Dokumen :
RENCANA ANGGARAN BIAYA
REGIONAL : III
WILAYAH : VII
ESTATE/PKS : CENTRAL WORKSHOP
JENIS PEKERJAAN : PABRIKASI CENTRAL WORKSHOP 15x12 METER
A PEKERJAAN PERSIAPAN -
B PEKERJAAN TANAH -
3 Urugan pasir bawah Pile cap, bawah lantai drainase dan sloof 5cm 1.78 m3 -
4 Pasang cerucuk galam d10cm di bangunan gudang galam 4 btg / m2, panjang 2 mtr 1,153.60 btg -
C PEKERJAAN PONDASI -
8 Lantai kerja pilecap, tie beam dan lantai tebal 5cm ex. Semen gresik 1Pc : 3Kr : 5Ps 16.53 m3 -
9 Pemasangan geogrid 180.00 m2 -
D PEKERJAAN PLESTER -
F BAJA STRUKTUR -
1 Kolom
-WF 300x150x6,5x9 Mob,cut,welded,erection,zinchromate. 1,181.59 kg -
-Base Plate Kolom Uk. 350x250x15mm Mob,cut,welded,erection,zinchromate. 63.80 kg -
-Anchore SR-24 D28mm + 2 Nut 1 baseplate 6 anchore 36.00 pcs -
2 Roof frame
Frame Line A-H (8 bh )
-Rafter WF 250x125x6x9 Mob,cut,welded,erection,zinchromate. 1,389.19 kg -
4 Bracing
-Bubungan atap zinkalume 0,45mm warna biru zinkalume 0,45mm 14.00 m' -
G PEKERJAAN LISTRIK -
1 Pas. Lampu tl 2 X 18 Watt komplit Phillips 18/54 (TL), RMI merk saka philips,box lamp 8.00 pcs -
2 Pas. Lampu Hemat Energi SL 18 Watt Phillips philips,box lamp 2.00 pcs -
6 Pas. Saklar double broco cream +inbow doss broco 3.00 pcs -
7 Pas. Stop kontak 16A broco 6.00 pcs -
10 Arde 2.00 bh -
Total Harga -
I REALCOAST
1. Pekerjaan Pabrikasi Central Workshop 15x12 Meter 1.00 ls 0.00
2. Jasa kontraktor (Profit 5%) 5% ls 0.00
II NILAI KONTRAK
1. Nilai Kontrak 0.00
DIBULATKAN 0.00