PEMBANGUNAN RUKO 3 UNIT

JALAN T. AMIR HAMZAH TANJUNG PURA


LAPORAN KEUANGAN

PENERIMAAN PENGELUARAN SALDO


TANGGAL URAIAN TRANSAKSI
NOMOR (Rp) (Rp) (Rp)

08 - 04 - 2019 Saldo Kas pertanggal 4 April 2019 - 49,238,000.00


08 - 04 - 2019 Pasir Ikat 4 Dum 1,400,000.00 47,838,000.00
08 - 04 - 2019 Operasional (Minum Tukang) 100,000.00 47,738,000.00
08 - 04 - 2019 Buat Bubur Kacang 250,000.00 47,488,000.00
08 - 04 - 2019 Pengadaan Air untuk Cor Beton 650,000.00 46,838,000.00
08 - 04 - 2019 Beli Nasi Tukang (siang) 200,000.00 46,638,000.00
08 - 04 - 2019 Operasional (Minum Tukang) 100,000.00 46,538,000.00
08 - 04 - 2019 Beli Nasi Tukang (Malam) 200,000.00 46,338,000.00
09 - 04 - 2019 Kayu 1x2x16 15 btg 555,000.00 45,983,000.00
09 - 04 - 2019 Kayu 1/2 x3x16 10 btg 475,000.00 45,863,000.00
10 - 04 - 2019 Batu Bata 15000 bh 6,000,000.00 39,983,000.00
10 - 04 - 2019 Sewa Tong Air 4 Bh 100,000.00 45,883,000.00
10 - 04 - 2019 Surat Lurah 5 Surat 250,000.00 39,733,000.00
12 - 04 - 2019 Kayu 1x2x16 15 btg 555,000.00 45,328,000.00
12 - 04 - 2019 Kayu 1x4 x16 6 btg 258,000.00 39,475,000.00
13 - 04 - 2019 Pasir Ikat 2 Dum 700,000.00 44,628,000.00
13 - 04 - 2019 Kayu 1x2x16 6 btg 222,000.00 39,253,000.00
13 - 04 - 2019 Operasional (Minum Tukang) 50,000.00 44,578,000.00
13 - 04 - 2019 Upah Tukang Listrik 3,000,000.00 36,253,000.00
13 - 04 - 2019 Gaji Mingguan Staff 4 0rg 1,200,000.00 43,378,000.00
13 - 04 - 2019 Gaji Tukang (B Darman) 8,000,000.00 28,253,000.00

Saldo sampai dengan ini :


Rp. 28.253000,- (Dua puluh delapan juta dua ratus lima puluh tiga ribu rupiah)

Tanjung Pura, 13 April 2019


Disetujui Oleh Disusun Oleh

M. NAZLI IBNU HAJAR