BREAKDOWN MATERIAL KOLAM

NO. DESKRIPSI MATERIAL QTY SATUAN HARGA/@ SUB TOTAL


1 TULANGAN SLOAF Ø8x12Mtr 18 BTG Rp 38,000.00 Rp 675,133.33
2 CINCIN SLOAF Ø6x12Mtr 16 BTG Rp 27,000.00 Rp 419,737.50
pengikat bendrat 1 kg Rp 23,000.00 Rp 23,000.00
5 COR K100 PASIR 0.6 M³ Rp 342,500.00 Rp 222,093.37
6 COR K100 SPLIT 0.6 M³ Rp 255,000.00 Rp 147,848.34
7 COR K100 SEMEN MP 6 ZAK Rp 50,000.00 Rp 306,874.75
Hebel 7.5x20x60 5 M³ Rp 460,000.00 Rp 2,262,012.01
perekat hebel Mortar 2 ZAK Rp 70,000.00 Rp 172,109.61
Pintu Kamar Mandi 2 pcs Rp 200,000.00 Rp 400,000.00
sanitasi keran sus304 2 pcs Rp 45,000.00 Rp 90,000.00
urinoir wc jongkok 2 pcs Rp 100,000.00 Rp 200,000.00
13 Bis Gorong Gorong dia.800x500 3 pcs Rp 255,000.00 Rp 765,000.00
GRAND TOTAL Rp 5,683,808.91

SPESIFIKASI

Tinggi kolom 2.5 Mtr


Jumlah kolom 5 Pcs
Panjang kolom 20.4 Mtr
panjang total kolom 53.3 Mtr

Volume kolom 1.04468 M³ 14x14

MUTU BETON K100


MATERIAL TONASE (KG) PEMAKAIAN/@
SEMEN 245.4998 6 ZAK
PASIR 907.82692 0.6 M³
KERIKIL 1043.63532 0.6 M³

Dibuat Oleh

Didik A.
BREAKDOWN MATERIAL PAGAR WORKSHOP BARU
NO. DESKRIPSI MATERIAL QTY SATUAN HARGA/@ SUB TOTAL
1 TULANGAN SLOAF Ø10x12Mtr 107 BTG Rp 73,181.00 Rp 7,854,760.67
2 CINCIN SLOAF Ø8x12Mtr 94 BTG Rp 47,272.00 Rp 4,439,628.67
3 DINDING HEBEL 600x200 24 M³ Rp 640,000.00 Rp 15,619,047.62
4 DINDING MORTAR/SEMEN 25 ZAK Rp 70,000.00 Rp 1,764,000.00
5 KOLOM PASIR 5.5 M³ Rp 290,000.00 Rp 1,598,799.00
6 KOLOM SPLIT 5.5 M³ Rp 250,000.00 Rp 1,364,475.00
7 KOLOM SEMEN 72 ZAK Rp 45,455.00 Rp 3,282,237.37
GRAND TOTAL Rp 35,922,948.32

SPESIFIKASI

Tinggi kolom 3 Mtr


Jumlah kolom 42 Pcs
Panjang kolom 98 Mtr
panjang total kolom 322 Mtr
Volume kolom 9.66 M³ 150x200
Luas total dinding 252 M²

MUTU BETON K150


MATERIAL TONASE (KG) PEMAKAIAN/@
SEMEN 2888.34 72 ZAK
PASIR 7718.34 5.5 M³
KERIKIL 9824.22 5.5 M³

DINDING
MORTAR 1008 25 ZAK

Mengetahui Dibuat Oleh

Mudzakir Didik A.
General Manager
BREAKDOWN HARGA UPAH PENGERJAAN
M S S R K J S
22 23 24 25 26 27 28
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1

Vol Kolom 9.66 M³


L.total Dinding 252 M²
ESTIMASI 19 HARI
BAGIAN Vol Hari GAJI TOTAL
T YAMAN 3.0 31 Rp 135,000.00 Rp 4,185,000.00
K MAMET 1.5 31 Rp 83,000.00 Rp 2,573,000.00
T HAERUDIN 3.0 31 Rp 120,000.00 Rp 3,720,000.00
K RAHMAT 1.5 31 Rp 83,000.00 Rp 2,573,000.00
K ENJUN 1.5 31 Rp 83,000.00 Rp 2,573,000.00
T ACENG 3.0 31 Rp 115,000.00 Rp 3,565,000.00

GRAND TOTAL Rp 19,189,000.00

Mengetahui Dibuat Oleh

Mudzakir Didik A.
General Manager
BREAKDOWN MATERIAL PAGAR WORKSHOP BARU
NO. DESKRIPSI MATERIAL QTY SATUAN HARGA/@ SUB TOTAL
1 TULANGAN SLOAF Ø10x12Mtr 164.3 BTG Rp 73,181.00 Rp 12,026,077.67
2 CINCIN SLOAF Ø8x12Mtr 144 BTG Rp 47,272.00 Rp 6,807,168.00
3 DINDING HEBEL 600x200 40 M³ Rp 640,000.00 Rp 25,600,000.00
4 DINDING MORTAR/SEMEN 45 ZAK Rp 70,000.00 Rp 3,136,000.00
5 KOLOM PASIR 8.4 M³ Rp 290,000.00 Rp 2,447,850.64
6 KOLOM SPLIT 8.4 M³ Rp 250,000.00 Rp 2,089,087.50
7 KOLOM SEMEN 111 ZAK Rp 45,455.00 Rp 5,025,288.89
GRAND TOTAL Rp 57,131,472.70

SPESIFIKASI

Tinggi kolom 3 Mtr


Jumlah kolom 65 Pcs
Panjang kolom 149 Mtr
panjang total kolom 493 Mtr
Volume kolom 14.79 M³ 150x200
Luas total dinding 448 M²

MUTU BETON K150


MATERIAL TONASE (KG) PEMAKAIAN/@
SEMEN 4422.21 111 ZAK
PASIR 11817.21 8.4 M³
KERIKIL 15041.43 8.4 M³

DINDING
MORTAR 1792 45 ZAK

Mengetahui Dibuat Oleh

Mudzakir Didik A.
General Manager
BREAKDOWN HARGA UPAH PENGERJAAN
M S S R K J S
22 23 24 25 26 27 28
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1

Vol Kolom 14.79 M³


L.total Dinding 448 M²
ESTIMASI 34 HARI
BAGIAN Vol Hari GAJI TOTAL
T YAMAN 3.0 31 Rp 135,000.00 Rp 4,185,000.00
K MAMET 1.5 31 Rp 83,000.00 Rp 2,573,000.00
T HAERUDIN 3.0 31 Rp 120,000.00 Rp 3,720,000.00
K RAHMAT 1.5 31 Rp 83,000.00 Rp 2,573,000.00
K ENJUN 1.5 31 Rp 83,000.00 Rp 2,573,000.00
T ACENG 3.0 31 Rp 115,000.00 Rp 3,565,000.00

GRAND TOTAL Rp 19,189,000.00

Mengetahui Dibuat Oleh

Mudzakir Didik A.
General Manager
BREAKDOWN MATERIAL PAGAR WORKSHOP BARU
NO. DESKRIPSI MATERIAL QTY SATUAN HARGA/@
1 TULANGAN SLOAF Ø10x12Mtr 164.3 BTG Rp 73,181.00
2 CINCIN SLOAF Ø8x12Mtr 144 BTG Rp 47,272.00
3 DINDING BATA 5x10x20 33920 PCS Rp 900.00
4 DINDING PLESTER ACI 1PC:5PP SEMEN 153 ZAK Rp 45,455.00
5 DINDING PLESTER ACI 1PC:5PP PASIR PASANG 32 M³ Rp 290,000.00
6 KOLOM PASIR 8.4 M³ Rp 290,000.00
7 KOLOM SPLIT 8.4 M³ Rp 250,000.00
8 KOLOM SEMEN 111 ZAK Rp 45,455.00
GRAND TOTAL

SPESIFIKASI

Tinggi kolom 3 Mtr


Jumlah kolom 65 Pcs
Panjang kolom 149 Mtr
panjang total kolom 493 Mtr
Volume kolom 14.79 M³ 150x200
Luas total dinding 394.24 M²

MUTU BETON K150


MATERIAL TONASE (KG) PEMAKAIAN/@
SEMEN 4422.21 111 ZAK
PASIR 11817.21 8.4 M³
KERIKIL 15041.43 8.4 M³

Mengetahui Dibuat Oleh

Mudzakir Didik A.
General Manager
SUB TOTAL
Rp 12,026,077.67
Rp 6,807,168.00
Rp 30,528,000.00
Rp 6,974,533.74
Rp 9,260,697.60
Rp 2,447,850.64
Rp 2,089,087.50
Rp 5,025,288.89
Rp 75,158,704.04
BREAKDOWN MATERIAL PAGAR WORKSHOP BARU
NO. DESKRIPSI MATERIAL QTY SATUAN HARGA/@ SUB TOTAL
1 TULANGAN SLOAF Ø10x12Mtr 55 BTG Rp 73,181.00 Rp 4,024,955.00
2 CINCIN SLOAF Ø8x12Mtr 48 BTG Rp 47,272.00 Rp 2,274,965.00
3 DINDING HEBEL 600x200 9 M³ Rp 631,818.00 Rp 5,963,104.25
4 DINDING MORTAR/SEMEN 13 ZAK Rp 70,000.00 Rp 924,000.00
5 KOLOM PASIR 2.8 M³ Rp 290,000.00 Rp 819,260.36
6 KOLOM SPLIT 2.8 M³ Rp 250,000.00 Rp 699,187.50
7 KOLOM SEMEN 37 ZAK Rp 45,455.00 Rp 1,681,891.82
8 PONDASI BATU KALO 12 M³ Rp 191,666.67 Rp 2,300,000.00
GRAND TOTAL Rp 18,687,363.92

SPESIFIKASI

Tinggi kolom 3 Mtr


Jumlah kolom 21 Pcs
Panjang kolom 51 Mtr
panjang total kolom 165 Mtr
Volume kolom 4.95 M³ 150x200
Luas total dinding 132 M²

MUTU BETON K150


MATERIAL TONASE (KG) PEMAKAIAN/@
SEMEN 1480.05 37 ZAK
PASIR 3955.05 2.8 M³
KERIKIL 5034.15 2.8 M³

DINDING
MORTAR 528 13 ZAK

Mengetahui Dibuat Oleh

Mudzakir Didik A.
General Manager
BREAKDOWN HARGA UPAH PENGERJAAN
M S S R K J S
22 23 24 25 26 27 28
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1

Vol Kolom 4.95 M³


L.total Dinding 132 M²
ESTIMASI 10 HARI
BAGIAN Vol Hari GAJI TOTAL
T YAMAN 3.0 31 Rp 135,000.00 Rp 4,185,000.00
K MAMET 1.5 31 Rp 83,000.00 Rp 2,573,000.00
T HAERUDIN 3.0 31 Rp 120,000.00 Rp 3,720,000.00
K RAHMAT 1.5 31 Rp 83,000.00 Rp 2,573,000.00
K ENJUN 1.5 31 Rp 83,000.00 Rp 2,573,000.00
T ACENG 3.0 31 Rp 115,000.00 Rp 3,565,000.00

GRAND TOTAL Rp 19,189,000.00

Mengetahui Dibuat Oleh

Mudzakir Didik A.
General Manager
BREAKDOWN MATERIAL PAGAR WORKSHOP BARU
NO. DESKRIPSI MATERIAL QTY SATUAN HARGA/@ SUB TOTAL
1 TULANGAN SLOAF Ø10x12Mtr 55 BTG Rp 73,181.00 Rp 4,024,955.00
2 CINCIN SLOAF Ø8x12Mtr 48 BTG Rp 47,272.00 Rp 2,274,965.00
3 DINDING HEBEL 600x200 12 M³ Rp 631,818.00 Rp 7,879,816.33
4 DINDING MORTAR/SEMEN 13 ZAK Rp 70,000.00 Rp 924,000.00
5 KOLOM PASIR 2.8 M³ Rp 290,000.00 Rp 819,260.36
6 KOLOM SPLIT 2.8 M³ Rp 250,000.00 Rp 699,187.50
7 KOLOM SEMEN 37 ZAK Rp 45,455.00 Rp 1,681,891.82
13 WIREMESH M6 x 2.1x5.4 Mtr 22 LBR Rp 350,000.00 Rp 7,700,000.00
8 PONDASI BATU KALI 15 M³ Rp 191,666.67 Rp 2,875,000.00
GRAND TOTAL Rp 28,879,076.00

SPESIFIKASI

Tinggi kolom 3 Mtr


Jumlah kolom 21 Pcs
Panjang kolom 51 Mtr
panjang total kolom 165 Mtr
Volume kolom 4.95 M³ 150x200
Luas total dinding 132 M²

MUTU BETON K150


MATERIAL TONASE (KG) PEMAKAIAN/@
SEMEN 1480.05 37 ZAK
PASIR 3955.05 2.8 M³
KERIKIL 5034.15 2.8 M³

DINDING
MORTAR 528 13 ZAK

Mengetahui Dibuat Oleh

Mudzakir Didik A.
General Manager
BREAKDOWN HARGA UPAH PENGERJAAN
M S S R K J S
22 23 24 25 26 27 28
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1

Vol Kolom 4.95 M³


L.total Dinding 132 M²
ESTIMASI 10 HARI
BAGIAN Vol Hari GAJI TOTAL
T YAMAN 3.0 31 Rp 135,000.00 Rp 4,185,000.00
K MAMET 1.5 31 Rp 83,000.00 Rp 2,573,000.00
T HAERUDIN 3.0 31 Rp 120,000.00 Rp 3,720,000.00
K RAHMAT 1.5 31 Rp 83,000.00 Rp 2,573,000.00
K ENJUN 1.5 31 Rp 83,000.00 Rp 2,573,000.00
T ACENG 3.0 31 Rp 115,000.00 Rp 3,565,000.00

GRAND TOTAL Rp 19,189,000.00

Mengetahui Dibuat Oleh

Mudzakir Didik A.
General Manager
BREAKDOWN MATERIAL PAGAR WORKSHOP BARU
NO. DESKRIPSI MATERIAL QTY SATUAN HARGA/@ SUB TOTAL
1 TULANGAN SLOAF Ø10x12Mtr 9 BTG Rp 73,181.00 Rp 670,825.83
2 CINCIN SLOAF Ø8x12Mtr 8 BTG Rp 47,272.00 Rp 379,160.83
3 DINDING HEBEL 600x200 1 M³ Rp 631,818.00 Rp 695,695.50
4 DINDING MORTAR/SEMEN 2 ZAK Rp 70,000.00 Rp 154,000.00
5 KOLOM PASIR 0.5 M³ Rp 290,000.00 Rp 136,543.39
6 KOLOM SPLIT 0.5 M³ Rp 250,000.00 Rp 116,531.25
7 KOLOM SEMEN 6 ZAK Rp 45,455.00 Rp 280,315.30
8 PONDASI BATU KALO 2 M³ Rp 191,666.67 Rp 383,333.33
GRAND TOTAL Rp 2,816,405.44

SPESIFIKASI

Tinggi kolom 2.5 Mtr


Jumlah kolom 3 Pcs
Panjang kolom 10 Mtr
panjang total kolom 27.5 Mtr
Volume kolom 0.825 M³ 150x200
Luas total dinding 22 M²

MUTU BETON K150


MATERIAL TONASE (KG) PEMAKAIAN/@
SEMEN 246.675 6 ZAK
PASIR 659.175 0.5 M³
KERIKIL 839.025 0.5 M³

DINDING
MORTAR 88 2 ZAK

Mengetahui Dibuat Oleh

Mudzakir Didik A.
General Manager
BREAKDOWN HARGA UPAH PENGERJAAN
M S S R K J S
22 23 24 25 26 27 28
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1

Vol Kolom 0.825 M³


L.total Dinding 22 M²
ESTIMASI 1.7 HARI
BAGIAN Vol Hari GAJI TOTAL
T YAMAN 3.0 31 Rp 135,000.00 Rp 4,185,000.00
K MAMET 1.5 31 Rp 83,000.00 Rp 2,573,000.00
T HAERUDIN 3.0 31 Rp 120,000.00 Rp 3,720,000.00
K RAHMAT 1.5 31 Rp 83,000.00 Rp 2,573,000.00
K ENJUN 1.5 31 Rp 83,000.00 Rp 2,573,000.00
T ACENG 3.0 31 Rp 115,000.00 Rp 3,565,000.00

GRAND TOTAL Rp 19,189,000.00

Mengetahui Dibuat Oleh

Mudzakir Didik A.
General Manager