@contoh Abk
@contoh Abk
FORM E
REKAPITULASI KEBUTUHAN JUMLAH PEJABAT/PEGAWAI, TINGKAT EFISIENSI UNIT (EU) DAN PRESTASI KERJA (PU)
JML.
JML.
BEBAN
NO NAMA JABATAN KERJA KEB. JML. PEG. +/- EU PU KET
UNIT PEG.
1 2 3 4 5 6 7 8
1 KEPALA DINAS 1,574.00 1 0 -1 1.21 A (Sangat Baik)
2 SEKRETARIAT 1,374.00 1 0 -1 1.06 A (Sangat Baik)
3 SUB BAGIAN UMUM DAN KEPEGAWAIAN 21,530.00 15 13 -2 1.10 A (Sangat Baik)
4 SUB BAGIAN KEUANGAN 12,068.00 8 8 0 1.16 A (Sangat Baik)
5 SUB BAGIAN PENYUSUNAN PROGRAM 4,262.00 3 3 0 1.09 A (Sangat Baik)
6 BIDANG BINA MARGA 1,425.00 1 1 0 1.10 A (Sangat Baik)
7 SEKSI JALAN 32,320.00 21 7 -14 1.18 A (Sangat Baik)
8 SEKSI JEMBATAN 14,332.00 10 5 -5 1.10 A (Sangat Baik)
9 SEKSI PERALATAN DAN PERBEKALAN 21,180.00 14 9 -5 1.16 A (Sangat Baik)
10 BIDANG PENGEMBANGAN SUMBER DAYA AIR 1,428.00 1 1 0 1.10 A (Sangat Baik)
11 SEKSI PENGEMBANGAN POTENSI SUMBER DAYA AIR 8,842.00 6 6 0 1.13 A (Sangat Baik)
12 BIDANG OPERASI DAN PEMELIHARAAN SUMBER DAYA AIR 1,846.00 1 1 0 1.42 A (Sangat Baik)
13 SEKSI OPERASI SUMBER DAYA AIR 7,248.00 5 3 -2 1.12 A (Sangat Baik)
14 SEKSI PEMELIHARAAN SUMBER DAYA AIR 5,788.00 4 4 0 1.11 A (Sangat Baik)
JML.
JML.
BEBAN
NO NAMA JABATAN KEB. JML. PEG. +/- EU PU KET
KERJA PEG.
UNIT
15 SEKSI BINA MANFAAT SUMBER DAYA AIR 5,430.00 4 4 0 1.04 A (Sangat Baik)
16 BIDANG TATA RUANG 1,340.00 1 0 -1 1.03 A (Sangat Baik)
17 SEKSI PEMANFAATAN RUANG 10,036.00 6 3 -3 1.29 A (Sangat Baik)
18 SEKSI PENGENDALIAN PEMANFAATAN RUANG 6,188.00 4 3 -1 1.19 A (Sangat Baik)
19 BIDANG PERENCANAAN TEKNIS 1,880.00 1 1 0 1.45 A (Sangat Baik)
20 SEKSI PERENCANAAN TEKNIS JALAN DAN JEMBATAN 10,776.00 7 5 -2 1.18 A (Sangat Baik)
21 SEKSI PERENCANAAN TEKNIS BANGUNAN SDA 8,196.00 6 6 0 1.05 A (Sangat Baik)
22 SEKSI EVALUASI DAN PELAPORAN 3,520.00 2 2 0 1.35 A (Sangat Baik)
Jumlah 182,583 122 85 -37 1.15 A (Sangat Baik)
PEMERINTAH KOTA KEDIRI
FORM D
PERHITUNGAN KEBUTUHAN PEJABAT/PEGAWAI, TINGKAT EFESIENSI JABATAN (EJ) DAN PRESTASI KERJA JABATAN (PJ)
JML.
NO NAMA JABATAN JML. BEBAN JML. KEB. PEG. +/- EJ PJ KET
KERJA UNIT PEG. YANG
ADA
1 2 3 4 5 6 7 8 9
1 KEPALA DINAS 1,574.00 1 0 -1 1.21 A (Sangat Baik)
2 SEKRETARIAT 1,374.00 1 0 -1 1.06 A (Sangat Baik)
3 SUB BAGIAN UMUM DAN KEPEGAWAIAN 1,610.00 1 1 0 1.24 A (Sangat Baik)
4 PENGADMINISTRASI PERSURATAN 2,640.00 2 2 0 1.02 A (Sangat Baik)
5 PRANATA KEARSIPAN 2,880.00 2 2 0 1.11 A (Sangat Baik)
6 ANALISIS ASET NEGARA 2,880.00 2 2 0 1.11 A (Sangat Baik)
7 PENGADMINISTRASI KEPEGAWAIAN 4,080.00 3 2 -1 1.05 A (Sangat Baik)
8 PENGELOLA KEPEGAWAIAN 3,760.00 2 2 0 1.45 A (Sangat Baik)
9 PRAMU KEBERSIHAN 1,680.00 1 1 0 1.29 A (Sangat Baik)
10 PENGEMUDI 1,680.00 1 1 0 1.29 A (Sangat Baik)
11 SUB BAGIAN KEUANGAN 1,640.00 1 1 0 1.26 A (Sangat Baik)
12 BENDAHARA 1,896.00 1 1 0 1.46 A (Sangat Baik)
13 PENGADMINISTRASI PENERIMAAN 1,584.00 1 1 0 1.22 A (Sangat Baik)
14 PENGADMINISTRASI KEUANGAN 4,128.00 3 3 0 1.06 A (Sangat Baik)
15 PENGELOLA GAJI 2,820.00 2 2 0 1.08 A (Sangat Baik)
16 SUB BAGIAN PENYUSUNAN PROGRAM 1,430.00 1 1 0 1.10 A (Sangat Baik)
JML.
JML. BEBAN JML. KEB. PEG.
NO NAMA JABATAN KERJA UNIT PEG. YANG +/- EJ PJ KET
ADA
17 PENGADMINISTRASI UMUM 2,832.00 2 2 0 1.09 A (Sangat Baik)
18 BIDANG BINA MARGA 1,425.00 1 1 0 1.10 A (Sangat Baik)
19 SEKSI JALAN 1,780.00 1 1 0 1.37 A (Sangat Baik)
20 ANALIS JALAN JEMBATAN 1,584.00 1 0 -1 1.22 A (Sangat Baik)
21 PEMELIHARA JALAN 11,040.00 8 0 -8 1.06 A (Sangat Baik)
22 PEMERIKSA JALAN 1,584.00 1 1 0 1.22 A (Sangat Baik)
23 PENELAAH BAHAN JALAN 1,536.00 1 1 0 1.18 A (Sangat Baik)
24 PENELAAH PENGELOLAAN LEGER JALAN 1,344.00 1 0 -1 1.03 A (Sangat Baik)
25 PENGELOLA KELENGKAPAN JALAN 1,824.00 1 0 -1 1.40 A (Sangat Baik)
26 PENGELOLA PEMBANGUNAN DAN PENINGKATAN JALAN 1,860.00 1 0 -1 1.43 A (Sangat Baik)
27 PENGELOLA PEMELIHARAAN JALAN 1,548.00 1 1 0 1.19 A (Sangat Baik)
28 PENGUJI LABORATORIUM TANAH, ASPAL DAN BETON 1,788.00 1 0 -1 1.38 A (Sangat Baik)
29 PENILIK JALAN 1,632.00 1 1 0 1.26 A (Sangat Baik)
30 PRANATA PENGELOLAAN LEGER JALAN 1,824.00 1 0 -1 1.40 A (Sangat Baik)
31 ADMINISTRASI JALAN 2,976.00 2 2 0 1.14 A (Sangat Baik)
32 SEKSI JEMBATAN 1,540.00 1 1 0 1.18 A (Sangat Baik)
33 PEMERIKSA JEMBATAN 2,640.00 2 1 -1 1.02 A (Sangat Baik)
34 PENGAWAS JEMBATAN 2,880.00 2 2 0 1.11 A (Sangat Baik)
35 PENGELOLA PEMBANGUNAN DAN PENGAWASAN JEMBATAN 5,592.00 4 0 -4 1.08 A (Sangat Baik)
36 ADMINISTRASI JEMBATAN 1,680.00 1 1 0 1.29 A (Sangat Baik)
37 SEKSI PERALATAN DAN PERBEKALAN 1,644.00 1 1 0 1.26 A (Sangat Baik)
38 OPERATOR ALAT BERAT 6,720.00 5 3 -2 1.03 A (Sangat Baik)
39 OPERATOR ALAT BERAT (WALLS)1 1,680.00 1 1 0 1.29 A (Sangat Baik)
40 PENGADMINISTRASI UMUM 3,072.00 2 2 0 1.18 A (Sangat Baik)
41 PEMELIHARAAN PERALATAN 1,680.00 1 1 0 1.29 A (Sangat Baik)
42 PRAMU KEBERSIHAN 1,680.00 1 1 0 1.29 A (Sangat Baik)
43 TEKNISI MEKANIK 1,824.00 1 0 -1 1.40 A (Sangat Baik)
44 KOMANDAN PETUGAS KEAMANAN 2,880.00 2 0 -2 1.11 A (Sangat Baik)
45 BIDANG PENGEMBANGAN SUMBER DAYA AIR 1,428.00 1 1 0 1.10 A (Sangat Baik)
46 SEKSI PENGEMBANGAN POTENSI SUMBER DAYA AIR 1,590.00 1 1 0 1.22 A (Sangat Baik)
47 ANALISIS SUMBER DAYA AIR 2,880.00 2 2 0 1.11 A (Sangat Baik)
48 SEKSI PEMBANGUNAN DAN REHABILITASI SUMBER DAYA AIR 1,540.00 1 1 0 1.18 A (Sangat Baik)
JML.
JML. BEBAN JML. KEB. PEG.
NO NAMA JABATAN KERJA UNIT PEG. YANG +/- EJ PJ KET
ADA
49 PENGOLAH SARANA DAN PRASARANA PENGAIRAN 2,832.00 2 2 0 1.09 A (Sangat Baik)
50 BIDANG OPERASI DAN PEMELIHARAAN SUMBER DAYA AIR 1,846.00 1 1 0 1.42 A (Sangat Baik)
51 SEKSI OPERASI SUMBER DAYA AIR 1,540.00 1 1 0 1.18 A (Sangat Baik)
52 PEMERIKSA IRIGASI 2,636.00 2 2 0 1.01 A (Sangat Baik)
53 PENELAAH DATA STATISTIK DAS 3,072.00 2 0 -2 1.18 A (Sangat Baik)
54 SEKSI PEMELIHARAAN SUMBER DAYA AIR 1,420.00 1 1 0 1.09 A (Sangat Baik)
55 PENGOLAH SARANA DAN PRASARANA PENGAIRAN 1,584.00 1 1 0 1.22 A (Sangat Baik)
56 PENGELOLA PEMELIHARAAN JARINGAN IRIGASI 2,784.00 2 2 0 1.07 A (Sangat Baik)
57 SEKSI BINA MANFAAT SUMBER DAYA AIR 1,350.00 1 1 0 1.04 A (Sangat Baik)
58 ANALISIS SUMBER DAYA AIR 4,080.00 3 3 0 1.05 A (Sangat Baik)
59 BIDANG TATA RUANG 1,340.00 1 0 -1 1.03 A (Sangat Baik)
60 SEKSI PEMANFAATAN RUANG 1,852.00 1 1 0 1.42 A (Sangat Baik)
61 ANALISIS PENGEMBANGAN WILAYAH 1,680.00 1 1 0 1.29 A (Sangat Baik)
62 ANALISIS PEMANFAATAN RUANG 2,880.00 2 0 -2 1.11 A (Sangat Baik)
63 BENDAHARA PENGELUARAN PEMBANTU 1,872.00 1 1 0 1.44 A (Sangat Baik)
64 ANALISIS TATA RUANG 1,752.00 1 0 -1 1.35 A (Sangat Baik)
65 SEKSI PENGENDALIAN PEMANFAATAN RUANG 1,772.00 1 1 0 1.36 A (Sangat Baik)
66 ANALISIS PENGEMBANGAN SARANA DAN PRASARANA 1,776.00 1 1 0 1.37 A (Sangat Baik)
67 ANALISIS PENERTIBAN PEMANFAATAN RUANG 2,640.00 2 1 -1 1.02 A (Sangat Baik)
68 BIDANG PERENCANAAN TEKNIS 1,880.00 1 1 0 1.45 A (Sangat Baik)
69 SEKSI PERENCANAAN TEKNIS JALAN DAN JEMBATAN 1,800.00 1 0 -1 1.38 A (Sangat Baik)
70 ANALIS INFRASTRUKTUR 2,976.00 2 2 0 1.14 A (Sangat Baik)
71 ANALIS JASA KONSULTASI 4,320.00 3 3 0 1.11 A (Sangat Baik)
72 ANALIS JALAN DAN JEMBATAN 1,680.00 1 0 -1 1.29 A (Sangat Baik)
73 SEKSI PERENCANAAN TEKNIS BANGUNAN SDA 1,320.00 1 1 0 1.02 A (Sangat Baik)
74 ANALIS PENGELOLAAN SDA 2,640.00 2 2 0 1.02 A (Sangat Baik)
75 ANALIS SDA 2,880.00 2 2 0 1.11 A (Sangat Baik)
76 JURU OPERASI DAN PEMELIHARAAN SDA 1,356.00 1 1 0 1.04 A (Sangat Baik)
77 SEKSI EVALUASI DAN PELAPORAN 1,840.00 1 1 0 1.42 A (Sangat Baik)
78 PENGADMINISTRASI UMUM 1,680.00 1 1 0 1.29 A (Sangat Baik)
Jumlah 182,263 121 85 -36 1.16 A (Sangat Baik)
PEMERINTAH KOTA KEDIRI
FORM C
REKAPITULASI JUMLAH BEBAN KERJA JABATAN
JUMLAH BEBAN
KERJA JABATAN
NO NAMA JABATAN (VOLUME KERJA X
NORMA WAKTU)
1 2 3
1 KEPALA DINAS 1,574.00
2 SEKRETARIAT 1,374.00
3 SUB BAGIAN UMUM DAN KEPEGAWAIAN 1,610.00
4 PENGADMINISTRASI PERSURATAN 2,640.00
5 PRANATA KEARSIPAN 2,880.00
6 ANALISIS ASET NEGARA 2,880.00
7 PENGADMINISTRASI KEPEGAWAIAN 4,080.00
8 PENGELOLA KEPEGAWAIAN 3,760.00
9 PRAMU KEBERSIHAN 1,680.00
10 PENGEMUDI 1,680.00
11 SUB BAGIAN KEUANGAN 1,640.00
12 BENDAHARA 1,896.00
13 PENGADMINISTRASI PENERIMAAN 1,584.00
14 PENGADMINISTRASI KEUANGAN 4,128.00
JUMLAH BEBAN
KERJA JABATAN
NO NAMA JABATAN
(VOLUME KERJA X
NORMA WAKTU)
FORM B
INVENTARISASI JUMLAH PEMANGKU JABATAN
1 2 3 4 5
1 KEPALA DINAS IV/b 0
2 SEKRETARIAT III/d 0
3 SUB BAGIAN UMUM DAN KEPEGAWAIAN III/c 1
4 PENGADMINISTRASI PERSURATAN III/a 2
5 PRANATA KEARSIPAN II/c 2
6 ANALISIS ASET NEGARA III/a 2
7 PENGADMINISTRASI KEPEGAWAIAN II/c 2
8 PENGELOLA KEPEGAWAIAN II/c 2
9 PRAMU KEBERSIHAN II/b 1
10 PENGEMUDI II/a 1
11 SUB BAGIAN KEUANGAN III/c 1
12 BENDAHARA II/c 1
13 PENGADMINISTRASI PENERIMAAN II/c 1
14 PENGADMINISTRASI KEUANGAN II/c 3
15 PENGELOLA GAJI II/c 2
16 SUB BAGIAN PENYUSUNAN PROGRAM III/c 1
NO NAMA JABATAN GOLONGAN JUMLAH KET
FORM A
PENGUMPULAN DATA BEBAN KERJA
JUMLAH
VOLUME KERJA NORMA
NO TUPOKSI/RINCIAN TUGAS/KEGIATAN SATUAN WAKTU BEBAN KERJA KET
(JAM) (VK x NW)
(PERTAHUN)
1 2 3 4 5 6 7
1 Perumusan kebijakan teknis dibidang pekerjaan Konsep 2 100.0 200.0
umum dan penataan ruang
2 Penyusunan perencanaan program dan anggaran Konsep 1 15.0 15.0
dibidang pekerjaan umum dan penataan ruang
3 Pelaksanaan dibidang pekerjaan umum dan penataan Kegiatan 24 5.0 120.0
ruang
4 Pemantauan, evaluasi dan pelaporan atas Kegiatan 48 3.0 144.0
pelaksanaan dibidang pekerjaan umum dan penataan
ruang
5 Koordinasi dan sinkronisasi pelaksanaan dibidang Kegiatan 48 3.0 144.0
pekerjaan umum dan penataan ruang
6 Pembinaan penyelenggaraan dibidang pekerjaan Kegiatan 24 4.0 96.0
umum dan penataan ruang
7 Pembinaan UPTD Kegiatan 24 5.0 120.0
8 Pelaksanaan administrasi dibidang pekerjaan umum Kegiatan 48 10.0 480.0
dan penataan ruang
9 Penyusunan dan perumusan laporan kinerja secara Berkas 1 15.0 15.0
periodik kepada Bupati
10 Pelaksanaan tugas lain yang diberikan oleh Bupati Kegiatan 48 5.0 240.0
sesuai dengan peraturan perundang-undangan
268 165.0
JUMLAH 1,574.0
PEMERINTAH KOTA KEDIRI
FORM A
PENGUMPULAN DATA BEBAN KERJA
JUMLAH
VOLUME KERJA NORMA
NO TUPOKSI/RINCIAN TUGAS/KEGIATAN SATUAN WAKTU BEBAN KERJA KET
(JAM) (VK x NW)
(PERTAHUN)
1 2 3 4 5 6 7
1 Penyusunan rancangan kebijakan dinas Konsep 1 100.0 100.0
2 Pengoordinasian pelaksanaan tugas bidang-bidang Kegiatan 12 15.0 180.0
dan UPTD
3 Penyusunan program dan pelaporan pengelolaan Berkas 12 25.0 300.0
sistem informasi, pemantauan dan evaluasi kegiatan
dinas
4 Pelaksanaan pembinaan, pengelolaan dan Kegiatan 12 25.0 300.0
pengendalian administrasi umum, keuangan, sarana
prasarana, ketenagaan, kerumahtanggaan, dan
kelembagaan
5 Pengoordinasian penyusunan rancangan peraturan Kegiatan 12 5.0 60.0
perundang-undangan bidang Pekerjaan Umum dan
Penataan ruang
6 Pengelolaan urusan rumah tangga, surat menyurat, Kegiatan 48 3.0 144.0
kearsipan, hubungan masyarakat, dokumentasi dan
perpustakaan
7 Pelaksanaan analisis jabatan dan beban kerja Kegiatan 1 100.0 100.0
8 Pengoordinasian penyusunan Standar Operasional Kegiatan 2 10.0 20.0
Prosedur (SOP) kegiatan dinas
9 Penyusunan profil dinas Berkas 1 50.0 50.0
10 Pelaksanaan monitoring dan evaluasi kebijakan dinas Kegiatan 12 10.0 120.0
113 343.0
JUMLAH 1,374.0
PEMERINTAH KOTA KEDIRI
FORM A
PENGUMPULAN DATA BEBAN KERJA
JUMLAH
VOLUME KERJA NORMA
NO TUPOKSI/RINCIAN TUGAS/KEGIATAN SATUAN WAKTU BEBAN KERJA KET
(JAM) (VK x NW)
(PERTAHUN)
1 2 3 4 5 6 7
1 Penyiapan bahan penyusunan perencanaan kegiatan Berkas 240 1.0 240.0
urusan rumah tangga, surat menyurat, kearsipan,
dokumentasi, perpustakaan, kehumasan, dan sarana
prasarana
2 Pengelolaan administrasi perkantoran rumah tangga, Kegiatan 240 1.0 240.0
surat menyurat, kearsipan, dokumentasi,
perpustakaan, kehumasan, dan sarana prasarana
3 Penyiapan bahan usulan kenaikan pangkat, mutasi, Berkas 3 50.0 150.0
promosi, pendidikan dan pelatihan serta
kesejahteraan pegawai
4 Penyiapan bahan penilaian angka kredit pejabat Berkas 1 100.0 100.0
fungsional
5 Penyiapan bahan pembinaan administrasi pegawai Berkas 12 5.0 60.0
6 Penyiapan bahan analisa jabatan dan beban kerja Berkas 1 100.0 100.0
7 Penyiapan bahan monitoring dan evaluasi kegaiatan Berkas 12 25.0 300.0
kepegawaian
8 Penyiapan bahan pelaksanaan penggandaan dan Berkas 12 10.0 120.0
pendistribusian barang di Lingkungan Dinas
9 Pengelolaan, pengamanan dan perawatan Kegiatan 12 10.0 120.0
barang/perawatan inventaris serta gedung
10 Pengelolaan inventaris baran/peralatan serta Kegiatan 12 5.0 60.0
pemeriksaan barang secara berkala
11 Penyiapan bahan pelaksanaan keprotokolan, dan Berkas 12 5.0 60.0
pengurusan administrasi perjalanan Dinas
12 Penyiapan bahan pelaporan inventarisasi barang dan Berkas 12 5.0 60.0
gedung
569 317.0
JUMLAH 1,610.0
PEMERINTAH KOTA KEDIRI
FORM A
PENGUMPULAN DATA BEBAN KERJA
JUMLAH
VOLUME KERJA NORMA
NO TUPOKSI/RINCIAN TUGAS/KEGIATAN SATUAN WAKTU BEBAN KERJA KET
(JAM) (VK x NW)
(PERTAHUN)
1 2 3 4 5 6 7
1 Membantu membuatkan surat tugas setiap pegawai Kegiatan 235 5 1,175
yang melakukan perjalanan dinas luar daerah dan
dalam daerah
2 Membantu mempersiapkan absensi pegawai Kegiatan 235 2 470
3 Melakukan pemantauan terhadap komputer agar bisa Kegiatan 235 3 705
menunjang pekerjaan sehingga dapat berjalan secara
optimal
4 Melakukan inspeksi atau pengecekan secara berkala Kegiatan 235 3 705
terhadap komputer yang digunakan
5 Membantu panyiapan bahan usulan pensiun Kegiatan 235 3 705
1,175 16
JUMLAH 3,760