JENIS BARANG
NO UNIT SATUAN HARGA SATUAN JUMLAH KETERANGAN
YANG DIBUTUHKAN
1 GRANIT 60 DUZ 145,000 Rp 8,700,000
2 KERAMIK 50 DUZ 43,000 Rp 2,150,000
3 BESI PAGAR 100 LONJOR 65,000 Rp 6,500,000
4 PASIR 2 RIT 1,000,000 Rp 2,000,000
5 SEMEN 50 SAK 40,000 Rp 2,000,000
6 JENDELA 8 PLONG 1,500,000 Rp 12,000,000
7 PINTU 2 PLONG 2,000,000 Rp 4,000,000
8 PINTU DEPAN KUPU TARUNG 1 PLONG 3,500,000 Rp 3,500,000
9 ONGKOS TUKANG 1/3 DARI TOTAL BIAYA = 40.850.000:3 Rp 13,600,000
TOTAL Rp 54,450,000
54450000