(1) (2) (3) (4) (5) (6)=4x5 (7) (8)=4x7 (9) (10)=4x9
A TENAGA KERJA :
I PEK. PERSIAPAN
1 Pengukuran dan pas Bouplank m 9.00 #N/A
II PEKERJAAN TANAH -
1 Galian Tanah m3 1.38 0.75 1.03
2 Urugan Tanah Kembali m3 0.34 0.50 0.17
3 Urug Tanah Timbunan Peninggian lantai m3 6.60 0.30 1.98
JUMLAH TENAGA
76.6287 53.6380 - -
( HOK )
BATACO Main Truss C 75.75 SPANDEKS paku skrup BESI @6 KAWAT BESI CAT AIR
NO URAIAN Satuan Volume
Volume Volume Volume Volume Volume Volume Volume Volume
Koef Koef Koef Koef Koef Koef Koef Koef
( Biji ) ( Kg ) ( m3 ) kg ( m3 ) ( m3 ) ( KG ) ( m3 )
(1) (2) (3) (4) (5) (6)=4x5 (7) (8)=4x7 (9) (10)=4x9 (11 (12)=4x11 (13) (14)=4x13 (13) (14)=4x13 (13) (14)=4x13 (13) (14)=4x13
B BAHAN/MATERIAL :
I PEK. PERSIAPAN -
1 Pengukuran dan pas Bouplank m 9.00
2 Papan nama Proyek Ls 1.00
- 0.00
II PEKERJAAN TANAH - 0.00
1 Galian Tanah m3 1.38
2 Urugan Tanah Kembali m3 0.34
3 Urug Tanah Timbunan Peninggian lantai m3 6.60
0.00
III PEK. PONDASI -
2 Pas. Batu Kali m3 2.64
3 Plesteran M2 6.60
4 Sloop 13/15 m3 0.31 215 67.6390
0.00
IV PEK. PASANGAN - 0.00
1 Pas Bataco m2 16.32 25.00 408.00
2 Pas dinding Rangka Baja Ringan m2 38.05 0.00 3.50 133.18
3 Pas Rangka Atap m2 37.50 0.00 3.07 114.94
4 Pas. Dinding Calsiboord m2 38.05 0.00 3.50 133.18
5 Pas. Atap Spandeks m2 37.50 0.00 3.50 131.25 1.05 39.38 0.0200 0.7500
6 Kusen Pintu dan Jendela bh 5.00 0.00 0.00
7 Pas daun Pintu dan Jendela bh 5.00 0.00 0.00
8 Plesteran m2 32.64 0.00
9 acian Dinding m2 32.64 0.00
10 Aian lantai m2 19.50 0.00
0.00 0.00
V PEK. PENGECATAN - 0.00 0.00
1 EXTERIOR M2 44.65 0.00 0.3600 16.0740
2 INTERIOR M2 52.75 0.00 0.3600 18.9900
C ALAT:
Alat bantu ( meteran, cepang, ember, cangkul,
PEMERINTAH KABUPATEN LOMBOK TENGAH
DESA UNGGA
Perhitungan Volume /
No. Uraian Pekerjaan Satuan Volume Pekerjaan Kuantitas
I PEK. PERSIAPAN Ls 1 = 1 1
1 Pengukuran dan pas Bouplank m 9 9 9
2 Papan nama Proyek Ls 1 1 1
II PEKERJAAN TANAH
1 Galian Tanah m3 0.25 x 0.25 x 22 x 1 = 1.38 1.38
2 Urugan Tanah Kembali m3 0.25 x 1.375 0.34375 0.34375
3 Urug Tanah Timbunan Peninggian lantai m3 0.3 22 1 6.6 6.6
m3
III PEK. PONDASI
2 Pas. Batu Kali m3 0.3 0.4 22.0 x 1 2.64 2.64
3 Plesteran M2 0.3 x 22.0 1 = 6.60 6.60
4 Sloop 13/15 m3 0.11 x 0.13 x 22 1 0.31 0.31
IV PEK. PASANGAN
1 Pas Bataco m2 0.8 x 22 - 1 16.32 16.32
2 Pas dinding Rangka Baja Ringan m2 1.95 22 5 38.05 38.05
3 Pas Rangka Atap m2 5 x 6 : cos 30 37.50 37.50
4 Pas. Dinding Calsiboord m2 38.05 38.05
5 Pas. Atap Spandeks m2 37.50 37.50
6 Kusen Pintu dan Jendela bh 5.00 5.00
7 Pas daun Pintu dan Jendela bh 5.00 5.00
8 Plesteran m2 32.64 32.64
9 acian Dinding m2 32.64 32.64
10 Aian lantai m2 3.9 5 19.50 19.50
V PEK. PENGECATAN
1 EXTERIOR M2 49.5 4.85 44.65 44.65
2 INTERIOR M2 26.4 2.15 24.25 52.75
31.2 2.7 28.50
VI UMUM
PKA LS 1.00 1.00
ATK LS 1.00 1.00
RAB DAN GAMBAR LS 1.00 1.00
PEMERINTAH KABUPATEN LOMBOK TENGAH
KECAMATAN PRAYA BARAT DAYA
DESA UNGGA
(1) (2) (3) (4) (5) (6)=4x5 (7) (8)=4x7 (9) (10)=4x9
A TENAGA KERJA :
I PEK. PERSIAPAN
1 Pengukuran dan pas Bouplank m 9.00 #N/A
II PEKERJAAN TANAH -
1 Galian Tanah m3 1.38 0.75 1.03
2 Urugan Tanah Kembali m3 0.34 0.50 0.17
3 Urug Tanah Timbunan Peninggian lantai m3 6.60 0.30 1.98
JUMLAH TENAGA
76.6287 53.6380 - -
( HOK )
BATU KALI SEMEN PASIR PASANG PASIR URUG TANAH URUG KERIKIL PASIR BETON AIR
NO URAIAN Satuan Volume
Volume Volume Volume Volume Volume Volume Volume Volume
Koef Koef Koef Koef Koef Koef Koef Koef
( Biji ) ( Kg ) ( m3 ) ( m3 ) ( m3 ) ( m3 ) ( m3 ) ( m3 )
(1) (2) (3) (4) (5) (6)=4x5 (7) (8)=4x7 (9) (10)=4x9 (11 (12)=4x11 (13) (14)=4x13 (13) (14)=4x13 (13) (14)=4x13 (13) (14)=4x13
B BAHAN/MATERIAL :
I PEK. PERSIAPAN -
1 Pengukuran dan pas Bouplank m 9.00
2 Papan nama Proyek Ls 1.00
- 0.00
II PEKERJAAN TANAH - 0.00
1 Galian Tanah m3 1.38
2 Urugan Tanah Kembali m3 0.34
3 Urug Tanah Timbunan Peninggian lantai m3 6.60 1.2000 7.9200
0.00
III PEK. PONDASI -
2 Pas. Batu Kali m3 2.64 1.20 3.17 136.00 359.04 0.54 1.44
3 Plesteran M2 6.60 7.78 51.32 0.01 0.08
4 Sloop 13/15 m3 0.31 352.00 110.74 0.00 0.7637 0.2403 0.5221 0.1643
0.00 0.00 0.00
IV PEK. PASANGAN - 0.00 0.00 0.00
1 Pas Bataco m2 16.32 9.68 157.98 0.05 0.73
2 Pas dinding Rangka Baja Ringan m2 38.05 0.00
3 Pas Rangka Atap m2 37.50 0.00
4 Pas. Dinding Calsiboord m2 38.05 0.00
5 Pas. Atap Spandeks m2 37.50 0.00
6 Kusen Pintu dan Jendela bh 5.00 0.00
7 Pas daun Pintu dan Jendela bh 5.00 0.00
8 Plesteran m2 32.64 7.78 253.81
9 acian Dinding m2 32.64 3.25 106.08
10 Aian lantai m2 19.50 3.25 63.38
0.00 0.00
V PEK. PENGECATAN - 0.00
1 EXTERIOR M2 44.65
2 INTERIOR M2 52.75
C ALAT:
Alat bantu ( meteran, cepang, ember, cangkul,
tiga puluh tiga juta tujuh ratus tiga puluh tujuh ribu rupiah
33,737,000.00 0.00 0 0.00
0.00 0 0.00 0.00 0.00
0.00 0 0.00
0.00 0 0.00
30,000,000.00 3 3.00 0.00 0.00 tiga tiga tiga
3,000,000.00 3 3.00 tiga tiga tiga
700,000.00 7 7.00 tujuh tujuh tujuh
30,000.00 3 3.00 0.00 0.00 tiga tiga tiga
7,000.00 7 7.00 tujuh tujuh tujuh
0.00 0 0.00
0.00 0 0.00 0.00 0.00
0.00 0 0.00
0.00 0 0.00 0.00 0.00
0.00 0 0.00
0.00 10.00 sepuluh
1.00 satu 11.00 sebelas
2.00 dua 12.00 dua belas
3.00 tiga 13.00 tiga belas
puluh puluh 4.00 empat 14.00 empat belas
juta juta 5.00 lima 15.00 lima belas
ratus ratus 6.00 enam 16.00 enam belas
puluh puluh 7.00 tujuh 17.00 tujuh belas
ribu ribu 8.00 delapan 18.00 delapan belas
9.00 sembilan 19.00 sembilan belas
rupiah rupiah
empat belas
delapan belas
sembilan belas
DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT
HARGA
NO. URAIAN SATUAN KETERANGAN
SATUAN
-
2. BAHAN ATAP -
Atap Multiroof m² 62,000.00
- Biasa m² 37,635.00
- Pasir m² 56,453.00
Genteng Lokal /Bh 1,232.00
Bubungan Genteng Lokal /Bh 1,541.00
- Melengkung m² 3,764.00
- Binting m² 2,509.00
Genteng Beton Pres Ukuran Besar /Bh 9,660.00
Bubungan Genteng Beton Pres Ukuran Besar /Bh 22,581.00
Genteng Beton Pres Ukuran Menengah /Bh 6,500.00
Bubungan Genteng Beton Pres Ukuran Menengah /Bh 15,000.00
Genteng Flat Motif Garis /Bh 12,000.00
Genteng Flat Motif Urat Batu /Bh 12,000.00
Genteng Flat Vertikal /Bh 12,000.00
Genteng Silang Kodok Palembang /Bh 6,273.00
Bubungan Silang Kodok Palembang /Bh 18,000.00
Genteng Mantili Besar /Bh 5,771.00
Bubungan Mantili Besar /Bh 10,000.00
Genteng Mantili Kecil /Bh 4,300.00
Bubungan Mantili Kecil /Bh 10,000.00
Genteng Pejaten Bali Besar /Bh 32,000.00
Bubungan Pejaten Bali Besar /Bh 7,500.00
Genteng Pejaten Mini Bali /Bh 3,100.00
Bubungan Pejaten Mini Bali /Bh 6,273.00
Genteng Pres Manual /Bh 650.00
Bubungan Pres Manual /Bh 3,120.00
Genteng Karang Pilang /Bh 6,700.00
Bubungan Karang Pilang /Bh 31,000.00
Genteng Kaca /Bh 25,000.00
Genteng Pejaten Lokal /Bh 1,800.00
Bubungan Pejaten Lokal /Bh 5,000.00
Genteng Keramik /Bh 21,000.00
Bubungan Genteng Keramik /Bh 23,000.00
Bubungan Tepi /Bh 11,600.00
Bubungan Ujung /Bh 50,000.00
Bubungan Metal Polos Warna 0,22 m 101,000.00 1x5
Genteng Metal Berpasir Warna Tebal 0,35 m² 137,000.00 1x5
Genteng Metal Berpasir 0,35 m Minimalis m² 125,000.00 2x2
Genteng Metal Berpasir 0,30 m Minimalis m² 116,000.00 2x2
Genteng Metal Berpasir Warna 0,25 m² 119,178.00
Asbes Bubungan Gelombang Besar /Lembar 35,126.00
Seng Gelombang Besar BJLS 20 /Lembar 66,000.00
Seng Gelombang Besar BJLS 25 /Lembar 71,000.00
Seng Gelombang Besar BJLS 30 /Lembar 74,000.00
Seng Plat BJLS 10 /Lembar 43,000.00
Seng Plat BJLS 20 /Lembar 50,180.00
Seng Plat BJLS 25 /Lembar 62,725.00
Seng Plat BJLS 30 /Lembar 75,270.00
Genteng Multitup 0,25 /Lembar 45,789.00
Genteng Multitup 0,35 /Lembar 56,453.00
Sepandek Warna /m' 75,000.00 0,35 x 1 m
Sepandek Warna /m' 50,180.00 0,25 x 1 m
Sepandek Warna /m' 43,908.00 0,20 x 1 m
Sepandek Polos /m' 37,635.00 0,35 x 1 m
Sepandek Polos /m' 31,363.00 0,25 x 1 m
Sepandek Polos /m' 25,090.00 0,20 x 1 m
Bubungan Sepandek Warna /m' 43,908.00
Sepandek Tebal 0,4 mm x 1 m /m' 80,000.00
Canal 0,70 BMT/0,75 TCT Ljr 80,000.00
Canal 0,60 BMT/0,65 TCT Ljr 75,000.00
Reng 0,40 BMT/0,45 TCT Ljr 45,000.00
Talang PVC Kotak /m' 55,000.00
Seng Talang L = 60 cm BJLS 20 /m' 35,000.00
Seng Talang L = 50 cm BJLS 20 /m' 30,000.00
Seng Talang L = 40 cm BJLS 20 /m' 25,000.00
Seng Talang L = 30 cm BJLS 20 /m' 16,500.00
-
3. HARGA BAJA RINGAN -
RANGKA C75, RENG B30 & TALANG GALVALUM -
Reng B-30 T=0,45 Galv (P=6 m') btg 47,671.00
Reng B-30 T=0,4 Galv (P=6 m') btg 45,000.00
Rangka C-7575 Galv P=7 m' btg 97,851.00
Rangka C-7565 Galv P=6 m' btg 87,815.00
Rangka C-75100 Galv P=7 m' btg 175,630.00
BAUT-BAUT BAJA RINGAN -
Skrew # 12 (Baut Kuda-kuda) @ 800 Pc Pc 376,000.00
Skrew # 10 (Baut Reng) @ 1000 Pc Pc 251,000.00
Baut Lisplank 12 # T 1 x 1/2 @ 200 Pc 502,000.00
Fisher (s10) Pc 125,000.00
Taping (Pasangan Fisher S 10) @ 400 Pc 125,000.00
Dinabolt 10 x 65 @ 150 Pc 2,509.00
Baut SDS 12 x 50 (Baut Spandek) @ 200 Pc 753,000.00
Ripet 440 Pc 55,198.00
Ripet 550 Pc 27,599.00
ALAT KERJA BAJA RINGAN -
Bor Maktek Type 601 Unit 514,345.00
Bor Beton Merk Makta Type HR 2020 Unit 482,983.00
Srew Driver M10 Buah 25,090.00
Mata Bor Beton Ø 10 mm SDS Unit 37,635.00
Gunting Baja Ringan (Domax) Buah 137,995.00
Gunting Baja Halus Buah 94,088.00
RANGKA C85, RENG B41 GALVALUM (Eceran Khusus) -
Rangka C 8585 Panjang @ 9 M" btg 288,535.00
Rangka C 8565 Panjang @ 9 M" btg 238,355.00
Reng B41 Panjang @ 6 M" btg 41,399.00
4. HARGA BAHAN KAYU -
Papan Kayu Klas I m³ 7,200,000.00
Balok Kayu Klas I m³ 7,000,000.00
Papan Kayu Klas II m³ 4,500,000.00
Balok Kayu Klas II m³ 4,500,000.00
Papan Kayu Klas III m³ 3,200,000.00
Balok Kayu Klas III m³ 3,200,000.00
Kayu untuk Bagisting m³ 2,340,000.00
Lys Plapond ( 1 x 3 x 4 ) m' 12,800.00
Lys Plapond ( 1 x 5 x 4 ) m' 15,000.00
Lys Plapond ( 3 x 3 x 4 ) m' 14,500.00
Lys Plapond ( 4 x 4 x 4 ) m' 36,500.00
Kayu Dolken / Perancah 8 - 10 cm m' 35,000.00
Kayu Bakar m³ 100,000.00
-
5. BAHAN BAMBU -
Bambu Besar ( p= 4 m, 08 - 12 cm ) Batang 39,000.00
Bambu Sedang ( p= 4 m, 06 - 8 cm ) Batang 32,500.00
Bambu Kecil ( p= 4 m, 03 - 5 cm ) Batang 29,900.00
Bedek Kulitan m² 45,500.00
Bedek Pagar m² 22,100.00
kampu m² 13,000.00
-
6. BAHAN CETAKAN -
Loster Jogja 25 x 25 cm Bh 54,600.00
Loster Jogja 30 x 30 cm Bh 67,600.00
Loster Jogja 20 x 20 cm Bh 48,100.00
Loster Jogja 40 x 40 cm Bh 100,100.00
Loster Jogja 40 x 20 cm Bh 67,600.00
Loster Jogja 30 x 20 cm Bh 54,600.00
Loster Bali 30 x 30 cm Bh 50,180.00
Loster Bali 25 x 25 cm Bh 56,453.00
Loster Bali 50 x 25 cm Bh 112,905.00
Loster Bali 40 x 40 cm Bh 87,815.00
Loster Jawa 23 x 23 cm Bh 51,435.00
Loster Jawa 23 x 12 cm Bh 68,998.00
Loster Keramik 30 x 30 cm Bh 68,998.00
Lubang Angin 10 x 20 cm Bh 5,018.00
Lubang Angin 20 x 20 cm Bh 8,782.00
Lubang Angin 30 x 30 cm Bh 24,463.00
Deuker Ø 40, p= 0,50 cm Bh 100,360.00
Deuker Ø 30, p= 0,50 cm Bh 43,908.00
Deuker Ø 20, p= 1 m Bh 62,725.00
Deuker Ø 30, p= 1 m Bh 100,360.00
Buis Ø 80, p= 0,50 cm Bh 137,995.00
Buis Ø 60, p= 0,50 cm Bh 100,360.00
Buis Sigaran Ø 25, p=0.50m Bh 18,818.00
Buis Sigaran Ø 20, p=1m Bh 43,908.00
Buis Sigaran Ø 15, p=1m Bh 31,363.00
Buis Sigaran Ø 30, p=1m Bh 56,453.00
Loster Beton Biasa 25 x 25 cm Bh 8,782.00
Loster Beton Biasa 20 x 20 cm Bh 6,273.00
Loster Beton Biasa 30 x 30 cm Bh 18,818.00
Sigaran U 40 cm (K175) Biji 148,031.00
Sigaran U 45 cm (k175) Biji 154,304.00
Sigaran U 55 cm (k175) Biji 160,576.00
Buis Ødalam = 25, Øluar = 40, p = 50 cm, tebal 7,5 Biji 25,090.00
Bataco 40 x 20 x 10 cm Manual Bh 2,007.00
Bataco 37 x 20 x 10 cm Manual Bh 1,882.00
Bataco 37 x 20 x 9 cm Manual Bh 3,136.00
Bataco 40 x 20 x 10 cm pres Bh 2,258.00
Bataco 37 x 20 x 10 cm Pres Bh 2,509.00
Bataco 37 x 20 x 9 cm Pres Bh 1,882.00
Paving Blok Segi Enam Manual m² 56,453.00
Paving Blok Bata Manual m² 56,453.00
Kansteen 20x40 (K200) bj 51,058.00
Kansteen 30x50 (K200) bj 57,707.00
Kansteen 30x60 (K300) bj 90,951.00
Paving Blok Tebal 8 cm K 100 m² 107,887.00
Paving Blok Tebal 8 cm K 200 m² 123,568.00
Paving Blok Tebal 8 cm K 300 m² 132,977.00
Paving Blok Tebal 8 cm K 400 m² 154,304.00
Paving Blok Tebal 6 cm K 200 m² 104,751.00
Paving Blok Tebal 6 cm K 300 m² 117,296.00
Paving Blok Tebal 6 cm K 400 m² 132,977.00
-
7. BAHAN LANTAI -
Keramik Dinding Kamar mandi Kw. I 20x25 cm m2 74,016.00
Keramik Lantai Kamar mandi 120x25 cm murah m2 65,234.00
Keramik Lantai Kamar mandi 20x20 cm m2 68,998.00
Marmer B1 40 x 60 m2 313,625.00
Marmer B1 60 x 60 m2 439,075.00
Marmer B1 40 x 40 m2 250,900.00
lantai Geranit kristal Black kw 40 x 40 m2 355,024.00
Lantai Geranit Mirror siena 40 x 40 m2 288,535.00
Lantai Geranit Mirror 40 x 40 m2 288,535.00
Marmer Tulung Agung m2 253,409.00
Batu Candi m2 156,813.00
Batu Endesit m2 200,720.00
Batu Paras Putih m2 137,995.00
Batu Marmo m2 169,358.00
Batu Granit m2 589,615.00
Batu Paras m2 163,085.00
Granit Niko m2 233,337.00
Granit Sandi Mas m2 210,756.00
Granit Granito m2 244,628.00
Lantai Granit Kw I Megolite GSM 03 30 x60 m2 317,389.00
-
8. BAHAN BESI -
Besi Ulir /Kg 33,872.00
Besi Polos /Kg 12,043.20
Besi Siku 4x4 /Kg 9,408.80
Baja Plat 1. 22 x 2.42x1.2mm Lembar 32,930.60
Kawat Ikat Beton Kg 25,090.00
Kawat Nyamuk Besi m² 37,635.00
Kawat Nyamuk Plastik m² 25,090.00
Kawat Saringan Pasir m² 37,635.00
Kawat Duri Rool 94,088.00
Kawat Talang 90.6 m m' 37,635.00
Angker Ø 22 mm p = 50 cm Bh 15,681.00
Angker Ø 16 mm p = 50 cm Bh 19,445.00
Baut/Mur Ø 25 mm Bh 12,545.00
Baut/Mur Ø 20 mm Bh 10,036.00
Baut/Mur Ø 15 mm Bh 7,527.00
Baut/Mur Ø 12 mm Bh 5,018.00
Baut / Mur 30 cm Bh 15,054.00
Baut / Mur 25 cm Bh 15,054.00
Baut / Mur 20 cm Bh 12,545.00
Baut / Mur 15 cm Bh 6,273.00
Blugel Komplit Bh 37,635.00
Angker kuda-kuda Ø 16 mm p= 40 cm Bh 37,635.00
Angker kuda-kuda Ø 12 mm p= 30 cm Bh 33,872.00
Baja Profil Siku Kg 23,836.00
Baja Pelat Kg 27,599.00
Baja Pelat 1,22 x 2,42 x 1,2 mm Lembar 627,250.00
Kawat Las Kotak 169,358.00
Besi Siku 30, 30, 3 m' 62,725.00
Besi Siku 40, 40, 4 m' 125,450.00
Besi Siku 50, 50, 5 m' 376,350.00
Besi Siku 60, 60, 6 m' 439,075.00
Besi Siku 70, 70, 7 m' 629,759.00
Pintu Roling Door Klas I m2 878,150.00
Pintu Roling Door Harmonika Klas I m2 1,254,500.00
-
9. BAHAN LANGIT-LANGIT / PLAPOND -
Eternit 100 x 100 cm Lembar 22,581.00
Triplek 120 x 240 x 2 mm Lembar 50,180.00
Triplek 120 x 240 x 3 mm Lembar 62,725.00
Triplek 120 x 240 x 4 mm Lembar 75,270.00
Triplek 120 x 240 x 6 mm Lembar 87,815.00
Triplek 120 x 240 x 9 mm Lembar 125,450.00
Triplek 120 x 240 x 12 mm Lembar 188,175.00
Triplek 120 x 240 x 18 mm Lembar 263,445.00
Triplek Lapis Aluminium Lembar 137,995.00
Triplek 3 x 7 Lembar 50,180.00
Polidor 3 x 7 Lembar 94,088.00
Calsiboard 120 x 240 x 3,5 mm Lembar 71,507.00
Calsiboard 120 x 240 x 6 mm Lembar 85,000.00
Plywood 120 x 240 x 3 mm Lembar 104,000.00
Blockwood Lembar 299,000.00
Teakblock Lembar 351,000.00
Teakwood 120 x 240 x 3 mm Lembar 123,500.00
Formika Warna 120 x 240 cm Lembar 78,000.00
Lys Gypsum 3 cm m' 13,000.00
Lys Gypsum 5 cm m' 17,000.00
Lys Gypsum 8 cm m' 20,000.00
Lys Gypsum 10 cm m' 25,000.00
Lys Gypsum 15 cm m' 35,290.00
Lys Gypsum 25 cm m' 39,040.00
GRC ( 6 mm ) Gypsum Lembar 78,000.00
GRC ( 9 mm ) Gypsum Lembar 115,000.00
GRC ( 12 mm ) Gypsum Lembar 125,000.00
Melamin 2 mm Lembar 84,500.00
Melamin 3 mm Lembar 117,000.00
Partikel 18 mm Lembar 236,600.00
Pintu Fiber Bh 299,000.00
-
10. HARGA BAHAN PIPA -
Pipa PVC Type S - 10 : SCJ : Solven -
PVC SCJ Ø 1/2" (20 mm) WP m 4,352.00 RRJ : Rubber Ring
PVC SCJ Ø 3/4" ( 25 m) WP m 6,528.00
PVC SCJ Ø 1" (32 m) WP m 11,392.00
PVC SCJ Ø 1 1/4" (40 mm) WP m 16,896.00
PVC SCJ Ø 1 1/2" (50 mm) m 26,880.00
PVC SCJ Ø 2" ( 63 mm) m 42,079.00
PVC SCJ Ø 2 1/2" ( 75 mm) m 59,824.00
PVC SCJ Ø 3" ( 90 mm) m 86,187.00
PVC SCJ Ø 4" (110 mm) m 127,199.00
PVC SCJ Ø 6" (160 mm) m 269,292.00
PVC SCJ Ø 8" (200 mm) m 448,961.00
PVC SCJ Ø 10" ( 250 mm) m 700,459.00
PVC SCJ Ø 12" (315 mm) m 1,115,499.00
PVC RRJ Ø 2" ( 63 mm) m 46,529.00
PVC RRJ Ø 2 1/2" (75 mm) m 65,190.00
PVC RRJ Ø 3" ( 90 mm) m 91,754.00
PVC RRJ Ø 4" (110 mm) m 135,439.00
PVC RRJ Ø 6" (160 mm) m 280,949.00
PVC RRJ Ø 8" ( 200 mm) m 467,963.00
PVC RRJ Ø 10" ( 250 mm) m 724,931.00
PVC RRJ Ø 12" (315 mm) m 1,146,910.00
PVC RRJ Ø 14" (355 mm) m 1,637,864.00
PVC RRJ Ø 16"- ( 400 mm) m 2,078,517.00
Pipa PVC Type S - 12,5 : -
PVC SCJ Ø 1/2" (20 mm) m 4,129.00
PVC SCJ Ø 3/4" (25 mm) m 6,203.00
PVC SCJ Ø 1" ( 32 mm) m 9,849.00
PVC SCJ Ø 1 1/4" (40 mm) m 15,126.00
PVC SCJ Ø 1 1/2" - (50 mm) m 23,191.00
PVC SCJ Ø 2" (63 mm) m 32,622.00
PVC SCJ Ø 2 1/2" (75 mm) m 47,940.00
PVC SCJ Ø 3" (90 mm) m 69,398.00
PVC SCJ Ø 4" (110 mm) m 102,680.00
PVC SCJ Ø 6" (160 mm) m 219,724.00
PVC SCJ Ø 8" (200 mm ) m 364,444.00
PVC SCJ Ø 10" - ( 250 mm ) m 571,427.00
PVC SCJ Ø 12" (315 mm) m 90,950.00
PVC RRJ Ø 2" (63 mm) m 38,576.00
PVC RRJ Ø 2 1/2" (75 mm) m 54,355.00
PVC RRJ Ø 3" (90 mm) m 76,512.00
PVC RRJ Ø 4" (110 mm) m 110,669.00
PVC RRJ Ø 6" (160 mm) m 231,068.00
PVC RRJ Ø 8" (200 mm) m 382,079.00
PVC RRJ Ø 10" (250 mm) m 595,028.00
PVC RRJ Ø 12" (315 mm) m 939,926.00
PVC RRJ Ø 14" (355 mm) m 1,214,522.00
PVC RRJ Ø 16" - (400 mm) m 1,593,842.00
Band PVC RRJ 45° dia 8" Buah 648,025.00
Band PVC RRJ 45° dia 6" Buah 363,146.00
Band PVC RRJ 45° dia 4" Buah 175,386.00
Band PVC RRJ 45° dia 3" Buah 117,178.00
Band PVC RRJ 90° dia 2,5" Buah 106,382.00
Band PVC RRJ 90° dia 2" Buah 71,931.00
Band PVC RRJ 90° dia 1,5" Buah 33,219.00
Band PVC RRJ 90° dia 3" Buah 752,956.00
Band PVC RRJ 90° dia 3'' Buah 413,974.00
Band PVC RRJ 90° dia 4" Buah 193,885.00
Band PVC RRJ 90° dia 3" Buah 136,631.00
Band PVC RRJ 90° dia 2,5" Buah 121,584.00
Band PVC RRJ 90° dia 2" Buah 82,169.00
Band PVC RRJ 90° dia 1,5" Buah 37,648.00
Packing dia 8" Buah 43,423.00
Packing dia 6" Buah 30,396.00
Packing dia 5" Buah 27,139.00
Packing dia 4" Buah 20,626.00
Packing dia 3" Buah 18,455.00
Packing dia 2" Buah 14,112.00
Pipa Gl Medium A dia 8" m 1,120,000.00
Pipa Gl Medium A dia 6" m 524,013.00
Pipa GI Medium A dia 4" m 354,267.00
Pipa Gl Medium A dia 3" m 262,085.00
Pipa GI Medium A dia 2,5" m 178,941.00
Pipa Gl Medium A dia 2" m 137,368.00
Pipa Gl Medium A dia 1,5 m 97,604.00
Pipa Gl Medium A dia 1" m 70,492.00
Pipa Gl Medium A dia 3/4" m 36,228.00
Pipa Gl Medium A dia 1/2" m 34,342.00
Pipa Gl Medium B dia 8" m 1,084,492.00
Pipa Gl Medium B dia 6" m 397,646.00
Pipa Gl Medium B dia 4" m 240,395.00
Pipa Gl Medium B dia 3" m 177,135.00
Pipa Gl Medium B dia 2,5" m 142,762.00
Pipa Gl Medium B dia 2" m 313,625.00
Pipa Gl Medium B dia 1,5" m 188,175.00
Pipa Gl Medium B dia 1" m 112,905.00
Pipa Gl Medium B dia 3/4" m 87,815.00
Pipa Gl Medium B dia 1/2" m 75,270.00
Band Gl All - Flange 90° dia 8" Buah 1,411,251.00
Band Gl All - Flange 90° dia 6" Buah 1,031,297.00
Band Gl All - Flange 90° dia 4" Buah 597,067.00
Band Gl All - Flange 90° dia 3" Buah 531,933.00
Band Gl All - Flange 90° dia 2,5" Buah 466,797.00
Band Gl All - Flange 90° dia 2" Buah 369,097.00
Band Gl All - Flange 45° dia 8" Buah 1,356,971.00
Band Gl All - Flange 45° dia 6" Buah 977,020.00
Band Gl All - Flange 45° dia 4" Buah 564,500.00
Band Gl All - Flange 45° dia 3" Buah 499,366.00
Band Gl All - Flange 45° dia 2,5" Buah 445,087.00
Band Gl All - Flange 45° dia 2" Buah 347,385.00
Socket Gl dia 6" Buah 390,808.00
Socket Gl dia 4" Buah 143,296.00
Socket Gl dia 3" Buah 86,846.00
Socket Gl dia 2,5" Buah 58,621.00
Socket Gl dia 2" Buah 32,567.00
Socket Gl dia 1,5" Buah 20,626.00
Socket Gl dia 1" Buah 11,941.00
Socket Gl dia 3/4" Buah 18,818.00
Socket Gl dia 1/2" Buah 12,545.00
Screen dia 8" Buah 3,148,173.00
Screen dia 6" Buah 2,605,384.00
Screen dia 4" Buah 911,884.00
Screen dia 2,5" Buah 542,789.00
Screen dia 2" Buah 349,196.00
Pipa PVC klas AW-4m dia 4" Batang 326,170.00
Pipa PVC klas AW-4m dia 3" Batang 213,265.00
Pipa PVC klas AW-4m dia 2,5" Batang 106,633.00
Pipa PVC klas AW-4m dia 2" Batang 81,543.00
Pipa PVC klas AW-4m dia 1,5" Batang 68,998.00
Pipa PVC klas AW-4m dia 1" Batang 50,180.00
Pipa PVC klas AW-4m dia 3/4" Batang 37,635.00
Pipa PVC klas AW-4m dia 1/2" Batang 31,363.00
Pipa PVC klas D -4m dia 4" Batang 196,329.00
Pipa PVC klas D -4m dia 3" Batang 208,749.00
Pipa PVC klas D -4m dia 2,5" Batang 104,374.00
Pipa PVC klas D -4m dia 2" Batang 80,288.00
Pipa PVC klas D -4m dia 1,5" Batang 71,507.00
Pipa PVC klas C - 4m dia 4" Batang 107,385.00
Pipa PVC klas C - 4m dia 3" Batang 82,797.00
Pipa PVC klas C - 4m dia 2,5" Batang 66,739.00
Pipa PVC klas C - 4m dia 2" Batang 52,689.00
Pipa PVC klas C - 4m dia 1,2" Batang 37,635.00
Pipa PVC klas C - 4m dia 1" Batang 25,090.00
Pipa PVC klas C - 4m dia 3/4" Batang 18,818.00
Pipa PVC klas C - 4m dia 1/2" Batang 15,054.00
Fauket Socket PVC dia 4" Buah 60,969.00
Fauket Socket PVC dia 3" Buah 41,273.00
Fauket Socket PVC dia 2,5" Buah 56,202.00
Fauket Socket PVC dia 2" Buah 23,459.00
Fauket Socket PVC dia 1,5" Buah 24,086.00
Fauket Socket PVC dia 1" Buah 8,029.00
Fauket Socket PVC dia 3/4" Buah 4,767.00
Fauket Socket PVC dia 1/2" Buah 2,509.00
Flange Socket dia 4" Buah 12,545.00
Flange Socket dia 3" Buah 8,782.00
Flange Socket dia 2,5" Buah 7,527.00
Flange Socket dia 2" Buah 152,498.00
Flange Socket dia 1,5" Buah 152,498.00
Flange Spigot dia 4" Buah 217,310.00
Flange Spigot dia 3" Buah 173,468.00
Flange Spigot dia 2,5" Buah 144,873.00
Flange Spigot dia 2" Buah 127,590.00
Flange Spigot dia 1,5" Buah 127,717.00
Valve Socket PVC dia 4" Buah 61,951.00
Valve Socket PVC dia 3" Buah 41,937.00
Valve Socket PVC dia 2,5" Buah 38,125.00
Valve Socket PVC dia 2" Buah 23,828.00
Valve Socket PVC dia 1,5" Buah 23,836.00
Valve Socket PVC dia 1" Buah 5,018.00
Valve Socket PVC dia 3/4" Buah 3,764.00
Valve Socket PVC dia 1/2" Buah 2,509.00
Stop Kran dia 4" Buah 564,525.00
Stop Kran dia 3" Buah 376,350.00
Stop Kran dia 2,5" Plastik Buah 250,900.00
Stop Kran dia 2" Plastik Buah 94,088.00
Stop Kran dia 1,5" Plastik Buah 62,725.00
Stop Kran dia 1" Plastik Buah 43,908.00
Stop Kran dia 3/4" Buah 100,360.00
Stop Kran dia 1/2" Buah 87,815.00
Doble Niple dia 4" Buah 108,656.00
Doble Niple dia 3" Buah 68,624.00
Doble Niple dia 2,5" Buah 40,031.00
Doble Niple dia 2" Buah 22,875.00
Doble Niple dia 1,5" Buah 18,109.00
Doble Niple dia 1" Buah 8,768.00
Doble Niple dia 3/4" Buah 6,101.00
Doble Niple dia 1/2" Buah 12,545.00
Water Mour dia 4" Buah 400,310.00
Water Mour dia 3" Buah 217,310.00
Water Mour dia 2,5" Buah 137,250.00
Water Mour dia 2" Buah 78,155.00
Water Mour dia 1,5" Buah 106,005.00
Water Mour dia 1" Buah 25,090.00
Water Mour dia 3/4" Buah 18,818.00
Water Mour dia 1/2" Buah 12,545.00
Keni Gl dia 4" Buah 200,155.00
Keni Gl dia 3" Buah 114,374.00
Keni Gl dia 2,5" Buah 74,343.00
Keni Gl dia 2" Buah 41,937.00
Keni Gl dia 1,5" Buah 27,640.00
Keni Gl dia 1" Buah 29,355.00
Keni Gl dia 3/4" Buah 18,818.00
Keni Gl dia 1/2" Buah 12,545.00
Atap Kran Ø 3/4" Buah 33,359.00
Atap Kran Ø 1/2" Buah 22,875.00
Pelampung dia 2" Buah 1,524,988.00
Pelampung dia 1,5" Buah 667,184.00
Pelampung dia 1" Buah 372,587.00
Pelampung dia 3/4" Buah 100,360.00
Pelampung dia 1/2" Buah 81,543.00
Flange Las dia 8" Buah 333,590.00
Flange Las dia 6" Buah 228,749.00
Flange Las dia 4" Buah 133,437.00
Flange Las dia 3" Buah 114,374.00
Flange Las dia 2,5" Buah 95,313.00
Flange Las dia 2" Buah 85,780.00
Tee PVC dia 8"x8" Buah 1,744,204.00
Tee PVC dia 8"x6" Buah 1,563,114.00
Tee PVC dia 8"x4" Buah 1,296,239.00
Tee PVC dia 8"x3" Buah 1,334,365.00
Tee PVC dia 6"x6" Buah 743,433.00
Tee PVC dia 6"x4" Buah 648,120.00
Tee PVC dia 6"x3" Buah 581,402.00
Tee PVC dia 4"x4" Buah 388,895.00
Tee PVC dia 4"x3" Buah 369,810.00
Tee PVC dia 4"x2" Buah 339,192.00
Tee PVC dia 3"x3" Buah 244,628.00
Tee PVC dia 3"x2" Buah 213,499.00
Tee PVC dia 3"x1,5" Buah 257,341.00
Tee PVC dia 2"x2" Buah 148,687.00
Tee PVC dia 2"x1,5" Buah 152,498.00
Tee PVC dia 2"x1" Buah 152,498.00
Tee PVC dia 1"x1" Buah 5,018.00
Tee PVC dia 1"x3/4" Buah 11,437.00
Tee PVC dia 1"x1/2" Buah 6,273.00
Dop Flange dia 8" Buah 667,184.00
Dop Flange dia 6" Buah 438,435.00
Dop PVC dia 4" Buah 15,054.00
Dop PVC dia 3" Buah 10,036.00
Dop PVC dia 2,5" Buah 8,782.00
Dop PVC dia 2" Buah 7,527.00
Dop PVC dia 1,5" Buah 12,545.00
Dop PVC dia 1" Buah 5,018.00
Dop PVC dia 3/4" Buah 4,391.00
Dop PVC dia 1/2" Buah 3,136.00
Air Valve Singel dia 1,5" Buah 953,118.00
Air Valve Singel dia 1" Buah 333,590.00
Air Valve Singel dia 3/4" Buah 333,590.00
Air Valve Singel dia 1/2" Buah 333,590.00
Gante Valve All - Flange dia 8" Buah 4,289,000.00
Gante Valve All - Flange dia 6" Buah 2,954,000.00
Gante Valve All - Flange dia 4" Buah 1,620,000.00
Gante Valve All - Flange dia 3" Buah 1,448,000.00
Gante Valve All - Flange dia 2,5" Buah 1,143,000.00
Gante Valve All - Flange dia 2" Buah 810,151.00
Gante Valve All - Flange dia 1,5" Buah 762,494.00
Cleam Sandel dia 8" x 1" Buah 333,590.00
Cleam Sandel dia 6" x 1" Buah 162,031.00
Cleam Sandel dia 4" x 1" Buah 66,718.00
Cleam Sandel dia 4" x 3/4" Buah 66,718.00
Cleam Sandel dia 4" x 1/2" Buah 66,718.00
Cleam Sandel dia 3" x 1" Buah 57,188.00
Cleam Sandel dia 3" x 3/4" Buah 57,188.00
Cleam Sandel dia 3" x 1/2" Buah 57,188.00
Gibould Joint PVC dia 8" Buah 905,461.00
Gibould Joint PVC dia 6" Buah 524,214.00
Gibould Joint PVC dia 4" Buah 333,590.00
Gibould Joint PVC dia 3" Buah 266,873.00
Gibould Joint Foor ACP dia 8" Buah 1,086,666.00
Gibould Joint Foor ACP dia 6" Buah 629,058.00
Reducer PVC dia 8"x6" Buah 667,184.00
Reducer PVC dia 6"x4" Buah 362,186.00
Reducer PVC dia 4"x3" Buah 15,054.00
Reducer PVC dia 3"x2,5" Buah 10,036.00
Reducer PVC dia 2,5"x2" Buah 8,782.00
Reducer PVC dia 2"x1,5" Buah 7,527.00
Reducer PVC dia 2"x1" Buah 18,818.00
Water Meter dia 3/4" Buah 410,598.00
Water Meter dia 1/2" Buah 217,279.00
Box Meter Buah 62,976.00
Hu Fiber Glass (2m3) Buah 3,450,000.00
-
11. BAHAN KACA -
Kaca Polos 3 mm m² 156,813.00
Kaca Polos 5 mm /m² 288,535.00
Kaca Raybend 3 mm /m² 169,358.00
Kaca Raybend 5 mm /m² 294,808.00
Lys kaca /m' 6,273.00
Kerangka Nako 5 mm Bh 31,363.00
Glass Blok Bh 31,363.00
-
12. FINISHING -
Amplas Kayu /Meter 12,000.00
Amplas Air /Lembar 6,000.00
Selang Air 1" roll 350,000.00
Selang Air 3/4" roll 310,000.00
Selang Air 1/2" roll 180,000.00
Cat Besi Kg 75,000.00
Plamir Tembok Kg 35,000.00
Minyak Cat Ltr 43,908.00
Minyak Cat Spesial Ltr 50,180.00
Aqua Proff Kg 68,998.00
Cat Marka Jalan Strada Kg 98,604.00
Cat Marka Jalan Scalato Kg 81,919.00
FASILITAS LALU LINTAS -
Pagar Pengaman Jalan (Guard rail ) M 1,500,000.00
Rambu Jalan : -
-Ukuran 60 x 60 cm + Tiang 3 M P.lombok Buah 1,350,000.00
-Ukuran 60 x 60 cm + Tiang 3 M P.sumbawa Buah 796,000.00
Penunjuk Jalan : -
-RPPJ 90 x 120 cm + 2 Tiang Buah 2,180,000.00
-RPPJ 120 x 160 cm + 2 Tiang Buah 5,160,000.00
Teer Blk 62,725.00
Meni Besi Kg 40,000.00
Meni Kayu Kg 37,000.00
Teak Oil Kg 69,123.00
Resido Ltr 21,000.00
Plamir Kayu Kg 35,000.00
Cat Genteng Mutu Tinggi Galon 175,000.00
Cat Genteng Mutu Rendah Galon 135,000.00
Politur Air Ltr 94,088.00
Politur I Pager Ltr 50,180.00
Politur kayu warna Ltr 75,270.00
Kuas Cat 5" Bh 18,818.00
Kuas Cat 4" Bh 12,545.00
Kuas Cat 3" Bh 10,036.00
Kuas Cat 2,5" Bh 7,527.00
Kuas Cat 2" Bh 6,273.00
Kuas Cat 1,5" Bh 5,018.00
Rol Cat Besar Bh 25,090.00
Rol Cat Kecil Bh 18,818.00
Solar Ltr 6,900.00
Oli Minyak Pelumas Ltr 40,771.00
Soda Api Ltr 25,090.00
Build Kg 2,509.00
Cat Tembok Mutu Sedang Kg 37,635.00
Cat Tembok Mutu Tinggi (interior) Kg 13,799.50
Cat Tembok Mutu Tinggi (exterior) kg 13,799.50
Spiritus Ltr 25,090.00
Cairan Pengupas Cat Ltr 56,453.00
Minyak Bekisting Ltr 33,370.00
Cat Genteng Taka Kg 33,370.00
Cat Batu Alam Arca Kg 112,905.00
Lem Kayu Kg 17,563.00
Cat Kayu Mutu Menengah Kg 70,000.00
Cat Kayu Mutu Tingggi Kg 75,000.00
Air Cat Spesial Ltr 45,000.00
Cat Meni Kg 25,090.00
Plamir Kayu Kg 25,090.00
-
13. BAHAN PENGUNCI -
Kunci Pintu Kuda Terbang Unit 100,360.00
Kunci Pintu Handal 1 Set Unit 376,350.00
Kunci Fauri Besar Unit 219,538.00
Kunci Imperial Besar Unit 156,813.00
Kunci Misin Unit 161,831.00
Kunci Jangkar Unit 106,633.00
Kunci Falor Unit 125,450.00
Kunci Pintu Tanggung Faori Unit 169,358.00
Union 2 Slag Unit 1,000,000.00
Kunci Pintu Yale 2 Slag Unit 138,999.00
Kunci Pintu Jangkar Buah 114,160.00
Kunci Tanam Biasa Bagus Buah 114,160.00
Kunci Pintu Merk Erdoz Buah 145,522.00
Kunci Silinder I set Buah 254,538.00
Kunci Kodai Buah 125,450.00
Kunci Fauri Buah 188,175.00
Kunci Crocodile Buah 100,360.00
Kunci Gembok Besar Buah 56,453.00
Hak Angin Besar Pasang 37,635.00
Hak Angin Menengah Pasang 25,090.00
Hak Angin Kecil Pasang 6,273.00
Grendel Besar Klas Biasa Buah 31,363.00
Grendel Besar Klas Menengah Buah 18,818.00
Grendel Besar Klas Tinggi Buah 55,574.00
Grendel Tanam Buah 94,088.00
Ensel H Pasang 12,545.00
Beugel Komplit Buah 43,908.00
-
14. BAHAN SANITAIRE -
Klosed Duduk Merk TOTO Unit 4,860,000.00
Klosed Duduk American Standar Unit 1,880,000.00
Klosed Jongkok Unit 137,995.00
Wastafel dan Accesoris set 627,250.00
Bak Air Sudut Fiber Unit 282,263.00
Bak Cuci Piring Stainles Buah 219,538.00
Kran ½ Klas Biasa Buah 18,818.00
Kran ½ Klas Menengah Buah 37,635.00
Kran ½ Klas Tinggi Buah 75,270.00
Kran ¾ Klas Biasa Buah 25,090.00
Kran ¾ Klas Menengah Buah 37,635.00
Kran ¾ Klas Tinggi Buah 100,360.00
Stop Kran ½ Buah 87,815.00
Stop Kran ¾ Buah 37,635.00
Hand Shower Unit 188,175.00
-
15. HARGA BAHAN PAKU -
Paku Panjang 1 - 3 cm Kg 22,500.00
Paku Panjang 3 - 5 cm Kg 22,500.00
Paku Panjang 5 - 7 cm Kg 22,500.00
Paku Panjang 4 - 6 cm Kg 22,500.00
Paku Panjang 7 - 12 cm Kg 22,500.00
Paku Asbes Kg 40,000.00
Skrup / Diks 1,5 cm Kotak 100,000.00
Skrup / Diks 2,0 cm Kotak 150,000.00
Paku Beton Kotak 25,000.00
Paku Seng Ulir Kg 50,000.00
Paku Kasiboard Kotak 35,000.00
Paku Gypsum Kg 35,000.00
Baugel / Kuda-kuda 8 x 40 cm Bh 37,635.00
Baugel / Kuda-kuda 8 x 50 cm Bh 50,000.00
Baut/Mur Ø 12 5-20cm Bh 50,000.00
Baut/Mur Ø 14 15 cm Bh 7,500.00
Baut/Mur Ø 14 20cm Bh 8,750.00
Baut Kuda-kuda Baja Ø 17 mm (25 cm) Bh 10,000.00
Baut Kuda-kuda Baja Ø 17 mm (30 cm) Bh 11,000.00
-
16. BAHAN INSTALASI LISTRIK -
Titik Lampu /titik 13,800.00
Stop Kontak Tanam Double /buah 24,000.00
Stop Kontak Tanam Engkel /buah 17,000.00
Stop Kontak Luar /buah 18,000.00
Zekering Box 1 Group /unit 13,800.00
Zekering Box 2 Group /unit 18,000.00
Zekering Box 3 Group /unit 90,000.00
NYA 1,5 mm Visicom (1 Roll) 100 m 225,000.00
NYA 2,5 mm Visicom (1 Rol) 100 m 450,000.00
NYA 4 mm /m' 12,000.00
NYM 2x1,5 mm Visicom /m' 9,000.00
NYM 3x1,5 mm Visicom /m' 12,500.00
YM 3x4 mm Visicom /m' 25,000.00
YM 3x4,5 mm /m' 35,000.00
YM 4X1,5 mm Visicom /m' 24,000.00
YM 4X2,5 mm Visicom /m' 35,000.00
YM 4x4 mm Visicom (NYY) /m' 65,000.00
YM 4x6 mm Visicom /m' 80,000.00
YM 4x10 mm Visicom ( NYY) /m' 120,000.00
YM 4x16 mm Visicom (NYY) /m' 175,000.00
YY 2x1,5 mm Visicom /m' 20,000.00
YY 2x2,5 mm Visicom /m' 12,000.00
YY 3x1,5 mm Visicom /m' 13,500.00
-
-
1000 232000 232.000 185600
1000 232000 232.000 185600
1000 232000 232.000 185600
1000 232000 232.000 185600
1000 0
1000 557000 557.000 445600
1000 609000 609.000 487200
1000 642000 642.000 513600 2,568,000.00
1000 674000 674.000 539200
1000 0 0
1000 481000 481.000 384800
1000 404000 404.000 323200
1000 449000 449.000 359200
1000 195000 195.000 156000
1000 288000 288.000 230400
1000 321000 321.000 256800
1000 545000 545.000 436000
1000 0 0
1000 208000 208.000 166400
1000 200000 200.000 160000
1000 321000 321.000 256800
1000 321000 321.000 256800
1000 0 0
1000 288000 288.000 230400
1000 219000 219.000 175200
1000 188000 188.000 150400
1000 111000 111.000 88800
1000 94000 94.000 75200
1000 156000 156.000 124800
1000 146000 146.000 116800
1000 1066 1 852.8
1000 1035 1 828
1000 182000 182.000 145600
1000 205000 205.000 164000
1000 205000 205.000 164000
1000 205000 205.000 164000
1000 205000 205.000 164000
1000 7527 7.527 6021.6
1000 3011 3.011 2408.8
1000 18000 18.000 14400
1000 3700 3.700 2960
1000 65000 75.000 52000
1000 74000 74.000 59200
1000 72000 72.000 57600
1000 71000 71.000 56800
1000 156000 156.000 124800
1000 74000 74.000 59200
1000 192000 192.000 153600
1000 70000 70.000 56000
1000 247000 247.000 197600
0
1000 0 0
1000 0 0
1000 62000 62.000 49600
1000 37635 37.635 30108
1000 56453 56.453 45162.4
1000 1232 1.232 985.6
1000 1541 1.541 1232.8
1000 3764 3.764 3011.2
1000 2509 2.509 2007.2
1000 9660 9.660 7728
1000 22581 22.581 18064.8
1000 6500 6.500 5200
1000 15000 15.000 12000
1000 12000 12.000 9600
1000 12000 12.000 9600
1000 12000 12.000 9600
1000 6273 6.273 5018.4
1000 18000 18.000 14400
1000 5771 5.771 4616.8
1000 10000 10.000 8000
1000 4300 4.300 3440
1000 10000 10.000 8000
1000 32000 32.000 25600
1000 7500 7.500 6000
1000 3100 3.100 2480
1000 6273 6.273 5018.4
1000 1250 1 1000
1000 3120 3.120 2496
1000 6700 6.700 5360
1000 31000 31.000 24800
1000 25000 25.000 20000
1000 1800 1.800 1440
1000 5000 5.000 4000
1000 21000 21.000 16800
1000 23000 23.000 18400
1000 11600 11.600 9280
1000 50000 50.000 40000
1000 101000 101.000 80800
1000 137000 137.000 109600
1000 125000 125.000 100000
1000 116000 116.000 92800
1000 119178 119.178 95342.4
1000 35126 35.126 28100.8
1000 66000 66.000 52800
1000 71000 71.000 56800
1000 74000 74.000 59200
1000 43000 43.000 34400
1000 50180 50.180 40144
1000 62725 62.725 50180
1000 75270 75.270 60216
1000 45789 45.789 36631.2
1000 56453 56.453 45162.4
1000 75000 75.000 60000
1000 50180 50.180 40144
1000 43908 43.908 35126.4
1000 37635 37.635 30108
1000 31363 31.363 25090.4
1000 25090 25.090 20072
1000 43908 43.908 35126.4
1000 100360 100.360 80288
1000 100360 100.360 80288
1000 94088 94.088 75270.4
1000 48298 48.298 38638.4
1000 68998 68.998 55198.4
1000 37635 37.635 30108
1000 31363 31.363 25090.4
1000 25090 25.090 20072
1000 18818 18.818 15054.4
1000 0 0
1000 0 0
1000 0 0
1000 47671 47.671 38136.8
1000 45000 45000.000 36000
1000 97851 97.851 78280.8
1000 87815 87.815 70252
1000 175630 175.630 140504
1000 0 0
1000 376000 376 300800
1000 251000 251 200800
1000 502000 502 401600
1000 125000 125 100000
1000 125000 125 100000
1000 2509 2.509 2007.2
1000 753000 753 602400
1000 55198 55.198 44158.4
1000 27599 27.599 22079.2
1000 0 0
1000 514345 514.345 411476
1000 482983 482.983 386386.4
1000 25090 25.090 20072
1000 37635 37.635 30108
1000 137995 137.995 110396
1000 94088 94.088 75270.4
1000 0 0
1000 288535 288.535 230828
1000 238355 238.355 190684
1000 41399 41.399 33119.2
1000 0 0
1000 10500000 10.500.000 8400000
1000 10000000 10.000.000 8000000
1000 9000000 9.000.000 7200000
1000 8750000 8.750.000 7000000
1000 5700000 5.700.000 4560000
1000 5000000 5.000.000 4000000
1000 2340000 2.340.000 1872000
1000 12800 12.800 10240
1000 19510 19.510 15608
1000 19200 19.200 15360
1000 45500 45.500 36400
1000 45000 45.000 36000
1000 130000 130.000 104000
1000 0 0
1000 0 0
1000 39000 39.000 31200
1000 32500 32.500 26000
1000 29900 29.900 23920
1000 45500 45.500 36400
1000 22100 22.100 17680
1000 13000 13.000 10400
1000 0 0
1000 0 0
1000 54600 54.600 43680
1000 67600 67.600 54080
1000 48100 48.100 38480
1000 100100 100.100 80080
1000 67600 67.600 54080
1000 54600 54.600 43680
1000 50180 50.180 40144
1000 56453 56.453 45162.4
1000 112905 112.905 90324
1000 87815 87.815 70252
1000 51435 51.435 41148
1000 68998 68.998 55198.4
1000 68998 68.998 55198.4
1000 5018 5.018 4014.4
1000 8782 8.782 7025.6
1000 24463 24.463 19570.4
1000 100360 100.360 80288
1000 43908 43.908 35126.4
1000 62725 62.725 50180
1000 100360 100.360 80288
1000 137995 137.995 110396
1000 100360 100.360 80288
1000 18818 18.818 15054.4
1000 43908 43.908 35126.4
1000 31363 31.363 25090.4
1000 56453 56.453 45162.4
1000 8782 8.782 7025.6
1000 6273 6.273 5018.4
1000 18818 18.818 15054.4
1000 148031 148.031 118424.8
1000 154304 154.304 123443.2
1000 160576 160.576 128460.8
1000 25090 25.090 20072
1000 2007 2.007 1605.6
1000 1882 1.882 1505.6
1000 3136 3.136 2508.8
1000 2258 2.258 1806.4
1000 2509 2.509 2007.2
1000 1882 1.882 1505.6
1000 56453 56.453 45162.4
1000 56453 56.453 45162.4
1000 51058 51.058 40846.4
1000 57707 57.707 46165.6
1000 90951 90.951 72760.8
1000 107887 107.887 86309.6
1000 123568 123.568 98854.4
1000 132977 132.977 106381.6
1000 154304 154.304 123443.2
1000 104751 104.751 83800.8
1000 117296 117.296 93836.8
1000 132977 132.977 106381.6
1000 0 0
1000 0 0
1000 74016 74.016 59212.8
1000 65234 65.234 52187.2
1000 68998 68.998 55198.4
1000 313625 313.625 250900
1000 439075 439.075 351260
1000 250900 250.900 200720
1000 355024 355.024 284019.2
1000 288535 288.535 230828
1000 288535 288.535 230828
1000 253409 253.409 202727.2
1000 156813 156.813 125450.4
1000 200720 200.720 160576
1000 137995 137.995 110396
1000 169358 169.358 135486.4
1000 589615 589.615 471692
1000 163085 163.085 130468
1000 233337 233.337 186669.6
1000 210756 210.756 168604.8
1000 244628 244.628 195702.4
1000 317389 317.389 253911.2
1000 0 0
1000 0 0
1000 33872 33.872 27097.6
100 12043.2 120.432 9634.56
100 9408.8 94.088 7527.04
100 32930.6 329.306 26344.48
1000 25090 25.090 20072
1000 37635 37.635 30108
1000 25090 25.090 20072
1000 37635 37.635 30108
1000 94088 94.088 75270.4
1000 37635 37.635 30108
1000 15681 15.681 12544.8
1000 19445 19.445 15556
1000 12545 12.545 10036
1000 10036 10.036 8028.8
1000 7527 7.527 6021.6
1000 5018 5.018 4014.4
1000 15054 15.054 12043.2
1000 15054 15.054 12043.2
1000 12545 12.545 10036
1000 6273 6.273 5018.4
1000 37635 37.635 30108
1000 37635 37.635 30108
1000 33872 33.872 27097.6
1000 23836 23.836 19068.8
1000 27599 27.599 22079.2
1000 627250 627.250 501800
1000 169358 169.358 135486.4
1000 62725 62.725 50180
1000 125450 125.450 100360
1000 376350 376.350 301080
1000 439075 439.075 351260
1000 629759 629.759 503807.2
1000 878150 878.150 702520
1000 1254500 1.254.500 1003600
1000 0 0
1000 0 0
1000 22581 22.581 18064.8
1000 50180 50.180 40144
1000 62725 62.725 50180
1000 75270 75.270 60216
1000 87815 87.815 70252
1000 125450 125.450 100360
1000 188175 188.175 150540
1000 263445 263.445 210756
1000 137995 137.995 110396
1000 50180 50.180 40144
1000 94088 94.088 75270.4
1000 71507 71.507 57205.6
1000 85000 85.000 68000
1000 104000 104.000 83200
1000 299000 299.000 239200
1000 351000 351.000 280800
1000 123500 123.500 98800
1000 78000 78.000 62400
1000 13000 13.000 10400
1000 17000 17.000 13600
1000 20000 20.000 16000
1000 25000 25.000 20000
1000 35290 35.290 28232
1000 39040 39.040 31232
1000 78000 78.000 62400
1000 115000 115.000 92000
1000 125000 125.000 100000
1000 84500 84.500 67600
1000 117000 117.000 93600
1000 236600 236.600 189280
1000 299000 299.000 239200
1000 0 0
1000 0 0
1000 0 0
1000 4352 4.352 3481.6
1000 6528 6.528 5222.4
1000 11392 11.392 9113.6
1000 16896 16.896 13516.8
1000 26880 26.880 21504
1000 42079 42.079 33663.2
1000 59824 59.824 47859.2
1000 86187 86.187 68949.6
1000 127199 127.199 101759.2
1000 269292 269.292 215433.6
1000 448961 448.961 359168.8
1000 700459 700.459 560367.2
1000 1115500 1.115.499 892400
1000 46529 46.529 37223.2
1000 65190 65.190 52152
1000 91754 91.754 73403.2
1000 135439 135.439 108351.2
1000 280949 280.949 224759.2
1000 467963 467.963 374370.4
1000 724931 724.931 579944.8
1000 1146900 1.146.910 917520
1000 1637864 1.637.864 1310291.2
1000 2078517 2.078.517 1662813.6
1000 0 0
1000 4129 4.129 3303.2
1000 6203 6.203 4962.4
1000 9849 9.849 7879.2
1000 15126 15.126 12100.8
1000 23191 23.191 18552.8
1000 32622 32.622 26097.6
1000 47940 47.940 38352
1000 69398 69.398 55518.4
1000 102680 102.680 82144
1000 219724 219.724 175779.2
1000 364444 364.444 291555.2
1000 571427 571.427 457141.6
1000 90950 90.950 72760
1000 38576 38.576 30860.8
1000 54355 54.355 43484
1000 76512 76.512 61209.6
1000 110669 110.669 88535.2
1000 231068 231.068 184854.4
1000 382079 382.079 305663.2
1000 595028 595.028 476022.4
1000 939926 939.926 751940.8
1000 1214622 1.214.522 971697.6
1000 1593800 1.593.842 1275040
1000 648025 648.025 518420
1000 363146 363.146 290516.8
1000 175386 175.386 140308.8
1000 117178 117.178 93742.4
1000 106382 106.382 85105.6
1000 71931 71.931 57544.8
1000 33219 33.219 26575.2
1000 752956 752.956 602364.8
1000 413974 413.974 331179.2
1000 193885 193.885 155108
1000 136631 136.631 109304.8
1000 121584 121.584 97267.2
1000 82169 82.169 65735.2
1000 37648 37.648 30118.4
1000 43423 43.423 34738.4
1000 30396 30.396 24316.8
1000 27139 27.139 21711.2
1000 20626 20.626 16500.8
1000 18455 18.455 14764
1000 14112 14.112 11289.6
1000 1120000 1.120.642 896000
1000 524013 524.013 419210.4
1000 354267 354.267 283413.6
1000 262085 262.085 209668
1000 178941 178.941 143152.8
1000 137368 137.368 109894.4
1000 97604 97.604 78083.2
1000 70492 70.492 56393.6
1000 36228 36.228 28982.4
1000 34342 34.342 27473.6
1000 1084000 1.084.492 867200
1000 397646 397.646 318116.8
1000 240395 240.395 192316
1000 177135 177.135 141708
1000 142762 142.762 114209.6
1000 313625 313.625 250900
1000 188175 188.175 150540
1000 112905 112.905 90324
1000 87815 87.815 70252
1000 75270 75.270 60216
1000 1411000 1.411.251 1128800
1000 1031000 1.031.297 824800
1000 597067 597.067 477653.6
1000 531933 531.933 425546.4
1000 466797 466.797 373437.6
1000 369097 369.097 295277.6
1000 1356000 1.356.971 1084800
1000 977020 977.020 781616
1000 564500 564.500 451600
1000 499366 499.366 399492.8
1000 445087 445.087 356069.6
1000 347385 347.385 277908
1000 390808 390.808 312646.4
1000 143296 143.296 114636.8
1000 86846 86.846 69476.8
1000 58621 58.621 46896.8
1000 32567 32.567 26053.6
1000 20626 20.626 16500.8
1000 11941 11.941 9552.8
1000 18818 18.818 15054.4
1000 12545 12.545 10036
1000 3148000 3.148.173 2518400
1000 2605000 2.605.384 2084000
1000 911884 911.884 729507.2
1000 542789 542.789 434231.2
1000 349196 349.196 279356.8
1000 326170 326.170 260936
1000 213265 213.265 170612
1000 106633 106.633 85306.4
1000 81543 81.543 65234.4
1000 68998 68.998 55198.4
1000 50180 50.180 40144
1000 37635 37.635 30108
1000 31363 31.363 25090.4
1000 196329 196.329 157063.2
1000 208749 208.749 166999.2
1000 104374 104.374 83499.2
1000 80288 80.288 64230.4
1000 71507 71.507 57205.6
1000 107385 107.385 85908
1000 82797 82.797 66237.6
1000 66739 66.739 53391.2
1000 52689 52.689 42151.2
1000 37635 37.635 30108
1000 25090 25.090 20072
1000 18818 18.818 15054.4
1000 15054 15.054 12043.2
1000 60969 60.969 48775.2
1000 41273 41.273 33018.4
1000 56202 56.202 44961.6
1000 23459 23.459 18767.2
1000 24086 24.086 19268.8
1000 8029 8.029 6423.2
1000 4767 4.767 3813.6
1000 2509 2.509 2007.2
1000 12545 12.545 10036
1000 8782 8.782 7025.6
1000 7527 7.527 6021.6
1000 152498 152.498 121998.4
1000 152498 152.498 121998.4
1000 217310 217.310 173848
1000 173468 173.468 138774.4
1000 144873 144.873 115898.4
1000 127590 127.590 102072
1000 127717 127.717 102173.6
1000 61951 61.951 49560.8
1000 41937 41.937 33549.6
1000 38125 38.125 30500
1000 23828 23.828 19062.4
1000 23836 23.836 19068.8
1000 5018 5.018 4014.4
1000 3764 3.764 3011.2
1000 2509 2.509 2007.2
1000 564525 564.525 451620
1000 376350 376.350 301080
1000 250900 250.900 200720
1000 94088 94.088 75270.4
1000 62725 62.725 50180
1000 43908 43.908 35126.4
1000 100360 100.360 80288
1000 87815 87.815 70252
1000 108656 108.656 86924.8
1000 68624 68.624 54899.2
1000 40031 40.031 32024.8
1000 22875 22.875 18300
1000 18109 18.109 14487.2
1000 8768 8.768 7014.4
1000 6101 6.101 4880.8
1000 12545 12.545 10036
1000 400310 400.310 320248
1000 217310 217.310 173848
1000 137250 137.250 109800
1000 78155 78.155 62524
1000 106005 106.005 84804
1000 25090 25.090 20072
1000 18818 18.818 15054.4
1000 12545 12.545 10036
1000 200155 200.155 160124
1000 114374 114.374 91499.2
1000 74343 74.343 59474.4
1000 41937 41.937 33549.6
1000 27640 27.640 22112
1000 29355 29.355 23484
1000 18818 18.818 15054.4
1000 12545 12.545 10036
1000 33359 33.359 26687.2
1000 22875 22.875 18300
1000 1524000 1.524.988 1219200
1000 667184 667.184 533747.2
1000 372587 372.587 298069.6
1000 100360 100.360 80288
1000 81543 81.543 65234.4
1000 333590 333.590 266872
1000 228749 228.749 182999.2
1000 133437 133.437 106749.6
1000 114374 114.374 91499.2
1000 95313 95.313 76250.4
1000 85780 85.780 68624
1000 1744000 1.744.204 1395200
1000 1563000 1.563.114 1250400
1000 1296000 1.296.239 1036800
1000 1334000 1.334.365 1067200
1000 743433 743.433 594746.4
1000 648120 648.120 518496
1000 581402 581.402 465121.6
1000 388895 388.895 311116
1000 369810 369.810 295848
1000 339192 339.192 271353.6
1000 244628 244.628 195702.4
1000 213499 213.499 170799.2
1000 257341 257.341 205872.8
1000 148687 148.687 118949.6
1000 152498 152.498 121998.4
1000 152498 152.498 121998.4
1000 5018 5.018 4014.4
1000 11437 11.437 9149.6
1000 6273 6.273 5018.4
1000 667184 667.184 533747.2
1000 438435 438.435 350748
1000 15054 15.054 12043.2
1000 10036 10.036 8028.8
1000 8782 8.782 7025.6
1000 7527 7.527 6021.6
1000 12545 12.545 10036
1000 5018 5.018 4014.4
1000 4391 4.391 3512.8
1000 3136 3.136 2508.8
1000 953118 953.118 762494.4
1000 333590 333.590 266872
1000 333590 333.590 266872
1000 333590 333.590 266872
1000 4289000 4.289.031 3431200
1000 2954000 2.954.666 2363200
1000 1620000 1.620.301 1296000
1000 1448000 1.448.948 1158400
1000 1143000 1.143.741 914400
1000 810151 810.151 648120.8
1000 762494 762.494 609995.2
1000 333590 333.590 266872
1000 162031 162.031 129624.8
1000 66718 66.718 53374.4
1000 66718 66.718 53374.4
1000 66718 66.718 53374.4
1000 57188 57.188 45750.4
1000 57188 57.188 45750.4
1000 57188 57.188 45750.4
1000 905461 905.461 724368.8
1000 524214 524.214 419371.2
1000 333590 333.590 266872
1000 266873 266.873 213498.4
1000 1086000 1.086.555 868800
1000 629058 629.058 503246.4
1000 667184 667.184 533747.2
1000 362186 362.186 289748.8
1000 15054 15.054 12043.2
1000 10036 10.036 8028.8
1000 8782 8.782 7025.6
1000 7527 7.527 6021.6
1000 18818 18.818 15054.4
1000 410598 410.598 328478.4
1000 217279 217.279 173823.2
1000 62976 62.976 50380.8
1000 3450000 3.449.875 2760000
1000 0 0
1000 0 0
1000 156813 156.813 125450.4
1000 288535 288.535 230828
1000 169358 169.358 135486.4
1000 294808 294.808 235846.4
1000 6273 6.273 5018.4
1000 31363 31.363 25090.4
1000 31363 31.363 25090.4
1000 0 0
1000 0 0
1000 15054 15.054 12043.2
1000 6273 6.273 5018.4
1000 439075 439.075 351260
1000 313625 313.625 250900
1000 188175 188.175 150540
1000 75270 75.270 60216
1000 62725 62.725 50180
1000 43908 43.908 35126.4
1000 50180 50.180 40144
1000 68998 68.998 55198.4
1000 98604 98.604 78883.2
1000 81919 81.919 65535.2
1000 0 0
1000 1500000 1.503.895 1200000
1000 0 0
1000 1350000 1.372.674 1080000
1000 796000 796.357 636800
1000 0 0
1000 2180000 2.191.862 1744000
1000 5160000 5.161.515 4128000
1000 62725 62.725 50180
1000 43908 43.908 35126.4
1000 43908 43.908 35126.4
1000 69123 69.123 55298.4
1000 27097 27.097 21677.6
1000 43908 43.908 35126.4
1000 219538 219.538 175630.4
1000 156813 156.813 125450.4
1000 94088 94.088 75270.4
1000 50180 50.180 40144
1000 75270 75.270 60216
1000 18818 18.818 15054.4
1000 12545 12.545 10036
1000 10036 10.036 8028.8
1000 7527 7.527 6021.6
1000 6273 6.273 5018.4
1000 5018 5.018 4014.4
1000 25090 25.090 20072
1000 18818 18.818 15054.4
1000 6900 6.900 5520
1000 40771 40.771 32616.8
1000 25090 25.090 20072
1000 2509 2.509 2007.2
100 37635 376.350 30108
100 13799.5 137.995 11039.6
100 13799.5 137.995 11039.6
1000 25090 25.090 20072
1000 56453 56.453 45162.4
1000 33370 33.370 26696
1000 33370 33.370 26696
1000 112905 112.905 90324
1000 17563 17.563 14050.4
1000 87815 87.815 70252
1000 56453 56.453 45162.4
1000 50180 50.180 40144
1000 25090 25.090 20072
1000 25090 25.090 20072
1000 0 0
1000 0 0
1000 100360 100.360 80288
1000 376350 376.350 301080
1000 219538 219.538 175630.4
1000 156813 156.813 125450.4
1000 161831 161.831 129464.8
1000 106633 106.633 85306.4
1000 125450 125.450 100360
1000 169358 169.358 135486.4
1000 1000000 1.003.600 800000
1000 138999 138.999 111199.2
1000 114160 114.160 91328
1000 114160 114.160 91328
1000 145522 145.522 116417.6
1000 254538 254.538 203630.4
1000 125450 125.450 100360
1000 188175 188.175 150540
1000 100360 100.360 80288
1000 56453 56.453 45162.4
1000 37635 37.635 30108
1000 25090 25.090 20072
1000 6273 6.273 5018.4
1000 31363 31.363 25090.4
1000 18818 18.818 15054.4
1000 55574 55.574 44459.2
1000 94088 94.088 75270.4
1000 12545 12.545 10036
1000 43908 43.908 35126.4
1000 0 0
1000 0 0
1000 4860000 4.861.188 3888000
1000 1880000 1.881.750 1504000
1000 137995 137.995 110396
1000 627250 627.250 501800
1000 282263 282.263 225810.4
1000 219538 219.538 175630.4
1000 18818 18.818 15054.4
1000 37635 37.635 30108
1000 75270 75.270 60216
1000 25090 25.090 20072
1000 37635 37.635 30108
1000 100360 100.360 80288
1000 87815 87.815 70252
1000 37635 37.635 30108
1000 188175 188.175 150540
1000 0 0
1000 0 0
1000 25090 25.090 20072
1000 22581 22.581 18064.8
1000 22581 22.581 18064.8
1000 22581 22.581 18064.8
1000 22581 22.581 18064.8
1000 50180 50.180 40144
1000 123443 123.443 98754.4
1000 188928 188.928 151142.4
1000 25090 25.090 20072
1000 56453 56.453 45162.4
1000 37635 37.635 30108
1000 37635 37.635 30108
1000 37635 37.635 30108
1000 52689 52.689 42151.2
1000 52689 52.689 42151.2
1000 7527 7.527 6021.6
1000 8782 8.782 7025.6
1000 10036 10.036 8028.8
1000 11291 11.291 9032.8
1000 0 0
1000 0 0
1000 13800 13.800 11040
1000 24463 24.463 19570.4
1000 17563 17.563 14050.4
1000 18818 18.818 15054.4
1000 13800 13.800 11040
1000 18818 18.818 15054.4
1000 92645 92.645 74116
1000 275990 275.990 220792
1000 451620 451.620 361296
1000 12294 12.294 9835.2
1000 9409 9.409 7527.2
1000 12545 12.545 10036
1000 31363 31.363 25090.4
1000 40771 40.771 32616.8
1000 24714 24.714 19771.2
1000 38262 38.262 30609.6
1000 67931 67.931 54344.8
1000 81417 81.417 65133.6
1000 144518 144.518 115614.4
1000 213014 213.014 170411.2
1000 21577 21.577 17261.6
1000 13172 13.172 10537.6
1000 16936 16.936 13548.8
PEMERINTAH KABUPATEN LOMBOK TENGAH
KECAMATAN PRAYA BARAT DAYA
DESA UNGGA
II PEKERJAAN TANAH
Galian Tanah biasa kedalaman s/d 1m VOLUME = P x L x T JML 49.44 M3
206.00 0.30 0.80 = 49.44
= -
I PEK. PERSIAPAN
1 Pengukuran dan pas Bouplank 9.00 m Ls 12,500.00 112,500.00
2 Papan nama Proyek 1.00 Ls Ls 100,000.00 100,000.00
II PEKERJAAN TANAH - -
1 Galian Tanah 1.38 m3 A.2.3.1.2. 60,000.00 82,500.00
2 Urugan Tanah Kembali 0.34 m3 A.2.3.1.9. 40,000.00 13,750.00
3 Urug Tanah Timbunan Peninggian lantai 6.60 m3 A.2.3.1.11. 138,100.00 911,460.00
IV PEK. PASANGAN -
1 Pas Bataco 16.32 m2 A. 4.4.1.24 113,044.00 1,844,878.08
2 Pas dinding Rangka Baja Ringan 38.05 m2 A.4.2.1.20. 99,750.00 3,795,487.50
3 Pas Rangka Atap 37.50 m2 ls 99,750.00 3,740,625.00
4 Pas. Dinding Calsiboord 38.05 m2 ls 99,750.00 3,795,487.50
5 Pas. Atap Spandeks 37.50 m2 A.4.5.2.40.a 62,071.75 2,327,690.63
6 Kusen Pintu dan Jendela 5.00 bh ls 350,000.00 1,750,000.00
7 Pas daun Pintu dan Jendela 5.00 bh ls 350,000.00 1,750,000.00
8 Plesteran 32.64 m2 A.3.2.1.3. 53,627.20 1,750,391.81
9 acian Dinding 32.64 m2 A.4.4.2.3. 32,225.00 1,051,824.00
10 Aian lantai 19.50 m2 A.4.4.2.3. 32,225.00 628,387.50
V PEK. PENGECATAN -
1 EXTERIOR 44.65 A.4.7.1.10.a 18,260.00 815,309.00
2 INTERIOR 52.75 ` 19,260.00 1,015,965.00
VI UMUM
0 PKA 1.00 ls ls 670,000.00 670,000.00
0 ATK 1.00 ls ls 200,000.00 200,000.00
0 RAB DAN GAMBAR 1.00 ls ls 500,000.00 500,000.00
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : BELANJA MODAL GEDUNG DAN BANGUNAN PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : ; RTLH
LOKASI : : DESA UNGGA
TAHUN : : 2021
JUMLAH 30,670,121.41
PPN 10% 3,067,012.14
JUMLAH 33,737,133.55
DIBULATKAN 33,737,000.00 -
TERBILANG : tiga puluh tiga juta tujuh ratus tiga puluh tujuh ribu rupiah
KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN : #REF!
#REF!
Disetujui oleh Dibuat oleh ;
Pejabat Pembuat Komitmen Konsultan Perencana
#REF!
#REF! #REF!
#REF! Direktur
Mengetahui; Mengetahui;
Kepala Kantor Kementerian Agama RI An. Kepala Dinas PU Penataan Ruang
Kabupaten Lombok Tengah Kabid Cipta Karya Kab. Lombok Tengah
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP. Rp 52,498.00
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II Rp 857,422.50
Pembuatan dan pemasangan 1 m2 daun pintu panel lapis formica, kayu
A.4.6.1.5.a kelas I atau II
Rp 939,619.78
Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I
A.4.6.1.6. atau II
Rp 620,933.50
A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
Jumlah
D 562,820.00
(A+B+C)
E Overhead (10 %) 10% x D 56,282.00
F Harga Satuan Pekerjaan (D+E) 619,102.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.010 120,000.00 1,200.00
Kepala Tukang L.03 OH 0.200 125,000.00 25,000.00
Mandor L.04 OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 40,700.00
B BAHAN
Bambu (dia.7 cm, P- 4 m) Batang 1.250 10,000.00 12,500.00
Tali ijuk m3 0.186 -
JUMLAH HARGA BAHAN 12,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang
L.02 OH 0.300 120,000.00 36,000.00
Kayu
Kepala
L.03 OH 0.030 125,000.00 3,750.00
Tukang
JUMLAH TENAGA KERJA 39,750.00
B BAHAN
Kayu papan kelas III m3 0.036
Kayu balok 5/7 kelas III m3
Paku biasa kg 0.080
JUMLAH HARGA BAHAN
PERALATA
C
N
Jumlah
D
(A+B+C)
E Overhead (10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 1.000 80,000.00 80,000.00
Mandor L.04 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 80,650.00
B BAHAN
Batu Kali Belah m3 0.150 185,600.00
Batu pecah m3 0.090
Pasir pasang m3 0.010
JUMLAH HARGA BAHAN
PERALATA
C
N
Jumlah
D
(A+B+C)
E Overhead (10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 13.334 80,000.00 1,066,720.00
Mandor L.04 0.666 130,000.00 86,580.00
JUMLAH TENAGA KERJA 1,153,300.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.600 80,000.00 48,000.00
Mandor L.04 0.033 130,000.00 4,329.00
JUMLAH TENAGA KERJA 52,329.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.042 80,000.00 3,360.00
Tukang L.02 0.004 120,000.00 480.00
Kepala Tukang L.03 0.002 125,000.00 250.00
Mandor L.04 0.042 130,000.00 5,460.00
JUMLAH TENAGA KERJA 9,550.00
B BAHAN
Kawat jaring Lbr 0.143
JUMLAH HARGA BAHAN
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.375 80,000.00 30,000.00
Tukang L.02 0.125 120,000.00 15,000.00
Kepala
L.03 0.012 125,000.00 1,500.00
Tukang
Mandor L.04 0.019 130,000.00 2,470.00
JUMLAH TENAGA KERJA 48,970.00
B BAHAN
Panel beton
Lbr 0.986
pracetak
Kolom beton
Batang 0.525
pracetak
Semen PC Kg 45.000
Pasir beton m3 0.074
Koral m3 0.146
JUMLAH HARGA BAHAN
PERALATA
C
N
Jumlah
D
(A+B+C)
E Overhead (10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Usuk 5/7 Kayu Klas II m3 0.012 7,000,000.00 84,000.00
Paku 7 - 12 cm kg 0.020 22,500.00 450.00
Triplek 120x240x 3 mm m2 0.350 60,000.00 21,000.00
Cetakan Huruf Bahan Vynil m 3
1.050 25,000.00 26,250.00
JUMLAH HARGA BAHAN 131,700.00
C PERALATAN
B BAHAN
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
B BAHAN
C PERALATAN
A.2.3.1.9. (K3) Pengurugan kembali 1 m3 galian tanah
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Mandor L.04 OH 0.050 -
B BAHAN
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Mandor L.04 OH 0.050 130,000.00 6,500.00
B BAHAN
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Mandor L.04 OH 0.010 -
B BAHAN
Pasir Urug / Timbunan 1.200 111,000.00 133,200.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Mandor L.04 OH 0.010 130,000.00 1,300.00
B BAHAN
Tanah urug Biasa 1.200 94,000.00 112,800.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang Batu L.02 OH 0.750 120,000.00 90,000.00
Kepala Tukang L.03 OH 0.075 -
Mandor L.04 OH 0.075 -
B BAHAN
Batu belah 15 cm - 20 cm m3 1.200 185,600.00 222,720.00
Semen PC Kg 136.000 1,300.00 176,800.00
Pasir Pasang m3 0.544 188,000.00 102,272.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.780 80,000.00 62,400.00
Tukang Batu L.02 OH 0.390 120,000.00 46,800.00
Kepala Tukang L.03 OH 0.039 -
Mandor L.04 OH 0.039 -
B BAHAN
Batu belah 15 cm - 20 cm m3 1.200 185,600.00 222,720.00
Pasir Urug / Timbunan m3 0.432 111,000.00 47,952.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 -
Mandor L.04 OH 0.083 -
B BAHAN
Semen PC kg 276.000 1,300.00 358,800.00
Pasir Beton (PB) m3 0.591 234,000.00 138,394.29
Kerikil Beton (max. 30mm) m3 0.750 321,000.00 240,631.11
Air Liter 215.000 100.00 21,500.00
C PERALATAN
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang Batu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 -
Mandor L.04 OH 0.060 -
B BAHAN
Semen PC kg 230.000 1,300.00 299,000.00
Pasir Beton (PB) m3 0.638 234,000.00 149,258.57
Kerikil Beton (max. 30mm) m3 0.761 288,000.00 219,093.33
Air Liter 200.000 100.00 20,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
B BAHAN
Semen PC kg 326.000 1,300.00 423,800.00
Pasir Beton (PB) m3 0.543 234,000.00 127,028.57
Kerikil Beton (max. 30mm) m3 0.762 288,000.00 219,520.00
Air Liter 215.000 100.00 21,500.00
A.4.1.1.6 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
B BAHAN
Semen PC kg 352.000 1,300.00 457,600.00
Pasir Beton (PB) m3 0.522 234,000.00 122,181.43
Kerikil Beton (max. 30mm) m3 0.764 288,000.00 219,946.67
Air Liter 215.000 100.00 21,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
B BAHAN
Semen PC kg 371.000 1,300.00 482,300.00
Pasir Beton (PB) m3 0.499 234,000.00 116,665.71
Kerikil Beton (max. 30mm) m3 0.776 288,000.00 223,360.00
Air Liter 215.000 100.00 21,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang Besi L.02 OH 0.070 120,000.00 8,400.00
Kepala Tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.004 130,000.00 520.00
B BAHAN
Besi Beton Polos kg 10.500 12,000.00 126,000.00
Kawat Ikat Beton kg 0.150 22,000.00 3,300.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang Kayu L.02 OH 0.260 120,000.00 31,200.00
Kepala Tukang L.03 OH 0.026 125,000.00 3,250.00
Mandor L.04 OH 0.026 130,000.00 3,380.00
B BAHAN
Balok Kayu Klas III m3 0.040 4,500,000.00 180,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang Kayu L.02 OH 0.260 120,000.00 31,200.00
Kepala Tukang L.03 OH 0.026 125,000.00 3,250.00
Mandor L.04 OH 0.026 130,000.00 3,380.00
B BAHAN
Balok Kayu Klas III m3 0.045 4,500,000.00 202,500.00
Paku 7 - 12 cm kg 0.300 22,500.00 6,750.00
Minyak Begisting Liter 0.100 15,000.00 1,500.00
C PERALATAN
B BAHAN
Balok Kayu Klas III m3 0.040 4,500,000.00 180,000.00
Paku 7 - 12 cm kg 0.400 22,500.00 9,000.00
Minyak Begisting Liter 0.200 15,000.00 3,000.00
Balok Kayu Klas II m3 0.015 7,000,000.00 105,000.00
Triplek 120x240x 9 mm Lbr 0.350 120,000.00 42,000.00
Bambu (dia.7 cm, P- 4 m) Batang 2.000 10,000.00 20,000.00
C PERALATAN
B BAHAN
Balok Kayu Klas III m3 0.040 4,500,000.00 180,000.00
Paku 7 - 12 cm kg 0.400 22,500.00 9,000.00
Minyak Begisting Liter 0.200 15,000.00 3,000.00
Balok Kayu Klas II m3 0.018 7,000,000.00 126,000.00
Triplek 120x240x 9 mm Lbr 0.350 120,000.00 42,000.00
Bambu (dia.7 cm, P- 4 m) Batang 2.000 10,000.00 20,000.00
C PERALATAN
B BAHAN
Balok Kayu Klas IV m3 0.030 #N/A #N/A
Paku 7 - 12 cm kg 0.400 22,500.00 9,000.00
Minyak Begisting Liter 0.200 15,000.00 3,000.00
Usuk 5/7 Kayu Klas II m3 0.020 7,000,000.00 140,000.00
Triplek 120x240x 9 mm Lbr 0.350 120,000.00 42,000.00
Bambu (dia.7 cm, P- 4 m) Batang 3.000 10,000.00 30,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 130,000.00 4,290.00
B BAHAN
Balok Kayu Klas IV m3 0.030 #N/A #N/A
Paku 7 - 12 cm kg 0.400 22,500.00 9,000.00
Minyak Begisting Liter 0.150 15,000.00 2,250.00
Usuk 5/7 Kayu Klas II m3 0.015 7,000,000.00 105,000.00
Triplek 120x240x 9 mm Lbr 0.350 120,000.00 42,000.00
Bambu (dia.7 cm, P- 4 m) Batang 2.000 10,000.00 20,000.00
C PERALATAN
JUMLAH HARGA ALAT
B BAHAN
Balok Kayu Klas IV m3 0.026 #N/A #N/A
Paku 7 - 12 cm kg 0.600 22,500.00 13,500.00
Bambu (dia.7 cm, P- 4 m) Batang 0.500 10,000.00 5,000.00
C PERALATAN
A.4.1.1.36 Membuat 1 m’ ring balok/Balok Latai/Balok Gantung beton bertulang (10 x 15) cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.297 80,000.00 23,760.00
Tukang batu L.02 OH 0.033 120,000.00 3,960.00
Tukang kayu L.02 OH 0.033 120,000.00 3,960.00
Tukang besi L.02 OH 0.033 120,000.00 3,960.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
B BAHAN
Papan kayu bekisting m3 0.003 2,340,000.00 7,020.00
Paku 7 - 12 cm kg 0.020 22,500.00 450.00
Minyak bekisting Liter - 15,000.00 -
Besi beton polos kg 3.600 12,000.00 43,200.00
Kawat Ikat Beton kg 0.050 22,000.00 1,100.00
Semen PC kg 5.500 1,250.00 6,875.00
Pasir Beton (PB) m3 0.009 234,000.00 2,106.00
Kerikil Beton (max. 30mm) m3 0.015 288,000.00 4,320.00
C PERALATAN
A.4.1.1.6.b Membuat 1 m3 Sloof 20/25 dengan beton Mutu f’c = 16,9 MPa (K 200)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
1 Beton Mutu K200 m3 1.000 1,100,569.90 1,100,569.90
2 Begisting Sloof m2 8.0000 294,448.00 2,355,584.00
3 Pembesian dengan Besi Beton Polos kg 30.7899 15,916.45 490,066.59
4 Pembesian Dengan Besi Ulir kg 60.9032 17,071.45 1,039,705.65
A.4.1.1.6.d Membuat 1 m3 Kolom teras K2 dengan beton mutu f’c = 16,9 MPa (K 200)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
1 Beton Mutu K200 m3 1.000 1,100,569.90 1,100,569.90
2 Begisting Kolom m2 13.3333 505,796.50 6,743,953.33
3 Pembesian dengan Besi Beton Polos kg 129.5458 15,916.45 2,061,909.78
4 Pembesian Dengan Besi Ulir kg 0.0000 17,071.45 -
A.4.1.1.6.e Membuat 1 m3 Balok Ring/Balok Gantung/blk.gevel 13/20 dengan beton mutu f’c = 16,9 MPa (K 200)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
1 Beton Mutu K200 m3 1.000 1,100,569.90 1,100,569.90
2 Begisting Balok m2 10.3333 528,896.50 5,465,263.83
3 Pembesian dengan Besi Beton Polos kg 162.6341 15,916.45 2,588,556.84
4 Pembesian Dengan Besi Ulir kg 0.0000 17,071.45 -
A.4.1.1.6.j Membuat 1 m3 Foot Plate FP 120x120 dengan beton mutu f’c = 16,9 MPa (K 200)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
1 Beton Mutu K200 m3 1.000 1,100,569.90 1,100,569.90
2 Begisting Pondasi m2 3.3333 294,448.00 981,493.33
3 Pembesian dengan Besi Beton Polos kg 44.2112 15,916.45 703,685.35
4 Pembesian Dengan Besi Ulir kg 78.5977 17,071.45 1,341,776.52
A.4.1.1.6.l Membuat 1 m3 Beton plat meja beton T= 7 cm dengan beton mutu f’c = 16,9 MPa (K 200)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
1 Beton Mutu K200 m3 1.000 1,100,569.90 1,100,569.90
2 Begisting Lantai m2 6.6571 549,796.50 3,660,073.84
3 Pembesian dengan Besi Beton Polos kg 84.1537 15,916.45 1,339,427.49
4 Pembesian Dengan Besi Ulir kg 0.0000 17,071.45 -
A.4.1.1.6.m Membuat 1 m3 Beton plat duck T=10 cm dengan beton mutu f’c = 16,9 MPa (K 200)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
1 Beton Mutu K200 m3 1.000 1,100,569.90 1,100,569.90
2 Begisting Lantai m2 4.6600 549,796.50 2,562,051.69
3 Pembesian dengan Besi Beton Polos kg 107.3040 15,916.45 1,707,898.75
4 Pembesian Dengan Besi Ulir kg 0.0000 17,071.45 -
Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang Las Konstruksi L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.003 130,000.00 390.00
B BAHAN
Besi Profil ST 33 Kg 1.150 17,600.00 20,240.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang Las Konstruksi L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.003 130,000.00 390.00
B BAHAN
Besi Profil ST 33 Kg 1.150 17,600.00 20,240.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang Las Konstruksi L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.001 125,000.00 125.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Solar Liter 1.000 15,180.00 15,180.00
Minyak pelumas Liter 0.100 38,500.00 3,850.00
C PERALATAN
Alat Bantu Jam 0.800 110,000.00 88,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.050 80,000.00 84,000.00
Tukang Las Biasa L.02 OH 1.050 120,000.00 126,000.00
Kepala tukang L.03 OH 0.105 125,000.00 13,125.00
Mandor L.04 OH 0.052 130,000.00 6,760.00
B BAHAN
Besi Profil ST 33 Kg 15.000 17,600.00 264,000.00
Baja strip 30x3 mm Kg 32.800 17,600.00 577,280.00
Kawat las Kg 0.050 37,400.00 1,870.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang Las Konstruksi L.02 OH 0.020 120,000.00 2,400.00
Kepala tukang L.03 OH 0.002 125,000.00 250.00
Mandor L.04 OH 0.002 130,000.00 260.00
B BAHAN
Kawat Las Kg 0.400 37,400.00 14,960.00
Solar Liter 0.300 15,180.00 4,554.00
Minyak pelumas Liter 0.040 35,000.00 1,400.00
C PERALATAN
Sewa alat Jam 0.170 110,000.00 18,700.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.650 80,000.00 52,000.00
Tukang Las Biasa L.02 OH 0.650 120,000.00 78,000.00
Kepala tukang L.03 OH 0.065 125,000.00 8,125.00
Mandor L.04 OH 0.032 130,000.00 4,160.00
B BAHAN
Besi scuare tube m 4.760 #N/A #N/A
Besi list kaca (1 x 1) cm m 4.522 - -
Pengelasan cm 20.000 - -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang Las Biasa L.02 OH 1.200 120,000.00 144,000.00
Kepala tukang L.03 OH 0.120 125,000.00 15,000.00
Mandor L.04 OH 0.006 130,000.00 780.00
B BAHAN
Pintu gulung besi m2 1.000 - -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.440 80,000.00 35,200.00
Tukang L.02 OH 0.440 120,000.00 52,800.00
Kepala tukang L.03 OH 0.044 125,000.00 5,500.00
Mandor L.04 OH 0.022 130,000.00 2,860.00
B BAHAN
Pintu lipat m2 1.000 - -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang L.02 OH 0.800 120,000.00 96,000.00
Kepala tukang L.03 OH 0.080 125,000.00 10,000.00
Mandor L.04 OH 0.004 130,000.00 520.00
B BAHAN
Sunscreen alluminium m2 1.000 - -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang Khusus Alumunium L.02 OH 1.000 120,000.00 120,000.00
Kepala tukang L.03 OH 0.100 125,000.00 12,500.00
Mandor L.04 OH 0.050 130,000.00 6,500.00
B BAHAN
Rolling door alluminium m2 1.000 632,500.00 632,500.00
C PERALATAN
B BAHAN
Alluminium Kuzen tebal 1,2 mm (natural) m 1.100 87,500.00 96,250.00
Sekrup Fixer buah 2.000 170.00 340.00
Sealant Tube 0.060 60,000.00 3,600.00
C PERALATAN
B BAHAN
Profil ram aluminium m 4.400 74,750.00 328,900.00
Kaca bening 5 mm M2 1.050 80,000.00 84,000.00
Skrup fixer bh 12.000 170.00 2,040.00
Sealant tube 0.270 45,000.00 12,150.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.043 80,000.00 3,440.00
Tukang Khusus Alumunium L.02 OH 0.043 120,000.00 5,160.00
Kepala tukang L.03 OH 0.004 125,000.00
Mandor L.04 OH 0.002 130,000.00
B BAHAN
Alluminium Kuzen tebal 1,2 mm (natural) m 1.100 87,500.00 96,250.00
Paku piles buah 2.000 170.00 340.00
Sealant Tube 0.060 60,000.00 3,600.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 80,000.00 6,800.00
Tukang Khusus Allumunium L.02 OH 0.085 120,000.00 10,200.00
Kepala tukang L.03 OH 0.009 125,000.00
Mandor L.04 OH 0.004 130,000.00
B BAHAN
Kusen Aluminium 4″ powder Coating Putih/white m 4.400 66,000.00 290,400.00
Alumunium strip m 14.600
C PERALATAN
B BAHAN
Kusen Aluminium 4″ powder Coating Putih/white m 4.400 66,000.00 290,400.00
Profil kaca m 4.500 - -
Sealant Tube 0.270 45,000.00 12,150.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 80,000.00 6,800.00
Tukang Allumunium/Kaca L.02 OH 0.085 120,000.00 10,200.00
Kepala tukang L.03 OH 0.009 125,000.00
Mandor L.04 OH 0.005 130,000.00
JUMLAH TENAGA KERJA 17,000.00
B BAHAN
Alumunium strip powder Coating Putih/white m 4.400 76,000.00 334,400.00
Profil kaca m 4.500 - -
Sealant Tube 0.270 45,000.00 12,150.00
JUMLAH HARGA BAHAN 346,550.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 80,000.00 6,800.00
Tukang Allumunium/Kaca L.02 OH 0.085 120,000.00 10,200.00
Kepala tukang L.03 OH 0.009 125,000.00
Mandor L.04 OH 0.005 130,000.00
JUMLAH TENAGA KERJA 17,000.00
B BAHAN
Profil alluminium Almari 1 x 4 cm m 1.100 45,000.00 49,500.00
Railling almunium slidding m 1.000 15,000.00 15,000.00
Roda slidding bh 2.000 7,500.00 15,000.00
Kunci almari bh 2.000 15,000.00 30,000.00
Handle sendok bh 2.000 15,000.00 30,000.00
Kaca Polos 5 mm m2 1.050 80,000.00 84,000.00
Karet Kaca m 4.000 1,720.00 6,880.00
Sealant Tube 0.270 60,000.00 16,200.00
JUMLAH HARGA BAHAN 246,580.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00
Mandor L.04 OH 0.018 130,000.00
B BAHAN
Venetions blinds dan vertical blinds (tirai) m2 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profite 10 % 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.670 80,000.00 133,600.00
Tukang Las L.02 OH 1.670 120,000.00 200,400.00
Kepala tukang L.03 OH 0.167 125,000.00
Mandor L.04 OH 0.083 130,000.00
B BAHAN
Besi strip kg 6.177 -
Pengelasan cm 27.080
C PERALATAN
D Jumlah (A+B+C)
E Overhead
Overhead & Profite 10 % 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100
Tukang L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
B BAHAN
Kawat nyamuk m2 1.100
Pengelasan cm 11.110
Baja strip (0,2 x 2) cm kg 1.716
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profite 10 % 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200
Tukang L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.001
B BAHAN
Jendela nako (rangka + kaca 5 mm) m2 1.100
Paku skrup 1 cm – 2,5 cm buah 10.000
Besi strip m 7.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profite 10 % 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 20 lebar 90 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00
Mandor L.04 OH 0.001 130,000.00
B BAHAN
Seng Plat BJLS 20 lebar 90 cm m 1.050 45,000.00 47,250.00
Paku 1 - 3 cm kg 0.015 22,500.00 337.50
Papan Kayu Klas II m3 0.019 7,200,000.00 136,800.00
C PERALATAN
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang L.02 OH 0.300 120,000.00 36,000.00
Kepala tukang L.03 OH 0.030 125,000.00
Mandor L.04 OH 0.008 130,000.00
B BAHAN
Seng Plat BJLS 20 lebar 90 cm m 1.050 45,000.00 47,250.00
Paku 1 - 3 cm kg 0.010 22,500.00 225.00
Besi strip kg 0.500 - -
C PERALATAN
JUMLAH HARGA ALAT
A.4.2.1.20. Pemasangan 1 m2 rangka Baja Ringan C. 75.75 modul 60 x 120 cm, dinding partisi
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang Besi L.02 OH 0.250 120,000.00 30,000.00
Kepala Tukang L.03 OH 0.025 125,000.00
Mandor L.04 OH 0.013 130,000.00
B BAHAN
Main Truss C 75.75 M1 3.500 12,500.00 43,750.00
Self drilling screw dia-6x20 mm Ls 12.000 500.00 6,000.00
A.4.2.1.20.a. Pemasangan 1 m2 dinding Partisi Gypsum rangka besi hollow 1x40.40.2 mm, bag. Atas kaca 3mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang Besi L.02 OH 0.250 120,000.00 30,000.00
Kepala Tukang L.03 OH 0.025 125,000.00
Mandor L.04 OH 0.013 130,000.00
B BAHAN
Hollow 40.40.0,45 mm M1 3.000 6,000.00 18,000.00
Assesoris (perkuatan, las dll) Ls 100%xrangka 6,000.00 6,000.00
Gypsum board 1200 x 2400 x 9 mm M2 1.400 - -
Kaca Polos 5 mm M1 0.400 -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja ongkos dan peralatan ls 1.000 250,000.00 250,000.00
JUMLAH TENAGA KERJA 250,000.00
B BAHAN
Aluminium Composite Panel (ACP) T= 5 mm m2 1.020 458,968.00 468,147.36
Sealant tube 0.400 45,000.00 18,000.00
hollow 40.40.1.6 mm kg 3.840 6,000.00 23,040.00
Sekrup/Piles 1,5 cm bh 22.000 10,700.00 235,400.00
JUMLAH HARGA BAHAN 744,587.36
C PERALATAN
Alat Bantu Pek. ACP m2 1.000 50,000.00 50,000.00
JUMLAH HARGA ALAT 50,000.00
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.0,45 mm, modul 60 x 60 cm, plafon
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang Besi L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 125,000.00
Mandor L.04 OH 0.018 130,000.00
B BAHAN
hollow 40.40.1.6 mm M1 4.000 6,000.00 24,000.00
Self drilling screw dia-6x20 mm Ls 12.000 500.00 6,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.734 80,000.00 58,720.00
Tukang Besi L.02 OH 0.734 120,000.00 88,080.00
Kepala Tukang L.03 OH 0.073 125,000.00
Mandor L.04 OH 0.037 130,000.00
B BAHAN
Main Truss C 75.75 kg 3.065 6,500.00 19,922.50
A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2 PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang Batu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.030 130,000.00 3,900.00
B BAHAN
Bata merah kelas 1 Bh 140.000 750.00 105,000.00
Semen PC Kg 43.500 1,250.00 54,375.00
Pasir Pasang Galian m3 0.080 #N/A #N/A
C PERALATAN
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3 PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang Batu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.030 130,000.00 3,900.00
B BAHAN
Bata merah kelas 1 Bh 140.000 750.00 105,000.00
Semen PC Kg 32.950 1,250.00 41,187.50
Pasir Pasang Galian m3 0.091 #N/A #N/A
A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4 PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang Batu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.030 130,000.00 3,900.00
B BAHAN
Bata merah kelas 1 Bh 140.000 750.00 105,000.00
Semen PC Kg 26.550 1,300.00 34,515.00
Pasir Pasang m3 0.093 188,000.00 17,484.00
C PERALATAN
A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5 PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang Batu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.030 130,000.00 3,900.00
B BAHAN
Bata merah kelas 1 Bh 140.000 750.00 105,000.00
Semen PC Kg 22.200 1,300.00 28,860.00
Pasir Pasang m3 0.102 188,000.00 19,176.00
C PERALATAN
A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6 PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang Batu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.030 130,000.00 3,900.00
B BAHAN
Bata merah kelas 1 Bh 140.000 750.00 105,000.00
Semen PC Kg 18.500 1,300.00 24,050.00
Pasir Pasang m3 0.122 188,000.00 22,936.00
C PERALATAN
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :3PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
B BAHAN
Bata merah kelas 1 Bh 70.000 750.00 52,500.00
Semen PC Kg 14.370 1,300.00 18,681.00
Pasir Pasang m3 0.040 188,000.00 7,520.00
C PERALATAN
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
B BAHAN
Bata merah kelas 1 Bh 70.000 750.00 52,500.00
Semen PC Kg 11.500 1,300.00 14,950.00
Pasir Pasang Galian m3 0.043 188,000.00 8,084.00
C PERALATAN
A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP:5PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
B BAHAN
Bata merah kelas 1 Bh 70.000 750.00 52,500.00
Semen PC Kg 9.680 1,300.00 12,584.00
Pasir Pasang m3 0.045 188,000.00 8,460.00
A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :6PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
B BAHAN
Bata merah Bh 70.000 650.00 45,500.00
Semen Portland Kg 8.320 1,300.00 10,816.00
Pasir Pasang m3 0.049 188,000.00 9,212.00
C PERALATAN
A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
B BAHAN
Bata merah Bh 70.000 650.00 45,500.00
Semen Portland Kg 6.500 1,300.00 8,450.00
Pasir Pasang m3 0.050 188,000.00 9,400.00
A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :3KP :10PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
B BAHAN
Bata merah Bh 70.000 650.00 45,500.00
Semen Portlan Kg 4.500 1,300.00 5,850.00
Kapur Padam m3 0.015 -
Pasir Pasang m3 0.050 188,000.00 9,400.00
C PERALATAN
A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM :
1KP :1PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
B BAHAN
Bata merah Bh 70.000 650.00 45,500.00
Semen Merah Kg 0.018 1,300.00 23.40
Kapur Padam m3 0.018 -
Pasir Pasang m3 0.018 188,000.00 3,384.00
C PERALATAN
A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM :
1KP :2PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
B BAHAN
Bata merah Bh 70.000 650.00 45,500.00
Semen Merah Kg 0.014 - -
Kapur Padam m3 0.014 -
Pasir Pasang m3 0.028 188,000.00 5,264.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang Batu L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.018 130,000.00 2,340.00
JUMLAH TENAGA KERJA
B BAHAN
HB-20 m3 12.500
Semen Portland Kg 30.320
Pasir Pasang m3 0.728
Besi angker diameter 8 Kg 0.280
C PERALATAN
D Jumlah (A+B+C)
E Overhead (10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang Batu L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.018 130,000.00 2,340.00
B BAHAN
HB-20 m3 12.500
Semen Portland Kg 24.260
Pasir Pasang m3 0.772
Besi angker dia 8 Kg 0.280
C PERALATAN
D Jumlah (A+B+C)
E Overhead (10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.8 Pemasangan 1m2 dinding conblock HB15 campuran 1SP :3PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.320 80,000.00 25,600.00
Tukang Batu L.02 OH 0.120 120,000.00 14,400.00
Kepala Tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.016 130,000.00 2,080.00
B BAHAN
HB-15 m3 12.500
Semen Portland Kg 22.740
Pasir Pasang m3 0.550
Besi angker dia 8 Kg 0.280
C PERALATAN
D Jumlah (A+B+C)
E Overhead (10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.320 80,000.00 25,600.00
Tukang Batu L.02 OH 0.120 120,000.00 14,400.00
Kepala Tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.016 130,000.00 2,080.00
B BAHAN
HB-15 m3 12.500
Semen Portland Kg 18.200
Pasir Pasang m3 0.582
Besi angker dia 8 Kg 0.280
C PERALATAN
D Jumlah (A+B+C)
E Overhead (10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
B BAHAN
HB-10 m3 12.500
Semen Portland Kg 15.160
Pasir Pasang m3 0.364
Besi angker dia 8 Kg 0.280
C PERALATAN
D Jumlah (A+B+C)
E Overhead (10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
B BAHAN
HB-10 m3 12.500
Semen Portland Kg 12.130
Pasir Pasang m3 0.388
Besi angker dia 8 Kg 0.280
C PERALATAN
D Jumlah (A+B+C)
E Overhead (10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
B BAHAN
Lunag angin palimnan 2020 cm m2 3.000 33,000.00 99,000.00
Semen PC Kg 11.000 1,250.00 13,750.00
Pasir Pasang m3 0.035 175,000.00 6,125.00
C PERALATAN
A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
B BAHAN
Bata berongga m3 30.000
Semen Portland Kg 11.000
Pasir Pasang m3 0.035
C PERALATAN
D Jumlah (A+B+C)
E Overhead (10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 -
Mandor L.04 OH 0.015 -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.03 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 -
Mandor L.04 OH 0.015 -
B BAHAN
Semen PC Kg 7.776 1,300.00 10,108.80
Pasir Pasang m3 0.023 188,000.00 4,324.00
C PERALATAN
B BAHAN
Semen PC Kg 5.184 1,300.00 6,739.20
Pasir Pasang m3 0.026 188,000.00 4,888.00
C PERALATAN
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
B BAHAN
Semen PC Kg 6.340 1,300.00 8,242.00
Pasir Pasang m3 0.012 188,000.00 2,256.00
C PERALATAN
B BAHAN
Semen PC Kg 3.250 1,300.00 4,225.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang Batu L.02 OH 0.125 120,000.00 15,000.00
Kepala tukang L.03 OH 0.013 125,000.00
Mandor L.04 OH 0.013 130,000.00
JUMLAH TENAGA KERJA 35,000.00
B BAHAN
Koral Sikat m2 1.100 85,000.00 93,500.00
Semen PC kg 9.800 1,300.00 12,740.00
Semen warna Kg 1.300 15,000.00 19,500.00
Pasir Pasang M3 0.045 188,000.00 8,460.00
JUMLAH HARGA BAHAN 134,200.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang Batu L.02 OH 0.125 120,000.00 15,000.00
Kepala tukang L.03 OH 0.013 125,000.00
Mandor L.04 OH 0.013 130,000.00
B BAHAN
Ubin Granit 40/40 m2 1.000 150,000.00 150,000.00
Semen PC kg 9.800 1,250.00 12,250.00
Semen warna Kg 1.300 15,000.00 19,500.00
Pasir Pasang M3 0.045 188,000.00 8,460.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.260 80,000.00 20,800.00
Tukang Batu L.02 OH 0.130 120,000.00 15,600.00
Kepala tukang L.03 OH 0.013 125,000.00
Mandor L.04 OH 0.013 130,000.00
B BAHAN
Ubin Granit 30/30 m2 1.000 145,000.00 145,000.00
Semen PC kg 10.000 1,250.00 12,500.00
Semen warna Kg 1.500 15,000.00 22,500.00
Pasir Pasang M3 0.045 #N/A #N/A
C PERALATAN
A.4.4.3.11. Pemasangan 1m2 lantai ubin teralux kerang ukuran 40cm x40cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang Batu L.02 OH 0.125 120,000.00 15,000.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 130,000.00 1,690.00
B BAHAN
Ubin Teralux Kerang 40/40 m2 1.000 206,000.00 206,000.00
Semen PC kg 9.800 1,250.00 12,250.00
Semen warna Kg 1.300 15,000.00 19,500.00
Pasir Pasang Galian M3 0.045 #N/A #N/A
C PERALATAN
A.4.4.3.12. Pemasangan 1m2 lantai ubin teralux kerang ukuran 30cm x30cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.260 80,000.00 20,800.00
Tukang Batu L.02 OH 0.130 120,000.00 15,600.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 130,000.00 1,690.00
B BAHAN
Ubin Teralux Kerang 30/30 m2 1.000 206,000.00 206,000.00
Semen PC kg 10.000 1,250.00 12,500.00
Semen warna Kg 1.500 15,000.00 22,500.00
Pasir Pasang Galian M3 0.045 #N/A #N/A
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.240 80,000.00 19,200.00
Tukang Batu L.02 OH 0.120 120,000.00 14,400.00
Kepala tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.012 130,000.00 1,560.00
B BAHAN
Granite Unpolis 60x60 Cm m2 1.000 190,000.00 190,000.00
Semen PC kg 9.600 1,250.00 12,000.00
Semen warna Kg 1.500 15,000.00 22,500.00
Pasir Pasang Galian M3 0.045 #N/A #N/A
C PERALATAN
JUMLAH HARGA ALAT
A.4.4.3.14. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang Batu L.02 OH 0.125 120,000.00 15,000.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 130,000.00 1,690.00
B BAHAN
Ubin Teralux Marmer 40/40 m2 1.000 222,000.00 222,000.00
Semen PC kg 9.800 1,250.00 12,250.00
Semen warna Kg 1.300 15,000.00 19,500.00
Pasir Pasang Galian M3 0.045 #N/A #N/A
C PERALATAN
A.4.4.3.15. Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.260 80,000.00 20,800.00
Tukang Batu L.02 OH 0.130 120,000.00 15,600.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 130,000.00 1,690.00
B BAHAN
Ubin Teralux Marmer 30/30 m2 1.000 222,000.00 222,000.00
Semen PC kg 10.000 1,250.00 12,500.00
Semen warna Kg 1.500 15,000.00 22,500.00
Pasir Pasang Galian M3 0.045 #N/A #N/A
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint Ubin Abu-abu 15/20 Bh 5.300 29,000.00 153,700.00
Semen PC kg 1.650 1,250.00 2,062.50
Pasir Pasang Galian M3 0.004 #N/A #N/A
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint ubin PC Bh 3.530 9,666.67 34,123.33
Semen Portland kg 1.240 25.00 31.00
Pasir pasang M3 0.003 221,000.00 663.00
JUMLAH HARGA BAHAN 34,817.33
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint ubin PC Bh 2.650 21,500.00 56,975.00
Semen Portland kg 1.240 25.00 31.00
Pasir pasang M3 0.003 221,000.00 663.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint ubin warna Bh 2.650 25,500.00 67,575.00
Semen Portland kg 1.140 25.00 28.50
Semen warna Kg 0.100 15,000.00 1,500.00
Pasir pasang M3 0.003 221,000.00 663.00
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint ubin warna Bh 3.530 16,666.67 58,833.33
Semen Portland kg 1.140 25.00 28.50
Semen warna Kg 0.100 15,000.00 1,500.00
Pasir pasang M3 0.003 221,000.00 663.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.005 130,000.00 650.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint ubin teraso Bh 3.530 20,333.33 71,776.67
Semen Portland kg 1.140 25.00 28.50
Semen warna Kg 0.100 15,000.00 1,500.00
Pasir pasang M3 0.003 221,000.00 663.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint ubin teraso Bh 2.650 30,500.00 80,825.00
Semen Portland kg 1.140 25.00 28.50
Semen warna Kg 0.100 15,000.00 1,500.00
Pasir pasang M3 0.003 221,000.00 663.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint ubin granit Bh 2.650 17,500.00 46,375.00
Semen Portland kg 1.140 25.00 28.50
Semen warna Kg 0.100 15,000.00 1,500.00
Pasir pasang M3 0.003 221,000.00 663.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint ubin granit Bh 3.530 5,166.67 18,238.33
Semen Portland kg 1.140 25.00 28.50
Semen warna Kg 0.100 15,000.00 1,500.00
Pasir pasang M3 0.003 221,000.00 663.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint teralux kerang Bh 2.630 103,000.00 270,890.00
Semen Portland kg 1.140 25.00 28.50
Semen warna Kg 0.100 15,000.00 1,500.00
Pasir pasang M3 0.003 221,000.00 663.00
C PERALATAN
B BAHAN
Plint teralux kerang Bh 3.530 69,000.00 243,570.00
Semen Portland kg 1.140 25.00 28.50
Semen warna Kg 0.100 15,000.00 1,500.00
Pasir pasang M3 0.003 221,000.00 663.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint teralux marmer Bh 1.700 246,000.00 418,200.00
Semen Portland kg 1.140 25.00 28.50
Semen warna Kg 0.100 15,000.00 1,500.00
Pasir pasang M3 0.003 221,000.00 663.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint teralux marmer Bh 2.650 147,000.00 389,550.00
Semen Portland kg 1.140 25.00 28.50
Semen warna Kg 0.100 15,000.00 1,500.00
Pasir pasang M3 0.003 221,000.00 663.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint teralux marmer Bh 3.530 90,000.00 317,700.00
Semen Portland kg 1.140 25.00 28.50
Semen warna Kg 0.100 15,000.00 1,500.00
Pasir pasang M3 0.003 221,000.00 663.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.360 80,000.00 28,800.00
Tukang Batu L.02 OH 0.180 120,000.00 21,600.00
Kepala tukang L.03 OH 0.018 125,000.00 2,250.00
Mandor L.04 OH 0.018 130,000.00 2,340.00
B BAHAN
Teraso cor M3 0.036 687,000.00 24,732.00
Semen warna Kg 0.100 15,000.00 1,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
B BAHAN
Ubin keramik Bh 53.000 800.00 42,400.00
Semen Portland Kg 8.190 25.00 204.75
Pasir pasang M3 0.045 221,000.00 9,945.00
Semen warna Kg 2.750 15,000.00 41,250.00
C PERALATAN
A.4.4.3.33. Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
B BAHAN
Ubin keramik Bh 106.000 800.00 84,800.00
Semen Portland Kg 8.190 25.00 204.75
Pasir pasang M3 0.045 221,000.00 9,945.00
Semen w Kg 3.200 15,000.00 48,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
B BAHAN
Ubin keramik Bh 10.000 4,777.78 47,777.78
Semen Portland Kg 8.190 25.00 204.75
Pasir pasang M3 0.045 221,000.00 9,945.00
Semen warna Kg 1.620 15,000.00 24,300.00
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.260 80,000.00 20,800.00
Tukang Batu L.02 OH 0.130 120,000.00 15,600.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 130,000.00 1,690.00
B BAHAN
Keramik lantai KW II 40x40 m2 1.000 #NAME? #NAME?
Semen PC Kg 10.000 1,250.00 12,500.00
Pasir Pasang Galian M3 0.045 #N/A #N/A
Semen warna Kg 0.000 15,000.00 -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.260 80,000.00 20,800.00
Tukang Batu L.02 OH 0.130 120,000.00 15,600.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 130,000.00 1,690.00
B BAHAN
Geranito 60x60 Cm m2 1.000 150,000.00 150,000.00
Semen PC Kg 10.000 1,250.00 12,500.00
Pasir Pasang M3 0.045 175,000.00 7,875.00
Semen warna Kg 0.000 15,000.00 -
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
B BAHAN
Keramik Lantai Klas 20 x 20 m2 1.050 #N/A #N/A
Semen PC Kg 10.400 1,250.00 13,000.00
Pasir Pasang M3 0.045 175,000.00 7,875.00
Semen warna Kg 0.500 15,000.00 7,500.00
C PERALATAN
A.4.4.3.37. Pemasangan 1m2 lantai keramik ukuran 10cm x 33cm untuk variasi/border
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.050 80,000.00 84,000.00
Tukang Batu L.02 OH 0.525 120,000.00 63,000.00
Kepala tukang L.03 OH 0.053 125,000.00 6,625.00
Mandor L.04 OH 0.053 130,000.00 6,890.00
B BAHAN
Ubin Keramik 10/33 m2 1.000 72,000.00 72,000.00
Semen PC Kg 9.800 1,250.00 12,250.00
Pasir Pasang Galian M3 0.045 #N/A #N/A
Semen warna Kg 4.370 15,000.00 65,550.00
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
B BAHAN
Ubin keramik Bh 11.870 6,818.18 80,931.82
Semen Portland Kg 14.150 25.00 353.75
Pasir pasang M3 0.039 221,000.00 8,619.00
Semen warna Kg 2.000 15,000.00 30,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint Keramik artistik 10/20 Bh 5.300 - -
Semen Portland Kg 1.140 - -
Pasir pasang M3 0.003 - -
Semen warna Kg 0.025 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint keramik Bh 10.600
Semen Portland Kg 1.140
Pasir pasang M3 0.003
Semen warna Kg 0.050
C PERALATAN
D Jumlah (A+B+C) -
E Overhead (10 %) 10% x D -
F Harga Satuan Pekerjaan (D+E) -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Plint keramik Bh 5.300
Semen Portland Kg 0.570
Pasir pasang M3 0.002
Semen warna Kg 0.013
C PERALATAN
D Jumlah (A+B+C)
E Overhead (10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 80,000.00 60,000.00
Tukang Batu L.02 OH 0.750 120,000.00 90,000.00
Kepala tukang L.03 OH 0.075 125,000.00 9,375.00
Mandor L.04 OH 0.038 130,000.00 4,940.00
B BAHAN
Internal cove Bh 5.300 #NAME? #NAME?
Semen Portland Kg 1.140 25.00 28.50
Pasir pasang M3 0.003 221,000.00 663.00
Semen warna Kg 0.100 15,000.00 1,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 106,925.00
B BAHAN
Marmer Bh 1.060 320,000.00 339,200.00
Semen Portland Kg 8.190 25.00 204.75
Pasir pasang M3 0.045 221,000.00 9,945.00
Semen warna Kg 0.650 15,000.00 9,750.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.170 80,000.00 13,600.00
Tukang Kayu L.02 OH 0.170 120,000.00 20,400.00
Kepala tukang L.03 OH 0.017 125,000.00 2,125.00
Mandor L.04 OH 0.009 130,000.00 1,170.00
B BAHAN
Karpet m2 1.050 94,400.00 99,120.00
Lem Kg 0.350 - -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang Kayu L.02 OH 0.120 120,000.00 14,400.00
Kepala tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.006 130,000.00 780.00
B BAHAN
Underlayer m2 1.050 102,000.00 107,100.00
Lem Kg 0.350 - -
C PERALATAN
D Jumlah (A+B+C) 133,380.00
E Overhead (10 %) 10% x D 13,338.00
F Harga Satuan Pekerjaan (D+E) 146,718.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang Kayu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
B BAHAN
Parquet m2 1.050 131,000.00 137,550.00
Lem Kg 0.600 - -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang Kayu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 106,925.00
B BAHAN
gymfloor m2 1.050 130,700.00 137,235.00
Lem Kg 0.600 - -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang Batu L.02 OH 0.500 120,000.00 60,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.050 130,000.00 6,500.00
B BAHAN
Porslen Bh 86.000 814.81 70,074.07
Semen Portland Kg 9.300 25.00 232.50
Pasir pasang M3 0.018 221,000.00 3,978.00
Semen warna Kg 1.500 15,000.00 22,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang Batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 137,475.00
B BAHAN
Porslen Bh 53.000 1,020.00 54,060.00
Semen Portland Kg 9.300 25.00 232.50
Pasir Pasang M3 0.018 221,000.00 3,978.00
Semen warna Kg 2.750 15,000.00 41,250.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang Batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
B BAHAN
Porslen Bh 26.000 2,800.00 72,800.00
Semen Portland Kg 9.300 25.00 232.50
Pasir Pasang M3 0.018 221,000.00 3,978.00
Semen warna Kg 1.940 15,000.00 29,100.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang Batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
B BAHAN
Keramik artistik Bh 53.000 3,050.00 161,650.00
Semen Portland Kg 9.300 25.00 232.50
Pasir Pasang M3 0.018 221,000.00 3,978.00
Semen warna Kg 2.750 15,000.00 41,250.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang Batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
B BAHAN
Keramik artistik Bh 106.000 2,910.00 308,460.00
Semen Portland Kg 9.300 25.00 232.50
Pasir Pasang M3 0.018 221,000.00 3,978.00
Semen warna Kg 2.900 15,000.00 43,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang Batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
B BAHAN
Keramik artistik Bh 53.000 800.00 42,400.00
Semen Portland Kg 9.300 25.00 232.50
Pasir Pasang M3 0.018 221,000.00 3,978.00
Semen warna Kg 2.750 15,000.00 41,250.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang Batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
B BAHAN
Kelamik Lantai 20 x 20 m2 1.050 65,000.00 68,250.00
Semen PC Kg 10.400 1,250.00 13,000.00
Pasir Pasang M3 0.045 175,000.00 7,875.00
Semen warna Kg 0.500 15,000.00 7,500.00
C PERALATAN
B BAHAN
Kelamik Lantai 25 x 25 m2 1.050 65,000.00 68,250.00
Semen PC Kg 10.400 1,250.00 13,000.00
Pasir Pasang M3 0.045 175,000.00 7,875.00
Semen warna Kg 0.500 15,000.00 7,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang Batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
B BAHAN
Keramik dinding 40x25 m2 1.000 75,000.00 75,000.00
Semen PC Kg 9.300 1,250.00 11,625.00
Pasir Pasang M3 0.018 175,000.00 3,150.00
Semen warna Kg 0.000 15,000.00 -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
B BAHAN
Batu Paras M' 1.100 180,000.00 198,000.00
Semen PC Kg 11.750 1,250.00 14,687.50
Pasir Pasang M3 0.000 175,000.00 -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
B BAHAN
Batu Tempel Hitam M' 1.100 120,000.00 132,000.00
Semen PC Kg 11.750 1,250.00 14,687.50
Pasir Pasang M3 0.000 175,000.00 -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang Batu L.02 OH 0.125 120,000.00 15,000.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 130,000.00 1,690.00
B BAHAN
Keramik lantai KW I 40x40 m2 1.000 #N/A #N/A
Semen PC kg 9.800 1,250.00 12,250.00
Semen warna Kg 1.300 15,000.00 19,500.00
Pasir Pasang Galian M3 0.000 #N/A #N/A
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang Batu L.02 OH 0.125 120,000.00 15,000.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 130,000.00 1,690.00
B BAHAN
Ubin Granit 60/60 m2 1.000 150,000.00 150,000.00
Semen PC kg 9.800 1,250.00 12,250.00
Semen warna Kg 0.000 15,000.00 -
Pasir Pasang Galian M3 0.000 #N/A #N/A
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.260 80,000.00 20,800.00
Tukang Batu L.02 OH 0.130 120,000.00 15,600.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 39,715.00
B BAHAN
Paving Block Type Bata 20 x 10 cm Tebal 8 cm m2 1.000 90,000.00 90,000.00
Pasir Pasang M3 0.045 175,000.00 7,875.00
JUMLAH HARGA BAHAN 97,875.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.004 130,000.00 520.00
B BAHAN
Asbes semen (Eternit) m2 1.100 - -
Paku tripleks kg 0.010 25,000.00 250.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang L.02 OH 0.120 120,000.00 14,400.00
Kepala tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.006 130,000.00 780.00
B BAHAN
Akustik 30/30 Lembar 12.000 - -
Paku 1 - 3 cm kg 0.050 22,500.00 1,125.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 120,000.00 14,400.00
Kepala tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.006 130,000.00 780.00
B BAHAN
Akustik 30/60 Lembar 5.800 - -
Paku 1 - 3 cm kg 0.050 22,500.00 1,125.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Akustik 60/120 Lembar 1.500 - -
Paku 1 - 3 cm kg 0.050 22,500.00 1,125.00
C PERALATAN
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Triplek 120x240x 3 mm Lembar 0.375 60,000.00 22,500.00
Paku 1 - 3 cm kg 0.030 22,500.00 675.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.02 OH 0.800 120,000.00 96,000.00
Kepala tukang L.03 OH 0.080 125,000.00 10,000.00
Mandor L.04 OH 0.040 130,000.00 5,200.00
B BAHAN
Papan Kayu Klas II m3 0.015 7,200,000.00 108,000.00
Paku 1 - 3 cm kg 0.010 22,500.00 225.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala tukang L.03 OH 0.005 125,000.00 625.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Gypsum board 1200 x 2400 x 6 mm Lembar 0.364 72,500.00 26,390.00
Sekrup/Piles 2 cm kg 0.110 25,000.00 2,750.00
C PERALATAN
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Tukang Besi L.02 OH 0.500 120,000.00 60,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 130,000.00 3,250.00
B BAHAN
Profil Allum"T" m 3.600 - -
Kawat dia 4 mm kg 0.150 22,000.00 3,300.00
Ramset Buah 1.050 - -
Akustik60 x 120 Lembar 1.500 - -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala tukang L.03 OH 0.005 125,000.00 625.00
Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 15,275.00
B BAHAN
Calsiboard 120x240x3,5 mm Lembar 0.364 71,000.00 25,844.00
Sekrup/Piles 2 cm kg 0.110 25,000.00 2,750.00
JUMLAH HARGA BAHAN 28,594.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang Kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala tukang L.03 OH 0.005 125,000.00 625.00
Mandor L.04 OH 0.003 130,000.00 390.00
B BAHAN
List Kayu Profil m 1.050 16,670.00 17,503.50
Paku 4 - 6 cm kg 0.010 22,500.00 225.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang Kayu L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.003 130,000.00 390.00
B BAHAN
List Gypsum Profil C7 m 1.050 16,100.00 16,905.00
Tepung gypsum kg 0.150 - -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang Kayu L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.003 130,000.00 390.00
B BAHAN
Kalsiplank 9 mm m 1.575 16,500.00 25,987.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.075 120,000.00 9,000.00
Kepala tukang L.03 OH 0.008 125,000.00 937.50
Mandor L.04 OH 0.008 130,000.00 1,040.00
B BAHAN
Genteng Lokal Bh 25.000 2,420.00 60,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.075 120,000.00 9,000.00
Kepala tukang L.03 OH 0.008 125,000.00 1,000.00
Mandor L.04 OH 0.008 130,000.00 1,040.00
B BAHAN
Genteng karang pilang/Kodok Bh 25.000 6,600.00 165,000.00
C PERALATAN
B BAHAN
Genteng Karang Pilang Bh 12.000 - -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang Kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.002 130,000.00 260.00
B BAHAN
Bubungan Genteng Lokal Bh 5.000 5,750.00 28,750.00
Semen PC Kg 8.000 1,250.00 10,000.00
Pasir Pasang Galian M3 0.032 #N/A #N/A
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang Kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.002 130,000.00 260.00
B BAHAN
Bubungan Karang Pilang Bh 5.000 - -
Semen PC Kg 8.000 1,250.00 10,000.00
Pasir Pasang Galian M3 0.032 #N/A #N/A
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang Kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.002 130,000.00 260.00
B BAHAN
Bubungan Karang Pilang Bh 4.000 - -
Semen PC Kg 8.000 1,250.00 10,000.00
Pasir Pasang Galian M3 0.032 #N/A #N/A
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.067 120,000.00 8,040.00
Kepala t A.4.5.2.7. L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.007 130,000.00 910.00
B BAHAN
Rooflight 90x180 Lbr 0.600 - -
Paku biasa ½”-1” Kg 0.050 22,500.00 1,125.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.075 120,000.00 9,000.00
Kepala tukang L.03 OH 0.008 125,000.00 1,000.00
Mandor L.04 OH 0.008 130,000.00 1,040.00
B BAHAN
Asbes Gelombang 90 x 180 Lbr 0.500 - -
Paku Seng Kg 0.120 25,000.00 3,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.075 120,000.00 9,000.00
Kepala tukang L.03 OH 0.008 125,000.00 1,000.00
Mandor L.04 OH 0.008 130,000.00 1,040.00
B BAHAN
Asbes Gelombang 120 x 240 Lbr 0.600 - -
Paku Seng Kg 0.120 25,000.00 3,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.007 130,000.00 910.00
B BAHAN
Asbes gel 92x250 Lbr 0.600 - -
Paku pancing 6x23 Kg 0.120 25,000.00 3,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.007 130,000.00 910.00
B BAHAN
Asbes gel 92x180 Lbr 0.750 - -
Paku pancing 6x23 Kg 0.120 25,000.00 3,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.007 130,000.00 910.00
B BAHAN
Asbes gel 92x250 Lbr 0.350 - -
Paku pancing 6x23 Kg 0.120 25,000.00 3,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.007 130,000.00 910.00
B BAHAN
Asbes gel 92x250 Lbr 0.420 - -
Paku pancing 6x23 Kg 0.120 25,000.00 3,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.007 130,000.00 910.00
B BAHAN
Asbes gel 105x240 Lbr 0.440 - -
Paku pancing 6x23 Kg 0.120 25,000.00 3,000.00
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.007 130,000.00 910.00
B BAHAN
Asbes gel 92x250 Lbr 0.510 - -
Paku pancing 6x23 Kg 0.120 25,000.00 3,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.007 130,000.00 910.00
B BAHAN
Asbes gel 92x250 Lbr 0.800 - -
Paku pancing 6x23 Kg 0.120 25,000.00 3,000.00
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.007 130,000.00 910.00
B BAHAN
Asbes gel 92x250 Lbr 0.370 - -
Paku pancing 6x23 Kg 0.120 25,000.00 3,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.007 130,000.00 910.00
B BAHAN
Asbes gel 92x250 Lbr 0.380 - -
Paku pancing 6x23 Kg 0.120 25,000.00 3,000.00
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.007 130,000.00 910.00
B BAHAN
Asbes gel 92x250 Lbr 0.460 - -
Paku pancing 6x23 Kg 0.120 25,000.00 3,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.007 130,000.00 910.00
B BAHAN
Asbes gel 92x250 Lbr 0.490 - -
Paku pancing 6x23 Kg 0.120 25,000.00 3,000.00
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.007 130,000.00 910.00
B BAHAN
Asbes gel 92x250 Lbr 0.570 - -
Paku pancing 6x23 Kg 0.120 25,000.00 3,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang Kayu L.02 OH 0.125 120,000.00 15,000.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.004 130,000.00 520.00
B BAHAN
Bubung stel gel. Lbr 2.400 - -
Paku skrup 3,5” Bh 6.000 170.00 1,020.00
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang Kayu L.02 OH 0.125 120,000.00 15,000.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.004 130,000.00 520.00
B BAHAN
Bubung stel gel. Lbr 2.100 - -
Paku skrup 3,5” Bh 6.000 170.00 1,020.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang Kayu L.02 OH 0.125 120,000.00 15,000.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.004 130,000.00 520.00
B BAHAN
Nok paten 92cm Lbr 1.100 - -
Paku skrup 3,5” Bh 6.000 170.00 1,020.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang Kayu L.02 OH 0.125 120,000.00 15,000.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 23,865.00
B BAHAN
Talang Galvalum Lbr 1.100 50,000.00 55,000.00
Self drilling screw dia-6x20 mm Bh 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 58,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.010 130,000.00 1,300.00
B BAHAN
Genteng Beton/Pres ( Sudah di Cat ) Bh 10.000 7,425.00 74,250.00
C PERALATAN
B BAHAN
Genteng Keramik Bh 11.500 14,000.00 161,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.300 120,000.00 36,000.00
Kepala tukang L.03 OH 0.003 125,000.00 375.00
Mandor L.04 OH 0.010 130,000.00 1,300.00
B BAHAN
Genteng aspal Bh 6.900 Genteng aspal
Plywood 6mm Lbr 0.350 Plywood 6mm
Paku biasa ½”-1” Kg 0.030 Paku biasa ½”-1”
Plastic aerator Bh 0.500 Plastic aerator
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profite 10 % 10% x D
F Harga Satuan Pekerjaan (D+E) -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.001 130,000.00 130.00
B BAHAN
Atap Metalroof 0,25 mm (Lapis Butiran) m2 1.650 94,000.00 155,100.00
Sekrup/Piles 1,5 cm Kg 0.200 25,000.00 5,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 29,380.00
B BAHAN
Atap Metalroof 3,5 mm (Lapis Butiran) m2 1.020 56,453.00 57,582.06
Sekrup/Piles 1,5 cm Kg 0.200 10,700.00 2,140.00
JUMLAH HARGA BAHAN 59,722.06
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 29,380.00
B BAHAN
Atap Metalroof 0,30 mm (tanpa Lapis Butiran) m2 2.000 36,000.00 72,000.00
Sekrup/Piles 1,5 cm Kg 0.200 25,000.00 5,000.00
JUMLAH HARGA BAHAN 77,000.00
C PERALATAN
B BAHAN
Sirap kayu Bh 30.000 - -
Paku biasa ½”-1” Kg 0.200 22,500.00 4,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang Kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.020 130,000.00 2,600.00
B BAHAN
Bumbungan Genteng Beton ( Sudah Di Cat) Bh 3.500 11,500.00 40,250.00
Paku 1 - 3 cm Kg 0.050 22,500.00 1,125.00
Semen PC Kg 10.800 1,250.00 13,500.00
Pasir Pasang Galian M3 0.032 #N/A #N/A
Semen warna Kg 1.000 15,000.00 15,000.00
C PERALATAN
B BAHAN
Bubungan Genteng Keramik Bh 3.500 16,500.00 57,750.00
Paku 1 - 3 cm Kg 0.050 22,500.00 1,125.00
Semen PC Kg 10.800 1,250.00 13,500.00
Pasir Pasang Galian M3 0.032 #N/A #N/A
Semen warna Kg 1.000 15,000.00 15,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.125 80,000.00 10,000.00
Tukang Kayu L.02 OH 0.250 120,000.00 30,000.00
Kepala tukang L.03 OH 0.025 125,000.00 3,125.00
Mandor L.04 OH 0.006 130,000.00 780.00
B BAHAN
Nok genteng aspal Bh 2.000
Paku biasa ½”-1” Kg 0.050
Kayu balok borneo M3 0.004
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang Kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.013 130,000.00 1,690.00
B BAHAN
Bubungan Metalroof (tanpa lapis butiran) Bh 1.100 30,000.00 33,000.00
Paku 1 - 3 cm Kg 0.050 22,500.00 1,125.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.125 80,000.00 10,000.00
Tukang Kayu L.02 OH 0.250 120,000.00 30,000.00
Kepala tukang L.03 OH 0.025 125,000.00 3,125.00
Mandor L.04 OH 0.006 130,000.00 780.00
B BAHAN
Seng plat 3 x 6” Lbr 0.400 52,000.00 20,800.00
Paku biasa ½”-1” Kg 0.050 22,500.00 1,125.00
Paku biasa 2”-5” Kg 0.050 22,500.00 1,125.00
JUMLAH HARGA BAHAN 23,050.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang Kayu L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.006 130,000.00 780.00
B BAHAN
Seng Glmb. Besar BJLS 20 Lbr 0.700 54,000.00 37,800.00
Paku 1 - 3 cm Kg 0.020 22,500.00 450.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.006 130,000.00 780.00
B BAHAN
Seng Glmb. Besar BJLS 30 Lbr 0.300 -
Paku 1 - 3 cm Kg 0.040 22,500.00 900.00
JUMLAH HARGA BAHAN 900.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.006 130,000.00 780.00
B BAHAN
Seng Spandek 3,5 mm lebar 70 cm m2 1.050 37,635.00 39,516.75
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.100 125,000.00 12,500.00
Mandor L.04 OH 0.050 130,000.00 6,500.00
B BAHAN
Bubungan Asbes Gelombang Besar 105 cm Bh 1.200 - -
Paku Sekrup 5 cm Kg 0.040 25,000.00 1,000.00
C PERALATAN
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 35,150.00
B BAHAN
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang kayu L.02 OH 0.500 120,000.00 60,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.005 130,000.00 650.00
B BAHAN
Kunci Pintu (Handle + Body) Bh 1.000 400,000.00 400,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.001 130,000.00 104.00
B BAHAN
Engsel Pintu Bh 1.000 38,500.00 38,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.001 130,000.00 65.00
B BAHAN
Engsel Jendela Set 1.000 9,000.00 9,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.008 130,000.00 1,040.00
B BAHAN
Haag Angin Besar Bh 1.000 25,600.00 25,600.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
B BAHAN
Grendel Kecil Set 1.000 14,000.00 14,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
B BAHAN
Expagnolet Set 1.000 71,500.00 71,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.001 130,000.00 104.00
B BAHAN
Kaca Riben Tebal 5 mm m2 1.100 196,900.00 216,590.00
Sealant Kg 0.050 45,000.00 2,250.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.001 130,000.00 104.00
B BAHAN
Kaca Buram 5 mm m2 1.100 178,200.00 196,020.00
Sealant Kg 0.050 45,000.00 2,250.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.001 130,000.00 104.00
B BAHAN
Kaca Polos 5 mm m2 1.100 80,000.00 88,000.00
Sealant Kg 0.050 45,000.00 2,250.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang cat L.02 OH 0.009 120,000.00 1,080.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 7,820.00
B BAHAN
Meni Kayu Kg 0.200 35,000.00 7,000.00
Plamir Kayu Kg 0.150 35,000.00 5,250.00
Cat Dasar Kayu Kg 0.170 61,000.00 10,370.00
Cat Kayu Mutu Menengah Kg 0.260 61,000.00 15,860.00
Kuas Bh 0.010 9,000.00 90.00
Minyak Cat Kg 0.030 38,000.00 1,140.00
Ampelas Lbr 0.200 5,000.00 1,000.00
JUMLAH HARGA BAHAN 40,710.00
C PERALATAN
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis Plamir, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Mandor L.04 OH 0.006 130,000.00 780.00
JUMLAH TENAGA KERJA 8,780.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
B BAHAN
Vernis L 0.150 55,000.00 8,250.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
A.4.7.1.10.a Pengecatan 1 m2 tembok baru Exterior ( 1lapis Alkali, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
B BAHAN
Cat Alkali Kg 0.100 10,000.00 1,000.00
Cat Tembok Mutu Menengah Kg 0.100 22,500.00 2,250.00
Cat Tembok Mutu Menengah Kg 0.260 22,500.00 5,850.00
JUMLAH HARGA BAHAN 9,100.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.003 130,000.00 325.00
JUMLAH TENAGA KERJA 28,425.00
B BAHAN
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.300 80,000.00 264,000.00
Tukang batu L.02 OH 1.100 120,000.00 132,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.160 130,000.00 20,800.00
JUMLAH TENAGA KERJA 418,050.00
B BAHAN
Kloset Duduk Keramik Unit 1.000 2,500,000.00 2,500,000.00
Perlengkapan Ls 6% x closet 150,000.00 150,000.00
JUMLAH HARGA BAHAN 2,650,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.500 120,000.00 180,000.00
Kepala tukang L.03 OH 0.150 125,000.00 18,750.00
Mandor L.04 OH 0.160 130,000.00 20,800.00
JUMLAH TENAGA KERJA 299,550.00
B BAHAN
Closet Jongkok Porselin Unit 1.000 200,000.00 200,000.00
Semen PC Kg 6.000 1,250.00 7,500.00
Pasir Pasang Galian M3 0.010 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.500 120,000.00 180,000.00
Kepala tukang L.03 OH 0.150 125,000.00 18,750.00
Mandor L.04 OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 285,250.00
B BAHAN
Closet Jongkok Teraso Unit 1.000 225,000.00 225,000.00
Semen PC Kg 6.000 1,250.00 7,500.00
Pasir Pasang Galian M3 0.010 #N/A #N/A
Bata merah kelas 1 Bh 7.000 750.00 5,250.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.000 120,000.00 120,000.00
Kepala tukang L.03 OH 0.100 125,000.00 12,500.00
Mandor L.04 OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 219,000.00
B BAHAN
Urinoir Porselin Unit 1.000 1,350,000.00 1,350,000.00
Semen PC Kg 6.000 1,250.00 7,500.00
Pasir Pasang Galian M3 0.010 #N/A #N/A
Perlengkapan Ls 30% x Urinoir 405,000.00 405,000.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang batu L.02 OH 1.450 120,000.00 174,000.00
Kepala tukang L.03 OH 0.150 125,000.00 18,750.00
Mandor L.04 OH 0.060 130,000.00 7,800.00
JUMLAH TENAGA KERJA 296,550.00
B BAHAN
Wastafel Unit 1.200 307,000.00 368,400.00
Semen PC Kg 6.000 1,250.00 7,500.00
Pasir Pasang Galian M3 0.010 #N/A #N/A
Perlengkapan Ls 12% x wastafel 36,840.00 36,840.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.380 80,000.00 30,400.00
Tukang batu L.02 OH 0.190 120,000.00 22,800.00
Kepala tukang L.03 OH 0.019 125,000.00 2,375.00
Mandor L.04 OH 0.019 130,000.00 2,470.00
JUMLAH TENAGA KERJA 58,045.00
B BAHAN
Buis Beton Ǿ 80 cm x 100 cm bh 1.000 157,000.00 157,000.00
Bata merah kelas 1 m3 0.000 750.00 -
Semen PC kg 0.000 1,250.00 -
Pasir Pasang Galian m3 0.000 #N/A #N/A
Pasir Urug / Timbunan m3 0.069 111,000.00 7,659.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang batu L.02 0.500 120,000.00 60,000.00
Kepala tukang L.03 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 73,500.00
B BAHAN
Bak Cuci Piring Teraso Unit 1.000 296,000.00 296,000.00
Waterdrain Bh 1.000 -
Semen PC Kg 20.000 1,250.00 25,000.00
Pasir Pasang Galian M3 0.050 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) #N/A
E Overhead & Profite 10 % 10% x D #N/A
F Harga Satuan Pekerjaan (D+E) #N/A
A.5.1.1 14. Pemasangan 1 buah floor drain
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 14,700.00
B BAHAN
Floor Drain Unit 1.000 21,000.00 21,000.00
JUMLAH HARGA BAHAN 21,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang batu L.02 0.060 120,000.00 7,200.00
Kepala tukang L.03 0.006 125,000.00 750.00
Mandor L.04 OH 0.002 130,000.00 260.00
JUMLAH TENAGA KERJA 11,090.00
B BAHAN
Pipa PVC Ø ½" AW M 1.200 6,400.00 7,680.00
Perlengkapan Ls 35% x pipa 2,240.00 2,240.00
JUMLAH HARGA BAHAN 9,920.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang batu L.02 0.060 120,000.00 7,200.00
Kepala tukang L.03 0.006 125,000.00 750.00
Mandor L.04 OH 0.002 130,000.00 260.00
JUMLAH
11,090.00
TENAGA KERJA
B BAHAN
Pipa PVC Ø ¾" aw M 1.20 7,680.00 9,216.00
Perlengkapan Ls 35%xpipa 2,688.00 2,688.00
JUMLAH
11,904.00
HARGA BAHAN
C PERALATAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 22,994.00
E Overhead & Profite 10 % 10% x D 2,299.40
F Harga Satuan Pekerjaan (D+E) 25,293.40
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 16,635.00
B BAHAN
Pipa PVC Ø 2" M 1.200 16,640.00 19,968.00
Perlengkapan Ls 35% x pipa 5,824.00 5,824.00
JUMLAH HARGA BAHAN 25,792.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 0.135 120,000.00 16,200.00
Kepala tukang L.03 0.014 125,000.00 1,687.50
Mandor L.04 OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 24,887.50
B BAHAN
Pipa PVC Ø 2" M 1.200 16,640.00 19,968.00
Perlengkapan ls 35% x pipa 5,824.00 5,824.00
JUMLAH HARGA BAHAN 25,792.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 0.135 120,000.00 16,200.00
Kepala tukang L.03 0.014 125,000.00 1,687.50
Mandor L.04 OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 24,887.50
B BAHAN
Pipa PVC Ø 3" M 1.200 43,520.00 52,224.00
Perlengkapan % 35 15,232.00 15,232.00
JUMLAH HARGA BAHAN 67,456.00
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 0.135 120,000.00 16,200.00
Kepala tukang L.03 0.014 125,000.00 1,687.50
Mandor L.04 OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 24,887.50
B BAHAN
Pipa PVC Ø 4" M 1.200 66,560.00 79,872.00
Perlengkapan Ls 35%xpipa 23,296.00 23,296.00
JUMLAH HARGA BAHAN 103,168.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
Analisa (Rp) (Rp)
D Jumlah 3,296,905.00
F Harga Satuan Pekerjaan 3,296,905.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
Analisa (Rp) (Rp)
D Jumlah 751,101.49
F Harga Satuan Pekerjaan 751,101.49
A.8.4.1 HARGA SATUAN PEKERJAAN LISTRIK DALAM GEDUNG
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang listrik L.02 OH 0.600 120,000.00 72,000.00
Kepala tukang L.03 OH 0.060 125,000.00 7,500.00
B BAHAN
Kabel NYM 3x2,5 mm2 m' 7.0000 14,950.00 104,650.00
Isolasi bh 0.2500 15,000.00 3,750.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang listrik L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
B BAHAN
Stop Kontak Tanam bh 1.0000 20,000.00 20,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang listrik L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
B BAHAN
Stop Kontak AC bh 1.0000 60,000.00 60,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang listrik L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
B BAHAN
Saklar tunggal bh 1.0000 16,500.00 16,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang listrik L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
B BAHAN
Saklar ganda bh 1.0000 22,000.00 22,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang listrik L.02 OH 0.020 120,000.00 2,400.00
Kepala tukang L.03 OH 0.005 125,000.00 625.00
B BAHAN
Fitting Plafon bh 1.0000 12,000.00 12,000.00
Lampu SL bh 1.0000 22,000.00 22,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang listrik L.02 OH 0.020 120,000.00 2,400.00
Kepala tukang L.03 OH 0.005 125,000.00 625.00
B BAHAN
Fitting Plafon bh 1.0000 12,000.00 12,000.00
Lampu baret bh 1.0000 350,000.00 350,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang listrik L.02 OH 0.020 120,000.00 2,400.00
Kepala tukang L.03 OH 0.005 125,000.00 625.00
B BAHAN
Fiting Downlight bh 1.0000 35,000.00 35,000.00
Lampu SL 18 Watt bh 1.0000 47,300.00 47,300.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang listrik L.02 OH 0.020 120,000.00 2,400.00
Kepala tukang L.03 OH 0.005 125,000.00 625.00
B BAHAN
Fiting Downlight bh 1.0000 35,000.00 35,000.00
Lampu SL 13 Watt bh 1.0000 42,500.00 42,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang listrik L.02 OH 0.020 120,000.00 2,400.00
Kepala tukang L.03 OH 0.005 125,000.00 625.00
B BAHAN
Lampu TL 2x18 Watt grille bh 1.0000 265,000.00 265,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang listrik L.02 OH 0.250 120,000.00 30,000.00
Kepala tukang L.03 OH 0.025 125,000.00 3,125.00
B BAHAN
Pilot lamp + fuse unit 3.000 25,000.00 75,000.00
CT bh 3.000 65,000.00 195,000.00
Amperemeter bh 3.000 125,000.00 375,000.00
Voltmeter bh 1.000 250,000.00 250,000.00
Selector switch bh 1.000 75,000.00 75,000.00
MCCB 3 Phasa 50 A bh 1.000 425,000.00 425,000.00
MCCB 3 Phasa 30 A bh 1.000 425,000.00 425,000.00
MCCB 3 Phasa 25 A bh 2.000 425,000.00 850,000.00
Busbar RSTN-GND set 1.000 225,000.00 225,000.00
Grounnding panel BC 16
unit 1.000 300,000.00 300,000.00
mm2
Box Panel 80x40x20 unit 1.000 850,000.00 850,000.00
Kabel + Skun kabel +
lot 1.000 175,000.00 175,000.00
Assesoris
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang listrik L.02 OH 0.250 120,000.00 30,000.00
Kepala tukang L.03 OH 0.025 125,000.00 3,125.00
JUMLAH TENAGA KERJA 33,125.00
B BAHAN
Pilot lamp + fuse unit 3.000 25,000.00 75,000.00
MCCB 3 Phasa 25 A bh 3.000 425,000.00 1,275,000.00
MCB 1 Phasa 16 A bh 3.000 75,000.00 225,000.00
MCB 1 Phasa 10 A bh 1.000 75,000.00 75,000.00
Busbar N-GND bh 1.000 150,000.00 150,000.00
Box Panel 50x40x20 bh 1.000 850,000.00 850,000.00
Kabel + Skun kabel + bh 2.000 175,000.00 350,000.00
Assesoris
JUMLAH HARGA BAHAN 3,000,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang listrik L.02 OH 0.250 120,000.00 30,000.00
Kepala tukang L.03 OH 0.025 125,000.00 3,125.00
B BAHAN
Kabel NYA 3x2,5mm2 m' 5.0000 14,950.00 74,750.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.200 80,000.00 416,000.00
Mandor L.04 OH 0.335 130,000.00 43,550.00
B BAHAN
Identitas Logo 40x50 bahan
1,100,000.00 1,100,000.00
acrylic Unit 1.0000
JUMLAH HARGA BAHAN 1,100,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.350 80,000.00 268,000.00
Mandor L.04 OH 0.335 130,000.00 43,550.00
B BAHAN
Identitas Papan Nama
100,000.00 100,000.00
Identitas bahan acrylic bh 1.0000
JUMLAH HARGA BAHAN 100,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.010 80,000.00 160,800.00
Mandor L.04 OH 0.201 130,000.00 26,130.00
B BAHAN
Identitas Papan Nama
bh 1.0000 50,000.00 50,000.00
Identitas bahan acrylic
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.005 80,000.00 80,400.00
Mandor L.04 OH 0.101 130,000.00 13,065.00
B BAHAN
Identitas Papan Nama
bh 1.0000 30,000.00 30,000.00
Identitas bahan acrylic
C PERALATAN