PROGRAM DESA SINDANGLAYA 2023

REKAP KEGIATAN PEMBANGUNAN


KEGIATAN : BANGUNAN SARANA PRASARANA PENATAAN RUANG
PEKERJAAN : PAGAR KANTOR DESA
KABUPATEN : SERANG
KECAMATAN : CINANGKA
DESA : SINDANGLAYA
LOKASI : KP. CIPARAY RT 01 / RW 01
NO URAIAN SATUAN JUMLAH
I PEKERJAAN PERISPAN
1 PEKERJAAN PERSIAPAN M3 1,619,334.50
2 PEKERJAAN GALIAN TANAH M3 526,312.60
3 PEKERJAAN PONDASI M3 3,788,742.50
4 PEKERJAAN BETON M3 12,913,347.81
5 PEKERJAAN DINDING M2 11,070,888.64
6 PERLATAN LAINNYA LS 22,852,800.00
JUMLAH (SUB TOTAL) Rp 52,771,426.05

Mengetahui Sekretaris Desa


Kepala Desa Sindanglaya Sindanglaya

M. MAULIDIN ANWAR AGUS SAFARUDIN


Dibuat Oleh
Konsultan Perencana Kasi Kesejahteraan

MARDI, S.T ADE NUROHMAN


29,918,626.05
BACK UP VOLUME DESA SINDANGLAYA
KEGIATAN : BANGUNAN SARANA PRASARANA PENATAAN RUANG
PEKERJAAN : PAGAR KANTOR DESA
KABUPATEN : SERANG
KECAMATAN : CINANGKA
DESA : SINDANGLAYA
LOKASI : KP. CIPARAY RT 01 / RW 01 VOLUME 20 X 2 M2

PERINCIAN JUMLAH
NO ITEM PEKERJAAN SAT KET
L. L. SUB
PANJANG LEBAR TINGGI UNIT TOTAL
ATAS BAWAH TOTAL
MCK SUKA RENA
1.1 PEKERJAAN PERSIAPAN
1.1 Pek. Pembersihan Lokasi M² 20.00 0.25 1.00 5.00
5.00

1.2 Pek. Pemasanan Bowplank/Pengukuran M1


20.00 1.00 20.00
M1 0.25 1.00 0.25
20.25
2.1 PEKERJAAN GALIAN TANAH
2.1 Pek. Galian Tanah (Pondasi Batu Kali) M³ 20.00 0.50 0.65 1.00 6.50
6.50
Pek. Urugan Pasir Bawah Pondasi Batu
2.2 M³
Kali T. 5 Cm 20.00 0.60 0.05 1.00 0.60
0.60
2.3 Pek. Urugan Tanah Kembali M³ 2.15
2.15
3.1 PEKERJAAN PONDASI
3.1 Pek Pas Batu Kosong (Aanstamping) M³ 20.00 0.10 0.15 1.00 0.30
0.30
3.2 Pek Pas Pondasi batu kali Ad. 1:5 M³
M³ 20.00 0.25 0.60 0.50 1.00 4.25
4.25
4.1 PEKERJAAN BETON
4.1 Pek. Pas Beton Struktur Sloof 20/15
Beton K-175 M³ 20.00 0.20 0.20 1.00 0.80 20.00
0.80 20.00
Pek. Bikisting (2xPemakaian) 20.00 0.20 2.00 8.00
8.00
P total Unit Jumlah BJ UNIT P1 VOL.
(M') (M') (Btg) (Kg/m) (BH) (KG)
besi polos dia 12 mm kg 20.10 4.00 20.43 7.40 1.00 151.21
besi polos dia 8mm kg 0.65 100.50 5.44 4.74 1.00 25.80
177.01
4.2 Pek. Pas Kolom Utama 12/12
Beton K-175 M³ 0.12 0.12 2.00 8.00 0.23 10.00
0.23 10
Pek. Bikisting (2xPemakaian) 10.00 0.20 2.00 4.00
4.00
P total Unit Jumlah BJ UNIT P1 VOL.
(M') (M') (Btg) (Kg/m) (BH) (KG)
besi polos dia 12mm kg 10.10 4.00 10.43 10.70 1.00 111.64
besi polos dia 8mm kg 0.33 50.50 1.39 4.74 1.00 6.58
118.22
5.1 PEKERJAAN DINDING
5.1 Pek. Pas Dinding Bata Merah M² 14.00 2.00 1.00 28.00
6.1 PEKERJAAN CAT DINDING
6.1 Pek. Pas. Cat Dinding M² 14.00 2.00 2.00 56.00
7.1 PEKERJAAN PLESTERAN ACIAN
7.1 Pek. Pas Plesteran + Acian 1:4 M² 14.00 2.00 2.00 56.00 56.00
7.2 Profil Pager M² 14.00 1.20 2.00 33.60
33.60
7.3 Lampu hias BH 8.00 8.00
8.00

Mengetahui Sekretaris Desa


Kepala Desa Sindanglaya Sindanglaya

M. MAULIDIN ANWAR AGUS SAFARUDIN

Konsultan Perencana Kasi Kesejahteraan

MARDI, S.T ADE NUROHMAN


PROGRAM DESA SINDANGLAYA 2023
(ANALISA HARGA SATUAN PERMEN PUPR : 28/PRT/M 2016, AHSPBPU)
KEGIATAN : BANGUNAN SARANA PRASARANA PENATAAN RUANG
PEKERJAAN : PAGAR KANTOR DESA
KABUPATEN : SERANG
KECAMATAN : CINANGKA
DESA : SINDANGLAYA
LOKASI : KP. CIPARAY RT 01 / RW 01
Harga Satuan (Rp)
Jumlah Harga (Rp)
Jenis Kegiatan Koefisien Volume unit JUMLAH (Rp)
Bahan Upah
Bahan Upah

PEKERJAAN MCK
1.1 PEKERJAAN PERSIAPAN
Kode Analisa a.1.1
T.01.a PEMBERSIHAN LOKASI
1.1 T.01.a Pek. Pembersihan Lokasi 5.00
Upah
Pekerja 0.100 0.50 Hok 100,000.00 50,000.00 50,000.00
Mandor 0.050 0.25 Hok - - -
JUMLAH 50,000.00 50,000.00
1.2 T.02.B.2 Pek. Pas. Bowplank /
Pengukuran 20.25
Upah
Pekerja 0,10 2.03 Hok 100,000.00 202,500.00 202,500.00
Tukang kayu 0,10 2.03 Hok 120,000.00 243,000.00 243,000.00
Mandor 0,005 0.101 Hok - - -
Bahan
Kayu balok 5/7 0,012 0.24 M3 3,071,000.00 746,253.00 746,253.00
Paku 2”-3” 0,02 0.41 KG 23,000.00 9,315.00 9,315.00
Kayu papan 3/20 0,007 0.14 M3 2,598,000.00 368,266.50 368,266.50
JUMLAH 1,123,834.50 445,500.00 1,569,334.50
2.1 PEKERJAAN TANAH
2.1 T.06.a.1Pek. Galian Tanah Pondasi batu Kali 6.50
Upah
Pekerja 0.5630 3.66 Hok 100,000.00 365,950.00 365,950.00
Mandor 0.0563 0.37 Hok - - -
JUMLAH 365,950.00 365,950.00
2.2 T.14.c Pek Urugan 1m3 Dengan Pasir Urug 0.60
Upah
Pekerja 0.400 0.24 Hok 100,000.00 24,000.00 24,000.00
Mandor 0.040 0.024 Hok - - -
Bahan
Pasir 0.432 0.26 M3 253,000.00 65,577.60 65,577.60
JUMLAH 65,577.60 24,000.00 89,577.60
2.3 T.14.a.1 Urugan Tanah Kembali 2.15
Upah
Pekerja 0.3300 0.71 Hok 100,000.00 70,785.00 70,785.00
Mandor 0.0330 0.071 Hok - - -
JUMLAH - 70,785.00 70,785.00
3.1 PEKERJAAN PONDASI
3.1 Pek. Pas Batu kosong Annstamping 0.30
Upah
Pekerja 0.780 0.23 Hok 100,000.00 23,400.00 23,400.00
Tukang Batu 0.390 0.12 Hok 120,000.00 14,040.00 14,040.00
Mandor 0.039 0.01 Hok - - -
Bahan
Batu Belah 15/20 Cm 1.200 0.36 M³ 257,000.00 92,520.00 92,520.00
JUMLAH 92,520.00 37,440.00 129,960.00
3.2 P.01.C.1 Pek Pas. Pondasi batu kali 1 sp : 4 pp 4.25
Upah
Pekerja 1.500 6.38 Hok 100,000.00 637,500.00 637,500.00
Tukang Batu 0.750 3.19 Hok 120,000.00 382,500.00 382,500.00
Mandor 0.075 0.32 Hok - - -
Bahan
Batu Belah 15/20 Cm 1.200 5.10 M3 257,000.00 1,310,700.00 1,310,700.00
Semen Abu-abu (PC) 163.000 692.75 Kg 1,110.00 768,952.50 768,952.50
Pasir Pasang 0.520 2.21 M3 253,000.00 559,130.00 559,130.00
JUMLAH 2,638,782.50 1,020,000.00 3,658,782.50
4.1 PEKERJAAN BETON
4.1 A. A.4.1.1.5 Pek Pas sloof, kolom
MEMBUAT 1 M³ BETON MUTU f'c = 14,5
MPa (K.175), SLUMP (12 ± 2 ) cm, w/c=0,66 1.03
Upah
Pekerja 1.650 1.70 Hok 100,000.00 170,016.00 170,016.00
Tukang Batu 0.275 0.28 Hok 120,000.00 34,003.20 34,003.20
Mandor 0.083 0.09 Hok - - -
Bahan
Semen Abu-abu (PC) 326.00 335.91 Kg 1,110.00 372,860.54 372,860.54
Pasir Beton 0.54 0.56 m3 253,000.00 141,529.25 141,529.25
Krikil (Maks 30 Mm) 0.76 0.79 m3 295,000.00 231,684.41 231,684.41
JUMLAH 746,074.21 204,019.20 950,093.41
A.4.2.1.1. Pemasangan 1 kg besi profil 295.23
Upah
Pekerja 0.060 17.71 Hok 100,000.00 1,771,376.30 1,771,376.30
Tukang Besi 0.060 17.71 Hok 120,000.00 2,125,651.56 2,125,651.56
Mandor 0.003 0.89 Hok - - -
Bahan
Besi Beton Polos / Ulir 1.050 309.99 kg 18,000.00 5,579,835.35 5,579,835.35
Kawat Beton 0.015 4.43 kg 23,600.00 104,511.20 104,511.20
JUMLAH 5,684,346.55 3,897,027.86 9,581,374.41
4.3 A.4.1.1.21 PEMASANGAN 1 M²
BEKISTING UNTUK SLOOF, KOLOM 12.00
Upah
Pekerja 0.520 6.24 Hok 100,000.00 624,000.00 624,000.00
Tukang Kayu 0.260 3.12 Hok 120,000.00 374,400.00 374,400.00
Mandor 0.026 0.31 Hok - - -
Bahan
Kayu Kelas III 0.0450 0.54 M³ 2,362,000.00 1,275,480.00 1,275,480.00
Paku 5 cm - 10 cm 0.3000 3.60 Kg 23,000.00 82,800.00 82,800.00
Minyak Bekisting 0.1000 1.20 Ltr 21,000.00 25,200.00 25,200.00
JUMLAH 1,383,480.00 998,400.00 2,381,880.00
5.1 PEKERJAAN DINDING
5.1 A.4.4.1.9 PEMASANGAN 1 M² DINDING 28.00
BATA MERAH UKURAN (5X11X22) cm
TEBAL 1/2 BATU, CAMPURAN SPESI 1 SP
: 4 PP
Upah
Pekerja 0.300 8.40 Hok 100,000.00 840,000.00 840,000.00
Tukang Batu 0.100 2.80 Hok 120,000.00 336,000.00 336,000.00
Mandor 0.015 0.42 Hok - - -
Bahan
Bata Merah 70.000 1,960.00 Bh 640.00 1,254,400.00 1,254,400.00
Semen Abu-abu (PC) 11.500 322.00 kg 1,110.00 357,420.00 357,420.00
Pasir Pasang 0.043 1.20 M3 253,000.00 304,612.00 304,612.00
JUMLAH 1,916,432.00 1,176,000.00 3,092,432.00
6.1 PEKERJAAN PENGECATAN
5.2 N.14 Pengecatan tembok baru (1 lapis
plamir, 2 lapis cat penutup) Catylac Exterior
5 kg 56.00
Upah
Pekerja 0.0600 3.36 Hok 100,000.00 336,000.00 336,000.00
Tukang cat 0.1600 8.96 Hok 120,000.00 1,075,200.00 1,075,200.00
Mandor 0.0030 0.17 Hok - - -
Bahan
Plamir 0.1000 5.60 kg 20,000.00 112,000.00 112,000.00
Kapek 0.0500 2.80 bh 5,900.00 16,520.00 16,520.00
Cat vinilex enerior 0.4700 26.32 kg 82,000.00 2,158,240.00 2,158,240.00
Amplas 0.5000 28.00 bh 3,500.00 98,000.00 98,000.00
Roll cat 0.0100 0.56 bh 11,800.00 6,608.00 6,608.00
JUMLAH 2,391,368.00 1,411,200.00 3,802,568.00
7.1 PEKERJAAN PLESTERAN
4.3 A.4.4.2.4 Pek. Pas 1 M² Plesteran 1 SP :
4 PP, TEBAL 15 mm 89.60
Upah
Tukang Batu 0.150 13.44 Hok 120,000.00 1,612,800.00 1,612,800.00
Mandor 0.015 1.34 Hok - - -
Bahan
Semen Abu-abu (PC) 6.240 559.10 Kg 1,110.00 620,605.44 620,605.44
Pasir Pasang 0.024 2.15 M3 253,000.00 544,051.20 544,051.20
JUMLAH 1,164,656.64 1,612,800.00 2,777,456.64
4.4 A.4.4.2.27. Pemasangan 1M2 Acian 89.60
Upah
Tukang Batu 0.100 8.96 Hok 120,000.00 1,075,200.00 1,075,200.00
Mandor 0.010 0.90 Hok - - -
Bahan
Semen Abu-abu (PC) 3.250 291.20 Kg 1,110.00 323,232.00 323,232.00
JUMLAH 323,232.00 1,075,200.00 1,398,432.00
Peralatan Lainnya
Lampu Hias 8.00 8.00 Bh 413,000.00 3,304,000.00 3,304,000.00
Logo Kab + Papan Nama Timbul 1.00 1.00 Ls 3,543,000.00 3,543,000.00 3,543,000.00
Lampu pariasi Tanem 5.00 5.00 Bh 118,000.00 590,000.00 590,000.00
Pager Pipa Stainlees 2.00 2.00 Bh 7,087,000.00 14,174,000.00 14,174,000.00
Pengki 4.00 4.00 Bh 17,000.00 68,000.00 68,000.00
ember 6.00 6.00 Bh 7,000.00 42,000.00 42,000.00
benang 2.00 2.00 Bh 5,900.00 11,800.00 11,800.00
Kabel NYM 24.00 24.00 M' 8,000.00 192,000.00 192,000.00
Pipa 24.00 24.00 M' 7,000.00 168,000.00 168,000.00
Tee 3' 7.00 7.00 Bh 11,000.00 77,000.00 77,000.00
Kne 3' 3.00 3.00 Bh 11,000.00 33,000.00 33,000.00
JUMLAH 22,202,800.00 22,202,800.00
PAPAN PROYEK & PAPAN PRASASTI
Papan Proyek 1.00 1.00 BH 150,000.00 150,000.00 150,000.00
Papan Prasasti 1.00 1.00 BH 500,000.00 500,000.00 500,000.00
JUMLAH 650,000.00 650,000.00
JUMLAH 22,852,800.00 22,852,800.00
JUMLAH BIAYA BAHAN DAN UPAH 40,383,103.99 12,388,322.06 52,771,426.05
TOTAL BIAYA Rp52,771,426.05 Rp 52,771,426.05

Mengetahui Sekretaris Desa


Kepala Desa Sindanglaya Sindanglaya

M. MAULIDIN ANWAR AGUS SAFARUDIN


Dibuat Oleh
Konsultan Perencana Kasi Kesejahteraan

MARDI, S.T ADE NUROHMAN


50,000.00 746,253.00 PEKERJA 51.16
- 9,315.00 TUKANG 60.61
202,500.00 368,266.50 MANDOR 5.254

243,000.00 65,577.60
- 92,520.00 Balok Kayu Kaso 5/7 0.24
365,950.00 1,310,700.00 Paku 2'' 3'' 5'' 7'' 10'' 4.01
- 768,952.50 Kayu Papan 3/20 0.14
24,000.00 559,130.00 Pasir 6.38
- 372,860.54 batu belah 5.46
70,785.00 141,529.25 semen 2,200.96
- 231,684.41 krikil 0.79
23,400.00 5,579,835.35 besi polos 309.99
14,040.00 104,511.20 kawat beton 4.43
- 1,275,480.00 kayu kelas III 0.54
637,500.00 82,800.00 minyak bikisting 1.20
382,500.00 25,200.00 bata merah 1,960.00
- 1,254,400.00 Plamir 5.60
170,016.00 357,420.00 Kapek 2.80
34,003.20 304,612.00 Cat vinilex enerior 26.32
- 112,000.00 Amplas 28.00
1,771,376.30 16,520.00 Roll cat 0.56
2,125,651.56 2,158,240.00 Main Truss C.75.0,75 #REF!
- 98,000.00 Roof Bottom / R 33 - 0.45 #REF!
624,000.00 6,608.00 Self Drilling Screw Dia-6 x 2 mm (Truss Screw) #REF!
374,400.00 620,605.44 Self Drilling Screw Dia-4 x 16 mm (Roof Batten Screw) #REF!
- 544,051.20 Dynabol Dia 12 x 120 mm #REF!
840,000.00 323,232.00 Genteng metal #REF!
336,000.00 #REF! Genteng decra bond #REF!
- #REF! Listplank Woodplank L. 20 Cm #REF!
336,000.00 #REF! List Kayu Profil #REF!
1,075,200.00 #REF! Ubin keramik 40 x 40 cm Putih #REF!
- #REF! Semen warna #REF!
1,612,800.00 #REF! Keramik Dinding 20x25 KW II #REF!
- #REF! Gypsum board #REF!
1,075,200.00 #REF!
- #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! 22,202,800.00
#REF! 650,000.00
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
40,383,103.99

21,108,570

Rp 32,190,569.89
PROGRAM DESA SINDANGLAYA 2023
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN SARANA PRASARANA PENATAAN RUANG
PEKERJAAN : PAGAR KANTOR DESA
KABUPATEN : SERANG
KECAMATAN : CINANGKA
DESA : SINDANGLAYA
LOKASI : KP. CIPARAY RT 01 / RW 01
HARGA HARGA JUMLAH
JUMLAH DANA
NO URAIAN SAT KEB VOL SATUAN (RP) SATUAN (RP) DANA (RP)
(RP) srvy, pjk
srvy, inf, pjk srvy, pjk srvy, inf, pjk
A. TENAGA KERJA :
2 Tukang Hok 60.00 120,000.00 120,000.00 7,200,000.00 7,200,000
3 Pekerja Hok 52.00 100,000.00 100,000.00 5,200,000.00 5,200,000
Sub Jumlah Tenaga Kerja 12,400,000.00 12,400,000
B. BAHAN BANGUNAN :
1 Balok Kayu Kaso 5/7 M3 0.24 3,071,000.00 2,941,000.00 737,040.00 705,840
2 Paku 2'' 3'' 5'' 7'' 10'' Kg 4.00 23,000.00 22,000.00 92,000.00 88,000
3 Kayu Papan 3/20 M3 0.14 2,598,000.00 2,488,000.00 363,720.00 348,320
4 Pasir beton M3 6.40 253,000.00 243,000.00 1,619,200.00 1,555,200
5 batu belah M3 5.50 257,000.00 243,000.00 1,413,500.00 1,336,500
6 semen Zak 44.00 55,500.00 53,000.00 2,442,000.00 2,332,000
7 krikil M3 0.80 295,000.00 282,000.00 236,000.00 225,600
8 besi polos Kg 310.00 18,000.00 17,000.00 5,580,000.00 5,270,000
9 kawat beton Kg 4.00 23,600.00 22,600.00 94,400.00 90,400
10 kayu kelas III M3 0.54 2,362,000.00 2,262,000.00 1,275,480.00 1,221,480
11 minyak bikisting Ltr 1.10 21,000.00 20,000.00 23,100.00 22,000
12 bata merah Bh 1,961.00 640.00 620.00 1,255,040.00 1,215,820
13 Plamir Kg 5.65 20,000.00 19,000.00 113,000.00 107,350
14 Kapek Bh 2.00 5,900.00 5,600.00 11,800.00 11,200
15 Cat vinilex exterior Kg 26.74 82,000.00 79,000.00 2,192,680.00 2,112,460
16 Amplas Bh 28.00 3,500.00 3,300.00 98,000.00 92,400
17 Roll cat Bh 1.00 11,800.00 11,300.00 11,800.00 11,300
Sub Jumlah Bahan Matrial 17,558,760.00 16,745,870
C. ALAT :
1 Lampu Hias Bh 8.00 413,000.00 395,000.00 3,304,000.00 3,160,000.00
2 Logo Kab + Papan Nama Timbul Ls 1.00 3,543,000.00 3,393,000.00 3,543,000.00 3,393,000.00
3 Pager Pipa Stainlees Ls 2.00 7,087,000.00 6,787,000.00 14,174,000.00 13,574,000.00
4 Lampu Pariasi tanem Bh 5.00 118,000.00 113,000.00 590,000.00 565,000.00
5 Pengki Bh 4.00 7,000.00 16,000.00 28,000.00 64,000.00
6 ember Bh 6.00 7,000.00 6,000.00 42,000.00 36,000.00
7 benang Bh 2.00 5,900.00 5,600.00 11,800.00 11,200.00
8 Kabel NYM M' 24.00 8,000.00 7,000.00 192,000.00 168,000.00
9 Pipa M' 24.00 7,000.00 6,000.00 168,000.00 144,000.00
10 Tee 3' Bh 7.00 11,000.00 11,000.00 77,000.00 77,000.00
11 Kne 3' Bh 3.00 11,000.00 11,000.00 33,000.00 33,000.00
Sub Jumlah Alat 22,162,800.00 21,225,200
D. Papan Prasasti & Papan Proyek
1 Papan Proyek Ls 1.00 150,000.00 150,000.00 150,000.00 150,000.00
2 2Papan Prasasti Ls 1.00 500,000.00 500,000.00 500,000.00 500,000.00
Sub Jumlah Papan Proyek & Papan Prasasti 650,000.00 650,000.00
E. Jasa konsultan
1 Jasa konsultan Ls 1.00 2,110,800.00 2,035,500.00 2,110,800.00 2,035,500
Sub Jumlah Administrasi 2,110,800.00 2,035,500
JUMLAH 54,882,360.00 53,056,570.00
SUMBER DANA ( TOTAL DANA DESA + PAJAK PPN, PPN 11/110 3,972,156.00 3,797,107
PPH + JASA ) PPH 1,5/100 536,241.06 512,609
JUMLAH 50,373,962.94 48,746,853.56

Sekretaris Desa
Mengetahui Sindanglaya
Kepala Desa Sindanglaya

M. MAULIDIN ANWAR AGUS SAFARUDIN


Dibuat Oleh
Konsultan Perencana Kasi Kesejahteraan

MARDI, S.T ADE NUROHMAN


152.00

2,200.00 44.00 2,775,000.00

940

39,721,560.00

54,882,360.00 53,056,570.00
2,195,294.40 2,122,262.80
45,920,800 1,836,832
pagu analisa
52,771,426 2,110,933.95
2,110,933.95
DAFTAR BOBOT KUANTITAS PEKERJAAN
KEGIATAN : BANGUNAN SARANA PRASARANA GEDUNG
PEKERJAAN : MCK
KABUPATEN : SERANG
KECAMATAN : CIOMAS
DESA : SUKA RENA
LOKASI : KP. GUHA RT 09/ RW 02

No. Uraian Pekerjaan Satuan Volume Jumlah Harga bobot

I PEKERJAAN PERISPAN
1 PEKERJAAN PERSIAPAN M3 5.69 1,619,334.50 3%
2 PEKERJAAN GALIAN TANAH M3 22.40 526,312.60 1%
3 PEKERJAAN PONDASI M2 3,198.94 3,788,742.50 7%
4 PEKERJAAN BETON 12,913,347.81 24%
5 PEKERJAAN DINDING 11,070,888.64 21%
Julmah Sub I 3,227.03 29,918,626.05 57%
II PEKERJAAN ALAT KERJA LAINNYA
1 Lampu Hias Bh 8.00 3,304,000.00 6%
2 Logo Kab + Papan Nama Timbul Ls 1.00 3,543,000.00 7%
3 Pager Pipa Stainlees Bh 2.00 14,174,000.00 27%
Lampu pariasi Tanem Bh 5.00 590,000.00 1%
4 Pengki Bh 4.00 68,000.00 0%
5 ember Bh 6.00 42,000.00 0%
6 benang Bh 2.00 11,800.00 0%
7 Kabel NYM M' 24.00 192,000.00 0%
8 Pipa M' 24.00 168,000.00 0%
9 Tee 3' Bh 7.00 77,000.00 0%
10 Kne 3' Bh 3.00 33,000.00 0%
Julmah Sub II 76.00 22,202,800.00 42%
Biaya Papan Proyek Dan Prasasti
9 Papan Proyek ls 1.00 150,000.00 0%
10 Papan Prasasti ls 1.00 500,000.00 1%
Julmah Sub III 2.00 650,000.00 1%
Total Pekerjaan 3,305.03 Rp 52,771,426.05 100%

Mengetahui Sekretaris Desa


Kepala Desa Sindanglaya Sindanglaya

M. MAULIDIN ANWAR AGUS SAFARUDIN


Dibuat Oleh
Konsultan Perencana Kasi Kesejahteraan
MARDI, S.T ADE NUROHMAN
22,852,800.00
PROGRAM DESA SINDANGLAYA 2023
JADWAL PELAKSANAAN PEKERJAAN
WAKTU PELAKSANAAN ( HARI)
NO JENIS PEKERJAAN BIAYA BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Persiapan
1 PEKERJAAN PERSIAPAN 1,619,334.50 3%
2 PEKERJAAN GALIAN TANA 526,312.60 1%
3 PEKERJAAN PONDASI 3,788,742.50 7%
4 PEKERJAAN BETON 12,913,347.81 24%
5 PEKERJAAN DINDING 11,070,888.64 21%
10 PERLATAN LAINNYA 22,852,800.00 43%
JUMLAH BIAYA Rp 52,771,426.05 100%

Mengetahui Sekretaris Desa


Kepala Desa Sindanglaya Sindanglaya

M. MAULIDIN ANWAR AGUS SAFARUDIN

Dibuat Oleh
Konsultan Perencana Kasi Kesejahteraan

MARDI, S.T ADE NUROHMAN


DAFTAR HASIL SURVEY HARGA SATUAN BAHAN MATRIAL DAN ALAT
DESA SINDANGLAYA 2023

HARGA SATUAN (RP)


No URAIAN Satuan
(1) (2) (3) (4) (5) (6) (7) (8)

I TENAGA KERJA
1 Mandor Hok
2 Tukang Hok 120,000
3 Pekerja Hok 100,000
HARGA REAL
HARGA SAT PAJAK
BAHAN / MATRIAL PEMBULATA
REAL
HARGA SURVEY INFLASI 5%
12,5%
II N
1 Bata Merah Bh 640 650 550 27.50 72.1875
2 Semen ( 50 Kg ) kg 1,110 1,110 940 47 123
3 Batu Belah m3 257,000 257,513 218,000 10,900 28,613
4 Pasir beton / sedot m3 253,000 253,969 215,000 10,750 28,219
5 Pasir urug m3 212,000 212,625 180,000 9,000 23,625
6 Kayu Kelas III bh 2,362,000 2,362,500 2,000,000 100,000 262,500
7 Balok Kayu 5/7 M3 3,071,000 3,071,250 2,600,000 130,000 341,250
8 Kayu papan 3/20 M3 2,598,000 2,598,750 2,200,000 110,000 288,750
9 Paku 2" - 5" kg 23,000 23,625 20,000 1,000 2,625
10 kerikil 30 mm m3 295,000 295,313 250,000 12,500 32,813
11 Kayu Kelas II M³ 2,598,000 2,598,750 2,200,000 110,000 288,750
12 Paku 5 cm dan 7 cm Kg 23,000 23,625 20,000 1,000 2,625
13 Besi beton bolos 12 kg 18,000 18,428 15,600 780 2,048
14 Kawat beton kg 23,600 23,625 20,000 1,000 2,625
15 minyak bikisting ltr 21,000 21,853 18,500 925 2,428
16 Plamir kg 20,000 20,081 17,000 850 2,231
17 Kapek bh 5,900 5,906 5,000 250 656
18 Cat vinilex Inerior kg 82,000 82,688 70,000 3,500 9,188
19 Amplas bh 3,500 3,544 3,000 150 394
20 Roll cat bh 11,800 11,813 10,000 500 1,313
21 kuas 3'' Bh 5,000 5,906 5,000 250 656
22 Minyak cat Kg 11,000 11,813 10,000 500 1,313
23 Triplek 4mm Lbr 59,000 59,063 50,000 2,500 6,563
24 Cat Kayu Kg 23,000 23,625 20,000 1,000 2,625
25 Lampu Hias m2 413,000 413,438 350,000 17,500 45,938
26 Logo Kab + Papan Nama T m3 3,543,000 3,543,750 3,000,000 150,000 393,750
27 Lampu pariasi Tanem BH 118,000 118,125 100,000 5,000 13,125
28 Pager Pipa Stainlees BH 7,087,000 7,087,500 6,000,000 300,000 787,500
29 Pengki BH 17,000 17,719 15,000 750 1,969
30 ember ltr 7,000 7,088 6,000 300 788
31 benang Bh 5,900 5,906 5,000 250 656
32 Kabel NYM Bh 8,000 8,269 7,000 350 919
33 Pipa kg 7,000 7,088 6,000 300 788
34 Tee 3' M' 11,000 11,813 10,000 500 1,313
35 Kne 3' M' 11,000 11,813 10,000 500 1,313
Mengetahui Sekretaris Desa
Kepala Desa Sindanglaya Sindanglaya

M. MAULIDIN ANWAR AGUS SAFARUDIN


Dibuat Oleh
Konsultan Perencana Kasi Kesejahteraan
MARDI, S.T ADE NUROHMAN
inf, pk real
inf, pk real
pembulatan
622.1875 620
1,063 1,060 1100 55000
246,613 246,000
243,219 243,000
203,625 203,000
2,262,500 2,262,000
2,941,250 2,941,000
2,488,750 2,488,000
22,625 22,000
282,813 282,000
2,488,750 2,488,000
22,625 22,000
17,648 17,000
22,625 22,600
20,928 20,000
19,231 19,000
5,656 5,600
79,188 79,000
3,394 3,300
11,313 11,300
5,656 5,000
11,313 11,000
56,563 56,000
22,625 22,000
395,938 395,000
3,393,750 3,393,000
113,125 113,000
6,787,500 6,787,000
16,969 16,000
6,788 6,000
5,656 5,600
7,919 7,000
6,788 6,000
11,313 11,000
11,313 11,000