5000
K2
2000
12000
K2
K2
5000
20800
Pondasi Tapak 130.130.25 ( TP1)
Galian Tanah Pondasi Tapak
Cor Lantai Kerja Mutu f'c 9,8 MPa 1.20 1.20 0.07 -
Besi
Memanjang
Melintang
24.00 38.40 m3
1.00 6.82 m3
45.22 m3
1.055588
24.00 1.73
2.78 m3
24.00 2.42 m3
15.07269 m3
145.6 m3
0.47495 m3
0.259175 m3
0.91 m3
1.246 m3
1.07765 m3
0.405825 m3
0.322875 m3
0.595 m3
5.291475 m3
24.00 8.11 m3
Pondasi Tapak
DIMENSI
SELIMUT
No LOKASI
Panjang Lebar Tinggi
m m m mm
1 PEKERJAAN PILE CAP
a P1
Tulangan Bawah 1.3 1.3 0.2 0.06
Tulangan Atas 1.3 1.3 0.2 0.06
PANJANG
PANJANG POTONGAN JUMLAH
D/P TOTAL
TULANGAN
m' m'
mm a b c d e f g=a+b+c+d+e+f h
jarak
30.000 1.042 1,206.00 10.00
10.140 31.200
30.000 1.042 1,206.00 10.00
TOTAL 10.140 2,412.01 31.200
TABEL PERHITUNGAN KUANTITAS PEKERJAAN
URAIAN PERHITUNGAN
TOTAL
NO. URAIAN PEKERJAAN Ø Volume SAT.
Berat Panjang Lebar Tinggi/ Tbl Area Jumlah VOLUME
Perhitungan
Besi /m' ( m) ( m) ( m) (m2) (bh) Unit (bh)
Besi kg p l t A n u
A PEKERJAAN PERSIAPAN
1. Pengukuran/ Pemasangan Bouwplank 73.60 lot
- Bangunan 45.60 28.00 p + l 73.60 1276.8
2. Pembuatan Gudang Bahan/ Material 9.00 m2 2553.6
3. Pembuatan Jembatan Sementara 10.00 m2
4. Pembuatan Pagar Sementara Dari Seng T= 2 meter 120.00 m2
5. Pembersihan Awal dan Akhir 1.00 lot
6. Biaya Air Kerja 1.00 set
7. Biaya Listrik Kerja 1.00 set
8. Mobilisasai Dan Demob Pekrja Dan Peralatan 1.00 lot
B PENERAPAN SMKK
. 1. Alat Pelindung Kerja dan Alat Pelindung Diri 1.00 1.00 set
. 2. Personel Keselamatan Konstruksi 1.00 1.00 set
. 3. Fasilitas Sarana, Prasarana dan Alat Kesehatan 1.00 1.00 set
C PEKERJAAN TANAH
1. Galian Tanah
. - Luar Bawah Sloof 54.82 m3
Sb.x 3 2 5.55 3.15 1.35 15.05 23.72 0.58 0.50 p x l x t 6.82
Sb.y 1.9 0.95 1.7 2.715 1.40 8.67
23.72
Jlh
- Galian Tanah Pondasi Tapak 1.00 1.00 1.60 30.00 p x l x t x u 48.00 30
D. PEKERJAAN LANTAI 1
I PEKERJAAN PONDASI DAN STRUKTUR BETON BERTULANG
1. Pondasi Batu Padas camp. 1:4 4.15 m3
Sb.x 3 2 5.55 3.15 1.35 15.05
Sb.y 1.9 0.95 1.7 2.715 1.4 8.67
23.72
23.72 0.35 0.50 p x l x t 4.15
- Pembesian 1,528.32 Kg
Memanjang 13.00 1.04 3.06 8.00 30.00 kg x p x n x u 764.16 1.25 1.25
Melintang 13.00 1.04 3.06 8.00 30.00 kg x p x n x u 764.16 4d 0.16
- Bekisting 39.00 m2
5.20 0.25 30.00 p x t x u 39.00
- Pembesian 683.93 Kg
Besi D 16 mm 16.00 1.58 1.92 6.00 30.00 kg x p x n x u 545.44 0.2 0.25
Besi Behel Ø 8 mm 8.00 0.39 0.90 13.00 30.00 kg x p x n x u 138.49 4d 0.16
- Bekisting 50.16 m2
1.10 1.52 30.00 p x t x u 50.16
- Bekisting 80.16 m2
100.20 0.40 2.00 p x l x n 80.16
- Bekisting 12.48 m2
24.95 0.50 1.00 p x l x n 12.48
- Pembesian 1,625.53 kg
Besi D 16 mm 16.00 1.58 135.23 6.00 1,280.57 Samb
11.0 7.04
Besi Behel Ø 8 mm 8.00 0.39 1.20 731.00 344.95
0.2 0.35
Bekesting 103.68 m2
128.00 0.28 2.00 71.68
128.00 0.25 1.00 32.00
Bakesting 13.89 m2
24.80 0.18 2.00 8.93
24.80 0.20 1.00 4.96
- Bakesting 210.96 m2
Alas 12.00 17.00 204.00
Dinding 58.00 0.12 6.96
b Pondasi
- Beton Cor F'c = 20 Mpa 0.29 m3
1.25 0.60 0.15 0.11
1.25 0.20 0.70 0.17
- Pembesian 42.94 kg
0.29 150.00 42.94
c Balok Bordes uk. 20x30 cm b h
- Beton Cor F'c = 20 Mpa 2.5 0.2 0.18 0.09 0.09 m3 0.2 0.3
- Pembesian 21.67 kg
Besi D 13 mm 13.00 1.04 2.50 6.00 15.63
0.15 0.25
Besi Behel Ø 8 mm 8.00 0.39 0.90 17.00 6.04
- Bakesting 0.90 m2
Dinding 2.50 0.18 2.00 0.90
- Pembesian 46.88 kg
Besi Ø 10 mm 0.38 125.00 46.88
- Bakesting 4.03 m2
Alas 2.50 1.25 1.00 3.13
Dinding 7.50 0.12 0.90
- Bakesting 11.16 m2
Alas 3.60 1.25 2.00 9.00
Dinding 7.20 0.15 2.00 2.16
- Bekesting 10.06 m2
Alas 17.20 0.5 8.60
Dinding 18.20 0.08 1.456
15. Beton Cor Lantai Dasar F'c = 19,3 Mpa 14.28 14.28 m3
12.00 17.00 0.07 14.28
16. Pek. Wiremesh M.8 1 lapis 1,247.06 kg Luas per lbr Berat
12 20.8 240.75 21.23 1,247.06 11.34 58.74
8.85
Bkg P2 1.5 2.65 1.00 3.98 Jendela 0.30 6.70 4.00 1.50 12.06
BV1 0.67 0.60 4.00 1.61
3. Acian 14.80 m2
0.75 8.00 0.75 8.00 6.00
1.10 8.00 1.10 8.00 8.80
4. Dinding Partisi Gypsum
- Rangka Partisi 26.32 m2
8.00 3.50 1.68 26.32
- Pas Dinding Panel Stainless Steel Tbl 1.2 mm Bingkai Besi 6.34 ls
0.60 4.00 2.40
0.53 4.00 2.10
0.63 2.00 1.26
0.14 4.00 0.58
6.34
2. Pintu P1 2 unit
- Kusen UPCV uk. 58 mm 8.75 8.75 m1
Sb x 1.50 2.00 3.00
Sb y 2.65 2.00 5.30
0.45 1.00 0.45
8.75
- Daun Pintu Kaca Bingkai UPVC 2.1 0.70 2.00 2.94 2.94 m2
3. Pintu P2 4 unit
- Kusen UPCV uk. 58 mm 6.90 m1
Sb x 0.8 2 1.6
Sb y 2.65 2 5.3
6.90 6.90
4. Pintu P3 1 unit
- Kusen UPCV uk. 58 mm 6.80 6.80 m1
Sb x 1.50 1.00 1.50
Sb y 2.65 2.00 5.30
6.80
- Daun Pintu Kaca Bingkai UPVC 2.1 0.70 2.00 2.94 2.94 m2
- Daun Pintu Kaca Bingkai UPVC 2.1 0.70 2.00 2.94 2.94 Unit
- Engsel Pintu UPCV 2 2 4.00 4.00 bh
- Doorcloser 2.00 2.00 bh
- Handle Pintu 2.00 2.00 set
- Gerendel pjg=12 inchi 2.00 2.00 bh
- Kunci Tanam Tanpa Pegangan 1.00 1.00 bh
- Daun Pintu Kaca Bingkai UPVC 2.1 0.70 2.00 2.94 2.94 m
- Engsel Pintu UPCV 4.00 4.00 bh
- Doorcloser 2.00 2.00 bh
- Handle Pintu 2.00 2.00 set
- Gerendel pjg=12 inchi 2.00 2.00 bh
- Kunci Tanam Tanpa Pegangan 1.00 1.00 bh
- Daun Pintu Kaca Bingkai UPVC 2.1 0.80 1.00 1.68 1.68 m2
- Engsel Pintu UPCV 2.00 2.00 bh
- Doorcloser 1.00 1.00 bh
- Handle Pintu 1.00 1.00 set
- Kunci Tanam Tanpa Pegangan 1.00 1.00 bh
2.00
JENDELA
11. Jendela Type J1 2 unit
- Kusen UPVC uk. 58 mm 6.45 6.45 m1
Sb x 0.75 3.00 2.25
Sb y 2.10 2.00 4.20
6.45
- Kaca Polos 5 mm 1.06 m2
0.65 0.55 2.00 0.72
0.52 0.67 1.00 0.35
- Daun Pintu Kaca Bingkai UPVC 2.1 0.90 1.00 1.89 1.89 m2
- Rel pintu sleding 1.90 1.00 1.90 1.90 m1
- Daun Pintu Kaca Bingkai UPVC 2.1 0.90 1.00 1.89 1.89 m2
- Rel pintu sleding 1.90 1.00 1.90 1.90 m1
IV PEKERJAAN PLAFOND
1. Rangka Plafon Besi Furing Nerk Nikkei 176.89 m2
Plafon Dalam
Kiri 67.2
Kanan 49.4
KM Blkg 2.05 3 6.15
Pantry 2.67 1 2.67
Mushollah 4.98 1 4.98
Gudang 5.3 1 5.3
Wudhu 2.14 1 2.14
Gang KM 4.28 1 4.28
Gang Blkg 8.5 1 8.5
Gang 2m 26.27 1 26.27
176.89 176.89 176.89
X PEKERJAAN BESI
1 Handril Tangga Hollow 17.28
7 Handril Tangga SS dia 2' Disabilitas Ramp Akses Masuk 3.40 1 3.40 7.40 7.40 m
1.00 4 4.00
7.40
XI PEKERJAAN SALURAN DRAINASE GEDUNG
1 Galian Tanah 15.87 m3
Sb x 5.0 14.00 19.00
Sb y 22.8 21.67 44.47
Cross 0.0 - -
31.7 31.7 0.5 15.86625
E PEKERJAAN LANTAI 2
I PEKERJAAN STRUKTUR BETON BERTULANG
1 Kolom 25x30 b h
- Beton Cor F'c = 20 Mpa Untuk Kolom 6.12 m3 0.25 0.3
0.25 0.30 3.40 24.00 x - x - 6.12
- Pembesian Kolom 1,047.32 kg 0.2 0.25
Besi D 16 mm 16.00 1.58 3.65 6.00 24.00 - x - x - 829.52
Besi Behel Ø 8 mm 8.00 0.39 1.00 23.00 24.00 x - x - x - 217.80
- Bakesting Kolom 96.36 m2
3.65 1.10 24.00 x - x - 96.36
Bekisting 8.60 m2
15.35 0.18 2.00 5.53
15.35 0.20 3.07
- Bekisting 13.71 m2
3.65 3.30 12.05
13.90 0.12 1.67
- Begisting 21.62 m2
37.13 0.5 18.565
38.13 0.08 3.0504
7 Balok Level Atas Balkon
Sb x 6.00 b h
- Beton Cor F'c = 20 Mpa 0.24 m3 0.2 0.3
6.00 0.2 0.2 0.24 0.2
- Pembesian 51.71 kg
Besi D 13 mm 13.00 1.04 6.00 6.00 37.51 0.15 0.25
Besi Behel Ø 8 mm 8.00 0.39 0.90 40 14.20
- Begisting 2.48 m2
6.00 0.2 1.2
6.40 0.20 1.28
- Begisting 8.04 m2
6.00 1.2 7.2
8.40 0.10 0.84
6 Pemasangan Pipa Tegak PVC AW Ø 3" 26.36 1.00 30.8 26.36 26.36 m
IV PEKERJAAN PLAFOND
1 Rangka Plafon Besi Furing Merek Nikkei 176.89 176.89 m2
- Daun Pintu Kaca Bingkai UPVC 2.1 0.70 2.00 2.94 2.94 m2
2 Pintu P2 3 unit
- Kusen UPCV uk. 58 mm 6.90 m1
Sb x 0.8 2 1.6
Sb y 2.65 2 5.3
6.90 6.90
JENDELA
4 Jendela Type J1 2 Unit
- Kusen UPVC uk. 58 mm 6.45 6.45 m
Sb x 0.75 3.00 2.25
Sb y 2.10 2.00 4.20
6.45
- Kaca Polos 5 mm 1.06 m2
0.65 0.55 2.00 0.72
0.52 0.67 1.00 0.35
3 Dinding KM Keramik 30x60 cm Merek Platinium 5.05 1.8 2.00 18.18 18.18 m2
4 Lantai Keramik 30x30 cm Meja Pantry Merk Platinum 1.85 0.60 1.11 1.11 m2
IX PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Interior Dulux 246.63 m2
84.65 3.40 287.81
10.70 0.50 5.35
293.16
Peungrangan 46.53 246.63
- Bekisting 10.26 m2
4.20 2.00 8.4
12.40 0.15 1.86
5 Pembuatan Nama Tulisan BPS Stainlessteel Tampak Depan (Tinggi 120 mm) 38.00 38.00 bh
6 Pembuatan Nama Tulisan BPS Stainlessteel Dalam Bangunan (Tinggi 100 mm ) 38.00 2.00 76.00 76.00 bh
- Pek .Back Drop Dinding Lobby Lantai 2 3.20 2.65 8.48 8.48 m2
DATA TAMBAHAN
LANTAI 1
3 Kolom pedestal
PEKERJAAN KOLOM
DIMENSI Panjang PANJANG POTONGAN PANJANG TOTAL JUMLAH BJ VOLUME
D/P Selimut Beton JUMLAH TULANGAN
No LOKASI Panjang Lebar Bentang m' m' KOLOM kg/m BETON (m3) PEMBESIAN (kg) BEKISTING (m2) KETERANGAN
m m mm m m a b c d e f g=a+b+c+d+e+f h i j k=(g x h x i) x j
Tulangan Sengkang tumpuan 10 2 0.340 0.190 0.340 0.190 0.08 0.08 1.220 11 8.000 0.617 66.187 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 13 2 0.340 0.190 0.340 0.190 0.080 0.080 1.220 8 8.000 1.042 77.961 15 cm
TOTAL 1.600 655.953 13.800
2 250 x 300 a = Stek besi, Penanaman di sloof eksisting
Tulangan Utama 0.25 0.3 16 2 0.06 0.128 1.970 2.098 8 12.000 1.578 1.800 317.870 15.400 b = Tinggi Kolom bersih
overlap pondasi 16 0.640 0.640 8 12.000 1.578 96.967 c = Stek besi, Penanaman di hollow
overlap join 16 0.640 0.640 8 12.000 1.578 96.967
Bekisting masing-masing
2 sisi
Tulangan Sengkang tumpuan 10 2 0.240 0.190 0.240 0.190 0.08 0.08 1.020 11 12.000 0.617 83.006 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 2 0.240 0.190 0.240 0.190 0.080 0.080 1.020 8 12.000 0.617 57.852 15 cm
TOTAL 1.800 652.662 15.400
3 250 x 500 a = Stek besi, Penanaman di sloof eksisting
Tulangan Utama 0.25 0.5 16 2 0.06 0.128 1.970 2.098 16 10.000 1.578 2.500 529.784 21.000 b = Tinggi Kolom bersih
overlap pondasi 16 0.640 0.640 16 10.000 1.578 161.612 c = Stek besi, Penanaman di hollow
overlap join 16 0.640 0.640 16 10.000 1.578 161.612
Bekisting masing-masing
2 sisi
Tulangan Sengkang tumpuan 10 2 0.440 0.190 0.440 0.190 0.08 0.08 1.420 11 10.000 0.617 96.297 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 2 0.440 0.190 0.440 0.190 0.080 0.080 1.420 8 10.000 0.617 67.116 15 cm
TOTAL 2.500 1016.421 21.000
4 Sloof
sloof
DIMENSI Panjang PANJANG POTONGAN PANJANG TOTAL JUMLAH BJ VOLUME
D/P Selimut Beton JUMLAH TULANGAN
No LOKASI Panjang Lebar Bentang m' m' SLOOF kg/m BETON (m3) PEMBESIAN (kg) BEKISTING (m2) KETERANGAN
m m mm m m a b c d e f g=a+b+c+d+e+f h i j k=(g x h x i) x j
Tulangan Sengkang tumpuan 10 12 0.240 0.140 0.240 0.140 0.08 0.08 0.920 61 7.000 0.617 242.186 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 12 0.240 0.140 0.240 0.140 0.080 0.080 0.920 41 7.000 0.617 162.781 15 cm
2 200x300 a = Stek besi, Penanaman di sloof eksisting
AS A,D 1-7
Tulangan Utama 0.2 0.3 13 20.8 0.06 0.104 20.740 0.104 20.948 8 2.000 1.042 2.496 349.207 33.280 b = Tinggi Kolom bersih
overlap 13 0.520 0.520 8.000 2.000 1.042 8.668 Bekisting masing-masing
2 sisi
Tulangan Sengkang tumpuan 10 20.8 0.240 0.140 0.240 0.140 0.08 0.08 0.920 105 2.000 0.617 119.108 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 20.8 0.240 0.140 0.240 0.140 0.080 0.080 0.920 70 2.000 0.617 79.783 15 cm
3 200x300 a = Stek besi, Penanaman di sloof eksisting
AS B,C 1-7
Tulangan Utama 0.2 0.3 13 26.352 0.06 0.104 26.292 0.104 26.500 8 2.000 1.042 3.162 441.759 42.163 b = Tinggi Kolom bersih
overlap 2X 13 1.040 1.040 8.000 2.000 1.042 17.337 Bekisting masing-masing
2 sisi
Tulangan Sengkang tumpuan 10 26.352 0.240 0.140 0.240 0.140 0.08 0.08 0.920 133 2.000 0.617 150.598 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 26.352 0.240 0.140 0.240 0.140 0.080 0.080 0.920 89 2.000 0.617 100.777 15 cm
4 200x300 a = Stek besi, Penanaman di sloof eksisting
AS 1' B-C
Tulangan Utama 0.2 0.3 13 2 0.06 0.104 1.940 0.104 2.148 8 2.000 1.042 0.240 35.808 3.200 b = Tinggi Kolom bersih
2 sisi
Tulangan Sengkang tumpuan 10 2 0.240 0.140 0.240 0.140 0.08 0.08 0.920 11 2.000 0.617 12.478 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 2 0.240 0.140 0.240 0.140 0.080 0.080 0.920 8 2.000 0.617 8.697 15 cm
TOTAL 10.938 2437.967 133.843
5 Kolom Praktis
23 4 92 m
6 Kolom
PEKERJAAN KOLOM
DIMENSI Panjang PANJANG POTONGAN PANJANG TOTAL JUMLAH BJ VOLUME
D/P Bentang Selimut Beton JUMLAH TULANGAN KOLOM
No LOKASI Panjang Lebar m' m' kg/m BETON (m3) PEMBESIAN (kg) BEKISTING (m2) KETERANGAN
m m mm m m a b c d e f g=a+b+c+d+e+f h i j k=(g x h x i) x j
Tulangan Sengkang tumpuan 10 4 0.340 0.190 0.340 0.190 0.08 0.08 1.220 21 8.000 0.617 126.358 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 13 4 0.340 0.190 0.340 0.190 0.080 0.080 1.220 14 8.000 1.042 145.753 15 cm
TOTAL 3.200 1086.937 27.600
2 250 x 300 a = Stek besi, Penanaman di sloof eksisting
Tulangan Utama 0.25 0.3 16 4 0.06 0.128 3.970 4.098 8 12.000 1.578 3.600 620.892 30.800 b = Tinggi Kolom bersih
overlap pondasi 16 0.640 0.640 8 12.000 1.578 96.967 c = Stek besi, Penanaman di hollow
overlap join 16 0.640 0.640 8 12.000 1.578 96.967
Bekisting masing-masing
2 sisi
Tulangan Sengkang tumpuan 10 4 0.240 0.190 0.240 0.190 0.08 0.08 1.020 21 12.000 0.617 158.465 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 4 0.240 0.190 0.240 0.190 0.080 0.080 1.020 14 12.000 0.617 108.159 15 cm
TOTAL 3.600 1081.450 30.800
3 250 x 500 a = Stek besi, Penanaman di sloof eksisting
Tulangan Utama 0.25 0.5 16 4 0.06 0.128 3.970 4.098 16 10.000 1.578 5.000 1034.820 42.000 b = Tinggi Kolom bersih
overlap pondasi 16 0.640 0.640 16 10.000 1.578 161.612 c = Stek besi, Penanaman di hollow
overlap join 16 0.640 0.640 16 10.000 1.578 161.612
Bekisting masing-masing
2 sisi
Tulangan Sengkang tumpuan 10 4 0.440 0.190 0.440 0.190 0.08 0.08 1.420 21 10.000 0.617 183.840 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 4 0.440 0.190 0.440 0.190 0.080 0.080 1.420 14 10.000 0.617 125.478 15 cm
TOTAL 5.000 1667.363 42.000
7 tangga
Tulangan Sengkang 12 0.300 0.300 0.096 0.096 0.792 11 20.000 0.888 154.683
a
c
b
d
Tulangan Sengkang tumpuan 10 3.8 0.240 0.140 0.240 0.140 0.08 0.08 0.920 20 1.000 0.617 11.344 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 3.8 0.240 0.140 0.240 0.140 0.080 0.080 0.920 14 1.000 0.617 7.751 15 cm
TOTAL 0.228 52.002 3.800
3.4 10 34 M2
10 Plat beton jendela
J3
1 Tulangan Horizont 10 1.45 3.000 0.617 8.045 jarak antar tulangan
3.000 0.180 0.470 2.610 20 cm
2 Tulangan Vertikal 10 0.6 7.250 0.617 8.045
BV1
1 Tulangan Horizont 10 0.75 3.000 0.617 15.258 jarak antar tulangan
11.000 0.180 0.891 4.950 20 cm
2 Tulangan Vertikal 10 0.6 3.750 0.617 15.258
SUBTOTAL PEKERJAAN PLAT LANTAI 2.057 70.466 11.430
11 meja pantry
PEKERJAAN PLAT LANTAI
JUMLAH JUMLAH BJ VOLUME
D/P BENTANG TULANGA TEBAL PEMBESI BEKISTING
No LOKASI N PLAT kg/m BETON (m3) AN (kg) (m2) KETERANGAN
mm m i j h
J2
1 Tulangan Horizont 10 1.85 2.850 0.617 3.250 jarak antar tulangan
1.000 0.200 0.211 1.055 20 cm
2 Tulangan Vertikal 10 0.57 9.250 0.617 3.250
PINTU JENDELA
1 Pintu PWC
- Kusen UPCV uk. 58 mm 1.65 3.7 3.7 m'
2.05
3.7
5 skat folding
kusen upvc 2.9 12 34.8
0.85 12.00 10.2
kaca polos 2.9 0.6 6.00 45.00 m2
10.44
10.44 m2
1 PASANGAN DINDING
1 AS A
AS A 1-2 3.55 4 14.2
AS A 2-3 3.15 4 12.6
AS A 3-4 3.15 4 12.6
AS A 4-5 3.15 4 12.6
AS A 5-6 3.15 4 12.6
AS A 6-7 3.15 4 12.6
PENGURANGAN
J2 2.15 2.1 -2 -9.03
J3 1.45 2.1 -1 -3.045
BV1 0.75 0.65 -3 -1.4625
2 AS B
AS B 2-3 3.15 4 12.6
AS B 3-4 3.15 4 12.6
AS B 4-5 3.15 4 12.6
AS B 5-6 3.15 4 12.6
PENGURANGAN
J4 2.85 2.5 -2 -14.25
PJ2 1.5 3.1 -1 -4.65
1.65 2.8 -1 -4.62
3 AS C
AS C 2-3 3.15 4 12.6
AS C 3-4 3 4 12
AS C 4-5 3.15 4 12.6
AS C 5-6 0.48 4 1.92
AS C 6-7 2.15 4 8.6
PENGURANGAN
P2 0.9 2.5 -2 -4.5
BV2 1.55 0.65 -2 -2.015
4 AS D
AS D 1-2 3.4 4 13.6
AS D 2-3 3.15 4 12.6
AS D 3-4 3 4 12
AS D 4-5 3 4 12
AS D 5-6 2.85 4 11.4
AS D 6-7 3 4 12
PENGURANGAN
J2 2.15 2.1 -1 -4.515
J3 1.45 2.1 -2 -6.09
BV1 0.75 0.65 -4 -1.95
5 AS 1
AS 1 A-B 4.35 4 17.4
AS 1 B-C 1.75 4 7
AS 1 C-D 4.5 4 18
PENGURANGAN
J2 2.15 2.1 -2 -9.03
J1 0.75 2.1 -2 -3.15
PU 1.65 3 -1 -4.95
6 AS 2 4.7 4 18.8
AS 2 A-B 4.55 4 18.2
AS 2 C-D
PENGURANGAN
PJ 1 0.875 2.8 -2 -4.9
3.1 1.5 -1 -4.65
7 AS 3
PENGURANGAN 4.85 4 19.4
PK1 4.7 3.1 -1 -14.57
7 AS 4
AS 4 A-B 4.7 4 18.8
AS 4 C-D 4.85 4 19.4
8 AS 5
AS 5 B-C 1.85 4 7.4
3 4 12
PENGURANGAN
P1 1.4 1.95 -1 -2.73
9 AS 6
AS 6 A-B 4.55 4 18.2
AS 6 C-D 3 4 12
PENGURANGAN
P1 1.4 1.95 -1 -2.73
10 AS 7
AS 7 A-B 4.4 4 17.6
AS 7 B-C 1.85 4 7.4
AS 7 C-D 4.7 4 18.8
PENGURANGAN
BV 1 0.75 0.65 -4 -1.95
P1 1.4 1.95 -1 -2.73
2 PLASTERAN DIDING
878.5775 m2
PENGURANGAN
PJ3 0.85 3.1 -1 -2.635
0.5 2.8 -1 -1.4
18.465 M2
- Dinding Partisi Gypsum JAYA Board Tbl. 9 mm 18.465 m2
PEKERJAAN PLAFOND
1 RANGKA PLAFON
1 GRANIT 60X60
LOBBY HALL 33.4946298 1 33.4946298
R. KEPUSTAKAAN 31.0451048 1 31.0451048
KORIDOR 17.4128032 1 17.4128032
TATA USAHA 15.0623643 1 15.0623643
BENDAHARA 10.3212108 1 10.3212108
KA BADAN 20.3730637 1 20.3730637
R. KOMPUTER 27.8937967 1 27.8937967
R. SEVIS 2.34498307 1 2.34498307
MUSHOLA 7.92400405 1 7.92400405
LAKTASI 3.29203051 1 3.29203051
KORIDOR BLKNG 24.500647 1 24.500647
GUDANG 8.20926262 1 8.20926262
PANTRY 2.7999113 1 2.7999113
204.67381185 m2
2 KM KERAMIK
TOILET 1.77615164 3 15.9926807058729
T. DIFABEL 3.44166981 1 7.42069518037225
23.41337588625 m2
3 KM DINDING
TOILET 7.6 3.1 3 70.68
DIFABEL 8.44 3.1 1 26.164
PENGURANGAN
PWC 1 0.8 2.1 -3 -5.04
PWC 2 0.8 2.1 -1 -1.68
90.124 M2
4 MEJA KERAMIK 1.0175 1.0175
0.185 0.185
1.2025 M2
5 PANTRY DINDING 1.7 2.1 3.57
1.7 2.1 3.57
1.85 2.1 3.885
1.85 2.1 3.885
0.9 0.25 -1 -0.225
14.685 M2
6 TEMPAT WUDHU 1.25 2.1 1 2.625
0.85 2.1 1 1.785
0.85 2.1 1 1.785
1.25 0.2 2 0.5
1.25 0.1 1 0.125
6.82 M2
8 TANGGA 1.5 0.3 20 9
1.5 0.2 20 6
3.65 1.85 1 6.7525
18.7525 M2
9 STEP NOISING 1.5 0.1 20 3
3 M2
PEKERJAAN PENGECATAN
1 CAT INTERIOR
1 AS A
AS A 1-2 3.55 3.1 1 11.005
AS A 2-3 3.15 3.1 1 9.765
AS A 3-4 3.15 3.1 1 9.765
AS A 4-5 3.15 3.1 1 9.765
AS A 5-6 3.15 3.1 1 9.765
AS A 6-7 3.15 3.1 1 9.765
PENGURANGAN
J2 2.15 2.1 -2 -9.03
J3 1.45 2.1 -1 -3.045
BV1 0.75 0.65 -3 -1.4625
2 AS B
AS B 2-3 3.15 3.1 2 19.53
AS B 3-4 3.15 3.1 2 19.53
AS B 4-5 3.15 3.1 2 19.53
AS B 5-6 3.15 3.1 2 19.53
PENGURANGAN
J4 2.85 2.5 -2 -14.25
PJ2 1.5 3.1 -1 -4.65
1.65 2.8 -1 -4.62
3 AS C
AS C 2-3 3.15 3.1 2 19.53
AS C 3-4 3 3.1 2 18.6
AS C 4-5 3.15 3.1 2 19.53
AS C 5-6 0.48 3.1 2 2.976
AS C 6-7 2.15 3.1 2 13.33
PENGURANGAN
P2 0.9 2.5 -2 -4.5
BV2 1.55 0.65 -2 -2.015
4 AS D
AS D 1-2 3.4 3.1 1 10.54
AS D 2-3 3.15 3.1 1 9.765
AS D 3-4 3 3.1 1 9.3
AS D 4-5 3 3.1 1 9.3
AS D 5-6 2.85 3.1 1 8.835
AS D 6-7 3 3.1 1 9.3
PENGURANGAN
J2 2.15 2.1 -1 -4.515
J3 1.45 2.1 -2 -6.09
BV1 0.75 0.65 -4 -1.95
5 AS 1
AS 1 A-B 4.35 3.1 1 13.485
AS 1 B-C 1.75 3.1 1 5.425
AS 1 C-D 4.5 3.1 1 13.95
PENGURANGAN
J2 2.15 2.1 -2 -9.03
J1 0.75 2.1 -2 -3.15
PU 1.65 3 -1 -4.95
PENGURANGAN
PJ 1 0.875 2.8 -2 -4.9
3.1 1.5 -1 -4.65
7 AS 3
PENGURANGAN 4.85 3.1 2 30.07
PK1 4.7 3.1 -1 -14.57
7 AS 4
AS 4 A-B 4.7 3.1 2 29.14
AS 4 C-D 4.85 3.1 2 30.07
8 AS 5
AS 5 B-C 1.85 3.1 2 11.47
3 3.1 2 18.6
PENGURANGAN
P1 1.4 1.95 -1 -2.73
9 AS 6
AS 6 A-B 4.55 3.1 2 28.21
AS 6 C-D 3 3.1 2 18.6
PENGURANGAN
P1 1.4 1.95 -1 -2.73
10 AS 7
AS 7 A-B 4.4 3.1 1 13.64
AS 7 B-C 1.85 3.1 1 5.735
AS 7 C-D 4.7 3.1 1 14.57
PENGURANGAN
BV 1 0.75 0.65 -4 -1.95
P1 1.4 1.95 -1 -2.73
459.42175 m2
3 CAT EXTERIOR
1 AS A
AS A 1-2 3.55 4.5 1 15.975
AS A 2-3 3.15 4.5 1 14.175
AS A 3-4 3.15 4.5 1 14.175
AS A 4-5 3.15 4.5 1 14.175
AS A 5-6 3.15 4.5 1 14.175
AS A 6-7 3.15 4.5 1 14.175
PENGURANGAN
J2 2.15 2.1 -2 -9.03
J3 1.45 2.1 -1 -3.045
BV1 0.75 0.65 -3 -1.4625
4 AS D
AS D 1-2 3.4 4.5 1 15.3
AS D 2-3 3.15 4.5 1 14.175
AS D 3-4 3 4.5 1 13.5
AS D 4-5 3 4.5 1 13.5
AS D 5-6 2.85 4.5 1 12.825
AS D 6-7 3 4.5 1 13.5
PENGURANGAN
J2 2.15 2.1 -1 -4.515
J3 1.45 2.1 -2 -6.09
BV1 0.75 0.65 -4 -1.95
5 AS 1
AS 1 A-B 4.35 4.5 1 19.575
AS 1 B-C 1.75 4.5 1 7.875
AS 1 C-D 4.5 4.5 1 20.25
PENGURANGAN
J2 2.15 2.1 -2 -9.03
J1 0.75 2.1 -2 -3.15
PU 1.65 3 -1 -4.95
10 AS 7
AS 7 A-B 4.4 4.5 1 19.8
AS 7 B-C 1.85 4.5 1 8.325
AS 7 C-D 4.7 4.5 1 21.15
PENGURANGAN
BV 1 0.75 0.65 -4 -1.95
P1 1.4 1.95 -1 -2.73
218.7225 M2
LANTAI 2
1 KOLOM
PEKERJAAN KOLOM
DIMENSI Panjang PANJANG POTONGAN PANJANG TOTAL JUMLAH BJ VOLUME
D/P Selimut Beton JUMLAH TULANGAN
No LOKASI Panjang Lebar Bentang m' m' KOLOM kg/m BETON (m3) PEMBESIAN (kg) BEKISTING (m2) KETERANGAN
m m mm m m a b c d e f g=a+b+c+d+e+f h i j k=(g x h x i) x j
Tulangan Sengkang tumpuan 10 3.7 0.340 0.190 0.340 0.190 0.08 0.08 1.220 20 8.000 0.617 117.332 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 13 3.7 0.340 0.190 0.340 0.190 0.080 0.080 1.220 13 8.000 1.042 135.584 15 cm
TOTAL 2.960 1022.289 25.530
2 250 x 300 a = Stek besi, Penanaman di sloof eksisting
Tulangan Utama 0.25 0.3 16 3.7 0.06 0.128 3.670 3.798 8 12.000 1.578 3.330 575.439 28.490 b = Tinggi Kolom bersih
overlap pondasi 16 0.640 0.640 8 12.000 1.578 96.967 c = Stek besi, Penanaman di hollow
overlap join 16 0.640 0.640 8 12.000 1.578 96.967
Bekisting masing-masing
2 sisi
Tulangan Sengkang tumpuan 10 3.7 0.240 0.190 0.240 0.190 0.08 0.08 1.020 20 12.000 0.617 147.146 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 3.7 0.240 0.190 0.240 0.190 0.080 0.080 1.020 13 12.000 0.617 100.613 15 cm
TOTAL 3.330 1017.132 28.490
3 250 x 500 a = Stek besi, Penanaman di sloof eksisting
Tulangan Utama 0.25 0.5 16 3.7 0.06 0.128 3.670 3.798 16 10.000 1.578 4.625 959.065 38.850 b = Tinggi Kolom bersih
overlap pondasi 16 0.640 0.640 16 10.000 1.578 161.612 c = Stek besi, Penanaman di hollow
overlap join 16 0.640 0.640 16 10.000 1.578 161.612
Bekisting masing-masing
2 sisi
Tulangan Sengkang tumpuan 10 3.7 0.440 0.190 0.440 0.190 0.08 0.08 1.420 20 10.000 0.617 170.709 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 3.7 0.440 0.190 0.440 0.190 0.080 0.080 1.420 13 10.000 0.617 116.724 15 cm
TOTAL 4.625 1569.721 38.850
2 KOLOM PRAKTIS
3.7 10 37 M2
3 BALOK INDUK
sloof
DIMENSI Panjang PANJANG POTONGAN PANJANG TOTAL JUMLAH BJ VOLUME
D/P Bentang Selimut Beton JUMLAH TULANGAN SLOOF
No LOKASI Panjang Lebar m' m' kg/m BETON (m3) PEMBESIAN (kg) BEKISTING (m2) KETERANGAN
m m mm m m a b c d e f g=a+b+c+d+e+f h i j k=(g x h x i) x j
Tulangan Sengkang tumpuan 10 12 0.440 0.190 0.440 0.190 0.08 0.08 1.420 41 7.000 0.617 251.248 15 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 12 0.440 0.190 0.440 0.190 0.080 0.080 1.420 41 7.000 0.617 251.248 15 cm
AS A,D 1-7
Tulangan Utama 0.25 0.5 16 20.8 0.06 0.128 20.740 0.128 20.996 10 2.000 1.578 5.200 662.735 52.000 b = Tinggi Kolom bersih
Tulangan Utama 0.25 0.5 13 20.8 0.06 0.104 20.740 0.104 20.948 2 2.000 1.042 87.302 Bekisting masing-masing
OVERLAP 16 0.640 0.640 10.000 2.000 1.578 20.201 2 sisi
OVERLAP 13 0.520 0.520 2.000 2.000 1.042 2.167
Tulangan Sengkang tumpuan 10 20.8 0.440 0.190 0.440 0.190 0.08 0.08 1.420 70 2.000 0.617 123.144 15 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 20.8 0.440 0.190 0.440 0.190 0.080 0.080 1.420 70 2.000 0.617 123.144 15 cm
3 BALOK ANAK
sloof
DIMENSI Panjang PANJANG POTONGAN PANJANG TOTAL JUMLAH BJ VOLUME
D/P Bentang Selimut Beton JUMLAH TULANGAN SLOOF
No LOKASI Panjang Lebar m' m' kg/m BETON (m3) PEMBESIAN (kg) BEKISTING (m2) KETERANGAN
m m mm m m a b c d e f g=a+b+c+d+e+f h i j k=(g x h x i) x j
dak beton
1 200X300 a = Stek besi, Penanaman di sloof eksisting
A,B,C,D
Tulangan Utama 0.2 0.3 16 3.4 0.06 0.128 3.340 0.128 3.596 6 1.000 1.578 0.204 34.052 3.400 b = Tinggi Kolom bersih
Tulangan Utama 0.2 0.3 13 3.4 0.06 0.104 3.340 0.104 3.548 2 1.000 1.042 7.393 Bekisting masing-masing
2 sisi
Tulangan Sengkang tumpuan 10 3.4 0.240 0.140 0.240 0.140 0.08 0.08 0.920 18 1.000 0.617 10.209 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 3.4 0.240 0.140 0.240 0.140 0.080 0.080 0.920 18 1.000 0.617 10.209 10 cm
5 RING BALOK
RING BALOK
DIMENSI Panjang PANJANG POTONGAN PANJANG TOTAL JUMLAH BJ VOLUME
D/P Bentang Selimut Beton JUMLAH TULANGAN SLOOF
No LOKASI Panjang Lebar m' m' kg/m BETON (m3) PEMBESIAN (kg) BEKISTING (m2) KETERANGAN
m m mm m m a b c d e f g=a+b+c+d+e+f h i j k=(g x h x i) x j
1,2,3,4,5
Tulangan Utama 0.25 0.4 16 12 0.06 0.128 11.940 0.128 12.196 6 5.000 1.578 6.000 577.446 54.000 b = Tinggi Kolom bersih
Tulangan Utama 0.25 0.4 13 12 0.06 0.104 11.940 0.104 12.148 2 5.000 1.042 126.568 Bekisting masing-masing
2 sisi
Tulangan Sengkang tumpuan 10 12 0.340 0.190 0.340 0.190 0.08 0.08 1.220 41 5.000 0.617 154.187 15 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 12 0.340 0.190 0.340 0.190 0.080 0.080 1.220 41 5.000 0.617 154.187 15 cm
dak beton
Tulangan Utama 0.25 0.4 16 3.4 0.06 0.128 3.340 0.128 3.596 6 1.000 1.578 0.340 34.052 4.420 b = Tinggi Kolom bersih
Tulangan Utama 0.25 0.4 13 3.4 0.06 0.104 3.340 0.104 3.548 2 1.000 1.042 7.393 Bekisting masing-masing
2 sisi
Tulangan Sengkang tumpuan 10 3.4 0.340 0.190 0.340 0.190 0.08 0.08 1.220 12 1.000 0.617 9.276 15 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 3.4 0.340 0.190 0.340 0.190 0.080 0.080 1.220 12 1.000 0.617 9.276 15 cm
10.500 1783.215 102.100
BV2
1 Tulangan Horizont 10 1.55 3.000 0.617 2.867 jarak antar tulangan
1.000 0.180 0.167 0.930 20 cm
2 Tulangan Vertikal 10 0.6 7.750 0.617 2.867
BV1
1 Tulangan Horizont 10 0.75 3.000 0.617 8.323 jarak antar tulangan
6.000 0.180 0.486 2.700 20 cm
2 Tulangan Vertikal 10 0.6 3.750 0.617 8.323
SUBTOTAL PEKERJAAN PLAT LANTAI 2.063 70.651 11.460
PEKERJAAN PASANGAN,PLESTERAN DAN ACIAN
PENGURANGAN
KOLOM UTAMA 0.25 3.7 -2 -1.85
KOLOM P 0.15 3.7 -5 -2.775
J1 0.75 2.1 -2 -3.15
J2 2.15 2.1 -2 -9.03
J3 1.45 2.1 1 3.045
AS 2
AS 2 B-C 1.85 3.7 6.845
AS 2 C-D 4.7 3.7 17.39
PENGURANGAN
P1 1.4 2.5 -1 -3.5
P2 0.9 2.5 -1 -2.25
AS 5-6
AS 5 B-D 4.85 3.7 17.945
5 3.7 18.5
1 3.7 3.7
2.57 3.7 9.509
3.4 3.7 12.58
PENGURANGAN
P1 1.4 2.5 -1 -3.5
P2 0.9 2.5 -1 -2.25
PWC1 0.8 2.1 -2 -3.36
AS 6
AS 6 A-B 4.7 3.7 17.39
AS 6 -C-D 4.7 3.7 17.39
AS 7
AS 7 A-D 11.85 3.7
PENGURANGAN
BV1 0.75 0.65 -4 -1.95
KOLOM 0.3 3.7 -2 -2.22
AS A
AS A 1-7 20.55 3.7 76.035
PENGURANGAN
KOLOM 0.5 3.7 -5 -9.25
J3 1.45 2.1 -4 -12.18
BV2 1.55 0.65 -1 -1.0075
AS B
AS B 1-2 3.6 3.7 13.32
AS B 5-7 6.3 3.7 23.31
PENGURANGAN
P2 0.9 2.5 -1 -2.25
PENGURANGAN
KOLOM 0.25 3.7 -3 -2.775
P1 1.4 2.5 -1 -3.5
P2 0.9 2.5 -1 -2.25
PENGURANGAN
J3 1.45 2.1 -5 -15.225
BV1 0.75 0.65 -2 -0.975
322.7625 M2
645.525 m2
PEKERJAAN PLAFOND
PLAFON DAN RANGKA
1 R TUNGGU 23.9422145 1 23.9422145
R RAPAT AULA 50.3272828 1 50.3272828
R STAFF 101.22562 1 101.22562
TOILET 1.77558839 2 3.55117678
PANTRY 2.6174694 1 2.6174694
KORIDOR 14.9360446 1 14.9360446
R BERSAMA 14.9465029 1 14.9465029
R ARSIP 14.9475225 1 14.9475225
226.49383348 M2
PROFIL
1 R TUNGGU 23.9422145 1 19.5723128934728
R RAPAT AULA 50.3272828 1 28.3766898140005
R STAFF 101.22562 1 40.2443774954962
TOILET 1.77558839 2 10.6600964798636
PANTRY 2.6174694 1 6.47143804729675
KORIDOR 14.9360446 1 15.458871679395
R BERSAMA 14.9465029 1 15.4642829255029
R ARSIP 14.9475225 1 15.464810377111
151.7128797121 M2
PENGURANGAN
PWC 1 0.8 2.1 -2 -3.36
32.724 M2
Lantai Keramik 30x30 cm Meja Pantry Merk Platinum
1.85 0.55 1.0175
0.15 1.85 0.2775
Dinding Keramik 30x60 cm Meja Pantry Merek Platinium 1.295 m2
1.55 2.1 3.255
1.55 2.1 3.255
1.85 2.1 3.885
1.7 2.1 3.57 11.715 m2
0.9 2.5 -1 -2.25
PEKERJAAN PENGECATAN
1 INTERIOR
AS 1
AS 1 A-D 11.85 3.1 1 36.735
PENGURANGAN
KOLOM UTAMA 0.25 3.1 -2 -1.55
KOLOM P 0.15 3.1 -5 -2.325
J1 0.75 2.1 -2 -3.15
J2 2.15 2.1 -2 -9.03
J3 1.45 2.1 1 3.045
AS 2
AS 2 B-C 1.85 3.1 2 11.47
AS 2 C-D 4.7 3.1 2 29.14
PENGURANGAN
P1 1.4 2.5 -1 -3.5
P2 0.9 2.5 -1 -2.25
AS 5-6
AS 5 B-D 4.85 3.1 2 30.07
5 3.1 2 31
1 3.1 2 6.2
2.57 3.1 2 15.934
3.4 3.1 2 21.08
PENGURANGAN
P1 1.4 2.5 -1 -3.5
P2 0.9 2.5 -1 -2.25
PWC1 0.8 2.1 -2 -3.36
AS 6
AS 6 A-B 4.7 3.1 2 29.14
AS 6 -C-D 4.7 3.1 2 29.14
AS 7
AS 7 A-D 11.85 3.7 1 43.845
PENGURANGAN
BV1 0.75 0.65 -4 -1.95
KOLOM 0.3 3.7 -2 -2.22
AS A
AS A 1-7 20.55 3.1 1 63.705
PENGURANGAN
KOLOM 0.5 3.7 -5 -9.25
J3 1.45 2.1 -4 -12.18
BV2 1.55 0.65 -1 -1.0075
AS B
AS B 1-2 3.6 3.1 2 22.32
AS B 5-7 6.3 3.1 2 39.06
PENGURANGAN
P2 0.9 2.5 -1 -2.25
PENGURANGAN
KOLOM 0.25 3.7 -3 -2.775
P1 1.4 2.5 -1 -3.5
P2 0.9 2.5 -1 -2.25
PENGURANGAN
J3 1.45 2.1 -5 -15.225
BV1 0.75 0.65 -2 -0.975
432.3985 M2
EXTERIOR
AS 1
AS 1 A-D 11.85 3.1 1 36.735
PENGURANGAN
KOLOM UTAMA 0.25 3.1 -2 -1.55
KOLOM P 0.15 3.1 -5 -2.325
J1 0.75 2.1 -2 -3.15
J2 2.15 2.1 -2 -9.03
J3 1.45 2.1 1 3.045
AS 7
AS 7 A-D 11.85 3.7 1 43.845
PENGURANGAN
BV1 0.75 0.65 -4 -1.95
KOLOM 0.3 3.7 -2 -2.22
AS A
AS A 1-7 20.55 3.1 1 63.705
PENGURANGAN
KOLOM 0.5 3.7 -5 -9.25
J3 1.45 2.1 -4 -12.18
BV2 1.55 0.65 -1 -1.0075
PENGURANGAN
J3 1.45 2.1 -5 -15.225
BV1 0.75 0.65 -2 -0.975
152.1725 M2
POS SATPAM
Tulangan Sengkang tumpuan 10 2 0.240 0.140 0.240 0.140 0.08 0.08 0.920 11 4.000 0.617 24.956 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 2 0.240 0.140 0.240 0.140 0.080 0.080 0.920 8 4.000 0.617 17.394 15 cm
0.480 113.964 5.600
g pasangan bata
dinding 2 2 4 16
rolag 3 0.3 4 3.6
19.6
h Cor Lantai 3 3 0.15 1 1.35 1.35
i Wiremsh 3 3 9 9
j Kolom 2.75 4 11 11
j ring balok
sloof
DIMENSI Panjang PANJANG POTONGAN PANJANG TOTAL JUMLAH BJ VOLUME
D/P Selimut Beton JUMLAH TULANGAN
No LOKASI Panjang Lebar Bentang m' m' SLOOF kg/m BETON (m3) PEMBESIAN (kg) BEKISTING (m2) KETERANGAN
m m mm m m a b c d e f g=a+b+c+d+e+f h i j k=(g x h x i) x j
Tulangan Sengkang tumpuan 10 2 0.190 0.090 0.190 0.090 0.08 0.08 0.720 11 4.000 0.617 19.531 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 2 0.190 0.090 0.190 0.090 0.080 0.080 0.720 8 4.000 0.617 13.612 15 cm
0.300 104.758 4.600
RUMAH GENSET
A GALIAN TANAH 3.45 3.45 0.75 1 8.926875 8.926875
B URUGAN TANAH KEMBALI 8.471 8.470875
C PASIR URUG 0.65 0.65 0.05 4 0.0845 0.0845
D LANTAI KERJA 0.65 0.65 0.05 4 0.0845 0.0845
E PONDASI SETEMPAT
DIMENSI PANJANG POTONGAN PANJANG TOTAL JUMLAH BJ VOLUME
SELIMUT D/P JUMLAH TULANGAN
No LOKASI Panjang Lebar Tinggi m' m' PONDASI kg/m BETON (m3) PEMBESIAN (kg) BEKISTING (m2) KETERANGAN
m m m mm mm a b c d e f g=a+b+c+d+e+f h i j k=(g x h x i) x j
1 PEKERJAAN PILE CAP
a P1 jarak
Tulangan Bawah 0.6 0.6 0.15 0.06 13 0.540 0.090 0.540 0.090 0.104 0.104 1.468 6.00 4.000 1.042 36.708 10.00
0.216 1.440
Tulangan Atas 0.6 0.6 0.15 0.06 13 0.540 0.090 0.540 0.090 0.104 0.104 1.468 6.00 4.000 1.042 36.708 10.00
TOTAL 0.216 73.415 1.440
F KOLOM PEDESTAL
PEKERJAAN KOLOM
DIMENSI Panjang PANJANG POTONGAN PANJANG TOTAL JUMLAH BJ VOLUME
D/P Bentang Selimut Beton JUMLAH TULANGAN KOLOM
No LOKASI Panjang Lebar m' m' kg/m BETON (m3) PEMBESIAN (kg) BEKISTING (m2) KETERANGAN
m m mm m m a b c d e f g=a+b+c+d+e+f h i j k=(g x h x i) x j
Tulangan Sengkang tumpuan 10 0.6 0.340 0.190 0.340 0.190 0.08 0.08 1.220 4 4.000 0.617 12.034 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 13 0.6 0.340 0.190 0.340 0.190 0.080 0.080 1.220 3 4.000 1.042 15.253 15 cm
TOTAL 0.240 161.878 2.220
g sloof
sloof
DIMENSI Panjang PANJANG POTONGAN PANJANG TOTAL JUMLAH BJ VOLUME
D/P Bentang Selimut Beton JUMLAH TULANGAN SLOOF
No LOKASI Panjang Lebar m' m' kg/m BETON (m3) PEMBESIAN (kg) BEKISTING (m2) KETERANGAN
m m mm m m a b c d e f g=a+b+c+d+e+f h i j k=(g x h x i) x j
Tulangan Sengkang tumpuan 10 2.3 0.140 0.090 0.140 0.090 0.08 0.08 0.620 13 2.000 0.617 9.556 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 2.3 0.140 0.090 0.140 0.090 0.080 0.080 0.620 9 2.000 0.617 6.625 15 cm
Tulangan Utama 0.15 0.2 13 2.7 0.06 0.104 2.640 0.104 2.848 8 2.000 1.042 0.162 47.477 2.970 b = Tinggi Kolom bersih
Bekisting masing-masing
2 sisi
Tulangan Sengkang tumpuan 10 2.7 0.140 0.090 0.140 0.090 0.08 0.08 0.620 15 2.000 0.617 11.085 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 2.7 0.140 0.090 0.140 0.090 0.080 0.080 0.620 10 2.000 0.617 7.645 15 cm
Tulangan Sengkang tumpuan 10 2.3 0.140 0.090 0.140 0.090 0.08 0.08 0.620 13 2.000 0.617 9.556 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 2.3 0.140 0.090 0.140 0.090 0.080 0.080 0.620 9 2.000 0.617 6.625 15 cm
Tulangan Utama 0.15 0.2 13 2.7 0.06 0.104 2.640 0.104 2.848 8 2.000 1.042 0.162 47.477 2.970 b = Tinggi Kolom bersih
Bekisting masing-masing
2 sisi
Tulangan Sengkang tumpuan 10 2.7 0.140 0.090 0.140 0.090 0.08 0.08 0.620 15 2.000 0.617 11.085 10 jarak antar tulangan sengkang
Tulangan Sengkang lapanga 10 2.7 0.140 0.090 0.140 0.090 0.080 0.080 0.620 10 2.000 0.617 7.645 15 cm
Tulangan Sengkang 12 0.300 0.300 0.096 0.096 0.792 25 4.000 0.888 69.373
a
c b
d
PEKERJAAN PANGGUNG
Hollow 40x40 4.85 5 2 48.5
2 10 2 40
1.6 2 2 6.4
0.6 5 2 6
0.4 50 20
0.28 5 1.4
122.3 m
PONDASI TAPAK
PEKERJAAN PONDASI
DIMENSI PANJANG POTONGAN PANJANG TOTAL JUMLAH BJ VOLUME
SELIMUT D/P JUMLAH TULANGAN PONDASI
No LOKASI Panjang Lebar Tinggi m' m' kg/m BETON (m3) PEMBESIAN (kg) BEKISTING (m2) KETERANGAN
m m m mm mm a b c d e f g=a+b+c+d+e+f h i j k=(g x h x i) x j
1 PEKERJAAN PILE CAP
a P1 jarak
Tulangan Bawah X 1.2 0.9 0.5 0.06 16 0.500 0.500 1.140 0.128 0.128 2.396 9.00 40.000 1.578 1361.327 10.00
Tulangan Bawah Y 1.2 0.9 0.5 0.06 16 0.500 0.500 0.840 0.128 0.128 2.096 9.00 40.000 1.578 1190.877 10.00
Tulangan Atas X 1.2 0.9 0.5 0.06 13 1.140 0.104 0.104 1.348 9.00 40.000 1.042 21.600 505.606 96.000 10.00
Tulangan Atas Y 1.2 0.9 0.5 0.06 13 0.840 0.104 0.104 1.048 9.00 40.000 1.042 393.082 10.00
tbl
0.25
2.5
t
1.52
t
1.52
2.495
0.1
Kait
0.19
0.10
Kait
0.60
0.10
0.10
0.1
Kait
0.16
0.10
0.1
0.1
Lantai Keramik 60 x 60 cm
Lantai Keramik 30x30 cm Kamar Mandi
Lantai Keramik 30x30 cm Meja Pantri
Dinding Keramik 30x60 cm Kamar Mandi
Dinding Keramik 30x60 cm Meja Pantri
BADAN PUSAT STATISTIK
KOTA PEMATANGSIANTAR
Jl. PORSEA KEC. SIANTAR BARAT NOMOR PAKET
R E K A P I T U L A S I
RENCANA ANGGARAN BIAYA ( RAB ) 2
Konstruksi Fisik Pembangunan Baru Bangunan Gedung Kantor Permanen BPS Kota Pematang Siantar Tahun Anggaran 2023
B PENERAPAN SMKK -
C PEKERJAAN TANAH 11,730,180.86
D. PEKERJAAN LANTAI 1 231,115,616.93
E PEKERJAAN LANTAI 2 241,804,922.63
F PEKERJAAN DAN LAIN-LAIN 17,128,204.25
Terbilang :
566,300,000.00 =PROPER(IF(K21=0;"nol";IF(K21<0;"minus ";"")&SUBSTITUTE(TRIM(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(IF(--MID(TEXT(ABS(K21);"000000000000000");1;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");1;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");2;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");3;1)&" trilyun ")&IF(--MID(TEXT(ABS(K21);"000000000000000");4;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");4;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");5;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");6;1)&" milyar ")&IF(--MID(TEXT(ABS(K21);"000000000000000");7;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");7;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");8;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");9;1)&" juta ")&IF(--MID(TEXT(ABS(K21);"000000000000000");10;3)=0;"";IF(--MID(TEXT(ABS(K21);"000000000000000");10;3)=1;"*";MID(TEXT(ABS(K21);"000000000000000");10;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");11;1)&" puluh ")&MID(TEXT(ABS(K21);"000000000000000");12;1)&" ribu ")&IF(--MID(TEXT(ABS(K21);"000000000000000");13;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");13;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");14;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");15;1));1;"satu");2;"dua");3;"tiga");4;"empat");5;"lima");6;"enam");7;"tujuh");8;"delapan");9;"sembilan");"0 ratus";"");"0 puluh";"");"satu puluh 0";"sepuluh");"satu puluh satu";"sebelas");"satu puluh dua";"duabelas");"satu puluh tiga";"tigabelas")
28
);1;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");2;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");3;1)&" trilyun ")&IF(--MID(TEXT(ABS(K21);"000000000000000");4;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");4;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");5;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");6;1)&" milyar ")&IF(--MID(TEXT(ABS(K21);"000000000000000");7;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");7;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");8;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");9;1)&" juta ")&IF(--MID(TEXT(ABS(K21);"000000000000000");10;3)=0;"";IF(--MID(TEXT(ABS(K21);"000000000000000");10;3)=1;"*";MID(TEXT(ABS(K21);"000000000000000");10;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");11;1)&" puluh ")&MID(TEXT(ABS(K21);"000000000000000");12;1)&" ribu ")&IF(--MID(TEXT(ABS(K21);"000000000000000");13;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");13;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");14;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");15;1));1;"satu");2;"dua");3;"tiga");4;"empat");5;"lima");6;"enam");7;"tujuh");8;"delapan");9;"sembilan");"0 ratus";"");"0 puluh";"");"satu puluh 0";"sepuluh");"satu puluh satu";"sebelas");"satu puluh dua";"duabelas");"satu puluh tiga";"tigabelas");"satu puluh empat";"empatbelas");"satu puluh lima";"limabelas");"satu puluh enam";"enambelas");"satu puluh tujuh";"tujuhbelas");"satu puluh delapan";"delapanbelas");"satu puluh sembilan";"sembilanbelas");"satu ratus";"seratus");"*satu ribu";"seribu");0;""));" ";" "))&" Rupiah")
29
;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");13;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");14;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");15;1));1;"satu");2;"dua");3;"tiga");4;"empat");5;"lima");6;"enam");7;"tujuh");8;"delapan");9;"sembilan");"0 ratus";"");"0 puluh";"");"satu puluh 0";"sepuluh");"satu puluh satu";"sebelas");"satu puluh dua";"duabelas");"satu puluh tiga";"tigabelas");"satu puluh empat";"empatbelas");"satu puluh lima";"limabelas");"satu puluh enam";"enambelas");"satu puluh tujuh";"tujuhbelas");"satu puluh delapan";"delapanbelas");"satu puluh sembilan";"sembilanbelas");"satu ratus";"seratus");"*satu ribu";"seribu");0;""));" ";" "))&" Rupiah")
30
RENCANA ANGGARAN BIAYA
( RAB )
Satuan Kerja : BADAN PUSAT STATISTIK KOTA PEMATANGSIANTAR
Pekerjaan : Konstruksi Fisik Pembangunan Baru Bangunan Gedung Kantor Permanen BPS Kota Pematang Siantar Tahun Anggaran 2023
Lokasi : Jl. PORSEA KEC. SIANTAR BARAT
Kota : PEMATANGSIANTAR
Provinsi : SUMATERA UTARA
Sumber Dana : APBN TA. 2022
No. Uraian Pekerjaan Kode Analisa Volume Sat Harga Satuan (Rp.) Jumlah Harga (Rp.)
1 2 3 4 5 6 7
A PEKERJAAN PERSIAPAN
1. Pengukuran/ Pemasangan Bouwplank A.2.2.1.4 73.60 m 26,345.00 1,938,992.00
2. Pembuatan Gudang Bahan/ Material A.2.2.1.5 (a) 9.00 m2 - -
3. Pembuatan Jembatan Sementara A.2.2.1.12 10.00 m2 110,715.00 1,107,150.00
4. Pembuatan Pagar Sementara Dari Seng T= 2 meter A.2.2.1.2 68.00 m2 73,200.00 4,977,600.00
5. Pembersihan Awal dan Akhir A.2.2.1.22 1.00 ls - -
6. Kantor Direksi Keet A.2.2.1.21 10.00 m2 40,975.00 409,750.00
Sub Jumlah A 8,433,492.00
B PENERAPAN SMKK
1. Alat Pelindung Kerja dan Alat Pelindung Diri A. 2.3 1.00 set - -
2. Fasilitas Sarana, Prasarana dan Alat Kesehatan A. 2.6 1.00 ls - -
Sub Jumlah B -
C PEKERJAAN TANAH
1. Galian Tanah A.2.3.1.1 54.82 m3 86,075.00 4,718,464.73
2. Pasir Urug A.2.3.1.11 3.22 m3 34,430.00 110,712.68
3. Cor Lantai Kerja Mutu f'c 12,2 MPa A.4.1.1.3 3.02 m3 64,350.00 194,594.40
4. Timbunan Tanah Kembali A.2.3.1.9 27.25 m3 62,150.00 1,693,401.05
5. Urugan Tanah dengan Tanah Timbun A.2.3.1.15 145.60 m3 34,430.00 5,013,008.00
Sub Jumlah C 11,730,180.86
D. PEKERJAAN LANTAI 1
I PEKERJAAN PONDASI DAN STRUKTUR BETON BERTULANG
1. Pondasi Batu Padas camp. 1:4 A.3.2.1.2 5.29 m3 -
2. Pondasi Tapak 130.130.25 ( TP1)
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 10.14 m3 -
- Pembesian A.4.1.1.17 2,412.01 kg -
- Bekisting A.4.1.1.20 (a) 31.20 m2 -
3. Kolom Pedestal uk. 25 x 40 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 1.60 m3 -
- Pembesian A.4.1.1.17 655.95 kg -
- Bekisting A.4.1.1.22 (b) 13.80 m2 -
4. Kolom Pedestal uk. 25 x 30 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 1.80 m3 -
- Pembesian A.4.1.1.17 652.66 kg -
- Bekisting A.4.1.1.22 (b) 15.40 m2 -
5. Kolom Pedestal uk. 25 x 50 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 2.50 m3 -
- Pembesian A.4.1.1.17 1,016.42 kg -
- Bekisting A.4.1.1.22 (b) 21.00 m2 -
6. Sloof uk. 20 x 30 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 10.94 m3 -
- Pembesian A.4.1.1.17 2,437.97 kg -
- Bekisting A.4.1.1.21 (b) 133.84 m2 98,956.00 13,244,587.70
7. Kolom uk. 25 x 40 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 3.20 m3 64,350.00 205,920.00
- Pembesian A.4.1.1.17 1,086.94 kg 1,851.30 2,012,246.43
- Bekisting A.4.1.1.22 (b) 27.60 m2 125,598.00 3,466,504.80
8. Kolom uk. 25 x 30 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 3.60 m3 64,350.00 231,660.00
- Pembesian A.4.1.1.17 1,081.45 kg 1,851.30 2,002,088.93
- Bekisting A.4.1.1.22 (b) 30.80 m2 125,598.00 3,868,418.40
9. Kolom uk. 25 x 50 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 5.00 m3 64,350.00 321,750.00
- Pembesian A.4.1.1.17 1,667.36 kg 1,851.30 3,086,788.30
- Bekisting A.4.1.1.22 (b) 42.00 m2 125,598.00 5,275,116.00
10. Kolom Praktis 13x13 Elv A.4.1.1.35 92.00 m 29,865.00 2,747,580.00
11. Struktur Tanga Beton
a Galian Tanah Pondasi A.2.3.1.1 0.52 m3 86,075.00 44,866.59
b Pondasi
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 0.29 m3 64,350.00 18,420.19
- Pembesian A.4.1.1.17 42.94 kg 1,851.30 79,490.19
c Balok Bordes uk. 20x30 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 0.23 m3 64,350.00 14,671.80
- Pembesian A.4.1.1.17 52.00 kg 1,851.30 96,271.22
- Bakesting A.4.1.1.23 (a) 3.80 m2 125,598.00 477,272.40
d Struktur Tangga
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 2.98 m3 64,350.00 191,647.49
- Pembesian A.4.1.1.17 309.61 kg 1,851.30 573,179.62
- Bakesting A.4.1.1.24 26.81 m2 125,598.00 3,366,968.39
12. Balok Lintei Di Atas Jendela A.4.1.1.36 34.00 m 49,313.00 1,676,642.00
13. Plat Beton T.8 ( Level Jendela )
2
No. Uraian Pekerjaan Kode Analisa Volume Sat Harga Satuan (Rp.) Jumlah Harga (Rp.)
3
No. Uraian Pekerjaan Kode Analisa Volume Sat Harga Satuan (Rp.) Jumlah Harga (Rp.)
JENDELA
9. Jendela Type J1 1 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 6.45 m 11,321.20 73,021.74
- Kaca Polos 5 mm A.4.6.2.17 (a) 1.06 m2 23,709.40 25,212.58
10. Jendela Type J1' 1 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 6.45 m 11,321.20 73,021.74
- Kaca Polos 5 mm A.4.6.2.17 (a) 1.07 m2 23,709.40 25,428.33
10. Jendela Type J2 4 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 68.00 m 11,321.20 769,841.60
- Kaca Polos 5 mm A.4.6.2.17 (a) 17.61 m2 23,709.40 417,456.15
- Daun Jendela Kaca Bingkai UPVC A.4.2.1.13 1.81 m2 22,572.00 40,864.15
- Engsel Casement A.4.6.2.5b 16.00 bh 23,709.40 379,350.40
- Handle Rambuncis A.4.6.2.6b 8.00 bh 23,709.40 189,675.20
11. Jendela Type J2' 1 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 17.00 m 11,321.20 192,460.40
- Kaca Polos 5 mm A.4.6.2.17 (a) 3.71 m2 23,709.40 87,843.33
11. Jendela Type J3 3 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 31.95 m 11,321.20 361,712.34
- Kaca Polos 5 mm A.4.6.2.17 (a) 6.38 m2 23,709.40 151,275.46
- Daun Jendela Kaca Bingkai UPVC A.4.2.1.13 3.12 m2 22,572.00 70,424.64
- Engsel Casement A.4.6.2.5b 12.00 bh 23,709.40 284,512.80
- Handle Rambuncis A.4.6.2.6b 6.00 bh 23,709.40 142,256.40
12. Jendela Type J4 2 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 34.08 m 11,321.20 385,826.50
- Kaca Polos 5 mm A.4.6.2.17 (a) 9.07 m2 23,709.40 215,091.68
13. Jendela Type J5 1 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 18.90 m 11,321.20 213,970.68
- Kaca Polos 5 mm A.4.6.2.17 (a) 6.16 m2 23,709.40 145,955.07
14. Ventilasi BV1 11 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 30.80 m 11,321.20 348,692.96
- Kaca Polos 5 mm A.4.6.2.17 (a) 4.95 m2 23,709.40 117,361.53
15. Ventilasi BV2 2 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 10.10 m 11,321.20 114,344.12
- Kaca Polos 5 mm A.4.6.2.17 (a) 0.96 m2 23,709.40 22,704.12
- Daun Jendela Kaca Bingkai UPVC A.4.2.1.13 1.54 m2 22,572.00 34,760.88
- Engsel Casement A.4.6.2.5b 8.00 bh 23,709.40 189,675.20
- Handle Rambuncis A.4.6.2.6b 4.00 bh 23,709.40 94,837.60
16. Sekat Pintu Kaca (PK1) 1 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 31.80 m 11,321.20 360,014.16
- Kaca Polos 5 mm A.4.6.2.17 (a) 12.69 m2 23,709.40 300,872.29
- Daun Pintu Kaca Bingkai UPVC A.4.2.1.13 1.89 m2 22,572.00 42,661.08
- Rel pintu sleding A.4.6.2.14 1.90 m 99,118.50 188,325.15
- Kunci sliding UPCV + Handle A.4.6.2.2d 1.00 bh 23,709.40 23,709.40
17. Sekat Pintu Kaca (PK2) 1 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 19.75 m 11,321.20 223,593.70
- Kaca Polos 5 mm A.4.6.2.17 (a) 7.38 m2 23,709.40 174,856.83
- Daun Pintu Kaca Bingkai UPVC A.4.2.1.13 1.89 m2 22,572.00 42,661.08
- Rel pintu sleding A.4.6.2.14 1.90 m 99,118.50 188,325.15
- Kunci sliding UPCV + Handle A.4.6.2.2d 1.00 bh 23,709.40 23,709.40
Sub Jumlah III 13,784,112.33
IV PEKERJAAN PLAFOND
1. Rangka Plafon Besi Furing Nerk Nikkei A.4.2.1.21 (a) 240.42 m2 65,934.00 15,851,575.01
2. Plafond PVC 8 mm Merk Legos Putih A.4.5.1.13 240.42 m2 52,690.00 12,667,508.22
3. Profil PVC A.4.5.1.11 236.47 m 13,244.00 3,131,766.26
Sub Jumlah IV 31,650,849.49
V PEKERJAAN FINISHING LANTAI DAN DINDING
1. Lantai Granit 60 x 60 cm Merk Imperial A.4.4.3.9 (a) 204.67 m2 45,672.00 9,347,862.33
2. Lantai KM Keramik 30x30 cm Merk Platinum A.4.4.3.35 23.41 m2 139,265.00 3,260,663.79
3. Dinding KM Keramik 30x60 cm A.4.4.3.54 (d) 90.12 m2 171,270.00 15,435,537.48
4. Lantai Keramik 30x30 cm Meja Pantry Merk Platinum A.4.4.3.35 1.20 m2 139,265.00 167,466.16
5. Dinding Keramik 30x60 cm Meja Pantry Merek Platinium A.4.4.3.54 (d) 2.78 m2 171,270.00 475,274.25
6. Lantai Keramik 30x30 cm Tempat Wudhu A.4.4.3.35 6.82 m2 139,265.00 949,787.30
7. Dinding Granit Polish 60x60 cm Untuk Depan A.4.4.3.55 18.40 m2 47,718.00 878,011.20
8. Lantai Granit 60 x 60 cm Tangga Merk Imperial A.4.4.3.9 (a) 18.75 m2 45,672.00 856,464.18
9. Pasang Step nosing 10x60 Merk Imperial A.4.4.3.39 3.00 m2 20,185.00 60,555.00
31,431,621.70
VI PEKERJAAN LISTRIK/ ELEKTRIKAL
1. Biaya Sambungan Listrik PLN Kap. 23.000 VA
- Biaya Penyambungan ls 1.00 ls - -
- Yuran ls 1.00 ls - -
- SLO ls 1.00 ls - -
- Jasa Pengurusan Perizinan ls 1.00 ls - -
2. Panel Listrik 3 Phase Lantai 1 (Sesuai dengan wireng diagram) Dihitung 1.00 unit - -
3. Pemasangan 1 m' jalur instalasi utama (kabel NYM 3 x 2,5 mm2) A.6.1.1.4 51.00 m 4,840.00 246,840.00
5. Stop Kontak Ganda Panasonic A.6.1.1.12a 26.00 bh 24,200.00 629,200.00
6. Stop Kontak AC Panasonic A.6.1.1.12 6.00 bh 24,200.00 145,200.00
9. Lampu LED Panel Outbow 12Watt Hannoch A.6.1.1.24 94.00 bh 9,680.00 909,920.00
13. Saklar Ganda Tanam Panasonic A.6.1.1.10 10.00 bh 30,250.00 302,500.00
4
No. Uraian Pekerjaan Kode Analisa Volume Sat Harga Satuan (Rp.) Jumlah Harga (Rp.)
5
No. Uraian Pekerjaan Kode Analisa Volume Sat Harga Satuan (Rp.) Jumlah Harga (Rp.)
JENDELA
4. Jendela Type J1 2 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 12.90 m 11,321.20 146,043.48
- Kaca Polos 5 mm A.4.6.2.17 (a) 2.13 m2 23,709.40 50,425.15
5. Jendela Type J2 2 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 34.00 m 11,321.20 384,920.80
- Kaca Polos 5 mm A.4.6.2.17 (a) 8.80 m2 23,709.40 208,728.07
6
No. Uraian Pekerjaan Kode Analisa Volume Sat Harga Satuan (Rp.) Jumlah Harga (Rp.)
Sub Jumlah XI -
XI PEKERJAAN CCTV
1. Instalasi Fix Dome Camera A.8.1.1.5 titik -
2. Fix Dome Camera A.8.1.1.6 bh -
Sub Jumlah XI -
Sub Jumlah E 241,804,922.63
F PEKERJAAN DAN LAIN-LAIN
1. Pekerjaan Plat Duiker
a Galian Tanah A.2.3.1.1 1.89 m3 86,075.00 162,681.75
b Pasangan Batu Padas Camp. 1:4 A.3.2.1.2 5.25 m3 285,450.00 1,498,612.50
c Plesteran Dinding Camp. 1 : 4 A.4.4.2.4 10.08 m2 43,890.00 442,411.20
d Balok Duiker
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 0.48 m3 64,350.00 30,888.00
- Pembesian A.4.1.1.17 106.58 kg 1,851.30 197,312.52
- Bekisting A.4.1.1.23 (a) 4.80 m2 125,598.00 602,870.40
e Plat Beton Duiker
7
No. Uraian Pekerjaan Kode Analisa Volume Sat Harga Satuan (Rp.) Jumlah Harga (Rp.)
510,212,416.67
TOTAL
8
BADAN PUSAT STATISTIK
KOTA PEMATANGSIANTAR
Jln. Sisingamangaraja kelurahan Bukit Sofa Kecamatan Siantar Sitalasari Kota Pematang Siantar - Pematang Siantar (Kota)
NOMOR PAKET
A JUMLAH HARGA PEKERJAAN (TERMASUK KEU 1,961,741,970.25 246,885,025.72 23,217,506.71 1,738,074,451.24 246,885,025.72 19,617,419.70 137,321,937.92
B PAJAK PERTAMBAHAN NILAI (PPN) = 11 % X (A 215,791,616.73 27,157,352.83 2,553,925.74 191,188,189.64 27,157,352.83
C JUMLAH HARGA PEKERJAAN = (A) + (B) 2,177,533,586.98 274,042,378.55 25,771,432.45 1,929,262,640.88 274,042,378.55
D DIBULATKAN 2,177,500,000.00 274,000,000.00 25,800,000.00 1,929,300,000.00 274,000,000.00 2,742,200,000.00
Terbilang :
0.7940827 2,177,500,000.00 =PROPER(IF(K21=0;"nol";IF(K21<0;"minus ";"")&SUBSTITUTE(TRIM(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(SUBSTITUTE(IF(--MID(TEXT(ABS(K21);"000000000000000");1;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");1;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");2;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");3;1)&" trilyun ")&IF(--MID(TEXT(ABS(K21);"000000000000000");4;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");4;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");5;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");6;1)&" milyar ")&IF(--MID(TEXT(ABS(K21);"000000000000000");7;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");7;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");8;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");9;1)&" juta ")&IF(--MID(TEXT(ABS(K21);"000000000000000");10;3)=0;"";IF(--MID(TEXT(ABS(K21);"000000000000000");10;3)=1;"*";MID(TEXT(ABS(K21);"000000000000000");10;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");11;1)&" puluh ")&MID(TEXT(ABS(K21);"000000000000000");12;1)&" ribu ")&IF(--MID(TEXT(ABS(K21);"000000000000000");13;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");13;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");14;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");15;1));1;"satu");2;"dua");3;"tiga");4;"empat");5;"lima");6;"enam");7;"tujuh");8;"delapan");9;"sembilan");"0 ratus";"");"0 puluh";"");"satu puluh 0";"sepuluh");"satu puluh satu";"sebe
9
ABS(K21);"000000000000000");1;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");2;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");3;1)&" trilyun ")&IF(--MID(TEXT(ABS(K21);"000000000000000");4;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");4;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");5;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");6;1)&" milyar ")&IF(--MID(TEXT(ABS(K21);"000000000000000");7;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");7;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");8;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");9;1)&" juta ")&IF(--MID(TEXT(ABS(K21);"000000000000000");10;3)=0;"";IF(--MID(TEXT(ABS(K21);"000000000000000");10;3)=1;"*";MID(TEXT(ABS(K21);"000000000000000");10;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");11;1)&" puluh ")&MID(TEXT(ABS(K21);"000000000000000");12;1)&" ribu ")&IF(--MID(TEXT(ABS(K21);"000000000000000");13;3)=0;"";MID(TEXT(ABS(K21);"000000000000000");13;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");14;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");15;1));1;"satu");2;"dua");3;"tiga");4;"empat");5;"lima");6;"enam");7;"tujuh");8;"delapan");9;"sembilan");"0 ratus";"");"0 puluh";"");"satu puluh 0";"sepuluh");"satu puluh satu";"sebelas");"satu puluh dua";"duabelas");"satu puluh tiga";"tigabelas");"satu puluh empat";"empatbelas");"satu puluh lima";"limabelas");"satu puluh enam";"enambelas");"satu puluh tujuh";"tujuhbelas");"satu puluh delapan";"delapanbelas");"satu puluh sembilan";"sembilanbelas");"satu ratus";"seratus");"*satu ribu";"seribu");0;""));" ";" "))&" Rupiah")
10
";MID(TEXT(ABS(K21);"000000000000000");13;1)&" ratus "&MID(TEXT(ABS(K21);"000000000000000");14;1)&" puluh "&MID(TEXT(ABS(K21);"000000000000000");15;1));1;"satu");2;"dua");3;"tiga");4;"empat");5;"lima");6;"enam");7;"tujuh");8;"delapan");9;"sembilan");"0 ratus";"");"0 puluh";"");"satu puluh 0";"sepuluh");"satu puluh satu";"sebelas");"satu puluh dua";"duabelas");"satu puluh tiga";"tigabelas");"satu puluh empat";"empatbelas");"satu puluh lima";"limabelas");"satu puluh enam";"enambelas");"satu puluh tujuh";"tujuhbelas");"satu puluh delapan";"delapanbelas");"satu puluh sembilan";"sembilanbelas");"satu ratus";"seratus");"*satu ribu";"seribu");0;""));" ";" "))&" Rupiah")
11
MUTHUAL CHECK (MC-0)
2
A PEKERJAAN PERSIAPAN
1. Pengukuran/ Pemasangan Bouwplank A.2.2.1.4 73.60 m 44,574.70 3,280,697.92 73.60 m 3,280,697.92 - - - - 73.60 m 3,280,697.92
2. Pembuatan Gudang Bahan/ Material A.2.2.1.5 (a) 9.00 m2 715,000.00 6,435,000.00 9.00 m2 6,435,000.00 - - - - 9.00 m2 6,435,000.00
3. Pembuatan Jembatan Sementara A.2.2.1.12 10.00 m2 120,310.13 1,203,101.30 10.00 m2 1,203,101.30 - - - - 10.00 m2 1,203,101.30
4. Pembuatan Pagar Sementara Dari Seng T= 2 meter A.2.2.1.2 68.00 m2 264,530.50 17,988,074.00 140.00 m2 37,034,270.00 72.00 19,046,196.00 - - 140.00 m2 37,034,270.00
5. Pembersihan Awal dan Akhir A.2.2.1.22 1.00 ls 4,959,576.47 4,959,576.47 1.00 ls 4,959,576.47 - - - - 1.00 ls 4,959,576.47
6. Kantor Direksi Keet A.2.2.1.21 10.00 m2 108,016.15 1,080,161.50 10.00 m2 1,080,161.50 - - - - 10.00 m2 1,080,161.50
Sub Jumlah A 34,946,611.19 53,992,807.19 19,046,196.00 - 53,992,807.19
B PENERAPAN SMKK
1. Alat Pelindung Kerja dan Alat Pelindung Diri A. 2.3 1.00 set 5,226,000.00 5,226,000.00 1.00 set 5,226,000.00 - - - - 1.00 set 5,226,000.00
2. Fasilitas Sarana, Prasarana dan Alat Kesehatan A. 2.6 1.00 ls 2,500,000.00 2,500,000.00 1.00 ls 2,500,000.00 - - - - 1.00 ls 2,500,000.00
Sub Jumlah B 7,726,000.00 7,726,000.00 - - 7,726,000.00
C PEKERJAAN TANAH
1. Galian Tanah A.2.3.1.1 45.22 m3 78,289.13 3,540,082.77 45.22 m3 3,540,082.77 - - - - 45.22 m3 3,540,082.77
2. Pasir Urug A.2.3.1.11 2.78 m3 133,366.65 371,237.74 2.78 m3 371,237.74 - - - - 2.78 m3 371,237.74
3. Cor Lantai Kerja Mutu f'c 12,2 MPa A.4.1.1.3 2.42 m3 919,329.44 2,224,041.78 2.42 m3 2,224,041.78 - - - - 2.42 m3 2,224,041.78
4. Timbunan Tanah Kembali A.2.3.1.9 20.18 m3 56,528.25 1,140,954.89 15.07 m3 852,032.65 - - 5.11 288,922.25 15.07 m3 852,032.65
5. Urugan Tanah dengan Tanah Timbun A.2.3.1.15 145.60 m3 31,315.65 4,559,558.64 145.60 m3 4,559,558.64 - - - - 145.60 m3 4,559,558.64
Sub Jumlah C 11,835,875.83 11,546,953.58 - 288,922.25 - 11,546,953.58
D. PEKERJAAN LANTAI 1 -
I PEKERJAAN PONDASI DAN STRUKTUR BETON BERTULANG -
1. Pondasi Batu Padas camp. 1:4 A.3.2.1.2 5.29 m3 649,624.65 3,437,472.59 5.29 m3 3,437,472.59 - - - - 5.29 m3 3,437,472.59
2. Pondasi Tapak 130.130.25 ( TP1)
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 8.64 m3 1,044,341.91 9,023,114.10 8.11 m3 8,471,701.57 - - 0.53 551,412.53 8.11 m3 8,471,701.57
- Pembesian A.4.1.1.17 2,076.44 kg 11,468.73 23,814,073.86 2,412.01 kg 27,662,639.27 335.57 3,848,565.41 - - 2,412.01 kg 27,662,639.27
- Bekisting A.4.1.1.20 (a) 28.80 m2 134,477.21 3,872,943.65 31.20 m2 4,195,688.95 2.40 322,745.30 - - 31.20 m2 4,195,688.95
3. Kolom Pedestal uk. 25 x 40 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 1.60 m3 1,044,341.91 1,670,947.06 m3 - - - 1.60 1,670,947.06 - m3 -
- Pembesian A.4.1.1.17 655.95 kg 11,468.73 7,522,942.28 kg - - - 655.95 7,522,942.28 - kg -
- Bekisting A.4.1.1.22 (b) 13.80 m2 189,525.06 2,615,445.83 m2 - - - 13.80 2,615,445.83 - m2 -
4. Kolom Pedestal uk. 25 x 30 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 1.80 m3 1,044,341.91 1,879,815.44 m3 - - - 1.80 1,879,815.44 - m3 -
- Pembesian A.4.1.1.17 652.66 kg 11,468.73 7,485,206.70 kg - - - 652.66 7,485,206.70 - kg -
- Bekisting A.4.1.1.22 (b) 15.40 m2 189,525.06 2,918,685.92 m2 - - - 15.40 2,918,685.92 - m2 -
5. Kolom Pedestal uk. 25 x 50 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 2.50 m3 1,044,341.91 2,610,854.78 m3 - - - 2.50 2,610,854.78 - m3 -
- Pembesian A.4.1.1.17 1,016.42 kg 11,468.73 11,657,055.21 kg - - - 1,016.42 11,657,055.21 - kg -
- Bekisting A.4.1.1.22 (b) 21.00 m2 189,525.06 3,980,026.26 m2 - - - 21.00 3,980,026.26 - m2 -
6. Sloof uk. 20 x 30 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 10.94 m3 1,044,341.91 11,423,262.45 m3 - - - 10.94 11,423,262.45 - m3 -
- Pembesian A.4.1.1.17 2,437.97 kg 11,468.73 27,960,386.46 kg - - - 2,437.97 27,960,386.46 - kg -
- Bekisting A.4.1.1.21 (b) 133.84 m2 125,022.48 16,733,408.80 m2 - - - 133.84 16,733,408.80 - m2 -
7. Kolom uk. 25 x 40 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 3.20 m3 1,044,341.91 3,341,894.11 m3 - - - 3.20 3,341,894.11 - m3 -
- Pembesian A.4.1.1.17 1,086.94 kg 11,468.73 12,465,786.74 kg - - - 1,086.94 12,465,786.74 - kg -
- Bekisting A.4.1.1.22 (b) 27.60 m2 189,525.06 5,230,891.66 m2 - - - 27.60 5,230,891.66 - m2 -
8. Kolom uk. 25 x 30 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 3.60 m3 1,044,341.91 3,759,630.88 m3 - - - 3.60 3,759,630.88 - m3 -
- Pembesian A.4.1.1.17 1,081.45 kg 11,468.73 12,402,861.42 kg - - - 1,081.45 12,402,861.42 - kg -
- Bekisting A.4.1.1.22 (b) 30.80 m2 189,525.06 5,837,371.85 m2 - - - 30.80 5,837,371.85 - m2 -
9. Kolom uk. 25 x 50 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 5.00 m3 1,044,341.91 5,221,709.55 m3 - - - 5.00 5,221,709.55 - m3 -
- Pembesian A.4.1.1.17 1,667.36 kg 11,468.73 19,122,530.96 kg - - - 1,667.36 19,122,530.96 - kg -
- Bekisting A.4.1.1.22 (b) 42.00 m2 189,525.06 7,960,052.52 m2 - - - 42.00 7,960,052.52 - m2 -
10. Kolom Praktis 13x13 Elv A.4.1.1.35 92.00 m 75,837.90 6,977,086.80 m - - - 92.00 6,977,086.80 - m -
11. Struktur Tanga Beton
a Galian Tanah Pondasi A.2.3.1.1 0.52 m3 78,289.13 40,808.21 m3 - - - 0.52 40,808.21 - m3 -
b Pondasi
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 0.29 m3 1,044,341.91 298,942.87 m3 - - - 0.29 298,942.87 - m3 -
- Pembesian A.4.1.1.17 42.94 kg 11,468.73 492,438.59 kg - - - 42.94 492,438.59 - kg -
c Balok Bordes uk. 20x30 cm
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 0.23 m3 1,044,341.91 238,109.96 m3 - - - 0.23 238,109.96 - m3 -
- Pembesian A.4.1.1.17 52.00 kg 11,468.73 596,396.39 kg - - - 52.00 596,396.39 - kg -
- Bakesting A.4.1.1.23 (a) 3.80 m2 170,245.33 646,932.25 m2 - - - 3.80 646,932.25 - m2 -
d Struktur Tangga
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 2.98 m3 1,044,341.91 3,110,264.27 m3 - - - 2.98 3,110,264.27 - m3 -
- Pembesian A.4.1.1.17 309.61 kg 11,468.73 3,550,825.00 kg - - - 309.61 3,550,825.00 - kg -
- Bakesting A.4.1.1.24 26.81 m2 420,941.37 11,284,385.78 m2 - - - 26.81 11,284,385.78 - m2 -
12. Balok Lintei Di Atas Jendela A.4.1.1.36 34.00 m' 95,907.93 3,260,869.62 m' - - - 34.00 3,260,869.62 - m' -
13. Plat Beton T.8 ( Level Jendela )
- Beton Cor F'c = 16,9 Mpa A.4.1.1.6 2.06 m3 926,473.01 1,906,125.57 m3 - - - 2.06 1,906,125.57 - m3 -
- Pembesian A.4.1.1.17 70.47 kg 11,468.73 808,154.95 kg - - - 70.47 808,154.95 - kg -
- Bekesting A.4.1.1.26 11.43 m2 262,562.22 3,001,086.17 m2 - - - 11.43 3,001,086.17 - m2 -
14. Plat Beton T.10 Meja Pantry
- Beton Cor F'c = 16,9 Mpa A.4.1.1.6 0.21 m3 926,473.01 195,393.16 m3 - - - 0.21 195,393.16 - m3 -
- Pembesian A.4.1.1.17 6.50 kg 11,468.73 74,558.13 kg - - - 6.50 74,558.13 - kg -
- Bakesting A.4.1.1.26 1.05 m2 262,562.22 276,871.86 m2 - - - 1.05 276,871.86 - m2 -
15. Beton Cor Lantai Dasar F'c = 19,3 Mpa A.4.1.1.7 21.34 m3 955,047.29 20,384,905.32 m3 - - - 21.34 20,384,905.32 - m3 -
16. Pek. Wiremesh M.8 1 lapis A.4.1.1.19 1,247.06 kg 15,285.64 19,062,102.94 kg - - - 1,247.06 19,062,102.94 - kg -
Sub Jumlah I 290,154,628.92 - 43,767,502.39 4,171,310.71 250,558,437.24 - 43,767,502.39
II PEKERJAAN PASANGAN, PLESTERAN DAN ACIAN
1. Pasangan Dinding Bata camp. 1: 4 A.4.4.1.9 439.29 m2 85,847.90 37,712,016.68 m2 - - - 439.29 37,712,016.68 - m2 -
2. Penebalan Dinding A.4.4.1.10 18.40 m2 171,695.80 3,159,202.72 m2 - - - 18.40 3,159,202.72 - m2 -
3. Plesteran Dinding camp. 1 : 4 A.4.4.2.4 878.58 m2 49,452.71 43,448,038.32 m2 - - - 878.58 43,448,038.32 - m2 -
4. Plasteran Penebalan Dinding A.4.4.2.4 18.40 m2 49,452.71 909,929.86 m2 - - - 18.40 909,929.86 - m2 -
5. Acian A.4.4.2.27 878.58 m2 12,750.65 11,202,434.20 m2 - - - 878.58 11,202,434.20 - m2 -
6. Dinding Partisi Gypsum
- Rangka Partisi A.4.2.1.20 (a) 18.47 m2 121,600.77 2,245,358.22 m2 - - - 18.47 2,245,358.22 - m2 -
- Dinding Partisi Gypsum JAYA Board Tbl. 9 mm A.4.6.1.30 18.47 m2 105,887.92 1,955,220.44 m2 - - - 18.47 1,955,220.44 - m2 -
Sub Jumlah II 100,632,200.45 - - - 100,632,200.45 - -
III PEKERJAAN KOSEN,DAUN PINTU, JENDELA DAN VENTILASI
PINTU
1. Pintu PU
- Kaca Bening (tempered) tbl 12 mm Asahimas A.4.6.2.19 3.68 m2 1,355,602.96 4,981,840.88 m2 - - - 3.68 4,981,840.88 - m2 -
- Engsel floor hinge frameless (Dorma BTS 84) A.4.6.2.5c 2.00 set 2,147,627.28 4,295,254.56 set - - - 2.00 4,295,254.56 - set -
- Pull Handle/ gagang 70 cm Stainless Steel Merk Belez A.4.6.2.6c 2.00 set 586,847.28 1,173,694.56 set - - - 2.00 1,173,694.56 - set -
- Kunci Tanam Lantai Dexon A.4.6.2.2c 2.00 set 326,209.40 652,418.80 set - - - 2.00 652,418.80 - set -
- Pas Dinding Panel Stainless Steel Tbl 1.2 mm Bingkai A.4.6.7.15 6.34 m2 942,471.51 5,971,499.49 m2 - - - 6.34 5,971,499.49 - m2 -
- Stiker Logo Pada Kaca Ls 1.00 ls 550,000.00 550,000.00 ls - - - 1.00 550,000.00 - ls -
2. Pintu P1 3 Unit - -
- Kusen UPCV uk. 58 mm A.4.2.1.11 (a) 26.25 m 233,108.50 6,119,098.13 m - - - 26.25 6,119,098.13 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 7.59 m2 195,803.35 1,487,028.54 m2 - - - 7.59 1,487,028.54 - m2 -
- Daun Pintu Kaca Bingkai UPVC A.4.2.1.13 8.82 m2 787,813.71 6,948,516.92 m2 - - - 8.82 6,948,516.92 - m2 -
- Engsel Pintu UPCV Ex. Dekson A.4.6.2.5 12.00 bh 146,909.40 1,762,912.80 bh - - - 12.00 1,762,912.80 - bh -
- Doorcloser Ex. Dekson A.4.6.2.10 6.00 bh 755,931.78 4,535,590.68 bh - - - 6.00 4,535,590.68 - bh -
- Handle Pintu Ex. Dekson A.4.6.2.6 6.00 set 286,697.28 1,720,183.68 set - - - 6.00 1,720,183.68 - set -
- Gerendel pjg=12 inchi A.4.6.2.7 6.00 bh 319,609.40 1,917,656.40 bh - - - 6.00 1,917,656.40 - bh -
- Kunci Tanam Tanpa Pegangan Ex. Dekson A.4.6.2.2 3.00 bh 309,709.40 929,128.20 bh - - - 3.00 929,128.20 - bh -
3. Pintu P2 5 Unit - -
- Kusen UPCV uk. 58 mm A.4.2.1.11 (a) 34.50 m 233,108.50 8,042,243.25 m - - - 34.50 8,042,243.25 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 7.26 m2 195,803.35 1,421,532.32 m2 - - - 7.26 1,421,532.32 - m2 -
- Daun Pintu Kaca Bingkai UPVC A.4.2.1.13 8.40 m2 787,813.71 6,617,635.16 m2 - - - 8.40 6,617,635.16 - m2 -
- Engsel Pintu UPCV Ex. Dekson A.4.6.2.5 10.00 bh 146,909.40 1,469,094.00 bh - - - 10.00 1,469,094.00 - bh -
- Doorcloser Ex. Dekson A.4.6.2.10 5.00 bh 755,931.78 3,779,658.90 bh - - - 5.00 3,779,658.90 - bh -
- Handle Pintu Ex. Dekson A.4.6.2.6 5.00 set 286,697.28 1,433,486.40 set - - - 5.00 1,433,486.40 - set -
- Kunci Tanam Tanpa Pegangan Ex. Dekson A.4.6.2.2 5.00 bh 309,709.40 1,548,547.00 bh - - - 5.00 1,548,547.00 - bh -
4. Pintu Type PJ1 1 Unit - -
- Kusen UPCV uk. 58 mm A.4.2.1.11 (a) 20.95 m 233,108.50 4,883,623.08 m - - - 20.95 4,883,623.08 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 7.50 m2 195,803.35 1,469,014.63 m2 - - - 7.50 1,469,014.63 - m2 -
- Daun Pintu Kaca Bingkai UPVC A.4.2.1.13 2.94 m2 787,813.71 2,316,172.31 m2 - - - 2.94 2,316,172.31 - m2 -
- Engsel Pintu UPCV Ex. Dekson A.4.6.2.5 4.00 bh 146,909.40 587,637.60 bh - - - 4.00 587,637.60 - bh -
- Doorcloser Ex. Dekson A.4.6.2.10 2.00 bh 755,931.78 1,511,863.56 bh - - - 2.00 1,511,863.56 - bh -
- Handle Pintu Ex. Dekson A.4.6.2.6 2.00 bh 286,697.28 573,394.56 bh - - - 2.00 573,394.56 - bh -
- Gerendel pjg=12 inchi A.4.6.2.7 2.00 bh 319,609.40 639,218.80 bh - - - 2.00 639,218.80 - bh -
- Kunci Tanam Tanpa Pegangan Ex. Dekson A.4.6.2.2 1.00 bh 309,709.40 309,709.40 bh - - - 1.00 309,709.40 - bh -
5. Pintu Type PJ2 1 Unit - -
- Kusen UPCV uk. 58 mm A.4.2.1.11 (a) 20.65 m 233,108.50 4,813,690.53 m - - - 20.65 4,813,690.53 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 7.27 m2 195,803.35 1,424,077.76 m2 - - - 7.27 1,424,077.76 - m2 -
- Daun Pintu Kaca Bingkai UPVC A.4.2.1.13 2.94 m2 787,813.71 2,316,172.31 m2 - - - 2.94 2,316,172.31 - m2 -
- Engsel Pintu UPCV Ex. Dekson A.4.6.2.5 4.00 bh 146,909.40 587,637.60 bh - - - 4.00 587,637.60 - bh -
- Doorcloser Ex. Dekson A.4.6.2.10 2.00 bh 755,931.78 1,511,863.56 bh - - - 2.00 1,511,863.56 - bh -
- Handle Pintu Ex. Dekson A.4.6.2.6 2.00 bh 286,697.28 573,394.56 bh - - - 2.00 573,394.56 - bh -
- Gerendel pjg=12 inchi A.4.6.2.7 2.00 bh 319,609.40 639,218.80 bh - - - 2.00 639,218.80 - bh -
- Kunci Tanam Tanpa Pegangan Ex. Dekson A.4.6.2.2 2.00 bh 309,709.40 619,418.80 bh - - - 2.00 619,418.80 - bh -
6. Pintu Type PJ3 2 Unit - -
- Kusen UPCV uk. 58 mm A.4.2.1.11 (a) 24.90 m 233,108.50 5,804,401.65 m - - - 24.90 5,804,401.65 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 6.38 m2 195,803.35 1,250,008.59 m2 - - - 6.38 1,250,008.59 - m2 -
- Daun Pintu Kaca Bingkai UPVC A.4.2.1.13 3.36 m2 787,813.71 2,647,054.07 m2 - - - 3.36 2,647,054.07 - m2 -
- Engsel Pintu UPCV Ex. Dekson A.4.6.2.5 4.00 bh 146,909.40 587,637.60 bh - - - 4.00 587,637.60 - bh -
- Doorcloser Ex. Dekson A.4.6.2.10 2.00 bh 755,931.78 1,511,863.56 bh - - - 2.00 1,511,863.56 - bh -
- Handle Pintu Ex. Dekson A.4.6.2.6 2.00 bh 286,697.28 573,394.56 bh - - - 2.00 573,394.56 - bh -
- Kunci Tanam Tanpa Pegangan Ex. Dekson A.4.6.2.2 2.00 bh 309,709.40 619,418.80 bh - - - 2.00 619,418.80 - bh -
3
7. Pintu PWC 1 3.00 Unit
- Kusen UPCV uk. 58 mm A.4.2.1.11 (a) 11.10 m 233,108.50 2,587,504.35 m - - - 11.10 2,587,504.35 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 3.53 m2 195,803.35 691,734.07 m2 - - - 3.53 691,734.07 - m2 -
- Daun Pintu Kaca Bingkai UPVC A.4.2.1.13 16.80 m 787,813.71 13,235,270.33 m - - - 16.80 13,235,270.33 - m -
- Engsel Pintu UPCV Ex. Dekson A.4.6.2.5 3.00 bh 146,909.40 440,728.20 bh - - - 3.00 440,728.20 - bh -
- Handle Pintu Ex. Dekson A.4.6.2.6 3.00 bh 286,697.28 860,091.84 bh - - - 3.00 860,091.84 - bh -
- Kunci Tanam Tanpa Pegangan Ex. Dekson A.4.6.2.2 3.00 bh 309,709.40 929,128.20 bh - - - 3.00 929,128.20 - bh -
8. Pintu PWC 2 - -
- Kusen UPCV uk. 58 mm A.4.2.1.11 (a) 3.70 m 233,108.50 862,501.45 m - - - 3.70 862,501.45 - m -
- Daun Pintu UPVC A.4.2.1.13 0.86 m2 787,813.71 673,895.85 m2 - - - 0.86 673,895.85 - m2 -
- Rel Pintu Sleding A.4.6.2.14 0.73 m 266,323.10 193,167.77 m - - - 0.73 193,167.77 - m -
- Handle Pintu Ex. Dekson A.4.6.2.6 1.00 bh 286,697.28 286,697.28 bh - - - 1.00 286,697.28 - bh -
- Kunci Tanam Tanpa Pegangan Ex. Dekson A.4.6.2.2 1.00 bh 309,709.40 309,709.40 bh - - - 1.00 309,709.40 - bh -
JENDELA
9. Jendela Type J1 1 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 6.45 m 233,108.50 1,503,549.83 m - - - 6.45 1,503,549.83 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 1.06 m2 195,803.35 208,217.28 m2 - - - 1.06 208,217.28 - m2 -
10. Jendela Type J1' 1 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 6.45 m 233,108.50 1,503,549.83 m - - - 6.45 1,503,549.83 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 1.07 m2 195,803.35 209,999.09 m2 - - - 1.07 209,999.09 - m2 -
10. Jendela Type J2 4 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 68.00 m 233,108.50 15,851,378.00 m - - - 68.00 15,851,378.00 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 17.61 m2 195,803.35 3,447,548.74 m2 - - - 17.61 3,447,548.74 - m2 -
- Daun Jendela Kaca Bingkai UPVC A.4.2.1.13 1.81 m2 787,813.71 1,426,250.91 m2 - - - 1.81 1,426,250.91 - m2 -
- Engsel Casement A.4.6.2.5b 16.00 bh 97,927.94 1,566,847.04 bh - - - 16.00 1,566,847.04 - bh -
- Handle Rambuncis A.4.6.2.6b 8.00 bh 34,071.03 272,568.24 bh - - - 8.00 272,568.24 - bh -
11. Jendela Type J2' 1 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 17.00 m 233,108.50 3,962,844.50 m - - - 17.00 3,962,844.50 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 3.71 m2 195,803.35 725,451.41 m2 - - - 3.71 725,451.41 - m2 -
11. Jendela Type J3 3 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 31.95 m 233,108.50 7,447,816.58 m - - - 31.95 7,447,816.58 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 6.38 m2 195,803.35 1,249,303.69 m2 - - - 6.38 1,249,303.69 - m2 -
- Daun Jendela Kaca Bingkai UPVC A.4.2.1.13 3.12 m2 787,813.71 2,457,978.78 m2 - - - 3.12 2,457,978.78 - m2 -
- Engsel Casement A.4.6.2.5b 12.00 bh 97,927.94 1,175,135.28 bh - - - 12.00 1,175,135.28 - bh -
- Handle Rambuncis A.4.6.2.6b 6.00 bh 34,071.03 204,426.18 bh - - - 6.00 204,426.18 - bh -
12. Jendela Type J4 2 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 34.08 m 233,108.50 7,944,337.68 m - - - 34.08 7,944,337.68 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 9.07 m2 195,803.35 1,776,327.99 m2 - - - 9.07 1,776,327.99 - m2 -
13. Jendela Type J5 1 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 18.90 m 233,108.50 4,405,750.65 m - - - 18.90 4,405,750.65 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 6.16 m2 195,803.35 1,205,365.42 m2 - - - 6.16 1,205,365.42 - m2 -
14. Ventilasi BV1 11 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 30.80 m 233,108.50 7,179,741.80 m - - - 30.80 7,179,741.80 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 4.95 m2 195,803.35 969,226.58 m2 - - - 4.95 969,226.58 - m2 -
15. Ventilasi BV2 2 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 10.10 m 233,108.50 2,354,395.85 m - - - 10.10 2,354,395.85 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 0.96 m2 195,803.35 187,501.29 m2 - - - 0.96 187,501.29 - m2 -
- Daun Jendela Kaca Bingkai UPVC A.4.2.1.13 1.54 m2 787,813.71 1,213,233.11 m2 - - - 1.54 1,213,233.11 - m2 -
- Engsel Casement A.4.6.2.5b 8.00 bh 97,927.94 783,423.52 bh - - - 8.00 783,423.52 - bh -
- Handle Rambuncis A.4.6.2.6b 4.00 bh 34,071.03 136,284.12 bh - - - 4.00 136,284.12 - bh -
16. Sekat Pintu Kaca (PK1) 1 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 31.80 m 233,108.50 7,412,850.30 m - - - 31.80 7,412,850.30 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 12.69 m2 195,803.35 2,484,744.51 m2 - - - 12.69 2,484,744.51 - m2 -
- Daun Pintu Kaca Bingkai UPVC A.4.2.1.13 1.89 m2 787,813.71 1,488,967.91 m2 - - - 1.89 1,488,967.91 - m2 -
- Rel pintu sleding A.4.6.2.14 1.90 m 266,323.10 506,013.89 m - - - 1.90 506,013.89 - m -
- Kunci sliding UPCV + Handle A.4.6.2.2d 1.00 bh 440,766.27 440,766.27 bh - - - 1.00 440,766.27 - bh -
17. Sekat Pintu Kaca (PK2) 1 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 19.75 m 233,108.50 4,603,892.88 m - - - 19.75 4,603,892.88 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 7.38 m2 195,803.35 1,444,049.71 m2 - - - 7.38 1,444,049.71 - m2 -
- Daun Pintu Kaca Bingkai UPVC A.4.2.1.13 1.89 m2 787,813.71 1,488,967.91 m2 - - - 1.89 1,488,967.91 - m2 -
- Rel pintu sleding A.4.6.2.14 1.90 m 266,323.10 506,013.89 m - - - 1.90 506,013.89 - m -
- Kunci sliding UPCV + Handle A.4.6.2.2d 1.00 bh 440,766.27 440,766.27 bh - - - 1.00 440,766.27 - bh -
Sub Jumlah III 218,382,823.01 - - - 218,382,823.01 - -
IV PEKERJAAN PLAFOND
1. Rangka Plafon Besi Furing Nerk Nikkei A.4.2.1.21 (a) 240.42 m2 94,257.11 22,660,898.00 m2 - - - 240.42 22,660,898.00 - m2 -
2. Plafond PVC 8 mm Merk Legos Putih A.4.5.1.13 240.42 m2 156,658.29 37,663,127.28 m2 - - - 240.42 37,663,127.28 - m2 -
3. Profil PVC A.4.5.1.11 236.47 m 25,082.54 5,931,187.90 m - - - 236.47 5,931,187.90 - m -
Sub Jumlah IV 66,255,213.18 - - - 66,255,213.18 - -
V PEKERJAAN FINISHING LANTAI DAN DINDING
1. Lantai Granit 60 x 60 cm Merk Imperial A.4.4.3.9 (a) 204.67 m2 187,542.05 38,384,946.26 m2 - - - 204.67 38,384,946.26 - m2 -
2. Lantai KM Keramik 30x30 cm Merk Platinum A.4.4.3.35 23.41 m2 235,316.24 5,509,547.58 m2 - - - 23.41 5,509,547.58 - m2 -
3. Dinding KM Keramik 30x60 cm A.4.4.3.54 (d) 90.12 m2 220,928.59 19,910,968.25 m2 - - - 90.12 19,910,968.25 - m2 -
4. Lantai Keramik 30x30 cm Meja Pantry Merk Platinum A.4.4.3.35 1.20 m2 235,316.24 282,967.78 m2 - - - 1.20 282,967.78 - m2 -
5. Dinding Keramik 30x60 cm Meja Pantry Merek Platinium A.4.4.3.54 (d) 2.78 m2 220,928.59 613,076.84 m2 - - - 2.78 613,076.84 - m2 -
6. Lantai Keramik 30x30 cm Tempat Wudhu A.4.4.3.35 6.82 m2 235,316.24 1,604,856.76 m2 - - - 6.82 1,604,856.76 - m2 -
7. Dinding Granit Polish 60x60 cm Untuk Depan A.4.4.3.55 18.40 m2 360,117.97 6,626,170.65 m2 - - - 18.40 6,626,170.65 - m2 -
8. Lantai Granit 60 x 60 cm Tangga Merk Imperial A.4.4.3.9 (a) 18.75 m2 187,542.05 3,516,882.29 m2 - - - 18.75 3,516,882.29 - m2 -
9. Pasang Step nosing 10x60 Merk Imperial A.4.4.3.39 3.00 m2 60,740.36 182,221.08 m2 - - - 3.00 182,221.08 - m2 -
76,631,637.47 - - 76,631,637.47 - -
-
-
-
VI PEKERJAAN LISTRIK/ ELEKTRIKAL -
1. Biaya Sambungan Listrik PLN Kap. 23.000 VA -
- Biaya Penyambungan ls 1.00 ls 6,515,315.32 6,515,315.32 1.00 ls 6,515,315.32 - - - - 1.00 ls 6,515,315.32
- Yuran ls 1.00 ls 8,500,000.00 8,500,000.00 1.00 ls 8,500,000.00 - - - - 1.00 ls 8,500,000.00
- SLO ls 1.00 ls 1,500,000.00 1,500,000.00 1.00 ls 1,500,000.00 - - - - 1.00 ls 1,500,000.00
- Jasa Pengurusan Perizinan ls 1.00 ls 2,000,000.00 2,000,000.00 1.00 ls 2,000,000.00 - - - - 1.00 ls 2,000,000.00
2. Panel Listrik 3 Phase Lantai 1 (Sesuai dengan wireng diagr Dihitung 1.00 unit 6,500,000.00 6,500,000.00 1.00 unit 6,500,000.00 - - - - 1.00 unit 6,500,000.00
3. Pemasangan 1 m' jalur instalasi utama (kabel NYM 3 x 2,5 A.6.1.1.4 51.00 m 23,361.68 1,191,445.68 51.00 m 1,191,445.68 - - - - 51.00 m 1,191,445.68
5. Stop Kontak Ganda Panasonic A.6.1.1.12a 26.00 bh 104,852.40 2,726,162.40 26.00 bh 2,726,162.40 - - - - 26.00 bh 2,726,162.40
6. Stop Kontak AC Panasonic A.6.1.1.12 6.00 bh 104,852.40 629,114.40 6.00 bh 629,114.40 - - - - 6.00 bh 629,114.40
9. Lampu LED Panel Outbow 12Watt Hannoch A.6.1.1.24 94.00 bh 87,230.00 8,199,620.00 94.00 bh 8,199,620.00 - - - - 94.00 bh 8,199,620.00
13. Saklar Ganda Tanam Panasonic A.6.1.1.10 10.00 bh 131,725.83 1,317,258.30 10.00 bh 1,317,258.30 - - - - 10.00 bh 1,317,258.30
14. Saklar Tunggal Tanam Panasonic A.6.1.1.9 4.00 bh 88,594.28 354,377.12 4.00 bh 354,377.12 - - - - 4.00 bh 354,377.12
15. Saklar Hotel (Tangga) Tanam Panasonic A.6.1.1.9 1.00 bh 88,594.28 88,594.28 1.00 bh 88,594.28 - - - - 1.00 bh 88,594.28
16. ATS 30A Dihitung 1.00 bh 570,000.00 570,000.00 1.00 bh 570,000.00 - - - - 1.00 bh 570,000.00
Sub Jumlah VI 40,091,887.50 - 40,091,887.50 - - - 40,091,887.50
VII PEKERJAAN PLUMBING DAN SANITARY
1. Biaya Penyambungan Meteran Air Dari PDAM Tirtauli Ls 1.00 unit 5,000,000.00 5,000,000.00 1.00 unit 5,000,000.00 - - - - 1.00 unit 5,000,000.00
2. Penyambungan Instalasi Ke Toren Air Ls 1.00 ls 2,000,000.00 2,000,000.00 1.00 ls 2,000,000.00 - - - - 1.00 ls 2,000,000.00
3. Pek. Plumbing
a Pas. Instalasi Air Bersih
- Pipa PVC Kelas AW Φ 1 1/2" (Buangan Air Bersih) A.8.4.1.1 (a) 36.00 m 20,637.63 742,954.68 36.00 m 742,954.68 - - - - 36.00 m 742,954.68
- Pipa PVC Kelas AW Φ 2" (Buangan Air Torn) A.8.4.1.1 15.00 m 16,739.14 251,087.10 15.00 m 251,087.10 - - - - 15.00 m 251,087.10
b Pas. Instalasi Air Kotor
- Pipa PVC Kelas D Φ 4" (Buangan Air Bekas) A.8.4.1.3 27.00 m 53,442.96 1,442,959.92 27.00 m 1,442,959.92 - - - - 27.00 m 1,442,959.92
- Pipa PVC Kelas D Φ 6" (Buangan Air Kotor) A.8.4.1.4 15.00 m 35,088.96 526,334.40 15.00 m 526,334.40 - - - - 15.00 m 526,334.40
4. Pek. Sanitair
- Bak Cuci Kitchen Zink Untuk Pantry 80 cm Dihitung 1.00 bh 1,350,000.00 1,350,000.00 1.00 bh 1,350,000.00 - - - - 1.00 bh 1,350,000.00
- Kran Kitchen Zink Dihitung 1.00 bh 279,000.00 279,000.00 1.00 bh 279,000.00 - - - - 1.00 bh 279,000.00
- Kran Air Stainlesstell A.5.1.1.19 2.00 bh 140,120.03 280,240.06 2.00 bh 280,240.06 - - - - 2.00 bh 280,240.06
- Pas. Floor Drain Stainlessteel A.5.1.1.14 5.00 bh 243,359.62 1,216,798.10 5.00 bh 1,216,798.10 - - - - 5.00 bh 1,216,798.10
- Closed Duduk Toto CW637J/SW637JP A.5.1.1.1 (a) 4.00 bh 2,110,154.55 8,440,618.20 4.00 bh 8,440,618.20 - - - - 4.00 bh 8,440,618.20
- Jet Washer merk American Standard Putih A.5.1.1.20 4.00 bh 253,055.00 1,012,220.00 4.00 bh 1,012,220.00 - - - - 4.00 bh 1,012,220.00
5. Wastafel Toto L521V1A A.5.1.1.5 1.00 unit 1,225,802.60 1,225,802.60 1.00 unit 1,225,802.60 - - - - 1.00 unit 1,225,802.60
6. Pemasangnan Kaca Cermin Wastafel Dihitung 1.00 unit 350,000.00 350,000.00 1.00 unit 350,000.00 - - - - 1.00 unit 350,000.00
7. Pemasangan Exhaus Fan Dia. 8 inchi merk Panasonic A.5.1.1.21 4.00 unit 523,490.00 2,093,960.00 4.00 unit 2,093,960.00 - - - - 4.00 unit 2,093,960.00
8. Pompa Air Dorong (Automat+Kabel Radar) + Instalasi Dihitung 1.00 unit 975,000.00 975,000.00 1.00 unit 975,000.00 - - - - 1.00 unit 975,000.00
9. Septictank Biotech (1,20 x 2,00) m' H 1,30 m' Dihitung 1.00 unit 6,800,000.00 6,800,000.00 1.00 unit 6,800,000.00 - - - - 1.00 unit 6,800,000.00
Sub Jumlah VII 34,389,942.86 - 33,986,975.06 - 402,967.80 - 33,986,975.06
VIII PEKERJAAN PENGECATAN
1. Pek. Cat Tembok Interior Dulux Pentalit A.4.7.1.10 459.42 m2 27,355.90 12,567,895.45 m2 - - - 459.42 12,567,895.45 - m2 -
2. Pek. Cat Tembok Exterior Jotun Jotashield A.4.7.1.10 (b) 218.72 m2 38,795.90 8,485,536.24 m2 - - - 218.72 8,485,536.24 - m2 -
Sub Jumlah VIII 21,053,431.69 - - - 21,053,431.69 - -
IX PEKERJAAN KANOPY TERAS
1. Besi Profil WF 200.100 A.4.2.1.2 492.28 kg 33,936.96 16,706,626.48 kg - - - 492.28 16,706,626.48 - kg -
2. Kolom H Beam 200.200 A.4.2.1.2 151.46 kg 33,936.96 5,140,237.89 kg - - - 151.46 5,140,237.89 - kg -
4. Cover Kolom ACP A.4.2.1.24 7.10 m2 963,902.58 6,843,708.32 m2 - - - 7.10 6,843,708.32 - m2 -
5. Pekerjaan Atap Dan Plafon
- Atap Bitumen A.4.5.2.44 31.47 m2 155,876.75 4,906,025.86 m2 - - - 31.47 4,906,025.86 - m2 -
- Rngka Plafon Besi Furing A.4.2.1.21 (a) 31.47 m2 94,257.11 2,966,624.72 m2 - - - 31.47 2,966,624.72 - m2 -
- Plafon PVC Tbl. 8 mm A.4.5.1.13 34.62 m2 156,658.29 5,423,686.24 m2 - - - 34.62 5,423,686.24 - m2 -
- Profil PVC A.4.5.1.11 23.54 m 25,082.54 590,442.99 m - - - 23.54 590,442.99 - m -
6. Talang Persegi + Gantungan, Plat Aluminium T 0,4 mm A.4.2.1.19 5.43 m' 138,194.06 750,393.75 m' - - - 5.43 750,393.75 - m' -
7. Pemasangan Pipa Tegak PVC AW Ø 3" A.8.4.1.2 26.36 m' 26,864.52 708,148.75 m' - - - 26.36 708,148.75 - m' -
8. Pekerjaan ACP + Rangka Holow Blacksteel A.4.2.1.24 8.27 m2 963,902.58 7,966,654.82 m2 - - - 8.27 7,966,654.82 - m2 -
Sub Jumlah IX 52,002,549.82 - - - 52,002,549.82 - -
X PEKERJAAN BESI
1. Handril Tangga Hollow A.4.2.1.25 8.95 m2 954,226.88 8,543,801.10 m2 - - - 8.95 8,543,801.10 - m2 -
2. Jerajak Besi Jendela A.4.2.1.26 (a) 34.86 m2 804,151.88 28,032,734.54 m2 - - - 34.86 28,032,734.54 - m2 -
3. Jerajak Besi Pintu A.4.2.1.26 (c) 7.00 m2 804,151.88 5,629,063.16 m2 - - - 7.00 5,629,063.16 - m2 -
4. Tangga Besi ( ut. Tangki Air ) A.4.2.1.25 1.00 ls 954,226.88 954,226.88 ls - - - 1.00 954,226.88 - ls -
5. Grill Penutup Saluran Dihitung 29.00 m 350,000.00 10,150,000.00 m - - - 29.00 10,150,000.00 - m -
6. Handril Tangga SS dia 2' Disabilitas Ramp Akses Masuk A.4.2.1.25 (c) 7.40 m 1,254,376.88 9,282,388.91 m - - - 7.40 9,282,388.91 - m -
7. Handril Besi Stainlessteel dia. 2 " Pjg= 60 cm KM Disabel Dihitung 4.00 Bh 1,200,000.00 4,800,000.00 Bh - - - 4.00 4,800,000.00 - Bh -
4
Sub Jumlah X 67,392,214.59 - - - 67,392,214.59 - -
XI PEKERJAAN SALURAN DRAINASE GEDUNG
1. Galian Tanah A.2.3.1.1 15.87 m3 78,289.13 1,242,154.91 m3 - - - 15.87 1,242,154.91 - m3 -
2. Urugan Pasir A.2.3.1.11 5.29 m3 133,366.65 705,342.87 m3 - - - 5.29 705,342.87 - m3 -
3. Pasangan Bata Rolag camp. 1: 4 A.4.4.1.9 57.12 m2 85,847.90 4,903,503.28 m2 - - - 57.12 4,903,503.28 - m2 -
4. Plesteran Dinding camp. 1 : 4 A.4.4.2.4 54.58 m2 49,452.71 2,699,123.97 m2 - - - 54.58 2,699,123.97 - m2 -
5. U Ditch A.4.4.3.68 63.47 m' 918,023.34 58,262,351.27 m' - - - 63.47 58,262,351.27 - m' -
6. Pasangan Bata A.4.4.2.4 38.08 m2 49,452.71 1,883,109.74 m2 - - - 38.08 1,883,109.74 - m2 -
7. Pek. Beton Cor F'c = 12,2 Mpa Lantai Teras A.4.1.1.3 5.55 m3 919,329.44 5,105,208.75 m3 - - - 5.55 5,105,208.75 - m3 -
Sub Jumlah XI 74,800,794.79 - - - 74,800,794.79 - -
XII PEKRJAAN PENANGKAL PETIR
1. Tiang Splitzen Dihitung 2.00 bh 115,000.00 230,000.00 2.00 bh 230,000.00 - - - - 2.00 bh 230,000.00
2. NYA 50 mm2 + conduit Dihitung 23.00 m 98,300.00 2,260,900.00 23.00 m 2,260,900.00 - - - - 23.00 m 2,260,900.00
3. Klem kabel Dihitung 10.00 bh 25,000.00 250,000.00 10.00 bh 250,000.00 - - - - 10.00 bh 250,000.00
4. Pentanahan max. 3 ohm + Copper Rod 5/8 " Dihitung 2.00 bh 1,280,000.00 2,560,000.00 2.00 bh 2,560,000.00 - - - - 2.00 bh 2,560,000.00
5. Bak kontrol 500 x 500 x 40 mm Dihitung 4.00 bh 325,000.00 1,300,000.00 4.00 bh 1,300,000.00 - - - - 4.00 bh 1,300,000.00
Sub Jumlah XII 6,600,900.00 - 6,600,900.00 - - - 6,600,900.00
Sub Jumlah D. 1,048,388,224.27 - 124,447,264.95 4,171,310.71 928,112,270.04 - 124,447,264.95
- -
- -
E PEKERJAAN LANTAI 2 - -
I PEKERJAAN STRUKTUR BETON BERTULANG
1. Kolom 25x40
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 2.96 m3 1,044,341.91 3,091,252.05 m3 - - - 2.96 3,091,252.05 - m3 -
- Pembesian Kolom A.4.1.1.17 1,022.29 kg 11,468.73 11,724,360.07 kg - - - 1,022.29 11,724,360.07 - kg -
- Bakesting Kolom A.4.1.1.22 (b) 25.53 m2 189,525.06 4,838,574.78 m2 - - - 25.53 4,838,574.78 - m2 -
2. Kolom 25x30
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 3.33 m3 1,044,341.91 3,477,658.56 m3 - - - 3.33 3,477,658.56 - m3 -
- Pembesian Kolom A.4.1.1.17 1,017.13 kg 11,468.73 11,665,213.21 kg - - - 1,017.13 11,665,213.21 - kg -
- Bakesting Kolom A.4.1.1.22 (b) 28.49 m2 189,525.06 5,399,568.96 m2 - - - 28.49 5,399,568.96 - m2 -
2. Kolom 25x50
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 4.63 m3 1,044,341.91 4,830,081.33 m3 - - - 4.63 4,830,081.33 - m3 -
- Pembesian Kolom A.4.1.1.17 1,569.72 kg 11,468.73 18,002,709.60 kg - - - 1,569.72 18,002,709.60 - kg -
- Bakesting Kolom A.4.1.1.22 (b) 38.85 m2 189,525.06 7,363,048.58 m2 - - - 38.85 7,363,048.58 - m2 -
2. Kolom Praktis 13x13 A.4.1.1.35 37.00 m 75,837.90 2,806,002.30 m - - - 37.00 2,806,002.30 - m -
3. Balok Induk uk. 25x50 cm (B1) Elv. ± 4000
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 15.70 m3 1,044,341.91 16,396,167.99 m3 - - - 15.70 16,396,167.99 - m3 -
- Pembesian A.4.1.1.17 3,045.76 kg 11,468.73 34,930,996.10 kg - - - 3,045.76 34,930,996.10 - kg -
- Bekesting A.4.1.1.23 (a) 142.00 m2 170,245.33 24,174,836.86 m2 - - - 142.00 24,174,836.86 - m2 -
4. Balok Anak uk. 20x30 cm (B2) Elv. ± 4000
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 0.20 m3 1,044,341.91 213,045.75 m3 - - - 0.20 213,045.75 - m3 -
- Pembesian A.4.1.1.17 61.86 kg 11,468.73 709,499.24 kg - - - 61.86 709,499.24 - kg -
- Bakesting A.4.1.1.23 (a) 3.40 m2 170,245.33 578,834.12 m2 - - - 3.40 578,834.12 - m2 -
5. Plat Lantai Beton Elv, ± 4000
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 29.95 m3 1,044,341.91 31,280,128.89 m3 - - - 29.95 31,280,128.89 - m3 -
- Pembesian A.4.1.1.17 1,538.78 kg 11,468.73 17,647,898.22 kg - - - 1,538.78 17,647,898.22 - kg -
- Bakesting A.4.1.1.26 249.60 m2 262,562.22 65,535,530.11 m2 - - - 249.60 65,535,530.11 - m2 -
6. Ring Balok uk. 20x20 cm (B1) Elv. ± 7700
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 10.50 m3 1,044,341.91 10,965,590.06 m3 - - - 10.50 10,965,590.06 - m3 -
- Pembesian Ring Balok A.4.1.1.17 1,783.22 kg 11,468.73 20,451,215.95 kg - - - 1,783.22 20,451,215.95 - kg -
- Begisting A.4.1.1.23 (a) 102.10 m2 170,245.33 17,382,048.19 m2 - - - 102.10 17,382,048.19 - m2 -
7. Pekerjaan Dudukan Tangki Air Elv. ± 7700
a Plat Dak Lantai Tbl 12 cm
- Beton Cor F'c = 19.3 Mpa A.4.1.1.7 1.45 m3 955,047.29 1,380,425.35 m3 - - - 1.45 1,380,425.35 - m3 -
- Pembesian A.4.1.1.17 195.13 kg 11,468.73 2,237,881.82 kg - - - 195.13 2,237,881.82 - kg -
- Bekisting A.4.1.1.26 13.71 m2 262,562.22 3,600,515.72 m2 - - - 13.71 3,600,515.72 - m2 -
8. Balok Lintel Di Atas Jendela Dan Dinding Atas A.4.1.1.36 47.80 m 95,907.93 4,584,399.05 m - - - 47.80 4,584,399.05 - m -
9. Plat Beton T.8 ( Level Jendela )
- Beton Cor F'c = 16,9 Mpa A.4.1.1.6 2.06 m3 926,473.01 1,911,128.53 m3 - - - 2.06 1,911,128.53 - m3 -
- Pembesian A.4.1.1.17 70.65 kg 11,468.73 810,276.10 kg - - - 70.65 810,276.10 - kg -
- Bekisting A.4.1.1.26 11.46 m2 262,562.22 3,008,963.04 m2 - - - 11.46 3,008,963.04 - m2 -
Sub Jumlah I 330,997,850.54 - - - 330,997,850.54 - -
II PEKERJAAN PASANGAN,PLESTERAN DAN ACIAN - -
1. Pasangan Dinding Bata camp. 1: 4 A.4.4.1.9 358.36 m2 85,847.90 30,764,136.12 m2 - - - 358.36 30,764,136.12 - m2 -
2. Penebalan Dinding A.4.4.1.10 20.00 m2 171,695.80 3,433,916.00 m2 - - - 20.00 3,433,916.00 - m2 -
3. Plesteran Dinding camp. 1 : 4 A.4.4.2.4 645.53 m2 49,452.71 31,922,960.62 m2 - - - 645.53 31,922,960.62 - m2 -
4. Plasteran Penebalan Dinding A.4.4.2.4 20.00 m2 49,452.71 989,054.20 m2 - - - 20.00 989,054.20 - m2 -
5. Acian A.4.4.2.27 645.53 m2 12,750.65 8,230,863.34 m2 - - - 645.53 8,230,863.34 - m2 -
Sub Jumlah II 75,340,930.28 - - - 75,340,930.28 - -
III PEKERJAAN ATAP - -
1. Rangka Atap Baja Ringan Merk Taso A.4.2.1.23 © 278.15 m2 134,060.10 37,288,239.74 m2 - - - 278.15 37,288,239.74 - m2 -
2. Atap Bitumen A.4.5.2.44 278.18 m2 155,876.75 43,361,794.32 m2 - - - 278.18 43,361,794.32 - m2 -
3. Rabung Atap Bitumen A.4.5.2.46 29.00 m' 125,143.00 3,629,147.00 m' - - - 29.00 3,629,147.00 - m' -
4. Listplank GRC tb. 6 mm A.4.6.1.21 70.00 m' 113,421.06 7,939,474.20 m' - - - 70.00 7,939,474.20 - m' -
Sub Jumlah III 92,218,655.25 - - - 92,218,655.25 - -
IV PEKERJAAN PLAFOND - -
1. Rangka Plafon Besi Furing Merek Nikkei A.4.2.1.21 (a) 226.49 m2 94,257.11 21,348,654.18 m2 - - - 226.49 21,348,654.18 - m2 -
2. Plafond PVC 8 mm Merk Legos Putih A.4.5.1.13 226.49 m2 156,658.29 35,482,136.65 m2 - - - 226.49 35,482,136.65 - m2 -
3. Profil PVC A.4.5.1.11 151.71 m 25,082.54 3,805,344.37 m - - - 151.71 3,805,344.37 - m -
Sub Jumlah IV 60,636,135.20 - - - 60,636,135.20 - -
V PEKERJAAN KOSEN,DAUN PINTU, JENDELA DAN VENTILASI - -
PINTU - -
1. Pintu P1 3 Unit
- Kusen UPCV uk. 58 mm A.4.2.1.11 (a) 26.25 m 233,108.50 6,119,098.13 m - - - 26.25 6,119,098.13 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 7.59 m2 195,803.35 1,487,028.54 m2 - - - 7.59 1,487,028.54 - m2 -
- Daun Pintu Kaca Bingkai UPVC A.4.2.1.13 8.82 m2 787,813.71 6,948,516.92 m2 - - - 8.82 6,948,516.92 - m2 -
- Engsel Pintu UPCV Ex. Dekson A.4.6.2.5 4.00 bh 146,909.40 587,637.60 bh - - - 4.00 587,637.60 - bh -
- Doorcloser Ex. Dekson A.4.6.2.10 6.00 bh 755,931.78 4,535,590.68 bh - - - 6.00 4,535,590.68 - bh -
- Handle Pintu Ex. Dekson A.4.6.2.6 6.00 bh 286,697.28 1,720,183.68 bh - - - 6.00 1,720,183.68 - bh -
- Gerendel pjg=12 inchi A.4.6.2.7 6.00 set 319,609.40 1,917,656.40 set - - - 6.00 1,917,656.40 - set -
- Kunci Tanam Tanpa Pegangan Ex. Dekson A.4.6.2.2 3.00 bh 309,709.40 929,128.20 bh - - - 3.00 929,128.20 - bh -
2. Pintu P2 4 Unit
- Kusen UPCV uk. 58 mm A.4.2.1.11 (a) 27.60 m 233,108.50 6,433,794.60 m - - - 27.60 6,433,794.60 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 5.81 m2 195,803.35 1,137,225.86 m2 - - - 5.81 1,137,225.86 - m2 -
- Daun Pintu Kaca Bingkai UPVC A.4.2.1.13 6.72 m2 787,813.71 5,294,108.13 m2 - - - 6.72 5,294,108.13 - m2 -
- Engsel Pintu UPCV Ex. Dekson A.4.6.2.5 8.00 bh 146,909.40 1,175,275.20 bh - - - 8.00 1,175,275.20 - bh -
- Doorcloser Ex. Dekson A.4.6.2.10 4.00 bh 755,931.78 3,023,727.12 bh - - - 4.00 3,023,727.12 - bh -
- Handle Pintu Ex. Dekson A.4.6.2.6 4.00 set 286,697.28 1,146,789.12 set - - - 4.00 1,146,789.12 - set -
- Kunci Tanam Tanpa Pegangan Ex. Dekson A.4.6.2.2 4.00 bh 309,709.40 1,238,837.60 bh - - - 4.00 1,238,837.60 - bh -
-
-
-
3. Pintu PWC 1 2 Unit
- Kusen UPCV uk. 58 mm A.4.2.1.11 (a) 7.40 m 233,108.50 1,725,002.90 m - - - 7.40 1,725,002.90 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 2.36 m2 195,803.35 461,156.05 m2 - - - 2.36 461,156.05 - m2 -
- Daun Pintu Kaca Bingkai UPVC A.4.2.1.13 11.20 m 787,813.71 8,823,513.55 m - - - 11.20 8,823,513.55 - m -
- Engsel Pintu UPCV Ex. Dekson A.4.6.2.5 2.00 bh 146,909.40 293,818.80 bh - - - 2.00 293,818.80 - bh -
- Handle Pintu Ex. Dekson A.4.6.2.6 2.00 bh 286,697.28 573,394.56 bh - - - 2.00 573,394.56 - bh -
- Kunci Tanam Tanpa Pegangan Ex. Dekson A.4.6.2.2 2.00 bh 309,709.40 619,418.80 bh - - - 2.00 619,418.80 - bh -
JENDELA
4. Jendela Type J1 2 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 12.90 m 233,108.50 3,007,099.65 m - - - 12.90 3,007,099.65 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 2.13 m2 195,803.35 416,434.56 m2 - - - 2.13 416,434.56 - m2 -
5. Jendela Type J2 2 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 34.00 m 233,108.50 7,925,689.00 m - - - 34.00 7,925,689.00 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 8.80 m2 195,803.35 1,723,774.37 m2 - - - 8.80 1,723,774.37 - m2 -
- Daun Jendela Kaca Bingkai UPVC A.4.2.1.13 2.08 m2 787,813.71 1,638,652.52 m2 - - - 2.08 1,638,652.52 - m2 -
- Engsel Casement A.4.6.2.5b 8.00 bh 97,927.94 783,423.52 bh - - - 8.00 783,423.52 - bh -
- Handle Rambuncis A.4.6.2.6b 4.00 bh 34,071.03 136,284.12 bh - - - 4.00 136,284.12 - bh -
6. Jendela Type J3 10 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 106.50 m 233,108.50 24,826,055.25 m - - - 106.50 24,826,055.25 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 10.40 m2 195,803.35 2,036,354.84 m2 - - - 10.40 2,036,354.84 - m2 -
- Daun Jendela Kaca Bingkai UPVC A.4.2.1.13 4.53 m2 787,813.71 3,565,627.27 m2 - - - 4.53 3,565,627.27 - m2 -
- Engsel Casement A.4.6.2.5b 40.00 bh 97,927.94 3,917,117.60 bh - - - 40.00 3,917,117.60 - bh -
- Handle Rambuncis A.4.6.2.6b 20.00 bh 34,071.03 681,420.60 bh - - - 20.00 681,420.60 - bh -
7. Ventilasi BV1 6 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 16.80 m 233,108.50 3,916,222.80 m - - - 16.80 3,916,222.80 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 2.70 m2 195,803.35 528,669.05 m2 - - - 2.70 528,669.05 - m2 -
8. Ventilasi BV2 1 Unit
- Kusen UPVC uk. 58 mm A.4.2.1.11 (a) 5.05 m 233,108.50 1,177,197.93 m - - - 5.05 1,177,197.93 - m -
- Kaca Polos 5 mm A.4.6.2.17 (a) 0.48 m2 195,803.35 93,750.64 m2 - - - 0.48 93,750.64 - m2 -
- Daun Jendela Kaca Bingkai UPVC A.4.2.1.13 0.77 m2 787,813.71 606,616.56 m2 - - - 0.77 606,616.56 - m2 -
- Engsel Casement A.4.6.2.5b 4.00 bh 97,927.94 391,711.76 bh - - - 4.00 391,711.76 - bh -
- Handle Rambuncis A.4.6.2.6b 2.00 bh 34,071.03 68,142.06 bh - - - 2.00 68,142.06 - bh -
. Sub Jumlah V 113,631,146.53 - - - 113,631,146.53 - -
VI PEKERJAAN FINISHING LANTAI DAN DINDING - -
1. Lantai Granit 60 x 60 cm Merk Imperial A.4.4.3.9 (a) 135.21 m2 187,542.05 25,357,424.08 m2 - - - 135.21 25,357,424.08 - m2 -
2. Lantai KM Keramik 30x30 cm Merek Platinium A.4.4.3.35 10.66 m2 235,316.24 2,508,493.82 m2 - - - 10.66 2,508,493.82 - m2 -
3. Dinding KM Keramik 30x60 cm Merek Platinium A.4.4.3.54 (d) 32.72 m2 220,928.59 7,229,667.18 m2 - - - 32.72 7,229,667.18 - m2 -
4. Lantai Keramik 30x30 cm Meja Pantry Merk Platinum A.4.4.3.35 1.02 m2 235,316.24 241,105.28 m2 - - - 1.02 241,105.28 - m2 -
5. Dinding Granit Polish 60x60 cm Untuk Depan A.4.4.3.55 20.00 m2 360,117.97 7,202,359.40 m2 - - - 20.00 7,202,359.40 - m2 -
6. Dinding Keramik 30x60 cm Meja Pantry Merek Platinium A.4.4.3.54 (d) 2.78 m2 220,928.59 613,076.84 m2 - - - 2.78 613,076.84 - m2 -
. Sub Jumlah VI 43,152,126.60 - - - 43,152,126.60 - -
VII PEKERJAAN lLISTRIK/ ELEKTRIKAL - -
1. Panel Listrik 3 Phase Lantai 1 (Sesuai dengan wireng diagr Dihitung 1.00 unit 6,500,000.00 6,500,000.00 unit - - - 1.00 6,500,000.00 - unit -
2. Pemasangan 1 m' jalur instalasi utama (kabel NYM 3 x 2,5 A.6.1.1.4 62.80 m 23,361.68 1,467,113.50 m - - - 62.80 1,467,113.50 - m -
3. Instalasi Stop Kontak Ganda A.6.1.1.12a 25.00 bh 104,852.40 2,621,310.00 bh - - - 25.00 2,621,310.00 - bh -
5
4. Instalasi Stop Kontak AC A.6.1.1.12 6.00 bh 104,852.40 629,114.40 bh - - - 6.00 629,114.40 - bh -
5. Lampu LED Panel Outbow 12 Watt A.6.1.1.24 67.00 bh 87,230.00 5,844,410.00 bh - - - 67.00 5,844,410.00 - bh -
8. Lampu LED Panel Outbow 30 Watt A.6.1.1.22 7.00 bh 8,804.40 61,630.80 bh - - - 7.00 61,630.80 - bh -
7. Lampu Sorot 50 Watt Hannoch A.6.1.1.26a 2.00 bh 28,014.00 56,028.00 bh - - - 2.00 56,028.00 - bh -
8. Saklar Ganda Tanam Panasonic A.6.1.1.10 7.00 bh 131,725.83 922,080.81 bh - - - 7.00 922,080.81 - bh -
9. Saklar Tunggal Tanam Panasonic A.6.1.1.9 2.00 bh 88,594.28 177,188.56 bh - - - 2.00 177,188.56 - bh -
. Sub Jumlah VII 18,278,876.07 - - - 18,278,876.07 - -
VIII PEKERJAAN PLUMBING DAN SANITARY - -
1. Pek. Plumbing
a Pas. Instalasi Air Bersih
- Pipa PVC dia. 1 1/2 " AW A.8.4.1.1 (a) 14.00 m 20,637.63 288,926.82 m - - - 14.00 288,926.82 - m -
b Pas. Instalasi Air Kotor
- Pipa PVC dia. 4 " D A.8.4.1.3 12.00 m 53,442.96 641,315.52 m - - - 12.00 641,315.52 - m -
- Pipa PVC dia. 6 " D A.8.4.1.4 12.00 m 35,088.96 421,067.52 m - - - 12.00 421,067.52 - m -
2. Pek. Sanitair
- Bak Cuci Kitchen Zink Untuk Pantry Pjg=80 cm Dihitung 1.00 bh 1,350,000.00 1,350,000.00 bh - - - 1.00 1,350,000.00 - bh -
- Kran Kitchen Zink Dihitung 1.00 bh 279,000.00 279,000.00 bh - - - 1.00 279,000.00 - bh -
- Kran Air Stainlesstell A.5.1.1.19 2.00 bh 140,120.03 280,240.06 bh - - - 2.00 280,240.06 - bh -
- Pas. Floor Drain Stainlessteel A.5.1.1.14 2.00 bh 243,359.62 486,719.24 bh - - - 2.00 486,719.24 - bh -
- Closed Jongkok Toto A.5.1.1.2 2.00 bh 623,661.68 1,247,323.36 bh - - - 2.00 1,247,323.36 - bh -
3. Pemasangan Exhaus Fan Dia. 8 inchi merk Panasonic A.5.1.1.21 2.00 unit 523,490.00 1,046,980.00 unit - - - 2.00 1,046,980.00 - unit -
4. Tangki Air Stainless Steel Kap. 1500 ltr + Dudukan Dihitung 1.00 unit 6,850,000.00 6,850,000.00 unit - - - 1.00 6,850,000.00 - unit -
Sub Jumlah VIII 12,891,572.52 - - - 12,891,572.52 - -
IX PEKERJAAN PENGECATAN - -
1. Pek. Cat Tembok Interior Dulux A.4.7.1.10 432.40 m2 27,355.90 11,828,650.13 m2 - - - 432.40 11,828,650.13 - m2 -
2. Pek. Cat Tembok Exterior Jotun Jotashield A.4.7.1.10 (b) 152.17 m2 38,795.90 5,903,669.09 m2 - - - 152.17 5,903,669.09 - m2 -
3. Dinding Sejajar Atap A.4.4.2.28 35.59 m2 38,795.90 1,380,893.65 m2 - - - 35.59 1,380,893.65 - m2 -
Sub Jumlah IX 19,113,212.86 - - - 19,113,212.86 - -
XI PEKERJAAN TATA UDARA - -
1. AC Split 2 PK Ex. Panasonic Dihitung - bh 7,999,000.00 - bh - - - - - - bh -
2. AC Split 1.5 PK Ex. Panasonic Dihitung - bh 6,095,000.00 - bh - - - - - - bh -
Sub Jumlah XI - - -
- -
- -
XI PEKERJAAN CCTV - -
1. Instalasi Fix Dome Camera A.8.1.1.5 titik - titik - - - - - - titik -
2. Fix Dome Camera A.8.1.1.6 bh - bh - - - - - - bh -
- -
Sub Jumlah XI - - -
Sub Jumlah E 766,260,505.86 - - - 766,260,505.86 - -
F PEKERJAAN DAN LAIN-LAIN - -
1. Pekerjaan Plat Duiker
a Galian Tanah A.2.3.1.1 1.89 m3 78,289.13 147,966.46 m3 - - - 1.89 147,966.46 - m3 -
b Pasangan Batu Padas Camp. 1:4 A.3.2.1.2 5.25 m3 649,624.65 3,410,529.41 m3 - - - 5.25 3,410,529.41 - m3 -
c Plesteran Dinding Camp. 1 : 4 A.4.4.2.4 10.08 m2 49,452.71 498,483.32 m2 - - - 10.08 498,483.32 - m2 -
d Balok Duiker
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 0.48 m3 1,044,341.91 501,284.12 m3 - - - 0.48 501,284.12 - m3 -
- Pembesian A.4.1.1.17 106.58 kg 11,468.73 1,222,343.21 kg - - - 106.58 1,222,343.21 - kg -
- Bekisting A.4.1.1.23 (a) 4.80 m2 170,245.33 817,177.58 m2 - - - 4.80 817,177.58 - m2 -
e Plat Beton Duiker
- Beton Cor F'c = 19,3 Mpa A.4.1.1.7 1.58 m3 955,047.29 1,504,199.48 m3 - - - 1.58 1,504,199.48 - m3 -
- Pembesian A.4.1.1.17 196.88 kg 11,468.73 2,257,906.22 kg - - - 196.88 2,257,906.22 - kg -
- Bekisting A.4.1.1.26 10.26 m2 262,562.22 2,693,888.38 m2 - - - 10.26 2,693,888.38 - m2 -
2. Pekerjaan Drainase Areal Samping
a Galian Tanah A.2.3.1.1 19.74 m3 78,289.13 1,545,427.43 m3 - - - 19.74 1,545,427.43 - m3 -
b Urugan Tanah Kembali A.2.3.1.9 6.58 m3 56,528.25 371,955.89 m3 - - - 6.58 371,955.89 - m3 -
c Pasangan Batu Padas A.3.2.1.2 21.57 m3 649,624.65 14,014,352.57 m3 - - - 21.57 14,014,352.57 - m3 -
d Plesteran Dinding Camp. 1 : 4 A.4.4.2.4 68.15 m2 49,452.71 3,370,202.19 m2 - - - 68.15 3,370,202.19 - m2 -
3. Pekerjaan Tiang Bendera Bahan Stainllessteel + Dudukan Ls 1.00 unit 5,500,000.00 5,500,000.00 unit - - - 1.00 5,500,000.00 - unit -
4. Pembuatan Logo BPS
- Logo Luar Depan uk. 80x80 cm Dihitung 1.00 unit 6,500,000.00 6,500,000.00 1.00 unit 6,500,000.00 - - - - 1.00 unit 6,500,000.00
- Logo Luar Gawangan Uk. 60x60 cm Dihitung 1.00 unit 5,500,000.00 5,500,000.00 1.00 unit 5,500,000.00 - - - - 1.00 unit 5,500,000.00
- Logo meja Resepsionis uk. 60x60 cm Dihitung 1.00 unit 5,500,000.00 5,500,000.00 1.00 unit 5,500,000.00 - - - - 1.00 unit 5,500,000.00
- Logo di Ruang Kepala Badan 60x60 cm Dihitung 1.00 unit 5,500,000.00 5,500,000.00 1.00 unit 5,500,000.00 - - - - 1.00 unit 5,500,000.00
- Logo di Ruang Rapat 60x60 cm Dihitung 1.00 unit 5,500,000.00 5,500,000.00 1.00 unit 5,500,000.00 - - - - 1.00 unit 5,500,000.00
5. Pembuatan Nama Tulisan BPS Stainlessteel Tampak Depan Dihitung 38.00 bh 204,000.00 7,752,000.00 38.00 bh 7,752,000.00 - - - - 38.00 bh 7,752,000.00
6. Pembuatan Nama Tulisan BPS Stainlessteel Dalam Banguna Dihitung 76.00 unit 170,000.00 12,920,000.00 76.00 unit 12,920,000.00 - - - - 76.00 unit 12,920,000.00
7. Pekerjaan Ramp
- Galian Tanah Rollag A.2.3.1.1 0.144 m3 78,289.13 11,273.63 m3 - - - 0.14 11,273.63 - m3 -
- Rollag A.4.4.1.9 1.08 m2 85,847.90 92,715.73 m2 - - - 1.08 92,715.73 - m2 -
- Beton Cor F'c = 12,2 Mpa A.4.1.1.3 0.918 m3 919,329.44 843,944.43 m3 - - - 0.92 843,944.43 - m3 -
8. Tangga Halaman
- Beton Cor F'c = 26,4 Mpa A.4.1.1.10 0.64 m3 1,044,341.91 667,334.48 m3 - - - 0.64 667,334.48 - m3 -
- Pembesian A.4.1.1.17 95.95 kg 11,468.73 1,100,414.33 kg - - - 95.95 1,100,414.33 - kg -
- Bakesting A.4.1.1.24 6.75 m2 420,941.37 2,841,354.25 m2 - - - 6.75 2,841,354.25 - m2 -