Anda di halaman 1dari 85

Laporan Drainase Jalan

Consultancy Engineering Services for Redesign and Basic Design


Improvement of Haul Road, Bridges and Its Supporting
Infrastructure for Coal Handling and Transportation in Kabupaten
Murung, Central Kalimantan

July 2012
Daftar Isi

1. Pendekatan Umum. ...................................................................................................... 1


2. Prinsip dasar. ................................................................................................................ 1
3. Tinjauan Konstruksi Saluran Jalan. ............................................................................. 2
3.1. Saluran Lapisan Kaku (Rigid Linning). ................................................................ 2
3.2. Konstruksi Lentur (Flexibel Linning) ................................................................... 2
3.3. Lokasi Penempatan Saluran Jalan. ....................................................................... 3
3.4. Kemiringan Dasar Saluran. .................................................................................. 4
3.5. Outlet Drain.......................................................................................................... 4
3.6. Gorong-gorong (Crossing Culvert). ..................................................................... 4
3.7. Bangunan Terjun. ................................................................................................. 6
4. Metoda Perencanaan. ................................................................................................... 7
4.1. Tinjauan Hidrologi. .............................................................................................. 7
4.2. Tinjauan Hidrolika.............................................................................................. 29
4.3. Tegangan Geser Ijin untuk beberapa jenis lereng saluran. ................................. 34
5. Disain komputasi. ...................................................................................................... 35

Laporan Drainase Jalan i


1. Pendekatan Umum.
Laporan Teknis Drainase ini merupakan bagian dari Dokumen Perencanaan : Re-Design
Coal Haul Road PT. DBK Kalimantan Tengah.
Perencanaan Drainase Jalan ditujukan untuk mengendalikan kelebihan limpasan air hujan
agar tidak menggenangi dan merusak badan jalan, yaitu dengan cara menyediakan sarana
drainase jalan (road side, side ditch), termasuk bangunan drainase (gorong gorong; lubang
lubang pelepasan; sedimentrap; dan lapisan menahan erosi).
Sistim drainase harus dilaksanakan lengkap mulai dari saluran penerima, pengumpul,
pembawa dan mengarahkan hingga ke pembuangan atau ke elevasi aman (sungai, rawa,
laut).

2. Prinsip dasar.

Perencanaan Drainase ini didasarkan pada disain final layout jalan sesuai kondisi topografi
dan sistim drainase disekitar termasuk tinjauan sistim drainase makro (sungai dan anak
sungai).
Konstruksi saluran dapat dipilih dengan pertimbangan aspek operasi dan pemeliharaan,
mencegah erosi, meningkatkan efisiensi hidrolik. Namun pertimbangan beban pengaliran,
kondisi topografi dan geologi tanah permukaan dapat menentukan bahan linning saluran
yang akan digunakan.
Jika memungkinkan, disain saluran drainase jalan dibuat dari material yang ramah
lingkungan seperti dengan vegetasi, susunan batuan alam, kerikil dan atau tanah, namun
bahan material lain dapat dipertimbangkan untuk alasan-alasan lain (teknis, biaya,
keamanan, estetika atau masalah lingkungan.
Prinsip dasar perencanaan drainase didasarkan aspek berikut:
a. Hidrologi.
Tinjauan hidrologi ditujukan untuk memperhitungkan volume limpasan air hujan yang
akan terkonsentrasi di suatu tempat yang akan ditinjau. Pendekatan teoritis besaran
debit banjir rencana didasarkan pada hasil analisa intensitas hujan rencana dari data
catatan curah hujan yang dicatat oleh beberapa Stasiun Pencatat Hujan terdekat.

b. Hidrolika.
Bahwa konsep pengendalian air hujan mulai dari badan air penerima hingga dialirkan
ke elevasi aman, dapat berjalan efektif sesuai beban layanan prinsip-prinsip hidrolika.

c. Topografi dan Kondisi Lahan.


Kondisi topografi dan karakteristik kondisi fisik permukaan lahan akan berpengaruh
terhadap penentuan parameter koefisien untuk perhitungan hidrolika.

d. Struktur dan geoteknik.


Konstruksi saluran juga harus memenuhi keamanan stabilitas keamanan, termasuk
bahaya gerusan (erosi) sesuai data geoteknik. Dalam hal ini pemilihan tipe linning
yang tepat perlu dipertimbangkan.

e. Pertimbangan Lingkungan.
Sedapat mungkin saluran drainase jalan didisain dengan tetap mempertahankan fitur
alami lahan, dampak lingkungan dan pengendalian sumberdaya air.

Laporan Drainase Jalan 1


f. Biaya.
Pemilihan jenis konstruksi, pelaksanaan dan pemeliharaan, juga harus menjadi
pertimbangan, sehingga diperoleh yang paling efisien.

3. Tinjauan Konstruksi Saluran jalan.

3.1. Saluran Lapisan Kaku (Rigid Linning).

Jenis konstruksi saluran kaku yang dapat dipilih antara lain:


• Konstruksi beton insitu.
• Konstuksi pasangan batu.
• Konstuksi tanah semen.
• Grouting riprap.

Linning dengan Soil Cement. Linning dengan beton.

Kelebihan konstruksi saluran kaku, mungkin lebih baik dalam menahan beban kerja
termasuk menahan erosi, namun memiliki beberapa kelemahan, antara lain:
• Biaya konstruksi relatif mahal dari pada konstruksi saluran lentur, termasuk juga
biaya pemeliharaan.
• Lebih rentan terhadap kerusakan akibat perilaku tanah dan tekanan hidrostatik.
• Menghambat proses infiltrasi air tanah.

3.2. Konstruksi Lentur (Flexibel Linning)

Jenis linning fleksibel meliputi:


• Konstruksi lapiran batu riprap, atau dengan wiremesh / gabion
• Saluran dengan vegetasi
• Linning dengan geotekstil
• Lembaran sintetik matras
• Turap/ linning kayu, dan lain-lainl

Kelebihan linning fleksibel antara lain:


• Biaya relatif lebih murah.
• Menambah volume infilrasi air tanah.
• Lebih banyak menggunakan material alam, dengan biaya yang murah.
• Lebih fleksibel terhadap perilaku beban dari luar.

Laporan Drainase Jalan 2


Saluran dengan vegetasi rumput. Saluran dengan lapisan Batu/Rock.

3.3. Lokasi Penempatan Saluran Jalan.

Saluran jalan pada umumnya ditempatkan disisi jalan dalam batas wilayah jalan, namun
pada beberapa lokasi, penempatan saluran harus disesuaikan dengan kondisi badan
jalan, misalnya pada kondisi jalan yang dibangun atas potongan bukit atau badan jalan
yang berada diatas timbunan dan memiliki lereng terjal.

Secara umum, penempatan saluran digambarkan pada gambar berikut:

Safety Bund
Road
Gutter Side Ditch

Outlet drain
Channel

Gutter
Gutter digunakan pada daerah timbunan, berfungsi untuk mengalirkan limpasan air dari
badan jalan menuju outlet drain yang dibuat pada setiap interval 25 meter menembus
timbunan pengaman (safety bund) dan dialirkan ke saluran membawa dikaki timbunan.

Ukuran Gutter dibuat dengan kapasitas yang cukup untuk menampung limpasan sejarak
25 meter, sehingga tidak membutuhkan dimensi yang besar

Dengan ukuran Gutter berbentuk segitiga lebar atas 1,5 meter, dan cukup untuk
menampung limpasan air dari jalan dengan debit limpasan sebesar 0.023 m3/dt.

Pada gradient 14%, kecepatan aliran tidak lebih 0.1 m/dt dan tegangan geser tidak lebih
dari 0.2 kg/cm2. Sehingga saluran tidak memerlukan lapisan penahan erosi.

Laporan Drainase Jalan 3


Side Ditch
Merupakan saluran pembawa yang menampung limpasan air hujan dari badan jalan dan
dari daerah ketinggian (perbukitan).

3.4. Kemiringan Dasar Saluran.

Kemiringan saluran dibuat mengikuti kemiringan (gradient) jalan atau sesuai kondisi sistim
jaringan drainase setempat, dengan batasan pada gradient jalan > 10%, kemiringan dasar
saluran dibatasi = 10% dan selebihnya dibuat terjunan.

3.5. Outlet drain.

Pada kondisi jalan melalui lembah (di atas timbunan), saluran samping direncanakan
berupa alur air yang hanya melayani limpasan air dari badan jalan dan setiap maksimum
25 meter dibuat saluran pelepasan (outlet drain) keluar badan jalan ke elevasi aman /
lembah, dengan cara memotong tanggul pengaman (safety bund seperti ditunjukkan pada
gambar dibawah.

Lereng / Lembah

25 m

Outlet drain Gutter

Safety bund

25 m

Lembah / Lereng

Gambar penempatan outlet drain

3.6. Gorong-gorong (Crossing Culvert).

Gorong-gorong (Crossing culvert) dibutuhkan pada dua kondisi, yaitu :


a. Pada daerah terendah pada setiap cekungan alinyemen vertikal jalan, agar tidak
terjadi genangan pada badan jalan.
b. Pada kondisi badan jalan memotong saluran alam atau anak sungai, dibuat
crossing drain (gorong gorong).

Laporan Drainase Jalan 4


Side ditch

Side ditch

Dalam perencanaan crossing culvert, dipilih jenis konstruksi flexible culvert, dengan
pertimbangan untuk mengantisipasi kondisi lapisan tanah yang labil dan erosif sesuai
rekomendasi Geologis.

 Sesuai rekomendasi geotek.


 Kemudahan kecepatan dalam pelaksanaan konstruksi.
 Biaya dan aspek Pemeliharaan.

Tipe Rigid Culvert. Tipe Flexibel Culvert

Khusus untuk Crossing Culvert digunakan bahan material pipa gelombang, berbahan anti
karat kelas medium dengan spefisikasi sesuai yang disyaratkan oleh produsen / pabrik.

Laporan Drainase Jalan 5


Penentuan panjang efektif crossing culvert.

1 1
1
Safety
bund
1 hsb 1
Safety
bund 1
1 4% 4% 1

hv (variable)
Ground level
1.5%
Bottom level of Bottom level of
creek/brook creek/brook

Lt

Panjang perlintasan drainase ( Lt ) diperhitungkan terhadap :


- Panjang badan jalan (perkerasan dan bahu jalan)
- Lebar kaki tanggul pengaman (safety bund)
- Lebar kemiringan peninggianbadan jalan.
- Lebar struktur pengaman ujung perlintasan drainase (pasangan Batu)

Variasi ketinggian badan jalan terhadap dasar elevasi saluran drainase, akan
menentukan variasi panjang perlintasan setiap bangunan crossing drain. Lihat Tabel
Hasil Perhitungan Dimensi Culvert Drain, terlampir.

3.7. Bangunan Terjun.

ROAD SURFACE

Bottom of Channel

TERJUNAN / DROP

Bangunan Terjun diperlukan pada kondisi gadient jalan yang ekstrim, dimana kecepatan
aliran air akan membahayakan erosi pada lapisan material (linning).
Pada perencanaan ini, slope saluran jalan hanya akan mengikuti untuk gradient jalan,
maksimum 10%, selebihnya harus dibuat terjunan.
Dalam perencanaan detil slope saluran dapat dibuat lebih dari 10%, dengan catatan cover
linning juga harus dibuat yang sesuai, dimana tegangan geser pada penampang saluran
harus lebih kecil dari tegangan geser ijin material linning.

Laporan Drainase Jalan 6


4. Metoda Perencanaan.
Tahapan perencanaan awal (basic design) drainase jalan ini, dapat dijelaskan seperti
Bagan Alir dibawah:

• Design Layout of Road • Hidrology map.


• Topographical map. • Rainfall data (10 years).

Catchment area Hidrology Geotech


Coeff runoff. Computation. recommendation

• Longitudinal Section of Hydraulic


Road Design. Computation
• Cross section of Design.
• Topographical map.
Dimension Structure /
Construction

Quantity

• Drawings Typical
• Drawing layout/Plan

4.1. Tinjauan Hidrologi.

Lokasi perencanaan yang berada di dalam wilayah administratif Kalimantan Tengah,


memiliki fitur alami dengan topografi berupa dataran bergelombang, banyak dialiri sungai
dan anak sungai, dan lahan-lahan basah.
Pada umumnya banjir rencana (design flood) di Indonesia ditentukan berdasarkan analisa
curah hujan harian maksimum yang tercatat. Frekuensi debit maksimum jarang diterapkan
karena keterbatasan masa pengamatan, maka analisisnya dilakukan dengan
menggunakan persamaan–persamaan empiris dengan memperhitungkan parameter–
parameter alam yang terkait.

Data curah hujan merupakan salah satu parameter alam yang dapat dipakai untuk
memperkirakan besarnya debit banjir dalam suatu area berdasarkan formula analisa
hidrologi dari para ahli. Dari hasil analisa Hidrologi akan menghasilkan nilai intensitas
curah hujan yang dapat dipakai untuk menghitung debit banjir maksinum untuk beberapa
periode ulang.

Laporan Drainase Jalan 7


Gambaran hidrologi permukaan Provinsi Kalimantan Tengah.

4.1.1. Data Curah Hujan.


Data curah hujan yang dipakai diambil dari beberapa stasiun terdekat disekitar
daerah perencanaan, dan diambil minimal selama pada kurun waktu 10 tahun
terakhir.
Data hujan yang dipakai diambil dari rata rata dari beberapa stasiun yang digunakan
dengan metoda poligon Thiessen.

Peta Hujan di Indonesia, sumber : diambil dari BMKG.

Berikut disajikan peta hujan di Kalimantan, yang diplot berdasarkan stasiun


pengamatan hujan (BMKG, PU dan Swasta) tahun 1974-2004, yang diplot dari hasil
interpolasi spasial metoda co-kriggimg.

Laporan Drainase Jalan 8


PROJECT
LOCATION

Peta Hujan Wilayah Kalimantan dan lokasi proyek diambil dari BMKG Peta Hujan
Indonesia .

Curah Hujan Harian Maks. Tahunan 3 Stasiun Pengamatan Hujan, Tahun 2000 sd. 2009

Stasiun Hujan Nilai C.H diambil


berdasarkan rata rata
Puruk Cahu Kapuas Murung Sintang Poligon Thiessen
No
No Sta.: 296 No Sta: 175 Disusun rangking
(mm) (mm) (mm) (mm)
40% 40% 20% 100%
1 102.0 54.8 10.9 64.9
2 148.0 56.3 35.1 88.7
3 297.8 62.8 39.1 152.1
4 306.3 73.8 50.0 162.0
5 338.0 122.6 69.9 198.2
6 344.2 145.4 90.9 214.0
7 345.2 154.2 113.8 222.5
8 352.9 162.6 125.0 231.2
9 357.3 162.6 131.1 234.2
10 360.9 163.9 144.0 238.7

4.1.2. Kriteria Perhitungan Hidrologi.

Dipakai 4 metoda perhitungan hidrologi, yaitu:


o Distribusi Gumbel Tipe I
o Distribusi log- Normal Dua Parameter
o Distribusi Log-Pearson Tipe III
o Distribusi Frechet.

Masing-masing hasil perhitungan akan di uji dengan metoda Chi Square, untuk
mengetahui tingkat penyimpangan data.

Laporan Drainase Jalan 9


4.1.3. Disain Periode Ulang.

Untuk saluran jalan side ditch digunakan periode ulang 2 tahun, sedangkan untuk
crossing drain digunakan periode ulang 5 tahunan.

4.1.4. Kriteria Perhitungan Rancangan Curah Hujan.

A. Metoda Gumbel Tipe I.


Persamaan empiris untuk distribusi Gumbel Tipe I sebagai berikut :
X = X + (S×K )
Keterangan :
X= Nilai yang diharapkan terjadi untuk kala ulang tertentu (mm)
X = Nilai rata-rata hitung data X (mm)
K= Faktor frekuensi
YT − Yn
=
Sn

YT = Reduced mean atau nilai reduksi data dari variabel yang diharapkan
terjadi pada periode ulang tertentu

  Tr (x ) − 1 
= − Ln  − Ln  
  Tr (x )  

Yn = Nilai rata-rata dari reduksi data, nilainya tergantung dari jumlah data (n)
dan dapat dilihat pada Tabel. 2.
Sn = Reduced Standard Deviation yang nilainya tergantung dari jumlah data
(n) dan dapat dilihat pada Tabel. 3
S = Simpangan baku
n

∑( X
i =1
i −X )2
=
n −1

N = Jumlah data
CS = koefisien kepencengan / penyimpangan data ( = 1,1396 )
CK = koefisien kurtosis ( = 5,4002 )

Laporan Drainase Jalan 10


Tabel Hubungan Reduksi Data Rata-rata (Yn) dengan Jumlah Data (n)

N yn N yn n yn n yn

10 0,4952 34 0,5396 58 0,5515 82 0,5672


11 0.4996 35 0.5402 59 0.5518 83 0.5574
12 0,5035 36 0,5410 60 0,5521 84 0,5576
13
0,5070 37 0,5418 61 0,5524 85 0,5578
14 0,5100 38 0,5424 62 0,5527 86 0,5580
15
0,5128 39 0,5430 63 0,5530 87 0,5581
16 0,5157 40 0,5436 64 0,5533 88 0,5583
17
0,5181 41 0,5442 65 0,5535 89 0,5585
18 0,5202 42 0,5448 66 0,5538 90 0,5586
19
0,5220 43 0,5453 67 0,5540 91 0,5587
20 0,5236 44 0,5458 68 0,5543 92 0,5589
21
0,5252 45 0,5463 69 0,5545 93 0,5591
22 0,5268 46 0,5468 70 0,5548 94 0,5592
23
0,5283 47 0,5473 71 0,5550 95 0,5593
24 0,5296 48 0,5477 72 0,5552 96 0,5595
25
0,5309 49 0,5481 73 0,5555 97 0,5596
26 0,5320 50 0,5485 74 0,5557 98 0,5598
27
0,5332 51 0,5489 75 0,5559 99 0,5599
28 0,5343 52 0,5493 76 0,5561 100 0.5600
29
0,5353 53 0,5497 77 0,5563
30 0,5362 54 0,5501 78 0,5565
31
0,5371 55 0,5504 79 0,5567
32 0,5380 56 0,5508 80 0,5569
33
0,5388 57 0,5511 81 0,5570
Sumber : Hidrologi Teknik, C.D. Soemarto, Edisi Ke-2, 1987:236

Laporan Drainase Jalan 11


TABEL HUBUNGAN ANTARA DEVIASI STANDAR (SN) DAN REDUKSI DATA DENGAN
JUMLAH DATA (N)

N Sn N Sn n Sn N Sn

10 0,9496 32 1,1193 54 1,1667 78 1,1923


11 0,9676 33 1,1226 55 1,1681 79 1,1930

12 0,9833 34 1,1255 56 1,1696 80 1,1938


13 0,9971 35 1,2865 57 1,1708 81 1,1945

14 1,0316 36 1,1313 58 1,1721 82 1,1953


15 1,0411 37 1,1339 59 1,1734 83 1,1959

16 1,0316 38 1,1363 62 1,1770 84 1,1967


17 1,0411 39 1,1388 63 1,1782 85 1,1973

18 1,0493 40 1,1413 64 1,1793 86 1,1980


19 1,0565 41 1,1436 65 1,1803 87 1,1987

20 1,0628 42 1,1458 66 1,1814 88 1,1994


21 1,0696 43 1,1480 67 1,1824 89 1,2001

22 1,0754 44 1,1499 68 1,1834 90 1,2007


23 1,0811 45 1,1519 69 1,1844 91 1,2013

24 1,0864 46 1,1538 70 1,1854 92 1,2020


25 1,0915 47 1,1557 71 1,1854 93 1,2026

26 1,0861 48 1,1574 72 1,1873 94 1,2032


27 1,1004 49 1,1590 73 1,1881 95 1,2038

28 1,1047 50 1,1607 74 1,1890 96 1,2044


29 1,1086 51 1,1623 75 1,1898 97 1,2049

30 1,1124 52 1,1638 76 1,1906 98 1,2055


31 1,1159 53 1,1658 77 1,1915 99 1,2060
100 1,2065
Sumber : Hidrologi Teknik, C.D. Soemarto, Edisi Ke-2, 1987:237

Laporan Drainase Jalan 12


Perhitungan Distribusi Curah Hujan dan metoda Gumbel Tipe I

No. Xi Xi - Xr (Xi - Xr)2 (Xi - Xr)3 (Xi - Xr)4

1 64.91 (115.74) 13,396.30 (1,550,520.28) 179,460,938.29


2 88.72 (91.93) 8,451.93 (777,023.47) 71,435,186.71
3 152.05 (28.60) 818.10 (23,399.55) 669,283.17
4 162.03 (18.62) 346.79 (6,458.13) 120,265.93
5 198.20 17.54 307.71 5,397.69 94,684.05
6 214.02 33.36 1,113.00 37,131.34 1,238,760.89
7 222.50 41.85 1,751.05 73,273.92 3,066,190.95
8 231.20 50.55 2,555.26 129,167.48 6,529,364.20
9 234.20 53.54 2,866.70 153,487.86 8,217,985.69
10 238.72 58.06 3,371.15 195,734.33 11,364,648.24

Jumlah 1806.54 0.00 34,978.00 (1,763,208.82) 282,197,308.11

Jumah Data ( n ) = 10
Rerata Xr = ∑ Xi / n = 180.654

Standar Deviasi (S) - X = 62.341

CS = n ∑(Xi - Xr)3 = -1.011

CK = 1.868

Tabel Hasil Perhitungan nilai ekstrim distribusi Gumbel Tipe I


T YT S Yn Sn K X (mm)

2 0.3665 62.3414 0.4952 0.9496 -0.1355 172.206


5 1.4999 62.3414 0.4952 0.9496 1.0581 246.616
10 2.2504 62.3414 0.4952 0.9496 1.8483 295.881
20 2.9957 62.3414 0.4952 0.9496 2.6332 344.815
25 3.2189 62.3414 0.4952 0.9496 2.8682 359.464
50 3.9120 62.3414 0.4952 0.9496 3.5982 404.969
100 4.6052 62.3414 0.4952 0.9496 4.3281 450.474

Laporan Drainase Jalan 13


B. Metoda Log Normal – Dua Paramater.

Distribusi Log–normal dua parameter mempunyai persamaan transformasi


sebagai berikut:
Log Xt = Log X + ( k ⋅ S Log X )
Keterangan,
Xt = Besarnya curah hujan dengan periode t (mm)

Log X = Rata-rata nilai logaritma data X hasil pengamatan (mm)

S Log X = Standar Deviasi nilai logaritma data X hasil pengamatan


n

∑ ( Log X
t =1
t − Log X ) 2
=
n −1
k = faktor frekuensi, sebagai fungsi dari koefisien variasi (cv) dengan periode
ulang t. Nilai k dapat diperoleh dari tabel yang merupakan fungsi peluang
kumulatif dan periode ulang, lihat Tabel 5-5.
CS = koefisien kepencengan / penyimpangan data
= 3 CV + CV3
CK = koefisien kurtosis
= CV8 + 6CV6 + 15CV4 + 16CV2 + 3
CV = koefisien variasi
σ
=
µ
σ = deviasi standar populasi ln X atau log X
µ = rata-rata hitung populasi ln X atau lo

Laporan Drainase Jalan 14


TABEL NILAI FAKTOR FREKUENSI (K) SEBAGAI FUNGSI DARI NILAI CV

Peluang Kumulatif P(%) : P(X<=X)


Koefisien
50 80 90 95 98 99
Variasi
Periode Ulang (Tahun)
(CV)
2 5 10 20 50 100
0.05 -0.0250 0.8334 1.2965 1.6863 2.1341 2.4570
0.10 -0.0496 0.8222 1.3078 1.7247 2.2130 2.5489
0.15 -0.0738 0.8085 1.3156 1.7598 2.2899 2.2607
0.20 -0.0971 0.7926 1.3200 1.7911 2.3640 2.7716
0.25 -0.1194 0.7746 1.3209 1.8183 2.4318 2.8805
0.30 -0.1406 0.7647 1.3183 1.8414 2.5015 2.9866
0.35 -0.1604 0.7333 1.3126 1.8602 2.5638 3.0890
0.40 -0.1788 0.7100 1.3037 1.8746 2.6212 3.1870
0.45 -0.1957 0.6870 1.2920 1.8848 2.6731 3.2799
0.50 -0.2111 0.6626 1.2778 1.8909 2.7202 3.3673
0.55 -0.2251 0.6379 1.2613 1.8931 2.7613 3.4488
0.60 -0.2375 0.6129 1.2428 1.8915 2.7971 3.5211
0.65 -0.2185 0.5879 1.2226 1.8866 2.8279 3.3930
0.70 -0.2582 0.5631 1.2011 1.8786 2.8532 3.3663
0.75 -0.2667 0.5387 1.1784 1.8677 2.8735 3.7118
0.80 -0.2739 0.5118 1.1548 1.8543 2.8891 3.7617
0.85 -0.2801 0.4914 1.1306 1.8388 2.9002 3.8056
0.90 -0.2852 0.4686 1.1060 1.8212 2.9071 3.8137
0.95 -0.2895 0.4466 1.0810 1.8021 2.9103 3.8762
1.00 -0.2929 0.4254 1.0560 1.7815 2.9098 3.9035
Sumber : Hidrologi, Soewarno, 1995

Laporan Drainase Jalan 15


Perhitungan Distribusi Curah Hujan dan metoda Log Normal Dua Parameter

No. Xi Log Xi (Log Xi-Log Xr) 2 3 4


(Log Xi - Log Xr) (Log Xi - Log Xr) (Log Xi - Log Xr)

1 64.91 1.812 -0.412 0.1693 -0.06968 0.028674


2 88.72 1.948 -0.276 0.0761 -0.02098 0.005786
3 152.05 2.182 -0.042 0.0018 -0.00007 0.000003
4 162.03 2.210 -0.014 0.0002 0.00000 0.000000
5 198.20 2.297 0.073 0.0054 0.00039 0.000029
6 214.02 2.330 0.107 0.0114 0.00121 0.000129
7 222.50 2.347 0.124 0.0153 0.00188 0.000233
8 231.20 2.364 0.140 0.0196 0.00275 0.000386
9 234.20 2.370 0.146 0.0212 0.00310 0.000451
10 238.72 2.378 0.154 0.0237 0.00366 0.000563
TOTAL 1806.54 22.238 -2.887E-15 0.3440 -0.07774 0.036255

Rerata Log Xr = 2.224


Standar Deviasi (S) = 0.195
CV = 0.088
CS = 0.264
CK = 3.125

Tabel :
Nilai Ekstrim Distribusi Log-Normal Dua Parameter
Log X = Log Xr + k . S

T P k Log X X (mm)
2 0.500 0.00 2.224 167.427
5 0.200 0.84 2.388 244.367
10 0.100 1.28 2.474 297.894
20 0.050 1.64 2.544 350.300
25 0.040 1.78 2.571 372.527
50 0.020 2.05 2.625 421.302
100 0.010 2.33 2.679 477.895

Laporan Drainase Jalan 16


C. Metoda Log Pearson Tipe III.

Distribusi Log Pearson Tipe III merupakan hasil transformasi dari distribusi
Pearson Tipe III dengan menggantikan data menjadi nilai logaritmik. Persamaan
distribusi Log Pearson Tipe III dapat ditulis sebagai berikut :
Log Xt = Log X + ( G × S )
Keterangan,
Xt = Besarnya curah hujan dengan periode t (mm)

Log X = Rata-rata nilai logaritma data X hasil pengamatan (mm)

(S ) = Standar Deviasi nilai logaritma data X hasil pengamatan


n

∑ ( Log X
t =1
t − Log X ) 2
=
n−1
CS = koefisien kepencengan / penyimpangan data
(
n.∑ logX − logX ) 3

( n − 1 )(. n − 2 ).( SlogX ) 3


=

CK = koefisien kurtosis
(
n 2 ∑ logX − logX )4

( n − 1 ) × ( n − 2 ) × ( n − 3 ) × ( S log X )
= 4

Laporan Drainase Jalan 17


Faktor Penyimpangan K yang digunakan untuk Sebaran
Distribusi Log Pearson Tipe III.
PERIODE ULANG (Tr)
Log Coef.
Of 2 5 10 25 50 100 200 1000
Skewness
50% 20% 10% 4% 2% 1% 0.5% 0.1%
3 -0.396 0.420 1.180 2.278 3.152 4.051 4.970 7.250
2.5 -0.360 0.518 1.250 2.262 3.048 3.845 4.652 6.600
2.2 -0.330 0.574 1.284 2.240 2.970 3.705 4.444 6.200
2 -0.307 0.609 1.302 2.219 2.912 3.605 4.298 5.390
1.8 -0.282 0.643 1.318 2.193 2.848 3.499 4.147 5.660
1.6 -0.254 0.675 1.329 2.163 2.780 3.388 3.990 5.390
1.4 -0.225 0.705 1.237 2.128 2.706 3.271 3.828 5.110
1.2 -0.195 0.732 1.340 2.087 2.626 3.149 3.661 4.820
1 -0.164 0.758 1.340 2.043 2.542 3.022 3.489 4.540
0.9 -0.148 0.769 1.339 2.018 2.498 2.957 3.401 4.395
0.8 -0.132 0.780 1.336 1.998 2.453 2.891 3.312 4.250
0.7 -0.116 0.790 1.333 1.967 2.407 2.824 3.223 4.105
0.6 -0.099 0.800 1.328 1.939 2.359 2.755 3.132 3.960
0.5 -0.083 0.808 1.323 1.910 2.311 2.686 3.041 3.815
0.4 -0.066 0.816 1.317 1.880 2.261 2.615 2.949 3.670
0.3 -0.050 0.824 1.309 1.849 2.211 2.544 2.856 3.525
0.2 -0.033 0.830 1.301 1.818 2.159 2.472 2.763 3.380
0.1 -0.017 0.836 1.292 1.785 2.107 2.400 2.670 3.235
0 0 0.842 1.282 1.751 2.054 2.326 2.576 3.090
-0.1 0.017 0.836 1.270 1.716 2.000 2.252 2.482 2.950
-0.2 0.033 0.850 1.258 1.680 1.945 2.178 2.388 2.810
-0.3 0.050 0.853 1.245 1.643 1.890 2.104 2.294 2.675
-0.4 0.066 0.855 1.231 1.606 1.834 2.029 2.201 2.540
-0.5 0.083 0.856 1.216 1.567 1.777 1.955 2.108 2.400
-0.6 0.099 0.857 1.200 1.528 1.720 1.880 2.016 2.275
-0.7 0.116 0.857 1.183 1.488 1.663 1.806 1.926 2.150
-0.8 0.132 0.856 1.166 1.448 1.606 1.733 1.837 2.035
-0.9 0.148 0.854 1.147 1.407 1.549 1.660 1.749 1.910
-1 0.164 0.852 1.128 1.366 1.492 1.588 1.664 1.800
-1.2 0.195 0.844 1.086 1.282 1.379 1.449 1.501 1.625
-1.4 0.225 0.832 1.041 1.198 1.270 1.318 1.351 1.465
-1.6 0.254 0.817 0.994 1.116 1.166 1.197 1.216 1.280
-1.8 0.282 0.799 0.945 1.035 1.069 1.087 1.997 1.130
-2 0.307 0.777 0.895 0.959 0.980 0.990 0.995 1.000
-2.2 0.330 0.752 0.844 0.888 0.900 0.905 0.907 0.910
-2.5 0.360 0.711 0.771 0.793 0.798 0.799 0.800 0.802
-3 0.396 0.636 0.660 0.666 0.666 0.667 0.667 0.668

Laporan Drainase Jalan 18


Perhitungan Distribusi Curah Hujan dan metoda Log Pearson Tipe III
2 3 4
No. Xi Log Xi (Log Xi-Log Xr) (Log Xi-Log Xr) (Log Xi-Log Xr) (Log Xi-Log Xr)

1 64.91 1.812 -0.412 0.1693 -0.06968 0.028674


2 88.72 1.948 -0.276 0.0761 -0.02098 0.005786
3 152.05 2.182 -0.042 0.0018 -0.00007 0.000003
4 162.03 2.210 -0.014 0.0002 0.00000 0.000000
5 198.20 2.297 0.073 0.0054 0.00039 0.000029
6 214.02 2.330 0.107 0.0114 0.00121 0.000129
7 222.50 2.347 0.124 0.0153 0.00188 0.000233
8 231.20 2.364 0.140 0.0196 0.00275 0.000386
9 234.20 2.370 0.146 0.0212 0.00310 0.000451
10 238.72 2.378 0.154 0.0237 0.00366 0.000563
TOTAL 1102.43 15.127 -4.400E-01 0.2793 -0.08725 0.034854

Rerata Log Xr = 2.224


Standar Deviasi (S) = 0.195
CS = -1.622
CK = 4.734

Tabel :
Nilai Ekstrim Distribusi Log Pearson Tipe III
Log X = Log Xr + G. S

T P(%) Cs G Log X X (mm)


2 50 -1.622 0.2585 2.274 188.088
5 20 -1.622 0.9393 2.407 255.540
10 10 -1.622 1.1370 2.446 279.326
20 5 -1.622 1.1902 2.457 286.093
25 4 -1.622 1.2168 2.462 289.537
50 2 -1.622 1.2116 2.461 288.866
100 1 -1.622 1.1603 2.451 282.263

Keterangan:
G = lihat Tabel. (Hubungan Cs dengan Kala Ulang (T) atau dengan Percent Chance (P%)
Log X = rerata Log X + G.S
X = curah hujan rancangan metoda Log Pearson Tipe III

Laporan Drainase Jalan 19


D. Metoda Frechet.
.
Perhitungan Distribusi Curah Hujan dan metoda Frechet

No. Xi Log Xi (Log Xi-Log Xr) 2 3 4


(Log Xi - Log Xr) (Log Xi - Log Xr) (Log Xi - Log Xr)

1 64.91 1.812 -0.412 0.1693 -0.06968 0.028674


2 88.72 1.948 -0.276 0.0761 -0.02098 0.005786
3 152.05 2.182 -0.042 0.0018 -0.00007 0.000003
4 162.03 2.210 -0.014 0.0002 0.00000 0.000000
5 198.20 2.297 0.073 0.0054 0.00039 0.000029
6 214.02 2.330 0.107 0.0114 0.00121 0.000129
7 222.50 2.347 0.124 0.0153 0.00188 0.000233
8 231.20 2.364 0.140 0.0196 0.00275 0.000386
9 234.20 2.370 0.146 0.0212 0.00310 0.000451
10 238.72 2.378 0.154 0.0237 0.00366 0.000563

TOTAL 1102.43 15.127 -4.400E-01 0.2793 -0.08725 0.034854

Rerata Log X = 2.224


Standar Deviasi (S) = 0.195
CS = -1.622
CK = 2.386

Nilai Ekstrim Distribusi Frechet

T P a X0 Y Log X X (mm)

2 0.500 6.558 2.1368 0.366 2.193 155.827


5 0.800 6.558 2.1368 1.510 2.367 232.860
10 0.900 6.558 2.1368 2.250 2.480 301.953
20 0.950 6.558 2.1368 2.970 2.590 388.808
25 0.955 6.558 2.1368 3.125 2.613 410.555
50 0.980 6.558 2.1368 3.900 2.732 538.956
100 0.990 6.558 2.1368 4.600 2.838 689.125

Laporan Drainase Jalan 20


Rekapitulasi Hasil Perhitungan Hujan Rancangan 4 Metoda

Log-Normal Log-Pearson
Kala Ulang Gumbel Tipe I Frechet
Dua Parameter Tipe III
(tahun) (mm) (mm) (mm) (mm)
2 172.21 167.43 188.09 155.83
5 246.62 244.37 255.54 232.86
10 295.88 297.89 279.33 301.95
20 344.81 350.30 286.09 388.81
25 359.46 372.53 289.54 410.55
50 404.97 421.30 288.87 538.96
100 450.47 477.89 282.26 689.13
Sumber : Hasil Perhitungan.

Grafik An alisis Perh itu ngan C.H. Ran cangan Harian Maks. Tah u n an

800

700

600
CH. Rancangan (mm)

500

400

300

200

100
2 5 10 20 25 50 100
Gumbel Tipe I 172.21 246.62 295.88 344.81 359.46 404.97 450.47
Log-Normal 167.43 244.37 297.89 350.30 372.53 421.30 477.89
Log-Pearson 188.09 255.54 279.33 286.09 289.54 288.87 282.26
Frechet 155.83 232.86 301.95 388.81 410.55 538.96 689.13

Kala Ulang (Tahun)

Gambar 4, Grafik Hasil 4 Metoda Perhitungan Curah Hujan Rancangan.

Laporan Drainase Jalan 21


4.1.5. Uji Distribusi Frekuensi Data Curah Hujan.
Uji Chi-Kuadrat hanya efektif bila jumlah data pengamatan besar, karena sebelum
dilakukan pengujian, data pengamatan akan dikelompokkan terlebih dahulu.
Uji ini dimaksudkan untuk melihat distribusi amatan apakah dapat dihampiri dengan
baik oleh distribusi teoritis. Uji ini dilakukan berdasarkan perbedaan antara nilai-nilai
yang diharapkan atau yang diperoleh secara teoritis. Uji ini digunakan untuk menguji
simpangan secara vertikal.
Rumus yang digunakan adalah sebagai berikut:

(Ef - Of)
χ2 = ∑
Ef
Dengan :
χ
2
= Harga Chi-Square.
Ef = frekuensi yang diharapkan dengan pembagian kelas.
Of = frekuensi yang diamati sesuai dengan pembagian kelas.
Jumlah kelas distribusi dihitung dengan rumus :
K = 1 + 3.22 log n
Derajat Kebebasan :
DK = K – (P+1)
Dimana :
P = Banyaknya keterikatan atau sama dengan banyaknya parameter.
K = Jumlah kelas distribusi.
n = Banyaknya data.
2 2
Agar distribusi frekuensi yang dipilih dapat diterima, maka harga X hitung < X Cr.
2
Harga X Cr dapat diperoleh dengan menentukan taraf signifikan α (alpha) dengan
derajat kebebasan.

Laporan Drainase Jalan 22


Tabel Chi Square
a derajat kepercayaan
DK
0.995 0.99 0.975 0.95 0.05 0.025 0.01 0.005
3.93E-
1 0.000157 0.000982 0.00393 3,841 5,024 6,635 7,879
05
2 0.01 0.0201 0.0506 0.103 5,991 7,378 9,210 10,597
3 0.0717 0.115 0.216 0.352 7,815 9,348 11,345 12,838
4 0.207 0.297 0.484 0.711 9,488 11,143 13,277 14,860
5 0.412 0.554 0.831 1,145 11,070 12,832 15,086 16,750

6 0.676 0.872 1,237 1,635 12,592 14,449 16,812 18,548


7 0.989 1,239 1,690 2,167 14,067 16,013 18,475 20,278
8 1,344 1,646 2,180 2,733 15,507 17,535 20,090 21,955
9 1,735 2,088 2,700 3,325 16,919 19,023 21,666 23,589
10 2,156 2,558 3,247 3,940 18,307 20,483 23,209 25,188

11 2,603 3,053 3,816 4,575 19,675 21,920 24,725 26,757


12 3,074 3,571 4,404 5,226 21,026 23,337 26,217 28,300
13 3,565 4,107 5,009 5,892 22,362 24,736 27,688 29,819
14 4,075 4,660 5,629 6,571 23,685 26,119 29,141 31,319
15 4,601 5,229 6,262 7,261 24,996 27,488 30,578 32,801

16 5,142 5,812 6,908 7,962 26,296 28,845 32,000 34,267


17 5,697 6,408 7,564 8,672 27,587 30,191 33,409 35,718
18 6,265 7,015 8,231 9,390 28,869 31,526 34,805 37,156
19 6,844 7,633 8,907 10,117 30,144 32,852 36,191 38,582
20 7,434 8,260 9,591 10,851 31,410 34,170 37,566 39,997

21 8,034 8,897 10,283 11,591 32,671 35,479 38,932 41,401


22 8,643 9,542 10,982 12,338 33,924 36,781 40,289 42,796
23 9,260 10,196 11,689 13,091 36,172 38,076 41,638 44,181
24 9,886 10,856 12,401 13,848 36,415 39,364 42,980 45,558
25 10,520 11,524 13,120 14,611 37,652 40,646 44,314 46,928

26 11,160 12,198 13,844 15,379 38,885 41,923 45,642 48,290


27 11,808 12,879 14,573 16,151 40,113 43,194 46,963 49,645
28 12,461 13,565 15,308 16,928 41,337 44,461 48,278 50,993
29 13,121 14,256 16,047 17,708 42,557 45,722 49,588 52,336
30 13,787 14,953 16,791 18,493 43,773 46,979 50,892 53,672
Sumber: Bonnier, 1980

Laporan Drainase Jalan 23


A. Uji Chi untuk Metoda Distribusi Gumbel Tipe I

25 4.000 1.2459 62.341 0.4952 0.9496 0.7905 229.938


50 2.000 0.3665 62.341 0.4952 0.9496 -0.1355 172.206

75 1.333 -0.3266 62.341 0.4952 0.9496 -0.8655 126.701

Sehingga:
Sub kelas 1 : X < 126.70
Sub kelas 2 : 126.70 < X < 172.21
Sub kelas 3 : 172.21 < X < 229.94
Sub kelas 4 : X > 229.94

Perhitungan Uji Chi-Kuadrat Untuk Distribusi Gumbel Tipe I

Nilai Batas Jumlah Data


No. (EF - OF)2 (EF - OF)2 / EF
Sub Kelas OF EF
1 X < 126.7 2 2.5 0.250 0.100

2 126.7 < X < 172.21 2 2.5 0.250 0.100


3 172.21 < X < 229.94 3 2.5 0.250 0.100

4 X > 229.94 3 2.5 0.250 0.100

10 10 0.400

c 2hitung = 0.400

DK = K - (P + 1) ----------> K (jumlah kelas) = 4

= 4 - (2 +1) = 1 P (parameter yang terikat dalam agihan frekuensi) = 2

Untuk: DK = 1 dan α = 5% ----> c 2cr = 3.841 (table Chi square, Bonnie 1980)

χ < χ2cr , maka : Distribusi Frekeuansi Dapat diterima


2
Didapat: hitung

Laporan Drainase Jalan 24


B. Uji Chi untuk Metoda Log Normal Dua Parameter.

Pembagian Kelas:
N = 10
K = 1 + 3,322 log N = 4.3220 ( 4 kelas)
Peluang batas kelas:
= 1/kelas = 1/4 = 0.25 = 25%

Besar Peluang dan Nilai Batas Kelas untuk Distribusi Log Normal

P k Log X X (mm)

0.250 0.670 2.355 226.36


0.500 - 2.224 167.43
0.750 (0.670) 2.093 123.84

Sehingga:
Sub kelas 1: X < 123.84
Sub kelas 2: 123.835 < X < 167.43
Sub kelas 3: 167.427 < X < 226.36
Sub kelas 4: X > 226.36

Perhitungan Uji Chi-Kuadrat Untuk Distribusi Log Normal

Nilai Batas Jumlah Data


No. (OF - EF)2 (OF - EF)2 / EF
Sub Kelas OF EF

1 X < 123.84 2 2.5 0.250 0.100


2 123.84 < X < 167.43 2 2.5 0.250 0.100
3 167.43 < X < 226.36 3 2.5 0.250 0.100
4 X > 226.36 3 2.5 0.250 0.100

10 10 0.400

Keterangan:
OF = Nilai Pengamatan

EF = Nilai Teoritis

c 2hitung = 0.400
DK = K - (P + 1) -----------> K (jumlah kelas) = 4

= 4 - (2+1) = 4 P (parameter yang terikat dalam agihan frekuensi) = 2

Untuk: DK = 1 dan α = 5% ----> c 2cr = 3.841 (table Chi square, Bonnie 1980)

2
Didapat : χ hitung < χ2cr , maka : Distribusi Frekeuansi Dapat diterima

Laporan Drainase Jalan 25


C. Uji Chi untuk Metoda Log Pearson Tipe III

Pembagian Kelas:
N = 10
K = 1 + 3,322 log N = 4.3220 ( 4 kelas)
Peluang batas kelas:
= 1/kelas = 1/4 = 0.25 = 25%

Besar Peluang dan Nilai Batas Kelas untuk Distribusi Log-Pearson Tipe III

P(%) Cs G Log X X (mm)


25 -1.622 0.826 2.385 242.81
50 -1.622 0.258 2.274 188.09
75 -1.622 (0.605) 2.106 127.54

Sehingga:
Sub kelas 1 X < 127.54
Sub kelas 2 127.54 < X < 188.09
Sub kelas 3 188.09 < X < 242.81
Sub kelas 4 X > 242.81

Perhitungan Uji Chi-Kuadrat Untuk Distribusi Log Pearson Tipe III


Nilai Batas Jumlah Data
No. (EF - OF)2 (EF - OF)2 / EF
Sub Kelas OF EF
1 X < 127.54 2 2.5 0.250 0.100
2 127.54 < X < 188.09 2 2.5 0.250 0.100

3 188.09 < X < 242.81 6 2.5 12.250 4.900


4 X > 242.81 0 2.5 6.250 2.500

10 10 7.600

2
χ hitung = 7.600

DK = K - (P + 1) -------------> K (jumlah kelas) = 4


= 4 - (2+1) = 1 P (parameter yang terikat dalam agihan frekuensi) = 2

Untuk: DK = 1 dan α = 5% ----> c 2cr = 3.841 (table Chi square, Bonnie 1980)
2
Didapat: χ hitung > χ2cr , maka : Distribusi Frekuensi Tidak dapat diterima

Laporan Drainase Jalan 26


D. Uji Chi untuk Metoda Frechet.
Pembagian Kelas:
N = 10
K = 1 + 3,322 log N = 4.3220 ( 4 kelas)
Peluang batas kelas:
= 1/kelas = 1/4 = 0.25 = 25%

Besar Peluang dan Nilai Batas Kelas untuk Distribusi Frechet


P a X0 Y Log X X (mm)

0.250 6.558 2.137 -0.326 2.087 122.213

0.500 6.558 2.137 0.366 2.193 155.827

0.750 6.558 2.137 1.240 2.326 211.798

Sehingga:
Sub kelas 1 : X < 122.21
Sub kelas 2 : 122.21 < X < 155.83
Sub kelas 3 : 155.83 < X < 211.80
Sub kelas 4 : X > 211.80

Perhitungan Uji Chi-Kuadrat Untuk Distribusi Frechet

Nilai Batas Jumlah Data


No. (OF - EF)2 (OF - EF)2 / EF
Sub Kelas OF EF

1 X < 122.21 2 2.5 0.250 0.100


2 122.21 < X < 155.83 1 2.5 2.250 0.900
3 155.83 < X < 211.8 3 2.5 0.250 0.100
4 X > 211.8 4 2.5 2.250 0.900

10 10 2.000

χ hitung
2 = 2.000
DK = K - (P + 1) ---------> K (jumlah kelas) = 4

= 4 - (2+1) = 1 P (parameter yang terikat dalam agihan frekuensi) = 2

Untuk: DK = 1 dan α = 5% ----> c 2cr = 3.841 (table Chi square, Bonnie 1980)
2
Didapat: χ hitung < χ2cr , maka : Distribusi Frekeuansi Dapat diterima

Laporan Drainase Jalan 27


Rekapitulasi Hasil Perhitungan Hujan Rancangan 4 Metoda

Log-Normal Log-Pearson
Kala Ulang Gumbel Tipe I Frechet
Dua Parameter Tipe III
(tahun) (mm) (mm) (mm) (mm)
2 172.21 167.43 188.09 155.83
5 246.62 244.37 255.54 232.86
10 295.88 297.89 279.33 301.95
20 344.81 350.30 286.09 388.81
25 359.46 372.53 289.54 410.55
50 404.97 421.30 288.87 538.96
100 450.47 477.89 282.26 689.13

Hasil Pengujian Distribusi dengan parameter Chi-Kuadrat

2 2
No. Metoda Distribusi Nilai χ hitung Nilai χ kritis Keterangan

1. Gumbel Tipe I 0.400 3.841 Diterima


2. Log-Normal Dua Parameter 0.400 3.841 Diterima
3. Log-Pearson Tipe III 7.600 3.841 Tidak Diterima
4. Frechet 2.000 3.841 Diterima

Laporan Drainase Jalan 28


4.2. Tinjauan Hidrolika.
Saluran drainase diperhitungkan dengan pilihan menampung dengan kapasitas dan
pengaliran yang memenuhi prinsip-prinsip hidrolika.

4.2.1. Kriteria Perhitungan Debit Banjir Rencana.


Penentuan debit banjir rencana dihitung dengan menggunakan rumus sebagai
berikut:
a. Rumus Rasional.
Digunakan untuk luas daerah aliran kecil dengan tangkapan hujan sampai
dengan 100 ha.
b. Rumus Modifikasi Rasional.
Digunakan untuk luas daerah aliran besar ( > 100 ha), katagori sungai dan
anak sungai.

Rumus Rasional ;

Q = 0,00278 C.I.A

Dimana :
3
Q = Debit puncak banjir (m /det)
C = Koefisien pengaliran (run off)
I = Intensitas curah hujan selama waktu konsentrasi (mm/jam)
A = Luas daerah aliran (ha)

Modifikasi Rasional ;

Q = 0,00278 C.Cs.I.A

Dimana :
3
Q = Debit puncak banjir (m /det)
C = Koefisien pengaliran, sesuai jenis lahan.
Cs = Koefisien penyerapan (Storage) = (2 tc) / (2 tc + td)
I = Intensitas curah hujan selama waktu konsentrasi (mm/jam)
A = Luas daerah aliran (ha)
tc = Waktu konsentrasi (menit)
td = Waktu pengaliran dalam saluran (menit)

tc = to + td
1/3
108 . n . L
t0 = --------------
1/5
S
td = L/V
Laporan Drainase Jalan 29
Kecepatan aliran dihitung dengan rumus Dr. Rziha :
0,6
V = 72 (H/L)

Dimana :

tc = Time of concentration/waktu konsentrasi (menit)


to = Waktu yang diperlukan untuk mengalirkan air hujan pada permukaan tanah
dari titik terjauh menuju ke awal saluran (menit).
td = Waktu yang diperlukan untuk mengalirkan air hujan didalam saluran dari
awal saluran sampai ke titik yang ditinjau (menit).
n = Koefisien kekasaran permukaan (menggunakan koefisien kekasaran dari
Manning = s)
S = Kemiringan medan lintasan (%).
L = Panjang lintasan/saluran yang dilewati, untuk rumus t0, L dalam satuan
meter, untuk rumus td, L dalam satuan rumus kilometer.
V = Kecepatan aliran (km/jam)
H = Beda tinggi antara titik ujung saluran ke titik yang ditinjau (km).

.
4.2.2. Koefisien Pengaliran.

Koefisian pengaliran (C) adalah perbandingan antara jumlah hujan yang jatuh
dengan air yang mengalir menjadi limpasan permukaan (runoff). Koefisien
pengaliran dapat dipengaruhi oleh geologi, jenis permukaan tanah dan kemiringan
daerah pengaliran serta jenis penggunaan lahan.

Pada suatu daerah pengaliran dengan tata guna lahan yang berbeda-beda, maka
besarnya angka koefisien pengaliran ditetapkan dengan mengambil harga rata-rata
berdasarkan bobot luas daerah.

Nilai Koefisien pengaliran diambil dari Tabel Dr. Mononobe dibawah :

Kondisi daerah pengaliran dan sungai Harga dari f/ α


Daerah pegunungan yang curam 0,75 - 0,90
Daerah pegunungan tersier 0.70 - 0,80
Tanah bergelombang dan hutan 0,50 - 0,75
Tanah dataran yang ditanami 0,45 - 0,60
Persawahan yang diairi 0,70 - 0,80
Sungai di daerah pegunungan 0,75 - 0,85
Sungai kecil di dataran 0,45 - 0,75
Sungai besar yang lebih dari setengah 0,50 - 0,75
daerah pengalirannya terdiri dari dataran

Laporan Drainase Jalan 30


4.2.3. Perhitungan Dimensi Saluran.

Paramater penting dalam perhitungan kapasitas saluran adalah kemiringan


penampang hidrolis.
Lebar optimal saluran diperkirakan sebesar setengah lebar saluran, atau sesuai
dengan kondisi (elevasi) medan.
Kapasitas saluran rencana dihitung dengan menggunakan persamaan rumus
Strickler dengan bentuk persamaan seperti berikut :

Rumus pengaliran dipakai rumus Strickler :

Q =vA
2/3 1/2
v = 1/n R S

Dalam hal ini :


3
Q = debit saluran, m /det
V = kecepatan aliran, m/det
2
A = luas potongan melintang aliran, m
n = koefisien kekasaran Manning.
R = jari–jari hidrolis, m
P = keliling basah, m
S = kemiringan dasar saluran

Laporan Drainase Jalan 31


4.2.4. Angka Kekasaran Manning.

Koefisien kekasaran Manning dipakai sesuai dengan jenis penutup linning yang
akan diterapkan.
Beberapa jenis penutup linning saluran disajikan seperti tabel dibawah.

Angka koefisien kekasaran n Manning untuk beberapa jenis linning.

Tipe Linning Maksimum Average Minimum

Concrete 0.015 0.013 0.011

Grout Riprap 0.040 0.030 0.026

Stone masonry 0.042 0.032 0.030

Soil Cement 0.025 0.022 0.020

Asphalt 0.018 0.016 0.016

Tanah 0.025 0.020 0.016

Tanah berbatu 0.045 0.035 0.016

RECP, Open wave textile 0.028 0.025 0.022

Erosion control blangket 0.045 0.035 0.028

Turf reinforcement mat 0.046 0.030 0.024

Gravel, D50 = 25 mm, flow depth = 0.15 m - 0.040 -

Gravel, D50 = 25 mm, flow depth = 0.50 m - 0.033 -

Gravel, D50 = 50 mm, flow depth = 0.15 m - 0.050 -

Gravel, D50 = 50 mm, flow depth = 0.50 m - 0.042 -

Cobbles, D50 = 100 mm, flow depth = 0.50 m - 0055 -

Cobbles, D50 = 100 mm, flow depth = 1.00 m - 0.047 -

Rock Riprap, D50 = 150 mm, flow depth = 0.50 m - 0.069 0.056

Rock Riprap, D50 = 150 mm, flow depth = 1.00 m - 0.056 -

Rock Riprap, D50 = 100 mm, flow depth = 1.00 m - 0.080 -


Sumber : Design Road Side of Channels, FHWA.

Laporan Drainase Jalan 32


4.2.5. Pemilihan bentuk Saluran.

w
Bentuk Trapesium
1
h
m

b a. Cocok untuk mengalirkan debit


A besar
R = b. Diterapkan pada lokasi lahan yang
P
cukup.
A = (b + m.h) . h c. Cocok untuk tipe flexible linning.
P = b + 2.h m 2 + 1

b
Bentuk Segi Empat
w a. Cocok untuk mengalirkan debit
kecil
b. Diterapkan pada lahan yang
h
terbatas atau di perkotaan.
c. Harus menggunakan pasangan /
A = b.h linning.

P = b + 2h
R = A/P = bh/(b+2h)

D
Bentuk Lingkaran
a. Cocok untuk mengalirkan aliran air
bertekanan atau saluran bawah
permukaan.
H = 0,8 D b. Diterapkan pada lahan yang
terbatas, atau karena alasan
teknis. .
c. Cocok untuk saluran air kotor
2
A = 0.3042 D
P = 2.213 D
R = A/P = 0.6733 D

Laporan Drainase Jalan 33


4.3. Tegangan Geser Ijin untuk beberapa jenis lereng saluran.

Kecepatan aliran didasar saluran akan menimbulkan tegangan geser, oleh karena itu
tegangan ijin geser perlu diketahui agar tidak menimbulkan gerusan / erosi.
Beberapa jenis lapisan material linning saluran dan tegangan geser ijin disajikan pada tabel
berikut. Tegangan Geser pada linning saluran akibat aliran air, dihitung dengan rumus :

= Tegangan geser idasar saluran

= Tegangan geser Ijin


R = Jari jari hidrolis.
S = Slope saluran

Tegangan geser ijin untuk beberapa jenis cover linning (material penahan erosi).
Katagori Penutup Linning Tipe Linning Tegangan Ijin
Geser ( )

Tanah Kohesif, Clayey sand 0.35 kg/cm2


PI = 10 Unorganic silts 0.25 kg/cm2
Silty Sand 0.24 kg/cm2
Tanah Kohesif Clayey sand 0.45 kg/cm2
PI > 20 Unorganic silts 0.40 kg/cm2
Silty Sand 0.35 kg/cm2
Inorganic Clay 0.66 kg/cm2
Tanah Non Kohesif, PI<10 Fine Sand D75 < 1.3 mm 0.10 kg/cm2
Fine Gravel D75 = 7.5 mm 0.66 kg/cm2
Gravel D50 = 15 mm 1.10 kg/cm2
Gravel Coarse D50 = 25 mm 1.90 kg/cm2
Very Coarse Gravel D50 = 50 mm 3.80 kg/cm2.
Rock Rirap D50 = 150 mm 11.3 kg/cm2.
D50 = 300 mm 22.7 kg/cm2.
Sumber : Design of Roadside channels with Flexible Linning, FHWA

Laporan Drainase Jalan 34


5. Disain komputasi.

Beberapa tabel hasil perhitungan terlampir, meliputi :

Lampiran 1 : Tabel Perhitungan Hidrologi.dan Kapasitas Crossing Drain


Lampiran 2 : Tabel Perhitungan Dimensi Struktur Crossing Drain, Pipa Culvert dan
Bangunan Terjun.
Lampiran 3 : Tabel Perhitungan Tegangan Geser dan kebutuhan lapisan penahan erosi.
Lampiran 4 : Tabel Volume Lapisan Porous.

Laporan Drainase Jalan 35


Laporan Drainase Jalan 36
Laporan Drainase Jalan 37
Laporan Drainase Jalan 38
Laporan Drainase Jalan 39
Laporan Drainase Jalan 40
Laporan Drainase Jalan 41
LAMPIRAN 1
Perhitungan Hidrologi dan Kapasitas Crossing Culvert.

Top of Dike (Safety bund)


Qd = 0,00278 C I A Qc = v x A
Qd = Debit rencana (m3/s) Qc = Kapasitas Aliran Cross Drain (m3/s)
I = Intensitas hujan rencana (mm/dt) Kecepatan aliran, v = k R2/3 S1/2
A = Luas daerah aliran (Ha) Koef. kekasaran, k = 0,50
D D/4
C = Koef. pengaliran Hydraulic gradient , R = 0,3042 D
2
Periode ulang : 5 tahun Hydraulic section , A = 0,6733 D
I, 5 tahun = 244.37 m/dt Kemiringan dasar saluran, S = 0,015 (1.5%)

Lebar headway : 13.00 M


Safety Bund
Lebar saluran samping: 1.50 M Gutter
CL
Slope
embankment
Lebar bawah SB 2.30 M 4% 4%

Total lebar jalan tanpa SB 16.00 M


Total lebar jalan termasuk SB 20.60 M
D 1.5%

Lt

Luas Daerah Koef.


Nama dan Lokasi Crossing Drain Dimensi Pipa
Aliran Pengaliran Debit Banjir
Debit rencana Cek
No Rencana KETERANGAN
Stationing Cell Panjang Qd (m3/dt) Qc > Qd ?
Nomenclature ( ha ) C (Qd) (m3/dt) D (m)
(STA) (jumlah) (m)

A SEGMEN A
1 J-A..1 161+335 S. Anak Tingang
2 1.Ø.1200 CP 161+200 25.39 0.60 2.87 1.20 1 33.30 3.42 Oke
3 1.Ø.1200 CP 160+655 4.58 0.60 0.52 1.20 1 86.80 3.42 Oke
4 1.Ø.1200 CP 160+566 2.50 0.60 0.28 1.20 1 37.80 3.42 Oke
5 1.Ø.1200 CP 160+364 14.05 0.60 1.59 1.20 1 30.20 3.42 Oke
6 1.Ø.1200 CP 160+335 0.75 0.60 0.08 1.20 1 30.80 3.42 Oke
7 1.Ø.1200 CP 16+086 2.33 0.60 0.26 1.20 1 31.60 3.42 Oke
8 1.Ø.1200 CP 159+972 8.57 0.60 0.97 1.20 1 23.00 3.42 Oke

Laporan Drainase Jalan 42


Luas Daerah Koef.
Nama dan Lokasi Crossing Drain Dimensi Pipa
Aliran Pengaliran Debit Banjir
Debit rencana Cek
No Rencana KETERANGAN
Stationing Cell Panjang Qd (m3/dt) Qc > Qd ?
Nomenclature ( ha ) C (Qd) (m3/dt) D (m)
(STA) (jumlah) (m)

9 1.Ø.1200 CP 159+700 10.64 0.60 1.20 1.20 1 20.00 3.42 Oke


10 1.Ø.1200 CP 159+606 5.32 0.60 0.60 1.20 1 21.00 3.42 Oke
11 1.Ø.1200 CP 159+300 22.46 0.60 2.54 1.20 1 22.00 3.42 Oke
12 J-A.2 159+129 S. Tingang
13 1.Ø.1200 CP 159+524 1.54 0.60 0.17 1.20 1 23.00 3.42 Oke
14 1.Ø.1200 CP 158+763 9.54 0.60 1.08 1.20 1 20.00 3.42 Oke
15 1.Ø.1200 CP 158+621 5.19 0.60 0.59 1.20 1 21.00 3.42 Oke
16 1.Ø.1200 CP 158+456 18.35 0.60 2.08 1.20 1 22.00 3.42 Oke
17 1.Ø.1200 CP 158+232 16.47 0.60 1.86 1.20 1 34.00 3.42 Oke
18 1.Ø.1200 CP 157+935 6.52 0.60 0.74 1.20 1 28.00 3.42 Oke
19 1.Ø.1800 CP 157+644 70.27 0.60 7.96 1.80 1 77.00 13.23 Oke
20 1.Ø.1200 CP 157+584 3.64 0.60 0.41 1.20 1 24.00 3.42 Oke
21 1.Ø.1200 CP 157+004 6.30 0.60 0.71 1.20 1 32.00 3.42 Oke
22 1.Ø.1200 CP 156+646 4.57 0.60 0.52 1.20 1 31.00 3.42 Oke
23 1.Ø.1200 CP 156+325 13.93 0.60 1.58 1.20 1 22.00 3.42 Oke
24 1.Ø.1200 CP 155+883 12.40 0.60 1.40 1.20 1 58.00 3.42 Oke
25 1.Ø.1200 CP 155+394 26.83 0.60 3.04 1.20 1 20.00 3.42 Oke
26 1.Ø.1200 CP 155+239 18.54 0.60 2.10 1.20 1 19.00 3.42 Oke
27 1.Ø.1200 CP 155+042 21.60 0.60 2.45 1.20 1 19.00 3.42 Oke
28 1.Ø.1200 CP 154+850 23.73 0.60 2.69 1.20 1 19.00 3.42 Oke
29 J-A.3 154+600 Jembatan S. Joloi
30 1.Ø.1800 CP 154+461 100.90 0.60 11.42 1.80 1 41.00 13.23 Oke
31 1.Ø.1800 CP 154+500 102.35 0.60 11.59 1.80 1 35.00 13.23 Oke
32 1.Ø.1200 CP 154+277 2.95 0.60 0.33 1.20 1 54.00 3.42 Oke
33 1.Ø.1200 CP 154+050 1.19 0.60 0.13 1.20 1 73.00 3.42 Oke
34 1.Ø.1800 CP 152+768 38.94 0.60 4.41 1.80 1 19.00 13.23 Oke
35 2.Ø.1800 CP 151+766 152.38 0.60 17.25 1.80 2 36.00 26.46 Oke
36 2.Ø.1800 CP 151+162 183.89 0.60 20.82 1.80 2 42.00 26.46 Oke

Laporan Drainase Jalan 43


Luas Daerah Koef.
Nama dan Lokasi Crossing Drain Dimensi Pipa
Aliran Pengaliran Debit Banjir
Debit rencana Cek
No Rencana KETERANGAN
Stationing Cell Panjang Qd (m3/dt) Qc > Qd ?
Nomenclature ( ha ) C (Qd) (m3/dt) D (m)
(STA) (jumlah) (m)

37 1.Ø.1200 CP 150+642 25.77 0.60 2.92 1.20 1 41.00 3.42 Oke


38 2.Ø.2400 CP 149+556 550.98 0.60 62.38 2.40 2 33.00 69.04 Oke
39 1.Ø.1800 CP 147+921 111.49 0.60 12.62 1.80 1 40.00 13.23 Oke
40 2.Ø.2400 CP 147+374 290.97 0.60 32.95 2.40 2 19.00 69.04 Oke
41 1.Ø.1200 CP 146+723 29.51 0.60 3.34 1.20 1 19.00 3.42 Oke
42 1.Ø.1200 CP 146+030 15.41 0.60 1.74 1.20 1 27.00 3.42 Oke
43 3.Ø.2400 CP 145+188 769.04 0.60 87.07 2.40 3 25.00 103.55 Oke
44 1.Ø.1800 CP 144+073 38.94 0.60 4.41 1.80 1 52.00 13.23 Oke
45 1.Ø.1200 CP 143+394 11.68 0.60 1.32 1.20 1 78.00 3.42 Oke
46 1.Ø.1200 CP 143+181 15.41 0.60 1.74 1.20 1 84.00 3.42 Oke
47 1.Ø.1200 CP 142+786 6.30 0.60 0.71 1.20 1 19.00 3.42 Oke
48 1.Ø.1200 CP 142+170 14.86 0.60 1.68 1.20 1 20.00 3.42 Oke
49 2.Ø.1800 CP 141+745 192.71 0.60 21.82 1.80 2 17.00 26.46 Oke
50 1.Ø.2400 CP 141+089 244.43 0.60 27.68 2.40 1 68.00 34.52 Oke
51 1.Ø.2400 CP 140+923 272.36 0.60 30.84 2.40 1 33.00 34.52 Oke
52 3.Ø.2400 CP 140+281 731.83 0.60 82.86 2.40 3 26.00 103.55 Oke
53 2.Ø.2400 CP 139+795 40.44 0.60 4.58 2.40 2 47.00 69.04 Oke
54 2.Ø.2400 CP 138+957 347.39 0.60 39.33 2.40 2 36.00 69.04 Oke
55 2.Ø.1800 CP 137+980 137.09 0.60 15.52 1.80 2 24.00 26.46 Oke
56 2.Ø.1800 CP 137+465 160.80 0.60 18.21 1.80 2 24.00 26.46 Oke
57 J-A.4 136+380 Jembatan S. Keramat-1
58 J-A.5 135+984 Jembatan S. Keramat-2
59 2.Ø.1800 CP 134+711 193.79 0.60 21.94 1.80 2 48.00 26.46 Oke
60 2.Ø.1800 CP 134+311 54.94 0.60 6.22 1.80 2 19.00 26.46 Oke
61 1.Ø.1800 CP 133+476 42.95 0.60 4.86 1.80 1 33.00 13.23 Oke
62 1.Ø.1800 CP 133+354 5.05 0.60 0.57 1.80 1 23.00 13.23 Oke
63 1.Ø.1800 CP 133+220 33.76 0.60 3.82 1.80 1 27.00 13.23 Oke
64 1.Ø.1800 CP 132+850 2.68 0.60 0.30 1.80 1 55.00 13.23 Oke

Laporan Drainase Jalan 44


Luas Daerah Koef.
Nama dan Lokasi Crossing Drain Dimensi Pipa
Aliran Pengaliran Debit Banjir
Debit rencana Cek
No Rencana KETERANGAN
Stationing Cell Panjang Qd (m3/dt) Qc > Qd ?
Nomenclature ( ha ) C (Qd) (m3/dt) D (m)
(STA) (jumlah) (m)

65 1.Ø.1800 CP 132+743 65.72 0.60 7.44 1.80 1 43.00 13.23 Oke


66 1.Ø.1800 CP 132+300 25.87 0.60 2.93 1.80 1 62.00 13.23 Oke
67 1.Ø.1800 CP 131+719 31.06 0.60 3.52 1.80 1 24.00 13.23 Oke
68 J-A.6 127+320 Jembatan S. Merah
69 1.Ø.1800 CP 126+893 76.19 0.60 8.63 1.80 1 42.00 13.23 Oke
70 1.Ø.1200 CP 126+617 18.99 0.60 2.15 1.20 1 48.00 3.42 Oke
71 1.Ø.1200 CP 125+286 11.57 0.60 1.31 1.20 1 51.00 3.42 Oke
72 J-A.7 124+900 Jembatan S. Baboi
73 2.Ø.1800 CP 124+000 123.16 0.60 13.94 1.80 2 72.00 26.46 Oke
74 2.Ø.1800 CP 123+550 189.45 0.60 21.45 1.80 2 53.00 26.46 Oke
75 1.Ø.1800 CP 124+924 59.65 0.60 6.75 1.80 1 42.00 13.23 Oke
76 1.Ø.1800 CP 122+940 58.02 0.60 6.57 1.80 1 73.00 13.23 Oke
77 1.Ø.1200 CP 122+527 9.06 0.60 1.03 1.20 1 59.00 3.42 Oke
78 1.Ø.1200 CP 122+045 3.22 0.60 0.36 1.20 1 58.00 3.42 Oke
79 1.Ø.1200 CP 120+200 2.87 0.60 0.32 1.20 1 17.00 3.42 Oke
80 1.Ø.1200 CP 118+948 9.20 0.60 1.04 1.20 1 67.00 3.42 Oke
81 1.Ø.1200 CP 118+529 9.70 0.60 1.10 1.20 1 62.00 3.42 Oke
82 1.Ø.1200 CP 117+185 10.32 0.60 1.17 1.20 1 91.00 3.42 Oke
83 J-A.8 116+142 Jembatan S. Sabunut
84 1.Ø.1800 CP 115+076 62.52 0.60 7.08 1.80 1 22.00 13.23 Oke
85 1.Ø.1200 CP 114+370 28.09 0.60 3.18 1.20 1 66.00 3.42 Oke
86 1.Ø.1200 CP 113+902 23.87 0.60 2.70 1.20 1 19.00 3.42 Oke
87 1.Ø.1200 CP 113+459 24.15 0.60 2.73 1.20 1 17.00 3.42 Oke
88 1.Ø.2400 CP 113+004 292.51 0.60 33.12 2.40 1 42.00 34.52 Oke
89 1.Ø.1200 CP 112+592 3.79 0.60 0.43 1.20 1 19.00 3.42 Oke

Laporan Drainase Jalan 45


Luas Daerah Koef.
Nama dan Lokasi Crossing Drain Dimensi Pipa
Aliran Pengaliran Debit Banjir
Debit rencana Cek
No Rencana KETERANGAN
Stationing Cell Panjang Qd (m3/dt) Qc > Qd ?
Nomenclature ( ha ) C (Qd) (m3/dt) D (m)
(STA) (jumlah) (m)

90 1.Ø.1800 CP 112+384 45.61 0.60 5.16 1.80 1 62.00 13.23 Oke


91 1.Ø.1200 CP 111+025 14.45 0.60 1.64 1.20 1 26.00 3.42 Oke
92 1.Ø.1200 CP 110+758 6.47 0.60 0.73 1.20 1 24.00 3.42 Oke
93 J-A.9 110+574 Jembatan Sungai Barito

B SEGMEN B.4
1 1.Ø.1200 CP 109+833 6.90 0.60 0.78 1.20 1 51.00 3.42 Oke
2 1.Ø.1200 CP 109+521 6.65 0.60 0.75 1.20 1 25.00 3.42 Oke
3 J-B.1 109+219 Jembatan Sungai Tuan
4 1.Ø.1200 CP 109+095 1.96 0.60 0.22 1.20 1 15.00 3.42 Oke
5 1.Ø.1200 CP 108+925 5.12 0.60 0.58 1.20 1 48.00 3.42 Oke
6 1.Ø.1200 CP 108+429 1.84 0.60 0.21 1.20 1 32.00 3.42 Oke
7 1.Ø.1200 CP 108+210 1.10 0.60 0.12 1.20 1 41.00 3.42 Oke
8 1.Ø.1800 CP 108+028 80.07 0.60 9.07 1.80 1 26.00 13.23 Oke
9 1.Ø.1200 CP 107+774 4.39 0.60 0.50 1.20 1 28.00 3.42 Oke
10 1.Ø.1800 CP 107+658 57.80 0.60 6.54 1.80 1 16.00 13.23 Oke
11 1.Ø.1200 CP 107+391 3.64 0.60 0.41 1.20 1 22.00 3.42 Oke
12 1.Ø.1200 CP 106+999 4.91 0.60 0.56 1.20 1 34.00 3.42 Oke
13 1.Ø.1200 CP 106+768 11.56 0.60 1.31 1.20 1 15.00 3.42 Oke
14 1.Ø.1200 CP 106+158 25.34 0.60 2.87 1.20 1 38.00 3.42 Oke
15 1.Ø.1200 CP 105+957 7.79 0.60 0.88 1.20 1 48.00 3.42 Oke
16 1.Ø.1200 CP 105+786 5.46 0.60 0.62 1.20 1 20.00 3.42 Oke
17 1.Ø.1200 CP 105+535 7.85 0.60 0.89 1.20 1 35.00 3.42 Oke
18 1.Ø.1200 CP 105+202 7.72 0.60 0.87 1.20 1 33.00 3.42 Oke
19 1.Ø.1800 CP 105+075 45.31 0.60 5.13 1.80 1 37.00 13.23 Oke
20 1.Ø.1200 CP 104+615 19.89 0.60 2.25 1.20 1 34.00 3.42 Oke
21 1.Ø.1200 CP 104+230 2.04 0.60 0.23 1.20 1 19.00 3.42 Oke
22 1.Ø.1200 CP 103+450 13.95 0.60 1.58 1.20 1 24.00 3.42 Oke

Laporan Drainase Jalan 46


Luas Daerah Koef.
Nama dan Lokasi Crossing Drain Dimensi Pipa
Aliran Pengaliran Debit Banjir
Debit rencana Cek
No Rencana KETERANGAN
Stationing Cell Panjang Qd (m3/dt) Qc > Qd ?
Nomenclature ( ha ) C (Qd) (m3/dt) D (m)
(STA) (jumlah) (m)

23 1.Ø.1200 CP 103+109 20.05 0.60 2.27 1.20 1 38.00 3.42 Oke


24 1.Ø.1200 CP 102+065 14.45 0.60 1.64 1.20 1 17.00 3.42 Oke
25 1.Ø.1800 CP 101+740 34.07 0.60 3.86 1.80 1 55.00 13.23 Oke
26 1.Ø.1800 CP 101+075 76.66 0.60 8.68 1.80 1 29.00 13.23 Oke
27 1.Ø.1800 CP 100+881 14.68 0.60 1.66 1.80 1 45.00 13.23 Oke
28 1.Ø.1200 CP 100+528 16.78 0.60 1.90 1.20 1 29.00 3.42 Oke
29 1.Ø.1200 CP 99+400 3.74 0.60 0.42 1.20 1 28.00 3.42 Oke
30 J-B.2 99+037 Jembatan Sungai Luhing
31 1.Ø.1200 CP 98+405 25.39 0.60 2.87 1.20 1 29.00 3.42 Oke
32 1.Ø.1200 CP 97+550 3.23 0.60 0.37 1.20 1 29.00 3.42 Oke
33 J-B.3 97+349 Jembatan Sungai Tungkah
34 1.Ø.1200 CP 96+528 15.53 0.60 1.76 1.20 1 34.00 3.42 Oke
35 1.Ø.1800 CP 95+366 43.12 0.60 4.88 1.80 1 21.00 13.23 Oke
36 1.Ø.1800 CP 94+858 16.45 0.60 1.86 1.80 1 21.00 13.23 Oke
37 1.Ø.1800 CP 94+305 35.45 0.60 4.01 1.80 1 24.00 13.23 Oke
38 2.Ø.1800 CP 94+131 203.05 0.60 22.99 1.80 2 39.00 26.46 Oke
39 2.Ø.1800 CP 93+263 61.00 0.60 6.91 1.80 2 39.00 26.46 Oke

SEGMEN B.3
40 1.Ø.1800 CP 92+491 31.19 0.60 3.53 1.80 1 25.00 13.23 Oke
41 1.Ø.1800 CP 92+228 10.63 0.60 1.20 1.80 1 18.00 13.23 Oke
42 J-B.4 91+683 Jembatan Sungai Moroi
43 2.Ø.2400 CP 91+125 263.13 0.60 29.79 2.40 2 19.00 69.04 Oke
44 2.Ø.1800 CP 89+458 131.25 0.60 14.86 1.80 2 22.00 26.46 Oke
45 1.Ø.1200 CP 88+719 5.98 0.60 0.68 1.20 1 46.00 3.42 Oke
46 1.Ø.1800 CP 88+446 45.93 0.60 5.20 1.80 1 74.00 13.23 Oke
47 1.Ø.1200 CP 87+782 16.03 0.60 1.81 1.20 1 44.00 3.42 Oke
48 1.Ø.1200 CP 85+612 167.67 0.60 18.98 1.20 1 31.00 3.42 Tidak Oke

Laporan Drainase Jalan 47


Luas Daerah Koef.
Nama dan Lokasi Crossing Drain Dimensi Pipa
Aliran Pengaliran Debit Banjir
Debit rencana Cek
No Rencana KETERANGAN
Stationing Cell Panjang Qd (m3/dt) Qc > Qd ?
Nomenclature ( ha ) C (Qd) (m3/dt) D (m)
(STA) (jumlah) (m)

49 J-B.5 82+599 Jembatan S Osom Kecil


50 1.Ø.1800 CP 81+449 45.18 0.60 5.12 1.80 1 36.00 13.23 Oke
51 1.Ø.1800 CP 80+711 45.24 0.60 5.12 1.80 1 35.00 13.23 Oke
52 1.Ø.1200 CP 80+356 17.30 0.60 1.96 1.20 1 22.00 3.42 Oke
53 1.Ø.1800 CP 79+791 66.91 0.60 7.58 1.80 1 28.00 13.23 Oke
54 1.Ø.1200 CP 79+206 10.99 0.60 1.24 1.20 1 25.00 3.42 Oke
55 1.Ø.1200 CP 79+040 6.06 0.60 0.69 1.20 1 32.00 3.42 Oke
56 1.Ø.1200 CP 77+837 12.74 0.60 1.44 1.20 1 31.00 3.42 Oke
57 1.Ø.1200 CP 77+600 13.92 0.60 1.58 1.20 1 71.00 3.42 Oke
58 1.Ø.1800 CP 75+750 41.31 0.60 4.68 1.80 1 21.00 13.23 Oke
59 1.Ø.1200 CP 74+689 1.90 0.60 0.22 1.20 1 27.00 3.42 Oke
60 1.Ø.1200 CP 73+987 9.29 0.60 1.05 1.20 1 40.00 3.42 Oke
61 J-B.6 73+476 Jembatan S Osom Besar
62 J-B.7 69+883 Jembatan S Anak Osom
63 J-B.8 68+907 Jembatan S Ponoy Besar
64 1.Ø.1800 CP 68+753 31.70 0.60 3.59 1.80 1 23.00 13.23 Oke
65 1.Ø.1200 CP 68+541 7.65 0.60 0.87 1.20 1 31.00 3.42 Oke
66 1.Ø.1200 CP 68+125 2.81 0.60 0.32 1.20 1 30.00 3.42 Oke
67 1.Ø.1200 CP 67+837 2.78 0.60 0.31 1.20 1 22.00 3.42 Oke
68 1.Ø.1200 CP 67+575 19.66 0.60 2.23 1.20 1 32.00 3.42 Oke
69 1.Ø.1200 CP 67+403 6.83 0.60 0.77 1.20 1 28.00 3.42 Oke
70 1.Ø.1800 CP 67+250 72.17 0.60 8.17 1.80 1 25.00 13.23 Oke
71 J-B.9 67+026 Jembatan S Ponoy Limoy
72 J-B.10 64+917 Jembatan S Ponoy kecil
73 J-B.11 64+288 Jembatan Sungai Blatu
74 1.Ø.1200 CP 64+115 12.85 0.60 1.45 1.20 1 34.00 3.42 Oke
75 1.Ø.1200 CP 63+807 14.22 0.60 1.61 1.20 1 50.00 3.42 Oke
76 1.Ø.1800 CP 63+660 38.40 0.60 4.35 1.80 1 22.00 13.23 Oke

Laporan Drainase Jalan 48


Luas Daerah Koef.
Nama dan Lokasi Crossing Drain Dimensi Pipa
Aliran Pengaliran Debit Banjir
Debit rencana Cek
No Rencana KETERANGAN
Stationing Cell Panjang Qd (m3/dt) Qc > Qd ?
Nomenclature ( ha ) C (Qd) (m3/dt) D (m)
(STA) (jumlah) (m)

SEGMEN B.2
77 1.Ø.1200 CP 62+689 5.98 0.60 0.68 1.20 1 23.00 3.42 Oke
78 1.Ø.1200 CP 62+450 4.36 0.60 0.49 1.20 1 31.00 3.42 Oke
79 1.Ø.1200 CP 62+200 10.53 0.60 1.19 1.20 1 29.00 3.42 Oke
80 1.Ø.1200 CP 60+369 4.23 0.60 0.48 1.20 1 23.00 3.42 Oke
81 J-B.12 60+058 Jembatan Sungai Sujan
82 1.Ø.1200 CP 59+569 2.54 0.60 0.29 1.20 1 35.00 3.42 Oke
83 1.Ø.1200 CP 59+090 25.09 0.60 2.84 1.20 1 19.00 3.42 Oke
84 1.Ø.1800 CP 58+150 53.93 0.60 6.11 1.80 1 26.00 13.23 Oke
85 2.Ø.1800 CP 57+375 218.80 0.60 24.77 1.80 2 22.00 26.46 Oke
86 1.Ø.1200 CP 56+505 16.50 0.60 1.87 1.20 1 23.00 3.42 Oke
87 1.Ø.1200 CP 56+150 14.42 0.60 1.63 1.20 1 17.00 3.42 Oke
88 1.Ø.1200 CP 56+000 3.41 0.60 0.39 1.20 1 21.00 3.42 Oke
89 1.Ø.1200 CP 55+800 15.07 0.60 1.71 1.20 1 23.00 3.42 Oke
90 1.Ø.1200 CP 55+457 7.50 0.60 0.85 1.20 1 44.00 3.42 Oke
91 1.Ø.1200 CP 54+914 13.13 0.60 1.49 1.20 1 53.00 3.42 Oke
92 1.Ø.1200 CP 54+700 24.74 0.60 2.80 1.20 1 37.00 3.42 Oke
93 1.Ø.1200 CP 54+356 21.78 0.60 2.47 1.20 1 59.00 3.42 Oke
94 J-B.13 52+268 Jembatan Sungai Apat
95 1.Ø.1200 CP 53+522 2.37 0.60 0.27 1.20 1 38.00 3.42 Oke
96 1.Ø.1200 CP 52+808 6.69 0.60 0.76 1.20 1 23.00 3.42 Oke
97 1.Ø.1200 CP 52+566 2.63 0.60 0.30 1.20 1 28.00 3.42 Oke
98 1.Ø.1200 CP 52+268 14.68 0.60 1.66 1.20 1 35.00 3.42 Oke
99 J-B.14 51+616 Jembatan Sungai Mohoy
100 1.Ø.1200 CP 51+134 10.36 0.60 1.17 1.20 1 24.00 3.42 Oke
101 1.Ø.1800 CP 50+871 34.39 0.60 3.89 1.80 1 23.00 13.23 Oke
102 1.Ø.1800 CP 50+639 37.46 0.60 4.24 1.80 1 19.00 13.23 Oke
103 1.Ø.1800 CP 50+238 39.23 0.60 4.44 1.80 1 32.00 13.23 Oke
104 2.Ø.2400 CP 50+325 234.00 0.60 26.49 2.40 2 32.00 69.04 Oke

Laporan Drainase Jalan 49


Luas Daerah Koef.
Nama dan Lokasi Crossing Drain Dimensi Pipa
Aliran Pengaliran Debit Banjir
Debit rencana Cek
No Rencana KETERANGAN
Stationing Cell Panjang Qd (m3/dt) Qc > Qd ?
Nomenclature ( ha ) C (Qd) (m3/dt) D (m)
(STA) (jumlah) (m)

105 J-B.16 49+194 Jembatan Sungai Topuh


106 1.Ø.1200 CP 48+932 7.15 0.60 0.81 1.20 1 44.00 3.42 Oke
107 2.Ø.1800 CP 48+489 198.41 0.60 22.46 1.80 2 16.00 26.46 Oke
108 1.Ø.1200 CP 48+196 14.97 0.60 1.69 1.20 1 23.00 3.42 Oke
109 1.Ø.1200 CP 47+633 12.34 0.60 1.40 1.20 1 67.00 3.42 Oke
110 1.Ø.1800 CP 45+464 41.46 0.60 4.69 1.80 1 39.00 13.23 Oke
111 2.Ø.1800 CP 45+258 97.25 0.60 11.01 1.80 2 32.00 26.46 Oke
112 1.Ø.1200 CP 44+527 11.48 0.60 1.30 1.20 1 32.00 3.42 Oke
113 1.Ø.1200 CP 44+050 10.57 0.60 1.20 1.20 1 17.00 3.42 Oke
114 1.Ø.1200 CP 43+750 13.02 0.60 1.47 1.20 1 53.00 3.42 Oke
115 J-B.17 43+032 Jembatan Sungai Babuat
116 1.Ø.1200 CP 42+350 3.20 0.60 0.36 1.20 1 29.00 3.42 Oke
117 1.Ø.1800 CP 42+176 40.85 0.60 4.63 1.80 1 43.00 13.23 Oke
118 1.Ø.1200 CP 42+028 1.37 0.60 0.16 1.20 1 24.00 3.42 Oke
119 1.Ø.1200 CP 41+963 15.15 0.60 1.72 1.20 1 39.00 3.42 Oke
120 1.Ø.1200 CP 41+614 9.42 0.60 1.07 1.20 1 41.00 3.42 Oke
121 1.Ø.1200 CP 41+308 10.52 0.60 1.19 1.20 1 33.00 3.42 Oke
122 1.Ø.1200 CP 40+075 4.61 0.60 0.52 1.20 1 45.00 3.42 Oke
123 1.Ø.1200 CP 39+421 9.71 0.60 1.10 1.20 1 42.00 3.42 Oke
124 J-B.18 38+706 Jembatan S Bumban
125 1.Ø.1200 CP 37+778 4.83 0.60 0.55 1.20 1 31.00 3.42 Oke
126 1.Ø.1200 CP 37+325 5.53 0.60 0.63 1.20 1 48.00 3.42 Oke
127 1.Ø.1200 CP 37+024 4.17 0.60 0.47 1.20 1 91.00 3.42 Oke
128 1.Ø.1200 CP 36+470 11.51 0.60 1.30 1.20 1 23.00 3.42 Oke
129 1.Ø.1800 CP 35+887 33.05 0.60 3.74 1.80 1 59.00 13.23 Oke
130 1.Ø.1800 CP 35+844 55.79 0.60 6.32 1.80 1 22.00 13.23 Oke
131 2.Ø.1800 CP 35+825 22.36 0.60 2.53 1.80 2 34.00 26.46 Oke
132 1.Ø.1800 CP 33+705 55.79 0.60 6.32 1.80 1 15.00 13.23 Oke
133 1.Ø.1800 CP 32+775 59.05 0.60 6.69 1.80 1 15.00 13.23 Oke

Laporan Drainase Jalan 50


Luas Daerah Koef.
Nama dan Lokasi Crossing Drain Dimensi Pipa
Aliran Pengaliran Debit Banjir
Debit rencana Cek
No Rencana KETERANGAN
Stationing Cell Panjang Qd (m3/dt) Qc > Qd ?
Nomenclature ( ha ) C (Qd) (m3/dt) D (m)
(STA) (jumlah) (m)

SEGMEN B.1
134 1.Ø.1800 CP 31+450 95.92 0.60 10.86 1.80 1 15.00 13.23 Oke
135 2.Ø.2400 CP 29+754 583.81 0.60 66.10 2.40 2 15.00 69.04 Oke
136 1.Ø.1800 CP 29+274 29.79 0.60 3.37 1.80 1 15.00 13.23 Oke
137 2.Ø.2400 CP 27+999 584.24 0.60 66.15 2.40 2 15.00 69.04 Oke
138 J-B.19 27+175 Jembatan Sungai Muwun
139 2.Ø.2400 CP 25+341 7.80 0.60 0.88 2.40 2 20.00 69.04 Oke
140 1.Ø.1800 CP 25+100 43.39 0.60 4.91 1.80 1 18.00 13.23 Oke
141 2.Ø.2400 CP 24+777 390.51 0.60 44.22 2.40 2 40.00 69.04 Oke
142 1.Ø.1800 CP 24+220 22.60 0.60 2.56 1.80 1 48.00 13.23 Oke
143 1.Ø.1800 CP 23+964 73.59 0.60 8.33 1.80 1 67.00 13.23 Oke
144 1.Ø.1800 CP 23+520 42.70 0.60 4.83 1.80 1 56.00 13.23 Oke
145 1.Ø.1800 CP 22+881 46.60 0.60 5.28 1.80 1 22.00 13.23 Oke
146 1.Ø.1800 CP 22+025 86.90 0.60 9.84 1.80 1 24.00 13.23 Oke
147 1.Ø.1800 CP 21+792 101.74 0.60 11.52 1.80 1 20.00 13.23 Oke
148 1.Ø.1200 CP 21+451 6.13 0.60 0.69 1.20 1 31.00 3.42 Oke
149 1.Ø.1200 CP 21+267 1.85 0.60 0.21 1.20 1 17.00 3.42 Oke
150 1.Ø.1200 CP 20+468 9.09 0.60 1.03 1.20 1 22.00 3.42 Oke
151 1.Ø.1200 CP 20+400 10.64 0.60 1.20 1.20 1 53.00 3.42 Oke
152 1.Ø.1200 CP 20+199 16.59 0.60 1.88 1.20 1 37.00 3.42 Oke
153 1.Ø.1200 CP 19+957 2.19 0.60 0.25 1.20 1 37.00 3.42 Oke
154 1.Ø.1200 CP 19+750 2.55 0.60 0.29 1.20 1 37.00 3.42 Oke
155 J-B.20 19+481 Jembatan S Mahanyan
156 1.Ø.1200 CP 19+061 3.93 0.60 0.44 1.20 1 38.00 3.42 Oke
157 1.Ø.1200 CP 18+844 21.73 0.60 2.46 1.20 1 46.00 3.42 Oke
158 1.Ø.1200 CP 18+600 12.73 0.60 1.44 1.20 1 28.00 3.42 Oke
159 1.Ø.1200 CP 18+014 0.72 0.60 0.08 1.20 1 37.00 3.42 Oke
160 1.Ø.1200 CP 17+825 0.84 0.60 0.10 1.20 1 26.00 3.42 Oke

Laporan Drainase Jalan 51


Luas Daerah Koef.
Nama dan Lokasi Crossing Drain Dimensi Pipa
Aliran Pengaliran Debit Banjir
Debit rencana Cek
No Rencana KETERANGAN
Stationing Cell Panjang Qd (m3/dt) Qc > Qd ?
Nomenclature ( ha ) C (Qd) (m3/dt) D (m)
(STA) (jumlah) (m)

161 1.Ø.1200 CP 16+118 1.46 0.60 0.17 1.20 1 33.00 3.42 Oke
162 1.Ø.1200 CP 15+550 1.15 0.60 0.13 1.20 1 24.00 3.42 Oke
163 1.Ø.1200 CP 15+015 11.40 0.60 1.29 1.20 1 18.00 3.42 Oke
164 1.Ø.1200 CP 14+250 7.65 0.60 0.87 1.20 1 32.00 3.42 Oke
165 2.Ø.1800 CP 13+687 2.57 0.60 0.29 1.80 2 36.00 26.46 Oke
166 1.Ø.1200 CP 13+176 3.78 0.60 0.43 1.20 1 20.00 3.42 Oke
167 2.Ø.1800 CP 11+875 218.67 0.60 24.76 1.80 2 30.00 26.46 Oke
168 1.Ø.1200 CP 11+705 9.37 0.60 1.06 1.20 1 27.00 3.42 Oke
169 1.Ø.1200 CP 11+522 2.61 0.60 0.30 1.20 1 49.00 3.42 Oke
170 1.Ø.1200 CP 10+271 17.98 0.60 2.04 1.20 1 34.00 3.42 Oke
171 1.Ø.1200 CP 9+778 13.11 0.60 1.48 1.20 1 29.00 3.42 Oke
172 1.Ø.1200 CP 9+533 2.11 0.60 0.24 1.20 1 39.00 3.42 Oke
173 1.Ø.1200 CP 9+157 6.78 0.60 0.77 1.20 1 35.00 3.42 Oke
174 1.Ø.1200 CP 8+918 3.67 0.60 0.42 1.20 1 26.00 3.42 Oke
175 1.Ø.1200 CP 8+689 1.37 0.60 0.16 1.20 1 21.00 3.42 Oke
176 1.Ø.1800 CP 8+612 2.52 0.60 0.29 1.80 1 50.00 13.23 Oke
177 1.Ø.1800 CP 8+319 39.30 0.60 4.45 1.80 1 19.00 13.23 Oke
178 1.Ø.1200 CP 8+097 4.22 0.60 0.48 1.20 1 46.00 3.42 Oke
179 1.Ø.1200 CP 7+139 21.78 0.60 2.47 1.20 1 30.00 3.42 Oke
180 1.Ø.1200 CP 7+034 3.07 0.60 0.35 1.20 1 56.00 3.42 Oke
181 1.Ø.1200 CP 6+771 15.12 0.60 1.71 1.20 1 30.00 3.42 Oke
182 1.Ø.1200 CP 6+625 0.39 0.60 0.04 1.20 1 42.00 3.42 Oke
183 1.Ø.1200 CP 6+542 0.32 0.60 0.04 1.20 1 36.00 3.42 Oke
184 1.Ø.1200 CP 6+448 0.46 0.60 0.05 1.20 1 47.00 3.42 Oke
185 1.Ø.1200 CP 6+425 0.97 0.60 0.11 1.20 1 17.00 3.42 Oke
186 1.Ø.1200 CP 6+325 0.87 0.60 0.10 1.20 1 23.00 3.42 Oke
187 1.Ø.1200 CP 6+275 11.52 0.60 1.30 1.20 1 24.00 3.42 Oke
188 1.Ø.1200 CP 6+140 2.98 0.60 0.34 1.20 1 22.00 3.42 Oke
189 1.Ø.1200 CP 5+672 1.44 0.60 0.16 1.20 1 38.00 3.42 Oke
190 1.Ø.1200 CP 5+505 15.26 0.60 1.73 1.20 1 18.00 3.42 Oke

Laporan Drainase Jalan 52


Luas Daerah Koef.
Nama dan Lokasi Crossing Drain Dimensi Pipa
Aliran Pengaliran Debit Banjir
Debit rencana Cek
No Rencana KETERANGAN
Stationing Cell Panjang Qd (m3/dt) Qc > Qd ?
Nomenclature ( ha ) C (Qd) (m3/dt) D (m)
(STA) (jumlah) (m)

191 1.Ø.1200 CP 4+983 6.68 0.60 0.76 1.20 1 31.00 3.42 Oke
192 1.Ø.1200 CP 4+714 1.24 0.60 0.14 1.20 1 35.00 3.42 Oke
193 1.Ø.1200 CP 4+489 2.39 0.60 0.27 1.20 1 36.00 3.42 Oke
194 1.Ø.1200 CP 4+330 1.75 0.60 0.20 1.20 1 44.00 3.42 Oke
195 1.Ø.1200 CP 4+110 1.53 0.60 0.17 1.20 1 19.00 3.42 Oke
196 1.Ø.1200 CP 3+950 1.93 0.60 0.22 1.20 1 24.00 3.42 Oke
197 1.Ø.1200 CP 3+843 6.65 0.60 0.75 1.20 1 27.00 3.42 Oke
198 1.Ø.1200 CP 3+580 18.58 0.60 2.10 1.20 1 48.00 3.42 Oke
199 1.Ø.1200 CP 3+294 10.61 0.60 1.20 1.20 1 57.00 3.42 Oke
200 1.Ø.1200 CP 2+861 24.00 0.60 2.72 1.20 1 48.00 3.42 Oke
201 1.Ø.1200 CP 2+545 1.97 0.60 0.22 1.20 1 29.00 3.42 Oke
202 1.Ø.1200 CP 2+439 17.92 0.60 2.03 1.20 1 47.00 3.42 Oke
203 1.Ø.1200 CP 2+148 6.90 0.60 0.78 1.20 1 41.00 3.42 Oke
204 1.Ø.1200 CP 1+106 3.08 0.60 0.35 1.20 1 53.00 3.42 Oke
205 1.Ø.1200 CP 0+618 12.36 0.60 1.40 1.20 1 51.00 3.42 Oke
206 1.Ø.1800 CP 0+425 40.86 0.60 4.63 1.80 1 47.00 13.23 Oke
207 1.Ø.1200 CP 0+291 4.48 0.60 0.51 1.20 1 51.00 3.42 Oke

Laporan Drainase Jalan 53


LAMPIRAN 2
Perhitungan Dimensi Struktur Crossing Culvert , volume Pipa dan Pasangan batu Top of Dike (Safety bund)

Lebar headway = 9.0 m hsb


Soil embankment
Lebar bahu, (Lsh ) = 2.0 m h2 var ba
B + 1.5 D
Lebar saluran samping, ( L.sd ) = 1.5 m
h1 D D
Lebar bawah SB, ( Lsb ) = 2.3 m
D D
1.5 D 2
Total lebar jalan tanpa SB = 16.0 m D/4 1
ho
Total lebar jalan termasuk SB = 20.6 m Sand Fill
bb
Total lebar bawah timbunan = Lo m B=n.D+(n-1)D/2

Ls L.sb L.hw L.sb Ls


(var) (var)
0.60 Side Ditch CL 0.60
Shoulder
1 1 1 1
Safety Safety
h3 1
bund
1
4% 4%
1
bund
1

d1 d1
h2 var
h1 1.5%
1.5%

D
z
ho
d3
Lebar bawah bahan porous , B1 = nD+(n-1)D/4 b3 d2
Lebar pemotongan untuk pipa, B2 = B1 + 1.5D Lt (panjang pipa crossing)

Desain Seksi Jalan Struktur Drainase Pasangan Berat Pipa


Bahan
batu,
No porous KETERANGAN
Saluran Headwall Unit
Lo L.hw Lsh Lsb Ls STA. D (m) cell (n) Lef (m) d1 d2 d3 h1 z ho b3 bb ba h2 (m3) Total (Kg)
Samping R/L (m3) (kg/m)

A SEGMEN A
1 161+335 Jembatan Jembatan
2 33.3 9.00 2.00 2.30 1.50 6.35 161+200 1.20 1 23.7 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 6.35 35.32 72.94 128.00 3,033.60
3 86.8 9.00 2.00 2.30 1.50 33.10 160+655 1.20 1 77.2 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 33.10 119.29 72.94 128.00 9,881.60
4 37.8 9.00 2.00 2.30 1.50 8.60 160+566 1.20 1 28.2 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 8.60 42.38 72.94 128.00 3,609.60
5 30.2 9.00 2.00 2.30 1.50 4.80 160+364 1.20 1 20.6 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 4.80 30.45 72.94 128.00 2,636.80
6 30.8 9.00 2.00 2.30 1.50 5.10 160+335 1.20 1 21.2 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.10 31.39 72.94 128.00 2,713.60
7 31.6 9.00 2.00 2.30 1.50 5.50 16+086 1.20 1 22.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.50 32.65 72.94 128.00 2,816.00
8 23.0 9.00 2.00 2.30 1.50 1.20 159+972 1.20 1 23.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.20 34.22 72.94 128.00 2,944.00
9 20.0 9.00 2.00 0.00 1.50 2.00 159+700 1.20 1 20.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.00 29.51 72.94 128.00 2,560.00
10 21.0 9.00 2.00 0.00 1.50 2.50 159+606 1.20 1 21.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.50 31.08 72.94 128.00 2,688.00
11 22.0 9.00 2.00 2.30 1.50 0.70 159+300 1.20 1 22.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.70 32.65 72.94 128.00 2,816.00
12 159+129 Jembatan Jembatan
13 23.0 9.00 2.00 2.30 1.50 1.20 159+524 1.20 1 23.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.20 34.22 72.94 128.00 2,944.00
14 20.0 9.00 2.00 0.00 1.50 2.00 158+763 1.20 1 20.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.00 29.51 72.94 128.00 2,560.00
15 21.0 9.00 2.00 0.00 1.50 2.50 158+621 1.20 1 21.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.50 31.08 72.94 128.00 2,688.00

Laporan Drainase Jalan 54


Desain Seksi Jalan Struktur Drainase Pasangan Berat Pipa
Bahan
batu,
No porous KETERANGAN
Saluran Headwall Unit
Lo L.hw Lsh Lsb Ls STA. D (m) cell (n) Lef (m) d1 d2 d3 h1 z ho b3 bb ba h2 (m3) Total (Kg)
Samping R/L (m3) (kg/m)

16 22.0 9.00 2.00 2.30 1.50 0.70 158+456 1.20 1 22.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.70 32.65 72.94 128.00 2,816.00
17 34.0 9.00 2.00 2.30 1.50 6.70 158+232 1.20 1 24.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 6.70 36.41 72.94 128.00 3,123.20
18 28.0 9.00 2.00 2.30 1.50 3.70 157+935 1.20 1 28.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 3.70 42.07 72.94 128.00 3,584.00
19 77.0 9.00 2.00 2.30 1.50 28.20 157+644 1.80 1 62.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 28.20 214.72 184.96 257.00 16,088.20
20 24.0 9.00 2.00 2.30 1.50 1.70 157+584 1.20 1 24.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.70 35.79 72.94 128.00 3,072.00
21 32.0 9.00 2.00 2.30 1.50 5.70 157+004 1.20 1 22.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.70 33.28 72.94 128.00 2,867.20
22 31.0 9.00 2.00 2.30 1.50 5.20 156+646 1.20 1 21.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.20 31.71 72.94 128.00 2,739.20
23 22.0 9.00 2.00 2.30 1.50 0.70 156+325 1.20 1 22.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.70 32.65 72.94 128.00 2,816.00
24 58.0 9.00 2.00 2.30 1.50 18.70 155+883 1.20 1 48.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 18.70 74.09 72.94 128.00 6,195.20
25 20.0 9.00 2.00 0.00 1.50 2.00 155+394 1.20 1 20.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.00 29.51 72.94 128.00 2,560.00
26 19.0 9.00 2.00 0.00 1.50 1.50 155+239 1.20 1 19.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.50 27.94 72.94 128.00 2,432.00
27 19.0 9.00 2.00 0.00 1.50 1.50 155+042 1.20 1 19.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.50 27.94 72.94 128.00 2,432.00
28 19.0 9.00 2.00 0.00 1.50 1.50 154+850 1.20 1 19.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.50 27.94 72.94 128.00 2,432.00
29 154+600 Jembatan Jembatan
30 41.0 9.00 2.00 2.30 1.50 10.20 154+461 1.80 1 26.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 10.20 87.58 184.96 257.00 6,836.20
31 35.0 9.00 2.00 2.30 1.50 7.20 154+500 1.80 1 20.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 7.20 66.39 184.96 257.00 5,294.20
32 54.0 9.00 2.00 2.30 1.50 16.70 154+277 1.20 1 44.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 16.70 67.81 72.94 128.00 5,683.20
33 73.0 9.00 2.00 2.30 1.50 26.20 154+050 1.20 1 63.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 26.20 97.63 72.94 128.00 8,115.20
34 19.0 9.00 2.00 0.00 1.50 1.50 152+768 1.80 1 19.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 1.50 60.74 184.96 257.00 4,883.00
35 36.0 9.00 2.00 2.30 1.50 7.70 151+766 1.80 2 21.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 7.70 91.74 216.30 257.00 11,102.40
36 42.0 9.00 2.00 2.30 1.50 10.70 151+162 1.80 2 27.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 10.70 119.54 216.30 257.00 14,186.40
37 41.0 9.00 2.00 2.30 1.50 10.20 150+642 1.20 1 31.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 10.20 47.40 72.94 128.00 4,019.20
38 33.0 9.00 2.00 2.30 1.50 6.20 149+556 2.40 2 33.0 0.50 1.10 0.30 2.40 0.50 2.00 9.60 10.20 15.00 6.20 253.69 426.96 347.00 22,902.00
39 40.0 9.00 2.00 2.30 1.50 9.70 147+921 1.80 1 25.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 9.70 84.05 184.96 257.00 6,579.20
40 19.0 9.00 2.00 0.00 1.50 1.50 147+374 2.40 2 19.0 0.50 1.10 0.30 2.40 0.50 2.00 9.60 10.20 15.00 1.50 138.38 426.96 347.00 13,186.00
41 19.0 9.00 2.00 0.00 1.50 1.50 146+723 1.20 1 19.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.50 27.94 72.94 128.00 2,432.00
42 27.0 9.00 2.00 2.30 1.50 3.20 146+030 1.20 1 27.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 3.20 40.50 72.94 128.00 3,456.00
43 25.0 9.00 2.00 2.30 1.50 2.20 145+188 2.40 3 25.0 0.50 1.10 0.30 2.40 0.50 2.00 9.60 13.20 18.00 2.20 232.45 492.51 347.00 26,025.00
44 52.0 9.00 2.00 2.30 1.50 15.70 144+073 1.80 1 37.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 15.70 126.43 184.96 257.00 9,663.20
45 78.0 9.00 2.00 2.30 1.50 28.70 143+394 1.20 1 68.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 28.70 105.48 72.94 128.00 8,755.20
46 84.0 9.00 2.00 2.30 1.50 31.70 143+181 1.20 1 74.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 31.70 114.89 72.94 128.00 9,523.20
47 19.0 9.00 2.00 0.00 1.50 1.50 142+786 1.20 1 19.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.50 27.94 72.94 128.00 2,432.00
48 20.0 9.00 2.00 0.00 1.50 2.00 142+170 1.20 1 20.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.00 29.51 72.94 128.00 2,560.00
49 17.0 9.00 2.00 0.00 1.50 0.50 141+745 1.80 2 17.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 0.50 70.42 216.30 257.00 8,738.00
50 68.0 9.00 2.00 2.30 1.50 23.70 141+089 2.40 1 48.8 0.50 1.10 0.30 2.40 0.50 2.00 9.60 7.20 12.00 23.70 292.57 361.42 347.00 16,933.60

Laporan Drainase Jalan 55


Desain Seksi Jalan Struktur Drainase Pasangan Berat Pipa
Bahan
batu,
No porous KETERANGAN
Saluran Headwall Unit
Lo L.hw Lsh Lsb Ls STA. D (m) cell (n) Lef (m) d1 d2 d3 h1 z ho b3 bb ba h2 (m3) Total (Kg)
Samping R/L (m3) (kg/m)

51 33.0 9.00 2.00 2.30 1.50 6.20 140+923 2.40 1 33.0 0.50 1.10 0.30 2.40 0.50 2.00 9.60 7.20 12.00 6.20 193.37 361.42 347.00 11,451.00
52 26.0 9.00 2.00 2.30 1.50 2.70 140+281 2.40 3 26.0 0.50 1.10 0.30 2.40 0.50 2.00 9.60 13.20 18.00 2.70 242.65 492.51 347.00 27,066.00
53 47.0 9.00 2.00 2.30 1.50 13.20 139+795 2.40 2 27.8 0.50 1.10 0.30 2.40 0.50 2.00 9.60 10.20 15.00 13.20 210.86 426.96 347.00 19,293.20
54 36.0 9.00 2.00 2.30 1.50 7.70 138+957 2.40 2 16.8 0.50 1.10 0.30 2.40 0.50 2.00 9.60 10.20 15.00 7.70 120.26 426.96 347.00 11,659.20
55 24.0 9.00 2.00 2.30 1.50 1.70 137+980 1.80 2 24.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 1.70 102.86 216.30 257.00 12,336.00
56 24.0 9.00 2.00 2.30 1.50 1.70 137+465 1.80 2 24.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 1.70 102.86 216.30 257.00 12,336.00
57 136+380 Jembatan Jembatan
58 135+984 Jembatan Jembatan
59 48.0 9.00 2.00 2.30 1.50 13.70 134+711 1.80 2 33.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 13.70 147.34 216.30 257.00 17,270.40
60 19.0 9.00 2.00 0.00 1.50 1.50 134+311 1.80 2 19.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 1.50 79.69 216.30 257.00 9,766.00
61 33.0 9.00 2.00 2.30 1.50 6.20 133+476 1.80 1 18.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 6.20 59.33 184.96 257.00 4,780.20
62 23.0 9.00 2.00 2.30 1.50 1.20 133+354 1.80 1 23.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 1.20 74.87 184.96 257.00 5,911.00
63 27.0 9.00 2.00 2.30 1.50 3.20 133+220 1.80 1 27.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 3.20 89.00 184.96 257.00 6,939.00
64 55.0 9.00 2.00 2.30 1.50 17.20 132+850 1.80 1 40.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 17.20 137.03 184.96 257.00 10,434.20
65 43.0 9.00 2.00 2.30 1.50 11.20 132+743 1.80 1 28.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 11.20 94.65 184.96 257.00 7,350.20
66 62.0 9.00 2.00 2.30 1.50 20.70 132+300 1.80 1 47.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 20.70 161.75 184.96 257.00 12,233.20
67 24.0 9.00 2.00 2.30 1.50 1.70 131+719 1.80 1 24.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 1.70 78.40 184.96 257.00 6,168.00
68 127+320 Jembatan Jembatan
69 42.0 9.00 2.00 2.30 1.50 10.70 126+893 1.80 1 27.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 10.70 91.12 184.96 257.00 7,093.20
70 48.0 9.00 2.00 2.30 1.50 13.70 126+617 1.20 1 38.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 13.70 58.39 72.94 128.00 4,915.20
71 51.0 9.00 2.00 2.30 1.50 15.20 125+286 1.20 1 41.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 15.20 63.10 72.94 128.00 5,299.20
72 124+900 Jembatan Jembatan
73 72.0 9.00 2.00 2.30 1.50 25.70 124+000 1.80 2 57.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 25.70 258.53 216.30 257.00 29,606.40
74 53.0 9.00 2.00 2.30 1.50 16.20 123+550 1.80 2 38.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 16.20 170.50 216.30 257.00 19,840.40
75 42.0 9.00 2.00 2.30 1.50 10.70 124+924 1.80 1 27.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 10.70 91.12 184.96 257.00 7,093.20
76 73.0 9.00 2.00 2.30 1.50 26.20 122+940 1.80 1 58.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 26.20 200.59 184.96 257.00 15,060.20
77 59.0 9.00 2.00 2.30 1.50 19.20 122+527 1.20 1 49.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 19.20 75.65 72.94 128.00 6,323.20
78 58.0 9.00 2.00 2.30 1.50 18.70 122+045 1.20 1 48.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 18.70 74.09 72.94 128.00 6,195.20
79 17.0 9.00 2.00 0.00 1.50 0.50 120+200 1.20 1 17.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.50 24.80 72.94 128.00 2,176.00
80 67.0 9.00 2.00 2.30 1.50 23.20 118+948 1.20 1 57.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 23.20 88.21 72.94 128.00 7,347.20
81 62.0 9.00 2.00 2.30 1.50 20.70 118+529 1.20 1 52.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 20.70 80.36 72.94 128.00 6,707.20
82 91.0 9.00 2.00 2.30 1.50 35.20 117+185 1.20 1 81.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 35.20 125.88 72.94 128.00 10,419.20
83 116+142 Jembatan Jembatan
84 22.0 9.00 2.00 2.30 1.50 0.70 115+076 1.80 1 22.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 0.70 71.34 184.96 257.00 5,654.00
85 66.0 9.00 2.00 2.30 1.50 22.70 114+370 1.20 1 56.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 22.70 86.64 72.94 128.00 7,219.20

Laporan Drainase Jalan 56


Desain Seksi Jalan Struktur Drainase Pasangan Berat Pipa
Bahan
batu,
No porous KETERANGAN
Saluran Headwall Unit
Lo L.hw Lsh Lsb Ls STA. D (m) cell (n) Lef (m) d1 d2 d3 h1 z ho b3 bb ba h2 (m3) Total (Kg)
Samping R/L (m3) (kg/m)

86 19.0 9.00 2.00 0.00 1.50 1.50 113+902 1.20 1 19.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.50 27.94 72.94 128.00 2,432.00
87 17.0 9.00 2.00 0.00 1.50 0.50 113+459 1.20 1 17.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.50 24.80 72.94 128.00 2,176.00
88 42.0 9.00 2.00 2.30 1.50 10.70 113+004 2.40 1 22.8 0.50 1.10 0.30 2.40 0.50 2.00 9.60 7.20 12.00 10.70 129.34 361.42 347.00 7,911.60
89 19.0 9.00 2.00 0.00 1.50 1.50 112+592 1.20 1 19.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.50 27.94 72.94 128.00 2,432.00
90 62.0 9.00 2.00 2.30 1.50 20.70 112+384 1.80 1 47.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 20.70 161.75 184.96 257.00 12,233.20
91 26.0 9.00 2.00 2.30 1.50 2.70 111+025 1.20 1 16.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.70 23.86 72.94 128.00 2,099.20
92 24.0 9.00 2.00 2.30 1.50 1.70 110+758 1.20 1 24.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.70 35.79 72.94 128.00 3,072.00
93 110+574 Jembatan Jembatan
Segmen A 7,230.12 12,553.89 638,652.00

B SEGMEN B4
1 51.0 9.00 2.00 2.30 1.50 15.20 109+833 1.20 1 41.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 15.20 63.10 72.94 128.00 5,299.20
2 25.0 9.00 2.00 2.30 1.50 2.20 109+521 1.20 1 25.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.20 37.36 72.94 128.00 3,200.00
3 109+219 Jembatan Jembatan
4 15.0 9.00 2.00 0.00 1.50 -0.50 109+095 1.20 1 15.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 -0.50 21.66 72.94 128.00 1,920.00
5 48.0 9.00 2.00 2.30 1.50 13.70 108+925 1.20 1 38.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 13.70 58.39 72.94 128.00 4,915.20
6 32.0 9.00 2.00 2.30 1.50 5.70 108+429 1.20 1 22.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.70 33.28 72.94 128.00 2,867.20
7 41.0 9.00 2.00 2.30 1.50 10.20 108+210 1.20 1 31.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 10.20 47.40 72.94 128.00 4,019.20
8 26.0 9.00 2.00 2.30 1.50 2.70 108+028 1.80 1 26.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 2.70 85.46 184.96 257.00 6,682.00
9 28.0 9.00 2.00 2.30 1.50 3.70 107+774 1.20 1 18.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 3.70 27.00 72.94 128.00 2,355.20
10 16.0 9.00 2.00 0.00 1.50 0.00 107+658 1.80 1 16.0 0.40 0.90 0.30 0.60 0.50 1.00 4.80 5.40 6.60 0.00 50.15 98.53 257.00 4,112.00
11 22.0 9.00 2.00 2.30 1.50 0.70 107+391 1.20 1 22.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.70 32.65 72.94 128.00 2,816.00
12 34.0 9.00 2.00 2.30 1.50 6.70 106+999 1.20 1 24.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 6.70 36.41 72.94 128.00 3,123.20
13 15.0 9.00 2.00 0.00 1.50 -0.50 106+768 1.20 1 15.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 -0.50 21.66 72.94 128.00 1,920.00
14 38.0 9.00 2.00 2.30 1.50 8.70 106+158 1.20 1 28.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 8.70 42.69 72.94 128.00 3,635.20
15 48.0 9.00 2.00 2.30 1.50 13.70 105+957 1.20 1 38.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 13.70 58.39 72.94 128.00 4,915.20
16 20.0 9.00 2.00 0.00 1.50 2.00 105+786 1.20 1 20.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.00 29.51 72.94 128.00 2,560.00
17 35.0 9.00 2.00 2.30 1.50 7.20 105+535 1.20 1 25.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 7.20 37.98 72.94 128.00 3,251.20
18 33.0 9.00 2.00 2.30 1.50 6.20 105+202 1.20 1 23.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 6.20 34.85 72.94 128.00 2,995.20
19 37.0 9.00 2.00 2.30 1.50 8.20 105+075 1.80 1 22.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 8.20 73.46 184.96 257.00 5,808.20
20 34.0 9.00 2.00 2.30 1.50 6.70 104+615 1.20 1 24.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 6.70 36.41 72.94 128.00 3,123.20
21 19.0 9.00 2.00 0.00 1.50 1.50 104+230 1.20 1 19.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.50 27.94 72.94 128.00 2,432.00
22 24.0 9.00 2.00 2.30 1.50 1.70 103+450 1.20 1 24.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.70 35.79 72.94 128.00 3,072.00
23 38.0 9.00 2.00 2.30 1.50 8.70 103+109 1.20 1 28.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 8.70 42.69 72.94 128.00 3,635.20
24 17.0 9.00 2.00 0.00 1.50 0.50 102+065 1.20 1 17.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.50 24.80 72.94 128.00 2,176.00
25 55.0 9.00 2.00 2.30 1.50 17.20 101+740 1.80 1 40.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 17.20 137.03 184.96 257.00 10,434.20

Laporan Drainase Jalan 57


Desain Seksi Jalan Struktur Drainase Pasangan Berat Pipa
Bahan
batu,
No porous KETERANGAN
Saluran Headwall Unit
Lo L.hw Lsh Lsb Ls STA. D (m) cell (n) Lef (m) d1 d2 d3 h1 z ho b3 bb ba h2 (m3) Total (Kg)
Samping R/L (m3) (kg/m)

26 29.0 9.00 2.00 2.30 1.50 4.20 101+075 1.80 1 29.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 4.20 96.06 184.96 257.00 7,453.00
27 45.0 9.00 2.00 2.30 1.50 12.20 100+881 1.80 1 30.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 12.20 101.71 184.96 257.00 7,864.20
28 29.0 9.00 2.00 2.30 1.50 4.20 100+528 1.20 1 19.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 4.20 28.57 72.94 128.00 2,483.20
29 28.0 9.00 2.00 2.30 1.50 3.70 99+400 1.20 1 18.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 3.70 27.00 72.94 128.00 2,355.20
30 99+037 Jembatan Jembatan
31 29.0 9.00 2.00 2.30 1.50 4.20 98+405 1.20 1 19.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 4.20 28.57 72.94 128.00 2,483.20
32 29.0 9.00 2.00 2.30 1.50 4.20 97+550 1.20 1 19.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 4.20 28.57 72.94 128.00 2,483.20
33 97+349 Jembatan Jembatan
34 34.0 9.00 2.00 2.30 1.50 6.70 96+528 1.20 1 24.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 6.70 36.41 72.94 128.00 3,123.20
35 21.0 9.00 2.00 0.00 1.50 2.50 95+366 1.80 1 21.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 2.50 67.81 184.96 257.00 5,397.00
36 21.0 9.00 2.00 0.00 1.50 2.50 94+858 1.80 1 21.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 2.50 67.81 184.96 257.00 5,397.00
37 24.0 9.00 2.00 2.30 1.50 1.70 94+305 1.80 1 24.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 1.70 78.40 184.96 257.00 6,168.00
38 39.0 9.00 2.00 2.30 1.50 9.20 94+131 1.80 2 24.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 9.20 105.64 216.30 257.00 12,644.40
39 39.0 9.00 2.00 2.30 1.50 9.20 93+263 1.80 2 24.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 9.20 105.64 216.30 257.00 12,644.40
Segmen B4 1,868.22 3,834.15 161,762.80

40 25.0 9.00 2.00 2.30 1.50 2.20 92+491 1.80 1 25.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 2.20 81.93 184.96 257.00 6,425.00
41 18.0 9.00 2.00 0.00 1.50 1.00 92+228 1.80 1 18.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 1.00 57.21 184.96 257.00 4,626.00
42 91+683 Jembatan Jembatan
43 19.0 9.00 2.00 0.00 1.50 1.50 91+125 2.40 2 19.0 0.50 1.10 0.30 2.40 0.50 2.00 9.60 10.20 15.00 1.50 138.38 426.96 347.00 13,186.00
44 22.0 9.00 2.00 2.30 1.50 0.70 89+458 1.80 2 22.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 0.70 93.59 216.30 257.00 11,308.00
45 46.0 9.00 2.00 2.30 1.50 12.70 88+719 1.20 1 36.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 12.70 55.25 72.94 128.00 4,659.20
46 74.0 9.00 2.00 2.30 1.50 26.70 88+446 1.80 1 59.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 26.70 204.13 184.96 257.00 15,317.20
47 44.0 9.00 2.00 2.30 1.50 11.70 87+782 1.20 1 34.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 11.70 52.11 72.94 128.00 4,403.20
48 31.0 9.00 2.00 2.30 1.50 5.20 85+612 1.20 1 21.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.20 31.71 72.94 128.00 2,739.20
49 82+599 Jembatan Jembatan
50 36.0 9.00 2.00 2.30 1.50 7.70 81+449 1.80 1 21.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 7.70 69.93 184.96 257.00 5,551.20
51 35.0 9.00 2.00 2.30 1.50 7.20 80+711 1.80 1 20.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 7.20 66.39 184.96 257.00 5,294.20
52 22.0 9.00 2.00 2.30 1.50 0.70 80+356 1.20 1 22.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.70 32.65 72.94 128.00 2,816.00
53 28.0 9.00 2.00 2.30 1.50 3.70 79+791 1.80 1 28.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 3.70 92.53 184.96 257.00 7,196.00
54 25.0 9.00 2.00 2.30 1.50 2.20 79+206 1.20 1 25.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.20 37.36 72.94 128.00 3,200.00
55 32.0 9.00 2.00 2.30 1.50 5.70 79+040 1.20 1 22.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.70 33.28 72.94 128.00 2,867.20
56 31.0 9.00 2.00 2.30 1.50 5.20 77+837 1.20 1 21.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.20 31.71 72.94 128.00 2,739.20
57 71.0 9.00 2.00 2.30 1.50 25.20 77+600 1.20 1 61.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 25.20 94.49 72.94 128.00 7,859.20
58 21.0 9.00 2.00 0.00 1.50 2.50 75+750 1.80 1 21.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 2.50 67.81 184.96 257.00 5,397.00
60 27.0 9.00 2.00 2.30 1.50 3.20 74+689 1.20 1 17.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 3.20 25.43 72.94 128.00 2,227.20

Laporan Drainase Jalan 58


Desain Seksi Jalan Struktur Drainase Pasangan Berat Pipa
Bahan
batu,
No porous KETERANGAN
Saluran Headwall Unit
Lo L.hw Lsh Lsb Ls STA. D (m) cell (n) Lef (m) d1 d2 d3 h1 z ho b3 bb ba h2 (m3) Total (Kg)
Samping R/L (m3) (kg/m)

61 40.0 9.00 2.00 2.30 1.50 9.70 73+987 1.20 1 30.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 9.70 45.83 72.94 128.00 3,891.20
59 73+476 Jembatan Jembatan
62 69+883 Jembatan Jembatan
63 68+907 Jembatan Jembatan
64 23.0 9.00 2.00 2.30 1.50 1.20 68+753 1.80 1 23.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 1.20 74.87 184.96 257.00 5,911.00
65 31.0 9.00 2.00 2.30 1.50 5.20 68+541 1.20 1 21.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.20 31.71 72.94 128.00 2,739.20
66 30.0 9.00 2.00 2.30 1.50 4.70 68+125 1.20 1 20.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 4.70 30.14 72.94 128.00 2,611.20
67 22.0 9.00 2.00 2.30 1.50 0.70 67+837 1.20 1 22.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.70 32.65 72.94 128.00 2,816.00
68 32.0 9.00 2.00 2.30 1.50 5.70 67+575 1.20 1 22.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.70 33.28 72.94 128.00 2,867.20
69 28.0 9.00 2.00 2.30 1.50 3.70 67+403 1.20 1 18.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 3.70 27.00 72.94 128.00 2,355.20
70 25.0 9.00 2.00 2.30 1.50 2.20 67+250 1.80 1 25.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 2.20 81.93 184.96 257.00 6,425.00
71 67+026 Jembatan Jembatan
72 64+917 Jembatan Jembatan
73 64+288 Jembatan Jembatan
74 34.0 9.00 2.00 2.30 1.50 6.70 64+115 1.20 1 24.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 6.70 36.41 72.94 128.00 3,123.20
75 50.0 9.00 2.00 2.30 1.50 14.70 63+807 1.20 1 40.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 14.70 61.53 72.94 128.00 5,171.20
76 22.0 9.00 2.00 2.30 1.50 0.70 63+660 1.80 1 22.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 0.70 71.34 184.96 257.00 5,654.00
Segmen B3 1,792.54 3,732.71 151,375.40

77 23.0 9.00 2.00 2.30 1.50 1.20 62+689 1.20 1 23.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.20 34.22 72.94 128.00 2,944.00
78 31.0 9.00 2.00 2.30 1.50 5.20 62+450 1.20 1 21.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.20 31.71 72.94 128.00 2,739.20
79 29.0 9.00 2.00 2.30 1.50 4.20 62+200 1.20 1 19.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 4.20 28.57 72.94 128.00 2,483.20
80 23.0 9.00 2.00 2.30 1.50 1.20 60+369 1.20 1 23.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.20 34.22 72.94 128.00 2,944.00
81 60+058 Jembatan Jembatan
82 35.0 9.00 2.00 2.30 1.50 7.20 59+569 1.20 1 25.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 7.20 37.98 72.94 128.00 3,251.20
83 19.0 9.00 2.00 0.00 1.50 1.50 59+090 1.20 1 19.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.50 27.94 72.94 128.00 2,432.00
84 26.0 9.00 2.00 2.30 1.50 2.70 58+150 1.80 1 26.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 2.70 85.46 184.96 257.00 6,682.00
85 22.0 9.00 2.00 2.30 1.50 0.70 57+375 1.80 2 22.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 0.70 93.59 216.30 257.00 11,308.00
86 23.0 9.00 2.00 2.30 1.50 1.20 56+505 1.20 1 23.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.20 34.22 72.94 128.00 2,944.00
87 17.0 9.00 2.00 0.00 1.50 0.50 56+150 1.20 1 17.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.50 24.80 72.94 128.00 2,176.00
88 21.0 9.00 2.00 0.00 1.50 2.50 56+000 1.20 1 21.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.50 31.08 72.94 128.00 2,688.00
89 23.0 9.00 2.00 2.30 1.50 1.20 55+800 1.20 1 23.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.20 34.22 72.94 128.00 2,944.00
90 44.0 9.00 2.00 2.30 1.50 11.70 55+457 1.20 1 34.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 11.70 52.11 72.94 128.00 4,403.20

Laporan Drainase Jalan 59


Desain Seksi Jalan Struktur Drainase Pasangan Berat Pipa
Bahan
batu,
No porous KETERANGAN
Saluran Headwall Unit
Lo L.hw Lsh Lsb Ls STA. D (m) cell (n) Lef (m) d1 d2 d3 h1 z ho b3 bb ba h2 (m3) Total (Kg)
Samping R/L (m3) (kg/m)

91 53.0 9.00 2.00 2.30 1.50 16.20 54+914 1.20 1 43.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 16.20 66.24 72.94 128.00 5,555.20
92 37.0 9.00 2.00 2.30 1.50 8.20 54+700 1.20 1 27.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 8.20 41.12 72.94 128.00 3,507.20
93 59.0 9.00 2.00 2.30 1.50 19.20 54+356 1.20 1 49.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 19.20 75.65 72.94 128.00 6,323.20
94 52+268 Jembatan Jembatan
95 38.0 9.00 2.00 2.30 1.50 8.70 53+522 1.20 1 28.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 8.70 42.69 72.94 128.00 3,635.20
96 23.0 9.00 2.00 2.30 1.50 1.20 52+808 1.20 1 23.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.20 34.22 72.94 128.00 2,944.00
97 28.0 9.00 2.00 2.30 1.50 3.70 52+566 1.20 1 18.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 3.70 27.00 72.94 128.00 2,355.20
98 35.0 9.00 2.00 2.30 1.50 7.20 52+268 1.20 1 25.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 7.20 37.98 72.94 128.00 3,251.20
99 51+616 0.00 Jembatan
100 24.0 9.00 2.00 2.30 1.50 1.70 51+134 1.20 1 24.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.70 35.79 72.94 128.00 3,072.00
101 23.0 9.00 2.00 2.30 1.50 1.20 50+871 1.80 1 23.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 1.20 74.87 184.96 257.00 5,911.00
102 19.0 9.00 2.00 0.00 1.50 1.50 50+639 1.80 1 19.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 1.50 60.74 184.96 257.00 4,883.00
103 32.0 9.00 2.00 2.30 1.50 5.70 50+238 1.80 1 17.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 5.70 55.80 184.96 257.00 4,523.20
104 32.0 9.00 2.00 2.30 1.50 5.70 50+325 2.40 2 32.0 0.50 1.10 0.30 2.40 0.50 2.00 9.60 10.20 15.00 5.70 245.46 426.96 347.00 22,208.00
105 49+194 Jembatan Jembatan
106 44.0 9.00 2.00 2.30 1.50 11.70 48+932 1.20 1 34.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 11.70 52.11 72.94 128.00 4,403.20
107 16.0 9.00 2.00 0.00 1.50 0.00 48+489 1.80 2 16.0 0.40 0.90 0.30 0.60 0.50 1.00 4.80 7.65 8.85 0.00 65.79 118.81 257.00 8,224.00
108 23.0 9.00 2.00 2.30 1.50 1.20 48+196 1.20 1 23.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.20 34.22 72.94 128.00 2,944.00
109 67.0 9.00 2.00 2.30 1.50 23.20 47+633 1.20 1 57.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 23.20 88.21 72.94 128.00 7,347.20
110 39.0 9.00 2.00 2.30 1.50 9.20 45+464 1.80 1 24.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 9.20 80.52 184.96 257.00 6,322.20
111 32.0 9.00 2.00 2.30 1.50 5.70 45+258 1.80 2 17.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 5.70 73.20 216.30 257.00 9,046.40
112 32.0 9.00 2.00 2.30 1.50 5.70 44+527 1.20 1 22.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.70 33.28 72.94 128.00 2,867.20
113 17.0 9.00 2.00 0.00 1.50 0.50 44+050 1.20 1 17.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.50 24.80 72.94 128.00 2,176.00
114 53.0 9.00 2.00 2.30 1.50 16.20 43+750 1.20 1 43.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 16.20 66.24 72.94 128.00 5,555.20
115 43+032 Jembatan Jembatan
116 29.0 9.00 2.00 2.30 1.50 4.20 42+350 1.20 1 19.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 4.20 28.57 72.94 128.00 2,483.20
117 43.0 9.00 2.00 2.30 1.50 11.20 42+176 1.80 1 28.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 11.20 94.65 184.96 257.00 7,350.20
118 24.0 9.00 2.00 2.30 1.50 1.70 42+028 1.20 1 24.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.70 35.79 72.94 128.00 3,072.00
119 39.0 9.00 2.00 2.30 1.50 9.20 41+963 1.20 1 29.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 9.20 44.26 72.94 128.00 3,763.20
120 41.0 9.00 2.00 2.30 1.50 10.20 41+614 1.20 1 31.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 10.20 47.40 72.94 128.00 4,019.20
121 33.0 9.00 2.00 2.30 1.50 6.20 41+308 1.20 1 23.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 6.20 34.85 72.94 128.00 2,995.20
122 45.0 9.00 2.00 2.30 1.50 12.20 40+075 1.20 1 35.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 12.20 53.68 72.94 128.00 4,531.20
123 42.0 9.00 2.00 2.30 1.50 10.70 39+421 1.20 1 32.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 10.70 48.97 72.94 128.00 4,147.20
124 38+706 Jembatan Jembatan
125 31.0 9.00 2.00 2.30 1.50 5.20 37+778 1.20 1 21.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.20 31.71 72.94 128.00 2,739.20

Laporan Drainase Jalan 60


Desain Seksi Jalan Struktur Drainase Pasangan Berat Pipa
Bahan
batu,
No porous KETERANGAN
Saluran Headwall Unit
Lo L.hw Lsh Lsb Ls STA. D (m) cell (n) Lef (m) d1 d2 d3 h1 z ho b3 bb ba h2 (m3) Total (Kg)
Samping R/L (m3) (kg/m)

126 48.0 9.00 2.00 2.30 1.50 13.70 37+325 1.20 1 38.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 13.70 58.39 72.94 128.00 4,915.20
127 91.0 9.00 2.00 2.30 1.50 35.20 37+024 1.20 1 81.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 35.20 125.88 72.94 128.00 10,419.20
128 23.0 9.00 2.00 2.30 1.50 1.20 36+470 1.20 1 23.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.20 34.22 72.94 128.00 2,944.00
129 59.0 9.00 2.00 2.30 1.50 19.20 35+887 1.80 1 44.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 19.20 151.15 184.96 257.00 11,462.20
130 22.0 9.00 2.00 2.30 1.50 0.70 35+844 1.80 1 22.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 0.70 71.34 184.96 257.00 5,654.00
131 34.0 9.00 2.00 2.30 1.50 6.70 35+825 1.80 2 19.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 6.70 82.47 216.30 257.00 10,074.40
132 15.0 9.00 2.00 0.00 1.50 -0.50 33+705 1.80 1 15.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 -0.50 46.62 184.96 257.00 3,855.00
133 15.0 9.00 2.00 0.00 1.50 -0.50 32+775 1.80 1 15.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 -0.50 46.62 184.96 257.00 3,855.00
Segmen B2 2,808.10 5,451.08 247,105.80

134 15.0 9.00 2.00 0.00 1.50 -0.50 31+450 1.80 1 15.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 -0.50 46.62 184.96 257.00 3,855.00
135 15.0 9.00 2.00 0.00 1.50 -0.50 29+754 2.40 2 15.0 0.50 1.10 0.30 2.40 0.50 2.00 9.60 10.20 15.00 -0.50 105.43 426.96 347.00 10,410.00
136 15.0 9.00 2.00 0.00 1.50 -0.50 29+274 1.80 1 15.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 -0.50 46.62 184.96 257.00 3,855.00
137 15.0 9.00 2.00 0.00 1.50 -0.50 27+999 2.40 2 15.0 0.50 1.10 0.30 2.40 0.50 2.00 9.60 10.20 15.00 -0.50 105.43 426.96 347.00 10,410.00
138 27+175 Jembatan
139 20.0 9.00 2.00 0.00 1.50 2.00 25+341 2.40 2 20.0 0.50 1.10 0.30 2.40 0.50 2.00 9.60 10.20 15.00 2.00 146.62 426.96 347.00 13,880.00
140 18.0 9.00 2.00 0.00 1.50 1.00 25+100 1.80 1 18.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 1.00 57.21 184.96 257.00 4,626.00
141 40.0 9.00 2.00 2.30 1.50 9.70 24+777 2.40 2 20.8 0.50 1.10 0.30 2.40 0.50 2.00 9.60 10.20 15.00 9.70 153.20 426.96 347.00 14,435.20
142 48.0 9.00 2.00 2.30 1.50 13.70 24+220 1.80 1 33.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 13.70 112.30 184.96 257.00 8,635.20
143 67.0 9.00 2.00 2.30 1.50 23.20 23+964 1.80 1 52.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 23.20 179.41 184.96 257.00 13,518.20
144 56.0 9.00 2.00 2.30 1.50 17.70 23+520 1.80 1 41.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 17.70 140.56 184.96 257.00 10,691.20
145 22.0 9.00 2.00 2.30 1.50 0.70 22+881 1.80 1 22.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 0.70 71.34 184.96 257.00 5,654.00
146 24.0 9.00 2.00 2.30 1.50 1.70 22+025 1.80 1 24.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 1.70 78.40 184.96 257.00 6,168.00
147 20.0 9.00 2.00 0.00 1.50 2.00 21+792 1.80 1 20.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 2.00 64.28 184.96 257.00 5,140.00
148 31.0 9.00 2.00 2.30 1.50 5.20 21+451 1.20 1 21.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.20 31.71 72.94 128.00 2,739.20
149 17.0 9.00 2.00 0.00 1.50 0.50 21+267 1.20 1 17.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.50 24.80 72.94 128.00 2,176.00
150 22.0 9.00 2.00 2.30 1.50 0.70 20+468 1.20 1 22.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.70 32.65 72.94 128.00 2,816.00
151 53.0 9.00 2.00 2.30 1.50 16.20 20+400 1.20 1 43.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 16.20 66.24 72.94 128.00 5,555.20
152 37.0 9.00 2.00 2.30 1.50 8.20 20+199 1.20 1 27.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 8.20 41.12 72.94 128.00 3,507.20
153 37.0 9.00 2.00 2.30 1.50 8.20 19+957 1.20 1 27.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 8.20 41.12 72.94 128.00 3,507.20
154 37.0 9.00 2.00 2.30 1.50 8.20 19+750 1.20 1 27.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 8.20 41.12 72.94 128.00 3,507.20
155 19+481 Jembatan Jembatan
156 38.0 9.00 2.00 2.30 1.50 8.70 19+061 1.20 1 28.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 8.70 42.69 72.94 128.00 3,635.20
157 46.0 9.00 2.00 2.30 1.50 12.70 18+844 1.20 1 36.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 12.70 55.25 72.94 128.00 4,659.20
158 28.0 9.00 2.00 2.30 1.50 3.70 18+600 1.20 1 18.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 3.70 27.00 72.94 128.00 2,355.20
159 37.0 9.00 2.00 2.30 1.50 8.20 18+014 1.20 1 27.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 8.20 41.12 72.94 128.00 3,507.20
160 26.0 9.00 2.00 2.30 1.50 2.70 17+825 1.20 1 16.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.70 23.86 72.94 128.00 2,099.20

Laporan Drainase Jalan 61


Desain Seksi Jalan Struktur Drainase Pasangan Berat Pipa
Bahan
batu,
No porous KETERANGAN
Saluran Headwall Unit
Lo L.hw Lsh Lsb Ls STA. D (m) cell (n) Lef (m) d1 d2 d3 h1 z ho b3 bb ba h2 (m3) Total (Kg)
Samping R/L (m3) (kg/m)

161 33.0 9.00 2.00 2.30 1.50 6.20 16+118 1.20 1 23.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 6.20 34.85 72.94 128.00 2,995.20
162 24.0 9.00 2.00 2.30 1.50 1.70 15+550 1.20 1 24.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.70 35.79 72.94 128.00 3,072.00
163 18.0 9.00 2.00 0.00 1.50 1.00 15+015 1.20 1 18.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.00 26.37 72.94 128.00 2,304.00
164 32.0 9.00 2.00 2.30 1.50 5.70 14+250 1.20 1 22.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.70 33.28 72.94 128.00 2,867.20
165 36.0 9.00 2.00 2.30 1.50 7.70 13+687 1.80 2 21.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 7.70 91.74 216.30 257.00 11,102.40
166 20.0 9.00 2.00 0.00 1.50 2.00 13+176 1.20 1 20.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.00 29.51 72.94 128.00 2,560.00
167 30.0 9.00 2.00 2.30 1.50 4.70 11+875 1.80 2 30.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 7.65 11.25 4.70 130.66 216.30 257.00 15,420.00
168 27.0 9.00 2.00 2.30 1.50 3.20 11+705 1.20 1 17.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 3.20 25.43 72.94 128.00 2,227.20
169 49.0 9.00 2.00 2.30 1.50 14.20 11+522 1.20 1 39.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 14.20 59.96 72.94 128.00 5,043.20
170 34.0 9.00 2.00 2.30 1.50 6.70 10+271 1.20 1 24.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 6.70 36.41 72.94 128.00 3,123.20
171 29.0 9.00 2.00 2.30 1.50 4.20 9+778 1.20 1 19.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 4.20 28.57 72.94 128.00 2,483.20
172 39.0 9.00 2.00 2.30 1.50 9.20 9+533 1.20 1 29.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 9.20 44.26 72.94 128.00 3,763.20
173 35.0 9.00 2.00 2.30 1.50 7.20 9+157 1.20 1 25.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 7.20 37.98 72.94 128.00 3,251.20
174 26.0 9.00 2.00 2.30 1.50 2.70 8+918 1.20 1 16.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.70 23.86 72.94 128.00 2,099.20
175 21.0 9.00 2.00 0.00 1.50 2.50 8+689 1.20 1 21.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 2.50 31.08 72.94 128.00 2,688.00
176 50.0 9.00 2.00 2.30 1.50 14.70 8+612 1.80 1 35.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 14.70 119.37 184.96 257.00 9,149.20
177 19.0 9.00 2.00 0.00 1.50 1.50 8+319 1.80 1 19.0 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 1.50 60.74 184.96 257.00 4,883.00
178 46.0 9.00 2.00 2.30 1.50 12.70 8+097 1.20 1 36.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 12.70 55.25 72.94 128.00 4,659.20
179 30.0 9.00 2.00 2.30 1.50 4.70 7+139 1.20 1 20.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 4.70 30.14 72.94 128.00 2,611.20
180 56.0 9.00 2.00 2.30 1.50 17.70 7+034 1.20 1 46.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 17.70 70.95 72.94 128.00 5,939.20
181 30.0 9.00 2.00 2.30 1.50 4.70 6+771 1.20 1 20.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 4.70 30.14 72.94 128.00 2,611.20
182 42.0 9.00 2.00 2.30 1.50 10.70 6+625 1.20 1 32.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 10.70 48.97 72.94 128.00 4,147.20
183 36.0 9.00 2.00 2.30 1.50 7.70 6+542 1.20 1 26.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 7.70 39.55 72.94 128.00 3,379.20
184 47.0 9.00 2.00 2.30 1.50 13.20 6+448 1.20 1 37.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 13.20 56.82 72.94 128.00 4,787.20
185 17.0 9.00 2.00 0.00 1.50 0.50 6+425 1.20 1 17.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.50 24.80 72.94 128.00 2,176.00
186 23.0 9.00 2.00 2.30 1.50 1.20 6+325 1.20 1 23.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.20 34.22 72.94 128.00 2,944.00
187 24.0 9.00 2.00 2.30 1.50 1.70 6+275 1.20 1 24.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.70 35.79 72.94 128.00 3,072.00
188 22.0 9.00 2.00 2.30 1.50 0.70 6+140 1.20 1 22.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 0.70 32.65 72.94 128.00 2,816.00
189 38.0 9.00 2.00 2.30 1.50 8.70 5+672 1.20 1 28.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 8.70 42.69 72.94 128.00 3,635.20
190 18.0 9.00 2.00 0.00 1.50 1.00 5+505 1.20 1 18.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.00 26.37 72.94 128.00 2,304.00
191 31.0 9.00 2.00 2.30 1.50 5.20 4+983 1.20 1 21.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 5.20 31.71 72.94 128.00 2,739.20
192 35.0 9.00 2.00 2.30 1.50 7.20 4+714 1.20 1 25.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 7.20 37.98 72.94 128.00 3,251.20
193 36.0 9.00 2.00 2.30 1.50 7.70 4+489 1.20 1 26.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 7.70 39.55 72.94 128.00 3,379.20
194 44.0 9.00 2.00 2.30 1.50 11.70 4+330 1.20 1 34.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 11.70 52.11 72.94 128.00 4,403.20
195 19.0 9.00 2.00 0.00 1.50 1.50 4+110 1.20 1 19.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.50 27.94 72.94 128.00 2,432.00

Laporan Drainase Jalan 62


Desain Seksi Jalan Struktur Drainase Pasangan Berat Pipa
Bahan
batu,
No porous KETERANGAN
Saluran Headwall Unit
Lo L.hw Lsh Lsb Ls STA. D (m) cell (n) Lef (m) d1 d2 d3 h1 z ho b3 bb ba h2 (m3) Total (Kg)
Samping R/L (m3) (kg/m)

196 24.0 9.00 2.00 2.30 1.50 1.70 3+950 1.20 1 24.0 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 1.70 35.79 72.94 128.00 3,072.00
197 27.0 9.00 2.00 2.30 1.50 3.20 3+843 1.20 1 17.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 3.20 25.43 72.94 128.00 2,227.20
198 48.0 9.00 2.00 2.30 1.50 13.70 3+580 1.20 1 38.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 13.70 58.39 72.94 128.00 4,915.20
199 57.0 9.00 2.00 2.30 1.50 18.20 3+294 1.20 1 47.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 18.20 72.52 72.94 128.00 6,067.20
200 48.0 9.00 2.00 2.30 1.50 13.70 2+861 1.20 1 38.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 13.70 58.39 72.94 128.00 4,915.20
201 29.0 9.00 2.00 2.30 1.50 4.20 2+545 1.20 1 19.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 4.20 28.57 72.94 128.00 2,483.20
202 47.0 9.00 2.00 2.30 1.50 13.20 2+439 1.20 1 37.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 13.20 56.82 72.94 128.00 4,787.20
203 41.0 9.00 2.00 2.30 1.50 10.20 2+148 1.20 1 31.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 10.20 47.40 72.94 128.00 4,019.20
204 53.0 9.00 2.00 2.30 1.50 16.20 1+106 1.20 1 43.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 16.20 66.24 72.94 128.00 5,555.20
205 51.0 9.00 2.00 2.30 1.50 15.20 0+618 1.20 1 41.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 15.20 63.10 72.94 128.00 5,299.20
206 47.0 9.00 2.00 2.30 1.50 13.20 0+425 1.80 1 32.6 0.40 0.90 0.30 1.80 0.50 1.50 7.20 5.40 9.00 13.20 108.77 184.96 257.00 8,378.20
207 51.0 9.00 2.00 2.30 1.50 15.20 0+291 1.20 1 41.4 0.40 0.60 0.30 1.20 0.50 1.00 4.80 3.60 6.00 15.20 63.10 72.94 128.00 5,299.20
Segmen B1 4,028.06 8,298.41 348,677.80

Laporan Drainase Jalan 63


LAMPIRAN 3
Perhitugan Tegangan Geser dan kebutuhan lapisan penahan erosi.

Asumsi : 1. Setiap saluran memiliki outlet drain setiap 25 m, sehingga hanya melayani luasan 25 x 1/2 lebar jalan ( A = 0.02 ha).
2. Kemiringan saluran mengikuti gradient jalan, dengan batasan, maksimal 10%
3. Untuk setiap Tegangan geser yang terjadi > Teg geser ijin, dipakai cover linning (lapisan porous) dengan tegangan ijin material yang sesuai.
4. Bentuk saluran adalah segitiga, dengan lebar atas 1.50 m.

Tegangan geser dihitung dengan rumus :

Ƭ = 9.81 R S Jenis tanah asli dasar saluran adalah Kohesif Silty Sand
Tegangan Ijin Geser : 0.24 kg/cm2
Dimana : Ƭ = Tegangan geser , N/m2
R = Jari jari Hidrolis
S = Kemiringan Saluran

Luas Kebutuhan
Koef. Debit Tegangan
Nama Saluran Daerah Dimensi Culvert / Jembatan Qc / Qd > 1 Lapisan Penahan
No Runoff Rencana Qd Geser
Aliran Erosi (Cover
(m3/dt) (N/m2)
Nomenclature gradient ha C h b S v Qd (m3/dt) Oke Linning)

1 Ditch / waterway 10.00 0.02 0.60 0.0023 0.29 1.16 0.100 0.07 0.024 Oke ! 1.27 Gravel 25 mm
2 Ditch / waterway 9.00 0.02 0.60 0.0023 0.30 1.20 0.090 0.07 0.026 Oke ! 1.18 Gravel 25 mm
3 Ditch / waterway 8.00 0.02 0.60 0.0023 0.30 1.20 0.080 0.07 0.024 Oke ! 1.05 Gravel 15 mm
4 Ditch / waterway 7.00 0.02 0.60 0.0023 0.30 1.20 0.070 0.06 0.023 Oke ! 0.92 Gravel 15 mm
5 Ditch / waterway 6.00 0.02 0.60 0.0023 0.31 1.24 0.060 0.06 0.024 Oke ! 0.82 Gravel 15 mm
6 Ditch / waterway 5.00 0.02 0.60 0.0023 0.32 1.28 0.050 0.06 0.025 Oke ! 0.70 Gravel 15 mm
7 Ditch / waterway 1.00 0.02 0.60 0.0023 0.38 1.53 0.010 0.04 0.023 Oke ! 0.17 Tidak perlu
8 Ditch / waterway 0.90 0.02 0.60 0.0023 0.39 1.56 0.009 0.04 0.023 Oke ! 0.15 Tidak perlu

Laporan Drainase Jalan 64


LAMPIRAN 4
PERHITUNGAN VOLUME LAPISAN POROUS DAN BANGUNAN TERJUN
Kemiringan saluran maks, tanpa terjunan 10 %
Tinggi Terjunan, z = 1.1 m
Lebar saluran tipe segitiga, b = 1.5 m
Kemiringan dinding saluran: 2 : 1
b V = 3.40 m3

2
1
Side Ditch V = 2.48 m3

Safety bund Cut

CL A

Z1
Fill Z
Z2 B
TERJUNAN , Z = 1.10 M

Gradient
STA Jarak Datar Jarak Miring Dimensi Saluran Jenis dan Volume Lapisan Penahan Erosi Bangunan Terjunan
Jalan
No b t Vol. Galian Volume Pasangan Batu
total z Jumlah
From To (m) (%) (m) Jenis Material
(m) (m) (m3) Gravel 15 mm Gravel 25 mm (m) (n) m3

A SEGMEN A
1 111+348 111+853 505.00 0.00 505.00 1.5 0.00 568.13 - - - - - -
2 111+853 111+903 50.00 0.65 50.00 1.5 0.00 56.25 - - - - - -
3 111+903 112+570 667.00 1.30 667.17 1.5 0.20 950.48 Gravel 15 mm 200.2 - - - -
4 112+570 112+630 60.00 5.90 60.00 1.5 0.20 85.50 Gravel 15 mm 18.0 - - - -
5 112+630 112+971 341.00 10.50 346.81 1.5 0.20 485.93 Gravel 25 mm - 104.0 2.98 3.00 17.64
6 112+971 113+021 50.00 7.10 50.00 1.5 0.20 71.25 Gravel 25 mm - 15.0 - - -
7 113+021 113+174 153.00 3.69 153.32 1.5 0.20 218.03 Gravel 15 mm 46.0 - - - -
8 113+174 113+224 50.00 8.41 50.00 1.5 0.20 71.25 Gravel 25 mm - 15.0 - - -
9 113+224 113+324 100.00 13.12 102.68 1.5 0.20 142.50 Gravel 25 mm - 30.8 5.44 5.00 29.40
10 113+324 113+399 75.00 6.94 75.00 1.5 0.20 106.88 Gravel 15 mm 22.5 - - - -
11 113+399 114+040 641.00 0.76 641.06 1.5 0.00 721.13 - - - - - -
12 114+040 114+117 77.00 6.38 77.00 1.5 0.20 109.73 Gravel 15 mm 23.1 - - - -
13 114+117 114+322 205.00 12.00 209.58 1.5 0.20 292.13 Gravel 25 mm - 62.9 7.15 7.00 41.16
14 114+322 114+372 50.00 6.56 50.00 1.5 0.20 71.25 Gravel 15 mm 15.0 - - - -
15 114+372 114+517 145.00 1.12 145.03 1.5 0.20 206.63 Gravel 15 mm 43.5 - - - -

Laporan Drainase Jalan 65


Gradient
STA Jarak Datar Jarak Miring Dimensi Saluran Jenis dan Volume Lapisan Penahan Erosi Bangunan Terjunan
Jalan
No b t Vol. Galian Volume Pasangan Batu
total z Jumlah
From To (m) (%) (m) Jenis Material
(m) (m) (m3) Gravel 15 mm Gravel 25 mm (m) (n) m3
16 114+517 114+577 60.00 3.81 60.00 1.5 0.20 85.50 Gravel 15 mm 18.0 - - - -
17 114+577 115+027 450.00 6.50 452.91 1.5 0.20 641.25 Gravel 15 mm 135.9 - - - -
18 115+027 115+077 50.00 3.43 50.00 1.5 0.20 71.25 Gravel 15 mm 15.0 - - - -
19 115+077 115+650 573.00 0.36 573.01 1.5 0.00 644.63 - - - - - -
20 115+650 115+740 90.00 6.18 90.00 1.5 0.20 128.25 Gravel 15 mm 27.0 - - - -
21 115+740 116+061 321.00 12.00 328.17 1.5 0.20 457.43 Gravel 25 mm - 98.5 11.20 10.00 58.80
22 116+061 116+141 80.00 6.64 80.00 1.5 0.20 114.00 Gravel 15 mm 24.0 - - - -
23 116+141 116+477 336.00 1.27 336.08 1.5 0.20 478.80 Gravel 15 mm 100.8 - - - -
24 116+477 116+541 64.00 6.64 64.00 1.5 0.20 91.20 Gravel 15 mm 19.2 - - - -
25 116+541 116+748 207.00 12.00 211.62 1.5 0.20 294.98 Gravel 25 mm - 63.5 7.22 7.00 41.16
26 116+748 116+948 200.00 11.24 200.00 1.5 0.20 285.00 Gravel 25 mm - 60.0 4.33 4.00 23.52
27 116+948 117+149 201.00 10.48 204.41 1.5 0.20 286.43 Gravel 25 mm - 61.3 1.68 2.00 11.76
28 117+149 117+214 65.00 5.24 65.00 1.5 0.20 92.63 Gravel 15 mm 19.5 - - - -
29 117+214 117+355 141.00 0.00 141.00 Jembatan
30 117+355 117+427 72.00 6.00 72.00 1.5 0.20 102.60 Gravel 15 mm 21.6 - - - -
31 117+427 117+961 534.00 12.00 545.93 1.5 0.20 760.95 Gravel 25 mm - 163.8 18.64 17.00 99.96
32 117+961 118+021 60.00 8.34 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 - - -
33 118+021 118+503 482.00 4.68 483.61 1.5 0.20 686.85 Gravel 15 mm 145.1 - - - -
34 118+503 118+553 50.00 8.34 50.00 1.5 0.20 71.25 Gravel 25 mm - 15.0 - - -
35 118+553 118+806 253.00 12.00 258.65 1.5 0.20 360.53 Gravel 25 mm - 77.6 8.83 8.00 47.04
36 118+806 118+856 50.00 7.03 50.00 1.5 0.20 71.25 Gravel 25 mm - 15.0 - - -
37 118+856 119+094 238.00 2.06 238.15 1.5 0.20 339.15 Gravel 15 mm 71.4 - - - -
38 119+094 119+154 60.00 7.03 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 - - -
39 119+154 119+603 449.00 12.00 459.03 1.5 0.20 639.83 Gravel 25 mm - 137.7 15.67 14.00 82.32
40 119+603 119+653 50.00 7.87 50.00 1.5 0.20 71.25 Gravel 25 mm - 15.0 - - -
41 119+653 119+869 216.00 3.74 216.46 1.5 0.20 307.80 Gravel 15 mm 64.9 - - - -
42 119+869 119+934 65.00 8.87 65.00 1.5 0.20 92.63 Gravel 25 mm - 19.5 - - -
43 119+934 120+558 624.00 14.00 643.10 1.5 0.20 889.20 Gravel 25 mm - 192.9 43.53 40.00 235.20
44 120+558 120+618 60.00 7.00 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 - - -
45 120+618 120+788 170.00 0.00 170.00 1.5 0.00 191.25 - - - - - -
46 120+788 120+838 50.00 4.69 50.00 1.5 0.20 71.25 Gravel 15 mm 15.0 - - - -
47 120+838 120+890 52.00 9.37 52.70 1.5 0.20 74.10 Gravel 25 mm - 15.8 - - -
48 120+890 121+254 364.00 10.69 364.00 1.5 0.20 518.70 Gravel 25 mm - 109.2 4.35 4.00 23.52
49 121+254 121+395 141.00 12.00 144.15 1.5 0.20 200.93 Gravel 25 mm - 43.2 4.92 4.00 23.52
50 121+395 121+445 50.00 7.63 50.00 1.5 0.20 71.25 Gravel 25 mm - 15.0 - - -

Laporan Drainase Jalan 66


Gradient
STA Jarak Datar Jarak Miring Dimensi Saluran Jenis dan Volume Lapisan Penahan Erosi Bangunan Terjunan
Jalan
No b t Vol. Galian Volume Pasangan Batu
total z Jumlah
From To (m) (%) (m) Jenis Material
(m) (m) (m3) Gravel 15 mm Gravel 25 mm (m) (n) m3
51 121+445 121+528 83.00 3.26 83.13 1.5 0.20 118.28 Gravel 15 mm 24.9 - - - -
52 121+528 121+608 80.00 7.63 80.00 1.5 0.20 114.00 Gravel 25 mm - 24.0 - - -
53 121+608 122+057 449.00 12.00 459.03 1.5 0.20 639.83 Gravel 25 mm - 137.7 15.67 14.00 82.32
54 122+057 122+107 50.00 9.33 50.00 1.5 0.20 71.25 Gravel 25 mm - 15.0 - - -
55 122+107 122+493 386.00 6.66 388.62 1.5 0.20 550.05 Gravel 15 mm 116.6 - - - -
56 122+493 122+553 60.00 3.60 60.00 1.5 0.20 85.50 Gravel 15 mm 18.0 - - - -
57 122+553 122+908 355.00 0.53 355.02 1.5 0.00 399.38 - - - - - -
58 122+908 122+959 51.00 4.77 51.00 1.5 0.20 72.68 Gravel 15 mm 15.3 - - - -
59 122+959 123+459 500.00 9.00 506.23 1.5 0.20 712.50 Gravel 25 mm - 151.9 - - -
60 123+459 123+519 60.00 11.50 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 1.57 1.00 5.88
61 123+519 124+155 636.00 14.00 655.47 1.5 0.20 906.30 Gravel 25 mm - 196.6 44.37 40.00 235.20
62 124+155 124+215 60.00 10.91 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 0.95 1.00 5.88
63 124+215 124+457 242.00 7.82 244.27 1.5 0.20 344.85 Gravel 25 mm - 73.3 - - -
64 124+457 124+517 60.00 10.91 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 0.95 1.00 5.88
65 124+517 125+095 578.00 14.00 595.69 1.5 0.20 823.65 Gravel 25 mm - 178.7 40.32 37.00 217.56
66 125+095 125+179 84.00 7.00 84.00 1.5 0.20 119.70 Gravel 25 mm - 25.2 - - -
67 125+179 125+215 36.00 0.00 36.00 1.5 0.00 40.50 - - - - - -
68 125+215 125+676 461.00 5.14 461.00 1.5 0.20 656.93 Gravel 15 mm 138.3 - - - -
69 125+676 125+807 131.00 10.28 133.14 1.5 0.20 186.68 Gravel 25 mm - 39.9 0.64 1.00 5.88
70 125+807 125+885 78.00 6.68 78.00 1.5 0.20 111.15 Gravel 15 mm 23.4 - - - -
71 125+885 125+987 102.00 3.08 62.15 Jembatan
72 125+987 126+057 70.00 8.54 70.00 1.5 0.20 99.75 Gravel 25 mm - 21.0 - - -
73 126+057 126+508 451.00 14.00 464.81 1.5 0.20 642.68 Gravel 25 mm - 139.4 31.46 29.00 170.52
74 126+508 126+568 60.00 11.35 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 1.41 1.00 5.88
75 126+568 126+768 200.00 8.69 202.32 1.5 0.20 285.00 Gravel 25 mm - 60.7 - - -
76 126+768 126+828 60.00 4.50 60.00 1.5 0.20 85.50 Gravel 15 mm 18.0 - - - -
77 126+828 127+483 655.00 0.31 655.01 1.5 0.00 736.88 - - - - - -
78 127+483 127+563 80.00 3.19 80.00 1.5 0.20 114.00 Gravel 15 mm 24.0 - - - -
79 127+563 128+151 588.00 6.07 591.32 1.5 0.20 837.90 Gravel 15 mm 177.4 - - - -
80 128+151 128+211 60.00 3.04 60.00 1.5 0.20 85.50 Gravel 15 mm 18.0 - - - -
81 128+211 128+421 210.00 0.00 210.00 Jembatan
82 128+421 128+505 84.00 7.00 84.00 1.5 0.20 119.70 Gravel 25 mm - 25.2 - - -
83 128+505 129+083 578.00 14.00 595.69 1.5 0.20 823.65 Gravel 25 mm - 178.7 40.32 37.00 217.56
84 129+083 129+143 60.00 10.89 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 0.93 1.00 5.88
85 129+143 129+463 320.00 7.77 322.97 1.5 0.20 456.00 Gravel 25 mm - 96.9 - - -

Laporan Drainase Jalan 67


Gradient
STA Jarak Datar Jarak Miring Dimensi Saluran Jenis dan Volume Lapisan Penahan Erosi Bangunan Terjunan
Jalan
No b t Vol. Galian Volume Pasangan Batu
total z Jumlah
From To (m) (%) (m) Jenis Material
(m) (m) (m3) Gravel 15 mm Gravel 25 mm (m) (n) m3
86 129+463 129+523 60.00 10.89 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 0.93 1.00 5.88
87 129+523 130+170 647.00 14.00 666.81 1.5 0.20 921.98 Gravel 25 mm - 200.0 45.13 41.00 241.08
88 130+170 130+470 300.00 13.00 300.00 1.5 0.20 427.50 Gravel 25 mm - 90.0 15.70 14.00 82.32
89 130+470 130+867 397.00 12.00 405.87 1.5 0.20 565.73 Gravel 25 mm - 121.8 13.86 13.00 76.44
90 130+867 130+927 60.00 7.05 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 - - -
91 130+927 131+068 141.00 2.09 141.09 1.5 0.20 200.93 Gravel 15 mm 42.3 - - - -
92 131+068 131+128 60.00 7.05 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 - - -
93 131+128 131+648 520.00 12.00 531.62 1.5 0.20 741.00 Gravel 25 mm - 159.5 18.15 16.00 94.08
94 131+648 131+738 90.00 7.05 90.00 1.5 0.20 128.25 Gravel 25 mm - 27.0 - - -
95 131+738 132+101 363.00 2.09 363.24 1.5 0.20 517.28 Gravel 15 mm 109.0 - - - -
96 132+101 132+197 96.00 8.05 96.00 1.5 0.20 136.80 Gravel 25 mm - 28.8 - - -
97 132+197 132+769 572.00 14.00 589.51 1.5 0.20 815.10 Gravel 25 mm - 176.9 39.90 36.00 211.68
98 132+769 132+829 60.00 11.18 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 1.24 1.00 5.88
99 132+829 133+243 414.00 8.36 418.45 1.5 0.20 589.95 Gravel 25 mm - 125.5 - - -
100 133+243 133+303 60.00 11.18 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 1.24 1.00 5.88
101 133+303 133+871 568.00 14.00 585.39 1.5 0.20 809.40 Gravel 25 mm - 175.6 39.62 36.00 211.68
102 133+871 133+975 104.00 8.67 104.00 1.5 0.20 148.20 Gravel 25 mm - 31.2 - - -
103 133+975 134+188 213.00 3.33 213.36 1.5 0.20 303.53 Gravel 15 mm 64.0 - - - -
104 134+188 134+258 70.00 4.01 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
105 134+258 134+508 250.00 4.68 250.84 1.5 0.20 356.25 Gravel 15 mm 75.3 - - - -
106 134+508 134+568 60.00 2.47 60.00 1.5 0.20 85.50 Gravel 15 mm 18.0 - - - -
107 134+568 135+919 1,351.00 0.25 1,351.01 1.5 0.00 1,519.88 - - - - - -
108 135+919 135+999 80.00 5.25 80.00 1.5 0.20 114.00 Gravel 15 mm 24.0 - - - -
109 135+999 136+257 258.00 10.24 262.18 1.5 0.20 367.65 Gravel 25 mm - 78.7 1.08 1.00 5.88
110 136+257 136+317 60.00 9.16 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 - - -
111 136+317 136+696 379.00 8.08 382.80 1.5 0.20 540.08 Gravel 25 mm - 114.8 - - -
112 136+696 137+047 351.00 4.04 351.00 1.5 0.20 500.18 Gravel 15 mm 105.3 - - - -
113 137+047 137+159 112.00 0.00 112.00 Jembatan
114 137+159 137+209 50.00 0.80 50.00 1.5 0.00 56.25 - - - - - -
115 137+209 137+304 95.00 1.59 95.04 1.5 0.20 135.38 Gravel 15 mm 28.5 - - - -
116 137+304 137+364 60.00 0.80 60.00 1.5 0.00 67.50 - - - - - -
117 137+364 137+475 111.00 0.00 111.00 Jembatan
118 137+475 137+547 72.00 6.00 72.00 1.5 0.20 102.60 Gravel 15 mm 21.6 - - - -
119 137+547 137+736 189.00 12.00 193.22 1.5 0.20 269.33 Gravel 25 mm - 58.0 6.60 6.00 35.28
120 137+736 137+941 205.00 11.50 205.00 1.5 0.20 292.13 Gravel 25 mm - 61.5 5.35 5.00 29.40

Laporan Drainase Jalan 68


Gradient
STA Jarak Datar Jarak Miring Dimensi Saluran Jenis dan Volume Lapisan Penahan Erosi Bangunan Terjunan
Jalan
No b t Vol. Galian Volume Pasangan Batu
total z Jumlah
From To (m) (%) (m) Jenis Material
(m) (m) (m3) Gravel 15 mm Gravel 25 mm (m) (n) m3
121 137+941 138+484 543.00 10.99 553.14 1.5 0.20 773.78 Gravel 25 mm - 165.9 9.38 9.00 52.92
122 138+484 138+584 100.00 5.73 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
123 138+584 139+936 1,352.00 0.46 1,352.04 1.5 0.00 1,521.00 - - - - - -
124 139+936 139+996 60.00 1.03 60.00 1.5 0.20 85.50 Gravel 15 mm 18.0 - - - -
125 139+996 141+546 1,550.00 1.60 1,550.60 1.5 0.20 2,208.75 Gravel 15 mm 465.2 - - - -
126 141+546 141+606 60.00 1.37 60.00 1.5 0.20 85.50 Gravel 15 mm 18.0 - - - -
127 141+606 142+586 980.00 1.13 980.19 1.5 0.20 1,396.50 Gravel 15 mm 294.1 - - - -
128 142+586 142+646 60.00 0.67 60.00 1.5 0.00 67.50 - - - - - -
129 142+646 144+332 1,686.00 0.21 1,686.01 1.5 0.00 1,896.75 - - - - - -
130 144+332 144+392 60.00 0.55 60.00 1.5 0.00 67.50 - - - - - -
131 144+392 146+243 1,851.00 0.88 1,851.22 1.5 0.00 2,082.38 - - - - - -
132 146+243 146+303 60.00 0.53 60.00 1.5 0.00 67.50 - - - - - -
133 146+303 149+184 2,881.00 0.17 2,881.01 1.5 0.00 3,241.13 - - - - - -
134 149+184 149+244 60.00 0.68 60.00 1.5 0.00 67.50 - - - - - -
135 149+244 150+171 927.00 1.19 927.20 1.5 0.20 1,320.98 Gravel 15 mm 278.2 - - - -
136 150+171 150+231 60.00 1.76 60.00 1.5 0.20 85.50 Gravel 15 mm 18.0 - - - -
137 150+231 150+984 753.00 2.32 753.62 1.5 0.20 1,073.03 Gravel 15 mm 226.1 - - - -
138 150+984 151+044 60.00 1.17 60.00 1.5 0.20 85.50 Gravel 15 mm 18.0 - - - -
139 151+044 153+255 2,211.00 0.02 2,211.00 1.5 0.00 2,487.38 - - - - - -
140 153+255 153+340 85.00 5.69 85.00 1.5 0.20 121.13 Gravel 15 mm 25.5 - - - -
141 153+340 153+692 352.00 11.35 359.02 1.5 0.20 501.60 Gravel 25 mm - 107.7 8.29 8.00 47.04
142 153+692 153+992 300.00 11.35 300.00 1.5 0.20 427.50 Gravel 25 mm - 90.0 7.07 6.00 35.28
143 153+992 154+227 235.00 11.35 239.69 1.5 0.20 334.88 Gravel 25 mm - 71.9 5.54 5.00 29.40
144 154+227 154+377 150.00 10.61 150.00 1.5 0.20 213.75 Gravel 25 mm - 45.0 1.60 1.00 5.88
145 154+377 154+779 402.00 9.87 408.04 1.5 0.20 572.85 Gravel 25 mm - 122.4 - - -
146 154+779 154+884 105.00 8.31 105.00 1.5 0.20 149.63 Gravel 25 mm - 31.5 - - -
147 154+884 155+934 1,050.00 6.75 1,057.33 1.5 0.20 1,496.25 Gravel 15 mm 317.2 - - - -
148 155+934 156+003 69.00 3.38 69.00 1.5 0.20 98.33 Gravel 15 mm 20.7 - - - -
149 156+003 156+201 198.00 0.00 198.00 Jembatan
150 156+201 156+273 72.00 6.00 72.00 1.5 0.20 102.60 Gravel 15 mm 21.6 - - - -
151 156+273 156+539 266.00 12.00 271.94 1.5 0.20 379.05 Gravel 25 mm - 81.6 9.28 8.00 47.04
152 156+539 156+599 60.00 6.36 60.00 1.5 0.20 85.50 Gravel 15 mm 18.0 - - - -
153 156+599 156+790 191.00 0.72 191.02 1.5 0.00 214.88 - - - - - -
154 156+790 156+870 80.00 5.01 80.00 1.5 0.20 114.00 Gravel 15 mm 24.0 - - - -
155 156+870 157+335 465.00 9.30 471.19 1.5 0.20 662.63 Gravel 25 mm - 141.4 - - -

Laporan Drainase Jalan 69


Gradient
STA Jarak Datar Jarak Miring Dimensi Saluran Jenis dan Volume Lapisan Penahan Erosi Bangunan Terjunan
Jalan
No b t Vol. Galian Volume Pasangan Batu
total z Jumlah
From To (m) (%) (m) Jenis Material
(m) (m) (m3) Gravel 15 mm Gravel 25 mm (m) (n) m3
156 157+335 157+635 300.00 8.61 300.00 1.5 0.20 427.50 Gravel 25 mm - 90.0 - - -
157 157+635 157+803 168.00 7.92 169.62 1.5 0.20 239.40 Gravel 25 mm - 50.9 - - -
158 157+803 157+899 96.00 7.92 96.00 1.5 0.20 136.80 Gravel 25 mm - 28.8 - - -
159 157+899 158+009 110.00 7.92 111.06 1.5 0.20 156.75 Gravel 25 mm - 33.3 - - -
160 158+009 158+184 175.00 7.50 175.00 1.5 0.20 249.38 Gravel 25 mm - 52.5 - - -
161 158+184 158+566 382.00 7.08 384.94 1.5 0.20 544.35 Gravel 25 mm - 115.5 - - -
162 158+566 158+639 73.00 6.02 73.00 1.5 0.20 104.03 Gravel 15 mm 21.9 - - - -
163 158+639 158+966 327.00 4.96 328.23 1.5 0.20 465.98 Gravel 15 mm 98.5 - - - -
164 158+966 159+036 70.00 8.48 70.00 1.5 0.20 99.75 Gravel 25 mm - 21.0 - - -
165 159+036 159+397 361.00 12.00 369.06 1.5 0.20 514.43 Gravel 25 mm - 110.7 12.60 11.00 64.68
166 159+397 159+497 100.00 7.82 100.00 1.5 0.20 142.50 Gravel 25 mm - 30.0 - - -
167 159+497 160+291 794.00 3.64 795.61 1.5 0.20 1,131.45 Gravel 15 mm 238.7 - - - -
168 160+291 160+596 305.00 1.83 305.00 1.5 0.20 434.63 Gravel 15 mm 91.5 - - - -
169 160+596 160+683 87.00 0.01 87.00 Jembatan
170 160+683 160+755 72.00 5.72 72.00 1.5 0.20 102.60 Gravel 15 mm 21.6 - - - -
171 160+755 161+264 509.00 11.43 519.30 1.5 0.20 725.33 Gravel 25 mm - 155.8 12.70 12.00 70.56
172 161+264 161+334 70.00 9.49 70.00 1.5 0.20 99.75 Gravel 25 mm - 21.0 - - -
173 161+334 161+768 434.00 7.55 437.80 1.5 0.20 618.45 Gravel 25 mm - 131.3 - - -
174 161+768 161+828 60.00 9.78 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 - - -
175 161+828 162+445 617.00 12.00 630.78 1.5 0.20 879.23 Gravel 25 mm - 189.2 21.53 20.00 117.60
176 162+445 162+518 73.00 6.00 73.00 1.5 0.20 104.03 Gravel 15 mm 21.9 - - - -
177 162+518 162+631 113.00 0.00 113.00 Jembatan
178 162+631 162+703 72.00 6.00 72.00 1.5 0.20 102.60 Gravel 15 mm 21.6 - - - -
179 162+703 163+108 405.00 12.00 414.05 1.5 0.20 577.13 Gravel 25 mm - 124.2 14.13 13.00 76.44
180 163+108 163+168 60.00 6.61 60.00 1.5 0.20 85.50 Gravel 15 mm 18.0 - - - -
181 163+168 163+518 350.00 1.22 350.08 1.5 0.20 498.75 Gravel 15 mm 105.0 - - - -
182 163+518 163+598 80.00 6.17 80.00 1.5 0.20 114.00 Gravel 15 mm 24.0 - - - -
183 163+598 164+285 687.00 11.12 700.14 1.5 0.20 978.98 Gravel 25 mm - 210.0 13.43 12.00 70.56
184 164+285 164+535 250.00 6.59 250.00 1.5 0.20 356.25 Gravel 15 mm 75.0 - - - -
185 164+535 164+982 447.00 2.06 447.29 1.5 0.20 636.98 Gravel 15 mm 134.2 - - - -
186 164+982 165+031 49.00 1.66 49.00 1.5 0.20 69.83 Gravel 15 mm 14.7 - - - -
187 165+031 165+631 600.00 1.25 600.14 1.5 0.20 855.00 Gravel 15 mm 180.0 - - - -
188 165+631 165+681 50.00 3.65 50.00 1.5 0.20 71.25 Gravel 15 mm 15.0 - - - -
189 165+681 166+349 668.00 6.04 671.73 1.5 0.20 951.90 Gravel 15 mm 201.5 - - - -
190 166+349 166+549 200.00 6.25 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
191 166+549 166+938 389.00 6.46 391.49 1.5 0.20 554.33 Gravel 15 mm 117.4 - - - -
192 166+938 166+998 60.00 9.23 60.00 1.5 0.20 85.50 Gravel 25 mm - 18.0 - - -
193 166+998 167+529 531.00 12.00 542.86 1.5 0.20 756.68 Gravel 25 mm - 162.9 18.53 17.00 99.96
194 167+529 167+614 85.00 6.95 85.00 1.5 0.20 121.13 Gravel 15 mm 25.5 - - - -
195 167+614 167+700 86.00 1.90 86.05 1.5 0.20 122.55 Gravel 15 mm 25.8 - - - -
56,352.0 74,313.8 5,433.0 6,816.9 3,416.3

Laporan Drainase Jalan 70


PERHITUNGAN VOLUME LAPISAN POROUS DAN BANGUNAN TERJUN

Kemiringan saluran maks, tanpa terjunan 10 %


Tinggi Terjunan, z = 1.1 m
Lebar saluran tipe segitiga, b = 1.5 m b
V = 3.40 m3

Slope dinding saluran: 2 : 1


2
1
Side Ditch V = 2.48 m3

Safety bund Cut

CL A

Z1
Fill Z
Z2 B
TERJUNAN , Z = 1.10 M
Average
STA Jarak Datar Jarak Miring Tegangan Geser dan Kebutuhan lapisan Porous Bangunan Terjunan
Gradient
No b t Pasangan Batu
Teg Geser Gravel Dia. 15 Gravel Dia. 25 total z Jumlah
Dari Ke (m) (%) (m)
(m) (m) kg/cm2 mm mm (m) (n) m3

B SEGMENT B.1
1 0+000 0+165 165.00 2.44 165.15 1.5 0.20 235.13 Gravel 15 mm 49.5 - - - -
2 0+165 0+265 100.00 1.83 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
3 0+265 0+531 266.00 1.22 266.06 1.5 0.20 379.05 Gravel 15 mm 79.8 - - - -
4 0+531 0+681 150.00 5.61 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
5 0+681 0+929 248.00 10.00 251.83 1.5 0.20 353.40 Gravel 25 mm - 75.5 - - -
6 0+929 1+029 100.00 6.01 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
7 1+029 1+575 545.90 2.01 546.24 1.5 0.20 777.91 Gravel 15 mm 163.9 - - - -
8 1+575 1+725 150.00 5.79 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
9 1+725 2+134 409.50 9.56 415.26 1.5 0.20 583.54 Gravel 25 mm - 124.6 - - -
10 2+134 2+284 150.00 4.93 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
11 2+284 2+923 638.40 0.31 638.41 1.5 0.00 718.20 - - - - - -
12 2+923 2+973 50.00 0.51 50.00 1.5 0.00 56.25 - - - - - -
13 2+973 3+600 627.20 0.71 627.25 1.5 0.00 705.60 - - - - - -
14 3+600 3+650 50.00 0.51 50.00 1.5 0.00 56.25 - - - - - -
15 3+650 4+168 518.30 0.32 518.31 1.5 0.00 583.09 - - - - - -
16 4+168 4+238 70.00 0.71 70.00 1.5 0.00 78.75 - - - - - -
17 4+238 4+723 484.80 1.11 484.89 1.5 0.20 690.84 Gravel 15 mm 145.5 - - - -
18 4+723 4+823 100.00 1.36 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
19 4+823 5+065 241.90 1.62 242.00 1.5 0.20 344.71 Gravel 15 mm 72.6 - - - -
20 5+065 5+165 100.00 2.71 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -

Laporan Drainase Jalan 71


Average
STA Jarak Datar Jarak Miring Tegangan Geser dan Kebutuhan lapisan Porous Bangunan Terjunan
Gradient
No b t Pasangan Batu
Teg Geser Gravel Dia. 15 Gravel Dia. 25 total z Jumlah
Dari Ke (m) (%) (m)
(m) (m) kg/cm2 mm mm (m) (n) m3
21 5+165 5+285 120.10 3.79 120.36 1.5 0.20 171.14 Gravel 15 mm 36.1 - - - -
22 5+285 5+385 100.00 4.14 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
23 5+385 5+621 235.90 4.49 236.63 1.5 0.20 336.16 Gravel 15 mm 71.0 - - - -
24 5+621 5+721 100.00 3.03 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
25 5+721 6+655 933.90 1.56 934.25 1.5 0.20 1,330.81 Gravel 15 mm 280.3 - - - -
26 6+655 6+755 100.00 1.43 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
27 6+755 7+191 436.00 1.29 436.11 1.5 0.20 621.30 Gravel 15 mm 130.8 - - - -
28 7+191 7+291 100.00 3.01 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
29 7+291 7+740 449.30 4.74 450.84 1.5 0.20 640.25 Gravel 15 mm 135.3 - - - -
30 7+740 7+940 200.00 4.89 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
31 7+940 8+396 456.00 5.05 457.78 1.5 0.20 649.80 Gravel 15 mm 137.3 - - - -
32 8+396 8+496 100.00 3.55 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
33 8+496 8+969 473.00 2.05 473.30 1.5 0.20 674.03 Gravel 15 mm 142.0 - - - -
34 8+969 9+039 70.00 2.86 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
35 9+039 9+365 326.10 3.67 326.77 1.5 0.20 464.69 Gravel 15 mm 98.0 - - - -
36 9+365 9+515 150.00 4.56 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
37 9+515 9+714 198.20 5.46 199.10 1.5 0.20 282.44 Gravel 15 mm 59.7 - - - -
38 9+714 9+784 70.00 3.14 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
39 9+784 10+383 599.80 0.82 599.86 1.5 0.00 674.77 - - - - - -
40 10+383 10+453 70.00 1.35 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
41 10+453 11+231 777.80 1.89 778.22 1.5 0.20 1,108.37 Gravel 15 mm 233.5 - - - -
42 11+231 11+431 200.00 2.83 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
43 11+431 11+868 436.70 3.77 437.65 1.5 0.20 622.30 Gravel 15 mm 131.3 - - - -
44 11+868 11+938 70.00 2.51 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
45 11+938 12+738 799.90 1.25 800.09 1.5 0.20 1,139.86 Gravel 15 mm 240.0 - - - -
46 12+738 12+808 70.00 0.97 70.00 1.5 0.00 78.75 - - - - - -
47 12+808 13+165 357.30 0.70 357.33 1.5 0.00 401.96 - - - - - -
48 13+165 13+235 70.00 0.78 70.00 1.5 0.00 78.75 - - - - - -
49 13+235 14+229 994.10 0.87 994.22 1.5 0.00 1,118.36 - - - - - -
50 14+229 14+299 70.00 0.81 70.00 1.5 0.00 78.75 - - - - - -
51 14+299 15+556 1,256.50 0.75 1,256.61 1.5 0.00 1,413.56 - - - - - -
52 15+556 15+656 100.00 3.56 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
53 15+656 15+893 236.90 6.37 238.37 1.5 0.20 337.58 Gravel 15 mm 71.5 - - - -
54 15+893 15+963 70.00 3.79 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
55 15+963 16+054 91.60 1.21 91.62 1.5 0.20 130.53 Gravel 15 mm 27.5 - - - -
56 16+054 16+124 70.00 4.51 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
57 16+124 16+311 186.40 7.81 188.15 1.5 0.20 265.62 Gravel 25 mm - 56.4 - - -
58 16+311 16+561 250.00 9.72 250.00 1.5 0.20 356.25 Gravel 25 mm - 75.0 - - -
59 16+561 16+625 64.80 11.62 66.16 1.5 0.20 92.34 Gravel 25 mm - 19.8 1.84 1.84 10.80
60 16+625 16+775 150.00 11.58 150.00 1.5 0.20 213.75 Gravel 25 mm - 45.0 4.13 4.13 24.31

Laporan Drainase Jalan 72


Average
STA Jarak Datar Jarak Miring Tegangan Geser dan Kebutuhan lapisan Porous Bangunan Terjunan
Gradient
No b t Pasangan Batu
Teg Geser Gravel Dia. 15 Gravel Dia. 25 total z Jumlah
Dari Ke (m) (%) (m)
(m) (m) kg/cm2 mm mm (m) (n) m3
61 16+775 17+029 253.90 11.54 259.13 1.5 0.20 361.81 Gravel 25 mm - 77.7 6.80 6.80 39.99
62 17+029 17+129 100.00 6.07 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
63 17+129 17+273 144.00 0.60 144.01 1.5 0.00 162.00 - - - - - -
64 17+273 17+373 100.00 6.22 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
65 17+373 17+616 243.00 11.84 248.28 1.5 0.20 346.28 Gravel 25 mm - 74.5 7.80 7.80 45.85
66 17+616 17+866 250.00 8.68 250.00 1.5 0.20 356.25 Gravel 25 mm - 75.0 - - -
67 17+866 18+205 339.00 5.52 340.58 1.5 0.20 483.08 Gravel 15 mm 102.2 - - - -
68 18+205 18+305 100.00 4.00 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
69 18+305 18+490 184.60 2.47 184.77 1.5 0.20 263.05 Gravel 15 mm 55.4 - - - -
70 18+490 18+640 150.00 5.57 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
71 18+640 18+994 354.10 8.67 358.19 1.5 0.20 504.59 Gravel 25 mm - 107.5 - - -
72 18+994 19+094 100.00 4.60 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
73 19+094 19+267 173.00 0.54 173.01 1.5 0.00 194.63 - - - - - -
74 19+267 19+367 100.00 2.79 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
75 19+367 19+623 256.40 5.04 257.40 1.5 0.20 365.37 Gravel 15 mm 77.2 - - - -
76 19+623 19+723 100.00 2.52 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
77 19+723 19+763 40.00 - 40.00 Jembatan
78 19+763 19+863 100.00 5.94 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
79 19+863 20+250 387.10 11.87 395.56 1.5 0.20 551.62 Gravel 25 mm - 118.7 12.66 12.66 74.43
80 20+250 20+450 200.00 6.90 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
81 20+450 20+679 228.30 1.93 228.43 1.5 0.20 325.33 Gravel 15 mm 68.5 - - - -
82 20+679 20+829 150.00 7.22 150.00 1.5 0.20 213.75 Gravel 25 mm - 45.0 - - -
83 20+829 20+883 54.30 12.51 55.62 1.5 0.20 77.38 Gravel 25 mm - 16.7 2.38 2.38 13.97
84 20+883 20+983 100.00 6.59 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
85 20+983 21+302 319.20 0.67 319.22 1.5 0.00 359.10 - - - - - -
86 21+302 21+402 100.00 5.82 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
87 21+402 21+586 183.30 10.98 186.71 1.5 0.20 261.20 Gravel 25 mm - 56.0 3.12 3.12 18.34
88 21+586 21+686 100.00 6.64 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
89 21+686 21+826 140.90 2.31 141.01 1.5 0.20 200.78 Gravel 15 mm 42.3 - - - -
90 21+826 21+896 70.00 3.80 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
91 21+896 22+029 132.80 5.28 133.37 1.5 0.20 189.24 Gravel 15 mm 40.0 - - - -
92 22+029 22+179 150.00 8.55 150.00 1.5 0.20 213.75 Gravel 25 mm - 45.0 - - -
93 22+179 22+612 433.10 11.81 442.46 1.5 0.20 617.17 Gravel 25 mm - 132.7 13.66 13.66 80.30
94 22+612 22+912 300.00 7.13 300.00 1.5 0.20 427.50 Gravel 25 mm - 90.0 - - -
95 22+912 23+256 343.40 2.46 343.72 1.5 0.20 489.35 Gravel 15 mm 103.1 - - - -
96 23+256 23+406 150.00 5.31 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
97 23+406 23+539 133.50 8.16 134.87 1.5 0.20 190.24 Gravel 25 mm - 40.5 - - -
98 23+539 23+689 150.00 4.86 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
99 23+689 24+366 676.90 1.56 677.15 1.5 0.20 964.58 Gravel 15 mm 203.1 - - - -
100 24+366 24+516 150.00 2.51 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -

Laporan Drainase Jalan 73


Average
STA Jarak Datar Jarak Miring Tegangan Geser dan Kebutuhan lapisan Porous Bangunan Terjunan
Gradient
No b t Pasangan Batu
Teg Geser Gravel Dia. 15 Gravel Dia. 25 total z Jumlah
Dari Ke (m) (%) (m)
(m) (m) kg/cm2 mm mm (m) (n) m3
101 24+516 24+900 383.90 3.46 384.60 1.5 0.20 547.06 Gravel 15 mm 115.4 - - - -
102 24+900 25+050 150.00 6.04 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
103 25+050 25+157 106.70 8.61 107.92 1.5 0.20 152.05 Gravel 25 mm - 32.4 - - -
104 25+157 25+257 100.00 5.45 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
105 25+257 25+448 191.70 2.29 191.85 1.5 0.20 273.17 Gravel 15 mm 57.6 - - - -
106 25+448 25+548 100.00 3.78 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
107 25+548 25+685 136.80 5.26 137.38 1.5 0.20 194.94 Gravel 15 mm 41.2 - - - -
108 25+685 25+835 150.00 6.02 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
109 25+835 26+010 174.40 6.78 175.63 1.5 0.20 248.52 Gravel 15 mm 52.7 - - - -
110 26+010 26+110 100.00 4.93 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
111 26+110 26+213 103.50 3.08 103.65 1.5 0.20 147.49 Gravel 15 mm 31.1 - - - -
112 26+213 26+283 70.00 5.82 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
113 26+283 26+364 80.70 8.55 81.61 1.5 0.20 115.00 Gravel 25 mm - 24.5 - - -
114 26+364 26+514 150.00 6.24 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
115 26+514 26+699 184.90 3.93 185.33 1.5 0.20 263.48 Gravel 15 mm 55.6 - - - -
116 26+699 26+849 150.00 5.72 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
117 26+849 27+037 188.40 7.51 190.03 1.5 0.20 268.47 Gravel 25 mm - 57.0 - - -
118 27+037 27+187 150.00 5.18 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
119 27+187 27+775 587.90 2.85 588.63 1.5 0.20 837.76 Gravel 15 mm 176.6 - - - -
120 27+775 27+925 150.00 5.12 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
121 27+925 28+014 88.90 7.39 89.64 1.5 0.20 126.68 Gravel 25 mm - 26.9 - - -
122 28+014 28+084 70.00 5.73 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
123 28+084 28+157 73.50 4.07 73.69 1.5 0.20 104.74 Gravel 15 mm 22.1 - - - -
124 28+157 28+227 70.00 7.98 70.00 1.5 0.20 99.75 Gravel 25 mm - 21.0 - - -
125 28+227 28+321 93.70 11.90 95.76 1.5 0.20 133.52 Gravel 25 mm - 28.7 3.11 3.11 18.28
126 28+321 28+421 100.00 5.95 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
127 28+421 28+451 30.00 - 30.00 Jembatan
128 28+451 28+551 100.00 5.88 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
129 28+551 28+705 153.70 11.76 157.00 1.5 0.20 219.02 Gravel 25 mm - 47.1 4.73 4.73 27.82
130 28+705 28+905 200.00 7.12 200.00 1.5 0.20 285.00 Gravel 25 mm - 60.0 - - -
131 28+905 29+270 365.00 2.47 365.34 1.5 0.20 520.13 Gravel 15 mm 109.6 - - - -
132 29+270 29+420 150.00 4.38 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
133 29+420 29+682 262.30 6.29 263.89 1.5 0.20 373.78 Gravel 15 mm 79.2 - - - -
134 29+682 29+982 300.00 9.04 300.00 1.5 0.20 427.50 Gravel 25 mm - 90.0 - - -
135 29+982 30+073 90.90 11.80 92.86 1.5 0.20 129.53 Gravel 25 mm - 27.9 2.85 2.85 16.76
136 30+073 30+273 200.00 11.09 200.00 1.5 0.20 285.00 Gravel 25 mm - 60.0 3.79 3.79 22.30
137 30+273 30+765 492.00 10.38 500.18 1.5 0.20 701.10 Gravel 25 mm - 150.1 3.23 3.23 18.98
138 30+765 30+835 70.00 7.76 70.00 1.5 0.20 99.75 Gravel 25 mm - 21.0 - - -
139 30+835 30+975 140.00 5.15 140.57 1.5 0.20 199.50 Gravel 15 mm 42.2 - - - -
140 30+975 31+075 100.00 8.47 100.00 1.5 0.20 142.50 Gravel 25 mm - 30.0 - - -

Jumlah Segmen B1 31,075.00 42,379.79 5,574.72 1,952.17 412.14

Laporan Drainase Jalan 74


Average
STA Jarak Datar Jarak Miring Tegangan Geser dan Kebutuhan lapisan Porous Bangunan Terjunan
Gradient
No b t Pasangan Batu
Teg Geser Gravel Dia. 15 Gravel Dia. 25 total z Jumlah
Dari Ke (m) (%) (m)
(m) (m) kg/cm2 mm mm (m) (n) m3
141 31+075 31+577 502.10 11.79 512.91 1.5 0.20 715.49 Gravel 25 mm - 153.9 15.64 15.64 91.96
142 31+577 31+727 150.00 7.31 150.00 1.5 0.20 213.75 Gravel 25 mm - 45.0 - - -
143 31+727 32+292 565.20 2.84 565.90 1.5 0.20 805.41 Gravel 15 mm 169.8 - - - -
144 32+292 32+332 40.00 2.44 40.00 1.5 0.20 57.00 Gravel 15 mm 12.0 - - - -
145 32+332 34+251 1,918.60 2.03 1,919.80 1.5 0.20 2,734.01 Gravel 15 mm 575.9 - - - -
146 34+251 34+451 200.00 6.25 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
147 34+451 35+099 648.00 10.48 659.00 1.5 0.20 923.40 Gravel 25 mm - 197.7 5.45 5.45 32.05
148 35+099 35+399 300.00 5.47 300.00 1.5 0.20 427.50 Gravel 15 mm 90.0 - - - -
149 35+399 35+875 476.10 0.45 476.11 1.5 0.00 535.61 - - - - - -
150 35+875 36+025 150.00 3.72 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
151 36+025 36+726 701.10 6.99 706.34 1.5 0.20 999.07 Gravel 15 mm 211.9 - - - -
152 36+726 36+826 100.00 4.49 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
153 36+826 37+030 204.10 1.99 204.22 1.5 0.20 290.84 Gravel 15 mm 61.3 - - - -
154 37+030 37+130 100.00 6.89 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
155 37+130 37+482 351.40 11.79 358.98 1.5 0.20 500.75 Gravel 25 mm - 107.7 10.99 10.99 64.61
156 37+482 37+582 100.00 7.97 100.00 1.5 0.20 142.50 Gravel 25 mm - 30.0 - - -
157 37+582 37+725 143.40 4.15 143.78 1.5 0.20 204.35 Gravel 15 mm 43.1 - - - -
158 37+725 37+825 100.00 7.95 100.00 1.5 0.20 142.50 Gravel 25 mm - 30.0 - - -
159 37+825 38+379 553.60 11.74 565.43 1.5 0.20 788.88 Gravel 25 mm - 169.6 16.83 16.83 98.95
160 38+379 38+579 200.00 6.93 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
161 38+579 39+281 702.80 2.11 703.28 1.5 0.20 1,001.49 Gravel 15 mm 211.0 - - - -
162 39+281 39+351 70.00 1.05 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
163 39+351 39+396 45.00 - 45.00 Jembatan
164 39+396 39+496 100.00 5.20 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
165 39+496 39+581 84.70 10.40 86.12 1.5 0.20 120.70 Gravel 25 mm - 25.8 0.60 0.60 3.50
166 39+581 39+681 100.00 5.74 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
167 39+681 40+714 1,033.10 1.08 1,033.28 1.5 0.20 1,472.17 Gravel 15 mm 310.0 - - - -
168 40+714 40+914 200.00 6.50 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
169 40+914 41+351 437.20 11.91 446.82 1.5 0.20 623.01 Gravel 25 mm - 134.0 14.56 14.56 85.64
170 41+351 41+551 200.00 6.10 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
171 41+551 43+096 1,544.20 0.30 1,544.22 1.5 0.00 1,737.23 - - - - - -
172 43+096 43+296 200.00 6.07 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
173 43+296 43+573 277.80 11.84 283.84 1.5 0.20 395.87 Gravel 25 mm - 85.2 8.93 8.93 52.51
174 43+573 43+673 100.00 5.92 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
175 43+673 43+713 40.00 - 40.00 Jembatan
176 43+713 43+813 100.00 5.97 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
177 43+813 44+372 558.50 11.93 570.84 1.5 0.20 795.86 Gravel 25 mm - 171.3 18.85 18.85 110.83
178 44+372 44+672 300.00 6.42 300.00 1.5 0.20 427.50 Gravel 15 mm 90.0 - - - -
179 44+672 45+046 374.00 0.90 374.05 1.5 0.00 420.75 - - - - - -
180 45+046 45+346 300.00 5.31 300.00 1.5 0.20 427.50 Gravel 15 mm 90.0 - - - -

Laporan Drainase Jalan 75


Average
STA Jarak Datar Jarak Miring Tegangan Geser dan Kebutuhan lapisan Porous Bangunan Terjunan
Gradient
No b t Pasangan Batu
Teg Geser Gravel Dia. 15 Gravel Dia. 25 total z Jumlah
Dari Ke (m) (%) (m)
(m) (m) kg/cm2 mm mm (m) (n) m3
181 45+346 45+954 608.00 9.72 616.86 1.5 0.20 866.40 Gravel 25 mm - 185.1 - - -
182 45+954 46+354 400.00 5.64 400.00 1.5 0.20 570.00 Gravel 15 mm 120.0 - - - -
183 46+354 47+049 695.20 1.57 695.46 1.5 0.20 990.66 Gravel 15 mm 208.6 - - - -
184 47+049 47+299 250.00 6.64 250.00 1.5 0.20 356.25 Gravel 15 mm 75.0 - - - -
185 47+299 47+550 250.90 11.71 256.23 1.5 0.20 357.53 Gravel 25 mm - 76.9 7.49 7.49 44.02
186 47+550 47+650 100.00 8.42 100.00 1.5 0.20 142.50 Gravel 25 mm - 30.0 - - -
187 47+650 47+746 95.80 5.12 96.18 1.5 0.20 136.52 Gravel 15 mm 28.9 - - - -
188 47+746 47+816 70.00 8.41 70.00 1.5 0.20 99.75 Gravel 25 mm - 21.0 - - -
189 47+816 48+373 557.40 11.70 569.23 1.5 0.20 794.29 Gravel 25 mm - 170.8 16.56 16.56 97.35
190 48+373 48+523 150.00 8.09 150.00 1.5 0.20 213.75 Gravel 25 mm - 45.0 - - -
191 48+523 49+055 531.70 4.47 533.32 1.5 0.20 757.67 Gravel 15 mm 160.0 - - - -
192 49+055 49+205 150.00 4.61 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
193 49+205 49+375 170.10 4.75 170.68 1.5 0.20 242.39 Gravel 15 mm 51.2 - - - -
194 49+375 49+525 150.00 3.83 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
195 49+525 49+862 337.00 2.92 337.44 1.5 0.20 480.23 Gravel 15 mm 101.2 - - - -
196 49+862 49+932 70.00 1.46 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
197 49+932 49+962 30.00 - 30.00 Jembatan
198 49+962 50+032 70.00 2.82 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
199 50+032 50+150 118.00 5.64 118.57 1.5 0.20 168.15 Gravel 15 mm 35.6 - - - -
200 50+150 50+250 100.00 3.16 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
201 50+250 51+215 965.00 0.68 965.07 1.5 0.00 1,085.63 - - - - - -
202 51+215 51+285 70.00 0.72 70.00 1.5 0.00 78.75 - - - - - -
203 51+285 52+007 721.50 0.76 721.56 1.5 0.00 811.69 - - - - - -
204 52+007 52+157 150.00 5.38 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
205 52+157 52+280 123.00 10.00 124.90 1.5 0.20 175.28 Gravel 25 mm - 37.5 0.00 0.00 0.00
206 52+280 52+380 100.00 5.00 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
207 52+380 52+410 30.00 - 30.00 Jembatan
208 52+410 52+510 100.00 5.00 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
209 52+510 52+697 187.50 10.00 190.39 1.5 0.20 267.19 Gravel 25 mm - 57.1 0.00 0.00 0.00
210 52+697 52+797 100.00 6.15 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
211 52+797 52+907 109.60 2.30 109.69 1.5 0.20 156.18 Gravel 15 mm 32.9 - - - -
212 52+907 52+977 70.00 6.15 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
213 52+977 53+081 104.60 10.00 106.21 1.5 0.20 149.05 Gravel 25 mm - 31.9 0.00 0.00 0.00
214 53+081 53+181 100.00 5.87 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
215 53+181 53+588 406.90 1.74 407.09 1.5 0.20 579.83 Gravel 15 mm 122.1 - - - -
216 53+588 53+688 100.00 3.48 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
217 53+688 53+962 273.50 5.22 274.64 1.5 0.20 389.74 Gravel 15 mm 82.4 - - - -
218 53+962 54+162 200.00 4.61 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
219 54+162 54+784 622.40 4.00 623.92 1.5 0.20 886.92 Gravel 15 mm 187.2 - - - -
220 54+784 54+844 60.00 2.00 60.00 1.5 0.20 85.50 Gravel 15 mm 18.0 - - - -

Laporan Drainase Jalan 76


Average
STA Jarak Datar Jarak Miring Tegangan Geser dan Kebutuhan lapisan Porous Bangunan Terjunan
Gradient
No b t Pasangan Batu
Teg Geser Gravel Dia. 15 Gravel Dia. 25 total z Jumlah
Dari Ke (m) (%) (m)
(m) (m) kg/cm2 mm mm (m) (n) m3
221 54+844 54+874 30.00 - 30.00 Jembatan
222 54+874 54+944 70.00 3.88 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
223 54+944 55+026 81.70 7.76 82.45 1.5 0.20 116.42 Gravel 25 mm - 24.7 - - -
224 55+026 55+126 100.00 7.27 100.00 1.5 0.20 142.50 Gravel 25 mm - 30.0 - - -
225 55+126 55+248 122.00 6.78 122.86 1.5 0.20 173.85 Gravel 15 mm 36.9 - - - -
226 55+248 55+348 100.00 5.20 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
227 55+348 55+825 477.30 3.63 478.26 1.5 0.20 680.15 Gravel 15 mm 143.5 - - - -
228 55+825 56+025 200.00 4.26 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
229 56+025 56+621 596.40 4.90 598.59 1.5 0.20 849.87 Gravel 15 mm 179.6 - - - -
230 56+621 56+771 150.00 3.12 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
231 56+771 57+425 653.60 1.33 653.78 1.5 0.20 931.38 Gravel 15 mm 196.1 - - - -
232 57+425 57+575 150.00 2.23 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
233 57+575 58+074 498.70 3.12 499.44 1.5 0.20 710.65 Gravel 15 mm 149.8 - - - -
234 58+074 58+274 200.00 5.34 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
235 58+274 58+394 120.60 7.57 121.66 1.5 0.20 171.86 Gravel 25 mm - 36.5 - - -
236 58+394 58+594 200.00 6.86 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
237 58+594 58+815 220.40 6.15 221.67 1.5 0.20 314.07 Gravel 15 mm 66.5 - - - -
238 58+815 59+015 200.00 5.35 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
239 59+015 59+410 395.00 4.56 396.25 1.5 0.20 562.88 Gravel 15 mm 118.9 - - - -
240 59+410 59+710 300.00 4.35 300.00 1.5 0.20 427.50 Gravel 15 mm 90.0 - - - -
241 59+710 60+212 502.20 4.13 503.51 1.5 0.20 715.64 Gravel 15 mm 151.1 - - - -
242 60+212 60+412 200.00 3.88 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
243 60+412 60+541 129.10 3.62 129.36 1.5 0.20 183.97 Gravel 15 mm 38.8 - - - -
244 60+541 60+691 150.00 5.58 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
245 60+691 60+783 91.60 7.53 92.40 1.5 0.20 130.53 Gravel 25 mm - 27.7 - - -
246 60+783 60+883 100.00 3.77 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
247 60+883 60+913 30.00 - 30.00 Jembatan
248 60+913 61+013 100.00 2.55 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
249 61+013 61+225 212.40 5.10 213.24 1.5 0.20 302.67 Gravel 15 mm 64.0 - - - -
250 61+225 61+375 150.00 3.44 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
251 61+375 61+511 135.60 1.78 135.67 1.5 0.20 193.23 Gravel 15 mm 40.7 - - - -
252 61+511 61+661 150.00 3.31 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
253 61+661 62+222 561.20 4.83 563.20 1.5 0.20 799.71 Gravel 15 mm 169.0 - - - -
254 62+222 62+522 300.00 4.59 300.00 1.5 0.20 427.50 Gravel 15 mm 90.0 - - - -
255 62+522 63+000 478.20 4.36 479.59 1.5 0.20 681.43 Gravel 15 mm 143.9 - - - -
Jumlah Segmen B2 31,925.0 43,955.8 6,386.7 1,924.3 681.4

Laporan Drainase Jalan 77


Average
STA Jarak Datar Jarak Miring Tegangan Geser dan Kebutuhan lapisan Porous Bangunan Terjunan
Gradient
No b t Pasangan Batu
Teg Geser Gravel Dia. 15 Gravel Dia. 25 total z Jumlah
Dari Ke (m) (%) (m)
(m) (m) kg/cm2 mm mm (m) (n) m3
SEGMENT B.3
256 63+000 63+049 48.60 4.36 48.74 1.5 0.20 69.25 Gravel 15 mm 14.6 - - - -
257 63+049 63+149 100.00 2.67 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
258 63+149 63+670 521.40 0.99 521.48 1.5 0.00 586.58 - - - - - -
259 63+670 63+780 110.00 1.16 110.00 1.5 0.20 156.75 Gravel 15 mm 33.0 - - - -
260 63+780 64+042 261.60 1.33 261.67 1.5 0.20 372.78 Gravel 15 mm 78.5 - - - -
261 64+042 64+142 100.00 2.33 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
262 64+142 64+458 316.80 3.34 317.34 1.5 0.20 451.44 Gravel 15 mm 95.2 - - - -
263 64+458 64+558 100.00 2.37 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
264 64+558 64+725 166.60 1.39 166.65 1.5 0.20 237.40 Gravel 15 mm 50.0 - - - -
265 64+725 64+875 150.00 4.59 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
266 64+875 64+943 68.10 7.80 68.74 1.5 0.20 97.04 Gravel 25 mm - 20.6 - - -
267 64+943 65+043 100.00 3.90 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
268 65+043 65+073 30.00 - 30.00 Jembatan
269 65+073 65+173 100.00 2.98 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
270 65+173 65+349 175.80 5.96 176.76 1.5 0.20 250.52 Gravel 15 mm 53.0 - - - -
271 65+349 65+549 200.00 7.24 200.00 1.5 0.20 285.00 Gravel 25 mm - 60.0 - - -
272 65+549 65+638 88.60 8.51 89.59 1.5 0.20 126.26 Gravel 25 mm - 26.9 - - -
273 65+638 65+738 100.00 4.25 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
274 65+738 65+768 30.00 - 30.00 Jembatan
275 65+768 65+868 100.00 4.76 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
276 65+868 66+168 300.70 9.52 304.89 1.5 0.20 428.50 Gravel 25 mm - 91.5 - - -
277 66+168 66+418 250.00 5.39 250.00 1.5 0.20 356.25 Gravel 15 mm 75.0 - - - -
278 66+418 67+431 1,012.30 1.26 1,012.55 1.5 0.20 1,442.53 Gravel 15 mm 303.8 - - - -
279 67+431 67+531 100.00 3.42 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
280 67+531 67+745 214.10 5.58 215.12 1.5 0.20 305.09 Gravel 15 mm 64.5 - - - -
281 67+745 67+845 100.00 2.79 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
282 67+845 67+875 30.00 - 30.00 Jembatan
283 67+875 67+975 100.00 1.63 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
284 67+975 68+421 446.10 3.25 446.82 1.5 0.20 635.69 Gravel 15 mm 134.0 - - - -
285 68+421 68+646 225.00 2.27 225.00 1.5 0.20 320.63 Gravel 15 mm 67.5 - - - -
286 68+646 69+652 1,006.60 1.28 1,006.85 1.5 0.20 1,434.41 Gravel 15 mm 302.1 - - - -
287 69+652 69+712 60.00 0.64 60.00 1.5 0.00 67.50 - - - - - -
288 69+712 69+762 50.00 - 50.00 Jembatan
289 69+762 69+862 100.00 5.98 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
290 69+862 70+391 528.80 11.95 540.52 1.5 0.20 753.54 Gravel 25 mm - 162.2 18.01 18.01 105.91
291 70+391 70+691 300.00 5.98 300.00 1.5 0.20 427.50 Gravel 15 mm 90.0 - - - -
292 70+691 70+759 68.10 - 68.10 Jembatan
293 70+759 70+859 100.00 4.89 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
294 70+859 71+348 488.50 9.79 495.72 1.5 0.20 696.11 Gravel 25 mm - 148.7 - - -
295 71+348 71+598 250.00 9.80 250.00 1.5 0.20 356.25 Gravel 25 mm - 75.0 - - -

Laporan Drainase Jalan 78


Average
STA Jarak Datar Jarak Miring Tegangan Geser dan Kebutuhan lapisan Porous Bangunan Terjunan
Gradient
No b t Pasangan Batu
Teg Geser Gravel Dia. 15 Gravel Dia. 25 total z Jumlah
Dari Ke (m) (%) (m)
(m) (m) kg/cm2 mm mm (m) (n) m3
296 71+598 72+015 417.00 9.81 423.19 1.5 0.20 594.23 Gravel 25 mm - 127.0 - - -
297 72+015 72+215 200.00 9.30 200.00 1.5 0.20 285.00 Gravel 25 mm - 60.0 - - -
298 72+215 72+459 243.90 8.80 246.80 1.5 0.20 347.56 Gravel 25 mm - 74.0 - - -
299 72+459 72+659 200.00 8.39 200.00 1.5 0.20 285.00 Gravel 25 mm - 60.0 - - -
300 72+659 73+075 416.40 7.99 420.48 1.5 0.20 593.37 Gravel 25 mm - 126.1 - - -
301 73+075 73+175 100.00 6.38 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
302 73+175 73+500 325.00 4.78 326.13 1.5 0.20 463.13 Gravel 15 mm 97.8 - - - -
303 73+500 73+600 100.00 8.34 100.00 1.5 0.20 142.50 Gravel 25 mm - 30.0 - - -
304 73+600 74+173 572.90 11.90 585.49 1.5 0.20 816.38 Gravel 25 mm - 175.6 19.01 19.01 111.81
305 74+173 74+273 100.00 5.95 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
306 74+273 74+353 80.00 - 80.00 Jembatan
307 74+353 74+453 100.00 5.95 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
308 74+453 74+573 120.30 11.90 122.94 1.5 0.20 171.43 Gravel 25 mm - 36.9 3.99 3.99 23.48
309 74+573 74+673 100.00 7.89 100.00 1.5 0.20 142.50 Gravel 25 mm - 30.0 - - -
310 74+673 74+950 276.30 3.87 276.93 1.5 0.20 393.73 Gravel 15 mm 83.1 - - - -
311 74+950 75+050 100.00 7.89 100.00 1.5 0.20 142.50 Gravel 25 mm - 30.0 - - -
312 75+050 75+300 250.50 11.91 256.01 1.5 0.20 356.96 Gravel 25 mm - 76.8 8.36 8.36 49.14
313 75+300 75+500 200.00 6.58 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
314 75+500 76+049 549.00 1.25 549.13 1.5 0.20 782.33 Gravel 15 mm 164.7 - - - -
315 76+049 76+249 200.00 5.97 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
316 76+249 76+628 379.40 10.68 386.09 1.5 0.20 540.64 Gravel 25 mm - 115.8 4.51 4.51 26.51
317 76+628 76+828 200.00 11.20 200.00 1.5 0.20 285.00 Gravel 25 mm - 60.0 4.20 4.20 24.72
318 76+828 77+225 396.60 11.73 405.06 1.5 0.20 565.16 Gravel 25 mm - 121.5 11.96 11.96 70.32
319 77+225 77+325 100.00 6.37 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
320 77+325 77+587 262.10 1.01 262.14 1.5 0.20 373.49 Gravel 15 mm 78.6 - - - -
321 77+587 77+687 100.00 4.97 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
322 77+687 77+938 251.20 8.93 254.28 1.5 0.20 357.96 Gravel 25 mm - 76.3 - - -
323 77+938 78+238 300.00 10.37 300.00 1.5 0.20 427.50 Gravel 25 mm - 90.0 1.93 1.93 11.38
324 78+238 78+521 282.70 11.81 288.81 1.5 0.20 402.85 Gravel 25 mm - 86.6 8.91 8.91 52.42
325 78+521 78+721 200.00 6.09 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
326 78+721 79+343 622.10 0.37 622.11 1.5 0.00 699.86 - - - - - -
327 79+343 79+543 200.00 2.14 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
328 79+543 80+374 830.50 3.90 832.43 1.5 0.20 1,183.46 Gravel 15 mm 249.7 - - - -
329 80+374 80+574 200.00 3.04 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
330 80+574 80+831 257.70 2.18 257.89 1.5 0.20 367.22 Gravel 15 mm 77.4 - - - -
331 80+831 80+981 150.00 6.20 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
332 80+981 81+304 322.70 10.22 327.90 1.5 0.20 459.85 Gravel 25 mm - 98.4 1.23 1.23 7.22
333 81+304 81+504 200.00 7.03 200.00 1.5 0.20 285.00 Gravel 25 mm - 60.0 - - -
334 81+504 81+901 397.10 3.84 397.99 1.5 0.20 565.87 Gravel 15 mm 119.4 - - - -
335 81+901 82+101 200.00 6.51 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -

Laporan Drainase Jalan 79


Average
STA Jarak Datar Jarak Miring Tegangan Geser dan Kebutuhan lapisan Porous Bangunan Terjunan
Gradient
No b t Pasangan Batu
Teg Geser Gravel Dia. 15 Gravel Dia. 25 total z Jumlah
Dari Ke (m) (%) (m)
(m) (m) kg/cm2 mm mm (m) (n) m3
336 82+101 82+290 188.90 9.17 191.35 1.5 0.20 269.18 Gravel 25 mm - 57.4 - - -
337 82+290 82+490 200.00 8.41 200.00 1.5 0.20 285.00 Gravel 25 mm - 60.0 - - -
338 82+490 82+925 435.00 7.65 438.90 1.5 0.20 619.88 Gravel 25 mm - 131.7 - - -
339 82+925 83+125 200.00 9.19 200.00 1.5 0.20 285.00 Gravel 25 mm - 60.0 - - -
340 83+125 83+428 302.70 10.73 308.09 1.5 0.20 431.35 Gravel 25 mm - 92.4 3.88 3.88 22.80
341 83+428 83+528 100.00 5.37 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
342 83+528 83+558 30.00 - 30.00 Jembatan
343 83+558 83+658 100.00 5.57 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
344 83+658 84+293 635.20 11.15 647.41 1.5 0.20 905.16 Gravel 25 mm - 194.2 12.69 12.69 74.63
345 84+293 84+593 300.00 6.20 300.00 1.5 0.20 427.50 Gravel 15 mm 90.0 - - - -
346 84+593 85+100 507.10 1.26 507.22 1.5 0.20 722.62 Gravel 15 mm 152.2 - - - -
347 85+100 85+300 200.00 2.46 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
348 85+300 85+952 651.80 3.65 653.13 1.5 0.20 928.82 Gravel 15 mm 195.9 - - - -
349 85+952 86+102 150.00 7.64 150.00 1.5 0.20 213.75 Gravel 25 mm - 45.0 - - -
350 86+102 86+406 304.20 11.64 310.58 1.5 0.20 433.48 Gravel 25 mm - 93.2 8.68 8.68 51.04
351 86+406 86+706 300.00 10.30 300.00 1.5 0.20 427.50 Gravel 25 mm - 90.0 1.55 1.55 9.13
352 86+706 87+448 741.60 8.96 750.76 1.5 0.20 1,056.78 Gravel 25 mm - 225.2 - - -
353 87+448 87+598 150.00 6.63 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
354 87+598 88+137 539.10 4.29 540.62 1.5 0.20 768.22 Gravel 15 mm 162.2 - - - -
355 88+137 88+287 150.00 9.15 150.00 1.5 0.20 213.75 Gravel 25 mm - 45.0 - - -
356 88+287 88+634 347.10 14.00 357.73 1.5 0.20 494.62 Gravel 25 mm - 107.3 24.21 24.21 142.37
357 88+634 88+704 70.00 9.44 70.00 1.5 0.20 99.75 Gravel 25 mm - 21.0 - - -
358 88+704 88+784 80.00 4.87 80.29 1.5 0.20 114.00 Gravel 15 mm 24.1 - - - -
359 88+784 88+854 70.00 9.44 70.00 1.5 0.20 99.75 Gravel 25 mm - 21.0 - - -
360 88+854 89+351 497.20 14.00 512.42 1.5 0.20 708.51 Gravel 25 mm - 153.7 34.68 34.68 203.94
361 89+351 89+501 150.00 7.54 150.00 1.5 0.20 213.75 Gravel 25 mm - 45.0 - - -
362 89+501 90+005 503.60 1.08 503.69 1.5 0.20 717.63 Gravel 15 mm 151.1 - - - -
363 90+005 90+105 100.00 1.76 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
364 90+105 91+402 1,297.00 2.44 1,298.18 1.5 0.20 1,848.23 Gravel 15 mm 389.5 - - - -
365 91+402 91+702 300.00 4.09 300.00 1.5 0.20 427.50 Gravel 15 mm 90.0 - - - -
366 91+702 92+065 363.00 5.74 364.83 1.5 0.20 517.28 Gravel 15 mm 109.4 - - - -
367 92+065 92+265 200.00 6.44 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
368 92+265 92+314 49.80 7.13 50.19 1.5 0.20 70.96 Gravel 25 mm - 15.1 - - -
369 92+314 92+514 200.00 7.48 200.00 1.5 0.20 285.00 Gravel 25 mm - 60.0 - - -
370 92+514 92+563 48.50 7.83 48.96 1.5 0.20 69.11 Gravel 25 mm - 14.7 - - -
371 92+563 92+633 70.00 3.91 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
372 92+633 92+673 40.00 - 40.00 Jembatan
373 92+673 92+743 70.00 4.00 70.00 1.5 0.20 99.75 Gravel 15 mm 21.0 - - - -
374 92+743 93+034 291.10 8.00 293.96 1.5 0.20 414.82 Gravel 25 mm - 88.2 - - -
375 93+034 93+184 150.00 7.48 150.00 1.5 0.20 213.75 Gravel 25 mm - 45.0 - - -

Laporan Drainase Jalan 80


Average
STA Jarak Datar Jarak Miring Tegangan Geser dan Kebutuhan lapisan Porous Bangunan Terjunan
Gradient
No b t Pasangan Batu
Teg Geser Gravel Dia. 15 Gravel Dia. 25 total z Jumlah
Dari Ke (m) (%) (m)
(m) (m) kg/cm2 mm mm (m) (n) m3
376 93+184 93+393 209.20 6.95 210.75 1.5 0.20 298.11 Gravel 15 mm 63.2 - - - -
377 93+393 93+593 200.00 6.99 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
378 93+593 94+007 413.90 7.03 417.03 1.5 0.20 589.81 Gravel 25 mm - 125.1 - - -
379 94+007 94+307 300.00 5.49 300.00 1.5 0.20 427.50 Gravel 15 mm 90.0 - - - -
380 94+307 94+621 314.10 3.94 314.85 1.5 0.20 447.59 Gravel 15 mm 94.5 - - - -

Jumlah Segmen B3 31,621.20 44,188.87 5,161.11 3,910.16 986.81

381 94+621 94+721 100.00 5.60 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
382 94+721 94+993 271.80 7.27 274.00 1.5 0.20 387.32 Gravel 25 mm - 82.2 - - -
383 94+993 95+193 200.00 4.32 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
384 95+193 97+039 1,845.90 1.37 1,846.42 1.5 0.20 2,630.41 Gravel 15 mm 553.9 - - - -
385 97+039 97+239 200.00 3.38 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
386 97+239 97+370 131.20 5.40 131.78 1.5 0.20 186.96 Gravel 15 mm 39.5 - - - -
387 97+370 97+570 200.00 4.13 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
388 97+570 97+727 156.50 2.86 156.70 1.5 0.20 223.01 Gravel 15 mm 47.0 - - - -
389 97+727 97+927 200.00 4.01 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
390 97+927 98+227 300.30 5.15 301.52 1.5 0.20 427.93 Gravel 15 mm 90.5 - - - -
391 98+227 98+327 100.00 2.58 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
392 98+327 98+382 55.00 - 55.00 Jembatan
393 98+382 98+432 50.00 0.26 50.00 1.5 0.00 56.25 - - - - - -
394 98+432 99+644 1,211.60 0.53 1,211.65 1.5 0.00 1,363.05 - - - - - -
395 99+644 99+744 100.00 1.27 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
396 99+744 99+916 172.20 2.02 172.31 1.5 0.20 245.38 Gravel 15 mm 51.7 - - - -
397 99+916 100+016 100.00 1.01 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
398 100+016 100+046 30.00 - 30.00 Jembatan
399 100+046 100+146 100.00 1.55 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
400 100+146 101+146 1,000.40 3.10 1,001.86 1.5 0.20 1,425.57 Gravel 15 mm 300.6 - - - -
401 101+146 101+346 200.00 3.10 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
402 101+346 102+049 703.20 3.10 704.23 1.5 0.20 1,002.06 Gravel 15 mm 211.3 - - - -
403 102+049 102+249 200.00 2.24 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
404 102+249 103+921 1,671.80 1.37 1,672.28 1.5 0.20 2,382.32 Gravel 15 mm 501.7 - - - -
405 103+921 104+071 150.00 1.79 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
406 104+071 104+382 311.10 2.21 311.33 1.5 0.20 443.32 Gravel 15 mm 93.4 - - - -
407 104+382 104+582 200.00 3.00 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
408 104+582 104+911 328.90 3.79 329.62 1.5 0.20 468.68 Gravel 15 mm 98.9 - - - -
409 104+911 105+111 200.00 3.42 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
410 105+111 105+906 795.20 3.04 796.32 1.5 0.20 1,133.16 Gravel 15 mm 238.9 - - - -
411 105+906 106+056 150.00 2.14 150.00 1.5 0.20 213.75 Gravel 15 mm 45.0 - - - -
412 106+056 106+303 246.30 1.24 246.36 1.5 0.20 350.98 Gravel 15 mm 73.9 - - - -
413 106+303 106+403 100.00 1.15 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
414 106+403 109+164 2,761.40 1.06 2,761.87 1.5 0.20 3,934.99 Gravel 15 mm 828.6 - - - -
415 109+164 109+364 200.00 3.32 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -

Laporan Drainase Jalan 81


Average
STA Jarak Datar Jarak Miring Tegangan Geser dan Kebutuhan lapisan Porous Bangunan Terjunan
Gradient
No b t Pasangan Batu
Teg Geser Gravel Dia. 15 Gravel Dia. 25 total z Jumlah
Dari Ke (m) (%) (m)
(m) (m) kg/cm2 mm mm (m) (n) m3
416 109+364 109+453 89.30 5.58 89.73 1.5 0.20 127.25 Gravel 15 mm 26.9 - - - -
417 109+453 109+653 200.00 4.76 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
418 109+653 110+119 465.70 3.95 466.81 1.5 0.20 663.62 Gravel 15 mm 140.0 - - - -
419 110+119 110+219 100.00 1.97 100.00 1.5 0.20 142.50 Gravel 15 mm 30.0 - - - -
420 110+219 110+249 30.00 - 30.00 Jembatan
421 110+249 110+359 110.00 1.78 110.00 1.5 0.20 156.75 Gravel 15 mm 33.0 - - - -
422 110+359 110+682 323.20 3.56 323.82 1.5 0.20 460.56 Gravel 15 mm 97.1 - - - -
423 110+682 110+882 200.00 2.48 200.00 1.5 0.20 285.00 Gravel 15 mm 60.0 - - - -
424 110+882 111+300 417.80 1.40 417.93 1.5 0.20 595.37 Gravel 15 mm 125.4 - - - -
Jumlah Segmen B4 16,678.8 23,224.9 4,512.3 82.2 0.0