RENCANA ANGGARAN BIAYA

REGIONAL : III
WILAYAH : VII
ESTATE/PKS : CENTRAL WORKSHOP
JENIS PEKERJAAN : PABRIKASI CENTRAL WORKSHOP 15x12 METER

No Item kerja Spesifikasi Vol. Harga Sat, Total Harga (Rp)

A PEKERJAAN PERSIAPAN -

1 Pengukuran dan pasang bowplank Kayu lokal 58.00 m1 -

2 Pembersihan awal dan akhir 1.00 Ls -

3 Mobilisasi - demobilisasi material dan alat 1.00 Ls -

B PEKERJAAN TANAH -

1 Galian tanah pondasi 14.80 m3 -


2 Langsir/meratakan tanah timbun dengan pasir dan pemadatan bawah
34.61 m3 -
lantai tebal 10 cm

3 Urugan pasir bawah Pile cap, bawah lantai drainase dan sloof 5cm 1.78 m3 -

4 Pasang cerucuk galam d10cm di bangunan gudang galam 4 btg / m2, panjang 2 mtr 1,153.60 btg -

C PEKERJAAN PONDASI -

1 Square pile 25x25 180.00 m' -


2 Jasa Pancang pancang,sambung,handling 180.00 m' -

3 Potong pancang 6.00 titik -

4 Sambung pancang 24.00 ea -


5 Pile Cap 1 Uk. 1200 x 600 x 400 mm (6 Buah) ready mix K-250 1.73 m3 -
6 Pedestal 40x40 cm ready mix K-250 1.54 m3 -
7 Tie beam 30/50 cm ready mix K-250 8.10 m3 -

8 Lantai kerja pilecap, tie beam dan lantai tebal 5cm ex. Semen gresik 1Pc : 3Kr : 5Ps 16.53 m3 -
9 Pemasangan geogrid 180.00 m2 -

10 Pemasangan geotex 180.00 m2 -

D PEKERJAAN PLESTER -

1 Plester+aci campuran,tebal 15mm parit 1 Pc : 2 Ps 9.60 m2 -


2 Plester+aci campuran, tebal 15mm kolom pedestal 1 Pc : 2 Ps 59.08 m2 -

E PEKERJAAN BETON DAN PEMBESIAN -

1 Beton lantai, tebal 15cm ready mix K-250 43.26 m3 -


2 Besi wiremesh M-8, 2 layer lantai bangunan lantai dalam 2 layer 576.80 m2 -

3 Besi wiremesh M-6 parit bangunan, 1 layer 63.30 m2 -

4 Beton parit bangunan tebal 10cm ready mix K-250 59.08 m3 -

F BAJA STRUKTUR -

1 Kolom
-WF 300x150x6,5x9 Mob,cut,welded,erection,zinchromate. 1,181.59 kg -
-Base Plate Kolom Uk. 350x250x15mm Mob,cut,welded,erection,zinchromate. 63.80 kg -
-Anchore SR-24 D28mm + 2 Nut 1 baseplate 6 anchore 36.00 pcs -
2 Roof frame
Frame Line A-H (8 bh )
-Rafter WF 250x125x6x9 Mob,cut,welded,erection,zinchromate. 1,389.19 kg -

-Overstek WF 150x75x5x7 Mob,cut,welded,erection,zinchromate. 246.12 kg -

-Cover, Rib, End Plate T:12mm (Rafter) Mob,cut,welded,erection,zinchromate. 301.00 kg -


-Cut Of Piece, WF 250x125x6x9 Mob,cut,welded,erection,zinchromate. 319.68 kg -

-End Plate T:10mm (Truss Girder) Mob,cut,welded,erection,zinchromate. 9.71 kg -


-Stiffener 10mm Mob,cut,welded,erection,zinchromate. 160.79 kg -

-Bolt HTB-ASTM A325 5/8 " + 2 Nut 192.00 pcs -


3 Truss girder
-WF 150x75x5x7 Mob,cut,welded,erection,zinchromate. 336.00 kg -
No Item kerja Spesifikasi Vol. Harga Sat, Total Harga (Rp)

4 Bracing

-Overstek Rafter WF 100x50x5x7 Mob,cut,welded,erection,zinchromate. 84.00 kg -

-Stiffener Plate T:8mm Mob,cut,welded,erection,zinchromate. 90.82 kg -


5 Roof Framing+assesories

-PURLIN CNP 125x50x20x2,3 Mob,cut,welded,erection,zinchromate. 1,262.80 kg -


-SAG ROD RB O 12mm x 1200mm + 2 Nut 140.96 kg -

-Horizontal bracing RB 16mm 116.33 m' -

-Roof zinkalume 0,45mm warna biru zinkalume 0,45mm 312.87 m2 -

-Bubungan atap zinkalume 0,45mm warna biru zinkalume 0,45mm 14.00 m' -

-Bolt HTB-ASTM A325 5/8 " + 2 Nut 142.00 pcs -

-Turnbuckle 16.00 pcs -

G PEKERJAAN LISTRIK -

1 Pas. Lampu tl 2 X 18 Watt komplit Phillips 18/54 (TL), RMI merk saka philips,box lamp 8.00 pcs -
2 Pas. Lampu Hemat Energi SL 18 Watt Phillips philips,box lamp 2.00 pcs -

3 Fitting lampu tempel 2.00 pcs -


4 Pas.instalasi lampu Jenis kabel NYM 3 x 2.5 mm 10.00 titik -

5 Pas.instalasi stop kontak Jenis kabel NYM 3 x 2.5 mm 6.00 titik -

6 Pas. Saklar double broco cream +inbow doss broco 3.00 pcs -
7 Pas. Stop kontak 16A broco 6.00 pcs -

8 Pas.Box mcb panel listrik Merk Broco 1.00 unit -


Merlin Gerin / Schneider / ABB
9 MCB 6A 2.00 pcs -

10 Arde 2.00 bh -

Total Harga -

I. REKAPITULASI RENCANA ANGGARAN BIAYA

NO URAIAN BIAYA HARGA

I REALCOAST
1. Pekerjaan Pabrikasi Central Workshop 15x12 Meter 1.00 ls 0.00
2. Jasa kontraktor (Profit 5%) 5% ls 0.00

II NILAI KONTRAK
1. Nilai Kontrak 0.00
DIBULATKAN 0.00