VOLUME VOLUME VOLUME HARGA SATUAN PEKERJAAN TAMBAH KURANG HARGA SATUAN
No URAIAN PEKERJAAN SAT JUMLAH (Rp) No URAIAN PEKERJAAN VOLUME SAT JUMLAH (Rp)
DEDI LAPANGAN FINAL QUANTITY (Rp) VOLUME BIAYA (Rp) (Rp)
1 2 3 3 4 5 6 minus dedi Minus kantor minus dedi Minus kantor 1 2 3 4 6 7
I.3 Pekerjaan Hydrant Luar Bangunan I.3 Pekerjaan Hydrant Luar Bangunan
BSP Sch. 40 Ø 65 mm + Isolasi ( SPINDO ) 245.00 Rp 62,500.00 Rp 15,312,500.00 245.00 Rp 15,312,500.00 BSP Sch. 40 Ø 65 mm + Isolasi ( SPINDO )
BSP Sch. 40 Ø 80 mm + Isolasi ( SPINDO ) 210.00 Rp 75,000.00 Rp 15,750,000.00 210.00 Rp 15,750,000.00 BSP Sch. 40 Ø 80 mm + Isolasi ( SPINDO )
1 BSP Sch. 40 Ø 100 mm + Isolasi ( SPINDO ) 287.00 328.05 400.00 m Rp 100,000.00 Rp 28,700,000.00 41.05 Rp 4,105,000.00 1 BSP Sch. 40 Ø 100 mm + Isolasi ( SPINDO ) 328.05 m Rp 100,000.00 Rp 32,805,000.00
2 BSP Sch. 40 Ø 150 mm + Isolasi ( SPINDO ) 176.00 166.40 100.00 m Rp 150,000.00 Rp 26,400,000.00 9.60 Rp 1,440,000.00 2 BSP Sch. 40 Ø 150 mm + Isolasi ( SPINDO ) 166.40 m Rp 150,000.00 Rp 24,960,000.00
2 Pipa PPR 1/2" Air bersih untuk wastafel Permanen 60.00 m Rp 22,000.00 Rp - 60.00 Rp 1,320,000.00 2 Pipa PPR 1/2" Air bersih untuk wastafel Permanen 60.00 m Rp 22,000.00 Rp 1,320,000.00
3 Pipa PVC 2" Air Bekas Wastafer Permanen 35.00 m Rp 25,000.00 Rp - 35.00 Rp 875,000.00 3 Pipa PVC 2" Air Bekas Wastafer Permanen 35.00 m Rp 25,000.00 Rp 875,000.00
4 Pipa 6" Untuk Air Hujan (Luar Banguinan) 134.00 102.00 m Rp 50,000.00 Rp - 134.00 Rp 6,700,000.00 4 Pipa 6" Untuk Air Hujan (Luar Banguinan) 134.00 m Rp 50,000.00 Rp 6,700,000.00
TOTAL PEKERJAAN PLUMBING Rp 230,863,500.00 Rp 83,166,100.00 Rp 164,651,250.00 TOTAL PEKERJAAN PLUMBING Rp 312,348,650.00
KETERANGAN : PADA ITEM PEKERJAAN YANG DI TANDAI WARNA ORANGE DIATAS MERUPAKAN ITEM BARU DI DALAM DATA INI KARENA PADA SAAT HITUNG LANGSUNG DI LAPANGAN TGL 09-10-2022 ANTARA RANGKUTI DAN DEDI MASTOK TIDAK TERHITUNG DIKARENAKAN KELALAIAN.
ITEM PEKERJAAN YANG DITANDAI WARNA ORANGE TERSEBUT HANYA ADA DI PENAWARAN BETESDA DAN PENAWARAN DEDI MASTOK DAN
MULAI DARI CCO-1, CCO-2, S/D FINAL QUANTITY ITEM PEKERJAAN TERSEBUT TELAH DITIADAKAN DALAM KONRAK PASAR BARU, MADINA (TIDAK TERPASANG DILAPANGAN)