Anda di halaman 1dari 6

DAFTAR HARGA SATUAN PEKERJAA

Pembangunan Rumah Dinas Type 36

No. URAIAN
A HARGA SATUAN UPAH
1 Pekerja
2 Mandor
3 Tukang Kayu
4 Kepala Tukang
5 Tukang Batu, Cat, Besi

B HARGA SATUAN BAHAN


I. GALIAN
1 Tanah timbun/merah
2 Pasir timbun
3 Pasir pasang
4 Batu kerikil (A) cor
5 Batu kali 15 - 20 cm
6 Batu bata
7 Semen PC @ 40 Kg
8 Semen Putih @ 40 Kg
9 Kapur pasang

II. KAYU
1 Broti/papan kayu sembarang keras
2 Broti kayu meranti
3 Papan kayu meranti
4 Kayu plat asbes ketam
5 Asbes atrisco 1 x 1 M

III. BESI/KAWAT
1 Paku biasa
2 Paku seng
3 Paku beton
4 Besi beton
5 Kawat beton

IV. ATAP
1 Rangka atap baja ringan
2 Atap genteng seng metal
3 Rabung genteng seng metal
4 Seng Plat BJLS K 35

V. CAT/AMPLAS
1 Cat minyak/perak
2 Cat tembok
3 Tinner
4 Kertas pasir
5 Paper tape (20 x 76)
6 Dempul gypsum
7 Screw
8 Gypsum board 6 mm
9 Gypsum board 9 mm
10 Top Cross
11 Furing Channel
12 Wall Angel (lokal)
13 Conector
14 Suspension spring Clip 5 mm
15 Suspension road 100 cm 5 mm
16 Besi angle bracket (to concrete)
17 Baut Ramset

VI. KACA
1 Kaca bening # = 5 mm

VII. KERAMIK
1 Klosed Jongkok
2 Keramik 20 x 20 cm
3 Keramik 20 x 25 cm
4 Keramik 40 x 40 cm
5 Plint Keramik 15 x 30 cm

VIII. PIPA PVC


1 Pipa PVC (Paralon) ø 1/2 "
2 Pipa PVC (Paralon) ø 4 "

No. URAIAN
IX. LISTRIK
1 Kabel listrik NGA goldel liver/sejenis 1,5 mm
2 Instalasi listrik stop kontak
3 Instalasi listrik nyala
4 Lampu XL 32 watt (komplet)
5 Lampu XL 18 watt (komplet)
6 Lampu XL 8 watt (komplet)
7 Lampu taman 40 watt
8 Saklar tunggal
9 Saklar ganda
10 Stop kontak tanam
11 Box zekering 1 group
12 MBC 2 ampere

X. SANIT AIR
1 Kran air lokal uk. 1/2"
2 Kran air type bebek
3 Instalasi air bersih
4 Tempat sabun keramik
5 Saringan air kamar mandi
6 Pipa pembuangan air bak
7 Kitchen Sink Meja Dapur
8 Septictank kapasitas 2.5 M3

IX. PENGUNCI DAN PENGGANTUNG


1 Kunci tanam besar union (sejenis)
2 Kunci tanam kecil union (sejenis)
3 Engsel pintu uk. 4"
4 Engsel Jendela uk. 3"
5 Grendel jendela
6 Hak angin siku
ATUAN PEKERJAAN
mah Dinas Type 36

HARGA SATUAN

Rp 120,000.00 Hari
Rp 150,000.00 Hari
Rp 120,000.00 Hari
Rp 135,000.00 Hari
Rp 120,000.00 Hari

Rp - M³
Rp 100,000.00 M³
Rp 120,000.00 M³
Rp 90,000.00 M³
Rp 120,000.00 M³
Rp 500.00 Bh
Rp 40,000.00 Zak
Rp 50,000.00 Zak
Rp 10,000.00 Kg

Rp 3,600,000.00 M³
Rp 3,000,000.00 M³
Rp 3,447,500.00 M³
Rp 2,500,000.00 Btg
Rp 22,200.00 Lbr

Rp 17,000.00 Kg
Rp 15,000.00 Kotak
Rp 16,000.00 Kotak
Rp 45,500.00 Kg
Rp 25,000.00 Kg

Rp 170,000.00 M²
Rp 35,000.00 M²
Rp 27,000.00 M²
Rp 277,600.00 Lbr

Rp 11,000.00 Kg
Rp 15,500.00 Kg
Rp 17,000.00 Ltr
Rp 3,000.00 Lbr
Rp 44,000.00 Rol
Rp 11,000.00 Kg
Rp 3,000.00 Bh
Rp 34,000.00 M²
Rp 46,000.00 M²
Rp 1,500.00 M
Rp 15,620.00 M
Rp 1,000.00 M
Rp 1,600.00 Bh
Rp 26,000.00 Bh
Rp 40,400.00 M
Rp 59,000.00 Bh
Rp 2,500.00 Bh

Rp 98,000.00 M²

Rp 40,000.00 Bh
Rp 3,000.00 Bh
Rp 3,250.00 Bh
Rp 4,000.00 Bh
Rp 3,300.00 Bh

Rp 3,500.00 M
Rp 51,500.00 M

HARGA SATUAN

Rp 100,000.00 Rol
Rp 175,000.00 Ttk
Rp 210,000.00 Ttk
Rp 58,000.00 Set
Rp 29,000.00 Set
Rp 22,000.00 Set
Rp 250,000.00 Bh
Rp 5,000.00 Bh
Rp 8,000.00 Bh
Rp 11,000.00 Bh
Rp 40,000.00 Set
Rp 25,000.00 Bh

Rp 40,000.00
Rp 12,000.00 Bh
Rp 25,000.00 Bh
Rp 45,000.00 M
Rp 5,000.00 Bh
Rp 5,000.00 Bh
Rp 3,000.00 Bh
Rp 163,000.00 Bh
Rp 700,000.00 Unit

Rp 150,000.00 Bh
Rp 132,000.00 Bh
Rp 14,500.00 Set
Rp 15,000.00 Set
Rp 15,000.00 Bh
Rp 13,000.00 Set

Anda mungkin juga menyukai