Anda di halaman 1dari 58

DAFTAR KUANTITAS - BILL OF QUANTITY ( BOQ)

GRAND REKAP
PEKERJAAN : KONSTRUKSI DALAM PENYELESAIAN
LOKASI : UNIVERSITAS MULAWARMAN
TAHUN : 2023

NO URAIAN HARGA JUMLAH

I. PEKERJAAN PRELIMINARY.

II. GEDUNG FISIPOL


a STRUKTUR
b ARSITEKTUR
c MEKANIKAL
d ELEKTRIKAL

III. GEDUNG DEKANAT FAPERTA


a STRUKTUR
b ARSITEKTUR
c MEKANIKAL
d ELEKTRIKAL

IV. GEDUNG FKIP BANGGERIS


a STRUKTUR
b ARSITEKTUR
c MEKANIKAL
d ELEKTRIKAL

V. GEDUNG FARMASI
a LABORATORIUM FARMASI
b WORKSHOP FARMASI

a. JUMLAH Rp.
b. PPN 11 % = 11% x a Rp.
c. JUMLAH TOTAL Rp.
d. DIBULATKAN Rp.
e. TERBILANG :
// //

Perusahaan
PT/ CV

Nama
Jabatan
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN KDP UNIVERSITAS MULAWARMAN.
LOKASI : SAMARINDA LINGKUP PEKERJAAN : PENDAHULUAN

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )

I. PEKERJAAN PRELIMINARY.

1 PEKERJAAN PENDAHULUAN ( PRELIMINARY ).


a Papan Nama Proyek bh 4.00
TOTAL - I. PEKERJAAN PRELIMINARY. :

2 PEKERJAAN K.3
a PENYIAPAN RK3K .
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Set 4.00
2 Pembuatan Kartu Identitas Pekerja (KIP); Lb 100.00
TOTAL - aPENYIAPAN RK3K . :
b SOSIALISASI DAN PROMOSI K.3
1 Induksi K3 (Safety Induction ); Khusus pekerja Baru Org 150.00
2 Spanduk (banner) ; Lb 8.00
3 Poster; Lb 8.00
4 Papan Informasi K3. Bh 8.00
TOTAL - b SOSIALISASI DAN PROMOSI K.3 :
c ALAT PELINDUNG KERJA.
1 Tali Keselamatan (Life Line); Ls 1.00
2 Penahan Jatuh (Safety Deck); Ls 1.00
3 Pagar Pengaman (Guard Railling); Ls 1.00
4 Pembatas Area (Restricted Area ). Ls 1.00
TOTAL - c ALAT PELINDUNG KERJA. :
d ALAT PELINDUNG DIRI.
1 Topi Pelindung (Safety Helmet) ; Bh 150.00
2 Pelindung Mata (Goggles, Spectacles); Psg 150.00
3 Pelindung Pernafasan Dan Mulut (Masker); Bh 150.00
4 Sarung Tangan (Safety Gloves); Psg 150.00
5 Sepatu Keselamatan (Safety Shoes); Psg 150.00
6 Penunjang Seluruh Tubuh (Full Body Harness); Bh 10.00
7 Rompi Keselamatan (Safety Vest); Bh 100.00
8 Pelindung Jatuh (Fall Arrester); Bh 10.00
TOTAL - d ALAT PELINDUNG DIRI. :
e ASURANSI DAN PERIJINAN TERDIRI ATAS :
1 BPJS Ketenagakerjaan Dan Kesehatan Kerja Ls 1.00
(0,21 % x Nilai Proyek)
2 Surat Ijin Kelaikan Alat; Alat/Kend 3.00
3 Surat Ijin Operator; Lb/Alat 1.00
TOTAL - e ASURANSI DAN PERIJINAN TERDIRI ATAS : :
f PERSONIL K3.
1 Petugas K3 OB 4.00
2 Petugas P3K; OB 4.00
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN KDP UNIVERSITAS MULAWARMAN.
LOKASI : SAMARINDA LINGKUP PEKERJAAN : PENDAHULUAN

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
TOTAL - f PERSONIL K3. :
g FASILITAS SARANA KESEHATAN :
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, Ls 1.00

TOTAL - g FASILITAS SARANA KESEHATAN : :


h RAMBU - RAMBU :
1 Rambu Petunjuk; Bh 12.00
2 Rambu Larangan; Bh 12.00
3 Rambu Peringatan; Bh 12.00
4 Rambu Kewajiban; Bh 12.00
5 Rambu Informasi; Bh 12.00
6 Rambu Pekerjaan Sementara; Bh 12.00
TOTAL - h RAMBU - RAMBU : :
i LAIN - LAIN TERKAIT PENGENDALIAN RESIKO K3.
1 Alat Pemadam Api Ringan (APAR); Bh 4.00
2 Bendera K3; Bh 4.00
TOTAL - i LAIN - LAIN TERKAIT PENGENDALIAN RESIKO K3. :
TOTAL PENDAHLUAN DAN K3 :
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH FKIP UNIVERSITAS MULAWARMAN.
LOKASI : JL. BANGGERIS NO.89, SAMARINDA.

JUMLAH HARGA
NO ITEM PEKERJAAN
( Rp. )

REKAPITULASI
PEKERJAAN STRUKTUR.

I. PEKERJAAN PRELIMINARY.

II.2. PEKERJAAN GALIAN TANAH & URUGAN

II.3. PEKERJAAN STRUKTUR BAWAH


II.3.1. PEKERJAAN SUB STRUKTUR
II.3.1.2. Pekerjaan Pile Cap / PC

II.3.2. UPPER STRUKTUR.


II.3.2.2. Lantai - 1 (satu) Elev. -50
II.3.2.3. Lantai - 2 (dua) ( El. + 3.950 )
II.3.2.4. Lantai - 3 (Tiga) ( El. + )

TOTAL REKAP STRUKTUR :


DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN KDP UNIVERSITAS MULAWARMAN.
LOKASI : SAMARINDA

HARGA SAT. JUMLAH HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )

II. BANGUNAN UTAMA .


II.2. PEKERJAAN GALIAN TANAH & URUGAN
1 Pek. Urugan pasir bawah lantai t. = 5 cm m3 71.02
2 Pek. Lantai kerja bawah lantai t. = 5 cm m3 71.02
3 Pek.buangan tanah sisa galian pondasi m3 119.70
4 Pek.Urugan tanah dalam bangunan m3 284.07
TOTAL. II.2. PEKERJAAN GALIAN TANAH & URUGAN :
II.3. PEKERJAAN STRUKTUR BAWAH
II.3.1.2. Pekerjaan Pile Cap / PC
1 Pek.Pedestal Kolom K1. 400x500
Beton K.250 m3 0.60
Bekisting m2 5.40
2 Pek.Pedestal Kolom K2. 400x500.
Beton K.250 m3 6.60
Bekisting m2 59.40
3 Pek.Pedestal Kolom K3. 300x300.
Beton K.250 m3 1.22
Bekisting m2 16.20
4 Pek.Pedestal Kolom K4. 250x250.
Beton K.250 m3 0.56
Bekisting m2 9.00
5 Pek.Pedestal Kolom K.G. 200x300.
Beton K.250 m3 1.17
Bekisting m2 19.50
SUB TOTAL. II.3.1.2. Pekerjaan Pile Cap / PC :
II.3.2. UPPER STRUKTUR.
II.3.2.2. Lantai - 1 (satu) Elev. -50
1 Plat Lantai t = 12,5 cm ( El.- 50 )
Beton K.250 108.59 kg/m3 m3 149.93
Besi ulir kg 16,281.06
Bekisting m2 1,230.82
2 Plat Lantai t = 10 cm ( El.- 250 )
Beton K.250 135.74 kg/m3 m3 18.19
Besi ulir kg 2,468.57
Bekisting m2 30.70
3 Balok TB1. 400x700
Beton K.250 241.84 kg/m3 m3 44.80
Besi ulir kg 10,834.35
Bekisting m2 224.00
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN KDP UNIVERSITAS MULAWARMAN.
LOKASI : SAMARINDA

HARGA SAT. JUMLAH HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
4 Balok TB2 250x400
Beton K.250 332.08 kg/m3 m3 28.88
Besi ulir kg 9,590.51
Bekisting m2 231.04
5 Balok TB3. 300x500
Beton K.250 280.86 kg/m3 m3 7.74
Besi ulir kg 2,173.83
Bekisting m2 51.60
6 Balok TB4. 200x300
Beton K.250 267.26 kg/m3 m3 7.09
Besi ulir kg 1,893.77
Bekisting m2 70.86
7 Balok TB5. 200x300
Beton K.250 232.69 kg/m3 m3 4.17
Besi ulir kg 971.44
Bekisting m2 41.75
8 Balok TB6. 300x600
Beton K.250 282.35 kg/m3 m3 4.75
Besi ulir kg 1,341.74
Bekisting m2 31.68
9 Balok BP. 200x400
Beton K.250 205.73 kg/m3 m3 15.49
Besi ulir kg 3,187.17
Bekisting m2 154.92
10 Balok CB.1. 250x400
Beton K.250 351.19 kg/m3 m3 5.25
Besi ulir kg 1,842.32
Bekisting m2 41.97
11 Balok CB.2. 250x400
Beton K.250 296.09 kg/m3 m3 1.53
Besi ulir kg 452.42
Bekisting m2 12.22
12 Kolom K1. 400x500
Beton K.250 213.42 kg/m3 m3 3.20
Besi ulir kg 682.93
Bekisting m2 28.80
13 Kolom K2. 400x500.
Beton K.250 269.17 kg/m3 m3 35.20
Besi ulir kg 9,474.61
Bekisting m2 316.80
14 Kolom K3. 300x300.
Beton K.250 307.64 kg/m3 m3 6.48
Besi ulir kg 1,993.54
Bekisting m2 86.40
15 Kolom K4. 250x250.
Beton K.250 308.50 kg/m3 m3 3.00
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN KDP UNIVERSITAS MULAWARMAN.
LOKASI : SAMARINDA

HARGA SAT. JUMLAH HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
Besi ulir kg 925.50
Bekisting m2 48.00
16 Kolom K.G. 200x300.
Beton K.250 236.46 kg/m3 m3 6.24
Besi ulir kg 1,475.48
Bekisting m2 104.00
17 Tangga Beton t = 15 cm as. ( D - C & E - F ) ( 0 - 1 )
Beton K.250 61.69 kg/m3 m3 7.30
Besi ulir kg 450.07
Bekisting m2 50.67
SUB TOTAL. II.3.2.2. Lantai - 1 (satu) Elev. -50 :
II.3.2.3. Lantai - 2 (dua) ( El. + 3.950 )
1 Plat Lantai t = 12,5 cm ( El.+ 3.950 ).
Beton K.250 108.59 kg/m3 m3 159.18
Besi ulir kg 17,285.13
Bekisting m2 1,296.34
2 Kolom K1. 400x500
Beton K.250 210.88 kg/m3 m3 3.52
Besi ulir kg 742.30
Bekisting m2 31.68
3 Kolom K2. 400x500.
Beton K.250 265.62 kg/m3 m3 38.72
Besi ulir kg 10,284.70
Bekisting m2 348.48
4 Kolom K3. 300x300.
Beton K.250 303.81 kg/m3 m3 7.13
Besi ulir kg 2,165.59
Bekisting m2 95.04
5 Kolom K4. 250x250.
Beton K.250 304.82 kg/m3 m3 3.30
Besi ulir kg 1,005.92
Bekisting m2 52.80
6 Kolom K.G. 200x300.
Beton K.250 234.92 kg/m3 m3 6.86
Besi ulir kg 1,612.49
Bekisting m2 114.40
7 Balok B1. 400x700
Beton K.250 240.19 kg/m3 m3 44.80
Besi ulir kg 10,760.65
Bekisting m2 41.40
8 Balok B2. 250x400
Beton K.250 289.72 kg/m3 m3 27.98
Besi ulir kg 8,106.32
Bekisting m2 153.89
9 Balok B3. 300x500
Beton K.250 496.11 kg/m3 m3 9.09
Besi ulir kg 4,509.61
Bekisting m2 45.45
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN KDP UNIVERSITAS MULAWARMAN.
LOKASI : SAMARINDA

HARGA SAT. JUMLAH HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
10 Balok B4. 200x300
Beton K.250 272.06 kg/m3 m3 8.11
Besi ulir kg 2,205.32
Bekisting m2 47.29
11 Balok B5. 200x300
Beton K.250 231.54 kg/m3 m3 3.57
Besi ulir kg 826.33
Bekisting m2 20.82
12 Balok B6. 300x600
Beton K.250 282.19 kg/m3 m3 4.61
Besi ulir kg 1,300.34
Bekisting m2 24.32
13 Balok B7. 200x400
Beton K.250 208.00 kg/m3 m3 7.26
Besi ulir kg 1,510.95
Bekisting m2 49.94
14 Balok BP.1. 150x200
Beton K.250 289.35 kg/m3 m3 0.09
Besi ulir kg 25.61
Bekisting m2 0.44
15 Balok BP.2. 200x300
Beton K.250 244.59 kg/m3 m3 0.18
Besi ulir kg 43.29
Bekisting m2 1.03
16 Balok CG.1. 250x400
Beton K.250 462.14 kg/m3 m3 3.38
Besi ulir kg 1,562.05
Bekisting m2 18.59
17 Balok CG.2. 250x400
Beton K.250 452.01 kg/m3 m3 0.11
Besi ulir kg 48.37
Bekisting m2 0.59
18 Tangga Beton t = 15 cm as. ( D - C & E - F ) ( 0 - 1 )
Beton K.250 61.69 kg/m3 m3 7.30
Besi ulir kg 450.07
Bekisting m2 50.67
SUB TOTAL. II.3.2.3. Lantai - 2 (dua) ( El. + 3.950 ) :
II.3.2.4. Lantai - 3 (Tiga) ( El. + )
1 Plat Lantai t = 12,5 cm ( El.+ 3.950 ).
Beton K.250 108.59 kg/m3 m3 159.18
Besi Polos kg 17,285.13
Plat Bondeks m2 1,296.34
2 Pek. Waterproofing m2 1,296.34
SUB TOTAL. II.3.2.4. Lantai - 3 (Tiga) ( El. + ) :
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG PERKULIAHAN DAN RUANG SERBA GUNA
FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNMUL
LOKASI #REF!

JUMLAH HARGA
NO ITEM PEKERJAAN
( Rp )

REKAPITULASI
1 PEKERJAAN PERSIAPAN
2 PEKERJAAN GALIAN TANAH & URUGAN
3 PEKERJAAN SUB STRUKTUR
4 PEKERJAAN PILE CAP
5 UPPER STRUKTUR.
a. Lantai - 1 (Satu) Elev. +.0.00
b. Lantai - 2 (Dua) ( El. + 3.55 )
c. Lantai - 3 (Tiga) ( El. + 7.10 )
d. Lantai - 4 (Empat) ( El. + 11.10 )
e. Lantai - RL ( El. + 14.60 )
6 PEKERJAAN RANGKA KUDA - KUDA DAN ATAP

TOTAL REKAP STRUKTUR :


DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN #REF!
LOKASI #REF!
HARGA SAT. TOTAL HARGA
NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
1 PEKERJAAN PERSIAPAN
1 Pek. Bouwplank M¹ 90.00
2 Pembersihan M² 420.00

TOTAL. 1 PEKERJAAN PERSIAPAN :


2 PEKERJAAN GALIAN TANAH & URUGAN
1 Pek. Galian pile cap M³ 103.57
2 Pek. Urugan pasir bawah pile cap & Sloof t.= 5 cm M³ 3.95
3 Pek. Urugan pasir bawah lantai t. = 5 cm M³ 21.00
4 Pek. Urugan tanah dalam bangunan + Pemadatan M³ 168.00

TOTAL. 2 PEKERJAAN GALIAN TANAH & URUGAN :


3 PEKERJAAN SUB STRUKTUR
3.1. Pekerjaan Pondasi
1 Pek. Borpile Type P.1 Ø 40 cm M¹ 648.00
Beton K-350 M³ 81.39
Pembesian
- Besi Ulir D 16 mm Kg 2,957.76
- Besi Polos Ø 8 mm Kg 255.96

2 Pek. Borpile Type P.2 Ø 40 cm M¹ 192.00


Beton K-350 M³ 24.12
Pembesian
- Besi Ulir D 16 mm Kg 1,314.56
- Besi Polos Ø 8 mm Kg 113.76

3 Pek. Borpile Type P.3 Ø 40 cm M¹ 48.00


Beton K-350 M³ 6.03
Pembesian
- Besi Ulir D 16 mm Kg 657.28
- Besi Polos Ø 8 mm Kg 56.88

4 Pek. Borpile Type P.4 Ø 40 cm M¹ 108.00


Beton K-350 M³ 13.56
Pembesian
- Besi Ulir D 16 mm Kg 1,478.88
- Besi Polos Ø 8 mm Kg 127.98

5 Pemotongan kepala Tiang Pancang. Titik 83.00


6 PDA Test. Titik 2.00

TOTAL. 3.1. Pekerjaan Pondasi :


3.2. PEKERJAAN PILE CAP
1 Pile Cap Type PC.1. 170x170x70
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN #REF!
LOKASI #REF!
HARGA SAT. TOTAL HARGA
NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
a.Beton K.250 M³ 29.04
b.Besi Ulir Kg 6,179.33
c.Bekisting M² 74.84
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN #REF!
LOKASI #REF!
HARGA SAT. TOTAL HARGA
NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
2 Pile Cap Type PC.2. 80x170x70
a.Beton K.250 M³ 7.62
b.Besi Ulir Kg 1,659.26
c.Bekisting M² 28.00
3 Pile Cap Type PC.3. 80x80x30
a.Beton K.250 M³ 1.79
b.Besi Ulir Kg 486.34
c.Bekisting M² 8.96
4 Pile Cap Type PC.4. 340x400x70
a.Beton K.250 M³ 9.52
b.Besi Ulir Kg 1,379.74
c.Bekisting M² 10.36

SUB TOTAL. 3.2. PEKERJAAN PILE CAP :


4 UPPER STRUKTUR.
4.1. Lantai - 1 (Satu) Elev. +.0.00
1 Kolom Pedestal K.1 40x60 cm
a.Beton K.250 M³ 5.76
b.Besi Ulir Kg 3,410.07
c.Besi Polos Kg 227.92
d.Bekisting M² 48.00
2 Kolom Pedestal K.2 40x40 cm
a.Beton K.250 M³ 1.28
b.Besi Ulir Kg 852.52
c.Besi Polos Kg 75.97
d.Bekisting M² 12.80
3 Kolom Pedestal K.3 25x25 cm
a.Beton K.250 M³ 0.13
b.Besi Ulir Kg 142.09
c.Besi Polos Kg 18.99
d.Bekisting M² 2.00
4 Plat Lantai. 1 t: 12 cm
a.Beton K.250 M³ 50.40
b.Besi polos Kg 7,321.68
c.Bekisting M² 429.84
5 Balok Tie Beam TB.1 30x50 cm
a.Beton K.250 M³ 36.90
b.Besi Ulir Kg 6,475.70
c.Besi Polos Kg 1,831.50
d.Bekisting M² 319.80
6 Balok Tie Beam TB.3 25x40 cm
a.Beton K.250 M³ 0.30
b.Besi Ulir Kg 37.92
c.Besi Polos Kg 19.43
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN #REF!
LOKASI #REF!
HARGA SAT. TOTAL HARGA
NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
d.Bekisting M² 3.15
7 Kolom K.1 40x60 cm
a.Beton K.250 M³ 20.16
b.Besi Ulir Kg 5,584.28
c.Besi Polos Kg 781.44
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN #REF!
LOKASI #REF!
HARGA SAT. TOTAL HARGA
NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
d.Bekisting M² 168.00
8 Kolom K.2 40X40 cm
a.Beton K.250 M³ 4.48
b.Besi Ulir Kg 1,396.07
c.Besi Polos Kg 260.48
d.Bekisting M² 44.80
9 Kolom K 3 25X25 cm
a.Beton K.250 M³ 0.44
b.Besi Ulir Kg 174.12
c.Besi Polos Kg 65.12
d.Bekisting M² 7.00
10 Teras Depan Lt.1
a.Beton K.250 M³ 1.95
b.Besi Ulir Kg 32.23
c.Besi Polos Kg 98.33
d.Bekisting M² 17.95
11 Tangga Lt.1 t:10 cm
a.Beton K.250 M³ 6.57
b.Besi Ulir Kg 377.52
c.Besi polos Kg 323.28
d.Bekisting M² 34.19
12 Plat Kanopy Lt.1
a.Beton K.250 M³ 0.70
b.Besi Polos Kg 50.26
c.Bekisting M² 12.75
13 Balok Jendela
a.Beton K.250 M³ 6.16
b.Besi ulir Kg 300.00
c.Besi polos Kg 414.40
d.Bekisting M² 84.48

SUB TOTAL. 4.1. Lantai - 1 (Satu) Elev. +.0.00 :


4.2. Lantai - 2 (Dua) ( El. + 3.55 )
1 Balok B1 30x60 cm
a.Beton K.250 M³ 12.24
b.Besi ulir Kg 2,054.27
c.Besi polos Kg 572.27
d.Bekisting M² 102.00
2 Balok B2 30x50 cm
a.Beton K.250 M³ 24.00
b.Besi ulir Kg 3,971.84
c.Besi polos Kg 1,349.76
d.Bekisting M² 231.40
3 Balok B3 25x40 cm
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN #REF!
LOKASI #REF!
HARGA SAT. TOTAL HARGA
NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
a.Beton K.250 M³ 0.30
b.Besi ulir Kg 44.56
c.Besi Polos Kg 339.94
d.Bekisting M² 3.15
4 Plat Lantai. 2 t: 12 cm
a.Beton K.250 M³ 47.56
c.Besi Polos Kg 6,911.73
c.Bekisting M² 406.17
5 Kolom K.1 40x60 cm
a.Beton K.250 M³ 20.16
b.Besi Ulir Kg 5,584.28
c.Besi Polos Kg 781.44
d.Bekisting M² 168.00
6 Kolom K.2 40X40 cm
a.Beton K.250 M³ 4.48
b.Besi Ulir Kg 1,396.07
c.Besi Polos Kg 260.48
d.Bekisting M² 44.80
7 Kolom K 3 25X25 cm
a.Beton K.250 M³ 0.44
b.Besi Ulir Kg 174.12
c.Besi Polos Kg 65.12
d.Bekisting M² 7.00
8 Tangga Lt.1 t:10 cm
a.Beton K.250 M³ 6.57
b.Besi Ulir Kg 377.52
c.Besi polos Kg 323.28
d.Bekisting M² 34.19
9 Plat Kanopy Lt.1
a.Beton K.250 M³ 0.70
b.Besi Polos Kg 50.26
c.Bekisting M² 12.75
10 Balok Jendela
a.Beton K.250 M³ 6.16
b.Besi ulir Kg 300.00
c.Besi polos Kg 414.40
d.Bekisting M² 84.48

SUB TOTAL. 4.2. Lantai - 2 (Dua) ( El. + 3.55 ) :


4.3. Lantai - 3 (Tiga) ( El. + 7.10 )
1 Balok B1 30x60 cm
a.Beton K.250 M³ 12.24
b.Besi ulir Kg 2,054.27
c.Besi polos Kg 572.27
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN #REF!
LOKASI #REF!
HARGA SAT. TOTAL HARGA
NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
d.Bekisting M² 102.00
2 Balok B2 30x50 cm
a.Beton K.250 M³ 24.00
b.Besi ulir Kg 3,971.84
c.Besi polos Kg 1,349.76
d.Bekisting M² 231.40
3 Balok B3 25x40 cm
a.Beton K.250 M³ 0.30
b.Besi ulir Kg 44.56
c.Besi polos Kg 339.94
d.Bekisting M² 3.15
4 Plat Lantai. 2 t: 12 cm
a.Beton K.250 M³ 47.56
b.Besi polos Kg 6,911.73
c.Bekisting M² 406.17
5 Kolom K.1 40x60 cm
a.Beton K.250 M³ 20.16
b.Besi Ulir Kg 5,584.28
c.Besi Polos Kg 781.44
d.Bekisting M² 168.00
6 Kolom K.2 40X40 cm
a.Beton K.250 M³ 13.44
b.Besi Ulir Kg 5,584.28
c.Besi Polos Kg 781.44
d.Bekisting M² 134.40
7 Kolom K 3 25X25 cm
a.Beton K.250 M³ 0.44
b.Besi Ulir Kg 261.18
c.Besi Polos Kg 65.12
d.Bekisting M² 7.00
8 Tangga Lt.1 t:10 cm
a.Beton K.250 M³ 6.57
b.Besi Ulir Kg 377.52
c.Besi polos Kg 323.28
d.Bekisting M² 34.19
9 Plat Kanopy Lt.1
a.Beton K.250 M³ 0.70
b.Besi Polos Kg 50.26
c.Bekisting M² 12.75
10 Balok Jendela
a.Beton K.250 M³ 6.16
b.Besi ulir Kg 300.00
c.Besi polos Kg 414.40
d.Bekisting M² 84.48
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN #REF!
LOKASI #REF!
HARGA SAT. TOTAL HARGA
NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )

SUB TOTAL. 4.3. Lantai - 3 (Tiga) ( El. + 7.10 ) :


4.4. Lantai - 4 (Empat) ( El. + 11.10 )
1 Balok B1 30x60 cm
a.Beton K.250 M³ 12.24
b.Besi ulir Kg 2,054.27
c.Besi polos Kg 572.27
d.Bekisting M² 102.00
2 Balok B2 30x50 cm
a.Beton K.250 M³ 24.00
b.Besi ulir Kg 3,971.84
c.Besi polos Kg 1,349.76
d.Bekisting M² 231.40
3 Balok B3 25x40 cm
a.Beton K.250 M³ 0.30
b.Besi ulir Kg 44.56
c.Besi polos Kg 339.94
d.Bekisting M² 3.15
4 Plat Lantai. 2 t: 12 cm
a.Beton K.250 M³ 47.56
b.Besi polos Kg 6,911.73
c.Bekisting M² 406.17
5 Kolom K.1 40x60 cm
a.Beton K.250 M³ 20.16
b.Besi Ulir Kg 5,584.28
c.Besi Polos Kg 781.44
d.Bekisting M² 168.00
6 Kolom K.2 40X40 cm
a.Beton K.250 M³ 13.44
b.Besi Ulir Kg 5,584.28
c.Besi Polos Kg 781.44
d.Bekisting M² 134.40
7 Kolom K 3 25X25 cm
a.Beton K.250 M³ 0.44
b.Besi Ulir Kg 348.24
c.Besi Polos Kg 65.12
d.Bekisting M² 7.00
8 Tangga Lt.1 t:10 cm
a.Beton K.250 M³ 6.57
b.Besi Ulir Kg 377.52
c.Besi polos Kg 323.28
d.Bekisting M² 34.19
9 Plat Kanopy Lt.1
a.Beton K.250 M³ 0.70
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN #REF!
LOKASI #REF!
HARGA SAT. TOTAL HARGA
NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
b.Besi Polos Kg 100.51
c.Bekisting M² 12.75
10 Balok Jendela
a.Beton K.250 M³ 5.25
b.Besi ulir Kg 266.67
c.Besi polos Kg 400.59
d.Bekisting M² 72.00

SUB TOTAL. 4.4. Lantai - 4 (Empat) ( El. + 11.10 ) :


4.5. Lantai - RL ( El. + 14.60 )
1 Balok RB1 25x40 cm
a.Beton K.250 M³ 11.10
b.Besi Ulir Kg 2,384.81
c.Besi Polos Kg 703.00
d.Bekisting M² 116.55
2 Balok RB2 25x40 cm
a.Beton K.250 M³ 1.10
b.Besi Ulir Kg 165.58
c.Besi Polos Kg 80.48
d.Bekisting M² 11.55
3 Balok CL 25x40 cm
a.Beton K.250 M³ 2.40
b.Besi Ulir Kg 444.93
c.Besi Polos Kg 24.05
d.Bekisting M² 25.20
4 Balok LS 65x8 cm
a.Beton K.250 M³ 2.81
b.Besi Ulir Kg 55.62
c.Besi Polos Kg 421.25
d.Bekisting M² 74.52
5 Plat Lantai RL
a.Beton K.250 M³ 9.18
b.Besi polos Kg 804.79
c.Bekisting M² 91.80

SUB TOTAL. 4.5. Lantai - RL ( El. + 14.60 ) :

5 PEKERJAAN RANGKA KUDA - KUDA DAN ATAP


1 Pek. Kuda - kuda Baja WF Kg 4,745.87
2 Pek. Gording Kanal C Kg 6,507.54
3 Pek. Tie Rod/Ikatan Angin Ø12 mm Kg 128.40
4 Pek. Trekstang Ø16 mm Kg 191.00
5 Pek. Plat Simpul Kg 849.92
6 Pas .Baut Ø 16 mm bh 1,152.00
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN #REF!
LOKASI #REF!
HARGA SAT. TOTAL HARGA
NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
7 Pas. Angkur Ø 22 - h. 50 cm bh 72.00
8 Pek. Pas. Rangka Atap genteng metal (Baja Ringan) M² 594.36
9 Pek. Pas. Atap Metal M² 594.36
10 Pek. Bubungan Atap M' 23.40
11 Pas.LisplanK GRC 9/30 CM M' 74.00

SUB TOTAL. 5PEKERJAAN RANGKA KUDA - KUDA DAN ATAP :


DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN KDP UNIVERSITAS MULAWARMAN.
LOKASI : SAMARINDA LINGKUP PEKERJAAN : PENDAHULUAN

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
TOTAL - f PERSONIL K3. :
g FASILITAS SARANA KESEHATAN :
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, Ls 1.00

TOTAL - g FASILITAS SARANA KESEHATAN : :


h RAMBU - RAMBU :
1 Rambu Petunjuk; Bh 12.00
2 Rambu Larangan; Bh 12.00
3 Rambu Peringatan; Bh 12.00
4 Rambu Kewajiban; Bh 12.00
5 Rambu Informasi; Bh 12.00
6 Rambu Pekerjaan Sementara; Bh 12.00
TOTAL - h RAMBU - RAMBU : :
i LAIN - LAIN TERKAIT PENGENDALIAN RESIKO K3.
1 Alat Pemadam Api Ringan (APAR); Bh 4.00
2 Bendera K3; Bh 4.00
TOTAL - i LAIN - LAIN TERKAIT PENGENDALIAN RESIKO K3. :
TOTAL PENDAHLUAN DAN K3 :
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PERENCANAAN GEDUNG DEKANAT DI FAKULTAS PERTANIAN UNIVERSITAS MULAWARMAN
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

JUMLAH HARGA
NO ITEM PEKERJAAN
( Rp )
PEKERJAAN ARSITEKTUR
1 PEKERJAAN PENDAHULUAN

2 PEKERJAAN UPPER STRUKTUR

3 PEKERJAAN PENUTUP ATAP

4 PEKERJAAN PASANGAN DINDING


Lantai Basement
Lantai 1
Lantai 2
Lantai 3
5 PEKERJAAN PINTU/ JENDELA
Lantai Basement
Lantai 1
Lantai 2
Lantai 3
6 PEKERJAAN LANTAI
Lantai Basement
Lantai 1
Lantai 2
Lantai 3
7 PEKERJAAN PLAFOND
Lantai Basement
Lantai 1
Lantai 2
Lantai 3
8 PEKERJAAN FINISHING
Lantai Basement
Lantai 1
Lantai 2
Lantai 3
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PERENCANAAN GEDUNG DEKANAT DI FAKULTAS PERTANIAN UNIVERSITAS MULAWARMAN
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SAT. VOLUME TOTAL HARGA
( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Pagar Seng Proyek M' 124.00
2 Bongkaran Kanopy Ls 1.00
TOTAL : I. PEKERJAAN PENDAHULUAN
III. PEKERJAAN UPPER STRUKTUR
1 Atap Space Frame Teras Lt.1 M² 53.20
2 Perkuatan Struktur Teras Lt.1
Plat Strip 750x50x6 mm Kg 356.48
Baut Bh 1,200.00

3 Perkuatan Struktur Teras Lt.2


Plat Strip 750x50x6 mm Kg 356.48
Baut Bh 1,200.00

4 Perkuatan Struktur Teras Lt.3


Plat Strip 750x50x6 mm Kg 356.48
Baut Bh 1,200.00

TOTAL : III. PEKERJAAN UPPER STRUKTUR

IV. PEKERJAAN PENUTUP ATAP


1 Pek. Atap Onduline Tile M² 1,055.99
2 Pek. Reng baja Ringan M² 1,055.99
3 Pek. Talang Jurai dalam M² 62.70
4 Pek. Bubungan Atap M' 80.00
5 Pas.LisplanK GRC 9/30 CM M' 224.00
6 Pek. Waterproofing Dak Atap M² 582.00

TOTAL : IV. PEKERJAAN PENUTUP ATAP


V. PEKERJAAN ARSITEKTUR
A. PEKERJAAN PASANGAN DINDING
Lantai Basement
1 Kolom+Balok Praktis 13/13 M' 48.00
2 Balok Latai 13/20 M' 38.60
3 Pasangan bata 1/2 batu 1 : 5 M² 154.40
4 Plesteran Dinding 1 : 4 M² 308.80
5 Plesteran Kolom 1 : 4 M² 231.10
6 Acian M³ 539.90
7 Cor Rabat Keliling Bangunan t. 10 cm 1 pc : 2 ps : 3 kr M³ 73.39
8 Relling Tangga M' 20.00
Jumlah :
Lantai 1
1 Kolom Praktis 13/13 M' 160.00
2 Balok Latai 13/20 M' 52.50
3 Bingkai Beton P1
Beton M³ 1.49
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PERENCANAAN GEDUNG DEKANAT DI FAKULTAS PERTANIAN UNIVERSITAS MULAWARMAN
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SAT. VOLUME TOTAL HARGA
( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 7
Besi Ulir Kg 50.73
Besi Polos Kg 70.31
Bekesting M² 14.88
4 Pasangan bata 1/2 batu 1 : 4 M² 572.99
5 Plesteran Dinding 1 : 4 M² 1,223.53
6 Plesteran Kolom 1 : 4 M³ 231.10
7 Acian M² 1,454.63
8 Dinding Partisi Gypsum M² 340.00
9 Dinding Partisi Gypsum, t:120 cm M² 18.00
10 Dinding Keramik Km/Wc 60 x 60 cm M² 109.12
11 Relling Tangga M' 16.10
Jumlah :
Lantai 2
1 Kolom Praktis 13/13 M' 160.00
2 Balok Latai 13/20 M' 52.50
3 Pasangan bata 1/2 batu 1 : 4 M² 436.03
4 Plesteran Dinding 1 : 4 M² 949.61
5 Plesteran Kolom 1 : 4 M³ 231.10
6 Acian M² 1,180.71
7 Dinding Partisi Gypsum M² 204.00
8 Dinding Partisi Gypsum, t:120 cm M² 12.00
9 Dinding Keramik Km/Wc 60 x 60 cm M² 110.50
10 Relling Tangga M' 16.10
Jumlah :

Lantai 3
1 Kolom Praktis 13/13 M' 100.00
2 Balok Latai 13/20 M' 52.50
3 Pasangan bata 1/2 batu 1 : 4 M² 342.23
4 Plesteran Dinding 1 : 4 M² 762.01
5 Plesteran Kolom 1 : 4 M² 231.10
6 Acian M² 993.11
7 Dinding Partisi Gypsum M' 993.11
8 Dinding Keramik Km/Wc 60 x 60 cm M' 46.50
9 Relling Tangga M' 16.10
Jumlah :
TOTAL : V.A. PEKERJAAN PASANGAN DINDING
B PEKERJAAN PINTU/ JENDELA
Lantai Basement
1 Pek. Pintu P4 Unit 2.00
2 Pek. Jendela V.1 Unit 6.00
Jumlah

Lantai 1
1 Pek. Aluminium Composit Panel M² 1,415.86
2 Pek. Ukiran Motif Kaltim ACP Depan M² 234.00
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PERENCANAAN GEDUNG DEKANAT DI FAKULTAS PERTANIAN UNIVERSITAS MULAWARMAN
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SAT. VOLUME TOTAL HARGA
( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 7
3 Pek. Ukiran Motif Kaltim ACP Teras M² 32.85
4 Pek. Pintu P1 Unit 2.00
5 Pek. Pintu P2 Unit 2.00
6 Pek. Pintu P3 Unit 2.00
7 Pek. Pintu P4 Unit 1.00
8 Pek. Pintu P5 Unit 8.00
9 Pek. Pintu P6 Unit 2.00
10 Pek. Pintu P7 Unit 7.00
11 Pek. Pintu P8 Unit 4.00
12 Pek. Pintu P9 Unit 2.00
13 Pek. Jendela CW.1 Unit 5.00
14 Pek. Jendela CW.2 Unit 7.00
15 Pek. Jendela CW.3 Unit 8.00
16 Pek. Jendela CW.4 Unit 4.00
17 Pek. Jendela V.1 Unit 26.00
18 Pek. Jendela V.2 Unit 14.00

Jumlah

Lantai 2
1 Pek. Ukiran Motif Kaltim ACP Teras M² 32.85
2 Pek. Pintu P2 Unit 2.00
3 Pek. Pintu P3 Unit 3.00
4 Pek. Pintu P4 Unit 4.00
5 Pek. Pintu P5 Unit 1.00
6 Pek. Pintu P6 Unit 1.00
7 Pek. Pintu P7 Unit 7.00
8 Pek. Pintu P8 Unit 5.00
9 Pek. Pintu P9 Unit 2.00
10 Pek. Jendela CW.1 Unit 7.00
11 Pek. Jendela CW.2 Unit 5.00
12 Pek. Jendela CW.3 Unit 8.00
13 Pek. Jendela CW.4 Unit 1.00
14 Pek. Jendela V.1 Unit 8.00
15 Pek. Jendela V.2 Unit 14.00

Jumlah
Lantai 3
1 Pek. Ukiran Motif Kaltim ACP Teras M² 32.85
2 Pek. Kaca Motif Kaltim (Bawah Atap) M² 101.45
3 Pek. Pintu P3 Unit 2.00
4 Pek. Pintu P5 Unit 5.00
5 Pek. Pintu P6 Unit 1.00
6 Pek. Pintu P7 Unit 3.00
7 Pek. Pintu P8 Unit 5.00
8 Pek. Pintu P9 Unit 3.00
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PERENCANAAN GEDUNG DEKANAT DI FAKULTAS PERTANIAN UNIVERSITAS MULAWARMAN
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SAT. VOLUME TOTAL HARGA
( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 7
9 Pek. Jendela CW.1,, Unit 5.00
10 Pek. Jendela CW.2,, Unit 4.00
11 Pek. Jendela CW.3,, Unit 9.00
12 Pek. Jendela CW.4,, Unit 5.00
13 Pek. Jendela V.1 Unit 13.00
14 Pek. Jendela V.2 Unit 11.00

Jumlah
TOTAL :V..B. PEKERJAAN PINTU/JENDELA
C. PEKERJAAN LANTAI
Lantai Basement
1 Keramik Tangga M² 25.36
2 Keramik Step Noushing M' 53.00
Jumlah
Lantai 1
1 Keramik Lantai 60/60 (Homogenus Tile) M² 648.14
2 Keramik Lantai 60/60 Km/Wc M² 23.72
3 Keramik Dinding 60 x 60 cm Km/Wc M² 109.12
4 Keramik Tangga M' 52.62
5 Keramik Step Noushing M' 95.18
Jumlah

Lantai 2
1 Keramik Lantai 60/60 (Homogenus Tile) M² 593.04
2 Keramik Lantai 60/60 Km/Wc M² 21.62
3 Keramik Dinding 60 x 60 cm Km/Wc M² 110.50
4 Keramik Tangga M² 52.62
5 Keramik Step Noushing M' 95.18
Jumlah

Lantai 3
1 Keramik Lantai 60/60 (Homogenus Tile) M² 584.84
2 Keramik Lantai 60/60 Km/Wc M² 9.72
3 Keramik Dinding 60 x 60 cm Km/Wc M² 46.50
4 Keramik Tangga M² 52.62
5 Keramik Step Noushing M' 95.18
Jumlah
TOTAL : V..C. PEKERJAAN LANTAI

D. PEKERJAAN PLAFOND
Lantai Basement
1 Pas. Plapond Gypsum t 9 mm M² 42.40
Jumlah
Lantai 1
1 Pas. Plapond Gypsum t 9 mm M² 679.66
2 Plafond Kalsibord 4.5 mm M² 23.72
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PERENCANAAN GEDUNG DEKANAT DI FAKULTAS PERTANIAN UNIVERSITAS MULAWARMAN
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SAT. VOLUME TOTAL HARGA
( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 7

Lantai 2
1 Pas. Plapond Gypsum t 9 mm M² 622.46
2 Plafond Kalsibord 4.5 mm M² 21.62
Jumlah
Lantai 3
1 Pas. Plapond Gypsum t 9 mm M² 673.34
2 Plafond Kalsibord 4.5 mm M² 9.72
Jumlah
TOTAL : V.D. PEKERJAAN PLAFOND
E. PEKERJAAN FINISHING
Lantai Basement
1 Cat Tembok Luar dan Dalam M² 539.90
2 Cat Plafond M² 42.40
Jumlah
Lantai 1
1 Cat Tembok Luar dan Dalam M² 1,454.63
2 Cat Plafond M² 703.38
Jumlah

Lantai 2
1 Cat Tembok Luar dan Dalam M² 1,180.71
2 Cat Plafond M² 701.28
Jumlah
Lantai 3
1 Cat Tembok Luar dan Dalam M² 993.11
2 Cat Plafond M² 701.28
3 Cat Listplang M² 224.00
Jumlah
TOTAL : V.E. PEKERJAAN FINISHING

F. PEKERJAAN SANITAIR
Lantai Basement
1 Septictank + Peresapan Unit 2.00
Jumlah
Lantai 1
1 Klosed Duduk Unit 7.00
2 Bak Air Fibber glass kap.0,30m3 Unit 7.00
3 Wastafel+Kran+Instalasi+Meja Beton Unit 7.00
4 Bak Cuci Piring Stenlis Unit 1.00
5 Kran air Jet washer + acsesories bh 7.00
6 Kran Air bh 7.00
Jumlah
Lantai 2
1 Klosed Duduk Unit 7.00
2 Bak Air Fibber glass kap.0,30m3 Unit 7.00
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PERENCANAAN GEDUNG DEKANAT DI FAKULTAS PERTANIAN UNIVERSITAS MULAWARMAN
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SAT. VOLUME TOTAL HARGA
( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 7
3 Wastafel+Kran+Instalasi+Meja Beton Unit 7.00
4 Kran air Jet washer + acsesories bh 7.00
5 Kran Air bh 7.00
Jumlah
Lantai 3
1 Klosed Duduk Unit 3.00
3 Bak Air Fibber glass kap.0,30m3 Unit 3.00
4 Wastafel+Kran+Instalasi+Meja Beton Unit 3.00
6 Kran air Jet washer + acsesories bh 3.00
7 Kran Air bh 7.00
Jumlah
TOTAL : V.F. PEKERJAAN SANITAIR
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH FKIP UNIVERSITAS MULAWARMAN .
LOKASI : JL. BANGGERIS NO.89,SAMARINDA. LINGKUP PEK. : ARSITEKTUR

JUMLAH HARGA
NO ITEM PEKERJAAN
( Rp )

REKAPITULASI
B. PEKERJAAN ARSITEKTUR

II. BANGUNAN UTAMA ( FAKULTAS ILMU KEGURUAN )


I. PEKERJAAN DINDING DAN PASANGAN
I. 1. Lantai 1 (satu).
I. 2. Lantai 2 (dua).
II. PEKERJAAN BETON
II. 1. Lantai 1 (satu).
II. 2. Lantai 2 (dua).
III. PEKERJAAN KUSEN, PINTU & JENDELA ALMUNIUM
(Lengkap dengan Kunci, Engsel + Kaca & Accessories) terpasang
III. 1. Lantai 1 (satu).
III. 2. Lantai 2 (dua).
IV. PEKERJAAN PENUTUP LANTAI DAN DINDING
IV. 1. Lantai 1 (satu).
IV. 2. Lantai 2 (dua).
V. PEKERJAAN PLAFOND
V.1. Lantai 1 (satu).
V. 2. Lantai 2 (dua).

VI. PEKERJAAN SANITAIR


VI. 1. Lantai 1 (satu).
VI. 2. Lantai 2 (dua).

VII. PEKERJAAN FINISHING


VIII. 1. Lantai 1 (satu).
VIII. 2. Lantai 2 (dua).

VIII. PEKERJAAN FASAD RL.1

TOTAL - II. BANGUNAN UTAMA ( FAKULTAS ILMU KEGURUAN ) :


DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH FKIP UNIVERSITAS MULAWARMAN .
LOKASI : JL. BANGGERIS NO.89,SAMARINDA. LINGKUP PEK. : ARSITEKTUR

HARGA SAT. JUMLAH HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )

B. PEKERJAAN ARSITEKTUR

I. PEKERJAAN DINDING DAN PASANGAN


I. 1. Lantai 1 (satu).
2
1 Pek. Pasangan Dinding Bata Ringan m 1,440.55
2
2 Pek. Plesteran Dinding Bata Ringan m 2,881.11
2
3 Pek. Acian Dinding Bata Ringan. m 2,881.11
2
4 Pek. Acian Beton Kolom. m 584.00
1
5 Kolom & Ring BalokPraktis 13x13 cm ( Opening Kusen ) m 385.24
6 Pek.Hollow 50 x 100 m1 260.00
7 Pek.Plester Camprot m2 20.46
8 Pas.Water Proofing membrane + Screed ( Plat Dak Beton ) El.+ 3.100 m1 23.03
Sub Total - I. 1. Lantai 1 (satu). :
I. 2. Lantai 2 (dua).
1 Pek. Pasangan Dinding Bata Ringan m2 1,368.70
2 Pek. Plesteran Dinding Bata Ringan m2 2,737.40
3 Pek. Acian Dinding Bata Ringan. m2 2,737.40
4 Pek. Acian Beton Kolom. m2 642.40
5 Kolom & Ring BalokPraktis 13x13 cm ( Opening Kusen ) m1 348.26
6 Pek.Plester Camprot m2 25.80
2
7 Pas.Water Proofing membrane + Screed ( Plat Dak Beton ) El.+ 7.900 m 475.71
8 Pek.Tutup Man Holle t = 2 mm + Rangka Besi L.40 x 40 x 4 ( uk.90 cm x 90 cm ) unit 1.00
9 PekTannga Service besi beton Ø 16 mm. unit 1.00
Sub Total - I. 2. Lantai 2 (dua). :
TOTAL. I (PEK. PASANGAN) :
II. PEKERJAAN BETON
II. 1. Lantai 1 (satu).
1 Pek. Kolom Praktis Beton Bertulang uk. 110 x 110 mm m1 144.00
2 Pek. Ring Balok Praktis Beton Bertulang uk. 100 x 150 mm m³ 0.45
2
3 Pek. Meja Beton Fin. Homogenous Area Toilet. m 2.23
3 Pek. Topian Beton Diatas Kusen. m2 7.70
Sub Total - II. 1. Lantai 1 (satu). :
II. 2. Lantai 2 (dua).
1 Pek. Kolom Praktis Beton Bertulang uk. 110 x 110 mm m1 144.00
2 Pek. Ring Balok Praktis Beton Bertulang uk. 100 x 150 mm m³ 0.45
3 Pek. Meja Beton Fin. Homogenous Area Toilet. m2 2.23
4 Pek. Topian Beton Diatas Kusen. m2 24.18
Sub Total - II. 2. Lantai 2 (dua). :
TOTAL. II (PEK. BETON) :
III. PEKERJAAN KUSEN, PINTU & JENDELA ALMUNIUM
(Lengkap dengan Kunci, Engsel + Kaca & Accessories) terpasang
III. 1. Lantai 1 (satu).
1 Pek. Kusen Pintu Kaca Type PD. 1. unit 1.00
2 Pek. Kusen Pintu Alumunium Type PD. 2. unit 1.00
3 Pek. Kusen Pintu Alumunium Type P. 1. unit 1.00
4 Pek. Kusen Pintu Alumunium Type P. 2. unit 2.00
5 Pek. Kusen Pintu Alumunium Type P. 3. unit 13.00
6 Pek. Kusen Pintu Alumunium Type P. 3.A unit 1.00
7 Pek. Kusen Pintu Alumunium Type PV.1 unit 5.00
8 Pek. Kusen Pintu Alumunium Type PV.2 unit 5.00
9 Pek. Kusen Pintu Type PS. 1. unit 1.00
10 Pek. Kusen Jendela Alumunium Type J. 1. unit 2.00
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH FKIP UNIVERSITAS MULAWARMAN .
LOKASI : JL. BANGGERIS NO.89,SAMARINDA. LINGKUP PEK. : ARSITEKTUR

HARGA SAT. JUMLAH HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
11 Pek. Kusen Jendela Alumunium Type J. 2. unit 8.00
12 Pek. Kusen Jendela Alumunium Type J. 3. unit 16.00
13 Pek. Kusen Jendela Alumunium Type V. 1. unit 12.00
14 Pek. Kusen Jendela Alumunium Type V. 2. unit 4.00
15 Pek. Kusen Jendela Alumunium Type V. 3. unit 2.00
16 Pek. Kusen Jendela Alumunium Type V. 4. unit 8.00
17 Pek. Kusen Jendela Alumunium Type V. 5. unit 4.00
18 Pek. Kusen Jendela Alumunium Type CW. 1. unit 2.00
19 Pek. Kusen Jendela Alumunium Type CW. 2. unit 1.00
20 Pek. Kusen Jendela Alumunium Type CW. 2A. unit 1.00
Sub Total - III. 1. Lantai 1 (satu). :
III. 2. Lantai 2 (dua).
1 Pek. Kusen Pintu Alumunium Type P. 1. unit 2.00
2 Pek. Kusen Pintu Alumunium Type P. 2. unit 2.00
3 Pek. Kusen Pintu Alumunium Type P. 3. unit 13.00
4 Pek. Kusen Pintu Alumunium Type PV.1 unit 5.00
5 Pek. Kusen Pintu Alumunium Type PV.2 unit 5.00
6 Pek. Kusen Pintu Type PS. 1. unit 1.00
7 Pek. Kusen Jendela Alumunium Type J. 1. unit 2.00
8 Pek. Kusen Jendela Alumunium Type J. 2. unit 8.00
9 Pek. Kusen Jendela Alumunium Type J. 3. unit 16.00
10 Pek. Kusen Jendela Alumunium Type V. 1. unit 12.00
11 Pek. Kusen Jendela Alumunium Type V. 2. unit 4.00
12 Pek. Kusen Jendela Alumunium Type V. 3. unit 2.00
13 Pek. Kusen Jendela Alumunium Type V. 4. unit 8.00
14 Pek. Kusen Jendela Alumunium Type V. 5. unit 4.00
15 Pek. Kusen Jendela Alumunium Type BV. 6. unit 4.00
16 Pek. Kusen Jendela Alumunium Type CW. 1. unit
17 Pek. Kusen Jendela Alumunium Type CW. 2. unit
Sub Total - III. 2. Lantai 2 (dua). :
TOTAL. III (PEK. KUSEN, PINTU & JENDELA ALMUNIUM) :
IV. PEKERJAAN PENUTUP LANTAI DAN DINDING
IV. 1. Lantai 1 (satu).
1 Pek. Lantai Homogenous Tile uk. 60 x 60 cm ( R.Kelas ). m2 698.94
2 Pek. Plint Homogenous Tile uk. 10 x 60 cm. m1 329.24
3 Pek. Lantai Homogenous Tile uk. 60 x 60 cm ( Hall ). m2 349.47
4 Pek. Plint Homogenous Tile uk. 10 x 60 cm. m1 203.64
5 Pek. Lantai Homogenous Tile uk. 60 x 60 cm ( Entrance ). m2 24.59
6 Pek. Plint Homogenous Tile uk. 10 x 60 cm. m1 4.66
7 Pek.Border l = 20 cm ( Entrance ) m1 9.28
8 Pek.Nosing Keramik 10 x 60 ( Trap Tangga Entrance ) m1 15.62
9 Pek. Lantai Homogenous Tile uk. 40 x 40 cm ( 2 ) ( Km / Wc ) m2 40.56
10 Pek. Dinding Homogenous Tile uk. 40 x 40 cm. m2 202.13
11 Pek. Lantai Keramik uk. 40 x 40 cm ( 3 ) ( R.Panel ). m2 7.96
12 Pek. Plint Keramik uk. 10 x 40 cm. m1 10.80
13 Pek. Lantai Keramik uk. 40 x 40 cm ( 3 ) ( Selasar ). m2 225.74
14 Pek. Plint Keramik uk. 10 x 40 cm. m1 188.28
Pekerjaan Tangga as.C - D & E - F ( 0 - 1 )
1 Pek. Lantai Homogenous Tile uk. 60 x 60 cm ( 2 ) ( Tannga) m2 26.56
2 Pek.Nosing Keramik 10 x 60 ( Trap Tangga Entrance ) m1 48.40
3 Pek.Railling Pipa SST.Ø 50 & Ø 25 t = 0,90 m. m1 16.94
4 Pek.Hand Railling. m1 22.62
Sub Total - IV. 1. Lantai 1 (satu). :
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH FKIP UNIVERSITAS MULAWARMAN .
LOKASI : JL. BANGGERIS NO.89,SAMARINDA. LINGKUP PEK. : ARSITEKTUR

HARGA SAT. JUMLAH HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
IV. 2. Lantai 2 (dua).
2
1 Pek. Lantai Homogenous Tile uk. 60 x 60 cm ( R.Kelas ). m 698.94
2 Pek. Plint Homogenous Tile uk. 10 x 60 cm. m1 329.24
2
3 Pek. Lantai Homogenous Tile uk. 60 x 60 cm ( Hall & Selasar ). m 333.48
1
4 Pek. Plint Homogenous Tile uk. 10 x 60 cm. m 203.90
2
5 Pek. Lantai Homogenous Tile uk. 40 x 40 cm ( 2 ) ( Km / Wc ) m 40.56
2
6 Pek. Dinding Homogenous Tile uk. 40 x 40 cm. m 202.13
7 Pek. Lantai Keramik uk. 40 x 40 cm ( 3 ) ( Gudang ). m2 7.96
1
8 Pek. Plint Keramik uk. 10 x 40 cm. m 10.80
9 Pek. Waterproofing Coating ( KM / WC ). m2 57.28
Pekerjaan Tangga as.C - D & E - F ( 0 - 1 )
1 Pek. Lantai Homogenous Tile uk. 60 x 60 cm ( 2 ) ( Tannga) m2 26.56
2 Pek.Railling Pipa SST.Ø 50 & Ø 25 t = 0,90 m. m1 16.94
3 Pek.Hand Railling. m1 22.62
Sub Total - IV. 2. Lantai 2 (dua). :
TOTAL. IV ( PEK. LANTAI ) :
V. PEKERJAAN PLAFOND
V.1. Lantai 1 (satu).
1 Pek. Plafond Gypsum board tebal 9 mm Rangka Metal Furing ( 1 ) ( Ruang Kelas ) m2 703.56
2 Pek.Allumunium U.20 x 10. m¹ 345.04
2
3 Pek. Plafond Gypsum board tebal 9 mm Rangka Metal Furing ( 1 ) ( Entrance ) m 15.37
4 Pek.Allumunium U.20 x 10. m¹ 21.86
5 Pek. Plafond Gypsum board tebal 9 mm Rangka Metal Furing ( 1 ) ( Hall ) m2 334.91
6 Pek.Allumunium U.20 x 10. m¹ 225.60
7 Pek. Plafond Calciboard tebal 6 mm ( 2 ) m2 57.21
8 Pek.Allumunium U.20 x 10. m¹ 69.09
9 Pek.Beton Exposed m2 111.68
Sub Total - V.1. Lantai 1 (satu). :
V. 2. Lantai 2 (dua).
2
1 Pek. Plafond Gypsum board tebal 9 mm Rangka Metal Furing ( 1 ) ( Ruang Kelas ) m 703.56
2 Pek.Allumunium U.20 x 10. m¹ 345.04
2
3 Pek. Plafond Gypsum board tebal 9 mm Rangka Metal Furing ( 1 ) ( Hall ) m 355.48
4 Pek.Allumunium U.20 x 10. m¹ 258.91
5 Pek. Plafond Calciboard tebal 6 mm ( 2 ) m2 57.21
6 Pek.Allumunium U.20 x 10. m¹ 69.09
7 Pek.Beton Exposed m2 65.87
Sub Total - V. 2. Lantai 2 (dua). :
TOTAL. V ( PEK. PLAFOND ) :
VI. PEKERJAAN SANITAIR
VI. 1. Lantai 1 (satu).
1 Pek. Kloset Duduk. bh 13.00
2 Pek. Urinoir. bh 3.00
3 Pek. Kran Dinding. bh 13.00
4 Pek. Floor Drain. bh 17.00
5 Pek. Wastafel Type Bulat bh 3.00
6 Pek. Wastafel Type Kotak bh 1.00
7 Pek. Penyekat Urinoir. bh 2.00
8 Pek. Jet Shower bh 13.00
9 Pek. Tempat Sabun. bh 13.00
10 Pek. Pas. Cermin Uk. 1600 mm x 900 mm (Dibevel), sejumlah 2 unit m2 2.88
Sub Total - VI. 1. Lantai 1 (satu). :
VI. 2. Lantai 2 (dua).
1 Pek. Kloset Duduk. bh 12.00
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH FKIP UNIVERSITAS MULAWARMAN .
LOKASI : JL. BANGGERIS NO.89,SAMARINDA. LINGKUP PEK. : ARSITEKTUR

HARGA SAT. JUMLAH HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
2 Pek. Urinoir. bh 3.00
3 Pek. Kran Dinding. bh 13.00
4 Pek. Floor Drain. bh 16.00
5 Pek. Wastafel Type Bulat bh 3.00
6 Pek. Penyekat Urinoir. bh 2.00
7 Pek. Jet Shower bh 12.00
8 Pek. Tempat Sabun. bh 12.00
9 Pek. Pas. Cermin Uk. 1600 mm x 900 mm (Dibevel), sejumlah 2 unit m2 2.88
Sub Total - VI. 2. Lantai 2 (dua). :
TOTAL. VI ( PEK. SANITAIR ) :
VIII. PEKERJAAN FINISHING
VIII. 1. Lantai 1 (satu).
1 Pek.Pengecatan Dinding Tembok ( Interior ). m2 2,882.87
2 Pek.Pengecatan Dinding Tembok (Exterior) Weathershield. m2 582.24
3 Pek. Pengecatan Plafond & Beton Exposed. m2 1,222.73
Sub Total - VIII. 1. Lantai 1 (satu). :
VIII. 2. Lantai 2 (dua).
1 Pek.Pengecatan Dinding Tembok ( Interior ). m2 2,719.01
2 Pek.Pengecatan Dinding Tembok (Exterior) Weathershield. m2 660.79
3 Pek. Pengecatan Plafond & Beton Exposed. m2 1,182.12
Sub Total - VIII. 2. Lantai 2 (dua). :
TOTAL. VIII ( PEK. FINISHING ) :
IX PEKERJAAN FASAD RL.1
1 Rangka Hollow + Kalsibord 4 mm m2 240.80
2 Pek. Pengecatan m2 240.80

Sub Total - IXPEKERJAAN FASAD RL.1 :


DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG PERKULIAHAN DAN RUANG SERBA GUNA
FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNMUL
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

JUMLAH HARGA
NO ITEM PEKERJAAN
( Rp )
PEKERJAAN ARSITEKTUR
1 PEKERJAAN PASANGAN DINDING
####
- Lantai II (Elevasi ± 4.00)
- Lantai III (Elevasi ± 8.00)
- Lantai IV (Elevasi ± 12.00)

2 PEKERJAAN PINTU/ JENDELA


####
- Lantai II (Elevasi ± 4.00)
- Lantai III (Elevasi ± 8.00)
- Lantai IV (Elevasi ± 12.00)

3 PEKERJAAN LANTAI
- Lantai I (Elevasi ± 0.00)
- Lantai II (Elevasi ± 4.00)
- Lantai III (Elevasi ± 8.00)
- Lantai IV (Elevasi ± 12.00)

4 PEKERJAAN PLAFOND
- Lantai I (Elevasi ± 0.00)
- Lantai II (Elevasi ± 4.00)
- Lantai III (Elevasi ± 8.00)
- Lantai IV (Elevasi ± 12.00)

5 PEKERJAAN FINISHING
- Lantai I (Elevasi ± 0.00)
- Lantai II (Elevasi ± 4.00)
- Lantai III (Elevasi ± 8.00)
- Lantai IV (Elevasi ± 12.00)
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG PERKULIAHAN DAN RUANG SERBA GUNA
FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNMUL
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

JUMLAH HARGA
NO ITEM PEKERJAAN
( Rp )
6 PEKERJAAN SANITAIR
####
- Lantai II (Elevasi ± 4.00)
- Lantai III (Elevasi ± 8.00)
- Lantai IV (Elevasi ± 12.00)

TOTAL REKAP ARSITEKTUR :


DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG PERKULIAHAN DAN RUANG SERBA GUNA
FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNMUL
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
PEKERJAAN ARSITEKTUR
A. PEKERJAAN PASANGAN DINDING
- Lantai II (Elevasi ± 4.00)
1 Kolom Praktis 13/13 M' 154.00
2 Balok Latai M' 68.80
3 Pemasangan dinding HB10 campuran 1PC:3PP M² 605.50
4 Pemasangan plesteran 1PC:4PP tebal 20 mm M² 1,211.00
5 Plesteran Kolom 1 : 4 M² 278.40
6 Pemasangan acian M² 1,489.40
7 Dinding Keramik Km/Wc 20/40 M² 71.69
8 Pas. Dinding Roster Kaca (ST1 + ST3) M² 4.00
9 Relling Tangga M² 14.81

TOTAL. - Lantai II (Elevasi ± 4.00) :


- Lantai III (Elevasi ± 8.00)
1 Kolom Praktis 13/13 M' 154.00
2 Balok Latai M' 68.80
3 Pemasangan dinding HB10 campuran 1PC:3PP M² 605.50
4 Pemasangan plesteran 1PC:4PP tebal 20 mm M² 1,211.00
5 Plesteran Kolom 1 : 4 M² 278.40
6 Pemasangan acian M² 1,489.40
7 Dinding Keramik Km/Wc 20/40 M² 71.69
8 Pas. Dinding Roster Kaca (ST1 + ST3) M² 4.00
9 Relling Tangga M² 14.81

TOTAL. - Lantai III (Elevasi ± 8.00) :


- Lantai IV (Elevasi ± 12.00)
1 Kolom Praktis 13/13 M' 154.00
2 Balok Latai M' 68.80
3 Pemasangan dinding HB10 campuran 1PC:3PP M² 605.50
4 Pemasangan plesteran 1PC:4PP tebal 20 mm M² 1,211.00
5 Plesteran Kolom 1 : 4 M² 278.40
6 Pemasangan acian M² 1,489.40
7 Dinding Keramik Km/Wc 20/40 M² 71.69
8 Pas. Dinding Roster Kaca (ST1 + ST3) M² 4.00
9 Relling Tangga M² 14.81

TOTAL. - Lantai IV (Elevasi ± 12.00) :


B PEKERJAAN PINTU/ JENDELA
- Lantai II (Elevasi ± 4.00)
1 Pek. Pintu Type P2 Bh 4.00
2 Pek. Pintu Type P4 Bh 4.00
3 Pek. Pintu Type P5 Bh 3.00
4 Pek. Pintu Type PS Bh 2.00
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG PERKULIAHAN DAN RUANG SERBA GUNA
FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNMUL
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
5 Pek. Jendela Type J1 Bh 8.00
6 Pek. Jendela Type J2 Bh 1.00
7 Pek. Jendela Type J3 Bh 1.00
8 Pek. Jendela Type BV1 Bh 6.00
9 Pek. Jendela Type BV2 Bh 2.00
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG PERKULIAHAN DAN RUANG SERBA GUNA
FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNMUL
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
10 Pek. Jendela Type BV3 Bh 1.00
11 Pek. Jendela Type BV4 Bh 4.00

TOTAL. - Lantai II (Elevasi ± 4.00) :


- Lantai III (Elevasi ± 8.00)
1 Pek. Pintu Type P2 Bh 4.00
2 Pek. Pintu Type P4 Bh 4.00
3 Pek. Pintu Type P5 Bh 3.00
4 Pek. Pintu Type PS Bh 2.00
5 Pek. Jendela Type J1 Bh 8.00
6 Pek. Jendela Type J2 Bh 1.00
7 Pek. Jendela Type J3 Bh 1.00
8 Pek. Jendela Type BV1 Bh 6.00
9 Pek. Jendela Type BV2 Bh 2.00
10 Pek. Jendela Type BV3 Bh 1.00
11 Pek. Jendela Type BV4 Bh 4.00

TOTAL. - Lantai III (Elevasi ± 8.00) :


- Lantai IV (Elevasi ± 12.00)
1 Pek. Pintu Type P1 Bh 2.00
2 Pek. Pintu Type P4 Bh 4.00
3 Pek. Pintu Type P5 Bh 3.00
4 Pek. Pintu Type P6 Bh 2.00
5 Pek. Pintu Type PS Bh 2.00
6 Pek. Jendela Type J2 Bh 1.00
7 Pek. Jendela Type BV3 Bh 1.00
8 Pek. Jendela Type BV4 Bh 4.00
9 Pek. Jendela Type BV5 Bh 6.00

TOTAL. - Lantai IV (Elevasi ± 12.00) :


C. PEKERJAAN LANTAI
- Lantai I (Elevasi ± 0.00)
1 Keramik Tangga M² 29.48
2 Keramik Step Noushing M' 77.40

TOTAL. - Lantai I (Elevasi ± 0.00) :

- Lantai II (Elevasi ± 4.00)


1 Keramik Lantai 60/60 (Homogenus Tile) M² 380.25
2 Keramik Lantai 30/30 Km/Wc M² 38.25
3 Keramik Dinding Km/Wc M² 34.00
4 Keramik Tangga M' 29.48
5 Keramik Step Noushing M' 77.40
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG PERKULIAHAN DAN RUANG SERBA GUNA
FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNMUL
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
TOTAL. - Lantai II (Elevasi ± 4.00) :
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG PERKULIAHAN DAN RUANG SERBA GUNA
FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNMUL
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
- Lantai III (Elevasi ± 8.00)
1 Keramik Lantai 60/60 (Homogenus Tile) M² 362.25
2 Keramik Lantai 30/30 Km/Wc M² 38.25
3 Keramik Dinding Km/Wc M² 34.00
4 Keramik Tangga M² 29.48
5 Keramik Step Noushing M' 77.40

TOTAL. - Lantai III (Elevasi ± 8.00) :


- Lantai IV (Elevasi ± 12.00)
1 Keramik Lantai 60/60 (Homogenus Tile) M² 362.25
2 Keramik Lantai 30/30 Km/Wc M² 19.70
3 Keramik Dinding Km/Wc M² 76.00
4 Keramik Tangga M² 29.48
5 Keramik Step Noushing M' 77.40

TOTAL. - Lantai IV (Elevasi ± 12.00) :


D. PEKERJAAN PLAFOND
- Lantai I (Elevasi ± 0.00)
1 Pas. Plapond Gypsum t 9 mm M² 299.50
2 Plafond Kalsibord 4.5 mm M² 84.50
3 List Plafond Gipsum Kecil M' 43.00
4 Pas. List Profil Gipsum Standart Lebar Sampai 5-10cm M' 216.50

TOTAL. - Lantai I (Elevasi ± 0.00) :


- Lantai II (Elevasi ± 4.00)
1 Pas. Plapond Gypsum t 9 mm M² 299.50
2 Plafond Kalsibord 4.5 mm M² 84.50
3 List Plafond Gipsum Kecil M' 43.00
4 Pas. List Profil Gipsum Standart Lebar Sampai 5-10cm M' 216.50

TOTAL. - Lantai II (Elevasi ± 4.00) :


- Lantai III (Elevasi ± 8.00)
1 Pas. Plapond Gypsum t 9 mm M² 299.50
2 Plafond Kalsibord 4.5 mm M² 84.50
3 List Plafond Gipsum Kecil M' 43.00
4 List Plafond Gipsum Standart M' 216.50

TOTAL. - Lantai III (Elevasi ± 8.00) :


- Lantai IV (Elevasi ± 12.00)
1 Pas. Plapond Gypsum t 9 mm M² 335.50
2 Pas. Plaapond GRC t = 4 mm M² 166.50
3 List Plafond Gipsum Kecil M' 43.00
4 List Plafond Gipsum Standart M' 140.00
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG PERKULIAHAN DAN RUANG SERBA GUNA
FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNMUL
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
TOTAL. - Lantai IV (Elevasi ± 12.00) :
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG PERKULIAHAN DAN RUANG SERBA GUNA
FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNMUL
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
E. PEKERJAAN FINISHING
- Lantai I (Elevasi ± 0.00)
1 Cat Tembok Luar M² 25.00
2 Cat Plafond M² 384.00

TOTAL. - Lantai I (Elevasi ± 0.00) :


- Lantai II (Elevasi ± 4.00)
1 Cat Tembok Luar M² 448.00
2 Cat Tembok Dalam M² 1,533.44
3 Cat Plafond M² 384.00

TOTAL. - Lantai II (Elevasi ± 4.00) :


- Lantai III (Elevasi ± 8.00)
1 Cat Tembok Luar M² 528.00
2 Cat Tembok Dalam M² 1,680.96
3 Cat Plafond M² 384.00

TOTAL. - Lantai III (Elevasi ± 8.00) :


- Lantai IV (Elevasi ± 12.00)
1 Cat Tembok Luar M² 132.64
2 Cat Tembok Dalam M² 205.00
3 Cat Plafond M² 166.50
4 Cat lis plapond M² 13.50
5 Cat Listplang M² 71.63

TOTAL. - Lantai IV (Elevasi ± 12.00) :


F. PEKERJAAN SANITAIR
- Lantai II (Elevasi ± 4.00)
1 Klosed Duduk Unit 2.00
2 Klosed Jongkok Unit 2.00
3 Bak Air Fibber glass kap.0,30m3 Unit 2.00
4 Satu Wastafel+Kran+Instalasi+Meja Beton Unit 2.00
6 Bak Cuci Piring Stenlis Unit 1.00
7 Kran air Jet washer + acsesories bh 2.00
8 Kran Air bh 2.00

TOTAL. - Lantai II (Elevasi ± 4.00) :


- Lantai III (Elevasi ± 8.00)
1 Klosed Duduk Unit 2.00
2 Klosed Jongkok Unit 2.00
3 Bak Air Fibber glass kap.0,30m3 Unit 2.00
4 Satu Wastafel+Kran+Instalasi+Meja Beton Unit 2.00
6 Kran air Jet washer + acsesories bh 2.00
7 Kran Air bh 2.00
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG PERKULIAHAN DAN RUANG SERBA GUNA
FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNMUL
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
8 Urinoir Unit 2.00
9 Penyekat Urinoir bh 2.00

TOTAL. - Lantai III (Elevasi ± 8.00) :


DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PEMBANGUNAN GEDUNG PERKULIAHAN DAN RUANG SERBA GUNA
FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNMUL
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
- Lantai IV (Elevasi ± 12.00)
1 Klosed Duduk Unit 2.00
2 Klosed Jongkok Unit 2.00
3 Bak Air Fibber glass kap.0,30m3 Unit 2.00
4 Satu Wastafel+Kran+Instalasi+Meja Beton Unit 2.00
6 Kran air Jet washer + acsesories bh 2.00
7 Kran Air bh 2.00
8 Urinoir Unit 2.00
9 Penyekat Urinoir bh 2.00

TOTAL. - Lantai IV (Elevasi ± 12.00) :


DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : PERENCANAAN GEDUNG DEKANAT DI FAKULTAS PERTANIAN UNIVERSITAS MULAWARMAN
LOKASI : UNIVERSITAS MULAWARMAN, SAMARINDA.

JUMLAH HARGA
NO ITEM PEKERJAAN
( Rp )
9 PEKERJAAN SANITAIR
Lantai Basement
Lantai 1
Lantai 2
Lantai 3

TOTAL REKAP ARSITEKTUR :


DAFTAR KUANTITAS
( BILL OF QUANTITY )
Kegiatan : LANJUTAN DAN REHABILITASI PEMBANGUNAN GEDUNG LABORATORIUM FARMASI
Pekerjaan : PERNCANAAN LANJUTAN PEMBANGUNAN FASILITAS PERKULIAHAN FAKULTAS FARMASI
Lokasi : JL. KUARO, GUNUNG KELUA, SAMARINDA ULU, KOTA SAMARINDA 75242
TA : 2019

No. PEKERJAAN GEDUNG LABORATORIUM FARMASI HARGA


I PEKERJAAN PENDAHULUAN
II RENOVASI LANTAI 1
III RENOVASI LANTAI 2
IV RENOVASI LANTAI 3
JUMLAH
DAFTAR KUANTITAS
( BILL OF QUANTITY )
Kegiatan : LANJUTAN DAN REHABILITASI PEMBANGUNAN GEDUNG LABORATORIUM FARMASI
Pekerjaan : PERNCANAAN LANJUTAN PEMBANGUNAN FASILITAS PERKULIAHAN FAKULTAS FARMASI
Lokasi : JL. KUARO, GUNUNG KELUA, SAMARINDA ULU, KOTA SAMARINDA 75242
TA : 2019

HARGA SATUAN JUMLAH HARGA


NO PEKERJAAN SATUAN VOLUME
RP RP
1 2 3 4 5 Rp 6.0
I PEKERJAAN PENDAHULUAN
1 Pembersihan Gedung Ls 1.00
2 Pembongkaran Cor teras Lantai 1 M² 7.21
3 Pembongkaran Lisplank beton teras luar bangunan koneksi M² 0.35
3
4 Pengecoran Lisplank teras luar M 0.35
5 Rolag bata sisi luar teras (t =10 cm) M² 4.90
3
6 Penimbunan tanah pilihan ruangan dan teras lantai 1 (t =10 cm) + Pemadatan M 42.60

Sub Total 1 :
II RENOVASI LANTAI 1
II.A Struktur Lantai 1
1 Plat lantai + wire mesh (t = 10 cm) (dalam ruangan)
- Waremash M8 kg 1567.05
- Cor Beton K 250 m3 28.75
- Bekesting / Cetakan m2 0.68
2 Plat lantai + wire mesh (t = 8 cm) (teras)
- Waremash M8 kg 654.60
- Cor Beton K 250 m3 7.21
2
- Bekesting / Cetakan m 3.92
3 Pondasi Telapak
- Besi D13 - 150 mm kg 8.86
- Bekesting / Cetakan m2 0.85
- Cor Beton K 250 m3 0.17
4 Kolom
- Besi Pokok 4 D 16 mm kg 22.92
- Sengkang/begel polos dia. 10 mm kg 7.26
- Bekesting / Cetakan m2 3.85
- Cor Beton K 250 m3 0.25
5 Atap Kanopi
5a Pembongkaran atap kanopi eksisiting Ls 1.00

II.B PEKERJAAN PASANGAN DAN PLESTERAN


3
1 Pekerjaan pembongkaran dinding siisi belakang ruangan m 9.82
2
2 Pas. Dinding 1/2 bata camp 1 : 4 m 60.00
2
3 Plesteran Dinding 1/2 bata camp 1 : 4 sisi belakang ruangan m 43.76
4 Acian Dinding + Perapian sudut dinding sisi belakang ruangan m2 153.60

II.C PEKERJAAN PASANGAN KERAMIK LANTAI, DINDING DAN TANGGA


2
1 Pasangan Lantai Ruangan 60/60 (Granit Polished) m 288.00
2
2 Pasangan Lantai Teras 40/40 (HT. Unpolished) m 120.11
2
3 Pasangan Lantai Toilet 25/25 & Waterproofing Coating Toilet m 16.83
2
4 Pasangan Dinding Toilet 25/40 m 49.57
2
5 Pasangan Lantai Tangga 30/30 dan Stepnossing Tangga (10/30) m 23.80
6 Relling Tangga m' 7.20

II.D PEKERJAAN PLAFOND


2
1 Pembongkaran Plafond + rangka m 426.00
2
2 Pekerjaan Plafond Gypsum t = 9 mm + Rangka Plafond m 426.00
3 List Gypsum int = 9 cm m1 332.20

II.E PEKERJAAN KUSEN & JENDELA


(Lengkap dengan Engsel, Grendel, Kunci, dan Handel) Terpasang
1 J1 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated Unit 20.00
2 PJ1 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated Unit 3.00
3 P1 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated Unit 1.00
4 P2 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated, Door Closer Unit 5.00
5 P3 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated Unit 2.00
6 P4 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated, Door Closer Unit 4.00

II.F PEKERJAAN SANITARY


1 Pasang Kloset Duduk Monoblok unit 4.00
2 Pasang urinoir unit 3.00
3 Pasang floor drain / avour lantai bh 4.00
4 Wastafel (Atas Meja) + kran wastapel + Komplet kaca cermin 5 mm bh 4.00
5 Pasang Jet Washer+fleksibel Komplit bh 4.00
6 Pek. kran air bh 4.00

II.G PEKERJAAAN PENGECATAN


1 Pengecatan Dinding dalam Waterbase M² 507.14
2 Pengecatan Dinding Luar Weather Shield M² 210.24
3 Pengecatan Plafond M² 426.00

II.H PEKERJAAN INTERIOR


1 Meja Laboratorium Unit 21.00

II.I PEKERJAAN PARTISI


1 Dinding Partisi Gypsum 9mm 2 sisi + rangka hollow M² 62.00

Sub Total 2
DAFTAR KUANTITAS
( BILL OF QUANTITY )
Kegiatan : LANJUTAN DAN REHABILITASI PEMBANGUNAN GEDUNG LABORATORIUM FARMASI
Pekerjaan : PERNCANAAN LANJUTAN PEMBANGUNAN FASILITAS PERKULIAHAN FAKULTAS FARMASI
Lokasi : JL. KUARO, GUNUNG KELUA, SAMARINDA ULU, KOTA SAMARINDA 75242
TA : 2019

HARGA SATUAN JUMLAH HARGA


NO PEKERJAAN SATUAN VOLUME
RP RP
1 2 3 4 5 Rp 6.0
III RENOVASI LANTAI 2
III.A Struktur Lantai 1
1 Atap Kanopi
1a Pembongkaran atap kanopi eksisiting ls 1.00
2 Lapis ACP Exterior (PVDF) + rangka pada dinding m2 53.33

III.B PEKERJAAN PASANGAN KERAMIK LANTAI DAN DINDING


2
1 Pasangan Lantai Ruangan 60/60 (Granit) m 288.00
2
2 Pasangan Lantai teras 30/30 (Keramik) m 120.12
2
3 Pasangan Lantai Toilet 25/25 & Waterproofing Coating Toilet m 16.83
2
4 Pasangan Dinding Toilet 25/40 m 49.57
2
5 Pasangan Lantai Tangga 30/30 dan Stepnossing Tangga (10/30) m 23.80
6 Relling Tangga m' 7.20

III.C PEKERJAAN PLAFOND


2
1 Pembongkaran Plafond + rangka m 426.00
2
2 Pekerjaan Plafond Gypsum t = 9 mm + Rangka Plafond m 426.00
3 List Gypsum int = 9 cm m1 332.20

III.D PEKERJAAN KUSEN & JENDELA


(Lengkap dengan Engsel, Grendel, Kunci, dan Handel) Terpasang
1 J1 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated Unit 20.00
2 PJ1 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated Unit 3.00
3 P1 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated Unit 1.00
4 P2 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated Unit 5.00
5 P3 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated Unit 2.00
6 P4 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated Unit 4.00

III.E PEKERJAAN SANITARY


1 Pasang Kloset Duduk Monoblok unit 4.00
2 Pasang urinoir unit 3.00
3 Pasang floor drain / avour lantai bh 4.00
4 Wastafel (Atas Meja) + kran wastapel + Komplet kaca cermin 5 mm bh 4.00
5 Pasang Jet Washer+fleksibel Komplit bh 4.00
6 Pasang kran air cabang bh 4.00

III.F PEKERJAAAN PENGECATAN


1 Pengecatan Dinding dalam Waterbase M² 784.25
2 Pengecatan Dinding Luar Weather Shield M² 430.52
3 Pengecatan Plafond M² 426.00

III.G PEKERJAAN INTERIOR


1 Meja Laboratorium+ acc Unit 21.00

III.H PEKERJAAN PARTISI


1 Dinding Partisi Gypsum 9mm 2 sisi + rangka hollow M² 62.00

Sub Total 3 :
IV RENOVASI LANTAI 3
IV.A Struktur Lantai 1
1 Atap Kanopi
1a Pembongkaran atap kanopi eksisiting ls 1.00
2
2 Lapis ACP Exterior (PVDF) + rangka pada dinding m 53.33

IV.B PEKERJAAN PASANGAN KERAMIK LANTAI DAN DINDING


1 Pasangan Lantai Ruangan 60/60 (Granit) m2 288.00
2
2 Pasangan Lantai teras 30/30 (Keramik) m 120.12
2
3 Pasangan Lantai Toilet 25/25 & Waterproofing Coating Toilet m 16.83
4 Pasangan Dinding Toilet 25/40 m2 49.57
5 relling tangga/ pagar pembatas ujung tangga m' 1.50

IV.C PEKERJAAN PLAFOND


1 Pembongkaran Plafond + rangka m2 426.00
2 Pekerjaan Plafond Gypsum t = 9 mm + Rangka Plafond m2 426.00
3 List Gypsum int = 9 cm m2 332.20

IV.D PEKERJAAN KUSEN & JENDELA


(Lengkap dengan Engsel, Grendel, Kunci, dan Handel) Terpasang
1 J1 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated Unit 20.00
2 PJ1 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated Unit 3.00
3 P1 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated Unit 1.00
4 P2 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated, Door Closer Unit 5.00
5 P3 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated Unit 2.00
6 P4 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated, Door Closer Unit 4.00

IV.E PEKERJAAN SANITARY


1 Pasang Kloset Duduk Monoblok Unit 4.00
2 Pasang urinoir Unit 3.00
3 Pasang floor drain / avour lantai Unit 4.00
4 Wastafel (Atas Meja) + kran wastapel + Komplet kaca cermin 5 mm Unit 4.00
5 Pasang Jet Washer+fleksibel Komplit Unit 4.00
6 Pasang kran air cabang Unit 4.00

IV.F PEKERJAAAN PENGECATAN


1 Pengecatan Dinding dalam Waterbase 0.00 787.93
2 Pengecatan Dinding Luar Weather Shield unit 430.52
3 Pengecatan Plafond unit 426.00

IV.G PEKERJAAN INTERIOR


Meja Laboratorium bh 21.00

IV.H PEKERJAAN PARTISI


1 Dinding Partisi Gypsum 9mm 2 sisi + rangka hollow M² 62.00

Sub Total 4 :
DAFTAR KUANTITAS
( BILL OF QUANTITY )

No. PEKERJAAN GEDUNG WORKSHOP FARMASI HARGA


I Pekerjaan Struktur IDR -
II Pekerjaan Arsitektural IDR -
JUMLAH IDR -
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : Gedung Workshop Fakultas Farmasi
LOKASI : Universitas Mulawarman

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
I. PEKERJAAN PENDAHULUAN
1 Direksi keet dan Gudang bahan Ls 1
2 Pengukuran & Pasang Bouplank M1 68.8
3 Molisasi alat dan tenaga Ls 1

TOTAL - I. PEKERJAAN PENDAHULUAN :


II. PEKERJAAN STRUKTUR BAWAH
II.1 PEKERJAAN TANAH, PONDASI DAN PEDESTAL
1 Pekerjaan Urugan Tanah m3 136.356
2 Pekerjaan Pondasi Batu Gunung m3 17.7
3 Pekerjaan Colomn Cap
Beton K.250 m3 7.29
Besi ulir D16 kg 887.3785
2
Bekisting m 35.1
4 Pondasi Telapak
Beton K.250 m3 3.025
Besi ulir D16 kg 331.45
2
Bekisting m 11
5 Cerucuk ulin (10/10) P = 4 m titik 45
Total :
II.2 PEKERJAAN SLOOF DAN TIE BEAM
1 Pekerjaan Tie Beam (25/50)
Beton K.250 m3 16.5375
Besi ulir D16 kg 1431.867
Besi ulir D13 kg 315.0852
Besi Sengkang φ = 10 mm kg 838.9843
2
Bekisting m 132.3
2 Pekerjaan Sloof (20/40)
Beton K.250 m3 12.096
Besi ulir D16 kg 417.6277
Besi Sengkang φ = 10 mm 269.3036
Bekisting m2 62.4
Total :
TOTAL - II.PEKERJAAN STRUKTUR BAWAH :
III. PEKERJAAN STRUKTUR ATAS
III.1 LANTAI - 1 (SATU) ELEV.0.00
1 Pengupasan Kolom setinggi 90 cm m3 2.187
2 Plat Lantai t = 10 cm
Beton K.300 m3 21.888
Besi polos φ = 10 mm kg 1686.847
3 Kolom K1. 450x300
Beton K.300 m3 8.073
Besi ulir D19 kg 1633.664
Besi Sengkang φ = 10 mm kg 344.1102
Bekisting m2 89.7
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : Gedung Workshop Fakultas Farmasi
LOKASI : Universitas Mulawarman

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
4 Kolom K2. 350x350
Beton K.300 m3 2.51125
Besi ulir D19 kg 490.767
Besi Sengkang φ = 10 mm kg 124.2323
Bekisting m2 31.5
5 Tangga Beton-1 t pelat = 13 cm
Pelat Tangga
Beton K.300 m3 2.24512
Besi ulir D13 kg 83.35588
Besi polos φ = 10 mm (As = 0,000079) kg 134.8984
Bekisting m2 13.02
6 Kolom Praktis (13/13) m1 27.84
Total-1 :
III.2 LANTAI - 2 (SATU) ELEV.+3.50
1 Plat Lantai t = 12 cm
Beton K.300 m3 22.98
Besi polos φ = 10 mm kg 3148.78
2
Bekisting m 136.25
2 Kolom K1. 450x300
Beton K.300 m3 8.51
Besi ulir D19 kg 1402.19
Besi Sengkang φ = 10 mm kg 362.52
Bekisting m2 94.50
4 Kolom Praktis m1 27.84
5 Balok B1. 250x600
Beton K.300 m3 18.14
Besi ulir D19 kg 2692.21
Besi ulir D13 kg 315.09
Besi Sengkang φ = 10 mm kg 994.35
Bekisting m2 10.16
6 Balok B2. 250x450
Beton K.300 m3 1.88
Besi ulir D16 kg 215.92
Besi Sengkang φ = 10 mm kg 103.09
2
Bekisting m 17.33
Total- 2 :
III.3 TERAS ELEV. +3.600
1 Plat Lantai t = 12 cm
Beton K.300 m3 3.28
Besi polos φ = 10 mm kg 449.83
Bekisting m2 32.60
3 Balok Penumpu
Beton K.300 m3 0.61
Besi ulir D19 kg 96.15
Besi Sengkang φ = 10 mm kg 124.29
Bekisting m2 6.06
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : Gedung Workshop Fakultas Farmasi
LOKASI : Universitas Mulawarman

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
4 Balok B3. 150x400
Beton K.300 m3 1.37
Besi ulir D16 kg 202.98
Besi Sengkang φ = 8 mm kg 59.98
2
Bekisting m 21.66
Total- 3 :
III.4 KANOPI DAN RING BALOK
1 Plat Dak t = 8 cm
Beton K.175 m3 2.4624
Besi polos φ = 10 mm kg 0.032233
Bekisting kg 34.644
2 Balok R1. 200x400
Beton K.250 m3 4.992
Besi ulir D16 kg 964.173
Besi Sengkang φ = 10 mm kg 282.128
Bekisting m2 49.92
3 Balok Penumpu
Beton K.250 m3 0.6075
Besi ulir D16 kg 96.15027
Besi Sengkang φ = 10 mm kg 124.294
Bekisting m2 6.0615
Total - 4 :
TOTAL - III.PEKERJAAN STRUKTUR ATAS :
IV. PEKERJAAN ATAP
IV.1 Pekerjaan Rangka Atap Baja Ringan m2 275.88
2
IV.2 Pekerjaan penutup atap onduline tile m 275.88
IV.3 Pekerjaan Bubungan 22.8
TOTAL - IV.PEKERJAAN ATAP :
V. SOPI-SOPI/GEWEL
V.1 Balok B4. 150x250
Beton K.250 m3 0.19
Besi ulir D13 kg 12.58
Besi Sengkang φ = 8 mm kg 24.86
Bekisting m2 3.32
Total - 1 :
V.2 Kolom K3. 150x250
Beton K.250 m3 0.40
Besi ulir D13 kg 13.07
Besi Sengkang φ = 8mm kg 16.90
2
Bekisting m 3.45
Total - 2 :
V.3 Pasangan Bata
Pasangan bata 1/2 batu 1:5 m2 9.492
2
Plesteran m 18.98
Acian m2 18.98
Total - 3 :
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : Gedung Workshop Fakultas Farmasi
LOKASI : Universitas Mulawarman

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
TOTAL - V.SOPI-SOPI/GEWEL :
VI. PEKERJAAN KORIDOR
VI.1 Pengupasan Kolom setinggi 30 cm m3 0.66
VI.2 Balok B2. 200x400
Beton K.250 m3 2.16
Besi ulir D16 kg 240.38
Besi Sengkang φ = 10 mm kg 110.98
Bekisting 13.5
Total - 1 :
VI.3 Pondasi Batu Gunung m3 5.0625
3
VI.4 Tanah Urug Pilihan m 7.506
3
VI.5 Pekerjaan Beton Rabat Camp 1:2:3 m 2.224
2
VI.6 Pekerjaan Keramik HT.Unpolished 40x40 m 27.8
TOTAL - VI.PEKERJAAN KORIDOR :
BIAYA TOTAL PEKERJAAN
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : Gedung Workshop Fakultas Farmasi
LOKASI : Universitas Mulawarman

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6

I PEKERJAAN LANTAI 1
I.A PEKERJAAN PASANGAN DAN PLESTERAN
2
1 Pas. Dinding 1/2 bata camp 1 : 4 m 207.94
2 Plesteran Dinding 1/2 bata camp 1 : 4 m2 415.88
2
3 Acian Dinding + Perapian sudut dinding m 415.88

I.B PEKERJAAN PASANGAN KERAMIK LANTAI, DINDING DAN TANGGA


1 Pasangan Lantai Ruangan 60/60 (Granit Polished) m2 170.40
2 Pasangan Lantai Teras 40/40 (HT Unpolished) m2 34.20
3 Pasangan Lantai Toilet 25/25 & Waterproofing Coating Toilet m2 8.25
2
4 Pasangan keramik Dinding Toilet 25/40 m 28.80
2
5 Pasangan keramik Lantai Tangga 30/30 dan Stepnossing Tangga (10/30) m 12.06
6 Relling Tangga m' 6.70

I.C PEKERJAAN PLAFOND


Plafond Gypsum 9 mm Rangka Hollow Galvanis 2/4 dan 4/4 t = 0,8 mm,Rod 2
1 m 210.00
Hanger 10 mm ( F )
2 List Gypsum int = 9 cm m' 95.62

I.D PEKERJAAN KUSEN, PINTU & JENDELA


(Lengkap dengan Engsel, Grendel, Kunci, dan Handel) Terpasang
Pek.Kusen dan Jendela J1 Double Plywood Fin. HPL, Kusen Alumunium Fin.
1
Powder Coated bh 11.00
Pek.Kusen dan Pintu P1 Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder
2
Coated bh 3.00
Pek. Kusen dan Pintu P4 Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder
3
Coated bh 3.00
4 Boven m2 3.00
5 Glass Block m2 0.96
6 Balok latei diatas kusen 13/20 m' 39.00

IE PEKERJAAN SANITARY
1 Pasang Kloset Duduk Monoblok bh 3.00
2 Pasang floor drain / avour lantai bh 3.00
3 Pasang Jet Washer+fleksibel Komplit bh 3.00
4 Pasang kran air dinding bh 3.00

IF PEKERJAAAN PENGECATAN
1 Pengecatan Dinding dalam Waterbase m2 330.92
2 Pengecatan Dinding Luar Weather Shield m2 288.52
2
3 Pengecatan Plafond m 212.85
Total- I

II PEKERJAAN LANTAI II
II.A PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding 1/2 bata camp 1 : 4 m2 219.79
2 Plesteran Dinding 1/2 bata camp 1 : 4 sisi belakang ruangan m2 439.58
3 Acian Dinding + Perapian sudut dinding sisi belakang ruangan m2 439.58

II.B PEKERJAAN PASANGAN KERAMIK LANTAI, DINDING DAN TANGGA


1 Pasangan Lantai Ruangan 60/60 (Granit Polished) m2 173.1
2 Pasangan Lantai Teras 40/40 (HT Unpolished) m2 34.2
3 Pasangan Lantai Toilet 25/25 & Waterproofing Coating Toilet m2 6
4 Pasangan Dinding Toilet 25/40 m2 19.2
DAFTAR KUANTITAS
( BILL OF QUANTITY )
PEKERJAAN : Gedung Workshop Fakultas Farmasi
LOKASI : Universitas Mulawarman

HARGA SAT. TOTAL HARGA


NO ITEM PEKERJAAN SAT. VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6
II.C PEKERJAAN PLAFOND
Plafond Gypsum 9 mm Rangka Hollow Galvanis 2/4 dan 4/4 t = 0,8 mm,Rod
1
Hanger 10 mm ( F ) m2 225.12
2 List Gypsum int = 9 cm m' 107.62

II.D PEKERJAAN KUSEN & JENDELA


(Lengkap dengan Engsel, Grendel, Kunci, dan Handel) Terpasang
1 J1 Jendela Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated bh 11
2 PJ1 Pintu Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated bh 3
3 P3 Pintu Double Plywood Fin. HPL, Kusen Alumunium Fin. Powder Coated bh 3
4 Boven bh 3
5 Glass Block bh 0.96
6 Balok latei diatas kusen 13/20 bh 39

II.E PEKERJAAN SANITARY


1 Pasang Kloset Duduk Monoblok bh 2.00
3 Pasang floor drain / avour lantai bh 2.00
3 Pasang Jet Washer+fleksibel Komplit bh 2.00
6 Pasang kran air cabang bh 2.00

II.F PEKERJAAAN PENGECATAN


1 Pengecatan Dinding dalam Waterbase m2 321.32
2 Pengecatan Dinding Luar Weather Shield m2 311.32
3 Pengecatan Plafond m2 224.91

II.G Ralling Selasar Gedung m' 26.00

Total- II
Total Keseluruhan