Anda di halaman 1dari 10

KAYON | KAYONINDOBERKAHJAYA

DAFTAR ABSENSI & UPAH TENAGA KERJA

PROYEK : WISMA PALAWI - BATURADEN PERIODE : 17-May-16 S.D 21-May-16

16-May 17-May 18-May 19-May 20-May 21-May H.K


NO NAMA PEKERJA Upah Jumlah Sub Total
SN SL RB KM JM SB Lbr
1 1 1 1 1 1 6 135,000 810,000
1 MBAH PENK TUKANG 1,230,000
1 1 1 1 1 1 6 70,000 420,000
1 1 1 1 1 1 6 75,000 450,000
2 KASUM TUKANG 765,000
1 1 1 1 1 1 6 52,500 315,000
0 0 1 1 1 1 4 65,000 260,000
3 WARNO TUKANG 470,000
0 0 1 1 1 1 4 52,500 210,000
0 0 1 1 1 1 4 75,000 300,000
4 WITO TUKANG 510,000
0 0 1 1 1 1 4 52,500 210,000
4 4 8 8 8 8 40 TOTAL 2,975,000
DAFTAR ABSENSI & UPAH TENAGA KERJA

PROYEK : REVISI MM UNSOED PERIODE : 5/29/2016

29-May H.K
NO NAMA PEKERJA Upah Jumlah Sub Total
MING Lbr
1 1 135,000 135,000
1 MBAH PENK TK-IN 270,000
1 1 135,000 135,000
1 1 95,000 95,000
2 HAMID TK-IN 190,000
1 1 95,000 95,000
0 - 75,000 -
3 KASUM TK-SOLID -
0 - 75,000 -
1 1 65,000 65,000
4 WARNO TENAGA 130,000
1 1 65,000 65,000
0 1 50,000 50,000
5 SASI TENAGA 100,000
0 1 50,000 50,000
0 - 75,000 -
6 WITO TK-SOLID -
0 - 52,500 -
6 6 TOTAL 690,000
KAYON | KAYONINDOBERKAHJAYA

DAFTAR ABSENSI & UPAH TENAGA KERJA

PROYEK : BANYUMAS PERIODE : 30-May-16

30-May 31-May 1-Jun 2-Jun 3-Jun 4-Jun H.K


NO NAMA PEKERJA
SN SL RB KM JM SB Lbr
1 1 1 1 1 1 6
1 MBAH PENK TK-IN
0 0 1 1 1 1 4
1 1 1 1 1 1 6
2 HAMID TK-IN
0 0 1 1 1 1 4
0 0 1 1 1 1 4
2 KASUM TK-SOLID
0 0 1 1 1 1 4
1 1 1 1 1 1 6
3 WARSO TENAGA
0 0 1 1 1 1 4
1 1 1 1 1 1 6
4 SASI TENAGA
0 0 1 1 1 1 4
0 0 0 0 0 0 -
5 WITO TK-SOLID
0 0 0 0 0 0 -
4 4 10 10 10 10 48

DAFTAR ABSENSI & UPAH TENAGA KERJA

PROYEK : BMS PERIODE : 05/06/2016

29-May H.K
NO NAMA PEKERJA Upah Jumlah Sub Total
MING Lbr
1 1 135,000 135,000
1 MBAH PENK TK-IN 270,000
1 1 135,000 135,000
1 1 95,000 95,000
2 HAMID TK-IN 190,000
1 1 95,000 95,000
1 1 75,000 75,000
3 KASUM TK-SOLID 150,000
1 1 75,000 75,000
1 1 65,000 65,000
4 WARNO TENAGA 130,000
1 1 65,000 65,000
1 1 65,000 65,000
5 SASI TENAGA 130,000
1 1 65,000 65,000
0 - 75,000 -
6 WITO TK-SOLID -
0 - 52,500 -
10 10 TOTAL 870,000
RJA

S.D 4-Jun-16

Upah Jumlah Sub Total

135,000 810,000
1,090,000
70,000 280,000
95,000 570,000
950,000
95,000 380,000
75,000 300,000
510,000
52,500 210,000
65,000 390,000
600,000
52,500 210,000
50,000 300,000
510,000
52,500 210,000
75,000 -
-
52,500 -
TOTAL 3,660,000
KAYON | KAYONINDOBERKAHJAYA

DAFTAR ABSENSI & UPAH TENAGA KERJA

PROYEK : GH-Bu Rustin PERIODE : 13-Jun-16 S.D 18-Jun-16

30-May 31-May 1-Jun 2-Jun 3-Jun 4-Jun H.K


NO NAMA PEKERJA Upah Jumlah Sub Total
SN SL RB KM JM SB Lbr
1 1 1 1 1 1 6 135,000 810,000
1 MBAH PENK TK-IN 1,170,000
1 1 1 1 1 1 6 60,000 360,000
1 1 1 1 1 1 6 95,000 570,000
2 HAMID TK-IN 810,000
1 1 1 1 1 1 6 40,000 240,000
1 1 1 1 1 1 6 75,000 450,000
2 KASUM TK-SOLID 690,000
1 1 1 1 1 1 6 40,000 240,000
1 1 1 1 1 1 6 65,000 390,000
3 WARSO TENAGA 630,000
1 1 1 1 1 1 6 40,000 240,000
1 1 1 1 1 1 6 50,000 300,000
4 SASI TENAGA 540,000
1 1 1 1 1 1 6 40,000 240,000
10 10 10 10 10 10 60 TOTAL 3,840,000
KAYON | KAYONINDOBERKAHJAYA

DAFTAR ABSENSI & UPAH TENAGA KERJA

PROYEK : GH-Bu Rustin PERIODE : 20-Jun-16 S.D 25-Jun-16

20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun H.K


NO NAMA PEKERJA Upah Jumlah Sub Total
SN SL RB KM JM SB Lbr
1 1 1 1 0 1 5 135,000 675,000
1 MBAH PENK TK-IN 795,000
1 1 0 0 0 0 2 60,000 120,000
1 1 1 1 0 1 5 95,000 475,000
2 HAMID TK-IN 555,000
1 1 0 0 0 0 2 40,000 80,000
1 1 1 1 0 1 5 75,000 375,000
2 KASUM TK-SOLID 455,000
1 1 0 0 0 0 2 40,000 80,000
1 1 1 1 0 1 5 65,000 325,000
3 WARSO TENAGA 405,000
1 1 0 0 0 0 2 40,000 80,000
1 1 1 1 0 1 5 50,000 250,000
4 SASI TENAGA 330,000
1 1 0 0 0 0 2 40,000 80,000
10 10 5 5 0 5 35 TOTAL 2,540,000
KAYON | KAYONINDOBERKAHJAYA

DAFTAR ABSENSI & UPAH TENAGA KERJA

PROYEK : GH-Bu Rustin PERIODE : 26-Jun-16 S.D 2-Jul-16

26-Jun 27-Jun 28-Jun 29-Jun 30-Jun 1-Jul 2-Jul H.K


NO NAMA PEKERJA Upah Jumlah Sub Total
SN SN SL RB KM JM SB Lbr
1 1 1 1 1 1 1 6 135,000 810,000
1 MBAH PENK TK-IN 1,110,000
1 1 1 1 1 1 0 5 60,000 300,000
1 1 1 1 1 1 1 6 95,000 570,000
2 HAMID TK-IN 770,000
1 1 1 1 1 1 0 5 40,000 200,000
1 1 1 1 1 1 1 6 75,000 450,000
2 KASUM TK-SOLID 650,000
1 1 1 1 1 1 0 5 40,000 200,000
1 1 1 1 0 0 1 4 65,000 260,000
3 WARSO TENAGA 380,000
1 1 1 1 0 0 0 3 40,000 120,000
1 1 1 1 0 0 1 4 50,000 200,000
4 SASI TENAGA 320,000
1 1 1 1 0 0 0 3 40,000 120,000
10 10 10 10 6 6 5 47 TOTAL 3,230,000
KAYON | KAYONINDOBERKAHJAYA

DAFTAR ABSENSI & UPAH TENAGA KERJA

PROYEK : GH-Bu Rustin PERIODE : 3-Jul-16 S.D 5-Jul-16

3-Jul 4-Jul 5-Jul H.K


NO NAMA PEKERJA Upah Jumlah Sub Total
SN SN SL Lbr
1 1 1 2 135,000 270,000
1 MBAH PENK TK-IN 390,000
1 1 1 2 60,000 120,000
1 1 1 2 95,000 190,000
2 HAMID TK-IN 270,000
1 1 1 2 40,000 80,000
1 1 1 2 75,000 150,000
2 KASUM TK-SOLID 230,000
1 1 1 2 40,000 80,000
1 1 1 2 65,000 130,000
3 WARSO TENAGA 210,000
1 1 1 2 40,000 80,000
1 1 1 2 50,000 100,000
4 SASI TENAGA 180,000
1 1 1 2 40,000 80,000
10 10 10 20 TOTAL 1,280,000
KAYON | KAYONINDOBERKAHJAYA

DAFTAR ABSENSI & UPAH TENAGA KERJA

PROYEK : - PERIODE : THR

THR H.K
NO NAMA PEKERJA Upah Jumlah Sub Total
SN SL RB KM JM SB Lbr
1 1 1 1 1 1 6 135,000 810,000
1 MBAH PENK TK-IN 810,000
0 0 0 0 0 0 - 60,000 -
1 1 1 1 1 1 6 95,000 570,000
2 HAMID TK-IN 570,000
0 0 0 0 0 0 - 40,000 -
0 0 0 0 0 0 - 75,000 -
2 KASUM TK-SOLID -
0 0 0 0 0 0 - 40,000 -
0 0 0 0 0 0 - 65,000 -
3 WARSO TENAGA -
0 0 0 0 0 0 - 40,000 -
0 0 0 0 0 0 - 50,000 -
4 SASI TENAGA -
0 0 0 0 0 0 - 40,000 -
2 2 2 2 2 2 12 TOTAL 1,380,000

Anda mungkin juga menyukai