BELANJA MODAL
I ALAT
Meteran 5 M 1.0 bh 35,000 Rp 35,000 Rp 35,000
Ember 9.0 bh 15,000 Rp 135,000 Rp 135,000
Benang Nilon 4.0 Bh 6,000 Rp 24,000 Rp 24,000
Banner Kegiatan 1.0 Bh 150,000 Rp 150,000 Rp 150,000
Nomenklatur 1.0 Bh 500,000 Rp 500,000 Rp 500,000
Cangkul 2.0 Bh 85,000 Rp 170,000 Rp 170,000
Troli / Angkong 1.0 Ls 525,000 Rp 525,000 Rp 525,000
SUB TOTAL I Rp 1,539,000
II BAHAN
Pasir Beton 76.5 m3 204,000 Rp 15,606,000 Rp 15,606,000
Semen 657.0 Sak 75,000 Rp 49,275,000 Rp 49,275,000
Koral Beton 66.1 m3 427,550 Rp 28,261,055 Rp 28,261,055
Kayu Kelas III ( Papan ) 2.9 m3 2,750,000 Rp 7,975,000 Rp 7,975,000
Plastik Cor 627.7 M2 10,900 Rp 6,841,930 Rp 6,841,930
Paku 28.0 Kg 28,000 Rp 784,000 Rp 784,000
SUB TOTAL II Rp 108,742,985
III UPAH
Tukang 47.0 Oh 120,000 Rp 5,640,000 Rp 5,640,000
Pekerja 267.0 Oh 100,000 Rp 26,700,000 Rp 26,700,000
SUB TOTAL III Rp 32,340,000
Keterangan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
….................... ........................
PEMERINTAH KABUPATEN WAY KANAN
KECAMATAN PAKUAN RATU
KAMPUNG TANJUNG RATU
ENGINEERING ESTIMATE
(EE)
PEKERJAAN
: Pembangunan Gapura
LOKASI
Tanjung Ratu
: Dusun 3
1 2 3 4 5 6 7
1 BAHAN
-
1 Kayu Kasau kelas III 0.5 M3 2,750,000 Rp 1,375,000 Rp 1,375,000
2 Paku Kasau/balok/reng/papan 46.0 Kg 28,000 Rp 1,288,000 Rp 1,288,000
3 Kayu Papan kelas III 5.0 M3 2,750,000 Rp 13,750,000 Rp 13,750,000
4 Material Tanah Timbunan 6.0 M3 86,000 Rp 516,000 Rp 516,000
5 Semen PC 160.0 Zak 75,000 Rp 12,000,000 Rp 12,000,000
6 Pasir Pasang 2.0 M3 198,000 Rp 396,000 Rp 396,000
7 Batu bata 1,815.0 Buah 750 Rp 1,361,250 Rp 1,361,250
8 kawat Beton 32.0 Kg 35,000 Rp 1,120,000 Rp 1,120,000
9 Pasir Beton 9.0 M3 204,000 Rp 1,836,000 Rp 1,836,000
10 Batu 1/2 Cm (Split) 14.0 M3 475,300 Rp 6,654,200 Rp 6,654,200
11 Besi Beton Polos Ø 12 42.0 Batang 181,220 Rp 7,611,240 Rp 7,611,240
12 Besi Beton Polos Ø 10 50.0 Batang 125,800 Rp 6,290,000 Rp 6,290,000
13 Besi Beton Polos Ø 8 38.0 Batang 75,990 Rp 2,887,620 Rp 2,887,620
14 Besi Beton Polos Ø 16 6.0 Batang 322,320 Rp 1,933,920 Rp 1,933,920
15 Besi Beton Polos Ø 19 37.0 Batang 454,920 Rp 16,832,040 Rp 16,832,040
16 Minyak Bekisting 22.0 Liter 2,000 Rp 44,000 Rp 44,000
17 Kayu Balok kelas II 2.0 M3 3,750,000 Rp 7,500,000 Rp 7,500,000
18 Plywood (240x120x0,9) cm 35.0 Lembar 132,000 Rp 4,620,000 Rp 4,620,000
19 Kayu Cerucuk / Dolken 203.0 Batang 37,500 Rp 7,612,500 Rp 7,612,500
20 Plamir Tembok 10.0 Kg 28,000 Rp 280,000 Rp 280,000
21 Cat Dasar 10.0 Kg 37,000 Rp 370,000 Rp 370,000
22 Cat Tembok 25.0 Kg 52,000 Rp 1,300,000 Rp 1,300,000
Sub Total I Rp 97,577,770 Rp 97,577,770
2 ALAT
1 2 3 4 5 6 7
3 UPAH
Keterangan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
….................... ........................
P L T koefesien jumlah
orname 1 hollow 2x4 19.0
Paku skrup dll
P L T koefesien jumlah
ornamen 2 hollow 2x4 7.7
Paku skrup dll
volume harga
7.7 16,000.00 123,520.00
1 100,000.00 100,000.00
1 2 3 4 5 6 7
1 BAHAN
-
2 Semen Portland 89.0 ZAK 75,000 Rp 6,675,000 Rp 6,675,000
3 Pasir Pasang 13.0 M3 198,000 Rp 2,574,000 Rp 2,574,000
4 Pasir Urug 1.0 M3 220,000 Rp 220,000 Rp 220,000
5 Tanah Timbunan 14.0 M3 86,000 Rp 1,204,000 Rp 1,204,000
6 Bata Merah 5,890.0 BUAH 750 Rp 4,417,500 Rp 4,417,500
8 Paku 5 cm - 12 cm 8.0 KG 28,000 Rp 224,000 Rp 224,000
18 Pasir Beton 1.0 M3 204,000 Rp 204,000 Rp 204,000
19 Koral Beton 2.0 M3 427,550 Rp 855,100 Rp 855,100
20 Besi Dia 10 mm 37.0 BATANG 115,769 Rp 4,283,451 Rp 4,283,451
21 Besi Dia 8 mm 38.0 BATANG 74,115 Rp 2,816,356 Rp 2,816,356
22 Kawat Beton 15.0 KG 35,000 Rp 525,000 Rp 525,000
23 Kayu Kelas III ( Papan ) 1.0 M3 2,750,000 Rp 2,750,000 Rp 2,750,000
25 Minyak Bekisting 4.0 LITER 2,000 Rp 8,000 Rp 8,000
26 Kayu Kelas II ( Balok ) - M3 3,750,000 Rp - Rp -
27 Plywood Tebal 9 mm 7.0 LEMBAR 132,000 Rp 924,000 Rp 924,000
28 Dolken Kayu Kelas III Ø8-10/400 cm 39.0 BATANG 37,500 Rp 1,462,500 Rp 1,462,500
29 Plamir 46.0 KG 28,000 Rp 1,288,000 Rp 1,288,000
30 Cat Dasar 46.0 KG 37,000 Rp 1,702,000 Rp 1,702,000
31 Cat Tembok 119.0 KG 52,000 Rp 6,188,000 Rp 6,188,000
34 Paku Skrup 1 - 2,5 cm 75.0 KG 35,000 Rp 2,625,000 Rp 2,625,000
36 Plavond PVC 152.0 LEMBAR 155,000 Rp 23,560,000 Rp 23,560,000
37 List Plavond Pvc 195.0 M' 18,500 Rp 3,607,500 Rp 3,607,500
39 Keramik 40 x 40 977.0 BUAH 2,000 Rp 1,954,000 Rp 1,954,000
40 Semen Warna 75.0 KG 25,000 Rp 1,875,000 Rp 1,875,000
41 0 81.0 BATANG 182,000 Rp 14,742,000 Rp 14,742,000
42 Profil Reng RT.15 249.0 BATANG 84,000 Rp 20,916,000 Rp 20,916,000
43 Plat Peletakan 63.0 BUAH 52,400 Rp 3,301,200 Rp 3,301,200
44 Plat Sudut 28.0 BUAH 18,400 Rp 515,200 Rp 515,200
46 Listplank GRC 70.4 M' 47,500 Rp 3,344,000 Rp 3,344,000
49 Genteng Metal Pasir 303.0 BUAH 78,500 Rp 23,785,500 Rp 23,785,500
50 Nok Genteng Metal 58.0 M' 63,500 Rp 3,683,000 Rp 3,683,000
51 Hollow 4x4 rangka Plafond 73.0 BATANG 110,000 Rp 8,030,000 Rp 8,030,000
53 Plint Keramik 10/40 121.0 BUAH 10,000 Rp 1,210,000 Rp 1,210,000
54 Pas. Pintu Alumunium Coklat Type P2 2.0 BUAH 4,689,000 Rp 9,378,000 Rp 9,378,000
55 Pas. Jendela Alumunium Coklat Type J2 1.0 BUAH 2,954,000 Rp 2,954,000 Rp 2,954,000
56 Saklar Ganda 2.0 BUAH 41,500 Rp 83,000 Rp 83,000
57 Stop Kontak + Instalasi 8.0 BUAH 35,500 Rp 284,000 Rp 284,000
58 1 Buah Box Panel PVC isi 4 CB 1.0 BUAH 235,000 Rp 235,000 Rp 235,000
59 Saklar tunggal 1.0 BUAH 30,500 Rp 30,500 Rp 30,500
60 Lampu Downlight Inbow 3" 8.0 BUAH 50,000 Rp 400,000 Rp 400,000
61 Lampu SL 1.0 BUAH 50,000 Rp 50,000 Rp 50,000
62 Kabel Listrik NYM 3 x 2,5 mm 128.0 M' 13,200 Rp 1,689,600 Rp 1,689,600
63 Pvc ( Partisi ) 27.0 LEMBAR 155,000 Rp 4,185,000 Rp 4,185,000
64 Rangka Hollow Partisi 4/4 21.0 BATANG 110,000 Rp 2,310,000 Rp 2,310,000
Sub Total I Rp 173,068,407 Rp 173,068,407
2 ALAT
HARGA SATUAN JUMLAH TOTAL
No. URAIAN VOLUME SATUAN JUMLAH
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
3 1 Unit Logo Akrilik Led lambang garuda 25 cm 1.0 Buah 450,000 Rp 450,000 Rp 450,000
Keterangan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
….................... ........................
BACK UP DATA
Kampung : Tanjung Ratu No Rab :
Kecamatan : Pakuan Ratu Bidang : 2 ( Pelaksanaan Pembangunan )
Kabupaten : Way Kanan Kegiatan : Pembangunan Gapura
Provinsi : Lampung : 12 m
Tahun : 2023 Lokasi : Dusun 3
DETAIL PERHITUNGAN
N0. KOMPONEN PEKERJAAN VOLUME
VER HOR P L T Jumlah Koef.
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan 1 m’ Bouwplank 1.000 M1
2 Pembuatan Laporan, Dokumentasi dan Asbuilt Drawing 1.000 Ls
3 Penyediaan K3 & Asuransi Jiwa 1.000 Ls
4 Pembuatan Papan Nama Proyek ( P 120 cm x L 100 cm ) 1.000 Ls
5 Pembersihan Sebelum dan Setelah Pekerjaan 1.000 Ls
II PEKERJAAN TANAH DAN PASIR VER HOR P L T Jumlah Koef.
1 Pek. Galian Tanah Pondasi & Pondasi Tapak 14.356 M3
FP1 1.800 1.800 1.850 2.000 11.988 M3
FP2 0.800 0.800 1.850 2.000 2.368 M3
3 Pek. Urugan Tanah Kembali 0.333 4.785 M3
4 Pek. Urugan Tanah Peninggian Lantai 4.746 M3
0.600 2.000 3.955 4.746
5 Pek. Urugan Pasir Bawah Pondasi Menerus dan Lantai t.5cm 0.388 M3
FP1 1.800 1.800 0.050 2.000 0.324
FP2 0.800 0.800 0.050 2.000 0.064
IV PEKERJAAN BETON
1 Pek. Pondasi Foot Plat FP1 Tapak 180X180
Pas. Beton Lantai Kerja K-100 VER HOR P L T Jumlah Koef. 0.324 M3
1.800 1.800 0.050 2.000 0.324 M3
PEKERJAAN SLOOF
3 Pek. Sloof SL 15/20
Pas. Beton K-250 VER HOR P L T Jumlah Koef. 0.108 m3
1.800 0.150 0.200 2.000 0.108
PEKERJAAN BALK
5 Pek. Balok 80x40 cm (Balk Gantung)
Pas. Beton K-250 VER HOR P L T Jumlah Koef. 4.000 m3
12.500 0.400 0.800 4.000
2 Pek. Pas. Plesteran Dinding Bata VER HOR P L T Jumlah Koef. 25.935 M2
1.000 25.935 25.935
IX PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Baru VER HOR P L T Jumlah Koef. 97.970 M2
DINDING ATAS BALOK 12.000 0.800 1.600 15.360
12.000 0.400 0.800 3.840
KOLOM k1 2.400 7.430 2.000 35.664
KOLOM k2 15.913 1.200 2.000 38.192
KOLOM k3 2.730 0.900 2.000 4.914
DAFTAR HARGA MATERIAL
DI LOKASI PEKERJAAN
KAMPUNG TANJUNG REJO
A. PEKERJAAN TANAH
B. PEKERJAAN BOWPLANK
1 M' Bowplak
Kasau 5/7 = 0.012
Kayu Papan 3/20 = 0.007
Paku Campur = 0.020
Pekerja = 0.100
Tukang = 0.100
C. PEKERJAAN PONDASI
D. PEKERJAAN BETON
Catatan:
Besi Dia 6 = 2.6 Kg/Btg/12 M
Besi Dia 10 = 7.4 Kg/Btg/12 M
Besi Dia 12 = 10.7 Kg/Btg/12 M
Besi Dia 14 = 14.55 Kg/Btg/12 M
Besi Dia 16 = 18.5 Kg/Btg/12 M
Kebutuhan besi dihitung secara menual sesuai dng kebutuhan + 10 % (Sambungan + Lipatan)
E. PEKERJAAN BEKISTING
F. PEKERJAAN DINDING
Berdasarkan perbandingan Spesi pada tabel, maka indeks satuan pekerjaan untuk bata -
(9x9x18) adalah indeks (5x11x22) di kalikan dengan 0,68.
3. Memasang 1 M2 dinding bata merah Ukuran (9x9x18) Cm tebal 1/2 bata
Campuran Spesi 1 : 3 ( Kedap Air)
Bata Merah = 50.000 Buah = 50 Buah
Semen = 0.379 Sak x 0.68 = 0.258 Sak
Pasir Pasangan = 0.038 M3 x 0.68 = 0.026 M3
Pekerja = 0.300 Hok x 0.68 = 0.204 Hok
Tukang = 0.100 Hok x 0.68 = 0.068 Hok
4. Pendirian.....
G. PEKERJAAN PLESTERAN
3. Mengerjakan 1 M2 Acian
Semen = 0.065 Sak
Pekerja = 0.100 Hok
Tukang = 0.010 Hok
H. PEKERJAAN KAYU
1. Membuat dan memasang 1M3 kusen pintu dan kusen jendela, Kayu kelas I
2. Membuat dan memasang 1M3 kusen pintu dan kusen jendela, Kayu kelas II atau III
Kaso 5 x 7 Cm = 0.014 M3
Reng 3 x 4 Cm = 0.036 M3
Paku Campur = 0.250 Kg
Pekerja = 0.100 Hok
Tukang = 0.100 Hok
Kasau 5 x 7 Cm = 0.016 M3
Paku Campur = 0.250 Kg
Pekerja = 0.200 Hok
Tukang = 0.300 Hok
Papan = 0.011 M3
Paku Campur = 0.100 Kg
Pekerja = 0.100 Hok
Tukang = 0.100 Hok
11. Memasang 1 M2 langit-langit tripleks ukuran (120 x 240 ) Cm
Tripleks = 0.375 Lembar
Paku Tripleks = 0.030 Kg
Pekerja = 0.070 Hok
Tukang = 0.100 Hok
I. PEKERJAAN ATAP
2. 1 M' Pekerjaan.....
J. PEKERJAAN LANTAI
L. PEKERJAAN BERONJONG
N. PEKERJAAN TELFORD/ONDERLAGH
Tebal Pekerasan 10/15 = 0.150 M (Batu Ukuran 10/15 dan Pecahan dari batu belah)
Batu Pengunci = Pecahan dari batu belah
Kemampuan Kerja
Pemecahan Batu = 3 M3 / HOK Pekerja
Penghamparan Pasir = 4 M3 / HOK Pekerja
Pemasangan Batu = 12 M2 / HOK Pekerja
Catt : 15 HOK Pekerja membutuhkan 1 Ketua Kelompok/Tukang (Disesuaikan dng Kondisi Tenaga Kerja)
O. PEKERJAAN ASPHALT LAPIS PENETRASI (Lapen)
Kebutuhan HOK
Penghamparan Batu 5/7 = 1 Hok : 27 M2
Penghamparan Batu 3/5 = 1 Hok : 27 M2
Penghaparan Batu 2/3 = 1 Hok : 27 M2
Penghamparan Batu 1/2 = 1 Hok : 27 M2
Penghamparan Lapisan Atas = 1 Hok : 4 M3
Penghamparan Aspal = 1 Hok : 775 Kg
A. PEKERJAAN PERSIAPAN
Analisa B.2 Menggali 1 M3 Tanah Biasa sedalam 1 - 2 Meter
Tenaga Kerja Pekerja OH 0.9000
Mandor OH 0.0450
Jumlah Harga per Satuan Pekerjaan
Analisa B.9 Mengurug kembali 1 M3 galian
Tenaga Kerja Pekerja OH 0.2500
Nilai Terpakai
Rp 447,550
Rp 1,750,000
Rp 2,150,000
Rp 395,000
Rp 475,000
Rp 475,000
Rp 1,300,000
Rp 680,000
Rp 660,000
Rp 825,000
Rp 675,000
Rp 660,000
Rp 450,000
Rp 675,000
Rp 65,000
Rp 447,550
Rp 442,000
Rp 447,550
Rp 475,300
Rp 100
Rp 75,000
Rp 650,000
Rp 20,000
Rp 16,500
Rp 16,500
Rp 14,000
Rp 14,000
Rp 29,187,351
Rp 43,000
Rp 50,000
Rp 52,000
Rp 37,000
Rp 40,000
Rp 36,000
Rp 53,000
Rp 52,000
Rp 46,000
Rp 25,000
Rp 50,000
Rp 39,000
Rp 61,000
Rp 72,000
Rp 66,000
Rp 79,000
Rp 106,000
Rp 116,000
Rp 15,000
Rp 19,000
Rp 23,000
Rp 23,000
Rp 15,800
Rp 13,000
Rp 12,000
Rp 12,300
Rp 12,300
Rp 16,800
Rp 225,000
Rp 60,000
Rp 250,000
Rp 30,000
Rp 35,000
Rp 50,000
Rp 60,000
Rp 90,000
Rp 11,000
Rp 15,000
Rp 438,000
Rp 330,000
Rp 270,000
Rp 330,000
Rp 1,250,000
Rp 250,000
Rp 442,000
Rp 430,900
Rp 8,000
Rp 8,000
Rp 2,920,000
Rp 70,000
Rp 135,000
Rp 160,000
Rp 140,000
Rp 150,000
Rp 140,000
Rp 150,000
Rp 150,000
Rp 750
Rp 825
Rp 825
Rp 800
Rp 12,350
Rp 260,000
Rp 275
Rp 297,800
Rp 297,800
Rp 297,800
Rp 130,000
Rp 150,000
Rp 274,000
Rp 477,000
Rp 477,000
Rp 140,000
Rp 140,000
Rp 70,000
Rp 60,000
Rp 60,000
Rp 442,000
Rp 475,300
Rp 312,900
Rp 323,900
Rp 447,550
Rp 442,000
Rp 364,300
Rp 355,900
Rp 19,000
Rp 20,000
Rp 13,000
Rp 16,000
Rp 13,500
Rp 17,000
Rp 15,000
Rp 16,000
Rp 16,000
Rp 22,000
Rp 130,000
Rp 120,000
Rp 110,000
Rp 35,000
Rp 45,000
Rp 3,667
Rp 23,000
Rp 16,000
Rp 16,000
Rp 830,000
Rp 1,175,000
Rp 1,530,000
Rp 140,000
Rp 200,000
Rp 375,000
Rp 475,000
Rp 520,000
Rp 715,000
Rp 760,000
Rp 895,000
Rp 17,000
Rp 48,000
Rp 315,000
Rp 6,548,300
Rp 7,095,000
Rp 14,069,000
Rp 1,485,000
Rp 1,815,000
Rp 2,585,000
Rp 90,000
Rp 445,000
Rp 330,000
Rp 445,000
Rp 445,000
Rp 302,000
Rp 45,000
Rp 48,000
Rp 52,000
Rp 56,500
Rp 650,000
Rp 70,000
Rp 75,000
Rp 100,000
Rp 110,000
Rp 350,000
Rp 300,000
Rp 400,000
Rp 475,000
Rp 400,000
Rp 550,000
Rp 500,000
Rp 37,000
Rp 60,000
Rp 83,000
Rp 130,000
Rp 85,000
Rp 37,000
Rp 185,000
Rp 55,000
Rp 35,000
Rp 90,000
Rp 85,000
Rp 66,000
Rp 78,000
Rp 88,000
Rp 72,000
Rp 50,000
Rp 85,000
Rp 77,000
Rp 150,000
Rp 88,000
Rp 88,000
Rp 52,000
Rp 50,000
Rp 135,000
Rp 135,000
Rp 135,000
Rp 190,000
Rp 2,500,000
Rp 390,000
Rp 385,000
Rp 80,000
Rp 80,000
Rp 38,500
Rp 200,000
Rp 25,000
Rp 65,000
Rp 40,500
Rp 1,300
Rp 37,500
Rp 171,000
Rp 171,000
Rp 175,000
Rp 29,000
Rp 35,255
Rp 610,000
Rp 690,000
Rp 870,000
Rp 980,000
Rp 255,200
Rp 28,000
Rp 30,000
Rp 50,000
Rp 9,000
Rp 60,000
Rp 60,000
Rp 33,000
Rp 68,000
Rp 126,500
Rp 63,250
Rp 6,050
Rp 2,000
Rp 115,000
Rp 69,000
Rp 101,200
Rp 114,425
Rp 18,000
Rp 82,500
Rp 1,875
Rp 1,875
Rp 2,000
Rp 1,300,000
Rp 320,000
Rp 115,000
Rp 75,000
Rp 60,000
Rp 35,000
Rp 10,000
Rp 15,000
Rp 10,000
Rp 9,000
Rp 9,000
Rp 4,000
Rp 198,000
Rp 4,500
Rp 9,000
Rp 30,000
Rp 1,500
Rp 80,000
Rp 70,000
Rp 2,000
Rp 3,000
Rp 3,000
Rp 3,000
Rp 80,000
Rp 66,000
Rp 35,000
Rp 480,000
Rp 580,000
Rp 85,000
Rp 25,000
Rp 130,000
Rp 105,000
Rp 90,000
Rp 500,000
Rp 35,000
Rp 35,000
Rp 72,000
Rp 118,000
Rp 118,000
Rp 162,000
Rp 22,000
Rp 39,000
Rp 33,000
Rp 33,000
Rp 1,480,000
Rp 65,250
Rp 94,000
Rp 94,000
Rp 61,000
Rp 650,000
Rp 200,000
Rp 13,000
Rp 300,000
Rp 87,000
Rp 69,100
Rp 4,000
Rp 7,000
Rp 4,000
Rp 7,000
Rp 11,000
Rp 9,000
Rp 11,000
Rp 15,000
Rp 12,100
Rp 16,000
Rp 7,000
Rp 9,000
Rp 7,500
Rp 40,000
Rp 45,000
Rp 13,000
Rp 9,000
Rp 13,000
Rp 130,000
Rp 170,000
Rp 50,000
Rp 100,000
Rp 50,000
Rp 149,000
Rp 149,000
Rp 187,000
Rp 95,000
Rp 95,000
Rp 101,000
Rp 110,000
Rp 165,000
Rp 220,000
Rp 209,000
Rp 255,000
Rp 90,000
Rp 145,000
Rp 600,000
Rp 500,000
Rp 210,000
Rp 13,000
Rp 8,000
Rp 39,000
Rp 35,000
Rp 22,000
Rp 57,500
Rp 23,500
Rp 150,000
Rp 13,200
Rp 165,000
Rp 8,000,000
Rp 8,500,000
Rp 3,500,000
Rp 3,500,000
Rp 3,500,000
Rp 3,750,000
Rp 3,750,000
Rp 2,750,000
Rp 2,750,000
Rp 2,750,000
Rp 2,750,000
Rp 2,750,000
Rp 2,200,000
Rp 2,200,000
Rp 1,700,000
Rp 7,500
Rp 175,000
Rp 3,038
Rp 80,500
Rp 3,200
Rp 91,000
Rp 4,400
Rp 91,000
Rp 4,800
Rp 96,000
Rp 96,000
Rp 96,000
Rp 88,000
Rp 70,000
Rp 90,000
Rp 60,000
Rp 68,000
Rp 90,000
Rp 85,000
Rp 135,000
Rp 150,000
Rp 185,000
Rp 15,000
Rp 15,000
Rp 3,000
Rp 3,000
Rp 6,000
Rp 6,000
Rp 17,000
Rp 17,000
Rp 3,000
Rp 3,000
Rp 3,000
Rp 3,000
Rp 6,000
Rp 6,000
Rp 6,000
Rp 12,000
Rp 23,000
Rp 1,350,000
Rp 8,000
Rp 3,000
Rp 10,000
Rp 5,000
Rp 15,000
Rp 1,540,000
Rp 1,540,000
Rp 1,540,000
Rp 473,000
Rp 330,000
Rp 180,000
Rp 8,000
Rp 6,000
Rp 75,000
Rp 7,000
Rp 100,000
Rp 372,100
Rp 207
Rp 39,000
Rp 28,000
Rp 55,000
Rp 75,000
Rp 25,000
Rp 38,000
Rp 10,000
Rp 45,000
Rp 9,000
Rp 10,000
Rp 28,000
Rp 30,000
Rp 9,000
Rp 127,000
Rp 127,000
Rp 121,000
Rp 121,000
Rp 165,000
Rp 165,000
Rp 171,000
Rp 195,000
Rp 70,000
Rp 60,000
Rp 150,000
Rp 75,000
Rp 1,100,000
Rp 1,100,000
Rp 1,300,000
Rp 1,300,000
Rp 900,000
Rp 900,000
Rp 1,000,000
Rp 1,000,000
Rp 1,100,000
Rp 900,000
Rp 1,100,000
Rp 1,300,000
Rp 80,000
Rp 200,000
Rp 200,000
Rp 250,000
Rp 1,800,000
Rp 1,400,000
Rp 1,500,000
Rp 2,500,000
Rp 1,600,000
Rp 80,000
Rp 300,000
Rp 50,000
Rp 65,000
Rp 60,000
Rp 80,000
Rp 130,000
Rp 20,000
Rp 25,000
Rp 35,000
Rp 55,000
Rp 60,000
Rp 22,000
Rp 22,000
Rp 6,000
Rp 6,000
Rp 50,000
Rp 50,000
Rp 650,000
Rp 250,000
Rp 270,000
Rp 125,000
Rp 57,000
Rp 57,000
Rp 57,000
Rp 35,000
Rp 28,800
Rp 40,000
Rp 40,000
Rp 23,000
Rp 60,000
Rp 20,000
Rp 165,000
Rp 192,500
Rp 90,000
Rp 2,000
Rp 2,000
Rp 33,000
Rp 35,000
Rp 22,000
Rp 32,500
Rp 8,800
Rp 150,000
Rp 231,000
Rp 136,000
Rp 9,500
Rp 5,500
Rp 18,000
Rp 16,000
Rp 47,000
Rp 27,000
Rp 41,000
Rp 9,000
Rp 38,000
Rp 63,500
Rp 79,000
Rp 25,000
Rp 28,000
Rp 7,700
Rp 7,500
Rp 115,000
Rp 28,000
Rp 19,000
Rp 28,000
Rp 30,000
Rp 19,000
Rp 28,000
Rp 40,000
Rp 19,000
Rp 19,000
Rp 19,000
Rp 19,000
Rp 55,000
Rp 55,000
Rp 55,000
Rp 45,000
Rp 20,000
Rp 20,000
Rp 20,000
Rp 20,000
Rp 1,000
Rp 29,000
Rp 35,000
Rp 35,000
Rp 29,000
Rp 55,000
Rp 44,000
Rp 23,000
Rp 204,000
Rp 204,000
Rp 145
Rp 166,100
Rp 198,000
Rp 198,000
Rp 220,000
Rp 158,000
Rp 3,500
Rp 4,200
Rp 4,000
Rp 4,500
Rp 3,500,000
Rp 3,055,000
Rp 420,000
Rp 330,000
Rp 275,000
Rp 800,000
Rp 320,000
Rp 185,000
Rp 185,000
Rp 185,000
Rp 185,000
Rp 185,000
Rp 185,000
Rp 350,000
Rp 492,500
Rp 297,500
Rp 172,500
Rp 600,000
Rp 612,000
Rp 790,000
Rp 194,000
Rp 1,600,000
Rp 1,600,000
Rp 695,200
Rp 585,200
Rp 1,478,400
Rp 928,400
Rp 1,929,400
Rp 2,743,400
Rp 3,712,500
Rp 4,799,300
Rp 7,384,300
Rp 427,900
Rp 217,800
Rp 289,300
Rp 250,000
Rp 200,000
Rp 180,000
Rp 95,000
Rp 420,000
Rp 320,000
Rp 520,000
Rp 140,000
Rp 625,000
Rp 720,000
Rp 1,650,000
Rp 1,850,000
Rp 330,000
Rp 285,000
Rp 230,000
Rp 135,000
Rp 660,000
Rp 420,000
Rp 820,000
Rp 175,000
Rp 1,200,000
Rp 1,650,000
Rp 2,200,000
Rp 3,150,000
Rp 29,000
Rp 29,000
Rp 29,000
Rp 29,000
Rp 29,000
Rp 29,000
Rp 29,000
Rp 36,000
Rp 50,000
Rp 70,000
Rp 18,000
Rp 145,000
Rp 25,000
Rp 285,000
Rp 383,000
Rp 1,100,000
Rp 230,000
Rp 10,000
Rp 12,500
Rp 96,500
Rp 103,750
Rp 158,750
Rp 25,000
Rp 26,000
Rp 70,000
Rp 300,000
Rp 275,000
Rp 185,000
Rp 190,000
Rp 55,000
Rp 28,000
Rp 55,000
Rp 50,000
Rp 535,000
Rp 860,000
Rp 750,000
Rp 2,100,000
Rp 2,600,000
Rp 3,190,000
Rp 3,500,000
Rp 4,050,000
Rp 450,000
Rp 525,000
Rp 565,000
Rp 630,000
Rp 4,250,000
Rp 5,400,000
Rp 890,000
Rp 1,130,000
Rp 1,130,000
Rp 1,757,000
Rp 52,400
Rp 14,000
Rp 18,400
Rp 10,000
Rp 10,000
Rp 15,000
Rp 3,300
Rp 10,000
Rp 10,000
Rp 10,000
Rp 7,500
Rp 170,000
Rp 185,000
Rp 79,000
Rp 83,000
Rp 132,000
Rp 70,000
Rp 70,000
Rp 180,000
Rp 110,000
Rp 150,000
Rp 19,250
Rp 19,250
Rp 12,500,000
Rp 606,650
Rp 146,000
Rp 170,000
Rp 178,000
Rp 185,000
Rp 198,000
Rp 218,000
Rp 257,000
Rp 35,000
Rp 40,000
Rp 88,000
Rp 42,000
Rp 32,000
Rp 26,000
Rp 33,000
Rp 502,700
Rp 502,700
Rp 620,000
Rp 660,000
Rp 780,000
Rp 10,233
Rp 26,000
Rp 55,000
Rp 70,000
Rp 34,000
Rp 2,500
Rp 145,000
Rp 4,000
Rp 22,000
Rp 22,000
Rp 20,000
Rp 500
Rp 800
Rp 15,000
Rp 17,000
Rp 2,000
Rp 2,000
Rp 25,000
Rp 30,000
Rp 17,000
Rp 55,000
Rp 58,000
Rp 62,000
Rp 66,000
Rp 85,000
Rp 75,000
Rp 50,000
Rp 55,500
Rp 17,000
Rp 12,000
Rp 520,000
Rp 110,000
Rp 200,000
Rp 200,000
Rp 4,000
Rp 1,100
Rp 61,000
Rp 16,500
Rp 17,600
Rp 1,200,000
Rp 122,000
Rp 121,250
Rp 150,000
Rp 113,750
Rp 760,000
Rp 58,333
Rp 64,167
Rp 80,000
Rp 240,000
Rp 245,000
Rp 117,000
Rp 30,000
Rp 35,500
Rp 35,500
Rp 199,500
Rp 70,000
Rp 57,000
Rp 2,250
Rp 165,000
Rp 175,000
Rp 165,000
Rp 28,000
Rp 19,000
Rp 19,000
Rp 78,000
Rp 350,000
Rp 200,000
Rp 17,000
Rp 31,000
Rp 31,000
Rp 1,900,000
Rp 4,000,000
Rp 5,290,000
Rp 8,395,000
Rp 3,400,000
Rp 4,200,000
Rp 9,600,000
Rp 15,700,000
Rp 83,000
Rp 88,000
Rp 149,000
Rp 66,000
Rp 88,000
Rp 94,000
Rp 3,418,800
Rp 1,006,500
Rp 1,412,400
Rp 1,705,000
Rp 2,145,000
Rp 3,300
Rp 7,700
Rp 2,690,000
Rp 55,000
Rp 55,000
Rp 210,000
Rp 1,867,000
Rp 575,000
Rp 495,000
Rp 4,610,000
Rp 83,000
Rp 60,000
Rp 60,000
Rp 135,000
Rp 135,000
Rp 135,000
BACK UP DATA PEKERJAAN
UKURAN
NO JENIS PEKERJAAN GAMBAR KET PERHITUNGAN VOLUME SAT.
P L T JUMLAH
I Pekerjaan persiapan
Pekerjaan Biaya Bongkar Lantai
1.00 Pekerjaan Biaya Bongkar Lantai
16.000 8 keramik ruangan 16 x 8 - 128 m2
5.000 4 keramik teras 5 x 4 - 20 m2
2.00 Pekerjaan Biaya Bongkar Atap
Total 148 m2
Pekerjaan Biaya Bongkar Atap
3.00 Pekerjaan Biaya Bongkar kusen pintu
18.000 5.52 atap belakang 18 x 5.52 99.36 m2
Pekerjaan Biaya Bongkar kusen 11.5 3.86 2.00 teras 11.5 / 2 x 3.86 x 2 44.39 m2
4.00
jendela 18.000 5.52 13.51 depan 18 x 5.52 - 13.51 85.85 m2
229.6 m2
Pekerjaan Biaya Bongkar kusen pintu
1.00 pintu 1.00 Bh
1.00 Bh
Pekerjaan Biaya Bongkar kusen jendela
9,113,000 1.00 jendela 1.00 Bh
1.00 Bh
PERHITUNGAN
NO KODE SNI ANALISA PEKERJAAN VOLUME TOTAL SATUAN KETERANGAN
Koefisien X VOLUME
1 m2 Bongkaran Lantai
1.00 Analisa A.16
Pekerja 0.300 148.000 44.40 OH
1 m2 Penurunan Atap
2.00 Analisa A.15
Pekerja 0.050 229.600 11.48 OH
3.00 LS Bongkaran Kusen Pintu 1.000 1.00 Bh
5.00 Analisa N.1 1 m² Mengikis / Mengerok Permukaan Cat Tembok Lama 0.150 458.950 34.74 OH
UKURAN
NO JENIS PEKERJAAN GAMBAR KET PERHITUNGAN VOLUME SAT.
P L T JUMLAH
II Pekerjaan Tanah Dan Pasir
1.00 Pek. Urugan Tanah Peninggian Lantai
Pek. Urugan Tanah Peninggian Lantai
8.000 3.00 0.50 8.00 x 3.00 x 0.50 12.00 m3
12.00 m3
2.00 Pek. Urugan Pasir Bawah Lantai t.5cm
Pek. Urugan Pasir Bawah Lantai t.5cm
8.000 3.00 0.05 8.00 x 3.00 x 0.05 1.20 m3
1.20 m3
PERHITUNGAN
NO KODE SNI ANALISA PEKERJAAN VOLUME TOTAL SATUAN KETERANGAN
Koefisien X VOLUME
Mengurug 1 m3 tanah dipadatkan
1.00 Analisa spl B.14
Bahan Material Tanah Timbunan 1.200 x 12.000 14.40 M3
Pekerja 0.300 x 12.000 3.60 OH
Mengurug 1 m3 tanah dipadatkan
2.00 Analisa B.11
Bahan Pasir Urug 1.200 x 1.200 1.44 0.000
Pekerja 0.300 x 1.200 0.36 M3
UKURAN
NO JENIS PEKERJAAN GAMBAR KET PERHITUNGAN VOLUME SAT.
P L T JUMLAH
III Pekerjaan Beton
1.00 Pek. Kolom Praktis Pas. Beton K-250
a Pas. Beton K-250 0.130 0.130 1.300 10.000 beton 0.130 x 0.130 x 1.300 x 10.000 0.2197 m3
b Pek. Besi Tulangan 0.130 0.130 4.000 2.000 beton 0.130 x 0.130 x 4.000 x 2.000 0.1352 m3
c Pek. Bekisting 0.3549 m3
Pek. Besi Tulangan
1.300 40.00 besi pokok 1.300 x 40.00 x 0.617 32.084 Kg
4.000 8.00 besi pokok 4.000 x 8.00 x 0.617 19.744 Kg
0.480 87 besi cincin 0.480 x 87 x 0.395 16.432 Kg
0.480 53 besi cincin 0.480 x 53 x 0.395 10.112 Kg
78.372 Kg
Pek. Bekisting
0.260 1.300 10.000 bekisting t=50cm 0.260 x 1.300 x 10.000 3.38 m2
0.260 4.000 2.000 bekisting t=4m 0.260 x 4.000 x 2.000 2.08 m2
5.46 m2
PERHITUNGAN
NO KODE SNI ANALISA PEKERJAAN VOLUME TOTAL SATUAN KETERANGAN
KOEFISIEN X VOLUME
Membuat 1 m 3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Bahan Semen PC 7.420 x 0.355 2.63 Zak
a Analisa G.7 Pasir Beton 0.499 x 0.355 0.18 M3
Batu Belah Hitam 1/2 Cm 0.776 x 0.355 0.28 M3
(Split)
Tenaga Kerja Pekerja 1.650 x 0.355 0.59 OH
Tukang Batu 0.275 x 0.355 0.10 OH
Pembesian 10 kg dengan besi polos atau besi ulir
Bahan Besi Beton Polos 10.500 x 78.372 822.91 Kg
b Analisa G.14
Kawat Beton 0.150 x 78.372 11.76 Kg
Tenaga Kerja Pekerja 0.070 x 78.372 5.49 OH
Tukang Besi 0.070 x 78.372 OH
Memasang 1 m 2 bekisting untuk kolom
Bahan Kayu Papan kelas III 0.040 x 5.460 0.22 M3
Paku Kasau/balok/reng/papan 0.400 x 5.460 2.18 Kg
Minyak Bekisting 0.200 x 5.460 1.09 Liter
c Analisa G.19
Kayu Balok kelas II 0.015 x 5.460 0.08 M3
Plywood (240x120x0,9) cm 0.350 x 5.460 1.91 Lembar
Kayu Cerucuk / Dolken 2.000 x 5.460 10.92 Batang
Tenaga Kerja Pekerja 0.660 x 5.460 3.60 OH
Tukang Kayu 0.330 x 5.460 OH
UKURAN
NO JENIS PEKERJAAN GAMBAR KET PERHITUNGAN VOLUME SAT.
P L T JUMLAH
III Pekerjaan Beton
2.00 Pek. Balok Latai 11x11 cm (BLI) Pas. Beton K-250
a Pas. Beton K-250 2.500 0.11 0.11 pintu 2.50 x 0.11 x 0.11 0.030 m3
b Pek. Besi Tulangan 2.150 0.11 0.11 jendela 2.15 x 0.11 x 0.11 0.026 m3
c Pek. Bekisting 0.056 m3
Pek. Besi Tulangan
4.650 4.00 besi pokok 4.65 X 4.00 x 0.62 11.476 Kg
0.400 31.00 besi cincin 0.40 X 31.00 x 0.40 4.898 Kg
16.374 Kg
Pek. Bekisting
2.500 0.33 pintu 2.50 x 0.33 0.825 m2
2.150 0.22 jendela 2.15 x 0.22 0.473 m2
1.298 m2
PERHITUNGAN
NO KODE SNI ANALISA PEKERJAAN VOLUME TOTAL SATUAN KETERANGAN
KOEFISIEN X VOLUME
Membuat 1 m 3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Bahan Semen PC 0.130 x 0.056 0.01 Zak
Pasir Beton 0.543 x 0.056 0.03 M3
a Analisa G.5
Batu 1/2 Cm (Split) 0.762 x 0.056 0.04 M3
Air 215.000 x 0.056 12.10 Liter
Tenaga Kerja Pekerja 1.650 x 0.056 0.09 OH
Tukang Batu 0.275 x 0.056 0.02 OH
Pembesian 10 kg dengan besi polos atau besi ulir
Bahan Besi Beton Polos 10.500 x 16.37 171.93 Kg
b Analisa G.14
Kawat Beton 0.150 x 16.37 2.46 Kg
Tenaga Kerja Pekerja 0.070 x 16.37 1.15 OH
Tukang Besi 0.070 x 16.37 OH
Memasang 1 m 2 bekisting untuk balok
Bahan Kayu Papan kelas III 0.040 x 1.30 0.05 M3
Paku Kasau/balok/reng/papan 0.400 x 1.30 0.52 Kg
Minyak Bekisting 0.200 x 1.30 0.26 Liter
c Analisa G.20
Kayu Balok kelas II 0.018 x 1.30 0.02 M3
Plywood (240x120x0,9) cm 0.350 x 1.30 0.45 Lembar
Kayu Cerucuk / Dolken 2.000 x 1.30 2.60 Batang
Tenaga Kerja Pekerja 0.660 x 1.30 0.86 OH
Tukang Kayu 0.330 x 1.30 OH
UKURAN
NO JENIS PEKERJAAN GAMBAR KET PERHITUNGAN VOLUME SAT.
P L T JUMLAH
III Pekerjaan Beton
3 Pek. Balok 15x20 cm Pas. Beton K-250
a Pas. Beton K-250 45.000 0.15 0.20 ring balk 45.00 x 0.15 x 0.20 1.35 m3
b Pek. Besi Tulangan 24.780 0.15 0.20 gunung-gunung 24.78 x 0.15 x 0.20 0.7434 m3
c Pek. Bekisting 16.000 0.15 0.20 balok gantung 16.00 x 0.15 x 0.20 0.48 m3
2.5734 m3
Pek. Besi Tulangan
85.780 4.00 besi pokok 85.78 X 4.00 x 0.62 211.70504 Kg
0.660 571.87 besi cincin 0.66 X 571.87 x 0.40 149.08564 Kg
360.79068 Kg
Pek. Bekisting
45.000 0.40 ring balk 45.00 x 0.40 18 m2
24.780 0.40 gunung-gunung 24.78 x 0.40 9.912 m2
16.000 0.60 balok gantung 16.00 x 0.60 9.6 m3
2 kali pakai 12.504 m2
PERHITUNGAN
NO KODE SNI ANALISA PEKERJAAN VOLUME TOTAL SATUAN KETERANGAN
KOEFISIEN X VOLUME
Membuat 1 m 3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Bahan Semen PC 7.420 x 2.573 19.09 Zak
a Analisa G.7 Pasir Beton 0.499 x 2.573 1.28 M3
Batu Belah Hitam 1/2 Cm (Split) 0.776 x 2.573 2.00 M3
Tenaga Kerja Pekerja 1.650 x 2.573 4.25 OH
Tukang Batu 0.275 x 2.573 0.71 OH
Pembesian 10 kg dengan besi polos atau besi ulir
Bahan Besi Beton Polos 10.500 x 360.79 3788.30 Kg
b Analisa G.14
Kawat Beton 0.150 x 360.79 1.28 Kg
Tenaga Kerja Pekerja 0.070 x 360.79 2.00 OH
Tukang Besi 0.070 x 360.79 4.25 OH
Memasang 1 m 2 bekisting untuk balok
Bahan Kayu Papan kelas III 0.040 x 12.50 0.50 M3
Paku Kasau/balok/reng/papan 0.400 x 12.50 5.00 Kg
Minyak Bekisting 0.200 x 12.50 2.50 Liter
c Analisa G.20
Kayu Balok kelas II 0.018 x 12.50 0.23 M3
Plywood (240x120x0,9) cm 0.350 x 12.50 4.38 Lembar
Kayu Cerucuk / Dolken 2.000 x 12.50 25.01 Batang
Tenaga Kerja Pekerja 0.660 x 12.50 8.25 OH
Tukang Kayu 0.330 x 12.50 4.13 OH
UKURAN
NO JENIS PEKERJAAN GAMBAR KET PERHITUNGAN VOLUME SAT.
P L T JUMLAH
IV Pekerjaan Pasangan
1 Pek. Pas. Dinding Bata adk. 1:4 Pek. Pas. Dinding Bata adk. 1:4
2 Pek. Pas. Plesteran Dinding Bata 32.000 1.30 dinding belakang depan 32.00 x 1.30 41.600 m2
3 Pek. Pas. Acian Dinding 1.13 1.30 4.00 dinding samping 1.125 x 1.30 x 4.00 5.850 m2
3.000 2.50 dinding ex pintu belakang 3.00 x 2.50 7.500 m2
1.18 1.72 2.00 dinding ex jendela 1.18 x 1.72 x 2.00 4.059 m2
1.35 1.52 1.00 dinding ex jendela 1.35 x 1.52 x 1.00 2.052 m2
0.95 1.85 2.00 dinding ex pintu samping 0.95 x 1.85 x 2.00 3.515 m2
0.25 0.25 15.00 angin jalusi 0.25 x 0.25 x 15.00 0.938 m2
4.50 1.30 2.00 dinding teras 4.50 x 1.30 x 2.00 11.700 m2
1.13 1.30 2.00 dinding teras depan 1.13 x 1.30 x 2.00 2.925 m2
pasangan pondasi rollag
8.00 0.50 8.00 x 0.50 4.000 m2
panggung
84.139 m2
Pek. Pas. Plesteran Dinding Bata
16.000 5.00 4.00 dinding belakang depan 16.00 x 5.00 80.000 m2
8.000 5.00 4.00 dinding samping 0 x 5.00 x 4 0.000 m2
4.50 1.30 4.00 dinding teras 4.50 x 1.30 x 4 23.400 m2
1.13 1.30 4.00 dinding teras depan 1.13 x 1.30 x 4 5.850 m2
pasangan pondasi rollag
8.00 0.50 1.00 8.00 x 0.50 x 1.00 4.000 m2
panggung
113.250 m2
Pek. Pas. Acian Dinding
16.000 5.00 4.00 dinding belakang depan 16.00 x 5.00 80.000 m2
8.000 5.00 4.00 dinding samping 0 x 5.00 x 4 0.000 m2
4.50 1.30 4.00 dinding teras 4.50 x 1.30 x 4 23.400 m2
1.13 1.30 4.00 dinding teras depan 1.13 x 1.30 x 4 5.850 m2
109.250 m2
PERHITUNGAN
NO KODE SNI ANALISA PEKERJAAN VOLUME TOTAL SATUAN KETERANGAN
KOEFISIEN X VOLUME
Memasang 1 m 2 dinding Batu bata ukuran (5 x 11 x 22) cm tebal 1/2 bata,campuran
spesi 1 PC : 2 PP
Bahan Batu bata 70.000 x 84.14 5889.71 Buah
1 Analisa D.9 Semen PC 0.230 x 84.14 19.35 Zak
Pasir Pasang 0.043 x 84.14 3.62 M3
Tenaga Kerja Pekerja 0.300 x 84.14 25.24 OH
Tukang batu 0.100 x 84.14 8.41 OH
1 m2 Plesteran Dinding 1Pc : 5Ps
Bahan Semen PC 0.086 x 113.25 9.78 Zak
2 Analisa E.2
Pasir pasang 0.022 x 113.25 2.49 M3
Tenaga Kerja Pekerja 0.200 x 113.25 22.65 OH
Tukang Batu 0.150 x 113.25 16.99 OH
1 M2 ACIAN
3 Analisa E.31 Bahan Semen PC 0.065 x 109.25 7.10 Zak
Pekerja 0.100 x 109.25 10.93 OH
Tukang Batu 0.010 x 109.25 1.09 OH
UKURAN
NO JENIS PEKERJAAN GAMBAR KET PERHITUNGAN VOLUME SAT.
P L T JUMLAH
IV Pekerjaan Pasangan
4 Pek. Opening Kusen Pintu Dan Pek. Opening Kusen Pintu Dan Jendela
Jendela 32.000 0.50 pintu 32.00 x 0.50 16.00 m1
5 18.840 0.50 jendela 18.84 x 0.50 9.42 m1
Pek. Dinding Partisi pvc
25.42 M1
6 Pek. Dinding Partisi pvc
Pek. Pasangan Huruf akrilik LED T:20 1.00 Rangka Hollow 8 x 4 21.33 Batang
cm (Pemerintah Kampung Gunung Pvc 32.00 m2
Sangkaran) Dan T:15 cm (Kecamatan
Blambangan Umpu Kabupaten Way Pek. Pasangan Huruf akrilik LED T:20 cm (Pemerintah Kampung Gunung Sangkaran) Dan T:15 cm (Kecamatan Blambangan Umpu Kabupaten Way Kanan)
Kanan)
1.00 1.00 Unit
7 Pek. Logo lambang garuda 1.00 Unit
JUMLAH TOTAL
PERHITUNGAN
NO KODE SNI ANALISA PEKERJAAN VOLUME TOTAL SATUAN KETERANGAN
KOEFISIEN X VOLUME
1 m² Mengecat Tembok baru ( 1 Plamir, 1 lapis cat dasar, 2 Lapis Cat penutup)
Bahan Plamir Tembok 0.100 x 458.95 45.90 Kg
1 Analisa N.11
Cat Dasar 0.100 x 458.95 45.90 Kg
Cat Tembok 0.260 x 458.95 119.33 Kg
Tenaga Kerja Pekerja 0.020 x 458.95 9.18 OH
UKURAN
NO JENIS PEKERJAAN GAMBAR KET PERHITUNGAN VOLUME SAT.
P L T JUMLAH
IX Pekerjaan Mekanikal Dan Elektrikal
Pek. Pas. Titik Api
1 Pek. Pas. Titik Api
16.00 Ruang utama 16.00 Titik
1.00 Teras 1.00 Titik
2 Pek. Pas. Lampu 18 Watt
17.00 Titik
Pek. Pas. Lampu 18 Watt
3 Pek. Pas. Lampu Downlight
1.00 Teras 1.00 Buah
1.00 Buah
4 Pek. Pas. Saklar Single
Pek. Pas. Lampu Downlight
8.00 Ruang utama 8.00 Buah
8.00 Buah
Pek. Pas. Saklar Single
1.00 Ruang utama 1.00 Buah
1.00 Buah
PERHITUNGAN
NO KODE SNI ANALISA PEKERJAAN VOLUME TOTAL SATUAN KETERANGAN
KOEFISIEN X VOLUME
1 Titik Instalasi Listrik
Bahan Kabel Listrik NYM 3 x 2,5 mm 7.500 x 17.00 127.50 M'
1 Analisa O.5
Assecories dihitung 30% dari Bahan 0.300 x 17.00 5.10 Titik
Tenaga Kerja Instalatur Listrik 0.320 x 17.00 5.44 OH
Asisten Instalatur Listrik 0.160 x 17.00 2.72 OH
Pas. 1 buah Lampu SL 18 Watt
Bahan Lampu SL 1.000 x 1.00 1.00 Buah
2 SUPL A.6.1.1.6a
Assecories dihitung 10% dari Bahan 0.100 x 1.00 0.10 Titik
Tenaga Kerja Instalatur Listrik 0.320 x 1.00 0.32 OH
Asisten Instalatur Listrik 0.160 x 1.00 0.16 OH
Pas. 1 buah Lampu Downlight
Bahan Lampu Downlight Inbow 3" 1.000 x 8.00 8.00 Buah
3 A.6.1.1.6
Assecories dihitung 10% dari Bahan 0.100 x 8.00 0.80 Titik
Tenaga Kerja Instalatur Listrik 0.320 x 8.00 2.56 OH
Asisten Instalatur Listrik 0.160 x 8.00 1.28 OH
1 Buah Pasang saklar Single
4 Analisa O.3 Bahan Saklar tunggal 1.000 x 1.00 1.00 Buah
Tenaga Kerja Instalatur Listrik 0.320 x 1.00 0.32 OH
Asisten Instalatur Listrik 0.160 x 1.00 0.16 OH
UKURAN
NO JENIS PEKERJAAN GAMBAR KET PERHITUNGAN VOLUME SAT.
P L T JUMLAH
IX Pekerjaan Mekanikal Dan Elektrikal
Pek. Pas. Saklar Double
5 Pek. Pas. Saklar Double
2.00 Ruang utama 2.00 Buah
2.00 Buah
6 Pek. Pas. Stop Kontak
1 Buah Pasang Stopkontak
8.00 Ruang utama 8.00 Buah
7 Pek. Pas. Box Panel PVC isi 4 CB
8.00 Buah
1 Buah Pasang Box Panel PVC isi 4 CB
1.00 Ruang utama 1.00 Unit
1.00 Unit
PERHITUNGAN
NO KODE SNI ANALISA PEKERJAAN VOLUME TOTAL SATUAN KETERANGAN
KOEFISIEN X VOLUME
1 Buah Pasang saklar Double
5 Analisa O.2 Bahan Saklar Ganda 1.000 x 2.00 2.00 Buah
Tenaga Kerja Instalatur Listrik 0.320 x 2.00 0.64 OH
Asisten Instalatur Listrik 0.160 x 2.00 0.32 OH
1 Buah Pasang Stopkontak
6 Analisa O.4 Bahan Stop Kontak + Instalasi 1.000 x 8.00 8.00 Buah
Tenaga Kerja Instalatur Listrik 0.320 x 8.00 2.56 OH
Asisten Instalatur Listrik 0.160 x 8.00 1.28 OH
7 Ls 1 Buah Box Panel PVC isi 4 CB 1.00 1.00 Unit
NO JENIS MATERIAL SPESIFIKASI VOLUME SATUAN PEMBULATAN JENIS KETERAMPILAN KERJA VOLUME PEMBULATAN
BELANJA MODAL
I ALAT
Meteran 5 M 1.0 bh 35,000 Rp 35,000 Rp 35,000
Ember 9.0 bh 15,000 Rp 135,000 Rp 135,000
Benang Nilon 4.0 Bh 6,000 Rp 24,000 Rp 24,000
Banner Kegiatan 1.0 Bh 150,000 Rp 150,000 Rp 150,000
Nomenklatur 1.0 Bh 500,000 Rp 500,000 Rp 500,000
Cangkul 1.0 Bh 85,000 Rp 85,000 Rp 85,000
Troli / Angkong 1.0 Ls 525,000 Rp 525,000 Rp 525,000
SUB TOTAL I Rp 1,454,000
II BAHAN
Pasir Beton 76.5 m3 198,000 Rp 15,147,000 Rp 15,147,000
Semen 657.0 Sak 75,000 Rp 49,275,000 Rp 49,275,000
Koral Beton 66.1 m3 427,550 Rp 28,261,055 Rp 28,261,055
Kayu Kelas III ( Papan ) 2.9 m3 2,750,000 Rp 7,975,000 Rp 7,975,000
Plastik Cor 627.7 M2 10,900 Rp 6,841,930 Rp 6,841,930
Paku 28.0 Kg 28,000 Rp 784,000 Rp 784,000
SUB TOTAL II Rp 108,283,985
III UPAH
Tukang 47.0 Oh 120,000 Rp 5,640,000 Rp 5,640,000
Pekerja 267.0 Oh 100,000 Rp 26,700,000 Rp 26,700,000
SUB TOTAL III Rp 32,340,000
….................... ........................
BACK UP DATA TALUD
Kampung : Tanjung Ratu Bidang : 2 ( Pelaksanaan Pembangunan )
Kecamatan : Pakuan Ratu Kegiatan : Pembangunan Rabat Beton
Kabupaten : Way Kanan Lokasi : Dusun 4
Provinsi : Lampung Panjang :6 M
Tahun : 2023 Tinggi :7 M
b1 b4
PLESTERAN + ACI
TIMBUNAN
PAS. BATU
h1
SULING SULING
GALIAN
h3
h2
b2
b3
No. Tipe A1 =
((b1+b2)/2 PA = h3 = A2 = A3 =
h1 b1 b2 b3 b4 h2
xh1)+ b1+0,10 h2+0,10 b3xh3 1/2xb4xh1
(b2xh2))
1 2 3 4 5 6 7 8 9 10 11 12 13
3 130 1.00 0.30 0.55 0.70 0.70 0.30 0.635 0.40 0.40 0.14 0.35
28.40 130 0.64 130 0.64 0.64 18.03 0.40 0.40 11.36 0.14 0.14 3.98 0.35 0.35 9.94
PEKERJAAN TANAH
Analisa B.1 Menggali 1 M3 Tanah Biasa sedalam 0 - 1 Meter
Tenaga Kerja Pekerja OH 0.750 x 3.98 = 2.985 OH
PEKERJAAN PONDASI
Analisa C.2 Memasang 1 m 3 pondasi batu belah, campuran 1 PC : 4 PP
Bahan Batu belah M3 1.200 x 18.03 = 21.636 M3
Semen PC Zak 3.260 x 18.03 = 58.7778 Zak
Pasir Pasang M3 0.520 x 18.03 = 9.3756 M3
Tenaga Kerja Pekerja OH 1.500 x 18.03 = 27.045 OH
Tukang batu OH 0.600 x 18.03 = 10.818 OH
PEKERJAAN TANAH
Analisa B.9 Mengurug kembali 1 M3 galian
Tenaga Kerja Pekerja OH 0.250 x 1.33 = 0.3316667 OH