Jenis Pekerjaan : Betonisasi Jalan Desa Kp. Gunung Suerueh No. RAB : 001A/DBK/2020
Nama Desa : Sadeng Lokasi : Kp. Gunung Suerueh
Kecamatan : Leuwisadeng Jns. Kegeatan : Betonisasi Jalan Desa
Kbupaten : Bogor Ukuran : 817 x 3 x 0,15 m
Provinsi : Jawa Barat
Tahun : 2021
Sumber Dana : Dana Bantuan Kabupaten Bogor 2021
1 Semen PC (50 kg) 7.6000 zak 65,000 494,000 2,794.1 2,795.0 181,675,000
2 Split pecah mesin 1/2 0.8100 m³ 275,000 222,750 297.8 298.0 81,950,000
3 Pasir Beton 0.4900 m³ 350,000 171,500 180.1 181.0 63,350,000
4 Pasir Urugan 0.0300 m3 190,000 5,700 73.5 74.0 14,060,000
5 Bescous 0.0200 M3 275,000 5,500 49.0 50.0 13,750,000
6 ADT Additive 0.2500 M3 47,000 11,750 91.9 92.0 4,324,000
7 Air 2.1500 m3 5,000 10,750 790.4 791.0 3,955,000
363,064,000
1 Pekerja 1.5000 org 110,000 165,000 551.48 552.0 60,720,000
2 Tukang 0.7500 org 130,000 97,500 275.74 276.0 35,880,000
96,600,000
1 Mobilisasi Molen 0.002720 ls 2,500,000 6,800 1.00 1.0 2,500,000
2 Sewa Molen 0.000049 Hr 350,000 952 55.15 56.0 19,600,000
3 Solar 0.000010 Liter 9,000 24 275.74 276.0 2,484,000
24,584,000
Jumlah 1,192,226 817 3 0.15 367.65 484,248,000
Mengetahui,
Pendamping Desa
Suherman, S.Ag
HARGA SATUAN BAHAN/MATERIAL - ALAT BANTU KERJA - TENAGA
No Jenis Bahan / Material/ Alat Bantu Satuan KLASIFIKASI Harga satuan Keterangan
kerja
1 Batu m3 B 295,000
2 Pasir Urugan m3 B 190,000
3 Pasir Cor m3 A 350,000
4 Pasir Pasang m3 275,000
5 Portland cement (PC) kg A 65,000
6 Split pecah mesin 1/2 m3 A 275,000
7 Ember bh A 15,000
8 Cangkul bh A 90,000
9 Sekop bh A 60,000
10 Pipa PVC btg A 21,000
11 Pengki bh A 25,000
12 Mobilisasi Bahan m3 100,000
13 Mobilisasi Semen Sak 3,000
13 ADT Additive Ltr A 47,000
14 Kawat Tali kg A 15,000
15 Air m3 5,000
16 Plastik Cor m2 A 5,000
17 Paku kg A 17,000
18 Bambu btg 15,000
19 Benang bh A 10,000
20 Papan Bekisting 15 cm btg B 21,000
21 Sewa Mesin Stoom hr A 650,000
22 Mobilisasi Mesin Stoom ls 5,000,000
23 Solar ltr NS 9,000
24 Sewa Molen hr A 350,000
25 Mobilisasi Molen ls 2,500,000
26 Papan Kegiatan bh A 250,000
27 Prasasti bh A 500,000
Suherman, S.Ag
PERHITUNGAN KEBUTUHAN BAHAN
Jumlah 358,740,000
Suherman, S.Ag
PERHITUNGAN KEBUTUHAN UPAH
Jumlah 96,600,000
Suherman, S.Ag
RENCANA ANGGARAN BIAYA (RAB)
I. BAHAN
1. Semen PC (50) Kg 2,795 - 2795.0 Sak 65,000 65,000 6,500 975 7,475 72,475 - 181,675,000 20,892,625 - 202,567,625
2. Batu Split 1/2 298 - 298.0 M3 275,000 275,000 27,500 4,125 31,625 306,625 - 81,950,000 9,424,250 - 91,374,250
3. Pasir Cor 181 - 181.0 M3 350,000 350,000 35,000 5,250 40,250 390,250 - 63,350,000 7,285,250 - 70,635,250
4. Pasir Urugan 74 - 74.0 M3 190,000 190,000 - 190,000 - 14,060,000 - - 14,060,000
5. Bescous 50 50.0 M3 275,000 275,000 27,500 4,125 31,625 306,625 - 13,750,000 1,581,250 - 15,331,250
6. Air 791 - 791.0 M3 5,000 5,000 - 5,000 - 3,955,000 - - 3,955,000
Sub Total I) 69,000 - 10,350 - 79,350 - 358,740,000 39,183,375 - 397,923,375
II. ALAT
1. Ember 50 50.0 Bh 15,000 15,000 1,500 300 1,800 16,800 - 750,000 90,000 - 840,000
2. Pengki 10 10.0 Bh 25,000 25,000 2,500 500 3,000 28,000 - 250,000 30,000 - 280,000
4. Mobilisasi Pasir Cor 181 181.0 Rit 100,000 100,000 10,000 2,000 12,000 112,000 - 18,100,000 2,172,000 - 20,272,000
5. Mobilisasi Split 1/2 298 298.0 Rit 100,000 100,000 10,000 2,000 12,000 112,000 - 29,800,000 3,576,000 - 33,376,000
6. Plastik Cor 1,225 1225.0 Mtr 5,000 5,000 500 100 600 5,600 - 6,125,000 735,000 - 6,860,000
7. Papan Bekisting 15 Cm 409 409.0 Lbr 21,000 21,000 2,100 420 2,520 23,520 - 8,589,000 1,030,680 - 9,619,680
8. Paku 15 15 15.0 Kg 17,000 17,000 1,700 340 2,040 19,040 - 255,000 30,600 - 285,600
9. Benang 15 15 15.0 Bh 10,000 10,000 1,000 200 1,200 11,200 - 150,000 18,000 - 168,000
10. Bambu 15 15 15.0 Btg 15,000 15,000 - 15,000 - 225,000 - - 225,000
11. Sewa Molen 56 56 56.0 Hr 350,000 350,000 35,000 7,000 42,000 392,000 - 19,600,000 2,352,000 - 21,952,000
12. Mobilisasi Molen 1 1 1.0 Ls 2,500,000 2,500,000 250,000 50,000 300,000 2,800,000 - 2,500,000 300,000 - 2,800,000
13. Solar 276 276 276.0 Ltr 9,000 9,000 900 180 1,080 10,080 - 2,484,000 298,080 - 2,782,080
14. Papan Kegiatan 2 2 4.0 Bh 250,000 250,000 25,000 5,000 30,000 280,000 500,000 500,000 60,000 - 560,000
15. Prasasti 1 1 2.0 Bh 500,000 500,000 50,000 10,000 60,000 560,000 500,000 500,000 60,000 - 560,000
Sub Total II) 390,200 - - 78,040 468,240 500,000 89,828,000 10,752,360 - 100,580,360
III. UPAH
1. Pekerja 552 - 552.0 HOK 110,000 - 60,720,000 - 60,720,000
2. Tukang 276 - 276.0 HOK 130,000 35,880,000 - 35,880,000
Sub Total III) - - - - - - 96,600,000 - - 96,600,000
IV. UPAH PADAT KARYA TUNAI
1. Pekerja Padat Karya Tunai 700 - 700.0 HOK 100,000 - 70,000,000 - 70,000,000
Sub Total IV) 70,000,000 - 70,000,000
V. OPERASIONAL TPK (5%)
1. OP TPK dan Pelaporan (LPJ) 1 0 1 Ls 33,234,538 ### 1,661,727 34,896,265 33,234,538 1,661,727 - 34,896,265
Sub Total V) - ### - - 1,661,727 33,234,538 1,661,727 - 34,896,265
Dari Dana APBD : 648,402,538 51,597,462 - 700,000,000
- Bahan dan tenaga : -
SUMBER DANA Dari Swadaya :
- Uang Tunai : -
Grand Total : 700,000,000
Sadeng, ..... Desember 2020
Disusun Oleh,
Ketua TPK
Diketahui,
Kepala Desa Sadeng
( ......................... )
Kbupaten : Bogor
Tahun : 2021
I Biaya Persiapan
17,532,530 Err:509
II Bahan Material
8. Batu M3 0.0 - - -
Err:509 Err:509
IV Upah Kerja
136,040,000 Err:509
97,900,000 Err:509
Err:509 Err:509
Disetujui Oleh:
Pendamping Desa
Suherman, S.Ag
Kalong II Jan-21
.............................. ............................
Kalong II Jan-21
............................... ............................
Kalong II Jan-21
Toko Desa Kalong II
Tuan ...............................
.............................. ............................
Kalong II Jan-21
............................... ............................
Kalong II Jan-21
.............................. ............................
Kalong II Jan-21
............................... ............................
Kalong II Jan-21
.............................. ............................
Kalong II Jan-21
............................... ............................
Kalong II Jan-21
.............................. ............................
Kalong II Jan-21
............................... ............................
Kalong II Jan-21
.............................. ............................
Kalong II Jan-21
............................... ............................
Kalong II Jan-21
.............................. ............................
Kalong II Jan-21
............................... ............................
Kalong II Jan-21
.............................. ............................
Kalong II Jan-21
............................... ............................
Kalong II Jan-21
.............................. ............................
Kalong II Jan-21
............................... ............................
Kalong II Jan-21
.............................. ............................
Kalong II Jan-21
............................... ............................
Kalong II Jan-21
.............................. ............................
Kalong II Jan-21
............................... ............................
Kalong II Jan-21
.............................. ............................
NO. 1 KWITANSI
Uang sejumlah : Sebelas juta lima ratus dua belas ribu tiga ratus tujuh puluh lima Rupiah
Kalong II Jan-21
Rp. 11,512,375
abcd
NO. 2 KWITANSI
Uang sejumlah : Lima puluh sembilan juta delapan ratus enam puluh empat ribu tiga ratus lima puluh Rupiah
Kalong II Jan-21
Rp. ###
abcd
NO. 3 KWITANSI
Uang sejumlah : Enam belas juta dua ratus lima puluh ribu Rupiah
Kalong II Jan-21
Rp. 16,250,000
abcd
NO. 4 KWITANSI
Kalong II Jan-21
Rp. 8,000,000
abcd
NO. 5 KWITANSI
Kalong II Jan-21
Rp. 11,700,000
abcd
NO. 6 KWITANSI
Uang sejumlah : Dua puluh dua juta empat ratus enam puluh tujuh ribu dua ratus lima puluh Rupiah
Kalong II Jan-21
Rp. ###
abcd
NO. 7 KWITANSI
Uang sejumlah : Tujuh belas juta sembilan ratus sembilan puluh lima ribu Rupiah
Kalong II Jan-21
Rp. 17,995,000
abcd
NO. 8 KWITANSI
Kalong II Jan-21
Rp. 475,000
abcd
NO. 9 KWITANSI
Uang sejumlah : Lima ratus lima belas ribu seratus tiga puluh Rupiah
Kalong II Jan-21
Rp. 515,130
abcd
NO. 10 KWITANSI
Uang sejumlah : Tiga puluh delapan juta lima puluh lima ribu Rupiah
Kalong II Jan-21
Rp. ###
abcd
NO. 11 KWITANSI
Uang sejumlah : Dua puluh enam juta sembilan puluh satu ribu Rupiah
Kalong II Jan-21
Rp. 26,091,000
abcd
NO. 12 KWITANSI
Uang sejumlah : Tiga belas juta tiga ratus delapan puluh ribu Rupiah
Kalong II Jan-21
Rp. 13,380,000
abcd
NO. 13 KWITANSI
Uang sejumlah : Tiga juta sembilan ratus dua puluh ribu Rupiah
Kalong II Jan-21
Rp. 3,920,000
abcd
NO. 14 KWITANSI
Uang sejumlah : Tujuh juta tujuh ratus dua puluh delapan ribu Rupiah
Kalong II Jan-21
Rp. ###
abcd
NO. 15 KWITANSI
Uang sejumlah : Enam belas juta empat ratus enam puluh empat ribu Rupiah
Kalong II Jan-21
Rp. 16,464,000
abcd
NO. 16 KWITANSI
Uang sejumlah : Satu juta sembilan ratus enam puluh ribu Rupiah
Kalong II Jan-21
Rp. 1,960,000
abcd
NO. 17 KWITANSI
Uang sejumlah : Sepuluh juta seratus sembilan puluh dua ribu Rupiah
Kalong II Jan-21
Rp. 10,192,000
abcd
NO. 18 KWITANSI
Kalong II Jan-21
Rp. ###
abcd
NO. 19 KWITANSI
Uang sejumlah : Dua juta dua ratus empat puluh ribu Rupiah
Kalong II Jan-21
Rp. 2,240,000
abcd
NO. 20 KWITANSI
Uang sejumlah : Satu juta tujuh ratus tiga puluh enam ribu Rupiah
Kalong II Jan-21
Rp. 1,736,000
abcd
NO. 21 KWITANSI
Uang sejumlah : Dua juta empat puluh sembilan ribu enam ratus Rupiah
Kalong II Jan-21
Rp. 2,049,600
abcd
NO. 22 KWITANSI
Uang sejumlah : Empat juta tiga ratus tiga puluh empat ribu empat ratus Rupiah
Kalong II Jan-21
Rp. ###
abcd
NO. 23 KWITANSI
Uang sejumlah : Empat ratus dua ribu dua ratus delapan puluh Rupiah
Kalong II Jan-21
Rp. 402,280
abcd
NO. 24 KWITANSI
Kalong II Jan-21
Rp. -
0
RENCANA ANGGARAN BIAYA
Kbupaten : Bogor
Tahun : 2021
I Biaya Persiapan
II Bahan Material
397,923,375 Err:509
III Peralatan
1. Ember Bh 50.0 15,000 1,800 840,000
Err:509 Err:509
IV Upah Kerja
96,600,000 Err:509
V Padat Karya Tunai
1. Pekerja Padat Karya Tunai HOK 700.0 100,000 0 70,000,000
70,000,000 Err:509
Err:509 Err:509
Terbilang Tujuh ratus juta rupiah
Disetujui Oleh:
Pendamping Desa
Suherman, S.Ag
RENCANA ANGGARAN BIAYA
Kbupaten : Bogor
Tahun : 2021
I Biaya Persiapan
II Bahan Material
95,181,300 Err:509
III Peralatan
1. Ember Bh 12.00 15,000 1,800 201,600
Err:509 Err:509
IV Upah Kerja
23,100,000 Err:509
V Padat Karya Tunai
1. Pekerja Padat Karya Tunai HOK 175.00 100,000 0 17,500,000
17,500,000 Err:509
Err:509 Err:509
Terbilang Tujuh ratus juta rupiah
Disetujui Oleh:
Pendamping Desa
Suherman, S.Ag
RENCANA ANGGARAN BIAYA
Kbupaten : Bogor
Tahun : 2021
I Biaya Persiapan
II Bahan Material
302,742,075 Err:509
III Peralatan
1. Ember Bh 38.00 15,000 1,800 638,400
Err:509 Err:509
IV Upah Kerja
73,500,000 Err:509
V Padat Karya Tunai
1. Pekerja Padat Karya Tunai HOK 525.00 100,000 0 52,500,000
52,500,000 Err:509
Err:509 Err:509
Terbilang Tujuh ratus juta rupiah
Disetujui Oleh:
Pendamping Desa
Suherman, S.Ag