Anda di halaman 1dari 24

TUGAS

SISTEM KELENGKAPAN BANGUNAN

NAMA : ADRIANTO MATOLODULA


NIM : 551420011
KELAS : A

JURUSAN TEKNIK ARSITEKTUR


FAKULTAS TEKNIK
UNIVERSITAS NEGERI GORONTALO
TAHUN AJARAN 2021/2022
RK1.F.LT1 RK1.E.LT1 MUSHOLA
RK1.H.LT1 RK1.G.LT1
±0,00 ±0,00 ±0,00
±0,00 ±0,00

700
RK1.D.LT1 RK1.C.LT1 RK1.B.LT1 RK1.A.LT1
WC PUTRA WC PUTRI ±0,00
±0,00 ±0,00 -0,05
±0,00
-0,05

JANITOR
-0,05

DETAIL KRAN AIR


SKALA 1 : 2O
RENCANA INSTALASI AIR BERSIH
LT. 1 BANGUNAN PEMBELAJARAN
SKALA 1 : 230

JANITOR
-0,05

WC PUTRA WC PUTRI
-0,05 -0,05

KETERANGAN :

SALURAN AIR LIMBAH

KRAN AIR WASTAFEL (8 BH) RUANG TATA USAHA MUSHOLA


±0,00 ±0,00
LOBBY
KRAN AIR TOILET (12 BH) ±0,00

280
250
RUANG DOSEN RUANG DOSEN
KEPARIWISATAAN KEPARIWISATAAN
±0,00 ±0,00

DETAIL KRAN AIR


SKALA 1 : 20
RENCANA INSTALASI AIR BERSIH
LT. 1 BANGUNAN ADMINISTRASI
SKALA 1 : 230

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN RENCANA INSTALASI NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 AIR BERSIH & DETAIL KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
ST2.B.LT3 ST1.A.LT3 MUSHOLA
ST4.D.LT3 ST3.C.LT3
±0,00 ±0,00 ±0,00
±0,00 ±0,00

S ERIAL

S ERIAL
S ERIAL

S ERIAL
S ERIAL

S ERIAL
RK3.D.LT3 RK3.C.LT3 RK3.B.LT3 RK3.A.LT3
±0,00 ±0,00 WC PUTRA WC PUTRI ±0,00 ±0,00
-0,05 -0,05

JANITOR
-0,05

RENCANA INSTALASI AIR BERSIH


LT. 3 BANGUNAN PEMBELAJARAN
SKALA 1 : 160

700

280
250
KETERANGAN :

SALURAN AIR LIMBAH

KRAN AIR WASTAFEL (4 BH)

KRAN AIR TOILET (6 BH)

DETAIL KRAN AIR


DETAIL KRAN AIR
SKALA 1 : 20
SKALA 1 : 2O

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN RENCANA INSTALASI NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 AIR BERSIH & DETAIL KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
ST2.B.LT3 ST1.A.LT3 MUSHOLA
ST4.D.LT3 ST3.C.LT3
±0,00 ±0,00 ±0,00
±0,00 ±0,00

S ERIAL

S ERIAL
S ERIAL

S ERIAL
S ERIAL

S ERIAL
RK3.D.LT3 RK3.C.LT3 RK3.B.LT3 RK3.A.LT3
±0,00 ±0,00 WC PUTRA WC PUTRI ±0,00 ±0,00
-0,05 -0,05

JANITOR
-0,05

RENCANA INSTALASI AIR KOTOR


LT. 3 BANGUNAN ADMINISTRASI
SKALA 1 : 160

75

75

190

80 55 145
280
530
222.5
265
KETERANGAN :

SALURAN DISPOSAL PADAT


SALURAN DISPOSAL CAIR

FLOOR DRAIN (6 BH)

BAK KONTROL

DETAIL URINOIR DETAIL WATER CLOSET


SKALA 1 : 2O SKALA 1 : 2O

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN RENCANA INSTALASI NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 AIR KOTOR & DETAIL KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
RK1.F.LT1 RK1.E.LT1 MUSHOLA
RK1.H.LT1 RK1.G.LT1
±0,00 ±0,00 ±0,00
±0,00 ±0,00

75

190
RK1.D.LT1 RK1.C.LT1 RK1.B.LT1 RK1.A.LT1
WC PUTRA WC PUTRI ±0,00
±0,00 ±0,00 ±0,00
-0,05 -0,05

530
222.5
265
RENCANA INSTALASI AIR KOTOR
LT. 1 BANGUNAN PEMBELAJARAN
SKALA 1 : 230
DETAIL URINOIR
SKALA 1 : 2O

WC PUTRA WC PUTRI
-0,05 -0,05

RUANG TATA USAHA MUSHOLA


±0,00 ±0,00
LOBBY
±0,00

75

80 55 145
280
RUANG DOSEN
KEPARIWISATAAN
RUANG DOSEN
KEPARIWISATAAN
KETERANGAN :
±0,00 ±0,00

SALURAN DISPOSAL PADAT


SALURAN DISPOSAL CAIR

FLOOR DRAIN (6 BH)

BAK KONTROL

RENCANA INSTALASI AIR KOTOR


LT. 1 BANGUNAN ADMINISTRASI DETAIL WATER CLOSET
SKALA 1 : 2O
SKALA 1 : 230

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN RENCANA INSTALASI NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 AIR KOTOR & DETAIL KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
RK2.F.LT2 RK2.E.LT2 MUSHOLA
RK2.H.LT2 RK2.G.LT2
±0,00 ±0,00 ±0,00
±0,00 ±0,00

75

190
RK2.A.LT2

530
RK2.D.LT2 RK2.C.LT2 RK2.B.LT2
±0,00 ±0,00 ±0,00 ±0,00
WC PUTRA WC PUTRI
-0,05 -0,05

222.5
265
RENCANA INSTALASI AIR KOTOR
LT. 2 BANGUNAN PEMBELAJARAN
SKALA 1 : 230
DETAIL URINOIR
SKALA 1 : 2O

JANITOR WC PUTRA
-0,05 ±0,00

WC PUTRA WC PUTRI
-0,05 -0,05

RUANG RAPAT
±0,00

75

80 55 145
KETERANGAN :

280
SALURAN DISPOSAL PADAT
RUANG DOSEN PERJALANAN RUANG DOSEN PERJALANAN SALURAN DISPOSAL CAIR
±0,00 ±0,00

FLOOR DRAIN ( 6 BH)

BAK KONTROL

RENCANA INSTALASI AIR KOTOR


LT. 2 BANGUNAN ADMINISTRASI
SKALA 1 : 230 DETAIL WATER CLOSET
SKALA 1 : 2O

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN RENCANA INSTALASI NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 AIR KOTOR & DETAIL KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
RK2.F.LT2 RK2.E.LT2 MUSHOLA
RK2.H.LT2 RK2.G.LT2
±0,00 ±0,00 ±0,00
±0,00 ±0,00

700
RK2.D.LT2 RK2.C.LT2 RK2.B.LT2 RK2.A.LT2
±0,00 ±0,00 WC PUTRA ±0,00 ±0,00
WC PUTRI
-0,05 -0,05

JANITOR
-0,05

DETAIL KRAN AIR


RENCANA INSTALASI AIR BERSIH SKALA 1 : 2O
LT. 2 BANGUNAN PEMBELAJARAN
SKALA 1 : 230

JANITOR WC PUTRA
-0,05 ±0,00

WC PUTRA WC PUTRI
-0,05 -0,05

KETERANGAN :

SALURAN AIR LIMBAH RUANG RAPAT


±0,00

KRAN AIR WASTAFEL (8 BH)

280
250
KRAN AIR TOILET (12 BH)

RUANG DOSEN PERJALANAN RUANG DOSEN PERJALANAN


±0,00 ±0,00

DETAIL KRAN AIR


320 160 320 SKALA 1 : 20
800

RENCANA INSTALASI AIR BERSIH


LT. 2 BANGUNAN ADMINISTRASI
SKALA 1 : 230

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN NIM 551420011
FAKULTAS TEKNIK RENCANA INSTALASI
TAHUN 2020 KELAS A
JURUSAN TEKNIK ARSITEKTUR AIR BERSIH & DETAIL
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
A
OL
SH 0
MU ±0,0

1
.LT
1.E 0
RK ±0,0

1
.LT
1.F 0 1
RK ±0,0 .LT
1.A 0
RK ±0,0

1
.LT
1.G 0 1
RK ±0,0 .LT
1.B 0
RK ±0,0

1
.LT
1.H 0
RK ±0,0 I
TR
PU
C
W -0,05

C
TR
PU 5
A
KETERANGAN :
W -0,0

SALURAN DISPOSAL PADAT


SALURAN DISPOSAL CAIR
1
.LT
1.C 0
RK ±0,0 FLOOR DRAIN ( 6 BH)

1
.LT
1.D 0
RK ±0,0

I
TR
PU
C
W -0,05

ISOMETRI INSTALASI AIR KOTOR C


TR
PU 5
A

LT. 1 BANGUNAN PEMBELAJARAN


W -0,0 A
OL
SH 0
MU ±0,0

SKALA 1 : 230

Y
BB
LO 0,00
±

N
SE N
A D O T AA
G
AH AN ISA
US RU ARIW ,00
TA P ± 0
TA 0 KE
NG ±0,0
R UA

N
SE N
D O T AA
G
AN ISA
RU ARIW ,00
P ±0
KE

ISOMETRI INSTALASI AIR KOTOR


LT. 1 BANGUNAN ADMINISTRASI
SKALA 1 : 230

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN ISOMETRI INSTALASI NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 AIR KOTOR KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
A
OL
SH 0
MU ±0,0

2
.LT
2.E 0
RK ±0,0

2
.LT
2.F 0 2
RK ±0,0 .LT
2.A 0
RK ±0,0

2
.LT
2.G 0 2
RK ±0,0 .LT
2.B 0
RK ±0,0

2
.LT
2.H 0
RK ±0,0
C
TR
PU 5
W -0,0
I
KETERANGAN :

C
TR
PU 5
W -0,0
A
SALURAN DISPOSAL PADAT
SALURAN DISPOSAL CAIR

FLOOR DRAIN ( 6 BH)


2
.LT
2.C 0
RK ±0,0

2
.LT
2.D 0
RK ±0,0

A
TR
PU
C 0,00
W ±

OR
NIT 5
JA
-0,0

I
TR
PU
C
W -0,05

ISOMETRI INSTALASI AIR KOTOR W


C
TR
PU 5
-0,0
A

LT. 2 BANGUNAN PEMBELAJARAN


SKALA 1 : 230
T
PA
RA
G
AN 0,00
RU ±

AN
AN
AL
RJ
PE
N
SE ,00
D O ±0
G
AN
RU

AN
AN
AL
RJ
PE
EN 0
D OS ±0,0
G
AN
RU

ISOMETRI INSTALASI AIR KOTOR


LT. 2 BANGUNAN ADMINISTRASI
SKALA 1 : 230

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN ISOMETRI INSTALASI NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 AIR KOTOR KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
A
OL
SH 0
MU ±0,0

2
.LT
2.E 0
RK ±0,0

2
.LT
2.F 0 2
RK ±0,0 .LT
2.A 0
RK ±0,0

2
.LT
2.G 0 2
RK ±0,0 .LT
2.B 0
RK ±0,0

2
.LT
2.H 0
RK ±0,0 I
TR
PU
C
W -0,05

TR
PU 5
A KETERANGAN :
C
W -0,0

SALURAN DISPOSAL PADAT


SALURAN DISPOSAL CAIR

.LT
2 FLOOR DRAIN (6 BH)
2.C 0
RK ±0,0

2
.LT
2.D 0
RK ±0,0

ISOMETRI INSTALASI AIR KOTOR


LT. 3 BANGUNAN PEMBELAJARAN
SKALA 1 : 230

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN ISOMETRI INSTALASI NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 AIR KOTOR KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
A
OL
SH 0
MU ±0,0

1
.LT
1.E 0
RK ±0,0

1
.LT
1.F 0
RK 0,0 .LT
1
±
1.A 0
RK ±0,0

1
.LT
1.G 0 1
RK ±0,0 .LT
1.B 0
RK ±0,0

1
.LT
1.H 0
RK ±0,0 I
TR
PU
C
W -0,05

A
TR
PU 5
C
W -0,0

KETERANGAN :
OR
NIT 5
JA
-0,0
SALURAN AIR LIMBAH
1
.LT
1.C 0
RK ±0,0 KRAN AIR WASTAFEL (8 BH)

KRAN AIR TOILET (12 BH)

1
.LT
1.D 0
RK ±0,0

OR
NIT 5
JA
-0,0

I
TR
PU 5
C
W -0,0

A
TR

RENCANA INSTALASI AIR BERSIH


PU 5
C
W -0,0 A
OL
SH 0
MU ±0,0

LT. 1 BANGUNAN PEMBELAJARAN


SKALA 1 : 230
Y
BB
LO 0,00
±

N
SE N
A D O T AA
G
AH AN ISA
US RU ARIW ,00
TA P ± 0
TA 0 KE
NG ±0,0
R UA

N
SE N
D O T AA
G A
AN IS
RU ARIW ,00
P ±0
KE

ISOMETRI INSTALASI AIR BERSIH


LT. 1 BANGUNAN ADMINISTRASI
SKALA 1 : 230

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN ISOMETRI INSTALASI NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 AIR BERSIH KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
A
OL
SH 0
MU ±0,0

2
.LT
2.E 0
RK ±0,0

2
.LT
2.F 0
RK ±0,0 .LT
2
2.A 0
RK ±0,0

2
.LT
2.G 0 2
RK ±0,0 .LT
2.B 0
RK ±0,0

2
.LT
2.H 0
RK ±0,0 I
TR
PU
C
W -0,05

A
TR
PU 5
C
W -0,0

OR
NIT 5
KETERANGAN :
JA
-0,0

.LT
2.C 0
2
SALURAN AIR LIMBAH
RK ±0,0

KRAN AIR WASTAFEL (8 BH)

KRAN AIR TOILET (12 BH)

2
.LT
2.D 0
RK ±0,0

A
TR
PU
C 0,00
W ±

OR
NIT 5
JA
-0,0

I
TR
PU
C
W -0,05

RENCANA INSTALASI AIR BERSIH C


TR
PU 5
A

-0,0

LT. 2 BANGUNAN PEMBELAJARAN


W

SKALA 1 : 230
T
PA
RA
G
AN 0,00
RU ±

AN
AN
AL
RJ
PE
N
SE ,00
D O ±0
G
AN
RU

0
80

AN
AN
AL
RJ
PE
SEN 0
O ±0,0
0
40
D
G
AN
RU

00
20
ISOMETRI INSTALASI AIR BERSIH
80
0
LT. 2 BANGUNAN ADMINISTRASI
SKALA 1 : 230

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN ISOMETRI INSTALASI NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 AIR BERSIH KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
A
OL
SH 0
MU ±0,0

2
.LT
2.E 0
RK ±0,0

2
.LT
2.F 0 2
RK ±0,0 .LT
2.A 0
RK ±0,0

2
.LT
2.G 0 2
RK ±0,0 .LT
2.B 0
RK ±0,0

2
.LT
2.H 0
RK ±0,0 I
TR
PU
C
W -0,05

A
TR
PU 5
C
W -0,0

KETERANGAN :

2
SALURAN AIR LIMBAH
.LT
2.C 0
RK ±0,0
KRAN AIR WASTAFEL (8 BH)

KRAN AIR TOILET (12 BH)

2
.LT
2.D 0
RK ±0,0

RENCANA INSTALASI AIR BERSIH


LT. 3 BANGUNAN PEMBELAJARAN
SKALA 1 : 230

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN ISOMETRI INSTALASI NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 AIR BERSIH KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
Line Ke penangkap petir
Kabel Coaxial 2x35 mm2
KABEL SCHOON 35 mm
BUSBAR TEMBAGA 30x30x250 mm

KABEL BC 70mm2
KABEL BC 70mm2 KABEL BC 70mm2

EARTHING ROD Ø 5 8 " EARTHING ROD Ø 5 8 " EARTHING ROD Ø 5 8 "

DETAIL GROUNDING SYSTEM


SKALA 1 : 2O

PENANGKAP PETIR : NEO FLASH TZ03 RADIUS 67 MTR


TERMINATION KIT
FRP BLACK MASK

PLAT BESI
T. 10 MM + LASAN
KLEM SELING
KABEL SELING 4 ARAH DIA. 12MM
BESI BETON 10MM DILAS

PIPA GALVANIS 2 INCH

KABEL COAXIAL 2X35MM

ATAP
KLEM KABEL
JARAK ~50CM

SPAN SEKRUP

PLAT BESI
T. 10 MM + LASAN

KETERANGAN : DETAIL PEMASANGAN TIANG PENANGKAL PETIR


SKALA 1 : 2O
TITIK TIANG
PENANGKAL PETIR (10 BH)

ATAP SPANDEK

RENCANA TITIK SISTEM PENANGKAL PETIR


SKALA 1 : 2O

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN RENCANA TITIK SISTEM NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 PENANGKAL PETIR & DETAIL KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
3700

400 400 400 400 400 400 400 400 500

350

350
301

300
1650

1650
300

300
350

350
350

350
400 400 400 400 300 150 200 150 300 400 400 400 400

4300

RENCANA SISTEM ELEKTRIKAL LT 1


BANGUNAN PEMBELANJARAN
2000
SKALA 1 : 230 500 248 150 200 150 248 500

400

400
300

300
800

800
2300

2300
KETERANGAN :

LAMPU PK 20 WATT : 10 BH (GEDUNG ADMINISTRASI )


10 BH (GEDUNG PEMBELAJARAN)
KWH BOX : 48 BH (GEDUNG ADMINISTRASI)
91 BH (GEDUNG PEMBELAJARAN)
STOP KONTAK GANDENG : 3 BH (GEDUNG ADMINISTRASI)
600

600
SAKLAR TUNGGAL : 2 BH (GEDUNG PEMBELAJARAN)
STOP KONTAK GANDENG : 5 BH (GEDUNG ADMINISTRASI)
SAKLAR GANDA : 10 BH (GEDUNG PEMBELAJARAN)
SAKLAR GANDA : 2 BH (GEDUNG ADMINISTRASI)
: 2 BH (GEDUNG PEMBELAJARAN)
200

200
SAKLAR TUNGGAL : 2 BH (GEDUNG ADMINISTRASI)
: 2 BH (GEDUNG PEMBELAJARAN)
800 400 800
STOP KONTAK : 4 BH (GEDUNG PEMBELAJARAN)
RENCANA SISTEM ELEKTRIKAL LT 1 2000

BANGUNAN ADMINISTRASI
SKALA 1 : 230

NAMA TUGAS : NAMA LEMBAR TUGAS


UNIVERSITAS NEGERI GORONTALO EAH63143 ADRIANTO MATOLODULA
NIM
FAKULTAS TEKNIK SISTEM KELENGKAPAN BANGUNAN RENCANA SISTEM ELEKTRIKAL LT. 1 KELAS
551420011
TAHUN 2020 BANGUNAN ADMINISTRASI DAN A
JURUSAN TEKNIK ARSITEKTUR DOSEN
BANGUNAN PEMBELAJARAN MUTMAINNAH, ST.,M.Ars.
PENGAJAR
3700

400 400 400 400 400 400 400 400 500

350

350
301

300
1650

1650
300

300
350

350
350

350
400 400 400 400 300 150 200 150 300 400 400 400 400

4300

RENCANA SISTEM ELEKTRIKAL LT. 3


BANGUNAN PEMBELANJARAN
KETERANGAN :
SKALA 1 : 160 LAMPU PK 20 WATT : 10 BH (GEDUNG PEMBELAJARAN)

KWH BOX : 91 BH (GEDUNG PEMBELAJARAN)

STOP KONTAK GANDENG : 2 BH (GEDUNG PEMBELAJARAN)


SAKLAR TUNGGAL
STOP KONTAK GANDENG : 10 BH (GEDUNG PEMBELAJARAN)
SAKLAR GANDA
SAKLAR GANDA : 2 BH (GEDUNG PEMBELAJARAN)

SAKLAR TUNGGAL : 2 BH (GEDUNG PEMBELAJARAN)

STOP KONTAK : 4 BH (GEDUNG PEMBELAJARAN)

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN RENCANA SISTEM ELEKTRIKAL LT. 2 NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 BANGUNAN ADMINISTRASI DAN KELAS A
JURUSAN TEKNIK ARSITEKTUR
BANGUNAN PEMBELAJARAN PEMBIMBING MUTMAINNAH, ST.,M.Ars.
3700

400 400 400 400 400 400 400 400 500

350

350
301

300
1650

1650
300

300
350

350
350

350
400 400 400 400 300 150 200 150 300 400 400 400 400

4300

RENCANA SISTEM ELEKTRIKAL LT. 2


BANGUNAN PEMBELANJARAN
SKALA 1 : 230 2000

500 250 150 200 150 250 500

400

400
300

300
2100

2100
800

800
KETERANGAN :

LAMPU PK 20 WATT : 10 BH (GEDUNG ADMINISTRASI )


10 BH (GEDUNG PEMBELAJARAN)
KWH BOX : 49 BH (GEDUNG ADMINISTRASI)
91 BH (GEDUNG PEMBELAJARAN)
600

600
STOP KONTAK GANDENG : 2 BH (GEDUNG ADMINISTRASI)
SAKLAR TUNGGAL : 2 BH (GEDUNG PEMBELAJARAN)
STOP KONTAK GANDENG : 6 BH (GEDUNG ADMINISTRASI)
SAKLAR GANDA : 10 BH (GEDUNG PEMBELAJARAN)
SAKLAR GANDA : 2 BH (GEDUNG ADMINISTRASI)
800 400 800
: 2 BH (GEDUNG PEMBELAJARAN)
2000 SAKLAR TUNGGAL : 2 BH (GEDUNG ADMINISTRASI)
: 2 BH (GEDUNG PEMBELAJARAN)
RENCANA SISTEM ELEKTRIKAL LT 2 STOP KONTAK : 4 BH (GEDUNG PEMBELAJARAN)

BANGUNAN ADMINISTRASI
SKALA 1 : 230

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN RENCANA SISTEM ELEKTRIKAL LT. 2 NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 BANGUNAN ADMINISTRASI DAN KELAS A
JURUSAN TEKNIK ARSITEKTUR
BANGUNAN PEMBELAJARAN PEMBIMBING MUTMAINNAH, ST.,M.Ars.
TAMPAK ATAP SAMPING

50
10 30 10

DRAINASE AIR HUJAN

DETAIL DRAINASE
SKALA 1 : 2O

KETERANGAN :

ARAH JATUH AIR

RENCANA SISTEM PENYALURAN AIR ATAP SPANDEK


SKALA 1 : 230

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO RENCANA SISTEM PENYALURAN AIR
SISTEM KELENGKAPAN BANGUNAN NIM 551420011
FAKULTAS TEKNIK DAN
TAHUN 2020 KELAS A
JURUSAN TEKNIK ARSITEKTUR DRAINASE LUAR BANGUNAN PEMBIMBING MUTMAINNAH, ST.,M.Ars.
Drain AC PVC 1" Drain AC PVC 1"
Drain AC PVC 1"

Drain AC PVC 1" Drain AC PVC 1" out


Drain AC PVC 1" Drain AC PVC 1" out Drain AC PVC 1" Drain AC PVC 1" Drain AC PVC 1" Drain AC PVC 1"
out out out out out out out out out

A C 2,5 A C 2,5 A C 2,5 A C 2,5 A C 2,5 A C 2,5 A C 2,5 A C 2,5


indoor indoor indoor indoor indoor indoor indoor indoor

A C 2,5
A C 2,5

indoor
A C 2,5

A C 2,5
indoor
indoor

indoor
out
RK1.F.LT1 RK1.E.LT1 MUSHOLA
RK1.H.LT1 RK1.G.LT1
±0,00 ±0,00

Drain AC PVC 1"


±0,00 ±0,00 ±0,00

A C 2,5
A C 2,5
indoor

indoor
out

out
Drain AC PVC 1"

Drain AC PVC 1"


A C 2,5
A C 2,5
indoor

indoor
out
RK1.A.LT1

Drain AC PVC 1"


RK1.D.LT1 RK1.C.LT1 RK1.B.LT1
WC PUTRA WC PUTRI ±0,00
±0,00 ±0,00 ±0,00
-0,05 -0,05

JANITOR WC PUTRA
indoor indoor indoor indoor -0,05 indoor indoor indoor indoor
A C 2,5 A C 2,5 A C 2,5 A C 2,5 A C 2,5 A C 2,5 A C 2,5 A C 2,5

out out out out out out out out


Drain AC PVC 1" Drain AC PVC 1" out Drain AC PVC 1" Drain AC PVC 1" out out Drain AC PVC 1" Drain AC PVC 1" Drain AC PVC 1" Drain AC PVC 1"

DETAIL AC SPLIT
Drain AC PVC 1" Drain AC PVC 1"

RENCANA SISTEM TATA UDARA SKALA 1 : 2O


LT. 1 BANGUNAN PEMBELAJARAN
SKALA 1 : 230

JANITOR WC PUTRA
-0,05 ±0,00

WC PUTRA WC PUTRI
-0,05 -0,05
A C 2,5
indoor
out
Drain AC PVC 1"

RUANG TATA USAHA MUSHOLA


±0,00 ±0,00
LOBBY
±0,00
A C 2,5
indoor
out

KETERANGAN :
Drain AC PVC 1"

SELANG AC (DRAIN AC PVC 1')


AC 2

AC 2
indoor

indoor

RUANG DOSEN RUANG DOSEN


out

out

KEPARIWISATAAN KEPARIWISATAAN
Drain AC PVC 1"

Drain AC PVC 1"

±0,00 ±0,00

AC 2,5 AC SPLIT 2,5 PK (30 BH)


indoor indoor indoor indoor

AC SPLIT 2 PK (2 BH)
AC 2 AC 2 AC 2 AC 2

AC 2
out out out out
Drain AC PVC 1" Drain AC PVC 1" Drain AC PVC 1" Drain AC PVC 1"

RENCANA SISTEM TATA UDARA


LT. 1 BANGUNAN ADMINISTRASI
SKALA 1 : 230

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN RENCANA SISTEM TATA UDARA NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 DAN DETAIL KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
Drain AC PVC 1" Drain AC PVC 1"
Drain AC PVC 1"

out
Drain AC PVC 1" out
Drain AC PVC 1" out out
Drain AC PVC 1" out
Drain AC PVC 1" out Drain AC PVC 1" Drain AC PVC 1" out
Drain AC PVC 1" Drain AC PVC 1"
out out out out

AC 2,5 AC 2,5 AC 2,5 AC 2,5 AC 2,5 AC 2,5 AC 2,5 AC 2,5


indoor indoor indoor indoor indoor indoor indoor indoor

AC 2,5
AC 2,5

indoor

AC 2,5
AC 2,5

indoor
indoor

indoor
out
RK1.F.LT1 RK1.E.LT1 MUSHOLA
RK1.H.LT1 RK1.G.LT1
±0,00 ±0,00

Drain AC PVC 1"


±0,00 ±0,00 ±0,00

AC 2,5
AC 2,5
indoor

indoor
out

out
Drain AC PVC 1"

Drain AC PVC 1"


AC 2,5
AC 2,5
indoor

indoor
RK1.D.LT1 RK1.C.LT1 RK1.B.LT1 RK1.A.LT1
WC PUTRA WC PUTRI ±0,00
±0,00 ±0,00 -0,05
±0,00
-0,05

JANITOR
indoor indoor indoor indoor -0,05 indoor indoor
AC 2,5
indoor indoor
AC 2,5 AC 2,5 AC 2,5 AC 2,5 AC 2,5 AC 2,5 AC 2,5

out out out out out out out out


Drain AC PVC 1" Drain AC PVC 1" out Drain AC PVC 1" Drain AC PVC 1"out out Drain AC PVC 1" Drain AC PVC 1" Drain AC PVC 1" Drain AC PVC 1"
Drain AC PVC 1" Drain AC PVC 1"

DETAIL AC SPLIT
RENCANA SISTEM TATA UDARA SKALA 1 : 2O
LT. 2 BANGUNAN PEMBELAJARAN
SKALA 1 : 230

JANITOR WC PUTRA
-0,05 ±0,00

150
150
WC PUTRA WC PUTRI
-0,05 -0,05

300
150

RUANG RAPAT
±0,00

275

MONTAJE FAN COIL


S/E

DETAIL AC SENTRAL
SKALA 1 : 2O
indoor

indoor
indoor

indoor
AC 2

AC 2
AC 2

AC 2
out

out

RUANG DOSEN PERJALANAN RUANG DOSEN PERJALANAN


±0,00 ±0,00
Drain AC PVC 1"

Drain AC PVC 1"

indoor
AC 2

out out out


indoor
AC 2

out
KETERANGAN :
Drain AC PVC 1" Drain AC PVC 1"
Drain AC PVC 1" Drain AC PVC 1"

SELANG AC (DRAIN AC PVC 1')


RENCANA SISTEM TATA UDARA
LT. 2 BANGUNAN ADMINISTRASI
AC 2,5 AC SPLIT 2,5 PK (30 BH)
SKALA 1 : 230 AC SENTRAL 2,5 PK (5 BH)

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN RENCANA SISTEM TATA UDARA NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 DAN DETAIL KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
Drain AC PVC 1" Drain AC PVC 1"
Drain AC PVC 1"

Drain AC PVC 1" Drain AC PVC 1" out


Drain AC PVC 1" Drain AC PVC 1" out Drain AC PVC 1" Drain AC PVC 1" Drain AC PVC 1" Drain AC PVC 1"
out out out out out out out out out

AC 2,5 AC 2,5 AC 2,5 AC 2,5 AC 2,5 AC 2,5 AC 2,5 AC 2,5


indoor indoor indoor indoor indoor indoor indoor indoor

indoor
AC 2,5
indoor
indoor
AC 2,5

AC 2,5

AC 2,5
indoor
out
ST2.B.LT3 ST1.A.LT3 MUSHOLA
ST4.D.LT3 ST3.C.LT3
±0,00 ±0,00 ±0,00
±0,00 ±0,00

Drain AC PVC 1"

S ERIAL

S ERIAL
indoor

indoor
AC 2,5

AC 2,5
out

out
S ERIAL

S ERIAL
Drain AC PVC 1"

Drain AC PVC 1"


S ERIAL

S ERIAL
indoor

indoor
AC 2,5
AC 2,5
RK3.D.LT3 RK3.C.LT3 RK3.B.LT3 RK3.A.LT3
±0,00 ±0,00 WC PUTRA WC PUTRI ±0,00 ±0,00
-0,05 -0,05

JANITOR WC PUTRA
indoor
AC 2,5
indoor
AC 2,5
indoor
AC 2,5
indoor
AC 2,5
-0,05 indoor
AC 2,5
indoor
AC 2,5
indoor
AC 2,5
indoor
AC 2,5

out out out out out out out out


Drain AC PVC 1" Drain AC PVC 1" out Drain AC PVC 1" Drain AC PVC 1"out out Drain AC PVC 1" Drain AC PVC 1" Drain AC PVC 1" Drain AC PVC 1"
Drain AC PVC 1" Drain AC PVC 1"

RENCANA SISTEM TATA UDARA


LT. 3 BANGUNAN PEMBELAJARAN
SKALA 1 : 230

KETERANGAN :

SELANG AC (DRAIN AC PVC 1')

AC 2,5 AC SPLIT 2,5 PK (24 BH)


DETAIL AC SPLIT
SKALA 1 : 2O

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN RENCANA SISTEM TATA UDARA NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 DAN DETAIL KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
ORGANIK
RK1.F.LT1 RK1.E.LT1 MUSHOLA
RK1.H.LT1 RK1.G.LT1
±0,00 ±0,00 ±0,00
±0,00 ±0,00

NON ORGANIK
B3
RK1.D.LT1 RK1.C.LT1 RK1.B.LT1 RK1.A.LT1
WC PUTRA WC PUTRI ±0,00
±0,00 ±0,00 -0,05
±0,00
-0,05

JANITOR WC PUTRA
-0,05

RENCANA SISTEM PEMBUANGAN


SAMPAH LT. 1 BANGUNAN PEMBELAJARAN
SKALA 1 : 230
DETAIL TEMPAT SAMPAH
SKALA 1 : 20
JANITOR WC PUTRA
-0,05 ±0,00

ORGANIK NON ORGANIK B3

WC PUTRA WC PUTRI
-0,05 -0,05

RUANG TATA USAHA MUSHOLA


±0,00 ±0,00
LOBBY
±0,00

KETERANGAN :
RUANG DOSEN RUANG DOSEN
KEPARIWISATAAN KEPARIWISATAAN
±0,00 ±0,00
TEMPAT SAMPAH INDOOR (10 BH)

ORGANIK NON ORGANIK B3

TEMPAT SAMPAH OUTDOOR (2 BH)

RENCANA SISTEM PEMBUANGAN


SAMPAH LT. 1 BANGUNAN ADMINISTRASI
SKALA 1 : 230

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN RENCANA SISTEM PEMBUANGAN NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 SAMPAH DAN DETAIL KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
RK2.F.LT2 RK2.E.LT2 MUSHOLA
RK2.H.LT2 RK2.G.LT2
±0,00 ±0,00 ±0,00
±0,00 ±0,00

RK2.D.LT2 RK2.C.LT2 RK2.B.LT2 RK2.A.LT2


±0,00 ±0,00 WC PUTRA ±0,00 ±0,00
WC PUTRI
-0,05 -0,05

JANITOR WC PUTRA
-0,05

RENCANA SISTEM PEMBUANGAN


SAMPAH LT. 2 BANGUNAN PEMBELAJARAN
SKALA 1 : 230
DETAIL TEMPAT SAMPAH
SKALA 1 : 20

JANITOR WC PUTRA
-0,05 ±0,00

WC PUTRA WC PUTRI
-0,05 -0,05

RUANG RAPAT
±0,00

RUANG DOSEN PERJALANAN


±0,00
RUANG DOSEN PERJALANAN KETERANGAN :
±0,00

TEMPAT SAMPAH INDOOR (10 BH)

RENCANA SISTEM PEMBUANGAN


SAMPAH LT. 2 BANGUNAN ADMINISTRASI
SKALA 1 : 230

NAMA TUGAS : LEMBAR TUGAS


EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN RENCANA SISTEM PEMBUANGAN NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 SAMPAH DAN DETAIL KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.
ST2.B.LT3 ST1.A.LT3 MUSHOLA
ST4.D.LT3 ST3.C.LT3
±0,00 ±0,00 ±0,00
±0,00 ±0,00

S ERIAL

S ERIAL
S ERIAL

S ERIAL
S ERIAL

S ERIAL
RK3.D.LT3 RK3.C.LT3 RK3.B.LT3 RK3.A.LT3
±0,00 ±0,00 WC PUTRA WC PUTRI ±0,00 ±0,00
-0,05 -0,05

JANITOR WC PUTRA
-0,05

RENCANA INSTALASI AIR BERSIH


LT. 3 BANGUNAN PEMBELAJARAN KETERANGAN :
SKALA 1 : 160 TEMPAT SAMPAH INDOOR (10 BH)

DETAIL TEMPAT SAMPAH


SKALA 1 : 20
NAMA TUGAS : LEMBAR TUGAS
EAH63143 NAMA ADRIANTO MATOLODULA
UNIVERSITAS NEGERI GORONTALO
SISTEM KELENGKAPAN BANGUNAN RENCANA SISTEM PEMBUANGAN NIM 551420011
FAKULTAS TEKNIK
TAHUN 2020 SAMPAH DAN DETAIL KELAS A
JURUSAN TEKNIK ARSITEKTUR
PEMBIMBING MUTMAINNAH, ST.,M.Ars.

Anda mungkin juga menyukai