Anda di halaman 1dari 11

DRAWING NO.

: PGAS -CA-E089-01-CAS-DG-0001
REVISI :0

AS BUILT DRAWING
PEKERJAAN PEMASANGAN PIPA PENYALUR GAS DAN MRS
PELANGGA KECIL PAKET 6 (CUSTOMER ATTACHMENT)

AYAM GORENG ASLI PEMUDA - SURABAYA

PT. PERUSAHAAN GAS NEGARA Tbk


PROJECT MANAGEMENT OFFICE
Jl. Pemuda No.56-58
Phone : 5490555 Fax. 5490333
Surabaya
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

KEY PLAN
PLAN
N
A A
W E

B B

C C

D LEGEND D

LOKASI PEKERJAAN TL TIANG LISTRIK


PIPA BARU
AYAM GORENG ASLI PEMUDA TT TIANG TELEPON

PIPA EKSISTING TLmp TIANG LAMPU

37.00
KONTUR MINOR
E E
37.00
KONTUR MAJOR TEST BOX

STA 0+000 STATION POINT JUNCTION BOX


W
SUNGAI

JALAN MARKER POST

E760500 KOORDINAT PATOK GAS


N9293000
F BERM F
PAVING
PEMILIK
PT. PERUSAHAAN GAS NEGARA Tbk
PMO - PROJECT MANAGEMENT OFFICE
Jl. Pemuda No.56-58
Phone : 5490555 Fax. 5490333
Surabaya
G G
PMO - PROJECT MANAGEMENT OFFICE

NAMA PARAF TANGGAL


DIPERIKSA ANDHIKA
DISETUJUI SETYO DENY HUDAYA
DIKETAHUI WAHYU WIJAYA
H H

PELAKSANA

NAMA PARAF TANGGAL


I DIGAMBAR SLAMET PURWONO I
DIPERIKSA ANANG WAHYUDI
DISETUJUI DEDDY EFENDI

PROJECT
PEKERJAAN PEMASANGAN PIPA
PENYALUR GAS DAN MRS PELANGGAN
J J
KECIL PAKET 6 (CUSTOMER ATTACHMENT)
AS BUILT DRAWING
TITLE :
PETA LOKASI

AYAM GORENG ASLI PEMUDA


K Jl. Tidar,Sawahan Kec.Sawahan - SURABAYA K

DRAWING NO. SCALE DATE REV

PGAS -CA-E089-01-EPL-DG-0001

SHEET NO. 1 OF 10
NTS 27-03-2023 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PLAN
KEY PLAN
N PLAN
N
A A
W
W E E

S
B B

KIM AN
PERMU
C C

AN
P ADAY
D JL.PA LEGEND D

JL.TAMPOMAS
JL.H
TL TIANG LISTRIK
PIPA BARU

ALIM
TT TIANG TELEPON

AWAL PEKERJAAN PIPA EKSISTING TLmp TIANG LAMPU

UN
E
Pemotongan End Cap Eksisting Ø63mm & 37.00
KONTUR MINOR
E
Connect Coupler PE Ø63mm CAFE KONTUR MAJOR TEST BOX
POPPY
37.00
LANG

-7.258205°S / 112.732399°E STA 0+000 STATION POINT JUNCTION BOX


W
SUNGAI
OPT
GEN

JALAN MARKER POST


IC JO

E760500 KOORDINAT PATOK GAS


N
GANGA
N9293000

KIMAN
G

AKHIR PEKERJAAN PERMU PERDA


F F
RUKO
BERM
PAVING
End Cap Ø63mm
YO

PEMILIK
-7.257583°S /112.730433°E G
R PIPA EKSISTIN
A TIDA KS
PIPA E
LUBANG LUBANG PT. PERUSAHAAN GAS NEGARA Tbk
KERJA JL.RAY KERJA MM PMO - PROJECT MANAGEMENT OFFICE
LUBANG 0 PE Ø63 Jl. Pemuda No.56-58
STA 0+05
KIMAN
KERJA Phone : 5490555 Fax. 5490333
PEMASANGAN PIPA
PERMU
LUBANG 12361.6157
Surabaya
G Kabel Tanam PLN CABANG PE Ø63MM KERJA 6999.7637

G
150 KV LUBANG
GA NGAN
6739.3714

LUBANG
1998.6335

LUBANG
LUBANG
A TIDAR 0
KERJA KERJA
PERDA PMO - PROJECT MANAGEMENT OFFICE

JL.RAY
KERJA
KERJA STA 0+15
LUBANG NAMA PARAF TANGGAL
KERJA 0
LUBANG STA 0+10 DIPERIKSA ANDHIKA
KERJA
0 DISETUJUI SETYO DENY HUDAYA
STA 0+20

0 LUBANG RUMAH DIKETAHUI WAHYU WIJAYA


H STA 0+25 KERJA OP H
TIC
9999.9544

N
KERJAA
0
STA 0+20
AWAL PE 32MM PELAKSANA
ing S a d dle Ø 3X
6
MAX O
NE
Tapp
EKERJA
AN HOTEL
AKHIR P A GI
A)

WISMA
NG

s G 2.5 BANK
Meter Ga
M

NAMA
A

PARAF TANGGAL
D

I I
SI LA
GORE

PARKIR
DIGAMBAR SLAMET PURWONO
CIMB
EMU

JL.WID

DIPERIKSA ANANG WAHYUDI

MOBIL
U)

DISETUJUI DEDDY EFENDI


NG

RUMAH
(LOKA
R
A

ASLI P
AYAM
D
SI BA

PROJECT
GORE

ODARE
EMU

PEKERJAAN PEMASANGAN PIPA


PENYALUR GAS DAN MRS PELANGGAN
(LOKA

J J
ASLI P

KECIL PAKET 6 (CUSTOMER ATTACHMENT)


AYAM

AS BUILT DRAWING
TITLE :
RUMAH LAYOUT
AYAM GORENG ASLI PEMUDA
K Jl. Tidar,Sawahan Kec.Sawahan ,Surabaya K

DRAWING NO. SCALE DATE REV


PGAS -CA-E089-EPL-DG-0001

SHEET NO. 2 OF 10
NTS 27-03-2023 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
8 7 6 5 4 3 2 1
VILLAGE SAWAHAN KEY MAP
DISTRICT SAWAHAN
OWNERSHIP
THIS DRAWING
REGENCY SURABAYA

OPTIC JOYO
LANGGENG

JL.HALIMUN
AWAL PEKERJAAN
AKHIR PEKERJAAN Pemotongan End Cap
D End Cap Ø63mm RUKO Eksisting Ø63mm & Connect D
-7.257583°S /112.730433°E Coupler PE Ø63mm
AN
PE RMUKIM PERMUKIMAN -7.258205°S / 112.732399°E
A
Kabel Tanam PLN
9999.9544

150 KV
N JL.RAYA TIDAR
PENGEMBANGAN PIPA CABANG
1998.6335

6739.3714

6999.7637

LUBANG STA 0+000


12361.6157

STA 0+250
PIPA PE Ø 63 MM
LUBANG
JL.RAYA TIDAR STA 0+100
LUBANG STA 0+050 LUBANG
KERJA
KERJA
PIPA EKS
LUBANG STA 0+200 LUBANG LUBANG KERJA
LUBANG KERJA LUBANG STA 0+150
W E KERJA
KERJA KERJA KERJA
KERJA
LUBANG
KERJA
LUBANG
KERJA
PE Ø63MM
LUBANG
KERJA 6999.7637
12361.6157

1998.6335

9999.9544

6739.3714

S LEGEND
STA 0+092
A
OP TIOCIU
TIC

A)
NG

JL.WIDODAREN
SI LAM
A
PIPA EXISTING TL TIANG LISTRIK
(LOKASI BARU)

D
AYAM GORENG

GORE
U
ASLI PEMUDA

TT TIANG TELEPON

M
BANK PIPA BARU

E
RUMAH MAX ONE

A
CIMB

ASLI P
K
RUMAH

AYAM
HOTEL 37.00
KONTUR MINOR TLmp TIANG LAMPU

O
WISMA AGI PARKIR

(L
MOBIL 37.00
KONTUR MAJOR W

C STA 0+000 STATION POINT


MARKER POS (MP) C
SUNGAI
PATOK GAS (PG)
JALAN

E760500 KOORDINAT
N9293000
STA 0+250 STA 0+200 STA 0+150 STA 0+100 STA 0+050 STA 0+000
BERM

AWAL PEKERJAAN PAVING


+04.00 +04.00
AKHIR PEKERJAAN Pemotongan End Cap
+03.00 End Cap Ø63mm Eksisting Ø63mm & Connect +03.00
+02.00 Coupler PE Ø63mm +02.00 PEMILIK
LUBANG KERJA LUBANG KERJA LUBANG KERJA LUBANG KERJA
LUBANG KERJA
LONGITUDINAL +01.00 (ASPAL L=1M) W (BETON P=1M) (ASPAL P=1M) (ASPAL L=PM) +01.00 PT. PERUSAHAAN GAS NEGARA Tbk
(BETON P=1M)
PROFILE PROJECT MANAGEMENT OFFICE
HORIZONTAL SKALA : +00.00 +00.00 Jl. Pemuda No.56-58
A1=1:500, A3=1:1000 Phone : 5490555 Fax. 5490333
VERTICAL SKALA : -01.00 LUBANG KERJA LUBANG KERJA LUBANG KERJA LUBANG KERJA Elb.90° LUBANG KERJA -01.00 Surabaya
A1=1:100, A3=1:200 (ASPAL P=1M) (TANAH P= 1M) (ASPAL P = 1M) (TANAH P= 2M) Ø63MM (ASPAL P=1M)
-02.00 -02.00
NAMA PARAF TANGGAL
Elb.45°
-03.00 LUBANG KERJA
Ø63MM -03.00 DIPERIKSA ANDHIKA
(ASPAL P=1M)
-04.00 -04.00 DISETUJUI SETYO DENY HUDAYA
-01.60 +00.00

-01.60 +00.00
-01.60 +00.00

-01.60 +00.00

-01.60 +00.00
-01.60 +00.00

-01.60 +00.00

-01.60 +00.00
-01.90 +00.00

-01.90 +00.00

-01.60 +00.00

-01.60 +00.00

ASPAL -01.60 +00.00


-00.90 +00.00
DIKETAHUI WAHYU WIJAYA
B GROUND ELEVATION

B
TOP PIPE ELEVATION KONTRAKTOR PELAKSANA

TYPE OF ROAD MANUAL BORING

3m
HORZ. DISTANCE 20 m 30 m 36 m 12 m 49 m 40 m 10 m 10 m 37 m
1m 1m 1m
COMULATIVE
0.250

0.230

0.200
0.199

0.163

0.151

0.101
0.100

0.060

0.050

0.040

0.003
0.000
0.150

NAMA PARAF TANGGAL


HORZ. DISTANCE DIGAMBAR SLAMET PURWONO
PATOK GAS, MARKER POST & DIPERIKSA ANANG WAHYUDI
PG PG MP PG PG PG
TEST BOX DISETUJUI DEDDY EFENDI

PIPE PIPE, MDPE, SDR 11, YELLOW, PE 80


PROJECT
NAMA MATERIAL DIMENSI SPESIFIKASI VOLUME KET
NO TEKNIK
Ø63 MM MDPE,SDR 11, PEKERJAAN PEMASANGAN PIPA PENYALUR GAS DAN MRS
1 PIPE PE 250 M
YELLOW,PE80 PELANGGAN KECIL PAKET 6
PEDESTRIAN
MAX ONE (CUSTOMER ATTACMENT )
2 COUPLER Ø63 MM HDPE,SDR 11,PE100,EF 1 Bh
HOTEL INLET L.60XT.40Cm A
3 ELBOW 90° Ø63 MM HDPE,SDR 11,PE100,EF 1 Bh
TITLE :
ALIGNMENT SHEET
4 ELBOW 45° Ø63 MM HDPE,SDR 11,PE100,EF 1 Bh
JL.RAYA TIDAR TANAH STA 0+000 - STA 0+250
END CAP Ø63 MM HDPE,SDR 11,PE100,EF 1 Bh 0.7 ASPAL (PIPA Ø63MM)
5 1.6 AYAM GORENG ASLI PEMUDA
6 PATOK GAS 5 Bh
PEMASANGAN DRAWING NO. SCALE DATE REV
PIPA PE Ø PE 63
7 MARKER POST 1 Bh 7 PGAS -CA-E089-01-CAS-DG-0001
1 : 200
2.7 1 2
3 OF 10
1 : 1000
27-03-2023 0
SHEET NO.

1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

KEY PLAN
PLAN
PLAN N
A THIS DRAWING A
N W E

S
W E

B S B

K IMAN
9999.9544

PER M U
1998.6335

6739.3714

C C

D Salur
an L.1 LEGEND D
mxT.1
m
AWAL PEKERJAAN TL TIANG LISTRIK

Tapping Saddle Ø63X32MM Kabel Tanam PLN PIPA BARU TT TIANG TELEPON

-7.257591°S /112.730447°E 150 KV LANGGENG


PIPA EKSISTING TLmp TIANG LAMPU

37.00
KONTUR MINOR
E Tam E
Salura a
n L.1m n
x0,6m
JL.RA 37.00
KONTUR MAJOR TEST BOX

YA TI STA 0+000 STATION POINT JUNCTION BOX

AKHIR PEKERJAAN
DAR SUNGAI
W

MARKER POST
JALAN
Meter Gas G 2.5 E760500 KOORDINAT PATOK GAS
N9293000
F -7.257629°S /112.730433°E BERM F
PAVING
9999.9544

PEMILIK
PT. PERUSAHAAN GAS NEGARA Tbk
(LO I PEM RENG

PMO - PROJECT MANAGEMENT OFFICE


Jl. Pemuda No.56-58
U)

LAMA)
SI B DA

Phone : 5490555 Fax. 5490333

G
Surabaya
AR

G G

MUDA
OREN
U
AS M GO

PMO - PROJECT MANAGEMENT OFFICE

NAMA PARAF TANGGAL

S I
KA

DIPERIKSA ANDHIKA
A

E
G
BANK

A
RUMAH
DISETUJUI SETYO DENY HUDAYA
L
AY

P
K
DIKETAHUI WAHYU WIJAYA

M
CIMB

I
(LO
H H

L
A
AS
AY
PELAKSANA

AKHIR PEKERJAAN NAMA PARAF TANGGAL


I METER GAS G 2.5 DIGAMBAR SLAMET PURWONO I
-7.257629°S /112.730433°E AWAL PEKERJAAN DIPERIKSA ANANG WAHYUDI
DISETUJUI DEDDY EFENDI
TAPPING SADDLE Ø 63x 32 mm
-7.257591°S /112.730447°E PERMUKIMAN PROJECT
AYAM GORENG ASLI PEMUDA PEKERJAAN PEMASANGAN PIPA
PENYALUR GAS DAN MRS PELANGGAN
PAGAR

J J
KECIL PAKET 6 (CUSTOMER ATTACHMENT)
JL TIDAR AS BUILT DRAWING
RABAT TITLE : LAYOUT
PIPA SERVIS PIPA Ø32MM
0.8 MAKER TA
PE
PEMASANGAN PIPA SERVIS
0.8
CONCRETE
SL AB ±1m AYAM GORENG ASLI PEMUDA
PIPA PE Ø 32 MM
K K
PIPA CAS
ING Ø2"
GALVANIS DRAWING NO. SCALE DATE REV
PGAS -CA-E089-01-CAS-DG-0001
1 1 1 2 1 10
SHEET NO. 4 OF 10
NTS 27-03-2023 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

KETERANGAN
1. Semua dimensi dalam satuan Meter kecuali
A A
ditentukan lain.

2 . Legend :
= PIPA EKSISTING
= PIPA BARU

B 1 = DAFTAR MATERIAL B

2 J01A = NOMER JOINT

C J. C
05

D D

3
E E

J.
06

F PEMILIK F

PT. PERUSAHAAN GAS NEGARA Tbk


PMO - PROJECT MANAGEMENT OFFICE
Jl. Pemuda No.56-58
Phone : 5490555 Fax. 5490333
Surabaya

PMO - PROJECT MANAGEMENT OFFICE


G G
NAMA PARAF TANGGAL

4 DIPERIKSA
DISETUJUI
ANDHIKA
SETYO DENY H
DIKETAHUI WAHYU WIJAYA
J.
07
H PELAKSANA H

NAMA PARAF TANGGAL


DIGAMBAR SLAMET PURWONO
DIPERIKSA ANANG WAHYUDI
I DISETUJUI DEDDY EFENDI I

PROJECT

PEKERJAAN PEMASANGAN PIPA BAJA


PENYALUR GAS DAN MRS
PAKET 6 (CUSTOMER ATTACHMENT)
J SPESIFIKASI J
NO NAMA MATERIAL DIMENSI TEKNIK VOLUME KET
AS BUILT DRAWING
1 PIPE PE Ø63 MM MDPE,SDR 11, 250 M
YELLOW,PE80 TITLE :
ISOMETRIC
2 COUPLER Ø63 MM HDPE,SDR 11,PE100,EF 1 Bh
PIPA CABANG PE Ø63MM
5 3 ELBOW 90° Ø63 MM HDPE,SDR 11,PE100,EF 1 Bh AYAM GORENG ASLI PEMUDA
K J. K
4 ELBOW 45° Ø63 MM HDPE,SDR 11,PE100,EF 1 Bh
08 DRAWING NO. SCALE DATE REV
5 END CAP Ø63 MM HDPE,SDR 11,PE100,EF 1 Bh
PGAS -CA-E089-01-CAS-DG-0001

SHEET NO. 5 OF 10
NTS 27-03-2023 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NO NAMA MATERIAL DIMENSI SPESIFIKASI SATUAN VOLUME KETERANGAN


TEKNIK
1. Semua dimensi dalam satuan Meter kecuali
A MDPE,SDR 11, A
1 Pipa Polyethylene Ø 32mm YELLOW,PE80
M' 7 ditentukan lain.

2 Tapping Saddle Ø 63x32mm HDPE,SDR 11,PE100,EF Bh 1 2 . Legend :


= PIPA EKSISTING
3 Transition Fitting Ø 32x25mm HDPE,SDR 11,PE100,EF Bh 1
= PIPA BARU
4 Elbow 90° Galvanize Ø 1" NPT ( F - M ) Bh 2
B 1 = DAFTAR MATERIAL B
5 Pipa Galvanize Ø 1" Medium A M' 1.5
6 Klem Pipa Bh 2 J01A = NOMER JOINT

7 Ball Valve Ø 1" Brass,NPT M' 1


C 8 Double Nipple Ø1 NPT ( M - M ) Bh 3 C
Max Inlet : 2- 4 barg,
9 Service Regulator Ø 1" Outlet: 0.25 sd 0.85 barg
SN: 24219
Bh 1
10 Reducer Socket Ø1 "X3/4" NPT ( F - M ) Bh 1
Diaphragma
11 Meter G 2.5 Bh 1
No.22110147429
D Elbow 90° Ø32mm HDPE,SDR 11,PE100,EF Bh 1 D
12
13 Coupler Ø32mm HDPE,SDR 11,PE100,EF Bh 1
14 Pipa Casing Galvanize Ø 2" Medium A M' 3
15 Reducer Tee Ø 1x1x1/2" Galvanize .NPT Bh 2
E E
16 Double Nipple Ø1/2 " NPT ( M - M ) Bh 2
17 Ball Valve Ø 1/2" Brass,NPT Bh 2
18 End Plug Ø1/2 " Galvanize .NPT Bh 2
F PEMILIK F

PT. PERUSAHAAN GAS NEGARA Tbk


PMO - PROJECT MANAGEMENT OFFICE
Jl. Pemuda No.56-58
Phone : 5490555 Fax. 5490333
Surabaya

G 2 PMO - PROJECT MANAGEMENT OFFICE


G
3 NAMA PARAF TANGGAL
DIPERIKSA ANDHIKA
DISETUJUI SETYO DENY H
DIKETAHUI WAHYU WIJAYA

H PELAKSANA H

1 NAMA PARAF TANGGAL


DIGAMBAR SLAMET PURWONO
DIPERIKSA ANANG WAHYUDI
I DISETUJUI DEDDY EFENDI I

PROJECT

PEKERJAAN PEMASANGAN PIPA BAJA


PENYALUR GAS DAN MRS
PAKET 6 (CUSTOMER ATTACHMENT)
J J

AS BUILT DRAWING
TITLE :
ISOMETRIC
PIPA SERVIS PE Ø32MM
AYAM GORENG ASLI PEMUDA
K K

DRAWING NO. SCALE DATE REV


PGAS -CA-E089-01-CAS-DG-0001

SHEET NO. 6 OF 10
NTS 27-03-2023 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

KEY PLAN
PLAN
N
A A
W E
PLAN
N S

W E
B B

C C

D LEGEND D

TL TIANG LISTRIK
PIPA BARU TT TIANG TELEPON

AKHIR PEKERJAAN PIPA EKSISTING TLmp TIANG LAMPU

37.00
KONTUR MINOR
E
End Cap Ø63mm 37.00
KONTUR MAJOR TEST BOX
E
AWAL PEKERJAAN STATION POINT JUNCTION BOX

AWAL PEKERJAAN Pemotongan End Cap STA 0+000

SUNGAI
W

Tapping Saddle Ø63X32MM Eksisting Ø63mm & JALAN MARKER POST

E760500

F
Connect Coupler PE N9293000
KOORDINAT

BERM
PATOK GAS
F
CROSSING Ø63mm PAVING
PEMILIK
SALURAN PIPA EKS
PEMASANGAN PIPA CABANG PE Ø63MM PT. PERUSAHAAN GAS NEGARA Tbk
PMO - PROJECT MANAGEMENT OFFICE
Jl. Pemuda No.56-58
PIPA PE Ø 63 MM PIPA EKSISTING Phone : 5490555 Fax. 5490333
Surabaya
G CROS G
SING
JALAN PMO - PROJECT MANAGEMENT OFFICE
CROSSING SALURAN
NAMA PARAF TANGGAL
DIPERIKSA ANDHIKA
DISETUJUI SETYO DENY HUDAYA
DIKETAHUI WAHYU WIJAYA
G2.5

H PEMASANGAN PIPA SERVIS H


PIPA PE Ø 32 MM
PELAKSANA

AKHIR PEKERJAAN NAMA PARAF TANGGAL


I Meter Gas G 2.5 DIGAMBAR SLAMET PURWONO I
DIPERIKSA ANANG WAHYUDI
DISETUJUI DEDDY EFENDI

PROJECT
PEKERJAAN PEMASANGAN PIPA
PENYALUR GAS DAN MRS PELANGGAN
J J
KECIL PAKET 6 (CUSTOMER ATTACHMENT)
AS BUILT DRAWING
TITLE :

SKEMATIK

K AYAM GORENG ASLI PEMUDA K

DRAWING NO. SCALE DATE REV


PGAS -CA-E089-01-CAS-DG-0001

SHEET NO. 7 OF 10
NTS 27-03-2023 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

KEY PLAN
NAMA MATERIAL DIMENSI SPESIFIKASI
NO TEKNIK PLAN
N
A A
MDPE,SDR 11,
1 Pipa Polyethylene Ø 32mm W E
YELLOW,PE80
S
2 Tapping Saddle Ø 63x32mm HDPE,SDR 11,PE100,EF

3 Transition Fitting Ø 32x25mm HDPE,SDR 11,PE100,EF


B NPT ( F - M ) B
4 Elbow 90° Galvanize Ø 1"
5 Pipa Galvanize Ø 1" Medium A
6 Klem Pipa

7 Ball Valve Ø 1" Brass,NPT


C C

8 Double Nipple Ø1 NPT ( M - M )


Max Inlet : 2- 4barg,
9 Service Regulator Ø 1" Outlet: 0.25 sd 0.85 barg

10 Reducer Socket Ø1 "X3/4" NPT ( F - M )


D LEGEND D
11 Meter G 2.5 + Coupling Diaphragma
TL TIANG LISTRIK
12 Elbow 90° Ø32mm HDPE,SDR 11,PE100,EF
PIPA BARU TT TIANG TELEPON

13 Coupler Ø32mm HDPE,SDR 11,PE100,EF 0 0 0 00 0 0 0


PIPA EKSISTING TLmp TIANG LAMPU

E 14 Pipa Casing Galvanize Ø 2" Medium A 37.00


KONTUR MINOR
E
37.00
KONTUR MAJOR TEST BOX

15 Reducer Tee Ø 1x1x1/2" Galvanize .NPT STA 0+000 STATION POINT JUNCTION BOX

16 Double Nipple Ø1/2 " NPT ( M - M ) SUNGAI


W

MARKER POST
METER G 2.5 JALAN

17 Ball Valve Ø 1/2" Brass,NPT E760500 KOORDINAT PATOK GAS


N9293000
F BERM F
18 End Plug Ø1/2 " Galvanize .NPT PAVING
PEMILIK
PT. PERUSAHAAN GAS NEGARA Tbk
PMO - PROJECT MANAGEMENT OFFICE
Jl. Pemuda No.56-58
Phone : 5490555 Fax. 5490333
Surabaya
G G
PMO - PROJECT MANAGEMENT OFFICE

NAMA PARAF TANGGAL


DIPERIKSA ANDHIKA
DISETUJUI SETYO DENY HUDAYA
DIKETAHUI WAHYU WIJAYA
H H

PELAKSANA

FLOOR

NAMA PARAF TANGGAL


I Concrete Adukan (Site Mix) DIGAMBAR SLAMET PURWONO I
DIPERIKSA ANANG WAHYUDI
1PC : 2 PS : 3 KR
DISETUJUI DEDDY EFENDI
Dimensi L. 30x T. 40 cm

2 13 PROJECT
PEKERJAAN PEMASANGAN PIPA
PENYALUR GAS DAN MRS PELANGGAN
J J
KECIL PAKET 6 (CUSTOMER ATTACHMENT)
AS BUILT DRAWING
PIPA PE EKSISTING TITLE :
GAMBAR TIPIKAL
PEMASANGAN SAMBUNGAN KE PELANGGAN

K AYAM GORENG ASLI PEMUDA K

DRAWING NO. SCALE DATE REV


PGAS -CA-E089-01-CAS-DG-0001

SHEET NO. 8 OF 10
NTS 27-03-2023 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

KETERANGAN

A A

B B

Perhatian !
C C

SEPANJANG JALUR INI TERTANAM PIPA GAS


TEKANAN MENENGAH
D Untuk gangguan atau kondisi darurat hubungi Contact Center D

PT Perusahaan Gas Negara Tbk.

E E

MARKER POST JARINGAN

F F
PEMILIK
PT. PERUSAHAAN GAS NEGARA Tbk
PMO - PROJECT MANAGEMENT OFFICE
Jl. Pemuda No.56-58
Phone : 5490555 Fax. 5490333
Surabaya
FRONT VIEW MARKER POST
G PMO - PROJECT MANAGEMENT OFFICE G

150 NAMA

150
PARAF TANGGAL

DIPERIKSA ANDHIKA
SETYO DENY HUDAYA
MATERIAL DISETUJUI
WAHYU WIJAYA
GA

600
DIKETAHUI
BETON K=225
H (Site Mix) TM S PELAKSANA H

NAMA PARAF TANGGAL

150
DIGAMBAR SLAMET PURWONO
DIPERIKSA ANANG WAHYUDI
I DISETUJUI DEDDY EFENDI
I

PROJECT

PEKERJAAN PEMASANGAN PIPA


PENYALUR GAS DAN MRS
PELANGGAN KECIL PAKET 6

450150 150 50
J (CUSTOMER ATTACHMENT) J

AS BUILT DRAWING
4 TITLE : DETAIL
MARKER POST & PATOK GAS

AYAM GORENG ASLI PEMUDA


K K
PATOK GAS
DRAWING NO. SCALE DATE REV

PGAS -CA-E089-01-EPL-DG-0002

SHEET NO. 9 OF 10
NTS 20-03-2023 A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

KETERANGAN
A A

B B

C C

RANGKAIAN METER
Max Inlet : 2- 4 barg,
D Outlet: 0.25 sd 0.85 barg
1 Bh D
25 SERVICE REGULATOR 24 KLEM PIPA Ø 1" 2 Bh -
SN: 24219
23 REDUCER SOCKET Ø1x3/4" GALVANIS NPT (M - F) 1 Bh - 22 END PLUG Ø1/2" GALVANIS NPT (M - M) 2 Bh -

21 DOUBLE NIPPLE Ø1/2" GALVANIS NPT (M - M) 2 Bh - 20 REDUCER TEE Ø1x1x1/2" GALVANIS NPT (F - F) 2 Bh -
G 2.5 , Diaphragma 3 Bh
E 19 METER GAS
No : 22110147429
- 18 DOUBLE NIPPLE Ø1" GALVANIS NPT (M - M) - E

Lever Operated , ASME B16.33 Lever Operated , ASME B16.33


17 BALL VALVE BRASS Ø1" Brass / copper / bronze , 1 Bh - 16 BALL VALVE BRASS Ø1/2" Brass / copper / bronze , 2 Bh -
End Connect Type NPTF x NPTF End Connect Type NPTF x NPTF

15 PIPE GALVANIS Ø1" MEDIUM Gr.A 1.5 M' - 14 ELBOW Ø1" GALVANIS NPT (F - M) 2 Bh -
F PEMILIK F
PIPA SERVIS PT. PERUSAHAAN GAS NEGARA Tbk
PMO - PROJECT MANAGEMENT OFFICE
Jl. Pemuda No.56-58
13 ELBOW Ø32MM HDPE,SDR 11,90°,PE100, EF 1 Bh - 12 FEMALE TRANSITION Ø32 MMx1" HDPE,SDR 11,PE100, EF 1 Bh - Phone : 5490555 Fax. 5490333
Surabaya

11 PIPE CASING GALVANIS Ø2" MEDIUM Gr.A 3 M' - 10 COUPLER Ø32 MM HDPE,SDR 11,PE100, EF 1 Bh -
PMO - PROJECT MANAGEMENT OFFICE
G MDPE,SDR 11, G
9 TAPPING SADDLE Ø63X32 MM HDPE,SDR 11,PE100, EF 1 Bh - 8 PIPE PE Ø32 MM 7 M' -
YELLOW,PE80 NAMA PARAF TANGGAL
DIPERIKSA ANDHIKA
PIPA CABANG DISETUJUI SETYO DENY H
DIKETAHUI WAHYU WIJAYA
7 PATOK GAS TYPE A 5 Bh -

H 5 ELBOW Ø63MM HDPE,SDR 11,90°,PE100, EF 1 Bh - 6 MARKER POST 1 Bh - PELAKSANA H

3 COUPLER Ø63MM HDPE,SDR 11,PE100, EF 1 Bh - 4 END CAP Ø63MM HDPE,SDR 11,PE100, EF 1 Bh -

1 PIPE PE MDPE,SDR 11, 250 M' - 2 ELBOW Ø63MM 1 Bh - NAMA PARAF TANGGAL
Ø63 MM HDPE,SDR 11,45°,PE100, EF
YELLOW,PE80 DIGAMBAR SLAMET PURWONO
DIPERIKSA ANANG WAHYUDI
I
NAMA MATERIAL DIMENSI SPESIFIKASI VOLUME KET NAMA MATERIAL DIMENSI SPESIFIKASI VOLUME KET
I
NO TEKNIK NO TEKNIK
DISETUJUI DEDDY EFENDI

PROJECT

PEKERJAAN PEMASANGAN PIPA BAJA


PENYALUR GAS DAN MRS
PAKET 6 (CUSTOMER ATTACHMENT)
J J

AS BUILT DRAWING
TITLE :
DAFTAR MATERIAL
AYAM GORENG ASLI PEMUDA
K K
Jl. Tidar,Sawahan Kec.Sawahan - SURABAYA
DRAWING NO. SCALE DATE REV
PGAS -CA-E089-01-CAS-DG-0001

SHEET NO. 10 OF 10
NTS 27-03-2023 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16