Anda di halaman 1dari 8

No.

Uraian Satuan Volum Harga Jumlah Bob


Mat
a b c e d Satuan e Harga
f=d*e otg

DIVISI 1. UMUM
1.2 Mobilisasi LS 1,00
1.17.(Pengujian pH Buah 3,00
1.17.(Pengujian Oksigen Terlarut (DO) Buah 3,00
1.17.(Pengujian Zat Padat Terlarut (TDS) Buah 3,00
1.17.(Pengujian Zat Padat Tersuspensi (TSS) Buah 3,00
1.17.(Pengujian Biological Oxygen Demand (BODBuah 3,00
1.17.(Pengujian Parameter Kebisingan dan/atauBuah 3,00
1.17.(Pengujian Hidro Carbon (HC)-CH4 Buah 3,00
1.17.(Pengujian Total Partikulat (TSP) - Debu Buah 3,00
SKh-1.Pembuatan dokumen RKK, RMPK, RKPPL, Set 1,00
SKh-1.Pembuatan prosedur dan instruksi kerja Set 1,00
SKh-1.Penyusunan pelaporan penerapan SMKK Set 1,00
SKh-1.Induksi Keselamatan Konstruksi (Safety In Org 40,00
SKh-1.Pertemuan keselamatan (Safety Talk dan/aOrg 40,00
SKh-1.Pelatihan Keselamatan Konstruksi, antara Org 40,00
lain:
SKh-1.Simulasi Keselamatan Konstruksi LS 40,00
SKh-1.Spanduk (Banner) Buah 4,00
SKh-1.Poster/leaflet Lembar 6,00
SKh-1.Papan Informasi Keselamatan konstruksi Lembar 2,00
SKh-1.Topi pelindung (Safety Helmet) Buah 40,00
SKh-1.Pelindung mata (Goggles, Spectacles) Buah 10,00
SKh-1.Sarung tangan (Safety Gloves) Pasang 40,00
SKh-1.Sepatu keselamatan (Safety Shoes, rubberPasang 40,00
SKh-1.Rompi keselamatan (Safety Vest) Buah 40,00
SKh-1.Asuransi (Construction All Risk/ CAR) LS 1,00
SKh-1.Petugas Keselamatan Konstruksi, Petugas Org 1,00
SKh-1.Petugas pengatur lalu lintas Org 2,00
SKh-1.Koordinator Manajemen dan KeselamatanOrg 1,00
SKh-1.Peralatan P3K Set 1,00
SKh-1.Ruang P3K Set 1,00
SKh-1.Peralatan Pengasapan (Obat dan mesin FoUnit 1,00
SKh-1.Rambu larangan Buah 6,00
SKh-1.Rambu peringatan Buah 40,00
SKh-1.Kerucut lalu lintas (traffic cone) Buah 40,00
SKh-1.Lampu darurat (Emergency Lamp) Buah 2,00
SKh-1.Alat Pemadam Api Ringan (APAR) Buah 2,00
SKh-1.Bendera K3 Buah 2,00
SKh-1.Pembuatan Kartu Identitas Pekerja (KIP) Buah 40,00

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitula

DIVISI 2. DRAINASE
2.1.(1Galian untuk Selokan Drainase dan Saluran M3 50,00
2.2.(1Pasangan Batu dengan Mortar M3 28,50
2.3.(1Gorong-gorong Kotak Beton Bertulang, uk M1 50,00
2.3.(2Saluran berbentuk U Tipe DS 3 M1 100,00
2.3.(2Saluran berbentuk U Tipe DS 3a (dengan t M1 79,00
2.3.(2Saluran berbentuk U Tipe DS 4 M1 8.210,00
2.3.(2Saluran berbentuk U Tipe DS 4a (dengan t M1 1.515,00

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitula

DIVISI 3. PEKERJAAN TANAH DAN GEOS


3.1.(1Galian Biasa M3 19.919,
3.1.(4Galian Struktur dengan kedalaman 0 - 2 m M3 1.640,32
3.1.(5Galian Struktur dengan kedalaman 2 - 4 m M3 615,12
3.1.(1Galian Perkerasan Beton M3 1.644,30
3.2.(1Timbunan Biasa dari sumber galian M3 116,10
3.2.(2Timbunan Pilihan dari sumber galian M3 170,00
3.3.(1Penyiapan Badan Jalan M2 30.885,

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitula

DIVISI 4. PEKERJAAN PREVENTIF


4.9.(5Pemasangan Sealant M1 13.680,

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitula

DIVISI 5. PERKERASAN BERBUTIR DAN


5.1.(1Lapis Fondasi Agregat Kelas A M3 7.812,86
5.1.(3Lapis Fondasi Agregat Kelas S M3 1.740,00
5.3.(3Lapis Fondasi bawah Beton Kurus M3 2.862,16
SKh-1.Perkerasan Beton Semen untuk Pembukaan M3
Lalu Lintas
8.372,86
Umur Beton Lebih dari 3 hari dan kurang dari 7 H

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitula

DIVISI 6. PERKERASAN ASPAL


6.1 ( Lapis Perekat - Aspal Cair/Emulsi Liter 343,20
6.3(5aLaston Lapis Aus (AC-WC) Ton 49,00
6.3(6aLaston Lapis Antara (AC-BC) Ton 73,50
6.3.(8Bahan anti pengelupasan Kg 21,39

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitula

DIVISI 7. STRUKTUR
7.1 ( Beton struktur, fc’30 Mpa M3 955,52
7.1 ( Beton, fc’10 Mpa M3 84,02
7.3 (3Baja Tulangan Sirip BjTS 420A Kg 45.648,
7.3 (5Baja Tulangan Sirip BjTS 520 Kg 139.450
7.9.(1Pasangan Batu M3 210,20
7.16.(Pipa Drainase PVC diameter 200 mm M1 116,10

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitula

DIVISI 9. PEKERJAAN HARIAN DAN PEK


9.2.(1Marka Jalan Termoplastik M2 1.705,20
9.2.(3Rambu Jalan Tunggal dengan Permukaan PBuah 24,00
9.2.(6Patok Kilometer Buah 6,00
9.2.(1Kereb Pracetak Jenis 2 (Penghalang/Barrie M1 711,00
9.2.(1Kereb Pracetak Jenis 6 (Kereb dengan Buk Buah 170,00
9.2.(1Kereb Pracetak Jenis 7 (Kereb pada PelandBuah 106,00
9.2.(1Kereb Pracetak Jenis 8 (Kereb pada PelandBuah 106,00
9.2.(1Kereb Pracetak Jenis 9 (Kereb pada PelandBuah 212,00
9.2.(1Perkerasan Blok Beton pada Trotoar dan M2 1.020,00

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitula


N URAIAN SAT UAN VOL.HARGA SATUAN
JUMLAH
(Rp.)
HARGA (Rp.)
o.

A. Sewa Tanah M2 1.000

B. PERALATAN
Periksa lembar 1.2-2
C. Kantor Lapangan dan Fasilitas LS 1,00
1 Base Camp Kantor Barak Bengkel
2 Gudang, dan lain-lain
3 Posko Lebaran + Natal Tahun Baru
4
5 ....
6

D. MOBILISASI FASILITAS set 1,00


1 LABORATORIUM
Pendukung (Periksa Fasilitas
Laboratorium)
2
E. MOBILISASI PERSONIL LS
E. Personil Sesuai Struktur Organisasi
I. GS
1 Tenaga Ahli Jalan ....
2 Tenaga Ahli Jembatan ....
3 ...................... ....
4 ...................... ....
5 ......................
6 Set
Personi Lainnya ....
E. Koordinator Manajemen dan ....
II. Keselamatan Lalu Lint ....
1 Manajer Kendal Mutu ....
2 ...................... ....
3 ...................... ....
4 ......................
5 ......................
6

F. Manajemen dan Keselamatan lalu LS


lintas
G DEMOBILISASI LS 1,00
.
Total Biaya Mobilisasi
ITEMEMBAYARAN
P JENIS NO. : 1.2 Lembar
PEKERJAAN
No JENIS ALAT : KODE ALAT
SATUAN VOL.
HARGA SATUAN 1.2-2
JUMLAH
(Rp.)
HARGA (Rp.)
.B. PERALATAN
1 ASPHALT FINISHER E02 Unit 1,00
2 COMPRESSOR 4000-6500 LE05 Unit 1,00
3 CONCRETE MIXER 0.3-0.6 E06 Unit 1,00
4 DUMP TRUCK 3 - 4 M3 E08 Unit 11,00
5 DUMP TRUCK 6-8 M3 E09 Unit 11,00
6 EXCAVATOR 80-140 HP E10 Unit 1,00
7 FLAT BED TRUCK 3-4 TON E11 Unit 10,00
8 GENERATOR SET E12 Unit 1,00
9 MOTOR GRADER >100 HP E13 Unit 1,00
10 WHEEL LOADER 1.0-1.6 M3E15 Unit 1,00
11 TANDEM ROLLER 6-8 T. E17 Unit 1,00
12 TIRE ROLLER 8-10 T. E18 Unit 1,00
13 VIBRATORY ROLLER 5-8 T.E19 Unit 1,00
14 CONCRETE VIBRATOR E20 Unit 6,00
15 WATER TANKER 3000-4500E23 Unit 1,00
16 PEDESTRIAN ROLLER E24 Unit 1,00
17 TAMPER E25 Unit 1,00
18 JACK HAMMER E26 Unit 1,00
19 Trailer Tronton 30 T E35a Unit 1,00
20 TRUK MIXER (AGITATOR) E49 Unit 6,00
21 CRANE ON TRACK 75-100 E51 Unit 1,00
NO. URAIAN SATUAVOLUME HARGA SATUAN
TOTAL KETERAN

I. Laboratory Building
1 Laboratory Building m2 108,00

II. Soil & Aggregate Testing


1 Compaction Test
2 CBR Test
3 Specifc Gravity
4 Atterberg Limits
5 Grain Size Analysis
6 Field Density Test by Sand Co
7 Moisture Content
8 Abrasion of Aggregate by Los A

III. Bituminous Testing 1,00


1 Marshall Asphalt Test
2 Extraction Test, Centrifuge/Ref
3 Specific Gravity of Coarse Aggr
4 Specific Gravity of Fine Aggrega
5 Mix Air Viod Content (Accurate
6 Core Drill
7 Metal Thermometer
8 Accessories and Tolls
9 Penetration Test
10 Softening Point
11 Refusal Density Compactor

IV. Concrete Testing 1,00


1 Slump Cone
2 Cylinder/Cube Mould for
3 Compressive Strength
Beam Mould for Flexural
4
Strength

V. Peralatan pendukung 1,00


1 Mobil Pick Up
2 Komputer + Printer
3 Furniture

VI. Operasional
VII. Test Luar
Test Luar, sesuai kebutuhan ata
perintah Pengawas Pekerjaan

TOTAL BIAYA MOBILISASI

No Uraian Pekerjaan Satuan Kuantitas Harga Total


.1 Mobilisasi Ukuran
LS 1,00 Satuan Harga
2 Pengujian pH Buah 3,00
3 Pengujian Oksigen Terlarut Buah 3,00
(DO)
4 Pengujian Zat Padat Terlarut Buah 3,00
(TDS)
5 Pengujian Zat Padat Buah 3,00
Tersuspensi (TSS)
6 Pengujian Biological Oxygen Buah 3,00
Demand
7 Pengujian (BOD) Parameter Buah 3,00
Kebisingan dan/atau
8 Pengujian Hidro Carbon Getaran Buah 3,00
(HC)-CH4
9 Pengujian Total Partikulat Buah 3,00
(TSP) - Debu
Total Daftar 1 (pindahkan nilai total ke Daftar Rekapitulasi)
No. Uraian Pekerjaan Satuan Kuantitas Harga Total
1 Pembuatan dokumen RKK, Ukuran 1,00
Set Satuan Harga
2 Pembuatan prosedur dan Set 1,00
3 Penyusunan pelaporan Set 1,00
4 penerapan
Induksi SMKK
Keselamatan Org 40,00
5 Konstruksi keselamatan
Pertemuan (Safety (Safety Talk
Orgdan/atau40,00
Tool Box Meeting)
6 Pelatihan Keselamatan Org 40,00
7 Konstruksi, antara
Simulasi Keselamatanlain: LS 40,00
Konstruksi
8 Spanduk (Banner) Buah 4,00
9 Poster/leaflet Lembar 6,00
10 Papan Informasi Lembar 2,00
11 Topi pelindung (Safety Buah 40,00
Helmet)
12 Pelindung mata (Goggles, Buah 10,00
13 Sarung tangan (Safety Pasang 40,00
Gloves)
14 Sepatu keselamatan (Safety Pasang 40,00
Shoes, rubber safety shoes
15 Rompi keselamatan (Safety Buah 40,00
16 Asuransi (Construction All LS 1,00
17 Petugas Keselamatan Org 1,00
18 Konstruksi, Petugas
Petugas pengatur laluK3lintas Org 2,00
19 Koordinator Manajemen dan Org 1,00
20 Keselamatan
Peralatan P3KLalu Set 1,00
21 Ruang P3K Set 1,00
22 Peralatan Pengasapan Unit 1,00
(Obat dan mesin
23 Rambu larangan Fogging) Buah 6,00
24 Rambu peringatan Buah 40,00
25 Kerucut lalu lintas (traffic Buah 40,00
26 Lampu darurat (Emergency Buah 2,00
Lamp)
27 Alat Pemadam Api Ringan Buah 2,00
28 Bendera K3 Buah 2,00
29 Pembuatan Kartu Identitas Buah 40,00
Total Daftar 2 (pindahkan nilai total ke Daftar Rekapitulasi) Rp.......
No. Uraian Pekerjaan Satuan Kuantitas Harga Total
Perkerasan Beton Semen Ukuran
M3 8.372,86 Satuan Harga
Totaluntuk
DaftarPembukaan Lalu
3 (pindahkan Lintas
nilai total ke Daftar Rekapitulasi)
No.Uraian Pekerjaan Satuan Kuantitas Harga Total
1 Galian untuk Selokan Ukuran
M³ 50,00 Satuan Harga
Drainase dan
2 Pasangan BatuSaluran
denganAir M³ 28,50
3 Mortar
Gorong-gorong Kotak Beton M¹ 50,00
Bertulang, ukuran dalam
4 Saluran berbentuk U Tipe DS M¹ 100,00
3
5 Saluran berbentuk U Tipe DS M¹ 79,00
3a (dengan tutup)
6 Saluran berbentuk U Tipe DS M¹ 1.515,00
4a (dengan
7 Galian Biasa tutup) M³ 19.919,55
8 Galian Struktur dengan kedalaman 0M³ - 2 meter 1.640,32
9 Galian Struktur dengan kedalaman 2M³ - 4 meter 615,12
10 Galian Perkerasan Beton M³ 1.644,30
11 Timbunan Biasa dari sumber M³ 116,10
galian
12 Timbunan Pilihan dari M³ 170,00
13 sumber
Penyiapangalian
Badan Jalan M² 30.885,00
14 Pemasangan Sealant M¹ 13.680,00
15 Lapis Fondasi Agregat Kelas A M³ 7.812,86
16 Lapis Fondasi Agregat Kelas S M³ 1.740,00
17 Lapis Fondasi Bawah Beton M³ 2.862,16
18 Kurus
Lapis Perekat - Aspal Liter 343,20
Cair/Emulsi
19 Laston Lapis Aus (AC-WC) Ton 49,00
20 Laston Lapis Antara (AC-BC) Ton 73,50
21 Bahan anti pengelupasan Kg 21,39
22 Beton Struktur fc’30 Mpa M³ 955,52
23 Beton, fc’10 Mpa M³ 84,02
25 Baja Tulangan Sirip BjTS Kg 45.648,51
420A
26 Baja Tulangan Sirip BjTS 520 Kg 139.450,66
28 Pasangan Batu M³ 210,20
29 Pipa Drainase PVC diameter M¹ 116,10
30 200
MarkammJalan Termoplastik M² 1.705,20
31 Rambu Jalan Tunggal dengan Buah 24,00
32 Permukaan Pemantul
Patok Kilometer Buah 6,00
33 Kereb Pracetak Jenis 2 M' 711,00
34 (Penghalang/Barrier)
Kereb Pracetak Jenis 6 (Kereb dengan Buah
Bukaan)170,00
35 Kereb Pracetak Jenis 7 (Kereb Buah 106,00
pada Pelandaian Trotoar)
36 Kereb Pracetak Jenis 8 (Kereb Buah 106,00
pada Pelandaian Trotoar)
37 Kereb Pracetak Jenis 9 (Kereb pada BuahPelandaian212,00
Trotoar)
38 Perkerasan Blok Beton pada M² 1.020,00
Trotoar atau Median
Total Daftar 4 (pindahkan nilai total ke Daftar Rekapitulasi)
No Uraian Pekerjaan Satuan Kuantitas Harga Satuan/ Keluaran
Total Nilai Bobot Kumulatif
.1 Perkerasan Beton Semen Ukuran
M³ 8.372,86 Harga
2 untuk Pembukaan
Saluran berbentuk Lalu
U M¹ 8.210,00
Tipe DS 4
3 Lapis Fondasi M³ 7.812,86
Agregat Kelas A
4 Lapis Fondasi bawah M³ 2.862,16
Beton Kurus
5 Saluran berbentuk U M¹ 1.515,00
Tipe DS
6 Beton 4a (dengan
Struktur fc’30 M³ 955,52
MataMpa
Pembayaran Harga
Daftar No. 1: Mata Pembayaran Umum
Daftar No. 2: Mata Pembayaran Perkiraaan Biaya
Penerapan
Daftar No. Sistem
3: MataKeselamatan
Pembayaran Pekerjaan Utama
Daftar No. 4: Mata Pembayaran selain yang sudah
diuraikan
—dll.— dalam Mata Pembayaran Pekerjaan
TOTAL NILAI
PPN 11%
Total termasuk PPN 11%