Tugas Besar 2 - Kelompok 2 - Stupa 2 - WBS
Tugas Besar 2 - Kelompok 2 - Stupa 2 - WBS
1.1. ADMIN & DOKUMENTASI 2.1. STRUKTUR BAWAH 2.2. PEKERJAAN STRUKTUR LT 1 2.3. PEKERJAAN STRUKTUR LT TYPICAL 2.4. PEKERJAAN STRUKTUR LT ATAP
1.2. K3 2.1.1. PEKERJAAN PONDASI BORED PILE 2.2.1. PEKERJAAN KOLOM LT 1 2.3.1. PEKERJAAN KOLOM LT TYPICAL 2.4.1. PEKERJAAN BALOK LT ATAP
2.2.2. PEKERJAAN PLAT LT 1 2.3.2. PEKERJAAN BALOK LT TYPICAL 2.4.2. PEKERJAAN PLAT LT TYPICAL
1.6. DIREKSI KEET 2.1.1.4. PEKERJAAN PENGECORAN BORED PILE
2.3.2.1. PEKERJAAN PEMBESIAN BALOK LT
2.2.2.1. PEKERJAAN PEMBESIAN PLAT LT 1 2.4.2.1. PEKERJAAN PEMBESIAN PLAT LT ATAP
TYPICAL
1.7. AIR & LISTRIK KERJA 2.1.2. PEKERJAAN PILE CAP
2.3.2.2. PEKERJAAN BEKISTING BALOK LT
2.2.2.2. PEKERJAAN BEKISTING PLAT LT 1 2.4.2.2. PEKERJAAN BEKISTING PLAT LT ATAP
TYPICAL
1.8. PENGUKURAN & BOWPLANK 2.1.2.1. PEKERJAAN GALIAN PILE CAP
2.3.2.3. PEKERJAAN PENGECORAN BALOK LT 2.4.2.3. PEKERJAAN PENGECORAN PLAT LT
2.2.2.3. PEKERJAAN PENGECORAN PLAT LT 1
TYPICAL ATAP
1.9. LAND CLEARING & PEMBONGKARAN 2.1.2.2. PEKERJAAN PEMBESIAN PILE CAP
2.2.3. PEKERJAAN TANGGA LT 1
2.3.3. PEKERJAAN PLAT LT TYPICAL