DOKUMEN TENDER
UNTUK PEKERJAAN JASA KONSTRUKSI
KONTRAK HARGA SATUAN
PEKERJAAN
PERENCANAAN TEKNIK JALAN DAN JEMBATAN PROVINSI NTB
TAHUN 2021 ( DED)
PANJANG KM. MTR
NO.RUAS RUAS JALAN PENANGANAN LOKASI
(KM) AWAL AKHIR
0.0425 BATU LAYAR 10+840 10+883
-
042.042 AMPENAN - PEMENANG LONGSORAN
0.140 PASIFIK 15+300 15+440
GAMBAR RENCANA
MEI 2021
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL NTB
PEKERJAAN
PERENCANAAN TEKNIK JALAN DAN JEMBATAN PROVINSI NTB
TAHUN 2021 ( DED)
PANJANG KM. MTR
NO.RUAS RUAS JALAN PENANGANAN LOKASI
(KM) AWAL AKHIR
0.0425 BATU LAYAR 10+840 10+883
-
042.042 AMPENAN - PEMENANG LONGSORAN
0.140 PASIFIK 15+300 15+440
Mengetahui :
Kepala Balai Pelaksanaan Jalan Nasional NTB
I. UMUM
1.1 SAMPUL
1.2 LEMBAR PENGESAHAN
1.3 DAFTAR ISI
1.4 LEGENDA SIMBUL DAN SINGKATAN
1.5 PETA LOKASI KEGIATAN
1.6 PETA SUMBER MATERIAL
1.7 DAFTAR KUANTITAS
LP
LPA
LPB
MAN
MAB
Bp
Bs
Bg
C
L
ELEV
KM
MAKS
MIN
STA
BM DMJ
Ki
Ka ES
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL NTB
PELABUHAN INTERNASIONAL
PELABUHAN NASIONAL
PELABUHAN REGIONAL
SAM UD ER A HIN D IA
P K
002 015
K
K 003
001 014
010
004K
011
005
006
K 013
007 012
009 035
030
036 031
008
037
032
033
B
034
B
P
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL NTB
BELANTING
DEPOSIT ± 4 - 5 TAHUN
52
51
50
49
48
47
47
46
45 48
44
50
43
44
42
45
46
Gondang
47
41
48
49
40
50
39
LADANG
K.Sokon
g
51
35
38
LADANG
52
36
33
37
Teluk Dalam
32 53
K.Segara
31
54
30
6
Jangkok
Kokok
Kokok Jangkok
2
3
4
Narmada
5
Bertais 15
5 6
11 12 14
7
3 13
10
8
9
6
DESA MARONG 6
5
7
8
LADANG
SUMBER ASAL MATERIAL
SUMBER ASAL MATERIAL SUNGAI KIDANG
KILOMETER KM 67+600 DARI MATARAM
DESA MANGKUNG
DESA KATENG
DESA PANGEMBUR
DESA SELAYAR
DESA KETARA
Tl. Tampah
Tl. Tebuwak
KILOMETER KM 60+300
DEPOSIT ± 4 - 5 TAHUN
BATU LAYAR
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL NTB
75
Beton fc' 30 MPa
35
135
Balok Beton 42/85 (fc' 30 MPa)
4
73
TIPIKAL RENCANA PENANGANAN
STA. 0+000 - 0+0425
Balok Beton 60/80 (fc' 30 MPa)
54.68
95
15
150
RENCANA PENANGANAN
STA. 0+075 - 0+100
96
98
9
Ground Anchor
78
78
87
9
136
84
0
LAPISAN BATUAN KERAS
40
204
40
0
47.01
84 Ground Anchor 50
9
50
204
40
0
72
2
50
204
40
59 0
5
50
40
0
204
46
8
50
40
0
34
1
204
50
40
0
50 100 21 50
38.68
5 40
0
50
20
50
40
0
300
360
50
40 60 200
60
PAKET PERENCANAAN TEKNIK JALAN DAN JEMBATAN PROV. NTB KONSULTAN : PT. SURYA PERDANA KONSULTAN KSO PT. PURI DIMENSI DAN CV.CITRA ADI DAYA KONSULTAN JUDUL GAMBAR : GBR NO. : TPM - 02/03
REPUBLIK INDONESIA SATUAN KERJA
NO. RUAS - Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
LONGSORAN PASIFIK Cs. SKALA :
KEMENTERA
I NPEKERJAANUMUMDANPERUMAHANRAKYAT PERENCANAAN DAN PENGAWASAN
JALAN NASIONAL 1 : 100
DIREKTORAT JENDERAL BINA MARGA NAMA RUAS SENGIGI - PEMENANG
BALAI PELAKSANAAN JALAN NASIONAL NTB NUSA TENGGARA BARAT WIRA SAKTI KUSUMA SAMUDI, ST. Ir. M. LILY RISTYANTO DETAIL
PROVINSI NUSA TENGGARA BARAT Draftman / Auto Cad Programmer Highway Engineer Team Leader TANGGAL : MEI. 2021
53.20
BH-1 BH-2
RENCANA PENANGANAN
STA. 0+100 - 0+215
Variasi 77
7
65
2 Ground Anchor
40
47.01
0
60 40
0 0
50
Ground Anchor
50
51
9
40
0
43
7
50
40
0
35
6
50
40
0
27
5 50
40
39.88
BH-3 0
1000.00
50 100
19 50
3 40
0
50
20
50
40
0
300
360
50
40 60 200
60
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL NTB
CATATAN :
- Mutu beton bangunan lantai, bangunan atas, bangunan bawah dan bore
pile minimal menggunakan mutu, f'c 30 Mpa.
- Mutu baja tulangan menggunakan BJTP 280 untuk < D13, dan BJTS 420
atau BJTS 520 untuk > D13, dengan variasi diameter tulangan di batasi
paling banyak 5 ukuran. untuk desain bangunan lantai , khususnya pada
daerah momen negatif di sarankan menggunakan BJTP 280
KOORDINAT KOORDINAT
AWAL KEGIATAN AKHIR KEGIATAN
STA. 0+075 STA. 0+215
N 9060914.340 N 9061038.268
E 394221.583 E 394285.386
60
58
56
54
52
70
68
66
64
62
60
58
56
54
KOORDINAT
AWAL KEGIATAN
STA. 0+075 KOORDINAT
N 9060914.340 AKHIR KEGIATAN
E 394221.583 STA. 0+215
N 9061038.268
E 394285.386
2000.00
7000.00
PAKET PERENCANAAN TEKNIK JALAN DAN JEMBATAN PROV. NTB KONSULTAN : PT. SURYA PERDANA KONSULTAN KSO PT. PURI DIMENSI DAN CV.CITRA ADI DAYA KONSULTAN JUDUL GAMBAR : GBR NO. : TPM - 03/03
REPUBLIK INDONESIA SATUAN KERJA
NO. RUAS - Digambar Oleh : Direncanakan Oleh : Disetujui Oleh :
LONGSORAN PASIFIK Cs. SKALA :
KEMENTERA
I NPEKERJAANUMUMDANPERUMAHANRAKYAT PERENCANAAN DAN PENGAWASAN
JALAN NASIONAL 1 : 40
DIREKTORAT JENDERAL BINA MARGA NAMA RUAS SENGIGI - PEMENANG
BALAI PELAKSANAAN JALAN NASIONAL NTB NUSA TENGGARA BARAT WIRA SAKTI KUSUMA SAMUDI, ST. Ir. M. LILY RISTYANTO DETAIL TULANGAN
PROVINSI NUSA TENGGARA BARAT Draftman / Auto Cad Programmer Highway Engineer Team Leader TANGGAL : MEI. 2021
50 50
(1)Øs16-200
50
50
20
20
(2)Øs13-200
SIRIP RETAINING WALL
(3)Øs16-200
300
(4)Øs19-200
360
360
(a)3Øs16
(5)Øp12-600/600 Øs13-200
40 60 200
(7)Øs19-200
(9)Øs16-400/600
60
60
18.5 18.5
(6)Øs16-200