tabel monitoring harga bahan untuk satu unit type 45 silfa indah permai rexidence

NO URAIAN SATUAN KOEF HRG SATUAN


JUMLAH
NO TANGGAL URAIAN MASUK
1 26 JUNI 2022 TRANSFER MASUK DARI IBU SILVA Rp 7,000,000
2 26 JUNI 2022 PANJER BAS AMIN Rp -
3 27 JUNI 2022 TRANSFER MASUK DARI IBU SILVA Rp 23,000,000
4 28 JUNI 2022 SENG BEKAS UNTUK DAPUR Rp -
5 28 JUNI 2022 BELI 2 DRUM PLASTIK @Rp. 420.000 Rp -
6 28 JUNI 2022 2 RET BATU PONDASI @ Rp. 600.000 Rp -
7 28 JUNI 2022 2 RET PASIR KASAR @ Rp. 650.000 Rp -
8 28 JUNI 2022 40 SAK SEMEN CHOINS @ Rp. 75.000 Rp -
9 28 JUNI 2022 1 BUAH GEROBAK ARCO Rp -
10 28 JUNI 2022 2 BUAH SEKOP @ Rp. 80.000 Rp -
11 28 JUNI 2022 2 BUAH PACUL @ Rp. 59.000 Rp -
12 28 JUNI 2022 1 BUAH TERPAL Rp -
13 28 JUNI 2022 2 KG PAKU 10" @Rp. 21.000 Rp -
14 28 JUNI 2022 1 BUAH METERAN 5 METER Rp -
15 29 JUNI 2022 4 BUAH PIPA PVC TRILIUN 3" @Rp. 119.000 Rp -
16 29 JUNI 2022 4 BUAH ELBOW PVC 3" @Rp. 15.000 Rp -
17 29 JUNI 2022 1 BUAH LEM WAVIN 60 GR Rp -
18 29 JUNI 2022 1 BUAH METERAN ROLL 50 METER Rp -
19 29 JUNI 2022 3 BUAH KINIK BATU POTONG @Rp. 10.600 Rp -
20 29 JUNI 2022 1 BUAH MODERN DISC GERINDA Rp -
21 29 JUNI 2022 2 RET PASIR KASAR @ Rp. 650.000 Rp -
22 29 JUNI 2022 2 RET BATU PONDASI @ Rp. 600.000 Rp -
23 01 JULI 2022 1 BUAH SIKU TUKANG IGM 12 Rp -
24 01 JULI 2022 WATER PAS TORPEDO Rp -
25 01 JULI 2022 5 RET TANAH TIMBUNAN @ Rp. 350.000 Rp -
26 02 JULI 2022 WATER PAS 48" TOHO Rp -
27 02 JULI 2022 4 RET TANAH TIMBUNAN @ Rp. 350.000 Rp -
28 02JULI 2022 PULSA LISTRIK Rp -
29 02JULI 2022 1 SET KUSEN TYPE 45 Rp -
JUMLAH>> Rp 30,000,000

NO TANGGAL URAIAN MASUK

1 tf dari ibu silfa Rp 35,000,000


2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
KELUAR SALDO AKHIR BAHAN/MATRIAL KOEF
Rp - Rp 7,000,000
Rp 7,000,000 Rp -
Rp - Rp 23,000,000
Rp 500,000 Rp 22,500,000
Rp 840,000 Rp 21,660,000
Rp 1,200,000 Rp 20,460,000 bqtu pondasi 2ret
Rp 1,300,000 Rp 19,160,000 pasir kasar 2ret
Rp 3,000,000 Rp 16,160,000 semen 40sak
Rp 700,000 Rp 15,460,000
Rp 160,000 Rp 15,300,000
Rp 118,000 Rp 15,182,000
Rp 145,000 Rp 15,037,000
Rp 42,000 Rp 14,995,000 paku 2kg
Rp 39,000 Rp 14,956,000
Rp 476,000 Rp 14,480,000 piva pvc 4 inc 4 staf
Rp 60,000 Rp 14,420,000 elbow 4 buah
Rp 17,000 Rp 14,403,000 lem wavin 1
Rp 141,000 Rp 14,262,000
Rp 31,800 Rp 14,230,200 knik mt potng besi 3 buah
Rp 364,000 Rp 13,866,200 gurinda modern 1 buah
Rp 1,300,000 Rp 12,566,200 pasir kasar 1
Rp 1,200,000 Rp 11,366,200 batu pondasi 1
Rp 38,000 Rp 11,328,200
Rp 38,000 Rp 11,290,200
Rp 1,750,000 Rp 9,540,200 tanah timbunan 5
Rp 195,000 Rp 9,345,200
Rp 1,400,000 Rp 7,945,200 tanah timbunan 4
Rp 100,000 Rp 7,845,200
Rp 4,500,000 Rp 3,345,200 kusen 1 set
Rp 26,654,800 Rp 3,345,200 SALDO

KELUAR SALDO AKHIR

Rp 3,345,200
JUMLAH bahan /alat KOEF JUMLAH

seng bekas 14 lmbr 500000


drum pplastik 2 buah 840000
1200000
1300000
3000000

42000

60000
17000

31600
364000
1300000
1200000

1750000

1400000

4500000
7000000

gerobak arco 1 700000


skop 2 160000
pacul 2 118000
terpal 1 145000
1
meteran 39000

meteran roll 50m 1 141000


progres laporan upah kerja
NAMA : BASS AMIN
2 UNIT TYPE 45

BLOK TANGGAL URAIAN TOTAL HARGA

I1 27 JUNI 2022 SPK NO. : 01/SPK-SKIM/VI/2022 Rp 26,000,000


27 JUNI 2022 PANJAR PERTAMA
PANJAR KEDUA
PANJAR KETIGA
I2 27 JUNI 2022 SPK NO. : 02/SPK-SKIM/VI/2022 Rp 26,000,000
PANJAR PERTAMA
PANJAR KEDUA
PANJAR KETIGA
TOTAL Rp 52,000,000
PENGAMBILAN / SISA KETERANGAN
PANJAR PEMBAYARAN
Rp - Rp 26,000,000 BAS AMIN
Rp 7,000,000 Rp 19,000,000 BAS AMIN
Rp - Rp 19,000,000
Rp - Rp 19,000,000
Rp - Rp 26,000,000 BAS AMIN
Rp - Rp 26,000,000
Rp - Rp 26,000,000
Rp - Rp 26,000,000
Rp 7,000,000 Rp 45,000,000