PEKERJAAN : KANOPI CLINIC DAN KANOPI DEPAN ANEX BUILDING
LOKASI : PLTU TAHUN : 2022
NO URAIAN PEKERJAAN VOL SATUAN HARGA SATUAN JUMLAH
I BAHAN MATERIAL 1 BBM Genset 180 liter Rp 19,000 Rp 3.420,000 2 BBM Pick Up 110 liter Rp 19,000 Rp 2.090,000 3 Batu Potong Gerinda 40 pak Rp 350,000 Rp 14.000,000 4 BBM Truck 90 liter Rp 19,000 Rp 1.710,000 TOTAL I Rp 21.220,000 II TENAGA KERJA 1 Tenaga Bongkar 6 Orang 12 hari Rp 1.260,000 Rp 15.120,000 2 Tenaga Angkut Armada (Truck) 5 Orang 10 hari Rp 840,000 Rp 8.400,000 3 Tenaga Install dan Bongkar Scaffolding 7 Orang 12 hari Rp 470,000 Rp 5.640,000 4 Tenaga Plekmen 4 orang 12 hari Rp 1.080,000 Rp 12.960,000 TOTAL II Rp 42.120,000 III SEWA PERALATAN 1 Scaffolding T = 3, 5M L=1M P=6M 4 set Rp 10.500,000 Rp 42.000,000 2 1 Unit Pick Up 8 hari Rp 275,000 Rp 2.200,000 3 1 Unit Truck 4 hari Rp 3.750,000 Rp 15.000,000 4 1 Unit Genset 12 hari Rp 150,000 Rp 1.800,000 5 4 Unit Bor Tangan 12 hari Rp 200,000 Rp 2.400,000 6 3 Unit Gerenda Tangan 12 hari Rp 150,000 Rp 1.800,000 7 Tali Seling Tambang 4 roll Rp 600,000 Rp 2.400,000 TOTAL III Rp 67.600,000
Jumlah I + II + III Rp 130.940,000
Dikurangi besi 750kg x Rp 3250 Rp 2.437,500 TOTAL Rp 128.502,500 Dibulatkan Rp 128.500,000 Ppn 11% Rp 14.135,000 JUMLAH Rp 142.635,000