10 Desember 2021
Realisasi Fisik Perminggu 2.12% 2.11% 3.72% 1.77% 3.53% 1.92% 3.24% 4.38% 4.72% 4.75% 2.83% 0.87% 2.95% 8.72% 9.79% 3.26% 4.24%
Realisasi Fisik Perminggu 2.12% 4.23% 7.95% 9.72% 13.25% 15.17% 18.41% 22.78% 27.50% 32.25% 35.08% 35.95% 38.90% 47.62% 57.41% 60.67% 64.91%
Deviasi Fisik Perminggu 0.60% 0.42% 0.94% -1.75% -1.00% -0.10% -0.72% -1.04% -3.66% -1.52% -5.74% -4.89% -6.46% -6.10% -4.39% 3.06% 1.19%
Deviasi Fisik Komulatif 0.60% 1.02% 1.96% 0.21% -0.79% -0.89% -1.60% -2.64% -6.31% -7.83% -13.57% -18.46% -24.92% -31.02% -35.40% -32.35% -31.16%
hal. 2 / 234
MINGGU 8
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
www.jayakaryakontrindo.com
LAPORAN MINGGUAN KONSTRUKSI STRUKTUR MHC JEMBER
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A PEKERJAAN PERSIAPAN
1 Pembersihan lahan 0.76% 100.00%
2 Pembuatan site office 0.095% 0.000946
3 Pembuatan bedeng pekerja 0.047% 0.000473
4 Pembuatan gudang material dan alat-alat 0.047% 0.000473
5 Pengukuran dan pembuatan bouwplank 0.000% 0.000000
6 Air untuk kebutuhan kerja ( pakai sumur yang ada ) 0.019% 0.000189
7 Listrik untuk kebutuhan kerja 0.038% 0.000378
8 Pembuatan shop darawing & as b 0.000%
8 Sarana K3 helm, sarung tangaj, s 0.019% 0.000189
9 Mobiliasasi dan demobilisasi ten
10 Mobiliasasi dan demobilisasi alat
11 Alat-alat pendukung lainnya (scaf 0.142% 0.001418
12 Site management team ( Tidak t 0.095% 0.000059 0.000059 0.000059 0.000059 0.000059 0.000059 0.000059 0.000059 0.000059 0.000059 0.000059 0.000059 0.000059 0.000059 0.000059 0.000059
13 Keamanan lokasi proyek (24 jam 0.261% 0.000163 0.000163 0.000163 0.000163 0.000163 0.000163 0.000163 0.000163 0.000163 0.000163 0.000163 0.000163 0.000163 0.000163 0.000163 0.000163
B PEKERJAAN STRUKTUR
B2 PEKERJAAN SUBSTRUCTURE & UPPER STRUCTURE
I FOUNDATION 80.00%
( ) ( )
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
e-mail : jayakaryakontrindo@gmail.com
website : jayakaryakontrindo.com
3 Pembuatan bedeng pekerja ls 1.00 0.047% 1.00 100.00 0.047 1.00 100.00 0.0473
4 Pembuatan gudang material dan alat-alat ls 1.00 0.047% 1.00 100.00 0.047 1.00 100.00 0.0473
5 Pengukuran dan pembuatan bouwplank ls 1.00 0.051% 1.00 100.00 0.051 1.00 100.00 0.0512
6 Air untuk kebutuhan kerja ( pakai sumur yang ada ) bln 4.00 0.019% 4.00 100.00 0.019 4.00 100.00 0.0189
7 Listrik untuk kebutuhan kerja bln 4.00 0.038% 4.00 100.00 0.038 4.00 100.00 0.0378
8 Sarana K3 helm, sarung tangaj, sepatu safety, dll) ls 1.00 0.019% 1.00 100.00 0.019 1.00 100.00 0.0189
12 Site management team ( Tidak termasuk kontrak Arsitektur ) bln 4.00 0.095% 0.25 6.25 0.006 0.25 6.25 0.0059
13 Keamanan lokasi proyek (24 jam = 3 shift ) bln 4.00 0.261% 0.25 6.25 0.016 0.25 6.25 0.0163
B PEKERJAAN STRUKTUR
B2 PEKERJAAN SUBSTRUCTURE & UPPER STRUCTURE
I FOUNDATION
2 Urugan pasir t = 10 cm m 3
3.90 0.007%
3 Rabatan t = 5 cm m 2
39.00 0.013%
4 Begesting batako m2 27.54 0.025%
5 Pembesian (ulir TS420) kg 1,839.33 0.296%
6 Beton (K250) m3 17.55 0.159%
7 Pemindahan tanah bekas galian m3 39.00 0.007%
2 Urugan pasir t = 10 cm m 3
4.16 0.008% - - - .0 - - -
2 Urugan pasir t = 10 cm m3 15.26 0.028% 1.72 11.30 0.003 1.72 11.30 0.003
2 Pancang Pile 25x25 system Inject @4m(3m) x 164 ttk m1 1.426% 0.01 62.19 0.887 0.01 62.19 0.887
3 Pancang Pile 25x25 system Inject @4,5m(4,05) x 199 ttk m1 1.946% 0.00 10.55 0.205 0.00 10.55 0.205
4 Pancang Pile 25x25 system Inject @4,5m(4,1) x 84 ttk m1 0.822% 0.00 33.33 0.274 0.00 33.33 0.274
1 Kolom Pedestal
Begesting (C1)
multipleks m2 14.40 0.115%
0.021%
1 Kolom Pedestal
Begesting (C2)
multipleks m2 25.60 0.146%
0.038%
1 Kolom Pedestal
Begesting (C3)
multipleks m2 100.80 0.413%
0.149%
No. Uraian Sat. Vol BOBOT %
2.117 2.117
Total Bobot 100.000%
( ) ( )
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
website : jayakaryakontrindo.com
I FOUNDATION
II LANTAI 1
Sloof Lantai 1 (BS1) 8.106%
1 Galian untuk sloof BS1 m3 322.45 0.152%
2 Begesting batako m2
1,203.40 1.100%
3 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 33,811.89 5.368%
4 Beton (K250) m3 150.42 1.362%
5 Rabatan sloof m2 376.06 0.124%
III LANTAI 2
Balok Lantai 2 - (B1) 1.988%
1 Begesting multipleks m2 285.71 0.435%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243%
3 Beton (K250) m3 34.29 0.310%
VII ATAP
Balok Atap - (B4) 5.069%
1 Begesting multipleks m2 870.33 1.316%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995%
3 Beton (K250) m3 82.89 0.758%
( ) ( )
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
website : jayakaryakontrindo.com
I FOUNDATION
II LANTAI 1
Sloof Lantai 1 (BS1) 8.106%
1 Galian untuk sloof BS1 m3 322.45 0.152%
2 Begesting batako m2
1,203.40 1.100%
3 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 33,811.89 5.368%
4 Beton (K250) m3 150.42 1.362%
5 Rabatan sloof m2 376.06 0.124%
III LANTAI 2
Balok Lantai 2 - (B1) 1.988%
1 Begesting multipleks m2 285.71 0.435%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243%
3 Beton (K250) m3 34.29 0.310%
VII ATAP
Balok Atap - (B4) 5.069%
1 Begesting multipleks m2 870.33 1.316%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995%
3 Beton (K250) m3 82.89 0.758%
( ) ( )
PT. J
Jl. Brig
Tel
A PEKERJAAN PERSIAPAN
1 Pembersihan lahan m²
2 Pembuatan site office ls
3 Pembuatan bedeng pekerja ls
4 Pembuatan gudang material dan alat-alat ls
5 Pengukuran dan pembuatan bouwplank ls
6 Air untuk kebutuhan kerja ( pakai sumur yang ada ) bln
7 Listrik untuk kebutuhan kerja bln
8 Pembuatan shop darawing & as built drawing ls
8 Sarana K3 helm, sarung tangaj, sepatu safety, dll) ls
9 Mobiliasasi dan demobilisasi tenaga kerja ls
10 Mobiliasasi dan demobilisasi alat-alat kerja ls
11 Alat-alat pendukung lainnya (scafolding, drill, molen, dsb) ls
12 Site management team ( Tidak termasuk kontrak Arsitektur ) bln
13 Keamanan lokasi proyek (24 jam = 3 shift ) bln
PEKERJAAN PERSIAPAN
B PEKERJAAN STRUKTUR
B2 PEKERJAAN SUBSTRUCTURE & UPPER STRUCTURE
I FOUNDATION
Pit Lift
1 Galian tanah termasuk bobok beton existing m3
2 Urugan pasir t = 10 cm m3
3 Rabatan t = 5 cm ( 1pc :3psr :5bt ) m2
4 Begesting batako m2
5 Begesting multipleks m2
6 Pembesian lantai (ulir TS420) kg
7 Pembesian dinding (ulir TS420) kg
8 Beton lantai (K250) m3
9 Beton dinding (K250) m3
10 Waterproofing integral ( Conplast WP421 2 ltr/m3) m3
11 Pemindahan tanah bekas galian m3
Hoist Lift
1 Begesting multipleks dinding m2
2 Pembesian dinding (ulir TS420) kg
3 Beton dinding (K250) m3
4 Waterproofing integral ( Conplast WP421 2 ltr/m3) m3
II LANTAI 1
Sloof Lantai 1 (BS1)
1 Galian untuk sloof BS1 m3
2 Begesting batako m2
3 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg
4 Beton (K250) m3
5 Rabatan sloof m2
VII ATAP
Balok Atap - (B4)
1 Begesting multipleks m2
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg
3 Beton (K250) m3
Plat Gording
1 Plat 6mm (0,18x0,12) kg
2 Baut gording 3/8"x1" bh
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg
Konstruksi Baja Façade
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50
1 Baja HB 150.150.7.10 kg
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg
Total Bob
Di buat Oleh :
Kontraktor
( )
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
website : jayakaryakontrindo.com
2,550.00 0.81%
1.00 0.095% 1.00 100.00 0.09 - -
1.00 0.047% 1.00 100.00 0.05 - -
1.00 0.047% 1.00 100.00 0.05 - -
1.00 0.051% 1.00 100.00 0.05 - -
4.00 0.019% 4.00 100.00 0.02 - -
4.00 0.038% 4.00 100.00 0.04 - -
0.00 0.000% - - - - -
1.00 0.019% 1.00 100.00 0.02 - -
1.00 - -
1.00 - -
1.00 0.142% 1.00 100.00 0.14 - -
4.00 0.095% 0.75 18.75 0.02 0.25 6.25
4.00 0.261% 0.75 18.75 0.05 0.25 6.25
0.813%
0.274%
12.01 0.006%
0.71 0.001%
7.06 0.002%
26.61 0.024%
23.48 0.030%
228.64 0.037%
759.99 0.122%
1.41 0.013%
3.64 0.033%
5.05 0.003%
12.01 0.002%
0.723%
105.74 0.137%
3,423.11 0.552%
3.64 0.033%
3.64 0.002%
3.156%
245.76 0.116% 61.44 25.00 0.03 102.41 41.67
24.58 0.046% 6.14 25.00 0.01 10.24 41.67
245.76 0.081% 61.44 25.00 0.02 102.41 41.67
138.24 0.126% 34.56 25.00 0.03 57.60 41.67
10,790.72 1.739% 4,496.49 41.67 0.72 2,697.68 25.00
110.59 1.001% 9.21 8.33 0.08 50.70 45.84
245.76 0.046% - -
0.526%
39.00 0.018% 39.00 100.00 0.02 - -
3.90 0.007% 3.90 100.00 0.01 - -
39.00 0.013% 39.00 100.00 0.01 - -
27.54 0.025% 27.54 100.00 0.03 - -
1,839.33 0.296% 1,839.33 100.00 0.30 - -
17.55 0.159% 14.62 83.33
39.00 0.007%
0.658%
41.58 0.020% - -
4.16 0.008% - -
41.58 0.014% - -
38.61 0.035%
2,507.46 0.404%
18.71 0.169%
41.58 0.008%
0.474%
32.40 0.015% 6.48 20.00 0.00 9.72 30.00
3.24 0.006% 0.65 20.00 0.00 0.97 30.00
32.40 0.011% 6.48 20.00 0.00 9.72 30.00
32.40 0.030% 6.48 20.00 0.01 9.72 30.00
1,703.08 0.274% 681.23 40.00 0.11 170.31 10.00
14.58 0.132% 4.37 30.00
32.40 0.006% - -
2.290%
152.64 0.072% 31.67 20.75 0.01 25.93 16.99
15.26 0.028% 3.17 20.75 0.01 2.30 15.10
152.64 0.050% 31.67 20.75 0.01 23.05 15.10
162.18 0.148% 33.65 20.75 0.03 6.13 3.78
8,318.11 1.340% 3,119.29 37.50 0.50 - -
68.69 0.622% - - - - -
152.64 0.029% - - - - -
1.053%
68.04 0.032% 34.02 50.00 0.02 14.58 21.43
6.80 0.013% 3.40 50.00 0.01 1.46 21.43
68.04 0.022% 34.02 50.00 0.01 14.58 21.43
90.72 0.083% 36.72 40.48 0.03 25.92 28.57
3,994.64 0.644% 2,472.68 61.90 0.40 - -
27.22 0.246% 1.94 7.14 0.02 10.37 38.10
68.04 0.013% - - - - -
5.194%
0.473% 0.00 100.00 0.47 - -
1.426% 0.01 100.00 1.43 - -
1.946% 0.02 100.00 1.95 - -
0.822% 0.01 100.00 0.82 - -
0.261% 0.00 100.00 0.26 - -
0.267% 0.00 25.69 0.07 0.00 22.62
0.115%
14.40 0.021%
495.91 0.079%
1.62 0.015%
0.146%
25.60 0.038% - - - 0.00005 12.50
537.19 0.085% - - - 0.00016 18.75
2.56 0.023% - - - 0.00003 12.50
0.413%
100.80 0.149% - - - 0.00008 5.13
1,160.30 0.184% - - - 0.00067 36.36
8.82 0.080% - - - 0.00004 5.13
0.083%
14.00 0.021% - - -
324.65 0.052% - - -
1.20 0.011% - - -
0.310%
43.20 0.064% - - - 0.00005 8.33
1,274.08 0.202% - - - 0.00110 54.17
4.86 0.044% - - - - -
0.142%
23.80 0.035% - - - - -
551.90 0.088% - - - 0.00044 50.00
2.08 0.019% - - - -
8.106%
322.45 0.152%
1,203.40 1.100%
33,811.89 5.368%
150.42 1.362%
376.06 0.124%
0.528%
31.39 0.015%
86.36 0.079%
2,058.20 0.327%
10.80 0.098%
30.84 0.010%
2.573%
353.84 0.067%
2,585.84 1.816%
401.51 0.551%
4,015.10 0.140%
5.486%
38.13 0.041%
2,979.82 2.287%
348.86 3.158%
3.326%
25.68 0.028%
1,135.65 1.116%
166.19 1.505%
1,523.90 0.310%
1,523.90 0.346%
466.50 0.022%
0.608%
76.32 0.113%
2,628.34 0.417%
8.59 0.078%
0.775%
135.68 0.200%
2,847.13 0.452%
13.57 0.123%
2.187%
534.24 0.788%
6,149.60 0.976%
46.75 0.423%
0.440%
74.20 0.109%
1,720.64 0.273%
6.36 0.058%
1.643%
228.96 0.338%
6,752.64 1.072%
25.76 0.233%
0.750%
126.14 0.186%
2,925.09 0.464%
11.04 0.100%
1.988%
285.71 0.435%
7,830.39 1.243%
34.29 0.310%
4.187%
612.14 0.931%
16,476.08 2.616%
70.63 0.639%
1.084%
185.09 0.282%
4,020.65 0.638%
18.11 0.164%
3.688%
633.10 0.963%
13,720.77 2.178%
60.30 0.546%
0.358%
71.38 0.109%
1,133.54 0.180%
7.72 0.070%
0.431%
78.28 0.119%
1,554.04 0.247%
7.21 0.065%
0.000%
0.000%
0.00 0.000%
0.00 0.000%
0.00 0.000%
0.291%
34.65 0.053%
1,230.69 0.195%
4.78 0.043%
2.153%
278.85 0.424%
8,697.77 1.381%
38.45 0.348%
1.921%
303.00 0.461%
7,470.21 1.186%
30.30 0.274%
0.323%
39.00 0.059%
1,339.65 0.213%
5.60 0.051%
0.095%
10.29 0.016%
420.54 0.067%
1.35 0.012%
0.097%
13.88 0.021%
380.27 0.060%
1.67 0.015%
5.653%
962.15 1.246%
958.32 3.138%
140.24 1.270%
10.563%
2,236.53 2.896%
2,292.44 4.714%
326.25 2.954%
0.256%
44.80 0.066%
940.09 0.149%
4.48 0.041%
1.651%
403.20 0.594%
4,641.21 0.737%
35.28 0.319%
1.129%
190.40 0.281%
4,415.23 0.701%
16.32 0.148%
0.047%
170.64 0.039%
25.60 0.006%
196.24 0.003%
0.287%
1,008.00 0.236%
151.20 0.034%
1,159.20 0.016%
5.069%
870.33 1.316%
18,861.98 2.995%
82.89 0.758%
0.936%
170.05 0.257%
3,376.09 0.536%
15.66 0.143%
100.47 0.056%
0.056%
0.143%
515.29 0.117%
77.29 0.018%
592.58 0.008%
0.317%
1,145.64 0.260%
171.85 0.039%
1,317.49 0.019%
0.503%
1,815.95 0.412%
272.39 0.062%
2,088.35 0.030%
0.171%
616.03 0.140%
92.40 0.021%
708.44 0.010%
4.812%
1,081.17 1.390%
1,305.96 1.876%
159.26 1.457%
159.26
0.090%
0.017%
4.00 0.006%
54.46 0.009%
0.24 0.002%
0.193%
698.02 0.158%
104.70 0.024%
802.73 0.011%
0.367%
1,325.33 0.301%
198.80 0.045%
1,524.13 0.022%
0.335%
1,178.10 0.276%
176.72 0.040%
1,354.82 0.019%
0.107%
25.57 0.039%
322.76 0.051%
1.92 0.018%
0.00
0.00
0.00
0.167%
604.24 0.137%
90.64 0.021%
694.88 0.010%
0.229%
827.95 0.188%
124.19 0.028%
952.14 0.013%
5,325.00
190.53
120.00
5,515.53
0.00
0.00
0.00
0.866%
3,074.13 0.697%
100.80 0.023%
158.77 0.036%
81.66 0.019%
304.00 0.043%
3,415.36 0.048%
0.096%
267.75 0.061%
87.50 0.020%
36.00 0.010%
355.25 0.005%
0.017%
54.60 0.013%
208.00 0.003%
54.60 0.001%
0.149%
1,467.90 0.090%
220.19 0.050%
1,688.09 0.009%
0.030%
248.49 0.019%
37.27 0.008%
285.77 0.002%
0.437%
2,287.88 0.333%
343.18 0.078%
2,631.06 0.026%
0.283%
839.55 0.238%
125.93 0.029%
965.48 0.017%
0.220%
791.28 0.206%
50.40 0.014%
0.209%
753.60 0.196%
48.00 0.014%
5.273%
27,443.68 0.584%
19,654.88 0.418%
3,057.04 0.029%
3,057.04 0.231%
3,057.04 0.000%
7,064.78 0.134%
47,098.56 0.267%
2,446 0.029%
3,057.04 3.582%
(
riode ini S/d Perode Ini
Bobot Qty Prestasi Bobot
(%) (%) (%)
-
0.044 0.00044 50.00 0.044 50.00%
1.771 9.721
Diperiksa Oleh:
Konsultan MK
( )
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
website : jayakaryakontrindo.com
LAPORAN KEMAJUAN PEKERJAAN
I FOUNDATION
II LANTAI 1
Sloof Lantai 1 (BS1) 8.106%
1 Galian untuk sloof BS1 m3 322.45 0.152%
2 Begesting batako m2 1,203.40 1.100%
3 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 33,811.89 5.368%
4 Beton (K250) m3 150.42 1.362%
5 Rabatan sloof m2 376.06 0.124%
III LANTAI 2
Balok Lantai 2 - (B1) 1.988%
1 Begesting multipleks m2 285.71 0.435%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243%
3 Beton (K250) m3 34.29 0.310%
VII ATAP
Balok Atap - (B4) 5.069%
1 Begesting multipleks m2 870.33 1.316%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995%
3 Beton (K250) m 3
82.89 0.758%
( ) ( )
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
website : jayakaryakontrindo.com
LAPORAN KEMAJUAN PEKERJAAN
I FOUNDATION
II LANTAI 1
Sloof Lantai 1 (BS1) 8.106%
1 Galian untuk sloof BS1 m3 322.45 0.152% - - - 21.430 6.65 0.010 21.43 6.65 0.010
2 Begesting batako m 2
1,203.40 1.100%
3 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 33,811.89 5.368% 2,111.310 6.24 0.335 2,111.31 6.24 0.335
4 Beton (K300) m3 150.42 1.362%
5 Rabatan sloof m2 376.06 0.124% 47.630 12.67 0.016 47.63 12.67 0.016
2 Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816%
3 Urugan pasir t = 10 cm m3 401.51 0.551%
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140%
III LANTAI 2
Balok Lantai 2 - (B1) 1.988%
1 Begesting multipleks m2 285.71 0.435%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243%
3 Beton (K300) m3 34.29 0.310%
VII ATAP
Balok Atap - (B4) 5.069%
1 Begesting multipleks m2 870.33 1.316%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995%
3 Beton (K300) m3 82.89 0.758%
( ) ( )
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
website : jayakaryakontrindo.com
LAPORAN KEMAJUAN PEKERJAAN
I FOUNDATION
II LANTAI 1
Sloof Lantai 1 (BS1) 8.106%
1 Galian untuk sloof BS1 m3 322.45 0.152% 21.43 6.65 0.01013 32.58 10.10 0.015 54.01 16.75 0.026
2 Begesting batako m 2
1,203.40 1.100% - - - 201.88 16.78 0.184 201.88 16.78 0.184
3 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 33,811.89 5.368% 2,111.31 6.24 0.33520 5,656.69 16.73 0.898 7,768.00 22.97 1.233
4 Beton (K250) m3 150.42 1.362% - - -
5 Rabatan sloof m2 376.06 0.124% 47.63 12.67 0.01571 72.39 19.25 0.024 120.02 31.91 0.040
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 145.41 5.62 0.102 145.41 5.62 0.102
3 Urugan pasir t = 10 cm m3 401.51 0.551% 75.20 18.73 0.103 75.20 18.73 0.103
4 Rabatan t = 5 cm diganti plastik cor m 2
4,015.10 0.140% - - - - - -
III LANTAI 2
Balok Lantai 2 - (B1) 1.988%
1 Begesting multipleks m2 285.71 0.435%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243%
3 Beton (K250) m3 34.29 0.310%
VII ATAP
Balok Atap - (B4) 5.069%
1 Begesting multipleks m2 870.33 1.316%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995%
3 Beton (K250) m 3
82.89 0.758%
( ) ( )
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
website : jayakaryakontrindo.com
LAPORAN KEMAJUAN PEKERJAAN
I FOUNDATION
II LANTAI 1
Sloof Lantai 1 (BS1) 8.106%
1 Galian untuk sloof BS1 m3 322.45 0.152% 54.01 16.75 0.026 241.24 74.81 0.114 295.25 91.56 0.140
2 Begesting batako m2 1,203.40 1.100% 201.88 16.78 0.184 134.87 11.21 0.123 336.75 27.98 0.308
3 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 33,811.89 5.368% 7,768.0 22.97 1.233 5,959.00 17.62 0.946 13,727.0 40.60 2.179
4 Beton (K250) m 3
150.42 1.362% - - -
5 Rabatan sloof m2 376.06 0.124% 120.02 31.91 0.040 67.98 18.08 0.022 188.00 49.99 0.062
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 145.41 5.62 0.102 239.39 9.26 0.168 384.80 14.88 0.270
3 Urugan pasir t = 10 cm m3 401.51 0.551% 75.20 18.73 0.10 33.39 8.32 0.046 108.59 27.05 0.149
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 920.00 22.91 0.032 920.00 22.91 0.032
III LANTAI 2
Balok Lantai 2 - (B1) 1.988%
1 Begesting multipleks m2 285.71 0.435%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243%
3 Beton (K250) m3 34.29 0.310%
VII ATAP
Balok Atap - (B4) 5.069%
1 Begesting multipleks m2 870.33 1.316%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995%
3 Beton (K250) m 3
82.89 0.758%
Kontraktor Konsultan MK
( ) ( )
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
website : jayakaryakontrindo.com
LAPORAN KEMAJUAN PEKERJAAN
I FOUNDATION
II LANTAI 1
Sloof Lantai 1 (BS1) 8.106%
1 Galian untuk sloof BS1 m3 322.45 0.152% 295.25 91.56 0.140 27.20 8.44 0.013 322.45 100.00 0.152
2 Begesting batako m2 1,203.40 1.100% 336.75 27.98 0.308 546.61 45.42 0.500 883.36 73.41 0.807
3 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 33,811.89 5.368% 13,727.00 40.60 2.179 11,398.00 33.71 1.810 25,125.0 74.31 3.989
4 Beton (K250) m 3
150.42 1.362% - - - 45.50 30.25 0.412 45.5 30.25 0.412
5 Rabatan sloof m2 376.06 0.124% 188.00 49.99 0.062 70.58 18.77 0.023 258.58 68.76 0.085
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 384.80 14.88 0.270 615.85 23.82 0.433 1,000.65 38.70 0.703
3 Urugan pasir t = 10 cm m3 401.51 0.551% 108.59 27.05 0.149 46.81 11.66 0.064 155.40 38.70 0.213
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 920.00 22.91 0.032 634.00 15.79 0.022 1,554.00 38.70 0.054
III LANTAI 2
Balok Lantai 2 - (B1) 1.988%
1 Begesting multipleks m2 285.71 0.435%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243%
3 Beton (K250) m3 34.29 0.310%
VII ATAP
Balok Atap - (B4) 5.069%
1 Begesting multipleks m2 870.33 1.316%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995%
3 Beton (K250) m3 82.89 0.758%
( ) ( )
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
website : jayakaryakontrindo.com
LAPORAN KEMAJUAN PEKERJAAN
I FOUNDATION
II LANTAI 1
Sloof Lantai 1 (BS1) 8.106%
1 Galian untuk sloof BS1 m3 322.45 0.152% 322.45 100.00 0.152 - - - 322.45 100.00 0.152
2 Begesting batako m2 1,203.40 1.100% 883.36 73.41 0.807 - - - 883.36 73.41 0.807
3 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 33,811.89 5.368% 25,125.00 74.31 3.989 1,217.00 3.60 0.193 26,342.0 77.91 4.182
4 Beton (K250) m 3
150.42 1.362% 45.50 30.25 0.412 59.92 39.83 0.542 105.4 70.08 0.954
5 Rabatan sloof m2 376.06 0.124% 258.58 68.76 0.085 17.47 4.65 0.006 276.05 73.41 0.091
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 1000.65 38.70 0.703 1,188.35 45.96 0.835 2,189.00 84.65 1.537
3 Urugan pasir t = 10 cm m3 401.51 0.551% 155.40 38.70 0.213 90.80 22.61 0.125 246.20 61.32 0.338
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 1554.00 38.70 0.054 908.00 22.61 0.032 2,462.00 61.32 0.086
III LANTAI 2
Balok Lantai 2 - (B1) 1.988%
1 Begesting multipleks m2 285.71 0.435%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243%
3 Beton (K250) m3 34.29 0.310%
VII ATAP
Balok Atap - (B4) 5.069%
1 Begesting multipleks m2 870.33 1.316%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995%
3 Beton (K250) m3 82.89 0.758%
( ) ( )
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
website : jayakaryakontrindo.com
LAPORAN KEMAJUAN PEKERJAAN
I FOUNDATION
II LANTAI 1
Sloof Lantai 1 (BS1) 8.106%
1 Galian untuk sloof BS1 m3 322.45 0.152% 322.45 100.00 0.152 - - - 322.45 100.00 0.152
2 Begesting batako m2 1,203.40 1.100% 883.36 73.41 0.807 69.56 5.78 0.064 952.92 79.19 0.871
3 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 33,811.89 5.368% 26,342.00 77.91 4.182 1,193.00 3.53 0.189 27,535.0 81.44 4.372
4 Beton (K250) m 3
150.42 1.362% 105.42 70.08 0.954 10.00 6.65 0.091 115.4 76.73 1.045
5 Rabatan sloof m2 376.06 0.124% 276.05 73.41 0.091 12.95 3.44 0.004 289.00 76.85 0.095
-
Sloof Lantai 1 (BS2) 0.528% -
1 Galian untuk sloof BS2 m3 31.39 0.015% 31.39 100.00 0.015 - - - 31.39 100.00 0.015
2 Begesting batako m2 86.36 0.079% 86.36 100.00 0.079 - - - 86.36 100.00 0.079
3 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,058.20 0.327% 2,058.20 100.00 0.327 2,058.2 100.00 0.327
4 Beton (K250) m3 10.80 0.098% 10.01 92.73 0.091 0.79 7.27 0.007 10.80 100.00 0.098
5 Rabatan sloof m2 30.84 0.010% 30.84 100.00 0.010 - - - 30.84 100.00 0.010
-
Pekerjaan Urugan & Rabatan Lantai 1 (Store dan Gudang) 2.573% -
1 Perataan kembali galian untuk sloof m3 353.84 0.067% 303.84 85.87 0.057 20.00 5.65 0.004 323.84 91.52 0.061
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 2,189.00 84.65 1.537 100.00 3.87 0.070 2,289.00 88.52 1.608
3 Urugan pasir t = 10 cm m3 401.51 0.551% 246.20 61.32 0.338 60.00 14.94 0.082 306.20 76.26 0.420
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 2,462.00 61.32 0.086 1,000.00 24.91 0.035 3,462.00 86.22 0.121
-
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% -
1 Begesting batako/multipleks m2 38.13 0.041% 36.87 96.70 0.040 - - - 36.87 96.70 0.040
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,462.00 82.62 1.889 211.16 7.09 0.162 2,673.16 89.71 2.051
3 Beton (K250) m 3
348.86 3.158% 295.50 84.71 2.675 24.50 7.02 0.222 320.00 91.73 2.897
III LANTAI 2
Balok Lantai 2 - (B1) 1.988%
1 Begesting multipleks m2 285.71 0.435%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243%
3 Beton (K250) m3 34.29 0.310%
VII ATAP
Balok Atap - (B4) 5.069%
1 Begesting multipleks m2 870.33 1.316%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995%
3 Beton (K250) m3 82.89 0.758%
( ) ( )
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
website : jayakaryakontrindo.com
LAPORAN KEMAJUAN PEKERJAAN
I FOUNDATION
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 2,289.00 88.52 1.608 20.50 0.79 0.014 2,309.50 89.31 1.622
3 Urugan pasir t = 10 cm m3 401.51 0.551% 306.20 76.26 0.420 5.12 1.28 0.007 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 3,462.00 86.22 0.121 51.25 1.28 0.002 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 36.87 96.70 0.040 0.30 0.79 0.000 37.17 97.49 0.040
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,673.16 89.71 2.051 51.25 1.72 0.039 2,724.41 91.43 2.091
3 Beton (K250) m 3
348.86 3.158% 320.00 91.73 2.897 6.15 1.76 0.056 326.15 93.49 2.953
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.113 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.417 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 6.40 74.54 0.058 - - - 6.40 74.54 0.058
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.200 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.452 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% - - -
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 146.38 27.40 0.216 - - - 146.38 27.40 0.216
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 5,349.31 86.99 0.849 631.81 10.27 0.100 5,981.1 97.26 0.950
3 Beton (K250) m3 46.75 0.423% 30.06 64.30 0.272 3.24 6.93 0.029 33.3 71.24 0.301
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.109 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.273 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 4.70 73.90 0.043 - - - 4.70 73.90 0.043
- - -
Kolom di Lantai 1 (C6) 1.643% - - - \
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.338 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.072 - - - 6,752.6 100.00 1.072
3 Beton (K250) m3 25.76 0.233% 18.32 71.12 0.166 7.44 28.88 0.067 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.186 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.464 - - - 2,925.09 100.00 0.464
3 Beton (K250) m 3
11.04 0.100% 6.04 54.72 0.055 3.37 30.53 0.031 9.41 85.26 0.085
III LANTAI 2
Balok Lantai 2 - (B1) 1.988%
1 Begesting multipleks m2 285.71 0.435% - - - 18.00 6.30 0.027 18.00 6.30 0.027
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% - - - 1,032.00 13.18 0.164 1,032.00 13.18 0.164
3 Beton (K250) m3 34.29 0.310% - - - - - - - - -
VII ATAP
Balok Atap - (B4) 5.069%
1 Begesting multipleks m2 870.33 1.316%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995%
3 Beton (K250) m3 82.89 0.758%
( ) ( )
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
website : jayakaryakontrindo.com
LAPORAN KEMAJUAN PEKERJAAN
I FOUNDATION
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 2,309.50 89.31 1.622 - - - 2,309.50 89.31 1.622
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.427 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 3,513.25 87.50 0.122 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 37.17 97.49 0.040 - - - 37.17 97.49 0.040
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,724.41 91.43 2.091 - - - 2,724.41 91.43 2.091
3 Beton (K250) m 3
348.86 3.158% 326.15 93.49 2.953 - - - 326.15 93.49 2.953
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.113 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.417 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 6.40 74.54 0.058 0.40 4.66 0.004 6.80 79.20 0.062
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.200 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.452 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% - - -
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 146.38 27.40 0.216 - - - 146.38 27.40 0.216
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 5,981.12 97.26 0.950 - - - 5,981.1 97.26 0.950
3 Beton (K250) m3 46.75 0.423% 33.30 71.24 0.301 - - - 33.3 71.24 0.301
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.109 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.273 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 4.70 73.90 0.043 - - - 4.70 73.90 0.043
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.338 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.072 - - - 6,752.6 100.00 1.072
3 Beton (K250) m3 25.76 0.233% 25.76 100.00 0.233 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.186 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.464 - - - 2,925.09 100.00 0.464
3 Beton (K250) m 3
11.04 0.100% 9.41 85.26 0.085 - - - 9.41 85.26 0.085
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 18.00 6.30 0.027 50.40 17.64 0.077 68.40 23.94 0.104
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 1,032.00 13.18 0.164 1,245.00 15.90 0.198 2,277.00 29.08 0.362
3 Beton (K250) m3 34.29 0.310% - - - - - - - - -
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 7.20 1.18 0.011 19.00 3.10 0.029 26.20 4.28 0.040
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% - - - 759.00 4.61 0.121 759.00 4.61 0.121
3 Beton (K250) m3 70.63 0.639% - - - - - - - - -
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 7.50 4.05 0.011 16.20 8.75 0.025 23.70 12.80 0.036
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 700.50 17.42 0.111 32.27 0.80 0.005 732.77 18.23 0.116
3 Beton (K250) m 3
18.11 0.164% - - - - - - - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B4) 3.688% - - -
1 Begesting multipleks m2 633.10 0.963% 7.63 1.21 0.012 26.37 4.17 0.040 34.00 5.37 0.052
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 664.18 4.84 0.105 318.22 2.32 0.051 982.40 7.16 0.156
3 Beton (K250) m3 60.30 0.546% - - - - - - - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B4a) 0.358%
1 Begesting multipleks m2 71.38 0.109% - - - - - - - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% - - - - - - - - -
3 Beton (K250) m3 7.72 0.070% - - - - - - - - -
VII ATAP
Balok Atap - (B4) 5.069%
1 Begesting multipleks m2 870.33 1.316%
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995%
3 Beton (K250) m3 82.89 0.758%
1
Tambahan waterprofing integral utk volume balok atap ( karena
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) m3 100.47 0.056%
0.056%
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143%
1 Baja WF 200.100.5,5.8 kg 515.29 0.117%
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018%
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008%
( ) ( )
PT. JAYA KARYA KONTRINDO
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
website : jayakaryakontrindo.com
LAPORAN KEMAJUAN PEKERJAAN
I FOUNDATION
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 2,309.50 89.31 1.622 - - - 2,309.50 89.31 1.622
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.427 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m 2
4,015.10 0.140% 3,513.25 87.50 0.122 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 37.17 97.49 0.040 - - - 37.17 97.49 0.040
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,724.41 91.43 2.091 - - - 2,724.41 91.43 2.091
3 Beton (K250) m3 348.86 3.158% 326.15 93.49 2.953 - - - 326.15 93.49 2.953
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.113 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.417 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 6.80 79.20 0.062 - - - 6.80 79.20 0.062
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.200 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.452 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% - - -
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 146.38 27.40 0.216 - - - 146.38 27.40 0.216
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 5,981.12 97.26 0.950 - - - 5,981.1 97.26 0.950
3 Beton (K250) m 3
46.75 0.423% 33.30 71.24 0.301 - - - 33.3 71.24 0.301
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.109 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.273 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 4.70 73.90 0.043 - - - 4.70 73.90 0.043
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.338 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.072 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.233 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.186 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.464 - - - 2,925.09 100.00 0.464
3 Beton (K250) m3 11.04 0.100% 9.41 85.26 0.085 - - - 9.41 85.26 0.085
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 68.40 23.94 0.104 92.85 32.50 0.141 161.25 56.44 0.245
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 2,277.00 29.08 0.362 1,658.90 21.19 0.263 3,935.90 50.26 0.625
3 Beton (K250) m3 34.29 0.310% - - - - - - - - -
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 26.20 4.28 0.040 537.60 87.82 0.818 563.80 92.10 0.858
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 759.00 4.61 0.121 14,441.21 87.65 2.293 15,200.21 92.26 2.413
3 Beton (K250) m3 70.63 0.639% - - - - - - - - -
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 23.70 12.80 0.036 77.50 41.87 0.118 101.20 54.68 0.154
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 732.77 18.23 0.116 1,576.15 39.20 0.250 2,308.92 57.43 0.367
3 Beton (K250) m 3
18.11 0.164% - - - - - - - - -
- - -
Balok Lantai 2 - (B4) - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
1 Begesting multipleks m2 633.10 0.963% 34.00 5.37 0.052 379.95 60.01 0.578 413.95 65.38 0.630
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 982.40 7.16 0.156 8,269.04 60.27 1.313 9,251.44 67.43 1.469
3 Beton (K250) m3 60.30 0.546% - - - - - - - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B4a) 0.358%
1 Begesting multipleks m2 71.38 0.109% - - - - - - - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% - - - - - - - - -
3 Beton (K250) m3 7.72 0.070% - - - - - - - - -
I FOUNDATION
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 2,309.50 89.31 1.622 - - - 2,309.50 89.31 1.622
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.427 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 3,513.25 87.50 0.122 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 37.17 97.49 0.040 - - - 37.17 97.49 0.040
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,724.41 91.43 2.091 - - - 2,724.41 91.43 2.091
3 Beton (K250) m3 348.86 3.158% 326.15 93.49 2.953 - - - 326.15 93.49 2.953
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m 3
166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.113 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.417 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 6.80 79.20 0.062 - - - 6.80 79.20 0.062
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.200 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.452 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% - - -
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 146.38 27.40 0.216 334.43 62.60 0.493 480.82 90.00 0.709
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 5,981.12 97.26 0.950 - - - 5,981.1 97.26 0.950
3 Beton (K250) m3 46.75 0.423% 33.30 71.24 0.301 - - - 33.3 71.24 0.301
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.109 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.273 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 4.70 73.90 0.043 - - - 4.70 73.90 0.043
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.338 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.072 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.233 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.186 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.464 - - - 2,925.09 100.00 0.464
3 Beton (K250) m 3
11.04 0.100% 9.41 85.26 0.085 - - - 9.41 85.26 0.085
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 161.25 56.44 0.245 - - - 161.25 56.44 0.245
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 3,935.90 50.26 0.625 - - - 3,935.90 50.26 0.625
3 Beton (K250) m3 34.29 0.310% - - - 16.65 48.56 0.151 16.65 48.56 0.151
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 563.80 92.10 0.858 - - - 563.80 92.10 0.858
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 15,200.21 92.26 2.413 - - - 15,200.21 92.26 2.413
3 Beton (K250) m3 70.63 0.639% - - - 63.90 90.47 0.579 63.90 90.47 0.579
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 101.20 54.68 0.154 - - - 101.20 54.68 0.154
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 2,308.92 57.43 0.367 - - - 2,308.92 57.43 0.367
3 Beton (K250) m3 18.11 0.164% - - - 9.90 54.68 0.090 9.90 54.68 0.090
- - -
Balok Lantai 2 - (B4) 3.688% - - -
1 Begesting multipleks m2 633.10 0.963% 413.95 65.38 0.630 - - - 413.95 65.38 0.630
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 9,251.44 67.43 1.469 - - - 9,251.44 67.43 1.469
3 Beton (K250) m 3
60.30 0.546% - - - 39.43 65.39 0.357 39.43 65.39 0.357
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% - - - - - - - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% - - - - - - - - -
3 Beton (K250) m3 7.72 0.070% - - - - - - - - -
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 36.62 46.78 0.056 - - - 36.62 46.78 0.056
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 747.18 48.08 0.119 - - - 747.18 48.08 0.119
3 Beton (K250) m3 7.21 0.065% - - - 3.37 46.79 0.031 3.37 46.79 0.031
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% - - - - - - - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% - - - - - - - - -
3 Beton (K250) m3 4.78 0.043% - - - - - - - - -
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 235.95 84.62 0.359 - - - 235.95 84.62 0.359
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 7,318.34 84.14 1.162 - - - 7,318.34 84.14 1.162
3 Beton (K250) m3 38.45 0.348% - - - 32.53 84.62 0.295 32.53 84.62 0.295
- - -
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 201.25 66.42 0.306 - - - 201.25 66.42 0.306
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 4,925.57 65.94 0.782 - - - 4,925.57 65.94 0.782
3 Beton (K250) m3 30.30 0.274% - - - 20.13 66.42 0.182 20.13 66.42 0.182
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% - - - - - - - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% - - - - - - - - -
3 Beton (K250) m3 5.60 0.051% - - - - - - - - -
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% - - - - - - - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% - - - - - - - - -
3 Beton (K250) m3 1.35 0.012% - - - - - - - - -
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 4.20 30.27 0.006 - - - 4.20 30.27 0.006
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 96.30 25.32 0.015 - - - 96.30 25.32 0.015
3 Beton (K250) m 3
1.67 0.015% - - - - - - - - -
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 755.15 78.49 0.978 - - - 755.15 78.49 0.978
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% - - - 755.15 78.80 2.473 755.15 78.80 2.473
3 Beton (K250) m3 140.24 1.270% - - - 134.17 95.67 1.215 134.17 95.67 1.215
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 956.52 42.77 1.238 - - - 956.52 42.77 1.238
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% - - - 956.52 41.72 1.967 956.52 41.72 1.967
3 Beton (K250) m3 326.25 2.954% - - - 214.35 65.70 1.941 214.35 65.70 1.941
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% - - -
3 Beton (K250) m3 4.48 0.041% - - -
- - -
Kolom di Lantai 2 - (C3) 1.651% - - -
1 Begesting multipleks m2 403.20 0.594% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% - - -
3 Beton (K250) m3 35.28 0.319% - - -
- - -
Kolom di Lantai 2 - (C4) 1.129% - - -
1 Begesting multipleks m2 190.40 0.281% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% - - -
3 Beton (K250) m3 16.32 0.148% - - -
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% - - -
3 Beton (K250) m3 82.89 0.758% - - -
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% - - -
3 Beton (K250) m3 15.66 0.143% - - -
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) m3 100.47 0.056% - - -
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 708.44 0.010% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% - - -
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% - - -
3 Beton (K250) m 3
159.26 1.457% - - -
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m 3
159.26
ltr/m3) 0.090% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% - - -
3 Beton (K250) m3 0.24 0.002% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% - - -
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m3 1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% - - -
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% - - -
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% - - -
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% - - -
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% - - -
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% - - -
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% - - -
5 Baut angkur 3/4" bh 36.00 0.010% - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% - - -
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% - - -
2 Baut gording 3/8"x1" bh 208.00 0.003% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% - - -
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - -
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - -
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - -
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 6,443.00 23.48 0.137 - - - 6,443.00 23.48 0.137
2 Pasang gording - (re-install) kg 19,654.88 0.418% 9,511.00 48.39 0.202 945.40 4.81 0.020 10,456.40 53.20 0.222
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% - - -
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% - - -
5 Pasang atap spandek - (re-install) m2 3,057.04 0.000% - - -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% - - -
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% - - -
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% - - -
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% - - -
I FOUNDATION
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 2,309.50 89.31 1.622 - - - 2,309.50 89.31 1.622
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.427 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m 2
4,015.10 0.140% 3,513.25 87.50 0.122 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 37.17 97.49 0.040 - - - 37.17 97.49 0.040
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,724.41 91.43 2.091 - - - 2,724.41 91.43 2.091
3 Beton (K250) m3 348.86 3.158% 326.15 93.49 2.953 - - - 326.15 93.49 2.953
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.113 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.417 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 6.80 79.20 0.062 1.79 20.80 0.016 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.200 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.452 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% - - - 13.57 100.00 0.123 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 480.82 90.00 0.709 53.42 10.00 0.079 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 5,981.12 97.26 0.950 168.48 2.74 0.027 6,149.6 100.00 0.976
3 Beton (K250) m 3
46.75 0.423% 33.30 71.24 0.301 13.45 28.76 0.122 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.109 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.273 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 4.70 73.90 0.043 1.66 26.10 0.015 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.338 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.072 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.233 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.186 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.464 - - - 2,925.09 100.00 0.464
3 Beton (K250) m3 11.04 0.100% 9.41 85.26 0.085 1.63 14.74 0.015 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 161.25 56.44 0.245 - - - 161.25 56.44 0.245
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 3,935.90 50.26 0.625 - - - 3,935.90 50.26 0.625
3 Beton (K250) m3 34.29 0.310% 16.65 48.56 0.151 - - - 16.65 48.56 0.151
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 563.80 92.10 0.858 - - - 563.80 92.10 0.858
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 15,200.21 92.26 2.413 - - - 15,200.21 92.26 2.413
3 Beton (K250) m3 70.63 0.639% 63.90 90.47 0.579 - - - 63.90 90.47 0.579
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 101.20 54.68 0.154 - - - 101.20 54.68 0.154
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 2,308.92 57.43 0.367 - - - 2,308.92 57.43 0.367
3 Beton (K250) m 3
18.11 0.164% 9.90 54.68 0.090 - - - 9.90 54.68 0.090
- - -
Balok Lantai 2 - (B4) 3.688% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
1 Begesting multipleks m2 633.10 0.963% 413.95 65.38 0.630 - - - 413.95 65.38 0.630
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 9,251.44 67.43 1.469 - - - 9,251.44 67.43 1.469
3 Beton (K250) m3 60.30 0.546% 39.43 65.39 0.357 - - - 39.43 65.39 0.357
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% - - - - - - - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% - - - - - - - - -
3 Beton (K250) m 3
7.72 0.070% - - - - - - - - -
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 36.62 46.78 0.056 - - - 36.62 46.78 0.056
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 747.18 48.08 0.119 - - - 747.18 48.08 0.119
3 Beton (K250) m3 7.21 0.065% 3.37 46.79 0.031 - - - 3.37 46.79 0.031
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% - - - 34.65 100.00 0.053 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% - - - 1,230.69 100.00 0.195 1,230.69 100.00 0.195
3 Beton (K250) m 3
4.78 0.043% - - - - - - - - -
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 235.95 84.62 0.359 - - - 235.95 84.62 0.359
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 7,318.34 84.14 1.162 - - - 7,318.34 84.14 1.162
3 Beton (K250) m3 38.45 0.348% 32.53 84.62 0.295 - - - 32.53 84.62 0.295
- - -
Balok Lantai 2 - (B9) 1.921% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
1 Begesting multipleks m2 303.00 0.461% 201.25 66.42 0.306 - - - 201.25 66.42 0.306
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 4,925.57 65.94 0.782 - - - 4,925.57 65.94 0.782
3 Beton (K250) m3 30.30 0.274% 20.13 66.42 0.182 - - - 20.13 66.42 0.182
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% - - - 39.00 100.00 0.059 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% - - - 1,339.65 100.00 0.213 1,339.65 100.00 0.213
3 Beton (K250) m 3
5.60 0.051% - - - - - - - - -
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% - - - - - - - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% - - - - - - - - -
3 Beton (K250) m3 1.35 0.012% - - - - - - - - -
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 4.20 30.27 0.006 5.68 40.91 0.009 9.88 71.18 0.015
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 96.30 25.32 0.015 216.58 56.95 0.034 312.88 82.28 0.050
3 Beton (K250) m 3
1.67 0.015% - - - 1.33 79.58 0.012 1.33 79.58 0.012
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 755.15 78.49 0.978 - - - 755.15 78.49 0.978
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 755.15 78.80 2.473 - - - 755.15 78.80 2.473
3 Beton (K250) m3 140.24 1.270% 134.17 95.67 1.215 - - - 134.17 95.67 1.215
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 956.52 42.77 1.238 205.29 9.18 0.266 1,161.81 51.95 1.504
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 956.52 41.72 1.967 205.29 8.96 0.422 1,161.81 50.68 2.389
3 Beton (K250) m3 326.25 2.954% 214.35 65.70 1.941 - - - 214.35 65.70 1.941
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% - - - - - - - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% - - - - - - - - -
3 Beton (K250) m3 4.48 0.041% - - - - - - - - -
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% - - - 156.80 38.89 0.231 156.80 38.89 0.231
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% - - - 2,062.76 44.44 0.327 2,062.76 44.44 0.327
3 Beton (K250) m 3
35.28 0.319% - - - - - - - - -
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% - - - 151.20 79.41 0.223 151.20 79.41 0.223
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% - - - 4,025.65 91.18 0.639 4,025.65 91.18 0.639
3 Beton (K250) m3 16.32 0.148% - - - - - - - - -
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% - - -
3 Beton (K250) m 3
82.89 0.758% - - -
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% - - -
3 Beton (K250) m3 15.66 0.143% - - -
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) m3 100.47 0.056% - - -
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% - - -
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% - - -
3 Beton (K250) m3 159.26 1.457% - - -
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m3 159.26
ltr/m3) 0.090% - - -
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% - - -
3 Beton (K250) m3 0.24 0.002% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,524.13 0.022% - - -
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m3 1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% - - -
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% - - -
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% - - -
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% - - -
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% - - -
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% - - -
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% - - -
5 Baut angkur 3/4" bh 36.00 0.010% - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% - - -
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% - - -
2 Baut gording 3/8"x1" bh 208.00 0.003% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% - - -
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - -
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - -
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - -
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 6,443.00 23.48 0.14 - - - 6,443.00 23.48 0.137
2 Pasang gording - (re-install) kg 19,654.88 0.418% 10,456.40 53.20 0.22 - - - 10,456.40 53.20 0.222
3 Pasang besi angin-angin - (re-install) m 2
3,057.04 0.029% - - -
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% - - -
5 Pasang atap spandek - (re-install) m2 3,057.04 0.000% - - -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% - - -
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% - - - 23,488.05 49.87 0.133 23,488.05 49.87 0.133
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% - - -
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% - - -
I FOUNDATION
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 2,309.50 89.31 1.62 - - - 2,309.50 89.31 1.622
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.43 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m 2
4,015.10 0.140% 3,513.25 87.50 0.12 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 37.17 97.49 0.04 - - - 37.17 97.49 0.040
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,724.41 91.43 2.09 - - - 2,724.41 91.43 2.091
3 Beton (K250) m3 348.86 3.158% 326.15 93.49 2.95 - - - 326.15 93.49 2.953
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.11 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.42 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.08 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.20 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.45 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.12 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.79 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.98 - - - 6,149.6 100.00 0.976
3 Beton (K250) m 3
46.75 0.423% 46.75 100.00 0.42 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.11 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.27 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.06 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.34 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.07 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.23 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.19 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.46 - - - 2,925.09 100.00 0.464
3 Beton (K250) m3 11.04 0.100% 11.04 100.00 0.10 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 161.25 56.44 0.25 90.00 31.50 0.137 251.25 87.94 0.382
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 3,935.90 50.26 0.62 3,894.49 49.74 0.618 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 16.65 48.56 0.15 - - - 16.65 48.56 0.151
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 563.80 92.10 0.86 30.00 4.90 0.046 593.80 97.00 0.903
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 15,200.21 92.26 2.41 1,275.87 7.74 0.203 16,476.08 100.00 2.616
3 Beton (K250) m3 70.63 0.639% 63.90 90.47 0.58 - - - 63.90 90.47 0.579
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 101.20 54.68 0.15 60.00 32.42 0.091 161.20 87.09 0.245
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 2,308.92 57.43 0.37 1,711.73 42.57 0.272 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 9.90 54.68 0.09 - - - 9.90 54.68 0.090
- - -
Balok Lantai 2 - (B4) 3.688% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
1 Begesting multipleks m2 633.10 0.963% 413.95 65.38 0.63 100.00 15.80 0.152 513.95 81.18 0.782
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 9,251.44 67.43 1.47 2,469.33 18.00 0.392 11,720.77 85.42 1.861
3 Beton (K250) m3 60.30 0.546% 39.43 65.39 0.36 - - - 39.43 65.39 0.357
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% - - - 31.67 44.37 0.048 31.67 44.37 0.048
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% - - - 512.65 45.23 0.081 512.65 45.23 0.081
3 Beton (K250) m 3
7.72 0.070% - - - - - - - - -
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 36.62 46.78 0.06 - - - 36.62 46.78 0.056
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 747.18 48.08 0.12 - - - 747.18 48.08 0.119
3 Beton (K250) m3 7.21 0.065% 3.37 46.79 0.03 - - - 3.37 46.79 0.031
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.05 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.20 - - - 1,230.69 100.00 0.195
3 Beton (K250) m 3
4.78 0.043% - - - - - - - - -
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 235.95 84.62 0.36 42.90 15.38 0.065 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 7,318.34 84.14 1.16 1,379.43 15.86 0.219 8,697.77 100.00 1.381
3 Beton (K250) m3 38.45 0.348% 32.53 84.62 0.29 - - - 32.53 84.62 0.295
- - -
Balok Lantai 2 - (B9) 1.921% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
1 Begesting multipleks m2 303.00 0.461% 201.25 66.42 0.31 101.75 33.58 0.155 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 4,925.57 65.94 0.78 2,544.64 34.06 0.404 7,470.21 100.00 1.186
3 Beton (K250) m3 30.30 0.274% 20.13 66.42 0.18 - - - 20.13 66.42 0.182
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.06 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.21 - - - 1,339.65 100.00 0.213
3 Beton (K250) m 3
5.60 0.051% - - - - - - - - -
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% - - - - - - - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% - - - - - - - - -
3 Beton (K250) m3 1.35 0.012% - - - - - - - - -
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 9.88 71.18 0.02 - - - 9.88 71.18 0.015
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 312.88 82.28 0.05 - - - 312.88 82.28 0.050
3 Beton (K250) m 3
1.67 0.015% 1.33 79.58 0.01 - - - 1.33 79.58 0.012
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 755.15 78.49 0.98 150.75 15.67 0.195 905.90 94.15 1.173
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 755.15 78.80 2.47 150.75 15.73 0.494 905.90 94.53 2.966
3 Beton (K250) m3 140.24 1.270% 134.17 95.67 1.21 - - - 134.17 95.67 1.215
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 1,161.81 51.95 1.50 - - - 1,161.81 51.95 1.504
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 1,161.81 50.68 2.39 - - - 1,161.81 50.68 2.389
3 Beton (K250) m3 326.25 2.954% 214.35 65.70 1.94 39.13 11.99 0.354 253.48 77.69 2.295
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% - - - - - - - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% - - - - - - - - -
3 Beton (K250) m3 4.48 0.041% - - - - - - - - -
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 156.80 38.89 0.23 11.20 2.78 0.017 168.00 41.67 0.248
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 2,062.76 44.44 0.33 - - - 2,062.76 44.44 0.327
3 Beton (K250) m 3
35.28 0.319% - - - 14.70 41.67 0.133 14.70 41.67 0.133
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 151.20 79.41 0.22 22.40 11.76 0.033 173.60 91.18 0.256
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,025.65 91.18 0.64 - - - 4,025.65 91.18 0.639
3 Beton (K250) m3 16.32 0.148% - - - 14.88 91.18 0.135 14.88 91.18 0.135
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% - - -
3 Beton (K250) m 3
82.89 0.758% - - -
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% - - -
3 Beton (K250) m3 15.66 0.143% - - -
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) m3 100.47 0.056% - - -
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% - - -
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% - - -
3 Beton (K250) m3 159.26 1.457% - - -
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m3 159.26
ltr/m3) 0.090% - - -
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% - - -
3 Beton (K250) m3 0.24 0.002% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,524.13 0.022% - - -
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m3 1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% - - -
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% - - -
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% - - -
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% - - -
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% - - -
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% - - -
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% - - -
5 Baut angkur 3/4" bh 36.00 0.010% - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% - - -
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% - - -
2 Baut gording 3/8"x1" bh 208.00 0.003% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% - - -
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - -
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - -
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - -
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 6,443.00 23.48 0.14 - - - 6,443.00 23.48 0.137
2 Pasang gording - (re-install) kg 19,654.88 0.418% 10,456.40 53.20 0.22 - - - 10,456.40 53.20 0.222
3 Pasang besi angin-angin - (re-install) m 2
3,057.04 0.029% - - -
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% - - -
5 Pasang atap spandek - (re-install) m2 3,057.04 0.000% - - -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% - - -
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 23,488.05 49.87 0.13 - - - 23,488.05 49.87 0.133
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% - - -
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% - - -
I FOUNDATION
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 2,309.50 89.31 1.62 - - - 2,309.50 89.31 1.622
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.43 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m 2
4,015.10 0.140% 3,513.25 87.50 0.12 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 37.17 97.49 0.04 - - - 37.17 97.49 0.040
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,724.41 91.43 2.09 - - - 2,724.41 91.43 2.091
3 Beton (K250) m3 348.86 3.158% 326.15 93.49 2.95 - - - 326.15 93.49 2.953
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.11 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.42 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.08 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.20 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.45 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.12 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.79 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.98 - - - 6,149.6 100.00 0.976
3 Beton (K250) m 3
46.75 0.423% 46.75 100.00 0.42 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.11 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.27 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.06 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.34 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.07 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.23 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.19 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.46 - - - 2,925.09 100.00 0.464
3 Beton (K250) m3 11.04 0.100% 11.04 100.00 0.10 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 251.25 87.94 0.38 34.46 12.06 0.052 285.71 100.00 0.435
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 7,830.39 100.00 1.24 - - - 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 16.65 48.56 0.15 - - - 16.65 48.56 0.151
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 593.80 97.00 0.90 18.34 3.00 0.028 612.14 100.00 0.931
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 16,476.08 100.00 2.62 - - - 16,476.08 100.00 2.616
3 Beton (K250) m3 70.63 0.639% 63.90 90.47 0.58 - - - 63.90 90.47 0.579
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 161.20 87.09 0.25 23.89 12.91 0.036 185.09 100.00 0.282
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 4,020.65 100.00 0.64 - - - 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 9.90 54.68 0.09 - - - 9.90 54.68 0.090
- - -
Balok Lantai 2 - (B4) 3.688% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
1 Begesting multipleks m2 633.10 0.963% 513.95 81.18 0.78 119.15 18.82 0.181 633.10 100.00 0.963
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 11,720.77 85.42 1.86 2,000.00 14.58 0.318 13,720.77 100.00 2.178
3 Beton (K250) m3 60.30 0.546% 39.43 65.39 0.36 - - - 39.43 65.39 0.357
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% 31.67 44.37 0.05 39.71 55.63 0.060 71.38 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% 512.65 45.23 0.08 620.89 54.77 0.099 1,133.54 100.00 0.180
3 Beton (K250) m 3
7.72 0.070% - - - - - - - - -
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 36.62 46.78 0.06 41.66 53.22 0.063 78.28 100.00 0.119
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 747.18 48.08 0.12 806.86 51.92 0.128 1,554.04 100.00 0.247
3 Beton (K250) m3 7.21 0.065% 3.37 46.79 0.03 - - - 3.37 46.79 0.031
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.05 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.20 - - - 1,230.69 100.00 0.195
3 Beton (K250) m 3
4.78 0.043% - - - - - - - - -
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 278.85 100.00 0.42 - - - 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 8,697.77 100.00 1.38 - - - 8,697.77 100.00 1.381
3 Beton (K250) m3 38.45 0.348% 32.53 84.62 0.29 - - - 32.53 84.62 0.295
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 303.00 100.00 0.46 - - - 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 7,470.21 100.00 1.19 - - - 7,470.21 100.00 1.186
3 Beton (K250) m3 30.30 0.274% 20.13 66.42 0.18 - - - 20.13 66.42 0.182
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.06 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.21 - - - 1,339.65 100.00 0.213
3 Beton (K250) m3 5.60 0.051% - - - - - - - - -
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% - - - 10.29 100.00 0.016 10.29 100.00 0.016
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% - - - 420.54 100.00 0.067 420.54 100.00 0.067
3 Beton (K250) m 3
1.35 0.012% - - - - - - - - -
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 9.88 71.18 0.02 4.00 28.82 0.006 13.88 100.00 0.021
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 312.88 82.28 0.05 67.39 17.72 0.011 380.27 100.00 0.060
3 Beton (K250) m3 1.67 0.015% 1.33 79.58 0.01 - - - 1.33 79.58 0.012
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 905.90 94.15 1.17 56.25 5.85 0.073 962.15 100.00 1.246
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 905.90 94.53 2.97 52.43 5.47 0.172 958.32 100.00 3.138
3 Beton (K250) m 3
140.24 1.270% 134.17 95.67 1.21 - - - 134.17 95.67 1.215
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 1,161.81 51.95 1.50 1,074.71 48.05 1.391 2,236.53 100.00 2.896
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 1,161.81 50.68 2.39 1,130.63 49.32 2.325 2,292.44 100.00 4.714
3 Beton (K250) m3 326.25 2.954% 253.48 77.69 2.29 - - - 253.48 77.69 2.295
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% - - - - - - - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% - - - - - - - - -
3 Beton (K250) m 3
4.48 0.041% - - - - - - - - -
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 168.00 41.67 0.25 11.20 2.78 0.017 179.20 44.44 0.264
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 2,062.76 44.44 0.33 - - - 2,062.76 44.44 0.327
3 Beton (K250) m3 35.28 0.319% 14.70 41.67 0.13 0.98 2.78 0.009 15.68 44.44 0.142
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 173.60 91.18 0.26 - - - 173.60 91.18 0.256
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,025.65 91.18 0.64 - - - 4,025.65 91.18 0.639
3 Beton (K250) m 3
16.32 0.148% 14.88 91.18 0.13 - - - 14.88 91.18 0.135
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% - - -
3 Beton (K250) m3 82.89 0.758% - - -
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% - - -
3 Beton (K250) m 3
15.66 0.143% - - -
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) m3 100.47 0.056% - - -
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% - - -
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% - - -
3 Beton (K250) m 3
159.26 1.457% - - -
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m 3
159.26
ltr/m3) 0.090% - - -
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% - - -
3 Beton (K250) m 3
0.24 0.002% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% - - -
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m3 1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% - - -
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% - - -
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% - - -
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% - - -
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% - - -
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% - - -
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% - - -
5 Baut angkur 3/4" bh 36.00 0.010% - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% - - -
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% - - -
2 Baut gording 3/8"x1" bh 208.00 0.003% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% - - -
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - -
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - -
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - -
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 6,443.00 23.48 0.14 - - - 6,443.00 23.48 0.137
2 Pasang gording - (re-install) kg 19,654.88 0.418% 10,456.40 53.20 0.22 - - - 10,456.40 53.20 0.222
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% - - -
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% - - -
5 Pasang atap spandek - (re-install) m 2
3,057.04 0.000% - - -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% - - -
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 23,488.05 49.87 0.13 - - - 23,488.05 49.87 0.133
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% - - -
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% - - -
I FOUNDATION
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 2,309.50 89.31 1.62 - - - 2,309.50 89.31 1.622
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.43 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m 2
4,015.10 0.140% 3,513.25 87.50 0.12 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 37.17 97.49 0.04 0.96 2.51 0.001 38.13 100.00 0.041
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,724.41 91.43 2.09 255.41 8.57 0.196 2,979.82 100.00 2.287
3 Beton (K250) m3 348.86 3.158% 326.15 93.49 2.95 22.71 6.51 0.206 348.86 100.00 3.158
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.11 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.42 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.08 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.20 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.45 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.12 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.79 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.98 - - - 6,149.6 100.00 0.976
3 Beton (K250) m 3
46.75 0.423% 46.75 100.00 0.42 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.11 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.27 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.06 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.34 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.07 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.23 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.19 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.46 - - - 2,925.09 100.00 0.464
3 Beton (K250) m3 11.04 0.100% 11.04 100.00 0.10 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 285.71 100.00 0.43 - - - 285.71 100.00 0.435
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 7,830.39 100.00 1.24 - - - 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 16.65 48.56 0.15 17.64 51.44 0.160 34.29 100.00 0.310
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 612.14 100.00 0.93 - - - 612.14 100.00 0.931
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 16,476.08 100.00 2.62 - - - 16,476.08 100.00 2.616
3 Beton (K250) m3 70.63 0.639% 63.90 90.47 0.58 6.73 9.53 0.061 70.63 100.00 0.639
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 185.09 100.00 0.28 - - - 185.09 100.00 0.282
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 4,020.65 100.00 0.64 - - - 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 9.90 54.68 0.09 8.21 45.32 0.074 18.11 100.00 0.164
- - -
Balok Lantai 2 - (B4) 3.688% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
1 Begesting multipleks m2 633.10 0.963% 633.10 100.00 0.96 - - - 633.10 100.00 0.963
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 13,720.77 100.00 2.18 - - - 13,720.77 100.00 2.178
3 Beton (K250) m3 60.30 0.546% 39.43 65.39 0.36 20.87 34.61 0.189 60.30 100.00 0.546
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% 71.38 100.00 0.11 - - - 71.38 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% 1,133.54 100.00 0.18 - - - 1,133.54 100.00 0.180
3 Beton (K250) m 3
7.72 0.070% - - - 7.72 100.00 0.070 7.72 100.00 0.070
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 78.28 100.00 0.12 - - - 78.28 100.00 0.119
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 1,554.04 100.00 0.25 - - - 1,554.04 100.00 0.247
3 Beton (K250) m3 7.21 0.065% 3.37 46.79 0.03 3.84 53.21 0.035 7.21 100.00 0.065
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.05 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.20 - - - 1,230.69 100.00 0.195
3 Beton (K250) m 3
4.78 0.043% - - - 4.78 100.00 0.043 4.78 100.00 0.043
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 278.85 100.00 0.42 - - - 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 8,697.77 100.00 1.38 - - - 8,697.77 100.00 1.381
3 Beton (K250) m3 38.45 0.348% 32.53 84.62 0.29 5.92 15.38 0.054 38.45 100.00 0.348
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 303.00 100.00 0.46 - - - 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 7,470.21 100.00 1.19 - - - 7,470.21 100.00 1.186
3 Beton (K250) m3 30.30 0.274% 20.13 66.42 0.18 10.18 33.58 0.092 30.30 100.00 0.274
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.06 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.21 - - - 1,339.65 100.00 0.213
3 Beton (K250) m3 5.60 0.051% - - - 5.60 100.00 0.051 5.60 100.00 0.051
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% 10.29 100.00 0.02 - - - 10.29 100.00 0.016
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% 420.54 100.00 0.07 - - - 420.54 100.00 0.067
3 Beton (K250) m 3
1.35 0.012% - - - 1.35 100.00 0.012 1.35 100.00 0.012
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 13.88 100.00 0.02 - - - 13.88 100.00 0.021
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 380.27 100.00 0.06 - - - 380.27 100.00 0.060
3 Beton (K250) m3 1.67 0.015% 1.33 79.58 0.01 0.34 20.42 0.003 1.67 100.00 0.015
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 962.15 100.00 1.25 - - - 962.15 100.00 1.246
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 958.32 100.00 3.14 - - - 958.32 100.00 3.138
3 Beton (K250) m 3
140.24 1.270% 134.17 95.67 1.21 6.07 4.33 0.055 140.24 100.00 1.270
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 2,236.53 100.00 2.90 - - - 2,236.53 100.00 2.896
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 2,292.44 100.00 4.71 - - - 2,292.44 100.00 4.714
3 Beton (K250) m3 326.25 2.954% 253.48 77.69 2.29 72.78 22.31 0.659 326.25 100.00 2.954
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% - - - - - - - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% - - - - - - - - -
3 Beton (K250) m 3
4.48 0.041% - - - - - - - - -
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 179.20 44.44 0.26 56.00 13.89 0.083 235.20 58.33 0.347
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 2,062.76 44.44 0.33 644.61 13.89 0.102 2,707.37 58.33 0.430
3 Beton (K250) m3 35.28 0.319% 15.68 44.44 0.14 4.90 13.89 0.044 20.58 58.33 0.186
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 173.60 91.18 0.26 - - - 173.60 91.18 0.256
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,025.65 91.18 0.64 - - - 4,025.65 91.18 0.639
3 Beton (K250) m 3
16.32 0.148% 14.88 91.18 0.13 - - - 14.88 91.18 0.135
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% - - - 670.00 76.98 1.013 670.00 76.98 1.013
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% - - - 10,622.00 56.31 1.686 10,622.00 56.31 1.686
3 Beton (K250) m3 82.89 0.758% - - - - - - - - -
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% - - - 163.00 95.85 0.246 163.00 95.85 0.246
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% - - - 3,123.00 92.50 0.496 3,123.00 92.50 0.496
3 Beton (K250) m 3
15.66 0.143% - - - - - - - - -
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) m3 100.47 0.056% - - -
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% - - - 870.00 80.47 1.118 870.00 80.47 1.118
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% - - -
3 Beton (K250) m 3
159.26 1.457% - - -
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m3 159.26
ltr/m3) 0.090% - - -
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% - - -
3 Beton (K250) m 3
0.24 0.002% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% - - -
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m3 1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% - - -
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% - - -
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% - - -
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% - - -
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% - - -
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% - - -
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% - - -
5 Baut angkur 3/4" bh 36.00 0.010% - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% - - -
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% - - -
2 Baut gording 3/8"x1" bh 208.00 0.003% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% - - -
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - -
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - -
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - -
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 6,443.00 23.48 0.14 - - - 6,443.00 23.48 0.137
2 Pasang gording - (re-install) kg 19,654.88 0.418% 10,456.40 53.20 0.22 - - - 10,456.40 53.20 0.222
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% - - -
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% - - -
5 Pasang atap spandek - (re-install) m 2
3,057.04 0.000% - - -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% - - -
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 23,488.05 49.87 0.13 - - - 23,488.05 49.87 0.133
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% - - -
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% - - -
I FOUNDATION
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 2,309.50 89.31 1.622 - - - 2,309.50 89.31 1.622
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.427 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m 2
4,015.10 0.140% 3,513.25 87.50 0.122 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 38.13 100.00 0.041 - - - 38.13 100.00 0.041
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,979.82 100.00 2.287 - - - 2,979.82 100.00 2.287
3 Beton (K250) m3 348.86 3.158% 348.86 100.00 3.158 - - - 348.86 100.00 3.158
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.113 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.417 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.078 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.200 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.452 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.123 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.788 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.976 - - - 6,149.6 100.00 0.976
3 Beton (K250) m 3
46.75 0.423% 46.75 100.00 0.423 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.109 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.273 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.058 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.338 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.072 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.233 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.186 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.464 - - - 2,925.09 100.00 0.464
3 Beton (K250) m3 11.04 0.100% 11.04 100.00 0.100 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 285.71 100.00 0.435 - - - 285.71 100.00 0.435
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 7,830.39 100.00 1.243 - - - 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 34.29 100.00 0.310 - - - 34.29 100.00 0.310
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 612.14 100.00 0.931 - - - 612.14 100.00 0.931
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 16,476.08 100.00 2.616 - - - 16,476.08 100.00 2.616
3 Beton (K250) m3 70.63 0.639% 70.63 100.00 0.639 - - - 70.63 100.00 0.639
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 185.09 100.00 0.282 - - - 185.09 100.00 0.282
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 4,020.65 100.00 0.638 - - - 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 18.11 100.00 0.164 - - - 18.11 100.00 0.164
- - -
Balok Lantai 2 - (B4) 3.688% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
1 Begesting multipleks m2 633.10 0.963% 633.10 100.00 0.963 - - - 633.10 100.00 0.963
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 13,720.77 100.00 2.178 - - - 13,720.77 100.00 2.178
3 Beton (K250) m3 60.30 0.546% 60.30 100.00 0.546 - - - 60.30 100.00 0.546
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% 71.38 100.00 0.109 - - - 71.38 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% 1,133.54 100.00 0.180 - - - 1,133.54 100.00 0.180
3 Beton (K250) m 3
7.72 0.070% 7.72 100.00 0.070 - - - 7.72 100.00 0.070
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 78.28 100.00 0.119 - - - 78.28 100.00 0.119
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 1,554.04 100.00 0.247 - - - 1,554.04 100.00 0.247
3 Beton (K250) m3 7.21 0.065% 7.21 100.00 0.065 - - - 7.21 100.00 0.065
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.053 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.195 - - - 1,230.69 100.00 0.195
3 Beton (K250) m 3
4.78 0.043% 4.78 100.00 0.043 - - - 4.78 100.00 0.043
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 278.85 100.00 0.424 - - - 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 8,697.77 100.00 1.381 - - - 8,697.77 100.00 1.381
3 Beton (K250) m3 38.45 0.348% 38.45 100.00 0.348 - - - 38.45 100.00 0.348
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 303.00 100.00 0.461 - - - 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 7,470.21 100.00 1.186 - - - 7,470.21 100.00 1.186
3 Beton (K250) m3 30.30 0.274% 30.30 100.00 0.274 - - - 30.30 100.00 0.274
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.059 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.213 - - - 1,339.65 100.00 0.213
3 Beton (K250) m3 5.60 0.051% 5.60 100.00 0.051 - - - 5.60 100.00 0.051
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% 10.29 100.00 0.016 - - - 10.29 100.00 0.016
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% 420.54 100.00 0.067 - - - 420.54 100.00 0.067
3 Beton (K250) m 3
1.35 0.012% 1.35 100.00 0.012 - - - 1.35 100.00 0.012
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 13.88 100.00 0.021 - - - 13.88 100.00 0.021
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 380.27 100.00 0.060 - - - 380.27 100.00 0.060
3 Beton (K250) m3 1.67 0.015% 1.67 100.00 0.015 - - - 1.67 100.00 0.015
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 962.15 100.00 1.246 - - - 962.15 100.00 1.246
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 958.32 100.00 3.138 - - - 958.32 100.00 3.138
3 Beton (K250) m 3
140.24 1.270% 140.24 100.00 1.270 - - - 140.24 100.00 1.270
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 2,236.53 100.00 2.896 - - - 2,236.53 100.00 2.896
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 2,292.44 100.00 4.714 - - - 2,292.44 100.00 4.714
3 Beton (K250) m3 326.25 2.954% 326.25 100.00 2.954 - - - 326.25 100.00 2.954
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% - - - - - - - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% - - - - - - - - -
3 Beton (K250) m 3
4.48 0.041% - - - - - - - - -
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 235.20 58.33 0.347 84.00 20.83 0.124 319.20 79.17 0.471
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 2,707.37 58.33 0.430 966.92 20.83 0.154 3,674.29 79.17 0.583
3 Beton (K250) m3 35.28 0.319% 20.58 58.33 0.186 - - - 20.58 58.33 0.186
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 173.60 91.18 0.256 - - - 173.60 91.18 0.256
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,025.65 91.18 0.639 - - - 4,025.65 91.18 0.639
3 Beton (K250) m 3
16.32 0.148% 14.88 91.18 0.135 - - - 14.88 91.18 0.135
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% 670.00 76.98 1.013 - - - 670.00 76.98 1.013
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% 10,622.00 56.31 1.686 2,120.00 11.24 0.337 12,742.00 67.55 2.023
3 Beton (K250) m3 82.89 0.758% - - - - - - - - -
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% 163.00 95.85 0.246 7.05 4.15 0.011 170.05 100.00 0.257
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% 3,123.00 92.50 0.496 253.09 7.50 0.040 3,376.09 100.00 0.536
3 Beton (K250) m 3
15.66 0.143% - - - - - - - - -
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) m3 100.47 0.056% - - -
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% 870.00 80.47 1.118 74.00 6.84 0.095 944.00 87.31 1.213
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% - - - 873.00 66.85 1.254 873.00 66.85 1.254
3 Beton (K250) m 3
159.26 1.457% - - -
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m 3
159.26
ltr/m3) 0.090% - - -
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% - - -
3 Beton (K250) m 3
0.24 0.002% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% - - -
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m3 1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% - - -
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% - - -
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% - - -
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% - - -
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% - - -
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% - - -
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% - - -
5 Baut angkur 3/4" bh 36.00 0.010% - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% - - -
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% - - -
2 Baut gording 3/8"x1" bh 208.00 0.003% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% - - -
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - -
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - -
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - -
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 6,443.00 23.48 0.137 - - - 6,443.00 23.48 0.137
2 Pasang gording - (re-install) kg 19,654.88 0.418% 10,456.40 53.20 0.222 - - - 10,456.40 53.20 0.222
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% - - -
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% - - -
5 Pasang atap spandek - (re-install) m 2
3,057.04 0.000% - - -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% - - -
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 23,488.05 49.87 0.133 - - - 23,488.05 49.87 0.133
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% - - -
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% - - -
2
Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% 2,309.50 89.31 1.622 - - - 2,309.50 89.31 1.622
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.427 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m 2
4,015.10 0.140% 3,513.25 87.50 0.122 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 38.13 100.00 0.041 - - - 38.13 100.00 0.041
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,979.82 100.00 2.287 - - - 2,979.82 100.00 2.287
3 Beton (K250) m3 348.86 3.158% 348.86 100.00 3.158 - - - 348.86 100.00 3.158
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.113 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.417 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.078 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.200 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.452 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.123 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.788 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.976 - - - 6,149.6 100.00 0.976
3 Beton (K250) m 3
46.75 0.423% 46.75 100.00 0.423 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.109 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.273 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.058 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.338 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.072 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.233 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.186 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.464 - - - 2,925.09 100.00 0.464
3 Beton (K250) m3 11.04 0.100% 11.04 100.00 0.100 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 285.71 100.00 0.435 - - - 285.71 100.00 0.435
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 7,830.39 100.00 1.243 - - - 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 34.29 100.00 0.310 - - - 34.29 100.00 0.310
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 612.14 100.00 0.931 - - - 612.14 100.00 0.931
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 16,476.08 100.00 2.616 - - - 16,476.08 100.00 2.616
3 Beton (K250) m3 70.63 0.639% 70.63 100.00 0.639 - - - 70.63 100.00 0.639
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 185.09 100.00 0.282 - - - 185.09 100.00 0.282
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 4,020.65 100.00 0.638 - - - 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 18.11 100.00 0.164 - - - 18.11 100.00 0.164
- - -
Balok Lantai 2 - (B4) 3.688% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
1 Begesting multipleks m2 633.10 0.963% 633.10 100.00 0.963 - - - 633.10 100.00 0.963
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 13,720.77 100.00 2.178 - - - 13,720.77 100.00 2.178
3 Beton (K250) m3 60.30 0.546% 60.30 100.00 0.546 - - - 60.30 100.00 0.546
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% 71.38 100.00 0.109 - - - 71.38 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% 1,133.54 100.00 0.180 - - - 1,133.54 100.00 0.180
3 Beton (K250) m 3
7.72 0.070% 7.72 100.00 0.070 - - - 7.72 100.00 0.070
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 78.28 100.00 0.119 - - - 78.28 100.00 0.119
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 1,554.04 100.00 0.247 - - - 1,554.04 100.00 0.247
3 Beton (K250) m3 7.21 0.065% 7.21 100.00 0.065 - - - 7.21 100.00 0.065
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.053 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.195 - - - 1,230.69 100.00 0.195
3 Beton (K250) m 3
4.78 0.043% 4.78 100.00 0.043 - - - 4.78 100.00 0.043
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 278.85 100.00 0.424 - - - 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 8,697.77 100.00 1.381 - - - 8,697.77 100.00 1.381
3 Beton (K250) m3 38.45 0.348% 38.45 100.00 0.348 - - - 38.45 100.00 0.348
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 303.00 100.00 0.461 - - - 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 7,470.21 100.00 1.186 - - - 7,470.21 100.00 1.186
3 Beton (K250) m3 30.30 0.274% 30.30 100.00 0.274 - - - 30.30 100.00 0.274
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.059 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.213 - - - 1,339.65 100.00 0.213
3 Beton (K250) m3 5.60 0.051% 5.60 100.00 0.051 - - - 5.60 100.00 0.051
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% 10.29 100.00 0.016 - - - 10.29 100.00 0.016
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% 420.54 100.00 0.067 - - - 420.54 100.00 0.067
3 Beton (K250) m 3
1.35 0.012% 1.35 100.00 0.012 - - - 1.35 100.00 0.012
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 13.88 100.00 0.021 - - - 13.88 100.00 0.021
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 380.27 100.00 0.060 - - - 380.27 100.00 0.060
3 Beton (K250) m3 1.67 0.015% 1.67 100.00 0.015 - - - 1.67 100.00 0.015
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 962.15 100.00 1.246 - - - 962.15 100.00 1.246
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 958.32 100.00 3.138 - - - 958.32 100.00 3.138
3 Beton (K250) m 3
140.24 1.270% 140.24 100.00 1.270 - - - 140.24 100.00 1.270
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 2,236.53 100.00 2.896 - - - 2,236.53 100.00 2.896
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 2,292.44 100.00 4.714 - - - 2,292.44 100.00 4.714
3 Beton (K250) m3 326.25 2.954% 326.25 100.00 2.954 - - - 326.25 100.00 2.954
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% - - - 44.80 100.00 0.066 44.80 100.00 0.066
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% - - - 940.09 100.00 0.149 940.09 100.00 0.149
3 Beton (K250) m 3
4.48 0.041% - - - - - - - - -
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 319.20 79.17 0.471 84.00 20.83 0.124 403.20 100.00 0.594
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 3,674.29 79.17 0.583 966.92 20.83 0.154 4,641.21 100.00 0.737
3 Beton (K250) m3 35.28 0.319% 20.58 58.33 0.186 13.23 37.50 0.120 33.81 95.83 0.306
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 173.60 91.18 0.256 16.80 8.82 0.025 190.40 100.00 0.281
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,025.65 91.18 0.639 389.58 8.82 0.062 4,415.23 100.00 0.701
3 Beton (K250) m 3
16.32 0.148% 14.88 91.18 0.135 - - - 14.88 91.18 0.135
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% 670.00 76.98 1.013 - - - 670.00 76.98 1.013
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% 12,742.00 67.55 2.023 - - - 12,742.00 67.55 2.023
3 Beton (K250) m3 82.89 0.758% - - - 30.65 36.98 0.280 30.65 36.98 0.280
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% 170.05 100.00 0.257 - - - 170.05 100.00 0.257
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% 3,376.09 100.00 0.536 - - - 3,376.09 100.00 0.536
3 Beton (K250) m 3
15.66 0.143% - - - 15.66 100.00 0.143 15.66 100.00 0.143
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) m3 100.47 0.056% - - -
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% 944.00 87.31 1.213 - - - 944.00 87.31 1.213
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% 873.00 66.85 1.254 - - - 873.00 66.85 1.254
3 Beton (K250) m 3
159.26 1.457% - - - 118.37 74.32 1.083 118.37 74.32 1.083
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m 3
159.26
ltr/m3) 0.090% - - - 118.37 74.32 0.067 118.37 74.32 0.067
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% - - -
3 Beton (K250) m 3
0.24 0.002% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% - - - 16.00 15.28 0.004 16.00 15.28 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% - - - 50.67 25.49 0.011 50.67 25.49 0.011
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% - - -
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m3 1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% - - -
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% - - -
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% - - -
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% - - -
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% - - -
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% - - -
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% - - -
5 Baut angkur 3/4" bh 36.00 0.010% - - - 36.00 100.00 0.010 36.00 100.00 0.010
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% - - -
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% - - -
2 Baut gording 3/8"x1" bh 208.00 0.003% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% - - -
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - -
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - -
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - -
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 6,443.00 23.48 0.137 - - - 6,443.00 23.48 0.137
2 Pasang gording - (re-install) kg 19,654.88 0.418% 10,456.40 53.20 0.222 - - - 10,456.40 53.20 0.222
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% - - -
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% - - -
5 Pasang atap spandek - (re-install) m 2
3,057.04 0.000% - - -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% - - -
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 23,488.05 49.87 0.133 - - - 23,488.05 49.87 0.133
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% - - -
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% - - -
2 Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% - - - 2,309.50 89.31 1.622
2,309.50 89.31 1.622
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.427 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 3,513.25 87.50 0.122 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 38.13 100.00 0.041 - - - 38.13 100.00 0.041
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,979.82 100.00 2.287 - - - 2,979.82 100.00 2.287
3 Beton (K250) m3 348.86 3.158% 348.86 100.00 3.158 - - - 348.86 100.00 3.158
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.113 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.417 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.078 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.200 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.452 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.123 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.788 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.976 - - - 6,149.6 100.00 0.976
3 Beton (K250) m 3
46.75 0.423% 46.75 100.00 0.423 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.109 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.273 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.058 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.338 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.072 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.233 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.186 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.464 - - - 2,925.09 100.00 0.464
3 Beton (K250) m3 11.04 0.100% 11.04 100.00 0.100 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 285.71 100.00 0.435 - - - 285.71 100.00 0.435
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 7,830.39 100.00 1.243 - - - 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 34.29 100.00 0.310 - - - 34.29 100.00 0.310
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 612.14 100.00 0.931 - - - 612.14 100.00 0.931
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 16,476.08 100.00 2.616 - - - 16,476.08 100.00 2.616
3 Beton (K250) m3 70.63 0.639% 70.63 100.00 0.639 - - - 70.63 100.00 0.639
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 185.09 100.00 0.282 - - - 185.09 100.00 0.282
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 4,020.65 100.00 0.638 - - - 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 18.11 100.00 0.164 - - - 18.11 100.00 0.164
- - -
Balok Lantai 2 - (B4) 3.688% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
1 Begesting multipleks m2 633.10 0.963% 633.10 100.00 0.963 - - - 633.10 100.00 0.963
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 13,720.77 100.00 2.178 - - - 13,720.77 100.00 2.178
3 Beton (K250) m3 60.30 0.546% 60.30 100.00 0.546 - - - 60.30 100.00 0.546
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% 71.38 100.00 0.109 - - - 71.38 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% 1,133.54 100.00 0.180 - - - 1,133.54 100.00 0.180
3 Beton (K250) m 3
7.72 0.070% 7.72 100.00 0.070 - - - 7.72 100.00 0.070
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 78.28 100.00 0.119 - - - 78.28 100.00 0.119
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 1,554.04 100.00 0.247 - - - 1,554.04 100.00 0.247
3 Beton (K250) m3 7.21 0.065% 7.21 100.00 0.065 - - - 7.21 100.00 0.065
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.053 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.195 - - - 1,230.69 100.00 0.195
3 Beton (K250) m 3
4.78 0.043% 4.78 100.00 0.043 - - - 4.78 100.00 0.043
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 278.85 100.00 0.424 - - - 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 8,697.77 100.00 1.381 - - - 8,697.77 100.00 1.381
3 Beton (K250) m3 38.45 0.348% 38.45 100.00 0.348 - - - 38.45 100.00 0.348
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 303.00 100.00 0.461 - - - 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 7,470.21 100.00 1.186 - - - 7,470.21 100.00 1.186
3 Beton (K250) m3 30.30 0.274% 30.30 100.00 0.274 - - - 30.30 100.00 0.274
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.059 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.213 - - - 1,339.65 100.00 0.213
3 Beton (K250) m3 5.60 0.051% 5.60 100.00 0.051 - - - 5.60 100.00 0.051
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% 10.29 100.00 0.016 - - - 10.29 100.00 0.016
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% 420.54 100.00 0.067 - - - 420.54 100.00 0.067
3 Beton (K250) m 3
1.35 0.012% 1.35 100.00 0.012 - - - 1.35 100.00 0.012
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 13.88 100.00 0.021 - - - 13.88 100.00 0.021
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 380.27 100.00 0.060 - - - 380.27 100.00 0.060
3 Beton (K250) m3 1.67 0.015% 1.67 100.00 0.015 - - - 1.67 100.00 0.015
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 962.15 100.00 1.246 - - - 962.15 100.00 1.246
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 958.32 100.00 3.138 - - - 958.32 100.00 3.138
3 Beton (K250) m 3
140.24 1.270% 140.24 100.00 1.270 - - - 140.24 100.00 1.270
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 2,236.53 100.00 2.896 - - - 2,236.53 100.00 2.896
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 2,292.44 100.00 4.714 - - - 2,292.44 100.00 4.714
3 Beton (K250) m3 326.25 2.954% 326.25 100.00 2.954 - - - 326.25 100.00 2.954
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% 44.80 100.00 0.066 - - - 44.80 100.00 0.066
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% 940.09 100.00 0.149 - - - 940.09 100.00 0.149
3 Beton (K250) m 3
4.48 0.041% - - - 4.48 100.00 0.041 4.48 100.00 0.041
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 403.20 100.00 0.594 - - - 403.20 100.00 0.594
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 4,641.21 100.00 0.737 - - - 4,641.21 100.00 0.737
3 Beton (K250) m3 35.28 0.319% 33.81 95.83 0.306 1.47 4.17 0.013 35.28 100.00 0.319
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 190.40 100.00 0.281 - - - 190.40 100.00 0.281
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,415.23 100.00 0.701 - - - 4,415.23 100.00 0.701
3 Beton (K250) m 3
16.32 0.148% 14.88 91.18 0.135 1.44 8.82 0.013 16.32 100.00 0.148
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% 670.00 76.98 1.013 132.46 15.22 0.200 802.46 92.20 1.213
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% 12,742.00 67.55 2.023 4,003.00 21.22 0.636 16,745.00 88.78 2.659
3 Beton (K250) m3 82.89 0.758% 30.65 36.98 0.280 - - - 30.65 36.98 0.280
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% 170.05 100.00 0.257 - - - 170.05 100.00 0.257
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% 3,376.09 100.00 0.536 - - - 3,376.09 100.00 0.536
3 Beton (K250) m 3
15.66 0.143% 15.66 100.00 0.143 - - - 15.66 100.00 0.143
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena m3 100.47 0.056% 46.32 46.10 0.026 46.32 46.10 0.026
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) - - -
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% 944.00 87.31 1.213 76.00 7.03 0.098 1,020.00 94.34 1.311
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% 873.00 66.85 1.254 304.00 23.28 0.437 1,177.00 90.13 1.691
3 Beton (K250) m 3
159.26 1.457% 118.37 74.32 1.083 - - - 118.37 74.32 1.083
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m 3
159.26
ltr/m3) 0.090% 118.37 74.32 0.067 - - - 118.37 74.32 0.067
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% - - -
3 Beton (K250) m 3
0.24 0.002% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% 16.00 15.28 0.004 - - - 16.00 15.28 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% - - - 1,010.00 76.21 0.229 1,010.00 76.21 0.229
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% 50.67 25.49 0.011 105.33 52.98 0.024 156.00 78.47 0.035
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% - - - 1,100.00 72.17 0.016 1,100.00 72.17 0.016
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m3 1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% - - - - - - - - -
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% - - - - - - - - -
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% - - - - - - - - -
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% - - - - - - - - -
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% - - - - - - - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% - - - - - - - - -
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% - - - 107.10 40.00 0.024 107.10 40.00 0.024
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% - - - 35.00 40.00 0.008 35.00 40.00 0.008
5 Baut angkur 3/4" bh 36.00 0.010% 36.00 100.00 0.010 - - - 36.00 100.00 0.010
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% - - - 142.10 40.00 0.002 142.10 40.00 0.002
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% - - -
2 Baut gording 3/8"x1" bh 208.00 0.003% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% - - -
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - -
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - -
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - -
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 6,443.00 23.48 0.137 - - - 6,443.00 23.48 0.137
2 Pasang gording - (re-install) kg 19,654.88 0.418% 10,456.40 53.20 0.222 - - - 10,456.40 53.20 0.222
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% - - -
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% - - -
5 Pasang atap spandek - (re-install) m 2
3,057.04 0.000% - - -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% - - -
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 23,488.05 49.87 0.133 12,306.85 26.13 0.070 35,794.91 76.00 0.203
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% - - - 1,858.68 76.00 0.022 1,858.68 76.00 0.022
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% - - - - - - - - -
2 Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% - - - 2,309.50 89.31 1.622
2,309.50 89.31 1.62
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.43 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 3,513.25 87.50 0.12 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 38.13 100.00 0.04 - - - 38.13 100.00 0.041
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,979.82 100.00 2.29 - - - 2,979.82 100.00 2.287
3 Beton (K250) m3 348.86 3.158% 348.86 100.00 3.16 - - - 348.86 100.00 3.158
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.11 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.42 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.08 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.20 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.45 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.12 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.79 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.98 - - - 6,149.6 100.00 0.976
3 Beton (K250) m 3
46.75 0.423% 46.75 100.00 0.42 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.11 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.27 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.06 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.34 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.07 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.23 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.19 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.46 - - - 2,925.09 100.00 0.464
3 Beton (K250) m3 11.04 0.100% 11.04 100.00 0.10 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 285.71 100.00 0.43 - - - 285.71 100.00 0.435
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 7,830.39 100.00 1.24 - - - 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 34.29 100.00 0.31 - - - 34.29 100.00 0.310
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 612.14 100.00 0.93 - - - 612.14 100.00 0.931
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 16,476.08 100.00 2.62 - - - 16,476.08 100.00 2.616
3 Beton (K250) m3 70.63 0.639% 70.63 100.00 0.64 - - - 70.63 100.00 0.639
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 185.09 100.00 0.28 - - - 185.09 100.00 0.282
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 4,020.65 100.00 0.64 - - - 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 18.11 100.00 0.16 - - - 18.11 100.00 0.164
- - -
Balok Lantai 2 - (B4) 3.688% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
1 Begesting multipleks m2 633.10 0.963% 633.10 100.00 0.96 - - - 633.10 100.00 0.963
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 13,720.77 100.00 2.18 - - - 13,720.77 100.00 2.178
3 Beton (K250) m3 60.30 0.546% 60.30 100.00 0.55 - - - 60.30 100.00 0.546
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% 71.38 100.00 0.11 - - - 71.38 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% 1,133.54 100.00 0.18 - - - 1,133.54 100.00 0.180
3 Beton (K250) m 3
7.72 0.070% 7.72 100.00 0.07 - - - 7.72 100.00 0.070
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 78.28 100.00 0.12 - - - 78.28 100.00 0.119
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 1,554.04 100.00 0.25 - - - 1,554.04 100.00 0.247
3 Beton (K250) m3 7.21 0.065% 7.21 100.00 0.07 - - - 7.21 100.00 0.065
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.05 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.20 - - - 1,230.69 100.00 0.195
3 Beton (K250) m 3
4.78 0.043% 4.78 100.00 0.04 - - - 4.78 100.00 0.043
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 278.85 100.00 0.42 - - - 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 8,697.77 100.00 1.38 - - - 8,697.77 100.00 1.381
3 Beton (K250) m3 38.45 0.348% 38.45 100.00 0.35 - - - 38.45 100.00 0.348
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 303.00 100.00 0.46 - - - 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 7,470.21 100.00 1.19 - - - 7,470.21 100.00 1.186
3 Beton (K250) m3 30.30 0.274% 30.30 100.00 0.27 - - - 30.30 100.00 0.274
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.06 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.21 - - - 1,339.65 100.00 0.213
3 Beton (K250) m3 5.60 0.051% 5.60 100.00 0.05 - - - 5.60 100.00 0.051
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% 10.29 100.00 0.02 - - - 10.29 100.00 0.016
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% 420.54 100.00 0.07 - - - 420.54 100.00 0.067
3 Beton (K250) m 3
1.35 0.012% 1.35 100.00 0.01 - - - 1.35 100.00 0.012
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 13.88 100.00 0.02 - - - 13.88 100.00 0.021
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 380.27 100.00 0.06 - - - 380.27 100.00 0.060
3 Beton (K250) m3 1.67 0.015% 1.67 100.00 0.02 - - - 1.67 100.00 0.015
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 962.15 100.00 1.25 - - - 962.15 100.00 1.246
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 958.32 100.00 3.14 - - - 958.32 100.00 3.138
3 Beton (K250) m 3
140.24 1.270% 140.24 100.00 1.27 - - - 140.24 100.00 1.270
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 2,236.53 100.00 2.90 - - - 2,236.53 100.00 2.896
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 2,292.44 100.00 4.71 - - - 2,292.44 100.00 4.714
3 Beton (K250) m3 326.25 2.954% 326.25 100.00 2.95 - - - 326.25 100.00 2.954
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% 44.80 100.00 0.07 - - - 44.80 100.00 0.066
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% 940.09 100.00 0.15 - - - 940.09 100.00 0.149
3 Beton (K250) m 3
4.48 0.041% 4.48 100.00 0.04 - - - 4.48 100.00 0.041
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 403.20 100.00 0.59 - - - 403.20 100.00 0.594
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 4,641.21 100.00 0.74 - - - 4,641.21 100.00 0.737
3 Beton (K250) m3 35.28 0.319% 35.28 100.00 0.32 - - - 35.28 100.00 0.319
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 190.40 100.00 0.28 - - - 190.40 100.00 0.281
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,415.23 100.00 0.70 - - - 4,415.23 100.00 0.701
3 Beton (K250) m 3
16.32 0.148% 16.32 100.00 0.15 - - - 16.32 100.00 0.148
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% 802.46 92.20 1.21 41.76 4.80 0.063 844.22 97.00 1.276
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% 16,745.00 88.78 2.66 1,362.50 7.22 0.216 18,107.50 96.00 2.875
3 Beton (K250) m3 82.89 0.758% 30.65 36.98 0.28 - - - 30.65 36.98 0.280
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% 170.05 100.00 0.26 - - - 170.05 100.00 0.257
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% 3,376.09 100.00 0.54 - - - 3,376.09 100.00 0.536
3 Beton (K250) m 3
15.66 0.143% 15.66 100.00 0.14 - - - 15.66 100.00 0.143
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena m3 100.47 0.056% - - - 46.32 46.10 0.026
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) 46.32 46.10 0.03
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% 1,020.00 94.34 1.31 61.17 5.66 0.079 1,081.17 100.00 1.390
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% 1,177.00 90.13 1.69 63.66 4.87 0.091 1,240.66 95.00 1.782
3 Beton (K250) m 3
159.26 1.457% 118.37 74.32 1.08 - - - 118.37 74.32 1.083
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m 3
159.26
ltr/m3) 0.090% 118.37 74.32 0.07 - - - 118.37 74.32 0.067
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% - - -
3 Beton (K250) m 3
0.24 0.002% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% 16.00 15.28 0.00 - - - 16.00 15.28 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% 1,010.00 76.21 0.23 - - - 1,010.00 76.21 0.229
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% 156.00 78.47 0.04 - - - 156.00 78.47 0.035
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% 1,100.00 72.17 0.02 - - - 1,100.00 72.17 0.016
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m3 1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% - - - 922.24 30.00 0.209 922.24 30.00 0.209
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% - - - - - - - - -
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% - - - - - - - - -
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% - - - - - - - - -
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% - - - - - - - - -
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% - - - - - - - - -
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% 107.10 40.00 0.02 88.36 33.00 0.020 195.46 73.00 0.044
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% 35.00 40.00 0.01 28.88 33.00 0.007 63.88 73.00 0.014
5 Baut angkur 3/4" bh 36.00 0.010% 36.00 100.00 0.01 - - - 36.00 100.00 0.010
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% 142.10 40.00 0.00 71.05 20.00 0.001 213.15 60.00 0.003
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% - - - 19.11 35.00 0.005 19.11 35.00 0.005
2 Baut gording 3/8"x1" bh 208.00 0.003% - - - 72.80 35.00 0.001 72.80 35.00 0.001
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% - - - 19.11 35.00 0.000 19.11 35.00 0.000
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% - - - 94.68 43.00 0.021 94.68 43.00 0.021
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - - - - - - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% - - - 17.15 46.00 0.004 17.15 46.00 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - - - - - - - -
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - - - - - - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - - - - - - - -
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - - - - - - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - - - - - - - -
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - - - - - - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - - - - - - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - - - - - - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - - - - - - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 6,443.00 23.48 0.14 9,363.00 34.12 0.199 15,806.00 57.59 0.336
2 Pasang gording - (re-install) kg 19,654.88 0.418% 10,456.40 53.20 0.22 598.48 3.04 0.013 11,054.88 56.24 0.235
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% - - - 1,019.00 33.33 0.010 1,019.00 33.33 0.010
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% - - - - - - - - -
5 Pasang atap spandek - (re-install) m 2
3,057.04 0.000% - - - - - - - - -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% - - - 3,247.00 45.96 0.061 3,247.00 45.96 0.061
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 35,794.91 76.00 0.20 - - - 35,794.91 76.00 0.203
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% 1,858.68 76.00 0.02 - - - 1,858.68 76.00 0.022
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% - - - - - - - - -
2 Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% - - - 2,309.50 89.31 1.622
2,309.50 89.31 1.62
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.43 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 3,513.25 87.50 0.12 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 38.13 100.00 0.04 - - - 38.13 100.00 0.041
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,979.82 100.00 2.29 - - - 2,979.82 100.00 2.287
3 Beton (K250) m3 348.86 3.158% 348.86 100.00 3.16 - - - 348.86 100.00 3.158
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.11 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.42 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.08 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.20 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.45 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.12 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.79 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.98 - - - 6,149.6 100.00 0.976
3 Beton (K250) m 3
46.75 0.423% 46.75 100.00 0.42 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.11 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.27 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.06 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.34 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.07 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.23 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.19 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.46 - - - 2,925.09 100.00 0.464
3 Beton (K250) m3 11.04 0.100% 11.04 100.00 0.10 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 285.71 100.00 0.43 - - - 285.71 100.00 0.435
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 7,830.39 100.00 1.24 - - - 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 34.29 100.00 0.31 - - - 34.29 100.00 0.310
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 612.14 100.00 0.93 - - - 612.14 100.00 0.931
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 16,476.08 100.00 2.62 - - - 16,476.08 100.00 2.616
3 Beton (K250) m3 70.63 0.639% 70.63 100.00 0.64 - - - 70.63 100.00 0.639
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 185.09 100.00 0.28 - - - 185.09 100.00 0.282
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 4,020.65 100.00 0.64 - - - 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 18.11 100.00 0.16 - - - 18.11 100.00 0.164
- - -
Balok Lantai 2 - (B4) 3.688% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
1 Begesting multipleks m2 633.10 0.963% 633.10 100.00 0.96 - - - 633.10 100.00 0.963
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 13,720.77 100.00 2.18 - - - 13,720.77 100.00 2.178
3 Beton (K250) m3 60.30 0.546% 60.30 100.00 0.55 - - - 60.30 100.00 0.546
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% 71.38 100.00 0.11 - - - 71.38 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% 1,133.54 100.00 0.18 - - - 1,133.54 100.00 0.180
3 Beton (K250) m 3
7.72 0.070% 7.72 100.00 0.07 - - - 7.72 100.00 0.070
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 78.28 100.00 0.12 - - - 78.28 100.00 0.119
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 1,554.04 100.00 0.25 - - - 1,554.04 100.00 0.247
3 Beton (K250) m3 7.21 0.065% 7.21 100.00 0.07 - - - 7.21 100.00 0.065
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.05 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.20 - - - 1,230.69 100.00 0.195
3 Beton (K250) m 3
4.78 0.043% 4.78 100.00 0.04 - - - 4.78 100.00 0.043
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 278.85 100.00 0.42 - - - 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 8,697.77 100.00 1.38 - - - 8,697.77 100.00 1.381
3 Beton (K250) m3 38.45 0.348% 38.45 100.00 0.35 - - - 38.45 100.00 0.348
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 303.00 100.00 0.46 - - - 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 7,470.21 100.00 1.19 - - - 7,470.21 100.00 1.186
3 Beton (K250) m3 30.30 0.274% 30.30 100.00 0.27 - - - 30.30 100.00 0.274
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.06 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.21 - - - 1,339.65 100.00 0.213
3 Beton (K250) m3 5.60 0.051% 5.60 100.00 0.05 - - - 5.60 100.00 0.051
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% 10.29 100.00 0.02 - - - 10.29 100.00 0.016
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% 420.54 100.00 0.07 - - - 420.54 100.00 0.067
3 Beton (K250) m 3
1.35 0.012% 1.35 100.00 0.01 - - - 1.35 100.00 0.012
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 13.88 100.00 0.02 - - - 13.88 100.00 0.021
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 380.27 100.00 0.06 - - - 380.27 100.00 0.060
3 Beton (K250) m3 1.67 0.015% 1.67 100.00 0.02 - - - 1.67 100.00 0.015
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 962.15 100.00 1.25 - - - 962.15 100.00 1.246
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 958.32 100.00 3.14 - - - 958.32 100.00 3.138
3 Beton (K250) m 3
140.24 1.270% 140.24 100.00 1.27 - - - 140.24 100.00 1.270
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 2,236.53 100.00 2.90 - - - 2,236.53 100.00 2.896
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 2,292.44 100.00 4.71 - - - 2,292.44 100.00 4.714
3 Beton (K250) m3 326.25 2.954% 326.25 100.00 2.95 - - - 326.25 100.00 2.954
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% 44.80 100.00 0.07 - - - 44.80 100.00 0.066
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% 940.09 100.00 0.15 - - - 940.09 100.00 0.149
3 Beton (K250) m 3
4.48 0.041% 4.48 100.00 0.04 - - - 4.48 100.00 0.041
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 403.20 100.00 0.59 - - - 403.20 100.00 0.594
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 4,641.21 100.00 0.74 - - - 4,641.21 100.00 0.737
3 Beton (K250) m3 35.28 0.319% 35.28 100.00 0.32 - - - 35.28 100.00 0.319
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 190.40 100.00 0.28 - - - 190.40 100.00 0.281
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,415.23 100.00 0.70 - - - 4,415.23 100.00 0.701
3 Beton (K250) m 3
16.32 0.148% 16.32 100.00 0.15 - - - 16.32 100.00 0.148
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% 844.22 97.00 1.28 26.11 3.00 0.039 870.33 100.00 1.316
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% 18,107.50 96.00 2.87 754.48 4.00 0.120 18,861.98 100.00 2.995
3 Beton (K250) m3 82.89 0.758% 30.65 36.98 0.28 52.23 63.02 0.478 82.89 100.00 0.758
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% 170.05 100.00 0.26 - - - 170.05 100.00 0.257
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% 3,376.09 100.00 0.54 - - - 3,376.09 100.00 0.536
3 Beton (K250) m 3
15.66 0.143% 15.66 100.00 0.14 - - - 15.66 100.00 0.143
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena m3 100.47 0.056% 54.15 53.90 0.030 100.47 100.00 0.056
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) 46.32 46.10 0.03
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% 1,081.17 100.00 1.39 - - - 1,081.17 100.00 1.390
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% 1,240.66 95.00 1.78 - - - 1,240.66 95.00 1.782
3 Beton (K250) m 3
159.26 1.457% 118.37 74.32 1.08 17.13 10.76 0.157 135.50 85.08 1.240
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m 3
159.26
ltr/m3) 0.090% 118.37 74.32 0.07 17.13 10.76 0.010 135.50 85.08 0.076
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% - - -
3 Beton (K250) m 3
0.24 0.002% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% 16.00 15.28 0.00 - - - 16.00 15.28 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% 1,010.00 76.21 0.23 315.33 23.79 0.072 1,325.33 100.00 0.301
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% 156.00 78.47 0.04 42.80 21.53 0.010 198.80 100.00 0.045
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% 1,100.00 72.17 0.02 424.13 27.83 0.006 1,524.13 100.00 0.022
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m3 1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% 922.24 30.00 0.21 614.83 20.00 0.139 1,537.06 50.00 0.349
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% - - - 50.40 50.00 0.011 50.40 50.00 0.011
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% - - - 79.39 50.00 0.018 79.39 50.00 0.018
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% - - - 40.83 50.00 0.009 40.83 50.00 0.009
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% - - - 152.00 50.00 0.022 152.00 50.00 0.022
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% - - - 1,707.68 50.00 0.024 1,707.68 50.00 0.024
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% 195.46 73.00 0.04 - - - 195.46 73.00 0.044
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% 63.88 73.00 0.01 - - - 63.88 73.00 0.014
5 Baut angkur 3/4" bh 36.00 0.010% 36.00 100.00 0.01 - - - 36.00 100.00 0.010
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% 213.15 60.00 0.00 - - - 213.15 60.00 0.003
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% 19.11 35.00 0.00 14.74 27.00 0.004 33.85 62.00 0.008
2 Baut gording 3/8"x1" bh 208.00 0.003% 72.80 35.00 0.00 56.16 27.00 0.001 128.96 62.00 0.002
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% 19.11 35.00 0.00 14.74 27.00 0.000 33.85 62.00 0.000
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% 94.68 43.00 0.02 - - - 94.68 43.00 0.021
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - - - - - - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% 17.15 46.00 0.00 - - - 17.15 46.00 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - - - - - - - -
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - - - - - - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - - - - - - - -
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - - - - - - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - - - - - - - -
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - - - - - - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - - - - - - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - - - - - - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - - - - - - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 15,806.00 57.59 0.34 - - - 15,806.00 57.59 0.336
2 Pasang gording - (re-install) kg 19,654.88 0.418% 11,054.88 56.24 0.24 - - - 11,054.88 56.24 0.235
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% 1,019.00 33.33 0.01 515.00 16.85 0.005 1,534.00 50.18 0.014
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% - - - - - - - - -
5 Pasang atap spandek - (re-install) m 2
3,057.04 0.000% - - - - - - - - -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% 3,247.00 45.96 0.06 - - - 3,247.00 45.96 0.061
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 35,794.91 76.00 0.20 - - - 35,794.91 76.00 0.203
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% 1,858.68 76.00 0.02 - - - 1,858.68 76.00 0.022
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% - - - - - - - - -
2 Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% - - - 2,309.50 89.31 1.622
2,309.50 89.31 1.62
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.43 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 3,513.25 87.50 0.12 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 38.13 100.00 0.04 - - - 38.13 100.00 0.041
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,979.82 100.00 2.29 - - - 2,979.82 100.00 2.287
3 Beton (K250) m3 348.86 3.158% 348.86 100.00 3.16 - - - 348.86 100.00 3.158
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.11 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.42 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.08 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.20 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.45 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.12 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.79 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.98 - - - 6,149.6 100.00 0.976
3 Beton (K250) m 3
46.75 0.423% 46.75 100.00 0.42 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.11 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.27 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.06 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.34 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.07 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.23 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.19 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.46 - - - 2,925.09 100.00 0.464
3 Beton (K250) m3 11.04 0.100% 11.04 100.00 0.10 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 285.71 100.00 0.43 - - - 285.71 100.00 0.435
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 7,830.39 100.00 1.24 - - - 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 34.29 100.00 0.31 - - - 34.29 100.00 0.310
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 612.14 100.00 0.93 - - - 612.14 100.00 0.931
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 16,476.08 100.00 2.62 - - - 16,476.08 100.00 2.616
3 Beton (K250) m3 70.63 0.639% 70.63 100.00 0.64 - - - 70.63 100.00 0.639
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 185.09 100.00 0.28 - - - 185.09 100.00 0.282
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 4,020.65 100.00 0.64 - - - 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 18.11 100.00 0.16 - - - 18.11 100.00 0.164
- - -
Balok Lantai 2 - (B4) 3.688% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
1 Begesting multipleks m2 633.10 0.963% 633.10 100.00 0.96 - - - 633.10 100.00 0.963
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 13,720.77 100.00 2.18 - - - 13,720.77 100.00 2.178
3 Beton (K250) m3 60.30 0.546% 60.30 100.00 0.55 - - - 60.30 100.00 0.546
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% 71.38 100.00 0.11 - - - 71.38 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% 1,133.54 100.00 0.18 - - - 1,133.54 100.00 0.180
3 Beton (K250) m 3
7.72 0.070% 7.72 100.00 0.07 - - - 7.72 100.00 0.070
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 78.28 100.00 0.12 - - - 78.28 100.00 0.119
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 1,554.04 100.00 0.25 - - - 1,554.04 100.00 0.247
3 Beton (K250) m3 7.21 0.065% 7.21 100.00 0.07 - - - 7.21 100.00 0.065
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.05 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.20 - - - 1,230.69 100.00 0.195
3 Beton (K250) m 3
4.78 0.043% 4.78 100.00 0.04 - - - 4.78 100.00 0.043
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 278.85 100.00 0.42 - - - 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 8,697.77 100.00 1.38 - - - 8,697.77 100.00 1.381
3 Beton (K250) m3 38.45 0.348% 38.45 100.00 0.35 - - - 38.45 100.00 0.348
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 303.00 100.00 0.46 - - - 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 7,470.21 100.00 1.19 - - - 7,470.21 100.00 1.186
3 Beton (K250) m3 30.30 0.274% 30.30 100.00 0.27 - - - 30.30 100.00 0.274
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.06 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.21 - - - 1,339.65 100.00 0.213
3 Beton (K250) m3 5.60 0.051% 5.60 100.00 0.05 - - - 5.60 100.00 0.051
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% 10.29 100.00 0.02 - - - 10.29 100.00 0.016
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% 420.54 100.00 0.07 - - - 420.54 100.00 0.067
3 Beton (K250) m 3
1.35 0.012% 1.35 100.00 0.01 - - - 1.35 100.00 0.012
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 13.88 100.00 0.02 - - - 13.88 100.00 0.021
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 380.27 100.00 0.06 - - - 380.27 100.00 0.060
3 Beton (K250) m3 1.67 0.015% 1.67 100.00 0.02 - - - 1.67 100.00 0.015
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 962.15 100.00 1.25 - - - 962.15 100.00 1.246
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 958.32 100.00 3.14 - - - 958.32 100.00 3.138
3 Beton (K250) m 3
140.24 1.270% 140.24 100.00 1.27 - - - 140.24 100.00 1.270
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 2,236.53 100.00 2.90 - - - 2,236.53 100.00 2.896
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 2,292.44 100.00 4.71 - - - 2,292.44 100.00 4.714
3 Beton (K250) m3 326.25 2.954% 326.25 100.00 2.95 - - - 326.25 100.00 2.954
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% 44.80 100.00 0.07 - - - 44.80 100.00 0.066
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% 940.09 100.00 0.15 - - - 940.09 100.00 0.149
3 Beton (K250) m 3
4.48 0.041% 4.48 100.00 0.04 - - - 4.48 100.00 0.041
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 403.20 100.00 0.59 - - - 403.20 100.00 0.594
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 4,641.21 100.00 0.74 - - - 4,641.21 100.00 0.737
3 Beton (K250) m3 35.28 0.319% 35.28 100.00 0.32 - - - 35.28 100.00 0.319
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 190.40 100.00 0.28 - - - 190.40 100.00 0.281
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,415.23 100.00 0.70 - - - 4,415.23 100.00 0.701
3 Beton (K250) m 3
16.32 0.148% 16.32 100.00 0.15 - - - 16.32 100.00 0.148
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% 870.33 100.00 1.32 - - - 870.33 100.00 1.316
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% 18,861.98 100.00 2.99 - - - 18,861.98 100.00 2.995
3 Beton (K250) m3 82.89 0.758% 82.89 100.00 0.76 - - - 82.89 100.00 0.758
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% 170.05 100.00 0.26 - - - 170.05 100.00 0.257
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% 3,376.09 100.00 0.54 - - - 3,376.09 100.00 0.536
3 Beton (K250) m 3
15.66 0.143% 15.66 100.00 0.14 - - - 15.66 100.00 0.143
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena m3 100.47 0.056% - - - 100.47 100.00 0.056
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) 100.47 100.00 0.06
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% 1,081.17 100.00 1.39 - - - 1,081.17 100.00 1.390
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% 1,240.66 95.00 1.78 - - - 1,240.66 95.00 1.782
3 Beton (K250) m 3
159.26 1.457% 135.50 85.08 1.24 - - - 135.50 85.08 1.240
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m 3
159.26
ltr/m3) 0.090% 135.50 85.08 0.08 - - - 135.50 85.08 0.076
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% - - - 54.46 100.00 0.009 54.46 100.00 0.009
3 Beton (K250) m 3
0.24 0.002% - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% 16.00 15.28 0.00 - - - 16.00 15.28 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% 1,325.33 100.00 0.30 - - - 1,325.33 100.00 0.301
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% 198.80 100.00 0.05 - - - 198.80 100.00 0.045
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% 1,524.13 100.00 0.02 - - - 1,524.13 100.00 0.022
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m3 1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% 1,537.06 50.00 0.35 1,383.36 45.00 0.314 2,920.42 95.00 0.662
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% 50.40 50.00 0.01 45.36 45.00 0.010 95.76 95.00 0.022
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% 79.39 50.00 0.02 71.45 45.00 0.016 150.83 95.00 0.034
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% 40.83 50.00 0.01 36.74 45.00 0.008 77.57 95.00 0.018
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% 152.00 50.00 0.02 136.80 45.00 0.019 288.80 95.00 0.041
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% 1,707.68 50.00 0.02 1,536.91 45.00 0.022 3,244.59 95.00 0.046
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% 195.46 73.00 0.04 72.29 27.00 0.016 267.75 100.00 0.061
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% 63.88 73.00 0.01 23.63 27.00 0.005 87.50 100.00 0.020
5 Baut angkur 3/4" bh 36.00 0.010% 36.00 100.00 0.01 - - - 36.00 100.00 0.010
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% 213.15 60.00 0.00 142.10 40.00 0.002 355.25 100.00 0.005
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% 33.85 62.00 0.01 20.75 38.00 0.005 54.60 100.00 0.013
2 Baut gording 3/8"x1" bh 208.00 0.003% 128.96 62.00 0.00 79.04 38.00 0.001 208.00 100.00 0.003
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% 33.85 62.00 0.00 20.75 38.00 0.000 54.60 100.00 0.001
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% 94.68 43.00 0.02 - - - 94.68 43.00 0.021
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - - - - - - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% 17.15 46.00 0.00 - - - 17.15 46.00 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - - - - - - - -
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - - - - - - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - - - - - - - -
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - - - - - - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - - - - - - - -
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - - - - - - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - - - - - - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - - - - - - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - - - - - - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 15,806.00 57.59 0.34 8,000.00 29.15 0.170 23,806.00 86.74 0.506
2 Pasang gording - (re-install) kg 19,654.88 0.418% 11,054.88 56.24 0.24 6,199.12 31.54 0.132 17,254.00 87.78 0.367
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% 1,534.00 50.18 0.01 600.00 19.63 0.006 2,134.00 69.81 0.020
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% - - - - - - - - -
5 Pasang atap spandek - (re-install) m 2
3,057.04 0.000% - - - - - - - - -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% 3,247.00 45.96 0.06 3,000.00 42.46 0.057 6,247.00 88.42 0.118
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 35,794.91 76.00 0.20 4,238.87 9.00 0.024 40,033.78 85.00 0.227
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% 1,858.68 76.00 0.02 - - - 1,858.68 76.00 0.022
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% - - - - - - - - -
2 Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% - - - 2,309.50 89.31 1.622
2,309.50 89.31 1.622
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.427 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 3,513.25 87.50 0.122 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 38.13 100.00 0.041 - - - 38.13 100.00 0.041
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,979.82 100.00 2.287 - - - 2,979.82 100.00 2.287
3 Beton (K250) m 3
348.86 3.158% 348.86 100.00 3.158 - - - 348.86 100.00 3.158
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.113 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.417 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.078 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.200 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.452 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.123 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.788 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.976 - - - 6,149.6 100.00 0.976
3 Beton (K250) m3 46.75 0.423% 46.75 100.00 0.423 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.109 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.273 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.058 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.338 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.072 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.233 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.186 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.464 - - - 2,925.09 100.00 0.464
3 Beton (K250) m 3
11.04 0.100% 11.04 100.00 0.100 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 285.71 100.00 0.435 - - - 285.71 100.00 0.435
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 7,830.39 100.00 1.243 - - - 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 34.29 100.00 0.310 - - - 34.29 100.00 0.310
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 612.14 100.00 0.931 - - - 612.14 100.00 0.931
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 16,476.08 100.00 2.616 - - - 16,476.08 100.00 2.616
3 Beton (K250) m 3
70.63 0.639% 70.63 100.00 0.639 - - - 70.63 100.00 0.639
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 185.09 100.00 0.282 - - - 185.09 100.00 0.282
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 4,020.65 100.00 0.638 - - - 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 18.11 100.00 0.164 - - - 18.11 100.00 0.164
- - -
Balok Lantai 2 - (B4) 3.688% - - -
1 Begesting multipleks m2 633.10 0.963% 633.10 100.00 0.963 - - - 633.10 100.00 0.963
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 13,720.77 100.00 2.178 - - - 13,720.77 100.00 2.178
3 Beton (K250) m3 60.30 0.546% 60.30 100.00 0.546 - - - 60.30 100.00 0.546
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% 71.38 100.00 0.109 - - - 71.38 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% 1,133.54 100.00 0.180 - - - 1,133.54 100.00 0.180
3 Beton (K250) m3 7.72 0.070% 7.72 100.00 0.070 - - - 7.72 100.00 0.070
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 78.28 100.00 0.119 - - - 78.28 100.00 0.119
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 1,554.04 100.00 0.247 - - - 1,554.04 100.00 0.247
3 Beton (K250) m3 7.21 0.065% 7.21 100.00 0.065 - - - 7.21 100.00 0.065
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.053 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.195 - - - 1,230.69 100.00 0.195
3 Beton (K250) m3 4.78 0.043% 4.78 100.00 0.043 - - - 4.78 100.00 0.043
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 278.85 100.00 0.424 - - - 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 8,697.77 100.00 1.381 - - - 8,697.77 100.00 1.381
3 Beton (K250) m 3
38.45 0.348% 38.45 100.00 0.348 - - - 38.45 100.00 0.348
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 303.00 100.00 0.461 - - - 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 7,470.21 100.00 1.186 - - - 7,470.21 100.00 1.186
3 Beton (K250) m 3
30.30 0.274% 30.30 100.00 0.274 - - - 30.30 100.00 0.274
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.059 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.213 - - - 1,339.65 100.00 0.213
3 Beton (K250) m 3
5.60 0.051% 5.60 100.00 0.051 - - - 5.60 100.00 0.051
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% 10.29 100.00 0.016 - - - 10.29 100.00 0.016
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% 420.54 100.00 0.067 - - - 420.54 100.00 0.067
3 Beton (K250) m3 1.35 0.012% 1.35 100.00 0.012 - - - 1.35 100.00 0.012
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 13.88 100.00 0.021 - - - 13.88 100.00 0.021
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 380.27 100.00 0.060 - - - 380.27 100.00 0.060
3 Beton (K250) m3 1.67 0.015% 1.67 100.00 0.015 - - - 1.67 100.00 0.015
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 962.15 100.00 1.246 - - - 962.15 100.00 1.246
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 958.32 100.00 3.138 - - - 958.32 100.00 3.138
3 Beton (K250) m 3
140.24 1.270% 140.24 100.00 1.270 - - - 140.24 100.00 1.270
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 2,236.53 100.00 2.896 - - - 2,236.53 100.00 2.896
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 2,292.44 100.00 4.714 - - - 2,292.44 100.00 4.714
3 Beton (K250) m3 326.25 2.954% 326.25 100.00 2.954 - - - 326.25 100.00 2.954
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% 44.80 100.00 0.066 - - - 44.80 100.00 0.066
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% 940.09 100.00 0.149 - - - 940.09 100.00 0.149
3 Beton (K250) m3 4.48 0.041% 4.48 100.00 0.041 - - - 4.48 100.00 0.041
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 403.20 100.00 0.594 - - - 403.20 100.00 0.594
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 4,641.21 100.00 0.737 - - - 4,641.21 100.00 0.737
3 Beton (K250) m3 35.28 0.319% 35.28 100.00 0.319 - - - 35.28 100.00 0.319
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 190.40 100.00 0.281 - - - 190.40 100.00 0.281
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,415.23 100.00 0.701 - - - 4,415.23 100.00 0.701
3 Beton (K250) m3 16.32 0.148% 16.32 100.00 0.148 - - - 16.32 100.00 0.148
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% 870.33 100.00 1.316 - - - 870.33 100.00 1.316
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% 18,861.98 100.00 2.995 - - - 18,861.98 100.00 2.995
3 Beton (K250) m3 82.89 0.758% 82.89 100.00 0.758 - - - 82.89 100.00 0.758
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% 170.05 100.00 0.257 - - - 170.05 100.00 0.257
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% 3,376.09 100.00 0.536 - - - 3,376.09 100.00 0.536
3 Beton (K250) m 3
15.66 0.143% 15.66 100.00 0.143 - - - 15.66 100.00 0.143
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena m3 100.47 0.056% - - - 100.47 100.00 0.056
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) 100.47 100.00 0.056
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% 1,081.17 100.00 1.390 - - - 1,081.17 100.00 1.390
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% 1,240.66 95.00 1.782 - - - 1,240.66 95.00 1.782
3 Beton (K250) m3 159.26 1.457% 135.50 85.08 1.240 12.62 7.92 0.115 148.12 93.00 1.355
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m3 159.26
ltr/m3) 0.090% 135.50 85.08 0.076 12.62 7.92 0.007 148.12 93.00 0.083
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% - - - 4.00 100.00 0.006 4.00 100.00 0.006
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% 54.46 100.00 0.009 - - - 54.46 100.00 0.009
3 Beton (K250) m3 0.24 0.002% - - - 0.24 100.00 0.002 0.24 100.00 0.002
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% 16.00 15.28 0.004 - - - 16.00 15.28 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% 1,325.33 100.00 0.301 - - - 1,325.33 100.00 0.301
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% 198.80 100.00 0.045 - - - 198.80 100.00 0.045
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% 1,524.13 100.00 0.022 - - - 1,524.13 100.00 0.022
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m 3
1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% 2,920.42 95.00 0.662 153.71 5.00 0.035 3,074.13 100.00 0.697
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% 95.76 95.00 0.022 5.04 5.00 0.001 100.80 100.00 0.023
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% 150.83 95.00 0.034 7.94 5.00 0.002 158.77 100.00 0.036
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% 77.57 95.00 0.018 4.08 5.00 0.001 81.66 100.00 0.019
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% 288.80 95.00 0.041 15.20 5.00 0.002 304.00 100.00 0.043
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% 3,244.59 95.00 0.046 170.77 5.00 0.002 3,415.36 100.00 0.048
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% 267.75 100.00 0.061 - - - 267.75 100.00 0.061
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% 87.50 100.00 0.020 - - - 87.50 100.00 0.020
5 Baut angkur 3/4" bh 36.00 0.010% 36.00 100.00 0.010 - - - 36.00 100.00 0.010
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% 355.25 100.00 0.005 - - - 355.25 100.00 0.005
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% 54.60 100.00 0.013 - - - 54.60 100.00 0.013
2 Baut gording 3/8"x1" bh 208.00 0.003% 208.00 100.00 0.003 - - - 208.00 100.00 0.003
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% 54.60 100.00 0.001 - - - 54.60 100.00 0.001
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% 94.68 43.00 0.021 - - - 94.68 43.00 0.021
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - - - - - - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% 17.15 46.00 0.004 - - - 17.15 46.00 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - - - - - - - -
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - - - - - - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - - - - - - - -
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - - - - - - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - - - - - - - -
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - - - - - - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - - - - - - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - - - - - - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - - - - - - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 23,806.00 86.74 0.506 3,637.68 13.26 0.077 27,443.68 100.00 0.584
2 Pasang gording - (re-install) kg 19,654.88 0.418% 17,254.00 87.78 0.367 2,400.88 12.22 0.051 19,654.88 100.00 0.418
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% 2,134.00 69.81 0.020 923.04 30.19 0.009 3,057.04 100.00 0.029
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% - - - 1,222.81 40.00 0.092 1,222.81 40.00 0.092
5 Pasang atap spandek - (re-install) m 2
3,057.04 0.000% - - - 1,222.81 40.00 - 1,222.81 40.00 -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% 6,247.00 88.42 0.118 817.78 11.58 0.015 7,064.78 100.00 0.134
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 40,033.78 85.00 0.227 7,064.78 15.00 0.040 47,098.56 100.00 0.267
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% 1,858.68 76.00 0.022 586.95 24.00 0.007 2,445.63 100.00 0.029
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% - - - 1,222.81 40.00 1.433 1,222.81 40.00 1.433
2 Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% - - - 2,309.50 89.31 1.622
2,309.50 89.31 1.62
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.43 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 3,513.25 87.50 0.12 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 38.13 100.00 0.04 - - - 38.13 100.00 0.041
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,979.82 100.00 2.29 - - - 2,979.82 100.00 2.287
3 Beton (K250) m 3
348.86 3.158% 348.86 100.00 3.16 - - - 348.86 100.00 3.158
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.11 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.42 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.08 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.20 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.45 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.12 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.79 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.98 - - - 6,149.6 100.00 0.976
3 Beton (K250) m3 46.75 0.423% 46.75 100.00 0.42 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.11 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.27 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.06 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.34 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.07 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.23 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.19 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.46 - - - 2,925.09 100.00 0.464
3 Beton (K250) m 3
11.04 0.100% 11.04 100.00 0.10 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 285.71 100.00 0.43 - - - 285.71 100.00 0.435
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 7,830.39 100.00 1.24 - - - 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 34.29 100.00 0.31 - - - 34.29 100.00 0.310
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 612.14 100.00 0.93 - - - 612.14 100.00 0.931
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 16,476.08 100.00 2.62 - - - 16,476.08 100.00 2.616
3 Beton (K250) m 3
70.63 0.639% 70.63 100.00 0.64 - - - 70.63 100.00 0.639
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 185.09 100.00 0.28 - - - 185.09 100.00 0.282
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 4,020.65 100.00 0.64 - - - 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 18.11 100.00 0.16 - - - 18.11 100.00 0.164
- - -
Balok Lantai 2 - (B4) 3.688% - - -
1 Begesting multipleks m2 633.10 0.963% 633.10 100.00 0.96 - - - 633.10 100.00 0.963
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 13,720.77 100.00 2.18 - - - 13,720.77 100.00 2.178
3 Beton (K250) m3 60.30 0.546% 60.30 100.00 0.55 - - - 60.30 100.00 0.546
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% 71.38 100.00 0.11 - - - 71.38 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% 1,133.54 100.00 0.18 - - - 1,133.54 100.00 0.180
3 Beton (K250) m3 7.72 0.070% 7.72 100.00 0.07 - - - 7.72 100.00 0.070
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 78.28 100.00 0.12 - - - 78.28 100.00 0.119
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 1,554.04 100.00 0.25 - - - 1,554.04 100.00 0.247
3 Beton (K250) m3 7.21 0.065% 7.21 100.00 0.07 - - - 7.21 100.00 0.065
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.05 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.20 - - - 1,230.69 100.00 0.195
3 Beton (K250) m3 4.78 0.043% 4.78 100.00 0.04 - - - 4.78 100.00 0.043
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 278.85 100.00 0.42 - - - 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 8,697.77 100.00 1.38 - - - 8,697.77 100.00 1.381
3 Beton (K250) m 3
38.45 0.348% 38.45 100.00 0.35 - - - 38.45 100.00 0.348
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 303.00 100.00 0.46 - - - 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 7,470.21 100.00 1.19 - - - 7,470.21 100.00 1.186
3 Beton (K250) m 3
30.30 0.274% 30.30 100.00 0.27 - - - 30.30 100.00 0.274
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.06 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.21 - - - 1,339.65 100.00 0.213
3 Beton (K250) m 3
5.60 0.051% 5.60 100.00 0.05 - - - 5.60 100.00 0.051
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% 10.29 100.00 0.02 - - - 10.29 100.00 0.016
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% 420.54 100.00 0.07 - - - 420.54 100.00 0.067
3 Beton (K250) m3 1.35 0.012% 1.35 100.00 0.01 - - - 1.35 100.00 0.012
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 13.88 100.00 0.02 - - - 13.88 100.00 0.021
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 380.27 100.00 0.06 - - - 380.27 100.00 0.060
3 Beton (K250) m3 1.67 0.015% 1.67 100.00 0.02 - - - 1.67 100.00 0.015
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 962.15 100.00 1.25 - - - 962.15 100.00 1.246
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 958.32 100.00 3.14 - - - 958.32 100.00 3.138
3 Beton (K250) m 3
140.24 1.270% 140.24 100.00 1.27 - - - 140.24 100.00 1.270
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 2,236.53 100.00 2.90 - - - 2,236.53 100.00 2.896
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 2,292.44 100.00 4.71 - - - 2,292.44 100.00 4.714
3 Beton (K250) m3 326.25 2.954% 326.25 100.00 2.95 - - - 326.25 100.00 2.954
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% 44.80 100.00 0.07 - - - 44.80 100.00 0.066
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% 940.09 100.00 0.15 - - - 940.09 100.00 0.149
3 Beton (K250) m3 4.48 0.041% 4.48 100.00 0.04 - - - 4.48 100.00 0.041
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 403.20 100.00 0.59 - - - 403.20 100.00 0.594
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 4,641.21 100.00 0.74 - - - 4,641.21 100.00 0.737
3 Beton (K250) m3 35.28 0.319% 35.28 100.00 0.32 - - - 35.28 100.00 0.319
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 190.40 100.00 0.28 - - - 190.40 100.00 0.281
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,415.23 100.00 0.70 - - - 4,415.23 100.00 0.701
3 Beton (K250) m3 16.32 0.148% 16.32 100.00 0.15 - - - 16.32 100.00 0.148
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% 870.33 100.00 1.32 - - - 870.33 100.00 1.316
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% 18,861.98 100.00 2.99 - - - 18,861.98 100.00 2.995
3 Beton (K250) m3 82.89 0.758% 82.89 100.00 0.76 - - - 82.89 100.00 0.758
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% 170.05 100.00 0.26 - - - 170.05 100.00 0.257
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% 3,376.09 100.00 0.54 - - - 3,376.09 100.00 0.536
3 Beton (K250) m 3
15.66 0.143% 15.66 100.00 0.14 - - - 15.66 100.00 0.143
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena m3 100.47 0.056% - - - 100.47 100.00 0.056
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) 100.47 100.00 0.06
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% 1,081.17 100.00 1.39 - - - 1,081.17 100.00 1.390
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% 1,240.66 95.00 1.78 - - - 1,240.66 95.00 1.782
3 Beton (K250) m3 159.26 1.457% 148.12 93.00 1.35 - - - 148.12 93.00 1.355
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m3 159.26
ltr/m3) 0.090% 148.12 93.00 0.08 - - - 148.12 93.00 0.083
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% 4.00 100.00 0.01 - - - 4.00 100.00 0.006
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% 54.46 100.00 0.01 - - - 54.46 100.00 0.009
3 Beton (K250) m3 0.24 0.002% 0.24 100.00 0.00 - - - 0.24 100.00 0.002
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% 16.00 15.28 0.00 - - - 16.00 15.28 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% 1,325.33 100.00 0.30 - - - 1,325.33 100.00 0.301
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% 198.80 100.00 0.05 - - - 198.80 100.00 0.045
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% 1,524.13 100.00 0.02 - - - 1,524.13 100.00 0.022
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m 3
1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% 3,074.13 100.00 0.70 - - - 3,074.13 100.00 0.697
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% 100.80 100.00 0.02 - - - 100.80 100.00 0.023
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% 158.77 100.00 0.04 - - - 158.77 100.00 0.036
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% 81.66 100.00 0.02 - - - 81.66 100.00 0.019
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% 304.00 100.00 0.04 - - - 304.00 100.00 0.043
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% 3,415.36 100.00 0.05 - - - 3,415.36 100.00 0.048
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% 267.75 100.00 0.06 - - - 267.75 100.00 0.061
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% 87.50 100.00 0.02 - - - 87.50 100.00 0.020
5 Baut angkur 3/4" bh 36.00 0.010% 36.00 100.00 0.01 - - - 36.00 100.00 0.010
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% 355.25 100.00 0.01 - - - 355.25 100.00 0.005
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% 54.60 100.00 0.01 - - - 54.60 100.00 0.013
2 Baut gording 3/8"x1" bh 208.00 0.003% 208.00 100.00 0.00 - - - 208.00 100.00 0.003
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% 54.60 100.00 0.00 - - - 54.60 100.00 0.001
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% 94.68 43.00 0.02 - - - 94.68 43.00 0.021
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - - - - - - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% 17.15 46.00 0.00 - - - 17.15 46.00 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - - - - - - - -
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - - - - - - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - - - - - - - -
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - - - - - - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - - - - - - - -
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - - - - - - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - - - - - - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - - - - - - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - - - - - - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 27,443.68 100.00 0.58 - - - 27,443.68 100.00 0.584
2 Pasang gording - (re-install) kg 19,654.88 0.418% 19,654.88 100.00 0.42 - - - 19,654.88 100.00 0.418
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% 3,057.04 100.00 0.03 - - - 3,057.04 100.00 0.029
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% 1,222.81 40.00 0.09 611.41 20.00 0.046 1,834.22 60.00 0.139
5 Pasang atap spandek - (re-install) m 2
3,057.04 0.000% 1,222.81 40.00 - 611.41 20.00 - 1,834.22 60.00 -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% 7,064.78 100.00 0.13 - - - 7,064.78 100.00 0.134
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 47,098.56 100.00 0.27 - - - 47,098.56 100.00 0.267
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% 2,445.63 100.00 0.03 - - - 2,445.63 100.00 0.029
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% 1,222.81 40.00 1.43 611.41 20.00 0.716 1,834.22 60.00 2.149
2 Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% - - - 2,309.50 89.31 1.622
2,309.50 89.31 1.62
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.43 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 3,513.25 87.50 0.12 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 38.13 100.00 0.04 - - - 38.13 100.00 0.041
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,979.82 100.00 2.29 - - - 2,979.82 100.00 2.287
3 Beton (K250) m 3
348.86 3.158% 348.86 100.00 3.16 - - - 348.86 100.00 3.158
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.11 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.42 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.08 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.20 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.45 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.12 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.79 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.98 - - - 6,149.6 100.00 0.976
3 Beton (K250) m3 46.75 0.423% 46.75 100.00 0.42 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.11 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.27 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.06 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.34 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.07 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.23 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.19 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.46 - - - 2,925.09 100.00 0.464
3 Beton (K250) m 3
11.04 0.100% 11.04 100.00 0.10 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 285.71 100.00 0.43 - - - 285.71 100.00 0.435
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 7,830.39 100.00 1.24 - - - 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 34.29 100.00 0.31 - - - 34.29 100.00 0.310
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 612.14 100.00 0.93 - - - 612.14 100.00 0.931
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 16,476.08 100.00 2.62 - - - 16,476.08 100.00 2.616
3 Beton (K250) m 3
70.63 0.639% 70.63 100.00 0.64 - - - 70.63 100.00 0.639
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 185.09 100.00 0.28 - - - 185.09 100.00 0.282
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 4,020.65 100.00 0.64 - - - 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 18.11 100.00 0.16 - - - 18.11 100.00 0.164
- - -
Balok Lantai 2 - (B4) 3.688% - - -
1 Begesting multipleks m2 633.10 0.963% 633.10 100.00 0.96 - - - 633.10 100.00 0.963
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 13,720.77 100.00 2.18 - - - 13,720.77 100.00 2.178
3 Beton (K250) m3 60.30 0.546% 60.30 100.00 0.55 - - - 60.30 100.00 0.546
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% 71.38 100.00 0.11 - - - 71.38 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% 1,133.54 100.00 0.18 - - - 1,133.54 100.00 0.180
3 Beton (K250) m3 7.72 0.070% 7.72 100.00 0.07 - - - 7.72 100.00 0.070
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 78.28 100.00 0.12 - - - 78.28 100.00 0.119
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 1,554.04 100.00 0.25 - - - 1,554.04 100.00 0.247
3 Beton (K250) m3 7.21 0.065% 7.21 100.00 0.07 - - - 7.21 100.00 0.065
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.05 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.20 - - - 1,230.69 100.00 0.195
3 Beton (K250) m3 4.78 0.043% 4.78 100.00 0.04 - - - 4.78 100.00 0.043
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 278.85 100.00 0.42 - - - 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 8,697.77 100.00 1.38 - - - 8,697.77 100.00 1.381
3 Beton (K250) m 3
38.45 0.348% 38.45 100.00 0.35 - - - 38.45 100.00 0.348
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 303.00 100.00 0.46 - - - 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 7,470.21 100.00 1.19 - - - 7,470.21 100.00 1.186
3 Beton (K250) m 3
30.30 0.274% 30.30 100.00 0.27 - - - 30.30 100.00 0.274
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.06 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.21 - - - 1,339.65 100.00 0.213
3 Beton (K250) m 3
5.60 0.051% 5.60 100.00 0.05 - - - 5.60 100.00 0.051
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% 10.29 100.00 0.02 - - - 10.29 100.00 0.016
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% 420.54 100.00 0.07 - - - 420.54 100.00 0.067
3 Beton (K250) m3 1.35 0.012% 1.35 100.00 0.01 - - - 1.35 100.00 0.012
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 13.88 100.00 0.02 - - - 13.88 100.00 0.021
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 380.27 100.00 0.06 - - - 380.27 100.00 0.060
3 Beton (K250) m3 1.67 0.015% 1.67 100.00 0.02 - - - 1.67 100.00 0.015
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 962.15 100.00 1.25 - - - 962.15 100.00 1.246
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 958.32 100.00 3.14 - - - 958.32 100.00 3.138
3 Beton (K250) m 3
140.24 1.270% 140.24 100.00 1.27 - - - 140.24 100.00 1.270
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 2,236.53 100.00 2.90 - - - 2,236.53 100.00 2.896
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 2,292.44 100.00 4.71 - - - 2,292.44 100.00 4.714
3 Beton (K250) m3 326.25 2.954% 326.25 100.00 2.95 - - - 326.25 100.00 2.954
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% 44.80 100.00 0.07 - - - 44.80 100.00 0.066
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% 940.09 100.00 0.15 - - - 940.09 100.00 0.149
3 Beton (K250) m3 4.48 0.041% 4.48 100.00 0.04 - - - 4.48 100.00 0.041
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 403.20 100.00 0.59 - - - 403.20 100.00 0.594
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 4,641.21 100.00 0.74 - - - 4,641.21 100.00 0.737
3 Beton (K250) m3 35.28 0.319% 35.28 100.00 0.32 - - - 35.28 100.00 0.319
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 190.40 100.00 0.28 - - - 190.40 100.00 0.281
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,415.23 100.00 0.70 - - - 4,415.23 100.00 0.701
3 Beton (K250) m3 16.32 0.148% 16.32 100.00 0.15 - - - 16.32 100.00 0.148
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% 870.33 100.00 1.32 - - - 870.33 100.00 1.316
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% 18,861.98 100.00 2.99 - - - 18,861.98 100.00 2.995
3 Beton (K250) m3 82.89 0.758% 82.89 100.00 0.76 - - - 82.89 100.00 0.758
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% 170.05 100.00 0.26 - - - 170.05 100.00 0.257
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% 3,376.09 100.00 0.54 - - - 3,376.09 100.00 0.536
3 Beton (K250) m 3
15.66 0.143% 15.66 100.00 0.14 - - - 15.66 100.00 0.143
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena m3 100.47 0.056% - - - 100.47 100.00 0.056
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) 100.47 100.00 0.06
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% 1,081.17 100.00 1.39 - - - 1,081.17 100.00 1.390
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% 1,240.66 95.00 1.78 - - - 1,240.66 95.00 1.782
3 Beton (K250) m3 159.26 1.457% 148.12 93.00 1.35 - - - 148.12 93.00 1.355
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m3 159.26
ltr/m3) 0.090% 148.12 93.00 0.08 - - - 148.12 93.00 0.083
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% 4.00 100.00 0.01 - - - 4.00 100.00 0.006
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% 54.46 100.00 0.01 - - - 54.46 100.00 0.009
3 Beton (K250) m3 0.24 0.002% 0.24 100.00 0.00 - - - 0.24 100.00 0.002
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% 16.00 15.28 0.00 - - - 16.00 15.28 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% 1,325.33 100.00 0.30 - - - 1,325.33 100.00 0.301
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% 198.80 100.00 0.05 - - - 198.80 100.00 0.045
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% 1,524.13 100.00 0.02 - - - 1,524.13 100.00 0.022
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m 3
1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% 3,074.13 100.00 0.70 - - - 3,074.13 100.00 0.697
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% 100.80 100.00 0.02 - - - 100.80 100.00 0.023
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% 158.77 100.00 0.04 - - - 158.77 100.00 0.036
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% 81.66 100.00 0.02 - - - 81.66 100.00 0.019
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% 304.00 100.00 0.04 - - - 304.00 100.00 0.043
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% 3,415.36 100.00 0.05 - - - 3,415.36 100.00 0.048
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% 267.75 100.00 0.06 - - - 267.75 100.00 0.061
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% 87.50 100.00 0.02 - - - 87.50 100.00 0.020
5 Baut angkur 3/4" bh 36.00 0.010% 36.00 100.00 0.01 - - - 36.00 100.00 0.010
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% 355.25 100.00 0.01 - - - 355.25 100.00 0.005
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% 54.60 100.00 0.01 - - - 54.60 100.00 0.013
2 Baut gording 3/8"x1" bh 208.00 0.003% 208.00 100.00 0.00 - - - 208.00 100.00 0.003
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% 54.60 100.00 0.00 - - - 54.60 100.00 0.001
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% 94.68 43.00 0.02 - - - 94.68 43.00 0.021
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - - - - - - - -
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% 17.15 46.00 0.00 - - - 17.15 46.00 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - - - - - - - -
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - - - - - - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - - - - - - - -
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - - - - - - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - - - - - - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - - - - - - - -
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - - - - - - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - - - - - - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - - - - - - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - - - - - - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 27,443.68 100.00 0.58 - - - 27,443.68 100.00 0.584
2 Pasang gording - (re-install) kg 19,654.88 0.418% 19,654.88 100.00 0.42 - - - 19,654.88 100.00 0.418
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% 3,057.04 100.00 0.03 - - - 3,057.04 100.00 0.029
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% 1,834.22 60.00 0.14 825.40 27.00 0.062 2,659.62 87.00 0.201
5 Pasang atap spandek - (re-install) m 2
3,057.04 0.000% 1,834.22 60.00 - 825.40 27.00 - 2,659.62 87.00 -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% 7,064.78 100.00 0.13 - - - 7,064.78 100.00 0.134
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 47,098.56 100.00 0.27 - - - 47,098.56 100.00 0.267
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% 2,445.63 100.00 0.03 - - - 2,445.63 100.00 0.029
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% 1,834.22 60.00 2.15 825.40 27.00 0.967 2,659.62 87.00 3.117
2 Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% - - - 2,309.50 89.31 1.622
2,309.50 89.31 1.622
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.427 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 3,513.25 87.50 0.122 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 38.13 100.00 0.041 - - - 38.13 100.00 0.041
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,979.82 100.00 2.287 - - - 2,979.82 100.00 2.287
3 Beton (K250) m 3
348.86 3.158% 348.86 100.00 3.158 - - - 348.86 100.00 3.158
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.113 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.417 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.078 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.200 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.452 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.123 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.788 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.976 - - - 6,149.6 100.00 0.976
3 Beton (K250) m3 46.75 0.423% 46.75 100.00 0.423 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.109 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.273 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.058 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.338 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.072 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.233 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.186 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.464 - - - 2,925.09 100.00 0.464
3 Beton (K250) m 3
11.04 0.100% 11.04 100.00 0.100 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 285.71 100.00 0.435 - - - 285.71 100.00 0.435
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 7,830.39 100.00 1.243 - - - 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 34.29 100.00 0.310 - - - 34.29 100.00 0.310
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 612.14 100.00 0.931 - - - 612.14 100.00 0.931
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 16,476.08 100.00 2.616 - - - 16,476.08 100.00 2.616
3 Beton (K250) m 3
70.63 0.639% 70.63 100.00 0.639 - - - 70.63 100.00 0.639
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 185.09 100.00 0.282 - - - 185.09 100.00 0.282
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 4,020.65 100.00 0.638 - - - 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 18.11 100.00 0.164 - - - 18.11 100.00 0.164
- - -
Balok Lantai 2 - (B4) 3.688% - - -
1 Begesting multipleks m2 633.10 0.963% 633.10 100.00 0.963 - - - 633.10 100.00 0.963
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 13,720.77 100.00 2.178 - - - 13,720.77 100.00 2.178
3 Beton (K250) m3 60.30 0.546% 60.30 100.00 0.546 - - - 60.30 100.00 0.546
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% 71.38 100.00 0.109 - - - 71.38 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% 1,133.54 100.00 0.180 - - - 1,133.54 100.00 0.180
3 Beton (K250) m3 7.72 0.070% 7.72 100.00 0.070 - - - 7.72 100.00 0.070
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 78.28 100.00 0.119 - - - 78.28 100.00 0.119
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 1,554.04 100.00 0.247 - - - 1,554.04 100.00 0.247
3 Beton (K250) m3 7.21 0.065% 7.21 100.00 0.065 - - - 7.21 100.00 0.065
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.053 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.195 - - - 1,230.69 100.00 0.195
3 Beton (K250) m3 4.78 0.043% 4.78 100.00 0.043 - - - 4.78 100.00 0.043
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 278.85 100.00 0.424 - - - 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 8,697.77 100.00 1.381 - - - 8,697.77 100.00 1.381
3 Beton (K250) m 3
38.45 0.348% 38.45 100.00 0.348 - - - 38.45 100.00 0.348
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 303.00 100.00 0.461 - - - 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 7,470.21 100.00 1.186 - - - 7,470.21 100.00 1.186
3 Beton (K250) m 3
30.30 0.274% 30.30 100.00 0.274 - - - 30.30 100.00 0.274
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.059 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.213 - - - 1,339.65 100.00 0.213
3 Beton (K250) m 3
5.60 0.051% 5.60 100.00 0.051 - - - 5.60 100.00 0.051
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% 10.29 100.00 0.016 - - - 10.29 100.00 0.016
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% 420.54 100.00 0.067 - - - 420.54 100.00 0.067
3 Beton (K250) m3 1.35 0.012% 1.35 100.00 0.012 - - - 1.35 100.00 0.012
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 13.88 100.00 0.021 - - - 13.88 100.00 0.021
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 380.27 100.00 0.060 - - - 380.27 100.00 0.060
3 Beton (K250) m3 1.67 0.015% 1.67 100.00 0.015 - - - 1.67 100.00 0.015
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 962.15 100.00 1.246 - - - 962.15 100.00 1.246
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 958.32 100.00 3.138 - - - 958.32 100.00 3.138
3 Beton (K250) m 3
140.24 1.270% 140.24 100.00 1.270 - - - 140.24 100.00 1.270
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 2,236.53 100.00 2.896 - - - 2,236.53 100.00 2.896
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 2,292.44 100.00 4.714 - - - 2,292.44 100.00 4.714
3 Beton (K250) m3 326.25 2.954% 326.25 100.00 2.954 - - - 326.25 100.00 2.954
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% 44.80 100.00 0.066 - - - 44.80 100.00 0.066
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% 940.09 100.00 0.149 - - - 940.09 100.00 0.149
3 Beton (K250) m3 4.48 0.041% 4.48 100.00 0.041 - - - 4.48 100.00 0.041
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 403.20 100.00 0.594 - - - 403.20 100.00 0.594
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 4,641.21 100.00 0.737 - - - 4,641.21 100.00 0.737
3 Beton (K250) m3 35.28 0.319% 35.28 100.00 0.319 - - - 35.28 100.00 0.319
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 190.40 100.00 0.281 - - - 190.40 100.00 0.281
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,415.23 100.00 0.701 - - - 4,415.23 100.00 0.701
3 Beton (K250) m3 16.32 0.148% 16.32 100.00 0.148 - - - 16.32 100.00 0.148
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% 870.33 100.00 1.316 - - - 870.33 100.00 1.316
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% 18,861.98 100.00 2.995 - - - 18,861.98 100.00 2.995
3 Beton (K250) m3 82.89 0.758% 82.89 100.00 0.758 - - - 82.89 100.00 0.758
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% 170.05 100.00 0.257 - - - 170.05 100.00 0.257
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% 3,376.09 100.00 0.536 - - - 3,376.09 100.00 0.536
3 Beton (K250) m 3
15.66 0.143% 15.66 100.00 0.143 - - - 15.66 100.00 0.143
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena m3 100.47 0.056% - - - 100.47 100.00 0.056
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) 100.47 100.00 0.056
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - -
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% 1,081.17 100.00 1.390 - - - 1,081.17 100.00 1.390
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% 1,240.66 95.00 1.782 - - - 1,240.66 95.00 1.782
3 Beton (K250) m3 159.26 1.457% 148.12 93.00 1.355 - - - 148.12 93.00 1.355
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m3 159.26
ltr/m3) 0.090% 148.12 93.00 0.083 - - - 148.12 93.00 0.083
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% 4.00 100.00 0.006 - - - 4.00 100.00 0.006
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% 54.46 100.00 0.009 - - - 54.46 100.00 0.009
3 Beton (K250) m3 0.24 0.002% 0.24 100.00 0.002 - - - 0.24 100.00 0.002
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% 16.00 15.28 0.004 - - - 16.00 15.28 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - -
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% 1,325.33 100.00 0.301 - - - 1,325.33 100.00 0.301
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% 198.80 100.00 0.045 - - - 198.80 100.00 0.045
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% 1,524.13 100.00 0.022 - - - 1,524.13 100.00 0.022
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - -
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - -
3 Beton (K250) m 3
1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% 3,074.13 100.00 0.697 - - - 3,074.13 100.00 0.697
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% 100.80 100.00 0.023 - - - 100.80 100.00 0.023
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% 158.77 100.00 0.036 - - - 158.77 100.00 0.036
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% 81.66 100.00 0.019 - - - 81.66 100.00 0.019
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% 304.00 100.00 0.043 - - - 304.00 100.00 0.043
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% 3,415.36 100.00 0.048 - - - 3,415.36 100.00 0.048
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% 267.75 100.00 0.061 - - - 267.75 100.00 0.061
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% 87.50 100.00 0.020 - - - 87.50 100.00 0.020
5 Baut angkur 3/4" bh 36.00 0.010% 36.00 100.00 0.010 - - - 36.00 100.00 0.010
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% 355.25 100.00 0.005 - - - 355.25 100.00 0.005
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% 54.60 100.00 0.013 - - - 54.60 100.00 0.013
2 Baut gording 3/8"x1" bh 208.00 0.003% 208.00 100.00 0.003 - - - 208.00 100.00 0.003
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% 54.60 100.00 0.001 - - - 54.60 100.00 0.001
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% - - - 880.74 60.00 0.054 880.74 60.00 0.054
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% 94.68 43.00 0.021 37.43 17.00 0.008 132.11 60.00 0.030
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% - - - 1,012.85 60.00 0.005 1,012.85 60.00 0.005
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% - - - 49.70 20.00 0.004 49.70 20.00 0.004
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% 17.15 46.00 0.004 1.49 4.00 0.000 18.64 50.00 0.004
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% - - - 57.15 20.00 0.000 57.15 20.00 0.000
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% - - - 1,372.73 60.00 0.200 1,372.73 60.00 0.200
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% - - - 205.91 60.00 0.047 205.91 60.00 0.047
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% - - - 1,578.64 60.00 0.015 1,578.64 60.00 0.015
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% - - - 251.86 30.00 0.071 251.86 30.00 0.071
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% - - - 37.78 30.00 0.009 37.78 30.00 0.009
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% - - - 289.64 30.00 0.005 289.64 30.00 0.005
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - - - - - - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - - - - - - - -
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - - - - - - - -
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - - - - - - - -
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 27,443.68 100.00 0.584 - - - 27,443.68 100.00 0.584
2 Pasang gording - (re-install) kg 19,654.88 0.418% 19,654.88 100.00 0.418 - - - 19,654.88 100.00 0.418
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% 3,057.04 100.00 0.029 - - - 3,057.04 100.00 0.029
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% 2,659.62 87.00 0.201 397.41 13.00 0.030 3,057.04 100.00 0.231
5 Pasang atap spandek - (re-install) m 2
3,057.04 0.000% 2,659.62 87.00 - 397.41 13.00 - 3,057.04 100.00 -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% 7,064.78 100.00 0.134 - - - 7,064.78 100.00 0.134
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 47,098.56 100.00 0.267 - - - 47,098.56 100.00 0.267
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% 2,445.63 100.00 0.029 - - - 2,445.63 100.00 0.029
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% 2,659.62 87.00 3.117 397.41 13.00 0.466 3,057.04 100.00 3.582
2 Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% - - - 2,309.50 89.31 1.622
2,309.50 89.31 1.62
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.43 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 3,513.25 87.50 0.12 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 38.13 100.00 0.04 - - - 38.13 100.00 0.041
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,979.82 100.00 2.29 - - - 2,979.82 100.00 2.287
3 Beton (K250) m 3
348.86 3.158% 348.86 100.00 3.16 - - - 348.86 100.00 3.158
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.11 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.42 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.08 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.20 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.45 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.12 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.79 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.98 - - - 6,149.6 100.00 0.976
3 Beton (K250) m3 46.75 0.423% 46.75 100.00 0.42 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.11 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.27 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.06 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.34 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.07 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.23 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.19 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.46 - - - 2,925.09 100.00 0.464
3 Beton (K250) m 3
11.04 0.100% 11.04 100.00 0.10 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 285.71 100.00 0.43 - - - 285.71 100.00 0.435
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 7,830.39 100.00 1.24 - - - 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 34.29 100.00 0.31 - - - 34.29 100.00 0.310
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 612.14 100.00 0.93 - - - 612.14 100.00 0.931
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 16,476.08 100.00 2.62 - - - 16,476.08 100.00 2.616
3 Beton (K250) m 3
70.63 0.639% 70.63 100.00 0.64 - - - 70.63 100.00 0.639
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 185.09 100.00 0.28 - - - 185.09 100.00 0.282
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 4,020.65 100.00 0.64 - - - 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 18.11 100.00 0.16 - - - 18.11 100.00 0.164
- - -
Balok Lantai 2 - (B4) 3.688% - - -
1 Begesting multipleks m2 633.10 0.963% 633.10 100.00 0.96 - - - 633.10 100.00 0.963
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 13,720.77 100.00 2.18 - - - 13,720.77 100.00 2.178
3 Beton (K250) m3 60.30 0.546% 60.30 100.00 0.55 - - - 60.30 100.00 0.546
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% 71.38 100.00 0.11 - - - 71.38 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% 1,133.54 100.00 0.18 - - - 1,133.54 100.00 0.180
3 Beton (K250) m3 7.72 0.070% 7.72 100.00 0.07 - - - 7.72 100.00 0.070
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 78.28 100.00 0.12 - - - 78.28 100.00 0.119
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 1,554.04 100.00 0.25 - - - 1,554.04 100.00 0.247
3 Beton (K250) m3 7.21 0.065% 7.21 100.00 0.07 - - - 7.21 100.00 0.065
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.05 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.20 - - - 1,230.69 100.00 0.195
3 Beton (K250) m3 4.78 0.043% 4.78 100.00 0.04 - - - 4.78 100.00 0.043
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 278.85 100.00 0.42 - - - 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 8,697.77 100.00 1.38 - - - 8,697.77 100.00 1.381
3 Beton (K250) m 3
38.45 0.348% 38.45 100.00 0.35 - - - 38.45 100.00 0.348
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 303.00 100.00 0.46 - - - 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 7,470.21 100.00 1.19 - - - 7,470.21 100.00 1.186
3 Beton (K250) m 3
30.30 0.274% 30.30 100.00 0.27 - - - 30.30 100.00 0.274
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.06 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.21 - - - 1,339.65 100.00 0.213
3 Beton (K250) m 3
5.60 0.051% 5.60 100.00 0.05 - - - 5.60 100.00 0.051
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% 10.29 100.00 0.02 - - - 10.29 100.00 0.016
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% 420.54 100.00 0.07 - - - 420.54 100.00 0.067
3 Beton (K250) m3 1.35 0.012% 1.35 100.00 0.01 - - - 1.35 100.00 0.012
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 13.88 100.00 0.02 - - - 13.88 100.00 0.021
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 380.27 100.00 0.06 - - - 380.27 100.00 0.060
3 Beton (K250) m3 1.67 0.015% 1.67 100.00 0.02 - - - 1.67 100.00 0.015
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 962.15 100.00 1.25 - - - 962.15 100.00 1.246
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 958.32 100.00 3.14 - - - 958.32 100.00 3.138
3 Beton (K250) m 3
140.24 1.270% 140.24 100.00 1.27 - - - 140.24 100.00 1.270
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 2,236.53 100.00 2.90 - - - 2,236.53 100.00 2.896
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 2,292.44 100.00 4.71 - - - 2,292.44 100.00 4.714
3 Beton (K250) m3 326.25 2.954% 326.25 100.00 2.95 - - - 326.25 100.00 2.954
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% 44.80 100.00 0.07 - - - 44.80 100.00 0.066
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% 940.09 100.00 0.15 - - - 940.09 100.00 0.149
3 Beton (K250) m3 4.48 0.041% 4.48 100.00 0.04 - - - 4.48 100.00 0.041
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 403.20 100.00 0.59 - - - 403.20 100.00 0.594
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 4,641.21 100.00 0.74 - - - 4,641.21 100.00 0.737
3 Beton (K250) m3 35.28 0.319% 35.28 100.00 0.32 - - - 35.28 100.00 0.319
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 190.40 100.00 0.28 - - - 190.40 100.00 0.281
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,415.23 100.00 0.70 - - - 4,415.23 100.00 0.701
3 Beton (K250) m3 16.32 0.148% 16.32 100.00 0.15 - - - 16.32 100.00 0.148
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - -
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - -
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% 870.33 100.00 1.32 - - - 870.33 100.00 1.316
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% 18,861.98 100.00 2.99 - - - 18,861.98 100.00 2.995
3 Beton (K250) m3 82.89 0.758% 82.89 100.00 0.76 - - - 82.89 100.00 0.758
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% 170.05 100.00 0.26 - - - 170.05 100.00 0.257
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% 3,376.09 100.00 0.54 - - - 3,376.09 100.00 0.536
3 Beton (K250) m 3
15.66 0.143% 15.66 100.00 0.14 - - - 15.66 100.00 0.143
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena m3 100.47 0.056% - - - 100.47 100.00 0.056
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) 100.47 100.00 0.06
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% - - - 515.29 100.00 0.117 515.29 100.00 0.117
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% - - - 77.29 100.00 0.018 77.29 100.00 0.018
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% - - - 592.58 100.00 0.008 592.58 100.00 0.008
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - -
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - -
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 708.44 0.010% - - -
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% 1,081.17 100.00 1.39 - - - 1,081.17 100.00 1.390
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% 1,240.66 95.00 1.78 - - - 1,240.66 95.00 1.782
3 Beton (K250) m3 159.26 1.457% 148.12 93.00 1.35 - - - 148.12 93.00 1.355
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m3 159.26
ltr/m3) 0.090% 148.12 93.00 0.08 - - - 148.12 93.00 0.083
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% 4.00 100.00 0.01 - - - 4.00 100.00 0.006
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% 54.46 100.00 0.01 - - - 54.46 100.00 0.009
3 Beton (K250) m3 0.24 0.002% 0.24 100.00 0.00 - - - 0.24 100.00 0.002
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% - - - 698.02 100.00 0.158 698.02 100.00 0.158
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% 16.00 15.28 0.00 88.70 84.72 0.020 104.70 100.00 0.024
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% - - - 802.73 100.00 0.011 802.73 100.00 0.011
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% 1,325.33 100.00 0.30 - - - 1,325.33 100.00 0.301
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% 198.80 100.00 0.05 - - - 198.80 100.00 0.045
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% 1,524.13 100.00 0.02 - - - 1,524.13 100.00 0.022
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - -
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% - - - 25.57 100.00 0.039 25.57 100.00 0.039
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% - - - 322.76 100.00 0.051 322.76 100.00 0.051
3 Beton (K250) m 3
1.92 0.018% - - -
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - -
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - -
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - -
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - -
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% 3,074.13 100.00 0.70 - - - 3,074.13 100.00 0.697
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% 100.80 100.00 0.02 - - - 100.80 100.00 0.023
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% 158.77 100.00 0.04 - - - 158.77 100.00 0.036
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% 81.66 100.00 0.02 - - - 81.66 100.00 0.019
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% 304.00 100.00 0.04 - - - 304.00 100.00 0.043
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% 3,415.36 100.00 0.05 - - - 3,415.36 100.00 0.048
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% 267.75 100.00 0.06 - - - 267.75 100.00 0.061
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% 87.50 100.00 0.02 - - - 87.50 100.00 0.020
5 Baut angkur 3/4" bh 36.00 0.010% 36.00 100.00 0.01 - - - 36.00 100.00 0.010
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% 355.25 100.00 0.01 - - - 355.25 100.00 0.005
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% 54.60 100.00 0.01 - - - 54.60 100.00 0.013
2 Baut gording 3/8"x1" bh 208.00 0.003% 208.00 100.00 0.00 - - - 208.00 100.00 0.003
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% 54.60 100.00 0.00 - - - 54.60 100.00 0.001
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% 880.74 60.00 0.05 587.16 40.00 0.036 1,467.90 100.00 0.090
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% 132.11 60.00 0.03 88.07 40.00 0.020 220.19 100.00 0.050
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% 1,012.85 60.00 0.01 675.23 40.00 0.003 1,688.09 100.00 0.009
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% 49.70 20.00 0.00 62.12 25.00 0.005 111.82 45.00 0.009
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% 18.64 50.00 0.00 3.73 10.00 0.001 22.36 60.00 0.005
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% 57.15 20.00 0.00 71.44 25.00 0.000 128.60 45.00 0.001
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% 1,372.73 60.00 0.20 457.58 20.00 0.067 1,830.30 80.00 0.267
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% 205.91 60.00 0.05 68.64 20.00 0.016 274.55 80.00 0.062
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% 1,578.64 60.00 0.02 526.21 20.00 0.005 2,104.85 80.00 0.021
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% 251.86 30.00 0.07 419.77 50.00 0.119 671.64 80.00 0.190
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% 37.78 30.00 0.01 62.97 50.00 0.014 100.75 80.00 0.023
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% 289.64 30.00 0.00 482.74 50.00 0.008 772.38 80.00 0.013
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% - - - 791.28 100.00 0.206 791.28 100.00 0.206
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% - - - 50.40 100.00 0.014 50.40 100.00 0.014
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% - - - 753.60 100.00 0.196 753.60 100.00 0.196
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% - - - 48.00 100.00 0.014 48.00 100.00 0.014
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 27,443.68 100.00 0.58 - - - 27,443.68 100.00 0.584
2 Pasang gording - (re-install) kg 19,654.88 0.418% 19,654.88 100.00 0.42 - - - 19,654.88 100.00 0.418
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% 3,057.04 100.00 0.03 - - - 3,057.04 100.00 0.029
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% 3,057.04 100.00 0.23 - - - 3,057.04 100.00 0.231
5 Pasang atap spandek - (re-install) m 2
3,057.04 0.000% 3,057.04 100.00 - - - - 3,057.04 100.00 -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% 7,064.78 100.00 0.13 - - - 7,064.78 100.00 0.134
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 47,098.56 100.00 0.27 - - - 47,098.56 100.00 0.267
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% 2,445.63 100.00 0.03 - - - 2,445.63 100.00 0.029
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% 3,057.04 100.00 3.58 - - - 3,057.04 100.00 3.582
MINGGU 32
General Contractor & Trading
Jl. Brigjend. Katamso no. 99, Wirolegi – Jember 68124
Telp : ( 0331 ) 332 999 Fax : ( 0331 ) 5442928
e-mail : jayakaryakontrindo@gmail.com
www.jayakaryakontrindo.com
BQ KONTRUKSI STRUKTUR MHC JEMBER ( Revisi kurva s 12 mei 22 )
B PEKERJAAN STRUKTUR
I FOUNDATION
Pit Lift 0.27%
Hoist Lift 0.72% 0.72% 0.0018 0.0018 0.0018 0.0018
Pondasi Footing (P1) (24 bh) 3.16%
Pondasi Footing (P2) (6 bh) 0.53%
Pondasi Footing (P3) (11 bh) 0.66%
Pondasi Footing (P4) (10 bh) 0.47%
Pondasi Footing (P5) (53 bh) 2.29%
Pondasi Footing (P6) (42 bh) 1.05%
Pondasi Mini Pile 25x25 5.19%
Kolom Pedestal (C1) 0.11%
Kolom Pedestal (C2) 0.15%
Kolom Pedestal (C3) 0.41%
Kolom Pedestal (C4) 0.08%
Kolom Pedestal (C6) 0.31%
Kolom Pedestal (C7) 0.14%
II LANTAI 1
Sloof Lantai 1 (BS1) 8.11% 1.57% 0.0157
Sloof Lantai 1 (BS2) 0.53%
Pekerjaan Urugan & Rabatan Lantai 1 (Store dan Gudang) 2.57% 0.34% 0.0034
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.49% 0.40% 0.0040
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.33% 3.33% 0.0333 ###
Kolom di Lantai 1 (C1) 0.61% 0.02% 0.0002
Kolom di Lantai 1 (C2) 0.77% 0.03% 0.0003
Kolom di Lantai 1 (C3) 2.19% 0.23% 0.0023
Kolom di Lantai 1 (C4) 0.44% 0.02% 0.0002
Kolom di Lantai 1 (C6) 1.64%
Kolom di Lantai 1 (C7) 0.75% 0.01% 0.0001
III LANTAI 2
Balok Lantai 2 - (B1) 1.99% 0.97% 0.0019 0.0019 0.0058
Balok Lantai 2 - (B2) 4.19% 0.97% 0.0019 0.0019 0.0058
Balok Lantai 2 - (B3) 1.08% 0.47% 0.0009 0.0009 0.0028
Balok Lantai 2 - (B4) 3.69% 1.23% 0.0025 0.0025 0.0074
Balok Lantai 2 - (B4a) 0.36% 0.36% 0.0007 0.0007 0.0022
Balok Lantai 2 - (B5) 0.43% 0.23% 0.0005 0.0005 0.0014
Balok Lantai 2 - (B7) 0.29% 0.29% 0.0006 0.0006 0.0017
Balok Lantai 2 - (B8) 2.15% 0.34% 0.0007 0.0007 0.0020
Balok Lantai 2 - (B9) 1.92% 0.65% 0.0013 0.0013 0.0039
Balok Lantai 2 - (BK1) 0.32% 0.32% 0.0006 0.0006 0.0019
Balok Lantai 2 - (BK2) 0.09% 0.09% 0.0002 0.0002 0.0006
Balok Lantai 2 - (BK3) 0.10% 0.07% 0.0001 0.0001 0.0004
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.65% 0.99% 0.0020 0.0020 0.0059
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.56% 5.42% 0.0108 0.0108 0.0325
Kolom di Lantai 2 - (C2) 0.26% 0.26% 0.0005 0.0005 0.0015
Kolom di Lantai 2 - (C3) 1.65% 1.65% 0.0021 0.0021 0.0021 0.0021 0.0021 0.0062
Kolom di Lantai 2 - (C4) 1.13% 1.13% 0.0019 0.0019 0.0019 0.0019 0.0038
Kolom di Lantai 2 - (WF-200.100.5,5.8) 0.05% 0.05% 0.0001 0.0001 0.0002
Kolom di Lantai 2 - (HB-150.150.7.10) 0.29% 0.29% 0.0007 0.0007 0.0014
VII A T A P
Balok Atap - (B4) 5.07% 5.07% 0.0084 0.0084 0.0084 0.0253
Balok Atap - (B5) 0.94% 0.94% 0.0016 0.0016 0.0016 0.0047
Tambahan waterprofing integral utk volume balok atap ( karena pengecoran bersamaan
dengan plat atap ) ( Conplast WP421 2 ltr/m3) 0.06% 0.06% 0.0006
2 Perataan dan pemadatan area ground floor ( Vibro kap 20ton ) m3 2,585.84 1.816% - - - 2,309.50 89.31 1.622
2,309.50 89.31 1.622
3 Urugan pasir t = 10 cm m3 401.51 0.551% 311.32 77.54 0.427 - - - 311.32 77.54 0.427
4 Rabatan t = 5 cm diganti plastik cor m2 4,015.10 0.140% 3,513.25 87.50 0.122 - - - 3,513.25 87.50 0.122
- - -
Slab Beton Lantai 1, tebal slab t = 12 cm (Store) 5.486% - - -
1 Begesting batako/multipleks m2 38.13 0.041% 38.13 100.00 0.041 - - - 38.13 100.00 0.041
2 Pembesian M7 (single layer) - overlaping 30cm grid 3lbr m2 2,979.82 2.287% 2,979.82 100.00 2.287 - - - 2,979.82 100.00 2.287
3 Beton (K250) m 3
348.86 3.158% 348.86 100.00 3.158 - - - 348.86 100.00 3.158
- - -
Slab Beton Lantai 1, tebal slab t = 15 cm (Gudang) 3.326% - - -
1 Begesting batako/multipleks m2 25.68 0.028% - - -
2 Pembesian M8 (single layer) - overlaping 30cm grid 3lbr m2 1,135.65 1.116% - - -
3 Beton (K250) m3 166.19 1.505% - - -
4 Finishing trowel lantai gudang m2 1,523.90 0.310% - - -
5 Tambahan Floor hardener lantai gudang ( Sika Chapdur Natural ) m2 1,523.90 0.346% - - -
6 Siar / cutting lantai grid 5,48m x 6,08m m 466.50 0.022% - - -
- - -
Kolom di Lantai 1 (C1) 0.608% - - -
1 Begesting multipleks m2 76.32 0.113% 76.32 100.00 0.113 - - - 76.32 100.00 0.113
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,628.34 0.417% 2,628.34 100.00 0.417 - - - 2,628.34 100.00 0.417
3 Beton (K250) m3 8.59 0.078% 8.59 100.00 0.078 - - - 8.59 100.00 0.078
- - -
Kolom di Lantai 1 (C2) 0.775% - - -
1 Begesting multipleks m2 135.68 0.200% 135.68 100.00 0.200 - - - 135.68 100.00 0.200
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,847.13 0.452% 2,847.13 100.00 0.452 - - - 2,847.13 100.00 0.452
3 Beton (K250) m3 13.57 0.123% 13.57 100.00 0.123 - - - 13.57 100.00 0.123
- - -
Kolom di Lantai 1 (C3) 2.187% - - -
1 Begesting multipleks m2 534.24 0.788% 534.24 100.00 0.788 - - - 534.24 100.00 0.788
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,149.60 0.976% 6,149.60 100.00 0.976 - - - 6,149.6 100.00 0.976
3 Beton (K250) m3 46.75 0.423% 46.75 100.00 0.423 - - - 46.7 100.00 0.423
- - -
Kolom di Lantai 1 (C4) 0.440% - - -
1 Begesting multipleks m2 74.20 0.109% 74.20 100.00 0.109 - - - 74.20 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,720.64 0.273% 1,720.64 100.00 0.273 - - - 1,720.64 100.00 0.273
3 Beton (K250) m3 6.36 0.058% 6.36 100.00 0.058 - - - 6.36 100.00 0.058
- - -
Kolom di Lantai 1 (C6) 1.643% - - -
1 Begesting multipleks m2 228.96 0.338% 228.96 100.00 0.338 - - - 228.96 100.00 0.338
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 6,752.64 1.072% 6,752.64 100.00 1.072 - - - 6,752.6 100.00 1.072
3 Beton (K250) m 3
25.76 0.233% 25.76 100.00 0.233 - - - 25.76 100.00 0.233
- - -
Kolom di Lantai 1 (C7) 0.750% - - -
1 Begesting multipleks m2 126.14 0.186% 126.14 100.00 0.186 - - - 126.14 100.00 0.186
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 2,925.09 0.464% 2,925.09 100.00 0.464 - - - 2,925.09 100.00 0.464
3 Beton (K250) m 3
11.04 0.100% 11.04 100.00 0.100 - - - 11.04 100.00 0.100
- - -
III LANTAI 2 - - -
Balok Lantai 2 - (B1) 1.988% - - -
1 Begesting multipleks m2 285.71 0.435% 285.71 100.00 0.435 - - - 285.71 100.00 0.435
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,830.39 1.243% 7,830.39 100.00 1.243 - - - 7,830.39 100.00 1.243
3 Beton (K250) m3 34.29 0.310% 34.29 100.00 0.310 - - - 34.29 100.00 0.310
- - -
Balok Lantai 2 - (B2) 4.187% - - -
1 Begesting multipleks m2 612.14 0.931% 612.14 100.00 0.931 - - - 612.14 100.00 0.931
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 16,476.08 2.616% 16,476.08 100.00 2.616 - - - 16,476.08 100.00 2.616
3 Beton (K250) m 3
70.63 0.639% 70.63 100.00 0.639 - - - 70.63 100.00 0.639
- - -
Balok Lantai 2 - (B3) 1.084% - - -
1 Begesting multipleks m2 185.09 0.282% 185.09 100.00 0.282 - - - 185.09 100.00 0.282
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,020.65 0.638% 4,020.65 100.00 0.638 - - - 4,020.65 100.00 0.638
3 Beton (K250) m 3
18.11 0.164% 18.11 100.00 0.164 - - - 18.11 100.00 0.164
- - -
Balok Lantai 2 - (B4) 3.688% - - -
1 Begesting multipleks m2 633.10 0.963% 633.10 100.00 0.963 - - - 633.10 100.00 0.963
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 13,720.77 2.178% 13,720.77 100.00 2.178 - - - 13,720.77 100.00 2.178
3 Beton (K250) m3 60.30 0.546% 60.30 100.00 0.546 - - - 60.30 100.00 0.546
- - -
Balok Lantai 2 - (B4a) 0.358% - - -
1 Begesting multipleks m2 71.38 0.109% 71.38 100.00 0.109 - - - 71.38 100.00 0.109
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,133.54 0.180% 1,133.54 100.00 0.180 - - - 1,133.54 100.00 0.180
3 Beton (K250) m3 7.72 0.070% 7.72 100.00 0.070 - - - 7.72 100.00 0.070
- - -
Balok Lantai 2 - (B5) 0.431% - - -
1 Begesting multipleks m2 78.28 0.119% 78.28 100.00 0.119 - - - 78.28 100.00 0.119
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,554.04 0.247% 1,554.04 100.00 0.247 - - - 1,554.04 100.00 0.247
3 Beton (K250) m3 7.21 0.065% 7.21 100.00 0.065 - - - 7.21 100.00 0.065
- - -
Balok Lantai 2 - (B7) 0.291% - - -
1 Begesting multipleks m2 34.65 0.053% 34.65 100.00 0.053 - - - 34.65 100.00 0.053
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,230.69 0.195% 1,230.69 100.00 0.195 - - - 1,230.69 100.00 0.195
3 Beton (K250) m3 4.78 0.043% 4.78 100.00 0.043 - - - 4.78 100.00 0.043
- - -
Balok Lantai 2 - (B8) 2.153% - - -
1 Begesting multipleks m2 278.85 0.424% 278.85 100.00 0.424 - - - 278.85 100.00 0.424
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 8,697.77 1.381% 8,697.77 100.00 1.381 - - - 8,697.77 100.00 1.381
3 Beton (K250) m 3
38.45 0.348% 38.45 100.00 0.348 - - - 38.45 100.00 0.348
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Lantai 2 - (B9) 1.921% - - -
1 Begesting multipleks m2 303.00 0.461% 303.00 100.00 0.461 - - - 303.00 100.00 0.461
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 7,470.21 1.186% 7,470.21 100.00 1.186 - - - 7,470.21 100.00 1.186
3 Beton (K250) m 3
30.30 0.274% 30.30 100.00 0.274 - - - 30.30 100.00 0.274
- - -
Balok Lantai 2 - (BK1) 0.323% - - -
1 Begesting multipleks m2 39.00 0.059% 39.00 100.00 0.059 - - - 39.00 100.00 0.059
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 1,339.65 0.213% 1,339.65 100.00 0.213 - - - 1,339.65 100.00 0.213
3 Beton (K250) m 3
5.60 0.051% 5.60 100.00 0.051 - - - 5.60 100.00 0.051
- - -
Balok Lantai 2 - (BK2) 0.095% - - -
1 Begesting multipleks m2 10.29 0.016% 10.29 100.00 0.016 - - - 10.29 100.00 0.016
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 420.54 0.067% 420.54 100.00 0.067 - - - 420.54 100.00 0.067
3 Beton (K250) m3 1.35 0.012% 1.35 100.00 0.012 - - - 1.35 100.00 0.012
- - -
Balok Lantai 2 - (BK3) 0.097% - - -
1 Begesting multipleks m2 13.88 0.021% 13.88 100.00 0.021 - - - 13.88 100.00 0.021
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 380.27 0.060% 380.27 100.00 0.060 - - - 380.27 100.00 0.060
3 Beton (K250) m3 1.67 0.015% 1.67 100.00 0.015 - - - 1.67 100.00 0.015
- - -
Slab Beton Lantai 2, tebal slab t = 18 cm (Store & Warehouse) 5.653% - - -
1 Begesting multipleks m2 962.15 1.246% 962.15 100.00 1.246 - - - 962.15 100.00 1.246
2 Wiremesh M10 (double layer) -overlaping 30cm m2 958.32 3.138% 958.32 100.00 3.138 - - - 958.32 100.00 3.138
3 Beton (K250) m 3
140.24 1.270% 140.24 100.00 1.270 - - - 140.24 100.00 1.270
- - -
Slab Beton Lantai 2, tebal slab t = 15 cm (Store & Warehouse) 10.563% - - -
1 Begesting multipleks m2 2,236.53 2.896% 2,236.53 100.00 2.896 - - - 2,236.53 100.00 2.896
2 Wiremesh M8 (double layer) -overlaping 30cm m2 2,292.44 4.714% 2,292.44 100.00 4.714 - - - 2,292.44 100.00 4.714
3 Beton (K250) m3 326.25 2.954% 326.25 100.00 2.954 - - - 326.25 100.00 2.954
- - -
Kolom di Lantai 2 - (C2) 0.256% - - -
1 Begesting multipleks m2 44.80 0.066% 44.80 100.00 0.066 - - - 44.80 100.00 0.066
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 940.09 0.149% 940.09 100.00 0.149 - - - 940.09 100.00 0.149
3 Beton (K250) m3 4.48 0.041% 4.48 100.00 0.041 - - - 4.48 100.00 0.041
- - - - -
Kolom di Lantai 2 - (C3) 1.651% - - - -
1 Begesting multipleks m2 403.20 0.594% 403.20 100.00 0.594 - - - 403.20 100.00 0.594
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,641.21 0.737% 4,641.21 100.00 0.737 - - - 4,641.21 100.00 0.737
3 Beton (K250) m3 35.28 0.319% 35.28 100.00 0.319 - - - 35.28 100.00 0.319
- - - -
Kolom di Lantai 2 - (C4) 1.129% - - - -
1 Begesting multipleks m2 190.40 0.281% 190.40 100.00 0.281 - - - 190.40 100.00 0.281
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 4,415.23 0.701% 4,415.23 100.00 0.701 - - - 4,415.23 100.00 0.701
3 Beton (K250) m3 16.32 0.148% 16.32 100.00 0.148 - - - 16.32 100.00 0.148
- - -
Kolom di Lantai 2 - (WF-200.100.5,5.8) 21.33 0.047% - - -
1 Baja WF 200.100.5,5.8 kg 170.64 0.039% - - - 170.64 100.00 0.039 170.64 100.00 0.039
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 25.60 0.006% - - - 25.60 100.00 0.006 25.60 100.00 0.006
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 196.24 0.003% - - - 196.24 100.00 0.003 196.24 100.00 0.003
- - -
Kolom di Lantai 2 - (HB-150.150.7.10) 31.50 0.287% - - -
1 Baja HB 150.150.7.10 kg 1,008.00 0.236% - - - 1,008.00 100.00 0.236 1,008.00 100.00 0.236
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 151.20 0.034% - - - 151.20 100.00 0.034 151.20 100.00 0.034
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,159.20 0.016% - - - 1,159.20 100.00 0.016 1,159.20 100.00 0.016
- - -
VII ATAP - - -
Balok Atap - (B4) 5.069% - - -
1 Begesting multipleks m2 870.33 1.316% 870.33 100.00 1.316 - - - 870.33 100.00 1.316
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 18,861.98 2.995% 18,861.98 100.00 2.995 - - - 18,861.98 100.00 2.995
3 Beton (K250) m3 82.89 0.758% 82.89 100.00 0.758 - - - 82.89 100.00 0.758
- - -
Balok Atap - (B5) 0.936% - - -
1 Begesting multipleks m2 170.05 0.257% 170.05 100.00 0.257 - - - 170.05 100.00 0.257
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 3,376.09 0.536% 3,376.09 100.00 0.536 - - - 3,376.09 100.00 0.536
3 Beton (K250) m 3
15.66 0.143% 15.66 100.00 0.143 - - - 15.66 100.00 0.143
- - -
1
Tambahan waterprofing integral utk volume balok atap ( karena m3 100.47 0.056% - - - 100.47 100.00 0.056
pengecoran bersamaan dengan plat atap ) ( Conplast WP421 2 ltr/m3) 100.47 100.00 0.056
0.056% - - -
Balok Atap - (WF-200.100.5,5.8) 21.33 0.143% - - -
1 Baja WF 200.100.5,5.8 kg 515.29 0.117% 515.29 100.00 0.117 - - - 515.29 100.00 0.117
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 77.29 0.018% 77.29 100.00 0.018 - - - 77.29 100.00 0.018
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 592.58 0.008% 592.58 100.00 0.008 - - - 592.58 100.00 0.008
- - -
Balok Atap - (WF-250.125.6.9) 29.58 0.317% - - -
1 Baja WF 250.125.6.9 m2 1,145.64 0.260% - - - 1,145.64 100.00 0.260 1,145.64 100.00 0.260
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 171.85 0.039% - - - 171.85 100.00 0.039 171.85 100.00 0.039
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 1,317.49 0.019% - - - 1,317.49 100.00 0.019 1,317.49 100.00 0.019
- - -
Balok Atap - (WF-300.150.6,5.9) 36.67 0.503% - - -
1 Baja WF WF-300.150.6,5.9 m2 1,815.95 0.412% - - - 1,815.95 100.00 0.412 1,815.95 100.00 0.412
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 272.39 0.062% - - - 272.39 100.00 0.062 272.39 100.00 0.062
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 2,088.35 0.030% - - - 2,088.35 100.00 0.030 2,088.35 100.00 0.030
- - -
Balok Atap - (WF-350.175.6.9) 41.42 0.171% - - -
1 Baja WF 200100. m2 616.03 0.140% - - - 616.03 100.00 0.140 616.03 100.00 0.140
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 92.40 0.021% - - - 92.40 100.00 0.021 92.40 100.00 0.021
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m3 708.44 0.010% - - - 708.44 100.00 0.010 708.44 100.00 0.010
- - -
Plat Atap tebal t = 12.5 cm 4.812% - - -
1 Begesting multipleks m2 1,081.17 1.390% 1,081.17 100.00 1.390 - - - 1,081.17 100.00 1.390
2 Wiremesh M7 (double layer) - overlaping 15cm m2 1,305.96 1.876% 1,240.66 95.00 1.782 65.30 5.00 0.094 1,305.96 100.00 1.876
3 Beton (K250) m3 159.26 1.457% 148.12 93.00 1.355 11.15 7.00 0.102 159.26 100.00 1.457
Waterproofing integral ex. Fosroc atau setara ( Conplast WP421 2
4 m3 159.26
ltr/m3) 0.090% 148.12 93.00 0.083 11.15 7.00 0.006 159.26 100.00 0.090
- - -
Kolom di Lantai Atap - (C5) 0.017% - - -
1 Begesting multipleks m2 4.00 0.006% 4.00 100.00 0.006 - - - 4.00 100.00 0.006
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 54.46 0.009% 54.46 100.00 0.009 - - - 54.46 100.00 0.009
3 Beton (K250) m3 0.24 0.002% 0.24 100.00 0.002 - - - 0.24 100.00 0.002
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.193% - - -
1 Baja WF 200.100.5,5.8 kg 698.02 0.158% 698.02 100.00 0.158 - - - 698.02 100.00 0.158
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 104.70 0.024% 104.70 100.00 0.024 - - - 104.70 100.00 0.024
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 802.73 0.011% 802.73 100.00 0.011 - - - 802.73 100.00 0.011
- - -
Kolom di Lantai Atap - (WF-350.175.6.9) 41.42 0.367% - - -
1 Baja WF 200100. m2 1,325.33 0.301% 1,325.33 100.00 0.301 - - - 1,325.33 100.00 0.301
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 198.80 0.045% 198.80 100.00 0.045 - - - 198.80 100.00 0.045
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) m 3
1,524.13 0.022% 1,524.13 100.00 0.022 - - - 1,524.13 100.00 0.022
- - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.335% - - -
1 Baja HB 150.150.7.10 kg 1,178.10 0.276% - - - 1,178.10 100.00 0.276 1,178.10 100.00 0.276
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 176.72 0.040% - - - 176.72 100.00 0.040 176.72 100.00 0.040
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,354.82 0.019% - - - 1,354.82 100.00 0.019 1,354.82 100.00 0.019
- - -
Balok Ring Atap - (B6) 0.107% - - -
1 Begesting multipleks m2 25.57 0.039% 25.57 100.00 0.039 - - - 25.57 100.00 0.039
2 Pembesian ( Begel Polos TS280, isian Ulir TS420 ) kg 322.76 0.051% 322.76 100.00 0.051 - - - 322.76 100.00 0.051
3 Beton (K250) m 3
1.92 0.018% - - - 1.92 100.00 0.018 1.92 100.00 0.018
- - -
Balok Ring Atap - (WF-150.75.5.7) 14 0.167% - - -
1 Baja WF 150.75.5.7 kg 604.24 0.137% - - - 604.24 100.00 0.137 604.24 100.00 0.137
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 90.64 0.021% - - - 90.64 100.00 0.021 90.64 100.00 0.021
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 694.88 0.010% - - - 694.88 100.00 0.010 694.88 100.00 0.010
- - -
S/d Periode Lalu Periode ini S/d Perode Ini
No. Uraian Sat. Vol BOBOT % Qty Prestasi Bobot Qty Prestasi Bobot Qty Prestasi Bobot
(%) (%) (%) (%) (%) (%)
Balok Atap - (WF-200.100.5,5.8) 21.33 0.229% - - -
1 Baja WF 200.100.5,5.8 kg 827.95 0.188% - - - 827.95 100.00 0.188 827.95 100.00 0.188
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 124.19 0.028% - - - 124.19 100.00 0.028 124.19 100.00 0.028
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 952.14 0.013% - - - 952.14 100.00 0.013 952.14 100.00 0.013
- - -
- - -
Kuda-kuda WF350 ( kekurangan 2 set ) 0.866% - - -
1 Baja WF350 ( 62m ) kg 3,074.13 0.697% 3,074.13 100.00 0.697 - - - 3,074.13 100.00 0.697
2 Plat 12mm ( 0,18x0,72 x 8bh ) kg 100.80 0.023% 100.80 100.00 0.023 - - - 100.80 100.00 0.023
3 Plat 10mm ( 0,7x0,35 x 8bh ) kg 158.77 0.036% 158.77 100.00 0.036 - - - 158.77 100.00 0.036
4 Plat 10mm ( 0,7x0,18 x 8bh ) kg 81.66 0.019% 81.66 100.00 0.019 - - - 81.66 100.00 0.019
5 Mur Baut A325 3/4" x 2,5" bh 304.00 0.043% 304.00 100.00 0.043 - - - 304.00 100.00 0.043
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 3,415.36 0.048% 3,415.36 100.00 0.048 - - - 3,415.36 100.00 0.048
- - -
Kolom Kuda-kuda WF350 ( kekurangan 9bh ) 0.096% - - -
1 Baja WF350 ( 0,6 x 9 ) kg 267.75 0.061% 267.75 100.00 0.061 - - - 267.75 100.00 0.061
2 Plat 12mm ( 0,25x0,4 x 9bh ) kg 87.50 0.020% 87.50 100.00 0.020 - - - 87.50 100.00 0.020
5 Baut angkur 3/4" bh 36.00 0.010% 36.00 100.00 0.010 - - - 36.00 100.00 0.010
6 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 355.25 0.005% 355.25 100.00 0.005 - - - 355.25 100.00 0.005
- - -
Plat Gording 0.017% - - -
1 Plat 6mm (0,18x0,12) kg 54.60 0.013% 54.60 100.00 0.013 - - - 54.60 100.00 0.013
2 Baut gording 3/8"x1" bh 208.00 0.003% 208.00 100.00 0.003 - - - 208.00 100.00 0.003
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 54.60 0.001% 54.60 100.00 0.001 - - - 54.60 100.00 0.001
- - -
Konstruksi Baja Façade - - -
Kolom di Lantai Atap - (HB-150.150.7.10) 31.50 0.149% - - -
1 Baja HB 150.150.7.10 kg 1,467.90 0.090% 1,467.90 100.00 0.090 - - - 1,467.90 100.00 0.090
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 220.19 0.050% 220.19 100.00 0.050 - - - 220.19 100.00 0.050
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 1,688.09 0.009% 1,688.09 100.00 0.009 - - - 1,688.09 100.00 0.009
- - -
Kolom di Lantai Atap - (WF-200.100.5,5.8) 21.33 0.030% - - -
1 Baja WF 200.100.5,5.8 kg 248.49 0.019% 111.82 45.00 0.009 136.67 55.00 0.011 248.49 100.00 0.019
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 37.27 0.008% 22.36 60.00 0.005 14.91 40.00 0.003 37.27 100.00 0.008
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 285.77 0.002% 128.60 45.00 0.001 157.17 55.00 0.001 285.77 100.00 0.002
- - -
Rangka Atap - (WF-150.75.5.7) 14 0.437% - - -
1 Baja WF 150.75.5.7 kg 2,287.88 0.333% 1,830.30 80.00 0.267 457.58 20.00 0.067 2,287.88 100.00 0.333
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 343.18 0.078% 274.55 80.00 0.062 68.64 20.00 0.016 343.18 100.00 0.078
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 2,631.06 0.026% 2,104.85 80.00 0.021 526.21 20.00 0.005 2,631.06 100.00 0.026
- - -
Rangka Atap - (WF-200.100.5,5.8) 21.33 0.283% - - -
1 Baja WF 200.100.5,5.8 kg 839.55 0.238% 671.64 80.00 0.190 167.91 20.00 0.048 839.55 100.00 0.238
2 Aksesories (base plat, end plate, stiffener, HTB, dll) kg 125.93 0.029% 100.75 80.00 0.023 25.19 20.00 0.006 125.93 100.00 0.029
3 Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 965.48 0.017% 772.38 80.00 0.013 193.10 20.00 0.003 965.48 100.00 0.017
- - -
Atap Gudang Area Depan 0.220% - - -
1 Gording Hollow 100x100x2mm ( 21 ljr ) kg 791.28 0.206% 791.28 100.00 0.206 - - - 791.28 100.00 0.206
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 50.40 0.014% 50.40 100.00 0.014 - - - 50.40 100.00 0.014
- - -
Atap Gudang Area Depan m2 0.209% - - -
1 Gording Hollow 100x100x2mm ( 20 ljr ) kg 753.60 0.196% 753.60 100.00 0.196 - - - 753.60 100.00 0.196
2 Penutup atap ( Belum ada detail bahan ) m2 - - - -
3 Cat zyncromate ( Bodelac 2in1 warna menyesuaikan ) m2 48.00 0.014% 48.00 100.00 0.014 - - - 48.00 100.00 0.014
- - -
Pemasangan Atap Lama Kembali 5.273% - - -
1 Baja WF 350.175.5,5.8 - (re-install) kg 27,443.68 0.584% 27,443.68 100.00 0.584 - - - 27,443.68 100.00 0.584
2 Pasang gording - (re-install) kg 19,654.88 0.418% 19,654.88 100.00 0.418 - - - 19,654.88 100.00 0.418
3 Pasang besi angin-angin - (re-install) m2 3,057.04 0.029% 3,057.04 100.00 0.029 - - - 3,057.04 100.00 0.029
4 Pasang aluminium foil - (re-install) m2 3,057.04 0.231% 3,057.04 100.00 0.231 - - - 3,057.04 100.00 0.231
5 Pasang atap spandek - (re-install) m 2
3,057.04 0.000% 3,057.04 100.00 - - - - 3,057.04 100.00 -
6 Aksesories (base plat, end plate, stiffener, HTB, dll) - angkur baru kg 7,064.78 0.134% 7,064.78 100.00 0.134 - - - 7,064.78 100.00 0.134
7 Re-Zyncromate ( Bodelac 2in1 warna menyesuaikan ) kg 47,098.56 0.267% 47,098.56 100.00 0.267 - - - 47,098.56 100.00 0.267
Mur Baut Gording UNC 3/8x1" ( yg lama tidak bisa dipasang kembali
8 karena berkarat semua, harus dipotong blander ) pcs 2,446 0.029% 2,445.63 100.00 0.029 - - - 2,445.63 100.00 0.029
Pasang baru atap spandek kontruksi atap lama + baut sds 12x45mm
9 ( AZ100 0,4mm type CD750 Ex : Zinium / Bluescope ) m2 3,057.04 3.582% 3,057.04 100.00 3.582 - - - 3,057.04 100.00 3.582