59 5,000,000.00

2,834,306,000.76 2,562,623,398.43
1,169,677,000.11 1,059,863,599.07

#REF! #REF! #REF!


14 15 16
VOLUME SAT WAKTU PELAKSANAAN

B1 B2 B3 B4 B5 B6

20.00 M1
-
14,717.00 M1 - - - - 0.02 0.02
-
125.00 M2 0.18 0.18 0.16 0.16 0.16 0.16
-
20.00 M1 0.18 0.18 0.16 0.16 0.16 0.16
5.00 Buah 0.18 0.18 0.16 0.16 0.16 0.16
5.00 Buah 0.18 0.18 0.16 0.16 0.16 0.16
5.00 Buah 0.18 0.18 0.16 0.16 0.16 0.16
20.00 Buah 0.18 0.18 0.16 0.16 0.16 0.16
10.00 M2 0.18 0.18 0.16 0.16 0.16 0.16
-
114.50 M3 1.84 1.84 1.66 1.47 1.47 1.47
97.00 M3
63.40 M3 - - - - - -
3.50 M3 - - - - - -
16.40 M3 - - - - - -
112.60 M3
5,000.00 M2 - - - - - -
0.50 M3
64.05 M3 - - - - - -
21.00 M3 - - - - - -
28.40 M3 - - - - - -
200.00 M2
100.00 M1 - - - - - -
27.00 Buah - - - - - -
70.00 Buah - - - - - -
14,430.00 M1 - - - - - -
638,596.00 M2 - - - - - -

Chart Title
600.00 M1 - - - - 0.37 0.37

7.30 M3 1.84 1.84 1.66 1.47 1.47 1.47


2.80 M3
3.90 M3 - - - - - -
8.70 M3
0.20 M3
9.01 M3 - - - - - -
3.50 M3 - - - - - -
100.00 M1 - - - - - -
4.00 Buah - - - - - -
100.00 M1 - - - - - -
4,800.00 M2 - - - C
-
ha rt
-
T i tl e
-

Chart Title

2.65 M3 1.88 1.88 2.36 1.88 1.88 1.88


400.00 M1 1.88 1.88 2.36 1.88 1.88 1.88

1.00 M3 8.99 8.99 8.99 - - -

1,155.00 Liter 1.88 1.88 2.36 1.88 1.88 1.88


714.56 Ton 1.88 1.88 2.36 1.88 1.88 1.88

753.90 M2 1.88 1.88 2.36 1.88 1.88 1.88

- - - - - -
- - - - - -

13.95 M3 0.00 0.00 0.00 0.00 0.00 0.00

41.85 Liter 0.15 0.15 0.15 0.15 0.15 0.15


25.89 Ton 0.29 0.29 0.29 0.29 0.29 0.29
4.89 Kg - - - - - -

402.40 Kg 0.05 0.05 0.05 0.05 0.05 0.05

0.96 M3 0.05 0.05 0.05 0.05 0.05 0.05


2.50 M1 0.05 0.05 0.05 0.05 0.05 0.05

0.20 M3 0.05 0.05 0.05 0.05 0.05 0.05


1.00 LS 0.05 0.05 0.05 0.05 0.05 0.05
1.00 LS 0.05 0.05 0.05 0.05 0.05 0.05
1.00 LS 0.05 0.05 0.05 0.05 0.05 0.05
1.00 LS 0.05 0.05 0.05 0.05 0.05 0.05
1.00 LS 0.05 0.05 0.05 0.05 0.05 0.05
1.00 LS 0.05 0.05 0.05 0.05 0.05 0.05
1.00 LS 0.05 0.05 0.05 0.05 0.05 0.05
1.00 LS 0.05 0.05 0.05 0.05 0.05 0.05
1.00 LS 0.05 0.05 0.05 0.05 0.05 0.05
1.00 LS 0.05 0.05 0.05 0.05 0.05 0.05
1.00 LS 0.05 0.05 0.05 0.05 0.05 0.05
1.00 LS 0.05 0.05 0.05 0.05 0.05 0.05
1.00 LS 0.05 0.05 0.05 0.05 0.05 0.05

RK
Chart Title
-
RK -

#REF! #REF! #REF! #REF! #REF!


Chart Title #REF!

#REF! #REF! #REF! #REF! #REF! #REF!


1.11
H.SAT PPN

B7 B8 B9 B10 B11 B12

207,197.76

0.02 0.02 0.02 0.02 0.02 - 16,650.00

0.16 0.11 - - - - 66,600.00

0.16 0.11 - - - - 123,326.74


0.16 0.11 - - - - 63,595.45
0.16 0.11 - - - - 97,668.77
0.16 0.11 - - - - 97,668.77
0.16 0.11 - - - - 82,048.28
0.16 0.11 - - - - 184,002.20

1.47 1.47 1.47 0.54 - - 46,532.83


320,758.94
- 0.60 0.60 - - - 822,485.20
- 0.03 0.03 - - - 339,632.88
- 0.03 0.03 - - - 300,506.75
264,601.99
- 0.60 0.60 - - - 11,816.48
3,885,000.00
- 0.60 0.60 - - - 1,965,699.00
- 0.03 0.03 - - - 1,218,890.33
- 0.03 0.03 - - - 822,485.20
55,500.00
- 0.60 0.60 - - - 33,300.00
- 0.03 0.03 - - - 16,650.00
- 0.03 0.03 - - - 16,650.00
- 0.60 0.60 - - - 22,200.00
- 0.03 0.03 - - - 777.00

Title
0.37 0.37 0.37 0.37 0.37 - 16,650.00

1.47 1.47 1.47 0.54 - - 46,532.83


320,758.94
- 0.60 0.60 - - - 822,485.20
264,601.99
3,885,000.00
- 0.60 0.60 - - - 1,965,699.00
- 0.03 0.03 - - - 1,218,890.33
- 0.60 0.60 - - - 33,300.00
- 0.03 0.03 - - - 16,650.00
- 0.60 0.60 - - - 22,200.00
T i tl e
- 0.03 0.03 - - - 777.00

Title

1.88 1.88 1.88 1.88 1.88 1.41 1,965,699.00


1.88 1.88 1.88 1.88 1.88 1.41 16,650.00

- - - - - - 1,218,890.33

1.88 1.88 1.88 1.88 1.88 1.41 16,831.82


1.88 1.88 1.88 1.88 1.88 1.41 1,562,100.09

1.88 1.88 1.88 1.88 1.88 1.41 181,265.34

- - - - - -
- - - - - -

0.00 0.00 0.00 0.00 0.00 0.00 529,704.12

0.15 0.15 0.15 0.15 0.15 0.15 16,831.82


0.29 0.29 0.29 0.29 0.29 0.29 1,562,100.09
12.52 - - - - - 39,443.85

0.05 0.05 0.05 0.05 0.05 0.05 27,750.00

0.05 0.05 0.05 0.05 0.05 0.05 3,330,000.00


0.05 0.05 0.05 0.05 0.05 0.05 3,330,000.00

0.05 0.05 0.05 0.05 0.05 0.05 3,885,000.00


0.05 0.05 0.05 0.05 0.05 0.05 5,550,000.00
0.05 0.05 0.05 0.05 0.05 0.05 8,325,000.00
0.05 0.05 0.05 0.05 0.05 0.05 44,400,000.00
0.05 0.05 0.05 0.05 0.05 0.05 22,200,000.00
0.05 0.05 0.05 0.05 0.05 0.05 5,550,000.00
0.05 0.05 0.05 0.05 0.05 0.05 5,550,000.00
0.05 0.05 0.05 0.05 0.05 0.05 6,105,000.00
0.05 0.05 0.05 0.05 0.05 0.05 5,550,000.00
0.05 0.05 0.05 0.05 0.05 0.05 5,550,000.00
0.05 0.05 0.05 0.05 0.05 0.05 16,650,000.00
0.05 0.05 0.05 0.05 0.05 0.05 5,550,000.00
0.05 0.05 0.05 0.05 0.05 0.05 5,550,000.00
0.05 0.05 0.05 0.05 0.05 0.05 5,550,000.00

itle 1,176,044,073.41 663,695,659.90


666,156,039.42 42,378,604.44

Title #REF! #REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF!
TAHUN 2022
POT. UM POT RET H.SAT KEU KODE
Vol

PL
PL
PL
PL
33,056.68 10,359.89 163,781.19 PL 20
PL -
2,656.37 832.50 13,161.13 PL 14,717
PL -
10,625.48 3,330.00 52,644.52 PL 125
PL -
19,675.76 6,166.34 97,484.64 PL 20
10,146.13 3,179.77 50,269.55 PL 5
15,582.24 4,883.44 77,203.09 PL 5
15,582.24 4,883.44 77,203.09 PL 5
13,090.12 4,102.41 64,855.74 PL 20
29,356.02 9,200.11 145,446.07 PL 10
PL -
7,423.93 2,326.64 36,782.26 PL 115
51,174.43 16,037.95 253,546.57 PL 97
131,220.69 41,124.26 650,140.26 PL 63
54,185.61 16,981.64 268,465.63 PL 4
47,943.36 15,025.34 237,538.05 PL 16
42,215.05 13,230.10 209,156.84 PL 113
1,885.22 590.82 9,340.44 PL 5,000
619,819.50 194,250.00 3,070,930.50 PL 1
313,610.96 98,284.95 1,553,803.09 PL 64
194,463.84 60,944.52 963,481.98 PL 21
131,220.69 41,124.26 650,140.26 PL 28
8,854.56 2,775.00 43,870.44 PL 200
5,312.74 1,665.00 26,322.26 PL 100
2,656.37 832.50 13,161.13 PL 27
2,656.37 832.50 13,161.13 PL 70
3,541.83 1,110.00 17,548.17 PL 14,430
123.96 38.85 614.19 PL 638,596

PKD -
PKD -
2,656.37 832.50 13,161.13 PKD 600

PKD -
7,423.93 2,326.64 36,782.26 PL 7
51,174.43 16,037.95 253,546.57 PL 3
131,220.69 41,124.26 650,140.26 PL 4
42,215.05 13,230.10 209,156.84 PL 9
619,819.50 194,250.00 3,070,930.50 PL 0
313,610.96 98,284.95 1,553,803.09 PL 9
194,463.84 60,944.52 963,481.98 PL 4
5,312.74 1,665.00 26,322.26 PL 100
2,656.37 832.50 13,161.13 PL 4
3,541.83 1,110.00 17,548.17 PL 100
123.96 38.85 614.19 PL 4,800

RJ -
RJ -
RJ -
313,610.96 98,284.95 1,553,803.09 RJ 3
2,656.37 832.50 13,161.13 RJ 400
RJ -
194,463.84 60,944.52 963,481.98 RJ 1
RJ -
2,685.38 841.59 13,304.85 RJ 1,155
249,220.10 78,105.00 1,234,774.98 RJ 715
RJ -
28,919.38 9,063.27 143,282.69 RJ 754

PKRJ -
PKRJ -

PKRJ -
PKRJ -
PKRJ -
RK
RK
RK
84,509.90 26,485.21 418,709.02 RK 14
RK -
2,685.38 841.59 13,304.85 RK 42
249,220.10 78,105.00 1,234,774.98 RK 26
6,292.94 1,972.19 31,178.72 RK 5
RK -
4,427.28 1,387.50 21,935.22 RK 402
RK -
531,273.86 166,500.00 2,632,226.14 RK 1
531,273.86 166,500.00 2,632,226.14 RK 3
RK -
619,819.50 194,250.00 3,070,930.50 RK 0
885,456.44 277,500.00 4,387,043.57 RK 1
1,328,184.65 416,250.00 6,580,565.35 RK 1
7,083,651.48 2,220,000.00 35,096,348.52 RK 1
3,541,825.74 1,110,000.00 17,548,174.26 RK 1
885,456.44 277,500.00 4,387,043.57 RK 1
885,456.44 277,500.00 4,387,043.57 RK 1
974,002.08 305,250.00 4,825,747.92 RK 1
885,456.44 277,500.00 4,387,043.57 RK 1
885,456.44 277,500.00 4,387,043.57 RK 1
2,656,369.31 832,500.00 13,161,130.70 RK 1
885,456.44 277,500.00 4,387,043.57 RK 1
885,456.44 277,500.00 4,387,043.57 RK 1
885,456.44 277,500.00 4,387,043.57 RK 1

88,734,029.32 1,928,473,762.64 - 65,569,515.72 29,578,009.77


71,923,331.61 780,457,975.46 - 32,507,781.44 23,974,443.87

PKRJL -
PKRJL -

PL PELEBARAN
RJ RUTIN JEMBATAN
RK RUTIN KONDISI
PKPL PK PELEBARAN
PKD PK DRAINASE
PKRK PK RUTIN KONDISI
PKRJ PK RUTIN JEMBATAN
PKRJL PK RUTIN JALAN
TAHUN 2022 %
KDN KLN
Harsat Personil Bahan Alat Total Personil Bahan Alat Total

147,403 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A


-
11,845 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
-
47,380 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
-
87,736 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
45,243 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
69,483 30.00% 70.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
69,483 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
58,370 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
130,901 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
-
33,104 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
228,192 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
585,126 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
241,619 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
213,784 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
188,241 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
8,406 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
2,763,837 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1,398,423 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
867,134 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
585,126 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
39,483 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
23,690 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
11,845 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
11,845 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
15,793 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
553 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%

-
-
11,845 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

-
33,104 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
228,192 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
585,126 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
188,241 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
2,763,837 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1,398,423 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
867,134 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
23,690 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
11,845 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
15,793 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
553 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%

-
-
-
1,398,423 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
11,845 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
-
867,134 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
-
11,974 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1,111,297 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
-
128,954 30.00% 70.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%

-
-

-
-
-
-
-
-
376,838 29.22% 65.08% 1.44% 95.74% 0.00% 3.77% 0.48% 4.26%
-
11,974 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1,111,297 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
28,061 1.43% 45.84% 39.55% 86.82% 0.00% 0.00% 13.18% 13.18%
-
19,742 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
-
2,369,004 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
2,369,004 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
-
2,763,837 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
5,922,509 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
31,586,714 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
15,793,357 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
4,343,173 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
11,845,018 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%
3,948,339 100.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00% 0.00%

95,147,525.49 2,023,621,288.13 #REF! #REF!


56,482,225.31 836,940,200.78 #REF! #REF!

-
-
B I A Y A (Rupiah)
KDN
Personil Bahan Alat Total

#REF! #REF! #REF! #REF!


#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A


- - - -
#N/A #N/A #N/A #N/A
- - - -
#N/A #N/A #N/A #N/A
- - - -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
104,224.17 243,189.73 - 347,413.89
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
- - - -
3,790,412.21 - - 3,790,412.21
#N/A #N/A #N/A #N/A
37,097,002.95 - - 37,097,002.95
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
16,617,584.92 - - 16,617,584.92
7,896,678.42 - - 7,896,678.42
#N/A #N/A #N/A #N/A
319,815.48 - - 319,815.48
#N/A #N/A #N/A #N/A
227,898,139.11 - - 227,898,139.11
352,995,107.53 - - 352,995,107.53

#N/A #N/A #N/A #N/A


- - - -
#N/A #N/A #N/A #N/A

- - - -
241,659.47 - - 241,659.47
#N/A #N/A #N/A #N/A
2,281,992.30 - - 2,281,992.30
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
1,579,335.68 - - 1,579,335.68
2,653,283.95 - - 2,653,283.95

#N/A #N/A #N/A #N/A


#N/A #N/A #N/A #N/A
- - - -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
- - - -
#N/A #N/A #N/A #N/A
- - - -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
- - - -
29,165,622.25 68,053,118.57 - 97,218,740.82

- - - -
- - - -

- - - -
- - - -
- - - -
#REF! #REF! #REF! #REF!
#N/A #REF! #REF! #REF!
- - - -
1,536,268.91 3,421,110.96 75,820.05 5,033,199.91
- - - -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
1,965.26 62,901.32 54,263.22 119,129.80
- - - -
#N/A #N/A #N/A #N/A
- - - -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
- - - -
#N/A #N/A #N/A #N/A
3,948,339.21 - - 3,948,339.21
5,922,508.81 - - 5,922,508.81
31,586,713.67 - - 31,586,713.67
15,793,356.83 - - 15,793,356.83
3,948,339.21 - - 3,948,339.21
3,948,339.21 - - 3,948,339.21
4,343,173.13 - - 4,343,173.13
3,948,339.21 - - 3,948,339.21
3,948,339.21 - - 3,948,339.21
11,845,017.63 - - 11,845,017.63
3,948,339.21 - - 3,948,339.21
3,948,339.21 - - 3,948,339.21
3,948,339.21 - - 3,948,339.21

1,133,325,784,174,080,000,000,000.00 #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#N/A #N/A #N/A #N/A


#N/A #N/A #N/A #N/A
piah)
KLN TOTAL TKDN
Personil Bahan Alat Total (%)

#REF! #REF! #REF! #REF! #REF! #REF!


#N/A #N/A #N/A #N/A #N/A #N/A
-
-
#N/A #N/A #N/A #N/A #N/A
- - - - -
#N/A #N/A #N/A #N/A #N/A
- - - - -
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - 347,413.89 #REF!
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - -
- - - - 3,790,412.21 #REF!
#N/A #N/A #N/A #N/A #N/A
- - - - 37,097,002.95 #REF!
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - 16,617,584.92 #REF!
- - - - 7,896,678.42
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - 319,815.48 #REF!
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - 227,898,139.11 #REF!
- - - - 352,995,107.53 #REF!

#N/A #N/A #N/A #N/A #N/A #N/A


- - - - -
#N/A #N/A #N/A #N/A #N/A #N/A

- - - - -
- - - - 241,659.47 #REF!
#N/A #N/A #N/A #N/A #N/A
- - - - 2,281,992.30 #REF!
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - 1,579,335.68 #REF!
- - - - 2,653,283.95 #REF!

#N/A #N/A #N/A #N/A #N/A #N/A


#N/A #N/A #N/A #N/A #N/A #N/A
- - - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - -
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - -
- - - - 97,218,740.82 #REF!

- - - - - #REF!
- - - - -

- - - - -
- - - - -
- - - - -
#REF! #REF! #REF! #REF! #REF! #REF!
#N/A #N/A #N/A #N/A #N/A #REF!
- - - - -
- 198,418.48 25,273.35 223,691.83 5,256,891.74 #REF!
- - - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
- - 18,087.74 18,087.74 137,217.54 #REF!
- - - - -
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - -
#N/A #N/A #N/A #N/A #N/A #N/A
- - - - 3,948,339.21 #REF!
- - - - 5,922,508.81 #REF!
- - - - 31,586,713.67 #REF!
- - - - 15,793,356.83 #REF!
- - - - 3,948,339.21 #REF!
- - - - 3,948,339.21 #REF!
- - - - 4,343,173.13 #REF!
- - - - 3,948,339.21 #REF!
- - - - 3,948,339.21 #REF!
- - - - 11,845,017.63 #REF!
- - - - 3,948,339.21 #REF!
- - - - 3,948,339.21 #REF!
- - - - 3,948,339.21 #REF!

- - - - #REF!

#REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!

#N/A #N/A #N/A #N/A


#N/A #N/A #N/A #N/A
KLN
(%)

#REF!
#N/A

#N/A

#N/A
#N/A
#REF!
#N/A
#N/A
#N/A

#REF!

#REF!
#N/A
#N/A

#N/A

#N/A
#N/A
#REF!

#N/A
#REF!
#N/A
#REF!
#REF!

#N/A

#N/A

#REF!

#REF!
#N/A
#N/A
#N/A
#N/A
#REF!
#REF!

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A
#N/A

#REF!

#REF!

#REF!
#N/A

#REF!

#N/A
#N/A
#REF!

#N/A

#N/A
#N/A

#N/A
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
-2.962241,119.356842 #REF! #REF! #REF!
PERBANDINGAN FISIK - KEU PL PKPL PKD
0.88505 #REF! #REF! #REF!
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
ALOKASI PER PPK/ PAKET 12,628,022,767
KODE
PROGRAM/ AKTIVITAS/ KRO/ RO/ KOMPONEN/ RENCANA REVISI
PAGU DIPA AWAL 2022 TKDN TKDN TKDN
SUBKOMP/ DETIL DIPA 2022 KONTRAK REALISASI DIPA
RINCIAN RENCANA REVISI DIPA 2022 REALISASI REALISASI REALISASI REALISASI REALISASI REALISASI REALISASI REALISASI REALISASI RINCIAN KONTRAK MYC RINCIAN REALISASI DIPA 2021 SISA KONTRAK TERMIN SD MEI
MYC 2021
TERMIN 1 TERMIN 2 TERMIN 3 TERMIN 4 TERMIN 5 TERMIN 6 TERMIN 7 TERMIN 8 TERMIN SISA SLOT
JAN - AGS 2022 SEPT - DES 2022 JAN - DES 2022 (JAN-FEB) (MAR) (APR) (MEI) (JUN) (JUL) (AUG-A) (AUG-B) S/D SAAT INI
PATCHING PAS BATU Total Total PATCHING PAS BATU PATCHING PAS BATU
A B RUTIN JEMBATAN FRP JEMBATAN Personil Bahan Alat Personil Bahan Alat Personil Bahan Alat Total C RUTIN JEMBATAN FRP JEMBATAN D RUTIN JEMBATAN FRP JEMBATAN E = C-D
JEMBATAN JEMBATAN JEMBATAN JEMBATAN JEMBATAN JEMBATAN
PPK 2.2 183,209,567,000 183,209,567,000
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #REF! #REF! #N/A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
21,100,667,080

PRESERVASI RUTIN JALAN SERDANG -


CD BOJONEGARA - MERAK 183,209,567,000 183,209,567,000 21100667080.3518
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #REF! #REF! #N/A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

2409.RDC OM Prasarana Bidang Konektivitas Darat


176,165,654,000 176,165,654,000 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #REF! #REF! #N/A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
(Jalan) 21020364411
2409.RDC.001 Preservasi Pemeliharaan Rutin Jalan 1,187,202,000 1,187,202,000 807,080,250,966 5,806,324 516,213,729 807,602,271,018 - 806,865,349,896 - 3,799,721 - 416,414,148 - 807,285,563,766 #N/A #REF! #REF! #N/A 118,226,767 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 760532672.257687
RJL 319 Pemeliharaan Rutin 593,601,000 593,601,000 807,080,250,966 5,806,324 516,213,729 807,602,271,018 - 806,865,349,896 - 3,799,721 - 416,414,148 - 807,285,563,766 #N/A #REF! #REF! #N/A 118,226,767 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #N/A #N/A 760532672.257687
CD PRESERVASI RUTIN JALAN SERDANG -
593,601,000 593,601,000 118,226,767 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
BOJONEGARA - MERAK 760532672.257687
523131 Belanja Pemeliharaan Jalan dan Jembatan
1 - Ruas Serdang - Bojonegara - Merak (22.23.K) 593,601,000 593,601,000 59,113,384 315,624,334 171,049,846 - - 545,787,564 47,813,436 4,302,336,214 3,303,981,500 998,354,714 385,794,955 385794954.628843

RK 320 Pemeliharaan Rutin Kondisi 593,601,000 593,601,000 447,117,224,050 - - 447,117,224,050 - 446,976,851,760 - - - 446,976,851,760 #NAME? #NAME? #NAME? #NAME? 118,226,767 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #NAME? #NAME? 760532672.257687
CD PRESERVASI RUTIN JALAN SERDANG -
593,601,000 593,601,000 118,226,767 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
BOJONEGARA - MERAK 760532672.257687
523131 Belanja Pemeliharaan Jalan dan Jembatan
1 - Ruas Serdang - Bojonegara - Merak (22.23.K) 593,601,000 593,601,000 59,113,384 315,624,334 171,049,846 - - 545,787,564 47,813,436 4,302,336,214 3,303,981,500 998,354,714 385,794,955 385794954.628843

2409.RDC.005
Jalan Akses Simpul Transportasi (ProPN) (PEN) 87,489,226,000 87,489,226,000 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 3,906,402,786 8,844,174,235 2,989,231,440 3,212,863,803 4,902,893,172 3,464,788,519 3,728,309,804 6,182,534,083 37,231,197,842 50,258,028,158 154,936,667,969 41,918,878,000 113,017,789,969 18,952,672,264
18952672264.3709
RMNJ 322 Rehabilitasi Minor Jalan 87,489,226,000 87,489,226,000 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 3,906,402,786 8,844,174,235 2,989,231,440 3,212,863,803 4,902,893,172 3,464,788,519 3,728,309,804 6,182,534,083 37,231,197,842 50,258,028,158 154,936,667,969 41,918,878,000 113,017,789,969 18,952,672,264 #N/A #N/A 18952672264.3709
CD PRESERVASI RUTIN JALAN SERDANG - 87,489,226,000 87,489,226,000 3,906,402,786 8,844,174,235 2,989,231,440 3,212,863,803 4,902,893,172 3,464,788,519 3,728,309,804 6,182,534,083 37,231,197,842 50,258,028,158 154,936,667,969 41,918,878,000 113,017,789,969 18,952,672,264
BOJONEGARA - MERAK 18952672264.3709
534141 Belanja Penambahan Nilai Jalan dan Jembatan
1
- Ruas Serdang - Bojonegara - Merak (22.23.K) 87,373,006,000 87,489,226,000 3,906,402,786 8,844,174,235 2,989,231,440 3,212,863,803 4,902,893,172 3,464,788,519 3,728,309,804 6,182,534,083 37,231,197,842 50,258,028,158 154,936,667,969 41,918,878,000 113,017,789,969 18,952,672,264
18,952,672,264

RKJ 324 Rekonstruksi Jalan 87,489,226,000 87,489,226,000 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #NAME? #NAME? #NAME? #NAME? 3,906,402,786 8,844,174,235 2,989,231,440 3,212,863,803 4,902,893,172 3,464,788,519 3,728,309,804 6,182,534,083 37,231,197,842 50,258,028,158 154,936,667,969 41,918,878,000 113,017,789,969 18,952,672,264 #NAME? #NAME? 18952672264.3709
CD PRESERVASI RUTIN JALAN SERDANG -
87,489,226,000 87,489,226,000 3,906,402,786 8,844,174,235 2,989,231,440 3,212,863,803 4,902,893,172 3,464,788,519 3,728,309,804 6,182,534,083 37,231,197,842 50,258,028,158 154,936,667,969 41,918,878,000 113,017,789,969 18,952,672,264
BOJONEGARA - MERAK 18952672264.3709
534141 Belanja Penambahan Nilai Jalan dan Jembatan
1
- Ruas Serdang - Bojonegara - Merak (22.23.K) 87,373,006,000 87,489,226,000 3,906,402,786 8,844,174,235 2,989,231,440 3,212,863,803 4,902,893,172 3,464,788,519 3,728,309,804 6,182,534,083 37,231,197,842 50,258,028,158 154,936,667,969 41,918,878,000 113,017,789,969 18,952,672,264
18,952,672,264

2409.RDF OM Prasarana Bidang Konektivitas Darat


7,043,913,000 7,043,913,000 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 25,008,598 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
(Jalan) 80302669.3518074
2409.RDF.001 Preservasi Rutin Jembatan 325,500,000.00 325,500,000.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 35,000,000 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 583864705.253921
PRJ 325 Pemeliharaan Rutin Jembatan 325,500,000.00 325,500,000.00 - - - - - - - - - - - - 35,000,000 31,125,600 40,125,641 - 135,864,000 - - 69,144,608 311,259,849 14,240,152 1,188,571,286 - 1,188,571,286 106,251,241 325,500,000 0% 106251240.5
CD PRESERVASI RUTIN JALAN SERDANG -
325,500,000 325,500,000 35,000,000 31,125,600 40,125,641 - 135,864,000 - - 69,144,608 311,259,849 14,240,152 1,188,571,286 - 1,188,571,286 106,251,241
BOJONEGARA - MERAK 106251240.5
523131 Belanja Pemeliharaan Jalan dan Jembatan
1
- Ruas Serdang - Bojonegara - Merak (22.23.K) 325,500,000 325,500,000 35,000,000 31,125,600 40,125,641 - 135,864,000 - - 69,144,608 311,259,849 14,240,152 1,188,571,286 1,188,571,286 106,251,241
106251240.5

2409.RDF.005
Jalan Akses Simpul Transportasi (ProPN) (PEN) 6,718,413,000 6,718,413,000 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #NAME? #NAME? #NAME? #NAME? 209,213,125 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
723294769.3784
PBJ 333 Pemeliharaan Berkala Jembatan 6,718,413,000 6,718,413,000 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #NAME? #NAME? #NAME? #NAME? 209,213,125 271,420,820 - 47,272,114 297,742,909 470,187,363 - 277,085,497 1,572,921,828 5,145,491,172 11,472,920,038 - 11,472,920,038 527,906,059 #NAME? #NAME? 527906059.3784
CB PRESERVASI RUTIN JALAN SERDANG -
6,718,413,000 6,718,413,000 209,213,125 271,420,820 - 47,272,114 297,742,909 470,187,363 - 277,085,497 1,572,921,828 5,145,491,172 11,472,920,038 - 11,472,920,038 527,906,059
BOJONEGARA - MERAK 527906059.3784
534141 Belanja Penambahan Nilai Jalan dan Jembatan
1
- Ruas Serdang - Bojonegara - Merak (22.23.K) 6,718,413,000 6,718,413,000 209,213,125 271,420,820 47,272,114 297,742,909 470,187,363 - 277,085,497 1,572,921,828 5,145,491,172 11,472,920,038 11,472,920,038 527,906,059
527,906,059

REKAP PAKET #REF! #REF! #REF! #REF! #REF! #REF!

JALAN #REF! #REF! #REF! #REF! #REF! #REF!


BELANJA BARANG #REF! #REF! #REF! #REF! #REF! #REF!
BELANJA MODAL #REF! #REF! #REF! #REF! #REF! #REF!

JEMBATAN #REF! #REF! #REF! #REF! #REF! #REF!


BELANJA BARANG #REF! #REF! #REF! #REF! #REF! #REF!
BELANJA MODAL
Kementerian Pekerjaan Umum dan Perumahan Rakyat
Direktorat Jenderal Bina Marga PT. PUNDI VIWI PERDANA
Balai Pelaksanaan Jalan Nasional Banten Engineering & Management Consultans
Satuan Kerja Pelaksanaan Jalan Nasional Wilayah I
Provinsi Banten

Satker : Satuan Kerja Pelaksanaan Jalan Nasional Wilayah I Provinsi Banten


Nama Paket : PRESERVASI JALAN SERDANG - BOJONEGARA - MERAK
Provinsi/Kab./Kota : Provinsi Banten
No. Kontrak :
Tanggal SPMK :
Sumber Dana : APBN
Tahun Anggaran : 2021-2022
1 2 3 4 5 6 7 8 9 10 23 24 25 26.00 27.00
15
MC.0

Progres sd agust
NO. MATA Sisa Alokasi 2022
2022
PEMBAYA URAIAN PEKERJAAN Ket.
RAN PERKIRAAN HARGA SATUAN BOBOT
SAT. JUMLAH HARGA (Rp)
VOLUME (Rp) (%)
Sisa 2021 & 2023 Vol Vol Jumlah Harga

a b c d e f g q
DIVISI 1. UMUM 90%
1.2 Mobilisasi LS 1.00 160,300,000.00 160,300,000.00 0.254 1.000 0.70 0.00 0.00 1,790,179,000
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 103,400,000.00 103,400,000.00 0.164 1.000 0.52 (0.32) (33,125,490.71) 178,554,000
1.17.(1a) Pengujian pH Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 34,000
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 46,000
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 46,000
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 46,000
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 46,000
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 46,000
1.17.(1g) Pengujian Coliform Buah 6.00 100,000.00 600,000.00 0.001 6.000 3.00 0.00 0.00 69,000
1.17.(1h) Pengujian E. Coli Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 415,000
1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Buah 6.00 400,000.00 2,400,000.00 0.004 6.000 3.00 0.00 0.00 46,000
1.17.(1j) Pengujian Temperatur (Suhu) Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 57,000
1.17.(2a) Pengujian Vibrasi Lin Buah 6.00 1,000,000.00 6,000,000.00 0.009 6.000 3.00 0.00 0.00 69,000
1.17.(2b) Pengujian tingkat getaran kendaraan bermotor Buah 6.00 50,000.00 300,000.00 0.000 6.000 3.00 0.00 0.00 69,000
1.17.(3a) Pengujian NoX Buah 6.00 200,000.00 1,200,000.00 0.002 6.000 3.00 0.00 0.00 69,000
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 6.00 150,000.00 900,000.00 0.001 6.000 3.00 0.00 0.00 69,000
1.17.(3c) Pengujian Karbondioksida (CO2) Buah 6.00 150,000.00 900,000.00 0.001 6.000
1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 Buah 6.00 150,000.00 900,000.00 0.001 6.000 0.47 (0.15) (22,899.69) 1,188,612,200
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 6.00 500,000.00 3,000,000.00 0.005 6.000
1.17.(3g) Pengujian Timah Hitam (Pb) Buah 6.00 50,000.00 300,000.00 0.000 6.000 320.00 (320.00) (16,000,000.00) 1,436,875
1.17.(3h) Pengujian Parameter Udara Emisi dan Ambien lainnya : ………….. Buah 6.00 50,000.00 300,000.00 0.000 6.000 0.49 (0.29) (14,381.33) 293,250,000
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 174,900,000.00 174,900,000.00 0.277 1.000 0.47 (0.15) (26,701,034.61) 1,188,612,200
1.21 Manajemen Mutu LS 1.00 141,400,000.00 141,400,000.00 0.224 1.000

SUB TOTAL PEKERJAAN DIVISI 1 - 599,200,000.00 0.948 - (75,863,806.33)


DIVISI 2. DRAINASE - -
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 92.73 41,921.47 3,887,377.91 0.006 92.730 1,717.09 (1,717.09) (71,982,979.93) 29,239
2.2.(1) Pasangan Batu dengan Mortar M3 48.22 817,427.78 39,416,367.55 0.062 48.220 626.00 (626.00) (511,709,105.68) 785,794
2.3.(1) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm M1 400.00 186,664.65 74,665,860.00 0.118 380.000 - 20.00 3,733,293.00 8,224,000
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 200 cm x 100 cm M1 87.00 5,334,761.58 464,124,257.46 0.735 87.000 - 0.00 0.00 10,193,000
2.3.(21) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 500 cm x 250 cm M1 12.00 54,988,868.56 659,866,422.72 1.045 12.000 - 0.00 0.00 1,153,000
2.3.(26) Saluran berbentuk U Tipe DS 3 M1 6,958.00 1,101,010.00 7,660,827,580.00 12.126 6,958.000 1,717.09 (1,717.09) (1,890,534,390.54) 29,239
2.3.(27) Saluran berbentuk U Tipe DS 3a (dengan tutup) M1 250.00 1,299,000.00 324,750,000.00 0.514 250.000 626.00 (626.00) (813,172,912.09) 785,794
2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1 1,280.00 1,472,819.00 1,885,208,320.00 2.984 1,280.000 - 0.00 0.00 8,224,000

SUB TOTAL PEKERJAAN DIVISI 2 - 11,112,746,185.64 17.591 - (2,703,707,302.62)


DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK - -
3.1.(1) Galian Biasa M3 5,168.70 41,921.47 216,679,501.99 0.343 5,168.700 21,368.95 (19,569.74) (820,392,102.54) 23,484
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 19.64 477,210.92 9,372,422.47 0.015 5.690 - 13.95 6,657,092.33 102,000
3.1.(10). Galian Perkerasan Beton M3 125.00 382,562.08 47,820,260.00 0.076 125.000 144.72 (144.72) (55,365,005.88) 24,000
3.2.(1a) Timbunan Biasa dari sumber galian M3 642.20 264,138.09 169,629,481.40 0.269 642.200 122.12 (122.12) (32,256,543.55) 37,000
3.2.(2a) Timbunan Pilihan dari sumber galian M3 150.00 288,972.02 43,345,803.00 0.069 150.000 1,490.00 (1,061.41) (306,717,213.80) 145,000
3.3.(1) Penyiapan Badan Jalan M2 12,148.00 10,645.48 129,321,291.04 0.205 12,148.000 1,848.00 (1,443.00) (15,361,427.64) 34,000
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm buah 10.00 122,977.93 1,229,779.30 0.002 10.000 340.00 (340.00) (41,812,496.20) 30,563
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm buah 10.00 395,981.21 3,959,812.10 0.006 10.000 4,376.00 (3,776.00) (1,495,225,048.96) 209,937
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm buah 10.00 987,045.54 9,870,455.40 0.016 10.000 52,987.24 (48,798.72) (48,166,556,320.15) 5,000
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm buah 5.00 1,632,233.46 8,161,167.30 0.013 5.000 4.00 (4.00) (6,528,933.84) 133,011

SUB TOTAL PEKERJAAN DIVISI 3 - 639,389,974.00 1.012 - (50,933,558,000.24)


DIVISI 4. PEKERJAAN PREVENTIF - -
4.9.(3) Tambalan Penuh dengan Beton Semen Cepat Mengeras untuk Pembukaan Lalu Lintas Umur Bet
M3 376.28 1,770,900.00 666,354,252.00 1.055 373.630
4.9.(5) Pemasangan Sealant M1 20,717.00 15,000.00 310,755,000.00 0.492 5,000.000 - 15,717.00 235,755,000.00 1,106,632

SUB TOTAL PEKERJAAN DIVISI 4 - 977,109,252.00 1.55 - 0.00 0.00


DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN - - 0.00
5.1.(1) Lapis Fondasi Agregat Kelas A M3 5,805.00 305,975.57 1,776,188,183.85 2.812 5,805.000 22,380.84 (21,480.84) (6,572,612,769.25) 293,245
5.1.(2) Lapis Fondasi Agregat Kelas B M3 66.18 270,726.80 17,916,699.62 0.028 66.180 - 0.00 0.00 240,036
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 200.00 238,380.17 47,676,034.00 0.075 200.000 - 0.00 0.00 1,686,239
5.3.(3) Lapis Fondasi bawah Beton Kurus M3 5,928.50 1,098,099.40 6,510,082,292.90 10.305 5,927.500 - 1.00 1,098,099.40 1,010,219
SKh-1.5.3.(3) Perkerasan Jalan Beton Semen untuk Pembukaan Lalu Lintas Umur Beton Lebih dari 3 hari d M3 17,888.25 1,770,900.00 31,678,301,925.00 50.144 17,888.250 - 0.00 0.00 901,167

SUB TOTAL PEKERJAAN DIVISI 5 - 40,030,165,135.37 63.364 - (6,571,514,669.85)


DIVISI 6. PERKERASAN ASPAL - -
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 504.00 15,034.34 7,577,307.36 0.012 504.000 41,165.72 (39,041.83) (586,968,172.53) 13,666
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 5,821.35 15,163.80 88,273,787.13 0.140 4,624.500 69,825.80 (38,156.87) (578,603,174.57) 13,279
6.3(5a) Laston Lapis Aus (AC-WC) Ton 2,184.37 1,407,297.38 3,074,058,177.95 4.866 1,443.920 7,922.51 (4,887.58) (6,878,283,994.62) 63,000
6.3(6a) Laston Lapis Antara (AC-BC) Ton 2,028.84 1,304,923.89 2,647,481,784.99 4.191 2,028.840 19,224.05 (17,965.83) (23,444,041,725.06) 1,065,704
6.3.(8) Bahan anti pengelupasan Kg 772.00 35,535.00 27,433,020.00 0.043 767.110 24,340.80 (12,149.18) (431,721,044.94) 1,006,591

SUB TOTAL PEKERJAAN DIVISI 6 - 5,844,824,077.43 9.252 - (31,919,618,111.73)


DIVISI 7. STRUKTUR - -
7.1 (5a) Beton struktur, fc’30 MPa M3 32.76 1,608,410.80 52,691,537.81 0.083 32.760 108.35 (74.54) (119,886,115.80) 1,649,640
7.1 (10) Beton, fc’10 Mpa M3 2.40 1,452,674.69 3,486,419.26 0.006 663.693 27.00 (688.29) (999,865,820.40) 1,285,000
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 250.00 17,020.00 4,255,000.00 0.007 (411.293) - 661.29 11,255,206.86 944,782
7.3 (3) Baja Tulangan Sirip BjTS 420A Kg 2,880.72 15,678.33 45,164,878.80 0.071 2,880.720 - 0.00 0.00 1,121,000
7.3 (8) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 500.00 19,463.75 9,731,875.00 0.015 1,107.747 20.59 (623.91) (12,143,628.26) 1,052,058
7.4 (1b) Penyediaan Baja Struktur Grade 345 (Kuat Leleh 345 MPa) Kg 402.40 25,000.00 10,060,000.00 0.016 (205.347) - 607.75 15,193,675.00 750,838
7.9.(1) Pasangan Batu M3 562.40 740,977.66 416,725,835.98 0.660 946.017 21,064.33 (9,502.56) (7,041,183,696.96) 16,837
7.10.(1) Pasangan Batu Kosong yang Diisi Adukan M3 13.20 763,836.59 10,082,642.99 0.016 13.200 14,752.00 (14,752.00) (11,268,117,375.68) 39,000
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 100.00 552,230.00 55,223,000.00 0.087 100.000 - 0.00 0.00 292,000
7.14.(1) Papan Nama Jembatan M1 2.00 691,918.76 1,383,837.52 0.002 2.000 - 0.00 0.00 172,000

SUB TOTAL PEKERJAAN DIVISI 7 - 608,805,027.35 0.964 - (19,414,747,755.25)


DIVISI 8. REHABILITASI JEMBATAN - -
8.2.(2) Perbaikan Dengan Cara Graut M3 2.35 3,000,000.00 7,050,000.00 0.011 1.390 25.94 (6.59) (19,782,428.14) 12,589,000
8.7.(1b) Pengecatan struktur baja pada daerah kering tebal 240 mikron M2 818.16 60,000.00 49,089,600.00 0.078 818.160 501.04 (162.00) (9,720,000.00) 1,326,000
8.7.(3a) Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail) 80 mikron M2 161.00 60,000.00 9,660,000.00 0.015 36.000 25.94 117.45 7,046,751.44 12,589,000
8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 27.30 3,000,000.00 81,900,000.00 0.130 24.800 501.04 (159.50) (478,500,000.00) 1,326,000
8.11.(3) Penggantian Karet Pengisi Sambungan Siar Muai Tipe Strip Seal M1 2.50 1,200,000.00 3,000,000.00 0.005 2.500 501.04 (162.00) (194,400,000.00) 1,326,000

SUB TOTAL PEKERJAAN DIVISI 8 - 150,699,600.00 0.239 - (665,853,248.56)


DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN - -
9.2.(1) Marka Jalan Termoplastik M2 7,377.01 163,302.11 1,204,681,298.49 1.907 6,623.110 30.00 753.90 123,113,460.73 20,743
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 36.00 592,603.65 21,333,731.40 0.034 36.000 67.00 0.00 0.00 13,829
9.2.(3b) Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade Buah 2.00 603,328.72 1,206,657.44 0.002 2.000 60.00 0.00 0.00 167,695
9.2.(6a) Patok Kilometer Buah 6.00 285,481.27 1,712,887.62 0.003 6.000 63.00 0.00 0.00 554,576
9.2.(7) Rel Pengaman M1 60.00 648,507.33 38,910,439.80 0.062 60.000 62.00 0.00 0.00 536,536
9.2.(10b) Kereb Pracetak Jenis 2 (Penghalang/Barrier) M1 1,407.00 111,105.17 156,324,974.19 0.247 1,387.000 60.00 20.00 2,222,103.40 523,941
9.2.(10f) Kereb Pracetak Jenis 6 (Kereb dengan Bukaan) Buah 385.00 57,293.20 22,057,882.00 0.035 380.000 50.00 5.00 286,466.00 183,755
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah 45.00 87,989.88 3,959,544.60 0.006 40.000 50.00 5.00 439,949.40 55,000
9.2.(10h) Kereb Pracetak Jenis 8 (Kereb pada Pelandaian Trotoar) Buah 45.00 87,989.88 3,959,544.60 0.006 40.000 459.67 (454.67) (40,006,534.72) 122,200
9.2.(10i) Kereb Pracetak Jenis 9 (Kereb pada Pelandaian Trotoar) Buah 495.00 73,917.37 36,589,098.15 0.058 475.000 - 20.00 1,478,347.40 312,000
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 2,860.00 165,767.75 474,095,765.00 0.750 2,850.000 - 10.00 1,657,677.50 824,000

SUB TOTAL PEKERJAAN DIVISI 9 - 1,964,831,823.29 3.110 - 89,191,469.71


DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA - -
10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 322.22 41,921.47 13,507,936.06 0.021 200.420 300.24 37.80 1,584,631.57 97,000
10.1.(2) Timbunan Pilihan pada Lereng Tepi Saluran untuk Pemeliharaan M3 99.80 288,972.02 28,839,407.60 0.046 - 31.91 99.80 28,839,407.60 713,000
10.1.(3) Pebaikan Pasangan Batu dengan Mortar M3 67.30 740,977.66 49,867,796.52 0.079 - 385.85 67.30 49,867,796.52 849,000
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 3.50 305,975.57 1,070,914.50 0.002 - - 3.50 1,070,914.50 393,000
10.1.(5) Perbaikan Lapis Fondasi Agregat Kelas B M3 16.40 270,726.80 4,439,919.52 0.007 - 1,332.40 (36.32) (9,833,901.22) 2,662,900
10.1.(6a) Perbaikan Lapis Fondasi Agregat Kelas S M3 121.30 238,380.17 28,915,514.62 0.046 - 49,200.00 (5,260.43) (1,253,981,032.82) 13,000
10.1.(7) Perbaikan dan Perataan Permukaan JalanTanah M2 5,000.00 10,645.48 53,227,400.00 0.084 - 299.44 5,000.00 53,227,400.00 569,000
10.1.(9) Perbaikan Campuran Aspal Panas M3 0.90 3,500,000.00 3,150,000.00 0.005 - 790.70 0.90 3,150,000.00 22,000
10.1.(14) Perbaikan Perkerasan Beton Semen M3 73.06 1,770,900.00 129,381,954.00 0.205 - 94.00 41.06 72,713,154.00 58,000
10.1.(15) Perbaikan Lapis Fondasi Bawah Beton Kurus M3 24.50 1,098,099.40 26,903,435.30 0.043 - 139,660.47 (48,164.03) (52,888,889,188.32) 8,400
10.1.(16) Perbaikan Pasangan Batu M3 28.40 740,977.66 21,043,765.54 0.033 - 3,218,627.64 (1,619,356.24) (1,199,906,796,101.73) 360
10.1.(17) Pengecatan Kereb pada Trotoar atau Median M2 200.00 50,000.00 10,000,000.00 0.016 - 0.62 199.89 9,994,640.00 7,898,000
10.1.(18b) Perbaikan Rel Pengaman M1 200.00 30,000.00 6,000,000.00 0.009 - 0.62 199.89 5,996,784.38 53,790,000
10.1.(19b) Pembersihan Patok Buah 27.00 15,000.00 405,000.00 0.001 - 0.62 26.89 403,392.19 4,439,000
10.1.(20b) Pembersihan Rambu Buah 74.00 15,000.00 1,110,000.00 0.002 - 0.57 73.88 1,108,195.31 6,687,000
10.1.(21) Pembersihan Drainase M1 14,530.00 20,000.00 290,600,000.00 0.460 - 0.57 14,529.88 290,597,593.75 4,381,000
10.1.(22) Pengendalian Tanaman M2 643,396.00 700.00 450,377,200.00 0.713 - 0.57 643,395.88 450,377,115.78 6,053,000
10.2.(1) Pemeliharaan Kinerja Jembatan Serdang bentang 7.00 m LS 1.00 5,000,000.00 5,000,000.00 0.008 - 0.62 0.89 4,464,062.50 6,341,000
10.2.(2) Pemeliharaan Kinerja Jembatan Trumix Seruni bentang 9.00 m LS 1.00 7,500,000.00 7,500,000.00 0.012 - 0.62 0.89 6,696,093.75 3,747,000
10.2.(3) Pemeliharaan Kinerja Jembatan Fly Over Seruni bentang 68.30 m LS 1.00 40,000,000.00 40,000,000.00 0.063 - 0.62 0.89 35,712,500.00 6,341,000
10.2.(4) Pemeliharaan Kinerja Jembatan Serdang Terate bentang 36.50 m LS 1.00 20,000,000.00 20,000,000.00 0.032 - 0.57 0.88 17,593,750.00 4,035,000
10.2.(5) Pemeliharaan Kinerja Jembatan Terate II Amnonim II bentang 7.00 m LS 1.00 5,000,000.00 5,000,000.00 0.008 - 0.62 0.89 4,464,062.50 4,035,000
10.2.(6) Pemeliharaan Kinerja Jembatan Terate III bentang 7.00 m LS 1.00 5,000,000.00 5,000,000.00 0.008 - 0.57 0.88 4,398,437.50 5,765,000
10.2.(7) Pemeliharaan Kinerja Jembatan Grenyang bentang 8.00 m LS 1.00 5,500,000.00 5,500,000.00 0.009 - 0.62 0.89 4,910,468.75 11,876,000
10.2.(8) Pemeliharaan Kinerja Jembatan Ragas bentang 7.10 m LS 1.00 5,000,000.00 5,000,000.00 0.008 - 0.62 0.89 4,464,062.50 8,763,000
10.2.(9) Pemeliharaan Kinerja Jembatan Ragas II bentang 7.00 m LS 1.00 5,000,000.00 5,000,000.00 0.008 - 0.57 0.88 4,398,437.50 4,035,000
10.2.(10) Pemeliharaan Kinerja Jembatan Pangoreng bentang 26.00 m LS 1.00 15,000,000.00 15,000,000.00 0.024 - 0.62 0.89 13,392,187.50 47,621,000
10.2.(11) Pemeliharaan Kinerja Jembatan Cicegah bentang 7.60 m LS 1.00 5,000,000.00 5,000,000.00 0.008 - 0.57 0.88 4,398,437.50 4,612,000
10.2.(12) Pemeliharaan Kinerja Jembatan Lebak Gede I bentang 6.00 m LS 1.00 5,000,000.00 5,000,000.00 0.008 - 0.57 0.88 4,398,437.50 6,341,000
10.2.(13) Pemeliharaan Kinerja Jembatan Lebak Gede II bentang 6.00 m LS 1.00 5,000,000.00 5,000,000.00 0.008 - 0.57 0.88 4,398,437.50 3,459,000

SUB TOTAL PEKERJAAN DIVISI 10 1,246,840,243.66 1.974 (1,252,976,879,823.51)


TOTAL 63,174,611,318.74 100.000 (1,365,172,551,248.38) (1,365,172,551,248.38)
Rencana sd Bulan ini : 69.416 % %
Realisasi sd Bulan ini : 1.933 % %
Deviasi : - 67.484 % %
Control DPP 63,174,611,318.74
PPN 10% 6,317,461,131.87
NILAI KONTRAK 69,492,072,450.62
PEMBULATAN 69,492,072,000.00 OK
-
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK : % Lembar


Lembar1.2-1
1.2-1
% TKDN KDN KLN
No. URAIAN SATUAN VOL. HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)
(Rp.) 1.1

A. Sewa Tanah M2 1,000.00 30,000.00 30,000,000.00 100.00 30,000,000.00 - 10,000.00 -

B. PERALATAN
Periksa lembar 1.2-2 LS 1.00 208,967,905.18 208,967,905.18 156,725,928.88 52,241,976.29

C. FASILITAS KONTRAKTOR
1 Base Camp M2 1.00 35,000,000.00 35,000,000.00 100.00 35,000,000.00 - 1,350,000.00 3.00
2 Kantor M2 1,485,000.00 - 100.00 - - 1,350,000.00 174.00
3 Barak M2 1,070,000.00 - 100.00 - - 1,000,000.00 1.00
4 Bengkel M2 1,097,000.00 - 100.00 - - 1,000,000.00 50.00
5 Gudang, dan lain-lain M2 987,000.00 - 100.00 - - 900,000.00 72.00
10,000,000.00

D. MOBILISASI FASILITAS LABORATORIUM set 1.00 5,000,000.00 5,000,000.00 100.00 5,000,000.00 - 35,000,000.00 -
1 Ruang Laboratorium (sesuai gambar) set

2 Soil & Agggregate Testing


- Compaction Test Set
- CBR Test Set
- Spesific Gravity Set
- Atterberg Limits Set Termasuk dalam Harga
Satuan Mata
- Grain Size Analysis Set Pembayaran
- Field Density Test by Sand Cone Method Set
- Moisture Content Set
- Abrasion of Aggregate by Los Angeles Machine Bln

3 Bituminous Testing
- Marshall Asphalt Test Set
- Extraction Test, Centrifuge/Refflux Method Set
- Specific Gravity for Coarse Aggregate Set
- Specific Gravity for Fine Aggregate Set
- Mix Air Viod Content (Accurate Method) Set Termasuk dalam Harga
- Core Drill Set Satuan Mata
- Metal Thermometer Set Pembayaran
- Accessories and Tolls Set
- Penetration Test Bln
- Softening Point Set
- Refusal Density Compactor Set

4 Concrete Testing
- Slump Cone Set
- Sylinder/cube Mould for Compressive Strength Set
- Beam Mould for Flexural Strength (RIGID) Set
- Crushing Machine Set

5 Pendukung (Periksa Fasilitas Laboratorium)

6 Operasional (Periksa Fasilitas Laboratorium)

E. MOBILISASI PERSONIL
E.I Personil sesuai struktur organisasi Ls 65,997,000.00 - 100.00 - - 60,000,000
1 .......................... LS
2 .......................... LS
3 .......................... LS
4 ..........................
5 ..........................
E.II Personil Lainnya Set 32,997,000.00 - 100.00 - - 30,000,000
1 .......................... Set -
2 .......................... Bh -
3 .......................... Bh -
4 ..........................
5 ..........................
6 ..........................

F. DEMOBILISASI LS 1.00 45,150,000.00 45,150,000.00 156,725,928.88 52,241,976.29

1.2.a Total Biaya Mobilisasi 324,117,905.18 383,451,857.76 104,483,952.59

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi diatas sudah termasuk over-head dan laba 118% 32%
serta seluruh dan bea (Kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI -
Lembar 1.2-2
% TKDN KDN KLN
No. Jenis Alat KODE Sat Jumlah Harsat Jumlah Harga KETERANGAN
(Rp.) 1.1

B PERALATAN
1 ASPHALT MIXING PLANT E01 Unit 1.00 48,108,252 48,108,251.69 75.00 36,081,188.77 12,027,062.92 43,734,774.26
2 ASPHALT FINISHER E02 Unit 2.00 6,219,521 12,439,041.62 75.00 9,329,281.21 3,109,760.40 5,654,109.83
3 POWER BROOM E03 Unit 575,154 - 522,867.22
4 BULLDOZER 100-150 HP E04 Unit 1.00 3,164,753 3,164,753.00 75.00 2,373,564.75 791,188.25 2,877,048.18
5 COMPRESSOR 4000-6500 L\M E05 Unit 4.00 1,145,529 4,582,114.35 75.00 3,436,585.77 1,145,528.59 1,041,389.63
6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit 16.00 617,272 9,876,357.29 75.00 7,407,267.96 2,469,089.32 561,156.66
7 CRANE 10-15 TON E07 Unit 4,106,274 - 3,732,976.58
8 DUMP TRUCK 3 - 4 M3 E08 Unit 12.00 192,500 2,310,000.00 75.00 1,732,500.00 577,500.00 175,000.00
9 DUMP TRUCK 6-8 M3 E09 Unit 15.00 334,910 5,023,646.06 75.00 3,767,734.55 1,255,911.52 304,463.40
10 EXCAVATOR 80-140 HP E10 Unit 4.00 3,065,051 12,260,202.96 75.00 9,195,152.22 3,065,050.74 2,786,409.76
11 FLAT BED TRUCK 3-4 TON E11 Unit 2.00 2,022,596 4,045,191.58 75.00 3,033,893.68 1,011,297.89 1,838,723.45
12 GENERATOR SET E12 Unit 2.00 2,091,512 4,183,024.23 75.00 3,137,268.17 1,045,756.06 1,901,374.65
13 MOTOR GRADER >100 HP E13 Unit 2.00 2,611,895 5,223,790.27 75.00 3,917,842.71 1,305,947.57 2,374,450.12
14 TRACK LOADER 75-100 HP E14 Unit 1,892,191 - 1,720,173.25
15 WHEEL LOADER 1.0-1.6 M3 E15 Unit 2.00 2,122,773 4,245,546.04 75.00 3,184,159.53 1,061,386.51 1,929,793.65
16 THREE WHEEL ROLLER 6-8 T E16 Unit 1.00 1,434,029 1,434,028.68 75.00 1,075,521.51 358,507.17 1,303,662.44
17 TANDEM ROLLER 6-8 T. E17 Unit 2.00 2,695,000 5,390,000.00 75.00 4,042,500.00 1,347,500.00 2,450,000.00
18 TIRE ROLLER 8-10 T. E18 Unit 2.00 3,018,068 6,036,136.00 75.00 4,527,102.00 1,509,034.00 2,743,698.18
19 VIBRATORY ROLLER 5-8 T. E19 Unit 2.00 2,663,420 5,326,839.12 75.00 3,995,129.34 1,331,709.78 2,421,290.51
20 CONCRETE VIBRATOR E20 Unit 1.00 461,062 461,062.35 75.00 345,796.77 115,265.59 419,147.60
21 STONE CRUSHER E21 Unit 2.00 4,029,734 8,059,467.19 75.00 6,044,600.39 2,014,866.80 3,663,394.18
22 WATER PUMP 70-100 mm E22 Unit 2.00 452,477 904,954.54 75.00 678,715.91 226,238.64 411,342.97
23 WATER TANKER 3000-4500 L. E23 Unit 2.00 1,576,517 3,153,034.53 75.00 2,364,775.90 788,258.63 1,433,197.52
24 PEDESTRIAN ROLLER E24 Unit 834,696 - 758,814.49
25 TAMPER E25 Unit 2.00 479,570 959,140.29 75.00 719,355.22 239,785.07 435,972.86
26 JACK HAMMER E26 Unit 2.00 454,694 909,388.16 75.00 682,041.12 227,347.04 413,358.25
27 FULVI MIXER E27 Unit 7,162,882 - 6,511,710.96
28 CONCRETE PUMP E28 Unit 1,681,190 - 1,528,354.96
29 TRAILER 20 TON E29 Unit 2,666,443 - 2,424,038.75
30 PILE DRIVER + HAMMER E30 Unit 1.00 2,165,969 2,165,968.64 75.00 1,624,476.48 541,492.16 1,969,062.40
31 CRANE ON TRACK 35 TON E31 Unit 2,710,959 - 2,464,508.05
32 WELDING SET E32 Unit 2.00 508,409 1,016,817.88 75.00 762,613.41 254,204.47 462,189.94
33 BORE PILE MACHINE E33 Unit 5,197,196 - 4,724,723.48
34 ASPHALT LIQUID MIXER E34 Unit 463,687 - 421,533.67
35 TRONTON 15 TON E35 Unit 1.00 3,162,983 3,162,983.27 75.00 2,372,237.45 790,745.82 2,875,439.33
36 COLD MILLING MACHINE E36 Unit 1.00 11,496,847 11,496,846.79 75.00 8,622,635.09 2,874,211.70 10,451,678.90
37 ROCK DRILL BREAKER E37 Unit 1.00 3,371,556 3,371,555.81 75.00 2,528,666.86 842,888.95 3,065,050.74
38 COLD RECYCLER E38 Unit 24,052,921 - 21,866,292.15
39 HOT RECYCLER E39 Unit 56,741,887 - 51,583,533.35
40 AGGREGAT (CHIP) SPREADER E40 Unit 3,418,702 - 3,107,910.56
41 ASPHALT DISTRIBUTOR E41 Unit 2.00 2,978,798 5,957,595.28 75.00 4,468,196.46 1,489,398.82 2,707,997.86
42 SLIP FORM PAVER E42 Unit 4,245,646 - 3,859,677.83
43 CONCRETE PAN MIXER E43 Unit 1.00 2,849,740 2,849,740.47 75.00 2,137,305.36 712,435.12 2,590,673.16
44 CONCRETE BREAKER E44 Unit 4,528,877 - 4,117,160.68
45 ASPAHLT TANKER E45 Unit 2,901,485 - 2,637,713.60
46 CEMENT TANKER E46 Unit 2,611,965 - 2,374,513.60
47 CONDRETE MIXER (350) E47 Unit 659,989 - 599989.7728
48 VIBRATING RAMMER E48 Unit 515,798 - 468907.191939095
49 TRUK MIXER (AGITATOR) E49 Unit 2.00 3,369,488 6,738,976.91 75.00 5,054,232.68 1,684,744.23 3,063,171.32
50 BORE PILE MACHINE E50 Unit 3,772,915 - 3429922.84294956
51 CRANE ON TRACK 75-100 TON E51 Unit 1.00 15,311,450 15,311,450.18 75.00 11,483,587.63 3,827,862.54 13,919,500.16
52 ASPHALT CUTTER Unit 2.00 550,000 1,100,000.00 75.00 825,000.00 275,000.00 500,000.00
53 ASPHALT SPRAYER Unit 2.00 1,100,000 2,200,000.00 75.00 1,650,000.00 550,000.00 1,000,000.00
54 BABY ROLLER Unit 1.00 1,100,000 1,100,000.00 75.00 825,000.00 275,000.00 1,000,000.00
55 BLENDING EQUIPMENT Unit 1.00 3,850,000 3,850,000.00 75.00 2,887,500.00 962,500.00 3,500,000.00
56 WATER JET Unit 1.00 550,000 550,000.00 75.00 412,500.00 137,500.00 500,000.00

Total untuk Item B pada Lembar 1 208,967,905.18 156,725,928.88 52,241,976.29


FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.8.(1)


JENIS PEKERJAAN : Manajemen dan Keselamatan Lalu Lintas
SATUAN PEMBAYARAN : LS Lembar 1.2-1
HARGA SATUAN JUMLAH HARGA
No. URAIAN SATUAN VOL.
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Panjang Lokasi Pekerjaan KM 70.63
2 Total Masa Pelaksanaan Kegiatan Bulan 27.00
3 Masa Mobilisasi Bulan 2.00
4 Periode Pekerjaan Perkerasan Jalan Bulan 25.00
5 Panjang Zona kerja perkerasan Jalan M 70,628.00

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan
selama periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu lintas sesuai schedule
pekerjan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 Shift
4 Mengalihkan lalu lintas harus izin PPK dan Pihak terkait
5 Semua rambu harus jelas dan terbaca oleh pengguna Jalan

C. PERALATAN KESELAMATAN LALU LINTAS


1 Rambu Batas Kecepatan Buah 20.00 78,000.00 1,560,000.00
2 Rambu Perintah Mengikuti Lajur Buah 4.00 78,000.00 312,000.00
3 Rambu Pengarah Tikungan Buah 3.00 78,000.00 234,000.00
4 Rambu Berjalan Terus Buah - - -
5 Rambu Larangan Menyalip Buah 4.00 78,000.00 312,000.00
6 Rambu Peringatan Jalan Licin Buah - - -
7 Rambu Peengarah Tikungan Ganda Buah - - -
8 Rambu APILL Buah - - -
9 Rambu Peringatan Dengan Kata2 Buah 24.00 102,000.00 2,448,000.00
10 Rambu Peringatan Pekerjaan Jalan Buah 4.00 102,000.00 408,000.00
11 Rambu Peringatan Lalu Lintas Buah - - -
12 Water Barrier Buah - - -
13 Traffic Cone Buah - - -
14 Police Line Buah - - -
15 Concrete Barrier Buah - - -
16 Lampu Semantara Buah - - -
17 APILL Sementara Buah - - -
18 Marka Jalan Sementara M2 - - -
19 Jalur Evakuasi Ls - -
20 Tongkat pengatur lalu lintas Buah - -
21 Lampu putar Buah - -
22 Lampu selang lalu lintas Ls - -
23 Pagar Jaringan Pengaman termasuk perlengkapanya M' 200.00 102,000.00 20,400,000.00
24 Peralatan Komunikasi dan Lainya Set 2.00 1,440,000.00 2,880,000.00
25 Alat Bantu Ls - -
- -
D. TENAGA/PERSONIL - -
1 Pekerja (Flagman) OB 50.00 3,000,000.00 150,000,000.00
2 Koordinator/Pengatur OB - - -

E. TOTAL BIAYA MANAJEMEN DAN KESELAMATAN LALU LINTAS 178,554,000.00

Catatan : 1. Harga satuan personil tersebut sudah termasuk seluruh pajak dan bea (Kecuali PPN),
Asuransi Tenaga Kerja dan Pengeluaran Lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu Lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
ITEM PEMBAYARAN NO. : 1.19
JENIS PEKERJAAN : Keselamatan dan Kesehatan Kerja
SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DANJalan
Pekerjaan ASUMSI
dan Jembatan
1 Nilai Pekerjaan Jalan Asumsi Rp
Nilai Pekerjaan Jembatan Asumsi Rp
2 Jangka Waktu Pekerjaan Jalan Merujuk Ke Masa Pe Bulan 27.00 - -
Jangka Waktu Pekerjaan Jembatan Merujuk Ke Masa Pe Bulan
3 Penyuluhan Penanggulangan HIVAIDS Jika disebutkan dala Org 290.00 - -

Keselamatan dan KesehaSE Menteri No. 11 Tahun 2019


1 Penyiapan RKK :
a Pembuatan Dokumen Rencana Keselematan Konstruksi Set 1.00 - -
b Pembuatan Prosedur dan Instruksi Kerja
c Penyiapan Formulir

2 Sosialisasi dan Promosi Dan Pelatihan:


a Induksi K3 (Safety Induction) Org 290.00 55,000.00 15,950,000.00
b Pengarahan K3 (Safety briefing). Org 290.00 55,000.00 15,950,000.00
c Pertemuan keselamatan (Safety Talk /Tool Box Meeting Org 290.00 55,000.00 15,950,000.00
d Pelatihan K3 Org 290.00 55,000.00 15,950,000.00
e P3K Org 290.00 55,000.00 15,950,000.00
f Bekerja Di Ketinggian Org 60.00 55,000.00 3,300,000.00
g Simulasi K3 Org 60.00 55,000.00 3,300,000.00
h Spanduk (Banner) Lbr 12.00 55,000.00 660,000.00
i Poster Lbr 2.00 55,000.00 110,000.00
j Papan Informasi K3 Buah 2.00 220,000.00 440,000.00

3 Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD)


Alat Pelindung Kerja (APK)antara lains:
a Jaring pengaman (Safety Net) Ls
b Tali keselamatan (Life Line) Ls 6.00 2,200,000.00 13,200,000.00
c Penahan Jatuh (Safety Deck) Ls
d Pagar pengaman (Guard Railling) Ls
e Pembatas Area (Restricted Area) Ls 6.00 5,500,000.00 33,000,000.00
Alat Pelindung Diri (APD) terdidir atas
a Topi pelindung (Safety helmet) Buah 330.00 71,500.00 23,595,000.00
b Pelindung mata (Goggles, Spectacles) Psg 8.00 60,500.00 484,000.00
c Tameng muka (Face shield) Buah 8.00 825,000.00 6,600,000.00
d Pelindung pernafasan dan mulut (Masker) Box 3,190.00 71,500.00 228,085,000.00
e Sarung tangan (Safety gloves) Psg 40.00 5,500.00 220,000.00
f Sepatu keselamatan (Safety shoes) Psg 330.00 140,250.00 46,282,500.00
g Penunjang seluruh tubuh (Full bodu harness) Buah
h Rompi keselamatan (Safety vest) Buah 40.00 38,500.00 1,540,000.00
i Celemek (Apron/coveralls) Buah 5.00 198,000.00 990,000.00
k Pelindung jatuh (Fall arrester) Buah

4 Asuransi dan Perizinan


a Asuransi dan Perizinan Ls 1.00 220,434,500.00 220,434,500.00
b Sertifikat
Surat izinKompetensi
Laik OperasiOperator yang diterbitkan oleh Lembaga/Instansi yang Buah 2.00 5,500,000.00 11,000,000.00
c berwenang sesuai dengan ketentuan peraturan perundang-undangan Buah 2.00 11,000,000.00 22,000,000.00
d Surat Pengesahan Organisasi K3 (P2K3), seusai dengan ketentuan peraturan perundang-undang Ls 1.00 5,500,000.00 5,500,000.00
e Perizinan terkait lingkungan kerja

5 Personel K3 Konstruksi Bulan


a Ahli K3 Risiko K3 Tinggi OB 27.00 7,755,000.00 209,385,000.00
b Petugas K3 Risiko K3 Sedang/kecil OB 27.00 4,103,000.00 110,781,000.00
c Petugas tanggap darurat OB
d Petugas P3K OB
e Petugas Paramedis OB

6 Fasilitas sarana kesehatan Ls


a Peralatan P3K (Kotak P3K, Tandu, Obat Luka, Perban, Dll) Ls 1.00 63,700,000.00 63,700,000.00
b Ruang P3K (tempat Tidur Pasien, Stetoskop, Timbangan berat badan) Ls 1.00 14,528,500.00 14,528,500.00
c Peralatan pengasapan (fogging) LS

7 Rambu-rambu terdiri atas: Ada di 1.8 (Manajemen Keselamatan Lalu Lintas)

8 Konsultasi dengan Ahli Terkait Keselamatan Konstruksi


a Ahli Keselamatan terkait Jembatan OJ
b Ahli Keselamatan terkait Jalan OJ

9 Lain-lain terkait pengendalian risiko K3


a Alat pemadam api ringan (APAR) Buah 4.00 3,850,000.00 15,400,000.00
b Bendera K3 Buah 4.00 550,000.00 2,200,000.00
c Lampu darurat (Emergency lamp) Buah
d Pembuatan Kartu Identitas Pekerja (KIP) Lb 40.00 88,000.00 3,520,000.00
e Program inspeksi Ls
f Pelaporan dan penyelidikan insiden Ls
g Titik Kumpul (assembly Poin) Ls 1.00 1,106,700.00 1,106,700.00
h Ambulance atau Mobil untuk angkutan ke RS Bulan 27.00 2,500,000.00 67,500,000.00

D TOTAL BIAYA PENGAMANAN LINGKUNGAN 1,188,612,200.00


FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.21


JENIS PEKERJAAN : Manajemen Mutu
SATUAN PEMBAYARAN : LS Lembar 1.2-1

No. URAIAN SATUAN VOL. HARGA SATUAN JUMLAH HARGA


(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Tidak ada pengadaan peralatan pengujian mutu dan
perlengkapan perangkat alat tulis dan kantor
2 Hanya jasa pengendalian Mutu Pekerjaan dilapangan
selama masa pelaksanaan pekerjaan
3 Personil melakukan pengendalian mutu berdasarkan spesifikasi
pekerjaan dan membuat laporan mutu pekerjaan
4 Manajemen Mutu sesuai ketentuan Ditjen Bina Marga

B. URUTAN KERJA
1 Penyedia setelah menerima SPMK mengusulkan personil
Tenaga Ahli Mutu pekerjaan sbg Manager Kendali Mutu
2 Tenaga Ahli dibantu oleh asisten kendali mutu yang
berpengalaman dibidangnya dan tenaga pendukung
3 Membuat RMK dan laporan mutu yang disetujui PPK
4 Melakukan Pengendalian Mutu semua pekerjaan dan membuat
laporan sekala berkala

C. TENAGA/PERSONIL
Masa Pelaksana Pekerjaan Bulan 27.00 - -
1 Ahli Kendali Mutu OB 27.00 7,500,000.00 202,500,000.00
2 Asisten Ahli Kendali Mutu OB - - -
3 Staff Pendukung (Support Staff) OB 24.00 3,500,000.00 84,000,000.00
4 Laporan Kendali Mutu Bulan 27.00 250,000.00 6,750,000.00

E. TOTAL BIAYA PENGENDALIAN MUTU 293,250,000.00

Catatan : 1. Harga satuan personil tersebut sudah termasuk seluruh pajak dan bea (Kecuali PPN),
Asuransi Tenaga Kerja dan Pengeluaran Lainnya.
2. Biaya tersebut sudah termasuk biaya pembuatan laporan yang terkait dengan mutu pekerjaan
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan pembuatan laporan mutu seperti komputer, printer, kertas, dan sebagainya
OK
DAFTAR HARGA SATUAN DASAR UPAH

PPK : PPK 1.2 Provinsi Banten


No. Paket Kontrak :
Nama Paket : Preservasi Jalan Serdang - Bojonegara - Merak
Prop / Kab / Kodya : Banten / Cilegon

NO URAIAN SAT HARGA SATUAN

u1 1 Mandor OH 132,000.00
u2 2 Kepala Tukang OH 121,000.00
u3 3 Tukang OH 110,000.00
u4 4 Pekerja OH 88,000.00
u5 5 Operator Jam 22,000.00 154,000.00
u6 6 Pembantu Operator Jam 14,000.00 98,000.00
u7 7 Mekanik Jam 22,000.00 154,000.00
u8 8 Pembantu Mekanik Jam 14,000.00 98,000.00
u9 9 Surveyor Jam 33,000.00 231,000.00
u10 10 Pembantu Surveyor Jam 17,000.00 119,000.00
u11 11 Sopir Jam 22,000.00 154,000.00
u12
DAFTAR HARGA SATUAN DASAR BAHAN

PPK : PPK 1.2 Provinsi Banten


No. Paket Kontrak :
Nama Paket : Preservasi Jalan Serdang - Bojonegara - Merak
Prop / Kab / Kodya : Banten / Cilegon

NO URAIAN SAT HARGA SATUAN

b1 1 Tanah timbunan m3 68,600.00 b1PL


b2 2 Semen kg 1,600.00 b2PL
b3 3 Pasir m3 78,200.00 b3PL
b4 4 Batu pecah m3 102,700.00 b4PL
b5 5 Batu kali m3 98,500.00 b5PL
b6 6 Abu Batu m3 104,200.00 b6PL
b7 7 Aspal kg 9,100.00 b7PL
b8 8 Minyak tanah ltr 10,700.00 b8PL
b9 9 Besi beton kg 12,300.00 b9PL
b10 10 Kawat bendrat kg 20,100.00 b10PL
b11 11 Paku kg 31,700.00 b11PL
b12 12 Minyak bekisting kg 9,100.00 b12PL
b13 13 Kayu bekisting m3 3,410,400.00 b13PL
b15 14 Multiplex 12 mm lbr 206,800.00 b15PL
b17 15 Pasir Lapen m3 67,600.00 b17PL
b19 16 Timbunan Pilihan m3 63,600.00 b19PL
b20 17 Sirtu saring m3 68,600.00 b20PL
b22 18 Agregat Kelas A m3 107,700.00 b22PL
b22a 19 Agregat Kelas S m3 77,400.00 b22aPL
b23 20 Agregat Halus m3 102,700.00 b23PL
b24 21 Agr 5-10 & 10-15 m3 102,700.00 b24PL
b24a 22 Agr 5-10 m3 102,700.00 b24aPL
b25 23 Agr 0-5 m3 102,700.00 b25PL
b26 24 Filler kg 1,600.00 b26PL
b27 25 Asbuton Mikro kg 1,200.00 b27PL
b28 26 Solar Industri Ltr 10,200.00 b28PL
b41 27 Beton K-300 M3 1,320,200.00 b41PL
b42 28 Baja Tul (dowel) D32 Kg 12,300.00 b42PL
b43 29 Join sealent Kg 46,900.00 b43PL
b44 30 Cat anti karat Kg 102,600.00 b44PL
b45 31 Expantion cap M2 9,400.00 b45PL
b46 32 Poliatilin 125 mikron Kg 38,700.00 b46PL
b47 33 Curing compond Ltr 2,100.00 b47PL
b48 34 Multiplek 12 mm Lbr 206,800.00 b48PL
b49 35 Kayu acuan M3 1,705,200.00 b49PL
b50 36 Additive Ltr 57,700.00 b50PL
b56 37 Emulsi Buras Kg - b56PL
b57 38 Emulsi Prime coat Kg - b57PL
b58 39 Emulsi Tack coat Kg - b58PL
b63 40 Aspal CPHMA Ton - b63PL
DAFTAR HARGA SATUAN DASAR PERALATAN

PPK : PPK 1.2 Provinsi Banten


No. Paket Kontrak :
Nama Paket : Preservasi Jalan Serdang - Bojonegara - Merak
Prop / Kab / Kodya : Banten / Cilegon

NO URAIAN SAT HARGA SATUAN

a1 1 Excavator, 0.93 M3 Jam 398,058.54 a1PL


a2 2 Dump Truck, 10 Ton Jam 404,130.00 a2PL
a3 3 Bulldozer 15 Ton Jam 411,006.88 a3PL
a4 4 Vibro Roller 10 Ton Jam 345,898.64 a4PL
a5 5 Motor Grader Jam 339,207.16 a5PL
a6 6 Concrete Mixer hari 80,165.24 a6PL
a7 7 Concrete Vibrator hari 59,878.23 a7PL
a8 8 Truck Mixer Jam 437,595.90 a8PL
a9 9 Concrete paver Jam 551,382.55 a9PL
a10 10 Water Tank Truck Jam 204,742.50 a10PL
a11 11 AMP Jam 6,247,824.89 a11PL
a12 12 Genset 250 KVA Jam 271,624.95 a12PL
a13 13 Wheel Loader Jam 275,684.81 a13PL
a14 14 Asphat Distributor Jam 386,856.84 a14PL
a15 15 Air Compressor Jam 148,769.95 a15PL
a16 16 Asphat Finisher Jam 807,729.98 a16PL
a17 17 Tandem Roller Jam 350,000.00 a17PL
a18 18 Pneumatic Tyre Roller Jam 391,956.88 a18PL
a19 19 Yapcrane kap. 10 ton Jam 531,600.00 a19PL
a20 20 Alat Bantu Ls - a20PL
a21 21 Excavator Breacker Jam 425,294.38 a21PL
a22 22 Dump Truck, 5 Ton Jam 175,000.00 a22PL
a23 23 Batching Plant jam 805,320.00 a23PL
a24 24 Stamper Jam 62,281.84 a24PL
a25 25 Crane 10 - 15 Ton Jam 533,282.37 a25PL
a26 26 Asphalt Sprayer Jam 206,660.00 a26PL
a27 27 Blending Equipment Jam 248,950.74 a27PL
0.89

PL
Jumlah Vol
#N/A
#N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
-
-
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
-
#N/A #N/A
-
-
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A
#N/A #N/A
-
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
-
-
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
-
#N/A
#N/A
-
#N/A #N/A
#N/A #N/A
#N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
-
-
-
#N/A #N/A
#N/A #N/A
-
-
-
#N/A #N/A
1 2 34 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
ANALISA HARGA STUAN PEKERJAAN Tenaga Bahan Alat Vol Jumlah Harga
KDN KLN KDN KLN KDN KLN kode kode uba vol. realisasi
PEKERJAAN : Preservasi Jalan Surumana (Bts. Sulteng) - Pasang Kayu - Baras - Karossa (UMYC)
LOKASI : Banten/Serang

JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 1.17.(3g) RKJ #N/A Buah 320
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
a b c d e=cxd f=c-e
I UPAH / TENAGA :

u4 PL/PKD 1 Pekerja OH 0.0069 88,000.00 610.74 100.00 610.74 -


u1 PL/PKD 2 Mandor OH 0.0035 132,000.00 458.05 100.00 458.05 -

2.1.(1)
PL/PKD SUB JUMLAH I 1,068.79 1,068.79 - 4.00% 0.00% 0.00% 0.00% 72.00% 24.00% 100.00%

II BAHAN / MATERIAL :

2.1.(1)
PL/PKD SUB JUMLAH II - - -

III PERALATAN :
a1 PL/PKD 1 Excavator, 0.93 M3 Jam 0.0243 398,058.54 9,669.12 75.00 7,251.84 2,417.28 #N/A #N/A a a1PL/PKD
a22 PL/PKD 2 Dump Truck, 5 Ton Jam 0.0915 175,000.00 16,004.71 75.00 12,003.53 4,001.18 #N/A #N/A a a22PL/PKD

2.1.(1)
PL/PKD SUB JUMLAH III 25,673.83 19,255.37 6,418.46
2.1.(1) SUB JUMLAH ( I + II + III ) 26,742.62 20,324.17 6,418.46
PL/PKD IV LAIN - LAIN : 76.00% 24.00%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 1,069.70
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 1,604.56
SUB JUMLAH IV 2,674.26
JUMLAH HARGA ( I + II + III + IV ) 29,416.89 20,324.17 6,418.46
2.1.(1) PL/PKD HARGA SATUAN PEKERJAAN ( Dibulatkan ) 29,416.00 20,324.00 6,418.00

JENIS PEKERJAAN : Pasangan Batu dengan Mortar


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 2.2.(1) PL #N/A M3 626
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
DASAR (Rp) ( Rp. ) (Rp.)
OFISIEN
a b c d e=cxd f=c-e
I UPAH / TENAGA :

u4 PKD 1 Pekerja OH 1.4850 88,000.00 130,680.00 100.00 130,680.00 -


u3 PKD 2 Tukang OH 0.4500 110,000.00 49,500.00 100.00 49,500.00 -
u2 PKD 3 Kepala Tukang OH 0.0450 121,000.00 5,445.00 100.00 5,445.00 -
u1 PKD 4 Mandor OH 0.1350 132,000.00 17,820.00 100.00 17,820.00 -

2.2.(1) PKD SUB JUMLAH I 203,445.00 203,445.00 - 29.22% 0.00% 65.08% 3.77% 1.44% 0.48% 100.00%

II BAHAN / MATERIAL :
b5 PKD 1 Batu kali m3 1.2000 98,500.00 118,200.00 100.00 118,200.00 - #N/A #N/A b b5PKD
b3 PKD 2 Pasir m3 0.4850 78,200.00 37,927.00 100.00 37,927.00 - #N/A #N/A b b3PKD
b2 PKD 3 Semen kg 202.0000 1,600.00 323,200.00 91.87 296,923.84 26,276.16 #N/A #N/A PT. Tonasa b b2PKD

2.2.(1) PKD SUB JUMLAH II 479,327.00 453,050.84 26,276.16

III PERALATAN :
a6 PKD 1 Concrete Mixer hari 0.1670 80,165.24 13,387.59 75.00 10,040.70 3,346.90 #N/A #N/A a a6PKD

2.2.(1) PKD SUB JUMLAH III 13,387.59 10,040.70 3,346.90


SUB JUMLAH ( I + II + III ) 696,159.59 666,536.54 3,346.90
2.2.(1) PKD IV LAIN - LAIN : 95.74% 0.48%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 27,846.38
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 41,769.58
SUB JUMLAH IV 69,615.96
JUMLAH HARGA ( I + II + III + IV ) 765,775.55 666,536.54 3,346.90
2.2.(1) PKD HARGA SATUAN PEKERJAAN ( Dibulatkan ) 765,775.00 666,536.00 3,346.00
JENIS PEKERJAAN : Saluran berbentuk U Tipe DS 4a (dengan tutup)
SATUAN / UNIT : M1
NOMOR PEMBAYARAN : 2.3.(29) PL #N/A M1 -

JENIS PEKERJAAN : Err:509


SATUAN / UNIT : Err:509
NOMOR PEMBAYARAN : Err:509 Err:509 Err:509 Err:509 Err:509

JENIS PEKERJAAN : 0
SATUAN / UNIT : 0
NOMOR PEMBAYARAN : 0 - - - -

JENIS PEKERJAAN : Galian Biasa


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 3.1.(1) PL #N/A M3 19,570
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e

u4 PL 1 Pekerja OH 0.0060 88,000.00 530.10 100.00 530.10 -


u1 PL 2 Mandor OH 0.0030 132,000.00 397.58 100.00 397.58 -

3.1.(1) PL SUB JUMLAH I 927.68 927.68 - 4.37% 0.00% 0.00% 0.00% 71.72% 23.91% 100.00%

II BAHAN / MATERIAL :

3.1.(1) PL SUB JUMLAH II - - -

III PERALATAN :
a1 PL 1 Excavator, 0.93 M3 Jam 0.0211 398,058.54 8,392.55 75.00 6,294.41 2,098.14 #N/A #N/A a a1PL
a22 PL 2 Dump Truck, 5 Ton Jam 0.0681 175,000.00 11,914.80 75.00 8,936.10 2,978.70 #N/A #N/A a a22PL

3.1.(1) PL SUB JUMLAH III 20,307.34 15,230.51 5,076.84


SUB JUMLAH ( I + II + III ) 21,235.03 16,158.19 5,076.84
3.1.(1) PL IV LAIN - LAIN : 76.09% 23.91%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 849.40
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 1,274.10
SUB JUMLAH IV 2,123.50
JUMLAH HARGA ( I + II + III + IV ) 23,358.53 16,158.19 5,076.84
3.1.(1) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 23,358.00 16,158.00 5,076.00
JENIS PEKERJAAN : Galian Batu
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : =

JENIS PEKERJAAN : Galian Struktur dengan kedalaman 0 - 2 meter (+ pengukuran patok)


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 3.1.(4) #N/A #N/A #N/A #N/A

JENIS PEKERJAAN : Galian Struktur dengan kedalaman 2 - 4 meter


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 3.1.(5) #N/A #N/A #N/A #N/A

JENIS PEKERJAAN : Galian Perkerasan Beraspal dengan Cold Milling Machine


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 3.1.(7) PL #N/A M3 -

JENIS PEKERJAAN : Galian Perkerasan berbutir


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 3.1.(9) #N/A #N/A #N/A #N/A

JENIS PEKERJAAN : Timbunan Biasa dari sumber galian


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 3.2.(1b) #N/A #N/A #N/A #N/A
HARGA SATUAN HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K DASAR (Rp)
OFISIEN ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e

u4 PL 1 Pekerja OH 0.0314 88,000.00 2,759.86 100.00 2,759.86 -


u1 PL 2 Mandor OH 0.0105 132,000.00 1,379.93 100.00 1,379.93 -

3.2.(1b) PL SUB JUMLAH I 4,139.78 4,139.78 - 15.15% 0.00% 0.00% 0.00% 63.64% 21.21% 100.00%

II BAHAN / MATERIAL :
b1 PL 1 Tanah timbunan m3 - 68,600.00 - #N/A #N/A b b1PL #N/A

3.2.(1b) PL SUB JUMLAH II - - -

III PERALATAN :
a1 PL 1 Excavator, 0.93 M3 Jam 0.0105 398,058.54 4,161.30 75.00 3,120.98 1,040.33 #N/A #N/A a a1PL
a22 PL 2 Dump Truck, 5 Ton Jam 0.0871 175,000.00 15,240.96 75.00 11,430.72 3,810.24 #N/A #N/A a a22PL
a5 PL 3 Motor Grader Jam 0.0027 339,207.16 906.00 75.00 679.50 226.50 #N/A #N/A a a5PL
a4 PL 4 Vibro Roller 10 Ton Jam 0.0042 345,898.64 1,447.03 75.00 1,085.27 361.76 #N/A #N/A a a4PL
a10 PL 5 Water Tank Truck Jam 0.0070 204,742.50 1,438.95 75.00 1,079.21 359.74 #N/A #N/A a a10PL
a20 PL a a20PL

3.2.(1b) PL SUB JUMLAH III 23,194.26 17,395.69 5,798.56


SUB JUMLAH ( I + II + III ) 27,334.04 21,535.48 5,798.56
3.2.(1b) PL IV LAIN - LAIN : 78.79% 21.21%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 1,093.36
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 1,640.04
SUB JUMLAH IV 2,733.40
JUMLAH HARGA ( I + II + III + IV ) 30,067.45 21,535.48 5,798.56
3.2.(1b) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 30,067.00 21,535.00 5,798.00
JENIS PEKERJAAN : Timbunan Pilihan dari Sumber Galian
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 3.2.(2a) PL #N/A M3 1,061
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e

u4 PL 1 Pekerja OH 0.0403 88,000.00 3,546.80 100.00 3,546.80 -


u1 PL 2 Mandor OH 0.0101 132,000.00 1,330.05 100.00 1,330.05 -

3.2.(2a) PL SUB JUMLAH I 4,876.86 4,876.86 - 2.40% 0.00% 36.12% 0.00% 46.11% 15.37% 100.00%

II BAHAN / MATERIAL :
b19 PL 1 Timbunan Pilihan m3 1.1550 63,600.00 73,458.00 100.00 73,458.00 - #N/A #N/A b b19PL 1,226

3.2.(2a) PL SUB JUMLAH II 73,458.00 73,458.00 -

III PERALATAN :
a1 PL 1 Excavator, 0.93 M3 Jam 0.0101 398,058.54 4,010.90 75.00 3,008.17 1,002.72 #N/A #N/A a a1PL
a22 PL 2 Dump Truck, 5 Ton Jam 0.6677 175,000.00 116,847.39 75.00 87,635.54 29,211.85 #N/A #N/A a a22PL
a5 PL 3 Motor Grader Jam 0.0037 339,207.16 1,268.40 75.00 951.30 317.10 #N/A #N/A a a5PL
a4 PL 4 Vibro Roller 10 Ton Jam 0.0042 345,898.64 1,447.03 75.00 1,085.27 361.76 #N/A #N/A a a4PL
a10 PL 5 Water Tank Truck Jam 0.0070 204,742.50 1,438.95 75.00 1,079.21 359.74 #N/A #N/A a a10PL

3.2.(2a) PL SUB JUMLAH III 125,012.67 93,759.51 31,253.17


SUB JUMLAH ( I + II + III ) 203,347.53 172,094.36 31,253.17
3.2.(2a) PL IV LAIN - LAIN : 84.63% 15.37%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 8,133.90
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 12,200.85
SUB JUMLAH IV 20,334.75
JUMLAH HARGA ( I + II + III + IV ) 223,682.28 172,094.36 31,253.17
3.2.(2a) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 223,682.00 172,094.00 31,253.00
JENIS PEKERJAAN : Lapis Tipis Beton Aspal - B Kasar (LTBA-B Kasar)
SATUAN / UNIT : Ton
NOMOR PEMBAYARAN : 4.7.(3) #N/A #N/A #N/A #N/A
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
a b c d e=cxd f=c-e
I UPAH / TENAGA :

u4 PL 1 Pekerja OH 0.3125 88,000.00 27,500.00 100.00 27,500.00 -


u1 PL 2 Mandor OH 0.0208 132,000.00 2,750.00 100.00 2,750.00 -

4.7.(3) PL SUB JUMLAH I 30,250.00 30,250.00 - 3.08% 0.00% 28.31% 38.85% 22.32% 7.44% 100.00%

II BAHAN / MATERIAL :
b24a PL 1 Agr 5-10 m3 0.3268 102,700.00 33,565.54 100.00 33,565.54 - #N/A #N/A Lokal b b24aPL #N/A
b25 PL 2 Agr 0-5 m3 0.3360 102,700.00 34,507.20 100.00 34,507.20 - #N/A #N/A Lokal b b25PL #N/A
b26 PL 3 Filler kg 18.9000 1,600.00 30,240.00 91.87 27,781.49 2,458.51 #N/A #N/A PT. Tonasa b b26PL #N/A
b7 PL 4 Aspal kg 61.8000 9,100.00 562,380.00 32.48 182,661.02 379,718.98 #N/A #N/A PT. Pertamina b b7PL #N/A

4.7.(3) PL SUB JUMLAH II 660,692.74 278,515.25 382,177.49

III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0154 275,684.81 4,256.90 75.00 3,192.67 1,064.22 #N/A #N/A sewa a a13PL
a11 PL 2 AMP Jam 0.0208 6,247,824.89 130,163.02 75.00 97,622.26 32,540.75 #N/A #N/A sewa a a11PL
a12 PL 3 Genset 250 KVA Jam 0.0208 271,624.95 5,658.85 75.00 4,244.14 1,414.71 #N/A #N/A sewa a a12PL
a2 PL 4 Dump Truck, 10 Ton Jam 0.2941 404,130.00 118,861.76 75.00 89,146.32 29,715.44 #N/A #N/A sewa a a2PL
a16 PL 5 Asphat Finisher Jam 0.0189 807,729.98 15,242.49 75.00 11,431.87 3,810.62 #N/A #N/A sewa a a16PL
a17 PL 6 Tandem Roller Jam 0.0354 350,000.00 12,387.98 75.00 9,290.98 3,096.99 #N/A #N/A sewa a a17PL
a18 PL 7 Pneumatic Tyre Roller Jam 0.0158 391,956.88 6,190.57 75.00 4,642.93 1,547.64 #N/A #N/A sewa a a18PL

4.7.(3) PL SUB JUMLAH III 292,761.57 219,571.18 73,190.39


SUB JUMLAH ( I + II + III ) 983,704.31 528,336.43 455,367.88
4.7.(3) PL IV LAIN - LAIN : 53.71% 46.29%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 39,348.17
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 59,022.26
SUB JUMLAH IV 98,370.43
JUMLAH HARGA ( I + II + III + IV ) 1,082,074.74 528,336.43 455,367.88
4.7.(3) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 1,082,074.00 528,336.00 455,367.00

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 5.1.(1) PL #N/A M3 21,481
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e

u4 PL 1 Pekerja OH 0.0375 88,000.00 3,298.53 100.00 3,298.53 -


u1 PL 2 Mandor OH 0.0054 132,000.00 706.83 100.00 706.83 -

5.1.(1) PL SUB JUMLAH I 4,005.35 4,005.35 - 1.43% 0.00% 45.84% 0.00% 39.55% 13.18% 100.00%

II BAHAN / MATERIAL :
b22 PL 1 Agregat Kelas A m3 1.1903 107,700.00 128,197.74 100.00 128,197.74 - #N/A #N/A b b22PL

5.1.(1) PL SUB JUMLAH II 128,197.74 128,197.74 -

III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0082 275,684.81 2,268.96 75.00 1,701.72 567.24 #N/A #N/A a a13PL 177
a22 PL 2 Dump Truck, 5 Ton Jam 0.7298 175,000.00 127,715.75 75.00 95,786.81 31,928.94 #N/A #N/A a a22PL 15,677
a5 PL 3 Motor Grader Jam 0.0021 339,207.16 722.42 75.00 541.82 180.61 #N/A #N/A a a5PL 46
a17 PL 4 Tandem Roller Jam 0.0054 350,000.00 1,874.16 75.00 1,405.62 468.54 #N/A #N/A a a17PL 115
a10 PL 5 Water Tank Truck Jam 0.0141 204,742.50 2,877.91 75.00 2,158.43 719.48 #N/A #N/A a a10PL 302
a27 PL 6 Blending Equipment Jam 0.0482 248,950.74 11,997.63 75.00 8,998.22 2,999.41 #N/A #N/A a a27PL 1,035

5.1.(1) PL SUB JUMLAH III 147,456.83 110,592.62 36,864.21


SUB JUMLAH ( I + II + III ) 279,659.92 242,795.72 36,864.21
5.1.(1) PL IV LAIN - LAIN : 86.82% 13.18%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 11,186.40
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 16,779.60
SUB JUMLAH IV 27,965.99
JUMLAH HARGA ( I + II + III + IV ) 307,625.92 242,795.72 36,864.21
5.1.(1) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 307,625.00 242,795.00 36,864.00
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas S
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 3.4.(3) PL #N/A buah 3,776
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e

u4 PL 1 Pekerja OH 0.0865 88,000.00 7,611.99 100.00 7,611.99 -


u1 PL 2 Mandor OH 0.0124 132,000.00 1,631.14 100.00 1,631.14 -

5.1.(3a) PL SUB JUMLAH I 9,243.13 9,243.13 - 4.08% 0.00% 40.68% 0.00% 41.43% 13.81% 100.00%

II BAHAN / MATERIAL :
b22a PL 1 Agregat Kelas S m3 1.1903 77,400.00 92,130.97 100.00 92,130.97 - #N/A #N/A b b22aPL

5.1.(3a) PL SUB JUMLAH II 92,130.97 92,130.97 -

III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0073 275,684.81 2,016.85 75.00 1,512.64 504.21 #N/A #N/A a a13PL
a22 PL 2 Dump Truck, 5 Ton Jam 0.6527 175,000.00 114,226.73 75.00 85,670.05 28,556.68 #N/A #N/A a a22PL
a5 PL 3 Motor Grader Jam 0.0049 339,207.16 1,667.12 75.00 1,250.34 416.78 #N/A #N/A a a5PL
a17 PL 4 Tandem Roller Jam 0.0124 350,000.00 4,324.99 75.00 3,243.74 1,081.25 #N/A #N/A a a17PL
a10 PL 5 Water Tank Truck Jam 0.0141 204,742.50 2,877.91 75.00 2,158.43 719.48 #N/A #N/A a a10PL

5.1.(3a) PL SUB JUMLAH III 125,113.60 93,835.20 31,278.40


SUB JUMLAH ( I + II + III ) 226,487.70 195,209.30 31,278.40
5.1.(3a) PL IV LAIN - LAIN : 86.19% 13.81%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 9,059.51
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 13,589.26
SUB JUMLAH IV 22,648.77
JUMLAH HARGA ( I + II + III + IV ) 249,136.47 195,209.30 31,278.40
5.1.(3a) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 249,136.00 195,209.00 31,278.00

JENIS PEKERJAAN : Perkerasan Jalan Beton Semen Untuk Pembukaan Lalu Lintas Umur Beton Lebih dari 3 hari kurang dar
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : SKh 1.5.3.( #N/A #N/A #N/A #N/A
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e

u4 PL 1 Pekerja OH 0.7530 88,000.00 66,265.06 100.00 66,265.06 -


u3 PL 2 Tukang OH 0.2510 110,000.00 27,610.44 100.00 27,610.44 -
u1 PL 3 Mandor OH 0.0502 132,000.00 6,626.51 100.00 6,626.51 -

5.3.(1.a) PL SUB JUMLAH I 100,502.01 100,502.01 - 6.77% 0.00% 67.20% 13.12% 9.79% 3.13% 100.00%

II BAHAN / MATERIAL :
b2 PL 1 Semen kg 410.0000 1,600.00 656,000.00 91.87 602,667.20 53,332.80 #N/A #N/A PT. Tonasa b b2PL #N/A
b3 PL 2 Pasir m3 0.6237 78,200.00 48,771.23 100.00 48,771.23 - #N/A #N/A b b3PL #N/A
b4 PL 3 Batu pecah m3 0.7360 102,700.00 75,582.07 100.00 75,582.07 - #N/A #N/A b b4PL #N/A
b42 PL 4 Baja Tul (dowel) D32 Kg 15.7750 12,300.00 194,032.50 51.47 99,868.53 94,163.97 #N/A #N/A b b42PL #N/A
b43 PL 5 Join sealent Kg 0.9653 46,900.00 45,270.56 38.33 17,352.21 27,918.35 #N/A #N/A b b43PL #N/A
b44 PL 6 Cat anti karat Kg 0.0200 102,600.00 2,052.00 21.20 435.02 1,616.98 #N/A #N/A b b44PL #N/A
b45 PL 7 Expantion cap M2 0.1700 9,400.00 1,598.00 100.00 1,598.00 - #N/A #N/A b b45PL #N/A
b46 PL 8 Poliatilin 125 mikron Kg 0.4375 38,700.00 16,931.25 75.00 12,698.44 4,232.81 #N/A #N/A b b46PL #N/A
b47 PL 9 Curing compond Ltr 0.8700 2,100.00 1,827.00 75.00 1,370.25 456.75 #N/A #N/A b b47PL #N/A
b48 PL 10 Multiplek 12 mm Lbr 0.1600 206,800.00 33,088.00 100.00 33,088.00 - #N/A #N/A b b48PL #N/A
b49 PL 11 Kayu acuan M3 0.0192 1,705,200.00 32,739.84 100.00 32,739.84 - #N/A #N/A b b49PL #N/A
b11 PL 12 Paku kg 1.0240 31,700.00 32,460.80 100.00 32,460.80 - #N/A #N/A b b11PL #N/A
b50 PL 13 Additive Ltr 0.9139 57,700.00 52,733.18 75.00 39,549.89 13,183.30 #N/A #N/A b b50PL #N/A

5.3.(1.a) PL SUB JUMLAH II 1,193,086.43 998,181.47 194,904.96

III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0236 275,684.81 6,512.75 75.00 4,884.56 1,628.19 #N/A #N/A a a13PL
a23 PL 2 Batching Plant jam 0.0502 805,320.00 40,427.71 75.00 30,320.78 10,106.93 #N/A #N/A a a23PL
a8 PL 3 Truck Mixer Jam 0.2919 437,595.90 127,741.98 75.00 95,806.48 31,935.49 #N/A #N/A a a8PL
a7 PL 4 Concrete Vibrator hari 0.0400 59,878.23 2,395.13 75.00 1,796.35 598.78 #N/A #N/A a a7PL
a10 PL 5 Water Tank Truck Jam 0.0422 204,742.50 8,633.72 75.00 6,475.29 2,158.43 #N/A #N/A a a10PL
a9 PL 7 Concrete paver Jam 0.0112 551,382.55 6,151.08 100.00 6,151.08 - #N/A #N/A a a9PL

5.3.(1.a) PL SUB JUMLAH III 191,862.37 145,434.54 46,427.82


SUB JUMLAH ( I + II + III ) 1,485,450.81 1,244,118.02 241,332.78
5.3.(1.a) PL IV LAIN - LAIN : 83.75% 16.25%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 59,418.03
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 89,127.05
SUB JUMLAH IV 148,545.08
JUMLAH HARGA ( I + II + III + IV ) 1,633,995.89 1,244,118.02 241,332.78
5.3.(1.a) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 1,633,995.00 1,244,118.00 241,332.00
JENIS PEKERJAAN : Lapis Pondasi bawah Beton Kurus (Concrete Vibrator)
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 5.3.(3) PL #N/A M3 -
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e

u4 PL 1 Pekerja OH 0.7530 88,000.00 66,265.06 100.00 66,265.06 -


u3 PL 2 Tukang OH 0.4016 110,000.00 44,176.71 100.00 44,176.71 -
u1 PL 3 Mandor OH 0.1004 132,000.00 13,253.01 100.00 13,253.01 -

5.3.(3) PL SUB JUMLAH I 123,694.78 123,694.78 - 14.10% 0.00% 62.24% 3.80% 14.96% 4.91% 100.00%

II BAHAN / MATERIAL :
b2 PL 1 Semen kg 256.2500 1,600.00 410,000.00 91.87 376,667.00 33,333.00 #N/A #N/A PT. Tonasa b b2PL -
b3 PL 2 Pasir m3 0.4991 78,200.00 39,029.32 100.00 39,029.32 - #N/A #N/A b b3PL -
b20 PL 3 Sirtu saring m3 0.8248 68,600.00 56,580.14 100.00 56,580.14 - #N/A #N/A b b20PL -
b48 PL 4 Multiplek 12 mm Lbr 0.1600 206,800.00 33,088.00 100.00 33,088.00 - #N/A #N/A b b48PL -
b49 PL 5 Kayu acuan M3 0.0192 1,705,200.00 32,739.84 100.00 32,739.84 - #N/A #N/A b b49PL -
b11 PL 6 Paku kg 0.2500 31,700.00 7,925.00 100.00 7,925.00 - #N/A #N/A b b11PL -

5.3.(3) PL SUB JUMLAH II 579,362.30 546,029.30 33,333.00

III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0244 275,684.81 6,729.84 75.00 5,047.38 1,682.46 #N/A #N/A a a13PL
a23 PL 2 Batching Plant jam 0.0502 805,320.00 40,427.71 75.00 30,320.78 10,106.93 #N/A #N/A a a23PL
a8 PL 3 Truck Mixer Jam 0.2607 437,595.90 114,067.10 75.00 85,550.33 28,516.78 #N/A #N/A a a8PL
a7 PL 4 Concrete Vibrator hari 0.0400 59,878.23 2,395.13 75.00 1,796.35 598.78 #N/A #N/A a a7PL
a10 PL 5 Water Tank Truck Jam 0.0422 204,742.50 8,633.72 75.00 6,475.29 2,158.43 #N/A #N/A a a10PL
a9 PL 6 Concrete paver Jam 0.0037 551,382.55 2,050.36 100.00 2,050.36 - #N/A #N/A a a9PL

5.3.(3) PL SUB JUMLAH III 174,303.87 131,240.49 43,063.38


SUB JUMLAH ( I + II + III ) 877,360.94 800,964.57 76,396.38
5.3.(3) PL IV LAIN - LAIN : 91.29% 8.71%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 35,094.44
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 52,641.66
SUB JUMLAH IV 87,736.09
JUMLAH HARGA ( I + II + III + IV ) 965,097.04 800,964.57 76,396.38
5.3.(3) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 965,097.00 800,964.00 76,396.00
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair
SATUAN / UNIT : Liter
NOMOR PEMBAYARAN : 6.1 (1) PL #N/A Liter 39,042
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e

u4 PL 1 Pekerja OH 0.0104 88,000.00 916.67 100.00 916.67 -


u1 PL 2 Mandor OH 0.0021 132,000.00 275.00 100.00 275.00 -

6.1 (1) PL SUB JUMLAH I 1,191.67 1,191.67 - 9.56% 0.00% 53.43% 32.54% 3.36% 1.12% 100.00%

II BAHAN / MATERIAL :
b57 PL 1 Emulsi Prime coat Kg - - - 100.00 - - #N/A #N/A b b57PL -
b7 PL 2 Aspal kg 0.6600 9,100.00 6,006.00 32.48 1,950.75 4,055.25 #N/A #N/A PT. Pertamina b b7PL 25,768
b8 PL 2 Minyak tanah ltr 0.4400 10,700.00 4,708.00 100.00 4,708.00 - #N/A #N/A b b8PL 17,178

6.1 (1) PL SUB JUMLAH II 10,714.00 6,658.75 4,055.25

III PERALATAN :
a14 PL 1 Asphat Distributor Jam 0.0010 386,856.84 402.98 75.00 302.23 100.74 #N/A #N/A a a14PL
a15 PL 2 Air Compressor Jam 0.0010 148,769.95 154.97 75.00 116.23 38.74 #N/A #N/A a a15PL

6.1 (1) PL SUB JUMLAH III 557.94 418.46 139.49


SUB JUMLAH ( I + II + III ) 12,463.61 8,268.87 4,194.74
6.1 (1) PL IV LAIN - LAIN : 66.34% 33.66%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 498.54
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 747.82
SUB JUMLAH IV 1,246.36
JUMLAH HARGA ( I + II + III + IV ) 13,709.97 8,268.87 4,194.74
6.1 (1) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 13,709.00 8,268.00 4,194.00
JENIS PEKERJAAN : Lapis Perekat - Aspal Cair
SATUAN / UNIT : Liter
NOMOR PEMBAYARAN : 6.1 (2a) PL #N/A Liter 39,354
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e

u4 PL 1 Pekerja OH 0.0104 88,000.00 916.67 100.00 916.67 -


u1 PL 2 Mandor OH 0.0021 132,000.00 275.00 100.00 275.00 -

6.1 (2a) PL SUB JUMLAH I 1,191.67 1,191.67 - 9.84% 0.00% 40.91% 44.64% 3.46% 1.15% 100.00%

II BAHAN / MATERIAL :
b58 PL 1 Emulsi Tack coat Kg - - - 100.00 - - #N/A #N/A b b58PL -
b7 PL 2 Aspal kg 0.8800 9,100.00 8,008.00 32.48 2,601.00 5,407.00 #N/A #N/A PT. Pertamina b b7PL 34,631
b8 PL 2 Minyak tanah ltr 0.2200 10,700.00 2,354.00 100.00 2,354.00 - #N/A #N/A b b8PL 8,658

6.1 (2a) PL SUB JUMLAH II 10,362.00 4,955.00 5,407.00

III PERALATAN :
a14 PL 1 Asphat Distributor Jam 0.0010 386,856.84 402.98 75.00 302.23 100.74 #N/A #N/A a a14PL
a15 PL 2 Air Compressor Jam 0.0010 148,769.95 154.97 75.00 116.23 38.74 #N/A #N/A a a15PL

6.1 (2a) PL SUB JUMLAH III 557.94 418.46 139.49


SUB JUMLAH ( I + II + III ) 12,111.61 6,565.12 5,546.49
6.1 (2a) PL IV LAIN - LAIN : 54.21% 45.79%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 484.46
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 726.70
SUB JUMLAH IV 1,211.16
JUMLAH HARGA ( I + II + III + IV ) 13,322.77 6,565.12 5,546.49
6.1 (2a) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 13,322.00 6,565.00 5,546.00
JENIS PEKERJAAN : Bahan anti pengelupasan
SATUAN / UNIT : Kg
NOMOR PEMBAYARAN : 6.3.(8) PL #N/A Kg 12,154

JENIS PEKERJAAN : Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir)
SATUAN / UNIT : Ton
NOMOR PEMBAYARAN : 6.5.(1b) #N/A #N/A #N/A #N/A
HARGA SATUAN HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K DASAR (Rp)
OFISIEN ( Rp. ) (Rp.)
d e=cxd f=c-e
I UPAH / TENAGA :

u4 PL 1 Pekerja OH 0.3922 88,000.00 34,509.80 100.00 34,509.80 -


u1 PL 2 Mandor OH 0.0196 132,000.00 2,588.24 100.00 2,588.24 -

6.5.(1b) PL SUB JUMLAH I 37,098.04 37,098.04 - 3.90% 0.00% 32.24% 31.50% 24.27% 8.09% 100.00%

II BAHAN / MATERIAL :
b25 PL 1 Agr 0-5 m3 0.2841 102,700.00 29,181.29 100.00 29,181.29 - #N/A #N/A Lokal b b25PL #N/A
b23 PL 2 Agregat Halus m3 0.3292 102,700.00 33,808.73 100.00 33,808.73 - #N/A #N/A Lokal b b23PL #N/A
b26 PL 3 Filler kg 8.9760 1,600.00 14,361.60 91.87 13,194.00 1,167.60 #N/A #N/A PT. Tonasa b b26PL #N/A
b7 PL 4 Aspal kg 47.2770 9,100.00 430,220.70 32.48 139,735.68 290,485.02 #N/A #N/A PT. Pertamina b b7PL #N/A
b27 PL 5 Asbuton Mikro kg 82.1100 1,200.00 98,532.00 91.99 90,639.59 7,892.41 #N/A #N/A PT. Asbuton Jaya Abadi b b27PL #N/A

6.5.(1b) PL SUB JUMLAH II 606,104.32 306,559.29 299,545.03

III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0176 275,684.81 4,843.86 75.00 3,632.89 1,210.96 #N/A #N/A Sewa a a13PL
a11 PL 2 AMP Jam 0.0196 6,247,824.89 122,506.37 75.00 91,879.78 30,626.59 #N/A #N/A Sewa a a11PL
a12 PL 3 Genset 250 KVA Jam 0.0196 271,624.95 5,325.98 75.00 3,994.48 1,331.49 #N/A #N/A Sewa a a12PL
a2 PL 4 Dump Truck, 10 Ton Jam 0.3292 404,130.00 133,045.94 75.00 99,784.45 33,261.48 #N/A #N/A Sewa a a2PL
a16 PL 5 Asphat Finisher Jam 0.0301 807,729.98 24,329.22 75.00 18,246.91 6,082.30 #N/A #N/A Sewa a a16PL
a17 PL 6 Tandem Roller Jam 0.0279 350,000.00 9,778.24 75.00 7,333.68 2,444.56 #N/A #N/A Sewa a a17PL
a18 PL 7 Pneumatic Tyre Roller Jam 0.0200 391,956.88 7,821.73 75.00 5,866.30 1,955.43 #N/A #N/A Sewa a a18PL

6.5.(1b) PL SUB JUMLAH III 307,651.34 230,738.50 76,912.83


SUB JUMLAH ( I + II + III ) 950,853.70 574,395.83 376,457.86
6.5.(1b) PL IV LAIN - LAIN : 60.41% 39.59%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 38,034.15
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 57,051.22
SUB JUMLAH IV 95,085.37
JUMLAH HARGA ( I + II + III + IV ) 1,045,939.07 574,395.83 376,457.86
6.5.(1b) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 1,045,939.00 574,395.00 376,457.00
JENIS PEKERJAAN : Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir)
SATUAN / UNIT : Ton
NOMOR PEMBAYARAN : 6.5.(2b) #N/A #N/A #N/A #N/A
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e

u4 PL 1 Pekerja OH 0.4016 88,000.00 35,341.37 100.00 35,341.37 -


u1 PL 2 Mandor OH 0.0201 132,000.00 2,650.60 100.00 2,650.60 -

6.5.(2b) PL SUB JUMLAH I 37,991.97 37,991.97 - 4.23% 0.00% 33.82% 29.18% 24.58% 8.19% 100.00%

II BAHAN / MATERIAL :
b25 PL 1 Agr 0-5 m3 0.2935 102,700.00 30,142.00 100.00 30,142.00 - #N/A #N/A b b25PL #N/A
b23 PL 2 Agregat Halus m3 0.3461 102,700.00 35,545.19 100.00 35,545.19 - #N/A #N/A b b23PL #N/A
b26 PL 3 Filler kg 8.9908 1,600.00 14,385.32 91.87 13,215.80 1,169.53 #N/A #N/A PT. Tonasa b b26PL #N/A
b7 PL 4 Aspal kg 40.9734 9,100.00 372,857.94 32.48 121,104.26 251,753.68 #N/A #N/A PT. Pertamina b b7PL #N/A
b27 PL 5 Asbuton Mikro kg 93.8400 1,200.00 112,608.00 91.99 103,588.10 9,019.90 #N/A #N/A PT. Asbuton Jaya Abadi b b27PL #N/A

6.5.(2b) PL SUB JUMLAH II 565,538.46 303,595.35 261,943.11

III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0184 275,684.81 5,074.52 75.00 3,805.89 1,268.63 #N/A #N/A a a13PL
a11 PL 2 AMP Jam 0.0201 6,247,824.89 125,458.33 75.00 94,093.75 31,364.58 #N/A #N/A a a11PL
a12 PL 3 Genset 250 KVA Jam 0.0201 271,624.95 5,454.32 75.00 4,090.74 1,363.58 #N/A #N/A a a12PL
a2 PL 4 Dump Truck, 10 Ton Jam 0.2952 404,130.00 119,293.70 75.00 89,470.28 29,823.43 #N/A #N/A a a2PL
a16 PL 5 Asphat Finisher Jam 0.0301 807,729.98 24,329.22 75.00 18,246.91 6,082.30 #N/A #N/A a a16PL
a17 PL 6 Tandem Roller Jam 0.0233 350,000.00 8,148.54 75.00 6,111.40 2,037.13 #N/A #N/A a a17PL
a18 PL 7 Pneumatic Tyre Roller Jam 0.0166 391,956.88 6,518.11 75.00 4,888.58 1,629.53 #N/A #N/A a a18PL

6.5.(2b) PL SUB JUMLAH III 294,276.74 220,707.55 73,569.18


SUB JUMLAH ( I + II + III ) 897,807.16 562,294.87 335,512.29
6.5.(2b) PL IV LAIN - LAIN : 62.63% 37.37%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 35,912.29
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 53,868.43
SUB JUMLAH IV 89,780.72
JUMLAH HARGA ( I + II + III + IV ) 987,587.88 562,294.87 335,512.29
6.5.(2b) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 987,587.00 562,294.00 335,512.00
JENIS PEKERJAAN : Lapis Penetrasi Macadam
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 6.7.(1) #N/A #N/A #N/A #N/A
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e

u4 PL 1 Pekerja OH 7.2289 88,000.00 636,144.58 100.00 636,144.58 -


u1 PL 2 Mandor OH 0.6024 132,000.00 79,518.07 100.00 79,518.07 -

6.7.(1) PL SUB JUMLAH I 715,662.65 715,662.65 - 34.59% 0.00% 20.71% 24.95% 14.82% 4.94% 100.00%

II BAHAN / MATERIAL :
b24a PL 1 Agr 5-10 m3 1.2138 102,700.00 124,656.55 100.00 124,656.55 - #N/A #N/A b b24aPL #N/A
b25 PL 2 Agr 0-5 m3 0.3793 102,700.00 38,955.17 100.00 38,955.17 - #N/A #N/A b b25PL #N/A
b3 PL 3 Pasir m3 0.2124 78,200.00 16,610.76 100.00 16,610.76 - #N/A #N/A b b3PL #N/A
b7 PL 4 Aspal kg 84.0000 9,100.00 764,400.00 32.48 248,277.12 516,122.88 #N/A #N/A PT. Pertamina b b7PL #N/A

6.7.(1) PL SUB JUMLAH II 944,622.48 428,499.60 516,122.88

III PERALATAN :
a13 PL 1 Wheel Loader Jam 0.0094 275,684.81 2,605.10 75.00 1,953.83 651.28 #N/A #N/A a a13PL
a2 PL 2 Dump Truck, 10 Ton Jam 0.3743 404,130.00 151,270.69 75.00 113,453.02 37,817.67 #N/A #N/A a a2PL
a3 PL 3 Bulldozer 15 Ton Jam - #N/A #N/A a a3PL
a17 PL 4 Tandem Roller Jam 0.0623 350,000.00 21,811.38 75.00 16,358.54 5,452.85 #N/A #N/A a a17PL
a14 PL 5 Asphat Distributor Jam 0.6024 386,856.84 233,046.29 75.00 174,784.72 58,261.57 #N/A #N/A a a14PL

6.7.(1) PL SUB JUMLAH III 408,733.46 306,550.10 102,183.37


SUB JUMLAH ( I + II + III ) 2,069,018.59 1,450,712.35 618,306.25
6.7.(1) PL IV LAIN - LAIN : 70.12% 29.88%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 82,760.74
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 124,141.12
SUB JUMLAH IV 206,901.86
JUMLAH HARGA ( I + II + III + IV ) 2,275,920.45 1,450,712.35 618,306.25
6.7.(1) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 2,275,920.00 1,450,712.00 618,306.00

2,284,350.00
(8,430.00)
JENIS PEKERJAAN : Beton Struktur, fc30 Mpa
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 7.1 (5a) PL #N/A M3 75
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e

u4 PL 1 Pekerja OH 1.1714 88,000.00 103,078.98 100.00 103,078.98 -


u3 PL 2 Tukang OH 0.5020 110,000.00 55,220.88 100.00 55,220.88 -
u1 PL 3 Mandor OH 0.1673 132,000.00 22,088.35 100.00 22,088.35 -

7.1 (5a) PL SUB JUMLAH I 180,388.22 180,388.22 - 12.54% 0.00% 59.33% 4.15% 17.99% 6.00% 100.00%

II BAHAN / MATERIAL :
b2 PL 1 Semen kg 459.0000 1,600.00 734,400.00 91.87 674,693.28 59,706.72 #N/A #N/A PT. Tonasa b b2PL 34,212
b3 PL 2 Pasir m3 0.4571 78,200.00 35,744.89 100.00 35,744.89 - #N/A #N/A b b3PL 34
b25 PL 3 Agr 0-5 m3 0.7171 102,700.00 73,642.32 100.00 73,642.32 - #N/A #N/A b b25PL 53
b49 PL 4 Kayu acuan M3 0.0175 1,705,200.00 29,841.00 100.00 29,841.00 - #N/A #N/A b b49PL 1
b11 PL 5 Paku kg 1.2500 31,700.00 39,625.00 100.00 39,625.00 - #N/A #N/A b b11PL 93

7.1 (5a) PL SUB JUMLAH II 913,253.21 853,546.49 59,706.72

III PERALATAN :
a23 PL 1 Batching Plant jam 0.1673 805,320.00 134,759.04 75.00 101,069.28 33,689.76 #N/A #N/A a a23PL
a8 PL 2 Truck Mixer Jam 0.4627 437,595.90 202,455.42 75.00 151,841.56 50,613.85 #N/A #N/A a a8PL
a10 PL 3 Water Tank Truck Jam 0.0382 204,742.50 7,811.46 75.00 5,858.60 1,952.87 #N/A #N/A a a10PL

7.1 (5a) PL SUB JUMLAH III 345,025.92 258,769.44 86,256.48


SUB JUMLAH ( I + II + III ) 1,438,667.35 1,292,704.15 145,963.20
7.1 (5a) PL IV LAIN - LAIN : 89.85% 10.15%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 57,546.69
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 86,320.04
SUB JUMLAH IV 143,866.73
JUMLAH HARGA ( I + II + III + IV ) 1,582,534.08 1,292,704.15 145,963.20
7.1 (5a) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 1,582,534.00 1,292,704.00 145,963.00
JENIS PEKERJAAN : Beton struktur, fc’20 Mpa
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 7.1 (7a) #N/A #N/A #N/A #N/A
JENIS PEKERJAAN : Beton Siklop, fc’15 Mpa
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 7.1 (9) #N/A #N/A #N/A #N/A
JENIS PEKERJAAN : Beton fc10 Mpa
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 7.1 (10) PL #N/A M3 27
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e

u4 PL 1 Pekerja OH 1.5937 88,000.00 140,243.51 100.00 140,243.51 -


u3 PL 2 Tukang OH 0.3984 110,000.00 43,826.10 100.00 43,826.10 -
u1 PL 3 Mandor OH 0.0797 132,000.00 10,518.26 100.00 10,518.26 -

7.1 (10) PL SUB JUMLAH I 194,587.88 194,587.88 - 21.79% 0.00% 68.43% 3.90% 4.41% 1.47% 100.00%

II BAHAN / MATERIAL :
b2 PL 1 Semen kg 267.8000 1,600.00 428,480.00 91.87 393,644.58 34,835.42 #N/A #N/A PT. Tonasa b b2PL 7,231
b3 PL 2 Pasir m3 0.5204 78,200.00 40,692.10 100.00 40,692.10 - #N/A #N/A b b3PL 14
b4 PL 3 Batu pecah m3 0.8298 102,700.00 85,221.74 100.00 85,221.74 - #N/A #N/A b b4PL 22
b13 PL 4 Kayu bekisting m3 0.0250 3,410,400.00 85,260.00 100.00 85,260.00 - #N/A #N/A b b13PL 1
b11 PL 5 Paku kg 0.2000 31,700.00 6,340.00 100.00 6,340.00 - #N/A #N/A b b11PL 5

7.1 (10) PL SUB JUMLAH II 645,993.84 611,158.42 34,835.42

III PERALATAN :
a6 PL 1 Concrete Mixer hari 0.5578 80,165.24 44,715.10 75.00 33,536.33 11,178.78 #N/A #N/A a a6PL
a10 PL 2 Water Tank Truck Jam 0.0382 204,742.50 7,811.46 75.00 5,858.60 1,952.87 #N/A #N/A a a10PL

7.1 (10) PL SUB JUMLAH III 52,526.56 39,394.92 13,131.64


SUB JUMLAH ( I + II + III ) 893,108.28 845,141.21 47,967.07
7.1 (10) PL IV LAIN - LAIN : 94.63% 5.37%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 35,724.33
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 53,586.50
SUB JUMLAH IV 89,310.83
JUMLAH HARGA ( I + II + III + IV ) 982,419.11 845,141.21 47,967.07
7.1 (10) PL HARGA SATUAN PEKERJAAN ( Dibulatkan ) 982,419.00 845,141.00 47,967.00
Fondasi Cerucuk, Penyediaan dan Pemancangan, dia. 12-16 cm, panjang
JENIS PEKERJAAN : 400 cm
SATUAN / UNIT : M1
NOMOR PEMBAYARAN : 7.6 (1) #N/A #N/A #N/A #N/A
Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 200 mm x
JENIS PEKERJAAN : 200 mm x 4000 mm
SATUAN / UNIT : M1
NOMOR PEMBAYARAN : 7.6.(10b) #N/A #N/A #N/A #N/A
Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 200 mm
JENIS PEKERJAAN : x 200 mm x 400 m
SATUAN / UNIT : M1
NOMOR PEMBAYARAN : 7.6.(16b) #N/A #N/A #N/A #N/A

JENIS PEKERJAAN : Pasangan Batu (menggunakan koef Tng Kerja dari SDA, modif analisis)
SATUAN / UNIT :
NOMOR PEMBAYARAN : 7.9.(1) PL #N/A M3 9,119
HARGA % TKDN KDN KLN
No. URAIAN SATUAN KUANTITAS/K HARGA SATUAN
OFISIEN DASAR (Rp) ( Rp. ) (Rp.)
I UPAH / TENAGA : d e=cxd f=c-e

u4 PKPL/RJ/ 1 Pekerja OH 1.0800 88,000.00 95,040.00 100.00 95,040.00 -


u3 PKPL/RJ/ 2 Tukang OH 0.5400 110,000.00 59,400.00 100.00 59,400.00 -
u1 PKPL/RJ/ 3 Mandor OH 0.1800 132,000.00 23,760.00 100.00 23,760.00 -

7.9.(1) PKPL/RJ/PKRK/PKRJ SUB JUMLAH I 178,200.00 178,200.00 - 29.51% 0.00% 65.98% 3.51% 0.76% 0.25% 100.00%

II BAHAN / MATERIAL :
b5 PKPL/RJ/ 1 Batu kali m3 1.2000 98,500.00 118,200.00 100.00 118,200.00 - #N/A #N/A b b5PKPL/RJ/PKRK/PKRJ
b3 PKPL/RJ/ 2 Pasir m3 0.5200 78,200.00 40,664.00 100.00 40,664.00 - #N/A #N/A b b3PKPL/RJ/PKRK/PKRJ
b2 PKPL/RJ/ 3 Semen kg 163.0000 1,600.00 260,800.00 91.87 239,596.96 21,203.04 #N/A #N/A PT. Tonasa b b2PKPL/RJ/PKRK/PKRJ

7.9.(1) PKPL/RJ/PKRK/PKRJ SUB JUMLAH II 419,664.00 398,460.96 21,203.04

III PERALATAN :
a6 PKPL/RJ/ 1 Concrete Mixer hari 0.0760 80,165.24 6,092.56 75.00 4,569.42 1,523.14 #N/A #N/A a a6PKPL/RJ/PKRK/PKRJ

7.9.(1) PKPL/RJ/PKRK/PKRJ SUB JUMLAH III 6,092.56 4,569.42 1,523.14


SUB JUMLAH ( I + II + III ) 603,956.56 581,230.38 22,726.18
7.9.(1) PKPL/RJ/ IV LAIN - LAIN : 96.24% 3.76%
- Biaya Umum 4.00% x Sub Jumlah (I+II+III) 24,158.26
- Keuntungan 6.00% x Sub Jumlah (I+II+III) 36,237.39
SUB JUMLAH IV 60,395.66
JUMLAH HARGA ( I + II + III + IV ) 664,352.21 581,230.38 22,726.18
7.9.(1) PKPL/RJ/PKRK/PKRJ HARGA SATUAN PEKERJAAN ( Dibulatkan ) 664,352.00 581,230.00 22,726.00

JENIS PEKERJAAN : Bronjong dengan kawat yang dilapisi Galvanis


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 7.10.(3a) PL #N/A M3 -

JENIS PEKERJAAN : Pembongkaran Pasangan Batu


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 7.15.(1) #N/A #N/A #N/A #N/A

JENIS PEKERJAAN : Pembongkaran Beton


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 7.15.(2) #N/A #N/A #N/A #N/A
Penambahan (Patching ), menggunakan campuran beton Pre Packed
JENIS PEKERJAAN : 50kg/zak
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 8.2.(1) #N/A #N/A #N/A #N/A
Perkuatan struktur dengan bahan FRP jenis e- glass per lapis pada
JENIS PEKERJAAN : daerah kering
SATUAN / UNIT : M2
NOMOR PEMBAYARAN : 8.4.(1) #N/A #N/A #N/A #N/A

JENIS PEKERJAAN : Marka Jalan Termoplastik


SATUAN / UNIT : Err:509
NOMOR PEMBAYARAN : Err:509 Err:509 Err:509 Err:509 Err:509

JENIS PEKERJAAN : Rel Pengaman


SATUAN / UNIT : M1
NOMOR PEMBAYARAN : 9.2.(7) PL #N/A M1 -

JENIS PEKERJAAN : Kerb Pracetak Jenis 1 (Peninggi/Mountable)


SATUAN / UNIT : M1
NOMOR PEMBAYARAN : 9.2(10a) #N/A #N/A #N/A #N/A

JENIS PEKERJAAN : Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar)


SATUAN / UNIT : Buah
NOMOR PEMBAYARAN : 9.2.(10g) PL #N/A Buah -

JENIS PEKERJAAN : Perkerasan Blok Beton pada Trotoar


SATUAN / UNIT : M2
NOMOR PEMBAYARAN : 9.2.(12a) PL #N/A M2 -

JENIS PEKERJAAN : Galian pada Saluran Air atau Lereng untuk Pemeliharaan
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 10.1.(1) RK #N/A M3 84

JENIS PEKERJAAN : Pebaikan Pasangan Batu dengan Mortar


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 10.1.(3) RK #N/A M3 -

JENIS PEKERJAAN : Perbaikan Lapis Fondasi Agregat Kelas A


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 10.1.(4) RK #N/A M3 -

JENIS PEKERJAAN : Perbaikan Lapis Fondasi Agregat Kelas S


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 10.1.(6a) RK #N/A M3 5,382

JENIS PEKERJAAN : Perbaikan Campuran Aspal Panas (Analisis diubah)


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 10.1.(9) PKRJL #N/A M3 -

JENIS PEKERJAAN : Residu Bitumen untuk Pemeliharaan


SATUAN / UNIT : Liter
NOMOR PEMBAYARAN : 10.1.(13) #N/A #N/A #N/A #N/A

JENIS PEKERJAAN : Perbaikan Pasangan Batu


SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 10.1.(16) PKRJL/RK #N/A M3 1,619,385

JENIS PEKERJAAN : Pengecatan Kereb pada Trotoar atau Median


SATUAN / UNIT : M1
NOMOR PEMBAYARAN : 10.1.(17) PKRJ #N/A M2 0
TKDN Gabungan Barang dan Jasa untuk Konstruksi/Fabrikasi
Nama Penyedia Barang/Jasa
Alamat
Nama Gabungan barang dan Jasa
Pemilik Gabungan barang dan Jasa
No. Dokumen Gabungan barang dan Jasa

No. Uraian Pekerjaan

1 2 3

RKJ 1.2 1

RKJ 1.8.(1) 2

RKJ 1.17.(1a) 3

RKJ 1.17.(1b) 4

RKJ 1.17.(1c) 5

RKJ 1.17.(1d) 6

RKJ 1.17.(1e) 7

RKJ 1.17.(1f) 8

RKJ 1.17.(1g) 9

RKJ 1.17.(1h) 10

RKJ 1.17.(1i) 11

RKJ 1.17.(1j) 12

RKJ 1.17.(2a) 13

RKJ 1.17.(2b) 14

RKJ 1.17.(3a) 15

RKJ 1.17.(3b) 16

RKJ 1.17.(3c) 17

RKJ 1.17.(3d) 18

RKJ 1.17.(3f) 19

RKJ 1.17.(3g) 20

RKJ 1.17.(3h) 21

RKJ 1.19 22
RKJ 1.21 23

PL 2.1.(1) 24

PL 2.2.(1) 25

PL 2.3.(1) 26

PL 2.3.(15) 27

PL 2.3.(21) 28

PL 2.3.(26) 29

PL 2.3.(27) 30

PL 2.3.(29) 31

PL 3.1.(1) 32

PL 3.1.(7) 33

PL 3.1.(10). 34

PL 3.2.(1a) 35

PL 3.2.(2a) 36

PL 3.3.(1) 37

PL 3.4.(2) 38

PL 3.4.(3) 39

PL 3.4.(4) 40

PL 3.4.(5) 41

PL 4.9.(3) 42

PL 4.9.(5) 43

PL 5.1.(1) 44

PL 5.1.(2) 45

PL 5.1.(3a) 46

PL 5.3.(3) 47

PL SKh-1.5.3.( 48

PL 6.1 (1) 49

PL 6.1 (2a) 50

PL 6.3(5a) 51

PL 6.3(6a) 52

PL 6.3.(8) 53

PL 7.1 (5a) 54

PL 7.1 (10) 55

PL 7.3 (1) 56
PL 7.3 (3) 57

PL 7.3 (8) 58

PKPL/RJ/PKRK/PKRJ7.4 (1b) 59

PL 7.9.(1) 60

PL 7.10.(1) 61

PL 7.10.(3a) 62

RJ 7.14.(1) 63

RJ 8.2.(2) 64

RK 8.7.(1b) 65

RK 8.7.(3a) 66

RK 8.11.(1) 67

RK 8.11.(3) 68

RK 9.2.(1) 69

RK 9.2.(3a) 70

RK 9.2.(3b) 71

RK 9.2.(6a) 72

PL 9.2.(7) 73

PL 9.2.(10b) 74

RK 9.2.(10f) 75

PL 9.2.(10g) 76

PL 9.2.(10h) 77

PL 9.2.(10i) 78

PL 9.2.(12a) 79

RK 10.1.(1) 80

RK 10.1.(2) 81

RK 10.1.(3) 82

RK 10.1.(4) 83

RK 10.1.(5) 84

RK 10.1.(6a) 85

RK 10.1.(7) 86

PKRJL 10.1.(9) 87

PKRJL 10.1.(14) 88

RK 10.1.(15) 89

PKRJL/RK 10.1.(16) 90
PKRJ 10.1.(17) 91

PKRJ 10.1.(18b) 92

PKRJ 10.1.(19b) 93

PKRJ 10.1.(20b) 94

PKRJ 10.1.(21) 95

PKRJ 10.1.(22) 96

PKRJ 10.2.(1) 97

PKRJ 10.2.(2) 98

PKRJ 10.2.(3) 99

PKRJ 10.2.(4) 100

PKRJ 10.2.(5) 101

PKRJ 10.2.(6) 102

PKRJ 10.2.(7) 103

PKRJ 10.2.(8)

PKRJ 10.2.(9)

PKRJ 10.2.(10)

PKRJ 10.2.(11)

PKRJ 10.2.(12)

PKRJ 10.2.(13)

PKRJ 0

PKRJ 0

PKRJ 0

PKRJ 10.2 (23)

PKRJ 10.2 (24)

PKRJ 10.2 (25)

PKRJ 10.2 (26)

PKRJ 10.2 (27)

PKRJ 10.2 (28)

PKRJ 10.2 (29)

PKRJ 10.2 (30)

PKRJ 10.2 (31)

PKRJ 10.2 (32)

PKRJ 10.2 (33)

PKRJ 10.2 (34)


PKRJ 10.2 (35)

PKRJ 10.2 (36)

PKRJ 10.2 (37)

PKRJ 10.2 (38)

PKRJ 10.2 (39)

PKRJ 10.2 (40)

PKRJ 10.2 (41)

PKRJ 10.2 (42)

PKRJ 10.2 (43)

PKRJ 10.2 (44)

PKRJ 10.2 (45)

PKRJ 10.2 (46)

PKRJ 10.2 (47)

PKRJ 10.2 (48)

PKRJ 10.2 (49)

PKRJ 10.2 (50)

PKRJ 10.2 (51)

PKRJ 10.2 (52)

PKRJ 10.2 (53)

PKRJ 10.2 (54)

PKRJ 10.2 (55)

PKRJ 10.2 (56)

PKRJ 10.2 (57)

PKRJ 10.2 (58)

PKRJ 10.2 (59)

PKRJ 10.2 (60)

PKRJ 10.2 (61)

PKRJ 10.2 (62)

PKRJ 10.2 (63)

PL
RJ
RK
PKPL
PKD
PKRK
PKRJ
PKRJL
TKDN Gabungan Barang dan Jasa untuk Konstruksi/Fabrikasi
Nama Penyedia Barang/Jasa

Nama Gabungan barang dan Jasa


Pemilik Gabungan barang dan Jasa
No. Dokumen Gabungan barang dan Jasa
1 2 4

Uraian Pekerjaan KDN

Personil
3 7

Mobilisasi 0.00%

Manajemen dan Keselamatan Lalu Lintas 100.00%

Pengujian pH 100.00%

Pengujian Oksigen Terlarut (DO) 100.00%

Pengujian Zat Padat Terlarut (TDS) 100.00%

Pengujian Zat Tersuspensi (TSS) 100.00%

Pengujian Biological Oxygen Demand (BOD) 100.00%

Pengujian Chemical Oxygen Demand (COD) 100.00%

Pengujian Coliform 100.00%

Pengujian E. Coli 100.00%

Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn 100.00%

Pengujian Temperatur (Suhu) 100.00%

Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan 100.00%

Pengujian tingkat getaran kendaraan bermotor 100.00%

Pengujian NoX 100.00%

Pengujian Sulfurdioksida (SO2) 100.00%

Pengujian Karbondioksida (CO2) 100.00%

Pengujian Hidro Carbon (HC)-CH4 100.00%

Pengujian Total Partikulat (TSP) - Debu 100.00%

Pengujian Timah Hitam (Pb) #N/A

Pengujian Parameter Udara Emisi dan Ambien lainnya : ………….. #N/A

Keselamatan dan Kesehatan Kerja 9.56%


Manajemen Mutu 9.56%

Saluran berbentuk U Tipe DS 4 9.56%

Galian Biasa 29.22%

Galian Batu 29.22%

Galian Struktur dengan kedalaman 0 - 2 meter (+ pengukuran patok) 29.22%

Galian Struktur dengan kedalaman 2 - 4 meter 29.22%

Galian Perkerasan Beraspal dengan Cold Milling Machine 29.22%

Galian Perkerasan berbutir 29.22%

Timbunan Biasa dari hasil galian #N/A


Timbunan Pilihan dari sumber galian
4.37%

Penyiapan Badan Jalan 29.22%

Pemotongan Pohon Pilihan diameter > 30 – 50 cm 100.00%

Pemotongan Pohon Pilihan diameter >50 – 75 cm 100.00%

Pemotongan Pohon Pilihan diameter > 75 cm 100.00%

Lapis Tipis Beton Aspal - B Kasar (LTBA-B Kasar) #N/A

Lapis Pondasi Agregat Kelas A #N/A

Lapis Pondasi Agregat Kelas S #N/A

Perkerasan Jalan Beton Semen Untuk Pembukaan Lalu Lintas Umur Beton Lebih dari 3 hari kurang dari 7 ha #N/A

Lapis Pondasi bawah Beton Kurus (Concrete Vibrator) #N/A

Lapis Pondasi bawah Beton Kurus (Concrete Vibrator)* #N/A

Lapis Resap Pengikat - Aspal Cair #N/A

Lapis Perekat - Aspal Cair 1.43%

Bahan anti pengelupasan 1.43%

Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) 4.08%

Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) 14.10%

Lapis Penetrasi Macadam #N/A

Beton struktur, fc’30 Mpa 9.56%

Beton struktur, fc’20 Mpa 9.56%

Beton struktur, fc’20 Mpa* 9.56%

Beton Siklop, fc’15 Mpa #N/A

Beton, fc’10 Mpa #N/A

Beton, fc’10 Mpa* #N/A

Baja Tulangan Sirip BjTS 420A 21.79%

Fondasi Cerucuk, Penyediaan dan Pemancangan, dia. 12-16 cm, panjang 400 cm 10.00%
Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 200 mm x 200 mm x 4000 mm 9.56%

Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 200 mm x 200 mm x 400 m 20.00%

Pasangan Batu (menggunakan koef Tng Kerja dari SDA, modif analisis) #N/A

Bronjong dengan kawat yang dilapisi Galvanis #N/A

Pembongkaran Pasangan Batu 29.22%

Pembongkaran Beton 29.22%

Penambahan (Patching ), menggunakan campuran beton Pre Packed 50kg/zak 30.00%

Perkuatan struktur dengan bahan FRP jenis e- glass per lapis pada daerah kering 30.00%

Mandor 100.00%

Pekerja Biasa 100.00%

Dump Truck, kapasitas 3 - 4 m³

Motor Grader min 100 PK

Loader Roda Karet 1.0 - 1.6 M3

Alat Penggali (Excavator) 80 - 140 PK

Kompresor 4000 - 6500 Ltr/mnt

Pompa Air 70 - 100 mm

Marka Jalan Termoplastik 30.00%

Patok Pengarah (delineator) 30.00%

Patok Kilometer 30.00%

Rel Pengaman 30.00%

Kerb Pracetak Jenis 1 (Peninggi/Mountable) 30.00%

Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) 30.00%

Perkerasan Blok Beton pada Trotoar 9.56%

Galian pada Saluran Air atau Lereng untuk Pemeliharaan 100.00%

Pebaikan Pasangan Batu dengan Mortar 100.00%

Perbaikan Lapis Fondasi Agregat Kelas A 100.00%

Perbaikan Lapis Fondasi Agregat Kelas S 100.00%

Perbaikan Campuran Aspal Panas (Analisis diubah) 4.08%

Residu Bitumen untuk Pemeliharaan 100.00%

Perbaikan Pasangan Batu 100.00%

Pengecatan Kereb pada Trotoar atau Median 100.00%

Pembersihan Patok 100.00%

Pembersihan Drainase 100.00%

Pengendalian Tanaman 100.00%


Pemeliharaan Kinerja Jembatan Serdang bentang 7.00 m 100.00%

Pemeliharaan Kinerja Jembatan Trumix Seruni bentang 9.00 m 100.00%

Pemeliharaan Kinerja Jembatan Fly Over Seruni bentang 68.30 m 100.00%

Pemeliharaan Kinerja Jembatan Serdang Terate bentang 36.50 m 100.00%

Pemeliharaan Kinerja Jembatan Terate II Amnonim II bentang 7.00 m 100.00%

Pemeliharaan Kinerja Jembatan Terate III bentang 7.00 m 100.00%

Pemeliharaan Kinerja Jembatan Grenyang bentang 8.00 m 100.00%

Pemeliharaan Kinerja Jembatan Ragas bentang 7.10 m 100.00%

Pemeliharaan Kinerja Jembatan Ragas II bentang 7.00 m 100.00%

Pemeliharaan Kinerja Jembatan Pangoreng bentang 26.00 m 100.00%

Pemeliharaan Kinerja Jembatan Cicegah bentang 7.60 m 100.00%

Pemeliharaan Kinerja Jembatan Lebak Gede I bentang 6.00 m 100.00%

Pemeliharaan Kinerja Jembatan Lebak Gede II bentang 6.00 m 100.00%


PELEBARAN
RUTIN JEMBATAN
RUTIN KONDISI
PK PELEBARAN
PK DRAINASE
PK RUTIN KONDISI
PK RUTIN JEMBATAN
PK RUTIN JALAN
5 6 7 8 9 10 11
% Rencana Tahun 2022

KDN KLN
Vol Sat
Bahan Alat Total Personil Bahan Alat Total
8 9 10 11 12 13 14 15 16

118.31% 118.31% 32.24% 32.24% #N/A LS

100.00% 0.00% #N/A LS

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Buah

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Buah

53.43% 3.36% 66.34% 0.00% 32.54% 1.12% 33.66% #N/A LS


53.43% 3.36% 66.34% 0.00% 32.54% 1.12% 33.66% #N/A LS

53.43% 3.36% 66.34% 0.00% 32.54% 1.12% 33.66% #N/A M3

65.08% 1.44% 95.74% 0.00% 3.77% 0.48% 4.26% #N/A M3

65.08% 1.44% 95.74% 0.00% 3.77% 0.48% 4.26% #N/A M1

65.08% 1.44% 95.74% 0.00% 3.77% 0.48% 4.26% #N/A M1

65.08% 1.44% 95.74% 0.00% 3.77% 0.48% 4.26% #N/A M1

65.08% 1.44% 95.74% 0.00% 3.77% 0.48% 4.26% #N/A M1

65.08% 1.44% 95.74% 0.00% 3.77% 0.48% 4.26% #N/A M1

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A M1

0.00% 71.72% 76.09% 0.00% 0.00% 23.91% 23.91% #N/A M3

65.08% 1.44% 95.74% 0.00% 3.77% 0.48% 4.26% #N/A M3

100.00% 0.00% #N/A M3

100.00% 0.00% #N/A M3

100.00% 0.00% #N/A M3

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A M2

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A buah

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A buah

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A buah

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A buah

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A M3

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A M1

45.84% 39.55% 86.82% 0.00% 0.00% 13.18% 13.18% #N/A M3

45.84% 39.55% 86.82% 0.00% 0.00% 13.18% 13.18% #N/A M3

40.68% 41.43% 86.19% 0.00% 0.00% 13.81% 13.81% #N/A M3

62.24% 14.96% 91.29% 0.00% 3.80% 4.91% 8.71% #N/A M3

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A M3

53.43% 3.36% 66.34% 0.00% 32.54% 1.12% 33.66% #N/A Liter

53.43% 3.36% 66.34% 0.00% 32.54% 1.12% 33.66% #N/A Liter

53.43% 3.36% 66.34% 0.00% 32.54% 1.12% 33.66% #N/A Ton

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Ton

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Kg

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A M3

68.43% 4.41% 94.63% 0.00% 3.90% 1.47% 5.37% #N/A M3

70.00% 20.00% 100.00% 0.00% #N/A Kg


53.43% 3.36% 66.34% 0.00% 32.54% 1.12% 33.66% #N/A Kg

80.00% 100.00% 0.00% #N/A Kg

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Kg

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A M3

65.08% 1.44% 95.74% 0.00% 3.77% 0.48% 4.26% #N/A M3

65.08% 1.44% 95.74% 0.00% 3.77% 0.48% 4.26% #N/A M3

70.00% 100.00% 0.00% #N/A M1

70.00% 100.00% 0.00% #N/A M3

100.00% 0.00% #N/A M2

100.00% 0.00% #N/A M2

75.00% 75.00% 25.00% 25.00% #N/A M1

75.00% 75.00% 25.00% 25.00% #N/A M1

75.00% 75.00% 25.00% 25.00% #N/A M2

75.00% 75.00% 25.00% 25.00% #N/A Buah

75.00% 75.00% 25.00% 25.00% #N/A Buah

75.00% 75.00% 25.00% 25.00% #N/A Buah

70.00% 100.00% 0.00% #N/A M1

70.00% 100.00% 0.00% #N/A M1

70.00% 100.00% 0.00% #N/A Buah

70.00% 100.00% 0.00% #N/A Buah

70.00% 100.00% 0.00% #N/A Buah

70.00% 100.00% 0.00% #N/A Buah

53.43% 3.36% 66.34% 0.00% 32.54% 1.12% 33.66% #N/A M2

100.00% 0.00% #N/A M3

100.00% 0.00% #N/A M3

100.00% 0.00% #N/A M3

100.00% 0.00% #N/A M3

40.68% 41.43% 86.19% 0.00% 0.00% 13.81% 13.81% #N/A M3

100.00% 0.00% #N/A M3

100.00% 0.00% #N/A M2

100.00% 0.00% #N/A M3

100.00% 0.00% #N/A M3

100.00% 0.00% #N/A M3

100.00% 0.00% #N/A M3


100.00% 0.00% #N/A M2

100.00% 0.00% #N/A M1

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A Buah

100.00% 0.00% #N/A M1

100.00% 0.00% #N/A M2

100.00% 0.00% #N/A LS

100.00% 0.00% #N/A LS

100.00% 0.00% #N/A LS

100.00% 0.00% #N/A LS

100.00% 0.00% #N/A LS

100.00% 0.00% #N/A LS

100.00% 0.00% #N/A LS


SUB TOTAL
Rencana Tahun 2022

KDN
Harsat Jumlah Harga
Personil Bahan
17 18 19 20

160,300,000.00 #N/A #N/A #N/A

103,400,000.00 #N/A #N/A #N/A

50,000.00 #N/A #N/A #N/A

50,000.00 #N/A #N/A #N/A

50,000.00 #N/A #N/A #N/A

50,000.00 #N/A #N/A #N/A

50,000.00 #N/A #N/A #N/A

50,000.00 #N/A #N/A #N/A

100,000.00 #N/A #N/A #N/A

50,000.00 #N/A #N/A #N/A

400,000.00 #N/A #N/A #N/A

50,000.00 #N/A #N/A #N/A

1,000,000.00 #N/A #N/A #N/A

50,000.00 #N/A #N/A #N/A

200,000.00 #N/A #N/A #N/A

150,000.00 #N/A #N/A #N/A

150,000.00 #N/A #N/A #N/A

150,000.00 #N/A #N/A #N/A

500,000.00 #N/A #N/A #N/A

50,000.00 #N/A #N/A #N/A

50,000.00 #N/A #N/A #N/A

174,900,000.00 #N/A #N/A #N/A


141,400,000.00 #N/A #N/A #N/A

41,921.47 #N/A #N/A #N/A

817,427.78 #N/A #N/A #N/A

186,664.65 #N/A #N/A #N/A

5,334,761.58 #N/A #N/A #N/A

54,988,868.56 #N/A #N/A #N/A

1,101,010.00 #N/A #N/A #N/A

1,299,000.00 #N/A #N/A #N/A

1,472,819.00 #N/A #N/A #N/A

41,921.47 #N/A #N/A #N/A

477,210.92 #N/A #N/A #N/A

382,562.08 #N/A #N/A #N/A

264,138.09 #N/A #N/A #N/A

288,972.02 #N/A #N/A #N/A

10,645.48 #N/A #N/A #N/A

122,977.93 #N/A #N/A #N/A

395,981.21 #N/A #N/A #N/A

987,045.54 #N/A #N/A #N/A

1,632,233.46 #N/A #N/A #N/A

1,770,900.00 #N/A #N/A #N/A

15,000.00 #N/A #N/A #N/A

305,975.57 #N/A #N/A #N/A

270,726.80 #N/A #N/A #N/A

238,380.17 #N/A #N/A #N/A

1,098,099.40 #N/A #N/A #N/A

1,770,900.00 #N/A #N/A #N/A

15,034.34 #N/A #N/A #N/A

15,163.80 #N/A #N/A #N/A

1,407,297.38 #N/A #N/A #N/A

1,304,923.89 #N/A #N/A #N/A

35,535.00 #N/A #N/A #N/A

1,608,410.80 #N/A #N/A #N/A

1,452,674.69 #N/A #N/A #N/A

17,020.00 #N/A #N/A #N/A


15,678.33 #N/A #N/A #N/A

19,463.75 #N/A #N/A #N/A

25,000.00 #N/A #N/A #N/A

740,977.66 #N/A #N/A #N/A

763,836.59 #N/A #N/A #N/A

552,230.00 #N/A #N/A #N/A

691,918.76 #N/A #N/A #N/A

3,000,000.00 #N/A #N/A #N/A

60,000.00 #N/A #N/A #N/A

60,000.00 #N/A #N/A #N/A

3,000,000.00 #N/A #N/A #N/A

1,200,000.00 #N/A #N/A #N/A

163,302.11 #N/A #N/A #N/A

592,603.65 #N/A #N/A #N/A

603,328.72 #N/A #N/A #N/A

285,481.27 #N/A #N/A #N/A

648,507.33 #N/A #N/A #N/A

111,105.17 #N/A #N/A #N/A

57,293.20 #N/A #N/A #N/A

87,989.88 #N/A #N/A #N/A

87,989.88 #N/A #N/A #N/A

73,917.37 #N/A #N/A #N/A

165,767.75 #N/A #N/A #N/A

41,921.47 #N/A #N/A #N/A

288,972.02 #N/A #N/A #N/A

740,977.66 #N/A #N/A #N/A

305,975.57 #N/A #N/A #N/A

270,726.80 #N/A #N/A #N/A

238,380.17 #N/A #N/A #N/A

10,645.48 #N/A #N/A #N/A

3,500,000.00 #N/A #N/A #N/A

1,770,900.00 #N/A #N/A #N/A

1,098,099.40 #N/A #N/A #N/A

740,977.66 #N/A #N/A #N/A


50,000.00 #N/A #N/A #N/A

30,000.00 #N/A #N/A #N/A

15,000.00 #N/A #N/A #N/A

15,000.00 #N/A #N/A #N/A

20,000.00 #N/A #N/A #N/A

700.00 #N/A #N/A #N/A

5,000,000.00 #N/A #N/A #N/A

7,500,000.00 #N/A #N/A #N/A

40,000,000.00 #N/A #N/A #N/A

20,000,000.00 #N/A #N/A #N/A

5,000,000.00 #N/A #N/A #N/A

5,000,000.00 #N/A #N/A #N/A

5,500,000.00 #N/A #N/A #N/A


#N/A #N/A #N/A

1,220,912,258 #N/A #N/A


#N/A #N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
B I A Y A (Rupiah)

KDN KLN

Alat Total Personil Bahan


21 22 23 24

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A


#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A


#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A


#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A


#N/A #N/A #N/A #N/A

#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
Self Assessment

TKDN KLN
KLN TOTAL
(%) (%)
Alat Total
25 26 27 28 29 30

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A


#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A


#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A c

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A


#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A


c
c
#N/A #N/A #N/A #N/A #N/A c
c
#N/A c
c
c
c
c
c
c
c
Realisasi Jan 2022 sd Agustus 2022

Vol Sat Harsat Jumlah Harga

31 32 33 34 35 36 37

150.54% ### #N/A - LS 160,300,000.00 -

100.00% 0.00% #N/A 0.32 LS 103,400,000.00 33,125,490.71

100.00% 0.00% #N/A - Buah 50,000.00 -

100.00% 0.00% #N/A - Buah 50,000.00 -

100.00% 0.00% #N/A - Buah 50,000.00 -

100.00% 0.00% #N/A - Buah 50,000.00 -

100.00% 0.00% #N/A - Buah 50,000.00 -

100.00% 0.00% #N/A - Buah 50,000.00 -

100.00% 0.00% #N/A - Buah 100,000.00 -

100.00% 0.00% #N/A - Buah 50,000.00 -

100.00% 0.00% #N/A - Buah 400,000.00 -

100.00% 0.00% #N/A - Buah 50,000.00 -

100.00% 0.00% #N/A - Buah 1,000,000.00 -

100.00% 0.00% #N/A - Buah 50,000.00 -

100.00% 0.00% #N/A - Buah 200,000.00 -

100.00% 0.00% #N/A - Buah 150,000.00 -

100.00% 0.00% #N/A - Buah 150,000.00 -

100.00% 0.00% #N/A 0.15 Buah 150,000.00 22,899.69

100.00% 0.00% #N/A - Buah 500,000.00 -

#N/A #N/A #N/A 320.00 Buah 50,000.00 16,000,000.00

#N/A #N/A #N/A 0.29 Buah 50,000.00 14,381.33

100.00% 0.00% #N/A 0.15 LS 174,900,000.00 26,701,034.61


100.00% 0.00% #N/A - LS 141,400,000.00 -

100.00% 0.00% #N/A 1,717.09 M3 41,921.47 71,982,979.93

100.00% 0.00% #N/A 626.00 M3 817,427.78 511,709,105.68

100.00% 0.00% #N/A - M1 186,664.65 -

100.00% 0.00% #N/A - M1 5,334,761.58 -

100.00% 0.00% #N/A - M1 54,988,868.56 -

100.00% 0.00% #N/A 1,717.09 M1 1,101,010.00 1,890,534,390.54

100.00% 0.00% #N/A 626.00 M1 1,299,000.00 813,172,912.09

#N/A #N/A #N/A - M1 1,472,819.00 -

100.00% 0.00% #N/A 19,569.74 M3 41,921.47 820,392,102.54

100.00% 0.00% #N/A - M3 477,210.92 -

100.00% 0.00% #N/A 144.72 M3 382,562.08 55,365,005.88

100.00% 0.00% #N/A 122.12 M3 264,138.09 32,256,543.55

100.00% 0.00% #N/A 1,061.41 M3 288,972.02 306,717,213.80

#N/A #N/A #N/A 1,443.00 M2 10,645.48 15,361,427.64

#N/A #N/A #N/A 340.00 buah 122,977.93 41,812,496.20

#N/A #N/A #N/A 3,776.00 buah 395,981.21 1,495,225,048.96

#N/A #N/A #N/A 48,798.72 buah 987,045.54 48,166,556,320.15

#N/A #N/A #N/A 4.00 buah 1,632,233.46 6,528,933.84

#N/A #N/A #N/A - M3 1,770,900.00 -

#N/A #N/A #N/A - M1 15,000.00 -

100.00% 0.00% #N/A 21,480.84 M3 305,975.57 6,572,612,769.25

100.00% 0.00% #N/A - M3 270,726.80 -

100.00% 0.00% #N/A - M3 238,380.17 -

100.00% 0.00% #N/A - M3 1,098,099.40 -

#N/A #N/A #N/A - M3 1,770,900.00 -

100.00% 0.00% #N/A 39,041.83 Liter 15,034.34 586,968,172.53

100.00% 0.00% #N/A 39,353.72 Liter 15,163.80 596,751,968.60

100.00% 0.00% #N/A 5,628.03 Ton 1,407,297.38 7,920,317,339.64

#N/A #N/A #N/A 17,965.83 Ton 1,304,923.89 23,444,041,725.06

#N/A #N/A #N/A 12,154.07 Kg 35,535.00 431,894,811.09

#N/A #N/A #N/A 74.54 M3 1,608,410.80 119,886,115.80

100.00% 0.00% #N/A 27.00 M3 1,452,674.69 39,222,216.63

100.00% 0.00% #N/A - Kg 17,020.00 -


100.00% 0.00% #N/A - Kg 15,678.33 -

100.00% 0.00% #N/A 16.16 Kg 19,463.75 314,592.59

#N/A #N/A #N/A - Kg 25,000.00 -

#N/A #N/A #N/A 9,118.94 M3 740,977.66 6,756,932,319.54

100.00% 0.00% #N/A 14,752.00 M3 763,836.59 11,268,117,375.68

100.00% 0.00% #N/A - M3 552,230.00 -

100.00% 0.00% #N/A - M1 691,918.76 -

100.00% 0.00% #N/A 7.55 M3 3,000,000.00 22,662,428.14

100.00% 0.00% #N/A 162.00 M2 60,000.00 9,720,000.00

100.00% 0.00% #N/A 7.55 M2 60,000.00 453,248.56

100.00% 0.00% #N/A 162.00 M1 3,000,000.00 486,000,000.00

100.00% 0.00% #N/A 162.00 M1 1,200,000.00 194,400,000.00

100.00% 0.00% #N/A - M2 163,302.11 -

100.00% 0.00% #N/A - Buah 592,603.65 -

100.00% 0.00% #N/A - Buah 603,328.72 -

100.00% 0.00% #N/A - Buah 285,481.27 -

100.00% 0.00% #N/A - M1 648,507.33 -

100.00% 0.00% #N/A - M1 111,105.17 -

100.00% 0.00% #N/A - Buah 57,293.20 -

100.00% 0.00% #N/A - Buah 87,989.88 -

100.00% 0.00% #N/A 459.67 Buah 87,989.88 40,446,484.12

100.00% 0.00% #N/A - Buah 73,917.37 -

100.00% 0.00% #N/A - M2 165,767.75 -

100.00% 0.00% #N/A 84.00 M3 41,921.47 3,521,403.48

100.00% 0.00% #N/A - M3 288,972.02 -

100.00% 0.00% #N/A - M3 740,977.66 -

100.00% 0.00% #N/A - M3 305,975.57 -

100.00% 0.00% #N/A 52.72 M3 270,726.80 14,273,820.74

100.00% 0.00% #N/A 5,381.73 M3 238,380.17 1,282,896,547.44

100.00% 0.00% #N/A - M2 10,645.48 -

100.00% 0.00% #N/A - M3 3,500,000.00 -

100.00% 0.00% #N/A 32.00 M3 1,770,900.00 56,668,800.00

100.00% 0.00% #N/A 48,188.53 M3 1,098,099.40 52,915,792,623.62

100.00% 0.00% #N/A 1,619,384.64 M3 740,977.66 1,199,927,839,867.27


100.00% 0.00% #N/A 0.11 M2 50,000.00 5,360.00

100.00% 0.00% #N/A 0.11 M1 30,000.00 3,215.63

100.00% 0.00% #N/A 0.11 Buah 15,000.00 1,607.81

100.00% 0.00% #N/A 0.12 Buah 15,000.00 1,804.69

100.00% 0.00% #N/A 0.12 M1 20,000.00 2,406.25

100.00% 0.00% #N/A 0.12 M2 700.00 84.22

100.00% 0.00% #N/A 0.11 LS 5,000,000.00 535,937.50

100.00% 0.00% #N/A 0.11 LS 7,500,000.00 803,906.25

100.00% 0.00% #N/A 0.11 LS 40,000,000.00 4,287,500.00

100.00% 0.00% #N/A 0.12 LS 20,000,000.00 2,406,250.00

100.00% 0.00% #N/A 0.11 LS 5,000,000.00 535,937.50

100.00% 0.00% #N/A 0.12 LS 5,000,000.00 601,562.50

100.00% 0.00% #N/A 0.11 LS 5,500,000.00 589,531.25


SUB TOTAL 1,367,004,988,021

Realisasi Jan 2022 sd Agustus 2022


B I A Y A (Rupiah)

KDN

Personil Bahan Alat Total Personil


38 39 40 41 42

- - - - -

33,125,490.71 - - 33,125,490.71 -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

22,899.69 - - 22,899.69 -

- - - - -

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

2,552,930.47 14,265,165.92 896,471.55 17,714,567.94 -


- - - - -

6,882,412.82 38,457,279.54 2,416,786.26 47,756,478.62 -

149,541,369.25 333,013,064.72 7,380,370.28 489,934,804.25 -

- - - - -

- - - - -

- - - - -

552,487,923.76 1,230,333,102.07 27,267,140.01 1,810,088,165.84 -

237,640,857.58 529,201,455.66 11,728,376.78 778,570,690.02 -

#N/A #N/A #N/A #N/A #N/A

35,840,015.77 - 588,414,065.08 624,254,080.85 -

- - - - -

55,365,005.88 - - 55,365,005.88 -

32,256,543.55 - - 32,256,543.55 -

306,717,213.80 - - 306,717,213.80 -

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

94,134,495.24 3,012,924,066.44 2,599,165,655.68 5,706,224,217.36 -

- - - - -

- - - - -

- - - - -

#N/A #N/A #N/A #N/A #N/A

56,121,006.39 313,590,783.73 19,707,111.52 389,418,901.64 -

57,056,451.46 318,817,827.42 20,035,596.73 395,909,875.60 -

757,274,756.66 4,231,470,526.32 265,920,001.16 5,254,665,284.14 -

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

8,545,624.28 26,839,956.95 1,730,088.34 37,115,669.57 -

- - - - -
- - - - -

62,918.52 - 251,674.07 314,592.59 -

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

3,292,983,616.05 7,333,131,772.01 162,519,833.37 10,788,635,221.42 -

- - - - -

- - - - -

6,798,728.44 15,863,699.70 - 22,662,428.14 -

9,720,000.00 - - 9,720,000.00 -

453,248.56 - - 453,248.56 -

- - 364,500,000.00 364,500,000.00 -

- - 145,800,000.00 145,800,000.00 -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

12,133,945.24 28,312,538.88 - 40,446,484.12 -

- - - - -

- - - - -

3,521,403.48 - - 3,521,403.48 -

- - - - -

- - - - -

- - - - -

582,524.92 5,806,323.81 5,913,729.00 12,302,577.74 -

1,282,896,547.44 - - 1,282,896,547.44 -

- - - - -

- - - - -

56,668,800.00 - - 56,668,800.00 -

52,915,792,623.62 - - 52,915,792,623.62 -

1,199,927,839,867.27 - - 1,199,927,839,867.27 -
5,360.00 - - 5,360.00 -

3,215.63 - - 3,215.63 -

1,607.81 - - 1,607.81 -

1,804.69 - - 1,804.69 -

2,406.25 - - 2,406.25 -

84.22 - - 84.22 -

535,937.50 - - 535,937.50 -

803,906.25 - - 803,906.25 -

4,287,500.00 - - 4,287,500.00 -

2,406,250.00 - - 2,406,250.00 -

535,937.50 - - 535,937.50 -

601,562.50 - - 601,562.50 -

589,531.25 - - 589,531.25 -
#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A


#N/A #N/A #N/A #N/A
807,080,250,966 5,806,324 516,213,729 807,602,271,018
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
447,117,224,050 - - 447,117,224,050
Self Assessment

ah)
TKDN
KLN TOTAL
(%)
Bahan Alat Total
43 44 45 46 47

- - - - #N/A

- - - 33,125,490.71 #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - 22,899.69 #N/A

- - - - #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

8,687,642.82 298,823.85 8,986,466.67 26,701,034.61 #N/A


- - - - #N/A

23,420,905.89 805,595.42 24,226,501.31 71,982,979.93 #N/A

19,314,178.01 2,460,123.43 21,774,301.44 511,709,105.68 #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

71,357,178.02 9,089,046.67 80,446,224.69 1,890,534,390.54 #N/A

30,692,763.14 3,909,458.93 34,602,222.06 813,172,912.09 #N/A

#N/A #N/A #N/A #N/A #N/A

- 196,138,021.69 196,138,021.69 820,392,102.54 #N/A

- - - - #N/A

- - - 55,365,005.88 #N/A

- - - 32,256,543.55 #N/A

- - - 306,717,213.80 #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

- 866,388,551.89 866,388,551.89 6,572,612,769.25 #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

#N/A #N/A #N/A #N/A #N/A

190,980,233.71 6,569,037.17 197,549,270.88 586,968,172.53 #N/A

194,163,560.76 6,678,532.24 200,842,093.00 596,751,968.60 #N/A

2,577,012,055.12 88,640,000.39 2,665,652,055.51 7,920,317,339.64 #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

1,529,850.95 576,696.11 2,106,547.06 39,222,216.63 #N/A

- - - - #N/A
- - - - #N/A

- - - 314,592.59 #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

425,308,876.47 54,173,277.79 479,482,154.26 11,268,117,375.68 #N/A

- - - - #N/A

- - - - #N/A

- - - 22,662,428.14 #N/A

- - - 9,720,000.00 #N/A

- - - 453,248.56 #N/A

- 121,500,000.00 121,500,000.00 486,000,000.00 #N/A

- 48,600,000.00 48,600,000.00 194,400,000.00 #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- - - 40,446,484.12 #N/A

- - - - #N/A

- - - - #N/A

- - - 3,521,403.48 #N/A

- - - - #N/A

- - - - #N/A

- - - - #N/A

- 1,971,243.00 1,971,243.00 14,273,820.74 #N/A

- - - 1,282,896,547.44 #N/A

- - - - #N/A

- - - - #N/A

- - - 56,668,800.00 #N/A

- - - 52,915,792,623.62 #N/A

- - - 1,199,927,839,867.27 #N/A
- - - 5,360.00 #N/A

- - - 3,215.63 #N/A

- - - 1,607.81 #N/A

- - - 1,804.69 #N/A

- - - 2,406.25 #N/A

- - - 84.22 #N/A

- - - 535,937.50 #N/A

- - - 803,906.25 #N/A

- - - 4,287,500.00 #N/A

- - - 2,406,250.00 #N/A

- - - 535,937.50 #N/A

- - - 601,562.50 #N/A

- - - 589,531.25 #N/A
#N/A #N/A #N/A #N/A #N/A

#N/A
Sisa Alokasi SD Des 2022
KLN
(%) Vol Sat Harsat Jumlah Harga
Personil
48 49 50 51 52 53 54 55

#N/A - 0.00 LS 160,300,000.00 0.00 -

#N/A - (0.32) LS 103,400,000.00 (33,125,490.71) (33,125,490.71)

#N/A - 0.00 Buah 50,000.00 0.00 -

#N/A - 0.00 Buah 50,000.00 0.00 -

#N/A - 0.00 Buah 50,000.00 0.00 -

#N/A - 0.00 Buah 50,000.00 0.00 -

#N/A - 0.00 Buah 50,000.00 0.00 -

#N/A - 0.00 Buah 50,000.00 0.00 -

#N/A - 0.00 Buah 100,000.00 0.00 -

#N/A - 0.00 Buah 50,000.00 0.00 -

#N/A - 0.00 Buah 400,000.00 0.00 -

#N/A - 0.00 Buah 50,000.00 0.00 -

#N/A - 0.00 Buah 1,000,000.00 0.00 -

#N/A - 0.00 Buah 50,000.00 0.00 -

#N/A - 0.00 Buah 200,000.00 0.00 -

#N/A - 0.00 Buah 150,000.00 0.00 -

#N/A - 0.00 Buah 150,000.00 0.00 -

#N/A - (0.15) Buah 150,000.00 (22,899.69) (22,899.69)

#N/A - 0.00 Buah 500,000.00 0.00 -

#N/A #N/A (320.00) Buah 50,000.00 (16,000,000.00) #N/A

#N/A #N/A (0.29) Buah 50,000.00 (14,381.33) #N/A

#N/A - (0.15) LS 174,900,000.00 (26,701,034.61) (2,552,930.47)


#N/A - 0.00 LS 141,400,000.00 0.00 -

#N/A - (1,717.09) M3 41,921.47 (71,982,979.93) (6,882,412.82)

#N/A - (626.00) M3 817,427.78 (511,709,105.68) (149,541,369.25)

#N/A - 20.00 M1 186,664.65 3,733,293.00 1,091,013.90

#N/A - 0.00 M1 5,334,761.58 0.00 -

#N/A - 0.00 M1 54,988,868.56 0.00 -

#N/A - (1,717.09) M1 1,101,010.00 (1,890,534,390.54) (552,487,923.76)

#N/A - (626.00) M1 1,299,000.00 (813,172,912.09) (237,640,857.58)

#N/A #N/A 0.00 M1 1,472,819.00 0.00 #N/A

#N/A - (19,569.74) M3 41,921.47 (820,392,102.54) (35,840,015.77)

#N/A - 13.95 M3 477,210.92 6,657,092.33 1,945,462.16

#N/A - (144.72) M3 382,562.08 (55,365,005.88) (55,365,005.88)

#N/A - (122.12) M3 264,138.09 (32,256,543.55) (32,256,543.55)

#N/A - (1,061.41) M3 288,972.02 (306,717,213.80) (306,717,213.80)

#N/A #N/A (1,443.00) M2 10,645.48 (15,361,427.64) #N/A

#N/A #N/A (340.00) buah 122,977.93 (41,812,496.20) #N/A

#N/A #N/A (3,776.00) buah 395,981.21 (1,495,225,048.96) #N/A

#N/A #N/A (48,798.72) buah 987,045.54 (48,166,556,320.15) #N/A

#N/A #N/A (4.00) buah 1,632,233.46 (6,528,933.84) #N/A

#N/A #N/A 0.00 M3 1,770,900.00 0.00 #N/A

#N/A #N/A 15,717.00 M1 15,000.00 235,755,000.00 #N/A

#N/A - (21,480.84) M3 305,975.57 (6,572,612,769.25) (94,134,495.24)

#N/A - 0.00 M3 270,726.80 0.00 -

#N/A - 0.00 M3 238,380.17 0.00 -

#N/A - 1.00 M3 1,098,099.40 1,098,099.40 154,815.60

#N/A #N/A 0.00 M3 1,770,900.00 0.00 #N/A

#N/A - (39,041.83) Liter 15,034.34 (586,968,172.53) (56,121,006.39)

#N/A - (38,156.87) Liter 15,163.80 (578,603,174.57) (55,321,214.98)

#N/A - (4,887.58) Ton 1,407,297.38 (6,878,283,994.62) (657,644,209.81)

#N/A #N/A (17,965.83) Ton 1,304,923.89 (23,444,041,725.06) #N/A

#N/A #N/A (12,149.18) Kg 35,535.00 (431,721,044.94) #N/A

#N/A #N/A (74.54) M3 1,608,410.80 (119,886,115.80) #N/A

#N/A - (688.29) M3 1,452,674.69 (999,865,820.40) (217,847,902.74)

#N/A - 661.29 Kg 17,020.00 11,255,206.86 1,125,520.69


#N/A - 0.00 Kg 15,678.33 0.00 -

#N/A - (623.91) Kg 19,463.75 (12,143,628.26) (2,428,725.65)

#N/A #N/A 607.75 Kg 25,000.00 15,193,675.00 #N/A

#N/A #N/A (9,502.56) M3 740,977.66 (7,041,183,696.96) #N/A

#N/A - (14,752.00) M3 763,836.59 (11,268,117,375.68) (3,292,983,616.05)

#N/A - 0.00 M3 552,230.00 0.00 -

#N/A - 0.00 M1 691,918.76 0.00 -

#N/A - (6.59) M3 3,000,000.00 (19,782,428.14) (5,934,728.44)

#N/A - (162.00) M2 60,000.00 (9,720,000.00) (9,720,000.00)

#N/A - 117.45 M2 60,000.00 7,046,751.44 7,046,751.44

#N/A - (159.50) M1 3,000,000.00 (478,500,000.00) -

#N/A - (162.00) M1 1,200,000.00 (194,400,000.00) -

#N/A - 753.90 M2 163,302.11 123,113,460.73 -

#N/A - 0.00 Buah 592,603.65 0.00 -

#N/A - 0.00 Buah 603,328.72 0.00 -

#N/A - 0.00 Buah 285,481.27 0.00 -

#N/A - 0.00 M1 648,507.33 0.00 -

#N/A - 20.00 M1 111,105.17 2,222,103.40 666,631.02

#N/A - 5.00 Buah 57,293.20 286,466.00 85,939.80

#N/A - 5.00 Buah 87,989.88 439,949.40 131,984.82

#N/A - (454.67) Buah 87,989.88 (40,006,534.72) (12,001,960.42)

#N/A - 20.00 Buah 73,917.37 1,478,347.40 443,504.22

#N/A - 10.00 M2 165,767.75 1,657,677.50 158,493.31

#N/A - 37.80 M3 41,921.47 1,584,631.57 1,584,631.57

#N/A - 99.80 M3 288,972.02 28,839,407.60 28,839,407.60

#N/A - 67.30 M3 740,977.66 49,867,796.52 49,867,796.52

#N/A - 3.50 M3 305,975.57 1,070,914.50 1,070,914.50

#N/A - (36.32) M3 270,726.80 (9,833,901.22) (401,328.60)

#N/A - (5,260.43) M3 238,380.17 (1,253,981,032.82) (1,253,981,032.82)

#N/A - 5,000.00 M2 10,645.48 53,227,400.00 53,227,400.00

#N/A - 0.90 M3 3,500,000.00 3,150,000.00 3,150,000.00

#N/A - 41.06 M3 1,770,900.00 72,713,154.00 72,713,154.00

#N/A - (48,164.03) M3 1,098,099.40 (52,888,889,188.32) (52,888,889,188.32)

#N/A - (1,619,356.24) M3 740,977.66 ### (1,199,906,796,101.73)


#N/A - 199.89 M2 50,000.00 9,994,640.00 9,994,640.00

#N/A - 199.89 M1 30,000.00 5,996,784.38 5,996,784.38

#N/A - 26.89 Buah 15,000.00 403,392.19 403,392.19

#N/A - 73.88 Buah 15,000.00 1,108,195.31 1,108,195.31

#N/A - 14,529.88 M1 20,000.00 290,597,593.75 290,597,593.75

#N/A - 643,395.88 M2 700.00 450,377,115.78 450,377,115.78

#N/A - 0.89 LS 5,000,000.00 4,464,062.50 4,464,062.50

#N/A - 0.89 LS 7,500,000.00 6,696,093.75 6,696,093.75

#N/A - 0.89 LS 40,000,000.00 35,712,500.00 35,712,500.00

#N/A - 0.88 LS 20,000,000.00 17,593,750.00 17,593,750.00

#N/A - 0.89 LS 5,000,000.00 4,464,062.50 4,464,062.50

#N/A - 0.88 LS 5,000,000.00 4,398,437.50 4,398,437.50

#N/A - 0.89 LS 5,500,000.00 4,910,468.75 4,910,468.75


#N/A SUB TOTAL ### #N/A

Sisa Alokasi SD Des 2022 #N/A


#N/A
(806,865,349,896)
#N/A
#N/A
#N/A
#N/A
(446,976,851,760)
B I A Y A (Rupiah)

KDN KLN

Bahan Alat Total Personil Bahan


56 57 58 59 60

- - - - -

- - (33,125,490.71) - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - (22,899.69) - -

- - - - -

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

(14,265,165.92) (896,471.55) (17,714,567.94) - (8,687,642.82)


- - - - -

(38,457,279.54) (2,416,786.26) (47,756,478.62) - (23,420,905.89)

(333,013,064.72) (7,380,370.28) (489,934,804.25) - (19,314,178.01)

2,429,574.40 53,845.21 3,574,433.51 - 140,911.09

- - - - -

- - - - -

(1,230,333,102.07) (27,267,140.01) (1,810,088,165.84) - (71,357,178.02)

(529,201,455.66) (11,728,376.78) (778,570,690.02) - (30,692,763.14)

#N/A #N/A #N/A #N/A #N/A

- (588,414,065.08) (624,254,080.85) - -

4,332,341.75 96,015.11 6,373,819.02 - 251,268.28

- - (55,365,005.88) - -

- - (32,256,543.55) - -

- - (306,717,213.80) - -

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

(3,012,924,066.44) (2,599,165,655.68) (5,706,224,217.36) - -

- - - - -

- - - - -

683,406.81 164,259.77 1,002,482.18 - 41,719.37

#N/A #N/A #N/A #N/A #N/A

(313,590,783.73) (19,707,111.52) (389,418,901.64) - (190,980,233.71)

(309,121,740.29) (19,426,261.63) (383,869,216.89) - (188,258,537.13)

(3,674,758,819.22) (230,934,343.84) (4,563,337,372.87) - (2,237,968,507.14)

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

(684,213,129.22) (44,103,988.62) (946,165,020.59) - (38,999,470.28)

7,878,644.80 2,251,041.37 11,255,206.86 - -


- - - - -

- (9,714,902.61) (12,143,628.26) - -

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

(7,333,131,772.01) (162,519,833.37) (10,788,635,221.42) - (425,308,876.47)

- - - - -

- - - - -

(13,847,699.70) - (19,782,428.14) - -

- - (9,720,000.00) - -

- - 7,046,751.44 - -

- (358,875,000.00) (358,875,000.00) - -

- (145,800,000.00) (145,800,000.00) - -

- 92,335,095.55 92,335,095.55 - -

- - - - -

- - - - -

- - - - -

- - - - -

1,555,472.38 - 2,222,103.40 - -

200,526.20 - 286,466.00 - -

307,964.58 - 439,949.40 - -

(28,004,574.30) - (40,006,534.72) - -

1,034,843.18 - 1,478,347.40 - -

885,622.78 55,655.55 1,099,771.64 - 539,354.01

- - 1,584,631.57 - -

- - 28,839,407.60 - -

- - 49,867,796.52 - -

- - 1,070,914.50 - -

(4,000,247.44) (4,074,243.88) (8,475,819.92) - -

- - (1,253,981,032.82) - -

- - 53,227,400.00 - -

- - 3,150,000.00 - -

- - 72,713,154.00 - -

- - (52,888,889,188.32) - -

- - (1,199,906,796,101.73) - -
- - 9,994,640.00 - -

- - 5,996,784.38 - -

- - 403,392.19 - -

- - 1,108,195.31 - -

- - 290,597,593.75 - -

- - 450,377,115.78 - -

- - 4,464,062.50 - -

- - 6,696,093.75 - -

- - 35,712,500.00 - -

- - 17,593,750.00 - -

- - 4,464,062.50 - -

- - 4,398,437.50 - -

- - 4,910,468.75 - -
#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A


#N/A #N/A #N/A
(3,799,721) (416,414,148) (807,285,563,766)
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
- - (446,976,851,760)
Self Assessment

TKDN KLN
KLN TOTAL
(%) (%)
Alat Total
61 62 63 64 65 66 67

- - - #N/A #N/A -

- - (33,125,490.71) #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - (22,899.69) #N/A #N/A -

- - - #N/A #N/A -

#N/A #N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A

(298,823.85) (8,986,466.67) (26,701,034.61) #N/A #N/A -


- - - #N/A #N/A -

(805,595.42) (24,226,501.31) (71,982,979.93) #N/A #N/A -

(2,460,123.43) (21,774,301.44) (511,709,105.68) #N/A #N/A -

17,948.40 158,859.49 3,733,293.00 #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

(9,089,046.67) (80,446,224.69) (1,890,534,390.54) #N/A #N/A -

(3,909,458.93) (34,602,222.06) (813,172,912.09) #N/A #N/A -

#N/A #N/A #N/A #N/A #N/A #N/A

(196,138,021.69) (196,138,021.69) (820,392,102.54) #N/A #N/A -

32,005.04 283,273.32 6,657,092.33 #N/A #N/A -

- - (55,365,005.88) #N/A #N/A -

- - (32,256,543.55) #N/A #N/A -

- - (306,717,213.80) #N/A #N/A -

#N/A #N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A

(866,388,551.89) (866,388,551.89) (6,572,612,769.25) #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

53,897.85 95,617.22 1,098,099.40 #N/A #N/A -

#N/A #N/A #N/A #N/A #N/A #N/A

(6,569,037.17) (197,549,270.88) (586,968,172.53) #N/A #N/A -

(6,475,420.54) (194,733,957.68) (578,603,174.57) #N/A #N/A -

(76,978,114.61) (2,314,946,621.75) (6,878,283,994.62) #N/A #N/A -

#N/A #N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A

(14,701,329.54) (53,700,799.82) (999,865,820.40) #N/A #N/A -

- - 11,255,206.86 #N/A #N/A -


- - - #N/A #N/A -

- - (12,143,628.26) #N/A #N/A -

#N/A #N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A

(54,173,277.79) (479,482,154.26) (11,268,117,375.68) #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - (19,782,428.14) #N/A #N/A -

- - (9,720,000.00) #N/A #N/A -

- - 7,046,751.44 #N/A #N/A -

(119,625,000.00) (119,625,000.00) (478,500,000.00) #N/A #N/A -

(48,600,000.00) (48,600,000.00) (194,400,000.00) #N/A #N/A -

30,778,365.18 30,778,365.18 123,113,460.73 #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - - #N/A #N/A -

- - 2,222,103.40 #N/A #N/A -

- - 286,466.00 #N/A #N/A -

- - 439,949.40 #N/A #N/A -

- - (40,006,534.72) #N/A #N/A -

- - 1,478,347.40 #N/A #N/A -

18,551.85 557,905.86 1,657,677.50 #N/A #N/A -

- - 1,584,631.57 #N/A #N/A -

- - 28,839,407.60 #N/A #N/A -

- - 49,867,796.52 #N/A #N/A -

- - 1,070,914.50 #N/A #N/A -

(1,358,081.29) (1,358,081.29) (9,833,901.22) #N/A #N/A -

- - (1,253,981,032.82) #N/A #N/A -

- - 53,227,400.00 #N/A #N/A -

- - 3,150,000.00 #N/A #N/A -

- - 72,713,154.00 #N/A #N/A -

- - (52,888,889,188.32) #N/A #N/A -

- - (1,199,906,796,101.73) #N/A #N/A -


- - 9,994,640.00 #N/A #N/A -

- - 5,996,784.38 #N/A #N/A -

- - 403,392.19 #N/A #N/A -

- - 1,108,195.31 #N/A #N/A -

- - 290,597,593.75 #N/A #N/A -

- - 450,377,115.78 #N/A #N/A -

- - 4,464,062.50 #N/A #N/A -

- - 6,696,093.75 #N/A #N/A -

- - 35,712,500.00 #N/A #N/A -

- - 17,593,750.00 #N/A #N/A -

- - 4,464,062.50 #N/A #N/A -

- - 4,398,437.50 #N/A #N/A -

- - 4,910,468.75 #N/A #N/A -


#N/A #N/A #N/A #N/A #N/A

#N/A
kode

68

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ

RKJ
RKJ

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL
PL

PL

PKPL/RJ/PKRK/PKRJ

PL

PL

PL

RJ

RJ

RK

RK

RK

RK

RK

RK

RK

RK

PL

PL

RK

PL

PL

PL

PL

RK

RK

RK

RK

RK

RK

RK

PKRJL

PKRJL

RK

PKRJL/RK
PKRJ

PKRJ

PKRJ

PKRJ

PKRJ

PKRJ

PKRJ

PKRJ

PKRJ

PKRJ

PKRJ

PKRJ

PKRJ
Material Peralatan Konstruksi 2022

No. Kode Paket Konstruksi/ MPK

RK 1 2409.RDC.001.320.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


2

PL 3 2409.RDC.003.327.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


4

PKRJL 5 2409.RDC.009.330.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


6

PKRK 7 2409.RDC.009.332.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


8

PKPL 9 2409.RDC.012.414.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


10

PKD 11 2409.RDC.012.542.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


12

RJ 13 2409.RDF.001.325.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


14

PKRJ 15 2409.RDF.007.569.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


16

TOTAL
21 1000 20

Alokasi Tambah Data Peralatan Konstruksi


Pagu Paket
MPK TKDN (%)
(Rp. Ribu)
Uraian Jumlah Alokasi
(Rp. )

1,169,677 #NAME? #NAME? #NAME?


- Tambah Data Peralatan Konstruksi
- Tambah Data Peralatan Konstruksi
87,489,226 #N/A #N/A #N/A
- Tambah Data Peralatan Konstruksi
- Tambah Data Peralatan Konstruksi
325,500 #N/A #N/A #N/A
- Tambah Data Peralatan Konstruksi
- Tambah Data Peralatan Konstruksi
1,339,129 #N/A #N/A #N/A
- Tambah Data Peralatan Konstruksi
- Tambah Data Peralatan Konstruksi
6,718,413 #N/A #N/A #N/A
- Tambah Data Peralatan Konstruksi
- Tambah Data Peralatan Konstruksi
1,885,906 #N/A #N/A #N/A
- Tambah Data Peralatan Konstruksi
- Tambah Data Peralatan Konstruksi
606,538 #N/A #N/A #N/A
- Tambah Data Peralatan Konstruksi
- Tambah Data Peralatan Konstruksi
606,537 #N/A #N/A #N/A
- Tambah Data Peralatan Konstruksi
- Tambah Data Peralatan Konstruksi
Tambah Data Peralatan Konstruksi
100,140,926 #NAME? #NAME? #NAME?
19

Tambah Data Material Konstruksi

% TKDN Uraian Volume Alokasi % TKDN Realisasi Volume

#NAME? #NAME? #NAME? 5,806.32


Tambah Data Material Konstruksi
Tambah Data Material Konstruksi
#N/A #N/A #N/A #N/A
Tambah Data Material Konstruksi
Tambah Data Material Konstruksi
#N/A #N/A #N/A
Tambah Data Material Konstruksi
Tambah Data Material Konstruksi
#N/A #N/A #N/A #NAME?
Tambah Data Material Konstruksi
Tambah Data Material Konstruksi
#N/A #N/A #N/A #NAME?
Tambah Data Material Konstruksi
Tambah Data Material Konstruksi
#N/A #N/A #N/A #NAME?
Tambah Data Material Konstruksi
Tambah Data Material Konstruksi
#N/A #N/A #N/A #NAME?
Tambah Data Material Konstruksi
Tambah Data Material Konstruksi
#N/A #N/A #N/A #NAME?
Tambah Data Material Konstruksi
Tambah Data Material Konstruksi
Tambah Data Material Konstruksi
#NAME? #NAME? #NAME? #N/A
Sisa Alokasi

#NAME?

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#NAME?
Material Peralatan Konstruksi 2022

No. Kode Paket Konstruksi/ MPK

RK 1 2409.RDC.001.320.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


2

PL 3 2409.RDC.003.327.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


PKRJL 5 2409.RDC.009.330.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P
6

PKRK 7 2409.RDC.009.332.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


8

PKPL 9 2409.RDC.012.414.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


10

PKD 11 2409.RDC.012.542.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


12

RJ 13 2409.RDF.001.325.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


14

PKRJ 15 2409.RDF.007.569.CB PRESERVASI JALAN SURUMANA (Bts. Sulteng) - P


16

TOTAL
21 1000 20

Alokasi Tambah Data Peralatan Konstruksi


Pagu Paket
MPK TKDN (%)
(Rp. Ribu)
Uraian Jumlah Alokasi
(Rp. )

1,169,677 #NAME? #NAME?

87,489,226 #N/A #N/A #N/A


Excavator, 0.93 M3 #N/A #N/A
Dump Truck, 10 Ton #N/A #N/A
Bulldozer 15 Ton - #N/A
Vibro Roller 10 Ton #N/A #N/A
Motor Grader #N/A #N/A
Concrete Mixer #N/A #N/A
Concrete Vibrator #N/A #N/A
Truck Mixer #N/A #N/A
Concrete paver #N/A #N/A
Water Tank Truck #N/A #N/A
AMP #N/A #N/A
Genset 250 KVA #N/A #N/A
Wheel Loader #N/A #N/A
Asphat Distributor #N/A #N/A
Air Compressor #N/A #N/A
Asphat Finisher #N/A #N/A
Tandem Roller #N/A #N/A
Pneumatic Tyre Roller #N/A #N/A
Yapcrane kap. 10 ton - -
Alat Bantu - -
Excavator Breacker - -
Dump Truck, 5 Ton #N/A #N/A
Batching Plant #N/A #N/A
Stamper - -
Crane 10 - 15 Ton - -
Asphalt Sprayer - -
Blending Equipment #N/A #N/A
325,500 0.00%

1,339,129 0.00%

6,718,413 0.00%

1,885,906 0.00%

606,538 0.00%

606,537 0.00%

100,140,926 #NAME? #NAME? #N/A


19

Tambah Data Material Konstruksi

% TKDN Uraian Volume Alokasi % TKDN Realisasi Volume

0.00% 0.00%

#N/A #N/A
75 Semen #N/A #N/A 91.87 #N/A
75 Pasir #N/A #N/A 100.00 #N/A
- Batu pecah #N/A #N/A 100.00 #N/A
75 Batu kali - -
75 Abu Batu - - -
75 Aspal #N/A #N/A 32.48 #N/A
75 Minyak tanah #N/A #N/A 100.00 25,836.22
75 Besi beton #N/A #N/A 51.47 -
100 Kawat bendrat #N/A #N/A 100.00 -
75 Paku #N/A #N/A 100.00 #N/A
75 Minyak bekisting - - -
75 Kayu bekisting #N/A #N/A 100.00 0.68
75 Multiplex 12 mm - - -
75 Pasir Lapen - - -
75 Timbunan Pilihan #N/A #N/A 100.00 1,225.93
75 Sirtu saring #N/A #N/A 100.00 -
75 Agregat Kelas A #N/A #N/A 100.00 -
75 Agregat Kelas S - #N/A 100.00 -
- Agregat Halus #N/A #N/A 100.00 #N/A
- Agr 5-10 & 10-15 - - -
Agr 5-10 #N/A #N/A 100.00 #N/A
75 Agr 0-5 #N/A #N/A 100.00 #N/A
75 Filler #N/A #N/A 91.87 #N/A
Asbuton Mikro #N/A #N/A 91.99 #N/A
Solar Industri - - -
Beton K-300 - - -
75 Baja Tul (dowel) D32 #N/A #N/A 51.47 #N/A
Join sealent #N/A #N/A 38.33 #N/A
Cat anti karat #N/A #N/A 21.20 #N/A
Expantion cap #N/A #N/A 100.00 #N/A
Poliatilin 125 mikron #N/A #N/A 75.00 #N/A
Curing compond #N/A #N/A 75.00 #N/A
Multiplek 12 mm #N/A #N/A 100.00 #N/A
Kayu acuan #N/A #N/A 100.00 #N/A
Additive #N/A #N/A 75.00 #N/A
0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

#N/A #N/A #N/A -


Sisa Alokasi

#N/A
#N/A
#N/A
-
-
#N/A
#N/A
#N/A
#N/A
#N/A
-
#N/A
-
-
#N/A
#N/A
#N/A
-
#N/A
-
#N/A
#N/A
#N/A
#N/A
-
-
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

-
DAFTAR PEKERJAAN YANG DISUBKONTRAKKAN

PPK : PPK 1.2 Provinsi Banten


No. Paket Kontrak :
Nama Paket : Preservasi Jalan Serdang - Bojonegara - Merak
Prop / Kab / Kodya : Banten / Cilegon
No. Jenis Pekerjaan yang Disubkontrakkan Nama dan Alamat Sub Penyedia Setempat
DAFTAR BARANG YANG DI IMPOR
PPK : PPK 1.2 Provinsi Banten
No. Paket Kontrak :
Nama Paket : Preservasi Jalan Serdang - Bojonegara - Merak
Prop / Kab / Kodya : Banten / Cilegon
NO. NAMA BARANG/URAIAN SPESIFIKASI SATUAN JUMLAH HARGA NEGARA ASAL

Tidak ada Barang yang di Impor

Jakarta, 18 Februari 2021

PT. ADHI KARYA (Persero) Tbk


Departemen Infrastruktur II

Ir. Harimawan, MM
General Manager
DAFTAR SPESIFIKASI TEKNIK
PPK : PPK 1.2 Provinsi Banten
No. Paket Kontrak :
Nama Paket : Preservasi Jalan Serdang - Bojonegara - Merak
Prop / Kab / Kodya : Banten / Cilegon

NO. ITEM PEKERJAAN SPESIFIKASI HAL PENGUJIAN

Spesifikasi Teknik Sesuai Dokumen Tender

Jakarta, 18 Februari 2021

PT. ADHI KARYA (Persero) Tbk


Departemen Infrastruktur II

Ir. Harimawan, MM
General Manager
REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI
(TKDN)

NILAI GABUNGAN BARANG / JASA (Rp) TKDN


URAIAN PEKERJAAN TOTAL Barang/
DN LN Gabungan
(Rp) % KDN Jasa

Barang
I. Material Langsung (Bahan baku) 85,967,348,735.90 85,967,348,735.90 100.00% 100.00% 52.54%
II. Peralatan (Barang jadi) 11,768,880,906.82 11,768,880,906.82 100.00% 100.00% 7.19%
A. Sub Total Barang 97,736,229,642.73 - 97,736,229,642.73 100.00% 100.00% 59.74%
Jasa
III. Manajemen Proyek dan Perekayasaan 7,914,774,297.89 7,914,774,297.89 100.00% 100.00% 4.84%
IV. Alat Kerja / Fasilitas kerja 24,872,161,446.83 24,872,161,446.83 100.00% 100.00% 15.20%
V. Konstruksi dan Pabrikasi 18,530,057,116.93 - 18,530,057,116.93 100.00% 100.00% 11.33%
VI. Jasa Umum 14,561,469,166.43 14,561,469,166.43 100.00% 100.00% 8.90%
B. Sub Total Jasa 65,878,462,028.08 - 65,878,462,028.08 100.00% 100.00% 40.26%

C. TOTAL Biaya (A+B) 163,614,691,670.81 - 163,614,691,670.81 100.00% 100.00% 100.00%


157,672,445,643.33
Formulasi perhitungan : 5,942,246,027.48

% TKDN (Gabungan barang dan


jasa) = 163,614,691,670.81 Jakarta, 18 Februari 2021
163,614,691,670.81
= 100.00% PT. ADHI KARYA (Persero) Tbk
Departemen Infrastruktur II
= -
163,614,691,670.81
= 0.00%

Ir. Harimawan, MM
General Manager

Anda mungkin juga menyukai