Anda di halaman 1dari 2
RATORIUM GEOTEKNIK DAN TRANSPORTAS! POLITEKNIK NEGERI BANJARMASIN «in Bécjend.H. Hasan Boory Banjermacin 70120 7 ABRASION TEST BY USE OF LOS ANGELES MACHINE ©: Jalan Houling Batubara © Batu Pecah Bukit Km, 16 ‘fn: Lapis Pondasi Agregat B 12 Maret 2011 oe | 635 J il ss al as aa 1260) t 19.0 1250) el as 1250) il os 1250] a] 63 475 238 ota 5000 LABORATORIUM GEOTEKNIK DAN TRASPORTAS! POLITEKNIK NEGERI BANJARMASIN sim Bdge H. Hasan Basry Banjarmasin 70125 Tetp. 0511-262344.207757 Fax 0511-208082 / 307787 E-mal: PERCOBAAN PEMADATAN AASHTO T-27-74 (COMPACTION TEST) Jalan Houling Batubara 36% Abu Btu (0- 20 mm )- 16% Batu Pecah (20-30 mm) - 35% Batu Pecah (80 - 50 rm) - {16% Batu Pecan (60 - 70 mm) Bukit Km, 18 Lapis Pondasi Agregat 8 214 Maret 2014 Volume Mold 2 2187,92 Om® 2.634 Beret penumbuk 14.54 kg Bn KeringMaksimum =: = 2.1. Gr/Cm®_—_| Jumlah Pukulan Per Lapisan 256 Optimum i 6% |Jumieh Lapisen 6 [3% The % % or 578 e798_|—e77i_| 8678 Gr 4032 |" 40s2|~4032[ 4032 Gr 4546 4766 4739 4646, ama | cm | 2137.92 | 2197.92 | 2197.62 | 2137.90 crim | 2.198 | 2.220 | 2217 | 2.173 ‘Grem® | 2.038 | 2.102 | 2069 [ 2.003} + Tanah Basah or iat 2i0 | 2125 | 946 ant Tanah Kering Gr, 174.04 | 108.78 [108-17 88 Gr eee | 1121 {13.33 68 73.38 _| "15.30 [42.88 | 10.14 60.66_| 105.4 | 166.34 _| 77.86 433 6.05 7.18 8.48 eee

Anda mungkin juga menyukai