Anda di halaman 1dari 1

B Z=21 Pasak Besi

M=10

NP16
Z=21
M=10

IV

20
NP20
100x10
2 Perletakan

Perunggu

15

200
380x8
M10 60 35

NP20 4M20

perunggu 100x40
III 0 75
100 10
0 95
0 155

10

30
POTONGAN DETAIL III

40

30

10
NP16
tinggi bukaan pintu

SKALA, C NP16

NP16
NP16 NP16
30
380x8
40

POTONGAN DETAIL IV
SKALA, C

II
NP16
DETAIL V
NP20 SKALA, D
NP20

NP20
160x210x10

NP20 160x210x10

NP16 NP16 NP16 NP16


NP16

0.32
perunggu 100x30
200/200 3M20

25
30
90
NP20 4M20 NP20 NP26
A A M10

NP26

NP26

100
4M20

90
40
I NP16

DETAIL II
85 85 NP16

30
NP20
20 200 20 SKALA, B
NP26
1 1
DETAIL IV
SKALA, B
100x10

POTONGAN B-B
SKALA, A
B
TAMPAK NP16 NP16
SKALA, A M10 perunggu 100x30
M16 Pengaku stang pintu

NP16 NP16 NP16

NP20
+141.20 +141.20
NP26 NP26
380x8

50 60 50
2M16

0.90-1.20 NP16

DETAIL III
DETAIL I SKALA, B
SKALA, B

V
Propinsi :
SULAWESI SELATAN
Pekerjaan :
Pembangunan Embung
Kabupaten Kep. Selayar
POTONGAN A-A
SKALA, A
Gambar : Shop Drawing (M.C. 0) Kabupaten :
Kepulauan Selayar
DETAIL PINTU INTAKE
No Register :

Digambar Kontaraktor Pelaksana : Novi Pratiwi Adhyaksa No Lembar :


CV. Tirsa Dwi Guna
Diperiksa Konsultan Supervisi : Wahyu Prasetyo, S.T. Tanggal : No Kontrak :
CV. Patoya Indah
Disetujui Direksi Pekerjaan : Hasanuddin, S.T. 20 Mei HK.02.01/Au.11.1/03
No.Rev Tgl Yang Direvisi Oleh Direnc Diset 2022
Mengetahui PPK Penyediaan Air Baku I : Riduan, S.E., S.T.

Anda mungkin juga menyukai