tabel monitoring harga bahan untuk satu unit type 45 silfa indah permai rexidence
NO URAIAN SATUAN KOEF HRG SATUAN
JUMLAH NO TANGGAL URAIAN MASUK 1 26 JUNI 2022 TRANSFER MASUK DARI IBU SILVA Rp 7,000,000 2 26 JUNI 2022 PANJER BAS AMIN Rp - 3 27 JUNI 2022 TRANSFER MASUK DARI IBU SILVA Rp 23,000,000 4 28 JUNI 2022 SENG BEKAS UNTUK DAPUR Rp - 5 28 JUNI 2022 BELI 2 DRUM PLASTIK @Rp. 420.000 Rp - 6 28 JUNI 2022 2 RET BATU PONDASI @ Rp. 600.000 Rp - 7 28 JUNI 2022 2 RET PASIR KASAR @ Rp. 650.000 Rp - 8 28 JUNI 2022 40 SAK SEMEN CHOINS @ Rp. 75.000 Rp - 9 28 JUNI 2022 1 BUAH GEROBAK ARCO Rp - 10 28 JUNI 2022 2 BUAH SEKOP @ Rp. 80.000 Rp - 11 28 JUNI 2022 2 BUAH PACUL @ Rp. 59.000 Rp - 12 28 JUNI 2022 1 BUAH TERPAL Rp - 13 28 JUNI 2022 2 KG PAKU 10" @Rp. 21.000 Rp - 14 28 JUNI 2022 1 BUAH METERAN 5 METER Rp - 15 29 JUNI 2022 4 BUAH PIPA PVC TRILIUN 3" @Rp. 119.000 Rp - 16 29 JUNI 2022 4 BUAH ELBOW PVC 3" @Rp. 15.000 Rp - 17 29 JUNI 2022 1 BUAH LEM WAVIN 60 GR Rp - 18 29 JUNI 2022 1 BUAH METERAN ROLL 50 METER Rp - 19 29 JUNI 2022 3 BUAH KINIK BATU POTONG @Rp. 10.600 Rp - 20 29 JUNI 2022 1 BUAH MODERN DISC GERINDA Rp - 21 29 JUNI 2022 2 RET PASIR KASAR @ Rp. 650.000 Rp - 22 29 JUNI 2022 2 RET BATU PONDASI @ Rp. 600.000 Rp - 23 01 JULI 2022 1 BUAH SIKU TUKANG IGM 12 Rp - 24 01 JULI 2022 WATER PAS TORPEDO Rp - 25 01 JULI 2022 5 RET TANAH TIMBUNAN @ Rp. 350.000 Rp - 26 02 JULI 2022 WATER PAS 48" TOHO Rp - 27 02 JULI 2022 4 RET TANAH TIMBUNAN @ Rp. 350.000 Rp - 28 02JULI 2022 PULSA LISTRIK Rp - 29 02JULI 2022 1 SET KUSEN TYPE 45 Rp - JUMLAH>> Rp 30,000,000
NO TANGGAL URAIAN MASUK
1 tf dari ibu silfa Rp 35,000,000
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 KELUAR SALDO AKHIR BAHAN/MATRIAL KOEF Rp - Rp 7,000,000 Rp 7,000,000 Rp - Rp - Rp 23,000,000 Rp 500,000 Rp 22,500,000 Rp 840,000 Rp 21,660,000 Rp 1,200,000 Rp 20,460,000 bqtu pondasi 2ret Rp 1,300,000 Rp 19,160,000 pasir kasar 2ret Rp 3,000,000 Rp 16,160,000 semen 40sak Rp 700,000 Rp 15,460,000 Rp 160,000 Rp 15,300,000 Rp 118,000 Rp 15,182,000 Rp 145,000 Rp 15,037,000 Rp 42,000 Rp 14,995,000 paku 2kg Rp 39,000 Rp 14,956,000 Rp 476,000 Rp 14,480,000 piva pvc 4 inc 4 staf Rp 60,000 Rp 14,420,000 elbow 4 buah Rp 17,000 Rp 14,403,000 lem wavin 1 Rp 141,000 Rp 14,262,000 Rp 31,800 Rp 14,230,200 knik mt potng besi 3 buah Rp 364,000 Rp 13,866,200 gurinda modern 1 buah Rp 1,300,000 Rp 12,566,200 pasir kasar 1 Rp 1,200,000 Rp 11,366,200 batu pondasi 1 Rp 38,000 Rp 11,328,200 Rp 38,000 Rp 11,290,200 Rp 1,750,000 Rp 9,540,200 tanah timbunan 5 Rp 195,000 Rp 9,345,200 Rp 1,400,000 Rp 7,945,200 tanah timbunan 4 Rp 100,000 Rp 7,845,200 Rp 4,500,000 Rp 3,345,200 kusen 1 set Rp 26,654,800 Rp 3,345,200 SALDO
KELUAR SALDO AKHIR
Rp 3,345,200 JUMLAH bahan /alat KOEF JUMLAH
seng bekas 14 lmbr 500000
drum pplastik 2 buah 840000 1200000 1300000 3000000
progres laporan upah kerja NAMA : BASS AMIN 2 UNIT TYPE 45
BLOK TANGGAL URAIAN TOTAL HARGA
I1 27 JUNI 2022 SPK NO. : 01/SPK-SKIM/VI/2022 Rp 26,000,000
27 JUNI 2022 PANJAR PERTAMA PANJAR KEDUA PANJAR KETIGA I2 27 JUNI 2022 SPK NO. : 02/SPK-SKIM/VI/2022 Rp 26,000,000 PANJAR PERTAMA PANJAR KEDUA PANJAR KETIGA TOTAL Rp 52,000,000 PENGAMBILAN / SISA KETERANGAN PANJAR PEMBAYARAN Rp - Rp 26,000,000 BAS AMIN Rp 7,000,000 Rp 19,000,000 BAS AMIN Rp - Rp 19,000,000 Rp - Rp 19,000,000 Rp - Rp 26,000,000 BAS AMIN Rp - Rp 26,000,000 Rp - Rp 26,000,000 Rp - Rp 26,000,000 Rp 7,000,000 Rp 45,000,000