Anda di halaman 1dari 13

No

Jenis
Komponen Pekerjaan Item Pekerjaan unit

1
pasangan batu bata pasang 1 memasang pasangan bata 1pc :4 pp m2

2
plester semen pasang 1 plester dinding batu bata m2

pasang 1 merakit rangaka pintu sliding m2

3 pembuatan pintu sliding


pasang 2 pembuatan rell pintu m2

pasang 3 pembuatan tiang pintu beton k 200 m3

4 acian pasang 1 acian dinding pagar m2


TO
Upah kerja
Volume per satuan total upah kerja material yang dibutuhkan jumlah

1 batu bata 2092.5


21.815 2 pasir pasang 1.15
Rp - 3 semen 5.4
1 semen 12
25.7417
2 pasir halus 2.33
1 BESI HOLLOW 4X4 CM/6 M. TEBAL 4MM 8.85
2 PLAT BESI T 4/40/5000 mm 3
3 kunci pagar 1
4 ball rel pintu 6
8.92
5 kawat las 10
6 bambu 14
7 ring 220
8 skrup baja panjang cm 220
1 semen 0.92
2 pasir pasang 0.07
0.1302
3 kerikil/split 0.1
4 besi D 12mm/ 11m 2
1 pasir pasang 0.02
2 semen 0.28
0.04 3 kerikil/split 0.03
4 bendrat 0.8
5 besi d 10 16
25.7417 1 semen 1.7
TOTAL Rp -
harga satuan Jumlah Total Harga Jumlah Total Harga
material total harga material Upah per Komponen Material per Komponen
satuan
buah Rp 1,000.00 Rp 2,092,500.00
m3 Rp 450,000.00 Rp 517,500.00
zak Rp 47,000.00 Rp 253,800.00
zak Rp 47,000.00 Rp 564,000.00
m3 Rp 550,000.00 Rp 1,281,500.00
buah Rp 152,000.00 Rp 1,345,200.00
lembar Rp 108,000.00 Rp 324,000.00
set Rp -
buah Rp 35,000.00 Rp 210,000.00
buah Rp -
buah Rp -
buah Rp -
buah Rp -
m3 Rp 47,000.00 Rp 43,240.00
m3 Rp 450,000.00 Rp 31,500.00
m3 Rp -
ujung Rp -
m3 Rp 450,000.00 Rp 9,000.00
m4 Rp 47,000.00 Rp 13,160.00
m5 Rp -
kg Rp -
m Rp -
zak Rp 47,000.00 Rp 79,900.00
TOTAL Rp 6,765,300.00 TOTAL
BIYAYA TAK TERDUGA
GRAND TOTAL
Jumlah Total Upah dan
Material per Komponen
Kebutuhan Material
No barang dan jasa jumlah satuan harga satuan
material
1 holow galfanis 4/4/600cm 1 buah Rp 152,000
2 plat 4/500 cm 1 buah Rp 108,000
3 roda besi 1 buah Rp 35,000
4 pasir halis 1 m3 Rp 550,000
5 pasir pasang 1 m3 Rp 450,000
6 batu bata 1 buah Rp 1,000
7
8
9
10
11
12
13
14
no variabel satuan
1 luas pas batu bata panjang lebar tinggi unit luas satuan
232
276
312
268
309
325
210
326
0.5 21.815 m2
312
298
275
324
291
295
310
43.63
2 luas acian 43.63 0.59 25.7417 m2
3 rangka pintu 4.46 2 8.92 M2
4 pembuatan rel pintu 12.4 0.21 0.05 0.1302 m3
5 tiang pintu k200 0.1 0.1 2 2 0.04 m3
6 acian dinding 43.63 0.59 25.7417 m2
7 PLAT BESI 0.71
k200
pasir 731
kerikil 1031
semen 352

95.1762
rel pintu
134.2362
45.8304

29.24
41.24
tiang pintu 14.08

acian 3.25
masa jenis
1400
1350

0.07
0.10
0.92

0.02
0.03
0.28

1.7
Kebutuhan Material
harga satuan
No material yang dibutuhkan jumlah satuan material
1 Semen #NAME? sak 57,000
2 Pasir #NAME? m3 350,000
3 Coral/Split #NAME? m3 #NAME?
4 Amplas #NAME? m2 2,500
5 Cat Tembok watershild #NAME? liter 112,500
6 Cat Polibest #NAME? liter 53,500
7 Thiner #NAME? liter 20,000
8 Keramik Dinding Kamar Mandi #NAME? m2 #NAME?
9 Cat Besi #NAME? kg #NAME?
10 Kuas #NAME? bh #NAME?
11 Shower + Sealtape 2 bh #NAME?
12 Closet Duduk "TOTO + Perlengkapan #NAME? bh #NAME?
13 Buis Beton #NAME? bh #NAME?
14 Pipa 4 Inch 1 btg #NAME?
15 Tutup Closet 2 bh #NAME?
16 Bata Merah #NAME? bh #NAME?
17 Semen Putih #NAME? sak #NAME?
18 Kayu Kaso Cor #NAME? btg #NAME?
19 Besi Beton 8mm #NAME? lonjor #NAME?
20 Besi Beton 12mm #NAME? lonjor #NAME?
21 Polywood 9mm #NAME? lbr #NAME?
22 Paku #NAME? kg #NAME?
23 Bendrat #NAME? kg #NAME?
24 Papan Kayu Jati Lokal 2x20 #NAME? m1 #NAME?
25 Politur Kayu #NAME? kg #NAME?
26 Plat besi Strip #NAME? set #NAME?
27 Semen Sika Nat #NAME? kg #NAME?
28 Rangka Besi Hollow 4x4 Backdrop Bar #NAME? m2 #NAME?
29 GRC Board #NAME? lbr #NAME?
30 Kompon Gypsum #NAME? kg #NAME?
31 Kasa Strimin #NAME? roll #NAME?
32 Cat Plafond #NAME? kg #NAME?
33 Kuas Roll #NAME? bh #NAME?
34 Gypsum #NAME? lbr #NAME?
35 Sika Top Seal Waterproof 1 set #NAME?
36 Kabel Eterna 3x2,5mm + Pralon #NAME? m1 #NAME?
37 Kabel Eterna 2x2,5mm + Pralon #NAME? m1 #NAME?
38 Kabel Eterna 2x1,5mm + Pralon #NAME? m1 #NAME?
39 Stop Kontak Broco+Inbow Dos #NAME? bh #NAME?
40 Atap Spandek #NAME? m2 #NAME?
41 Kusen Pintu 1 unit #NAME?
42 Glass Block #NAME? bh #NAME?
43 Kusen Pintu Koboi 2 unit #NAME?
44 Daun Pintu Koboi 2 set #NAME?
TOTAL
total harga
material
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
Kebutuhan Material dan Upah Kerja Cafe Suka UBUD
Aug-22

Jumlah Total Jumlah Total Jumlah Total


Upah kerja total upah harga satuan total harga Upah dan
No Komponen Jenis Pekerjaan Item Pekerjaan Unit Volume per satuan kerja material yang dibutuhkan jumlah satuan material material Harga Upah Harga Material Material per
per Komponen per Komponen Komponen
LANTAI 1
1 Amplas Bidang Kayu Lama m2 4.96 25,350 125,736 Amplas 4.96 lbr 4,000 19,840
1 Anak Tangga Pasang
2 Pengecatan Bidang Kayu Kembali m2 4.96 18,850 93,496 Politur Kayu 2.74 liter 150,000 410,837 219,232 430,677 649,909
kuas 1.00 bh 20,000 20,000
Pasang 1 Amplas Bidang Kayu Lama m2 5.616 25,350 142,366 Amplas 5.62 lbr 4,000 22,464
2 Kolom Kayu 2 Pengecatan Bidang Kayu Kembali m2 5.616 18,850 105,862 Politur Kayu 3.10 liter 150,000 465,173
kuas 1.00 bh 20,000 20,000 248,227 527,637 775,864
Dinding gunung Pasang 1 Pengerokan cat m2 8.91 20,900 186,219
3 2 Acian kembali dinding m2 8.91 46,310 412,622 Semen 0.72 sak 60,000 43,436
3 Coating glosy m2 8.91 26,650 237,452 Coating Propan 3.12 kg 95,000 296,258 836,293 339,694 1,175,986
Tutup dinding atas Pasang 1 Pemasangan papan kayu jati dan rangka m2 1.2 250,000 300,000 Papan Kayu jati 2/15 0.02 m3 16,000,000 384,000
4 Rangka Kayu 0.03 m3 14,000,000 392,000
2 Pengecatan Bidang Kayu m2 1.2 18,850 22,620 Politur Kayu 0.66 liter 150,000 99,396 322,620 875,396 1,198,016
Cat plafon atap Pasang 1 Cat Plafond m2 113 25,000 2,825,000 Cat Plafond 33.90 kg 82,000 2,779,800
5
lantai 2 kuas 2.00 bh 20,000 40,000 2,825,000 2,819,800 5,644,800
Penguatan baut tali
6 pagar ls 1.00 100,000 100,000 baut 30.00 pcs 2,500 75,000
1 Perbaikan baut dan tali yang kendor 100,000 75,000 175,000
Pasang Intalasi
7 Pasang set 12 65,000 780,000 Lampu Lombok 36.00 m1 20,000 720,000
lampu lombok 1 Instalasi Lampu Lombok
Dimmer 1.00 unit 45,000 45,000
Saklar 1.00 bh 35,000 35,000
Kabel Tambahan 15.00 m 3,500 52,500 780,000 852,500 1,632,500
Bongkar 1 Pembogkaran Keramik Meja m2 3.2342 68,050 220,087
Kramik meja bar Pasang 1 Pemasangan Kramik Meja Bar m2 3.2342 219,500 709,907 Semen 0.75 sak 60,000 45,117
8 koktail Pasir 0.06 m3 350,000 20,375
Semen Warna 9.70 kg 16,000 155,242 929,994 220,734 1,150,728
9 Pasang Instalasi Lampu Gantung expose Warm titik 2 95,000 190,000 Lampu 2.00 bh 55,000 110,000
1 white
pasang lampu
Fitting lampu 2.00 bh 40,000 80,000
warmlight
Saklar ganda 1.00 bh 45,000 45,000
Kabel + Pipa kabel 30.00 m1 15,000 450,000 190,000 685,000 875,000
TOTAL 6,451,366 TOTAL 6,826,438 TOTAL 13,277,804
Biaya Tak Terduga 15% 1,991,671
GRAND TOTAL 15,269,475