Kusen KEGIATAN :
PENYUSUNAN DED RUMAH SAKIT NYITDAH
PEKERJAAN :
PENYUSUNAN DED PEMBANGUNAN
RUMAH SAKIT NYITDAH
LOKASI :
DESA NYITDAH, KEDIRI, KAB. TABANAN
Jalur Kabel Foot Sensor - di bobok by other
OUTSIDE
INSIDE
7. I WAYAN TRIANA S, SKM.M.KES
8. I WAYAN WIASA, ST.,M.KES
9. dr. I GEDE SUDIARTA
10. I NYOMAN SARNA, SH.
MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
MENGETAHUI/MENETAPKAN
TAMPAK SAMPING
01 NTS
TAMPAK DEPAN 03 NTS
INSIDE
Dr. I NYM SURATMIKA, M.Kes.
NIP. 19630410 199003 1 014
MENGESAHKAN
PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
FOOT
SENSOR
FOOT SENSOR
I MADE YUDIANA, ST. MT.
NIP. 19690619 199803 1 005
FLOOR
02
TAMPAK ATAS TAMPAK SAMPING TEAM LEADER ENDRO ADIWIRAWAN, ST., MT.
NTS
AHLI TEKNIK
ARSITEKTUR
Ir. I KETUT BUDIARSA, MM., MT., IAI.
kusen SS insulated Foam, cover Stainless Steel 2 swing, Emergency fix handle, AHLI TEKNIK
MEKANIKAL/PLUMBING
I KOMANG DEWANTA, ST.
Material
AHLI TEKNIK
ELEKTRIKAL I WAYAN HANA, ST.
Pintu Manual swing with electroboth, Safety beam sensor, foot sensor, AHLI MANAJEMEN
Daun
automatic door drive tormax NO. LEMBAR JML. LEMBAR KODE GAMBAR
jendela 328
KONSULTAN PERENCANAN
Tempered Glass 8mm PT. "DANA SULARSA CIPTA" JO.
Kaca CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT
45
45
45
45
45
45
PEKERJAAN :
200
200
PENYUSUNAN DED PEMBANGUNAN
200 100 200 100 RUMAH SAKIT NYITDAH
LOKASI :
DESA NYITDAH, KEDIRI, KAB. TABANAN
2 2 4 2 2'
700
700
BIMBINGAN TEKNIS PARAF
2200
2200
4. I NYOMAN BAGIASTRA
5. GEDE SASTRA PRATYAHARA, ST.
2200
2200
2200
2200
2200
2155
2155
2155
2155
2155
6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
8. I WAYAN WIASA, ST.,M.KES
9. dr. I GEDE SUDIARTA
10. I NYOMAN SARNA, SH.
MENYETUJUI
1255
1255
PEJABAT PELAKSANA TEKNIS KEGIATAN
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
MENGETAHUI/MENETAPKAN
PLATE STAINLESS PLATE STAINLESS PLATE STAINLESS PLATE STAINLESS
Floor T=1.0MM T=1.0MM T=1.0MM T=1.0MM
PPK BIDANG BANGUNAN GEDUNG
PADA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
700 45 45 45 800 45 45
100 45 800 500 45 100 100
IR. K. FARIDATINI SUWECA
45 45 NIP. 19630517 199703 2 002
790 1390 890 MENGESAHKAN
KEPALA DINAS KESEHATAN KABUPATEN TABANAN
MENGESAHKAN
PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
45
45
100
100
100
NAMA GAMBAR SKALA
Rangka Kusen aluminium Kusen aluminium Kusen aluminium ARSITEKTUR LANSEKAP Ir. I NYOMAN SUWANDI
AHLI TEKNIK SIPIL I KETUT SUTAWA, ST.
& finishing
kusen YKK SF 100 T=1.35MM YB-1C (Powder Coating) YKK SF 100 T=1.35MM YB-1C (Powder Coating) YKK SF 100 T=1.35MM YB-1C (Powder Coating)
AHLI TEKNIK
MEKANIKAL/PLUMBING
I KOMANG DEWANTA, ST.
Material
AHLI TEKNIK
ELEKTRIKAL I WAYAN HANA, ST.
AHLI MANAJEMEN
Pintu Daun kayu finish HPL Daun kayu finish HPL Daun kayu finish HPL
Daun
jendela 329
KONSULTAN PERENCANAN
PT. "DANA SULARSA CIPTA" JO.
Kaca Wire glass t= 5mm Wire glass t= 5mm CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT
Acc Pintu Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Lockase IL 8485 + DC 60 ex. Dekson Lockase IL 8485 + DC 60 ex. Dekson Lockase IL 8485 + DC 60 ex. Dekson DIREKTUR
Type D4 D5 D6
PEMERINTAH DAERAH KABUPATEN TABANAN
DINAS PEKERJAAN UMUM
PENATAAN RUANG, PERUMAHAN, DAN KAWASAN PERMUKIMAN
KABUPATEN TABANAN
Jl. Arjuna No. 2 TLPN. (0361) 811909
45
45
45
45
45
PEKERJAAN :
200
PENYUSUNAN DED PEMBANGUNAN
100 200 RUMAH SAKIT NYITDAH
LOKASI :
DESA NYITDAH, KEDIRI, KAB. TABANAN
2 3 2 7
700
BIMBINGAN TEKNIS PARAF
2200
4. I NYOMAN BAGIASTRA
2200
5. GEDE SASTRA PRATYAHARA, ST.
2200
2200
2200
2200
2200
2155
2155
2155
2155
2155
6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
8. I WAYAN WIASA, ST.,M.KES
9. dr. I GEDE SUDIARTA
10. I NYOMAN SARNA, SH.
MENYETUJUI
1255
MENGETAHUI/MENETAPKAN
PLATE STAINLESS PLATE STAINLESS PLATE STAINLESS
Floor T=1.0MM T=1.0MM T=1.0MM
PPK BIDANG BANGUNAN GEDUNG
PADA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
Louvre
MENGESAHKAN
PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
35 35
810 810 35 760 35 I MADE YUDIANA, ST. MT.
100 610 100100 610 100 100 560 100 35 850 35 NIP. 19690619 199803 1 005
100 650 100
45
45
100
100
45
100
DETAIL KUSEN PINTU & JENDELA 1:20
45 1600 45
1690 45 740 45
45 830 45
830 JABATAN NAMA PARAF
920
TEAM LEADER ENDRO ADIWIRAWAN, ST., MT.
AHLI TEKNIK
ARSITEKTUR
Ir. I KETUT BUDIARSA, MM., MT., IAI.
AHLI TEKNIK
Rangka Kusen aluminium Kusen aluminium Kusen aluminium ARSITEKTUR LANSEKAP Ir. I NYOMAN SUWANDI
AHLI TEKNIK SIPIL I KETUT SUTAWA, ST.
& finishing
kusen YKK SF 100 T=1.35MM YB-1C (Powder Coating) YKK SF 100 T=1.35MM YB-1C (Powder Coating) YKK SF 100 T=1.35MM YB-1C (Powder Coating)
AHLI TEKNIK
MEKANIKAL/PLUMBING
I KOMANG DEWANTA, ST.
Material
AHLI TEKNIK
ELEKTRIKAL I WAYAN HANA, ST.
AHLI MANAJEMEN
Pintu Daun kayu finish HPL Daun kayu finish HPL Aluminium door frame
Daun
jendela 330
KONSULTAN PERENCANAN
PT. "DANA SULARSA CIPTA" JO.
Kaca kaca clear tempered 12 mm, stiker sand blast CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT
Acc Pintu Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Lockase IL 8485 + DC 60 ex. Dekson Lockase IL 8485 + DC 60 ex. Dekson Pull handle PH 801 32x350 ex. Dekson DIREKTUR
Type D7 D8
PEMERINTAH DAERAH KABUPATEN TABANAN
DINAS PEKERJAAN UMUM
65 PENATAAN RUANG, PERUMAHAN, DAN KAWASAN PERMUKIMAN
KABUPATEN TABANAN
Jl. Arjuna No. 2 TLPN. (0361) 811909
45 1' 45 A
100
KEGIATAN :
PENYUSUNAN DED RUMAH SAKIT NYITDAH
45
45
45
100
25 PEKERJAAN :
7 B
1210
BIMBINGAN TEKNIS PARAF
2200
2200
4. I NYOMAN BAGIASTRA
5. GEDE SASTRA PRATYAHARA, ST.
2073
2200
2200
2200
2155
6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
45
8. I WAYAN WIASA, ST.,M.KES
9. dr. I GEDE SUDIARTA
10. I NYOMAN SARNA, SH.
MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
900
I GUSTI NGURAH ADI GUNARSA, ST.
NIP. 19730819 200501 1 005
MENGETAHUI/MENETAPKAN
Louvre
60
7
830 45 10045 IR. K. FARIDATINI SUWECA
100 1600 150 NIP. 19630517 199703 2 002
920 10 MENGESAHKAN
1690 KEPALA DINAS KESEHATAN KABUPATEN TABANAN
MENGESAHKAN
PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
100 1490 100
45 1600 45
45
45 830 45
920 JABATAN NAMA PARAF
TEAM LEADER ENDRO ADIWIRAWAN, ST., MT.
AHLI TEKNIK
ARSITEKTUR
Ir. I KETUT BUDIARSA, MM., MT., IAI.
AHLI TEKNIK
Rangka Kusen aluminium Kusen aluminium ARSITEKTUR LANSEKAP Ir. I NYOMAN SUWANDI
AHLI TEKNIK SIPIL I KETUT SUTAWA, ST.
& finishing
kusen YKK SF 100 T=1.35MM YB-1C (Powder Coating) YKK SF 100 T=1.35MM YB-1C (Powder Coating)
AHLI TEKNIK
MEKANIKAL/PLUMBING
I KOMANG DEWANTA, ST.
Material
AHLI TEKNIK
ELEKTRIKAL I WAYAN HANA, ST.
AHLI MANAJEMEN
Pintu Aluminium door frame aluminium door frame
Daun
jendela 331
KONSULTAN PERENCANAN
PT. "DANA SULARSA CIPTA" JO.
Kaca kaca clear tempered 12 mm kaca clear tempered 12 mm CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT
Acc Pintu Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson, top Sliding door hard ware, botom sliding door hardware
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Lockase IL 8485 + DC 60 ex. Dekson Lockase IL 8485 + DC 60 ex. Dekson, aluminium cover DIREKTUR
Type D9
PEMERINTAH DAERAH KABUPATEN TABANAN
DINAS PEKERJAAN UMUM
1690 65 PENATAAN RUANG, PERUMAHAN, DAN KAWASAN PERMUKIMAN
KABUPATEN TABANAN
45 1600 45 Jl. Arjuna No. 2 TLPN. (0361) 811909
100
100
KEGIATAN :
PENYUSUNAN DED RUMAH SAKIT NYITDAH
45
100
25 PEKERJAAN :
1210
BIMBINGAN TEKNIS PARAF
2200
4. I NYOMAN BAGIASTRA
5. GEDE SASTRA PRATYAHARA, ST.
2073
6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
45
MENGETAHUI/MENETAPKAN
60
7
10045 IR. K. FARIDATINI SUWECA
150 NIP. 19630517 199703 2 002
MENGESAHKAN
KEPALA DINAS KESEHATAN KABUPATEN TABANAN
MENGESAHKAN
PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
1690
1122 60 1335 60
45 1032 45
I MADE YUDIANA, ST. MT.
NIP. 19690619 199803 1 005
AHLI TEKNIK
ELEKTRIKAL I WAYAN HANA, ST.
AHLI MANAJEMEN
Pintu aluminium door frame
Daun
jendela 332
KONSULTAN PERENCANAN
PT. "DANA SULARSA CIPTA" JO.
Kaca kaca clear tempered 12 mm CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT
Acc Pintu Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson, top Sliding door hard ware, botom sliding door hardware
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Lockase IL 8485 + DC 60 ex. Dekson, aluminium cover DIREKTUR
Type D10 ED
PEMERINTAH DAERAH KABUPATEN TABANAN
DINAS PEKERJAAN UMUM
1690 65 PENATAAN RUANG, PERUMAHAN, DAN KAWASAN PERMUKIMAN
KABUPATEN TABANAN
1340
45 1600 45 Jl. Arjuna No. 2 TLPN. (0361) 811909
50 1250 50
100
KEGIATAN :
PENYUSUNAN DED RUMAH SAKIT NYITDAH
45
50
100
25 PEKERJAAN :
2200
4. I NYOMAN BAGIASTRA
5. GEDE SASTRA PRATYAHARA, ST.
2073
2200
2200
2155
2155
6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
8. I WAYAN WIASA, ST.,M.KES
9. dr. I GEDE SUDIARTA
10. I NYOMAN SARNA, SH.
MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
MENGETAHUI/MENETAPKAN
60
7
10045 50 IR. K. FARIDATINI SUWECA
150 100 NIP. 19630517 199703 2 002
MENGESAHKAN
KEPALA DINAS KESEHATAN KABUPATEN TABANAN
35 1270 35
60 1150 60 I MADE YUDIANA, ST. MT.
45
100
100
NIP. 19690619 199803 1 005
1340
JABATAN NAMA PARAF
TEAM LEADER ENDRO ADIWIRAWAN, ST., MT.
AHLI TEKNIK
ARSITEKTUR
Ir. I KETUT BUDIARSA, MM., MT., IAI.
AHLI TEKNIK
Rangka Kusen aluminium steel frame ARSITEKTUR LANSEKAP Ir. I NYOMAN SUWANDI
AHLI TEKNIK SIPIL I KETUT SUTAWA, ST.
& finishing
kusen YKK SF 100 T=1.35MM YB-1C (Powder Coating) YKK SF 100 T=1.35MM YB-1C (Powder Coating)
AHLI TEKNIK
MEKANIKAL/PLUMBING
I KOMANG DEWANTA, ST.
Material
AHLI TEKNIK
ELEKTRIKAL I WAYAN HANA, ST.
AHLI MANAJEMEN
Pintu aluminium door frame stiffener steel
Daun
jendela 333
KONSULTAN PERENCANAN
PT. "DANA SULARSA CIPTA" JO.
Kaca kaca clear tempered 12 mm CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT
Acc Pintu Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson, top Sliding door hard ware door closer, ruber silent, Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Lockase IL 8485 + DC 60 ex. Dekson, aluminium cover, btm slding door panic bar, Lockase IL 8485 + DC 60 ex. Dekson, pin security DIREKTUR
Type D11
PEMERINTAH DAERAH KABUPATEN TABANAN
DINAS PEKERJAAN UMUM
PENATAAN RUANG, PERUMAHAN, DAN KAWASAN PERMUKIMAN
KABUPATEN TABANAN
1' 45
Jl. Arjuna No. 2 TLPN. (0361) 811909
45 A 45
2905 810 KEGIATAN :
PENYUSUNAN DED RUMAH SAKIT NYITDAH
PEKERJAAN :
PENYUSUNAN DED PEMBANGUNAN
RUMAH SAKIT NYITDAH
LOKASI :
DESA NYITDAH, KEDIRI, KAB. TABANAN
900
B D
MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
MENGETAHUI/MENETAPKAN
730
856
MENGESAHKAN
PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
AHLI TEKNIK
ELEKTRIKAL I WAYAN HANA, ST.
AHLI MANAJEMEN
Pintu aluminium door frame
Daun
jendela 334
KONSULTAN PERENCANAN
PT. "DANA SULARSA CIPTA" JO.
Kaca kaca clear tempered 12 mm (PINTU), kaca clear tempered 8 mm CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT
Acc Pintu Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson, top Sliding door hard ware
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Lockase IL 8485 + DC 60 ex. Dekson, aluminium cover, btm slding door DIREKTUR
Type D12 DF
PEMERINTAH DAERAH KABUPATEN TABANAN
DINAS PEKERJAAN UMUM
1690 65 PENATAAN RUANG, PERUMAHAN, DAN KAWASAN PERMUKIMAN
KABUPATEN TABANAN
45 1600 45 1090 Jl. Arjuna No. 2 TLPN. (0361) 811909
45 1 1000 45
100
100
KEGIATAN :
PENYUSUNAN DED RUMAH SAKIT NYITDAH
45
45
45
100
25 PEKERJAAN :
1210
BIMBINGAN TEKNIS PARAF
Alumunium Window 1. I WAYAN SUKAWANA, ST.
2. I GUSTI MADE WIRA ARIADI, ST.
3. I GDE PUTU ESA PRAKARSA NAYAKA, ST.
2200
2200
4. I NYOMAN BAGIASTRA
2200
5. GEDE SASTRA PRATYAHARA, ST.
2073
2155
2155
6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
45
8. I WAYAN WIASA, ST.,M.KES
9. dr. I GEDE SUDIARTA
10. I NYOMAN SARNA, SH.
MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
900
I GUSTI NGURAH ADI GUNARSA, ST.
NIP. 19730819 200501 1 005
MENGETAHUI/MENETAPKAN
60
7
10045 45 1000 45 45 IR. K. FARIDATINI SUWECA
150 100 NIP. 19630517 199703 2 002
1090 MENGESAHKAN
KEPALA DINAS KESEHATAN KABUPATEN TABANAN
1600
I MADE YUDIANA, ST. MT.
1690 45 1000 45 NIP. 19690619 199803 1 005
45 45 1090 NAMA GAMBAR SKALA
1122
DETAIL KUSEN PINTU & JENDELA 1:20
Rangka Kusen aluminium Kusen aluminium ARSITEKTUR LANSEKAP Ir. I NYOMAN SUWANDI
AHLI TEKNIK SIPIL I KETUT SUTAWA, ST.
& finishing
kusen YKK SF 100 T=1.35MM YB-1C (Powder Coating) YKK SF 100 T=1.35MM YB-1C (Powder Coating)
AHLI TEKNIK
MEKANIKAL/PLUMBING
I KOMANG DEWANTA, ST.
Material
AHLI TEKNIK
ELEKTRIKAL I WAYAN HANA, ST.
AHLI MANAJEMEN
Pintu aluminium door frame Daun kayu finish HPL
Daun
jendela 335
KONSULTAN PERENCANAN
PT. "DANA SULARSA CIPTA" JO.
Kaca kaca clear tempered 12 mm CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT
Acc Pintu Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson, top Sliding door hard ware Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Lockase IL 8485 + DC 60 ex. Dekson, aluminium cover, btm slding door Lockase IL 8485 + DC 60 ex. Dekson DIREKTUR
Type D13
PEMERINTAH DAERAH KABUPATEN TABANAN
DINAS PEKERJAAN UMUM
PENATAAN RUANG, PERUMAHAN, DAN KAWASAN PERMUKIMAN
KABUPATEN TABANAN
Jl. Arjuna No. 2 TLPN. (0361) 811909
KEGIATAN :
520
1240 1240 BIMBINGAN TEKNIS PARAF
PATCH FITTING OVER PANEL ALUMUNIUM
1. I WAYAN SUKAWANA, ST.
2. I GUSTI MADE WIRA ARIADI, ST.
3. I GDE PUTU ESA PRAKARSA NAYAKA, ST.
4. I NYOMAN BAGIASTRA
5. GEDE SASTRA PRATYAHARA, ST.
6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
8. I WAYAN WIASA, ST.,M.KES
9. dr. I GEDE SUDIARTA
10. I NYOMAN SARNA, SH.
MENYETUJUI
CENTER LOCK DIAMETER 32 mm PEJABAT PELAKSANA TEKNIS KEGIATAN
2200
400
600
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
MENGETAHUI/MENETAPKAN
PPK BIDANG BANGUNAN GEDUNG
PADA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
12 MM CLEAR TEMPERED GLASS DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
1199 MENGESAHKAN
619 PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
700
AHLI MANAJEMEN
kusen KONSTRUKSI Ir. KETUT GUPTA
Material
Pintu
Daun
Acc Floor hinge BTS 84 ex. Dekson Patch fitting PT 24 ex. Dekson Pull handle PH 32x600 ex. Dekson
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Patch fitting PT 10, PT 20, US 10 + double cilinder ex. Dekson DIREKTUR
PEMERINTAH DAERAH KABUPATEN TABANAN
DINAS PEKERJAAN UMUM
PENATAAN RUANG, PERUMAHAN, DAN KAWASAN PERMUKIMAN
KABUPATEN TABANAN
Jl. Arjuna No. 2 TLPN. (0361) 811909
KEGIATAN :
PENYUSUNAN DED RUMAH SAKIT NYITDAH
PEKERJAAN :
PENYUSUNAN DED PEMBANGUNAN
RUMAH SAKIT NYITDAH
LOKASI :
DESA NYITDAH, KEDIRI, KAB. TABANAN
BESI SIKU
50.50.5
1500 I GUSTI NGURAH ADI GUNARSA, ST.
NIP. 19730819 200501 1 005
100
PADA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
BESI SIKU 2X 50.50.5
KACA TEMPERED
MENGESAHKAN
PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DETAIL STRUKTUR POST / LINTEL BEAM, MAIN ENT. DOOR TYPE DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
337
KONSULTAN PERENCANAN
PT. "DANA SULARSA CIPTA" JO.
CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT
100
KEGIATAN :
1' PENYUSUNAN DED RUMAH SAKIT NYITDAH
45
45
100
25 PEKERJAAN :
2200
4. I NYOMAN BAGIASTRA
5. GEDE SASTRA PRATYAHARA, ST.
2073
2200
2200
2155
2155
6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
8. I WAYAN WIASA, ST.,M.KES
9. dr. I GEDE SUDIARTA
10. I NYOMAN SARNA, SH.
MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
MENGETAHUI/MENETAPKAN
60
7
6 45 45 1600 45 10045 IR. K. FARIDATINI SUWECA
100 150 NIP. 19630517 199703 2 002
45 800 800 45 1690 MENGESAHKAN
KEPALA DINAS KESEHATAN KABUPATEN TABANAN
1690
35 35
810 810
100 610 100100 610 100
45
Rangka Kusen aluminium Kusen aluminium ARSITEKTUR LANSEKAP Ir. I NYOMAN SUWANDI
AHLI TEKNIK SIPIL I KETUT SUTAWA, ST.
& finishing
kusen YKK SF 100 T=1.35MM YB-1C (Powder Coating) YKK SF 100 T=1.35MM YB-1C (Powder Coating)
AHLI TEKNIK
MEKANIKAL/PLUMBING
I KOMANG DEWANTA, ST.
Material
AHLI TEKNIK
ELEKTRIKAL I WAYAN HANA, ST.
AHLI MANAJEMEN
Pintu Aluminium door frame aluminium door frame
Daun
jendela 338
KONSULTAN PERENCANAN
PT. "DANA SULARSA CIPTA" JO.
Kaca kaca clear tempered 12mm kaca clear tempered 12 mm CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT
Acc Pintu Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson, top Sliding door hard ware
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Lockase IL 8485 + DC 60 ex. Dekson Lockase IL 8485 + DC 60 ex. Dekson, aluminium cover, btm sliding door hw DIREKTUR
Type D16 D17
PEMERINTAH DAERAH KABUPATEN TABANAN
DINAS PEKERJAAN UMUM
PENATAAN RUANG, PERUMAHAN, DAN KAWASAN PERMUKIMAN
KABUPATEN TABANAN
Jl. Arjuna No. 2 TLPN. (0361) 811909
1 1' KEGIATAN :
1' PENYUSUNAN DED RUMAH SAKIT NYITDAH
45
45
45
45
PEKERJAAN :
200
PENYUSUNAN DED PEMBANGUNAN
100 200 RUMAH SAKIT NYITDAH
LOKASI :
DESA NYITDAH, KEDIRI, KAB. TABANAN
2 3 7
700
BIMBINGAN TEKNIS PARAF
2200
2200
4. I NYOMAN BAGIASTRA
5. GEDE SASTRA PRATYAHARA, ST.
2200
2200
2155
2155
2155
2155
6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
8. I WAYAN WIASA, ST.,M.KES
9. dr. I GEDE SUDIARTA
10. I NYOMAN SARNA, SH.
MENYETUJUI
1255
PEJABAT PELAKSANA TEKNIS KEGIATAN
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
MENGETAHUI/MENETAPKAN
MENGESAHKAN
PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
35 35 35 35
965 965 965 965
100 765 100100 765 100 100 765 100100 765 100
45
45
I MADE YUDIANA, ST. MT.
100
100
NIP. 19690619 199803 1 005
Rangka Kusen aluminium Kusen aluminium ARSITEKTUR LANSEKAP Ir. I NYOMAN SUWANDI
AHLI TEKNIK SIPIL I KETUT SUTAWA, ST.
& finishing
kusen YKK SF 100 T=1.35MM YB-1C (Powder Coating) YKK SF 100 T=1.35MM YB-1C (Powder Coating)
AHLI TEKNIK
MEKANIKAL/PLUMBING
I KOMANG DEWANTA, ST.
Material
AHLI TEKNIK
ELEKTRIKAL I WAYAN HANA, ST.
AHLI MANAJEMEN
Pintu Daun kayu finish HPL Aluminium door frame
Daun
jendela 339
KONSULTAN PERENCANAN
PT. "DANA SULARSA CIPTA" JO.
Kaca kaca clear tempered 12mm CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT
Acc Pintu Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Lockase IL 8485 + DC 60 ex. Dekson Lockase IL 8485 + DC 60 ex. Dekson DIREKTUR
Type W1 W2
40
40
50
50
50
50
PEKERJAAN :
PENYUSUNAN DED PEMBANGUNAN
RUMAH SAKIT NYITDAH
LOKASI :
DESA NYITDAH, KEDIRI, KAB. TABANAN
2' 2'
1350
1350
1250
1170
1350
1350
1250
1170
BIMBINGAN TEKNIS PARAF
1310
1310
1. I WAYAN SUKAWANA, ST.
2. I GUSTI MADE WIRA ARIADI, ST.
3. I GDE PUTU ESA PRAKARSA NAYAKA, ST.
4. I NYOMAN BAGIASTRA
5. GEDE SASTRA PRATYAHARA, ST.
2200
2200
2200
2200
6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
50
50
8. I WAYAN WIASA, ST.,M.KES
50
50
40
40
9. dr. I GEDE SUDIARTA
10. I NYOMAN SARNA, SH.
MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
850
850
850
850
I GUSTI NGURAH ADI GUNARSA, ST.
NIP. 19730819 200501 1 005
MENGETAHUI/MENETAPKAN
MENGESAHKAN
PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
800 1550
50 50 50 50
100
100
30
Rangka Kusen aluminium Kusen aluminium ARSITEKTUR LANSEKAP Ir. I NYOMAN SUWANDI
AHLI TEKNIK SIPIL I KETUT SUTAWA, ST.
& finishing
kusen YKK SF 100 T=1.35MM YB-1C (Powder Coating) YKK SF 100 T=1.35MM YB-1C (Powder Coating)
AHLI TEKNIK
MEKANIKAL/PLUMBING
I KOMANG DEWANTA, ST.
Material
AHLI TEKNIK
ELEKTRIKAL I WAYAN HANA, ST.
AHLI MANAJEMEN
Pintu
Daun
jendela 340
KONSULTAN PERENCANAN
PT. "DANA SULARSA CIPTA" JO.
Kaca Kaca clear 6 mm Kaca clear 6 mm CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT
Acc Pintu Friction stay 16" ex. Dekson Friction stay 16" ex. Dekson
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Rambuncis 426 ex. Dekson Rambuncis 426 ex. Dekson DIREKTUR
Type W5 PS
KEGIATAN :
PENYUSUNAN DED RUMAH SAKIT NYITDAH
PEKERJAAN :
PENYUSUNAN DED PEMBANGUNAN
RUMAH SAKIT NYITDAH
LOKASI :
DESA NYITDAH, KEDIRI, KAB. TABANAN
1'
3800 BIMBINGAN TEKNIS PARAF
40 30 30 30 30 40
720 720 720 720 720 1. I WAYAN SUKAWANA, ST.
40
50
2. I GUSTI MADE WIRA ARIADI, ST.
3. I GDE PUTU ESA PRAKARSA NAYAKA, ST.
1 4. I NYOMAN BAGIASTRA
5. GEDE SASTRA PRATYAHARA, ST.
45
45
2' 6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
1350
1170
2
1310
8. I WAYAN WIASA, ST.,M.KES
9. dr. I GEDE SUDIARTA
900
900
855
855
10. I NYOMAN SARNA, SH.
MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
2200
2200
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
50
40
45 I GUSTI NGURAH ADI GUNARSA, ST.
45 740 45 100 NIP. 19730819 200501 1 005
830
MENGETAHUI/MENETAPKAN
PPK BIDANG BANGUNAN GEDUNG
PADA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
900
850
850
Floor IR. K. FARIDATINI SUWECA
NIP. 19630517 199703 2 002
MENGESAHKAN
KEPALA DINAS KESEHATAN KABUPATEN TABANAN
MENGESAHKAN
PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
830
3800 45 740 45
50 50 I MADE YUDIANA, ST. MT.
100
NIP. 19690619 199803 1 005
45
100
AHLI MANAJEMEN
kusen YKK SF 100 T=1.35MM YB-1C (Powder Coating) YKK SF 100 T=1.35MM YB-1C (Powder Coating) KONSTRUKSI Ir. KETUT GUPTA
Material
Pintu
Daun
Acc Friction stay 16" ex. Dekson Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Rambuncis 426 ex. Dekson Lockase IL 8485 + DC 60 ex. Dekson DIREKTUR
Type W3 V4
KEGIATAN :
PENYUSUNAN DED RUMAH SAKIT NYITDAH
PEKERJAAN :
PENYUSUNAN DED PEMBANGUNAN
1' RUMAH SAKIT NYITDAH
2250 LOKASI :
40 30 30 30 40
520 520 520 520 DESA NYITDAH, KEDIRI, KAB. TABANAN
40
50
NO. CATATAN PARAF
2'
320
500
460
1'
2300 BIMBINGAN TEKNIS PARAF
40 30 30 40
50
720 720 720
40
1. I WAYAN SUKAWANA, ST.
40
50
50
2. I GUSTI MADE WIRA ARIADI, ST.
3. I GDE PUTU ESA PRAKARSA NAYAKA, ST.
4. I NYOMAN BAGIASTRA
5. GEDE SASTRA PRATYAHARA, ST.
2' 6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
1350
1350
1250
1170
1310
8. I WAYAN WIASA, ST.,M.KES
9. dr. I GEDE SUDIARTA
2700
2700
10. I NYOMAN SARNA, SH.
MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
2200
2200
2200
2200
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
50
50
40
I GUSTI NGURAH ADI GUNARSA, ST.
NIP. 19730819 200501 1 005
MENGETAHUI/MENETAPKAN
PPK BIDANG BANGUNAN GEDUNG
PADA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
850
850
Floor IR. K. FARIDATINI SUWECA
NIP. 19630517 199703 2 002
MENGESAHKAN
KEPALA DINAS KESEHATAN KABUPATEN TABANAN
MENGESAHKAN
PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
2300 2250
50 50 50 50 I MADE YUDIANA, ST. MT.
NIP. 19690619 199803 1 005
100
100
NAMA GAMBAR SKALA
30
30
50 620 5050 620 5050 620 50 50 420 5050 420 5050 420 5050 420 50 DETAIL KUSEN PINTU & JENDELA 1:25
40 720 30 720 30 720 40 40 520 30 520 30 520 30 520 40
AHLI MANAJEMEN
kusen YKK SF 100 T=1.35MM YB-1C (Powder Coating) YKK SF 100 T=1.35MM YB-1C (Powder Coating) KONSTRUKSI Ir. KETUT GUPTA
Material
Pintu
Daun
342
KONSULTAN PERENCANAN
jendela PT. "DANA SULARSA CIPTA" JO.
CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
Kaca Kaca clear 6 mm Kaca clear 6 mm ENGINEERING CONSULTANT
Acc Friction stay 16" ex. Dekson Friction stay 16" ex. Dekson
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Rambuncis 426 ex. Dekson Rambuncis 426 ex. Dekson DIREKTUR
Type V1 V2 V3
KEGIATAN :
PENYUSUNAN DED RUMAH SAKIT NYITDAH
PEKERJAAN :
PENYUSUNAN DED PEMBANGUNAN
1' 1' 1' RUMAH SAKIT NYITDAH
600 1700 1150
40 40 40 30 30 40 40 30 40 LOKASI :
520 520 520 520 520 520 DESA NYITDAH, KEDIRI, KAB. TABANAN
40
40
40
50
50
50
NO. CATATAN PARAF
2' 2' 2'
320
320
320
500
500
500
460
460
460
BIMBINGAN TEKNIS PARAF
50
50
50
40
40
40
1. I WAYAN SUKAWANA, ST.
2. I GUSTI MADE WIRA ARIADI, ST.
3. I GDE PUTU ESA PRAKARSA NAYAKA, ST.
4. I NYOMAN BAGIASTRA
2700
5. GEDE SASTRA PRATYAHARA, ST.
6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
8. I WAYAN WIASA, ST.,M.KES
9. dr. I GEDE SUDIARTA
2700
2700
2700
2700
2700
10. I NYOMAN SARNA, SH.
MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
2200
2200
2200
2200
2200
2200
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
MENGETAHUI/MENETAPKAN
PPK BIDANG BANGUNAN GEDUNG
PADA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
MENGESAHKAN
PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
100
100
NAMA GAMBAR SKALA
30
30
30
50 420 50 50 420 5050 420 5050 420 50 50 420 5050 420 DETAIL KUSEN PINTU & JENDELA 1:25
40 520 40 40 520 30 520 30 520 40 40 520 30 520 40
AHLI MANAJEMEN
kusen YKK SF 100 T=1.35MM YB-1C (Powder Coating) YKK SF 100 T=1.35MM YB-1C (Powder Coating) YKK SF 100 T=1.35MM YB-1C (Powder Coating) KONSTRUKSI Ir. KETUT GUPTA
Material
Pintu
Daun
343
KONSULTAN PERENCANAN
jendela PT. "DANA SULARSA CIPTA" JO.
CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
Kaca Kaca clear 6 mm Kaca clear 6 mm Kaca clear 6 mm ENGINEERING CONSULTANT
Acc Friction stay 16" ex. Dekson Friction stay 16" ex. Dekson Friction stay 16" ex. Dekson
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Rambuncis 426 ex. Dekson Rambuncis 426 ex. Dekson Rambuncis 426 ex. Dekson DIREKTUR
Type WK WG
KEGIATAN :
PENYUSUNAN DED RUMAH SAKIT NYITDAH
PEKERJAAN :
PENYUSUNAN DED PEMBANGUNAN
RUMAH SAKIT NYITDAH
LOKASI :
DESA NYITDAH, KEDIRI, KAB. TABANAN
2200
2200
2200
2200
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
MENGETAHUI/MENETAPKAN
PPK BIDANG BANGUNAN GEDUNG
PADA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
45 871 45
I MADE YUDIANA, ST. MT.
961 NIP. 19690619 199803 1 005
AHLI MANAJEMEN
kusen YKK SF 100 T=1.35MM YB-1C YKK SF 100 T=1.35MM YB-1C KONSTRUKSI Ir. KETUT GUPTA
Material
Pintu
Daun
344
KONSULTAN PERENCANAN
jendela PT. "DANA SULARSA CIPTA" JO.
CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
Kaca kaca clear tempered 12mm kaca clear tempered 12mm ENGINEERING CONSULTANT
Acc Pintu Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Lockase IL 8485 + DC 60 ex. Dekson Lockase IL 8485 + DC 60 ex. Dekson DIREKTUR
Type W4
KEGIATAN :
PENYUSUNAN DED RUMAH SAKIT NYITDAH
PEKERJAAN :
PENYUSUNAN DED PEMBANGUNAN
B D RUMAH SAKIT NYITDAH
LOKASI :
DESA NYITDAH, KEDIRI, KAB. TABANAN
2800
5. GEDE SASTRA PRATYAHARA, ST.
6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
8. I WAYAN WIASA, ST.,M.KES
9. dr. I GEDE SUDIARTA
10. I NYOMAN SARNA, SH.
MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
MENGETAHUI/MENETAPKAN
PPK BIDANG BANGUNAN GEDUNG
PADA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
MENGESAHKAN
5338 PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
1076 1068 1068 1068 1076
45 45 45 45 45 45
AHLI TEKNIK
ELEKTRIKAL I WAYAN HANA, ST.
AHLI MANAJEMEN
Pintu
Daun
jendela 345
KONSULTAN PERENCANAN
PT. "DANA SULARSA CIPTA" JO.
Kaca kaca clear tempered 12mm CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT
A KEGIATAN :
PENYUSUNAN DED RUMAH SAKIT NYITDAH
PEKERJAAN :
B D PENYUSUNAN DED PEMBANGUNAN
RUMAH SAKIT NYITDAH
A LOKASI :
DESA NYITDAH, KEDIRI, KAB. TABANAN
2326
1. I WAYAN SUKAWANA, ST.
B D 2. I GUSTI MADE WIRA ARIADI, ST.
3. I GDE PUTU ESA PRAKARSA NAYAKA, ST.
1300
1300
4. I NYOMAN BAGIASTRA
5. GEDE SASTRA PRATYAHARA, ST.
6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
3350
7. I WAYAN TRIANA S, SKM.M.KES
8. I WAYAN WIASA, ST.,M.KES
2200
2200
9. dr. I GEDE SUDIARTA
10. I NYOMAN SARNA, SH.
MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
MENGETAHUI/MENETAPKAN
PPK BIDANG BANGUNAN GEDUNG
945
855
900
900
PADA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
2000 MENGESAHKAN
PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
62 916 45 932 45
2198
45 1032 45 1032 45
I MADE YUDIANA, ST. MT.
100
Rangka Kusen aluminium Kusen aluminium ARSITEKTUR LANSEKAP Ir. I NYOMAN SUWANDI
AHLI TEKNIK SIPIL I KETUT SUTAWA, ST.
& finishing
AHLI TEKNIK
ELEKTRIKAL I WAYAN HANA, ST.
AHLI MANAJEMEN
Pintu
Daun
jendela 346
KONSULTAN PERENCANAN
PT. "DANA SULARSA CIPTA" JO.
Kaca kaca clear tempered 12mm kaca clear tempered 12mm CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT
Acc Pintu Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson Engsel EL 4"x3"x2mm - 2BB - SSS ex. Dekson
Ir. I KETUT BUDIARSA, MM. MT. IAI.
Lockase IL 8485 + DC 60 ex. Dekson Lockase IL 8485 + DC 60 ex. Dekson DIREKTUR
Type KR
KEGIATAN :
PENYUSUNAN DED RUMAH SAKIT NYITDAH
PEKERJAAN :
PENYUSUNAN DED PEMBANGUNAN
RUMAH SAKIT NYITDAH
LOKASI :
DESA NYITDAH, KEDIRI, KAB. TABANAN
2400
2400
3. I GDE PUTU ESA PRAKARSA NAYAKA, ST.
4. I NYOMAN BAGIASTRA
5. GEDE SASTRA PRATYAHARA, ST.
6. GEDE NYOMAN BUMI KARTHIKA WIJAYA, ST.
7. I WAYAN TRIANA S, SKM.M.KES
8. I WAYAN WIASA, ST.,M.KES
9. dr. I GEDE SUDIARTA
10. I NYOMAN SARNA, SH.
MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
PENYUSUNAN DED PEMBANGUNAN RUMAH SAKIT NYITDAH
MENGETAHUI/MENETAPKAN
PPK BIDANG BANGUNAN GEDUNG
PADA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
950
950
Dr. I NYM SURATMIKA, M.Kes.
NIP. 19630410 199003 1 014
Floor MENGESAHKAN
PLT. KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN,
DAN KAWASAN PERMUKIMAN KABUPATEN TABANAN
45 45
I MADE YUDIANA, ST. MT.
NIP. 19690619 199803 1 005
AHLI TEKNIK
ELEKTRIKAL I WAYAN HANA, ST.
AHLI MANAJEMEN
Pintu
Daun
jendela 347
KONSULTAN PERENCANAN
PT. "DANA SULARSA CIPTA" JO.
Kaca kaca clear tempered 12mm CV. "TRI MAYA" JO CV.PERMATA KONSULTAN
ENGINEERING CONSULTANT