Anda di halaman 1dari 30

Rekapitulasi 

Volume Grouting & Injeksi area Dolphin
VOLUME 
VOLUME Grouting (m3) VOLUME  VOLUME  DEVIASI Vol. 
Injeksi  DEVIASI Vol. 
LOKASI Grouting BoQ  Injeksi BoQ  Grouting 
PRIORITY  Injeksi (Titik)
PRIORITY NON PRIORITY (m3) (Titik) (m3)
(Titik)
DW 1 0,25 0,427 0,22 ‐0,0300 0
DW 3 0,3 0,7943 0,21 ‐0,0900 0
DW 5 0,0800 0,8237 0,18 0,1000 0
DW 8 0,0750 0,8237 0,16 0,0850 0
DW 10 0,7787 0,1390 0,85 20 0,0713 ‐20
DE 1 0,2426 1,1520 0,24 12 ‐0,0026 12
DE 3 0,0792 1,1220 0,32 0,2408 0
DE 5 0,7980 0,9992 0,37 ‐0,4280 0
DE 6 0,4600 1,0738 0,28 ‐0,1800 0
DE 8 0,0747 0,7546 0,24 0,1653 0
TOTAL 3,1383 8,1091 3,07 20 12 ‐0,0682 ‐8
GAMBAR LOKASI KERUSAKAN AREA DOLPHIN
JETTY BUNATI
KETERANGAN :

PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :
Vol. 0,2 m3
Kedalaman ±15 cm
EL. +4.000 (TOC)
OWNER

PT. BORNEO INDOBARA BUNATI


Vol. 0,1 m3
Kedalaman ±5 cm EL. +2.660 (HAT) KONSULTAN PERENCANA

PT. ITS TEKNO SAINS


EL. +1.420 (MSL) NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

EL. ±0.000 (LAT)


TAMPAK ATAS DW 1 01
TEAM
LEADER
YEYES MULYADI

SKALA 1 : 50
ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK ATAS & SAMPING KIRI
TAMPAK SAMPING KIRI DW 1 01 SKALA :
DW 1
NO. LEMBAR :
SKALA 1 : 50
1 : 50 01
KETERANGAN :

PRIORITY

REV. CATATAN TANGGAL

Vol. 0,3 m3 NOMOR KONTRAK :


Kedalaman ±15 cm

OWNER

PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA

PT. ITS TEKNO SAINS


NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

TAMPAK ATAS DW 3 01 ENGINEER M. FARID NURUL IMAN


SKALA 1 : 50

DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :

TAMPAK ATAS DW 3

SKALA : NO. LEMBAR :


1 : 50 02
KETERANGAN :

PRIORITY

EL. +4.000 (TOC)

REV. CATATAN TANGGAL


EL. +2.660 (HAT)

Vol. 0,08 m3
Kedalaman ±10 cm

NOMOR KONTRAK :
EL. +1.420 (MSL)
OWNER

PT. BORNEO INDOBARA BUNATI


EL. ±0.000 (LAT)
KONSULTAN PERENCANA

PT. ITS TEKNO SAINS


NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER
TAMPAK SAMPING KIRI DW 5 01 NAMA TD. TANGAN
SKALA 1 : 50
DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :

TAMPAK SAMPING KIRI DW 5

SKALA : NO. LEMBAR :


1 : 50 03
KETERANGAN :

PRIORITY

EL. +4.000 (TOC)

Vol. 0,075 m3
Kedalaman ±50 cm
REV. CATATAN TANGGAL

EL. +2.660 (HAT)

NOMOR KONTRAK :
EL. +1.420 (MSL)
OWNER

PT. BORNEO INDOBARA BUNATI


EL. ±0.000 (LAT) KONSULTAN PERENCANA

PT. ITS TEKNO SAINS


NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER
TAMPAK SAMPING KIRI DW 8 01 NAMA TD. TANGAN
SKALA 1 : 50
DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :

TAMPAK SAMPING KIRI DW 8

SKALA : NO. LEMBAR :


1 : 50 04
KETERANGAN :

PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :

Vol. 0,009 m3 Vol. 0,009 m3 Vol. Injeksi 11 Titik


Kedalaman ±15 cm Kedalaman ±15 cm OWNER
EL. +4.000 (TOC) EL. +4.000 (TOC)

Vol. 0,0467 m3
Kedalaman ±10 cm PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA
EL. +2.660 (HAT) EL. +2.660 (HAT)
Vol. Injeksi 9 Titik

PT. ITS TEKNO SAINS


NAMA PROYEK :
EL. +1.420 (MSL) EL. +1.420 (MSL)
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
EL. ±0.000 (LAT) EL. ±0.000 (LAT) LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK SAMPING KIRI &KANAN

TAMPAK SAMPING KANAN DW 10 01 TAMPAK SAMPING KIRI DW 10 01 SKALA :


DW 10
NO. LEMBAR :
SKALA 1 : 50 SKALA 1 : 50
1 : 50 05
KETERANGAN :

PRIORITY

EL. +4.000 (TOC) REV. CATATAN TANGGAL

EL. +2.660 (HHAT) NOMOR KONTRAK :


Vol. 0,294 m3
Kedalaman ±5 cm
OWNER

Vol. 0,42 m3 EL. +1.420 (MSL)


Kedalaman ±100 cm PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA

EL. ±0.000 (LAT) PT. ITS TEKNO SAINS


NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

TAMPAK DEPAN DW 10 01 DIPERIKSA


SKALA 1 : 50 OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK SAMPING DEPAN
DW 10
SKALA : NO. LEMBAR :
1 : 50 06
KETERANGAN :

PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :
EL. +4.000 (TOC) EL. +4.000 (TOC)
OWNER

Vol. 0,17 m3
Kedalaman ±40 cm Vol. 0,042 m3
PT. BORNEO INDOBARA BUNATI
Kedalaman ±10 cm
EL. +2.660 (HAT) EL. +2.660 (HAT)
KONSULTAN PERENCANA

PT. ITS TEKNO SAINS


EL. +1.420 (MSL) EL. +1.420 (MSL)
NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN
EL. ±0.000 (LAT) EL. ±0.000 (LAT)
TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK SAMPING KANAN & KIRI
DE 1
TAMPAK SAMPING KANAN DE 1 01 TAMPAK SAMPING KIRI DE 1 01 SKALA : NO. LEMBAR :
SKALA 1 : 50 SKALA 1 : 50 1 : 50 07
KETERANGAN :

PRIORITY

EL. +4.000 (TOC)


REV. CATATAN TANGGAL

Vol. 0,03 m3
Kedalaman ±10 cm

EL. +2.660 (HHAT) NOMOR KONTRAK :

OWNER

EL. +1.420 (MSL)


PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA

EL. ±0.000 (LAT)


PT. ITS TEKNO SAINS
NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

TAMPAK DEPAN DE 1 01 DIPERIKSA


OLEH
SKALA 1 : 50
MENGETAHUI

JUDUL GAMBAR :
TAMPAK DEPAN
DE 1
SKALA : NO. LEMBAR :
1 : 50 08
KETERANGAN :

PRIORITY

EL. +4.000 (TOC)

REV. CATATAN TANGGAL

Vol. 0,0792 m3
Kedalaman ±20 cm

EL. +2.660 (HHAT)

NOMOR KONTRAK :

OWNER

EL. +1.420 (MSL)

PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA

EL. ±0.000 (LAT)

PT. ITS TEKNO SAINS


NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER

TAMPAK DEPAN DE 3 01
NAMA TD. TANGAN

SKALA 1 : 50 DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK DEPAN
DE 3
SKALA : NO. LEMBAR :
1 : 50 09
KETERANGAN :

PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :

EL. +4.000 (TOC) EL. +4.000 (TOC)


OWNER

Vol. 0,495 m3 Vol. 0,234 m3


Kedalaman ±50 cm Kedalaman ±40 cm

PT. BORNEO INDOBARA BUNATI

EL. +2.660 (HAT) EL. +2.660 (HAT) KONSULTAN PERENCANA

PT. ITS TEKNO SAINS


EL. +1.420 (MSL) EL. +1.420 (MSL) NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

EL. ±0.000 (LAT) EL. ±0.000 (LAT) TEAM


YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK SAMPING KANAN & KIRI
DE 5
TAMPAK SAMPING KANAN DE 5 01 TAMPAK SAMPING KIRI DE 5 01 SKALA : NO. LEMBAR :
SKALA 1 : 50 SKALA 1 : 50 1 : 50 10
KETERANGAN :

PRIORITY

EL. +4.000 (TOC)

REV. CATATAN TANGGAL


Vol. 0,069 m3
Kedalaman ±10 cm

EL. +2.660 (HHAT)

NOMOR KONTRAK :

OWNER
EL. +1.420 (MSL)

PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA

EL. ±0.000 (LAT)

PT. ITS TEKNO SAINS


NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER

TAMPAK DEPAN DE 5 01
NAMA TD. TANGAN

SKALA 1 : 50 DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK DEPAN
DE 5
SKALA : NO. LEMBAR :
1 : 50 11
KETERANGAN :

PRIORITY

Vol. 0,13 m3
EL. +4.000 (TOC) Kedalaman ±40 cm

REV. CATATAN TANGGAL

Vol. 0,33 m3
Kedalaman ±20 cm
EL. +2.660 (HAT)

NOMOR KONTRAK :

OWNER

EL. +1.420 (MSL)

PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA

EL. ±0.000 (LAT)

PT. ITS TEKNO SAINS


NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER

TAMPAK SAMPING KANAN DE 6 01 DIGAMBAR


NAMA TD. TANGAN

SKALA 1 : 50 OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK SAMPING KANAN
DE 6
SKALA : NO. LEMBAR :
1 : 50 12
KETERANGAN :

PRIORITY

EL. +4.000 (TOC)

REV. CATATAN TANGGAL

Vol. 0,016 m3
Kedalaman ±10 cm

EL. +2.660 (HAT)

Vol. 0,0587 m3 NOMOR KONTRAK :


Kedalaman ±30 cm

OWNER

EL. +1.420 (MSL)

PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA

EL. ±0.000 (LAT)

PT. ITS TEKNO SAINS


NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER

TAMPAK SAMPING KANAN DE 8 01 DIGAMBAR


NAMA TD. TANGAN

SKALA 1 : 50 OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK SAMPING KANAN
DE 8
SKALA : NO. LEMBAR :
1 : 50 13
KETERANGAN :

NON PRIORITY

EL. +4.000 (TOC)

REV. CATATAN TANGGAL

EL. +2.660 (HHAT)


Vol. 0,007 m3
Kedalaman ±5 cm

NOMOR KONTRAK :

OWNER
Vol. 0,42 m3 EL. +1.420 (MSL)
Kedalaman ±100 cm

PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA

EL. ±0.000 (LAT)

PT. ITS TEKNO SAINS


NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER

TAMPAK DEPAN DW 1 01
NAMA TD. TANGAN

SKALA 1 : 50 DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK DEPAN
DW 1
SKALA : NO. LEMBAR :
1 : 50 14
KETERANGAN :

NON PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :

EL. +4.000 (TOC) EL. +4.000 (TOC)


OWNER

Vol. 0,0083 m3
Kedalaman ±5 cm
PT. BORNEO INDOBARA BUNATI
EL. +2.660 (HAT) EL. +2.660 (HHAT) KONSULTAN PERENCANA

Vol. 0,294 m3
Vol. 0,072 m3 Kedalaman ±5 cm
Kedalaman ±30 cm

PT. ITS TEKNO SAINS


EL. +1.420 (MSL) EL. +1.420 (MSL) NAMA PROYEK :
Vol. 0,42 m3
Kedalaman ±100 cm
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN
EL. ±0.000 (LAT) EL. ±0.000 (LAT)
TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK SAMPING KIRI & DEPAN
TAMPAK SAMPING KIRI DW 3 01 TAMPAK DEPAN DW 3 01 DW 3
SKALA 1 : 50 SKALA 1 : 50 SKALA : NO. LEMBAR :
1 : 50 15
KETERANGAN :

NON PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :

EL. +4.000 (TOC)


OWNER

Vol. 0,1096 m3 PT. BORNEO INDOBARA BUNATI


Kedalaman ±5 cm
EL. +2.660 (HHAT) KONSULTAN PERENCANA

Vol. 0,294 m3
Kedalaman ±5 cm

PT. ITS TEKNO SAINS

Vol. 0,42 m3 EL. +1.420 (MSL) NAMA PROYEK :


Kedalaman ±100 cm ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

EL. ±0.000 (LAT)


TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

TAMPAK ATAS DW 5 01 OWNER

SKALA 1 : 50 NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK ATAS & DEPAN
DW 5

TAMPAK DEPAN DW 5 01 SKALA :


1 : 50
NO. LEMBAR :

SKALA 1 : 50 16
KETERANGAN :

NON PRIORITY

REV. CATATAN TANGGAL

EL. +4.000 (TOC)


NOMOR KONTRAK :

OWNER

Vol. 0,1096 m3
Kedalaman ±5 cm
EL. +2.660 (HHAT)

Vol. 0,294 m3 PT. BORNEO INDOBARA BUNATI


Kedalaman ±5 cm
KONSULTAN PERENCANA

Vol. 0,42 m3 EL. +1.420 (MSL)


Kedalaman ±100 cm
PT. ITS TEKNO SAINS
NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

EL. ±0.000 (LAT)


KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

TAMPAK ATAS DW 8 01
DRAFTER MUCHAMMAD ICHWAN

SKALA 1 : 50 OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK ATAS & DEPAN
TAMPAK DEPAN DW 8 01 DW 8
SKALA 1 : 50 SKALA : NO. LEMBAR :
1 : 50 17
KETERANGAN :

NON PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :
Vol. 0,139 m3
Kedalaman ±5 cm
OWNER

PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA

PT. ITS TEKNO SAINS


NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

TAMPAK ATAS DW 10 01 ENGINEER M. FARID NURUL IMAN

SKALA 1 : 50
DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :

TAMPAK ATAS DW 10

SKALA : NO. LEMBAR :


1 : 50 18
KETERANGAN :

NON PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :

OWNER

Vol. 0,2275 m3
Kedalaman ±5 cm

PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA

PT. ITS TEKNO SAINS


NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

TAMPAK ATAS DE 1 01
SKALA 1 : 50 DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :

TAMPAK ATAS DE 1

SKALA : NO. LEMBAR :


1 : 50 19
KETERANGAN :

NON PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :

EL. +4.000 (TOC) EL. +4.000 (TOC) OWNER

Vol. 0,0005 m3
Kedalaman ±5 cm

PT. BORNEO INDOBARA BUNATI

EL. +2.660 (HAT) KONSULTAN PERENCANA


EL. +2.660 (HHAT)

Vol. 0,225 m3 Vol. 0,279 m3


Kedalaman ±30 cm Kedalaman ±5 cm

PT. ITS TEKNO SAINS


EL. +1.420 (MSL) EL. +1.420 (MSL) NAMA PROYEK :
Vol. 0,42 m3
Kedalaman ±100 cm ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

EL. ±0.000 (LAT) EL. ±0.000 (LAT) TEAM


YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK ATAS, & SAMPING KANAN
TAMPAK SAMPING KANAN DE 1 01 TAMPAK DEPAN DE 1 01 SKALA :
DE 1
NO. LEMBAR :
SKALA 1 : 50 SKALA 1 : 50
1 : 50 20
KETERANGAN :

NON PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :

Vol. 0,1105 m3
Kedalaman ±5 cm OWNER

PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA

PT. ITS TEKNO SAINS


NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

TAMPAK ATAS DE 3 01
SKALA 1 : 50 DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :

TAMPAK ATAS DE 3

SKALA : NO. LEMBAR :


1 : 50 21
KETERANGAN :

NON PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :
EL. +4.000 (TOC) EL. +4.000 (TOC)
OWNER

Vol. 0,2601 m3
Kedalaman ±30 cm

PT. BORNEO INDOBARA BUNATI


EL. +2.660 (HAT) Vol. 0,327 m3 EL. +2.660 (HHAT)
Kedalaman ±5 cm KONSULTAN PERENCANA

Vol. 0,0076 m3
Vol. 0,0044 m3
Kedalaman ±10 cm
Kedalaman ±5 cm

EL. +1.420 (MSL) PT. ITS TEKNO SAINS


Vol. 0,42 m3 EL. +1.420 (MSL)
Kedalaman ±100 cm NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA

EL. ±0.000 (LAT) NAMA TD. TANGAN


EL. ±0.000 (LAT)
TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK ATAS, SAMPING KIRI & DEPAN
TAMPAK SAMPING KIRI DE 3 01 TAMPAK DEPAN DE 3 01 SKALA :
DE 3
NO. LEMBAR :
SKALA 1 : 50 SKALA 1 : 50
1 : 50 22
KETERANGAN :

NON PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :

Vol. 0,2125 m3 OWNER


Kedalaman ±5 cm

PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA

PT. ITS TEKNO SAINS


NAMA PROYEK :
Vol. 0,0135 m3
Kedalaman ±5 cm ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN
Vol. 0,0288 m3
Kedalaman ±30 cm
KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

MUCHAMMAD ICHWAN

TAMPAK ATAS DE 5 01
DRAFTER

OWNER
SKALA 1 : 50
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK ATAS
DE 5
SKALA : NO. LEMBAR :
1 : 50 23
KETERANGAN :

NON PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :

EL. +4.000 (TOC) EL. +4.000 (TOC) OWNER

Vol. 0,0218 m3
Kedalaman ±10 cm
PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA
EL. +2.660 (HAT) EL. +2.660 (HHAT)

Vol. 0,04 m3 Vol. 0,2625 m3


Kedalaman ±20 cm Kedalaman ±5 cm

PT. ITS TEKNO SAINS


NAMA PROYEK :
EL. +1.420 (MSL) EL. +1.420 (MSL)
Vol. 0,42 m3
Kedalaman ±100 cm ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

EL. ±0.000 (LAT) EL. ±0.000 (LAT) TEAM


YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK SAMPING KIRI & DEPAN
DE 5
TAMPAK SAMPING KIRI DE 5 01 TAMPAK DEPAN DE 5 01 SKALA : NO. LEMBAR :
SKALA 1 : 50 SKALA 1 : 50 1 : 50 24
KETERANGAN :

NON PRIORITY

REV. CATATAN TANGGAL

Vol. 0,0805 m3
Kedalaman ±5 cm NOMOR KONTRAK :

OWNER

PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA

PT. ITS TEKNO SAINS


NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

TAMPAK ATAS DE 6 01
ENGINEER M. FARID NURUL IMAN

SKALA 1 : 50
DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :

TAMPAK ATAS DE 6

SKALA : NO. LEMBAR :


1 : 50 25
KETERANGAN :

NON PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :

EL. +4.000 (TOC) EL. +4.000 (TOC) OWNER

Vol. 0,0025 m3
Kedalaman ±5 cm

Vol. 0,2767 m3 PT. BORNEO INDOBARA BUNATI


Kedalaman ±30 cm
KONSULTAN PERENCANA
EL. +2.660 (HAT) EL. +2.660 (HHAT)

Vol. 0,294 m3
Kedalaman ±5 cm

PT. ITS TEKNO SAINS


NAMA PROYEK :
EL. +1.420 (MSL) EL. +1.420 (MSL)
Vol. 0,42 m3
Kedalaman ±100 cm ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN

EL. ±0.000 (LAT) EL. ±0.000 (LAT) TEAM


YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK ATAS, SAMPING KIRI & DEPAN
DE 6
TAMPAK SAMPING KIRI DE 6 01 TAMPAK DEPAN DE 6 01 SKALA : NO. LEMBAR :
SKALA 1 : 50 SKALA 1 : 50 1 : 50 26
KETERANGAN :

NON PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :
EL. +4.000 (TOC)
OWNER

Vol. 0,0881 m3 Vol. 0,0116 m3 PT. BORNEO INDOBARA BUNATI


Kedalaman ±5 cm EL. +2.660 (HAT) Kedalaman ±10 cm
KONSULTAN PERENCANA

PT. ITS TEKNO SAINS


EL. +1.420 (MSL)
NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
NAMA TD. TANGAN
EL. ±0.000 (LAT)
TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER

TAMPAK ATAS DE 8 01 DIGAMBAR


NAMA TD. TANGAN

SKALA 1 : 50 OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK ATAS, SAMPING KANAN
DE 8
TAMPAK SAMPING KANAN DE 8 01 SKALA : NO. LEMBAR :
SKALA 1 : 50 1 : 50 27
KETERANGAN :

NON PRIORITY

REV. CATATAN TANGGAL

NOMOR KONTRAK :
EL. +4.000 (TOC) EL. +4.000 (TOC)

OWNER

Vol. 0,0201 m3
Kedalaman ±10 cm
EL. +2.660 (HAT) EL. +2.660 (HHAT) PT. BORNEO INDOBARA BUNATI

KONSULTAN PERENCANA
Vol. 0,294 m3
Kedalaman ±5 cm

EL. +1.420 (MSL) EL. +1.420 (MSL) PT. ITS TEKNO SAINS
Vol. 0,42 m3
Kedalaman ±100 cm NAMA PROYEK :
ASSESMENT & TESTING JETTY
PT. BORNEO INDOBARA BUNATI,
KALIMANTAN SELATAN

KONSULTAN PERENCANA
EL. ±0.000 (LAT) EL. ±0.000 (LAT) NAMA TD. TANGAN

TEAM
YEYES MULYADI
LEADER

ENGINEER M. FARID NURUL IMAN

DRAFTER MUCHAMMAD ICHWAN

OWNER
NAMA TD. TANGAN

DIGAMBAR
OLEH

DIPERIKSA
OLEH

MENGETAHUI

JUDUL GAMBAR :
TAMPAK DEPAN & SAMPING KIRI
TAMPAK SAMPING KIRI DE 8 01 TAMPAK DEPAN DE 8 01 SKALA :
DE 8
NO. LEMBAR :
SKALA 1 : 50 SKALA 1 : 50
1 : 50 28